1 SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness ******** SFG2829 REV FINAL ETHNIC MINORITY POLICY FRAMEWORK SCALING-UP URBAN UPGRADING PROJECT PROJECT S LOCATION BEN TRE (BEN TRE PROVINCE), VI THANH (HAU GIANG PROVINCE), VINH LONG (VINH LONG PROVINCE), LONG XUYEN (AN GIANG PROVINCE), BAC LIEU (BAC LIEU), TAN AN (LONG AN PROVINCE), SOC TRANG (SOC TRANG PROVINCE) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized February 2017

2 PREFACE The has been prepared to ensure that the World Bank s Indigenous Peoples policy (OP4.10) is applied to all of the subproject activities of components under the Viet Nam Scaling-up Urban Upgrading Project (SUUP) for where Ethnic Minorities (EM) are living. The objectives of the EMPF are to avoid adverse impacts on EMs peoples, and to provide them with culturally appropriate benefits from the project. The EMP policy recognizes the distinct circumstances that expose EMs to different types of risks and impacts from development projects. As social groups with identities that are often distinct from dominant groups in their national societies, Ethnic Minority Peoples are frequently among the most marginalized and vulnerable segments of the population. Their economic, social, and legal status often limit their capacity to defend their rights to lands, territories, and other productive resources, and restricts their ability to participate in and benefit from development. Therefore, this EMPF has been prepared based on the results of a social assessment of the Project and the free, prior and informed consultation of the minority communities in areas where EMs are living that may potentially be affected by the Project. The process of consultation ensures that all the EM s needs and concerns are integrated into the activities of the project and confirms the broad support of the EM for the project. The EMPF describes the policy requirements and the planning procedures that project executing agencies will follow during the preparation and implementation of subprojects. i

3 TABLE OF CONTENTS ABBREVIATIONS... III GLOSSARY... IV I. INTRODUCTION Background Project objectives Project s components Ethnic Minority in the project area Objectives of the EMPF II. NATIONAL LEGAL AND POLICY FRAMEWORK National Legal and Policy Framework for Ethnic Minorities World Bank s Operational Policy on Indigenous Peoples (OP 4.10) III. POTENTIAL IMPACTS OF THE PROJECT Positive impacts Negative impacts IV. CONSULTATION AND INFORMATION DISCLOSURE Consultation and Information Disclosure Implementation of free, prior and informed consultation Broad Community Support (BCS) Information Disclosure...16 V. IMPLEMENTATION ARRANGEMENTS Institutional Arrangement...18 VI. GRIEVANCE REDRESS MECHANISM...19 VII. MONITORING AND EVALUATION Internal Monitoring External Monitoring...20 VIII. GUIDELINES FOR EMDP PREPARATION Screening Social Assessment: Preparation of the Ethnic Minority Development Plan (EMDP) Procedure for Review and Approval of an EMDP...23 IX. COSTS AND BUDGET...23 ii

4 ABBREVIATIONS BCS CEMA CPC DMS EM EMPF EMDP FPIC GOV HH IMA IOL LAR LIA LURC MOF MOLISA NGO OP 4.10 PAD PAH PAP PPC PRA RP RPF PMU SUUP TOR USD VND WB Broad Community Support Committee for Ethnic Minorities Affairs City People s committee Detailed Measurement Survey Ethnic Minority Ethnic Minority Policy Framework Ethnic Minority Development Plan Free, prior and informed consultation Government of Viet Nam Household Independent Monitoring Agency Inventory of Loss Land Acquisition and Resettlement Low Income Area Land Use Rights Certificate Ministry of Finance Ministry of Labour, Invalids and Social Assistance Non-Government Organization The World Bank s policy on indigenous people Project Appraisal Document Project Affected Household Project Affected person Provincial People s Committee Participatory Rapid Appraisal Resettlement Plan Resettlement Policy Framework Project Management Unit Scaling-up Urban Upgrading Project Terms of Reference US dollars Viet Nam dong World Bank iii

5 GLOSSARY Project impact Displaced people (affected) Indigenous People Vulnerable groups Means positive and negative impacts on EMs caused by all project components. Adverse impacts are often consequences immediately related to the taking of a parcel of land or to restrictions in the use of the legally designated parks or protected areas. People directly affected by land acquisition may lose their home, farmland, property, business, or other means of livelihood. In other words, they lose their ownership, occupancy, or use rights, because of land acquisition or restriction of access. Adverse impacts also refer to impacts on (i) customary rights of use and access to land and natural resources; (ii) negative effects on the socioeconomic and cultural integrity; (iii) effects on health, education, livelihood, access to the project benefits, and social security status; and (iv) other impacts that may alter or undermine indigenous knowledge and customary institutions. Refers to individuals or organizations that are directly affected socially and economically by Bank-assisted investment projects caused by the involuntary taking of land and other assets that results in (i) relocation or loss of shelter; (ii) loss of assets or access to assets; or (iii) loss of income sources or means of livelihood, whether or not the affected persons must move to another location. The involuntary land acquisition includes the exercise of possession when the proprietor has allowed and benefited from others' occupation of the area. In addition, affected person is one for whom involuntary restriction of access to legally designated parks and protected areas that result in adverse impacts on livelihoods also. Equivalent to ethnic minority people in Viet Nam, refers to a distinct and vulnerable group with social and cultural characteristics in varying degrees as follows: (i) self-identification as members of a distinct indigenous cultural group and recognition of this identify by others; (ii) collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories; (iii) customary cultural, socio-economic, or political institutions that are separate from those of the dominant society and culture; and (iv) an indigenous language, often different from the official language of the country or region. People who by virtue of gender, ethnicity, age, physical or mental disability, economic disadvantage, or social status may be more adversely affected by resettlement than others and who may be limited in their ability to claim or take advantage of resettlement assistance and related development benefits, include: (i) women headed household (single, widow, disabled husband) with dependents, (ii) disabled (loss of working ability), the elderly alone, (iii) poor and near poor household, (iv) the landless, (v) ethnic minority groups and (vi) the social policy households. iv

6 Culturally appropriate Free, prior and informed consultation Collective attachment Customary rights to lands and resources Means having regard to all aspects of the cultures, and being sensitive to their dynamics. Indigenous Peoples communities refer to a culturally appropriate and collective decision-making process subsequent to meaningful and good faith consultation and informed participation regarding the preparation and implementation of the project. It does not constitute a veto right for individuals or groups. Means that for generations there has been a physical presence in and economic ties to lands and territories traditionally owned, or customarily used or occupied, by the group concerned, including areas that hold special significance for it, such as sacred sites. Collective attachment also refers to the attachment of transhumant/nomadic groups to the territory they use on a seasonal or cyclical basis. Refers to patterns of long-standing community land and resource usage in accordance with Ethnic Minority Peoples customary laws, values, customs, and traditions, including seasonal or cyclical use, rather than formal legal title to land and resources issued by the State. v

