1 National Fire Protection Association 1 Batterymarch Park, Quincy, MA Phone: Fax: TO: FROM: Technical Committee on Air Conditioning (AIC-AAA) Allan Fraser, Staff Liaison DATE: December 29, 2015 SUBJECT: NFPA 90A First Draft TC Ballot Final Results (A2017) According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. 26 Members Eligible to Vote 6 Members Not Returned (Amawi, Caraway, Jr., Dillon, Ponder,, and Tucker) 17 Members Voted Affirmative on All Revisions (with comment Hirschler, Koffel and Sloan) 3 Members Voted Negative on one or more Revisions (Hirschler, Loyd, Straniero) 0 Members Abstained on one or more Revisions The attached report shows the number of affirmative, negative and abstaining votes as well as the explanation of the vote for each revision. To pass ballot, each revision requires: (1) a simple majority of those eligible to vote and (2) an affirmative vote of 2 /3 of ballots returned. See Sections (c) and of the Regulations Governing the Development of NFPA Standards.

2 NFPA 90A FIRST DRAFT BALLOT FINAL (A2017) FR-12, Global Input, See FR-12 Affirmative 20 For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes FR-13, Global Input, See FR-13 Affirmative 20 Page 1 of 12

3 For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes FR-14, Global Input, See FR-14 Affirmative 20 For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes Page 2 of 12

4 FR-1, Section No. 2.3, See FR-1 Affirmative 19 Negative 1 Marcelo M. Hirschler The dates of the ASTM standards have not been updated. They should have been updated as follows: ASTM D a ASTM E a ASTM E ASTM E For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes FR-2, Section No , See FR-2 Page 3 of 12

5 Affirmative 19 Affirmative with Comment 1 William E. Koffel At the end of paragraph add the words "or more" to address all instances in which the assembly is required to have a fire resistance rating of one hour or more and not just one hour assemblies. Clearly one could argue that an assembly that is required to have a two hour fire resistance rating is also required to have a one hour fire resistance rating but the proposed "editorial revision" adds clarity and is more consistent with how other NFPA documents are written. For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes FR-3, Section No , See FR-3 Affirmative 20 Page 4 of 12

6 For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes FR-4, Section No , See FR-4 Affirmative 17 Affirmative with Comment 2 Marcelo M. Hirschler Dwayne E. Sloan Signaling and optical fiber raceways were not dropped - it is simply the case that the requirements are common for them with communications raceways and thus no separate information is required. Retain the sentence "Cables installed within these raceways shall be listed as plenum cable in accordance with the requirements in This language for ceiling cavity plenums should mirror what we have for raised floor plenums. In past 90A discussions, it was felt important and necessary to clearly specify that cables within the raceways must be listed as plenum cable. Page 5 of 12

7 Negative 1 Richard E. Loyd UL 2864 is an inappropriate test method for a plastic plumbing piping and tubing in plenums.it has long been known that these products cannot pass E84 and revising the testing procedure does not equal equivlant safety in buildings. No substantiation was submitted to justify the reduction in testing requirements for this product, which if continued to be accepted will add products of combustion into the plenums which reduces the time and ability of occupants to exit the building in a fire situation. It would permit unlimited quantities of plastic piping and tubing in ceiling cavity and within raised floor plenums. In a fire situation there is or may be failure of all systems and there is no assurance nor can we assume there will be water in these systems.and, noncombustible products are readily available to serve these areas. For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes FR-5, Section No , See FR-5 Affirmative 18 Page 6 of 12

8 Negative 2 George A. Straniero Richard E. Loyd NEMA agrees with the comment made in Mr. Loyd s Negative ballot. UL 2864 is an inappropriate test method for a plastic plumbing piping and tubing in plenums.it has long been known that these products cannot pass E84 and revising the testing procedure does not equal equivlant safety in buildings. No substantiation was submitted to justify the reduction in testing requirements for this product, which if continued to be accepted will add products of combustion into the plenums which reduces the time and ability of occupants to exit the building in a fire situation. It would permit unlimited quantities of plastic piping and tubing in ceiling cavity and within raised floor plenums. In a fire situation there is or may be failure of all systems and there is no assurance nor can we assume there will be water in these systems.and, noncombustible products are readily available to serve these areas. For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes FR-6, Section No , See FR-6 Page 7 of 12

9 Affirmative 20 For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes FR-7, Section No , See FR-7 Affirmative 19 Affirmative with Comment 1 Marcelo M. Hirschler Signaling and optical fiber raceways were not dropped - it is simply the case that the requirements are common for them with communications raceways and thus no separate information is required. For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes Page 8 of 12

