EVN PO\VER CORPORATION CENTRAL POWER NETWORK PROJECT MANAGEMENT UNIT. Add: 4 Hoar 78A DuyTan, Da Nang city Tel: : Fax: 0511.

Size: px
Start display at page:

Download "EVN PO\VER CORPORATION CENTRAL POWER NETWORK PROJECT MANAGEMENT UNIT. Add: 4 Hoar 78A DuyTan, Da Nang city Tel: : Fax: 0511."

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized / ffi EVNCPC NPMU EVN PO\VER CORPORATION CENTRAL POWER NETWORK PROJECT MANAGEMENT UNIT Add: 4 Hoar 78A DuyTan, Da Nang city Tel: : Fax: RURAL DISTRIBlJTION PROJECT (RD) PROJECT EA KAR-KRONG PAK 110 KV LINE AND SUBSTATION IN DAK LAK PROVINCE REPORT ON RESETTLEMENT PLAN (RP) Da Nang, June 2011

2 ~ EVNCPC NPMU CENTRAL POWER CORPORATION CENTRAL POWER NET\VORK PROJECT MANAGEMENT UNIT Add: 4 floor - 78A Duy Tan, Da Nang city Tel: ; Fax: RURAL DISTRIBUTION PROJECT (RD)... PROJECT EA. KAR-KRONG PAK 110KV LINE AND SUBSTATION IN DAK LAK PROVINCE REPORT ON RESETTLEMENT PLAN (RP) Maker: Deputy director of compensation department: Nguyen Thanh Phong lib Le Huy Cuong..,~:~-- Da Nang, June 2011 Le Nam Hai

3 Rural Distribution Project (RDJ - Dak Lak province SUMMARY TABLE OF CONTENT 1. Policy Framework 2. Project impacts 3. Compensation policies 4. Community participation and consultation 5. Complaint and grievances 6. Institutional Arrangements 7. Implementation schedule 8. Cost estimate 9. Information Disclosure CHAPTER 1: INTRODUCTION 1.1 Policy Framework 1.2 Objectives and suggestion 1.3 Dak Lak provincial project CHAPTER 2: SOLUTIONS OF MITIGATING THE LOSSES 2.1 Solution of mitigating project impacts at the designing stage 2.2 Solution ofmitigatingproject impacts at the implementation stage 2.3 Results achieved from the solutions of mitigating project impacts CHAPTER 3: PROJECT IMPACTS 3.1 Affected households 3.2 Impacts to land 3.3 Impacts to houses and structures in Right qfway 3.4 Impacts to crops and trees 3.5 Impacts to Ethnic Minorities CHAPTER 4: SOCIO-ECONO:MIC INFORMATION 4.1 Baseline Information 4.2 Naturalfeatures 4.3 Socio-economic features RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak J 10k V substation- June 20 J 1

4 Rural Distribution Project (RD) - Dak Lak province 4.4 Socio-economic situation of affected households CHAPTER 5: INSTITUTIONAL AND LEGAL FRAMEWORK 5.1 Institutional framework 5.2 The Definition of eligibility and terms to compensation 5.3 Resettlement and compensation principles 5.4 Eligibility to compensation 5.5 Compensation policy 5.6 Classification of impacts and Entitlement policy CHAPTER 6: INSTITUTIONAL ORGANIZATION 6.1 Institutional organization 6.2 Tasks, competencies and responsibilities 6.3 Courses of training and seminar.... CHAPTER 7: IMPLEMENTATION ARRANGEMENTS 7.1 Information disclosure 7.2 Compensation schedule 7.3 Procedure of Resettlement Plan implementation 7.4 Implementation schedule CHAPTER 8: COSTS AND BUDGET 8.1 Budget 8.2 Cost estimate for compensation 8.3 Cost estimate 8.4 Total costsfor Resettlement Plan implementation CHAPTER 9: COMMUNITY CONSULTATION AND PARTICIPATION 9.1 Objectives of Community participation and consultation 9.2 Community participation and consultation aithe stage resettlement plan preparation. 9.3 Community participation and consultation at the stage of resettlement plan implementation. 9.4 Resettlement information booklet (RIB) RP project report: The Ea Kar - Krong Pak } lokv line and Krong Pak } lokv substation- June 20}} 2

5 Rural Distribution Project (RD) - Dak Lak province CHAPTER 10: COMPLAINTS AND GRIEVANCES CHAPTER 11: MONITORING AND EVALUATION 11.1 Internal monitoring 11.2 Independent monitoring APPENDIXES RP project report: The Ea Kar - Krong Pak 1 10k V line and Krong Pak 1 10k V substation- June

6 Rural Distribution Project (RD) - Dak Lak province ABBREVIATION '" PPC DMS DPC DRC EVN GOV HHs IDA IMA(O) LURC RP EVNCPC CPNPMU CCs RIB ROW TIL USD VND WB PMU CPC DPs BSP Provincial People's Committee Detail Measurement Survey District People's Committee District Resettlement Committee Electricity of Vietnam Government of Vietnam Households International Development Association. Independent Monitoring Agencies (Organ) Land Use Right Certificate Resettlement plan Central Power Corporation Central Power Network Project Management Unit Clearance Committees Resettlement information booklet Right of Way Transmission Line United State Dollar Vietnamese Dong World Bank Project Management Unit Communal People's Committee Displaced Persons Bank of Social Policy RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak 1 10k V substation- June

7 Rural Distribution Project (RD) - Dak Lak province SUMMARY... By the agreement ofevn, Central Power Corporation and World Bank (WB), Dak Lak province took part in the Rural Distribution project (RD) financed by the WB. The project aims at: (a) rehabilitating, improving and enlarging power system of Dak Lak province in order to meet the demand of supplying electricity for the socio-economic development in years later, up to 2020; (b) increasing reliability and quality of power network, reducing energy loss on the network; (c) and improving the efficiency of power sales. The Dak Iuak Rural Distribution project (RD) component's scope is (i) constructing 110kV power network implemented by EVN. The implementation of the construction of the power network will not cause any land acquisition and resettlement at the large scale. Resettlement plan (RP) is aimed at handling the compensation issue for the project relating losses of land/assets and restoring the living standards of project's displaced persons at Ea Kar district and Krong Pak district, Dak Lak province. 1. Policy Frameworks and Waivers: Resettlement plan (RP) of the project component in Dak Lak province was established based on the policies of preparing project on compensation, resettlement and living standard rehabilitation for project displaced persons. Displaced persons with eligible title will include: (a) Those that have formal legal rights to land or other assets; (b) those who initially do not have formal legal rights to land or other assets but have a claim to legal rights based upon the laws of the country; upon the possession of documents such as land tax receipts and residence certificates; or upon the permission of local authorities to occupy or to use the project affected plots; (c) Those who have no recognizable legal right or claim to the land they are occupying. Persons covered under (a) and (b) are compensated for the land and other assets they lose, and other assistance. Persons covered under (c) are provided with RP project report: The Ea Kar ~ Krong Pak J JOkV line and Krong Pak IIOkV substation- June

8 Rural Distribution Project (RD) - Dak Lak province resettlement assistance in lieu of compensation for the land they occupy so as to achieve the objectives set out in this policy, if they occupy the project area prior to a cut-off dates defined in RPs. Persons who encroach on the areas after the cut-off date defined in RPs are not entitled to compensation or any other form of resettlement assistance. Similar regulations will also be applied to DPs whose income is affected by the project. 2. Project impacts: The project will impact: Permanent land acquisition for tower foundations, substations and temporary access roads. Permanent impacts to trees, crops and other assets at the locations of foundations, substations and ROW. Assets at the temporary access roads. All trees, crops and other assets around the locations of foundations and substations. Temporary land acquisition when implementing the project. Results of collected data are as follows: + There are 84 affected households (418 people), in which: + 84 temporary and permanent affected households due to land, trees and crops lost. + There are 06 affected households in terms of houses and architectural materials. + No impact on cultural heritages, preservation area or sensitive ones. During Community participation and consultation period, project-affected households all agree on compensation by cash for affected assets based on market price or replacement price. 3. Compensation policies: The cut-off date is May 17 th, 20ll. Compensation price is based on the market price/replacement price. Compensation at the replacement price to land, houses and perennial trees; compensation at the market price to annual crops. All displaced persons are provided with: RP project report: The Ea Kor - Krong Pok I JOkV line and Krong Pok 110kV substation- June

9 Rural Distribution Project (RD) - Dak Lak province (i) transportation assistance; (ii) resettlement assistance; (iii) training assistance or other restoration assistance. Those who lost more than 10% of total area of land-holding are provided with: (iv) assistance to living standard restoration and/or training courses. According to inventory of losses, among 84 project-affected households located in Dak Lak province, none of those shall be relocated. There is no affection caused to business (there are 03 households having houses and architectural materials affected in the ROW). Up to now, according to the preliminary Feasibility Study, the inventory of losses and survey results of losses show that there are no severe impacts to the majority of displaced persons, community and common assets so that there is no need to have development of economic restoration program. However, during the stage of project implementation, if there are any severe impacts to displaced persons, the related partners must correspondingly be responsible for ensuring that displaced persons can achieve full restoration of income standard and productive capacity to the pre-project levels. 4. Community participation and consultations: Implementation of participation and consultations will limit conflicts and delay of the project implementation. Resettlement plan will be developed in complying with the consultative opinions of Local Authorities and displaced persons for developing a high degree of their participation in resettlement plan and resettlement implementation as well as in other socio - economic benefits. Local Authorities and displaced persons will be consulted and participated in the line route direction, resettlement policies, implementation of resettlement plan, institution of complaint and grievances in supervising and evaluating the living standard restoration of displaced persons after project implementation. 5. Complaint and grievances: During the process of project implementation, all complaint and grievances of displaced persons will be handled under Project RPF and the Law of Vietnam. RP project report: The Ea Kar - Krong Pak llokv line and Krong Pak I IOkV substation- June

10 Rural Distribution Project (RD) - Dak Lak province All will be handled fairly and will be guided by the related Agencies on the procedure of complaint and grievances. The complainants will be free of charge for complaint and grievances. The Central Power Network Project Management Unit and Local Authorities will be responsible for supervising the process of resettlement plan implementation. Besides, an independent consulting agency will be responsible for independent supervision. This agency will be chosen by the Project Management Unit or the Central Power Network Project Management Unit and will sign a contract after the resettlement plan had been approved and supervision activities shall be carried out since the stage of starting project implementation. This Independent Monitoring Agency will make report on the results of their supervising activities to World Bank. 6. Institutional Arrangements: The Project Management Unit of EVN will be responsible for managing the activities on guidelines of investment and communication between Local Authorities, Power Corporations, Provincial People's Committee and World Bank. The correlative Central Power Network Project Management Unit will support the Power Corporation appointed by EVN in carrying out the duty of constructing power network system, including resettlement implementation. 7. Implementation schedule: The process of implementing Resettlement Plan will be as follows: - Resettlement plan consideration and approval - Employing Independent Monitoring Agency - Detailed measurement survey : July 2011 : August 2011 : August Compensation payment and site clearance : December Independent and Internal monitoring: During the period of project implementation. - Commencement : June 2012 All activities of resettlement plan will be completed before World Bank had approved the contracts for sub-projects. All changes of resettlement plan after being RP project report: The Ea Kar - Krong Pak 11 OkV line and Krong Pak 110kV substation- June

11 Rural Distribution Project (RD) - Dak Lak province disbursed by World Bank must be considered by the World Bank Office in Ha Noi before implementation. 8. Cost estimate The total cost estimate for compensation is about: 4,179,997,468 VND (or 203,902 USD). In Cost estimate for resettlement plan, there is also cost of inventory work, monitoring, management, independent and internal monitoring and 15% for contingency. The total cost estimate for the whole program is about: 5,112,506,575 VND (or 249,390 USD) (1USD~O.500VND). 9. Information disclosure The draft Resettlement plan will be publicly disseminated at the People's Committee of Dak Lak province and the Vietnamese Development Information Centre belonged to World Bank Office in Ha Noi. The Central Power Network Project Management Unit of Central Power Corporation (EVN CPC) will send the copies of the RP to host District/City, Ward/Commune. RP project report: The Ea Kar - KrQng Pak 1 10k V line and Krong Pak 1 lokv substation- June

12 Rural Distribution Project (RD) - Dak Lak province CHAPTER 1: INTRODUCTION 1.1. Policy framework The Rural Distribution project (RD) has a common policy framework of resettlement. This policy framework is based on World Bank's policy for involuntary resettlement (OP4.12) and State Law on Land Acquisition of the Government. The main objectives of the policy framework for compensation, resettlement and living standard restoration are to ensure that all project-affected households will be provided with compensation for their losses at the replacement price and the solutions of living standard restoration in order to improve, or at least, achieve full restoration of incomes and living standards to the pre-project levels. Also, the policy framework presents the principles, objectives, and regulation standard on displaced persons, as well as entitlements, legal policy framework, measures of compensation, life stability, characteristics of community participation and consultation and procedure of complaint and grievances in order to orient the compensation, resettlement and living standard restoration. Resettlement plan will be carried out based on this policy framework Objectives and suggestion: Objectives of resettlement plan are to define compensation and resettlement programs for the project on the basis of limiting as much as possible the number of project-affected households and assets. The program will present the articles for compensating and helping project-affected households in improving or at least preserving their living standards to the pre-project levels. Compensation and resettlement program is aimed at. mitigating the negative effects caused by the project and providing chances to project displaced persons for restoring their living conditions. Resettlement plan is carried o~t with displaced persons' participation and consultations. Resettlement plan is approved by Vietnamese Government and World Bank. RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak 1 10k V substation-june

13 Rural Distribution Project (RD) - Dak Lak province.. To ensure that the objectives of project resettlement plan are met, the compensation price must be at the level of the market price or replacement one. Project Development Unit, Central Power Network Project Management Unit, Provincial People's Committee, Independent Monitoring Agency will be responsible for supervising and readjusting the price of compensation (If necessary) at the moment of carrying out the Resettlement Plan in order to ensure that the compensation price is equal to the replacement value Project component in Dak Lak province: - The Ea Kar - Krong Pak 110kV substation and line consists of: + Installation of 110kV line route of27,576 m long. + Expansion ofea Kar 110kV substation. + Construction of Krong PakiiO kv substation with the total capacity of 2x25MVA. RP project report: The Ea Kar - Krong Pak 1 IOkV line and Krong Pak 1 IOkV substation- June 20ll 11

14 Rural Distribution Project (RD) - Dak Lak province CHAPTER 2: SOLUTIONS OF MITIGATING THE LOSSES 2.1. Solution of mitigating project impacts at the designing stage: Solutions of mitigating the impacts at the preparation stage are based on: a) The usage of appropriate designs; and b) The consultation organization in localities. The power network will be designed appropriately to mitigate the impacts to land, crops and avoid highly sensitive areas. The power line should be designed to avoid natural forests, residential areas, preserved areas and public projects. Also, it is designed to avoid to a minimum of getting across houses and other building projects. If getting across houses and structures, technical treatments should be considered so that the houses can be existed in the ROW. These measures will increase the safety and mitigate tree cutting and relocation. The line route is decided with the consultation of local inhabitants and Authorities. This work is carried out at the stage of establishing the investment. project. However, during the period of designing, the line route as well as the design can be readjusted to avoid houses and mitigate negative impacts. By consultation of local inhabitants, local authorities and line route correction, project's negative impacts will be mitigated Location of substation: The expanded position of Ea Kar llokv substation is constructed in the residential land of local households. However, these households moved out and this residential land is only used for fruit trees and industrial trees. The Krong Pak llokv substation is designed to locate on the land of perennial trees. The area of land acquisition does not have much impact on the total land area of this household. This substation is near th~ available traffic road. At least 2 to 3 alternatives for the substation's location should be prepared. The one that has the minimal negative impacts O!l environment will be chosen Selection of line route direction The survey and design of line route will be carried out in the way of avoiding market area, crowded inhabitants, Buddhist temples, protective forests, natural RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 1 JOkV substation- June

15 Rural Distribution Project (RD) - Dak Lak province preservation zone, and cultural heritage; and will not go in parallel with or nearby the communication system, gas area, arms depot, etc. In order to avoid or mitigate impacts, line route direction is selected to lie right in ROW along the available traffic-way, or crossing agricultural land, inhabited land or garden land. Some of line routes will be cornered from 30 to 60. However, if necessary, the rudder angle will be 90, the line route direction must cross the road many times so as to prevent impacts on houses and structures. Selected line location will be less than Han far from existing traffic-ways. Hence, existing traffic-ways will be used while the building of new roads is limited. For each project, at least 2 or 3 alternatives of line route directions should be considered and the optimal one will be chosen Technical solutions: The average distance between towers of the line route will be from 200m to 300m. The positions at bare land will be prior to set up towers. Selecting different dimensions for the foundations so that they will be suitable to the selected positions. Temporary foundation area will be 100m 2 for each tower foundation, 787m 2 for the expanded position of 11 OkV Ea Kar substation and 5,516m 2 for each substation. To mitigate the impacts, temporary access roads will be constructed at the area of ROW (along the road) Community participation and consultations: At the stage of project preparation, the Central Power Network Project Management Unit will cooperate with consultants to carry out the community participation and consultations with Local Inhabitants and Authorities in selecting substation location and line route direction. All valuable feedbacks from Local Inhabitants and Authorities were considered while designing Solution of mitigating project impacts at the implementation stage The best solution and organization for project implementation were already considered. For instance, the implementation will be started after the harvest time and completed before new cultivation crop. In order to reach these objectives, working in shift should be carried out in certain days to shorten the period of causing impacts by means of livelihoods, access to income sources. Workers' RP project report: The Ea Kar" Krong Pak I 10k V line and Krong Pak I 10k V substation" June

16 Rural Distribution Project (RD) - Dak Lak province camps during implementation should be located in bare land or uncultivated public land near the office of People's Committee of communes, not in residential area. During the period of project preparation: Line route is decided with the consultation of Local inhabitants and Authorities. This is carried out at the stage of establishing the investment project. However, at the technical detail designing stage, line route as well as design project will be readjusted to avoid houses and mitigate impacts. By consultation of local inhabitants, local authorities and line route correction, project negative impacts will be mitigated. During the period of project implementation: There are 4 mitigation principles during the period of project implementation: 1) The site clearance should be done by manual equipment and all vegetation that is lower than required minimum height should be saved. 2) Completion of construction as fast as possible. 3) During the period of project construction, agricultural activities must be considered, for instance, construction should be carried out at the end of the harvest season and at the beginning of a new crops. 4) Finally, if it is necessary to build camps for workers, public unused land should be mobilized. According to the report, each commune has a certain amount of unused public land for camps and building materials storage yard. This will considerably mitigate the impacts on land and vegetation. During the period of operation: The maintenance and protection of line route are very necessary to ensure the minimum safety distance during the period of operation. On the other hand, trees growing higher than power lines must be cut down for safety Results achieved from the solutions of mitigating impacts At the stage of project preparation, at least 2 or 3 alternatives of line route directions as well as substation locations should be considered to choose the optimal one that causes the least impacts. RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak 1 10k V substation-june 201 J 14

17 Rural Distribution Project (RD) - Dak Lak province... The total affected landholding is 1, 172,862m 2 However, the project only affects 419,943 m 2, in which 17,103 m 2 will be pennanently acquired; accounting for 1.46% of the totalland area and 402,840 m 2 is temporarily acquired in the ROW. No impacts to business. No impacts to natural preservation zone, cultural heritage and Buddhist temples. In the sphere of impacts, losses are mostly inconsiderable; all affected households select to be compensated in cash at the replacement price. Resettlement arrangement is not necessary. RP project report: The Ea Kar - Krong Pak J J OkV line and /(rong Pak J J OkV substation- June

18 Rural Distribution Project (RD) - Dak Lak province CHAPTER 3: PROJECT IMPACTS Affected Households (HHs): Individuals, households or organizations who suffered from the project permanent or temporary impacts resulting in land acquisition are the eligible owners of land and assets, tenants whose land and houses located in ROW, at the positions of tower foundations, substation basement as well as at the temporary access roads. According to the survey's result, the project will impact: Total area of land affected by the project ,88mA! 84HHs Number of project affected households 418 people Number of resettlement households None Number of households whose houses and structural 06HHs materials are affected Total area of residential land lost 174,24mr-- - Total area of agricultural land lost 8.272,64 rna! - % of agricultural land lost per total area of landholding 0,50% - Temporary land (for ROW) m 2 Other affected assets None - Affected house and structure (in ROW) 186n?- Affected Residential land (in ROW) 1,657 m l Impacts on business, land and other assets None - Impacts on the living of tenants None - Impacts on sensitive areas None -- - Impacts on public areas None Impacts on human beings: There are 84 project-affected households ( 418 people), in which: -Total number of households permanently loses less than 10% of total productive landholding: 84 HHs ( 418 people) RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak 110kV substation- June

19 Rural Distribution Project (RD) - Dak Lak province -Total number of households permanently loses more than 10% of total productive landholding: None. none. -Total number of households has a partial loss of their structures in the ROW: -Total number of households has loss oftreeslcrops: 84 HHs -Total number of households has loss of business: None. -Total number of resettlement households: None Impacts on assets: Permanent affected land Residential land Productive land Irrigation land Temporary agriculture land (in ROW) Temporary residential land (in ROW) Permanent losses of sub-structures Temporary losses of houses, architectures (in ROW Permanent losses of crops Permanent losses of trees Temporary losses of trees Temporary losses of crops Main impact analysis: :17,103m 2 1,487m 2 14,816m 2 800m 2 : 402,840m 2 2, 100m 2 None : 152m 2 2,400m 2 4,414 trees 22,645 trees 75,300m 2 84 households will suffer from land lost with the total area of 17,103 m 2, among which 84 households lose an area of 10,800 m 2 for 108 tower foundations (76 households lose agricultural land with an area of 9,300 m 2 and 06 households lose residential land with an area of 700m 2 and lose irrigation land with an area of 800m 2 under the management of the Communal People's Committee). On an average, each household loses 130m 2 for each tower substations, accounting for low percentage in the total area of agricultural and residential land; 02 households lose an area of 6,303m 2 to build substations (01 household suffers from land lost with an area of 787m 2 for the expansion of Ea Kar substation and 01 household loses agricultural land with an area of 5,516m 2 for the new installation of Krong Pak substation). Losing some parts of agricultural land and residential land does not RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak 1 JOkV substation- June

20 Rural Distribution Project (RD) - Dak Lak province have negative impacts on the local people daily life. Affected land on ROW is mostly agricultural land, and irrigated land. The area of affected residential land is only 2,lOO m 2 Table 3.1. Total project affected households Communes Number of projectaffected households Number of people Ea Kar district Ea Dar district Ea Kar town eu Hue commune Krong Pak district Krong Buk commune 22 lo7 Ea Phe commune Hoa An commune Phuoc An town I TOTAL It is noted that after project approval and before project implementation, a Detailed Measurement Survey (DMS) will be carried out. This DMS will consider the impacts caused by power line direction change or other technical changes for mitigation of losses. In this DMS, the number of affected households alld assets will be adjusted due to possible change of the affected land Impacts of land and assets The total affected land area is 419,943m 2 However, the project will only require 17,103 m 2 to build tower foundations and substation, in which the land acquisition for ROW is 402,840m 2 Table 3.2 Total area of project-affected land Agricultural Communes land (m 2 ) Irrigated land, river land (m 2 ) (m 2 ) Residential Total (m 2 ) I RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 1 JOkV substation- June

21 Rural Distribution Project (RD) - Dak Lak province Ea Kar District 157,730 none 3, ,317 Ea Dar commune 25,700 none 2,587 28,287 Ea Kar town 54,730 I none ,330 Cu Hue commune 77,300 none ,700 Krong Pak district 223,526 35,100 none 258,626.. KIong Buk commune 103,400 none none 103,400 Ea Phe commune 47,800 35,100 none 82,900 Hoa An commune 19,600 none none 19,600 Phuoc An town 52,726 none none 52,726 TOTAL 381,256 35,100 3, , Permanent impacts of land: Permanent land acquisition consists of: - Land, trees and crops in the area of tower foundations and substations. - All trees in the area of tower foundations and high trees in ROW must be cut down (the distance from the top of trees to conductors must be less than 3m and all trees outside ROW but in the danger of touching conductors in case of tree falling down). - All structures and trees are impacted while construction. Table Total area of permanent acquired land for power network system (m 2 ) Agricultural Communes land (m 2 ) Irrigated land, river (m 2 ) Residential Total (m 2 ) land (m 2 ) Ea Kar district 3,300 none 1,487 4,787 Ea Dar commune 400 none 1,187 1,587 EaKartown 1,100 none 200 1,300 Cu Hue commune 1,800 none 100 1,900 Krong Pak district 11, none 12,316 Krong Buk commune 2,600 none none 2,600 RP project report; The Ea Kar - Krong Pak llokv line and Krong Pak I 10k V substalion- June

22 Rural Distribution Project (RD) - Dak Lak province Ea Phe commune 1, none 2,300 Hoa An commune 600 none none 600 Phuoc An town 6,816 none none 6,816 TOTAL 14, ,487 17, Temporary impacts ofland: - The land is acquired temporarily during project implementation along the ROW. - Trees, crops around the area of tower foundations, substations and temporary access roads. Project impacts on assets will be listed in the following table: Table Total area of temporary land acquisition for power network system Commune Agricultural land (m 2 ) Irrigated land, river (m 2 ) Residential land (m 2 ) Total (m 2 ) Ea Kar district 154,430 none 2, ,530 Ea Dar commune 25,300 none 1,400 26,700 Ea Kar town 53,630 none ,030 eu Hue commune 75,500 none ,800 Krong Pak district 212,010 34,300 none 246,310 Krong Buk commune 100,800 none none 100,800 Ea Phe commune 46,300 34,300 none 80,600 Hoa An commune 19,000 none none 19,000 Phuoc An town 45,910 None none 45,910 TOTAL 366,440 34,300 2, , Impacts on houses and other structures: According to statistics, the line route has 01 temporary house, 02 piggeries, 01 cow-house, 01 temporary house and 02 watch towers in the construction site of the RP project report: The Ea Kar- Krong Pak 11 Ok V line and Krong Pak 110kV substation-june

23 Rural Distribution Project (RD) - Da! La! province substation and in ROW as written in Article 6, Decree 106/ND-CP and Decree 81/ND-CP of Vietnamese Government about houses, constructions in the safe power network corridor. 01 watch-tower in ROW doesn't have to be removed. The tower distance is under technical solutions to remain in the safe power network corridor as written in Article 6, Decree 106/ND-CP and Decree 81/ND-CP of Vietnamese Government about houses, constructions in the safe power network corridor. Any resettlement demand will be compensated as written in Decrees 197 fcp and 69fCP. Table 3.3 Total of houses, structures in affected ROW Communes Watch tower, breeding Temporary house (ml) facility (m 2 ) Ea Kar district Ea Dar commune none 8 Ea Kar town none 56 Cu Hue commune Krong Pak district none 21 Krong Buk commune none 21 Ea Phe commune none none Hoa An commune none none Phuoc An town none none TOTAL Impacts on standing crops and trees: According to statistics and investigations, there are 84 affected households due to 1he cut down of trees/crops (4,414 trees and 2,400 m 2 of crops). Affected crops and trees consist of: 1) Standing crops and trees located in the expected area of tower foundations and substation; 2) All trees in the area of tower foundations and high trees in the corridor of power network. Those are the trees that their tops to conductors are less than 3m (when trees develop at the maximum height) and in the danger of touching conductors when they fall down. RP project report: The Ea Kar - Krong Pak llokv line and Krong Pak IlOkV substation- June 201 I 21

24 Rural Distribution Project (RD) - Dak Lak province The coffee trees in ROW will not impact on the power network operation or power safety in future. However, during implementation and site clearance m ROW, any affected tall trees will be compensated (30%/tree) It is noted that after project approval and before project implementation, a Detail Measurement Survey (DMS) will be carried out. During the period of DMS, it is necessary to adjust project-affected households and redefine the total numbers of affected trees. This DMS will also consider the impacts that are caused by power line direction change or other mitigation of losses. Table 3.4. Number of impacted standing crops and trees' Unit: Tree (crops: m 2 )... 0 I ::I &:I <= "0 0 "E - <= ;... b.il 0 11# &:I J:: <= <= u c.... ~ ~ &:I ::I.c... 0 <= a.. C. fill C. U 0 ;... ::I :g c. e ::I <= <= ~ ~ -< <= U ~ I-,) Commune b.il <= &:I a.. 0 <= '" ~ ~ Ea Kar district Ea Dar commune EaKartown eu Hue commune Krong Pak district 22 * * * Krong Buk commune Ea Phe commune Hoa An commune Phuoc An town TOTAL Commune &:I 0 "i:' <= &:I e ~ ~ "0 ~ ~ <=... <= ~ a.. "0 a..... a.. <= <=... a.. fill ::I <= ::I = 0 C..c u fill U 0 e... 0 cs "-' a.. e - <= u ::I U &:I <= "-' ~ <= U &:I u ~ c.;..; ~ rj1 0 ~ ~ ~ -< ~ u 8 Ea Kar district , i RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 1 10kV substation- June 201 I 22

25 h Rural Distribution Project (RD) - Dak Lak province.. Commune =... <:).'-'-, = -.:-:~' <:) "i:' <:) <:'IS.-... Qi Qi "0 = I Qi Qi <:'IS e... Qi.5 "0 0:1 0:1 '"'... 'JJ '"' <:).- '"' c..,.q <.l rn <:'IS = <.l <:) e... <:) e -- <:'IS <.l ~ Qi U '"' CJ ~ ~ - ~ = Qi.o::.i < ~ 00 C <:) = U = 0: u Ea Dar commune ,967 - Ea Kar town ,172 - Cu Hue commune , Krong Pak district ,820 12,336 1,800 Krong Buk commune , Ea Phe commune ,330 1,000 Hoa An commune ,478 - Phuoc An town ,240 3,571 - TOTAL ,510 22,642 2, Impact to Ethnic Minorities The project has impact on 42 ethnic minority households CEde, Nung, and Dao: 244 people). Most of them are farmers; some are workers for rubber and coffee farm. The project does not have much impact on the ethnic minority households due to the small percentage of land acquisition of foundations and substations in comparison to the total land area. Through consultation, all ethnic minority households agree on the project and require to be compensated in cash at replacement price under the province's regulation. Table 3.5. Communes of affected ethnic minorities Commune Number of Number of affected HHs affected people Ethnic group Ea Kar district Ede Ea Dar commune Ede EaKartown Ede Cu Hue commune Ede Krong Pak district Dao, N ung, Ede RP project report: The Ea Kar - Krong Pak 1 10k V line and Krong Pak 11 OkV substation- June