7 I. INTRODUCTION 1.1. Background 1. In recent years, Vietnam has made efforts to develop the country s market economy, which promotes the increase of urban population and urbanization. Vietnam is experiencing large scale, high quality and rapid urban development; Urban appearances have undergone positive changes through modernization, by forming new urban spaces, and by progressively meeting the working and living environment needs for urban citizens. Urbanization is seen as the driving force for development, economic restructuring, labor structure in each locality, each region and country. However, the process of urbanization in Vietnam is taking place spontaneously, on a large scale and in an unplanned manner. This leads to many problems including: Asynchronous and overloaded technical infrastructure and social infrastructure systems; Poor planning of transportation and low quality of transport infrastructure in urban areas, leading to increasingly serious traffic congestion; degraded and outdated drainage system in many urban areas resulting in frequent local flooding; Discharge of untreated waste and wastewater leading to environmental pollution. 2. To overcome the shortcomings mentioned above, Vietnam in general and the Mekong Delta region in particular, have set very clear objectives: to gradually establish and develop an urban system with synchronous, modern and sustainable infrastructure systems that are resilient to climate change; to enhance connections between urban areas ensuring comprehensive development of the technical infrastructure, social infrastructure and landscape; to utilize resources economically and efficiently, creating better living conditions for urban citizens; and to gradually erase the gaps between urban and rural areas. 3. With the support of the World Bank, the Government of Vietnam will have implemented two urban upgrading projects between 2004 and 2017: 1) Vietnam Urban Upgrading Project (VUUP1), implemented in the four cities of Nam Dinh, Hai Phong, Ho Chi Minh city, Can Tho; and 2) Mekong Delta region Urban Upgrading Project (MDR-UUP) implemented in the six cities of Can Tho, Cao Lanh, My Tho, Tra Vinh, Rach Gia and Ca Mau. The projects have brought significant benefits to each city by improving living conditions especially for poor HH and improving urban management. The Government considers the cities in the Mekong Delta Region (MDR) to be special priorities due to the increasing level of high vulnerability from natural water-related risks, requiring synchronous management to ensure the resilience of the MDR cities. 4. Building upon the lessons learnt from previous generation of urban upgrading projects, the Government of Vietnam has requested financial assistance from the World Bank for the Viet Nam Scaling-up Urban Upgrading Project (SUUP) in order to support the development of infrastructure for the 7 remaining cities in the Mekong Delta Region including Bac Lieu, Long Xuyen, Ben Tre, Vinh Long, Vi Thanh, Tan An and Soc Trang which are cities in the provinces of Bac Lieu, An Giang, Ben Tre, Vinh Long, Hau Giang, Long An and Soc Trang respectively

8 1.2. Project objectives 5. The project s objectives are to improve access to infrastructure in low-income areas, improve connectivity of priority city-level infrastructure and enhance the capacity of local governments to carry out coordinated urban planning in participating cities. 6. Urban upgrading in the low-income residential areas will be implemented through a multisectoral investment package. An urban development program will be broadly implemented through investment in primary and secondary infrastructure in order to enhance connectivity of network infrastructure. The project will promote construction of green infrastructure and adaption to climate change, improving access to public spaces and improving the capacity of the city on urban planning, land management and climate resilience Project s components 7. Components of the Viet Nam Scaling-up Urban Upgrading Project are presented below: Component 1: Tertiary Infrastructure Upgrading in Low Income Areas: This component includes: (a) construction, rehabilitation, and upgrading of roads and lanes; (b) construction and rehabilitation of drains; (c) improvements to environmental sanitation by rehabilitating or constructing public sewers, constructing septic tanks, providing access to septic management services, and house connections to public sewers; (d) improvement of water supply including the installation of metered domestic connections; (e) provision of metered domestic connections for electricity and public lighting in residential lanes and streets; and (f) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, public places and green spaces. The investments will utilize disaster and climate resilient technical and engineering standards. Component 2 Priority Primary and Secondary Infrastructures. Component 2 provides support to improve priority networked infrastructure in line with the broader city development agenda, and with a view to increasing connectivity with tertiary infrastructure in LIAs. It will include: (a) roads improving the connectivity among different parts of the city; (b) water supply lines; (c) drains and sewers; (d) electrical power lines; (e) river and canal embankments. Social infrastructure facilities such as markets, community halls, public places, schools and green spaces will also be included to benefit urban poor, where needed. The investments will utilize disaster and climate resilient technical and engineering standards. An initial hydraulic model will be developed for the catchment areas of the upgrading sites and integrated with existing urban plans for flood and salinity intrusion control, drainage, and waterways investments. Component 3 Resettlement Sites. Component 3 will provide support to prepare resettlement areas for affected persons, including construction of primary, secondary and tertiary infrastructure and public facilities. Component 4 Implementation Support and Capacity Building. Component 4 activities will focus on provision of support for (i) improving capacity for project implementation (management capacity for social safeguards, finance, procurement, monitoring and evaluation, including audits and learning inside/outside Vietnam); (ii) strengthening - 2 -

9 - 3 - capacity of participating cities for strategic and coordinated institutional planning, land management and utilization of GIS; (iii) enhanced capacity for disaster and climate riskinformed urban planning Ethnic Minority in the project area 8. Vietnam has recognized 54 official ethnic groups in which the Kinh ethnic group (Vietnamese or Vietnamese dominant) accounts for 87% of the population. The 53 remaining Ethnic Minority (EM) groups have different populations ranging from some hundreds to several hundred thousand of people for each group. 9. Mekong Delta is home to various ethnic groups, including the Kinh (88.8%), the Khmer (8%), the Chinese (Hoa) (1.8%), the remainder are Cham people and other smaller groups. As indicated in Table 1, the total population of EM in the Mekong delta in 2013 was 1,787,450 people out of a total population of 17,445,900 (accounting for 10.2%), of which the number of Khmer is: 1,428,848 (79.94%), the number of Chinese: 316,460 (17.66%), and the number of Cham and other smaller EM groups is: 42,140 (2.36%). 10. EM are unevenly distributed across the Mekong Delta Provinces. Within the project provinces, Soc Trang and Bac Lieu have by far the largest populations of EM. An Giang (Long Xuyen city) also has an important population of EM, however they are concentrated in rural areas and not in Long Xuyen City. In the provinces of Ben Tre, Ving Long and Hau Giang (Vi Thanh City), there are relatively small populations of EMs (between 11,000 & 28,000) also concentrated in rural areas, while Long An province (Tan An city) has a very low population of EMs (440). Table 1- Information on Ethnic Groups Situation in the Mekong Delta Ethnic Minority Groups No Province Population Kinh Chinese Other Total Ethnic % Khmer (Hoa) Groups Minorities 1 Long An % 2 Tien Giang % 3 Ben Tre % 4 Tra Vinh % 5 Vinh Long % 6 Dong Thap % 7 An Giang % 8 Kien Giang % 9 Can Tho % 10 Hau Giang % 11 Soc Trang % 12 Bac Lieu % 13 Ca Mau % Total % (Source: Statistics of the provinces, 2015) Provinces with participating cities under the SUUP

10 11. Screening for ethnic minority population was conducted in all the cities in May and June 2016 by cities consultants with the help of ethnic minority leaders and local authorities. The screening checked: i) the names of ethnic groups in the wards; ii) the total number and the percentage of ethnic minority in wards where investments are proposed; and iii) the number and percentage of ethnic minority households in the zone of influence of the proposed investments. 12. Two cities, Bac Lieu and Soc Trang, have a large population of ethnic minorities in the sub-project areas. In these two cities, Khmers form specific communities in some of the LIAs where interventions are proposed. In the other cities, some individual EM HH are sometimes present. Screening confirmed that these individual HH are urbanized and integrated into the urban mainstream way of life. This has considerably reduced their relative vulnerability and cultural distinctiveness relative to the dominant Kinh community. These HH are spread in the cities and do not comprise an EM community. Therefore, OP 4.10 is not triggered for these cities Bac Lieu City 13. There are 3 EM groups in Bac Lieu city: Khmer, Chinese and Cham. On 31/12/2015, the total number of EM households in the city was 7,113 households (or 32,662 people), accounting for 21% of the population in the city. 16,975 Khmer people (10.9%) live in communities that are mainly located in LIAs. Chinese people represent 10% of the population. Cham people account for a minor percentage of the population and are living in a scattered manner with other groups, all over the city. Ethnic population data for Bac Lieu is shown in table 2 below. Table 2 Ethnic minorities living in Bac Lieu city Area Number of ethnic minority people Total Percentage of EMs Khmer Chinese Cham population of per total population (Hoa) the area (%) Ward ,1 Ward ,3 Ward ,197 20,3 Ward ,180 15,3 Ward ,574 6,8 Ward 8 1, ,835 12,3 Nha Mat ward ,739 12,0 Hiep Thanh commune ,379 21,1 Vinh Trach commune 3, ,451 25,7 Vinh Trach Dong commune 9, ,831 86,3 City 16, ,519 10,9 Source: Annual abstracts of statistics year 2015 of Bac Lieu province Wards/communes with investments under the SUUP - 4 -