10 FR-8, Section No , See FR-8 Affirmative 18 Negative 2 George A. Straniero Richard E. Loyd NEMA agrees with the comment made in Mr. Loyd s Negative ballot. UL 2864 is an inappropriate test method for a plastic plumbing piping and tubing in plenums.it has long been known that these products cannot pass E84 and revising the testing procedure does not equal equivlant safety in buildings. No substantiation was submitted to justify the reduction in testing requirements for this product, which if continued to be accepted will add products of combustion into the plenums which reduces the time and ability of occupants to exit the building in a fire situation. It would permit unlimited quantities of plastic piping and tubing in ceiling cavity and within raised floor plenums. In a fire situation there is or may be failure of all systems and there is no assurance nor can we assume there will be water in these systems.and, noncombustible products are readily available to serve these areas. For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes Page 9 of 12

11 FR-9, Section No , See FR-9 Affirmative 19 Affirmative with Comment 1 Marcelo M. Hirschler It would be preferable to add the word "also" as shown below: The foam plastic insulation material shall exhibit a flame spread index of 25 or less and a smoke developed index of 50 or less when tested in accordance with ASTM E84, Standard Test Method for Surface Burning Characteristics of Building Materials, or ANSI/UL 723, Standard for Test for Surface Burning Characteristics of Building Materials, at the maximum thickness intended for use, and shall ALSO comply with the following criteria, when tested in accordance with NFPA 286, Standard Methods of Fire Tests for Evaluating Contribution of Wall and Ceiling Interior Finish to Room Fire Growth (where the testing shall be performed on the finished foam plastic assembly related to the actual end-use configuration and on the maximum thickness intended for use): For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes Page 10 of 12

12 FR-11, Section No. 7.2, See FR-11 Affirmative 20 For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes FR-10, Section No. C.1, See FR-10 Affirmative 20 Page 11 of 12

13 For Simple majority and also two-third majority election; the simple affirmative votes and the two-third affirmative votes Page 12 of 12

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: NEC Code-Making Panel 16 FROM: Kimberly Shea,

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: NEC Code-Making Panel 1 FROM: Kimberly Shea, Administrator,

More information

2015 Annual Revision Cycle Notice of a Consent Standard NFPA 1071

2015 Annual Revision Cycle Notice of a Consent Standard NFPA 1071 2015 Annual Revision Cycle Notice of a Consent Standard NFPA 1071 The Committee on Emergency Vehicle Technicians Professional Qualifications produced a First Revision Report for NFPA 1071, Standard for

More information

MEMORANDUM. Subject: NFPA 101 Proposed Tentative Interim Amendment (TIA) No.1114

MEMORANDUM. Subject: NFPA 101 Proposed Tentative Interim Amendment (TIA) No.1114 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Correlating Committee on Safety to Life (SAF-AAC)

More information

Technical Committee on Animal Housing Facilities. SUBJECT: NFPA 150 Second Draft TC Final Ballot Results (A2015)

Technical Committee on Animal Housing Facilities. SUBJECT: NFPA 150 Second Draft TC Final Ballot Results (A2015) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Animal Housing Facilities Tracy Vecchiarelli,

More information

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA)

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Electrical Equipment of Industrial Machinery

More information

M E M O R A N D U M. NFPA Technical Committee on Explosion Protection Systems

M E M O R A N D U M. NFPA Technical Committee on Explosion Protection Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Explosion Protection

More information

8. NFPA 5000 Second Draft (formerly ROC) Preparation. Public Comments to be distributed before meeting date.

8. NFPA 5000 Second Draft (formerly ROC) Preparation. Public Comments to be distributed before meeting date. AGENDA NFPA Technical Committee on Interior Finish and Contents NFPA 101 and NFPA 5000 SECOND DRAFT MEETING Thursday, May 23, 2013 DoubleTree by Hilton Hotel San Diego Downtown 1646 Front Street San Diego,

More information

MEMORANDUM. Subject: NFPA 259 Proposed Tentative Interim Amendment (TIA) No. 957

MEMORANDUM. Subject: NFPA 259 Proposed Tentative Interim Amendment (TIA) No. 957 MEMORANDUM To: From: Technical Committee on Fire Tests Gregory Harrington, Acting Staff Liaison Date: May 12, 2009 Subject: NFPA 259 Proposed Tentative Interim Amendment (TIA) No. 957 The attached proposed

More information

6 Disagree (Drobnick, Dyson, Eblen, Gray, Mohla)

6 Disagree (Drobnick, Dyson, Eblen, Gray, Mohla) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Electrical Safety in the Workplace

More information

ICC-ES APPLICATION FOR BUILDING PRODUCT LISTING REPORT FORM A

ICC-ES APPLICATION FOR BUILDING PRODUCT LISTING REPORT FORM A ICC-ES APPLICATION FOR BUILDING PRODUCT LISTING REPORT FORM A 1. APPLICATION TYPE (Please check one of the following): New listing report Revision to existing listing report Listing report number: 2. LISTING

More information

Technical Committee on Tank Leakage and Repair Safeguards. SUBJECT: NFPA 329 Second Draft TC Final Ballot Results (F2014)

Technical Committee on Tank Leakage and Repair Safeguards. SUBJECT: NFPA 329 Second Draft TC Final Ballot Results (F2014) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Tank Leakage and Repair Safeguards Lawrence

More information

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA)

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Electrical Equipment of Industrial Machinery

More information

*REPORT OF THE MOTIONS COMMITTEE

*REPORT OF THE MOTIONS COMMITTEE *REPORT OF THE MOTIONS COMMITTEE ON CERTIFIED AMENDING MOTIONS FOR PRESENTATION AT THE 2013 ASSOCIATION TECHNICAL MEETING JUNE 12-13, 2013 CHICAGO, IL FOR THE NFPA 70, NATIONAL ELECTRICAL CODE I. Introduction.