26 Rural Distribution Project (RD) - Dak Lak province Krong Buk commune Dao, Nung, Ede Ea Phe commune Nung, Ede Hoa An commune Phuoc An town TOTAL Dao, Nung, Ede.. RP project report: The Ea Kar - Krong Pak 1 JOkV line and /(rong Pak 1 JOkV substation June

27 Rural Distribution Project (RD) - Dak Lak province CHAPTER 4: SOCIO-ECONOMIC INFORMATION 4.1. Baseline information: This resettlement plan is based on the statistics of project displaced households for building the power network in Ea Kar District and Krong Pak District, Dak Lak province. The Central Power Network Project Management Unit of EVN CPC had cooperated with Local Authorities in counting up the affected land, assets and surveying the affected households from May 12th, 2011 to May 17 th, Land acquisition and resettlement requirements are calculated on the basis of detailed data of land use and design. Census and other detailed measurement survey are necessary during the project implementation to define precisely the projectaffected households. Hence, resettlement plan will be updated and current information will be reflected. The socio-economic survey on project-affected households is aimed at defining the characteristics of affected community, evaluating the population, houses' conditions, main economic activities and displaced persons' living standards, etc. Detailed interviews on resettlement plan of affected groups are carried out in order to collect data on: (i) demand of detailed resettlement of serious displaced peasants and vulnerable groups; (ii) concerns and selections of affected households, and (iii) solutions of mitigating the adverse impacts Natural features: Dak Lak province is located in the center of high land area. This land is famous for its coffee, rubber and festivals. Dak Lak lies in the longitude from l07 28'57"E and from 12 9'45" '06" N. It is adjacent to Gia Lai to the North, to Lam Dong province to the South, to Phu Yen and Khanh Hoa province to the East and to Cambodia and Dak Nong province to the West Terrain: The terrain here is large with a majority of area lies in the West of Truong Son range, lower from the South-East to the North-West. There are mountains, plains, valleys and productive land. RP project report: The Ea Kar - Krong Pak 1 IOkV line and Krong Pak 1 10k V substation-june

28 Rural Distribution Project (RD) - Dak Lak province Weather and climate: Annually, there are two seperate seasons. The rainy season is from May to Octorber, they dry season is from November to April of the following year. The average temperature is from C. The average rainfall is from 1,600mm to 1,800mm, suitable for many trees Natural resources and minerals: * Land resources: The total natural land area is km 2, among which is the grayish group, red bazan and others soil groups. The high homogeny of the natural and actual fertilization of the soil groups and soil types is very good for all types of trees. * Rivers and streams: Dak Lak province has a variety of rivers and streams system. There are two main river systems in the region: the Srepok and the Ba, hundreds of lakes and 833 streams of more than 10km long that create a dense river system for Dak Lak. * Forests: Dak Lak has a forest area of 608,886.2 ha, among which the natural one accounts for 594,488.9 ha, planted forest accounts for 14,397.3 ha. The forest coverage reaches 46.62%. Forests are equally allocated in every commune. The forests here are very rich and have many special trees that have both economic and scientific value. There are also many endangered species of animals that appear in the red book nationally and internationally. * Mineral resources: Dak Lak has a variety of mineral resources. There are many mineral fields with different capacity and many valuable minerals such as: kaolin clay, brick clay, gold, lead, phosphor, peat coals, gems, devitrified stones, building stones and sand, etc in the province Socio-economic features: Population: In 2009, the population of Dak Lak province is 1,728,380 people, among which the urban population accounts for 22.5%, the rest mainly live in rural area, accounting for 77.5%. The population in Dak Lak consists of 44 ethnic groups, among which the Kinh people account for 70%; the ethnic minorities such as Ede, M'nong, Thai, Tay, Nung accounts for nearly 30% of the total population. The RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 1 JOkV substation- June

29 Rural Distribution Project (RD) - Dak Lak province average population density in the province is 132 peoplel km 2, unequally allocated in the district areas but live mainly in Buon Ma Thuoc city, other towns and districts. The ethnic minorities live in communes in the province, mainly in mountainous and remote communes.," Economy - Commerce - Tourism: Dak: Lak: is located in the center economic zone of the Vietnamese high land area. The province has a rapid economic development and has all the necessary conditions to become an industrial province in The economic agriculture here basically turns into the commodity economy, planting and breeding develops quickly that improve the local benefits. Industrial production and small industry develop quickly. GDP in 2010 reach 12,813 billion VND, increasing 12.2% in comparison to 2009, in which: - Agriculture-Forestry-Aqua culture is expected to reach 6,367 billion VND, increasing 5.1% in comparison to 2009 (expected to increase 5-6%); - Industry-construction is expected to reach 2,253 billion VND, increasing 19% (expected to increase 28-30%); Industry is expected to reach 1,699 billion VND, increasing 20% (expected to increase 22-23%, about 1,710 billion VND) - Services reach 4,193 billion VND, increasing 20.8% (expected to increase %). Economic structure (at current price): Agriculture-forestry-aqua culture: 53.2%; Industry-construction: 18.4%; services: 28.4% In tourism, in 2010, the total number of tourists reaches 200,000 trips, accounting for 54.14%, increasing 11.73% in comparison to the same period in 2009, among which international tourists reach 18,500 trips, domestic tourists reach 181,570 trips. The total input is expected to be 143 billion VND Socio - Economic development plan of the years of : In future, the socio-economic development plan of Dak Lak province is to "Focus on industrialization and modernization in rural and urban development rapidly and stably. Develop economy, ensure social fairness, protect the environment and enhance the mental and spiritual life for the local people". Focus RP project report: The Ea Kar - Krong Pak J JOkV line and Krong Pak J JOkV substation- June

30 Rural Distribution Project (RD) - Dak Lak province on industrial development and exploit the potential of hydro power; exploit the advantages in natural resources to enhance the industry of agriculture and forestry processing such as the processing of rubber, cashew, coffee, cotton and others. Invest in infrastructure. This is the basic factor that creates premise for the developing process and also is the crucial point of the development and scheming progress in the next years * Goal until 2020: - The specific economic goal until 2020 is to increase the total GDP 3.03 times more than that of2010, the average income per capita reaching million VND. Try to reach the speed of economic development at about 12.5%-l3% in the period of , in which: Industry and construction increase 19-20%; agriculture and forestry reaches 4.4%-4.5%; services reach l3-14%. - The social goal is to reduce the percentage of natural population increase in 2020 down to 1.1 %, appropriately solve the social issues: no poor household in 2020, reduce the percentage of malnutrition children down to 15%, increase the percentage of HHs with power supply up to 100%; ensure 100% clean water for local people. - Environmental goal: Planting trees on bare land, increase the percentage of forest coverage up to 54%. Gradually apply the clean technology into the economic sectors of the province Socio-economic situation of affected households: The project is implemented on the area ofea Kar and Krong Pak district Ea Kar district: The project of Ea Kar district affects the Ea Dar commune, Ea Kar town and eu Hue commune. It is located in Dak Lak province to the South East with an area of 1,037.47km2, with the total population of 141,724 people, l37 people/km 2 The total production value in 2010 is expected to reach 1,869 billion VND; accounting for 100% under the resolution of the district people's committee; increasing 13.5% in comparition to the result of 2009) In which: RP project report: The Ea Kar - Krong Pak llokv line and Krong Pak llokv substation- June

31 Rural Distribution Project (RD) - Dak Lak province + The production value of agriculture and forestry is expected to reach 982 billion VND, accounting for 53% of the communal economic structure, increasing 9.1% in comparison to that of2009, reaching 100% of the plan. + Agricultural production and construction value is expected to reach billion VND, accounting for 29%, increasing 21% in comparison to that of 2009, reaching 100% of the plan. + The wholesale turnover in services and commerce in the district area reaches 2,664 billion VND. The increasing value is expected to reach billion VND, accounting for 18%, increasing 18% in comparison to that of 2009 and reach 100% of the plan. + The average income per capita in 2010 is expected to reach 14.8 million VND; the grain yield per capita is expected to reach 1,007 kg/person/year. * The socio-economic development in 2011: The main objective, task and plan in 2011 are: + Economic criteria: The total production value reaches: 2,106 billion VND, increasing from 12% to 13% in comparison to that of 2010; in which: for 50%. - Agriculture: 1,056 billion VND, increasing from 7.5% to 8%, accounting - Industry and construction: 655 billion VND, increasing from 12% to 13%, accounting for 31 %; - Service and commerce: 395 billion VND, increasing from 15% to 16%, accounting for 19%; - The income per capita reaches 16.2 million VNDI person/ year; - Total area under cultivation: 67,590 ha; - Total food capacity: 160,000 tons (paddy 54,000 tons, com 106,000 tons), per capita: 1,1 OO/kg/year; - Plant forest: 820 ha and plant trees in each HH, increasing the forest coverage up to 47%; - The total input of Governmental budget reaches: 88.2 billion VND, among which taxes and other expenses accounting for 74 billion VND; income through RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 1 10k V substation- June

32 Rural Distribution Project (RD) - Dak Lak province financial methodology method: 13.8 billion VND, income through Governmental budget management: 0.4 billion VND; - Total expense of local budget: billion VND; in which the expense of investment and development under the local authority management reaches billion VND; regular expense: 217,808 billion VND; budget contingency: 6.68 billion VND; expense from management income through Governmental budget 1.4 billion VND; expense for national target program: 2.5 billion VND. After carrying out the social condition survey of the affected HHs, here is the result: Average number of people per household: 5 people, in which male accounting for 52.6%, female accounting for 47.4% - Householder : Male - Education level: + Illiterate, below school age and primary school : 62.5% + Completion of secondary school : 21.8% + Completion of high school : 15.7% - Occupation : mainly agriculture - Average income : 10,657,000VND/year/person - Living conditions: + 100% HHs use clean water + 100% HHs have television and other electrical appliances Krong Pak district: The Krong Pak project affects Krong Buk commune, Ea Phe commune, Hoa An commune and Phuoc An town. Krong Pak district is adjacent to Buon Ma Thuoc to the West, to eu M'gar district to the North-West, to Buon Ho district to the North, to Ea Kar to the East, to Krong Bong district to the South-East. In 2010, the economic development of the commune reaches 8.3%, in which agriculture and forestry production increases 6%, industry and small industry increases 12.2%, services and commerce is approximately 7%. After carrying out the social condition survey of the affected HHs, here is the result: RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak I JOkV substation- June

33 Rural Distribution Project (RD) - Dak Lak province - Average number of people per household: 5 people, in which: Male accounts for 50%, female accounts for 50% - Householder : Male - Education level:.. + Primary school : 55.3% + Completion of secondary school : 21.8% + Completion of high school : 22.9% - Occupation : mainly agriculture - Average income : 10,789,000 VND/year/person - Living conditions: + 100% HHs use clean water + 100% HHs have television and other electrical appliances 4.5. Census and declaration: The basic information for project affected household consists of: (a) The names and number of people in a household (b) The number and total area of entire affected land (c) The number, type and total area of agricultural land lost (d) The number, type of crops and cultivated crops lost (e) Loss of business including buildings, land and other fixed assets (f) Profitable property lost: Percentage oftotal assets lost. (g) The number and classification of other fixed assets affected by each sub-project (h) Temporary loss of Profitable property Enclosed inventory forms (See Annex 2) 4.6. Resettlement Plan - Basic information for RP include: (a). Census and declaration (see above); (b) Detailed socio economic investigation ofdp: Age, gender, ethnicity, educational level, occupation, income, and total household income. - Inventory forms on socio - economic factors attached in Annex 3. -The entitlements of the project affected households are calculated based on the above basic information. A list of entitlements is shown in Annex 4. RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak J JOkV substation-june 201 J 31

34 Rural Distribution Project (RD) - Dak Lak province CHAPTER 5: INSTITUTIONAL AND LEGAL FRAMEWORK 5.1. Legal framework: The World Bank's policy on Involuntary Resettlement (OP 4.12) and Vietnamese laws about clearance and compensation will be applied Policies and Legal framework of Vietnamese Government: Policies and Legal framework of Government: - The 2003 Land Law enacted by National Assembly of Vietnam on November 26 th, 2003; - Decree No ND-CP issued on October 29 th, 2004 guiding the implementation of the Land Law. - Decree No 197/20041ND-CP issued on December 3 rd, 2004 on compensation, support and resettlement when land is recovered by the state. This Decree guides the implementation of compensation for land, compensation for assets, support policies and resettlement relating to land acquisition. - Circular NO 116/2004m-BTC, issued on December 7 th, 2004 by the Ministry of Finance provides guidelines to implement the Decree NO 197/20041ND CPo - Decree No 188/20041ND-CP issued by Government of Vietnam on November 16 th, 2004 on methods to determine land prices for different types of land. This Decree set forth the minimum and maximum prices of different types and categories of land covering the whole country. These prices are established for the purpose of land acquisition by the Government, tax value for transfer of land use rights, tax for leasing government land and public purposes. - Decree 84/20071ND-CP issued on 2515/2007 by Government regulating on granting additional land use right certificates, land acquisition, implementation of land use rights, procedures of compensation, assistance and resettlement when the Government acquisition the land and solve land claims. - Circular No 114/2004m-BTC issued on November 26 th, 2004 by the Ministry of Finance guiding the implementation of the Government's decree NO 188. This Circular elaborates in details the methodologies (for instance, direct compensation method and income method) for the land price verification of RP project report: The Ea Kar - Krong Pak 1 JOkV line and /(rong Pak 110kV substation- June

35 Rural Distribution Project (RDJ - Dak Lak province different types and-categories of land in different regions/areas to ensure the replacement cost. - Decree No 69/20091ND-CP on August 13th, 2009 of the Government on adding the scheme of land use, compensation, assistance and resettlement. -Circular No 14/2009fIT-BlNMT on January 01st, 2009 by ministry of Environment and Resources defming in details about compensation, assistance, resettlement and the process and procedure of land aqquisition, land transfer, land for lease. - Decree No 106/20051ND-CP issued on August 17 th, 2005 by Government of Vietnam regulates and guides in details some articles of Electricity Law on the protection of the high voltage power networks. - Decree No ND-CP on October 12th, 2009 of the Government on amending and supplementing some articles of Decree NO 106/20051ND-CP on August 17, 2005 of the Government stipulating information and guide the implementation of some articles of Electricity Law on protection of public safety and the high-voltage power network. - Circular No. 03/201 OfIT -BCT on January 22nd, 2010 of Ministry of Industry and Commerce on the protection of the high voltage power network. Current compensation regulations of Dak Lak Provincial People's Committee - Decision No /QD-UBND on December 31th, 2010 of Dak Lak people's committee about regulations on price of types of land in Dak Lak province area. - Decision No. 02/2010/QD-UBND on January 22th, 2010 of the People's Committee of Dak Lak on compensation, assistance and resettlement when land acquisition in Dak lak being carried out by Government. - Decision No /QD-UBND on Octcber 21th, 2009 of Dak Lak people's committee about regulating the price of build houses in Dak Lak province area. - Decision No TQD-UBND on January 07th, 2011 of Dak Lak people's committee about regulating the compensation price of plants, farrm RP project report: The Ea Kar - Krong Pak llokv line and Krong Pak II0kV substation- June

36 Rural Distribution Project (RD) - Dak Lak province produce on land when land acquisition in Dak Lak being carried out by the Government. The price of land is calculated based on the average price of free market. Under free market, land prices between cities, zones in the same district, between front roads and rear ones are different from one another. This point contributed to defining the price framework for the right of land use and compensation for land that is acquired by State and also defining framework of organization for defining own framework of land price which is within the common price framework of the whole country. With the price framework of the region, People's Committee of province/city has the right of applying adjustment coefficient. People's Committee of Districts, People's Committee of communes is responsible for defining the area of affected land and affected structures as well as eligibility to compensation payment. Some essential contents in Policies and Legal framework of Vietnamese Government: The 2003 Land Law enacted by National Assembly of Vietnam on November 26 th, 2003, provides that: "the persons with land to be recovered shall be compensated with the assignment of new land of the same use purposes; if having no land for compensation, shall be compensated with the land use that is equivalent to the value at the time of recovery. Provincial People's Committees and Centrallyrun Cities shall elaborate and execute resettlement projects before the land recovery for compensations with dwelling houses, residential land for persons having residential land recovered and having to move their places of residence. The resettlement zones must have development conditions being equal to or better than the conditions in the former places of residence. In cases of having no resettlement zones, the persons having land recovered shall be compensated with money and given priority to purchase or lease dwelling houses under the State's ownership, for urban areas; be compensated with residential land, for rural areas. The infrastructure condition in resettlement area has to be equivalent to or better than the condition in previous places. In case there is no land for resettlement, people who sufffer from land acquisition will be compensated in cash and be prior to buy State's houses in urban area, compensated by residential land in rural areas. In case of recovering RP project report: The Ea Kar - Krong Pak 1 IOkV line and Krong Pak J JOkV substation- June

37 Rural Distribution Project (RD) - Dak Lak province land of households and/or individuals, that is directly engaged in production, but having no land for compensation for continued production Guideline OP 4.12 of World Bank According to OP 4.12 guideline of World Bank on Involuntary Resettlement, all the project affected persons (PAP's) who lose property will be compensated in replacement price and will be provided with restoring methods to help them improve or at least remain their living standards and incomes to the pre-project level. The acquisition of land and other assets, and resettlement will be minimized to possible extent. All project affected households that are listed in the inventory tables will be compensated for their affected assets. Individual project affected households encroaching on the areas after the cut-off date will be considered to be illegal and not to be compensated. In accordance with the OP 4.12 guideline of World Bank, compensation price will be at replacement price for land, houses, trees; and market price for crops. According to WB policies, measures required to ensure that resettlement will have positive results include: Consulting with potential DPs on feasible measures for resettlement and rehabilitation; Providing DPs with options for resettlement and rehabilitation; Enabling their participation in planning and selecting these options; Providing compensation at replacement cost for losses; Choosing resettlement site that ensure benefits and services as the replaced sites. Providing allowances, training and income assistance to support easy resettlement; Identifying vulnerable groups and providing special assistance to them; Establishing an institutional and organizational structure that supports this process to a successful end Required Waivers RP project report: The Ea Kar- Krong Pak l/okv line and Krong Pak 1l0kV substation-june

38 Rural Distribution Project (RD) - Dak Lak province In order to meet the requirements of the World Bank's OP 4.12 on Involuntary Resettlement, some articles in various Vietnamese laws and regulations which do not ensure compensation at replacement cost or articles about legal rights but no recovery or assistance to households without proper land paper, will be waived. The articles of law and regulations that will be waived are mentioned below: Eligibility for compensation and! or assistance - Decree 197 and 69 Article 7 of Decree 197 (in case of land being recovered without compensation) stipulates that any person whose land is recovered and who has not meet one of the conditions of Article 8 of this Decree, or who violates the land, or who violates the protection corridor, or who illegally occupies land, shall not receive compensation when the state recovers the land. In case of necessity, the Provincial People's Committee shall consider and decide on a case-by-case baseline. Articles 18, 19 and 20 of Decree 197 and Article 24 of Decree 69: Houses and structures on non-compensated land that are eligible to land compensation without violating land in ROW will be assisted at 80% of replacement cost. Houses and structures on non-eligible-for-compensation land, which do not violates land or land in ROW will not be assisted. If necessary, the Provincial People's Committee will consider specific cases. Articles 20 and 22 of Decree 69: Project displaced persons who lose more than 30% of productive land will be entitled to living stabilization and job training. To ensure that the objectives of this resettlement policy are met, a special decision of the Government waiving Articles 7, 18, 20, 28, 29 of Decree 197 is needed to allow assistance and rehabilitation measures for illegal users of land as proposed in the policy. Land price for Calculation of Compensation Article 9 of Decree 197: The compensation rates for land are determined by the Provincial People's Committee for the type of land use at the time of land acquisition. To ensure that the objectives of the project resettlement policy are met, a special decision of the Government waiving Article 7, 18, 19, 20, 28, 29 of Decree 197 is RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak J lokv substation- June 201 J 36

39 Rural Distribution Project (RDJ - Dak Lak province needed to allow assistance and rehabilitation measures for illegal users of land as proposed in the policy. Assistance Policy for DPs who rent State-owned dwelling houses - Decree 197 Article 21 of Decree 197/20041ND-CP states that DPs who rent State-owned dwelling houses shall be provided with monetary supports equal to 60% of the land value and 60% of the value of currently rented houses, in cases of no resettlement houses to be arranged for them. Government commitment: To ensure that the objectives of the policy are met, a special decision of the Government of Vietnam regarding waiver of Article 21 of Decree 197/20041ND-CP is needed to permit assistance and rehabilitation measures for DPs who rent Stateowned dwelling houses as proposed in this policy. Article 2 of Decree 188/20041ND-CP on December 16 t h, 2004 states that the land price shall be defmed by People's Committees of Province/City to meet the replacement costs. Item 4, Article 2 of Decree ND-CP on November 09, 2006 guiding on the ada management stipulates that "in the case of the international agreements on ada have been signed between Vietnamese Government and sponsors stipulates other contents, then that international agreements will be followed", Government of Vietnam and World Bank Approaches There are various ways of the Vietnam Government approaches- either in policy or practice - that are compatible with World Bank guidelines. The most important compatibilities are:,/ Vietnam makes it possible for compensation for people without legal land rights but able to meet conditions of land legalization../' Permanent residents are provided with options that include relocation to a better site, or cash, or both../' Resettlement sites offer not only better improved infrastructure and services but represent higher living standard. RP project report: The Ea Kar- Krong Pak J JOkV line and Krong Pak J JOkV substation-june 20J 1 37

40 Rural Distribution Project (RD) - Dak Lak province./ Supports are provided to help the DPs in the transition period and there is an institutional structure through which people are informed and thanks to it, they can negotiate the compensation and express their disagreement, if any../ For the DPs which are not entitled to compensation, the Government will have proper support policies which are in consintence with the WB' s policies in order to assist people to recover their living. Differences between the approaches and measures that need to be addressed within the program also exist. However, procedures exist within national and City governments that allow the granting of waivers of domestic law on specific projects that may be in conflict with that of the funding agency../ On the issue of land tenure and the legal right to compensation, the Vietnamese Government and World Bank approaches are compatible. The Vietnamese government has its own process in place whereby land occupied without legal documentation can be legalized; this land, however, is compensated for at a rate equal to 100% of land price minus the taxes and fee for land use right registration after October 15th / According to Article 14 of Decree 69/2009/ND-CP on 13 August 2009, any person whose land is recovered shall receive compensation by providing new land with the same used purposes at the time of land acquisition in accordance with current regulations. If there is no land for compensation, compensation in cash with equivalent value of the value of land use right at the time of acquirement in accordance with current rules and regulations. In case of compensation by new land or house allotment, if there are any differences of value, they will be payable in cash The definition of eligibility and limit of compensation: Persons are displaced by project are: a) persons whose residential, garden or agricultural land is affected in part or in total (permanently or temporarily) by the project; b) Persons whose crops (annual and perennial) and trees are affected in part or in total by the Project. c) persons whose houses are affected in part or III total (temporarily or permanently) by the project; RP project report: The Ea Kar- Krong Pak 1 JOkV line and Krong Pak J 10kV substation- June 20/1 38

41 Rural Distribution Project (RD) - Dak Lak province d) persons whose businesses are affected in part or in total (temporarily or permanently) by the project Resettlement and compensation principles: The basic principles and objectives outlined in the World Bank's OP 4.12 will be approved in preparing this Policy Framework. The following principles and objectives will be applied: - Acquisition of land and other assets, and resettlement will be minimized as much as possible. - All DP's residing, working, doing business or cultivating land in ROW of transmission line (TIL), surrounding areas of tower foundation, the substation areas, in the service roads under the project on the date of the baseline surveys are entitled to be provided with rehabilitation measures sufficient to assist them to improve, or at least maintain their pre-project living standards and income earning capacity and production levels. Lack of/ega/ rights to the assets lost does not prevent the DPs (rom entitlement to rehabilitation of living standards. (c) The rehabilitation measures to be provided are: (i) compensation at replacement cost, without depreciation or salvage materials for houses and other structures; (ii) agricultural land with equal productive capacity acceptable to the DPs or being paid in cash according to DP's demand; (iii) replacement of residential, garden land of equal size acceptable to the DP or being compensated in cash according to DP's choice; and (iv) transfer and subsistence costs. Implementation should ensure effective and timely design, planning, consultation and implementation of DPs. Effective and timely Supervision, monitoring and evaluation of the implementation for DPs will be carried out. Local Authorities (Provincial People's Committee) will consider Resettlement Plan for project in locality in accordance with articles of Policy Framework Eligibility for compensation: The project displaced persons eligible for compensation are all the project affected households or institutions that are included in the inventory lists or by others to RP project report: The Ea Kar - Krong Pak 110kV line and Kr01zg Pak 110kV substation- June

42 Rural Distribution Project (RD) - Dak Lak province prove that before the cut-off date they owned, rented and used land and assets related to land of the project zone. Besides, the project displaced persons eligible for compensation are all the project affected households or institutions whose occupations and/or business and income sources are impacted as the result of permanent or temporary acquisition of land or other assets. The cut-off date is the last day of the population survey (May 17 th, 2011). The project displace persons eligible for legal right includes: (a) those who have formal legal rights to land or other assets; (b) those who initially do not have formal legal rights to land or other assets but have a claim to legal rights based upon the laws of the country; upon the possession of documents such as land tax receipts and residence certificates; or upon the permission of local authorities to occupy or use the project affected plots; and (c) those who have no recognizable legal right or claim to the land they are occupying. Persons covered under (a) and (b) are provided compensation for the land and other assets they lose, and other assistance. Persons covered under (c) are provided with resettlement assistance, in lieu of compensation for the land they occupy, and other assistance, if necessary, to achieve the objectives set out in this policy, if they occupy the project area prior to a cut-off dates defined in RPs. Persons who encroach on the areas after the cut-off date defined in RPs are not entitled to compensation or any other form of resettlement assistance. Such regulations are applied for those whose incomes are impacted by the project Compensation policy: Displaced persons will be entitled to the following types of rehabilitation and assistance measures, such as: DPs that lose agricultural, productive lanel crops and trees: If the portion of the land to be lost represents 10% compared with the cultivation land, and the remaining land is still viable for economic value, DPs can receive compensation is cash for the acquired area. If the portion of the land to be lost more than 10% of the total area of the landholding, and the remaining land is not economically viable then the project will RP project report: The Ea Kar - Krong Pak I JOkV line and Krong Pak 1 JOkV subslalion- June

43 Rural Distribution Project (RD) - Dak Lak province acquire the entire landholding and provide "land for land" arrangements of equal productive capacity, satisfactory to the project displaced persons. However, if the DPs prefer to receive cash instead of land, then cash compensation at replacement cost is applied. DPs will be compensated for the loss of crops at market price, and productive trees will be compensated at replacement cost. DPs whose land is temporarily taken by the works under the project will be compensated for the loss of income, crops and for the cost of soil restoration and damaged infrastructure. Temporary land acquisition will be rehabilitated by Construction unit and CPNPMB after project construction. DPs that lose residential land and house/structure: The mechanism for compensating loss of residential land and structures will be: (1) Cash compensation at replacement cost for the residential land that is only marginally affected and the remaining areas are still economically viable. (2) Provision of residential land or cash compensation according to the DPs' choice, if the remaining areas are not sufficient for reorganizing DPs' houses. (3) Cash compensation at replacement cost of the house/structures, without deduction for depreciation or salvage materials or compensation according to DPs' choice. (4) If residential land is only partially being affected by the project and the remaining areas are not sufficient for reorganizing DP's house then at the request of the DPs, the entire residential land will be acquired at replacement cost in the form of "land for land" that is satisfactory to the DPs or cash compensation according to the DPs' choice. (5) If houses and other structure are only partially being affected by the project and the remaining areas are not viable for economic use, the entire houses and structure will be acquired at replacement cost, without depreciation. Tenants, who have leased a house for residential purpose, will be provided with a cash grant of three months rental fee at the prevailing market price rate in the area, and will be assisted in identifying alternative accommodation. DPs that lose business: RP project report: The Ea Kar- Krong Pak 110kV line and Krong Pak 1 10k V substation-june

44 Rural Distribution Project (RD) - Dak Lak province The mechanism for compensating loss of business will be: (1) the provision of alternative business site of equal size and accessibility to customers, satisfactory to the DPs; (2) cash compensation for lost business structure at replacement cost of the structures, without depreciation; and (3) cash compensation for the loss of income during the transition period; DP's will also be provided with compensation at replacement cost, without deduction of salvage materials for any other fixed assets affected in part or in total by the project, such as tombs and wells. In cases where community infrastructure such as schools, factories, system of water supply, roads, damaged sewage systems, Provincial People's Committee and EVN will ensure that these would be restored or repaired as the case and at no cost to the community. Subsidies/allowances: Besides the direct compensation for the losses, DPs will also be entitled to remove households and receive additional assistance (subsidies/allowances) as stated in Decree 197 of Government. These allowances are as below: (i) Transportation assistance: - All DPs relocating -within the province are entitled to a minimum allowance of 4 million VND and maximum of 6 million VND. All DPs relocating out of the province are entitled to a minimum allowance of 8 million VND. This subsidy allowance is for the transportation of their salvageable materials and living_ facilities. While waiting for new houses at resettlement area, DPs will be entitled to: (i) temporary accommodation, or (ii) subsidies for temporary house rent. (U) Subsistence allowance for resettlement: All relocating DPs who do not set up new residence will be entitled to temporary accommodation or subsidized temporary house rent. Minimum assistance level is 1 million VND/ household and maximum of 1,500,000 VNDlhousehold in a period of 4 months counting from hand-over of field land. (iii) Restoration allowance: DPs, who are permanently affected more than 10% of productive land or incomes, or have to relocate, will be entitled to attend training or other economic restoration RP project report: The Ea Kar - Krong Pak llokv line and Krong Pak llokv substation- June