11 Soc Trang 14. Khmer and Chinese (Hoa) are the two-main EM group in Soc Trang with respectively 23.2 % and 12.7 % of the total population of the city. These percentages are respectively of 17% and 11% in the wards where investments are proposed. Most Khmer households affected by the Project are concentrated in Low Income Areas (LIAs). 15. Other groups such as Thai, Tay, Nung have very little population and are not present in the project area. The breakdown of ethnic minority population by Ward is shown in Table 3 below. Table 3 Ethnic minorities living in Soc Trang city Number of ethnic minority people Ward Total Chinese Khmer Other No % No % No % Ward 1 7,043 3, Ward 2 24,341 1, , Ward 3 25,458 1, , Ward 4 13,408 2, , Ward 5 14, , Ward 6 14,384 2, , Ward 7 11, , Ward 8 13,918 2, , Ward 9 8,990 1, , Ward 10 4, , Total 138,056 17, , Source: Soc Trang City Wards with investments under the SUUP 1.5. Objectives of the EMPF 16. Based on the screening conducted, Indigenous People are present in two sub-projects areas of two participating cities, Bac Lieu and Soc Trang. Therefore OP 4.10 on Indigenous Peoples is triggered for these two cities. An Ethnic Minority Planning Framework (EMPF) needs to be prepared in order to guide preparation of Ethnic Minority Development Plans (EMDP) in these two cities as well as to prepare for any changes in other cities that might lead to impacts on EMs. 17. The main objective of the EMPF is to ensure that: the development process fosters full respect for the dignity, human rights and cultural uniqueness of EMs; EMs do not suffer adverse impacts during the development process; and EMs receive culturally compatible social and economic benefits

12 18. The EMPF provides a framework for both mitigating negative impacts and ensuring that EMs will benefit from the Project. This EMPF is based on free, prior and informed consultation of affected ethnic minority people. The EMPF ensures: (a) How to avoid potential adverse impacts to ethnic minority communities; or (b) When ethnic minorities are adversely impacted, the impacts will be minimized and mitigated or compensated; and (c) Ensure that EMs receive social and economic benefits in a culturally appropriate manner which is inclusive in both gender and intergenerational terms, and obtain broad community support for the proposed sub project. 19. This EMPF was prepared on the basis of a) a social assessment prepared for the project, including ESIA; b) consultation with ethnic minority people present in the project areas

13 II. NATIONAL LEGAL AND POLICY FRAMEWORK 2.1. National Legal and Policy Framework for Ethnic Minorities 20. The Constitution of the Socialist Republic of Vietnam (2013) recognizes the equality between ethnic groups in Vietnam. Article 5 of the Constitution in 2013 provides: 1. The Socialist Republic of Vietnam is the unified state of all nationalities living in the country of Vietnam. 2. The nationalities equal, unite, respect and help each other to develop; prohibits any discrimination, ethnic division. 3. The national language is Vietnamese. The nation has the right to use voice, text, preserve the national identity, promote traditions, customs and culture. 4. The State implements a comprehensive development policy and creates reasonable conditions for the ethnic minorities to mobilize resources, along with the development of the country. 21. The Socio Economic Development Plan and Socio Economic Development Strategy of Vietnam specifically calls for attention to ethnic minorities. Major programs targeting ethnic minority people include Program 135 (infrastructure in poor and remote areas) and Program 134 (eradication of poor quality houses). A policy on education and health care for ethnic minorities is in place. The legal framework was updated in The Government of Vietnam has developed a series of policies to develop, enhance the socio economic conditions of ethnic minorities in the mountainous and remote regions. After the program 124 and the program 125 (phase 1 and phase 2), the government launched program 135 phase 3 with an opportunity to enhance socio economic development in poor communes and villages located in mountainous areas or where inhabited by ethnic minorities. In addition to the overall development program for ethnic minorities, the Government assigned the Committee for Ethnic Minorities Affairs to guide provinces to implement projects to provide Development Assistance for ethnic groups with less than 1,000 people, i.e. Si La, Pu Peo, Ro Mam, Brau, O Du. The Government also conducted a Rapid and Sustainable Pro poor Program in 61 poor districts, where many ethnic minorities live. 23. Several Decrees, circulars and decisions have been issued regarding EMs. Decree No. 05/2011/ND-CP (January 14th, 2011), provides the guidance for activities related to EMs which include support for the maintenance of language, culture and customs of EMs. According to this Decree, proposed projects affecting land, environment, or the life of EM communities, should disclose information and consultations should be carried out with representatives of the local authorities to ensure that all investments result in improved living conditions, and are carried out in a culturally appropriate manner (article 9). 24. The Prime Minister promulgated the Decree No. 84/2012/ND-CP dated 12 October, 2012 on the functions, tasks, powers and organizational structure of the Committee for Ethnic Minorities Affairs (CEMA). The Decree stipulated that the CEMA, a government agency, - 7 -

14 performs the function of state management of ethnic affairs in the country; state management of public services falls under the jurisdiction of CEMA as stipulated by law. Decree 05/2011/NDCP dated 14 January, 2011 on the work of EMs and Decree 84/2012/ND-CP were issued as a legal basis for CEMA to continue: implementing guidelines and policies of the State on ethnic minorities in the period of industrialization and modernization; promoting the power to unite the whole nation with the goals of enriching people, and strengthening the country, social justice, democracy and civilization, in order to ensure and promote equality, solidarity, respect and to help each other to develop and preserve the cultural identity of the peoples in the great family of ethnic groups of Vietnam. 25. The following regulations issued by the Government on the basis of democracy and the participation of local people are directly related to this EMPF. Ordinance No. 34/2007/PL- UBTVQH11, dated 20 April, 2007 (which replaced Decree 79/2003/ND-CP dated 07 July, 2003) on the implementation of democracy in communes, wards and towns provides the basis for community involvement in the preparation of development plans and supervision of community in Vietnam. Decision No. 80/2005/QD-TTg by the Prime Minister, dated 18 April, 2005 regulates the monitoring of community investments. 26. In 1995, The Committee of Ethnic Minority Affairs developed a framework for External Assistance through the Development of Ethnic Minorities. This framework resulted in a strategy for the development of ethnic minority people within the Government s goal of stability, sustainability growth and reduction of poverty. The key points of this framework are: a) to fight against poverty; b) to encourage active participation of the populations of ethnic minorities; d) to develop natural and human resources in sustainable manner; and e) to ensure mutual respect between, and increase the responsibility of the parties involved. The Decree No. 60/2008/NĐ-CP of the Prime Minister dated 9 May 2008 regulates the functions, tasks, powers and organizational structure of the Committee for Ethnic Minority Affairs (CEMA). The CEMA performs its functions of state management of nationwide ethnic minority affairs, public services within its authorities, and provincial departments. In provinces with a significant ethnic minority population, a Department of Ethnic Minority Affairs exists under the Provincial People s Committee. The functions of CEMA include the development of regulations on the implementation of development programs for EM, the monitoring of programs as well as acting as coordinator among different ministries of Vietnam and cooperating with international organizations within its authority as regulated by law. The legal framework was updated in All legal documents related to EM are shown in Table

