j,~~~s I, jri Is I wnflioa LLiNLL ;;dii. is Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Size: px
Start display at page:

Download "j,~~~s I, jri Is I wnflioa LLiNLL ;;dii. is Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized vj I j,~~~s I, jri Is I wnflioa LLiNLL ;;dii. is

2 I4

3 World Bank Loan Hunan Urban Development Project Corridor Component (Xiangtan Urban Section) Resettlement Action Plan Prepared by Hunan Provincial CZT Economic Integration Office Mar. 2004

4 I

5 Approval ShouXianQing Check XieZengLi Compile WangTong LiuFang SunQingNan Major Participators ChenYan ChenJunYan LiLin GuoAiPing ChenYingLong KangFuLi

6

7 Content 1. Summary Project Background Project Briefing Project Location Major Construction Contents Cost Estimates and Schedule Social Benefit of the Project ProjectAffected Scope Preparation of ResettlementAction Plan Basis and Target of the Report Preparation Method of This Report Project Impact Measures for Avoiding or Minimizing Land Acquisition and Relocationl Measure in Design Stage Measures in Construction Stage ProjectAffected Physical Indexes The Investigation Methodology and the Process ProjectAffected Land Population Affected by the Project House and Appendix Facilities Relocation Scattered Trees Infrastructure and Special Facilities Enterprise and Individual Business Shops Relics and Vulnerable Group Project Impact Analysis Impact on Agriculture Impact on Enterprises Impact on Infrastructure and Special Facilities Project Impact Analysis Natural, Social and Economic Survey in Project Affected Zone Natural Survey in ProjectAffected Zone 3-1

8 3.1.1 Geology and Geomorphology Meteorology and Hydrology Natural Resources Social and Economic Baseline in Counties and Districts Affected by the Project Social and Economical Baseline in Townships and Villages Affected Baseline of Resettler' Families in the Affected Zone Social and Economic Impact of Land Acquisition and Relocation on Population 3-18 Affected 4. Law Framework and Policies Main Laws and Policies for Resettlement Related Policies of World Bank Policies Target of the Project Compensation Qualification Compensation Criteria Varies Land Acquisition and Relocation Compensation Criteria and Standards Ownership Sheet Resettlement Plan ' Resettlement Strategy Resettlement Targets Resettlement Principles and Measures Resettlers' Living Restoration Plan Principle and Procedures of Resettlement Alternative Relocation and House Reconstruction Plan Infrastructure and Public Facilities Production Resettlement Plan Takes of Production Resettlement Standard of Resettlers Production Arrangement Environment Capacity Analysis Agricultural Arrangement Scheme Non-Agricultural Arrangement Scheme Restoration Scheme for Enterprises and Institutions Restoration Measures for Resetlers' Economic Income Comparison of Family Economic Income Levels before and after Resettlement 5-18

9 6. Organization and Responsibilities Organization Participating Resettlement Planning Organizations and Responsibilities of Resettlement Implementation and Management Organization Organization Responsibilities Supervision Organization Resettlement Management System Staffing and Facilities for Resettlement Organizations Training Training Plan of Resettlement Management Staff Resettlement Production Skill Training Plan Improving Measures for Organization Public Participation and Harmonization with Residents in the Host Sites Public Participation Strategy Participation and Consultation Approach Participation Approach Measures for Participation and Consultation Public Participation in Preparation of Resettlement Planning Report Public Participation Plan during Resettlement Report Implementation Participation in House Reconstruction Participation in Production Resettlement Participation in the Usage Management for Land Compensation Fee Participation in Project Construction Harmonization with Residents in the Host Sites Appeal Procedures Potential Complained Problems and Resolutions Appeal Channels and Procedures Appeal Channel Appeal Procedures Environmental Protection and Management 9-1

10 9.1 Needs for Environmental Protection Dismantling and Cleaning up Environment Management in Resettlement Area Monitoring and Evaluation Intemal Monitoring Purpose and Task Monitoring Organization Implement Procedure Monitoring Index Intemal Monitoring Report External Monitoring Evaluation Purpose and Tasks Principal Monitoring Index Monitoring Evaluation Methods Working Procedures Cost Estimate Cost Estimate Narrative Preparation Basis Resettlement Compensation Cost Summary Financing Cost Estimate of Itemized Investment Resettlement Compensation Cost Special Facilities Compensation Cost Others Compensation Cost Basic Contingency Cost Relevant Taxes Fund Use Balance of Land Compensation Fee and Production Resettlement Investment Fund Management andauditing Resettlement Implementation Scheduling Principles for Scheduling 12-1

11 I 12.2 Schedule Resettlement Implementation Schedule Yearly Fund Use Plan 12-2 Appendix Annex-1 ATTACHED TABLES ATTACHED FIGURE I

12

13 ;v;attached ArawinglI Schematic Drawing of Geographical Location of Project Region \ %, _ ** s ~ \ >t \Ci_angShbaCiCity ItF* _ P e to _7~~WM =1

14

15 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) 1. Summary 1.1 Project Background The construction of economic zones along rivers has been a dominant trend of economy development in China and some developed countries and regions. The rapid development of several economic zones along rivers in the world, like Rhine Economic Zone, Seine Economic Zone, Changjiang Delta Economic Zone and Zhujiang Delta Economic Zone has greatly supported the developing of towns and villages along the rivers, most of which have been the economic centres of their countries or regions. It is explicitly pointed out in national 'the tenth five-year developing program" that inland areas should take every advantage of their geographic positions and comprehensive resources to speed up the economic development. Focusing on the regions having main transportation lines on land and water, the role of central cities shall be fully played, while cultivating new economic increasing programs and zones at the same time. It can be expected that promoting the economic zones' development is one focus of the increasing developing strategies during the tenth five years in China. And here Xiangjiang ecologic economy zone is facing a rare chance. t These three cities (Changsha, Zhuzhou and Xiangtan), located in the east of Hunan province, form a city group in the triangle shape, attaching to each other, along the lower reach of Xiangjiang River. And the distances between each two of them never exceed 45km. In August 2001, the provincial planning office in Hunan entrusted Obermeyer Consulting Engineers (Germany) to prepare the conceptual plan of Xiangjiang ecologic economy zone in CZT (namely, Changsha, Zhuzhou and Xiangtan). Obviously, the geologic position of this region is ideal: being close to the golden watercourse of Changjiang in the north, it not only abuts with Wuhan economic circle and connects with Changjiang economic stripe, but also has Guangdong and Guangxi as its neighbours in the centre of the transition between Wuhan economic circle and the economic zone in Zhujiang delta. It would be expected that it would be a golden economic region receiving multi-fold economic radiation, a real "golden" delta area. The project of roads in Xiangjiang ecologic economy zone functioned as flood controlling and sight seeing has become one of the first proved projects on cities developing strategies (CDS) supported by the World Bank in China, being one of the seven major intensive habitations' constructions supported specially by national "tenth five-year developing program". Following the market economy rules, the big mingle of the three cities (CZT) will be made through the integrations in infrastructures, markets, industries and cities to galvanize Hunan economy and make CZT developing the nuclear of Hunan economy development,

16 Resettlement Action Plan for Comidor Component (Xiangtan Urban Section) the clustering area of high technology and modem ecologic city networks, finally influence and promote surrounding area and the whole province's economic development. Along Xiangjiang River, Xiangjiang ecologic economy zone has a road through these three cities (CZT), and it starts from the Yueliang Island Bridge in the north to Kongzhou Bridge of Zhouzhou in the south, extending for 128km, including more than 100 mountains and 15 islands, and connecting 3 major cities and 12 small towns. Being one of main parts in CZT economy integration program, it will become an well spaced economy entity with mature infrastructures and special landscape, which has combined the ecologic development in different fields: landscape, industries, cities and towns developing, culture and custom, high technology, recreation and tourism, and communication and flood controlling. While the preparation of the Xiangjiang scenery band was operating, the three cities would initiate the construction of Xiangjiang economic and scenery band, with the start of the building of flood controlling scenery zone along the river. Being an important part of this synthetic economy, the building of this flood preventing and controlling landscape roadi will not only greatly strengthen the flood controlling ability of the ecologic economy zone along Xiangjiang River, improve existing ecologic environment, but also give prominence to special culture and landscape in Hunan and enhance the connection of urban and rural area, to bring out a benign increase in ecologic development for both the project affected area and people's living standard. The theme of " High starting point, high strict standard, and high level" in this project, one part of the whole planning of Xiangjiang ecologic economy zone, will greatly promote the economic zone's fame. Moreover, the construction of this project will provide unlimited business chances for Xiangtan city, which can easily bring an all-round development of several economies along the Xiangjiang River, readjust its industrial structures and contribute much to its economy and the construction of ecologic scenery and flood controlling projects. This project consists of four sections: Changsha urban section, Zhuzhou urban section, Zhaoshan section in Xiangtan, and Xiangtan urban section, which would be built by four different work groups. Among them the Xiangtan urban and country section is 42km long 1-2

17 Resettlement Action Plan for Corridor Component (Xiangan Urban Section) and is planned as the first period. It starts from Xiangtan No.1 Bridge to Shangrui Expressway, extending for 10.57km. This section can be divided into two parts-the first part (with embankment) starts from Xiangtan No.1 Bridge upstream 800m to Xiangqian Railway Bridge with 4.1 km long; and the second part is from Xiangqian Railway Station to Shangrui Expressway with 6.47km long. The first part is the nuclear section in the city, which has already had inhabitancy, public facilities (Teenagers Palace, Sailing School), government facilities (gas storage and supply station), storage (salt storage), etc. Flood embankment has already been constructed in Binjiang and its flood control level is above the highest water line in a hundred years. Meanwhile, the developing activities are strictly planned and controlled in this area, which is in favour of the implement of new planning. The second part is at the edge of the completed section, of which the section from Railway Bridge to Electric Chemical Company is at the back of Xiang Textile Mill. No.3 Water Factory, Xiangfang Hospital, School, employees' dormitory and storage are built here. There is no road in Binjiang. The section between Electric Chemical Factory and Shangrui Expressway is the chemical section with heavy polluted chemical enterprises such as dyestuff chemical factory, organic chemical factory, finary chemical factory, electric chemical factory and Hetang Oil Storage, etc. and is connected by board and bamboo road with 7m wide through Binjiang. This section is well connected with the west bank. The No.1 and No.3 bridges connect the founded section of both sides closely and the No.4 Bridge, which will be built in the future, will connect the north part of both sides. Xiangtan Urban and Country Construction Investment Developing Co. is in charge of this project. 1.2 Project Briefing Project Location Xiangtan City is located on the easterly center of Hunan Province, in the middle and lower reaches of the Xiangjiang River, 180 km wide from east to west, and 81 km long from north to south, with the three counties of Lingxiang,Wangcheng and Changsha to the north, the district of Zhuzhou and Zhuzhou County to the east, the Hengdong,Hengshan 1-3

18 Resettlement Action Plan for Comidor Component (Xiangtan Urban Section) and Shuangfeng to the south, and Loudi and Lianyuan to the west. The city is surrounded with hills, with the center part relatively flat and the northeast part open. The fluctuation of the hypsography is small, with the altitude between 40 and 70 meters. The shape of Xiangjiang River in the Xiangtan district is S from the south to north. The district is the infall of the three rivers: Xiangjiang,Lianshui Juanshui Main Construction Contents The construction content of the coastwise flood control landscape corridor component (FCLCC) comprises three parts of coastwise road,flood control project and Landscape project. 1) Road Project The coastwise flood control road in the Xiangtan City district starts at the stake k8+000 of Tanshao Freeway, with the Zhengjiang village,fengtouling Shuangbu village,yangquegang on the way, crossing the Xiang-Qin railway at the stake K and the Xiangtan 3 rd Bridge at the stake k15+000, end at 800m ahead of Xiangtan 1 st Bridge. The total Length is 10.57km. Of which, the road from the stake k8+000 to k is constructed under Grade 2, with the road base 12m wide, road surface 7.5m wide and the footpath 3m wide. The road from the stake k to k is built under Grade 1 with the designed driving velocity is 60km/h and the road surface 57.5m wide; the maximum horizontal radius without super-elevation is 600m, and the minimum is 125m, the maximum longitudinal slope is 3%, the convex radius is 8000m and the concave radius is 6000m. The standard design load of the bridge and culvert is: City-grade A. 2) Flood Control Works The main construction of this project is in the district of Xiangtan district, the flood-prevention standard is once every 100 years, the water logging prevention standard is once every 10 years. The main content is heightening-and-thickening for 4.03km, slope protection for 4.03km, 4 culverts lengthened, 1 diversion canal strengthened, and 2 sets 6 units of 3510 kw electric power stations extended. 1-4

19 Resettlement Action Plan for Corfidor Component (Xiangtan Urban Section) 3) Landscape Works The construction range of landscape project is the whole road. With the green land structures such as road virescence band,public green land,and park green land, and sites such as the river leisure district culture-and-art corridor and natural landscape districts, the Xiangjiang flood-prevention landscape road will be a real landscape road. The acreage of the land required for the flood-prevention road of the Xiangtan district is 400 thousand m2. 4) The Employer The project Employer is the Xiangtan City Urban Construction Investment Development Corp. Xiangtan City Urban Construction Investment Development Corp. is founded in 1998, with enrollment fund 50 million yuan. The tenet and service range is: provide service for the urban construction; administrate the collection and usage of the city maintenance and construction fund; comprehensive develop by realty; collect city construction fund by making trading and fetch in foreign fund; in charge of the administration of the state-owned city construction fixed-assets. The subordinate are service department, operation department, commerce promotion and financing department, engineering technology department and administrative office. Since 2001, the corporation has invested about 200 million to rebuild 14 cities roads; build 10 more parks, with virescence acreage 400 thousand m2; install 2381 new street lamps, with the Xiangtan 1 St Bridge lightened; rebuild the Xiangtan sport center; finish 115 million engineering amount of construction of the 2 nd north ring road. By which the level of the main road of the city was elevated, the city was beautified, and the environment was improved. Xiangtan City Urban Construction Investment Development Corp. has three subsidiary companies, of which the Xiangtan City Urban Construction comprehensive Investment and Development company spends 200 million yuan to extend the east bank road which is 4240 meters long and 60 meters wide; to build the north Silk Road which is

20 Resettlenment Action Plan for Comidor Component (Xiangtan Urban Section) meters long and the Silk Square which has a virescence land of m 2 occupying a acreage of 125 Mu land, and Cichou Square with Greenland area of 26940m 2. The Xiangtan Ring Road Construction Real State Development Ltd. has finished the construction of the commercial residents in Xichun Road with an investment of 8 million yuan. The Xiangtan Comprehensive Development and Infrastructure Construction Ltd. has finished the urban infrastructure construction with a total value of 24 million yuan since its foundation Cost Estimates and Schedule The total investment of the project to be constructed is million yuan, with an average of million yuan for each kilometers. The period of the project is divided into two phases: the preparing period and the exerting period. The construction of the project is planned to start in January of 2005 and finish in December of 2006, with the total period of two years, (preparing period is 2 years, the total period is 4 years). The construction period comprises preparing period relocation and resettlement period, earth-and-stone engineering period, construction period, virescence engineering period, coastwise landscape period and fragmentary engineering period Social Benefit of the Project The implementation of the project will effectively speed the development of the economy of Xiangtan city and accelerate the development and the road construction of the coastwise landscape band. With the domestic economic evaluation, the project possesses considerable domestic economic benefit. For example: 1) the benefit from reducing the operation cost; 2) the benefit from reducing the time of the tourist; 3) the benefit from the flood and water-logging prevention (according to the study of feasibility, the benefit is about million yuan per year); 4) the benefit from value increment of the land. The analysis of the cost and benefit of the domestic economy could be seen at Table (data is from Study of Feasibility ) 1.3 Project Affected Zone 1-6

21 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) The eternal land acquisition and resettlement of the road construction involves 8 townships (street committees ) 14 villages and 26 groups in Xiangtan City such as the Hejie community of Dongping Street committee and Daqiao community of Jianshe Road street committee in Yuetang District,Shunjiang village of Xiacheng township,east Lake Fishing Ground, Jianbian village,yunpan village,shejiang community of shejian village Street committee of Baota township,bantang village,xiangyang community and Dianhua community of Dishui Street committee of Bantang township,dishui village,shuangbu village, Zhubu village,yijiaping village of Hetang township. The coastwise flood control road in the Xiangtan City district starts at the stake k8+000 of Tanshao Freeway, with the Zhengjiang village,fengtouling Shuangbu village,yangquegang on the way, crossing the Xiang-Qin railway at the stake K and the Xiangtan 3 rd Bridge at the stake k15+000, end at 800m ahead of Xiangtan 1 st Bridge. The total Length is 10.57km. In principle, the coastwise road should run parallel with the river, for it not only acclimates the contour line, but also bents correspondingly: according to the different land and highness difference condition, flood-prevention dyke is built one-off at lower place (improve the land acquisition condition of the submerged land at the previous year), coastwise road is built at upper place, at the conjunction of the two kind of place the disposition of dyke and road should be consistent with the driving criterion: the width is controlled in four different sects according to the actual condition: The first sect: From Dongsi Road (800m ahead Xiangtan 1 st Bridge) to Xiang-Qian Railway bridge, with a length of 4.3 km, the existing 8.5 meters' wide dyke is extended to 30 meters' wide road, with virescence land whose width is 50 meters and limited to less than 80 meters preserved. The second sect: From Xiang-Qian Railway bridge to the Electric and Chemistry Factory of the City, with a length of 3.65 km, a driving road which is 15 meters wide is built along the river( the road and dyke become one ). A virescence land whose width is about 35 meters and the actual width is limited to less than 50 meters preserved at the east side. The third sect: From the Electric and Chemistry Factory of the City to the Dye and Vitriol 1-7

22 Resettement Action Plan for Corridor Component (Xiangtan Urban Secton) Factory, with a length of 1.8 km, extend the existing plank and bamboo road which is 7 meters wide to driving road that is 20 meters wide. A virescence land whose width is about 30 meters and the actual width is limited to less than 50 meters preserved at the east side. The fourth sect: From the Dye and Vitriol Factory to Shang-Rui Freeway Bridge, with a length of 1.5 km, the Binjiang Chemistry plant and the Hetang oil storehouse are planned to remove. A driving road which is 20 meters wide is planned to built along the river, A virescence land whose width is about 30 meters and the actual width is limited to less than 50 meters preserved at the east side. Considering that there are many enterprises along the river, and the amount of resettlement is too large, the width of the driving road reduced to 15 meters according to the new plan, and the width of the virescence land reduced to 10 meters. 1.4 Preparation of Resettlement Action Plan Basis and Target of the Report. 1) Basis of Preparation I (1 ) The Preparation of the Service Contract based on the Resettlement Plan signed with the Owner (2) The Feasibility Study Report for Flood Control Landscape Corridor component along Xiangpiang River, Changzhutan Urban Development Project (Xiangtan Section) (3) the World Bank, Operational Policy on Involuntary Resefflement OP/BP 4.12) (4) Land Administration Law of P.R. C (1999) (5) Urban House Dismantling and Relocation Administrative Ordinance (2001) (6) Hunan Provincial Implementation of Urban House Dismantling and Relocation Administrative Ordinance (2000) (7) Land Requisition and Resefflement Compensation Method of Xiangtan city (TZF No 18 [2001]) (8) Social, economic and land acquisition and relocation physical index investigation within the land acquisition and relocation scope of the project I1-8