45 Rural Distribution Project (RD) - Dak Lak province programs at about 300,000 VND for each mouths/month, maximum allowance in 36 months for each month. (iv) Relocation bonus: DPs that dismantle their houses in accordance with the resettlement schedule of will get a maximum bonus of 1 million VNDlhousehold Classification of impacts and Entitlement policy: There are two main impacts on the resettlement: Temporary impacts: Those whose productive land, crops, trees and house structures that are in the ROW, around the tower foundations, on the temporary access roads are only temporarily affected at the stage of project construction. Group 1: Those whose land and garden used for profitable purposes acquired temporarily at the stage of project construction. Group 2: Those whose trees and crops are temporarily affected at the stage of executing, building temporary access roads or stretching conductors Permanent impacts: All the owners whose land and assets are permanently acquired for the purpose of execution and project maintenance, including tower foundations, area of substation, permanent road for the project and those whose auxiliary construction or high trees are in the ROW must be taken down or cut down. Impacts on residential, garden, agricultural land.and land in the ROW that are used for other purposes will be considered temporary impact, if can be, they will be used again with limited purposes. Group 3: All the owners whose productive land, residential land, garden land and land used for the other purposes are permanently acquired for the purpose of temporary access roads and project maintenance. Displaced persons who suffer from the permanent loss of land will be divided into four groups: For the productive land/agriculture: The area of acquired land is more than 10%. The area of acquired land is less than 10%. For residential land:. RP project report: The Ea Kar - Krong Pak llokv line and Krong Pak 110kV substation-june 201 J 43

46 Rural Distribution Project (RD) - Dak Lak province The rest area ofland is under 60 m 2 (in the city) and 100 m 2 (in the countryside). The rest land is equal or more than 60 m 2 (in the city) and 100 m 2 (in the countryside). Group 4: Those whose house structures are partially affected and this part does not impact the safety or using purpose of the whole structure (the part of taking down is under 10% of the area) and the lost part of the house can be able to rebuild nearby and also on the old part of land. Impacts on the residential land clearance that is in ROW will be considered to be temporary because it can be reused with the limited purposes. Group 5: Those whose houses are partially or wholly affected and these impact the safety or using purpose of the whole house structure (the part of taking down is more than 10% or even under 10% of the area, but the rest part can not be in use or inconvenient for usage), therefore, the house will be transferred and rebuilt nearby and also on the old part of land. Impacts on residential land clearance will be considered to be temporary because it can be reused with the limited purposes. Group 6: Those whose house structures are partially or wholly affected and these parts impact the safety or using purpose of the whole structures and therefore, the house will be wholly transferred and rebuilt. However, the land owners haven't got enough land to rebuild a new house that has the same area of the old one. The residential land that is enough to rebuild a new house must be at least 60 m 2 (in the city) and 100 m 2 (in the countryside). Group 7: Those whose business are affected Temporary impacts on business. Permanent impacts on business. Table: Entitlement Matrix (see Annex 1) RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 110kV substation- June

47 Rural Distribution Project (RD) - Dak Lak province CHAPTER 6: INSTITUTIONAL ORGANIZATION Representative of Vietnamese Government, the Ministry of Industry and Commerce is the Executive Service for Rural Distribution Project (RD). EVN is the investment unit for the medium and lower voltage grid. Both EVN and Dak Lak Provincial People's Committee are responsible for project implementation, including the implementation of RPs. Implementing Agencies closely co-ordinate with Local Authorities to ensure effective and easy implementation of RPs to avoid delay during implementation Institutional Arrangements EVN is responsible for the construction of power grids. Some Units under EVN and Dak Lak Provincial People's Committee are involved in the implementation of compensation: * Electricity of Vietnam (EVN) * EVN Central Power Corporation (EVN CPC) * Central Power Network Project Management Unit of EVN CPC (EVNCPC CPNPMU) * Dak Lak provincial People's Committee * Natural Resources and Environment service in Dak Lak province. * Industry and Commerce service in Dak Lak province. * Finance service in Dak Lak province. * People's committee in Ea Kar district. * People's committee in Krong Pak district. * Industry and Commerce department in Ea Kar District. * Industry and Commerce department in Krong Pak District. * Financial and Planning Department in Ea Kar district. * Financial and Planning Department in Krong Pak district. * Resettlement Committee ofea Kar district. * Resettlement Committee of Krong Pak district. * People's Committee in Ea Dar commune * People's Committee in Cu Hue commune * People's Committee in Ea Kar town RP projectreport:' The EaKar Krong Pak 11 OkV line and Krong Pak ljokv substation- June

48 Rural Distribution Project (RD) - Dak Lak province * People's Committee in Ea Phe commune * People's Committee in Hoa An commune * People's Committee in Krong Buk commune * People's Committee in Phuoc An town 6.2. Functions, competencies and responsibilities In order to implement successfully the Resettlement plan, the closing coordination between Electricity of Vietnam, Central Power Corporation, Local Authorities, Central Power Network Project Management Board and other Executive Agencies is required. One or two teams from Power Network Project Management Unit of Central Power Corporation who undertakes the resettlement will generally regulate all resettlement activities with the assistance of consultant staffs EVN: Electricity of Vietnam is a common regulation unit. EVN will establish a National Steering Committee to call, if necessary, any member to discuss about the common problems that impact the project implementation. This Steering Committee consists of one high-level officer of the Ministry of Industry and Commerce or Electricity of Vietnam who will be the Chairman and Power Services as well as the host provinces will be the members. The specific tasks of resettlement are quickly in presenting the solutions of resettlement problems for host provinces Central Power Corporation of Electricity of Vietnam - EVN CPC EVN CPC will be responsible for resettlement activities as follows: + Collect and classify the reports on the process of land acquisition and resettlement for EVN and World Bank. The approved resettlement plans of host provinces will be sent to World Bank. Collect and classify the final balance-sheet of project and review the project audit. + Recruit and supervise the consultancy, including external independent organizations in supervising the resettlement. + Assist Project Implementation Units, Central Power Network Project Management Unit with training courses on resettlement work for carrying out detailed measurement survey and other activities in resettlement plan. RP project report: The Ea Kar - Krong Pak llokv line and Krong Pak llokv substation- June

49 Rural Distribution Project (RD) - Dak Lak province Central Power Network Project Management Unit of EVN CPC: The Central Power Network Project management Unit - EVN CPC manage the power network investment. Its main responsibilities are: + Establishing implementation plan, managing and supervising project resettlement program. + Updating the information for project resettlement plan. Implementing and co-ordinate with Local Authorities in carrying out project resettlement activities. + Unifying the construction with land requisition and project resettlement activities. + Speeding up information campaigns, including information documents for the community, consultations of displaced persons in accordance with the project guidance. This work consists of responsibilities on exchange letters, forms of applications and requests and other necessary concerned documents. Cocoordinating with Local Authorities to hold the meeting with community, detailed measurement survey and inventory forms of displaced persons' entitlements. + Co-coordinating with other services for implementing sufficiently project resettlement plan in accordance with the principles and objectives of World Bank. Ensuring the right implementation of restorative solutions and other supported activities. + Presenting institution of compensation payment and expenditure payment for resettlement. Preparing necessary and concerned documents. + Supervising, checking compensation payment, land requisition and site clearance. + Ensure to pay compensation in time. + Carrying out the work of accountancy and audit when implementing the resettlement. +Reporting regularly to EVN and WB on the construction progress and activities of resettlement plan Provincial People's Committee: Dak Lak Provincial People's Committee will be responsible for resettlement policy implementation that approved by the Prime Minister, satisfying the RP project report: The Ea Kar - Krong Pak J JOkV line and Krong Pak} JOkV substation- June 10J J 47

50 Rural Distribution Project (RD) - Dak Lak province conditions of project implementation. Provincial People's Committee is also the one of highest administrative organ who is responsible for supervising project resettlement plan and presenting decisions that concern project resettlement program such as ratio of compensation and assistance for displaced persons. Entrusting Executive Agencies with work of resettlement plan for implementing the project. After having detail design, numbers of displaced persons and affected assets will be reviewed basing on detail measurement survey. The unit price of compensation and all the assistance for displaced persons and affected assets will be updated. Provincial People's Committee is responsible for conducting and supervising resettlement plan implementation, including the presentation of solutions on displaced persons' or Local Authorities' complaint and grievances Natural Resources and Environmental Service, Industry Commerce Service, Natural resources and Environmental Department, Agriculture and Rural Development Department belongs to District People's Committees: The Provincial Natural Resources and Environmental Service is responsible for studying and putting forward the unit price of compensation to Provincial People's Committee. When starting resettlement plan implementation, Natural Resources and Environmental Service co-ordinates with Industry-Commerce Service, Natural resources and Environment department, Agriculture and Rural Development Department of District People's Committees and Independent Monitoring Unit for defining types of soil, specifying the unit price of resettlement plan as well as for putting forward to Provincial People's Committee to adjust, if necessary, in order to ensure that the unit price of compensation is in accordance with the replacement price at the timing date of payment for resettlement activities to be carried out easily People's Committee of District People's Committee of District is responsible for defining land and structures, appointing members to coordinate with Central Power Network Project Management Unit in RP implementation. RP project report:.theea Kar- Krong Pak 1 10k V line and Krong Pak 1 JOkV substalion-june

51 Rural Distribution Project (RD) - Dak Lak province District compensative, assistant and resettlement Councils According to the Decree No 197/CP, there are compensative, assistant and resettlement Councils in districts. Members of these Units consist of Chainnan/vice Chainnan of District People's Committee who will be the chairman; representatives of District Departments such as: Construction department, Financial~Planning Department, Natural Resources and Environment Department, City Management Department, members of mass organizations, representatives of displaced persons and other members. For this project, District compensative, assistant and resettlement Council assists and c~ordinates (if necessary) with Central Power Network Project Management Board in carrying out the following tasks: + Participate in making plan of implementation for all resettlement activities. + Participate in infonning project infonnation to displaced persons and in consulting the community in accordance with the project guidance. + Co-ordinate with Central Power Network Project Management Unit in carrying out detail measurement survey, making plans for compensation and resettlement assistance, applying the unit price of compensation to the loss of assets, completing inventory fonns of displaced persons' compensation and payment. + Appointing inspectors for handling the complaint and grievances on resettlement policies and the eligibility to compensation. + Paying attention to the special groups of people (ethnic minority groups) or vulnerable people (children, old people, the single father or single mother households). + Co-coordinating closely with external monitoring organizations Commune People's Committee: Commune People's Committee is responsible for: + Contributing to the census and inventory. + In coordination with Power Network Project Management Unit, holding meeting with the community, announcing infonnation, carrying out detail measurement survey, setting up a file of compensation, paying the compensation/assistance for displaced persons. RP project report: The Ea Kar - Krong Pok I JOkY line and Krong Pak J 10kY substation- June 201 J 49

52 Rural Distribution Project (RD) - Dak Lak province + Sending displaced persons' feedback to Central Power Network Project Management Unit and People's Committee of the District; handling the complaint and grievances at Town level. Suggesting the solutions for big problems (if any). + Helping the regional people in overcoming difficulties at the stage of project construction and in repairing affected houses. Arranging "land for land" in case displaced persons ask to be compensated in accordance with this way Project displaced persons: Project displaced persons are responsible for inspecting the losses of assets and their equivalent entitlements. Carrying out site clearance in time after receiving sufficient compensation Courses of training and seminar: For carrying out favorably and efficient the resettlement plan, EVN coordinates with Wodd Bank in organizing the courses of training and seminar for giving guidance on tasks, requirements in carrying out detailed measurement survey, steps of implementing resettlement plan to all the Agencies/related persons of Power Corporations and Power Network Project Management Unit as well as for giving guidance on supervision, evaluation, report preparation and management of database to the staff who are in charge of the Resettlement Plan. Subjects of training: - Policies and principles of project resettlement plan. -Objectives of resettlement plan and procedures of resettlement plan preparation. - Census and inventory survey. - Detailed measurement survey. - Definition of entitlements, including eligibility to compensation and assistance for re-stabilization of life. - Management of database and finance. - Solutions of consultation and information announcement. - Steps of implementation, procedure and schedule. - Complaint and grievances and institution of handling. - Supervision and monitoring., RP project report: The Ea Kar - Krong Pak 1 10kV line and Krong Pak 1 10kV substation- June 201 J 50

53 Rural Distribution Project (RDJ - Dak Lak province CHAPTER 7: IMPLEMENTATION ARRANGEMENTS 7.1. Information disclosure All the project displaced persons will be informed sufficiently about the resettlement plan, including eligibility to compensation, policy of eligibility to compensation, measures and price of compensation, schedule, entitlements and procedure of complaint and grievances. The information file on resettlement program will be prepared by the Central Power Network Project Management Unit and will be guided to displaced persons or informed at the consultant meeting with displaced persons at the communes, districts and will be advertised at community places such as at administrative headquarters of Town, Culture - Information Centre, market, etc. Information to displaced persons will be carried out right after the Government of Vietnam and WB have approved the project. The information file on resettlement program consists of: (i) The project data. (ii) Project impacts and compensation policies. (iii) Eligibility to compensation and resettlement. (iv) Implementation arrangements of compensation and resettlement. (v) Responsibilities of related partners for implementation of resettlement plan. (vi) Settlement of complaint and grievances Compensation schedule Compensation payment for agricultural land, trees, crops and all other assistance must be carried out one month after the date of land acquisition as latest. Compensation payment for residential land and house structures must be carried out three months after the date of land acquisition as latest. Right upon project completion, the Contractors will restore the infrastructure as it was Procedure of implementation of resettlement plan: The procedures of implementation of resettlement plan consist of three activities as follows: RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 1 JOkV substation- June 20J I 51

54 Rural Distribution Project (RD) - Dak Lak province a) General activity: once before starting the project construction b) Separate activities: several times, once for each part of the project. c) Continuous activities: Continuous activities for the stages of project implementation. Activity 1: Establishing the action staff After the approval of WB on the fmancing, the Central Power Network Project Management Unit of EVN CPC will develop the project. The Central Power Network Project Management Unit will establish the staff who are in charge of project RP implementation and will divide the resettlement work into daily activities for the parts of building high voltage network and substations. Activity 2: Employing the independent monitoring agency The Central Power Network Project Management Unit ofevn CPC will employ an agency with qualified qualifications on social sciences or human civilization for monitoring the whole project. Activity 3: Arrangement of budget for resettlement implementation Central Power Network Project Management Unit of EVN CPC is responsible for preparing sufficient resettlement budget in order to carry out the implementation of compensation, removal and resettlement. Activity 4: Training the staff in charge of resettlement EVN coordinates with WB in holding training courses for the staff of Power Corporations and Central Power Network Project Management Unit who are in charge of project resettlement work in order to giving them guidance for implementation of the project resettlement plan. Activity 5: Campaign on information distribution on the project After project approval, Central; Power Network Project Management Unit of EVN CPC will supply Local Authorities with detailed information of project and implementation schedule. During the first months of project implementation, Central Power Network Project Management Unit of EVN CPC coordinates with Local Authorities in carrying out an information campaign on the project at all project communes in order to announce the project impacts, plan and activities to displaced persons and communities. Displaced persons and communities will be RP project report: The Ea Kar - Krong Pak J JOkV line and Krong Pak 1 JOkV substation- June

55 Rural Distribution Project (RD) - Dak Lak province supplied with detailed information of resettlement in accordance with the schedule plan of resettlement implementation. Activity 6: Census, inventory and evaluation of losses Central Power Network Project Management Unit coordinates with District Resettlement Committee and Local Authorities to cany out the detailed measurement survey (DMS) on affected land and assets and socio-economic situations of affected households. With the detailed measurement survey (DMS), the Independent Monitoring Agency and the related Services will define the unit price applying for resettlement plan and present to Provincial People's Committee to adjust, if necessary, in order to ensure that the unit price of compensation is in accordance with the replacement price at the timing date of implementing the resettlement plan. Activity 7: Definition of displaced persons' entitlements and measures of compensation The results of detail measurement survey is the basis of defining displaced persons' entitlements and applying unit price of compensation for affected assets as well as solutions of resettlement assistance and the choice of compensation measures. Activity 8: Consulting displaced persons on compensation measures Central Power Network Project Management Unit will supply displaced persons with the consultation questionnaires on the measures of compensation at the meeting of community consultation, agree on the measures of compensation and handle the complaint and grievances concerning to their entitlements. Activity 9: Preparation for recovery of living standard Beside compensation, the serious affected households are also supplied with the recovery program to recover or improve living conditions. When carrying out the compensation, Central Power Network Project Management Unit coordinates with Local Authorities and related Organizations in preparing the program of restoration and assistance for the serious displaced persons. The preparation is as follows: a. Making the list of displaced persons who are supplied with economic assistance. RP project report: The Ea Kar - Krong Pak J JOkV line and Krong Pak J JOkV substation-june 201 J 53

56 Rural Distribution Project (RD) - Dak Lak province b.together with Local Authorities and displaced persons, review the economic programs. c. Consulting displaced persons on the difficulties, demands and entitlements of the region and presenting the prior solutions. d. The prior solutions consist of: 1. Preparing the objectives of solutions. 2. Reviewing the program which was and being carried out in the region. 3. Consulting displaced persons and presenting the list of program participants. 4. The results of consulting Local Authorities, Training Centre and Departments that relate to the program. S. Anticipating the program. 6. Implementation arrangements. 7. Costs and budget. 8. Supervision and evaluation. Activity 10: Compensation payment and assistance implementation Central Power Network Project Management Unit of EVN CPC coordinates with District compensation and resettlement Council, with the assistance of Local Authorities will pay compensation for displaced persons. Displaced persons who lost more than 10% of productive land or income will be supported with living standard recovery. They will be supplied with training courses on agriculture, breeding or other program. These programs will be organized by Central Power Network Project Management Unit of EVN CPC during the period of resettlement plan implementation. These programs are based on the results of consulting with Local Authorities and displaced persons, and also consider the capacity of providing jobs after training courses. Activity 11: Supervision and evaluation. During the period of project implementation, Central Power Network Project Management Unit of EVN CPC and Independent Monitoring Agency will examine/supervise all activities of project resettlement implementation and program of living standard recovery. Table7.1: Implementation arrangements of resettlement plan RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak I JOkV substation- June 20/1 54

57 Rural Distribution Project (RD) - Dak Lak province No Tasks Implementation Units Implementation schedule Main activities of the projects 1 Establishing (EVNCPC), divisions of CPNPMU Central Power Network Project Management Board 2 Allocating (EVNCPC), budget for the CPNPMU resettlement implementation Within one month after starting the project implementation Within one month after starting the project implementation Investigation, survey 3 Employing CPNPMU of Within one month after Study, consultants and (EVNCPC) starting the project construction Independent Monitoring Agency implementation design: 2011 August 4 Guiding the staff Consultants, CPNPMU 5 Information Consultants, campaign on the CPNPMU, project Local authorities March 2011 April- May 2011 Invitation for bids of all parts of the project November Census, inventory detailed evaluation losses CPNPMU, and Local authorities of April- May Definition of (EVNCPC), project displaced CPNPMU, Local May 2011 RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak J JOkV substation- June 201 J 55

58 Rural Distribution Project (RD) - Dak Lak province No persons' Tasks entitlements and Implementation Implementation Main activities of authorities Units schedule the projects application of Bidding compensation measures. evaluation of the whole project 8 Consulting CPNPMU, Local May 2011 December 2011 project displaced authorities. persons on the compensation measures. 9 Preparing the (EVNCPC), June 2011 program of CPNPMU and economic consultants restoration 10 Compensation CPNPMU, Local October 2011 Contract award payment and authorities of whole assistance project: implementation. December Construction CPNPMU, February 2012 development Construction Unit 12 Supervision and (EVN CPC), Supervision report every During project evaluation CPNPMU, Local quarter and carry out the implementation authorities evaluation from 6 to 12 months 7.4. Implementation schedule RP project report: The Ea Kar - Krong Pak J JOkY line and Krong Pak J 10kY substatiqn- June 201 I 56

59 Rural Distribution Project (RD) Dak Lak province One of the articles in Resettlement plan is to implement in accordance with fixed schedule for ensuring security in site clearance and in conformity with project implementation. The project schedule is as follows: Description Implementation schedule 1 Project agreement December Preparation work and definition of March 2011 project scale, investment volume 3 Compensation and site clearance July 2011 Council 4 Detailed measurement survey, DPs August 2011 survey 5 Application of compensation unit price September 2011 and solutions of improving compensation policies 6 Compensation of Site clearance for October 2011 project construction 7 Rehabilitation assistance December Independent and Internal monitoring During the period of RP implementation 9 Starting construction February 2012 The preparation of Resettlement Plan must be completed before WB issues their no objection to the contract award to the Contractors. All changes of Resettlement Plan after WB clearance must be informed to WB Office in Ha Noi before starting execution Workshop and training To facilitate the efficient implementation ofrp, EVN has cooperated with WB to organize training courses and workshops to guide all relating units/persons of the PCs and NPMU about duties, requirements in making detailed measurement RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak J 10kV substation-june

60 Rural Distribution Project (RD) - Dak Lak province surveys, steps to perfonn RP, monitoring, evaluation, preparation of reports, database control for the staff relating to plan to perfonn RP. Training topics: - Resettlement policy and principles of the project Objectives ofrp and RP preparation process Census survey and statistics - Detailed measurement survey - Definition of rights including compensation rights and assistance for recovery of the livings - Database management and financial management - Methods of consultation and infonnation dissemination - Perfonnance steps, procedures and schedules Complaints and grievance and settlement mechanism Supervision and monitoring RP project report: The Ea Kar- Krong Pak J IOkV line and Krang Pak 110kV substation-june 201 J 58

61 Rural Distribution Project (RD) - Dak Lak province 8.1. Budget CHAPTER 8: COSTS AND BUDGET Budget for resettlement plan implementation will be from EVN CPC counterpart fund Compensation cost estimate: Compensation Cost estimate for the permanent and temporary loss of houses, structures, agricultural, forestry and cultivated land, trees, crops are based on: Decree ND CP issued on October 29 t h, 2004 guiding the implementation of the Land Law.. Decree 197/2004fND-CP issued by Government of Vietnam on December 3 rd, 2004, on compensation, support and resettlement when land is recovered by the State. This Decree guides the implementation of compensation for land and assets, as well as the policies assistance and resettlement relating to land acquisition. - Circular No 116/2004ill-BTC on December 7 th, 2004 by the Ministry of Finance provides guidelines to implement the Decree I 97/20041ND-CP. - Decree 188/20041NP-CP issued by Government of Vietnam on November 16 th, 2004 about the methodologies for defining land prices and land price framework of various categories of land. This Decree set forth the minimum and maximum prices of different types and categories of land covering the whole country. These prices have been established for the purpose of land acquisition by the Government, tax value for transfer of land use rights, leasing government land and national and public purposes. - Decree fND-CP Regulation on May 25 th 2007, granting additional land use right certificates, land acquisition, implementation of land use rights, procedures of compensation, assistance and resettlement when the land acquisition and settlement of land claims are carried out by State - Circular No 114/2004ill-BTC issued by the Ministry of Finance on November 26 th, 2004 guiding the implementation of Decree No 118. This Circular elaborates in details the methodologies (Le. direct compensation method and income method) RP project report: The Ea Kar - Krong Pak l10kv line and Krong Pak l10kv substation- June

62 Rural Distribution Project (RD) - Dak Lak province for the land price verification of different types and categories of land in different regions/areas to ensure the replacement cost. - Decree No 69/2009/ND-CP on August 13 th, 2009 of the Government's additional regulations on land use planning, compensation, and resettlement assistance. - Circular No 14/2009/TI-BTNMT on January Olst, 2009 of the Ministry of Natural Resources and Environment shall detail on compensation, support, resettlement and order, land acquisition procedures, land allocation, land lease. - Decree 106/2005/ND-CP issued by Government of Vietnam on August 17 th, 2005 regulates and guides in details some articles of Electricity Law on the protection of the high voltage networks. - Decree No /ND-CP on October li\2009 of the Government on amending and supplementing some articles of Decree 106/2005/ND-CP on August 17th, 2005 of the Government stipulating information and guide the implementation of some articles of Electricity Law on protection of public safety and the highvoltage power grid. - Circular 03/201 O/TI -BCT on January 22 nd, 2010 of Ministry of Industry and Commerce about the protection and safety of high-voltage power grid works. - Decision No 37/2010/QD-UBND dated December 31 st 2010 of Dak Lak provincial People's committee on publishing land price in Dak Lak province. - Decision 02/201O/QD-UBND on January 22nd 2010 of Dak Lak provincial People's Committee on policy of compensation, assistance and resettlement when State recover land in the area. - Decision No /QD-UBND dated October 21 st 2009 ofdak Lak provincial People's Committee on publishing new house price in Dak Lak province. - Decision No lllqd-ubnd dated January 07 th 2011 of Dak Lak provincial People's committee on publishing compensation price for trees, crops on State land during land acquisition in the area. - Preliminary evaluation on replacement price and market price for land, houses and trees implemented by NPMU-EVNCPC in cooperation with the local authority in the period ofloss inventory (July 2011) The results of preliminary evaluation on the replacement price that were carried out by consultants show that compensation rate for losses issued by Dak Lak RP project report: The Ea Kar - Krong Pak llokv line and Krong Pak I JOkV substation- June

63 Rural Distribution Project (RD) - Dak Lak province Provincial People's Committee is updated and rather lower than the current replacement price/market price. Therefore, when implementing the resettlement plan, compensation price for losses must be updated to ensure that displaced persons are compensated and supported sufficiently Cost estimate: i) Cost estimate for resettlement plan consists of: Preparation work: + All official work such as investigation, design, preparation of sample survey. + Survey work: census and inventory, socio-economic survey. The survey work shall be carried out in two stages: preliminary stage (preparation of resettlement plan) and detailed measurement survey (at the first stage of project implementation and resettlement plan). ii) Costs for compensation and living standard recovery Based on the affected categories and affected rate as stated in previous chapters, costs for compensation and living standard restoration consist of: Compensation to pennanent land acquisition. Compensation to affected trees, standing crops because of temporary or pennanent losses of land. Assistance of living standard restoration for the peasants who lost more than 10% of land area. Assistance of residential land and structures in ROW. iii) Costs for operation/management consist of: Costs for the staves of Central Power Network Project Management Board of EVN CPC, the local authorities consist of: material facilities, salary and assistance for management arrangements, the staffs who are in charg~ of full time or part time resettlement. Costs for training, seminar, infonnation campaign, etc. The management cost has not been listed in details yet. Cost for management and operation accounts for about 2% of total compensation cost. iv) Monitoring costs When implementing the project, the Central Power Network Project Management Board of EVN epe will sign the contract with the Independent RP project report: The Eo Kar - Krong Pak IJOkV lin.e and Krong Pak 1 JOkV substation-june

64 Rural Distribution Project (RD) - Dak Lak province Monitoring Agency. Because the cost of supervision has not yet standardized by the government regulations, it is expected that this will account for 3% of total compensation costs. Independent Monitoring Agencies being interested in the project will prepare the documents of technology and finance for bidding, the actual cost will be defmed by Independent Monitoring Agency who is awarded of contract. v) Arising costs/contingency According to previous project's experiences, arising cost is occupied about 15% of total cost of compensation and resettlement plan preparation. Total cost for RP implementation: Total cost for compensation is estimated as 5,112,506,575 VND or USD (IUS~ VND). In which: Components Total value 1. Cost for RP establishment 96,509, Compensation and recovery 4,179,997,468 - Compensation and assistance for land 1,705,162,000 - Trees/crops 2,398,652,200 - Houses/ architectures 76,183, Cost for management and operation = 2% of (2) 83,599, Cost for independent monitoring = 3% of (2) 125,399, Contingency= 15% of (2) 626,999,620 Total: ( ) 5,112,506,575 Detailed Cost estimate for each component part of the project will be enclosed (see annexes) RP project report: The Eo Kar - Krong Pak 11 OkV line and Krong Pak J JOkV substation- June

65 Rural Distribution Project (RD) - Dak Lak province CHAPTER 9: COMMUNITY PARTICIPATION AND CONSULTATION 9.1. Objectives of community participation and consultation The infonnation and community participation and consultation are aimed at: (i) limiting the possibility of conflicts, (ii) mitigating the risk of delaying the project, and (iii) allowing the project to present the resettlement and restored program in accordance with the demand of displaced persons, therefore, highly exploiting the project's socio-economic benefits. Objectives of infonnation campaign and community participation and consultation are: - Sharing the whole infonnation of the project as well as the project's activities with displaced persons. - Gathering infonnation of displaced persons' demands and their feedbacks for the policies and project activities. - Looking for the coordination and participation of displaced persons and community for the plan establishment and resettlement implementation. - Ensuring the obviousness in all activities that related to land acquisition, resettlement and restoration. The Infonnation campaign and community consultation consists of two stages: Stage 1: During the period of resettlement plan establishment and action preparation (Already carried out). This stage consists of line route selection, census, inventory of displaced persons and affected assets, decision of compensation measures, restoration and transfer. Wht~n implementing ih~~ census, inventor) displaced persons amount, losses of land and asscts~ and the surveyed tci;}.m~i cunsulted Authorities and groups of displac.cd persons in the host COHUllunc::: and fix gathering the opinions about the line route seit;l:tiuh, caiwcity c,f unit price of land, agricultural output in t.he arca~ and [31io of land changes. Commune is also consulted about the area community can be used '~lanil for land" compensation measun:, The draft or R~~st;Hlein",nt the s RP project The Fa r:ar... Fa!:- J!O/;V lim? (md,~>ong Pale J 10,1,,/,S'ibstaticm Jl'fle 201 J 63

66 Rural Distribution Project (RD) - Dak Lak province and EVN CPC and Central Power Network Project Management Board will ask Provincial People's Committee to carefully consider the requirements of some articles' waiver, eligibility to compensation, policy of entitlements, cost for resettlement plan, tasks, institution of complaint and grievances and the unit price that applied in the draft of resettlement plan. This draft will be submitted to the secretariat of Provincial People's Committee and the WB Office in Vietnam. All the feedbacks from Local Authorities and concerned Departments will be brought into the resettlement plan. Stage 2: During the period of resettlement plan implementation In this stage, consultations will be organized in each commune. Implementation of resettlement activities and rehabilitation including the policies of resettlement, entitlement calculation and compensation payment, last approval for displaced persons' options on the measures of compensation, training, etc Community participation and consultation at the stage of resettlement plan establishment and preparation During the first stage, (preparation of resettlement plan), the following activities will be carried out: Stage 1- Activity 1: Inform and discuss with Local Authorities on the line route direction After studying the map and visiting the site, the Consultancy Unit, Central Power Network Project Management Board of EVN CPC formed the preliminary line route direction on the map of ratio 1125,000. This map will be sent to Local Authorities where there are lines passing through. Local Authorities agreed with the line route direction. These activities were carried out in March Stage 1- Activity 2: Inventory of losses Based on the approval of line route direction, the survey teams, Central Power Network Project Management Board co-ordinates with Commune Authority in making the list of displaced persons whose land and assets are impacted as well as carrying out the survey on socio-economic situation of affected households. The period of implementation is in May RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak 1 JOkV substation- June