15 Table 4: Legal documents relating to ethnic minority Decision No. 2086/TTR-UBDT dated 31/10/2016 on Approval of the Special policy to support socio-economic development in ethnic minority and mountainous areas in the period of Decision 2085/QD-TTg dated 31/06/2016 on Approval the Special policy to support socio-economic development in ethnic minority and mountainous areas in the period of Decision No. 12/2016/QD-TTg dated 11/03/2016 (On the continued implementation of Decision No 30/2012/QD-TTg dated 18/07/2012 on the criteria for determining particularly difficult villages, communes in ethnic minority and mountainous area in ) and Decision No 1049/QD-TTg dated 26/06/2014 (Promulgating list of administrative units in disadvantaged areas) Decision No. 1557/QD-TTg dated 10/09/2015 of the Prime Minister on the approval of a number of indicators for the Millennium Development Goals for ethnic minority associated with sustainable development goals after Decision No. 456/QD-CEM dated 07/11/2014 on the issuance of the implementation plan to raise the effectiveness and efficiency of the State management of ethnic minority affairs Directive No.28/CT-TTg dated 10/08/2014 on improving the effectiveness and efficiency of the State management of ethnic minority affairs Joint Circular No. 05/2013-TTLT UBDT-NNPTNT-KHDT-TC-XD dated 18/11/2013 guiding the supported program 135 on investment in infrastructure, economic development for extremely difficult communes, borderline communes, social security area, and extremely difficult village and hamlets Decision No. 2214/QD-TTg dated 14/11/2013 of the Prime Minister, approving the scheme for Enhancing international cooperation to support the socio-economic development of Ethnic Minorities Decision No. 56/2013/QD-TTg dated 07/10/2013 on the amendment and supplement of some provisions of Decision No 18/2011/QD-TTg dated 18/03/2011 of the Prime Minister on the policy for prestigious people in ethnic minorities Decision No. 29/2013/QD-TTg of the Prime Minister, dated 09/06/2008 on a number of policies to support resettlement land, cultivated land and jobs for ethnic minorities and difficult households in the Mekong delta region Decision No. 551/QD-TTg dated 04/04/2013 of the Prime Minister, approving the program supported 135 investment in infrastructure, support for production supported program 135 on investment in infrastructure, production development for extremely difficult communes, borderline communes, social security area, and extremely difficult village and hamlets. Circular No.02/2013/TT-UBDT dated 04/12/2012 guiding the implementation of some articles of Decision No. 54/2012/QD-TTg dated 04/12/2012 of the Prime Minister promulgating the loan policy for economic development for ethnic minority households with special difficulties 2012 Decision No. 42/2012/QD-TTg dated 08/10/2012 of the Prime Minister Regarding Support for organizations and units utilizing employees that are ethnic minority - 9 -

16 people in mountainous and special difficult areas 2012 Joint Circular No. 01/2012 / TTLT-BTP-CEM date on January 17, 1012 of the Ministry of Justice and the Committee for Ethnic Minorities on guidelines and legal assistance for ethnic minorities Decision 2123/QD-TTg dated 22/11/2010 of the Prime Minister approving the scheme on educational development for ethnic minorities. Decree No.82/2010/ND-CP dated 15/07/2010 regulating for teaching and learning the spoken and written language of the ethnic minorities in general education and continuing education centers. Decision No. 61/QD-UBDT on 12/03/2009 on the recognition of the communes and districts in mountainous areas and highlands due to the adjustment of administrative boundaries Resolution No.30a/2008/NQ-CP of government, dated 27 December 2008 on the support program for rapid and sustainable poverty reduction for 61 poorest districts Decision No. 1366/QD-TTg dated 25/09/2008 of the Prime Minister on the amendment and supplement to Decision No. 289 / QD-TTg of March 18, 2008 on the issuance of a number of policies in support of EM, social policy households, poor and nearly poor households and fishermen. Resolution No. 30a / 2008 / NQ-CP dated 20/5/2013 of the government on supporting program for rapid and sustainable poverty reduction for 61 poorest districts. Challenges and gaps in the legal systems 28. In terms of the national legal framework, equality and rights of Ethnic Minorities (EM) are stipulated clearly in the Viet Nam Law. The new Constitution of Viet Nam (2013) acknowledges equality among ethnic groups and includes general principles such as: i) All the ethnicities are equal, unified and respect and assist one another for mutual development; all acts of national discrimination and division are strictly forbidden; ii) The national language is Vietnamese. Every ethnic group has the right to use its own language and system of writing, to preserve its national identity, to promote its fine customs, habits, traditions and culture.; and iii) The State implements a policy of comprehensive development, and provides conditions for the ethnic minorities to promote their physical and spiritual abilities and to develop together with the nation. 29. Several Decrees, circulars and decisions have been issued regarding EMs. Decree No. 05/2011/ND-CP on ethnic minorities works (Article 9) indicates that investors of planning and construction projects that affect the land, environment, ecology and life of ethnic minority groups shall publicize these projects, collect opinions of inhabitants in affected areas, organize resettlement and create conditions for relocated people to enjoy a better life in new areas. 30. Some gaps remain, they are discussed below: No provision is made in the legal framework for a separate indigenous peoples plan (IPP) or for a separate social impact assessment to be prepared. However, for projects with impacts on socioeconomic status and cultural traditions, a framework policy has to be

17 prepared (Land Law No: 45 /2013/QH13. Article 87 and Decree No. 47/2014/ND-CP Art. 17.1). Under the Project, SAs and EMDPs will be prepared. The legal framework doesn t clearly recognize customary rights on land. However, under the land law, land used stably before 1st July 2014, is entitled to compensation. Land Law (At. 131) also specifies that the use of agricultural land by communities is regulated as follows: a) Communities are allocated land or recognized land use rights by the State to preserve national dignity associated with the traditions and customs of the peoples. Under the Project, customary rights on land, if any, will be recognized. The existing legislation doesn t require the consent of ethnic minorities for commercial exploitation of their culture and knowledge, their physical relocation from their traditional land, or the commercial development of natural resources on their traditional land. They are treated like other citizens with the same rights. There is no specific mechanism to assess community support for the project. Under this Project, the broad community support for the Project will be sought World Bank s Operational Policy on Indigenous Peoples (OP 4.10) 31. The OP 4.10 aims at avoid potentially adverse effects on indigenous people and promote activities that bring Project benefits while taking into account their cultural demands and needs. The Bank requires indigenous peoples, (here refer as Ethnic Minorities), to be fully informed and able to freely participate in projects. The project has to be widely supported by the affected EMs. The project is designed to ensure that the EMs are not affected by adverse impacts of the development process, with mitigation measure to be defined if required, and that the EM peoples receive socio-economic benefits that are culturally appropriate to them. The Policy defines that EMs can be identified in particular geographical areas by the presence, in varying degrees, of the following characteristics: (a) (b) (c) (d) Self-identification as members of a distinct indigenous cultural group and recognition of this identity by others; Collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories; Customary cultural, economic, social, or political institutions that are separate from those of the dominant society and culture; and Speak an indigenous language, often different from the official language of the country or region. 32. As a prerequisite for approval of an investment project, OP 4.10 requires the borrower to conduct free, prior and informed consultations with potentially affected EM peoples and to establish a pattern of broad community support for the project and its objectives. The primary objectives of OP 4.10 are: - To ensure that such groups are afforded meaningful opportunities to participate in planning project activities that affects them; - To ensure that opportunities to provide such groups with culturally appropriate benefits are considered; and

18 - To ensure that any project impacts that adversely affect them are avoided or otherwise minimized and mitigated. 33. According to OP 4.10, this EMPF will be applied for subprojects, providing instruction on how to perform a preliminary screening of ethnic minorities, social assessment, identifying mitigation measures, resolving complaints/claims and gender-sensitive issues, and monitoring. Ethnic minorities will have long-term benefits through investment in the components of the project. However, they can also be negatively affected by land acquisition and/or resettlement. Specific policies and action plans to minimize the potential impact of land acquisition and resettlement will be addressed through the preparation of a resettlement action plan for each subproject. 34. Concerning consultation and participation of ethnic minority peoples, where the subprojects affect ethnic minorities, the free, prior and informed consultation will ensure: a) Ethnic minority and ethnic minority communities will be consulted at each stage of preparation and implementation of subproject; b) Methods of consultation appropriate to the culture and society of EMs are applied when carrying out consultation for EMs. During the consultation process, special attention will be paid to the concerns and wishes of women, youth, children and their accessibility to development activities; c) The ethnic minority people and communities affected by the project will be provided with information (including information about the potential negative impact of the project in line with their culture at each stage of preparation and implementation of the subproject); d) Free, prior and informed consultation will be carried out for EMs to achieve broad support of the community for the implementation of the project. e) In situations where the EM groups (equivalent to indigenous peoples) in the two cities are likely to receive direct benefits from the Project (most of the affected EM are located in LIAs where drainage, sanitation and access will be improved), but are negatively affected by land acquisition and/or relocation related to the sub-projects, a specific policy and action plan to mitigate the potential impacts due to land acquisition and relocation will be developed through the preparation of the Resettlement Plan (RP) for the two cities