23 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) (9) The discussions with the project employers, local govemments and representatives of the affected people 2) Targets of Preparation (1) The construction, technical and economic measures employed shall avoid or reduce the number of land acquisition and relocation as much as possible; while the relocation is unavoidable, effective measures shall be made to diminish the influence of land acquisition and relocation to the local residents' production and daily life. (2) Social economic investigation and relevant relocation program of the resettlers will be made during the preparation of the project. (3) The relocation of resettlers will base on the physical indexes and compensation criteria, targeting to improve or at least rehabilitate resettlers' original living standard. (4) Further development of the resettlers is highly recommenced. The relocation of people in village will be guided by those more developed second and third industries, on the basis of land exploit. (5) Encourage resettlers and existing residents in the host site to participate the planning of resettlement and planning Scheme; (6) Resettlers will be given prior consideration for relocation in the old community. (7) Both resettlers and existing residents will benefit from this project Preparing Method of This Report From August 13 to September 2 in 2003, the unit in charge of the preparation of this report organized specialists and experts, with the active cooperation of all level local govemments in the project zone, to make a comprehensive investigation concerning the physical indexes in the occupied area and influence to resettler's families in the project zone and a randomly sampling survey was made on the willingness of these resettlers. Meanwhile, holding a resettlement coordination meeting with the participation of the employers, the designers, government at all levels affected and the resettlement representatives, they listened to the opinions of various parties, discussed resettlement scheme, the ways of resettlement living restoration, compensation by adapting law framework and criteria etc., then proposed initial resettlement planning program. In line with the established policies of our country, law and statute and requirements of the World Bank for resettlement, they performed reasonability analysis and feasibility study analysis for how 1-9

24 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) townships at all levels (street office) in project zone affected, improved and perfected in accordance with the suggestions of technical assistance experts of the BANK and consultant experts of Mott MacDonald Company after their reading and observation on site, completed preparation of Resettlement Action Plan report at last. It was modified and prepared according to their suggestions. Table National Economic Evaluation Table for FCLCC (Xiabgtan Urban Section) Year Y Cost(10'Benefit Static benefit Social discount rate (12%) Economic oar (10 (10 caclto valuation Y (0yuan) calculation Discount Cost present Benefit Net present ex yuan) (104 yuan) factor value present value value ENPV I I_'(1 04 yuan): EIRR(%) EBCR: ~~~~~~~~~~~~~~~ Payback I period: (year)

25 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Salvage value 1-11

26

27 Resettement Action Plan for Coridor Component (Xiangtan Urban Section) 2. Project Impact 2.1 Measures for Avoiding and Minimizing Land Acquisition and Relocation Measures in Design Stage Feasibility Study Report has done comparison and selection of route alignment between two schemes, which are as follows: Scheme 1: the route starts at K8+000, going down across Tanshao Expressway, by the way of Zhengjia Village, Fengtouling, Shuanbu Village, Yangque Harbon, then down across Xiangtan Railway Bridge at K , and no. 3 Xiangtan Bridge at K15+000, it ends at 800m upstrain from No. 1 Bridge. It is kms long. With city main road class I standard, designing driving velocity V=60 km/h, the width of pavement is 57.5m, minimum horizontal radius without super-elevation 600m, minimum horizontal radius 125m, max. longitudinal slope 3%, concave radius 6000m. The design load standard of bridge and culvert is city-class A. Scheme 2: it has the same orientation with that of scheme 1. Transverse section is designed from K8+000 to K15+000, By class I1 highway, the width of pavement is 12m, pedestrian width is 3m. Arranging road along the Xiangjiang river: From K to the end K section, small horizontal radius is 600m, minimum horizontal radius 125m, max. longitudinal slope 3%, convex radius 8000m, concave radius 6000m. The design load standard of bridge and culvert is city-class A. Because the width of the pavement in scheme I is wider than that in scheme 2, the work of land acquisition and relocation quantity is evidently heavier than that in scheme 2, 2-1

28 Resettlement Action Plan for Corridor Component ()iangtan Urban Secton) considering this, the scheme 2 is superior, and thus scheme 2 is recommended the in Feasibility Study Report. We know from this investigation that there are more chemical enterprises scattered in the 1.5 km-section from Shangrui Expressway to Xiangtan Vitriol Factory (7 in all), the enterprises are operated normally at present, but the run of scheme 2 requires relocation. In order to reduce the impact of the project on the acquisition and relocation, the alignment is adjusted again in Feasibility Study Report. The changed route is firstly along the Banzhu Road from the bridge of Shangrui Expressway to Xiangtan Vitriol Factory, Xiangtan Electrolysis Factory, then goes to riverside, and goes along dormitory zone of Xiangtan Textile Dying Factory to the bridge of Xiangqian Railway. Thus the relocation of the enterprises is avoided, at the same time, the relocation of enterprises closed to the line minimized as much as possible. The scheme can reduce 369 resettlers of 107 householders and relocation of 5 units, avoid 36 affected shops, and reduce mu requisitioned land, and m 2 house relocation. The scheme can save million yuan for project investment Measures in Construction Stage The occupied land of this project is distributed linearly and the influence of land acquisition and relocation is not great. However, in order to minimize the effect of the project implementation to the area, it is necessary to pay attention to the construction layout and selection of construction schemes so as to avoid unnecessary land requisition and house relocation. The steps are suggested as follows: 1) Investigate will be made before the practice of relocation so as to distinguish the buildings that should not be relocated or only partly need relocated 2) For the buildings which are necessary to be relocated for the requirement of this project, it is necessary to notify the owner of the buildings in advance, or to construct temporary buildings at the place, then reconstruct them according to the form building 2-2

29 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) after the completion of this project which the owner have the right to use them. 3) The losses caused by the relocation of this project should be compensated sufficiently according to the replacement price and the adverse influence should be minimized to the smallest extent. 4) The Host site should be located near the former inhabitant site, so the inhabitants can keep touch with each other. On the other hand, increase of the distance from the host site to the worksite should be avoided. 5) The affected enterprises should be informed in advance and the host site should be arranged ahead and their losses should be compensated too, so the production interruption can be minimized and it is necessary to consult Mith the employer for the arrangement of the employees. 6) During resettlement, assistance and the convenience from relevant functional department should be offered to the inhabitants and affected enterprises in order to implement smoothly and to mitigate their overburden and losses. 2.2 Project Affected Physical Indexes The Land Acquisition of this project is mu, among them, the permanent occupied land is mu, including national land mu, and collective land mu(including mu cultivated land) and temporary occupied land is mu. The relocation house within the scope of the project is m 2, among them, the resident building area is m 2, and the non-residence is m 2. There are

30 Resetflement Action Plan for Conidor Component (XGangtan Urban Section) households all together impacted by the project including residence enterprise units, the number of affected people are 1378 in total, 350 households (1153 people) are effected, and 341 of them (1107 people) should be removed, the other 9 households (46 people) are partly affected. There are 31 enterprises including 225 employer, 722 people including 225 staff of the enterprise need production resefflement. 2-4

31 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Indexes Summary Table of Land Acquisition and Relocation for FCLCC ( Xiangtan Urban Section) Table uetang Xiangtan County Item Unit Jianshe Shejian Hetang Total Dongping Xiacheng Baota Dishuibu Hutan Subtotal Road Village Bantang Township Township ffice Township ownshi Office Township Office Office I Acquisition Use Land mu I) Permanent Occupation Land mu State-owned Land mu (1) Agricuture Use Land mu Of which Cultivated Land mu (2). Construction Land mu (3). Un-used Land mu Collecve Land u ). Agriculture Use Land mu Of which Cultivated Land mu (2). Construction Land mu ). Un-used Land mu (11) Temporary Occupation Land mu

32 Resettlement Action Plan for Corndor Component (Xiangtan Urban Section) Indexes Summary Table of Land Acquisition and Relocation for FCLCC ( Xiangtan Urban Section) Table Yuetang Xiangtan County Item Unit Jianshe Shejian Hetang Total Dongping Xiacheng Baota Dishuibu Hutan ubtotal Road Village Bantang Townshi Township Office Township Townshi Office Township Office Office imber mu Shrubbery mu Waste Land mu II. Housing Relocation m Residence m Formal House m Sundry House m Z. Non-residence m & Enterprise Unit House m Ill. No. of Affected Household Household IV. Affected Resident Population Person V No. of Relocation Household Househol VI. Relocation Resident Population Person

33 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Indexes Summary Table of Land Acquisition and Relocation for FCLCC (Xiangtan Urban Section) Table uetang Xiangtan County Item Unit lanshe Sheian Hetang otal Dongping Xiacheng Baota Dishuibu utan Subtotal Road Village Bantang Township Township ffice Township Township Office Township Office Office VII. Impact Non-residence No Vill. Affected Non-residence Populatio Person

34 ResettlementAcdon Plan for Conidor Component (Xiangtan Urban Sechon) The Investigation Methodology and the Process The house building area and appendix building numbers are measured by per household statistics, The landmark of the ministration and land are drawn on the spot with 1/1000-terrain fieldworks, then fixing every village group's cultivated land, gardening land, forest land, and the others by measuring maps. All kinds of professional projects should be investigated by category. all the physical indexes within affected area were investigated with methods referred above Project Affected Land 1) Permanent Project Acquisition The total number of permpnent Land Acquisition is mu, including national land and collective land. (1) National Land The number of national Land Acquisition is mu, account for 21.02%, and 2.86mu of it is agriculture land.(all is vegetable land) mu of them is construction land, including mu construction land, 96.4 mu enterprise land, 1.09 mu road land and 1.7 mu public land.. Among all national land; there is 3.87 mu land unused (waste land). (2) Collective Land The total number of collective land is mu, account for 78.98%, and the agriculture land occupied mu, account for 50.46% of the collective land.the number of 2-8

35 Resettlement Action Plan for Comridor Component (Xiangtan Urban Section) cultivated land is mu, which account for 36.39% of the collective land, 28.74% of the permanent Land Acquisition. Among the agriculture land, there are mu ponds, 7.7 mu fish ponds, mu timberland, and 5.18 mu water surface; the number of construction land within collective land is mu, including mu residential site, mu township collective enterprise land, mu road land, and mu public land. There is mu land unused within collective land, including mu grassland and mu wasteland. 2) Temporary Construction Land According to the temporary construction occupation scheme offered by Road Design Company, the number of temporary land of this project is mu, including Heping Borrow, Xiangtang Quarry in Xiangtan province and temporary construction facilities and temporary road construction land. Both 9.52 mu temporary facilities and 150 mu temporary road construction land can be sektled within the scope of the permanent acquisition area. The other borrows and quarries account for mu of timberland, mu bush land, 3.08 mu of wasteland, it's added up to mu in all. 2-9

36 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Land Acquisition Physical Indexes Detail Table for FCLCC (Xiangtan Urban Section) Table Yuetang Hetang Item Unit Dongping Jianshe Road Xiacheng Baota Shejian Dishuibu Bantang Township Township Total office Office Township Township Village Office Office Total mu State-owned Land nu Agriculture Land mu Cultivated Land nu Vegetable Land nu Dry Land mu 1.2 Lotus Root Pond mu 1.3 Forest Land nu imber mu 1.4 Water Surface mu 2. Construction Use Land mu Building Land u Enterprise Land mu Road Use Land u

37 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Land Acquisition Physical Indexes Detail Table for FCLCC (Xiangtan Urban Section) Table Yuetang Hetang Item Unit Dongping Jianshe Road Xiacheng Baota Shejian Dishuibu Bantang Township Township Total Office Office Township Township Village Office Office 3.4 Public Use Land mu Un-used Land mu Waste Land mu Collective Land mu Agnculture Land mu Cultivated Land mu Paddy Field mu Vegetable Land mu Dry Land mu Pond mu Fish Pond mu Forest Land mu Timber mu Water Surface mu

38 ReseWttement Action Plan for Conidor Component (Xiangtan Urban Section) Land Acquisition Physical Indexes Detail Table for FCLCC (Xiangtan Urban Section) Table Yuetang etang Item Unit Dongping Jianshe Road Xiacheng Baota Shejian Dishuibu Bantang Township ownship Total office Office Township Township Village Office Office 2. Construction Use Land mu Building Land mu Enterprise Land mu Road Use Land mu Public Use Land mu Un-used Land mu Grass Land mu Waste Land mu

39 Resettlement Action Plan for Comridor Component (Xiangtan Urban Section) Temporary Land Acquisition Physical Indexes Detail Table for FCLCC (Xiangtan Urban Section) Table Hutan Township Hetang Township Item Unit Total Xiangtan Heping Village Earth Borrow Xiangtan Xiangtang Village Quarry Temporary Occupation Land mu Timber mu Shrubbery mu Waste Land mu

40 ResettlementAction Plan for Comdor Component (Xiangtan Urban Section) Population Affected by the Project 1)Resident. After the on-site investigation, there are 420 householders, 1389 persons will be impacted by the project land requisition. Of which, 70 householders 236 persons will be only impacted by land requisition 273 householders, 892 persons will be only impacted by the house dismantling; 77 householders, 261 persons will be impacted by the land requisition and house dismantling; 341 householders, 1107 persons need remove and resettle; the house and attachment of 9 householders, 46 persons will be impacted, and 497 persons need production resettlement. 2) Non-residence This project land acquisition and relocation will affect 31 enterprises with 225 members, of which, 114 people scattered in 15 different place belong to national units, 75 members in 13 areas belong to collective units, and 36 members from 3 different sites belong to personal enterprises. The total population affected by this project will be people need production resettlement (including 225 staff from the enterprise). The table states are the exact project population. 2-14

41 Resettlement Action Plan for Coryidor Component (Xiangtan Urban Section) Land Acquisition and Relocation Population Statistics for FCLCC ( Xiangtan Urban Section) Table Yuetang District Jianshe Shejian Hetang Item Unit Dongping Xiacheng Baota Dishuibu Township Road Village Bantang Township Total Office Township Township Office Resident 1.Only relocating the HH of non-resettlement HHs ffice Only relocating the house no resettling People Only resettlement no relocation HHs HHs No. of only resettling no relocating People HHs No. of Relocating and resettlement HHs No. of Relocating and resettlement People No. of HHs affected HHs Population affected People No. of resident needs relocating HHs Population needs relocating People No.of affected resident HHs ce 2-15

42 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) Land Acquisition and Relocation Population Statistics for FCLCC ( Xiangtan Urban Section) Table Yuetang District Jianshe Shejian Hetang Item Unit Dongping Xiacheng Baota Dishuibu Township Road Village Bantang Township Total ffice Township Township Office Office office Resident population affected People Population needs resettlement People Non-residence 1.No. of affected non-residence No _1 1 2.Population of affected non-residence People Population of project affected People

43 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) House and Appendix Facilities Relocation Within the project land use scope, the Project entails relocation of house i 2, which includes residence and non-residence two categories. Of which, the residence building area is m 2 ' account for 71.9% of the total housing area, and the non-residence building area m 2, account for 28.1%. There is m 2 of former house in the relocation residence area, according to structure, it involves m 2 of brick and concrete structure, m 2 of brick and timber structure, and m 2 of earth and wood structure; the sundry house involves m 2, including m 2 of brick and concrete, m 2 of brick and timber, and m 2 of earth and wood, and 9.6m 2 of land. The relocation non-residence involves collective buildings, enterprises buildings. According to the structure, the former house( m 2 ) involves m 2 of brick and concrete structure, m 2 of brick and timber structure m2 of earth and wood; and the sundry house( ) involves m 2 of brick and concrete structure, m 2 of brick and timber structure, m 2 of earth and wood. After the investigation, all of the buildings in the project-affected zone are legal, and there is no temporary building. All of the non-residence users are legal managers. 2-17

44 Reseftiement Action Plan for Corridor Component (Xiangtan Urban Section) Physical Indexes Table of Housing and Appendix Facilities Relocation for FCLCC (Xiangtan Urban Section) Table Yuetang District Item nit Jianshe Road Xiacheng Shejian Village Bantang Dishuibu Hetang Township Dongping Office Baota Township Office Township Office Township Office House n Residence Formal House Brick and Concrete Brick and Timber m Earth and Wood m Sundry House m Brick and Concrete rick and limber Earth and Wood Wood Structure m Non-residence m Enterprise and Unit m Formal House m Brick and Concrete M

45 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Physical Indexes Table of Housing and Appendix Facilities Relocation for FCLCC (Xiangtan Urban Section) Table Yuetang District Item Unit Jianshe Road Xiacheng Shejian Village Bantang Dishuibu Hetang Township Dongping Office Baota Township Office Township office Township Office Brick and Timber m Earth and Wood m Sundry House m Brick and Concrete m Brick and Timber m Earth and Wood m Appendix Building m2 1. Sunning Ground m B Cement B Ume, gravel and soil mixture m Bounding Wall m Iron-made m Brick Masonry Protective Bank m Brock laying m

46 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) Physical Indexes Table of Housing and Appendix Facilities Relocation for FCLCC (Xiangtan Urban Section) Table Yuetang District Item Unit Jianshe Road Xiacheng Shejian Village Bantang Dishuibu Hetang Township Dongping Office Baota Township Office Township office Township Office Concrete Dry Masonry m Brick Masonry No Well o Earth Well No Pressure Well No WaterTank No Pond No Firedamp Basin No Manure Pit No

47 El Scattered Trees Resettlement Action Plan for Cormidor Component (Xiangtan Urban Section) During the investigation of physical indexes affected by the Project, the trees around the residences of the households affected by the project and other varieties of aged plants spreading over the field are sorted and counted by their species and sizes. According to the investigation and statistics, this project requires cutting down 899 trees, in which there are 293 fruit trees and 606 other kinds of trees, and one tomb need relocation for the effect of the project. The statistics of the trees and graves affected by the Project is given in Table Table Scattered Trees Statistics for FCLCC (Xiangtan Urban Section) Yuetang District Item Unit Jianshe hja Hetang Dongping Road XiachengeBaota Villan Bantang Township DishuibuTownshipTotal Dice Office Township ownship Office Office Scattered Tree No Fruit Tree No Mature Tree No Young Tree No OtherTree No Tomb No Infrastructure and Special Facilities Due to the project impact, it requires cement pavement 3872m 2, simple highway 1.45 km, tractor road 1.6km, high-voltage line 5 km, low-voltage line km, telecommunication line km, cable TV line 9.45 km and 1.7 km ditches as well as 4-sand factories. The infrastructure and special facilities affected by the project impact are given in Table

48 Resettlement Achon Plan for Comdor Cornponent (Xiangtan Urban Section) Special Facility Indexes Summary Table for FCLCC (Xiangtan Urban Section) Table Yuetang District Item Unil Jnpniansh ae nbo hejian shubetang. edongpig Rad Xiacheng Baota Sliage Bantang Township Dishuibu Township Total Office Office TownshipTownshi ce Ofrice Road Cement Pavement n Simple Highway km Tractor Road km Power Transmission Facility High Voltage Line km D Low Voltage Line km ) Telecommunication Line km Cable TV Line km Canal km Enterprise and Individual Business Shops 1) Units and Enterprises The number of units and enterprises affected in the scope of levied project land are totally 31 with 225 persons. Such three forms as state-owned enterprise, collectively-owned enterprise and privately-owned enterprise can be divided into according to enterprise ownership. Among them, the number of affected state-owned enterprises is 15 with 114 persons; the number of collective-owned enterprises is 13 with 75 persons and 3 private-owned enterprises with 36 persons. (1) State-owned Enterprises There are 15 state-owned enterprises affected in project land acquisition and relocation, with total area of house relocation m 2. Of this total, the formal houses include brick and concrete M 2, brick and timber m 2 and earth and timber m 2. The sundry houses include brick and concrete 75.81m 2 and brick and timber m