More information

NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE. AGENDA January 21, 2016 NFPA, Quincy, MA

NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE. AGENDA January 21, 2016 NFPA, Quincy, MA National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE AGENDA January 21, 2016

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 9 From: Kimberly Shea, Project Administrator

More information

MEMORANDUM. NFPA Correlating Committee on Health Care Facilities. Subject: NFPA 99 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Correlating Committee on Health Care Facilities. Subject: NFPA 99 Proposed Tentative Interim Amendment (TIA) No. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Correlating Committee on Health Care Facilities

More information

National Fire Protection Association MEMORANDUM. Subject: NFPA 20 Proposed Tentative Interim Amendment (TIA) No. 1199

National Fire Protection Association MEMORANDUM. Subject: NFPA 20 Proposed Tentative Interim Amendment (TIA) No. 1199 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Pumps Elena Carroll,

More information

Report on Comments F2005 Copyright, NFPA NFPA 211 Report of the Committee on

Report on Comments F2005 Copyright, NFPA NFPA 211 Report of the Committee on Report on Comments F2005 Copyright, NFPA NFPA 211 Report of the Committee on Chimneys, Fireplaces, and Venting Systems for Heat-Producing Appliances Robert V. LeClair, Chair State of Maine, ME [E] Robert

More information

MEMORANDUM. Subject: NFPA 1971 Proposed Tentative Interim Amendment (TIA) No.1159

MEMORANDUM. Subject: NFPA 1971 Proposed Tentative Interim Amendment (TIA) No.1159 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Correlating Committee on Fire and Emergency

More information

Hot Work Permit Guidelines

Hot Work Permit Guidelines 2408 Wanda Daley Drive Ames, Iowa 50011-3602 (515) 294-5359 www.ehs.iastate.edu Copyright 2014 Reviewed 2015 2 Hot Work Permit Guidelines Directory of Service and Emergency Providers Services Environmental

More information

MECHANICAL TECHNICAL ADVISORY COMMITTEE TELECONFERENCE MEETING FROM TALLAHASSEE, FLORIDA WEB URL:

MECHANICAL TECHNICAL ADVISORY COMMITTEE TELECONFERENCE MEETING FROM TALLAHASSEE, FLORIDA WEB URL: MECHANICAL TECHNICAL ADVISORY COMMITTEE TELECONFERENCE MEETING FROM TALLAHASSEE, FLORIDA WEB URL: https://global.gotomeeting.com/join/132875677 AUDIO DIAL IN NUMBER: 1-866-749-3129 MEETING ID / ACCESS

More information

MEMORANDUM. NFPA Technical Committee on Wastewater Treatment Plants. Subject: NFPA 820 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Technical Committee on Wastewater Treatment Plants. Subject: NFPA 820 Proposed Tentative Interim Amendment (TIA) No. MEMORANDUM To: From: NFPA Technical Committee on Wastewater Treatment Plants Joanne Goyette Date: March 25, 2011 Subject: NFPA 820 Proposed Tentative Interim Amendment (TIA) No. 1025 The attached proposed

More information

M E M O R A N D U M. NFPA Technical Committee on Fire Service Occupational Safety and Health

M E M O R A N D U M. NFPA Technical Committee on Fire Service Occupational Safety and Health National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Fire Service

More information

MEMORANDUM. SUBJECT: NFPA 70E Proposed Tentative Interim Amendment (TIA) No. 1253R

MEMORANDUM. SUBJECT: NFPA 70E Proposed Tentative Interim Amendment (TIA) No. 1253R National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: National Electrical Code Correlating Committee Sarah

More information

American National Standard For Electrical Rigid Aluminum Conduit (ERAC)

American National Standard For Electrical Rigid Aluminum Conduit (ERAC) Revision of ANSI C80.5-1994 American National Standard For Electrical Rigid Aluminum Conduit (ERAC) Secretariat: Approved August 18, 2005 American National Standards Institute, Inc. NOTICE AND DISCLAIMER

More information

MEMORANDUM. Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No. 1153

MEMORANDUM. Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No. 1153 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: Technical Committee on Liquefied Petroleum Gases

More information

1 Batterymarch Park, Quincy, MA Phone: Fax: NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE

1 Batterymarch Park, Quincy, MA Phone: Fax: NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE AGENDA May 12-15, 2015