19 III. POTENTIAL IMPACTS OF THE PROJECT 35. The project is expected to have significant positive social impacts by developing policies for ensuring consultation and participation and promoting social inclusion of the poor and vulnerable people living in the project area (in particular in the 30 LIAs) as well as by upgrading urban infrastructure (roads, drainage, water supply and sanitation, public facilities, and power supply) based on community priorities. Adverse impacts of the project will be caused by unavoidable land acquisition in all seven of the project cities, including impacts on Khmer ethnic minority peoples in two of the seven cities. Other adverse impacts are (i) potential negative effects on the socioeconomic and cultural integrity due to the presence of outside workers; (ii) effects on livelihood due to relocation; (iii) increased risks of flooding along some upgraded lanes in LIAs. 36. The potential impacts were assessed on the basis of extensive consultations with ethnic minority communities in the project area and through key informant and stakeholders interviews. These impacts will be detailed in the two EMDPs prepared for Bac Lieu and Soc Trang. Summary of consultation is presented in Annex Positive impacts For component 1 (upgrading LIAs), the proposed project is likely to directly benefit households in LIAs (including Khmer communities mainly located in LIAs) by improving sanitation conditions and widening of alleys that are linked to: better health outcomes over time in the LIAs, raise of land values and reduced transportation time and cost to travel to work, school and health facilities through better roads and increased intra-urban connectivity. Selected investments (i.e. canal improvement) will directly assist in reducing flooding during the rainy season, creating future resilience to heavy floods and reducing the associated costs related to physical damage to property and possessions, cleanup, loss of commercial goods, and loss of trading income. During the construction process, many local non-skilled workers (especially Khmer) will be hired and this will create short-term income opportunities for local people Negative impacts The potential negative impacts linked to the subprojects are presented below: Land Acquisition: The implementation of sub-projects in certain areas will unavoidably involve land acquisition (both permanent and temporary) in areas where EM are present. Impacts on livelihood: EM HH are often involved in small-business activities; relocation of EM HH may result in loss of customers if HH are relocated too far from their current location and place of business; temporary disruption of commercial activities during construction may also take place. Presence of outside workers. During construction time, many workers will come and stay

20 in LIAs, thus social problems may occur, affecting local security and health. Young EM people are particularly at risk; EM in LIAS may be exposed to increased risk of flooding in their house after the roads have been upgraded, as the lanes will be higher than their houses

21 IV. CONSULTATION AND INFORMATION DISCLOSURE 4.1. Consultation and Information Disclosure 37. This section provides a framework for ensuring that the ethnic minorities in the project area (equivalent to the indigenous peoples as defined in OP 4.10 of the WB) have equal opportunity to share the project benefits, that free, prior and informed consultation, and adequate information dissemination will be conducted to ensure their broad-based community access to and support for the project. Consultation will also ensure that any potential negative impacts are properly mitigated and the EMPF will be applied to all the subprojects. The framework provides guidance on how to conduct preliminary screening of ethnic minorities, social assessments, EMDP establishment and identification of mitigation measures given due consideration to consultation, grievance redress, gender-sensitivities, and monitoring. 38. In terms of the consultation and participation of ethnic minorities, when the subprojects have an impact on EM, the affected EM peoples have to be consulted on the basis of free, prior, and informed consultation (FPIC), to ensure: a. EM people and the community that they belong to, are consulted at each stage of subproject preparation and implementation; b. Socially and culturally appropriate consultation methods are used when consulting EM communities. During the consultation, special attention will be given to the concerns of EM women, youth, and children and their access to development activities; c. Affected EM people and their communities are provided, in a culturally appropriate manner at each stage of subproject preparation and implementation, with all relevant project information (including information on potential adverse effects that the project may have on them), and d. The free, prior and informed consultations with EM leads to a broad community support for project implementation. 39. If necessary, a local person (of the same EM group) will be invited to join the consultation, in case local EM language is required to promote the free exchange of information between the EM peoples, and the consultant team. 40. Consultation is important to EMDP preparation since it provides ethnic minority groups (both those potentially affected and those not affected by subprojects) with opportunities to participate in planning and implementation of subprojects. More importantly, it helps identify potential adverse impacts, if any, on EM s income generation activities and their livelihoods as a result of a subproject, thereby enabling appropriate measures to be developed to avoid, minimize, and mitigate adverse impacts. 41. Consultation also aims to ensure that EM people have opportunities to articulate, on the basis of their understanding of the subprojects/ the project goal, their needs for support from the project in relation to the project goal/project activities. The exercise of developing the EMDP is grounded on a study that is referred to, in Bank funded projects, as social assessment. 15

22 Method and form of consultation contents, time, and location of consultations have also to be appropriate for ethnic minority culture. 43. Annex 2 presents a summary of the consultation conducted in Bac Lieu and Soc Trang cities during EMDP preparation Implementation of free, prior and informed consultation 44. As mentioned above, the project must ensure the implementation of free, prior and informed consultation, promoting the participation of EMs in promulgation of information during the cycle of the subproject. The purpose of the implementation of free, prior and informed consultation is to determine whether the project has received extensive support from the community or not. In case the sub-project has negative impacts, it is important that the affected EMs fully and clearly understand the potential impact so that they can provide practical feedback on how to avoid/minimize/mitigate those effects and the arrangements for compensation in the event of an unavoidable negative impact. 45. The results of consultation should be provided to the affected EM communities to enable both research team and EM peoples to validate the results of the consultation process, and finetune the proposed actions, if necessary. Providing consultation feedback is particularly important for cases where adverse impact on the EM population were identified (from the social assessment), and were discussed with the EM peoples during the consultation process. Provision of feedback to the affected peoples could take the form of community meetings conducted in a manner similar to the FPIC standard Broad Community Support (BCS) 46. The broad community support for the implementation of the project is very important. The Bank will provide project financing only where free, prior and informed consultation results in broad community support. A meaningful BCS should come from good social assessment and consultation. It is important that the BCS (with good community representation and its level of support) be documented and reflected in the EMDP, particularly with project/subprojects with high impact on the local EM communities. The support of affected EM communities refers to a collective expression of the affected EM communities, through individuals and/or their recognized representatives, of broad community support for such project activities. Broad community support may exist even if some individuals or groups object to the project activities Information Disclosure 47. The draft EMPF was disclosed prior to project appraisal. The Vietnamese version was disclosed locally at provincial, city, and ward/commune level on 10 January The English version of this EMPF was disclosed on the Bank s Infoshop on 12 January Once the EMDPs have been cleared by the Bank, EMDPs must be disclosed locally prior to the appraisal of respective subprojects. EMDPs need to be disclosed in an accessible place and in a form and language understandable to the EM peoples as well as to other project stakeholders. For subprojects categorized by the Bank (at the time of appraisal of the subproject) - as Category

23 A (by Environmental screening), the EMDPs for such sub-projects must be translated into English by each PMU and submitted for the Bank disclosure on Bank s Infoshop. 49. Each EMDP will be updated before implementation to reflect any additional development needs that the EM peoples may have when the impact of the subproject is confirmed on the basis of final detailed engineering design. 17

PEOPLE S COMMITTEE OF BEN TRE PROVINCE PEOPLE S COMMITTEE OF BEN TRE CITY

PEOPLE S COMMITTEE OF BEN TRE PROVINCE PEOPLE S COMMITTEE OF BEN TRE CITY PEOPLE S COMMITTEE OF BEN TRE PROVINCE PEOPLE S COMMITTEE OF BEN TRE CITY SFG2836 V2 REV SCALING UP URBAN UPGRADING PROJECT SUBPROJECT OF BEN TRE CITY, BEN TRE PROVINCE RESETTLEMENT PLAN (Final Version)

More information

2017 RESETTLEMENT PLAN SCALING-UP URBAN UPGRADING PROJECT VINH LONG CITY SUB PROJECT SFG2836 V7 REV

2017 RESETTLEMENT PLAN SCALING-UP URBAN UPGRADING PROJECT VINH LONG CITY SUB PROJECT SFG2836 V7 REV SFG2836 V7 REV PEOPLE S COMMITTEE OF VINH LONG PROVINCE VINH LONG DEPARTMENT OF PLANNING & INVESTMENT SCALING-UP URBAN UPGRADING PROJECT VINH LONG CITY SUB PROJECT Public Disclosure Authorized Public Disclosure

