1 MINUTES OF MEETING Technical Committee on Pulverized Fuel Systems January 7-8, 2014 Doubletree Hotel Orlando Airport Orlando, FL I. Attendance: Principal Members/Staff: Andy Smith, Technical Committee Chair, Global Risk Consultants, GA Denise Beach, NFPA, MA Joseph Bittinger, Jr. American Electric Power Co., OH Vaughn Boley, Hartford Steam Boiler Inspection & Insurance Company, CT Qingsheng Lin, Babcock Power, Inc., MA William Martin, Babcock & Wilcox Company, OH (via teleconference) Cleveland Skinker, Bechtel Power Corporation, MD (via teleconference, Jan 8 only) II. Minutes of Meeting: 1. Call to order. The meeting was called to order at 8:10 a.m. on Jan. 7, Chairman Smith thanked the committee members for their presentation. 2. Introduction. The committee members introduced themselves and identified their affiliation. 3. Minutes Approval. The minutes from the January 2013 meeting were approved as written. 4. NFPA Staff Report. The NFPA Staff Liaison reviewed the new document revision process and tools, including the new terminology, the revision cycle timeline, and the online public input submittal process. (Attachment A) NFPA Staff reported that the NFPA Board of Directors approved a formal anti-trust policy at their November 2013 meeting (Attachment B). 5. Old Business. ASTM E1226. A new task group was established to look specifically at ASTM E ASTM E 1226 requires that test samples have 95% of sample capable of passing through a 200 mesh screen (smaller than 75 microns). The typical coal fineness level for pulverizer product applied to a coal-fired utility boiler is between 65% and 85% passing through 200 mesh. In addition, Pmax listed in Table 6.8.3, on page 6-146, Fire Protection Handbook (NFPA, 2008) shows Pmax is less than 10 Bar, from 8.4 to 9.1 bar, which is based on lab testing on different coals with a 20-liter container. The data was published by Eckhoff, initially by BIA. Finally, task group member Lin found a study performed in the the 1980s by EPRI. The EPRIsponsored research program to study pulverized coal fires and explosions in the US utility industry included a series of laboratory experiments performed by the Central

2 Electricity Generating Board (CEGB) in UK. The results of experiments showed that Pmax in vessel (explosion chamber) was below 10 Bar for all tests. However, Pmax greater than 10 Bar was observed in pipe for some tests. The maximum Pmax in the pipe for these tests was 1182 psig (81.5 Bar).The testing was performed with full scale laboratory test rigs and coal fineness level of 90% passing through 200 mesh. 6. New Business. A. Document Revision. The committee reviewed the public comments and created Second Revisions. The committee actions will be available in the Second Draft Report, which will be available no later than July 18, B. Glossary Review. The committee reviewed the NFPA 85 definitions specific to pulverized fuel systems. The committee made several recommendations for definitions to be deleted (Attachment C). The committee established a task group to review the fan definitions specific to PFS and create recommendations for the Fundamentals technical committee. The chair of the taskgroup is Qinsheng Lin. Additional volunteers are needed to complete the recommendations. C. BCS-FUN Actions. The committee reviewed the preliminary actions of the Fundamentals committee and determined that no action is necessary. D. Task Group on 9.6, Operations. A new task group was established to perform a complete review of section 9.6 and related annex material to ensure that it is complete and accurate to current practices, and create recommendations for revisions or additional annex material. 7. Final Review of Revised Chapter 9. The committee reviewed the final draft of chapter 9. The committee noted that coal, fuel, and pulverized fuel are all used in the chapter. The committee will review this further in the next revision cycle. The committee also noted that the term flue gas should be removed from , but this is new material that must be held until the next cycle. However, the new revision process has no mechanism for committee inputs to the next revision cycle. Finally, the committee reviewed the negative ballot submitted by committee member Erdem Ural. NFPA staff reminded the committee that a complete revision of the chapter dictated the First Revision being recorded as a single action item. The committee reviewed Mr. Ural s additional comments and found that the specific items noted (8% volatile content, allowable stress, and coverage of dusttight pulverizers) originated in the 1956 edition of the standard. Therefore, the committee didn t provide substantiation for maintaining existing text because no challenge was presented to the existing text. It was only reorganized. Mr. Ural is encouraged to submit Public Input to the next revision cycle. 8. Next Meeting. The next meeting will be scheduled as needed following publication of the 2015 edition. 9. Adjournment. The meeting adjourned at 9:40 a.m. EST on Jan. 8, 2014.

3 Attachment A: NFPA Staff Presentation

4 Welcome TC on Pulverized Fuel Systems At this and all NFPA committee meetings we are concerned with your safety. If the fire alarm sounds, please proceed to an exit. January 7-8, 2014 Doubletree Hotel Orlando, FL Members, please verify/update your contact information Use of tape recorders or other means capable of reproducing verbatim transcriptions of this or any NFPA meeting is not permitted Guests All guests are required to sign in and identify their affiliation. Participation is limited to TC members or those individuals who have previously requested time to address the committee. Other participation is granted at the discretion of the Chair. Guest chairs are located around the room as a courtesy. 1

5 Members categorized in ANY interest category who have been retained to represent the interests of ANOTHER interest category (with respect to a specific issue or issues that are to be addressed by a TC/CC) shall declare those interests to the committee and refrain from voting on any Public Input, Comment, or other matter relating to those issues throughout the process. General Procedures Follow Robert s Rules of Order. Discussion requires a motion. Motions for Ending Debate Previous Question or Call the Question Not in order when another has the floor Requires a second This motion is not debatable and DOES NOT automatically stop debate A 2/3 affirmative vote will immediately close debate and return to the original motion on the floor. Less then 2/3 will allow debate to continue. Committee member actions: Member addresses the chair. Receives recognition from the chair. Introduces the motion. Another member seconds the motion. 2

6 Committee chair actions: States the motion. Calls for discussion. Ensures all issues have been heard. Takes the vote. Announces the result of the vote. New Process What s New? New Term Input Stage Public Input First Draft Meeting Committee Input Committee Statement (CS) First Revision (FR) First Draft Report First Draft Changes in Terms: Old Term ROP Stage Proposal ROP Meeting Trial Balloon (or later, FR that fails ballot) Committee Statement Committee Proposal or Accepted Public Proposal ROP ROP Draft New Process What s New? New Term Comment Stage Public Comment Second Draft Meeting Committee Comment Second Revision Second Draft Report Second Draft Changes in Terms: Old Term ROC Stage Public Comment ROC Meeting Comment that Failed Ballot (Second Revision that failed ballot) Committee Comment or Accepted Public Comment ROC ROC Draft Technical Committee Actions: Resolving Public Comments Committee Action and Committee Statement Creating Second Revisions 3