More information

Technical Committee on Animal Housing Facilities

Technical Committee on Animal Housing Facilities National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Animal Housing Facilities Tracy Vecchiarelli,

More information

Board of Rules & Appeals

Board of Rules & Appeals BROWARD COUNTY Board of Rules & Appeals 955 S. Federal Highway, Suite 401, Fort Lauderdale, Florida 33316 Phone (954) 765-4500 Fax: (954) 765-4504 http://www.broward.org/codeappeals.htm BOARD OF RULES

More information

M E M O R A N D U M. NFPA 51B First Draft Technical Committee FINAL Ballot Results (A2018)

M E M O R A N D U M. NFPA 51B First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Hot Work Operations

More information

Areas that have been designed and constructed for performing open-flame or spark-producing work.

Areas that have been designed and constructed for performing open-flame or spark-producing work. PURPOSE Baylor University recognizes that there is a potential for injury to people and damage to property that can result from fire or sparks that arise when hot work is performed outside of a designated

More information

Desert Research Institute Hot Work Permit Program

Desert Research Institute Hot Work Permit Program 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this policy is to prevent any fires that may result from hot work processes. 1.2 SCOPE 1.2.1 For the purposes of this policy, hot work is defined as any temporary

More information

(WELDING, CUTTING, AND OPEN FLAME WORK)

(WELDING, CUTTING, AND OPEN FLAME WORK) THE UNIVERSITY OF TEXAS AT TYLER Hot Work (WELDING, CUTTING, AND OPEN FLAME WORK) Program 2016 Table of Contents 1. INTRODUCTION... 3 2. PURPOSE... 3 3. APPLICATION... 3 4. DEFINITIONS... 3 5. PROGRAM

More information

MEMORANDUM. NFPA Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Liquefied Petroleum Gases

More information

National Fire Protection Association 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-7070 www.nfpa.org Technical Committee on Emergency Communication Systems 2016 Second Draft

More information

MEMORANDUM. Subject: NFPA 1917 Proposed Tentative Interim Amendment (TIA) No.1170

MEMORANDUM. Subject: NFPA 1917 Proposed Tentative Interim Amendment (TIA) No.1170 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Ambulances Yvonne Smith,

More information

JOINT COMMITTEE ON AGENCY RULE REVIEW Agenda - 2/14/2011-1:30 P.M. Statehouse Hearing Room 121(William McKinley Room) Consent

JOINT COMMITTEE ON AGENCY RULE REVIEW Agenda - 2/14/2011-1:30 P.M. Statehouse Hearing Room 121(William McKinley Room) Consent Agenda - Consent 1 Department of Aging Total Rules: 1 Original Filing Date: 6/15/2010 Date of Refiled Filing: 2/4/2011 Jurisdiction Ends: 3/6/2011 Public Hearing: 9/2/2010 New Rule Refiled Filing No 173-39-02.20

More information

HOT WORK PROGRAM October 2016

HOT WORK PROGRAM October 2016 HOT WORK PROGRAM October 2016 A. SCOPE AND APPLICATION The UNLV Hot Work Program is established in accordance with the standards listed in Section H and specifies the requirements and procedures necessary

More information

University Environmental Health and Safety. Hot Work Permit Program

University Environmental Health and Safety. Hot Work Permit Program University Environmental Health and Safety Hot Work Permit Program 1 2 TABLE OF CONTENTS Section Title Page 1.0 Scope 3 2.0 Standards and Regulations Involved/Target Groups 3 3.0 Responsibilities 4 4.0

More information

MEMORANDUM. NFPA Technical Committee on Electronic Safety Equipment. Subject: NFPA 1982 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Technical Committee on Electronic Safety Equipment. Subject: NFPA 1982 Proposed Tentative Interim Amendment (TIA) No. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Electronic Safety Equipment

More information

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF TOPEKA, KANSAS: Section 1. That section , Uniform Mechanical Code Adopted, of The

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF TOPEKA, KANSAS: Section 1. That section , Uniform Mechanical Code Adopted, of The 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 (Published in the Topeka Metro News February 11, 2009) ORDINANCE NO. 19216 AN ORDINANCE introduced by City Manager Norton N. Bonaparte, Jr., amending

More information

HOT WORK MANAGEMENT PROGRAM

HOT WORK MANAGEMENT PROGRAM HOT WORK MANAGEMENT PROGRAM Rose-Hulman Institute of Technology Table of Contents SECTION 1.0 Purpose 2.0 Regulatory Reference 3.0 Scope 4.0 Elements of the Program 5.0 Responsibility 6.0 Training and

More information

Hot Work Program. Purpose of Procedure:

Hot Work Program. Purpose of Procedure: BGSU Hot Work Program Page 1 Bowling Green State University Purpose of Procedure: Hot Work Program These procedures have been established to comply with Ohio s Public Employee Risk Reduction Act, the OSHA