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6927 Mekong Delta Region Urban Upgrading Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6927 Mekong Delta Region Urban Upgrading Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agencies PROJECT INFORMATION

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Bac Lieu Province Prepared by the Ministry of Education

More information

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Final Project Number: 40282 September 2006 VIE: Calamity Damage Rehabilitation Project The summary

More information

Resettlement and Ethnic Minority Development Framework (REMDF)

Resettlement and Ethnic Minority Development Framework (REMDF) Resettlement and Ethnic Minority Development Framework (REMDF) Stage of the document: FINAL Project number: 49026-002 April 2017 VIE: Basic Infrastructure for Inclusive Growth in the Northeastern Provinces

More information

Indigenous Peoples Planning Framework. Multitranche Financing Facility VIE: Water Sector Investment Program

Indigenous Peoples Planning Framework. Multitranche Financing Facility VIE: Water Sector Investment Program Water Sector Investment Program (RRP VIE 41456) Indigenous Peoples Planning Framework October 2010 Multitranche Financing Facility VIE: Water Sector Investment Program Prepared by the borrower for the

More information

VIET NAM: MEDIUM CITES DEVELOPMENT PROJECT (MCDP) PHU LY CITY SUBPROJECT HA NAM PROVINCE. (Final Draft)

VIET NAM: MEDIUM CITES DEVELOPMENT PROJECT (MCDP) PHU LY CITY SUBPROJECT HA NAM PROVINCE. (Final Draft) Public Disclosure Authorized VIET NAM: MEDIUM CITES DEVELOPMENT PROJECT (MCDP) PHU LY CITY SUBPROJECT HA NAM PROVINCE COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY FRAMEWORK (Final Draft) Table of Contents

More information

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS ENVIRONMENTAL SAFEGUARDS Objectives To ensure the environmental soundness and sustainability of projects and to support the integration

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Binh Thuan Province Prepared by the Ministry of

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized PEOPLE S COMMITTEE OF PHU YEN PROVINCE PHU YEN PROJECT MANAGEMENT UNIT OF CONSTRUCTION INVESTMENT WORKS FOR AGRICULTURE AND RURAL DEVELOPMENT ----------------o0oo---------------

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

ABBREVIATED RESETTLEMENT ACTION PLAN

ABBREVIATED RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project: Irrigated Agriculture Improvement (IAIP) Subproject 1, Hoa Binh province SOCIALIST

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

STRATEGY AND GUIDELINES FOR ETHNIC MINORITY DEVELOPMENT PLAN

STRATEGY AND GUIDELINES FOR ETHNIC MINORITY DEVELOPMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IPP390 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT PROJECT PREPARATION UNIT RED RIVER

More information

ABBREVIATED RESETTLEMENT ACTION PLAN

ABBREVIATED RESETTLEMENT ACTION PLAN Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ==================== Public Disclosure Authorized Mekong Delta Integrated Climate Resilience and

More information

CAN THO URBAN DEVELOPMENT AND RESILIENCE PROJECT

CAN THO URBAN DEVELOPMENT AND RESILIENCE PROJECT CAN THO CITY PEOPLE S COMMITTEE CONSTRUCTION & INVESTMENT MANAGEMENT UNIT USING OFFICIAL DEVELOPMENT ASSISTANCE (ODA), CAN THO CITY ***** SFG1562 REV RESETTLEMENT POLICY FRAMEWORK FOR CAN THO URBAN DEVELOPMENT

More information

Income and Livelihood Restoration Plan. Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development

Income and Livelihood Restoration Plan. Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Income and Livelihood Restoration Plan Income and Livelihood Restoration Plan Document Stage: Final Project Number: 41013 June 2013 Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Prepared

More information

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang)

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Resettlement Plan August 2011 VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Prepared by the Lang Son Provincial People s Committee for the Asian

More information

Subproject: Hai Lang Province: Quang Tri

Subproject: Hai Lang Province: Quang Tri Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP299 vol. 4 Ministry of Agriculture and Rural Development The World Bank Natural Disaster

More information

SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ====================

SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ==================== Public Disclosure Authorized SFG1727 V5 SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ==================== Public Disclosure Authorized Mekong Delta Integrated Climate Resilience

More information

IPP182 v.1 MEKONG TRANSPORT INFRASTRUCTURE DEVELOPMENT PROJECT ETHNIC MINORITY DEVELOPMENT PLAN. March 2007

IPP182 v.1 MEKONG TRANSPORT INFRASTRUCTURE DEVELOPMENT PROJECT ETHNIC MINORITY DEVELOPMENT PLAN. March 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam World Bank IPP182 v.1 MEKONG TRANSPORT INFRASTRUCTURE DEVELOPMENT

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS

More information

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN. VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN. VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN Project Number: Loan 2225-VIE September 2013 VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE Prepared

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Cao Bang Province Prepared by the Ministry of Education

More information

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION Public Disclosure Authorized VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION ------------------------------------------------------------------ SFG1163 V11 Public Disclosure Authorized Public

More information

RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE

RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the CENTRAL

More information

SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 182/2013/ND-CP Hanoi, November 14, 2013 DECREE

SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 182/2013/ND-CP Hanoi, November 14, 2013 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- No. 182/2013/ND-CP Hanoi, November 14, 2013.. DECREE STIPULATING REGION-BASED MINIMUM WAGE LEVELS FOR LABORERS

More information

VIE: Strengthening Water Management and Irrigation Systems Rehabilitation Project

VIE: Strengthening Water Management and Irrigation Systems Rehabilitation Project Resettlement Plan Updated Resettlement Plan for Nghi Xuyen pumping station Sub-project October 2012 VIE: Strengthening Water Management and Irrigation Systems Rehabilitation Project Prepared by CPMO for

More information

SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 107/2010/ND-CP Hanoi, October 29, 2010 DECREE

SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 107/2010/ND-CP Hanoi, October 29, 2010 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- No. 107/2010/ND-CP Hanoi, October 29, 2010 DECREE STIPULATING REGION-BASED MINIMUM WAGE LEVELS FOR VIETNAMESE

More information

Indonesia: Enhanced Water Security Investment Project

Indonesia: Enhanced Water Security Investment Project Initial Poverty and Social Analysis March 2018 Indonesia: Enhanced Water Security Investment Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy

More information

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples THE WORLD BANK OPERATIONAL MANUAL Indigenous Peoples (Draft OP 4.10, March 09, 2000) INTRODUCTION. 1. The Bank's policy 1 towards indigenous peoples contributes to its wider objectives of poverty reduction

More information

More sustainable hunger eradication and poverty reduction in Vietnam

More sustainable hunger eradication and poverty reduction in Vietnam More sustainable hunger eradication and poverty reduction in Vietnam Vu Van Ninh* Eliminating hunger, reducing poverty, and improving the living conditions of the poor is not just a major consistent social

More information

Viet Nam: Central Region Urban Environmental Improvement Project

Viet Nam: Central Region Urban Environmental Improvement Project Resettlement Planning Document Resettlement Plan Document Stage: Updated Project Number: 34355 June 2008 Viet Nam: Central Region Urban Environmental Improvement Project Prepared by Project Coordination

More information

Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject

Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject Social Monitoring Report Corrective Action Plan September 2013 Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject Prepared by the Department of Agriculture

More information

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT (Loan No. 5233-VN) SFG1981 V2 RESETTLEMENT PLAN Public Disclosure

More information

VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT

VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT Resettlement Framework February 2012 VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT Prepared by the Ministry of Agriculture and Rural Development (MARD), Socialist

More information

Ethnic Minority Development Plan

Ethnic Minority Development Plan May 2013 VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project Subproject: Supply electricity for unelectrified Khmer households in Tra Vinh province

More information

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT (Loan No. 5233-VN) SFG2443 V2 RESETTLEMENT PLAN FOR THE ADJUSTMENT