7 Resolving Public Comments (See Regs ) Committee develops a Committee Action Accept Reject but see Reject Reject but Hold Committee Statements Committee must clearly indicate reasons for not accepting the recommendation and/or point to a relevant Second Revision All Public Comments Actions must have a Committee Statement Must include a valid technical reason No vague references to intent Explain how the submitter s substantiation is inadequate Neither PC Action nor Committee Statements get balloted Create a Second Revision (SR) Committee wants to make a change (to add, delete or modify) the First Draft. Committee develops a Committee Statement (CS) substantiating the change. Each SR gets balloted No new material after the Public Input Stage since it hasn t had the benefit of public review. What constitutes new material is decided by the TC or Correlating Committee. Adding new material at this Comments stage could successfully be challenged through appeal to the NFPA Standards Council 4

8 Formal voting Voting during meeting is used to establish a sense of agreement (simple majority) Secured by letter ballot (2/3 agreement) Only the results of the formal ballot determine the official position of the committee on the Second Draft Ballots are on the Second Revisions (SR) ONLY Public Comments and Committee Statements not balloted Reference materials are available - Second Draft, Public Comments, First Draft Report Ballot form allows you to vote: Affirmative on all SR Affirmative on all SR with exceptions specifically noted Ballot form provides a column for affirmative with comment Note: This box only needs to be checked if there is an accompanying comment. Reject or abstain requires a reason. Initial ballot Circulation of negatives and comments Members may change votes during circulation Second Revision that fails letter ballot shall be designated as a Committee Comment (in the 2 nd Draft Report), marked as Reject and deleted from the Second Draft. Electronic Balloting Ballots will be an online format Alternates are strongly encouraged to return ballots Ballot session will time out after 90 minutes Use submit to save your work 5

9 Electronic Balloting Click link on the ballot received Sign in with NFPA.org Committee Login and Password Electronic Balloting Select either Affirmative on All or Affirmative with Exception(s) Electronic Balloting Choosing AFFIRMATIVE ON ALL Use See FR/SR - # link to review all First/Second Revisions Use Edit election to change individual votes or to modify vote after submitting ballot. Electronic Balloting Choosing AFFIRMATIVE WITH EXCEPTION(S) Make selection: Affirmative with Comment, Negative, or Abstain No selection made-defaults to affirmative Must include comment on each vote. 6

10 Electronic Balloting To complete ballot click Participant Consent and Submit Return and edit any votes before ballot due date. TC Struggles with an Issue TC needs data on a new technology or emerging issue Two opposing views on an issue with no real data Data presented is not trusted by committee Code Fund Lends a Hand TC rep and/or staff liaison submits a Code Fund Request Requests are reviewed by a Panel and chosen based on need / feasibility Research Project Carried Out Funding for project is provided by the Code Fund and/or industry sponsors Project is completed and data is available to TC Legal Patent: Disclosures of essential patent claims should be made by the patent holder, but others may also notify NFPA if they believe that a proposed or existing NFPA standard includes an essential patent claim. Antitrust: the single most important provision-federal law prohibits contracts, combinations, or conspiracies which unreasonably restrain trade or commerce. Section 1 of the Sherman Act Legal Activities Disapproved by the Courts Packing meetings Hiding commercial interest throwing the committees out of balance Hiding scientific or technical information from committees No final decision-making authority to unbalanced Task Groups; include all interested parties. 7

11 Doc Info Pages Document Information Next Edition Technical Committee Document scope Current/Previous Edition information Issued TIAs, FIs and Errata Archived revision information Standard Council Decisions Articles and Reports Read only document Submit Public Input/Comments via Electronic Submission System. Meetings and Ballots ROP/ROC or First Draft Report and Second Draft Report NITMAMand Standard Council Decisions Private TC info Ballot circulations, informational ballots and other committee info Committee name, responsibility and scope Staff liaison Committee list Private committee contact information Current committee documents in PDF format Committees seeking members and committee online application Any questions? 8

12 Attachment B: NFPA Anti-Trust Policy

13 NFPA Antitrust Policy The NFPA is a not for profit organization with a mission of promoting the science and improving the methods of fire protection and prevention and electrical safety. The primary way in which the NFPA fulfills this mission is by developing and disseminating safety standards intended to minimize the possibility and effects of fire and other risks. The standards development process depends on volunteer participation by a diverse range of individuals on behalf of numerous stakeholders including participants representing business and industry. As a result, antitrust concerns can arise in connection with standards development activity. It is the policy of the NFPA to strictly comply with state and federal antitrust laws, and the NFPA expects all participants in NFPA standards development activities to conduct themselves in strict accordance with these laws. NFPA minimizes the risk of antitrust problems by providing a forum for standards activities that is based on the principles of openness, honesty, fairness and balance and that is conducted in accordance with published rules and regulations. Each participant in the standards development process has the obligation to adhere to all rules, regulations, and policies of the NFPA including, without limitation, the Regulations Governing the Development of NFPA Standards. In addition, participants can draw valuable guidance on how to conduct themselves by consulting NFPA s Guide for Conduct of Participants in the NFPA Standards Development Process. While compliance with NFPA s standards developments rules and regulations is essential, it alone is not sufficient to avoid conduct that may violate the antitrust laws. Participants must also avoid any conduct, conversations or agreements that would constitute an unreasonable restraint of trade or be otherwise illegal under the antitrust laws. Although it s not possible to identify every situation that could be found to be anticompetitive or a violation of antitrust laws, the following topics should NOT be addressed or discussed, even informally, by or among competitors or other individuals in the course of their NFPA involvement: - Profits, profit margins or cost data; - Prices, rates, and fees; - Selection, termination, division or allocation of customers, sales territories, or markets; or - Refusal to deal with a specific business entity. Participants in NFPA activities may receive antitrust training or advice from their employers or other organizations or entities they represent. This NFPA antitrust policy, as well as other information or presentations that NFPA may provide concerning the antitrust laws and standards development, are not intended to take the place of such training or advice; nor are they intended to constitute legal advice to participants. In addition to consulting with their legal counsel, however, participants can assist NFPA and their fellow participants by refusing to engage in inappropriate discussions and by speaking up if they have questions or concerns about any matter or discussion that occurs in the course of NFPA standards development activities. Participants should bring matters of concern to the attention of NFPA staff. Any participant may also raise questions regarding this policy to the NFPA s General Counsel.