49 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) State-owned enterprises affected in project land acquisition and relocation for more detail table Table State-owned Enterprises Affected in Project Land Acquisition and Relocation Town, Village Operation Population ownship Community) Unit Name peration Impact Scope (Agency) ituation ifected Shipping School Real Estate Company In Yuetang District Urban Architecture Institute Part of houses and appendix facilities Dommitory House Normal 1 four-story office uilding and appendi35 facilities Dongping Hengjie Dongping Real Estate Agency Community Company Dormitory House Food Bureau NO.4 Warehouse Urban Refinery Stop Part of houses County Steamboat Transportation Company Xiangqiao Development Co.,Ltd Manager House 5 District Real Estate Company Dormitory House ianshe Daqiao Urban Gas Company Part of houses agency ommunit Provincial Large Flood Preventio Normal 3 Material Reserve Muyuhu Reserve Nm 0m Site Baota Town Donghu Village Yanye Warehouse Overall Relocation 32 Dianhua Long Distance Telecommunicatio Employee Dormitory 1 Community Bureau (1 household) Dishui W harf _ Xiangyang Community Xiangtan Braiser Factory Stop Part of houses 36 hian Shejian Part of appendi gency ommunity Urban Water Pump House onormal facilities (2) Collectively-owned Enterprises There are 13 collective-owned enterprises affected in project land acquisition and relocation, with total area of house relocation m 2. Of this total, the formal houses include brick and concrete m 2, brick and timber m 2 and earth and timber 38.62m 2. The sundry houses include earth and timber m 2 and brick and timber 2-23

50 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) m 2. Collective-owned enterprises affected in project land acquisition and relocation for more detail see table Table Collectively-owned Enterprises Affected in Project Land Acquisition and Relocation Town, Operation Impact Population township Village (Community) Unit Name Sipeation Scope Affected (Agency) Stain Soe Afce Huanwei Bureau Dverall Prefabrication Relocation 2 Dongping engje Community Factory Agency Embankment Management Committee houses Zaixing.anshe Prefabrication 7 Road Agency Daqiao Community Factory Foundry Factory 8 Jiangbian Village Jianbian Village Collective Breakstone Normal 7 Factory Pump Station Jiangbian Village 6 Sand Field Baota Town Prefabrication Factory Overall 6 Relocation Yunpan Village Flood Prevention Sand Field Xinglong Cement Tube Mill B Tianxun Sand Field 5 Village Collectivity Hetang Town Dishui Village (Old People Stop Activity Center) Sale Department of Dishui Wharf Dianhua Community Dishui Supply and Normal 21.istribution Agency Sum total

51 Resettlement Action Plan for Cormdor Component (Xiangtan Urban Section) (3) Private-owned Enterprises There are 3 private-owned enterprises affected in project land acquisition and relocation, with total area of house relocation m 2. Of this total, the formal houses include brick and concrete m 2 and brick and timber m 2. The sundry houses include brick and concrete 26.24m 2 and brick and timber m 2. Private-owned enterprises affected in project land acquisition and relocation for more detail see table Table Privately-owned Enterprises Affected in Project Land Acquisition and Relocation Town, township Operation Impact Population Village (Community) Unit Name (Agency) Situation Scope Affected Jianshe Road Agency Urban Jimeng herbal Three-floor Daqiao Community Medicine Liver Disease Employee 6 Research Institute Normal Dormitory Overall Xiacheng Town Shunjiang Village Xiacheng Printing Press 25 l Relocation Xiangtan Wufang Part of houses Shejian Agency Shejian Community Stop 5 Cloth Plant Relocation 2) Business Shop Through investigation, no business shops are located in the project zone. No special care is required Relics and Vulnerable Group 1) Relics The investigation indicated that no important minerals and cultural heritage are existed in the project zone, thus no special care is required. 2) Vulnerable Group Vulnerable group: The vulnerable group includes poor families (the average subsistence is lower than 180 Yuan/month), the disabled families (physical disabled person), and old person over age of 70 who live alone, the minority family etc. According to this investigation result, 341 households with 1107 persons who need to be relocated in the project zone are all from the Han nationality, no minority family and vulnerable group. 2-25

52 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) According to the comparison and analysis between objective conditions of resettlement households such as their family structure, employment and possession, and the information mastered by local civil administrative agencies, the vulnerable group affected by the project will be further determined in the resettlement arrangement process. Once the households affected are considered belonging to the vulnerable group, the project office will give them special help. 2.3 Project Impact Analysis Impact on Agriculture The area affected contains 8 townships (street office), 14 villages (communities), 26 villager groups (communities), of them, the production resettlement area covers 3 villages and 7 villages, 21 groups, housing resettlement contains 7 countries, 14 villages and 23 groups (street offices). The population of 7 villages, which needs production resettlement, is 10242, agriculture population is about 9681, the cultivated land is mu, and the average cultivated land is 0.55 mu/person. The relocation population impacted by the project is 548 in 167 households and the production resettlement population is 497. They cover 5.66% and 5.13% individually. The cultivated land area is mu; it covers 3.89% of the total cultivatqd land and 19.59% of the land in the group. The condition affected in every village in the project-affected zone is different; the most proportion affected in the village is 22.96% (Bantang village, Bantang township) while the least only 0.27%(Yijia village, Hetang township). Among all the affected groups, the most affected in the village is 70.1%(Gongjia group, Bantang village, Bantang township), while the least only 1.46%(Xinba group, Yijia village, Hetang township). As far as the affected extent, there are 13 groups under 20%(account for6l.9%), 4 betweeen 20%-30% (account for 19.05%), 2 between 30% to 40% (account for 9.5%), and 2 above 40% (account for 9.55%). Thus it can be seen that the project and acquisition has some effect on local agriculture, we should pay special attention to production resettlement of such groups that are affected above 20% the comparison for the cultivated land used in every village in the project-affected zone is in the Table

53 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Cultivated Land Impact Extent Diagram 10% 19% 61% * <20% * 20-30% % 0 >40% 2-27

54 Table Before and After Occupation Area Comparision Table for FCLRP(Xiangtan Urban Section) Unit:mu (area). mu/person. % (Proportion) Culivated Land Before Relocation Occupation Cultivated Land Leftover Cultivated Land District (Tohwni Village Group Agriculture Subtotal Pdy D'Commercial Subtotal Pad,Commercial Subtotal Pad, Commerclal (Township) ~~population Pdy Dy Vegetable Paedd Land Vegetable Per dfield Vegetable Lanied Area.d ad er Fel Ln Are - P Fe Ld Land A Impact Land Area Cpn d ~~~~~~~~~~~Capita d Yuetang Baota I Township Donghu = Groupl Group = _=_ Group Group Group Jiangbian w Gaomao P 00 ~~~~~~~~~Group Gahap Group Beiting Group _ Yunpan Tangjia Group Sunjia Group _ Goump Bantang 1 2 Township Bantang Gongjia I_I Group _ 714 Wangzuo T G roup

55 Before and After Occupation Area Comparision Table for FCLRP(Xiangtan Urban Section) Table Unit:mu (area), mu/person. % (Proportion) Culivated Land Before Relocation Occupation Cultivated Land Leftover Cultivated Land Distrct Town Agrculture Commercia Subtotal Commercial (Township) Vlae Gop population Suttl Paddy Dry Vegetable Paddy Dry Coemertab Sbtta Paddy Dr Vegetable Per Field Land Field Land VgtbePer Field Land Area Land Ae ImatLand Area Land ~Capita _ Capita Yangque ~~Group Heto ng Township I I. Dishui Xiaojia Hutang Wuxing Xinhua Y4jia = Shanshan Group Xinba _ Group Zhubu _ Sanjin _6 a. Cw

56 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) Impact on Enterprises 1) State Enterprise Among 15 national enterprises, which are affected for project acquisition and relocation, some of them need wholly moved, like Civil Salt Warehouse, extremely large Provincial Flood Control Storage Material -- Muyuhu Storage Spot. And some of them are affected greatly, like City Building Research Institute, Xiangqiao Development Ltd, and the rest are partly affected in terms of house or appendix facilities, thus impact is slight. 2) Collective Enterprise Among 13 collective enterprises affected by project acquisition and relocation, all enterprises but Shuanbu Village Public House (Old People Activity Center) run normally, thereinto, 9 of them are some collective pre-fabricating factories, quarries, and the average of investment is about 60*104 to 70*104 or so, with 5-7 staffs, 25*10 4 to 35*104 Yuan per year production value. Affected by the project, except that embankment institute residence is partly affected, all units and enterprises need relocation or acquisition by purchase. 3) Individual Enterprise There are 3 civil enterprises affected by project acquisition and relocation, and impact is great on Civic Jimeng Hqrbal Medicine Liverish Graduate School, Xiacheng Township Shunjiang Village Xiacheng Printing Factory. Xiangtan Wu Textile is concerned with part house or appendix facilities. Xiacheng Printing Factory of Shunjiang Village, Xiacheng Township is a joint-stocked private enterprise mainly managed by City Administration Bureau Welfare Enterprise Office in Yuetang district. It covers an area of 180m 2, and the original fixing assets is 48.5*1 04 Yuan, with per year production value 220*1 04 Yuan. The enterprise has 25 staffs; it needs whole movement for the project effect. Jimeng Herbal Medicine Liverish Institute of Xiangtan City was built in 1989, for more than 10 years, it has become the biggest modern herbal medicine liverish institute of Hunan Province under support of multiple rank government leaders. The institute integrated scientific research, medical treatment clinic, pharmacy into a united whole. And it has 7600m 2 area of scientific research land, 36 professional technician, a 4-floor employee dormitory and mess hall and part appendix facilities need relocation for effect of the project Impact on Infrastructure and Special Facilities The project zone belongs to the suburban; it is close to G107 National Road, with 2-30

57 T Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) complete public facilities such as water and electricity supplies, road, telecommunication line, Cable TV line and pipes of water. The district road here is a mainly rural simple highway and tractor road; the villager's portable water source is pumped from well. Most of effected infrastructure and special facilities are the rural simple highways, tractor road, power supply, telecommunication line and some ditch lines. The amount is small and impact is slight Project Influence Analysis Affected by the project construction, the original production system within the affected scope will be damaged to some degree, which will has a little influence on the local residents' life and production. The decrease of land resources makes part of peasants lose their dependent material base for livelihood, which leads them to have to adapt to the new environment again for life and production. However, during the project designing, the project designing unit has taken fully consideration of the damage to local life and production system caused by the land acquisition, kept on optimizing the project program and taken measures to reduce the scope of relocation and land acquisition, in order to minimize the influence of project construction on local life and production. As a result, the construction of this project will not make large damage to the orjginal conditions of life and production in each village. Meanwhile, because the land occupation of this project distributes along the river embankment in the form of belt, the project influence is obvious only in part of project zone as far as project construction is concerned. The project construction will not have large influence on local industrial and agricultural production, people's life and the development of social economy. At present, most of the area along the Xiang River often suffers from floods, which restrict the fast development of local economy. The project of flood control landscape road provides an opportunity for local residents to rebuild society and production system. After the completion of project, it will strengthen the capacity to fight a flood and deal with the emergency, decrease the impact of flood, provide a good environment for safeguarding citizen's life and property to the maximum degree, speed up the circulation of local agriculture products and improve the development of local economy. Besides, with the compensatory payment, by means of improving farmland irrigation facilities, transforming farmland with middle and lower output, and adjusting industry structure, the potential of exiting land resources can be fully explored and the unit output can be increased so as to make up for the lost of income due to the decrease of cultivated land and reach or surpass the original level as soon as possible. 2-31

58 I

59 Resetitement Resettlement Action Plan for Conidor Corridor Component (Xiangtan Urban Section) 3. Natural, Social and Economic Survey in Project Affected Zone The project locates in Yuetang district of Xiangtan City, and its project-affected zone is the whole Xiangtan city. Based on the impact of the project and the social and economic condition, Xiangtan City is chosen as the investigated area and the key area is Yuetang district of Xiangtan City. 3.1 Natural, Social and Economic Survey in Xiangtan City Natural Survey 1) Geology and Geography The project zone belongs to Xiangtan Yuetang District. It is located in the Huamian folded system, inside the Asian-European plate. The stratum is ancient and more stable, magmatic activity is weak. Therefore, the project zone is located in the weak earthquake and less earthquake zone. It is situated in the red rock interhill basin in the central Hunan province. The soil layer consists of sandy gravel, sandstone, siltstone, sandy shale, shale, and argillaceous rock. The interhill basins have been formed from the lift-up and scaling of continental deposits accumulated between mountains in the arid cretacic period since the tertiary period. In the view of geography, it is high on the east and lower on the west, high on the north and lower on the south; it slopes off from the northeast toward the southwest. In the Yangtianhu section the plain, downland and hill, and the relief is steeper in comparison with the west bank of the Xiangjing. In the Zhaoshan Section the downlands scatter at the side of the Xiangjiang River along which the Quaternary Holocene and Pleistocene alluvial deposits. The Holocene alluvial deposits are isabelline clayey sand, isabelline fine sand layer mingled with clayey sand microlayer changing from top to bottom, and the thickness is 2-8m. in the southwest of this region the valley plain has been formed, where there is the lowest point Wujiagang in the whole town and the height above sea level is 29.6m. The Pleistocene alluvial deposits constitute the called downland, and in fact, it is resulted from the erosion that the 1-7 class terraces are subjected to, there is the laminated lam 3-1

60 Resettlement Action Plan for Comdor Component (Xiangtan Urban Sectfon) (orange or red) above each class terrace and the grave layer below it. In the project zone, the mountain system belongs in the southeast branch vein of the Hengshan mountain chain, including the Zhaoshan mountain, Yuping peak, Zhaizi ridge, Longgu ridge and Fengxing mountain, their height above sea level is m, the relative height m., the slope 5-15 degrees, the plain region on the southwest appears in smooth relief with less than 50 m. above sea level and the relative height of less than 10 m. and with the slope of less than 5 degrees, and the ground surface has no karst phenomenon. 2) Meteorology and Hydrology The Zhaoshan scenic spot belongs in the subtropical humid climate zone, characterized by monsoon, great humidity, and rich rainfall. The mean temperature in the summer is 28.1 ec with longer duration of about 125 days. In the winter the mean temperature is 6.6 'C with duration of about 95 days. The annual rainfall is about 1300 mm., annual mean atmospheric pressure is 1010 HPA. Annual mean sunshine duration is h., and relative humidity -81%. In the whole year the northwest wind is dominant, the mean wind speed in many years was 2.4 m/s., maximum wind speed was 28 m/s., the stronger wind speed in summer. I Social and Economic Survey 1) National Land and Population in the Project-affected Zone With an area of 5,015 km2, Xiangtan City makes up 2.37% of total land area in Hunan Province. With an area of 279 km2, Xiangtan urban area makes up 5.56% of total area in Xiangtan City. The population totaled 2,796,100 in 2002, making up 4.25% of total population in Hunan Province. The population density was persons/km2, which was times of Hunan Provincial population density of persons/km2. The population in urban area totaled 681,500, making up 24.30% of total population in Xiangtan City, and 1.03% of total population in Hunan Province. The population density was persons/km2, which was times of Hunan Provincial population density of persons/km2, the population comparison statistics in 2002 is as follows: 3-2

61 Resettlement Acton Plan for Cormidor Component (Xiangtan Urban Section) Population Comparison Statistics in 2002 Table District Land Total population Urban population Population Birth Dead area in the year end (104 persons) density rate rate Natural growth (km 2 ) (104 person) Amount Proportion (person/k ( O) ( ) rate ( %o (% in 2 ) Hunan province Xiangtan. city ciy Xiangtan urban area 2) Natural Resources in the Project-affected Zone Located in the central part of Hunan Province, Xiangtan City neighbors Changsha to the north, Zhuzhou to the east, Hengyang to the south, and Lianyuan to the west. The Xiangtan City administrates two districts like Yuhu District and Yuetang District, two cities like Xiangxiang City and Shaoshan City, and one county like Xiangtan County, with a total land area of 5015 km 2 and a population 2,800,000. The natural condition of Xiangtan City is outstanding with sufficient water and sunshine, fertilized land and rich natural resources. Xiangtan City, Zhuzhou City and Changsha City form a triangle with advanced politics, economy and culture in Hunan Province. The population density in Xiangtan City is large. According to the statistics in the end of 2001, the Xiangtan City was a densely populated area with a population of 2,804,700 and 3-3

62 Resettlement Action Plan for Comdor Component (Xiangtan Utban Sectron) with rich labor resource. There are many mineral resources with rich reserve in Xiangtan City; the main kinds include coal, silico, saggar, manganese, iron, lead, zinc, sulfur, and lime. There are also 28 kinds of the mineral resources such as tungsten, stannum, copper, kalium stone, phosphor, quartz, casting sand, carbon, gypsum, oil shale, china clay, barite, salt and other rare metal. The potential economic value of the large mineral resource is large. Xiangtan has abundant natural and human culture tourism resources with good fame and large scale. In Hunan provincial tourism planning and development, the tourism facilities in Xiangtan have already been perfected, and primary scale efficiency has been showed. There are about 80 tourism resources points in all sorts in Xiangtan City, the famous natural sceneries include Shaoshan Tourism Spot, Zhaoshan Scenic Spot, Dongtanshan Forest Park, Yinshan Mountain, Shuikumiao Reservoir, Huashi Lake, Baiquan Lake, Biquan Pond, Xiannv Mountain, Qinglongdong Cavity. Because there are many giants born in Xiangtan City, the human culture sceneries in Xiangtan City are also very rich. The famous giants include Mao Zhedong and Peng Dehuai, artists Qi Baishi, and Zhou Dunyi, Hu Guoan, Tao Kan, He Tengjiao, Zeng Guofan, Chen Gen, Huang Gonglve, Luo, Yifu, Zhou Xiaozhou. The famous historic sites include Yunmen Temple, Guanshen Temple, Wenmiao Temple, Liulieshi Ancestral Temple, Wangheng Kiosk, Datangxing Temple and Biquan College and many revolutionists commemorate sites. Now, there are three elaborate scenic lines around urban have been formed. A communication network around Xiangtan urban area to every direction has been formed. The highway ordinate is Jingzhou Expressway and 107 National Highway; it is in combination with Jingguang Railway and connects central China in the north and Guangdong, Guangxi in the south. The Tanshao Expressway and 320 National Highway are in combination with Xiangqian Railway and connect Shanghai, Hangzhou in the east, Guizhou, Yunnan in the west. Xiangjiang River runs across Xiangtan city, and connects Zhuzhou and Hengyang in the upstream, Changsha and Yueyang in the downstream. The river supplies convenient condition to Xiangtan City for navigation development with largest navigation ability in Hunan province. There is no airport in Xiangtan City, but the way to Huanghua Airport through Changtan Expressway in the distance of 80 km is very 3-4