67 Rural Distribution Project (RD) - Dak Lak province Stage 1 - Activity 3: Meeting displaced persons When completing the survey, EVN CPC co-ordinates with Commune Authority in meeting the affected households. The consultations were carried out in all host communes in May At these periods of consultations, the Consultants informs the project, objectives of the project, activities of the project, impacts of the project on land, crops and other assets, explain the objectives of RP, inform the policies of compensation and the displaced persons not to build new structures or not to plant trees in affected area. All affected households will be consulted about compensation policies and the majority agrees with payment in cash for losses of land and assets due to small areas of impact. All consulted households support the project construction and are ready to suffer losses of project development. They are desired to be informed about the project implementation schedule as soon as possible. Brief of community participation and consultation: METHOD DETAILS OF ACTIVITIES REFERENCE RESULTS Date of notice 7-10 days Details will be shown in annexes Location of People's notice Committee of Communes and Public notice hamlets/comm unes (the commune head, gathering activities place of people). Public Date of Apri12011 Details will be shown in annexes announcement announcement RP project report:. The Ea Kar - Krong Pak I JOkV line and Krong Pak I JOkV substation- June

68 Rural Distribution Project (RD) - Dak Lak province /radio Public meetings in each commune Time of The announcement Commune's Date: broadcasting system 12; 14; 16 and Summary ofpuhlic opinions: 17/5/2011. Implementation period: May 12th, 14th, During the site clearance, man plant 16 th and 17th forest, perennial tress should be 2011 noticed, only cut down trees that are in ROWand pay attention to landslide, avoid implementation in rainy season. Location Headquarter of Precinct/Corn. Use prior methodologies to minimize munal People's impacts on environmental landscapes. Committee Implementation when the harvest Participan ts: Headquarter of season is fmished. Numbers of Precinct/Com Most of displaced persons agree with participants: 26 munal People's the compensation by cash for the Representative Committee losses of land and other assets. s of Local Administration. Compensate fairly and appropriately according to the policy. and 71 - Make use of general workforce Representative S of Project Affected Households. (unemployed people) in the area.. Make use of signs when the project implementation passing through roads..., Implement in conformity with technical instructions. RP project report: The Ea Kar- Krong Pak J JOkV line and Krong Pak 110kV substation- June

69 Rural Distribution Project (RD) - Dak Lak province Methods of invitation Invited by After the implementation: communal - Return the previous lay-outs, repair People's roads due to the damage during committee, and implementation, clean the construction head of site. commune Operation period: - Regularly check the ROW to prevent failures, especially in rainy seasons or lightings. - Regularly cut and trim trees in ROW, mitigate bad effects on environment when the project is put into operation. - Providing guidelines for safety-use of electricity and fire-fighting, etc Stage 1 - Activity 4: Sending the draft 0/ resettlement plan and entitlement policies to Provincial People's Committee/or consideration Central Power Network Project Management Board of EVN CPC will send draft: of resettlement plan to Provincial People's Committee in July 2011 for report. Central Power Network Project Management Board and EVN CPC will send requirements to Provincial People's Committee and Local Authorities at various levels and ask them to consider carefully the requirements of abolishing some articles, eligibility to compensation, entitlement policies, cost of resettlement plan, tasks, institution of complaint and grievances and the unit price that applied in resettlement plan draft. The draft: of resettlement plan will be submitted to the secretariat of Provincial People's Committee and the WB Office in Vietnam in May Central Power Network Project Management Unit and EVN CPC will ask Local RP project report:. The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 1 10kV substation- June

70 Rural Distribution Project (RD) - Dak Lak province Authorities at various levels to consider carefully the requirements of abolishing some articles, capacity of receiving compensation, entitlement policies, cost of resettlement plan, the implementing units/staff and the unit price that applied in the draft of resettlement plan. The draft of resettlement plan will be saved at secretariat of Provincial People's Committee and the Vietnam Development Information Center (VDIC) of WB Office in Vietnam. 9.3 Community participation and consultation at the stage of RP implementation Stage 2 - Activityl: Holding, announcing information and training the staves wlto are in charge of resettlement plan implementation: After signing contract of loan, first activity of resettlement plan is that the Central Power Network Project Management Board of EVN CPC will send government levels the reports of resettlement plan, training implementation on the matters and steps of resettlement plan implementations well as announcing information of resettlement plan to all displaced persons. This activity will be implemented in July Stage 2 - Activity 2: Giving inventory forms of detailed measurement and tlte entitlements to displaced persons Central Power Network Project Management Board will carry out detailed measurement survey; provide inventory forms of detailed measurement and entitlements to displaced persons. The list of displaced persons, affected assets and their entitlements will be put up at the commune headquarters. This activity will be implemented from July to August Central Power Network Project Management Board co-ordinates with Local Authorities in calculating the compensation cost and giving inventory forms of compensation to all displaced persons. This inventory form will be put up at the commune headquarters. This activity will be implemented from September to October After each time of distributing information booklet of resettlement plan and entitlement inventory forms, Central Power Network Project Management Board. RP project report: The Ea Kar - Krong Pak ljokv line and Krong Pak I JOkV substation- June

71 Rural Distribution Project (RD) - Dak Lak province co-ordinates with Local Authorities to hold a meeting in each commune for clarifying thoroughly the policy of resettlement plan for displaced persons. In these meetings, displaced persons will raise their queries on the possible problems of resettlement plan. Stage 2 - Activity 3: Consulting with displaced persons on compensation After having receiving the data of the project losses of assets, Central Power Network Project Management Unit and Commune People's Committee will announce the unit price of compensation for all categories of impacted assets in accordance with the regulations of Provincial People's Committee to displaced persons. The price list of compensation will be put up at the headquarters of Commune People's Committee. At the meeting, displaced persons can express their opinions on the compensation price. DP's objections will be noted down for consideration. Displaced persons who agree with the compensation price will sign their names in compensation inventory. DP's objections will be noted down in reports to Executive Agencies. Displaced persons will be informed the time, place, procedure of compensation payment. All the meetings will be hold in October Stage 2 - Activity 4: Announcing the period o/implementation to Local Authorities Central Power Network Project Management Board of EVN CPC will inform the period and schedule of execution as well as the period of resettlement implementation to Commune Authorities and displaced persons. Commune Authorities closely co-ordinate with Central Power Network Project Management Board to ensure that all displaced persons will be fully informed of compensation and the period of project implementation as well as resettlement plan implementation. 9.4 Resettlement information booklet (RIB) To ensure that all displaced persons, their representatives and Local Authorities of the affected area understand thoroughly the details of resettlement plan, the Power Network Project Management Unit will prepare the resettlement., RPprojecl report: The Ea Kar - Krong Pak I 10k V line and Krong Pak I JOkV substation- June

72 Rural Distribution Project (RD) - Dak Lak province infonnation booklet and distribute to all project displaced persons at the first tenn of implementation stage. The resettlement infonnation booklet consists of the following contents: * Project description. * Objectives of project design. * Project impacts. * Displaced persons' eligibility to compensation, recovery and policy of entitlements. * The agencies that are responsible for resettlement. * Infonnation disclosure and consultation with displaced persons * Implementation schedule. * Complaint and grievances. * Supervision and evaluation for RP implementation. RP project report: The Ea Kar - Krong Pak J JOkV line and Krong PakllOkVsubstation-June

73 Rural Distribution Project (RD) - Dak Lak province CHAPTER 10: COMPLAINT AND GRIEVANCES To ensure that all complaint and grievances of displaced persons on compensation and resettlement will be handled, the project brought out the procedure of handling complaint and grievances with an objective of quickly and clearly handling the complaint and grievances of displaced persons. When complaint and grievances are handled, the progress of the project will be more reliable. The procedures of complaint and grievances are as follows: Stage 1: The complaint and grievances of displaced persons on resettlement program and discounted losses, first of all, must be reported to the Commune People's Committee in oral or by writing. In case of oral, the complaint and grievances will be written down and treated by Commune People's Committee, who will be responsible for resolving the issue within fifteen days from the date it receives the complaint. Stage 2: If any aggrieved person is not satisfied with the decision or does not receive any replies from Commune People's Committee within 15 days from the date of bringing out the complaint and grievances, displaced persons can bring the complaint and grievances to the District People's Committee and the Central Power Network Project Management Board. District People's Committee and the Central Power Network Project Management Board will reach a decision on the complaint within 1 month from the date it receives the complaint. Stage 3: If displaced persons are still not satisfied with the decision at district level or do not receive any replies from the Central Power Network Project Management Board, displaced persons can appeal to Provincial People's Committee. Provincial People's Committee and the representatives of Central Power Network Project Management Board will reach a decision on the complaint within 30 days from the date it receives the complaint. Stage 4: If displaced persons are still not satisfied with the decision of Provincial People's Committee or do not receive any replies from Provincial People's Committee in the defined time, the final displaced persons may be RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak 1 JOkV substation-june

74 Rural Distribution Project (RD) - Dak Lak province submitted for consideration by equivalent civilian Court, in accordance with the Code of Civil Procedure. Displaced persons can make the complaint and grievances on any items of resettlement and rehabilitation programs, including the unit price of compensation. The detailed procedure of handling complaint and grievances will be informed publicly to displaced persons at the periods of consultations and also be posted at the headquarters of Commune People's Committee. This information is also written down in resettlement information booklet for distributing to displaced persons before starting resettlement plan implementation. RP project report: -The Ea Kar - Krong Pak 110kV line and Krong Pak 110kV substation- June

75 Rural Distribution Project (RD) - Dak Lak province CHAPTER 11: SUPERVISION AND MONITORING Implementation of RPs will be frequently supervised and monitored by the Central Power Network Project Management Board in a close coordination with Local Authorities. An Independent Monitoring Agency will be entrusted with external monitoring task. The selection of this agency will be approved by the Central Power Network Project Management Board ofevn CPC. The Central Power Network Project Management Board will sign the contract with Independent Monitoring Agency right after resettlement plan approval and the activities of supervision and monitoring will start at the beginning period of resettlement plan implementation Internal monitoring: Implementation of RPs will be periodically supervised and monitored by the EVN NPMU in a close coordination with the respective People's Committees at different administrative units and independent monitoring agencies. The reports will be made quarterly to be presented to EVN. Internal monitoring and supervision is aimed at: (a) Verifying that the baseline information of all DP's has been carried out and that the valuation of assets lost or damaged, and the compensation, resettlement and other rehabilitation entitlements have been carried out in accordance with the provisions of this Policy Framework and the respective RP. (b) Monitoring that the RPs is implemented as designed and approved. (c) Verifying that funds for implementing the RPs are provided to the respective CPNPMU in due date and in amounts sufficient for their purposes, and that such funds are used in accordance with the proposed objective of the RP and policy framework. (d) Recording all complaints and grievances and their resolution and ensure that complaints are dealt with in a timely manner Independent Monitoring Organizations or individual consultant will be retained by EVN CPNPMB to periodically carry out external monitoring and evaluation of the implementation of RP project report: The Ea Kar - Krong Pak 1 10k V line and Krong Pak 1 JOkV subslation- June

76 Rural Distribution Project (RD) - Dak Lak province RPs. The independent agencies can be academic or research institutions, non Governmental Organization (NGO) or independent consulting firms with qualified and experienced staff and terms of reference acceptable to the World Bank. In addition to verify the information furnished in the internal supervision and monitoring reports of the respective PMUs, the external monitoring agency will visit, interview/discuss with affected household of the project (DPs). Detailed method will be described in TORs of the tasks of the consultants, every six months after implementation of each RP in order to: (a) Determine whether the procedures for DPs participation a:nd delivery of compensation and other rehabilitation entitlements has been done in accordance with this Policy Framework; (b) Assess if the Policy Framework objective of enhancement or at least restoration of living standards and income levels ofdps have been met. (c) Gather qualitative indications of the social and economic impact of Project implementation on the DPs. (d) Suggest modification in the implementation procedures of resettlement plan, as the case may be, to achieve the principles and objectives of this Policy Framework. Report of independent monitoring consists of (i) the report on the progress of resettlement plan implementation, the combination between the implementation of resettlement plan and the executive activities, (ii) the differences, if there are, about the articles and principles of resettlement plan, (iii) raising the questions and proposals of solution so that all the agencies carry out in accordance with these information and can solve the problems in time, and (iv) the report on the progress of the problems stated in the previous report. Based on the experiences of Resettlement Plan implementation to propose the solution of strengthening the present resettlement plan and improving the resettlement plan in future. The Central Power Network Project Management Unit of EVN CPC will bring out the reference articles. These articles will show obviously the tasks of the resettlement plan and will be sent to WB for approval before employing the Independent Monitoring Agency. RP project report: The Ea Kar - Krong Pak J 10kV line and Krong Pak 1l0kV substation-june 201 J 74

77 Rural Distribution Project (RD) Dak Lak province ANNEXES Annex 1: Entitlement Matrix Annex 2: Inventory of total Project Displaced Persons Annex 3: Entitlements Inventory of Project Displaced Persons Annex 4: Socio-Economic data sheet of Project Displaced Persons Annex 5: Total estimated cost of compensation for Project Displaced Persons Annex 6: Cost estimate of survey, assets inventory and community consultation for making resettlement plan. Enclosed Annexes: Minutes of community participation and consultation, survey and inventory of all host project displaced persons RP project report:' The Ea Kar ~ Krong Pak 1 10k V line and /(rong Pak J IOkV substation- June 201 J 75

78 Rural Distribution Project (RD) - Dak Lak province RP project report: The Eo Kar - Krong Pok Il0kV line and Krong Pak I /OkV substation- June

79 Rural DistributiQfl Project' (RD) :.. Dak Lak province I I ANNEX 1: ENTITLEMENT MATRIX Nol Type of loss Application Definition of entitled DPs Compensation Policy Implementation Issues 1 I Temporary All Displaced Displaced - Trees that have to be cut are regulated in acquisition of persons (DPs) persons (DPs) I -Cash compensation for I Article 5 of Decree 106/20051ND CP issued productive that have trees, with/without affected trees at the by Vietnamese Government on August 17 th, land in ROW. crops, and other Land Use replacement cost plus cost 2005, regulating and guiding in details some assets in ROW Registration for cutting trees, crops at articles of Electricity Law on the protection of Certificate market price. The number of the high voltage networks and in Article 1, included in the I crop patterns to be I Section 3 of Decree No /ND-CP on inventory or compensated is based on the October 12 th, 2009 of the Vietnamese able to prove time of temporarily acquired Government on amending and supplementing land occupancy of land. Article 5 of Decree 106/20051ND CP of the prior to cut-off -No compensation for land. I Government. date. -Contractors rehabilitate land - The Central Power Network Management after the project construction Unit and local authorities determine and ensure that compensation for trees will be at the replacement cost and for crops at the market price. Displaced persons (DP) have right for RP project report: The Ea Kar - Krong Pak J 10kV line and Krong Pak J 10kV substation- June

80 Rural Distributip'n Project (RDF- Dak Lak province j \ ' No I Type of loss Application Definition of entitled DPs Compensation Policy Implementation Issues using salvageable trees. - Full compensation must be at least 01 month before land clearance. Payment to DPs will be delivered by CPNPMU. - Affected land in ROW will be rehabilitated by Contractors after the project construction and land in ROW could be used for restricted purposes. - Finance available for compensation and well information disclose to DPs and related branches. 2 I Temporary All DPs with Displaced -Cash compensation for -Trees that have to be cut down are regulated acquisition of orchards or persons (DPs) affected orchards and in Article 5 of Decree 106/20051ND-CP issued residential perennial trees in with/without perennial trees at by Vietnamese Government on August 17 th, and garden ROW Land Use replacement cost regulating and guiding in details some land in ROW Registration - No compensation for land articles of Electricity Law on the protection of RP project report: The Eo Kor - Krong Pok 110kV line and Krong Pak 110kV substation- June

81 Rural Distributipn Project (RD)"- Dak Lak province f.. No I Type ofloss without houses or structures in ROW Application Definition of entitled DPs Compensation Policy Implementation Issues Certificate I -Contractors rehabilitate land the high voltage networks and in Article 1, included in the I after project construction. Section 3 of Decree No. S1I2009/ND-CP on inventory or October 12th, 2009 of the Government on able to prove amending and supplementing Article 5 of land occupancy Decree 106/2005/ND-CP of the Government. prior to cut-off date. - The Central Power Network Management Unit and local authorities determine and ensure that compensation for trees will be at the replacement cost and for crops at the market price. Displaced persons (DP) have right for using salvageable trees. - Full compensation must be at least 01 month before land clearance. Affected land in ROW will be recovered by the contractors after implementation. - Payment to DPs will be delivered by CPNPMB. - Finance available for compensation and well RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak J JOkV substation- June

82 Rural Distl'ibutif)n Project (RD) -- Dak Lak province I.. No I Type ofloss Application Definition of entitled DPs Compensation Policy Implementation Issues information disclose to DPs and related branches. 3 I Temporary All Displaced Displaced House/building: - Houses or construction being pulled down or impact on persons (DPs) persons (DPs) -DP can opt for: i) Keep their not in Article 6 of Decree 106/200S/ND-CP residential that have house/ with/without houses or buildings in ROW issued by Vietnamese Government on August land. Partial buildings. and Land Use with the conditions regulated 1 ih, 2005 regulating and guiding in details house/building trees/orchards in Registration by Article 6 of Decree some articles of Electricity Law on the within ROW ROW Certificate 106/2005/ND-CP issued by protection of the high voltage networks and in (area in ROW included in the Vietnamese Government on Article 1, Section 3 of Decree No. less than 10% inventory or August 17 th, 2005 regulating /ND-CP on October 12th, 2009 of the of total area) able to prove and guiding in details some Government on amending and supplementing and the land occupancy articles of Electricity Law on Article 6 of Decree 106/200S/ND-CP of the demolished prior to cut-off I the protection of the high I Government. area does not impact to the remaining house/building. date. voltage networks and by I - CNPMU and local authorities determine and Article 1, part 4 of Decree ensure that trees compensation will be at the /ND-CP on October replacement cost without reducing the cost of 12th, 2009 of the Government salvageable materials. RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak 110kV substation- June

83 Rural DistributiQn Project (RD) :... Dak Lak province f Nol Type ofl08s Residential I Application land and garden land outside of ROW sufficient IS for reorganizing (not less than 60m 2 ) Definition of entitled DPs Compensation Policy Implementation Issues about correcting and I - DPs will demolish the impacted areas and supplementing Article 6 of I reconstruct/or Decree 106/20051ND-CP of I themselves. improve their houses the Government. - Full compensation payment for orchards and -Subsidy allowance for perennial trees at least 01 month before site fireproof materials and clearance. If displaced persons (DP) require to lightning arrestors for the cut down trees, the expenses will be borne by existing house/building; or ii) NPMU. DPs can use salvageable trees. Cash compensation for - Full payment for project displaced persons directly affected rooms at the (DP) for houses and constructions at least 03 replacement cost and cost for months before site clearamce. demolishing affected rooms. - Payment to DPs will be delivered by -Allowance to conversion of CPNMU and Local Authorities. residential land tenure in - Land in ROW could be used with restricted ROW. purposes. -Contractors rehabilitate land - Finance available for compensation and well after the project construction. information disclose to DPs and related Perennial trees and I branches. RP project report: The Ea Kar - Krong Pak J JOkV line and Krong Pak J JOkV substation- June

84 Rural DistfibutiQ1'I Project (RD)!... Dak Lak province r No I Type of loss Application Definition of entitled DPs Compensation Policy orchards: - Compensation for affected perennial trees and orchards at the replacement cost. Allowances: - Transportation allowances has the maximum value of 8,000,000 VNDIHH Implementation Issues 4 I Temporary All DPs that House/building: - Houses or construction being pulled down or impact on have houses! Displaced -DP can opt for: i) Keep their not in Article 6 of Decree 106/200S/ND-CP residential and buildings and persons (DPs) houses or buildings in ROW issued by Vietnamese Government on August garden land. I trees in ROW with/without with the conditions regulated 17 th, 2005 regulating and guiding in details Impact more Land Use by Article 6 of Decree some articles of Electricity Law on the than 10% of Registration 106/2005/ND-CP issued by protection of the high voltage networks and in total Certificate Vietnamese Government on Article 1, Section 3 of Decree No. house/building included in the August 17 th, 2005 regulating /ND-CP on October 12th, 2009 of the area but the inventory or and guiding in details some Government on amending and supplementing demolished able to prove articles of Electricity Law on Article 6 of Decree 106/2005/ND-CP of the RP project report: The Ea Kar -Krong Pak IJOkV line and Krong Pak ljokv substation-june 20IJ 82

85 Rural Distribution Project'(RD) :... Dak Lak province f No I Type ofloss area will impact to the remaining of house/structure and has to be reorganized (not less than 60m 2 ) Application Definition of entitled DPs Compensation Policy Implementation Issues land occupancy the protection of the high Government. prior to cut-off voltage networks and by - CNPMU and local authorities determine and date. Article I, part 4 of Decree ensure that trees compensation will be at the /ND-CP on October replacement cost without reducing the cost of 12th, 2009 of the Government salvageable materials. about correcting and I - DPs will demolish the impacted areas and supplementing Article 6 of I reconstruct/or improve their houses Decree 106/200SIND-CP of I themselves. the Government. - Full compensation payment for orchards and -Subsidy allowance for perennial trees at least 01 month before site fireproof materials and clearance. If displaced persons (DP) require to lightning arrestors for the cut down trees, the expenses will be borne by existing houselbuilding; or ii) NPMU. DPs can use salvageable trees. Cash compensation for - Full payment for project displaced persons directly affected rooms at the (DP) for houses and constructions at least 03 replacement cost and cost for months before site clearamce. demolishing affected rooms. - Payment to DPs will be delivered by -Allowance to conversion of CPNMU and Local Authorities. RP project report: The Ea Kar - Krong Pak I JOkV line and Krong Pak J JOkV substation-june

86 Rural Disttibuti()n Project (RD)'- Dak Lak province I, ' No I Type of loss Application Definition of entitled DPs Compensation Policy Implementation Issues residential land tenure in - Land in ROW could be used with restricted ROW. purposes. -Contractors rehabilitate land - Finance available for compensation and well after the project construction. information disclose to DPs and related Perennial trees and branches. orchards: - Compensation for affected perennial trees and orchards at the replacement cost. Allowances: - Transportation allowances has the maximum value of 8,000,000 VNDIHH 5 I Temporary All DPs have Displaced -DPs can opt for: i) Keep - Houses or construction being pulled down or impact on houses! persons (DPs) their houses or buildings in not in Article 6 of Decree 106/2005/ND-CP residential or buildings and with/without ROW with the conditions issued by Vietnamese Government on August garden land in trees in ROW Land Use regulated by Article 6 of 17 th, 2005 regulating and guiding in details ROW. Full or Registration Decree 106/2005/ND-CP some articles of Electricity Law on the RP project report: The Ea Kar - Krong Pak J 10kV line and Krong Pak 1 JOkV substation- June

87 Rural Disttibutit;m Projecl (RD) ~ Dak Lak province. t No I Type of loss partial houselbuilding impacted and land outside of is not sufficient for reorganizing (not less than 60m 2 in district and 100m2 In rural) Application Definition of entitled D Ps Compensation Policy Implementation Issues Certificate I issued by Vietnamese protection of the high voltage networks. included in the I Government on August 17 th, - Consultation for DP's options on keeping inventory or regulating and guiding their house in ROW or moving out of ROW. able to prove in details some articles of I - CNPMUs and local authorities determine and land occupancy Electricity Law on the ensure that compensation will be at the prior to cut-off protection of the high voltage replacement cost at the time of payment. date. networks. Subsidy allowance - Replacement land and resettlement sites for fireproof materials and development. lightning arrestors for the - DPs will demolish the impacted areas and existing houselbuilding; or ii) I reconstruct/or Improve their houses Cash compensation for the I themselves. whole residential area which - Full compensation for perennial trees and DPs occupied (not only for fruit trees to DPs at least 01 month before land the impacted areas) and clearance. If DPs require to cut down trees, all properties associated with cost will be paid by Management Boards. DP occupied land at replacement has right to use salvageable trees. cost. Impacted land will be - Payment to DPs will be delivered by obtained by local authorities; CPNPMU and Local Authorities. RP project report: The Ea Kar - Krong Pak llokv line and Krong Pak 110kV substation-june

88 Rural Disttibutipn Project (RD) -- Dak Lak province ' No I Type of loss Application Definition of entitled DPs Compensation Policy Implementation Issues or iii) "Land for land" with I - Residential land clearance could be used with the same area plus restricted purposes. compensation by - Available finance for compensation and replacement cost for assets clear information should be disclosed to DPs with affected area. The land - CPNPMU and local authorities will consult occupied by DPs will be with displaced persons (DPs) who are eligible obtained by local authorities. to restoration programs for their options and - Compensation for affected prepare proposal for restoration programs in perennial trees and orchards the period of Resettlement Plan (RP) at the replacement cost. implementation. Allowances: - Transportation allowance has the maximum value of 8,000,000 VNDIHH. - Transportation allowance for relocating DP should be appropriate to Compensation Decree NO ND-CP. RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 1 JOkV substation-june

89 Rural Distributipn Project (RD)'- Dak Lak province ' I, No I Type of loss Application Definition of entitled DPs Compensation Policy - Rehabilitation assistance if DPs permanently lose chance for business or more than 10% of their incomes. Implementation Issues 6 I Permanent All DPs I Displaced For DPs who lose I - Consultation for DP's options on land acquisition of occupied land I persons (DPs) productive land: compensation. land for tower and assets I with/without a. Land loss less than 10% of - PNPMU and local authorities determine and foundations, associated with Land Use total landholding: ensure that compensation will be at substation and land Registration - Cash compensation for the replacement cost at the time of payment. access roads I permanently Certificate lost area if the remaining plot - Replacement land, and resettlement sites etc. I impacted by included in the is still economically viable. development. towers inventory or - Cash compensation for the - DPs receiving compensation will demolish foundations, able to prove whole impacted plot if the the impacted areas and reconstruct/or improve substation and land occupancy remaining plot is not their houses themselves. access roads prior to cut-off economically viable. - DPs will demolish the impacted areas and date. -Cash compensation for reconstruct/or improve their houses assets associated with land themselves. If DPs require to cut down trees, loss. I all cost will be paid by Management Boards. RP project report: The Ea Kar - Krong Pak llokv line and Krong Pok 1 JOkV substation-june

90 Rural Distributz:on Project (RD)'- Dak Lak province... No I Type of loss Application Definition of entitled DPs Compensation Policy Implementation Issues b. Land loss equal or more DP has right to use salvageable trees. than 10% of total - Payment to DPs will be delivered by PNPMU landholding and Local Authorities. DPs can opt for the 1- Available finance for compensation and clear followings: i) "Land for land" with the - PNPMU and local authorities will consult same area and equivalent with DPs who are eligible to restoration productivity of impacted area programs for their options and prepare if the remaining plots are still proposal for restoration programs in the period economically viable and for of Resettlement Plan (RP) implementation. the whole impacted plots if - DPs will be granted with Land Use Right the remaining plots are not Certificate without payment of administrative economically viable. fees. ii) Cash compensation for land at replacement cost. - Compensation for perennial trees and affected orchards at replacement cost. RP project report: The Ea Kar ~ Krong Pak 1 10k V line and Krong Pak J lokv substation- June

91 Rural Distributipn Project (RD)"- Dak Lak province!.. No I Type of loss Application Definition of entitled DPs Compensation Policy Implementation Issues - Rehabilitation assistance. For DPs who lose Residential and garden land: - If the remaining land is sufficient for reorganizing (not less than 60m 2 ): Cash compensation for the lost area and assets associated with land loss. - If remaining land is not sufficient to be reorganized: DP can opt for i) Cash compensation at replacement cost for land and assets on land, or ii) "Land for land" compensation for the whole RP project report: The Ea Kar - Krong Pak 1 JOkV line and Krong Pak 1 10kV substation- June 201 J 89

92 Rural Disttibutipn Projec; (RD) ~ Dak Lak province ' Definition of No [ Type ofloss Application Compensation Policy entitled DPs I---Ju- I I residential area which DP occupied (not only for the impacted areas) and assets associated with occupied land. For affected houses and buildings, DPs have the same entitlement as written categories 3 or 4 or 5. Implementation Issues 7 I Displaced All DPs I Displaced (a) Temporary impact on 1- Full compensation for incomes lost to DPs at persons (DPs) impacted on persons (DPs) business or other services. I least 01 month before land clearance. impacted on business or other with/without Compensation for income - NPMUs and local authorities will consult business or services. Land Use lost in the affected time. with DPs who are eligible to rehabilitation for other services Registration (b) Permanent impact on their options and prepare proposal for Certificate business or other services. rehabilitation programs in the period of included in the I ( c) Rehabilitation assistance. Resettlement Plan (RP) implementation. inventory or able to prove RP project report: The Ea Kar - Krong Pak I 10k V line and /(rong Pak IIOkV substation- June

93 Rural Distributi9n Project- (RD) ~ Dak Lak province No I Type ofl08s Application Definition of entitled DPs Compensation Policy Implementation Issues land occupancy prior to cut-off date. 8 I Public works - Temporary impacts All impacted institutional Displaced persons (DPs) All impacted - Measures to maintain the - Contract(s) with Contractor(s) should bear organization of normal functioning of the one article on this specific responsibility of the Displaced public works (i.e. roads, Contractor(s) persons (DPs) water supply, telephone lines - Approach the organization of DPs for shall be etc). cooperation; approached for - Recovery after the project - Arrange and pay for the expenses of the cooperation III I construction. measures to maintain the normal functioning performing - All expenses on measures of the impacted public work to satisfy the impact to maintain the normal demand of the organizations ofdps. mitigation functioning of public works measures as I shall be borne by RP project report: The Ea Kar - /(rong Pak 1 10kV line and Krong Pak 1 /OkV substation-june 201 I 91

94 Rural Distributi9n Project (RD).:... Dak Lak province ' No I Type ofloss -Permanent impacts Application All impacted institutional Displaced persons (DPs) Definition of Compensation Policy Implementation Issues entitled DPs well as I Contractor(s). measures for maintaining the normal functioning of public works Displaced - Measures to maintain the I - Contract(s) with Contractor(s) should bear persons (DPs) normal functioning of the one article on this specific responsibility of the with/without public works (Le. roads, Contractor(s) Land Use water supply, telephone lines - Approach the organization of DPs for Registration etc), cooperation; Certificate - All expenses on alternative - Arrange and pay for the expenses of the included in the I measures to maintain the measures to maintain the normal functioning inventory or normal functioning of public of the impacted public work to satisfy the able to prove works shall be born by demand of the organizations ofdps. land occupancy I Contractor(s). Complete the works for 'alternative prior to cut-off date. solutions' prior to the commencement of the project. RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak J JOkV substation-june 201 J 92