More information

Formal Interpretations/ Interprétation formelle

Formal Interpretations/ Interprétation formelle Formal Interpretations/ Interprétation formelle This section lists questions that individuals have submitted about a particular standard. Each question has been reviewed and answered by the appropriate

More information

Hot Work Permit Program

Hot Work Permit Program Environmental Health and Safety Office Hot Work Permit Program Permitting Process for welding, cutting and brazing. Adopted: March 6, 2007 Revised: 7/18/16 http://www.stlawu.edu/environmentalhealth-and-safety/environmental-healthand-safety-policies

More information

University of Nevada, Reno

University of Nevada, Reno University of Nevada, Reno HOT WORK PERMIT PROGRAM Program Contact Person: John A. Braun, CSP Environmental Health and Safety University of Nevada, Reno Phone: 775-784-6478 HOT WORK PERMIT PROGRAM UNIVERSITY

More information

Hot Work Procedures. Competent means possessing knowledge, experience and training to perform a specific duty.

Hot Work Procedures. Competent means possessing knowledge, experience and training to perform a specific duty. Hot Work Procedures Purpose This procedure will provide the knowledge and equipment required to minimize the identified workplace hazards associated with Hot Work. These procedures will provide: information

More information

MEMORANDUM. NFPA Correlating Committee on Professional Qualifications. Subject: NFPA 1006 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Correlating Committee on Professional Qualifications. Subject: NFPA 1006 Proposed Tentative Interim Amendment (TIA) No. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Correlating Committee on Professional Qualifications

More information

DUQUESNE UNIVERSITY HOT WORK PROGRAM

DUQUESNE UNIVERSITY HOT WORK PROGRAM DUQUESNE UNIVERSITY HOT WORK PROGRAM Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 2 General Requirements 2 Welding or Cutting Containers

More information

Hot Work Permit Program

Hot Work Permit Program Hot Work Permit Program 1 2 TABLE OF CONTENTS Section Title Page 1.0 Scope 3 2.0 Standards and Regulations Involved/Target Groups 3 3.0 Responsibilities 4 4.0 Training.. 5 5.0 Recordkeeping. 5 6.0 Permits

More information

The Ohio State University. Hot Work Permit Program (Welding, Cutting and Brazing)

The Ohio State University. Hot Work Permit Program (Welding, Cutting and Brazing) Environmental Health & Safety 1314 Kinnear Rd. Columbus, Ohio 43212 Phone (614) 292-1284 Fax (614) 292-6404 http://www.ehs.osu.edu/ The Ohio State University Hot Work Permit Program (Welding, Cutting and

More information

M E M O R A N D U M. NFPA 99 Second Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

M E M O R A N D U M. NFPA 99 Second Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Electrical Systems

More information

OFFICE OF STATE HUMAN RESOURCES

OFFICE OF STATE HUMAN RESOURCES OFFICE OF STATE HUMAN RESOURCES NUMBER: HWP-1 TOTAL PAGES: 6 SUBJECT: Hot Work Program Effective Date: Revision Date: Revision #: RELATED LEGISLATION: This program outlines procedures for [Agency/University]

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: NEC Code-Making Panel 2 FROM: Kimberly Shea, Project

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Liquefied Petroleum Gases

More information

MEMORANDUM. Subject: NEC Proposed Tentative Interim Amendment (TIA) No. 1117

MEMORANDUM. Subject: NEC Proposed Tentative Interim Amendment (TIA) No. 1117 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NEC Correlating Committee Kimberly Shea Date: August

More information

ORDINANCE NO. An ordinance amending Article 1 and Article 8, Chapter IX. of the Los Angeles Municipal Code and incorporating by reference

ORDINANCE NO. An ordinance amending Article 1 and Article 8, Chapter IX. of the Los Angeles Municipal Code and incorporating by reference ---------- -- - I :j. ORDINANCE NO An ordinance amending Article 1 and Article 8, Chapter IX of the Los Angeles Municipal Code and incorporating by reference portions of the 1985 Uniform Building Code.

More information

NEMA Standards Publication TF (R2000, R2005) Coated Electrical Sleeving

NEMA Standards Publication TF (R2000, R2005) Coated Electrical Sleeving NEMA Standards Publication TF 1-1993 (R2000, R2005) Coated Electrical Sleeving Published by: National Electrical Manufacturers Association 1300 North 17th Street, Suite 1847 Rosslyn, Virginia 22209 www.nema.org

More information

TOWN OF WINDSOR BYLAW # 18 PREVENTION OF FIRE BYLAW

TOWN OF WINDSOR BYLAW # 18 PREVENTION OF FIRE BYLAW TOWN OF WINDSOR BYLAW # 18 PREVENTION OF FIRE BYLAW 18.01 No person being in any building or structure on which or in which notices have been posted by order of a fire marshal to forbid smoking therein