14 Attachment C: Glossary of Terms Recommendations

15 NFPA 85 Boiler and Combustion Systems Hazards Code 2011 Edition The following words and phrases do not appear in NFPA 85, appear only in Chapter 3 and/or the Annex materials, or is a repeat of another definition. Definitions also appear in this list if a similar word or phrase appears in NFPA 85. Chapter 3 Definitions 3.3 General Definitions. [Note: these words, phrases, and synonyms were highlighted in NFPA 85.] Primary Air (in a Pulverized Fuel System). In a pulverized fuel system, either air or a flue gas air mixture; can simultaneously also be pulverizer air and/or transport air. The phrase primary air appears near pulverizer or coal in Chapters 1, 3, 6, 9, and Annex A. Recommendation: Keep definition as is Bin System (Storage System). A system in which the fuel is pulverized and stored in bins from which it is withdrawn through feeders, as needed, for burning. The phrase bin system (storage system) does not appear anywhere else, however both bin system and storage system appear individually in the body of the text. Recommendation: Request correlating committee update to indirect-fired system to be consistent with revised chapter Direct Fired System (Unit System). A system in which the fuel is pulverized and delivered in suspension directly to the burner(s). The phrase direct fire system (unit system) does not appear anywhere else, nor does direct fired system. Unit system appears once in Chapter 9. Already addressed by FUN Distributor/Divider. A device that splits a single stream of pulverized coal and primary air into two or more streams. The phrase distributor/divider does not appear anywhere else, nor does the word divider. However, distributor does appear in the body of the code. Already addressed by PFS and FUN in other revisons.

16 Exhauster Fan. A fan located at the pulverizer outlet used to draw the primary air through the pulverizer and to deliver the primary air fuel mixture to the burner(s) or other apparatus. Note: only appearance of exhauster fan is when the definition for exhauster refers to this one. Recommendation: Keep as is Friability. The tendency of coal to crumble or break into small pieces. The word friability does not appear anywhere else Grindability. The characteristic of solid fuel that indicates its relative ease of pulverization, as defined by ASTM D 409, Standard Test Method for Grindability of Coal by the Hardgrove-Machine Method. Note: grindability appears only in the Annex sections. Recommendation: Request correlating committee delete the definition to be consistent with the NFPA Manual of Style and action taken on Annex K Primary Air Fan (Pulverizer Air Fan). See , Primary Air Fan. The phrase primary air fan (pulverizer air fan) does not appear anywhere else. Pulverizer air fan does appear in Chapter 9. Primary air fan is a separate definition, and would be considered a repeat here. Recommendation: change storage to indirect-fired to be consistent with new chapter 9 terminology. Keep remainder as is.

Hartford Steam Boiler Inspection & Insurance, CT. DTE Electric Company, MI. General Electric/ALSTOM Power Inc., CT

Hartford Steam Boiler Inspection & Insurance, CT. DTE Electric Company, MI. General Electric/ALSTOM Power Inc., CT TECHNICAL COMMITTEE ON PULVERIZED FUEL SYSTEMS NFPA 85 First Draft Meeting Minutes March 2, 2017 10:00 AM 2:00 PM Eastern Time Web Meeting/Teleconference Attendees Committee Members: Joseph Bittinger,

More information

Honeywell/Eclipse/CEC Combustion Safety, Inc., OH. Southern Company Services, Inc., AL. Global Asset Protection Services, Inc., TN

Honeywell/Eclipse/CEC Combustion Safety, Inc., OH. Southern Company Services, Inc., AL. Global Asset Protection Services, Inc., TN TECHNICAL COMMITTEE ON FUNDAMENTALS OF COMBUSTION SYSTEM HAZARDS NFPA 85 First Draft Meeting Minutes January 17-18 8:00 AM - 5:00 PM CT Drury Inn & Suites San Antonio Riverwalk, San Antonio, TX Attendees:

More information

Global Asset Protection Services, LLC, CT. Liberty Mutual Commercial Markets, Property, KY. Burns & McDonnell Engineering Company, MO

Global Asset Protection Services, LLC, CT. Liberty Mutual Commercial Markets, Property, KY. Burns & McDonnell Engineering Company, MO TECHNICAL COMMITTEE ON SINGLE BURNER BOILERS NFPA 85 First Draft Meeting Minutes February 10, 2017 8:00 AM - 5:00 PM MT Embassy Suites by Hilton Phoenix-Tempe, Tempe, AZ Attendees Committee Members: Peter

More information

Technical Standards and Safety Authority, Canada. Southern Company Services, Inc., AL. Emerson Automation Solutions, PA

Technical Standards and Safety Authority, Canada. Southern Company Services, Inc., AL. Emerson Automation Solutions, PA TECHNICAL COMMITTEE ON HEAT RECOVERY STEAM GENERATORS NFPA 85 First Draft Meeting Minutes February 9, 2017 8:00 AM - 5:00 PM MT Embassy Suites by Hilton Phoenix-Tempe, Tempe, AZ Attendees Committee Members:

More information

NFPA Technical Committee on Building Systems. NFPA 5000 Second Draft Meeting AGENDA

NFPA Technical Committee on Building Systems. NFPA 5000 Second Draft Meeting AGENDA NFPA Technical Committee on Building Systems NFPA 5000 Second Draft Meeting AGENDA Monday, May 20, 2013 at the DoubleTree by Hilton Hotel San Diego Downtown San Diego, California 1. Call to Order: Call

More information

MINUTES OF MEETING. Technical Committee on Multiple Burner Boilers

MINUTES OF MEETING. Technical Committee on Multiple Burner Boilers MINUTES OF MEETING Technical Committee on Multiple Burner Boilers Feb. 26-27, 2013 Entergy New Orleans, LA I. Attendance: Principal Members/Staff: Mike Walz, Technical Committee Chair, Burns & McDonnell

More information

8. NFPA 5000 Second Draft (formerly ROC) Preparation. Public Comments to be distributed before meeting date.

8. NFPA 5000 Second Draft (formerly ROC) Preparation. Public Comments to be distributed before meeting date. AGENDA NFPA Technical Committee on Interior Finish and Contents NFPA 101 and NFPA 5000 SECOND DRAFT MEETING Thursday, May 23, 2013 DoubleTree by Hilton Hotel San Diego Downtown 1646 Front Street San Diego,

More information

2. Introduction of committee members and guests. For a current committee roster, see page 2.

2. Introduction of committee members and guests. For a current committee roster, see page 2. AGENDA NFPA Technical Committee on Building Systems NFPA 5000 Second Draft Meeting Monday, June 20, 2016 Hilton Fort Lauderdale Marina Fort Lauderdale, FL 1. Call to order. Call meeting to order by Chair

More information

Technical Committee on Liquefied Natural Gas

Technical Committee on Liquefied Natural Gas Technical Committee on Liquefied Natural Gas Minutes Bechtel Oil, Gas, & Chemicals Inc. 3000 Post Oak Blvd. Houston, TX 77056 March 11-12, 2014 Part I, Attendance: Principal Members and Staff: Jay Jablonski,

More information

Page 1 of Self-introduction of Committee Members and Guests. For a current committee roster, pg. 2.