63 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) convenient. The developing communication condition in Xiangtan is the basic condition for it economic development. In 1997, Hunan province brought forward the development visualization 'Chang-Zhu-Tan Economy Integration" to construct Chang-Zhu-Tan as a key increase core, scientific technology region and ecological, modern cities network, this region should be around Changsha, and show the function of Chang-Zhu-Tan Cities group. In the visualization, the Xiangtan city was conformed as economic development priority zone, and supplied good chance for the development. Xiangtan city, especial the urban area, is the import industry base of Hunan province with rich industries. Now, the primary industrial structure is reasonable with stable material and technology base, and the main industries are such three stanchion industries as metallurgy, machinery and textile. By the statistics in 2000, there wew more than 1340 independent-calculation enterprises in Xiangtan city, of which, 64 large and middle scale enterprises with 25.8*104 staff, 7*104 professionals. The largest-scale enterprises of Hunan such as steel plant, machinery factory and factories for comprehensive cable, iron alloy, cement manufacture, manganese metallurgy, textile, pesticide, construction chinaware, chemical fiber manufacture found in Xiangtan to supply the chance for economy development. 3) National Economic Condition In 2002, the GDP of Xiangtan was RMB billion yuan, with an increase of 10.7% over last year. Of which, the increase value for the first industry was RMB billion yuan, with an increase of 4.2%; the increase value for the second industry was RMB billion yuan, with an increase of 12.7%; the increase value for the third industry was RMB billion yuan, with an increase of 11.0%. The average GDP per capita was RMB yuan, with an increase of 10.5%. The ratio of the first, the second and third industries were 14.3:43.4:42.3. The increase of GDP in the city was 71.66% over 1995; the average increase in every year in the 'Ninth Five-Year Plan" was 9.01%. In Xiangtan urban area, the increase of GDP was 86.00% over 1995; the average increase in every year in the 'Ninth Five-Year Plan" was 11.09%. 3-5

64 ResettlementAction Plan for Comndor Component (Xiangtan Urban Section) Xiangtan is a basic industry city mainly including the industries such as textile, chemical, mechanical an electrical engineering, coal, electricity, metallurgy, construction material, packing and food. After the establishment of market economy, the industries in Xiangtan developed rapidly owing to the development policies such as assets recombination, lease and contraction, auction, strong and excellent industries fostering. In 2002, the total industrial output value is RMB28, 007,990,000 an increase of 16% compared to 2000, in it, the large-scale industries increase 18.8%, and small-scale industries increase 12.9%. In.ninth five-yeas plan", the industrial output value increase to RMB 24.3 billion in 2003 compared to 1995 of RMB billion, an increase of 43.58%. In Xiangtan city, the agriculture developed stably, and formed the following development structure: the main proportion is plantation and animal husbandry, the auxiliary is fishery, and the compensation is forestry. According to the statistics based on the 2002 price, the agriculture output value is RMB billion; the average per capita is RMB 1983/person, an increase of 1.23 time of average value in In 2002, the social fixed assets investment in Xiangtan City was RMB 6.08 billion, an increase of 17.8% comparbd to preceding year, and the increase speed was repaid. The total retail amount for social consumption was RMB billion in 2002, RMB billion in 1995, the compared increase was 69.99%, and annual increase was 9.24%. Based on the statistics, per capita income for farmer was RMB yuan/person in 2002, RMB yuan/person in 1995, the increase rate was is 65.09%, and annual increase was 8.72% with repaid development. In 2002, the import and export amount was USD182, 740,000 with an increase of 30.10% over The tourists were 3,040,000 person/time with an increase of 23% over preceding year, the comprehensive income was RMB 1.02 billion yuan with an increase of 41 %, and so the tourism became a new industry and new economic incremental point. 3-6

65 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) National Economic Value Index of Project-affected Zone in 2002 Table Industry Retail Agriculture Per capita Per capit ross amount fo Per capita GDP gross agriculture industry alue social GDP Index Name area value gross value gross value 104 yuan) consumption 104 (yuan/person) (104 yuan) (yuan/person) (yuan/person) yuan) (104 yuan) Hunan province Xiangtan city Xiangtan urban district City/province proportion 5.98% 4.23% 8.87%.10% % 99.57% % Urban/province proportion 3.26% 0.35% ).00% 2.88% % 34.28% 0.00% Natural Resources A) In the town region there is short of mine resource, and up to now, the certain storage capacity mine has not been ascertained. B) In the town region, the plant community is the typical central-subtropical hilly masson pine community. The main natural vegetative covers include the shell family, Lauraceace, llex-purea family, Lu camellia family, rose family, colewort and so on. The planted forest is dominant in the forest vegetation. The main vegetation types 3-7

66 Resefflement Action Plan for Comdor Component (Xiangtan Urban Section) are the broad-leaved evergreen forests, coniferous and broad-leaved mingled forests. The main tree-varieties resource-commercial forests have the masson pine, cedar, camphor tree and so on. The economic forests are oil-tea camellia and tung oil tree. The economic plants basically are classified as the starch plant, oil plant, industrial plant and medicinal plant. There is rich in the crop resources and animal resources, the grain crops have 98 families and more than 350 varieties, the paddy rice is dominant; economic crops have more than 20 species and more than 300 varieties, vegetable has more than 190 varieties; fish has 11 orders, 21 families, 71 genuses, 127 species; livestock and poultry have 7 families, 12 genuses, 105 varieties. 3.2 Social & Economic Baseline in Counties and Districts Affected the Project At present, Xiangtan City administers two cities, two districts and one county like Yuetang District, Yuhu Distric, Xiangtan County, Xiangxiang City, Shaoshan City. The land area is 5015km 2 and the population had reached 2,796,100 persons by the end of One of effected zone in this project is Yuetang District of Xiangtan city.in 2002, the national economy in Yuetang District realized moderate and rapid growth. The principal economic indexes basically reached the expected target and the national economy generally went smoothly. According to the statistics, the district ruled units accomplished gross production value 1,517,130,000yuan, up 12.2% than previous year. Of this total, the added value in primary industry was 127,840,000yuan, up 4.8%, as 818,520,000yuan in the secondary industry with a growth rate of 12.9% and 570,770,000yuan in the tertiary industry with a growth rate of 13.1%. The total level of market price rose a little, and the market material supply was ample and stable and tends to be blooming. The existing main problem is that, the district economy is short of characteristic pillar industries, the enterprises scale are a little small, the products are not rich in technology, the effect of agriculture restructuring is not obvious, the burdens of district ruled enterprises are a little heavy, the progress of system reform is not fast, the community construction and management can not meet the requirements of city development, the approaches for community construction, service and employment paths are not wide, and 3-8

67 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) the environment for economic development need to be further optimized. The agriculture continues to maintain stable development. In 2002, the agriculture restructuring intensity was strengthened and won initial success. The accomplished gross production value in sectors of farming, forestry, animal husbandry, sideline production and fishery was 244,060,000yuan in a whole year, up 5.6% than previous year. The district has a yearly grain output of tons with a decline rate 12.7%, vegetables tons with a growth rate of 9.7%, full-grown pigs with a growth rate of 5%, 810,000 poultry with a growth rate of 24%, and aquatic products 1660 tons with a growth rate of 1%. The restructuring intensity in planting industry is strengthened. The paddy field was adjusted and reduced 6300mu in a whole year to develop vegetables, flowers and plants. The construction scale of Wanyuanmu Base keeps on enlarging and the momentum of leading companies in agricultural industrialization is gratifying. In a whole year, Weihong Industry Company achieved output value 32,000,000yuan with a growth rate of 55% than previous year and export value about 14,800,000yuan. Xiangmin Company invested 1,500,000yuan to increase a modern duck processing production line with annual processing capacity of 1 million ducks. Yuanshan Dairy Industry Company newly increased milk cows with annul output capacity of fresh milk 3000 tons. The agricultural infrastructure keeps on improving. The whole year investment in water conservancy facilities was 8,800,000yuan. The situation of small town construction goes well. Shuangma Industrial Zone has taken shape and Golden Triangle Market and Red Flag Commodity Trade City of Zhaoshan Developent Zone have formed climate. The township enterprises keep on developing, which accomplished township enterprises gross production value 4,425,430,000yuan, up 15.5%, including township industrial gross production value 2,549,060,000yuan, up 6.5% and township enterprises added value 1,330,620,000yuan, up 19.16%. The industrial economy in the whole district maintains a stable increase, which accomplished aggregate industrial gross production value 2,795,130,000yuan (existing price), up 11.9% than previous year and achieved sales revenue of 5,000,000yuan in a 3-9

68 ResettlementAction Plan for Corrdor Component (Xiangtan Urban Section) whole year. The above industrial enterprises have accomplished industrial gross production value 779,670,000yuan, up 24.89%. In view of composition, the township enterprises accomplished production value 420,620,000yuan, down 14.1%, the district ruled enterprises accomplished 110,820,000yuan, up -0.2%, the neighborhood factories accomplished 88,860,000yuan, up 56.55%, the village enterprises accomplished 265,800,000yuan, down 1.3%, the rural private enterprises accomplished 1,014,520,000yuan, up 42.24%, the rural individual business accomplished 84, 272yuan, up 1.4%, and the township private individual business accomplished 40,460,000yuan, up 21.56%. The output generally keeps balance. The production and marketing rate of independent accounting enterprises with sales revenue above 5,000,000yuan, is 98.9% and the economic benefits rise again. The enterprise assets debt rate is 55.89%, the amount of loss is 2,900,000yuan, and the net profit after the counteraction between profit and loss is 6,612,000yuan with loss proportion 9.6%. The development of industrial enterprises is in a state of imbalance, as the township enterprises maintain rapid growth in contrast with the difficult position of the qeighborhood factories, which begin to shrink. The building industry develops rapidly. The collective construction enterprises accomplished construction production value 188,720,000yuan in a whole year, up 83.6% than previous year. The total house building area is 285,030m 2, the total area of buildings completed is 242,409m 2 and the project settled accounts revenue was 163,360,000yuan with tax revenue 10,200,000yuan. The investment in fixed assets keeps on increasing. The whole year fixed assets investment in a whole society was 961,730,000 yuan with an increase of 583,680,000 yuan than previous year. The collective investment amounted to 265,250,000 yuan, while the urban and rural residents' investment was yuan. Active changes begin to appear in investment structure. The key market construction has been accelerating, the urban and rural infrastructure is further improved and the investment benefits rise again. The consumer goods market continues to maintain stable growth. The whole year retail sales of consumer goods in a whole society reached 1,013,860,000 yuan, up 13.8% than 3-10

69 l Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) previous year. Of this total, the turnover of collectivity was 9346 yuan, while the turnover of individual and catering sector were yuan and yuan respectively. The growth was 16.5% higher compared with the same period. Foreign trade keeps on increasing. The whole year direct foreign capital utilized in place totaled 7,960,000 dollars and domestic projects totaled 29, achieving contractual foreign capital attracted 1.35 billion dollars and paid-in capital 370 million yuan. The investment structure is further improved. The achieved export delivery of a whole year was valued 23,830,000 yuan including direct export value 21,400,000 yuan. The effect of birth control is obvious and the population maintains slow growth. In a whole year, the population of birth and death were 2977 persons and 1626 persons respectively, and the birth rate and death rate were 9.04% and 4.94% respectively. The number of newly increased population was 1351 with the natural growth rate and birth control rate 4.1%o and 98.42% respectively. The total number of population at the end of the year was 330,780 including the number of agricultural population and non-agricultural population The income of urban and rural residents maintains a stable increase and the living conditions keep on improving. The average wage of staff in the whole district was 10,450 yuan, up 8% than previous year. The per-capita disposable income in rural areas was 3,944 yuan, the living conditions were further improved and the growth of telephone users in rural areas was outstanding. The social security and welfare work are further perfected. In the whole district, there is 1 welfare home and 6 old folks' homes, with 151 beds and 97 adoptive persons community service facilities have been set up in towns and the social security network coverage in rural areas reached 100%. The social relief work is further strengthened, as the number of different kinds of urban and rural traditional social relief objects, who got the national relief allowance, reached 355. By the end of the December, the population of the lowest life security objects among rural and urban residents was 8456 households with persons and 123 households with 313 persons respectively, and the allocated security funds were 11,020,000 yuan and 188,200 yuan respectively. The favorable 3-11

70 Resetflement Action Plan for Comdor Component (Xiangtan Urban Secton) resettlement work has been strengthened, as the living conditions and employment of demobilized soldiers were properly resettled. 3.3 Social Economic Baseline in the Townships and Villages Affected The project zone mainly involves 8 townships (street offices), 14 villages and 26 village groups of Yuetang borough, Xiangtan City.. All the involved districts are majoring in planting and stockbreeding, including the 2nd and 3rd industry. Planting mainly includes vegetable, rice etc. The total population in all the involved districts is (excluding Street resident committee), thereinto, agricultural population is 9681; the cultivated land has an average of Mu, that is 0.55 per person. The average income of farmers is RMB, increasing 1.36% compared to last year.the basic condition that the project impacts on every village can been seen in Table

71 Reseftlement Action Plan for Corridor Component (Xiangtan Urban Section) Table3.3-1 Baseline of Village Affected by FCLCC (Xiangtan Urban Section) Population (Person) Cultivated land area(mu) District Town Village Group Per capita cultivated land are (Township) illtotal Agriculture Non-agricultur Total Paddy Field Dry Lan Vegetable lan mu) Yuetang Distri Baota Township Donghu Village Grope Group Group Group Group Jiangbian Village Gaomao Group Mahao Group Beiting Group Hutian Group Dengjia Group Yanpo Group iangbian Village Yayao Group Lijia Group ; 0.52 Yunpan Yanjia Group Jizi Group

72 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table3.3-1 Baseline of Village Affected by FCLCC (Xiangtan Urban Section) District (Township) Village Group Population (Person) Cultivated land area(mu) Total griculturenon-agriculture Total (mul Paddy FieldDry LandVegetablelIandmu eanzhu Group Kianggang Group O baihua Group rangjia Group Yuetang Distric Baota Village Sunjia Group Doumi Group leye Group Nielan Group Huangni Group Nantang Group Cuoshu Group ijia Group lesheng Group Lanzhu Group Guogong Group Bantang Village Bantang Village Gongjia Group Wangzuo Group Yangque Group Hutang Group

73 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table3.3-1 Baseline of Village Affected by FCLCC (Xiangtan Urban Section) Population (Person) Cultivated land area(mu) DistfCt (Township) Village Group -(mu) otal Agriculture Non-agriculture Total Paddy Fiel Dry Lan Vegetable land(mu) Bantang Townshi Bantang Village Wawo Group Yangjia Group Xinwo Group Maozheng Group Yanshou Group Hetang Village Shuangbu Village Zhongjia Group Xinwo Group Gaojia Group Yuetang Disticl Bamu Group Zigu Group Dagan Group Xigan Group Xintang Group Shijia Group Zili Group Dishui Village Youcao Wazi _ijia

74 Resettlement Action Plan for Coridor Component (Xiangtan Urban Section) Table3.3-1 Baseline of Village Affected by FCLCC (Xiangtan Urban Section) District (Township) Village Group Population (Person) Cultivated land area(mu) (u Total griculture Non-agriculture Total Paddy Field Dry Land Vegetable iand mu Xiaojia Jizhong Tongzi Dishui Hutang Weixing Xinhua Tantang Yijia Wangzuo Xitang Xitangxia Guojia Shanshan Yuetang etang Xinba YInjia Yjia Wantang B Daqing Zhubu Xiaxi Shangxi

75 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table3.3-1 Baseline of Village Affected by FCLCC (Xiangtan Urban Section) Population (Person) Cultivated land area(mu) District (Township) Village Group Total Agriculture Non-agriculture Total Paddy Fiel Dry Land Vegetable land (mu (u Tuji Shangli Pengjia Shangyan Xiayan Chenjia Xintang Yuetang etang Zhubu Laowu Xinwu Datang X injin Sanjin Datuo

76 Resettlement Action Plan for Comdor Component (Xiang1an Urban Section) 3.4 Baseline of Resettlerm' Families in the Affected Zone 1) Family Survey Result As the survey result shows, all the residents in the project zone are suburban vegetable farmer; the majority is engaged in planting industry. The average house acreage is134.78sqm, and the average population are The proportion of men to women is 1:0.884; in the age composition structure, the labor force between 17 and 60 years old has a percentage of 67.59% within the total population, that below 17 is %, and that above 60 is 13.9%. In the project affected zone, there are 5.14 people having an education level above high school, as high school, 44 as junior school, and as primary school. In every family, the average number of labor force between 17 and 60 is 2.25 that below 17 are 0.61, and that above 60 is The people of the residents in the project zone is only Han, women's rights, interests and status of are the same as men, there is no need to give special care about the women. 2 ) The Living Standard of Resettlement Families As the statistic table about the economy of the villages in the project zone in shows, in 2002, the farmers' average income is RMB, with a growth rate of 4.02% per year. As clasiified by operation, the income from the lst industry has a percentage of 36.98%, there into, 76.74% from planting industry, 23.26% from stockbreeding; the percentage of income from 2 nd industry is 8.6%; that from 3 rd industry is 19.65%; that from working outside is 34.77%, The average all-income is RMB. As classified by production structure, agricultural income takes 17.82%, all is from planting industry, the income from stockbreeding takes 26.15%, that from fishing takes 1.38%, that from industry takes 35.92%, that from building takes 1.44%, that from transportation takes 5.75%, that from commercial drinking takes 10.92%, that from service industry takes 0.62%,. The average cost is RMB, of which, producing cost accounts for , taking 90.59%. The average income from working outside is RMB. The monthly income of the enterprise staff affected by the project is about yuan. 3.5 Social and Economic Impact of land Acquisition and Relocation on Population Affected After the investigation for the resettlers' living level, the project zone is near to the urban, the income structure is multi-distribution. In the village, the traditional first industry is 3-18

77 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) 36.98%, the second and third industry is 28.25%; the outgoing labor income is 34.77%. Almost workers in the impacted enterprises are farmers owning land, the income for second, third industry and outgoing labor are the import source of the income of the farmers, and these make the farmers possess a certain technology and production experience. But the project will make influence on the original production system in the project-impacted zone and the persons' living. (1) For the resettlers that their families' income mainly comes for the second and third industry and the outgoing labor, the project construction will make bad influence such as land less, house resettlement, plantation income lowing on them. But also, the project will bring them many chances on the production, in all the influence of the project on the living and production will be very limited. (2) For the PAPs who mainly depend on land, the land acquisition will lead to entirely or partly loss of the material condition on which they depend for living. Therefore they have to find out new way to make living to adapt new working and living conditions. For the people to be resettled by agricultural resettlement mode, their source of livelihood and their traditional production model will not change a lot, and their living level will be restored and developed in a short period, therefore the land acquisition will not bring great influence on their living. If they choose non-agricultural resettlement, they will change way of living, re-learn new skills to adapt to new working condition. It is difficult for them to adapt to new living conditions in a short time and their livelihood may lower than before. (3)The housing rebuilding and physical relocation of residents will entail certain manpower and material resources. Although it will affect relevant infrastructures of some residents and enterprises, it offers an opportunity of rebuilding production and social system to the resettles. The project can improve capability of controlling flood, reduce the extent of flooding calamities, supply good environment to protect life and properties of people to the largest extent, meanwhile, it can accelerate circulation of local product of agriculture and industry, promoting local development of economy, thus rapid sustainable development of economic in CAT even in Hunan Province will be realized. 3-19