More information

IWU PHYSICAL PLANT SAFETY PROGRAM

IWU PHYSICAL PLANT SAFETY PROGRAM STANDARDS Welding, Cutting and Brazing/General Requirements OSHA 1910.252, 1. Purpose Hot work is any temporary or permanent operation involving open flames or producing heat and/or sparks. This includes

More information

Fire Safety & Hot Work Permits. Oakland University Office of EH&S

Fire Safety & Hot Work Permits. Oakland University Office of EH&S Fire Safety & Hot Work Permits Oakland University Office of EH&S Topics of Discussion Why do we Need a Hot Work Permit Real-life Cutting/Welding Accidents When is a Hot Work Permit Required Hot Work Precautions

More information

Non Electrical Hot Work Program

Non Electrical Hot Work Program Environmental Health and Safety Name: Non Electrical Hot Work Program Date Created: 02/18/2014 Date Revised: Created By: Bob Happel PURPOSE The purpose of this Program is to protect people and property

More information

2. Introduction of committee members and guests. For a current committee roster, see page 2.

2. Introduction of committee members and guests. For a current committee roster, see page 2. AGENDA NFPA Technical Committee on Building Systems NFPA 5000 Second Draft Meeting Monday, June 20, 2016 Hilton Fort Lauderdale Marina Fort Lauderdale, FL 1. Call to order. Call meeting to order by Chair

More information

Fort Collins Amendments to the 2009 International Mechanical Code

Fort Collins Amendments to the 2009 International Mechanical Code Planning, Development & Transportation Services Community Development & Neighborhood Services 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.416.2740 970.224.6134- fax fcgov.com

More information

Hot Work Permit Program

Hot Work Permit Program Hot Work Permit Program 1 2 TABLE OF CONTENTS Section Title Page 1.0 Scope 3 2.0 Standards and Regulations Involved/Target Groups 3 3.0 Responsibilities 4 4.0 Training.. 5 5.0 Recordkeeping. 5 6.0 Permits

More information

CHAFFEE COUNTY ORDINANCE NO _

CHAFFEE COUNTY ORDINANCE NO _ CHAFFEE COUNTY ORDINANCE NO. 2007-_ TITLE: AN ORDINANCE ADOPTING THE 2006 INTERNATIONAL BUILDING CODE, THE 2006 INTERNATIONAL RESIDENTIAL CODE, THE 2005 NATIONAL ELECTRIC CODE, 2006 INTERNATIONAL FUEL

More information

NFPA Technical Committee on Building Systems. NFPA 5000 Second Draft Meeting AGENDA

NFPA Technical Committee on Building Systems. NFPA 5000 Second Draft Meeting AGENDA NFPA Technical Committee on Building Systems NFPA 5000 Second Draft Meeting AGENDA Monday, May 20, 2013 at the DoubleTree by Hilton Hotel San Diego Downtown San Diego, California 1. Call to Order: Call

More information

Roger Williams University Hot Work Plan

Roger Williams University Hot Work Plan Roger Williams University Hot Work Plan Roger Williams University Dept. Of Environmental Health and Safety One Old Ferry Road Bristol, RI 02809 Adopted: April 26, 2011(President s Cabinet) Roger Williams

More information

MINUTES OF MEETING. Technical Committee on Pulverized Fuel Systems

MINUTES OF MEETING. Technical Committee on Pulverized Fuel Systems MINUTES OF MEETING Technical Committee on Pulverized Fuel Systems January 7-8, 2014 Doubletree Hotel Orlando Airport Orlando, FL I. Attendance: Principal Members/Staff: Andy Smith, Technical Committee

More information

SCOPE OF ACCREDITATION

SCOPE OF ACCREDITATION SCOPE OF ACCREDITATION KINECTRICS INC. 800 Kipling Avenue, Unit 2, KL 206 Toronto, ON M8Z 5G5 Accredited Laboratory No. 610 (Conforms with requirements of CAN-P-4E (ISO/IEC 17025:2005)) CONTACT: Mr. Dave

More information

NFPA Technical Committee on Fire Department Rescue Tools

NFPA Technical Committee on Fire Department Rescue Tools NFPA Technical Committee on Fire Department Rescue Tools NFPA 1936 (F2014 cycle) Second Draft Meeting Hilton Carillon Park St. Petersburg, FL March 4 6, 2014 Meeting Schedule Day One: Day Two: March 4

More information

INTUMESCENT PAINT PERFORMANCE TEST MICON INTUSAYF WB

INTUMESCENT PAINT PERFORMANCE TEST MICON INTUSAYF WB INTUMESCENT PAINT PERFORMANCE TEST MICON INTUSAYF WB Page 1 of 8 Building Products & Services Programme INTUMESCENT PAINT PERFORMANCE TEST MICON INTUSAYF WB Contract No: BF 201/003 5600 5664 July 1997