Page 1 of Self-introduction of Committee Members and Guests. For a current committee roster, pg. 2. AGENDA NFPA Technical Committee on Structures and Construction & Materials NFPA 703 and NFPA 5000 Second Draft Meeting Tuesday, May 21, 2013 DoubleTree Hotel San Diego Downtown 1646 Front Street San Diego,

More information

2015 UPC & UMC TECHNICAL COMMITTEE MEETING WELCOME TECHNICAL COMMITTEE IAPMO CODES AND STANDARDS DEVELOPMENT PROCESS

2015 UPC & UMC TECHNICAL COMMITTEE MEETING WELCOME TECHNICAL COMMITTEE IAPMO CODES AND STANDARDS DEVELOPMENT PROCESS 2015 UPC & UMC TECHNICAL COMMITTEE MEETING WELCOME TECHNICAL COMMITTEE IAPMO CODES AND STANDARDS DEVELOPMENT PROCESS 2015-2018 1 THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE

More information

Technical Committee on Single Burner Boilers

Technical Committee on Single Burner Boilers Technical Committee on Single Burner Boilers Date: March 10, 2010 To: Technical Committee on Single Burner Boilers From: Denise Beach, Staff Liaison/Senior Engineer Re: Agenda Package April ROC Teleconference/

More information

Supplemental Operating Procedures for the National Electrical Code Project

Supplemental Operating Procedures for the National Electrical Code Project Adopted by the NEC Correlating Committee on April 27, 2012. Approved by the Standards Council on August 9, 2012. Introduction (a) Preamble. The Operations of the (i.e., the NEC Correlating Committee (CC)

More information

MINUTES OF ROC MEETING Technical Committee on Multiple Burner Boilers Fall 2010 cycle SRP PERA Club 1 E. Continental Drive Tempe, AZ 85281

MINUTES OF ROC MEETING Technical Committee on Multiple Burner Boilers Fall 2010 cycle SRP PERA Club 1 E. Continental Drive Tempe, AZ 85281 MINUTES OF ROC MEETING Technical Committee on Multiple Burner Boilers Fall 2010 cycle SRP PERA Club 1 E. Continental Drive Tempe, AZ 85281 March 30, 2010 Attendance: Principal Members/Staff: Harold Skip

More information

Technical Committee on Tank Leakage and Repair Safeguards

Technical Committee on Tank Leakage and Repair Safeguards Technical Committee on Tank Leakage and Repair Safeguards NFPA 326 and NFPA 329 Second Draft Web/Teleconference Agenda April 9, 2014, 1:00 PM (EDT) to 2:00 PM (EDT) CALL IN INFORMATION and ONLINE LINK:

More information

MEMORANDUM. NFPA Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Liquefied Petroleum Gases

More information

ASME Controls and Safety Devices for Automatically Fired Boilers (CSDAFB) Standards Committee

ASME Controls and Safety Devices for Automatically Fired Boilers (CSDAFB) Standards Committee ASME Controls and Safety Devices for Automatically Fired Boilers (CSDAFB) Standards Committee Supplement to Procedures for ASME Codes and Standards Revised to Update Reference to Accredited Standards Development

More information

MEMORANDUM. Subject: NEC Proposed Tentative Interim Amendment (TIA) No. 1117

MEMORANDUM. Subject: NEC Proposed Tentative Interim Amendment (TIA) No. 1117 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NEC Correlating Committee Kimberly Shea Date: August

More information

Meeting Notice 2021 USHGC Technical Committee Meeting June 19, 2019

Meeting Notice 2021 USHGC Technical Committee Meeting June 19, 2019 Meeting Notice 2021 USHGC Technical Committee Meeting Note from the Staff Liaison Dear Technical Committee Members: We are pleased that you are participating in the development of the 2021 Uniform Solar

More information

MEMORANDUM. Subject: NFPA 101 Proposed Tentative Interim Amendment (TIA) No.1114

MEMORANDUM. Subject: NFPA 101 Proposed Tentative Interim Amendment (TIA) No.1114 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Correlating Committee on Safety to Life (SAF-AAC)

More information

DRAFT AGENDA. AAMI ST/WG 92, Process Challenge Devices Working Group 30 April 2015 (9 a.m. to 12 p.m.) Annapolis, Maryland

DRAFT AGENDA. AAMI ST/WG 92, Process Challenge Devices Working Group 30 April 2015 (9 a.m. to 12 p.m.) Annapolis, Maryland DRAFT AGENDA AAMI ST/WG 92, Process Challenge Devices Working Group 30 April 2015 (9 a.m. to 12 p.m.) Annapolis, Maryland I. Welcome and Call to Order (Welcome to the new Co-Chair) II. III. IV. AAMI Anti-Trust

More information

MEMORANDUM. Subject: NFPA 259 Proposed Tentative Interim Amendment (TIA) No. 957

MEMORANDUM. Subject: NFPA 259 Proposed Tentative Interim Amendment (TIA) No. 957 MEMORANDUM To: From: Technical Committee on Fire Tests Gregory Harrington, Acting Staff Liaison Date: May 12, 2009 Subject: NFPA 259 Proposed Tentative Interim Amendment (TIA) No. 957 The attached proposed

More information

CP#28-05 Code Development

CP#28-05 Code Development Code Development Approved: 09/24/05 Revised: 10/20/18 1.0 Introduction 1.1 Purpose of Council Policy: The purpose of this Council Policy is to prescribe the Rules of Procedure utilized in the continued

More information

MEMORANDUM. Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No. 1153

MEMORANDUM. Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No. 1153 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: Technical Committee on Liquefied Petroleum Gases

More information

PDA STANDARDS DEVELOPMENT PROGRAM Policies and Procedures

PDA STANDARDS DEVELOPMENT PROGRAM Policies and Procedures PDA STANDARDS DEVELOPMENT PROGRAM Policies and Procedures Approved by the PDA Executive Management July 15, 2016 Approved by the ANSI Executive Standards Council March 01, 2017 Parenteral Drug Association

More information

SJI Procedures for the Development, Approval, and Maintenance of SJI American National Standards

SJI Procedures for the Development, Approval, and Maintenance of SJI American National Standards SJI Procedures for the Development, Approval, and Maintenance of SJI American National Standards Adopted and Approved by SJI Board of Directors, May 6, 2008 General Revision October 1, 2007 General Revision