78 I I I I

79 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) 4. LEGAL FRAMEWORK AND POLICIES The preparation of resettlement plan for displaced persons and its implementation for resettlement will be done based on related requirement described in The World Bank Operational Police The implementation shall be done based on the resettlement compensation standards in this resettlement plan, if any changes in the implementation, the approval of the World Bank are needed. 4.1 Main laws and Policies for Resettlement The main laws and policies for land requisition resettlement are as follows: (1) Land Administration Law of P.R.C. (2) Urban House Demolishment Management Regulation of PRC (2001, No. 305th Decree of State Council) (3) Basic Field Protection Ordinance (1998, No. 257th Decree of State Council) (4) Requisition, Usage and Administration Provisional Method for Forest Vegetation Restoration Fee printed by Financial Dept. and State Forestry Bureau (CZ [2002] No. 73) (5) Hunan Provincial Implementation of Land Administration Law of P.R.C. (2000) (6) Implementation for Hunan Provincial Cultivated Land Occupied Tax (modify) (7) Notice for 'Vegetable Basket" Construction (XZF [1993] No. 25) (8) Notice for Hunan Provincial State-owned Land System Administrative and Businesses Charge Project and its Standards made by Hunan Provincial Price Bureau and Financial Dept. (ZJF [2003] No. 42) (9) Land Requisition and Resettlement Compensation Method of Xiangtan (TZF [2001], No. 18) (10)TJGZ (2002) No. 66 Document issued by Xiangtan Municipal Price Bureau and Real 4-1

80 Estate Bureau Resetlement Actfon Plan for Cornidor Component (Xiangtan Urban SecUon) 4.2 Related Policies of World Bank (1) The Involuntary Resettlement Policies' targets of the Bank are the following: A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B. Where it is not feasible to avoid resettlement, resettlement activities should be conceived and executed as sustainable development programs, providing sufficient investment resources to enable the persons displaced by the project to share in project benefits. Displaced persons should be meaningfully consulted and should have opportunities to participate in planning and implementing resettlement programs. C. Measures to assist the displaced persons in their efforts to improve their livelihoods, or at least to restore them. l (2). To solve the live hood problem caused by the involuntary land requisition in the World Bank impact project, the World Bank require the loan party prepare a resettlement plan or resetlement policy framework. A. The resettlement plan or resettlement policy framework includes measures to ensure that the displaced persons are informed about their options and rights pertaining to resettlement; a. Informed about their options and rights pertaining to resettlement; b. Consulted on, offered choices among, and provided with technically and economically feasible resettlement alternatives; and c. Provided prompt and effective compensation at full replacement cost for losses of assets attributable directly to the project. 4-2

81 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) B. If the impacts include physical relocation, the resettlement plan or resettlement policy framework includes measures to ensure that the displaced persons are: a. Provided assistance (such as moving allowances) during relocation; and b. Provided with residential housing, or housing sites, or, as required, agricultural sites for which a combination of productive potential, local advantages, and other factors is at least equivalent to the advantages of the old site. C. Where necessary to achieve the objectives of the policy, the resettlement plan or resettlement policy framework also include measures to ensure that displaced persons are a. Offered support after displacement, for a transition period, based on a reasonable estimate of the time likely to be needed to restore their livelihood and standards of living; and b. Provided with development assistance in addition to corhpensation measures described in paragraph (a) (iii), such as land preparation, credit facilities, training, or job opportunities. 4.3 Policies Target of the Project Compensation Qualification All buildings, landowners and users in the land requisition relocation area of the project will get reasonable compensation and assistance. The impact persons are: the persons lose their houses and land because of the project. The land administration dept. of Xiangtan shall make a house relocation notice 3 days after the House Relocation Certificate has been rectified and issued to make public of displaced persons, relocation area and time limit. The land user or the owner shall register the land compensation in the given place and in the given period with the Land Ownership Certificate or other effective certificate. If any building on the requisitioned land, the legal certificate of the buildings shall be provided(the law document is not enough, the relevant document should be provided by the local basic organization and 4-3

82 Resettfement Action Plan for Comdor Component (Xiangtan Urban Section) project implementation structure. The land administration dept. shall organize the staff to survey and investigate on site, and a written notice for related dept. shall be given to stop doing the following procedures in the relocation area: (1) The business license rectifying and issuing for doing business in the relocation house. (2) Procedures for sell, exchange, division, present, remising, mortgage of house except the effective judgment made by People's Court or arbitration organization. (3) Examination and approval procedures for newly built, improving and reconstruction of the house and its attachment. To control the displaced persons amount. Before the deadline, all impact residential and work persons in the project zone shall be compensated and assist reasonably. (4) Those who get into the project area to occupy land or houses without authorization after issuing the report for the lan6 acquisition and relocation will not be considered for compensation and rehabilitation Compensation Criteria (1) Land compensation fee and resettlement subsidy fee, young crop compensation fee shall be calculated based on Hunan Provincial Implementation of Land Administration Law of P.R.C. and Land Requisition and Resettlement Compensation Method of Xiangtan. (2) Compensation criteria for houses and appendix facilities: the houses compensation fee shall be decided based on reset price in project impact zone referring to Land Requisition and Resettlement Compensation Method of Xiangtan. The appendix facilities shall be compensated based on the actual price. (3) The compensation standards for scatter trees shall be determined based on the actual value or expense needed for replanting. 4-4

83 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) (4) The compensation fee for special facilities shall be decided based on the actual restoration condition according to the "three original" (original scope, original standards, original function) criteria. (5) The relocation building and its attachment shall be compensated at first, and then dismantled. All fees for land requisition shall be paid in 3 months after Land Requisition and Resettlement Plan approval. (6) The land compensation fee shall be paid to village collective economy organization; the ground attachment and green crops compensation fee shall be paid to the owners. It is forbidden to embezzle or divert the land requisition and resettlement compensation fees. The rural collective economic organization shall relocate the displaced persons, and the resettlement fee shall be paid to, managed and used by rural collective economic organization. For the displaced persons relocated by other units, the resettlement fee shall be paid to other units. For the displaced persons don't need collective relocation, the resettlement fee shall be paid to each person, or paid for the insurance of displaced persons after their consent. For the resettlement fee paid to individual, the rural collective economic organization of land requisitioned shall register and check in. After 2/3 members' approval, the land compensation fee and resettlement subsidy fee shall be used together. Rural collective economic organizations shall make public to its members the receipts and expenditures of the land compensation fees for land requisitioned and accept their supervision. It is forbidden to embezzle or divert the land compensation fees and other related expenses. (7) For the refused compensation fees, the land administration dept. shall be bank the fee in the special account under the name of requisitioned land. (8) The requisitioned land shall be compensated according to the use character registered in the last year's land use statue quo survey (change survey). The waste production or living facilities shall not be compensated. For the use character change land without approval, the compensation shall be performed 4-5

84 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) based on the original use character. (9) For the temporary occupied land, the compensation shall be performed in the way of agriculture income based on the occupied period. In the temporary occupied period, the local peasants could get the compensation year by year; and after the period, the construction unit shall be responsible for the reclamation various land acquisition and relocation compensation criteria and standards 1) Land compensation criteria (1) Compensation criterion of permanent occupied land A. State-owned land According to the related stipulations in "Notice for Xiangtan Urban Basic Land Price Change" issued by Xiangtan Municipal Government, the degree of the state-owned land in the project impact zone is IV, the basic prices of the state-owned land for commonweal in the project zone are: for industry land, 247 yuan/m2; for residential land, 325 yuan/m 2. Green crop subsidy fee of the agricultural land in state land (always family plot) is 1500 Yuan/mu. B. Collectively-owned land a. Compensation standards of cultivated land and fishpond. The land compensation fee for cultivated land (including paddy field and dry land, vegetable land), fish ponds, lotus root ponds shall be the 6-10 times of average output value in three years preceding the requisition land according to the related stipulations in Hunan Provincial Implementation of Land Administration Law of P.R.C.; the resettlement subsidy fee for agricultural population to be resettled shall be 4-6 times of average output value in three years preceding the requisition land. If the land compensation fee and resettlement fee decided by the state can't help the agricultural population to be resettled restore the original living standards, the resettlement fee shall be added, but the 4-6

85 Resettflement Action Plan for Coridor Component (Xiangtan Urban Section) maximum resettlement fees and land compensation fee shall not exceed 30 times of the average annual output value of the three ye&.rs prior to the requisition. According to the related stipulations in Land Requisition and Resettlement Method of Xiangtan city, the per capital area in the zone is 0.55 mu, the land requisition compensation fee in the project zone shall be 9 times of average output value in three years preceding the requisition land; the compensation fee for fish ponds shall be 9 times of average output value in three years preceding the requisition land; the resettlement fee for fish ponds and cultivated land shall be 11 times of average output value in three years preceding the requisition land; the total compensation multiply for land and for fish pond is 20. the green crop compensation cost of cultivated land and fish pond is twice of the average output in the last three years. The paddy field alternation cultivation system in the project zone is early paddy-late paddy- cole (or middle paddy- cole), the main crops on the dry land are: cotton, soja and potato. According to the yearly statistics in the project zone, the average output of the paddy field is 1284 yuan/mu based on the average output of paddy and byproduct and the 2003 product price in the project zone; the dry land average output is 70% of the paddy field, that is 898 yuan/mu. The ordinary vegetable land output shall be calculated as 5525 yuan/mu referring to the average output value in three years preceding. After survey, the average output value in three years preceding of fish blending pond is 1900 yuan/mu. After calculation, the land compensation fees and resettlement subsidy fees for the cultivated land are: paddy field yuan/mu, dry land yuan/mu; vegetable land yuan/mu, fish pond yuan/mu, water ponds yuan/mu. In the project zone, the water and vegetable land average output will be given in the table to

86 Resettlement Acton Plan for Cormdor Component (Xiangtan Urban Section) Table Per Mu Paddy Field Output Calculaton Table Main Product Value Byproduct Value _~ ~ -C-omprehensive Rotation Rotation Proportion Unit Production Unit roduction production planting Production planting Cmp Output price Output price value mode modekg/m(yu (kg/mu) (yuan (unm)(kg/mu)(u value (yuanya/u ya value value Droportio(un/u % (yuan/mu) /kg) (yuan/mu) /kg) (yuan/mu) (yuan/mu) ( Early Early rice Late Late rice rice- rice- Rape Rape Early Early rice nice~ Late Late rice rice Middle Middle rice rice Rape Vegetable Table Commercial Vegetable Land Compensation Unit Price Calculation Table Main Product Value icomprehensive Rotation Proportion Unit Pouto pouto Rotation planting lnigpouto mode Crop (%)t Output p Productio production planting value (% pk/u ya value value proportion ya/u (kg/mu) (yuan (yuan/mu) (yuan/mu) (%) Towel gourd Towel gourd-vegetable Cabbage Shallot Bean Bean -vegetable Shallot Cabbage Cucumber Cucumber- vegetable Shallot Eggplant Garlic Vegetable-vegetable Celery Lettuce

87 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) b. Woodland requisition compensation standards According to the related stipulations in the Hunan Provincial Implementation for Land Administration Law of P.R.C., the occupied woodland is the wood material land. The land compensation fee for other woodland shall be 30%-50% of neighborhood paddy field compensation standards. The resettlement subsidy fee shall be 50% of neighborhood paddy field compensation standards. According to the related stipulations in the Land Requisition and Resettlement Method of Xiangtan city, the land compensation fee for other woodland shall be 40% of neighborhood paddy field compensation standards. The resettlement subsidy fee shall be 50% of neighborhood paddy field compensation standards. According to the height, breast and the shade degree, the green crop subsidy fee is 40% - 120% of the average output in the last three years. According to the investigation of physical index in the project zone, the green crop subsidy fee is 60% of the average output in the last three years! After calculation, the land compensation and resettlement subsidy fee for the woodland requisition is yuan/mu. c. Collective-owned construction land requisition compensation standards According to the related stipulations in the Hunan Provincial Implementation for Land Administration Law of P.R.C., the land requisition fee for village (town) public facilities, commonweal, enterprise and residential site shall be the compensation standard for the neighborhood paddy field. The resettlement subsidy fee: 1) if any restoration, the fee shall be the compensation standards of the neighborhood reconstruction site. 2) if no restoration, compensation shall be performed by the condition. According to the related stipulations in the Land Requisition and Resettlement Method of Xiangtan city, the land requisition fee for village (town) public facilities, commonweal, enterprise and residential site shall be the compensation standard for the neighborhood paddy field ; for occupied road and free ground, the compensation fee shall be the standard of the neighborhood land. The resettlement subsidy fee: 1) if any restoration, 4-9

88 Resettlement Acion Plan for Comdor Cornponent (Xiangtan Urban Secton) the fee shall be the compensation standards of the neighborhood reconstruction site, and no compensation for the original residential site. 2) if no restoration, compensation shall be performed 20% of the compensation standards of the neighborhood paddy field, and for the no-restored water ponds, the resettlement subsidy fee shall be 45% of the compensation standards of the neighborhood paddy field. The green crop subsidy fee of pond is 60% - 40% of the average output in the last three years, including the related fees of halieutics in dry pond and fry-changing pond loss, After calculation, the land compensation and resettlement subsidy fee for occupied residential site, enterprise, a public road compensation criterion is yuan/mu, for road, for water area, 5136 yuan/mu, for pond is yuan/mu. d. Other land compensation standards According to the related stipulations in the Hunan Provincial Implementation for Land Administration Law of P.R.C. and Land Requisition and Resettlement Method of Xiangtan city, the land compensation fee for wasteland and mountain, other unused land shall be 20% of neighb6rhood paddy field resettlement subsidy. compensation standards, there are no After calculation, the land compensation fee for occupied grassland and wasteland shall be 2311 yuan/mu. The compensation standards in Land Requisition and Resettlement Method of Xiangtan city will be given in to 4.3-6, the compensation fee for permanent occupied land will be given in

89 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table Land Compensation Cost Criteria in Xiangtan City T s0.32 so.s55j 0.76f t 11 >1 Per capita cultivated land(mulperson) ± l ll Multiple Unit: Yuan/mu Category Grade Mean annual product value Remarks. ~~~~~~~~~~~~~~Compensation amount Paddy field with ditch, canal and dam gravity Paddy field Climate field > Cold high water table field Valley tail field Abandoned and newly claimed paddy field in recent three years Brick or concrete ditch, canal and basin Professional vegeable Having part of condition of grade Having earth ditch, canal and basin Determined based on such conditions as soil, terrain, and Dry land snhn,irgto odto

90 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table Land Compensation Cost Criteria in Xiangtan City Unit: Yuan/mu Per capita cultivated land(mu/person) Category Grade Mean annual product value so.32 s0.55 so.76 s Multiple l Compensation amount Remarks Professional fish pond Brick, concrete or block slope protection Having part of condition of grade Without slope protection. Lotus root fie ld Note: The compensation for family plot is based on paddy field critera. No additional compensation is given to production facilities in column remarks. 4-12

91 Resettlement Action Plan for Cormdor Component (Xiangtan Urban Section) Land Compensaton Cost Critera In Xiangtan Ciy Table unit: yuan/mu Land Category Compensation criteria Remarks Orchard. Tea garden Economic forest land Forest land Pond. canal, dam Reservoir Residential site, township (town), village public facilities, commonweal. enterprise land As per 60% compensation criteria of nearby paddy field. As per 50% compensation criteria of nearby paddy field. As per 40% compensation criteria of nearby paddy field. As per compensation criteria of nearby paddy field. As per 60% compensation criteria of nearby paddy field. As per compensation criteria of nearby paddy field. If reconstruction is not needed, the criteria for compensation will be followed. If reconstruction is needed, compensation shall be based on host site land category compensation, no compensation will be given to the original residential site. Waste hill and land and As per 20% compensation criteria other unused land of nearby paddy field. Empty ground. road As per compensation criteria of nearby land category. 4-13

92 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table Resettlement Subsidy Criterla In Xangtan City unlt: yanlmu Per capita Cultivated Land(mu/person) s0.32 s50.39 s s HO s > Subsidy Multiple CPaddyfield Grade Mean annual product value Subsidy amount Paddy land Professional vegfetsnable 2 vegetable _ I _ Dry land Professional fishpond Lotus root field Note: The compensation for family plot is based on paddy field criteria 4-14

93 Resettlement Action Plan for CorTidor Component (Xiangtan Urban Section) Table Resettlement Subsidy Criteria in Xiangtan City unit: Yuan/mu Land Category Compensation criteria Orchard. Tea garden. Economic forest land Forest land As per nearby dry land subsidy criteria At per 50% nearby paddy field subsidy For land without restoration requirements, as per 45% nearby paddy Pond, canal, dam field subsidy. For the land with restoration requirement, as per category land resettlement subsidy Reservoir For land without restoration requirements, as per 40% nearby paddy field subsidy. For the land with restoration requirement, as per category land resettleenent subsidy Residential site, township (town) village public facilities, commonweal, enterprise land For land without restoration requirements, as per 20% nearby paddy field subsidy. For the land with restoration requirement, as per category land resettlement subsidy. No subsidy will be granted to original residential site. Waste hill and land No resettlement subsidy. 4-15

94 Resettlement Action Plan for Cornidor Component (Xiangtan Urban Section) Per mu Table Land Compensation Rate Calculation Table for CZTFCLR Project Permanent land Item production Land compensation Subsidy Total multiple Young crop Compensation Remarks vql jptv«, Multiple Compensation Multiple Subsidy compensation rate(yuan) Paddy field As per 0.55 mu/ person Vegetable land cultivated land in mroiect zone Dry land Dry land production value as pond Resettlement compensation Fish pond Timber forest The output of timber forest as Meadow 2311._._2311 Residential site Enterprise land Roadland As per weighed average of Public land Water surface Waste land

95 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) (2). Temporary occupied land compensation standards The temporary occupied land compensation fee includes young crops fee, land loss compensation fee and reclamation fee. The land compensation fee shall be used to compensate the output and income of the landowner; the reclamation fee shall be used to reclaim the temporary occupied land after construction. The land compensation fee shall be calculated based on the original average output value and occupied period; the reclamation fee shall be determined based on the actual expresses for reclamation. To lower the impact of project, the village labors on the occupied land could prior to attending the project construction and other labor output. According to the construction temporary land occupied scheme supplied by the road-designing unit, the temporary occupied land includes soil material yard in Heping village and block stone yard in Xiangtang village in Xiangtan (the temporary construction facilities and road lays in the permanent occupied land zone), and the occupied wood material land is mu, shrubbery mu, waste land 3.08 mu, and the occupied wood material land and shrubbery shall calculated in the compensation standards. According to related stipulations for the woodland compensation in Land Requisition and Resettlement Method of Xiangtan city, the average output of the wood material land shall be calculated as 60% of the neighborhood paddy field average output in the last three years, that is 770 yuan/mu; the average output of the shrubbery shall be calculated as 40% of the neighborhood paddy field average output in the last three years, that is 514 yuan/mu. The project will start in Jan. 2005, and end in Dec. 2006, the construction period is 2 years. The land compensation fee for wood material land is 1540 yuan/mu, for shrubbery is 1028 yuan/mu. The young crop compensation fee for the wood material land and shrubbery is 700 yuan/mu and 514 yuan/mu. The reclamation fee for the woodland shall be 1500 yuan/mu referring to the similar project in the province. After the temporary occupied period, the project unit shall organize reclamation. (3). Young crop compensation fee on the requisition land The young crop compensation standards in Land Requisition and Resettlement 4-17