More information

Public Input No. 17-NFPA 51B-2015 [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 17-NFPA 51B-2015 [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document of 55 11/18/2016 2:12 PM Public Input No. 17-NFPA 51B-2015 [ Global Input ] 3.3.X Responsible Party. The building owner, a lessee, or a duly authorized representative. Globally change "management" everywhere

More information

Hot Work Permitting Program

Hot Work Permitting Program Hot Work Permitting Program Environmental Health, Safety, and Risk Management Department Box 6113, SFA Station Nacogdoches, Texas 75962-6113 Original: January 2004 Revised: January 2011, April 2018 Table

More information

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM REV 10/2015 TABLE OF CONTENTS HOT WORK PERMIT PROGRAM Contents A. PURPOSE AND SCOPE... 3 B. HOT WORK PERMIT PROCEDURES... 3 C. HOT WORK PERMIT PROHIBITED CONDITIONS:...

More information

HOT WORK SAFETY GUIDELINE

HOT WORK SAFETY GUIDELINE HOT WORK SAFETY GUIDELINE SAFETY GUIDELINE 2017 1 Hot work safety guideline Index 1 Hot work training... 2 2 Purpose of the safety guidelines... 2 3 Binding force of the safety guidelines... 2 4 Definitions...

More information

SAFETY AND HEALTH STANDARD HOT WORK PERMIT Effective Date: 06/10/10 Standard: 16.1 Document Number: KUCSH0040 Rev: 04

SAFETY AND HEALTH STANDARD HOT WORK PERMIT Effective Date: 06/10/10 Standard: 16.1 Document Number: KUCSH0040 Rev: 04 16.1.1 INTRODUCTION 16.1.1.1 The purpose of this standard is to prevent the inadvertent ignition of combustible materials when performing hot work. 16.1.2 DEFINITIONS 16.1.2.1 Hot work - includes welding,

More information

Hot Work Program. Roles and Responsibilities. Management. PAI Responsibilities

Hot Work Program. Roles and Responsibilities. Management. PAI Responsibilities Hot Work Program Scope is aware of the hazards associated with hot work operations (cutting, welding, brazing and soldering, grinding, etc.) is committed to keeping our employees safe and to control hazards

More information

MCW s Hot Work Permit Program

MCW s Hot Work Permit Program 2019 MCW s Hot Work Permit Program - Hot Work/Fire Watch Operations This document is the Medical College of Wisconsin s (MCW) written program for conducting hot work, and identifies roles and responsibilities

More information

HOT WORK PROGRAM OSHA

HOT WORK PROGRAM OSHA HOT WORK PROGRAM 1910.252 OSHA Table of Contents Purpose... 3 Definitions... 3 Responsibilities... 3 Hot Work Permitted Locations... 5 Fire Prevention Precautions... 5 Personal Protective Equipment...

More information

HOT WORK PERMIT PROGRAM REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING & COMPLIANCE OFFICE

HOT WORK PERMIT PROGRAM REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING & COMPLIANCE OFFICE University of Vermont Department of Physical Plant Burlington, Vermont HOT WORK PERMIT PROGRAM REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING & COMPLIANCE OFFICE

More information

Technical Standards and Safety Authority, Canada. Southern Company Services, Inc., AL. Emerson Automation Solutions, PA

Technical Standards and Safety Authority, Canada. Southern Company Services, Inc., AL. Emerson Automation Solutions, PA TECHNICAL COMMITTEE ON HEAT RECOVERY STEAM GENERATORS NFPA 85 First Draft Meeting Minutes February 9, 2017 8:00 AM - 5:00 PM MT Embassy Suites by Hilton Phoenix-Tempe, Tempe, AZ Attendees Committee Members:

More information

Hot Work Program. Program Origination: October, 2017

Hot Work Program. Program Origination: October, 2017 Hot Work Program Program Origination: October, 2017 Contact Personnel: Jason Kayser, Fire & Safety Specialist Jason.kayser@uni.edu 319-273-2004 Hot Work Program UNI Employees & Contractors October, 2017

More information

American National Standard for Electrical Rigid Metal Conduit Aluminum (ERMC-A)

American National Standard for Electrical Rigid Metal Conduit Aluminum (ERMC-A) American National Standard for Electrical Rigid Metal Conduit Aluminum (ERMC-A) Secretariat: National Electrical Manufacturers Association Approved: December 14, 2015 American National Standards Institute,

More information

(Published in the Tulsa Daily Commerce & Legal News, December 19, 2005.) ORDINANCE NO

(Published in the Tulsa Daily Commerce & Legal News, December 19, 2005.) ORDINANCE NO (Published in the Tulsa Daily Commerce & Legal News, December 19, 2005.) ORDINANCE NO. 21206 AN ORDINANCE AMENDING THE MECHANICAL CODE OF THE CITY OF TULSA, OKLAHOMA, TITLE 59, TULSA REVISED ORDINANCES,