More information

Report on Comments F2005 Copyright, NFPA NFPA 211 Report of the Committee on

Report on Comments F2005 Copyright, NFPA NFPA 211 Report of the Committee on Report on Comments F2005 Copyright, NFPA NFPA 211 Report of the Committee on Chimneys, Fireplaces, and Venting Systems for Heat-Producing Appliances Robert V. LeClair, Chair State of Maine, ME [E] Robert

More information

MEETING NOTICE 2014 NEC REPORT ON PROPOSALS

MEETING NOTICE 2014 NEC REPORT ON PROPOSALS MEETING NOTICE 2014 NEC REPORT ON PROPOSALS JANUARY 9-21,2012 Important Information You Will Need for the Meetings in Hilton Head, SC Note from the Secretary Dear Panel Member: We are very pleased that

More information

ASTM INTERNATIONAL Helping our world work better. Regulations Governing ASTM Technical Committees

ASTM INTERNATIONAL Helping our world work better. Regulations Governing ASTM Technical Committees ASTM INTERNATIONAL Helping our world work better Regulations Governing ASTM Technical Committees April January 2016 2015 Society Scope: The corporation is formed for the development of standards on characteristics

More information

MEMORANDUM. NFPA Technical Committee on Electronic Safety Equipment. Subject: NFPA 1982 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Technical Committee on Electronic Safety Equipment. Subject: NFPA 1982 Proposed Tentative Interim Amendment (TIA) No. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Electronic Safety Equipment

More information

MEMORANDUM. Subject: NFPA 1971 Proposed Tentative Interim Amendment (TIA) No.1159

MEMORANDUM. Subject: NFPA 1971 Proposed Tentative Interim Amendment (TIA) No.1159 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Correlating Committee on Fire and Emergency

More information

NFPA TECHNICAL COMMITTEE FOR Powered Rescue Tools

NFPA TECHNICAL COMMITTEE FOR Powered Rescue Tools NFPA TECHNICAL COMMITTEE FOR Powered Rescue Tools Embassy Suites Charlotte, NC April 10-11, 2013 Agenda 1. Call to order 2. Introduction and attendance 3. Opening remarks by Chair, Glenn Mate 4. Review

More information

MEMORANDUM. NFPA Technical Committee on Wastewater Treatment Plants. Subject: NFPA 820 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Technical Committee on Wastewater Treatment Plants. Subject: NFPA 820 Proposed Tentative Interim Amendment (TIA) No. MEMORANDUM To: From: NFPA Technical Committee on Wastewater Treatment Plants Joanne Goyette Date: March 25, 2011 Subject: NFPA 820 Proposed Tentative Interim Amendment (TIA) No. 1025 The attached proposed

More information

Technical Committee on Tank Leakage and Repair Safeguards. SUBJECT: NFPA 329 Second Draft TC Final Ballot Results (F2014)

Technical Committee on Tank Leakage and Repair Safeguards. SUBJECT: NFPA 329 Second Draft TC Final Ballot Results (F2014) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Tank Leakage and Repair Safeguards Lawrence

More information

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA)

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Electrical Equipment of Industrial Machinery

More information

ISA Standards and Practices Department

ISA Standards and Practices Department ISA Standards and Practices Department Procedures 2017 Revision ANSI Approved 13 June 2017 The International Society of Automation (ISA) 67 T.W. Alexander Drive P.O. Box 12277 Research Triangle Park, NC

More information

NTAG OPERATING PROCEDURES

NTAG OPERATING PROCEDURES NTAG OPERATING PROCEDURES Updated January 22, 2007 1 BACKGROUND The function of the U.S. Nuclear Technical Advisory Group (NTAG) is to coordinate the United States participation on Technical Committee-85

More information

Organization and Procedures for the Committee on Standardization of Oilfield Equipment and Materials: Policy Document

Organization and Procedures for the Committee on Standardization of Oilfield Equipment and Materials: Policy Document Organization and Procedures for the Committee on Standardization of Oilfield Equipment and Materials: Policy Document API S1 Twenty-fourth Edition, June 2017 Contents 1 Scope... 1 2 Normative References...

More information

Operating Procedures for Accredited Standards Committee C63 Electromagnetic Compatibility (EMC) Date of Preparation: 3 March 2016

Operating Procedures for Accredited Standards Committee C63 Electromagnetic Compatibility (EMC) Date of Preparation: 3 March 2016 Operating Procedures for Accredited Standards Committee C63 Electromagnetic Compatibility (EMC) Date of Preparation: 3 March 2016 Date of ANSI Approval and Reaccreditation of ASC C63: 21 June 2016 Table

More information

AAMI/EQ, Medical Equipment Management Committee

AAMI/EQ, Medical Equipment Management Committee EQN092 AAMI/EQ, Medical Equipment Management Committee AGENDA Thursday, December 7, 2017, 9:00 am to 5:30 pm PST Friday, December 8, 2017, 8:00 am to ~2:00 pm PST Torrance Marriott Redondo Beach 3635 Fashion

More information

REGULATIONS GOVERNING ASTM TECHNICAL COMMITTEES

REGULATIONS GOVERNING ASTM TECHNICAL COMMITTEES REGULATIONS GOVERNING ASTM TECHNICAL COMMITTEES INTERNATIONAL Standards Worldwide Issued March 2010 REGULATIONS GOVERNING ASTM TECHNICAL COMMITTEES INTERNATIONAL Standards Worldwide Society Scope: The

More information

Meeting Minutes. Attendees:

Meeting Minutes. Attendees: Meeting Minutes ISA 67 Alexander Drive P.O. Box 12277 Research Triangle Park, NC 27709 PHONE (919) 549-8411 FAX (919) 549-8288 E-MAIL info@isa.org www.isa.org Meeting: ISA77 Fossil Fuel Power Plant s Committee

More information

70 th INTERNATIONAL ASTRONAUTICAL CONGRESS WASHINGTON D.C., UNITED STATES OCTOBER 2019 INSTRUCTIONS FOR AUTHORS

70 th INTERNATIONAL ASTRONAUTICAL CONGRESS WASHINGTON D.C., UNITED STATES OCTOBER 2019 INSTRUCTIONS FOR AUTHORS 70 th INTERNATIONAL ASTRONAUTICAL CONGRESS WASHINGTON D.C., UNITED STATES 21-25 OCTOBER 2019 INSTRUCTIONS FOR AUTHORS The following guidelines provide document formatting requirements and uploading instructions

More information

Policies and Procedures for Standards Development for the Industrial Electronics Society (IES) Standards Committee. Date of Submittal: August

Policies and Procedures for Standards Development for the Industrial Electronics Society (IES) Standards Committee. Date of Submittal: August Policies and Procedures for Standards Development for the Industrial Electronics Society (IES) Standards Committee Date of Submittal: August 25 2016 Date of Acceptance: 22 September 2016 Industrial Electronics

More information

NC General Statutes - Chapter 95 Article 7A 1

NC General Statutes - Chapter 95 Article 7A 1 Article 7A. Uniform Boiler and Pressure Vessel Act. 95-69.8. Short title. This Article shall be known as the Uniform Boiler and Pressure Vessel Act of North Carolina. (1975, c. 895, s. 1.) 95-69.9. Definitions.