95 --... Rural Distributiqn Project.(RD)!... Dak Lak province Definition of No Type oflos8 Application Compensation Policy Implementation Issues entitled DPs Pennanent All DPs who lose DPs with house Tenants who have leased a CPNPMU and local authorities will assist them 9 impacts on their leased lease contract house for residential in identifying alternative accommodation. rented houses houses. purposes will be provided ~ L--.. _~.. -- with a cash grant of six months rental fee at the prevailing market rate in the area ~... _- -_... _-..._- -_..._- RP project report: The Ea Kar - Krong Pak 110kV line and Krong Pak 110kV substation-june

96 This is best available table scan. Please see original report for more detail.

97 j The Yirtnam RD project Eft Kat" kri'lilg Pill;: IIOI;:V line llml su!~~talu~l Anne, 2 Dctails on entitlement of affected households (AI) Details of households i I Land damage (m2) i Numb Percentage Total Land er of ofdamagcd I No people land arca [{<sidelltia Agriculture Agriculture grow ing Land for land area Crops (m2) "amcs and surnames of owned by Iland land (rice) land (crops) the long irrigation in overtbe Iiouschoiders each : term trees each total area bouse household of owned (m2) I hold land :; Ricci crops.!:: J: " 0, t: C..., '"...l " A Ea Kar district ,844 1, , I I Ea Dar commune 44 82,143 1, I Y Ni5t Mlo (TBA Ea Kar) 9 8, H'Nen Nie 5 6, I 3 Y M~t l\ie 10 17, Y Khan Mlo I 8, I 5 Y WienNie 9 9, II' Nuon Nil! I 5, Nguy&n Sa Hi~n J 9, Bu, Xuan Van 4 6,500 - Ion Nguy~n T~n Thanh 4 9, II Ea Kar town , , Y WokNie 7 30, Y DhikNie 1 10, Y A Lah Mia 5 9,500 : Tnln TrQni> 'roan 2 16, Y Ooot Bya 5 12, Y Gru~n BKrang 8 10, , Y PliC6 MIa 4 10, Ph an Thanh HIi; 5 18, Y Mang Mia II 25, III elf liue commune ,420 too , Y Bun Mia 5 7, Y Trung Nie Kdl!m 4 12, Tr~n Van KMnh 4 9, Y Long MIa I ?' Y Em:vllii 6 6,000 -" Nguy~n Khac Lai I 13, Pham Anh 4 12, Nguy~n Minh Dugc 4 9, Y BI~c Nie 7 12, Y l\uh Mia 5 15, Y Kiang BKrong 5 11, I

98 Damage of trees and crops A ffeeted houses a od architectures (m2) Temporary impac! on land and CfOpS (m2) Land Land Rivers, Piggcry, for long Residential for long Coffee Total area Cay c5i Temporar Rice Crops swamp cowshed term land term (tree) of y house s... trees trees permanent land (m2) C. " ::: c- o,,-~ c 'l' " ~ I!o:: c.; ~ i'lumber Number....c (m2) (m2) E '" " I;,J E.~ ::! c.. E = '" 0.. "" '"... '".E "" ~~C; >- '" "" c " c:.. " " ~.~ 0 " " c:.. ::I ;.- ".E ~ :E ~ ~ " :::. '0 ~ C. "" " " " " '" ;; I , , , ,000.:> , ,900 2, ,700-4,787 i 8-1, , ~ :r , l , , ,630 4, , , I , S , ~ , , , , tt , , ~ - - &, I , ,600 4,167 15,200 6,700 1, , , , , , , , , , J , , , loa ,600-5, , , loa

99 800 No :'\amc~ alld ~ltn1amcs of Ilou,eholdcrs 1 I Land damage (m2) i I er of Total, i I I Land 1of damaged Numb I ,-----., r----' Percentage people land area, H('sidl...'!lli~i,i\g.dculturc Agriculture: gro"lllg <Li~Ud ~or land area Crops (Ill:!) in owned b), Ilanti Im,d (ricc) land (crops)i the long... gatloll! over the each ~ I term tn:l's! each household total area ,--- house (') I of owned! hold 01_ land 'Rice crop, 30 Nglly~n Van Ilila , '.-.ln Yiln Giang 4 7, Nguyen Van Qmu1g 4 9,540. IGO - LOS LUll I 34 Nglly~n Kh~c Chien I 15, , - 0,65 I 6, I , B Krong Pal< district , ,800 9,716 i, I,SOt),r--~ _ ~---+_---_+----+_---._---+_---~-~--- I Krong Bul( commulle , , _1 soo ----~--~ ~------~------I ~ ~ Ph~IHQu6c'\am 3 7, 'ruO'ng Yan Tien 4 9, , L 'ri~u Yan Chitn 4 9,120 ' , 38 Pham Thi Th(ip 2 16,928 ' ' 1, Ban Ilfru Ti~n 4 8, I D~og Van Sioh 4 5, ,83 41 Dieh Th~ Vinll 4 7,180 ' 100 ' D~ng Van Gh~n 5 9, ' \ Le Van Ngu 3 13,420 -' 100 0, 'rilnMinhllue 7 12, , Nguy~nYan~1inh 7 9,072 ' Lien Van Ceng 5 17, Ph~m Thi Tri I 12, Y Dang Bhang 7 7,165,, LtruT~nNalll 5 10, ,94 50 Ph~m Van Tri 4 16, Nguy~n1'hanhnj 5 13,720 -, ,73 52 Y Dik Ni1: 9?8000 ' ,07 i -, 53 Nguy n Yan Thanh 6 9,048 _ Y Djao Nil: 7 14,975 ' ' Y Son Bya Kbluom 7 8, ,23 56 Nguyen Cang Dang 4 10, ' 0.93 II Ea "he commune , , Tri';uyanCiin 10 11, Y rai Nil: Kd,.Iln 5 7, Y Tuong Nle 5 6, YTe1'\ie 10 13, Y BriilO Kbuor 6 16, Y U "ie 9 9, Ygll~nAyun 4 10, L~c 1'ri u Song 6 7, YWinBkray 7 7, Y Buill AS'un 5 9, Iloang Van LQc 4 13, Y Ballg 'ic S 9, Y ~a AYl'" ,,, , L I,no ,00 0,76 \, , , 100, ! 100

100 ,~ "-_ ~ Damage of tn:t'~,lild t't"ops I \ n,'ctcd houses and ;ii'ddtectu,-", (m2) impact on land and crop,~... ~-~.--~ Land 1 Land, 1 Rivers: I'iggery, ror lon~ 1 for long corfccl Total area Cfly d':li Tt.'mporar Rice Crops swamp cowsncd term term (tree) of ) house 1 s... trees trees permanent land (012) ~ ;: '" "umber Number,.;: :: " c '- ~ '" ~ is "" '" " is ~ (012) (011) J:,. c '" t E e E '" :: '" ",. E "., " " "..::s ~ :;; '-'., Q. '" c '" "" ::c "0... '".j , !. - I - - 3, , , ,800-2, I , ,400 ; 158,610 12, ,400 34,300 12, ,200 76,600 5,957-24,200 2, , , , , , , ,900 1, ,300 2, , , , , , , , , , , ), ,000-11, , i , ! 3,600-3, , 1(, 20-4, , - -, I ,200 17,100 1,330 29,200 34,300 2, , ,700-2, ,300-2, ,900 4, ,1 40 6, ,700-4, , , , , ,500 3, ,400 4::; ,200 3, ,800 2, ("'") I

101 I I Il'crc~Jltaoc L'IIlt! uamage (m2) I "umh Total I I b or of Lal~d, : of damaged I ' land area Residentia Agriculturt, Agriculture growing Lalld for; lanu area Names and surnames of pcop C owned by I land land (ricc) : m lautl (crops) Iilelong irrillation lover the "0 Householders each lerm Irees cach total area house household i of owned (m2) hold land Crops (m2) Rice crops - UBNDXii 150, ,53 - //I (foa An commune 28 48, i Hoang Ng9c Huy 5 7, ,27 - ; 71 Tr~n Van Hoang 5 9, L08-72 Nguy~n Vall Hoa 4 7, Nguy n Viin Tr~n 4 7,500! - -, Nguy~n )~c 3 7, Huynh Tao I 7 8,700 : I I 15 - IV Phu'o'c An lown ,233 i ; 6, Ngo Van Hi~n (TBA Krall' 7 63, ,516 8,76-77 Ph\lm Van Mong 7 15, Ph,un Van Mubn 6 10, Nguy~n Th~ Hi~n 5 15, Vo Thanh Xuan 6 6, Nglly~n Nguyen 3 11, Nguyiln NgQc Chilu 6 14, Nguy~n Tai 4 16, Li' Van Ngc;> (BI) Details commune! district I Land damage (m2) :'>iumb I Percentage Total cr of Land lor damaged land area Agriculture Agriculture people growing sidentialla Land for, land area owned by land (rice) No Name in land (crops) Ihe long irrigation over the each lerm trees each lolal area house household of owned (m2) hold land Crops (m2) Rice crop' I A Ea Kar dislrict ,84.t 1, ,700 I Ea Dar commune 44 82,143 1,187 - I 400 I L :2 Ea Kartown , ,100 : I ell Hue commune , ,200 I B Krong Pii k district , ,800 9,716! ,80( 4 Krong Buk commune , , Ea Phi' commune ,881-1, ,00( 6 Hila An cummune 28 48, Phu&c An town , ,

102 Damage of trees and crops Allected "O,,'"S and an:hitl'~tllrl's (m2) Temporar) illlpact '"' land and crops... (m2) Cay ciii " C. c. ::: 0 "E " ~ c: "'".0 " E ~ c: c. E.;: E 0. ~ E " " o. ;. ~ " " i3 ".~ '" c: c: '" ;; ;: ~ " " " ;:; '" '" c. " 0 c. eo "C... <J <J " " rjj -- " c: " "E ~ "C " -" 0 c: c <J '" C. ~ Temporar y house ;\'umhcr (m2) Piggery, cowshed :'\umher (m2) Land for long term trees Land Residential for long Coffee land term (tree) trees Rice Crops Rivers, swamp s... Total area of permanent land (m2) 34, ,000 1, , I , , , , , ,240 45,910 3,571 6, ,516 6, , , , , , , , Damage of trees and crops Affected houses and architectures (m2) Temporary impact on land and crops... (m2) Cayrai c c "C -0 c ell 0 ~ 01) " ";. c: " ".~ E " 0.~ " '" c c: <J C. E.0 " :::I <J c: 0 :::I C CJO '" ;..3 '" ~ ~ C. ~ " E C. "C <J <J " " rjj CO " <J '" "...! II _J?' II c: c: " 'E t:: "C " "0 " 0 c: <J c. '" ~ , ,240 Temporar y house :-.'umber (m2) Piggery, cowshed Number (m2) ( Land Land Rivers, for long Residential for long Coffee Total area Rice Crops swamp term land term (tree) of s... trees trees permanent land (m2) 21,900 21,900 53,400 24,200 29,200-2, ,530 10,306 15,200 6,700-4,787 1,400 25,300 1,967-1, ,630 4,172-1, ,600 4,167 15,200 6,700-1, ,610 12,336-53,400 3~,300 12,316 76,600 5,957 24,200 2,600 17,100 1,330 29,200 34,300 2,300 19,000 1, ,910 3,571-6,816

103 :\" Land d<llll<l~t' ful2) :Xumh ---,----1 Pcrc('nla~c rowl Land of damaged er of' cople lalld '''Tal RC~idenlilll Agriculturel Agricull ilre growing land area and surnames of I p. "" IIcd h, I \;liid land (rice) hl11d (crops) Iheloug irrigation over the Householders til I each term trees total area of (Jwucd l:1nd Crops (1112) Hicel <:rop~ (el) DctaiiDistrict.'io Name Numb Total Land damage (m2) er of I land area I'. j AgriCUlturel Agriculture pc~plc owned by slllenttallall~lid (ricc) land (crops) 10 each each house I household hold (mi) loa Kar dislrict 2 I Krong Pak district Total 152 I 412,844 1, ,018 1,800 J,112,862 1,487 JOO 2,100 Central Power ('nrporation Power Iletwork project management board

104 I)amagl' ~jf trees and crops A ffected houses llild architectures (Ill") Temporary impact on land "III! I'mps... (m2) Cilye6i ;:; e 0 0 '1 ':;.t:.::: " "" ";. u c c:. u c 0..., "..:l '" ell c ~ ~ t c :; '" 0 c:. t;; '': E ;> u ::l ;;;: '" c.. :::l " "... '".Q... C " E.. ".Q E " " E 0..~ " c u u '" '" ".. u 3 :::-0 --Ie Temporar! y house Piggcq, cowshcd Number I I'\umbcr o c u (m2) (1U2) " S Hiee Rivers, Crops I swamp s.., Tolal arca of perm~)n(.'nt 1'lIId (m2) -_. Damage of trees and crops Cay c5i.-- -, ~ c ':; c , 0 "0 c I.t: e< u 0 " >- '" " :; " e "".. c C..D " 0 c.. u.;:: c. ~~ " I~ " e.0 u 0 0 u " '" E C. '" c ;>,..l "" ::E c...., ~ " '" " '"0 " " " l- " ! II ~ ' " " c ~ v, C eo Vl '" " ~()O Affected houses and architectures (m2)._.- I'iggery, Temporar cowshed y house c,,- -= -..;: ~ J:;"i Number Number,,-"Co e ;; Q. (m2l (m2l S , , Temporary impact on land and crops... (m2) Land Land for!ong Residential for long Coffee term land term (tree) trees trees Rice Rivers, Crops swamp s ,900 2, ,530 10,306 15,200 6,700-53, ,610 12,336-53,400 34,300 c '------i--'--'- 75,300 2, ,140 22,642 15,200 60,100 34,300 - Total area of pennancnt laud (rn2l 4,787 12,316 17,103

105 ..-L... L.. ',, The Vietn~m RD 'project Ea Kar - Krong Piik llokv line and substation Annex 3 Social-economic information of project affected households No. A Householder Ea Kar district Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND! Ea Bar commune 1 YNiitMla Tong Sinh Hamlet Male 68 Ede 2/12 Agriculture Farmer H'RuhNie -nt- Female 63 Ede 1112 Agriculture Farmer H'LUtNie -nt- Female 37 Ede 3112 Agriculture J1armer YTimNie -nt- Male 33 Ede 1112 Agriculture.Farmer H' WilitNie -nt- Female 26 Ede 5/12 Agriculture Farmer YBhiu Nie -nt- Male 24 Ede 4/12 Agriculture Farmer YBotNie -nt- Male 21 Ede 9112 Agriculture Farmer H' OHitNie -nt- Female 18 Ede pupil pupil Y BienNie -nt- Male 8 Ette 2112 pupil pupil 2 H' NenNie Tong Sinh Hamlet Female 41 Ede 3/12 Agriculture Farmer YDol Nie -nt- Male 22 Ede 3112 Agriculture Farmer YMrikNie -nt- Male 20 Ede 3112 Agriculture Farmer Y Don Nie -nt- Male 16 Ette 8112 Agriculture Farmer H' TrangNie -nt- Female 12 Ette 6/12 pupil pupil 3 YMitNie Tong Sinh Hamlet Male 70 Ede 1/12 Agriculture Farmer H'RebMlo -nt- Female 68 Ede 1112 Agriculture Farmer YNanMlo -nt- Male 29 Ede 9112 Agriculture Farmer YLokMlO -nt- Male 27 Ede 7112 Agriculture Farmer Y Duc Mlo -nt- Male 25 Ede 6/12 Agriculture Farmer Y CuangMlo -nt- Male 23 Ette Student Student Y Chuang MID -nt- Male 20 Ette 3112 Agriculture Fanner.

106 ,,.. The Vietnam RD project Ea Kar - Krong Piik llokv line and substation, Annex 3 Social-economic information of project affected households No. Householder Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (personjyear)~ A Ea Kar district!! Ea Bar commune 1 YNiitMlo Tong Sinh Hamlet Male 68 Edt; 2/12 Agriculture Farmer H'RuhNie -nt- Female 63 Ede 1112 Agriculture Farmer H'Lt'rtNie -nt- Female 37 Ede 3/12 Agriculture Farmer Y Tim Nie -nt- Male 33 Bde 1/12 Agriculture Farmer H' WiatNie -nt- Female 26 Ede 5/12 Agriculture Farmer Y BhiuNie -nt- Male 24 Bde 4112 Agriculture Farmer YBotNiS -nt- Male 21 BdS 9112 Agriculture Farmer H' OiatNie -nt- Female 18 Ede pupil pupil YBienNie -nt- Male 8 Bde 2/12 pupil pupil 2 H' NenNie Tong Sinh Hamlet Female 41 Edt; 3/12 Agriculture Farmer Y Dol NiS -nt- Male 22 EdS 3/12 Agriculture Farmer Y MrikNie -nt- Male 20 Ede 3/12 Agriculture Farmer YD6nNiS -nt- Male 16 EdS 8/12 Agriculture Farmer H'TrangNie -nt- Female 12 Ede 6112 pupil pupil 3 YMltNie Tong Sinh Hamlet Male 70 Ede 1/12 Agriculture Farmer H'RebMlo -nt- Female 68 Ede 1112 Agriculture Farmer YNanMl6 -nt- Male 29 Ede 9112 Agriculture Farmer YLokMl6 -nf- Male 27 BdS 7112 Agriculture Farmer Y fluc MI6 -nt- Male 25 BdS 6/12 Agriculture Farmer YCuO'ngMI6 -nt- Male 23 Ede 12/12 Student Student YChuong~~ -nt- Male 20 Ede 3112 Agriculture Farmer ~ ~ :)

107 No. Householder.. i Residence of housholder Ethinie Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND H'Khui Mio -nt- Female 16 Ede 8112 Agriculture Farmer H'BeoMlo -nt- Female 14 Ede 7/12 pupil pupil H' EI Mio -nt- Female 12 Ede 6/12 Agriculture Farmer 4 YKhinMlo Tong Sinh Hamlet Male 40 Ede 7112 Agriculture Farmer YWienNie TO'Ilg Sinh Hamlet Male 61 Ede 3/12 Agriculture Farmer H'DrongMlo -nt- Female 60 Ede 1112 Agriculture Farmer YPhokMlo -nt- Male 36 Ede 8/12 Agriculture Farmer YPhorMlo -nt- Male 25 Ede Student Student YLongMlo -nt- Male 23 Ede Agriculture Farmer H'MingMlo -nt- Female 20 Ede Agriculture Farmer H' WingMlo -nt- Female 17 Ede 10/12 Agriculture Farmer. H'MoHiMlo -nt- Female 15 Ede 9112 pupil pupil H'Yuin Mlo -nt- Female 91 Ede illiterate Elderly Onha 6 HI Nuon Nie TO'Ilg Sinh Hamlet Female 59 Ede 3/12 Agriculture Farmer Nguy~n Ba Hilln 5 Hamlet Male 40 Kinh 12/12 Work for State. Work for State Bili Xuan Vln SarkHamlet Male 40 Kinh 12/12 Teacher Teacher Hua Thj Ngan -nt- Female 38 Kinh Doctor Doctor Bui Hua Xuan Huy -nt- Male 11 Kinh 6112 pupil pupil Bui Minh Hoang -nt- Male 5 Kinh - Small children Small children 9 N It ;: guyen Tan Thanh 5 Hamlet Male 52 Kinh 12/12 Agriculture Farmer NguyBn Thi Nguy~t -ot- Female 42 Kinh 12/12 Work for State Work for State Nguy~n Thi NgQc Di~m -nt- Female 14 Kinh 8/12 pupil pupil Nguy~n TAn Phuc -nt- Male 10 Kinh 5/12 pupil pupil II Town Ea Kar 10 YWokNie MO' rong A Hamlet Male 67 Ede 5/12 Agriculture Farmer H'TirBya -ot- Female 61 Ede 3112 Agriculture Farmer Y GelBya -ot- Male 32 Ede 5/12 Agriculture Farmer YXuanBya -nt- Male 24 Ede Worker Worker H'LongBya -nt- Female 22 Ede 12/12 Agriculture Farmer -- - ~. 2115

108 t No. Householder Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND H'DungBya -nt- Female 20 EdS 12/12 Student Student H' GiengBya -nt- Female 20 Ede 12/12 Student Student 11 YDhikNie 4 Block Male 40 tde 10/12 Agriculture Farmer " 12 Y ALahMlo 4 Block Male 36 tete 5/12 Agriculture Farmer H'BenNie -nt- Female 36 Ede 5/12 Agriculture Falmer YNolNie -nt- Male 16 EdS 9112 pupil pupil! YKol NiS -nt- Male 15 EdS 9/12 pupil pupil Y Pol Nie -nt- Male 3 EllS - Small children Small children i 13 Tr n Tr9ng Toan 4 Block Male 40 Kinh 9/12 Agriculture Farmer Chu Thi Van -nt- Female 39 Kinh Teacher Teacher 14 YDho1Byl TO' Lung Hamlet Male 43 tete 7/12 Agriculture Farmer H' EmNiS -nt- Female 42 EdS 3112 Agriculture Farmer Y'HekNie -nt- Female 15 EdS 7112 pupil pupil H'RoBin NiS -nt- Female 12 Ede 6/12 pupil pupil Y Lotli NiS -nt- Male 3 EdS - Small children Small children 15 Y Gru~n BKrong Ea Col Hamlet Male 40 tete 9/12 Agriculture Farmer H' BunNiS -nt- Female 86 EdS illiterate Elderly Elderly H' JaNie -nt- Female 36 EdS 4/12 Agriculture Farmer YYoHanNiS -nt- Male 10 EllS 4/12 pupil pupil Y SeLaNie -nt- Male 18 EdS 10/12 Agriculture Farmer YOSSNiS -nt- Male 16 EdS 9/12 pupil pupil Y YeRS MiNiS -nt- Male 11 Elle 5/12 pupil pupil H'DiemNiS -nt- Female 1 EllS - Small children Small children 16 YPliMMlo Ea Col Hamlet Male 36 tete 3/12 Agriculture Farmer H' Mon NiS -nt- Female 34 EllS 2/12 Agriculture Farmer H'ONiNiS -nt- Female 12 EllS 6/12 pupil pupil YHulNiS -nt- Male 6 EllS - Small children Onhit 17 Phan Thanh Hl}i TO' Lung Hamlet Male 62 Kinh 10/10 Retired Retired Cap Thi Th!ng -nt- Female 56 Kinh 10/10 Retired Retired ~ 3/15

109 No. Householder,, I --' Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND Phao Thanh Phuong -ot- Male 29 Kinh Teacher Teacher Phao Thanh Huong -nt- Male 25 Kinh Work for State Work for State Phan Thanh Male -ot- Male 14 Kioh 8/12 pupil pupil 18 YMangMlo TO' Lung Hamlet Male 81 E4e illiterate Agriculture Farmer H'BrenNie -nt- Female 80 E4e mil chfr Agriculture Farmer H' Juaih Nie -nt- Female 39 Ede 6112 Agriculture Farmer Y Long Mlo -nt- Male 41 Ede 5112 Agriculture Farmer YNorNie -nt- Male 32 Ede 5/12 Agriculture Farmer H'HongNie -nt- Female 27 Ede 4112 Agriculture Farmer H'XulinNie -nt- Female 16 Ede pupil pupil H'W!nNie -ot- Female 11 Ede 7/12 pupil pupil H'NuinNie -nt- Female 8 Ede 3112 pupil pupil YT!mNie -ot- Male 27 Ede 5/12 Agriculture Farmer H' Phuong Nie -nt- Female 3 Ede - Small children Small children III Commune Clf Hue 19 YBunMlo TO' Lung Hamlet Male 59 E4e 3/12 Agriculture Farmer H' Yuor Nie -nt- Female 53 Ede 3112 Agriculture Farmer YLunNie -ot- Male 26 Ede 6112 Agriculture Farmer YKhuonNie -nt- Male 23 Ede 5/12 Agriculture Farmer H'NumNie -nt- Female 20 Ede 12/12 pupil pupil 20 Y Trung Nie Ktllm Mrong A Hamlet Male 58 Etle 12/12 Retired Retired H' JonMlo -ot- Female 55 Ede Retired Retired H'Hue Ml6 -nt- Female 25 Ede 12/12 pupil pupil Y Gel Mlo -nt- Male 15 Ede 9112 pupil pupil 21 Trln Van Khanh Doim k~t Hamlet Male 41 Kinh 8/12 Agriculture Farmer Nguyen Thi Siu -nt- Female 38 Kinh 7112 Agriculture Farmer TrAn Van Hea -nt- Male 16 Kinh 10/12 pupil pupil TrAn Van Tuyen -nt- Male 13 Kinh 7112 pupil pupil L---_._... _ /15

110 No., Householder Residence of housholder Ethinic Education ProCession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND 1 22 YLongMlo MoarHamlet Male 30 E tie 12/12 Work for State Work for State YEmMlo MoarHamlet Male 36 E tie 9/12 Agriculture Farmer H' Nen BKrong -nt- Female 36 Ede 6112 Agriculture Farmer H' Stel BKrong -nt- Female 14 Edt; 8112 pupil pupil I H' Ji BKrong -nt- Female 13 Edt; 7/12 pupil pupil H' Jiang BKrong -nt- Female 9 Ede 3/12 pupil pupil, Y Kham BKrong -nt- Male 3 Edt; - Small children OnM 24 Nguy~n KhAc Lqi Char Nghia Hamlet Male 60 Kinh Agriculture Farmer Ph,mAnh Char Nghia Hamlet Male 39 Kinh 7112 Agriculture Farmer Vo Thi Lien -nt- Female 37 Kinh 9112 Agriculture Farmer Phtun Thj Kim Ly -nt- Female 14 Kinh 9112 pupil pupil Ph~m Hi~u Kha -nt- Male 5 Kinh - Small children Small children 26 Nguy~n Minh Dove Char Nghia Hamlet Male 54 Kinh 2/12 Agriculture Farmer Nguyen Thi Chi -nt- Female 55 Kinh 3112 Agriculture Farmer Nguyen Minh Tien -nt- Male 23 Kinh 9112 Worker Worker NguyBn Minh TiSn -nt- Male 17 Kinh 9112 pupil pupil 27 Y Bl~cNie MoarHamlet Male 45 E tie 3/12 Agriculture Farmer H'Dlut;Mlo -nt- Female 43 EdS 5/12 Agriculture Farmer Y BhitMlo -nt- Male 25 Ede 9112 Agriculture Farmer H'Mri Mlo -nt- Female 23 EaS 9112 Agriculture Farmer H'MraMlo -nt- Female 19 Ede 9112 Agriculture Farmer H' Ju~tMlo -nt- Female 14 EdS 8/12 pupil pupil H'NguonMlo -nt- Female 14 EdS 8112 pupil pupil 28 YNuhMlo MoarHamlet Male 67 E tie 4/12 Agriculture Farmer H'NBNiB -nt- Female 69 Ede 6/12 Agriculture Farmer H' Len NiB -nt- Female 49 EdB 3112 Agriculture Farmer Y KhitiNiB -nt- Female 30 EdB 2112 Agriculture Farmer Y BhatNiB -nt- Male 24 Ede 3/12 Agriculture Farmer 29 Y Kiang BKrong Hamlet M' Briu Male 55 E tie /12 A~!,i~ulture Farmer L /15!,

111 6115 No. Householder. ".,,, Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND H' Dun Nie -nt- Female 60. Eae 5/12 Agriculture Fanner H'MuelNie -nt- Female 26 Eae Agriculture Fanner H'NeoNie -nt- Female 19 Eae 10/12 Agriculture Fanner H'MiU.kNie -nt- Female 7 Eae 1112 pupil pupil 30 Nguy~n Van Hoa flob k~t Hamlet Male 64 Kinh 7/10 Retired Retired Vii Thi TuO'i -nt- Female 61 Kinh 5110 Agriculture Fanner I Nguyen Thi Vui -nt- Female 34 Kinh 8112 Worker Worker Nguyen Thj Kim -nt- Female 24 Kinh 7112 Worker Worker I! 31 Trin Van Giang floan k~t Hamlet Male 40 Kinh 8/10 Agriculture Farmer Nguyan Thi Ba -nt- Female 35 Kinh 7/10 Agriculture Fanner Tran VAn Tai -nt- Male 16 Kinh 10/12 pupil pupil Trin Thj PhuO'Dg Thilo -nt- Female 10 Kinh 4112 pupil pupil 32 Nguy@n Van Quang floan k~t Hamlet Male 41 Kinb 5/11 Agriculture Farmer Ph~m Thj Bay -nt- Female 37 Kinh 7/12 Agriculture Fanner Nguy~n Thj Xudn -nt- Female 17 Kinh pupil pupil Nguy~n VAn Canh -nt- Male 13 Kinh 7/12 pupil pupil 33 fl6 LU'U floan k~t Hamlet Male 35 Kinh lllll Agriculture Fal'mer Nguy~n Khlc Chieu floan k~t Hamlet Male 55 Kinh 9/12 Agriculture. Farmer , B District Krong Piik! Commune Krong Buk 35 Ph~m Quac Nam 18 Hamlet Male 41 Kinh 7112 Agriculture Fa."mer Nguyan Thi Luy8n -nt- Female 37 Kinh 12/12 Agriculture Fanner Ph~mQuAcHa -nt- Male 4 Kinh - Small children OnM 36 TrtrOllg Van Tien 4 Hamlet Male 55 Kinh 5/12 Agriculture Farmer TruO'Dg VAn Ti~n -nt- Male 25 Kinh 12/12 Worker Worker TruO'Dg VAn Cong -nt- Male 24 Kinh 9112 Worker Worker TruO'Dg Thj ThUy Ngdn -nt- Female 22 Kinh 12/12 Acounter Acounter 37 Tri~u Van Chi~n 18 Hamlet Male 37 Dao 5/12 Agriculture Farmer