More information

Guide to Hot Work NFPA 51B Understanding the new requirements after July 1, 2018

Guide to Hot Work NFPA 51B Understanding the new requirements after July 1, 2018 Guide to Hot Work NFPA 51B Understanding the new requirements after July 1, 2018 What is the issue that caused the change? Unpermitted hot work was determined to be the cause of a fire that killed two

More information

SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016)

SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: NEC Code-Making Panel 17 FROM: Kimberly Shea, Administrator, Technical

More information

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY WHAT IS HOT WORK? WORK INVOLVING BURNING, WELDING, OR A SIMILAR OPERATION THAT IS CAPABLE OF INITIATING FIRES OR EXPLOSIONS. EXAMPLES

More information

ORDINANCE NO. XXXX BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF LAWRENCE, KANSAS:

ORDINANCE NO. XXXX BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF LAWRENCE, KANSAS: ORDINANCE NO. XXXX AN ORDINANCE OF THE CITY OF LAWRENCE, KANSAS, REPEALING EXISTING CHAPTER 5, ARTICLE 5 OF THE CODE OF THE CITY OF LAWRENCE, 2018 EDITION, AND AMENDMENTS THERETO, AND ENACTING, IN ITS

More information

Hot Work Program June 2017

Hot Work Program June 2017 Hot Work Program June 2017 Hot Work Program TABLE of CONTENTS I. General Information II. Definitions III. Roles and Responsibilities IV. Hot Work Areas V. Hot Work Permit VI. Hot Work Permit-Not Required

More information

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY SAFETY AND HEALTH RISK MANAGEMENT AND SAFETY

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY SAFETY AND HEALTH RISK MANAGEMENT AND SAFETY HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY SAFETY AND HEALTH RISK MANAGEMENT AND SAFETY WORK INVOLVING BURNING, WELDING, OR A SIMILAR OPERATION THAT IS CAPABLE OF INITIATING FIRES OR EXPLOSIONS. WHAT IS

More information

DECLARATORY STATEMENT. THIS CAUSE came on for consideration upon the Petition for Declaratory Statement

DECLARATORY STATEMENT. THIS CAUSE came on for consideration upon the Petition for Declaratory Statement In The Matter Of: FRANK McELROY, Fire Marshal St. John s County, Case No.: 91169-07-FM Petition for Declaratory Statement to the Florida Department of Financial Services, Rick Gorham, Intervener. DECLARATORY

More information

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM REV 12/99 1 TABLE OF CONTENTS HOT WORK PERMIT PROGRAM A. Purpose and Scope.3 B. Hot Work Permit Procedures...3 C. Hot Work Permit - Prohibited Conditions...4

More information

KENNECOTT UTAH COPPER

KENNECOTT UTAH COPPER 16.1.1 INTRODUCTION 16.1.1.1 The purpose of this standard is to define the requirement for performing hot work operations on certain components of machinery, equipment and structures and preventing the

More information

WHEREAS, copies of said Codes of Ordinances are available in the office of the City Secretary for review and inspection by the public.

WHEREAS, copies of said Codes of Ordinances are available in the office of the City Secretary for review and inspection by the public. Ordinance amending Corpus Christi Code of Ordinance, Chapter 14, Sections 14-201 &14-241 to adopt the National Electrical Code, 2017 Edition, with local amendments, amending sections 14-1306,14-1316, 14-1311,

More information

Supplemental Operating Procedures for the National Electrical Code Project

Supplemental Operating Procedures for the National Electrical Code Project Adopted by the NEC Correlating Committee on April 27, 2012. Approved by the Standards Council on August 9, 2012. Introduction (a) Preamble. The Operations of the (i.e., the NEC Correlating Committee (CC)

More information

I am transmitting to you herewith the following decision of the IAPMO Standards Council.

I am transmitting to you herewith the following decision of the IAPMO Standards Council. November 21, 2008 Jack Beuschel, President Studor Inc. 11256 47 th Street North Clearwater, FL 33762 Re: IAPMO Standards Council Decision Docket #1153-09 Date of Decision: November 14, 2008* Uniform Plumbing

More information

RISKTOPICS. DISCUSSION For the purposes of this document, hot work: Management practices: Hot work Property and Business Interruption January 2013

RISKTOPICS. DISCUSSION For the purposes of this document, hot work: Management practices: Hot work Property and Business Interruption January 2013 RISKTOPICS Management practices: Hot work Property and Business Interruption January 2013 This document highlights the property conservation responsibilities of those who utilize hot work outside of areas

More information

Regulations TITLE 34. LABOR AND INDUSTRY PART XIV. UNIFORM CONSTRUCTION CODE

Regulations TITLE 34. LABOR AND INDUSTRY PART XIV. UNIFORM CONSTRUCTION CODE Regulations TITLE 34. LABOR AND INDUSTRY PART XIV. UNIFORM CONSTRUCTION CODE CHAPTER 401. UNIFORM CONSTRUCTION CODE TRAINING AND CERTIFICATION OF CODE ADMINISTRATORS 401.1. Definitions. The following words