More information

Standardization. Policies and Procedures. of the. National Electrical. Manufacturers. Association

Standardization. Policies and Procedures. of the. National Electrical. Manufacturers. Association Standardization Policies and Procedures of the National Electrical Manufacturers Association Approved September 1983 Revised May 1987, September 1988, September 1992, February 1994, May 1997, March 1998,

More information

IMPLEMENTATION GUIDE FOR THE PHOENIX AGREEMENT

IMPLEMENTATION GUIDE FOR THE PHOENIX AGREEMENT IMPLEMENTATION GUIDE FOR THE PHOENIX AGREEMENT API-EI Agreement for Joint Development, Publication and Maintenance of Petroleum Measurement Standards Introduction This guide has been written to provide

More information

Ph: Fax: East Philadelphia Street Ontario, California USA To:

Ph: Fax: East Philadelphia Street Ontario, California USA To: To: IAPMO Members and Other Interested Parties Date: August 2010 Enclosed is your 2010 Report on Proposals (ROP). These proposals were presented to the Plumbing Technical Committee who met in Milwaukee,

More information

Technical Committee Operations Manual

Technical Committee Operations Manual The Masonry Society's Technical Committee Operations Manual April 24, 2014 Prepared by the TMS Technical Activities Committee The Masonry Society 105 South Sunset, Suite Q, Longmont, CO 80501 Phone: 303-939-9700

More information

Policies and Procedures for Standards Development for the IEEE Cloud Computing Standards Committee. Date of Submittal: 08 July 2016

Policies and Procedures for Standards Development for the IEEE Cloud Computing Standards Committee. Date of Submittal: 08 July 2016 Policies and Procedures for Standards Development for the IEEE Cloud Computing Standards Committee Date of Submittal: 08 July 2016 Date of Acceptance: 22 September 2016 IEEE Cloud Computing Standards Committee

More information

June Regulations Governing Consensus Development of the Water Efficiency and Sanitation Standard

June Regulations Governing Consensus Development of the Water Efficiency and Sanitation Standard June 2016 Regulations Governing Consensus Development of the Water Efficiency and Sanitation Standard TABLE OF CONTENTS SECTION 1.0 SCOPE... 1 SECTION 2.0 GENERAL... 1-2 SECTION 3.0 ORGANIZATION... 2-4

More information

Technical Committee on Liquefied Natural Gas

Technical Committee on Liquefied Natural Gas Technical Committee on Liquefied Natural Gas AGENDA American Gas Association 400 North Capitol Street Washington, DC 20001 October 2, 2013 1. Chair s welcome, call to order, and opening remarks at 8:00

More information

AIAA STANDARDS PROGRAM PROCEDURES

AIAA STANDARDS PROGRAM PROCEDURES AIAA STANDARDS PROGRAM PROCEDURES ANSI Accredited 2015 Approved September 22, 2015 Revised Edition 2016 American Institute of Aeronautics and Astronautics 12700 Sunrise Valley Drive, Suite 200, Reston,

More information

MEMORANDUM. NFPA Correlating Committee on Health Care Facilities. Subject: NFPA 99 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Correlating Committee on Health Care Facilities. Subject: NFPA 99 Proposed Tentative Interim Amendment (TIA) No. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Correlating Committee on Health Care Facilities

More information

SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018

SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018 SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018 1 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. ORGANIZATION... 3 3. RECORDS... 4 4. MEMBERSHIP... 4 5. INTEREST CATEGORIES... 6 6.

More information

The Development and Revision of FSC Normative Documents FSC-PRO V3-1 EN

The Development and Revision of FSC Normative Documents FSC-PRO V3-1 EN The Development and Revision of FSC Normative Documents Title: Document reference code: Approval: Contact for comments: The Development and Revision of FSC Normative Documents V3-0: FSC BOARD OF DIRECTORS,

More information

Policies and Procedures for Standards Development for the IEEE Communication Society/Green ICT Standards Committee (COM/GreenICT-SC)

Policies and Procedures for Standards Development for the IEEE Communication Society/Green ICT Standards Committee (COM/GreenICT-SC) Policies and Procedures for Standards Development for the IEEE Communication Society/Green ICT Standards Committee (COM/GreenICT-SC) Date of Submittal: 29 Sep 2017 Date of Acceptance: 19 February 2018

More information

According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Air Conditioning (AIC-AAA) Allan Fraser,

More information

AAMI/AR, Anaesthetic and respiratory equipment

AAMI/AR, Anaesthetic and respiratory equipment AR N58 (August 2018) AAMI/AR, Anaesthetic and respiratory equipment (US TAG for ISO/TC 121) GoToMeeting see Kavi calendar Meeting date/time: Wednesday 12 September 2018 10:30 to 11:30 am 1. Opening and

More information

IEEE PES Substations Committee

IEEE PES Substations Committee 1 IEEE PES Substations Committee Working Group Chair Training Craig Preuss IEEE PES SUBS C0 Chair preusscm@bv.com 2 Agenda Initiating a PAR After the PAR Working group duration Working group organization

More information

Meeting Minutes. Attendees:

Meeting Minutes. Attendees: Meeting Minutes ISA 67 Alexander Drive P.O. Box 12277 Research Triangle Park, NC 27709 PHONE (919) 549-8411 FAX (919) 549-8288 E-MAIL info@isa.org www.isa.org Meeting: Chairman: Recorder: Date/Time: Location:

More information

Regulations Governing Consensus Development of the Uniform Solar, Hydronics & Geothermal and Swimming Pool, Spa & Hot Tub Codes

Regulations Governing Consensus Development of the Uniform Solar, Hydronics & Geothermal and Swimming Pool, Spa & Hot Tub Codes Regulations Governing Consensus Development of the Uniform Solar, Hydronics & Geothermal and Swimming Pool, Spa & Hot Tub Codes Revised Feb 2018 TABLE OF CONTENTS SECTION 1.0 SCOPE... 1 SECTION 2.0 GENERAL...