112 .,! No. Householder Residence of housholder Ethinic Education Profession and Total income, Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND Hoang Thi LIIU -nt- Female 37 Dao Agriculture Fanner Tri~u Viin TruOng -nt- Male 18 Dao 10/12 Agriculture Fanner Tri~u Thi HAng Hqp -nt- Female 17 Dao 10/12 Agriculture Fanner 38 Ph,m Thi Th~p 18 Hamlet Female 58 Kinh 7/10 Agriculture Farmer Phl;Ull Thanh Thuy -nt- Female 27 Kinh 12/12 Agriculture Fanner 39 Ban Huu Ti~n 15 Hamlet Male 37 Dao 5/12 Agriculture Farmer Ban Thi LIIU -nt- Female 34 Dao 5/12 Agriculture Fanner BanPMcAn -nt- Male 15 Dao 5/12 Agriculture Fanner BanPhuc Chu -nt- Male 13 Dao 8/12 pupil DihQc 40 B,ng Van Sinh 15 Hamlet Male 39 Dao illiterate Agriculture Farmer D~ng Mui NhAy -nt- Female 39 Dao muchu Agriculture Fanner D~g Thi Nghim -nt- Female 19 Dao 6/12 Agriculture Fanner D~gVlinCan -nt- Male 15 Dao 6/12 Agriculture Fanner, 41 Blch Th~ Vinh 15 Hamlet Male 54 Nung 10/10 Agriculture Farmer L\lc Thi Mai -nt- Female 51 Nung 7/10 Agriculture Fanner Dich Thi Hue -nt- Female 20 Nung 12/12 Agriculture Farmer Dich Thi Meo HAng -nt- Female 18 Nung pupil Di hqc 42 Bi-ng Van Gh~n 15 Hamlet Male 35 Dao 2/12 Agriculture Farmer Tri~u Thi Sao -nt- Female 34 Dao illiterate Agriculture Fanner Tri~u Thi Chan -nt- Female 16 Dao 10/12 pupil pupil D{ing Son Kim -nt- Male 12 Dao 6/12 pupil pupil LyThiNhdt -nt- Female 74 Dao illiterate Elderly Elderly 43 UVanNgii 10 Hamlet Male 38 Kinh 7/12 Driver Driver Bui Thi Gai -nt- Female 37 Kinh 9112 Sewer Sewer U Anh Hoang -nt- Male 3 Kinh - Small children Small children 44 Trin Mioh Hue 10 Hamlet Male 51 Kioh 8/12 Agriculture Farmer Nguy~n Thi Hu~ -nt- Female 50 Kinh 6/12 Agriculture Farmer Tr n Thanh Phong -ot- Male 25 Kinh 9112 Agriculture Fanner Tr n Thi NgQc Tuy~t -ot- Female 22 Kinh 9/12 Agriculture Farmer 7115

113 No. Householder Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (personlyear) VND Triln Thi NgQc Long -nt- Female 21 Kinh 9/12 Agriculture Farmer Trim Thi NgQc Sang -nt- Female 18 Kinh 9112 Agriculture Farmer TrAn Thanh Huang -nt- Male 16 Kinh 9112 pupil pupil 45 Nguy~n Van Minh 10 Hamlet Male 49 Kinh 6/12 Agriculture Farmer Hoang Thi Sen -nt- Female 45 Kinh 5/12 Agriculture Farmer NguySn Linh San -nt- Male 23 Kinh 10/12 Agriculture Farmer Nguyan Thi Hai -nt- Female 21 Kinh University Student Nguyan Van Hung -nt- Male 20 Kinh 10/12 pupil pupil N guyan Van Ki~t -nt- Male 9 Kinh 3112 pupil pupil NguySn Van Thi~u -nt- Male 3 Kinh 3/12 Elderly Elderly 46 Lien Van Cong Chq-Hamlet Male 49 Kinh 10/12 Agriculture Farmer V5Thi SAu -nt- Female 43 Kinh 7112 Agriculture Farmer Lien Thanh D~u -nt- Male 24 Kinh Worker Worker Lien Thi Thu Ba -nt- Female 13 Kinh 9112 pupil pupil Lien Thanh TU' -nt- Male 9 Kinh 3/12 pupil pupil 47 Ph,m Thi Tri 8 Hamlet Female 51 Kinh 9/12 Agriculture Farmer Y Dang Bkrong Ea6Hamiet Male 32 Ede 2/12 Agriculture Farmer I HNgorKbuor -nt- Female 34 Ede 1112 Agriculture Farmer H Moan Kbuor -nt- Female 10 Ede 4/12 pupil pupil HRi~t -nt- Female 8 Ed! 2/12 pupil pupil YSach -nt- Male 4 Ed! - Small children Small children YGhanh -nt- Male 66 Ede 2/12 Agriculture Farmer HLoan -nt- Female 66 Ed! illiterate Agriculture Farmer 49 Luu TinNam 8 Hamlet Male 39 Kinh 8/12 Agriculture Farmer Phan Thi Thiin -nt- Female 37 Kinh 9/12 Agriculture Fatmer Luu Cong Chinh -nt- Male 15 Kinh 11/12 pupil pupil Luu Thi Thu Thuy -nt- Female 14 Kinh 9112 pupil pupil Luu Cong Chung -nt- Male 10 Kinh 5/12 pupil pupil 50 Ph\lm Van Tri 8 Hamlet Male 41 Kinh 8/12 Agriculture Farmer

114 No. Householder Resideuce of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND Nguyan Thi Dao -nt- Female 35 Kinh 9112 Agriculture Farmer Ph~m Nguy~n Roai PhU'cmg -nt- Female 10 Kinh 4/12 pupil pupil Ph\im Nguy~n Hoai An -nt- Female 7 Kinh 1112 pupil pupil 51 Nguy~n Thanh Tai 10 Hamlet Male 36 Kinh 9/12 Agriculture Farmer Nguyen THi Th6i -nt- Female 35 Kinh 8112 Agriculture Farmer Nguyen NgQC Anh TUdn -nt- Male 14 Kinh 8112 pupil pupil NguySn NgQc Luan Vy -nt- Male 12 Kinh 6112 pupil pupil Nguy~n NgQc Thien Hoang -nt- Male 7 Kinh 1112 pupil pupil i 52 Y DikNie MtBeHamlet Male 70 Ede 3/12 Agriculture Farmer YBenKbuor -nt- Male 33 Ede illiterate Agriculture Farmer HII Kbuor -nt- Female 67 Ede illiterate Agriculture Farmer HLi Kbuor -nt- Female 42 EdS 4/12 Agriculture Farmer HMienKbuor -nt- Female 29 EdS illiterate Agriculture Farmer HMinKbuor -nt- Female 27 Ede 4112 Agriculture Farmer H DR(rc Kbuor -nt- Female 22 Ede Agriculture Farmer HNerKbuor -nt- Female 23 Ede 9112 Agriculture Farmer YTronNie -nt- Male 27 Ede 2112 Agriculture Farmer 53 Nguy~n Van Thanh Hamlet Cbq' Male 53 Kinh 12/12 Acounter Acounter Ph\lm Thi Cuc -nt- Female 50 Kinh 6112 Buyer Buyer Nguy8n Thi NgQc PhU'Q1lg -nt- Female 24 Kinh 12/12 University Student Nguy~n Van ThAng -nt- Male 22 Kinh 12/12 University Student Nguy~n Thi NgQc PhU'cmg -nt- Female 20 Kinh 12/12 University Student NguySn Thi NgQc Ph\lng -nt- Female 18 Kinh University Student 54 Y Djao Nie MtBeHamlet Male 45 Ede 5/12 Agriculture Farmer H Rui Kbuor -nt- Female 42 Ede 7112 Agriculture Farmer Y Khuit Kbuor -nt- Male 25 Ede 3/12 Agriculture Farmer H Sien Kbuor -nt- Female 22 Ede 10/12 Agriculture Farmer H SiapKbuor -nt- Female 19 Ede 4/12 Agriculture Farmer Y Khuon Kbuor -nt- Male 14 Ede 5/12 pupil Pllpil 9115

115 ,,,, Residence of housholder Ethinic Education Profession and Total income I No. Householder Sex Age Working status (Hamlet, hamlet) group level income (personlyear)~ I I H CHiap Kbuor -nt- Female 16 Ede 7112 pupil pupil 55 Y Son Bya Kbluom 15 Hamlet Male 49 Ede 6/12 Agriculture Farmer HVanNit; -nt- Female 44 Edt; illiterate Agriculture Farmer Y BhaiNie -nt- Male 23 Ede illiterate Agriculture Farmer Y PhoiNie -nt- Male 19 Ede 2112 Agriculture Farmer H Nguyeng Nie -nt- Female 17 Ede 2112 Agriculture Farmer HDangNiNie -nt- Female 13 Ede 6112 pupil pupil YPhaNie -nt- Male 7 Ede 1112 pupil pupil 56 Nguy~n Cong Dang ChQ'Hamlet Male 61 Kinh 10/12 Agriculture Farmer Ki~u Thi ThU'ang -nt- Female 56 Kinh 5/12 Agriculture Farmer Nguyen Ki~u HAng Minh -nt- Male 29 Kinh 12/12 University Student Nguy~n Ki~u Minh Khoa -nt- Male 20 Kinh 12/12 University Student, II Commune Ea Phe 57 Trj~u Van Can 6 Hamlet Male 69 Nung 8/10 Agriculture Farmer LeThi Giang -nt- Female 53 Nung Work for State Work for State Tri~u Minh Thanh -nt- Male 29 Nung University Student Tri~u Thi Thu -nt- Female 27 Nimg Agriculture Farmer Tri~u Thi Thito -nt- Female 26 Nung Work for State Work for State Tri~u Van Nguyen -nt- Male 23 Nung University Student Tri~u Van Thuy~t -nt- Male 20 Nimg 12/12 pupil pupil LU'U Thi Nga -nt- Female 22 Nimg Agriculture Fanner TrAn Tri~u NMt Quan -nt- Male 3 Nung - Small children Small children Tri~u Thi Minh Huy~n -nt- Female 2 Nung - Small children Small children 58 Y Pai Nie Kdam Hamlet EaXu Male 48 Ede 5/12 Agriculture Farmer HNgapEBan -nt- Female 36 Ede 4/12 Agriculture Farmer Y Thu:c E Ban -nt- Male 7 Ede 1112 pupil pupil HVmEBan -nt- Female 5 Ede - Small children Small children H Zuy~tE Ban -nt- Female 3 Ede - Small children Small children 59 YTuangNie chq'hamlet Male 29 Ede 9/12 Agriculture Farmer _._ _..._._....._

116 No. Householder., ", Residence oc housholder Ethinic Education ProCession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND HMuatAyun -nt- Female 30 Eete illiterate Agriculture Farmer Y Duong Ayun -nt- Male 15 Eete 5112 pupil pupil YThAiAyun -nt- Male 4 Eete - Small children Small children HBinhAyun -nt- Female 2 Eete - Small children Small children. 60 VTeNie Hamlet BonA Male 65 Ede 6/10 Agriculture Farmer i, HNcrNie -nt- Female 60 Eete 6/10 Agriculture Farmer YKyNie -nt- Male 34 Ede work for state work for state H SenNie -nt- Female 21 Ede 12/12 University Student HXuanNie -nt- Female 25 Ede University Student HNhuNie -nt- Female 23 Ede 12/12 University Student 1 Y Trinh Nie -nt- Male 31 Ede 12/12 Agriculture Farmer YNoNi8 -nt- Male 18 Eete 9112 Agriculture Farmer YTrungNie -nt- Male 16 Ede 10/12 pupil pupil YHuogNie -ot- Male 13 Ede 6/12 pupil pupil 61 Y Briao Kbuor Hamlet BonA Male 51 Ede illiterate Agriculture Farmer HLiaNie -nt- Female 47 Ede illiterate Agriculture Farmer HRiogNie -ot- Female 22 Eete Agriculture Farmer YLingNie -nt- Male 17 Ede 1/12 Agriculture Farmer HKiroaNie -nt- Female 19 Ede 1112 Agriculture Farmer Y Suaih Nie -nt- Male 12 Ede 5/12 pupil Di hqc 62 VtrNie Hamlet BonB Male 63 Ede 11/12 Agriculture Farmer HKaNie -ot- Female 60 Ede 10/12 Agriculture Fromer HVenNie -nt- Female 37 Ede 10/12 Teacher Teacher H Von Nie -nt- Female 35 Eete Teacher Teacher HWioNie -nt- Female 32 Eete 8112 Agriculture Farmer HVien Nie -nt- Female 31. Ede 12/12 work for State work for State Y Can Nie -nt- Male 28 Ede 8/12 Agriculture Farmer Y GolNie -ot- Male 3S Ede 8/12 Agriculture Farmer Y Bien Nie -nt- Male 42 Ede Agriculture Farmer -_._... _ _ /

117 ~, No. Householder - Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND. 63 Ygu~nAyun Hamlet Bon B Male 63 E de 5111 Agriculture Farmer HBen Nie -nt- Female 48 Ede illiterate Agriculture Farmer HHoanNie -nt- Female 19 Ede 5/12 Agriculture Farmer HLidaNie -nt- Female 16 Ede pupil pupil 64 L\lc Triiu SAng 8 Hamlet Male 61 Nung 5111 Agriculture Farmer Ma Thi Vuang -nt- Female 59 Nung 7112 Agriculture Farmer Ll,lc Vlin Han -nt- Male 27 NUng 4112 Agriculture Farmer Bao Thi Phong -nt- Female 26 Nung 12/12 Agriculture Farmer L\1c Nguy~t Nga -nt- Female 4 Nung - Small children Small children L\1c Thj HAng Di~m -nt- Female 1 NUng - Small children Small children 65 YWinBkriy Hamlet BonA Male 48 E de 1/11 Agriculture Farmer H Dihap Ktla -nt- Female 47 Ede illiterate Agriculture Farmer HJoan KtIa -nt- Female 22 Ede 6112 Agriculture Farmer HDoanKtla -nt- Female 20 Ede 12/12 Worker Worker YKuan Ktla -nt- Male 18 Eda pupil pupil H SO' rai Ktla -nt- Female 15 Ede 9/12 pupil pupil HDungKtla -nt- Female 10 Eda 4112 pupil pupil 66 YBuitAyun Hamlet BonA Male 66 Ede 1/11 Agriculture Farmer HDoi Ayun -nt- Female 29 Ede 9112 Agriculture Falmer YBu6tAyun -nt- Male 27 Ede 12/12 Agriculture Farmer HN~pAyun -nt- Female 23 Ede Agriculture Farmer Y SepAyun -nt- Male 20 Ede 6/12 Agriculture Farmer 67 Hoang Vin L(}c 6HamietC Male 45 Nung 7110 Agriculture Farmer Til Thi Soi -nt- Female 44 Nimg 10/10 Agriculture Farmer Hoang Thi Ngoan -nt- Female 18 Nimg 12/12 pupil DihQc Hoang Thi Huy~n -nt- Female 16 Nung 10/12 pupil DihQc 68 YBangNie Hamlet Phe Male 51 E de 6/11 Agriculture Farmer HGunMlo -nt- Female 46 Ede illiterate Agriculture Farmer HNhipMlo -nt- Female 22 Ede illiterate Agriculture Farmer _... _... _... _... _.. _... _... _... _

118 No. Householder Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND <, HRuenMlo -nt- Female 19 Ede 5/12 Agriculture Farmer YMachMlo -nt- Male 20 Ede illiterate Agriculture Farmer HKi~nMlo -nt- Female 12 Ede 6/12 pupil pupil Y Prom Mlo -nt- Male 16 Ede illiterate Agriculture Farmer HThoaMlo -nt- Female 9 Ede 3/12 pupil DihQc 69 YNaAyun Hamlet BanB Male 41 tde 2/12 Agriculture Farmer HDaNie -nt- Female 36 Ede illiterate Agriculture Farmer HZinNie -nt- Female 9 Ede 3/12 pupil pupil HLoraNie -nt- Female 4 Ede Small children Small children YBleinNie -nt- Male 3 Ede - Small children Small children III Commune Boa An 70 Hoang Ng9c Huy Hamlet Tan L{lp A Male 47 Kinh 6/12 Agriculture Farmer VoThiNhung -nt- Female 45 Kinh 4/12 Agriculture Farmer Hoang Kim Tung -nt- Male 22 Kinh 9/12 Agriculture FaJmer Hoang Thi Ti~n -nt- Female 16 Kinh 9/12 pupil pupil Hoang Thi Thiry -nt- Female 10 Kinh 4/12 pupil pupil 71 TrAn Van Hoang Hamlet Tan L{lp A Male 36 Kinh 9/12 Agriculture Farmer UThj HiSu -nt- Female 41 Kinh Agriculture Farmer TrAn Thi Trang -nt- Female 16 Kinh 10/12 pupil pupil TrAn VanHau -nt- Male 14 Kinh 8/12 pupil pupil TrAn Van Hao -nt- Male 6 Kinh 1112 pupil pupil 72 Nguy~n Van Hoa Hamlet Tan L~p A Male 41 Kinh 10/12 Agriculture Farmer Nguy~n Thj H~nh -nt- Female 37 Kinh 9/12 Agriculture Farmer Nguy n Van Quy -nt- Male 4 Kinh - Small children Small children Nguy8n Thao Quyen -nt- Female 2 Kinh - Small children Small children 73 Nguy~n Van Trln Hamlet Tan L~p A Male 58 Kinh 9/12 Agriculture Farmer TrAn Thj Sen -nt- Female 57 Kinh 9112 Agriculture Farmer Nguy8n Van Anh -nt- Male 37 Kinh Agriculture Farmer Nguy~n Van Linh -nt- Male 34 Kinh Teacher Teacher 13115

119 No.. Householder. Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND 1 74 Nguyln Die Hamlet Tan L~p A Male 68 Kinh 6/12 Agriculture Farmer UThiH6ng -nt- Female 62 Kinh 7/12 Agriculture Farmer Nguy n Van Quy8n -nt- Male 41 Kinh 9/12 Agriculture Farmer! 75 Huynh Tao Hamlet Tan L;p A Male 52 Kinh 12/12 Agriculture Farmer ! LeThjNhon -nt- Female 52 Kinh 9/12 Agriculture Farmer Huynh Truong Son -nt- Male 30 Kinh Agriculture Fatmer Huynh Truong Sa -nt- Male 26 Kinh Agriculture Farmer Huynh Truong Vii -nt- Male 26 Kinh 12/12 Agriculture Farmer HuYnh Truong Bao -nt- Male 23 Kinh 12/12 Agriculture Farmer Huynh Thi Dien -nt- Female 18 Kinh 12/12 pupil pupil IV Town PhllO'C An 76 NgaVanHi~n Block 1 Male 46 Kinh 5/12 Agriculture Farmer Nguy n Thi Blch Van -nt- Female 46 Kinh 5/12 Agriculture Farmer NgoVanH~u -nt- Male 25 Kinh 10/12 Agriculture Farmer Ngo Van CAn -nt- Male 22 Kinh 7/12 Agriculture Farmer NgoVanPhl,lc -nt- Male 20 Kinh Agriculture Farmer NgoThi Thuy -nt- Female 17 Kinh 8/12 Agriculture Farmer Khang Thi TUOng Vy -nt- Female 20 Kinh pupil pupil 77 Phtlm Van Mong Block 1 Male 56 Kinh 6/12 Agriculture Farmer N guy~n Thi Di~u -nt- Female 49 Kinh 4/12 Agriculture Farmer Ph~m Thi Thity Trinh -nt- Female 28 Kinh 12/12 Agriculture Farmer Ph?m Thi Thu Trang -nt- Female 26 Kinh 12/12 Agriculture Farmer Ph~m Thi Anh Nguy~t -nt- Female 24 Kinh 12/12 Agriculture Farmer Ph~m Thi Anb Ki~u -nt- Female 22 Kinh 12/12 University Student Ph~m NgQc Chau -nt- Male 19 Kinh Agriculture Farmer 78 Ph,m Van MuAn Block 1 Male 61 Kinh 2/12 Agriculture Farmer Truong Thi Bong -nt- Female 58 Kinh 3112 Agriculture Farmer Ph~m NgQc Huy -nt- Male 30 Kinh 12/12 Worker Worker Ph~m Van Long -nt- Male 27 Kinh 12/12 Work for State Work for State _ I I

120 No. Householder,, ;.. I Residence of housholder Ethinic Education Profession and Total income Sex Age Working status (Hamlet, hamlet) group level income (person/year) VND... ; Phtlm NgQc Phi -nt- Male 24 Kinh University Student Phtlm Truang Thao Suang -nt- Female 26 Kinh 12/12 Acounter Acounter 79 Nguy~n Th~ Hi~n Block 11 Male 45 Kinh 12/12 Agriculture Farmer Ki~u Thi Nhung -nt- Female 38 Kinh 8/12 Agriculture Farmer NguySn Thi Man -nt- Female 19 Kinh 12/12 pupil pupil Nguy~n Vii Hoang -nt- Male 13 Kinh 7/12 pupil pupil Nguy~n Ki~u Nhi -nt- Female 5 Kinh - Small children Small children 80 Vo Thanh Xuan Block 13 Male 50 Kinh 12/12 Agriculture Farmer HuYnh Thi Man -nt- Female 44 Kinh Agriculture Farmer VoThj Ha Tam -nt- Female 22 Kinh 12/12 University Student VoThj Hit Thu -nt- Female 19 Kinh 12/12 University Student VoHuYnhDo -nt- Male 15 Kinh 9112 pupil pupil Vo San Tra -nt- Male 13 Kinh 7/12 pupil pupil 81 Nguy~n Nguyen Block 11 Male 81 Kinh 4/10 Agriculture Farmer Phtlm Thi Nang -nt- Female 75 Kinh 3110 Agriculture Fanner Nguy~n TAn Qua -nt- Male 32 Kinh 12/12 Agriculture Fromer 82 Nguy~n Ngqc Chau Block 16 Male 71 Kinh 3/10 Agriculture Farmer Nguyen Thi Huang -nt- Female 67 Kinh 2110 Agriculture Fanner Nguyen NgQC Khanh -nt- Male 33 Kinh 7/12 Worker Worker Nguyen NgQC Hoa -nt- Male 30 Kinh 12/12 Agriculture Farmer Nguyen NgQC Thu~ -nt- Male 27 Kinh Agriculture Farmer Nguy~n Thi Thao -nt- Female 24 Kinh 7/12 Agriculture Fanner 83 NguySn Too Block 15 Male 74 Kinh 3/12 Agriculture Farmer Le ThiChau -nt- Female 63 Kinh 3/12 Agriculture Farmer Nguyen Van Thanh -nt- Male 28 Kinh Agriculture Fanner Phtlm Thi Thao -nt- Female 27 Kinh 7/12 Agriculture Farmer 84 Le Van Ngq Block 2 Male 59 Kinh 7112 Agriculture Farmer Nguy~n Thi KhAp -nt- Female 55 Kinh 2112 Agriculture Fanner Le CongViI -nt- Male 26 Kinh 12/12 Agriculture ~-... Farmer -~ _._ /15 I I

121 This is best available table scan. Please see original report for more detail.

122 rhe Vietnam RD project hi Kar - Krong PiU, 110kV lim' and substation Annex 4 \rrcctcd households entiticitit'nl details (A 1) Details of Households A' ;'\0. A 1\ Compensation for land Agricuturc land (growing Agricuture land (growing I Agricuturc land (growing I I I, '" 'II d rice) (Agricuturc land in crops) (Agricuturc land inllon~ term frees) (Agricuturc Compeusntol1 the rice Compensaton the crops (,CS'IuCnWl an '. I. town same the Agricuturc town same tlie Agncuturc I land li! town same the on land I on land I i'\ame and surname of land same tcvell land same level) Anricuture land same level ~ Householders I 1,I I.: tllit ii, Unit I 1 E. Kar district Ea Dar commune Y Niat M!6 (T,BA.Ea Kar) Ba Hi~n ibui Xuiin V~n I"guy~n Tiin Tho 10 IY WOK Nle II Y Dhik Ni'; 12 YALahMlil 13 ITd,n TrQng Toan 14 Iy Dhm Bya 15 Y Gruen BKrong )6 Y PliM Mlo 17 Phan Thanh fl(ii 18 Y MiingMlo III etr Hue commune 19 }O '"'k, I Umt!1 Unit \ Untt, I. I In I, i. In '"''''''''... pnce In Numb,., I pnce In Numb. prtee, In "b "urn e I' pnce In, l\umb I price' cas" h(v'" 'I Numb, I pnce leas" I h(v"i) n (V:\D) cash(vnd) or i(vl\d 1 sh(vnd) or (VND sh(vn!) r m2) i(vnd ca,h(vnd) or (V"D D) I er. (V:-\D. ) (012) (m2) 1 1 (m2»,~~ (m2» (m2» I 4,800, I 4,800,0001 2,700 I. 60,800, ,806, ,000 16, , , , IO.VUUI 16, , , ,000 16,000 lao 16, , , , Ill; noo ,800,0001 1,200 ioo 116, ' i i ,000, ,400,000 l ",LOU 1,6oo,oo~1 \ 3,500 2,250 i 3, I 3,500 2,250 3,500 2,250 3,SOo 2,250 3,500 1,600,000 2,250 3,500 1,600,000 2,250 I 3, ,000 2,150 3,500 35,200,000 1, ')on 1.600,000 1,600, ,250 3, , ,500 2, ,250 3,500 2,250 3,500 1_7..')0 3,500 -I :J

123 ~ -._. Compt'nsuton the long term trees and crops Compensaton the lung term trees c. (.lni! ~ Lnit Unit price I In "" ~ price I' " I Unit I In In ~ g, price cash(yi'd ; I price Unit I --Ill In "li! Cnit In f Cnil Unit price In In (Y"'O) cash(y"'d) ~ (Y'<I) i ""sh(y:>oo) e.sh(yi'd) OJ: (YNO) ) :;: (VNO) cash(yr>;i)1 ~ ~ I pdcc ca,h(yr>; 1: price (Y:,\D) cash(y,,",!) '" (Y"'D) OJ ~ (Y!\l) ~ ~. ~O~OO~ 26,100, S6 28,000, ,680,000 i , ,000, ~ 6,300, ,OOO~ 5.500,000, , ,500, o,~ool~1,ODO,CO() '1 234,000 9,800 3, , ,900, ,000, 234,000 9,800 3,IOO,QOO 180,000, 500, QOO II,500,0001 '1 234,000, 30 I 9, ,000 3,100, , ,000, ,000 9,800 3,100, ,000 1,950,0001- Jsoo.OOO ,000 9,8001,I 4 1,300,000 3,100, , ,000,,:1 5 _, , ,800 3,100,nOO,o ,.!lOOj_360,OOO , ,000 9, , , , ,~OO.~5_4.0'OOO 180, ,000, , ,000 3,100, ( ,80(1, ,000,000 I 12 2,808, ,500, ,000' 7.150, ,0001 2,000, ,000 9, , ,O()OI 2 650,000 1,300, ,500, ,000 9,800 1,800, , ,000 3,250,000/ ~,OOO'.OOO 312~4'OOO 702,000 9,800 1,800, ,500,000 _, ~~~- 2., , ,0001,650, ,500, , , ,000, 2 650,000 1,300, ,000.:;.,500,9EO 4 123~,OOO 936, ,000._ ,000 1,950, , I.. _. 234,000 9, , ,000 2, , , ,000 3,250, ,000 2,000, , ,000 9, ,QOO 1.000, , ,000 J,9JlO, , ,500, , , ,900, ,500, ,872, , , ,000 i 540, , ii80,ooor-360,qooi 2-234,000 9, ,500, ,800, , , , , , , , , , , , , ,000 9, I 4 I , ' 900,000! 900, , ,000,! , , ,800 c = 15 E ~ 40 Unit price 1 In I is (Y'<O) cash(yi\d) -E. 22,000, Unit price (Vr>;O 9 4,950,000 9,300, , ,.100, l,O( , ,000 no,oc 550, ,OC 550,000 l7d,oc S5E, ,0( 550, C 550,0001 1,650,000, 270,OC 550, C 10,450, , ,OC 270,O[ 27D,OC 270,O( 2,750, :0C 270,OC 270,0( 270.0( 270.0C 6,600,OOO[ 4 I 550,0001 2,200, C ,100,000 no.oc 550,000 no,qc 550,000 no.oc 550, , , , , , , ,000

124 liiltl5c and land assisstancc in RO\\I In I",;'(V'iO ~ ) '" Unit price I In (Vl'iD) cash(v:'<id) I'~ 5 Unit price I In l}'g (V"'D) cash(v:'id) Jl 73 11, i---i---j ,000 3,680, ,388, , , , , , , , , , , , , , , , , , ,000. _!c37g,ooo 640, ,000 3,_300, (j,132,000 2,640,000 5,120, ,664,000 2,560, , ,000 3,3g0,ooo ,000 2??~4,OOO ,000 4,224, ,000 2,640, , ,000 3, ,000 3,696,000 64o,QOOI 25 J 32,000 i300,ooo 1,440, ,0001 2,640,000 Unit price (Vl\'D) 132, ,000' 132, , , , , , , , ,000 J '132, , , , , , , ,000 -l-:-r Unit 8 In I' '" <ash(v:>))) price I In (VNll) cash(vnd) Temporary house I)iggcry, cuuwshcd... In :'(umb cash(v:'io) er (m2) Unit price (V:'iD) 690 l- II33,170,OOOI 20 18,402, , , ,950,000 ' ,700, , , , , , , MOO 193, ,860, ,000 3,860, , , ,4M,OOO , , ,000 3,860, ,000 3,860, ,000 3,860, ,000 3,860, , ,000 3,860, , ,000 3,860, , ,000 7,720, , ,580, , ,320,000 I 20, 18,402, ], , ,402,2EOI , ,QOO - geo, , , , J ,000 3,&60, J93, , ,720, ~60,OO() 60 19:\ , ()O 3.860< , ,114 -I , ,1 I In 2,725,600 19,079,200 19,079,200 22,559,348 8,441, Land in ROW (80'V.. assisstancc) Coffee tree (30% assis,!ancc) Unit :'(urnbe, pr,ice, IV n Unit 'j) 1 :>urnbcl pr,ice lin c.. h(v:>!) r (rn2) (V,,!) c"sh(" ) r (m2) (V)I(D) 350, , , I' 350, , , , , , , aOO, , Total (V"O) 736,000, , ,717, r ~ 392,000,0001 1, ,889, , , ,000 7,642, ,492, ,000 24,318, ,592,000 84, ,000 14,417, ,100 56,000, ,000 13,490,700 82,300,700 84,000, J 193, J , , , , ,000 1,825,000 44, ,695, ,748 25, ~ ' )()