More information

Internal Monitoring Report. VIE: Second Greater Mekong Subregion Corridor Towns Development Project. Semestral Report (From July to December 2017)

Internal Monitoring Report. VIE: Second Greater Mekong Subregion Corridor Towns Development Project. Semestral Report (From July to December 2017) Internal Monitoring Report Semestral Report (From July to December 2017) VIE: Second Greater Mekong Subregion Corridor Towns Development Project Prepared by: PMUs Bac Giang, Lao Cai and Mong Cai for Asian

More information

Resettlement and Ethnic Minority Development Plan (REMDP)

Resettlement and Ethnic Minority Development Plan (REMDP) Resettlement and Ethnic Minority Development Plan (REMDP) Stage of the document: Final Project number: 49026-002 April 2017 VIE: Basic Infrastructure for Inclusive Growth in the Northeastern Provinces

More information

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B. Module 8 - Involuntary Resettlement- Policy Principles & Requirements (World bank OP 4.12 and 4.12 Annex A) Key principles and objectives of an involuntary Resettlement Policy Resettlement planning instruments

More information

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang)

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Ethnic Minority Development Plan July 2011 VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Prepared by the Lang Son Provincial People s Committee

More information

Resettlement Due Diligence Report

Resettlement Due Diligence Report Resettlement Due Diligence Report August 2015 VIE: Power Transmission Investment Program, Tranche 2-500kV Pleiku-My Phuoc-Cau Bong Transmission Line Binh Phuoc Province Prepared by Central Vietnam Power

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

VIE: Greater Mekong Subregion Southern Coastal Corridor

VIE: Greater Mekong Subregion Southern Coastal Corridor Resettlement Plan March 2012 VIE: Greater Mekong Subregion Southern Coastal Corridor Updated Resettlement Plan of Xa Xia Ha Tien Section Prepared by Cuu Long Corporation for Investment, Development and

More information

VIE: Yen Vien-Lao Cai Railway Upgrading Project

VIE: Yen Vien-Lao Cai Railway Upgrading Project Social Monitoring Report Semi-Annual Report June 2014 VIE: Yen Vien-Lao Cai Railway Upgrading Project External Monitoring Report on RP Implementation Yen Bai Province Prepared by Railway Projects Management

More information

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sub-project: Improving grid medium, low voltage NORTH POWER COORATION Electric Network

More information

Viet Nam: Central Region Small and Medium Towns Development Cam Ranh (Khanh Hoa) Subproject

Viet Nam: Central Region Small and Medium Towns Development Cam Ranh (Khanh Hoa) Subproject Resettlement Monitoring Report Annual Report October 2012 Viet Nam: Central Region Small and Medium Towns Development Cam Ranh (Khanh Hoa) Subproject Prepared by the InvestConsult Group for the Provincial

More information

VIE: Phuoc Hoa Water Resources Project

VIE: Phuoc Hoa Water Resources Project Resettlement Plan Loan: 2025/2747 Document stage: updated Dec 2013 VIE: Phuoc Hoa Water Resources Project Component: Tan Bien Irrigation Area Five drainage canals in Chau Thanh District, Tay Ninh Province

More information

NH21/1 NAM DINH - LAC QUAN RESETTLEMENT ACTION PLAN

NH21/1 NAM DINH - LAC QUAN RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT PROJECT MANAGEMENT UNIT 18 ROAD NETWORK

More information

Vietnam: GMS Sustainable Tourism Development Project

Vietnam: GMS Sustainable Tourism Development Project December 2010 Vietnam: GMS Sustainable Tourism Development Project Prepared by Quang Binh Provincial Implementation Unit for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 17 August 2010) Currency

More information

MIGRATION AND URBANIZATION IN VIET NAM

MIGRATION AND URBANIZATION IN VIET NAM GENERAL STATISTICS OFFICE THE 2014 VIET NAM INTERCENSAL POPULATION AND HOUSING SURVEY UNITED NATIONS POPULATION FUND THE 2014 VIET NAM INTERCENSAL POPULATION AND HOUSING SURVEY MIGRATION AND URBANIZATION

More information

Socialist Republic of Viet Nam: Productive Rural Infrastructure Sector Project in the Central Highlands

Socialist Republic of Viet Nam: Productive Rural Infrastructure Sector Project in the Central Highlands Productive Rural Infrastructure Sector Project in the Central Highlands (RRP VIE 40238) Ethnic Minority Development Framework Document: EMDF Document Stage: Final Project Number: 40238 August 2013 Socialist

More information

NH21/2 LAC QUAN THINH LONG RESETTLEMENT ACTION PLAN

NH21/2 LAC QUAN THINH LONG RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT PROJECT MANAGEMENT UNIT 18 ROAD NETWORK

More information

Internal Migration in Vietnam: The Current Situation

Internal Migration in Vietnam: The Current Situation UNFPA, the United Nations Population Fund, is an international development agency that promotes the right of every woman, man and child to enjoy a life of health and equal opportunity. UNFPA supports countries

More information

a Infra-ThangJong Ethnic Minority Development Plan Ethnic Minority Development Plan Urban Upgrading Project in Mekong Delta-Rach Gia Sub-Project

a Infra-ThangJong Ethnic Minority Development Plan Ethnic Minority Development Plan Urban Upgrading Project in Mekong Delta-Rach Gia Sub-Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized a nfra-thangjong RACH GA PEOPLE'S COMMTTEE URBAN UPGRADNG PROJECT MAMAGEMENT UNT N KENGANGPROVNCE

More information

NH18: CUA ONG MONG DUONG RESETTLEMENT ACTION PLAN

NH18: CUA ONG MONG DUONG RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT PROJECT MANAGEMENT UNIT 18 ROAD NETWORK

More information

RP456 v 2. MEKONG TRANSPORT INFRASTRUCTURE DEVELOPMENT PROJECT RESETTLEMENT ACTION PLAN Road Component

RP456 v 2. MEKONG TRANSPORT INFRASTRUCTURE DEVELOPMENT PROJECT RESETTLEMENT ACTION PLAN Road Component Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam World Bank RP456 v 2 MEKONG TRANSPORT INFRASTRUCTURE DEVELOPMENT

More information

ABBREVIATED RESETTLEMENT PLAN

ABBREVIATED RESETTLEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF CONSTRUCTION ADMINISTRATION OF TECHNICAL INFRASTRUCTURE MANAGEMENT BOARD

More information

Ethnic Minorities Development Framework. PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program

Ethnic Minorities Development Framework. PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Ethnic Minorities Development Framework Project Number: 50050-002 September 2016 PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Prepared by the Government of the People

More information

VIE: Central Mekong Delta Region Connectivity Project

VIE: Central Mekong Delta Region Connectivity Project Social Monitoring Report Quarterly Report No. 3 April 2014 VIE: Central Mekong Delta Region Connectivity Project Prepared by Joint Venture: CDM Smith, Inc., WSP Finland Limited & Yooshin Engineering Corporation

More information

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project Initial Poverty and Social Analysis May 2018 People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project This document is being disclosed to the public in accordance

More information

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives Page 1 of 9 Involuntary Resettlement 1. Bank 1 experience indicates that involuntary resettlement under development projects, if unmitigated, often gives rise to severe economic, social, and environmental

More information

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007 Involuntary Resettlement - Overview Transport Forum Washington, D.C. March 30, 2007 OP 4.12 - Triggers Trigger: acquisition of land which displaces people physically and / or economically. Policy applies

More information

VIE: Northern Power Transmission Expansion Sector Project

VIE: Northern Power Transmission Expansion Sector Project Resettlement Monitoring Report March 2014 VIE: Northern Power Transmission Expansion Sector Project Prepared by the Local Implementation Consultant (LIC) Social for Viet Nam Electricity (EVN) Northern

More information

SFG1095 V4 SUBPROJECT: Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

SFG1095 V4 SUBPROJECT: Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized SFG1095 V4 Public Disclosure Authorized SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Binh Dinh, May 2015 SUBPROJECT: PROJECT OWNER THE CONSULTANT Binh