More information

Supplemental Operating Procedures for the NFPA Committees on Safety to Life

Supplemental Operating Procedures for the NFPA Committees on Safety to Life Supplemental Operating Procedures for the NFPA Committees on Safety to Life Adopted by the Technical Correlating Committee on Safety to Life: January 2002 (letter ballot). Approved by the Standards Council:

More information

Table of Contents. 9 Intellectual Property Policy

Table of Contents. 9 Intellectual Property Policy Society of Motion Picture and Television Engineers Intellectual Property Policy Extracted from Standards Operations Manual Approved by Board 2012-06-17 Effective 2013-08-05 9 Intellectual Property Policy

More information

Provisional rules of procedure

Provisional rules of procedure 13th Meeting of the Conference of the Contracting Parties to the Ramsar Convention on Wetlands Wetlands for a Sustainable Urban Future Dubai, United Arab Emirates, 21-29 October 2018 Ramsar COP13 Doc.4.1

More information

Meeting Agenda Second Draft Meeting NFPA 450, Guide for Emergency Medical Services and Systems August 12 th, 2015 Conference Call/Adobe Connect

Meeting Agenda Second Draft Meeting NFPA 450, Guide for Emergency Medical Services and Systems August 12 th, 2015 Conference Call/Adobe Connect Meeting Agenda Second Draft Meeting NFPA 450, Guide for Emergency Medical Services and Systems August 12 th, 2015 Conference Call/Adobe Connect I. Welcome Acting Chair Aarron Reinert II. Introductions

More information

Revision May 18, 2011 Publication Date. Copyright LXI Consortium, Inc. All rights reserved

Revision May 18, 2011 Publication Date. Copyright LXI Consortium, Inc. All rights reserved LXI Consortium Operating Procedures Revision 1..91 May 18, 2011 Publication Date Copyright 2004-2011 LXI Consortium, Inc. All rights reserved 1. Overview of the Operating Procedures... 5 1.1 Introduction...

More information

National Fire Protection Association MEMORANDUM. Subject: NFPA 20 Proposed Tentative Interim Amendment (TIA) No. 1199

National Fire Protection Association MEMORANDUM. Subject: NFPA 20 Proposed Tentative Interim Amendment (TIA) No. 1199 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Pumps Elena Carroll,

More information

Understanding Patent Issues During IEEE Standards Development

Understanding Patent Issues During IEEE Standards Development 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Understanding Patent Issues During IEEE Standards Development Patented Technology in IEEE standards

More information

ICC CONSENSUS PROCEDURES

ICC CONSENSUS PROCEDURES ICC CONSENSUS PROCEDURES ICC Board approved December 7, 2018 ANSI Approval pending 1. Due Process The International Code Council (ICC) adheres to the consensus procedures of the American National Standards

More information

AAMI/SM Software and IT Committee & AAMI/ Health IT Committee & AAMI/UL Joint Technical Committee 2800

AAMI/SM Software and IT Committee & AAMI/ Health IT Committee & AAMI/UL Joint Technical Committee 2800 SMN031 (April 2018) AAMI/SM Software and IT Committee & AAMI/ Health IT Committee & AAMI/UL Joint Technical Committee 2800 Westin Long Beach Long Beach, California Meeting date/time: 15 June 2018 9:00

More information

Agenda Standards Committee Process Subcommittee Meeting August 18, :30 3:30 p.m. Eastern

Agenda Standards Committee Process Subcommittee Meeting August 18, :30 3:30 p.m. Eastern Agenda Standards Committee Process Subcommittee Meeting August 18, 2017 1:30 3:30 p.m. Eastern Dial-in: 1-415-655-0002 Access Code: 739 849 179 Meeting Password: 081817 Click here for: Webinar Access Introduction

More information

RESNA Policies and Procedures for the Development of RESNA Assistive Technology Standards February 17, 2016

RESNA Policies and Procedures for the Development of RESNA Assistive Technology Standards February 17, 2016 RESNA Policies and Procedures for the Development of RESNA Assistive Technology Standards February 17, 2016 Copyright by the Rehabilitation Engineering and Assistive Technology Society of North America

More information

INTERNATIONAL CODE COUNCIL 2009/2010 CODE DEVELOPMENT CYCLE 2009/2010 REPORT OF THE PUBLIC HEARING ON THE 2009 EDITIONS OF THE

INTERNATIONAL CODE COUNCIL 2009/2010 CODE DEVELOPMENT CYCLE 2009/2010 REPORT OF THE PUBLIC HEARING ON THE 2009 EDITIONS OF THE INTERNATIONAL CODE COUNCIL 2009/2010 CODE DEVELOPMENT CYCLE 2009/2010 REPORT OF THE PUBLIC HEARING ON THE 2009 EDITIONS OF THE ICC ADMINISTRATIVE CODE PROVISIONS INTERNATIONAL BUILDING CODE INTERNATIONAL

More information

CUG Members' Handbook

CUG Members' Handbook CUG Members' Handbook March 31, 2016 Revisions 4/26/06 ToC add chapter 6 page 1 add xd1, xt3, and x1 list server info page 2 add xt3 and xd1 as eligible systems in section 1.2.1 page 4 replace old Program

More information

IEEE Power & Energy Society PES Technical Committee Sponsor Policies and Procedures (P&P)

IEEE Power & Energy Society PES Technical Committee Sponsor Policies and Procedures (P&P) IEEE Power & Energy Society PES Technical Committee Sponsor Policies and Procedures (P&P) Policies and Procedures for Standards Development for the Power System Relaying and Control Committee Date of Submittal:

More information

AAMI/AR, Anaesthetic and respiratory equipment

AAMI/AR, Anaesthetic and respiratory equipment AR N40 (March 2017) AAMI/AR, Anaesthetic and respiratory equipment (US TAG for ISO/TC 121) GoToMeeting see Kavi calendar Meeting date/time: Wednesday 26 April 2017 10:00 to 11:30 am 1. Opening and roll

More information

STATUTORY INSTRUMENTS. S.I. No.?????????? of 2016

STATUTORY INSTRUMENTS. S.I. No.?????????? of 2016 STATUTORY INSTRUMENTS S.I. No.?????????? of 2016 EUROPEAN UNION (EQUIPMENT AND PROTECTIVE SYSTEMS INTENDED FOR USE IN POTENTIALLY EXPLOSIVE ATMOSPHERES) REGULATIONS, 2016. 1 STATUTORY INSTRUMENTS S.I.

More information

Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards

Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards (Approved by ANSI November 23, 2015 Replaces Previous Procedures Dated May 21, 2010) The

More information

IEEE Standards Association (IEEE) Policies and Procedures for: PES Electric Machinery Committee Working Groups (Revision 7)

IEEE Standards Association (IEEE) Policies and Procedures for: PES Electric Machinery Committee Working Groups (Revision 7) IEEE Standards Association (IEEE) Policies and Procedures for: PES Electric Machinery Committee Working Groups (Revision 7) Date of Approval: 4 May 2015 1 Electric Machinery Committee Working Groups Policies

More information

Bylaws of Petroleum Industry Data Exchange, Inc.