125 ---~ --- t No, :\ame and!\ul'll:jiiic of liouscholdcrs --I --- NgLly~n Van Quang ~~_f~~!~.l~e~tj~;jor!.ilid \gnl'lliurc land (growing Land (~rowing Agricuturc l;mo (gnmi;;i;- ~-~~- fin:) (Agricuture land in crops) (At~dculuTe land in long term trees) (Agriculurc Residential land Compensaton the ricc Compensatoll the crops 10\\!l ';ljlh,' the Agricuturc town.':'ihlt' lih' ;\gricuture land in to\'i'fl 'iamt' tht, on land on land! ~~i~~~l~~_r:ne level) _ lar~~l~?lmc lcvcll Agricuturc lan~_ ~~!!!!cj.~'('ll ---,- -- Unit.'\umh t;~j( In ~ Cnit Cnit Unit I. C:'i' In '; i\umb In :\umb, tjnit [0 >; I' n " Numbc prke In. :"umb pnec,.:: In.. price price, ' price ' um) pnce t v:\ er cash(v:\d) er (VNO ens I(. cr (VND cash(vnd prier price i = (VND) cr (VND) cash(vnd) cr V:,\[) cash(vnd) r (m2) (V:"D) rush( V:\ I) cash(v:\o) (m2) (m2) (. J (m2)) OJ (V:"D).3 (VND) (m2) (m2)') ).., " ,000-16, ,000 1,600.0()() 2, , , D6 Luu - 500, ,000-16, ,000 1,600,000-2, , , , I Nguyl'~ Khac Chicli - 500,000-16, ,000 1,600,000 ' 16,000 ~ ----~ - 2, , , , , '-~.- --,-- B Krung Pak di~trict i - - 1,800-28,800,000 9,716-2M,512,OOO - -, 1,800 6,300, ,000, ~'- I----- Krfing Buk 'C'omnwoe ,800, ,800, ,800, ,500, ,--- r I I Ph?1l1 Quae ~a~;;, , ,600,000-16,000 - I 2, , 3, , , , Tnron~ Van Tiel! _ , ,000-2,250 3, , , Trj~u Van ChiEn - - -llb,doo - 16, ,000 1,600.0UO - 2, , , , Ph~m Thi Thep - 16,000-16, ,000 3,200,000 ' 2, , , , Ban Hfru Ti~n 16, , , ,000-2,250 3, ,000, , Di,'in Va~ Sinh , _000 1,600,000 16, , , , , Dich Th~ Villh , Qoo 16, l 1,600,000 16,000-2, , , , ,000 --, 42 Dijng Van Gilon , , ,000 16,000 ~ 2, , , , Le Van Ngil , ,000 1,600,000-2,250 3, , , Tr~n Minh Hue ,000 1,600,000-2,250 3,500 _ ' 500, , Ngu)'~n Van Minh ,000 ' ,000 1,600,000-2,250 3, , , Lien Van C{'mg ,000 ' ,600,000 2,250-3, , , Ph?m Thi Tri , ,000-2,250 3, , , Y Dang Bknlng , ,600,000-2,250 3, ,000 1,000, , Luu Tlin!':am ,000 -, ,000 1,600,000-2, , , Ph~m Van Trl , ,000 3,200,000-2, , ,000, 1,000, , Nguyen Thanh Titi ,000, - 16, ,000 1,600,000-2,250-3, , , Y Dik Nie , ,800,000 16,000-2, ,500 1,050, , , Nguy~n Van Thanh ,000-16_ ,000 I,GOO,OOO , , , Y Djao Nil! ,000 16, ,000 1,600,000-2,250-3,500 -, ,000 1,500, Y Son flya Kblu6m , ()OO 1,600,000-16,000-2, , , ,000 --= 900, Nguy~n C6ng Dang 16,000-16, ,000 1,600,000 2,250 3, , ,000 IT Ea Phc commune , ,000, ,000, I 1,000 -, 3,SOO,OOO 10 5,000,000 -, f Tri~u Van elin - 16,000-16, ,000 1,600,000-2,250-3, ,000 1,000, , Y Pai Nit Kdam - -.-: 16, ,600,000-16,000-2,250 -~! 100 3,5ilO 350, , , Y.TuOng Ni~ , a _._-- 1,600, , , ,000 : - 900, YTeNiil , ,000 3,200,000-16,000-2, , , , , Y Briao Kbuor , , ,000 3,200,000 - ' 2, , ,000 1,500, ,000, - 62 Y 11 :\ie ,000-16, ,000 1,600,000-2,250 3,500 3,500,000 1,500, , Y Ayun , 1,600,000-16,000-2_ , , , Lpc 1!ri~u S6ng -I 16, ,600,000 16,000 2, ,5()0 350, , , Y Win Bkriiy , ,600,000-16,0(l too 3, , , ,000 I 66 Y Bua! Ayun , ,600,000-16,000' 2, , , , Hoang Van L{)c ,000-16,000 10O 16,000 1,600,000 2,250 3, ,000 1,000, , Y Bang Nie , , , , , , , Y Na Ayun - 16, ,000 1, ,000-2, , , , ,000 ljb\d Xa =-._--= : = 16, <J , , ,O~ --- ~ ~~li)aan Commune ,600, J - 1,500, f Hoang ~g\h': Huy , ,000 r----u;oo,ooo -12,250-3, , , - 1 l:~ 900,000

126 Compcnsaton the In 'II(Y;>V) '" ;',e l..:nit price (V'\D) I. In cash(v!\:d ~ ) ~ Unit price! In (V!'>D) ca.\h(v,\1l) g, I Unit ; price In ::;: (VND) I cash(vl\'lj) I 8o,000i 1. _. 650, ,000 2,500,000 - J3.U)()O CompensatoD the rong term tn'es , r- r---- ;; L'nil 1 I 1 ~ pi-icc n, 5 g 1 Unit I price ~ (V'\lJ) ea,h(vnd) &l (v!'>!» " 9,800 :. 180,000 ' - 650, , , ,000 _ 9, ' ,UOO 1,500, oo~1 ~l- : " 79 51,J50,000I 9 " 4,500,0001 II 2,574,000, lj,650,ooo 7 ' 3,51l0,QOO 5 1,170, , ,000-9, , , : ' 234,000-9, , , ,000 9, ,000 ' 500, ,00o - 9, ,000 1,950, , ,000 ' 9,800 ISO,OOOi - 650, , ,000 ' 9,800 18o,~OOI 650, , ,000-9, ,000[ 650, , 234,000 9, ,000i 4 650,000 2,600,000. SOO,OOO ,000 9,800 18o,QOOI 2 650,000 1,300,000 - SOO.OOO 234,000-9, , ,000 3,250, , , , ,000 i 650,000 1,950, ,000 ' 234,000-9,800 ISO,OOO! - 650, :000 ' 5 234,000 1,170,000 9, , , ,000. 9, , , ,000 2,500, ,000-9, , ' 500, ,000-9, , , ,000 1,000, ,000 9, , , , ,000 ' 9, , ,000 ' 500, ,000-9, , ,000 -I ~OO,OOO ,000 _. '. 9, , , , ,000-9,800 18o~oool 650,000-~~OO,. 234:000 - t_9_,8_00-t-- Unit price I In I;:; (YND) cash(vl\'d) ~ pricl' (V:\ll) 325, , I OO,.O!)O 325,000 3, I OO.Ot)() ,000 -' ;., 13,6S0,O()OI 12., 5,850, , , , , , , , ,000 1,950,000 3,100,1)00 - '3,100,000, '),100,000 - '3, I 00,000 3,100,000 3,100,000 13,100,000-3,100, ,000, 325, , , , , , , , , , , , , ,100,000, ~,I 00,000..,,100,000 I '13,100,000 2,275,000-3, I 00,000 3,100,000 3,100,000. '3, I 00,000, '3,100,000 -, 3,100,000 -, 3.100,000 In cash(vnd) 37,20a,aoo, ;; ".., s e 'Unit III ::: Unit In I ~ price 2 price cash(v:\lj ~ (V:\DJ I <"sil(v:\!) Co (VND) ) " 27 17,550, ,900,000,. 1 BO'OtO 4 650,000 2,600, ,000,[234,000 ' - 9,800' 5 325,000 1,625,000-3,100, , ,000 -:~. 180,000 i 650, ,000,-- -'1234,000. _ , , ,100,000 " 550, , ,000 l -650, ,000 -, 23 1,000-9,800 _. 325,000 " 3,100, , , ,000-,234,000 -.~ 9, ,000 -, 3,100, , 550, ,000,000 " , ,000 7,800, ,000 - i 234, , , ,000 ' 3,100,000 -, 550, , , ,000 3,9()O,OOO - 500, ' 234,000 ' - 9, , ,000-3,100,000 " 550,000., 27~,~00 180, , , ,800 ' - 325, ,100, , , ,000, , ,000-9, ,000, - 3,100,000 ' - 550,000 -, 27Q,OOO 180, , ,000,234,000., 9,SOO 325,000, - 3,100, , ,000.! 180, ,400, ,400, , , ,QOO '1 550, ,000,, 550, , , , , ,000' 550, , , , , ,000 SSO,OOO 550, , , ,000 SSO,OOO -,550, , , , '270, , , , , , ,000 ' ,000., , , , , , 270, , , ,000,,270, , , , ,800 ' 325, ,000 -, 550, , ,000 3,250, , ,000-9, ,000 (,50,000-3,100, , , , , ,000-9,800 -, 325, , I 00, , ' - 500,000 ' , ,000 ' - 3, I 00, , ,000,I -!650, , ,000, - 9, ,000-3, i 00, SG.OOO ,000 1 A04,O()O nnnnfltl ' J, 7"V,V"" 24,800,000 I I I 5 i25.000~25,ooo I 3. I oa,oonl 550, , ,000 -,- tnil price In (V\j)) I cash(vn!») ' ,.. 00, 160.I)UO , , , , , , , ,000, 16D.OOD , , , , , , , , , ' , , , , , ,000 -! , ,000 -I

127 No. :'\amc lmd!<.urnamc of Householder... I Residential land Compensatiun for lalld '\gnru!uf(' Jand (growing (growinj!, Agricuturc land (gro\\lll~ ritt) {Agricuture land in crops) (A~! it'utun;: land in long term trees) Compensaton the ricc[ompcnsuwii the crops ttm 11 'a Ill<' the Agrieuturc town Slime the :,\grlculure land in town sallh.' tlit, on land On laud ~~~~~~-~f~~~~~!"_!n_d_s_"_mf~)cvel hwd :'UIHC level) A f Unit. Cnit Lui! Cnit Unil In Lllil, In.:; :'\:urnb. tn :\umh. In :\umh. In "b' III :\'umb price h V" \"umh prin'.:: prtce "NI price. pnce, "urn. price 'N. cas (.,. cash(vnd.,;, er (Vl'm) cash(.» cr (VND) cash(vi'id) cr (VNn cash(v,,!)} r (rn2) (V:"D) cash(\. D) cr (Vi'iD D) cr ("Nil ~ (m2) (m2) (m2» (m2» (rn2»)..., Unit price I In I ~ (V:"D) cash(vnd) ~ 7 Nguy n. 500, , , ,000 -: 1900,no~ Luu ,000 1, , , , , INguy6n Kh~c Chicu - -- i 500,000 ' ~ ,600,000-16, ,000 _ B Krang Pilk di,trict ,800 I 28,800,000 9, ,512, ,800. 6,300, II,OOO.OOO Unit price (VND) z, I Knjog Buk <011"" [I lie ,800,000 1,800-28,800, ,800, ,500, Ph~m Quilc :\am l ,600, , , , ,000i 36 Twang Van fiell - 16, ,000 I,GOO.OOO ,000i 37 Tri~u Van Chien , , , , , Ph am Th! Thiir , , ,000 3,200,000 2, , Bim Bau Ti6n. - 16,000 _. 16,000 -_~IO~_ 16,000 1,600,000.: 2, Elang V~,n Smh - 16, ,600,0.00 ~: 16, ,250 3, , ,5g0 41 Elich Th~ Vinh _ ,600, ~00 I 350, D~ng Van Gilen , ,000 1,600,000-16, , ,5~0 350, Le Van Ngu , ,000 1, , Trlin Minh Hue. _ ,000 1,600,UaO - 2, , Nguy nvan :viinh _ ,000 1,600, , Lien Van Cong _. - 16, , ,000 1,600,000-2, , Ph~m Til! Tri , , ,600,000 2,250. 3, Y Eiang Bkrong, ,000 _ ,000 1,600,000-2, ,500 '19 Ltru Tan ~~m -. - IG,oao ,000 1, , , Ph?m Van Tri , ,000 3,200, , INguy~n Thimh Tni _ , , ,250-3: Y Dik Nil! - 16, ,800,000-16,000 2, ,50\) I,OSO,OOO 53 Nguy~n Van Thanh., - 16,000 _ ' ,000 1,600,000-2, , Y Djao Nil!. - 16, ,000 1, , Y Son Kbluiltn ,600, ,000-2,250 _ 100 3, , , , , , ,QOO 1500, , , , , , ,QOO 500, INguy~~Cong Dang ,000 = - 16, ~ ,600, , , , ,000,500, , , ,000,0001_ ~~.1900, ,000 1, ,000,000 1,500,000-19~O~OOO 900, , , , , , , , ,000 _-1 900, , ,000 II Ea Phi' commune ,000-16,000, ,000, ,000. 3,500, , j J 57 Trieu Van can 16, ,000 1,600,000-2, , ,000 1,000, , Y Pai Nil! Kdum 16, ,600,000 16,000-2, , , ,000 '1 900, Y TtrOng Nie ,000 1:6~0,OO_0 16,000-2, ,50~ 350, ,000 '_1 ~. 900, Y T" Nt" 16, , ,000 16,000 2, , , ,000 '1 900, Y!.lriao Kbu6r 16, ,000 3,200,000 2, , ,000 1,500, _-1900, Y UNi LIDO 16,000 1, , , ,000 1,500, Y glh!n Ayun 16, ,600,000 16, , , , , L~c Tri~u Sling 16,000! 00 1,600,000., , , , , , Y Win Bkray 16, , c600,ooo 16, _ 100 3, , , Y Built Ayll1t 16, , , , , , , IiDang V~n LOc ,600,000 2, , ,000 1,000, , Y Bang Nie, 16, ,000 1,600,000 16, , , , , Y ~a Ayun IJR\O Xii ,600,000 16, , _ 100-3, , , IBoa An commune 600 9,600,000 1,500,000 7t)THoang \:g(,){,; Huy "2, I

128 Compensation for land Agrirutllrl' bind (growing Agricuturc land (grim lllg Agrieuture land (growill!!, rice) (Agricuturc land in crops) (Agricutun.' 1<llld III long term trees) (Agricuture I CUillpensaton the rice I Compcnsaton the..' crops Residential land town same the Agricuture town same the Agri('uturc hmd in town same the. on land 011 land \0. I Name and surnamc 01 1<i110 ~amc Icvcli land same In el) Acricuture land same Inc!) Householders Lnit Cnit Unit Lnit Cnit Unit In In.; '\limb In ;'\umb In Numb In In '\urnh rrice Numb price price price price :\umbe price eash(yn cash(y\u cr e.sh(ynd) er eash(y:\u) (YND) (Y\Il) cash(ynd) er (Y:\D) cash(y\il) cr (Y\D er (Y,",D r(m2) (YND) D) ) (1Il1) (m2) (m2) (rn2) ) (Ol2) ) ~.:: Unit I I I ~ I Luit I In ti price h(~\u) ::: pnce. r (YND) cas. ~ (V\D) cash(,nd) G! I!~~-y~n_~,?_~~~ 16,000 16, ,000 1,600, , , ~~u~~n '.:~~ ~6a 16,000 16, ,000 1,600,000 2,250 3, , , , Nguy~n Van Tr~n 16,000 16, ,000 1,600,000 2,250 3, , ~guy~n f)~c , ,000 1, ,250 3, ,000 1,000, , Huynh Tao , ,600, , , IY Phuo'c An town 6, , 1l2, _ ~~6_Xan ~.~!~n rr:_~:0 Kron( 16,000 16,000 5,516 16, ,000 2,250 3, , , Ph~~ ~~~ Mo~~_ , ,000 6,400,000 2,250 3, , , Ph~m Van Mu&n , ,000 3,200,000 2,250 3, , , Ng~~~n T~J l::!i~n 16, ,000 6,400,000 2,250 3, , , YO Thanh Xuiin 16,000 16, ,000 3,200,000 2,250 3, , , Ngu~e!1_~g~~~n 16,000 16, ,000 3,200,000 2,250 3, , , NguY~~_~~9~ ~h~u_ 16,000 16, ,000 3,200,000 2,250 3, , , Ngu~e~_~_~i 16,000 16, ,000 6,400, , , , ~e yan_~g9 16,000 16, ,000 9,600,000 2,250 3, , ,000 1 :1 (Btl Details commune! district i'io. Name Compensation for land Agricuture land (growing Agricuture land (growing Agricuture land (growing rice) (Agric"ture land in crops) (Agricuturc land in Residential land long term trees) (Agricutu~ompensaton the rice oi'bmpcnsaton the crops on I town same the Agricuture town same the Agricuture land in town same the land same level) land same level) Agricuture land same level) Unit Unit Numb In Numb In.; Numb Unit Numb Unit Numb Unit Unit Unit c Unit In In In i'iumbe In price pnce.:: In " In price cash(yn ct er price er price er price er er cash(yi\'d price price cash(yl':d) cash(yi\'d) r(m2) c.sh(ynd) (WiD (Yi'iD c e.sh(ynd) ti eash(yi'id) eash(yi'id) (012) (Yi'iD) (m2) (Vl':D) (m2) (Y:'I'D) (Yl':D) (m2) D) (m2) ) (YND) 5 (Y,",D) ) ).., " A Ea Kar district 1, ,450, ,800, ,800,000 2,700-60,800, , ,050, ,500, ,100,000 I Ea Dar commune ,450, ,400, ,000, ,300,000 2 Ea Kar town ,000,000-1, , ,000, ,800,000 3 CU Hue commune , , ,200 19, , ,500, ,000,000 B Krong Pak district ,800-28,800,000 9, ,512, I,ROO 6,300, ,000, :? 4 Krong Buk commune ,800,000 1,800 28,800, ,800, ,500, Ea Phc commune " 1,000 16,000, ,000,000 1,000 3,500, ,000, I loa An commune 600 9,600, ,500, Phuoc An town 6, ,112,000

129 0 ] " >- '" Unit price (VND) - 650, , , , , , , , ,000 _~.::~:~fh:nsaton the long term In.. cs ;1 II!! --=w COnljH.. n... tton 1l1c long term trees I I" I I I I = Lnit I t l:nit - g ; Unit In ;- Cnit I = U~it [n ; price ~ : price in. e price cash(v~ 1: pl"ic~ n 'C tv'id) ICaSh( No)1 i!.1 (V:\lJ) \ "",hiv'id) i,;:; i(vno) 0) ~ i pncc, _.c (V'iD) cash(vno) ~ (Vi'iO)! cash(v'id) ~ " SOO.OOO I 234,000 9,800 3,100, , , ,800 3,100,000 9,300, ,000 1,000,000-2)4,000 9,800 3,100, , ,000 9,800 2,175,000 3,100, , ,800 3,100,000 15,)00, , ,000 9, ,000\ 3,100, , ,000' 9, ,0001 3,100, , ,000-9, ,00 1 3,100,UOO 500, ,000 9, ,000, 3,100,000, -, 500, ,000-9, ,0] 3,100, , ,000 9, ,000 3,100, , ,000 9, ,000 3,100,000, 500, ,000 9, ,0001 3, ioo,ooo - 500, ,000 -, 9, ,000 3,100, ,000 -,550, _ , , , , , _ , , ~ , , In c.sh(v!,(o )., 3 I'~ U?it I III pnce,'" (Vl'O) cash{v. Il) ;:j 160, , , , ''""d=--:~ 160, , ,000 16~,OOO 16~~0 160, , ,000 \60,000 -l16 : /15 ";- : 120 Compensaton the long term trees and crops l;! Unit In.g Unit In g, Unit I I t; ~ ~ Compcnsaton the 'ong term trl~s Umt I :5 Unit In -E,;: Unit I iii Unit ( ~ Unit I E I, Unit In I" Unit In I_:! ;g price cash(vnd ~ price, ' ; price n r g:: pnce. n,. E price cash(vn a ~ price n,'5 price.' n t " ~ price n,. ~=- price cnsh(vnd ~ price 1'\0 ~,. (V!,>I) ) ~ (Vt'\D) cash(v!,(d) :;;:: (VNO) cash(vno) ls. (V!'>[) eash(vt'\d) ~ (V!,(O) 0) e;: (VND) <ash(v!'>[) -5 (Vl'\[) cash(\!'>o) ~ (VND) cash(vnd) c. (V:\O) ) ~ (VNO) <ash(vi )... - r ~ ,120, ,800, ,000,000, 20-4,680, , ,875, ,900, ,000, ,860, ,680, ~ -,-----:- 13-2,340_ ,800,000 II. 5,5()O,OOO , ,825, ,300, ,950,000 5 I 1,350,000 2J 3,680, ,880, IOO,0(j ,000, _808, , ,900, ,450,000 9! 2,430, ,120, , ,900, ,500, , , i 1l,700, l,700, _ 6_60o_ , ,880, ; _+-~_-_I-~_ l,350, ,500,000 II - 2,574, J 13,650, ,200,000 _ _650, ,500, ,170,000 - r-----::--~- 'i'8-~l , , ,550, _900, _ ,000_ ,404, ,900, ,800,000 _ - I 32 I I 81

130 --~ House and land <l:-.... i"",t;llll'(,'_."'--=:...:.:.- ;! I Lnil E price In 'Jl (V:'>'O) I cash(vno) ,000 3,168, , , ,000 4,620, ,972, ,000 3,300, , ,0'00 3,960, ,000 1,320, , , , ,000 -~IcIH' :g I pril'l' U (V'\I)) In casiliv:'>'o) 3.860,000 ),860, ,000 3,860,000 3, ,320, 189,140,000 7,720, , , ,000 er (m2) Temporary huuse 1-920, , , , ,114 Piggery, couwshed... I.",," i"i~ow (80% <1ssisstance) cash:~no) Coffee tnt (JH'~/Il "d~sisstance) Lnil trllt pril;c pt'il'l' In cash(vnd) \!'iambe (V,\!) (V:"D) j r(m2) ,138, ,000 12,622, ,159, ,232, ],000 18,470,100 -, 3, ,760, ,907, ,728, ,000 24,78 1, ,000 16,733, ,000 20,265, ,000 26,112, ,000 33,755, , ,471,000 Total (V,\O) 29,900,400 31,976,200 23,311,000 27,837, ,382, ,856, ,612,000 45,327,800 29,900,200 42,861, ,113,100 29,305,000 36,604,900 51,835,700 60,297, House and land assisstance in ROW Temporary house Piggery~ couwshcd... Land in ROW (80% assisstance) Coffee tree (30~Yo assisstance) -- : Total (V]'; D) Unit Unit Unit Numb Unit l"umb Unit Unil!Jnit In " ~ In price ~ price :!:: " In In In Numb. In Numb. price 0 er price er price price price In cash(vnd) eash(v:"o) cash(v!'id) (YND) VJ " (VNDI U cash(v),;d) cash(v1\m cash(v:"d) r (m21 cash(vnd) r (m2) (VND) (m2) (VNDI (m2) (YND) (V],;D) (V:"D) --~, ,660, ,170, ,402, ,364,148 2, ,000,000 10,306' - 596,717,400 14,388, ,390, ,725,600 1, ,000,000 1, ,889, , ,079, ,000, ,558, _..:. 46,320, , , ,000, =-.,1~ 241,269,300 r :: ,800,000 1, ,260, ,142, , ,254,-' ,060, ,980, ~ 19,300,00 1..""ooll ----~ ,142,440-5, ' - - 1,330 77,007,000 ~:~~~:~~~ 59 ',788,01'] ,160,000i - 1,478 85,576,200 10,692, ;, , ,OOOi - i -I -! 3, , ,664, :. 25,608,000-32,604,000-12, ,593,050,628 1,041,738, ,800, ~ 1,586,946, , ,989,000 J 83,102, ,856,900

131 \0. ~amc and surname of Householders Rcsidcntialland In cash(vi'id) CllmlH.'flSatioo fur land A~ricutur~ land \growi~g I Agrkuturc land (growin,g nee) (Agrlcu,,,rc land III crops) (Agri.uture I.nd In town same the At!ricutlll-C '1umbl Un.it er price (m2) (VNO).':: [lllil I In I ~ Illli! I In I ~> I :. price c pntc. ~ pi ~ (V:;O) cash(vnd).3 (V:; I) <llsh(v'>d) "" (V (el) Dctail District Stl A B Name Ea Kar district Krong Pak district Total I Residential hind Numb Vnit In er prie< casij(vi'io) (012) (VND) 1, ,450,000 1, ,4;;0,000 Corn pcnsation (or land Agricuture land (growing Agricut"rc land (growing Agritu!ur. land (growing rice) (Agrieutur. land in crops) (Agri.utur. land in long term trees) (AgricutUe'ompensatoll the rice o/lumpellsaton the erops on I (own same the Agrku(ure town same the Agricu(ure hind in town same the land same level) land same I..'el) A Jricu~~J~!ld same level) Numb Unit Numb Unit In In or price or price <ash(vi'io) cash(vno) (012) (VKD) (m2) (VI\O) , ,800, , , ,800,000 2,100-33,600,000 Unit Unit Unit Numb In l'iumh In Unit c U~it ~ :;umbe In price price ~ In ell In)l;; V price er cash(vi'i er cash(v:;o price r(m2) cash(vi'id) (Vi'iO (VN!) c pncc. ~ pi cash(vnd) (VI\'O) (012) 0) (m2) ) ~ (VI\O).3 ) )..., I"", """"} " IV 2,700.~ioo,ooo ,050, ,500, , I 00, , , , ,000 ~ (. ~ , ,3! 2, I - 675,000 2, ,nOO 57 28,500, , Central Power Corporation Power network project management board

132 \,;:...:..H, COmpl'Il"aIOtl lilt: long, term trees and crops Compcnsaton the long h.-nn trees Co i I.~ In 1;- Unit <ash(vn 1': price In ca,h(v,\!), '" 0) ~ (VND) I'" ~ I Unit rrice (VN!) I In h(v:\d) cas " ~ " Unit price (VNO) Compensatoo the long term trees and crops Cumpcnsaton the long term trees In 1-5 e I cash(vnd ~ ) ) ~ g. :<: " Unit price I In (VND) C<lSh(VND) l.; I Unit : price In ~ (VNO) I cash(vnd) " ' C,;, 1 In 1-0 ~ I!nit '~ ~ pr,lcc I' V:"l ~ - price : I (VND) 0) ~"(VND) Unit [n I E casb(vnd) -a Unit I [n price cash(v:\o (VND) ) " I Unit ~ pritt! '" (VtxU 6,120, , 79 28,000, ,000,000 I 4,860, Jf6,l;0, ,500, , ,000,000 j 4,860,000 73L-.