96 ResetlementActon Plan for Comdor Component (Xiangtan Utban Section) Method of Xiangtan city will be given in to ; the fee shall be 1500 yuan/mu. Young Crop compension Critria In Xlangtan City Table Land Mean annual Category Gradeoutput value Compensation criteria Unit: yuan/mu According to categories of paddy field requisitioned, the paddy filed of the inputted cost before rice transplanting will be compensated in light of 50 pe cent of annual output value. The paddy fields which can get harvest or have bad harvest will be given the compensation according this criteria. Professional According to categories of requisitioned land, the crop grow the period is uander one year, the compensation will be done in light of the output value o one season; the crop growth period is more than one year, the compensation vwill be conducted on the basis of annual output value standard; the farmland wich can get harvest or has had harvest will not given the compensation According to categories of fish pond requisitioned, the compensation will be Professional done in light of annual value standard. The pond for fry will be given the fish pond 1900 compensation on the basis of the annual output value plus 20% of the annual output value According to categories of requisitioned land, the crops growth period is less l t han one year, the compensation will given on the basis of 50%,The crops Dry land growth period is more than one year, the compensation will be done in light of annual output value. The farmland that can get harvest or have had harvest will not be given the compensation. 1 According to categories of requisitioned adjacent paddy fields, average Lotus root annual output criteria, the paddy fields of the invested cost before planting pond 2 will be compensated on the basis of M 50% of annual output value. Afte 3 planting, it will be compensated in light of the annual output value. 1 It will be compensated according to the 60% of annual output of the Water pond 2 requisitioned adjacent paddy field. 3 Reservoir 1 Compensation 40% as per annual output of paddy field nearby 4-18

97 Resettlement Adtion Plan for Conidor Component (Xiangtan Urban Section) Xlangtan City Young Crop Compensation Cost Criteria Table unit: Yuan/mu Growth period Item Seedling Transplant and InitialAbounding fruit Caducity stage j management period I f stage stage Compensation criteria Sweet orange Peach, plum, orange, chestnut, orange, Chinese chestnut, Nai plum, shaddock, grape, walnut Other fruit trees Tea Tea-oil, tong tree l ~~~Young crop, flower, Young flowecommon crop trees are compensated as per , and rare ones. herb medicine trees (i)1dentification principles of orange growth period: * Seeding stage: 1-2 year after planting; * Transplanting and management period: 3-5 year after planting; * Initial fruit stage: 5 year after planting, the crown diameter of a single plant should be up to2mand latest yield of 600kg/ mu; * Abounding fruit stage: 8 year after planting, the crown diameter of single plant should be up to 3m, and minimum yield ofl 500kg/mu. (2)The growth period identification principles of other fruit trees are referred to the orange criteria. Remark Rational planting density: plants/mu for mandarin orange, orange, shad dock citrus; plants/mu for peach, plum, prunus; plants/mu for grapes: (3)The planting of fruit trees like orange should perform to the Planning Requirement of China Main Reproducing Tree Species. The above compensations include the compensations of interplant or mixed planting crops. The area conversion of scattered trees is calculated by means of actual planting area and rational dense-planting of fruit trees planting. (4)When two or more varieties trees are planted with economic crops, the compensation will be accounted on the basis of the variety of most of fruit trees. 4-19

98 Resefflement Action Plan for Comdor Component (Xiangtan Urban Secton) Xiangtan City Young Crop Compensation Criteria Table Unit: yuan/mu Young crop Breast Breast up Item Height below diameter Remarks to14cm 3m 6-12cm Firry, foreign pine camphor, catalpa, nanmu. The proportional calculation is to be done according to the height, breast diamete and canopy density of all kinds of trees. The proportional calculation is to be done according to the height, breast diamete and canopy density of all kinds of trees. Masson pine, kiri, other arbors The mao bamboo will be compensated according to these criteria. The arbores that cannot be used for timber will be compensated according to other tree categories. The arbores and bushes that cannot be Other trees and bamboos used the timber will be calculated in proportion by means of canopy density. Firewood, twitch-grass, bulrush Growth situation compensation Yuan / mu. 2) Compensation Fee for House and Annexe (1). House The residential houses in the project zone are almost 1-2 stories brick-concrete or brick-wood structures. The detailed survey and analysis for reset price of the brick-concrete or brick-wood structure houses in the project zone have been done with the practicality index survey to prepare the compensation standard reasonably and ensure the displaced persons get the compensation fee to same tune of the house reset price. According to the related stipulations in the Land Requisition Compensation and Resettlement Method of Xiangtan City, the compensation rate of various houses shall 4-20

99 ( ~~~~~~~Resettement Action Plan for Comdor Component (Xangtan Urban Section) be the reset rate calculated by local material rate in 2003 based on the needed equipment and material according to house topic designing information (see the Attached Chart 2). The related stipulations in the Land Requisition Compensation and Resettlement Method of Xiangtan City will be given in table , and the Analysis table for rate area house reset price will be given in table From the analysis, the government's relevant housing compensation criteria should meet the World Bank on principle of the reset price for the housing compensation. Housing rate compensation see the table O Xiangtn Land Acqui sition an Houise Rlocation Compensation Criteia Table Unit: yuan/rn 2 Pramework. category D~corating Requirement Puirchasing Reconstruction Compensation compensatbon 24cm solid wall; standard beam and pillar; inside and outside Bnkand wall whitewashed by cement; brick work column concrete. Bonckee beam; prefabricated hollow cored slab wire mesh concrete roof;45t4 CVonreteo 1 concrete floor; double door three-piece door; cast-in-sites (okhp) gutter; brickwork open ditch drainage; transverse span of Mnore than 8m;indoor water and power supply; height of 4.5m. 24cm solid wall; standard beam and pillar; insides walls are whitewashed and smeared with porcelain; outside walls with Brick and drydash; prefabricated hollow-cored slab floor and flattop; Concrete 2 prefabricated flier, lift up balcony, metal handrail and guardrail, 7 8 (above 2 painted packing door; glass window; prefabricated cored slab 37 8 second floor) wire mesh concrete roof with thermal-protective coating, gutter drainage cement floor with damp proof course, indoor water and power supply; storey height of 3m 24cm solid and hollow wall or 18 cm wall; standard gird and. ~~~pillar; inside walls are whitewashed and smeared with Brick and porcelain; outside walls with drydash, prefabricated Concrete 3 hollow-cored slab floor and flattop; prefabricated flier; metal (second handrail and guardrail; painted packing door glass window grey E ~~floor) tile roof; gutter drainage; cement with floor with damp roof course, indoor water and power supply; storey height of 3m. 24cm solid and hollow wall or 18cm wall; criteria standard gird ~~~~~and pillar; concrete or brickwork column gallery; inside walls are Brck and whitewashed; outside walls with drydash; prefabricated concret hollow-cored slab floor, flattop; prefabricated flier; metal (secon handrail and guardrail; painted packing door glass window; grey foor) tile roof gutter drainage; cement floor with damp proof course; indoor water and power supply; storey height of 3m. 4-21

100 Resettiement Action Plan for Comdor Component (Xiangtan Urban Section) Table Xiangtan Land Acquisition an House Relocation Compensation Criteria Unit: yuan/m 2 Framework. Cate,ory Decorating Requirement Purchasing Reconstruction Framework. Catego.y Decorating Requirement Compensaton compensation 24cm solid and hollow wall or 18cm walls; inside and outside Brick and wall are whitewashed; panted packing door glass window; Concrete 5 prefabricated hollow-cored slab flattop roof; cement floor; (First floor) brickwork open ditch drainage; indoor water and power supply; storey height of 3m. 24cm solid wall with 50 brickwork column; inside walls of more Bricks and than one meter are whitewashed by cement; common wood Timber 6 frame; double door three piece glass window; grey tile roo (workshop) cement floor; brickwork open ditch drainage; indoor water and power supply; mean height of 4.5m. 24cm solid and hollow or 18 cm wall(wood frame with jammed Bricks and bricks);inside and outside walls are whitewashed, painted Timber 7 packing door and glass window, prefabricated flat-slab and (flat house) flat-top drainage, gray tile indoor roof, water cement and floor, power brickwork supply, open front ditch and back wall mean height of 3.5m. Bricks and 24cm solid and hollow wall or 18 wall; indoor wall are Timber 8 whitewashed; packing door and glass window; gray (flat tile hose) roof; 8 cement floor; (flat house) brickwork open power ditch supply; drainage; front and indoor back water mean and height of 3m. Bricks and 24 without solid and hollow or 13 wall, one side is of overlapping Timber 9 (without l(penthouse) wall); Painted packing door roof; and glass cement window; floor; gray indoor tile water and power supply; minimum (penthouse).mean height of 2.5m. Earthen and Cob brick earth filling or brick wall; packing door and glass Wood (flat 10 window; grey tile roof; tabia floor; indoor water and power house) supply; front and back wall mean height of 3.5m. 4-22

101 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Calculation table of the housing compensation reset price analysis Table Brick and concrete Brick and wood structure Rate structure No. Name Unit Remarks (Yuan) Amount Amount (Yuan) Qty. (Yuan) I Major materials Steels kg Tile No Cement kg Wood m ron cast pipe kg Felt m Asphalt kg Glass m Brick No Lime kg Sand m Gravel m Nail kg Scattered materials % sum of iteml calculated 4-23

102 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Calculation table of the housing compensation reset price analysis Table No. Name Unit Rate Brick and concrete structure Brick and wood structure (Yuan) Amount Amount Q (Yuan) Qty. (Yuan) Remarks 3 Wage Work. day Fee of water and electricity Total cost Yuan/m' Round up 6 Compensation criteria Yuan/m'

103 Resettlement Action Plan for CorTidor Component (Xiangtan Urban Section) Xiangtan House Compensation Unit Price for FCLCC (Urban Section) Table Category Structure Unit Compensation criteria Value planned I. Residence Brick and Concrete Yuan/rM Formal House Bnck and Timber Yuan/M Earth and Wood Yuan/m Brick and Concrete Yuan/M Sundry House Brick and Timber Yuan/M Earth and Wood Yuan/M Non-residence Enterprise house M2 Brick and Concrete Yuan/rn (1). Formal House Brick and Timber Yuan /M M2 Earth and Wood Yuan/rn Brick and Concrete Yuan /m (2)a Sundry House Brick and Timber Yuan /M Earth and Wood Yuan /m Wood house Yuan 1m

104 Resefflement Action Plan for Corndor Component (Xiangtan Urban Section) Xiangtan City Other Ground Attachment Compensation Criteria Table Purchasing Reconstruction Item Name Unit compensation compensation Remark (yuan) (yuan) Pond, manure pit, More than 13 bricklaying and whitewash, breeding basin m 6 within 1 m 3 Pond, manure pit, 3 More than 13 bricklaying and whitewash, breeding basin m within m 3 Pond, manure pit, 3 13 more than bricklaying and whitewash, breeding basin m within Pond, m Pond, 3 manure pit, 3 More than 13 bricklaying and whitewash, Manure breeding basin m within 5-10Om pit, 3 Breeding Pond, manure pit, m More than 13 bricklaying and whitewash, basin breeding basin more than 1Om 3 in 3 More than 1 Om 3 bricklaying and Tabia, breeding m whitewash, calculated as per 10/yuan/ m 3 m 3 Earth pool, breeding 5 Cement whitewashed 5 as per wall 10/yuan/ is calculated m 3 Manure pit sets Including pipe, gas meter etc. Red brick well m Including pump dismantlement facilities and installment Well Earth well m ~~~~~~~of Drill-control well No l The half-brick walls are whitewashed with Gutter m cement and calculated by developed area. Tabia ditch m Calculating by developed area Earth ditch m Calculating by earth volume Blind ditch m Bricklaying, fracture surface 35x50cm Drinage Hidden concrete culvert 166 Ditch pipe cpl00mm i Hidden concrete culvert m pipe qp200mm Concrete culvert 100mm m Cast iron pipe qpl0omm m Plastic pipe q m Note: The cement pond, which is not up to requirements of mortar laying body and whitewashing, will be deducted according to 50% of single criteria. 4-26

105 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table Other Ground Attachment Compensation Criteria in Xiangtan City Purchasing Compensation Item Name Unit compensation Remark (yuan) (yuan) Sunning ground Cement ground m2 9 9 Thickness of it is not less 6cm Tabia ground m2 4 4 Thickness of it is not less 6cm Earth ground m Earth road m 3 3 Only tractor road Sand and pebble road m2 7 7 Road Road with cinder and crushed stone m2 5 5 Concrete road m Not less than 8cm in thinness Block stone retaining wall m Block masonry Masonry Block stone retaining wall m Dry masonry Block stone protective slope m Block masonry Block stone protective slope m Brick kiln No Brick pig trough m Prefabricated pig trough m Bamboo-wood railing m2 6 6 Cement protective wall m

106 ResefflementAction Plan for Comdor Component (Xiangtan Urban Section) Table Other Ground Attachment Compensation Criteria in Xiangtan Cement electric pole No. 180 Below 7m, including the facilities on the pole Electrical Cement electric pole No. 230 Below 8m, Including the facilities on the pole pole relocation Outdoor lightning lines m 5 Double lines Power lines m 10 Four lines Earth tomb Single tomb 300 Good coffin Earth tomb Single tomb 100 Decayed coffin Earth tomb Double tomb 400 Good coffin Earth tomb Double tomb 150 Decayed coffin Tabia cement tomb Single tomb 500 Good coffin Tabia cement tomb Single tomb 150 Decayed coffin Tomb Tabia cement tomb Double tomb 600 Good coffin transferred Tabia cement tomb Double tomb 240 Decayed coffin Stone tombl Single tomb 500 Good coffin Stone tomb Single tomb 300 Decayed coffin Stone tomb Double tomb 700 Good coffin Stone tomb Double tomb 400 Decayed coffin Skeleton box No. 50 High voltage electric pole Highingvholtes electric pulli Hole 2 Professional vegetable land, including the influence digging holes and pulling Hole 250 of pulling lines lines Erecting high High voltage electric pole Paddy field, professional vegetable land, including voltage digging holes and pulling Hole 150 the influence of pulling lines electrical lines pole High voltage electric pole pola digging holtges andctric pul Hole 8 Dry land, professional vegetable land, including the Land digging holes and pulling Hole 80 influence of pulling lines acquisition lines High voltage electric pole Other land, professional vegetable land, including digging holes and pulling Hole 50 the influence of pulling lines lines 4-28

107 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Affiliated Building and Scatted Trees Compensation Unit Price of Xiangjiang FCLCC (Urban Section) Table Category Sub item Unit Compensation criteria Ironing 25 Bounding wall Yuan/m 2 Brickwork 10 Cement ground 9 Sunning ground Yuan/M 2 Earth ground 2 Block masonry 96 Dry-laid masonry 21 Protective-laid masonry Yuan/mi 2 Brickwork 18 Cement facing 2 Welt Earth well 1200 Yuan/No. Pressure well 200 Water tank 120 Yuan/mi 3 Pool 85 Firedamp basin 1600 Yuan Manure pit 190 Tomb Yuan/tomb 300 Mature fruit tree Yuan/mu 1800 Scattered tree Young fruit tree Yuan/mu 800 Other trees Plants 150 3). Business-stopping Compensation Fee for Impact Enterprises and Individual Merchant The impact enterprises for business stopping include Municipal Architecture Institute, Municipal Salt Warehouse, Dishui Saleroom and collective-owned sand yard, concrete yard in each village, and all these place shall be resettled and requisitioned. According to the reconstruction conditions in every enterprise after the project ending, the 4-29

108 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) business stopping compensation fee for every unit will be as following: for Municipal Architecture Institute, the fee shall be 150,000 RMB yuan, for Municipal Salt Warehouse, Dishui Saleroom, the fee shall be 30,000 RMB yuan. There will be no reconstruction condition in the collective-owned sand yard, concrete yard in each village, so there is no business stopping compensation fee, the houses of them shall be requisitioned in the way of monetary, the standards will be showed in tables , ). Compensation Fee for Foundation Facilities (1). Ground Leveling The houses of the displaced persons in the project zone is scatter, the residential site leveling shall be perform individual or together based on the aspiration of the displace persons. The residential site-leveling fee will be 2000 RMB yuan for each householder referring to the similar project. (2). Illumination According to the primary? resettlement plan, the displaced persons shall be resettled separately, and the compensation fee for water supply facilities shall be provided to every householder, the peasants shall be use these fees to solve the water supply problems. Nowadays, the village network-improving project has been completed, the power supply system in every resettlement site has been set up, so only the water supply pipe and electricity wire are needed in the project zone. According to the compensation standards for water, power and foundation in Land Requisition Compensation and Resettlement Method of Xiangtan City, the compensation fee for water supply shall be RMB yuan/householder, power supply shall be RMB yuan/householder, water and illumination facilities shall be 800 RMB yuan/householder. (3). Traffic According to the criterion for communication convenient, the new residential sites all locate near village roads, and the communication of the peasant could be solve with the residential leveling, the compensation fee for communication shall be 200 RMB yuan/householder. 4-30

109 Resettlement Actfon Plan for Comdor Component (Xiangtan Urban Section) The compensation standards for water, power and foundation in Land Requisition Compensation and Resettlement Method of Xiangtan City will be given in table Table Compensation Criteria for Reconstructing Water, Power, Road and Super-depth Foundation Compensation Item Unit Remark cost (Yuan) Water HH Compensated in a lump sum at one Power HH time, no additional compensation fo Roads HH uniform arrangement Brick foundation and earthwork m Take the ground beyond city as datum, Concrete and earthwork m 160 super-depth foundation compensation Rubble foundation m 3 80 l below 1.5m. Piling foundation m 32 Note: The household in the criteria refers to the actual reconstruction resident site as the stipulation. 5). Resettlement Compensation Fee and Temporary Transition Allowance (1). Residential House In the project zone, the displaced person shall be relocated in the local place. Although, the relocation distance will be less than 500m, the house construction period will be very short. In consideration of the old material of the original house usage, the temporary transition allowance shall be paid to the displaced persons. According to the related stipulations in the Land Requisition Compensation and Resettlement Method of Xiangtan City (see table ), the fee shall be 300 RMB yuan/month. Householder based on the average amount of 3.25 persons in each householder. The transition period will be 2 months, the temporary transition allowance shall be 600 RMB yuan/householder, the resefflement compensation fee shall be 380 RMB yuan/householder. 4-31