Bylaws of Petroleum Industry Data Exchange, Inc. Bylaws of Petroleum Industry Data Exchange, Inc. 1. Name and Location. Petroleum Industry Data Exchange, Inc. ( PIDX ) is an electronic business standards body principally located in Houston, Texas and/or

More information

6 Disagree (Drobnick, Dyson, Eblen, Gray, Mohla)

6 Disagree (Drobnick, Dyson, Eblen, Gray, Mohla) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Electrical Safety in the Workplace

More information

Policies and Procedures for Standards Development for the Smart Buildings, Loads and Customer Systems Technical Committee

Policies and Procedures for Standards Development for the Smart Buildings, Loads and Customer Systems Technical Committee Policies and Procedures for Standards Development for the Smart Buildings, Loads and Customer Systems Technical Committee Date of Submittal: July 20, 2016 Date of Acceptance: 5 February 2017 Smart Buildings,

More information

MEMORANDUM. NFPA Correlating Committee on Professional Qualifications. Subject: NFPA 1006 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Correlating Committee on Professional Qualifications. Subject: NFPA 1006 Proposed Tentative Interim Amendment (TIA) No. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Correlating Committee on Professional Qualifications

More information

TIA Procedures for American National Standards (PANS)

TIA Procedures for American National Standards (PANS) TIA Procedures for American National Standards (PANS) February 13, 2018 3 rd Edition Copyright 2018 by Telecommunications Industry Association 1320 N Courthouse Road, Suite 200 Arlington, VA 22201 USA

More information

Chapter 113 FIRE PREVENTION

Chapter 113 FIRE PREVENTION Chapter 113 FIRE PREVENTION ARTICLE I Fire Prevention Code 113-1. Adoption of standards. 113-2. Enforcing official. 113-3. Limits for certain uses established. 113-4. Amendments to standards. 113-5. Modifications.

More information

ANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO

ANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO ANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO Edition: January 20162017 Revision to: 2.3.1.2, 2.3.3, 2.5.5.5, A3 (all related) Copyright by the American National

More information

Standards Development Guide PE/SPDC Meeting Oct 14 th, Revised: 12 Oct, 2014

Standards Development Guide PE/SPDC Meeting Oct 14 th, Revised: 12 Oct, 2014 Standards Development Guide PE/SPDC Meeting Oct 14 th, 2014 Revised: 12 Oct, 2014 Table of Contents 1. Governance Structure a. Governance Structure pg 4 2. Standards Development Overview a. Five Basic

More information

Fire safety basics for hot work operatives. CFPA-E Guideline No 12:2012 F

Fire safety basics for hot work operatives. CFPA-E Guideline No 12:2012 F Fire safety basics for hot work operatives CFPA-E Guideline No 12:2012 F FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation

More information

Compliance & Enforcement Manual

Compliance & Enforcement Manual Compliance & Enforcement Manual April 2017 Version 2.3 BC Oil & Gas Commission 1 About the Commission About Us The BC Oil and Gas Commission is a singlewindow regulatory agency with responsibilities for

More information

ANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO

ANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO ANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO Edition: January 2018 Copyright by the American National Standards Institute (ANSI), 25 West 43rd Street, New York,

More information

Chairman's Decree No (6) of 2008 on the By- law for the preparation of the Yemeni Standards ( unofficial translation)

Chairman's Decree No (6) of 2008 on the By- law for the preparation of the Yemeni Standards ( unofficial translation) Chairman's Decree No (6) of 2008 on the By- law for the preparation of the Yemeni Standards ( unofficial translation) The Chairman: With consideration to : - Republican Decree on the Law No. (3) of 2006

More information

IPO Standing IP Committee Policy Manual

IPO Standing IP Committee Policy Manual 3 January 2017 IPO Standing IP Committee Policy Manual IPO President Kevin H. Rhodes Executive Director Mark W. Lauroesch Deputy Executive Director Jessica K. Landacre Intellectual Property Owners Association

More information

Key Considerations for Implementing Bodies and Oversight Actors

Key Considerations for Implementing Bodies and Oversight Actors Implementing and Overseeing Electronic Voting and Counting Technologies Key Considerations for Implementing Bodies and Oversight Actors Lead Authors Ben Goldsmith Holly Ruthrauff This publication is made

More information

Society of Motion Picture and Television Engineers Standards Operations Manual v.3 Approved by Board of Governors Effective

Society of Motion Picture and Television Engineers Standards Operations Manual v.3 Approved by Board of Governors Effective Society of Motion Picture and Television Engineers Standards Operations Manual v.3 Approved by Board of Governors 2014-10-24 Effective 2015-01-31 Table of Contents 1 Standards Purpose and Scope... 5 2

More information

TITLE 12 BUILDING, UTILITY, ETC. CODES CHAPTER 1 BUILDING PERMIT

TITLE 12 BUILDING, UTILITY, ETC. CODES CHAPTER 1 BUILDING PERMIT 12-1 TITLE 12 BUILDING, UTILITY, ETC. CODES CHAPTER 1. BUILDING PERMIT. 2. BUILDING CODE. 2. GAS CODE. 3. ENERGY CONSERVATION CODE. CHAPTER 1 BUILDING PERMIT SECTION 12-101. Permit required. 12-102. Compliance

More information

JEDEC SOLID STATE TECHNOLOGY ASSOCIATION

JEDEC SOLID STATE TECHNOLOGY ASSOCIATION JEDEC MANUAL JEDEC Manual of Organization and Procedure JM21R (Revision of JM21Q, November 2011) JULY 2015 JEDEC SOLID STATE TECHNOLOGY ASSOCIATION NOTICE JEDEC standards and publications contain material

More information

This manual represents a print version of the Online Filing Help.

This manual represents a print version of the Online Filing Help. by Arbitration Forums, Inc. This manual represents a print version of the Online Filing Help. Care should be tak en when referencing printed material as it may not represent the most up-to-date information

More information

Understanding Patent Issues During IEEE Standards Development

Understanding Patent Issues During IEEE Standards Development Understanding Patent Issues During IEEE Standards Development Patented Technology in IEEE standards This guide offers information concerning the IEEE Standards Association and its patent policies but does

More information

Understanding Patent Issues During IEEE Standards Development

Understanding Patent Issues During IEEE Standards Development 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Understanding Patent Issues During IEEE Standards Development Patented Technology in IEEE

More information