133 -~ ~ ~~- r I Temporary holise _-",-,,-::.:_=.:;:::::~~~~il~l Ii<()\\ Pi~j!,cry, cou\\'shcd... Land in HOW 18(1% as~i~, italh c) Coffee tree (30% -'l, I pncc Cnit I In,c: I ii.1 price Cnil I In "'-"" I ~ ~ (V:'iD) eash(v:'id) Ji (V:'ill).",h(V:'>!) 8 I Unit price (VNO) Cnit In price eash(v:'ilj) er (V:'>D) (012) Lllit pl"icc (V:'>[)) In cash(vnd) Lnit price i (V:'>I) 1 in cnsh(v:'>!» INumb. r (m2) Unit price -, Unit Unit In In.~ In :;: " price price cash(vnd), <a.h(vnd) " cash(vnd) 0 <FJ (VNH) (V:'iH) U I 11,680, I 66, ~ , ~ _ 52,8Il0,000 1,820 f ,680, ,264, i 52,SOO,(jQ0 2,510 Unit price (WiD) -. - INumb In er cash(v:'io) (m2)! Temporary house -r- Unit price (VND) House and land assiss!anc. in ROW riggery, CQuwshed... Land in ROW (80% assisstancc) Coffee Iree (30% assi"t.n ) :"umb Unit Unit In In NumbJ U~it In Numbe cr price I pnce price In cash(vnd) c.sh(vnd) cash(vnd) r (012) i (WiD) cashiv:'io) r(m2) (m2) (VND) (VNH) Tolal(VND) ,170, ,402, ,364,148 2,100 - I 736,000,000 10, ,717,400 2,593,050, , ,142, ~ - 714,254, ,946,840,80 1 4,179,997-, ,430, ,402, ,506,588 2,100 -I 736,OOO,00U 2~~~~~ 1.310,9. 71

134 The Vietnam RD project Ea Kar - Krong Pik 1l0kV line and substation Annex 5 COST ESTIMATE DETAILED TABLE OF COMPENSATION COST Ea Kar - Krong Pak 110kV line and substation Coe No Compensation and assistance list Unit Unit price ffici Volume ent In cash (VND) I Compensation for land assistance A Ea Kar district Compensation for permanent land acquisition of tower foundation Land belong to the 2 Hamlet, Ea Dar commune, Ea Kar district m , _-----_ _ Land belong to H3 XuAn Huang street, Ea Kar town, Ea Kar district _... _... _... e _... Land belong to the inter-hanlet road to Tu LQc, eu Hue commune, Ea Kar distric. _ e.... Agriculture land level 1 belong to Ea Kar town same 2 times Agricuture land same level _... _... _--_._--_._-_ _.. "' m , _... "'... _ _ , _---_ m , _-... _---_ ~ m , e _-- Agriculture land level 1 belong to the remain Villages. m , Compensation for permanent land acquisition of substation. Land belong to the Hamlet 2, Ea Dar commune, Ea Kar district m , II Assistance of houses and architectures beneath ROW due to restrictied usage 1 Assistance of land beneath ROW due to restrictied usage. Land belong to the Hamlet 2, Ea Dar commune, Ea Kar m , C district beneath ROW retrictied usage assitance of 80%.. --_.- -_ _... _--_.... _---_._--_..._-_._----_ _... _---_ _ _ _... Land belong to Ho Xuan Huong Str., Ea Dar commune, Ea Kar district beneath ROW retrictied usage assitance of m , % ~ _... "' _ _ Land belong to the inter-hanlet road to Tu LQc, eu Hue commune, Ea Kar distric beneath ROW retrictied usage m , assitance of 80% 2 Houses and architectures

135 .. No Compensation and assistance list Unit Volume Unit price ffici '-'u~ In cash (VND) Piggery rn , _ Cow-shed (soil foundation, wooden pole, zine-tole roof) rn , ~ Watch-tower (follow the unit price of temporary house with no large rocks, house with runded wooden frame m , group V, wooden covered wall group VIll, no ceiling, tile... ~<? f.?~ ~.~~?) Temporary wooden house of2 floors group IV, wooden wall, wooden floor group V, cement mortar floor, brick m , foundation, tole roof III Trees and crops compensation for acquisition of tower (] foundation and Ea Kar substation Trees and crops compensation for acquisition of tower foundation Coffee type A (6th year to 25th year) Cay , ~ Wet rice to be harvested m , _... Industrial cassava to be invested m , _.. _ _ ~ SOUl'SOp to be harvested Cay , ~ _ _ ~ Scattered eucalyptus fro years Cay , Trees and crops in Ea Kar substation area Mango >6 years Cay , _. _ 6 _ Longan >6 years Cay , Scattered cassia years Cay , _ ,_""'" I Coffee type A (6th year to 25th year) Cay , "'... "' _ "'... _... _-- I Piggery m , q I B Krong Piik district I Compensation for permanent land Compensation for permanent land acquisition of tower foundation (J Agriculture land level 1 belong to PhuCtc An town same 2 times Agricuture land same level. rn , _ _ _ _ _ Agriculture land level 1 belong to the remain villages. rn , Compensation for permanent land acquisition of (J substation. Agriculture land level 1 belong to PhuCtc An town same 2 times Agricuture land same level (Krong Pak Sub.) m , /4

136 No Compensation and assistance list Unit Volume Unit price ffici '"'v~ In cash (VND) II Assistance of houses and architectures beneath ROW ~ due to restrictied usage 1 Houses and architectures ~ Watch-tower (follow the unit price of temporary house with no large rocks, house with runded wooden frame m , group V, wooden covered wall group VIII, no ceiling, tile... ~<.?~f.~~1?~.~l!!~ Watch-tower (follow the unit price house of 1 floor with the foundation by large stone, cement brick wall, cement mortar floof, wooden covered, zine-tole roof) Assistance of 70% (Nfl 81) m , III Trees and crops compensation Trees and crops compensation for acquisition of tower foundation Coffee type A (6th year to 25th year) Cay , _... _ Industrial cassava to be invested m , Trees and crops compensation for acquisition Krong Pak substation Coffee type A (6th year to 25th year) Cay , q.. C Trees beneath ROW , I Compensation for trees I Scattered acacia years......_ Cay , oo _ r , Pepper type A in 3rd year of business Cay , _ _-_..._ _ Scattered cassia (pepper) years Cay , ~ _ _*_.._... Cocao type A in 3rd year of business Cay , _...* '"' Jack-fruit >7 years Cay , _ Mango >6 years Cay , _ _ _ "" ~.. Soursop to be harvested Cay , _... _ _ _ _..._--. Durian type A in 3rd year of business _ _ _ _-... Cay , C... _... Avocado Cay , C ~ _ Cay , C... ~~i. ~~? ~~~~~.~~. ~~~..." _ Plum >6 years Cay , _ _... _... _ _ "'.._ _ Guava >6 years Cay , C _..._ _..._ _ Longan >6 years Cay , C _-_....._ Bamboo Cay , II Assistance of trees beneath ROW (J 3/4

137 ""''It; In cash No Compensation and assistance list Unit Unit price ffici Volume (VND) _----_ ~ Coffee type A (6th year to 25th year) (during pull Cay , conductor affected coffee will assistance of30%) Total: ~... 4/4

138 The Vietnam RD project Ea Kar - Krong Pik 1l0kV line and snbstation Phu luc 6 Ea Kar - Krong Pak 110kV line and substation COST ESTIMATE OF INVESTIGATION, ASSETS STATISTICS, COMMUNITY PARTICIPATION AND CONSULTATION REPORTS (RP) Project: Ea Kar - Krong Pik 110kV line and substation No Contents Number of people Calculation explaination Number of Implematatio days n conclusion Unit price In cash (VND) COST FOR COMPENSATION AND RESETTLEMENT PLAN (RAP) (I+ +VI) I. Cost in public meeting and from ideas of people in the project area: Hold meetings to inform the provinces, districts and realted branches (meetings) Hold meetings to inform the affected households the preliminary stage of a meeting (02 communes) Cost of transportation (2 meetings/2 times travelling) 1 car x 600km x lian x 0.241/km x 21300dll x 1.1 x 2 times x Travelling expense + Residence ( Leaders + 2 consultants) II. Cost for supervision and making reports Salary of consultants who supervising data and making reports 1 (preliminary stage and detailed stage), 2 people per crew, travel 2 kms each day I 2 Collection ofrp data and general reports making Agreement on RP with communes Agreement on RP with district Agreement on RP with province Cost of transportation during the period of supervision and making report 200,000 VND/day x 05 days III. Cost of implementation Cost of transportation lear x 600km x ltime x km x 21300dll x 1.1 x 2 times Travelling expenses and residence expense of2 employees IV. Cost of stationery for buying documents Cost of stationery, telephones, photocopy of ducuments for supervisions Buying documents for supervisions, maps and others V. Cost for completing report documents Photocopy and printing documents: 100 pages x 1 books x 14 volumes (9 in Vietnamese and 5 in English) x 500VND/page IExpenses of translating the documents into English: 100 page x VNDlbooks x 1 books I I

Resettlement Due Diligence Report

Resettlement Due Diligence Report Resettlement Due Diligence Report August 2015 VIE: Power Transmission Investment Program, Tranche 2-500kV Pleiku-My Phuoc-Cau Bong Transmission Line Binh Phuoc Province Prepared by Central Vietnam Power

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized PEOPLE S COMMITTEE OF PHU YEN PROVINCE PHU YEN PROJECT MANAGEMENT UNIT OF CONSTRUCTION INVESTMENT WORKS FOR AGRICULTURE AND RURAL DEVELOPMENT ----------------o0oo---------------

More information

Subproject: Hai Lang Province: Quang Tri

Subproject: Hai Lang Province: Quang Tri Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP299 vol. 4 Ministry of Agriculture and Rural Development The World Bank Natural Disaster

More information

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT (Loan No. 5233-VN) SFG1981 V2 RESETTLEMENT PLAN Public Disclosure

More information

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Final Project Number: 40282 September 2006 VIE: Calamity Damage Rehabilitation Project The summary

More information

VIET NAM: MEDIUM CITES DEVELOPMENT PROJECT (MCDP) PHU LY CITY SUBPROJECT HA NAM PROVINCE. (Final Draft)

VIET NAM: MEDIUM CITES DEVELOPMENT PROJECT (MCDP) PHU LY CITY SUBPROJECT HA NAM PROVINCE. (Final Draft) Public Disclosure Authorized VIET NAM: MEDIUM CITES DEVELOPMENT PROJECT (MCDP) PHU LY CITY SUBPROJECT HA NAM PROVINCE COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY FRAMEWORK (Final Draft) Table of Contents

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project RESETTLEMENT PLAN Project Number: 46391-001 December 2017 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Hanoi City Power Corporation, Electricity of Vietnam for Asian

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN. VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN. VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN Project Number: Loan 2225-VIE September 2013 VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE Prepared

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of

More information

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION Public Disclosure Authorized VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION ------------------------------------------------------------------ SFG1163 V11 Public Disclosure Authorized Public

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Bac Lieu Province Prepared by the Ministry of Education

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang)

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Resettlement Plan August 2011 VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Prepared by the Lang Son Provincial People s Committee for the Asian

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sub-project: Improving grid medium, low voltage NORTH POWER COORATION Electric Network

More information

ABBREVIATED RESETTLEMENT ACTION PLAN

ABBREVIATED RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project: Irrigated Agriculture Improvement (IAIP) Subproject 1, Hoa Binh province SOCIALIST

More information

Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject

Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject Social Monitoring Report Corrective Action Plan September 2013 Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject Prepared by the Department of Agriculture

More information

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Dak Nong Province)

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Dak Nong Province) Social Monitoring Report July 2014 VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Dak Nong Province) Prepared by Central Vietnam Power Projects

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Binh Thuan Province Prepared by the Ministry of

More information

ABBREVIATED RESETTLEMENT PLAN

ABBREVIATED RESETTLEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF CONSTRUCTION ADMINISTRATION OF TECHNICAL INFRASTRUCTURE MANAGEMENT BOARD

More information

Income and Livelihood Restoration Plan. Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development

Income and Livelihood Restoration Plan. Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Income and Livelihood Restoration Plan Income and Livelihood Restoration Plan Document Stage: Final Project Number: 41013 June 2013 Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Prepared

More information

VIE: Mong Duong 1 Thermal Power Plant

VIE: Mong Duong 1 Thermal Power Plant 11 th Independent Monitoring Report November 2014 VIE: Mong Duong 1 Thermal Power Plant Prepared by the Development Research and Consultancy Center (DRCC) for Viet Nam Electricity (EVN) Thermal Power Project

More information

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the RESETTLEMENT FRAMEWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the Secondary Education Modernization Project II in Sri Lanka Ministry of Education

More information

VIE: Northern Power Transmission Expansion Sector Project

VIE: Northern Power Transmission Expansion Sector Project Resettlement Monitoring Report March 2014 VIE: Northern Power Transmission Expansion Sector Project Prepared by the Local Implementation Consultant (LIC) Social for Viet Nam Electricity (EVN) Northern

More information

Household income in present day Vietnam

Household income in present day Vietnam 2011 2nd International Conference on Humanities, Historical and Social Sciences IPEDR vol.17 (2011) (2011) IACSIT Press, Singapore Household income in present day Vietnam Nguyen, Thanh Binh 1 Free University

More information

Viet Nam: Water Sector Investment Program Tranche 3. Constructing New Water Treatment Plant, Phuc Triu Commune, Thai Nguyen City, Thai Nguyen Province

Viet Nam: Water Sector Investment Program Tranche 3. Constructing New Water Treatment Plant, Phuc Triu Commune, Thai Nguyen City, Thai Nguyen Province Resettlement Plan Resettlement Plan Document Stage: Revised Project Number: 41456-043 January 2019 Viet Nam: Water Sector Investment Program Tranche 3 Constructing New Water Treatment Plant, Phuc Triu

More information

INVESTMENT CONSTRUCTION FILE

INVESTMENT CONSTRUCTION FILE PlfUMlilJ,Lf THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness ---***--- PHU MINH INVESTMENT AND CONSTRUCTION J.S.C SUBPROJECT: RURAL MIDDLE VOLTAGE POWER NETWORK IN HAl DUONG PROVINCE

More information

DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= RESETTLEMENT PLAN

DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= RESETTLEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= RESETTLEMENT

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project RESETTLEMENT DUE DILIGENCE REPORT Project Number: 46391-001 January 2018 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation, Electricity

More information

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION ---------------------------------------------------------------

More information

Viet Nam: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

Viet Nam: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Resettlement Plan December 2013 Viet Nam: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project (EVN HANOI: 110 kv Noi Bai Airport Substation and Associated 110 kv Transmission Line) Prepared

More information

Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project

Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project Resettlement Planning Document Resettlement Plan Document Stage: Revised Project Number: 41013-013 March 2012 Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project Prepared by Provincial

More information

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT (Loan No. 5233-VN) SFG2443 V2 RESETTLEMENT PLAN FOR THE ADJUSTMENT

More information

Viet Nam: Secondary Cities Development Project. Package TK-02: Dien Bien Phu Road, Tam Ky City, Quang Nam Province

Viet Nam: Secondary Cities Development Project. Package TK-02: Dien Bien Phu Road, Tam Ky City, Quang Nam Province Resettlement Plan Resettlement Plan Document Stage: Revised Project Number: 45198 June 2016 Viet Nam: Secondary Cities Development Project Package TK-02: Dien Bien Phu Road, Tam Ky City, Quang Nam Province

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Cao Bang Province Prepared by the Ministry of Education

More information

VIE: Development of the Northern Chu and Southern Ma Rivers Irrigation System Project

VIE: Development of the Northern Chu and Southern Ma Rivers Irrigation System Project Social Monitoring Report 2nd Semi-annual Report January 2018 VIE: Development of the Northern Chu and Southern Ma Rivers Irrigation System Project Prepared by Development Research and Consultancy Centre

More information

VIE: Strengthening Water Management and Irrigation Systems Rehabilitation Project

VIE: Strengthening Water Management and Irrigation Systems Rehabilitation Project Resettlement Plan Updated Resettlement Plan for Nghi Xuyen pumping station Sub-project October 2012 VIE: Strengthening Water Management and Irrigation Systems Rehabilitation Project Prepared by CPMO for

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line Social Monitoring Report Semi-Annual Report January-June 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line Prepared by the Southern Vietnam Power Projects

More information

RESETTLEMENT PLAN (RP) TAY HA NOI 500KV SUBSTATION

RESETTLEMENT PLAN (RP) TAY HA NOI 500KV SUBSTATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANSMISSION CORPORATION Northern Power Projects Management Board -------------------------------

More information

Viet Nam: Central Region Small and Medium Towns Development Cam Ranh (Khanh Hoa) Subproject

Viet Nam: Central Region Small and Medium Towns Development Cam Ranh (Khanh Hoa) Subproject Resettlement Monitoring Report Annual Report October 2012 Viet Nam: Central Region Small and Medium Towns Development Cam Ranh (Khanh Hoa) Subproject Prepared by the InvestConsult Group for the Provincial

More information

Internal Migration in Vietnam: The Current Situation

Internal Migration in Vietnam: The Current Situation UNFPA, the United Nations Population Fund, is an international development agency that promotes the right of every woman, man and child to enjoy a life of health and equal opportunity. UNFPA supports countries

More information

Key Words: Song Hinh Multipurpose Project, Resettlement, Project Management Board

Key Words: Song Hinh Multipurpose Project, Resettlement, Project Management Board IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 07-02: Resettlement Song Hinh Multipurpose Project, Vietnam Key Issues:

More information

NINH THUAN UPDATED RESETTLEMENT PLAN

NINH THUAN UPDATED RESETTLEMENT PLAN SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT PROJECT MANAGEMENT UNIT No.1 CENTRAL REGION TRANSPORT NETWORKS IMPROVEMENT SECTOR PROJECT (ADB5) NINH THUAN UPDATED RESETTLEMENT PLAN August 2009 Table

More information

2017 RESETTLEMENT PLAN SCALING-UP URBAN UPGRADING PROJECT VINH LONG CITY SUB PROJECT SFG2836 V7 REV

2017 RESETTLEMENT PLAN SCALING-UP URBAN UPGRADING PROJECT VINH LONG CITY SUB PROJECT SFG2836 V7 REV SFG2836 V7 REV PEOPLE S COMMITTEE OF VINH LONG PROVINCE VINH LONG DEPARTMENT OF PLANNING & INVESTMENT SCALING-UP URBAN UPGRADING PROJECT VINH LONG CITY SUB PROJECT Public Disclosure Authorized Public Disclosure

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM HO CHI MlNH CITY'S INFRASTRUCTURE DEVELOPMENT FUND ********

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS

More information

CAN THO URBAN DEVELOPMENT AND RESILIENCE PROJECT

CAN THO URBAN DEVELOPMENT AND RESILIENCE PROJECT CAN THO CITY PEOPLE S COMMITTEE CONSTRUCTION & INVESTMENT MANAGEMENT UNIT USING OFFICIAL DEVELOPMENT ASSISTANCE (ODA), CAN THO CITY ***** SFG1562 REV RESETTLEMENT POLICY FRAMEWORK FOR CAN THO URBAN DEVELOPMENT

More information

ABBREVIATED RESETTLEMENT ACTION PLAN

ABBREVIATED RESETTLEMENT ACTION PLAN Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ==================== Public Disclosure Authorized Mekong Delta Integrated Climate Resilience and

More information

VIE: Mong Duong 1 Thermal Power Plant

VIE: Mong Duong 1 Thermal Power Plant Resettlement Monitoring Report Quarterly Report July September 2013 VIE: Mong Duong 1 Thermal Power Plant Prepared by Viet Nam Electricity (EVN) GENCO 3 Thermal Power Projects Management Board 1. Internal

More information

VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT

VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT Resettlement Framework February 2012 VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT Prepared by the Ministry of Agriculture and Rural Development (MARD), Socialist

More information

Resettlement and Ethnic Minority Development Plan

Resettlement and Ethnic Minority Development Plan Resettlement and Ethnic Minority Development Plan Stage of the document: Final Project number: 49026-003 June 2017 VIE: Basic Infrastructure for Inclusive Growth in Nghe An, Ha Tinh, Quang Binh and Quang

More information

RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE

RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the CENTRAL

More information

Resettlement Plan. September 2016

Resettlement Plan. September 2016 Resettlement Plan September 2016 VIE: GMS Flood and Drought Risk Management and Mitigation Project - Upgrading and Rehabilitation of Four Primary Canals in Plain of Reeds, Dong Thap Province - Cai Cai

More information

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS ENVIRONMENTAL SAFEGUARDS Objectives To ensure the environmental soundness and sustainability of projects and to support the integration

More information

SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ====================

SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ==================== Public Disclosure Authorized SFG1727 V5 SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ==================== Public Disclosure Authorized Mekong Delta Integrated Climate Resilience

More information

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B. Module 8 - Involuntary Resettlement- Policy Principles & Requirements (World bank OP 4.12 and 4.12 Annex A) Key principles and objectives of an involuntary Resettlement Policy Resettlement planning instruments

More information

REPORT ON RESETTLEMENT PLAN ( RP)

REPORT ON RESETTLEMENT PLAN ( RP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CENTRAL POWER CORPORATION POWER NETWORK PROJECT MANAGEMENT BOARD Add: 78A Duy Tan St,

More information

NUI PHAO MINING PROJECT DAI TU DISTRICT THAI NGUYEN PROVINCE RESETTLEMENT ACTION PLAN

NUI PHAO MINING PROJECT DAI TU DISTRICT THAI NGUYEN PROVINCE RESETTLEMENT ACTION PLAN The Provincial People s Committee of Thai Nguyen Nui Phao Mining Joint Venture Company NUI PHAO MINING PROJECT DAI TU DISTRICT THAI NGUYEN PROVINCE RESETTLEMENT ACTION PLAN Prepared by Nui Phao Mining

More information

NH21/1 NAM DINH - LAC QUAN RESETTLEMENT ACTION PLAN

NH21/1 NAM DINH - LAC QUAN RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT PROJECT MANAGEMENT UNIT 18 ROAD NETWORK

More information

VIE: Yen Vien-Lao Cai Railway Upgrading Project

VIE: Yen Vien-Lao Cai Railway Upgrading Project Social Monitoring Report Semi-Annual Report June 2014 VIE: Yen Vien-Lao Cai Railway Upgrading Project External Monitoring Report on RP Implementation Yen Bai Province Prepared by Railway Projects Management

More information

RESETTLEMENT PLAN (Final draft)

RESETTLEMENT PLAN (Final draft) SFG3898 V1 REV HA TINH PROVINCIAL PEOPLE S COMMITTEE WORLD BANK RESETTLEMENT PLAN (Final draft) DYNAMIC CITIES INTEGRATED DEVELOPMENT PROJECT KY ANH TOWN SUBPROJECT HA TINH PROVINCE Public Disclosure Authorized

More information

PEOPLE S COMMITTEE OF BEN TRE PROVINCE PEOPLE S COMMITTEE OF BEN TRE CITY

PEOPLE S COMMITTEE OF BEN TRE PROVINCE PEOPLE S COMMITTEE OF BEN TRE CITY PEOPLE S COMMITTEE OF BEN TRE PROVINCE PEOPLE S COMMITTEE OF BEN TRE CITY SFG2836 V2 REV SCALING UP URBAN UPGRADING PROJECT SUBPROJECT OF BEN TRE CITY, BEN TRE PROVINCE RESETTLEMENT PLAN (Final Version)

More information

Viet Nam: University of Science and Technology of Hanoi (New Model University) Project

Viet Nam: University of Science and Technology of Hanoi (New Model University) Project Social Monitoring Report Quarterly Report December 2017 Viet Nam: University of Science and Technology of Hanoi (New Model University) Project Prepared by the Viet Nam Academy of Science and Technology

More information

Resettlement and Ethnic Minority Development Plan (REMDP)

Resettlement and Ethnic Minority Development Plan (REMDP) Resettlement and Ethnic Minority Development Plan (REMDP) Stage of the document: Final Project number: 49026-002 April 2017 VIE: Basic Infrastructure for Inclusive Growth in the Northeastern Provinces

More information

NH18: CUA ONG MONG DUONG RESETTLEMENT ACTION PLAN

NH18: CUA ONG MONG DUONG RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT PROJECT MANAGEMENT UNIT 18 ROAD NETWORK

More information

VIE: Hanoi Metro Rail System Project Line 3: Nhon-Hanoi Station Section

VIE: Hanoi Metro Rail System Project Line 3: Nhon-Hanoi Station Section Social Due Diligence Report Document Stage: Second Draft Project Number: 40080 May 2013 VIE: Hanoi Metro Rail System Project Line 3: Nhon-Hanoi Station Section Prepared by Hanoi Metro Railway Board for

More information

VIE: Phuoc Hoa Water Resources Project

VIE: Phuoc Hoa Water Resources Project Resettlement Plan Sept 212 VIE: Phuoc Hoa Water Resources Project Component: Duc Hoa main canal Cu Chi section Prepared by Project Management Unit for Investment and Construction of Cu Chi District for

More information

Resettlement and Ethnic Minority Development Plan (REMDP)

Resettlement and Ethnic Minority Development Plan (REMDP) Resettlement and Ethnic Minority Development Plan (REMDP) Document Stage: Final 20 July 2010 GMS: Kunming-Hai Phong Transport Corridor - Noi Bai- Lao Cai Highway Project Bao Thang District, Lao Cai Province

More information

VIE: GMS Ben Luc - Long Thanh Expressway

VIE: GMS Ben Luc - Long Thanh Expressway Social Monitoring Report Inception Report May 2013 VIE: GMS Ben Luc - Long Thanh Expressway Prepared by Thanglong Infrastructure Development for Vietnam Expressway Corporation and the Asian Development

More information

Vietnam: GMS Sustainable Tourism Development Project

Vietnam: GMS Sustainable Tourism Development Project December 2010 Vietnam: GMS Sustainable Tourism Development Project Prepared by Quang Binh Provincial Implementation Unit for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 17 August 2010) Currency

More information

VIE: Hanoi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Hanoi and Ho Chi Minh City Power Grid Development Sector Project Resettlement Plan VIE: Hanoi and Ho Chi Minh City Power Grid Development Sector Project (EVN HANOI: Mo Lao 110kV Substation and 110kV Connection) Prepared by Ha Noi Power Corporation for the Asian Development

More information

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 07-01: Resettlement - Chiew Larn Multipurpose Project, Thailand Key

More information

VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Project

VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Project Resettlement Plan July 2012 VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Project Prepared by Ho Chi Minh City People s Committee Management Authority Of Urban Railway for the Asian Development

More information

RP82 RESETTLEMENT PLAN 220KV QUANG NINH TPP - HOANH BO TRANSMISSION LINE POWER EGINEEMNG CONSULTING JOINT-STOCK COMPANY 1 VOL. 30

RP82 RESETTLEMENT PLAN 220KV QUANG NINH TPP - HOANH BO TRANSMISSION LINE POWER EGINEEMNG CONSULTING JOINT-STOCK COMPANY 1 VOL. 30 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIET NAM POWER EGINEEMNG CONSULTING JOINT-STOCK COMPANY 1 PROJECT:

More information

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Resettlement Policy Framework for the Smallholder Agriculture Development Project

More information

VIE: Phuoc Hoa Water Resources Project

VIE: Phuoc Hoa Water Resources Project Resettlement Plan Loan: 2025/2747 Document stage: updated Dec 2013 VIE: Phuoc Hoa Water Resources Project Component: Tan Bien Irrigation Area Five drainage canals in Chau Thanh District, Tay Ninh Province

More information

L3173-VIE: INTEGRATED RURAL DEVELOPMENT SECTOR PROJECT IN THE CENTRAL PROVINCES (Additional Financing)

L3173-VIE: INTEGRATED RURAL DEVELOPMENT SECTOR PROJECT IN THE CENTRAL PROVINCES (Additional Financing) INTERNAL SOCIAL SAFEGUARDS MONITORING REPORT ON RESETTLEMENT (From July 2017 to December 2017) Document stage: Final report Loan Number: 3173 January, 2018 L3173-VIE: INTEGRATED RURAL DEVELOPMENT SECTOR

More information

IPP182 v.1 MEKONG TRANSPORT INFRASTRUCTURE DEVELOPMENT PROJECT ETHNIC MINORITY DEVELOPMENT PLAN. March 2007

IPP182 v.1 MEKONG TRANSPORT INFRASTRUCTURE DEVELOPMENT PROJECT ETHNIC MINORITY DEVELOPMENT PLAN. March 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam World Bank IPP182 v.1 MEKONG TRANSPORT INFRASTRUCTURE DEVELOPMENT

More information

EBRD Performance Requirement 5

EBRD Performance Requirement 5 EBRD Performance Requirement 5 Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or loss of

More information

Performance Standard 5 Land Acquisition and Involuntary Resettlement

Performance Standard 5 Land Acquisition and Involuntary Resettlement Introduction Performance Standard 5 1. Involuntary resettlement refers both to physical displacement (relocation or loss of shelter) and to economic displacement (loss of assets or access to assets that

More information

VIE: INTEGRATED RURAL DEVELOPMENT SECTOR PROJECT IN CENTRAL PROVINCES - Additional Financing

VIE: INTEGRATED RURAL DEVELOPMENT SECTOR PROJECT IN CENTRAL PROVINCES - Additional Financing Resettlement Plan March 2017 VIE: INTEGRATED RURAL DEVELOPMENT SECTOR PROJECT IN CENTRAL PROVINCES - Additional Financing Subproject: Upgrading Dai Giang River Dike system, Thua Thien Hue province Prepared

More information

NH21/2 LAC QUAN THINH LONG RESETTLEMENT ACTION PLAN

NH21/2 LAC QUAN THINH LONG RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT PROJECT MANAGEMENT UNIT 18 ROAD NETWORK

More information

Reality and Solutions for the Relationships between Social and Economic Growth in Vietnam

Reality and Solutions for the Relationships between Social and Economic Growth in Vietnam Reality and Solutions for the Relationships between Social and Economic Growth in Vietnam Le Dinh Phu Thu Dau Mot University E-mail: dinhngochuong2003@yahoo.com Received: September 22, 2017 Accepted: October

More information

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014 Work plan of Independent Agency and Implementation of IFC Performance Standards Green Goal Ltd., 17 February 2014 Content IFC performance standards Legal grounds of Cambodia Resettlement planning process

More information

Resettlement Plan. Stage of the document: Final Project number: June 2017

Resettlement Plan. Stage of the document: Final Project number: June 2017 1 Resettlement Plan Stage of the document: Final Project number: 49026-003 June 2017 VIE: Basic Infrastructure for Inclusive Growth in Nghe An, Ha Tinh, Quang Binh and Quang Tri Provinces Sector Project-Water

More information

Characteristics of the Vietnamese Rural Economy:

Characteristics of the Vietnamese Rural Economy: Characteristics of the Vietnamese Rural Economy: Evidence from a 2016 Rural Household Survey in 12 Provinces in Vietnam Presented by Finn Tarp and Saurabh Singhal CIEM, Hanoi, Vietnam November 7, 2017

More information

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING Road Development Agency 1 5 6 2 3 4 RESETTLEMENT POLICY FRAMEWORK FINAL REPORT Consultancy Services for the Design and Preparation of Bidding Documents for a Countrywide Roll-out of the Output and Performance

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized The World Bank SFG3873 REV Public Disclosure Authorized Hezhou Urban Water Infrastructure and Environment Improvement Project Public Disclosure Authorized Resettlement Policy

More information

RESETTLEMENT PLAN DANANG PEOPLE'S COMMITTEE PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG CITY SUSTAINABLE DEVELOPMENT PROJECT

RESETTLEMENT PLAN DANANG PEOPLE'S COMMITTEE PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG CITY SUSTAINABLE DEVELOPMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized, DANANG PEOPLE'S COMMITTEE PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT

More information

Updated Resettlement and Ethnic Minority Development Plan

Updated Resettlement and Ethnic Minority Development Plan Updated Resettlement and Ethnic Minority Development Plan Project Number: 46293-005 May 2018 Viet Nam: Greater Mekong Sub-Region Tourism Infrastructure for Inclusive Growth Project Subproject: Lao Cai

More information

Resettlement Plan Viet Nam: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

Resettlement Plan Viet Nam: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Resettlement Plan Project Number: 46391-001 December 2015 Viet Nam: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project EVN HCMC: 220-110kV Cau Bong Binh Tan Transmission Line Prepared by

More information

FINAL ETHNIC MINORITY POLICY FRAMEWORK

FINAL ETHNIC MINORITY POLICY FRAMEWORK SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness ******** SFG2829 REV FINAL ETHNIC MINORITY POLICY FRAMEWORK SCALING-UP URBAN UPGRADING PROJECT PROJECT S LOCATION BEN TRE (BEN TRE PROVINCE),

More information

Due Diligence Report and Corrective Action Plan. VIE: Productive Rural Infrastructure Sector Project in the Central Highlands Provinces

Due Diligence Report and Corrective Action Plan. VIE: Productive Rural Infrastructure Sector Project in the Central Highlands Provinces Due Diligence Report and Corrective Action Plan Document stage: final Project Number: 40238 November 2017 VIE: Productive Rural Infrastructure Sector Project in the Central Highlands Provinces Subproject:

More information

VIE: Yen Vien-Lao Cai Railway Upgrading Project

VIE: Yen Vien-Lao Cai Railway Upgrading Project Social Monitoring Report Semi-Annual Report June 2014 VIE: Yen Vien-Lao Cai Railway Upgrading Project Resettlement Monitoring Report Prepared by Railway Projects Management Unit of Viet Nam Railway for

More information

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION Table of Content Volume 4 Chapter 1: Project Description 1 PROJECT DESCRIPTION...1 1.1 THE NT2 PROJECT...1 1.2 THE NEED FOR RESETTLEMENT AND DEVELOPMENT...1 1.3 THE

More information

Viet Nam: Central Region Rural Water Supply and Sanitation Sector Project

Viet Nam: Central Region Rural Water Supply and Sanitation Sector Project Resettlement Plan September 2015 Viet Nam: Central Region Rural Water Supply and Sanitation Sector Project WATER SUPPLY AND SANITATION OF THACH BANG-THACH KIM-THINH LOC COMMUNES LOC HA DISTRICT, HA TINH

More information