110 ResettementAction Plan for Corrdor odmponent (Xiangtan Urban Secion) (2). Non residential House The provincial Muyuhu store yard for flood-proof material has stored 50,000 m3 scree, so the relocation compensation fee shall be 200,000 RMB yuan. The resettlement compensation fee for Municipal Architecture Institute shall be 30,000 RMB yuan; for sand and cement concrete in each village, the fee shall be 20,000 RMB yuan because of so many equipments; the resettlement fee for other collective-owned unit and enterprise, the fee shall be calculated as 15 RMB yuan/m2 based on the construction area. According to the related stipulations in the Land Requisition Compensation and Resettlement Method of Xiangtan City, the extra award shall be given to the displaced persons who relocate timely or ahead of the time. And the details will be given in table Table Other Compensation Criteria Compensation Item Name Unit funds Remark (Yuan) Physical relocation cost 2 person HH 200 Physical relocation cost 2 person HH 260 Physical relocation Physical relocation cost 3 person HH 320 It is calculated as per the resident population, disburse twice to people cost Physical relocation cost 4 person HH 380 Physical r0 _ o are in need of transition Physical relocation cost 5 person HH 420 Physical relocation cost 6 person HH 480 Transition cost 1 person HH 150 Transition cost 2 person HH 200 Transition cost 3person HH 250 Transition cost Transition cost 4 person HH 300 Transition cost 5 person HH 350 It is calculated as per the residen and monthly compensation criteria Transition cost 6 person HH 400 Transition cost >7 person

111 Resettlement Action Plan fhr Conidor Component (Xiangtan Urban Section) l Physical relocation m 10 It is calculated as per legal house awards in tme area of relocation house ~~~House relocation House relocation 5 days earlier than specified awards Physical relocation m2 5 physical relocation time, award will awards in advance be based on this cntena Miss-work day 20 Due to meeting attendance No compensation for Agriculture tools, non-households transforming, for 1-2 HH 200 livestock more than 2 people households, 50% each will be added. 6). Compensation Fee for Special Facilities The special facilities include traffic, communication, electricity and cable TV facilities. The related depts., didn't prepare the relocation plan for special facilities, the compensation fee shall be calculated based on the actual impact amount referring to the reset fee of similar project in 2003, and the reconstruction fee for the special project shall be the compensation fee after the negotiation between project office and administration dept. the temporary compensation standards are as follows: Cement Pavement 12 yuan/m 2 Simple highway 8000 Yuan RMB /km Tractor road 3 yuan/m 2 10kv High voltage 43,000 Yuan /km wire Low voltage wire 13,000 RMB Mail lines 25,000 RMB Yuan/km yuan/km Cable TV line 8,000 RMB yuan/km 7). Cultural Relic and Vulnerable Group There is no important cultural relic in the project impact zone. In the resettlement, the project headquarter shall provide the assistant to the vulnerable group, the related fee shall be calculate in the foundation reserve as 2000 Yuan/pr. 4-33

112 4.3.4 Ownership Sheet ResefflementActon Plan for Corridor Component (Xiangtan Urban Secton) The project impact units and individual shall share the following right, details show in table

113 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Ownership Sheet for Xiangtan FCLCC (Xiangtan Urban Section) Table Influence type Affected people Compensation Resettlement Polices Compensation item Compensation critera 1. All houses will get compensation as per replacement price without deduction discount. The useable materials of old house belong to resettlement household. They can use it to rebuild new house. 1. Formal house 2.Resettlement organization will assist resettlement household to fulfill new Brick and concrete 265 yuan/m 2 residential site at original villager. Under asking for their opinions, the work of ground leveling, drinking water and lighting and road can be done by resettlers, or entwust Brick and timber 215 yuan /m2 qualified construction unit. 3. The plan respect for the willingness of most resettlement household, adept the Earth and wood 180 yuan/m 2 way of dismantling and rebuild by them. Resettlers can choose if they make full use of useable material of old houses, before completing new houses, resettler can live 0 original house. They cannot be forced to relocate before fixed time. 5. C, 3 4.Resetters affected should get the notice 3 months before house-construction, at 2. Sundry house least 2 months. House-reconstruction time should be arranged after full discussion Brick and concrete 220 yuan/m2 and consultation with village, town and household, choose the farming spare time as possible. They can get relocation cost as per 380 yuan7household, transient subsidy Brick and timber 130 yuan/m2 cost as per 600 person/yuan. 5. Resettlement organizations should adapt effective measures to help poverty Earth and wood 70 yuan/ M 2 household during implementation. For those households, headquarter and village residential committee help them to rebuilt and assist move to new house after asking Wood structure 50 yuan /m 2 for their willingness. 6. Resettlers' house compensation should be paid before house-reconstruction, such as house compensating is paid periodically; last cost should be paid before Resettlement compensation cost 380 yuan/hh 4-35

114 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) Table Ownership Sheet for Xiangtan FCLCC (Xiangtan Urban Section) influence type Affected people Compensation Resettlement Polices Compensation item Compensation criteria completing house. 7. Resefflers can appeal in any aspects related to resettlement, including compensation criteria. No any charge will be made by the appeal reception agencies. Temporary transition subsidy 600 yuan/hh 1 Public house affected is planned to relocate and reconstruct by relevant unit on 1. Formal house o their own. Project headquarter will consult compensation criteria and relocation time with relevant unit. Construction cost is entailed total cost estimate for the Project and,7 Unit and staff disbursed by headquarter office before 4 months of opening, For laborer cost in the Brick and timber yuan/m 2 course of resettlement, is paid by headquarter as un-expectable cost. 2. Relocation cost for collective public house during relocation is compensated as Earth and wood yuan/n 2 relocation area as per 15 yuan/mr 3. No production interruption cost for state-owned and collective-owned enterprises. Brick and concrete yuan/m 2 Unit and staff Brick and timber yuan/m2 z 0 _ Earth and wood Resettlement compensation cost 70 yuan/m2 Flood control reserve Construction research institute Quarry and borrow 20*104 yuan 3^104 yuan yuan/place Other units 15 yuan/m 2 Work interruption subsidy 4-36

115 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Ownership Sheet for Xiangtan FCLCC (Xiangtan Urban Section) Table Influence type Affected people Compensation Resettlement Polices Compensation item Compensation criteria Construction research institute Salt storage Dishui supply 15*104 yuan 3*104 yuan M2 Xiangtan Municipal Government Land Administrative Charging Department levy 1. Industry land 247 yuan/in State land instead repayment-using cost of state-owned land uniformly then hand over to 2. Residence land 325 yuan/m2 Municipal Finance. 3. Young crop compensation 1500 yuan/mu 1. Acquisition land for project construction, relocated villages will get lanc 1. Cultivated land compensation cost, and resettlement subsidy from Land Acquisition Unit; relocate Paddy field yuan/mu household can get young crop compensation cost and ground attachmen compensation cost; in addition, if village and group perform land adjustment, or lan Vegetable land yuan/mu Permanent land development, relocated household can get land or other production resources and Dry land yuan/mu use and compensating cost and resettlement subsidy cost is managed and used by Collectes land village and group, the other way round, if village and grouip do not land adjustment, of land development, farming household do not get any means of production 3. Lotus root pond yuan/mu resettlement subsidy cost should disbursed to household, land compensation cos 4. Timber land yuan/mu s manage by village and group 5. Grass land 2311 yuan/mu 2. Land compensation cost and resektlement subsidy cost for projec construction acquisition land mainly used to recover resettlers' production and living, 6. Residential site yuan/mu such as Constructing of farming irrigation works facilities and improvement of rura 7. Enterprise land yuan/mu infrastructure and agriculture structure adjustment Permanent land Collective land 8. Road land yuan/mu 4-37

116 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table Ownership Sheet for Xiangtan FCLCC (Xiangtan Urban Section) Influence type Affected people Compensation Resettlement Polices Compensation item Compensafton criteria use 9. Water surface 5138 yuan/mu Temporary land Collected land 10. Public land yuan/mu 11. Waste land 2311 yuan/mu 1. Compensation cost for transient land 1. Young includes crop compensation young crop cosl compensation cost, land oss compensation cost and land reclaiming cost. Timber forest 770 yuan/mu 2. Land loss compensation, decided by primary land annual average output, is mainl Frutex forest 514 yuan/mu used to compensate land owner all output or input from land 3. Reclaim cost is used 2. Land to reclaim loss compensation for transient cost occupation land after it is on due. I_ decided as per actual cost of reclaim. After transient land expire, it is done by Timber forest 1540 yuan/mu construction unit Frutex forest 1028 yuan/mu 3. Land reclaiming cost 1500 yuan/mu 4-38

117 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) 5 Resettlement Plan 5.1 Resettlement Strategy Resettlement Targets The general target of the project resettlement planning: There is production way out for resettlers, labors can be rationally arranged and production and living levels will be improved or at least is not lower than the original. According to the resettlers' actual living standard in project zone in 2002 and in combination with the Tenth Five-year Plan national economic and social development aim and long-term aim up to year 2015 in the counties (districts), the determined resettlement target is as follows: 1) Grain self-support will be basically guaranteed. It is necessary to increase land output for areas with less farmland resource by means of agricultural structure adjustment and fully tapping the land potential. 2) Actively take measures to ensure the annual per capita net income of resettled family to gradually to be restored to the level before resettlement. 3) The public infrastructure, conditions for going to school and doctors, social welfare level, natural environment and traffic conditions will more be improved in comparison with that before resettlement Resettlement Principles and Measures 1) The presentation of resettlement plan depends upon the social and economic investigation and affected physical indexes statistics in project zone and takes the State and local policies, laws and rules on land acquisition and removal and the World Bank's Operational Policy for Involuntary Resettlement OD/BP4. 12 as the principle. 2) Optimize project design, pay attention to protect the cultivated land and reduce the affected scope of land acquisition and removal as soon as possible. Avoid the population dense zone or multistory and high-rise buildings as far as possible, and reduce the involuntary resettlers to minimum. The convenience-for-people 5-1

118 Resettfement Action Plan for Conidor Component (Xiangtan Urban Section) measures and the construction schemes for reducing disturbance to residents will be taken in the process of construction. 3) Compensation and resettlement to all involuntary resettles are a part of project construction. It is necessary to provide sufficient funds to resettlers and help them to obtain profits from the project. 4) Ensure that the affected people can receive all compensation for resettlement losses before removing. It is necessary to make the rational living arrangement and effective production restoration to them and to give them subsidy and help for their temporary difficulties. 5) Ensure that the living standard, production capacities and income of the affected people by land acquisition and removal will be restored and increased to the standard and levels before land acquisition and removing. 6) The compensation for house or other properties is the replacement price, and the depreciation or dis 9 ount shouldn't be deducted from the compensation. The compensation can use the money compensatory way or physical compensatory way. Both money compensation and physical compensation (e.g. property right is exchanged) should, at least, be satisfied with purchasing the houses of equal area, similar structure and similar conditions in the same area. The project unit should recommend the economical and appropriate houses to removing households and help the organizations concerned handle the physical relocation procedures (including the preferential policies that they can enjoy according to the stipulations). 7) This project will give compensation all people and all buildings affected by the Project construction in the project zone. Even if one or two people have had imperfect household register procedure or imperfect leasing procedure or imperfect business procedure or imperfect law procedure of a few of buildings, it does not become a reason to refuse to give compensation and help. 8) Some one who gets into the project zone to seize hold of land or houses without authority out of limited period will not be given compensation and resettlement. 5-2

119 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) Some one who does not sign the agreement of compensation and resettlement or does refuse removing after being signed the agreement should be subject to deal with according to administrative and judicial procedures. 9) The resettlers will obtain compensation in the transition stage of physical relocation and in the process of physical relocation. The proposed resettlement area should have the elementary infrastructure and service facilities. 10) The physical relocation of non-residential house unit will obtain subsidies for physical relocation and for losses of production stop and business stop. The local reconstruction or relocation resettlement should meet the plans and avoid the second physical relocation for the near term. 11) The competent departments will be responsible for arranging the stopped production enterprises, collective units, state-owned enterprises and units. The collective enterprises will be resettled by the collective enterprises themselves. I 12) It is necessary to give rational consideration for the vulnerable groups and help them choose the resettlement houses and remove. 13) Units of infrastructure property right will be given the compensation for relocation and reconstruction and function restoration of infrastructure affected by the Project. 14) Make the rational compensation for the requisitioned land and losses arisen from it. The land compensation fee should be owned by the collective and used for collective economic development, improvement of the public good and resettlement of the affected villagers. The resettlement subsidy disbursement will be given the resettlement units or the resettled persons or will be used to pay the insurance expenses of the resettled persons. 15) All expenses for requisitioning land should be paid by means of the full disbursement in three months from beginning of the approval date of land acquisition compensation and resettlement scheme, and the latest allowable date should be the day when this stretch of land has begun to be used for construction purpose. 5-3

120 Resettlement Acfion Plan for Corndor Component (Xiangtan Urban Section) 16) The temporary used land is generally limited in two years. When temporarily occupying cultivated land, the occupant should restore the planting conditions in one year from the expiration date of temporary used land. If the land of temporary use is the one owned by the collective, the rural collective organization or villagers' committee should on behalf of the land owners sign the contract of temporary used land with the users and should collect the subsidies for temporarily used land from the users. When setting up the compensatory criterion of temporarily used land, it is necessary to consider the losses of the owners and users of the original land, including agricultural tax to be paid. When the temporarily used land will be returned, the land use character or land ownership have changed, it is necessary to relevantly increase the land compensatory level and properly arrange the users of the original land. 17) It is necessary to make work arrangement to the labors affected by land acquisition and relocation and ensure that their living standard and income would not be reduced in spite of the land acquisition and relocation. It is necessary to encourage resettling depending upon land and support to develop the second and third industry. The farmers could volunteer to select the employment, if possible. Provided their rural residence registration will be changed into the city's, the original economic organization should help them pay all kinds of insurance expenses of resettlement population. 18) In the period of the resettlement plan preparation and execution, the resettlers, resettler-receiving party will be encouraged to take part in, public and note the compensation policies and standards. In the investigation, the compensation and resettlement suggestion will be got from them, and will be written in the plan. 19) The resettlement shall comply with the principle of handy resettlement, and shall consider the original habit and costumes of the resettlers. 20) The resettlers will be encouraged to take part in drawing up resettlement action plan and executing resettlement, and the policies and criteria of compensation and resettlement should be opened and published in time. In the process of investigation 5_ 4

121 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) to the affected persons who will be asked to make suggestions for compensation and resettlement, and these suggestions shall be reflected in the report. 21) It is necessary to pay attention to complaint and resentment of the affected people and help them rationally overcome the difficulties and inconveniences in the process of land acquisition and physical relocation. It is necessary to listen to resettlers' opinions about the compensation standard, which should be solved through consultation. If it is fail in consultation, the methods of arbitration award or prosecution could be taken. 22) The concerned organizations of resettlement work should strengthen combination and coordination each other. The resettlement organizations at all levels should be perfected and train all persons at posts. 23) In the process of executing project the owner will make internal survey for project implementation, and, in addition, the survey units will be engaged to carry out external survey and will periodically submit the survey rep6rt to the World Bank. The resettlement work assessment will be done after completing all activities. 24) In the process of resettlement action plan execution, the any large changes (including reducing compensation criteria, changing the place and scope of project's land acquisition and physical relocation, increasing new sub-item, changing some sub-item into domestic investment item, etc.) should be reported to The World Bank. It is possible to amend the resettlement action plan or prepare the other resettlement action plan. 25) In the World Bank's project zone, if the land acquisition and relocation work of non-the World Bank project will be in advance or this work will be carried out at the same time with one's of the World Bank, the World Bank's project could be "get a lift". However, all compensation and settlement policies should conform to the requirements of resettlement action plan. 5.2 Resettlers' Living Restoration Plan In August 2003, planning preparation units organized professional technicians, under 5-5

122 Resettement Action Plan for Comidor Component (Xiangtan Urban Section) great coordination of the Employer and leaders in project zone, to conduct the on-the-spot investigation, optimization and demonstration for resettlement area in the project zone. According to the project actual baseline. The living arrangement scheme of scattered and move-back resettlement has worked out, and it is necessary to ensure the resettlers to live and work in peace and happiness, after relocation Principle and Procedures of Resettlement Points alternative 1) Principles 1) The new resident point should possess the good topographic conditions and reliable drinking water source. After being relocated, the new site's infrastructure conditions, including water, power and road, are not lower than that before relocation. 2) It must conform to production development plan; 3) It is useful to production and convenient to living and management; 4) It can economize land, it is necessary to do not occupy land or to more less occupy land as far as possible; The house site area of rural resettlers should not less than the minimum standards stipulated by the State. 5) Considering the population growth in the future, the developing room should be left; 6) The layout of house complexes should be based on topographic features and should consider other conditions, including lighting, ventilation and afforestation and so on. 7) House designs should conform to the resettlers' willingness and their investment capacity. 8) The transition period of resettlement and house construction should not be longer than for 2 months. 2) Procedures The new site of resettlement point will has been decided such that the local governments, resettlers' representatives and govemments of resettlement zone will jointly make 5-6

123 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) consultation in accordance with the above principles; the local governments and technicians concerned will make the on-the-spot survey and choose the point and make the synthetic analysis of geology, topography, traffic, power, water source, etc; the resettlers' production and living conditions will well be considered Relocation and House Reconstruction Plan 1) Resettlement Targets and Scope The land acquisition and relocation of the project will affect 350 households with 1153 residents, including 130 households with 420 persons of Dongping Office, 37 households with 128 persons of Jiansha Road Office, 16 households with 39 persons of Xiacheng Township, 105 households with 371 persons of Baota Township, 4 households with 12 persons of Shejian Village Office, 11 households with 37 persons of Dishuibu Office and 47 hous, with 146 persons of Hetang Township. The 341 households with 1107 persons to be relocated are as follows: 125 households with 410 persons of Dongping Office, 36 households with 123 persons of Jianshe Road Office, 16 hous6holds with 39 persons of Xiacheng Township. 105 households with 371 persons of Baota Township, 4 households with 12 persons of Shejian Village Office, 9 households with 14 persons of Dishuibu Office, 46 households with 138 persons The other 9 households with 46 persons are subject to impact of partial houses and or partial attached facilities. In light of resettlement principle and in combination with the actual conditions and resettlers' withes in various areas, it is determined that the locally scattered and move back resettlement way will be adopted for most of resettlers relocated in project zone. By planning, 307 households with 1032 persons will select land to build houses by themselves according to this way. The scattered and move back resettlement scope is in the administrative region of this village or this neighborhood committee and should conform to the overall planning of citied and towns and townships. By planning, the money resettlement way will be adopted to 34 households with 75 persons because they have had the houses outside project zone. 2) Resettlement Sites 5-7

124 Resefflement Action Plan for Comdor Component (Xiangtan Urban Seclon) Based on the resettlement principle, the unoccupied and wasteland in different villages and groups will be selected as the Resettlement Sites, the 2-3 households are used as the small resettlement point to be settled. The relocation and reseftlement in project zone are relocation and resettlement in project zone are referred to 20 groups where the 123 scattered and move-back Resettlement Sites will be set up and 308 households with 1035 persons will be reseftled. 3) Criteria of Using Land Based on the stipulations and criteria concerned for house site use land in the State Land Administrative Law of P. R. China and the Hunan Provincial <Land Administrative Implementation Ways>, it is determined that the residential site land criterion for resettlers of using scattered and move-back reconstructing houses is m2/h. 4) Housing reconstruction The scattered and move back resettlement houses will be built by resettlers themselves, and the local resettlement office and state land administration are responsible for the land acquisition for new houses building. The resettlers can select the reasonable dwelling house type for building houses and they can also make design based on their own wishes and economic situation. The resettlement action plan report has provided several typical dwelling house drawings for rural residents, which can be used for their reference for housing construction. The typical dwelling house drawings for rural residents are shown in the Table Infrastructure and Public Facilities Due to move-back resettlement mainly depends on local existing infrastructure and social service system, no special plan is made. The affected infrastructure and public facilities will be compensated according to the criteria defined by typical analysis. In addition to reconstruction will be made for infrastructure and public facilities according to original scale, original standard, original function, local special organizations can concentrate fund or increase investment to improve original facilities to a in the principle of be favorable for production and convenient for livelihood by means of rational layout and uniform 5-8