More information

Terms of Reference National and International Consultant

Terms of Reference National and International Consultant Title Project title Location Duration Reporting to Synthesis of climate vulnerability and capacity of landless and land-poor in the Mekong Delta CARE - Integrated community-based adaptation in the Mekong

More information

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the RESETTLEMENT FRAMEWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the Secondary Education Modernization Project II in Sri Lanka Ministry of Education

More information

VIE: GMS Ben Luc - Long Thanh Expressway

VIE: GMS Ben Luc - Long Thanh Expressway Social Monitoring Report Inception Report May 2013 VIE: GMS Ben Luc - Long Thanh Expressway Prepared by Thanglong Infrastructure Development for Vietnam Expressway Corporation and the Asian Development

More information

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant IPP133 v 1 STRATEGY AND GUIDELINES FOR ETHNIC MINORITY DEVELOPMENT PLAN IN GUANGDONG PROVINCE Public Disclosure Authorized

More information

Resettlement and Ethnic Minority Development Plan (REMDP)

Resettlement and Ethnic Minority Development Plan (REMDP) Resettlement and Ethnic Minority Development Plan (REMDP) Stage of the document: Final Project number: 49026-002 April 2017 VIE: Basic Infrastructure for Inclusive Growth in the Northeastern Provinces

More information

RP530 MEKONG TRANSPORT/FLOOD PROTECTION PROJECT THE GANH HAO BRIDGE. Resettlement Action Plan (RAP)

RP530 MEKONG TRANSPORT/FLOOD PROTECTION PROJECT THE GANH HAO BRIDGE. Resettlement Action Plan (RAP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam World Bank RP530 MEKONG TRANSPORT/FLOOD PROTECTION PROJECT

More information

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia)

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Republic of Sakha (Yakutia) of the Russian Federation Innovative Development of Preschool

More information

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Resettlement Policy Framework for the Smallholder Agriculture Development Project

More information

RESETTLEMENT PLAN (Final draft)

RESETTLEMENT PLAN (Final draft) SFG3898 V1 REV HA TINH PROVINCIAL PEOPLE S COMMITTEE WORLD BANK RESETTLEMENT PLAN (Final draft) DYNAMIC CITIES INTEGRATED DEVELOPMENT PROJECT KY ANH TOWN SUBPROJECT HA TINH PROVINCE Public Disclosure Authorized

More information

ETHNIC MINORITY DEVELOPMENT PLAN

ETHNIC MINORITY DEVELOPMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF TRANSPORT WORLD BANK RURAL TRANSPORT PROJECT NO.3 ETHNIC MINORITY DEVELOPMENT

More information

Updated Resettlement and Ethnic Minority Development Plan

Updated Resettlement and Ethnic Minority Development Plan Updated Resettlement and Ethnic Minority Development Plan Project Number: 46293-005 May 2018 Viet Nam: Greater Mekong Sub-Region Tourism Infrastructure for Inclusive Growth Project Subproject: Lao Cai

More information

Transport Connection in Northern Mountainous Provinces Project Gender Action and Ethnic Minority Development Plan Ha Giang Province

Transport Connection in Northern Mountainous Provinces Project Gender Action and Ethnic Minority Development Plan Ha Giang Province Transport Connection in Northern Mountainous Provinces Project Gender Action and Ethnic Minority Development Plan Ha Giang Provincial People s Committee April 2011 (FINAL DRAFT) ABBREVIATIONS ADB = Asian

More information

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING Road Development Agency 1 5 6 2 3 4 RESETTLEMENT POLICY FRAMEWORK FINAL REPORT Consultancy Services for the Design and Preparation of Bidding Documents for a Countrywide Roll-out of the Output and Performance

More information

Social Management Policy Framework

Social Management Policy Framework Appendix 1-2 SFG1851 GEF Mainstreaming Integrated Water and Environment Management Project Social Management Policy Framework (Amended) Public Disclosure Authorized Public Disclosure Authorized Public

More information

Socialist Republic of Viet Nam: Second Greater Mekong Subregion Corridor Towns Development Project. Bac Giang Subproject

Socialist Republic of Viet Nam: Second Greater Mekong Subregion Corridor Towns Development Project. Bac Giang Subproject Resettlement Plan June 2015 Socialist Republic of Viet Nam: Second Greater Mekong Subregion Corridor Towns Development Project Bac Giang Subproject Prepared by Bac Giang Provincial People s Committee for

More information

IPP752 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT WORLD BANK ETHNIC MINORITY POLICY FRAMEWORK

IPP752 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT WORLD BANK ETHNIC MINORITY POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT WORLD BANK ETHNIC MINORITY POLICY FRAMEWORK

More information

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II Social Safeguards Monitoring Report Full Report November 2018 CAM: Rural Roads Improvement Project II Prepared by the Ministry of Rural Development for the Kingdom of Cambodia and the Asian Development

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project RESETTLEMENT PLAN Project Number: 46391-001 December 2017 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Hanoi City Power Corporation, Electricity of Vietnam for Asian

More information

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project BURCU ERGIN SOCIAL SAFEGUARDS SPECIALIST WORLD BANK RSM LAUNCH WORKSHOP IZMIR, 5 JULY 2018 Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project Why is it critical

More information

Economic and Social Council

Economic and Social Council United Nations E/C.19/2010/12/Add.5 Economic and Social Council Distr.: General 16 February 2010 Original: English Permanent Forum on Indigenous Issues Ninth session New York, 19-30 April 2010 Items 3

More information

EBRD Performance Requirement 5

EBRD Performance Requirement 5 EBRD Performance Requirement 5 Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or loss of

More information

THE PRIME MINISTER HEREBY DECIDES:

THE PRIME MINISTER HEREBY DECIDES: THE PRIME MINISTER No: 286/2006/QĐ-TTg THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness Hanoi, 27 December, 2006 DECISION on the Issuance of the National Program for the Promotion of Foreign

More information

STEERING COMMITTEE 138/CP REPORT ON

STEERING COMMITTEE 138/CP REPORT ON STEERING COMMITTEE 138/CP REPORT ON OVERVIEW OF CURRENT IMPLEMENTATION OF DECISION NO. 09/CP OF THE GOVERNMENT ON CRIME PREVENTION AND SUPPRESSION WITHIN THE DEVELOPMENT AND IMPLEMENTATION OF NATIONAL

More information

Building Capacity to Make Transport Work for Women and Men in Vietnam

Building Capacity to Make Transport Work for Women and Men in Vietnam 67980 EAST ASIA AND PACIFIC REGION Social Development Notes I N N O VATI O N S, LE S S O N S, A N D B E ST P R A CTI C E Building Capacity to Make Transport Work for Women and Men in Vietnam Gender and

More information

Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project

Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project Resettlement Planning Document Resettlement Plan Document Stage: Revised Project Number: 41013-013 March 2012 Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project Prepared by Provincial

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM HO CHI MlNH CITY'S INFRASTRUCTURE DEVELOPMENT FUND ********

More information

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness No. 164/2013/ND-CP Hanoi, November 12, 2013 DECREE

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness No. 164/2013/ND-CP Hanoi, November 12, 2013 DECREE THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM ------- Independence - Freedom - Happiness ---------- No. 164/2013/ND-CP Hanoi, November 12, 2013 DECREE AMENDING AND SUPPLEMENTING A NUMBER OF ARTICLES OF

More information

Resettlement Plan. September 2016

Resettlement Plan. September 2016 Resettlement Plan September 2016 VIE: GMS Flood and Drought Risk Management and Mitigation Project - Upgrading and Rehabilitation of Four Primary Canals in Plain of Reeds, Dong Thap Province - Cai Cai

More information

Prepared by Project Coordination Unit, Management Board for Surveying and Planning Investment Projects, Ministry of Constructions.

Prepared by Project Coordination Unit, Management Board for Surveying and Planning Investment Projects, Ministry of Constructions. Resettlement Planning Document Resettlement Plan Document Stage: Updated Project Number: 34355-01 May 2008 VIE: Central Region Urban Environmental Improvement Prepared by Project Coordination Unit, Management

More information