125 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) construction. Table Land Acquisition and Relocation Resettlement Planning Table for FCLRP (Xiangtan Urban Section) Group Total After Scattered Resettlement Money Resettlement Township Village No.of Household Rese lement District ( Residential Resettlement (Office) (Community) Committee) (Household) Population Resettlement Host Site Resettlement Host I Population Population Site Yuetang Dongping Hengjie Hengjie Chenjiaweizi Wihin Community 2 Yangjiayuanzi Jianshe Road Daqiao Within Taiping Community 7 Xiacheng Shunjiang Daqiao ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~W Village Yangjia Baota

126 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table Land Acquisition and Relocation Resettlement Planning Table for FCLRP (Xiangtan Urban Section) Group Total After ScaHtered ReseHtlement Money Resettlement Township Village No.of Household District ((Office) (Community) (Residential (Household) ReseHlement Resettlement Resettlement Host Committee) Population Host Site Population Population Site Donghu ground ground ground Within Village 4 ground ground Jiangbian Gaomao Mahao Within Village 2 Yunpan Sunjia Tangjia Within Village Hetang Zhubu Within Village 13 Yijiaping

127 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table Land Acquisition and Relocation Resettlement Planning Table for FCLRP (Xiangtan Urban Section) Group Total After Scattered Resettlement Money Resettlement District Township Village (Residential No.of Household Resettlement (Office) (Community) (Household) Resettlement Committee) Population Host Site Resettlement Host Population Population Site Daqing Shuangbu Gaojia Xinwu Dishui Wuxing Within Village Dishuibu Electrify Community Gaofengling Within Xiangyang Hongqiling Community 1 Shejian Within Shejian Shejian Community 5-11

128 Resettlement Actfon Plan for Comdor Cornponent (Xiangtan Urban Section) 5.3 Production Resettlement Plan Tasks of Production Resettlement The agricultural population and enterprises' staff and workers who have lost land by project occupation need the production arrangement plan. On the basis investigation, the 722 persons (including enterprise staff and workers of 225 persons) in the affected area by project should be given the production arrangement. The resettlers, who are under aontrol of the State enterprises and their work and production are affected, will be resettled by the competent units, and the resettlers, who are under control of township and village collective enterprises, will be resettled by the township and village concerned Standard of Resettlers Production Arrangement Reconstructing production activities and restoring resettlers' living standard is a main standard to judge whether or not the resettlement action plan is practicable. Concerning the agricultural income, the phenomena of level difference, high or lower, naturally exist in any place, In order to ensure that the individual living standard will not decreased after resettlement, it is necessary to take restoring and surpassing resettlers' existing per capita income as the target of resettlement action plan. It is necessary to take help measures to improve the agricultural in aspect of quality and technique, and, at the same time, to take the stability of gradually increasing income of resettlers as a target of resettlement action plan. In August, 2003, under coordination of the strong combination of local governments at all levels, the planning and working-out units under conducted the surveys of family properties were recorded one by one and bound into book form. Based on analysis of statistic annual report in recent three years in villages, per capita annual disposable income was yuan. Regardless of presence and absence project, the social and economical levels in project zone are continuously increasing, and resident per capita income also is increasing accordingly. In , the annual increase rate of countryside per capita income in project zone was 4.02%. In order to ensure that, after relocation, the resettlers' living standard can reach or surpass the original, and, up to project completion in 2006, the target value of per capita net income should reach

129 Reseftiement Action Plan for Comdor Component (Xiangtan Urban Section) Yuan. Because the project zone is close to urban area, the planting income proportion of resettler income is only 17.82%, the income structure tends to multi-element development, thus planning resettlement and production criteria are: (1) The affected villages and groups with the original farmland per capita of more than 0.5 mu will mainly adopt the resettlement way of readjusting farmland, the resettlement standard will be based on the leftover per capita cultivated land amount. If the resettlers have been engaged in the second or third industries, the resettlement way should be the second or third industries because they have similar experiences. The affected villages and groups with the leftover farmland per capita of less than 0.5 mu will mainly adopt resettlement way of developing the second and third industry and get appropriately readjusted partial land. Considering the less existing per capita cultivated land in the villages and groups, the land resource is in tension, and it is difficult to resettle in the way of adjusting cultivated land, the number of resettlers in this way should consult with the local villages and groups. The resettlement way should adopt the advices and suggestions frorn resettlers, and use land adjustment within the groups or in the villages (the adjusting cultivated land outside of the village should be avoided). The land adjusting standards in the groups should be based on the leftover per capita cultivated land. For the land adjusting standards in the villages, the original cultivated land per capita of more than 0.5 mu will be adjusted based on the standard of 0.5 mu/person, other resettlers will be relocated in the way of the second or third industries. Government will give priority to the resettler in job. The resettlement shall comply with the principle of handy resettlement, and shall consider the original habit and costumes of the resettlers. For the workers in the removing or production stopping enterprises, the resettlement shall comply with the principle of keeping the original living level. The resettlement subsidy fee, temporary transition fee and production stopping subsidy fee shall be given to the workers in the removing enterprises timely; the compensation fee shall be given to the workers in the production stopping enterprises. And the workers in these enterprises will be assisted to restore the original living level. 5-13

130 Resettement Action Plan for Comdor Component (Xiangtan Urban Section) Environment Capacity Analysis The environment capacity in resettlement zone means the resettlement population quantity that can stably be made offerings to and absorbed by economic development in one area, under ensuring natural ecological sound cycle and keeping certain living standard and environmental quality. The investigation scope of the resettlement environment capacity was based on the resettlers arrangement scheme stipulated by ReseKtlement action plan Report. 1 ) Analysis of Land Load Bearing Capacity At present, in all villages of the project zone, the Yijiawan Village of Hetang Township has the most per capita farmland area of 0.81 mu, and the Bantang Village of Bantang Township-the least, it is only 0.17 mu/pr. (in Donghu Village of Baota Township there is per capita farmland area is only 0.11 mu, but it is a fishing village, in addition there is per capita fine fishing pond area of 0.05 mu). The comparison and analysis of villages' farmland area before and after the occupation has shown (see Table 2.3-1) that the largest proportion of the occupied farmland in the village is 22.96% (in Bantang Village of Bantang Township), and the least is only 0.27% (in Yijia Village of Hetang Township). Though the impact of land acquisition is threadlike and partial Though the impact of land acquisition is threadlike and partial, the affecting extent of every village is different, the main reason is that project zone lies at the edge of city, some of villages and groups is affected by city construction, thus the average planting land is decreasing little by little, but at the same time, the structure of economic income has greatly changed too, Main income is changing little by little from planting to the 2 nd and 3rd industries, at present, the average planting land of 10 groups is less thano.5mu/per, which accounts for 47.62% of 21 group's; after the project is completed, there are still 16 groups whose average planting land is less than 0.5mu, which accounts for 76.19%. for the whole project zone, it has some effect on local industry and agriculture production, people's life and social economy, so groups whose average planting land is above 0.5mu/per can be considered to have enough carrying capacity, and then they can be resektled by way of agriculture resektlement. While groups whose average planting land is less than 0.5mu/per will be resektled mainly by measures of 2 nd and 3d industry. 5-14

131 Resetetement Action Plan for Conidor Component (Xiangtan Urban Section) Most of existing farmland in project zone are cultivated by villagers, so the agricultural population to be resettled by the agricultural way have to share the original land resource with residents of resettlement zone, but it is necessary to make both the residents and resettlers to be benefited. In order to reach this aim, it should be taken the a lot of measures such as increase agricultural investment, increase soil fertility, adjust crop varieties, improve low-yield land and change dry land to into paddy field as to increase agricultural income. At present the planting structure adjustment is under implementation in Yijiawan Town in project zone. According adjustment plan, the paddy fields will have been changed into the vegetable plots. After executing the project, the traffic conditions will be further improved, and it will speed up the agricultural products circulation. The other villages and groups in the project zone can also take the improvement measures, such as adjust the cultivation system, build field irrigation facilities, strengthen field management and transform the low-fields. In that case, the farmers' planting income proportion can be increased certainly, and it will create such conditions that the resettlers' economic income level can be up to the resettlement target value. 2) Capacity Analysis of the second and third Industry The very rich resources in the affected zone store the excellent resources in the affected zone store the excellent resource advantage for the zonal economic development. Firstly, there is a large number of surplus labors in the zone. A great quantity of labors have been liberated from poor efficiency agricultural production due to the State agricultural reform, and, at the same time, utilization of fine crop varieties, science and technology, scale production have facilitated agriculture further development. According to investigation and analysis, the more than 25% of agricultural population (mainly young people) are engaged in non-agricultural production, the monthly incoming per person is between yuan, and 28.25% of the second, third industry, and the going out labor service income accounted for 34.77% percent, and it greatly exceeded the first industry income rate of 36.98% per cent. Secondly, there are very rich natural resources in the affected zone, and it is a good base 5-15

132 Resettlement Acton Plan for Comdor Component (Xiangtan Urban Secwon) to develop the zonal industry and the third industry. The developed and used extent is not high, and there are excellent development prospects. If use the advanced techniques and make scale development in combination with the zonal environmental protection, the strong guarantee will be furnished for the zonal economic development. The mine resources have not only certain reserves, but also a given market attraction, and now it is under scattered management, small-scale production, high consumption and low efficiency. The concentrative management and advantage development will bring the favorable development to zonal economy. Though the zonal tourist resource is at the initiative development stage, it has obtained considerable social and economic benefit, and it playing an important role in facilitating the third industry development and will help the zonal infrastructure construction, bring along the new industry development and attract the surplus laborers. Obviously the tourism will gradually become the pillar industry of third industry. Meanwhile, it has more great strength for future development. With the project implementation and speeding-up of population urbanization progress, the industrial structure in project zone will be changed, and the proportion of second and third industry will increase. The resettlers affected by the project will be resettled by means of developing out-going labcr, transportation and garden economy (so called the second and third industry). 5-16

133 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) Agricultural Arrangement Scheme Land resource will be affected to some extent within the village or group by implementation of the project. After project implementation, the affected groups' per capita farmland area will be reduced from 0.41 mu (before land occupation) to 0.33 mu, the influence degree is 19.59%. Of which, the largest affected degree by the project is 70.1%(Gangjia Group of Bantang village), the smallest affected degree by the project is 1.46%(Xinbai Group of Hatang Township Yijian Village). After adjusting the planting structure, using quality varieties and transforming low-yield fields, the farmland unit area output value can be increased, and the farmland load capacities will go up. Through farmland adjustment in this village and its groups, most of resettlers in this village and its groups can be well resettled. The quantity and quality of land should be carrying out basis on the equal principles. Out-group adjustment cannot be less than 0.5mu/pr. According to per capita farmland area in resettlers' group, it is planned to adjust farmland of mu and resettle the resettlers of 196 pr in the groups and to adjust farmland of 3.3mu and settle the resettlers of 11 persons in the village Non-Agricultural Arrangement Scheme According to the investigation on the resettled family, over 25 % of the affected people have undertaken the second and third industry or work outside currently, in order to supplement the family income, which mainly refer to the commerce, food industry, transportation, and the object being served are the people in the surrounding. These resettlers have commerce experience and professional skills; the input of the land acquisition compensation fee will do well to the expansion of the operation and the improvement of the income. Meanwhile, the construction of the project itself will bring more opportunities for them to obtain employment and take part in commerce industry. And with the completion of the project, the transportation will become more convenient, the environment will gain improved, therefore the employment condition for the affected resettlers to take part in the second and third industry will be greatly improve. By planning, 290 resettlers will be arranged by means of the second and third industries, of which commerce is 238 persons, restaurant industry is 27 persons, traffic transport industry is 25 persons. The production arrangement plan of every village is detailed in the Table

134 Reseftlement Action Plan for Conidor Component (Xiangtan Urban Section) Table Land Acquisition and Relocation Production Resettlement planning Table for FCLRP(Xiangtan Urban Section) Leftover Total Cultivated Land Adjustment District Township Village Group Cultivateld Resettlement Subtotal Within the Group With in the Village Second,Third Industry (Office) (Community) Land Population Area Resettlement Area Total Area Resettled Resettled Resettd (mu) (Person) SetWed Population by (mu) Population (mu) (mu) Population Population Yuetang Baota Jiedao office Donghu Village Groupl Group Group Business Group Group Jiangbian Gaomao Group ~~ Mahao Business Beroupg

135 Resettlement Action Plan for Comridor Component (Xiangtan Urban Section) Land Acquisition and Relocation Production Resettlement planning Table for FCLRP(Xiangtan Urban Section) Table Leftover Total Cultivated Land Adjustment Township Village Cultivateld Resettlement Subtotal Within the Group With in the Village Second,Third Industry (Office) (Community) Land Population Area Resettlement Area Total Area Resettled Resettled Resettled. (mu ) (Person ) (mu) Population (mu) Seplaeo (mu) Population Poulation by Population Yunpan Tanglia Group Business Sunjia Group Doumi Group Business Bantang Township Hetang Township Bantang Gongj'ia Business Group Wangzuo Group Yangque Group Business Business Dishui

136 Resettlement Action Plan for Cornidor Component (Xiangtan Urban Section) Table Land Acquisition and Relocation Production Resettlement planning Table for FCLRP(Xiangtan Urban Section) Leftover Total Cultivated Land Adjustment Second Third Industry Township Village Cuftivateld Resettlement Subtotal Within the Group With in the Village (Office) (Community) Area R tlement Area TotandArea Resettled Reeled eb7l (mu) (Person) (m) Pplto m) Settled (u Polain Population by (mu) Poplation (u) (mu)populatio Xiaojia and Restaurant Drinking Hutang R stransport Wuxing and Restaurant Drinking Xinhua Business Yijia Shan shan Group Xinba Group Zhubu Sanjin Business 5-20

137 Resetlement Action Plan for Corridor Component (Xiangtan Urban Section) Restoration Scheme for Enterprises and Institutions Within the scope of project acquisition, 31 units, enterprises are affected by the project, and they can be defined according to ownership, that is state-owned enterprise, collective enterprise and individual enterprises, of these 31 units, there are 15 State-owned enterprises (institutions) with 114 affected persons; 13 collective enterprises with 75 affected people, 3 individual enterprises with 36 people. The total person needs resettle is ) Resettlement nearby Through consulting with the departments concerned of districts and towns in the project zone, it is planned that the Muyu Lake Storage of flood control station, City salt warehouse, Dishui Cooperative market and Dishui Village the older game center, the village collective public facility (transformer room) etc 17 units will be resettled by means of local reconstruction way. The money compensation resettletment way will be used to the enterprises of the occupied partial houses and partial facilities and partial land and partial village collective sub line or the units, which have not reconstruction conditions. There are 135 people of 16 units affected staff will work in the old unit continually, during the relocation, the loss of production stop will be set out. 2) Monetary Compensation and Resettlement Only part of buildings and auxiliaries in 14 units such as Navigation School, Xiangqiao Development Co., Ltd. are impacted, some of the buildings have stop using and with no advantages and disadvantages relationship for the units' operation. Only 5 workers in Xiangqiao Development Co., Ltd. need production resettlement, and the Xiangqiao Development Co., Ltd. will be planned to put these 5 workers in other depts. of the unit. So the monetary compensation will be planned to do to these units. Buildings in 5 units such as Tianxun Sandy Yard, Jiangbian Village Sandy Yard, Flood-control Sandy Yard and Xiangatan County Boiler Factory own no reconstruction 5-21

138 Resettlement Actkin Plan for Conidor Component (Xiangtan Urban Section) condition after the project, the holistic removing and dismantling will be done and 53 workers are impacted. Besides the monetary compensation measurements, the re-employment-obtaining will be included in the Plan. 16 workers in 3 sandy yards with low technical requirements are farmers owning land; the operation in Xiangtan Boiler Factory is not very smooth, so the unit can't resettle 36 workers impacted by the project; there is one building in Xiangtan Telecom Bureau will be dismantled with one worker impacted. In the Plan, These 53 people are planned to resettle as following in the electricity community: 6 person of which work to ensure public security, 16 person of which undertake afforestation, 20 person of which undertake public facilities maintenance and the rest 11 person undertake cleanness. The restored scheme for the enterprises, units and individual commercial will be showed in table

139 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table The restored scheme for the enterprises, units and individual commercial Population Name Conditions Scope of affected Resettlement affected Shipping school Normal Partly house and appendix Yuetang district estate. Company Dormitory Dongping estate. Company Monetary No.4 warehouse of food supplies office Stop compensation Municipal smelt metal plant County ship transport company Partly house Xiangqiao Development Ltd. company Normal Administrators' house 5 DishuiVillage old people game centre Stop Relocate as a whole Rebuild in the village Municipal gas company Normal Partly house Monetary compensation Tianxun sand pit Normal - Relocate as a whole 5 Stop(Resettle in the electricity Staff dormitory community Long distance telecommunication bureau Sa d i) 1 undertaking the Normal ~~~~~~~~~~~~ensure the public Normal ( 1 H facilities) Jianshe estate company Dormitory Monetary compensation 5-23

140 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table The restored scheme for the enterprises, units and individual commercial Population Name Conditions Scope of affected Resettlement affected Stop(Resettle 16 person in the electricity community Xiangtan county pot plant Stop Partly house 36 undertaking the afforestation, 20 person facilities maintenance) JiangbianSand pit Relocate as a whole 6 Stop(Resettle in the electricity public Flood prevention sand pit Normal 5Ncommunity undertaking cleanness) 4 Stories No.1 building and Monetary Municipal construction investigation station appendix facilities 35compensation and Municipal running water pump Partly appendix facilities 5 rebuilding nearby 5-24

141 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table The restored scheme for the enterprises, units and individual commercial Population Name Conditions Scope of affected Resettlement affected Prefabricate yard of environment and sanitation bureau sanitation bureau ~~~~~~~~Relocate as a whole 2 Embankment administive office Partly house City salt warehouse Relocate as a whole 32 Zaixin prefabricate yard 7 Sand plant 8 Jiangbian collective gravel plant 7 Pump station Prefabricate yard 6 Xinglong cement pipe-making plant 8 Dishui cooperative supply 21 Municipal Jimeng China medicine liverish 3 stories staff dormitory 6 research station Xiachen printing plant Relocate as a whole 25 Xiangtan textile plant Stop Partly house relocation 5 Muyu Lake storage of Provincial flood Normal 50000m 3 prevention storage 5-25

142 Resettlement Action Plan for Comridor Component (Xiangtan Urban Section) Restoration Measures for Resettlers' Economic Income In the whole process of resettler livelihood restoration, the organizations in charge of mobilization and relocation will help and support the resettlers as much as possible. 1) Timely deliver resettlement subsidies and help resettlers find jobs for themselves. 2) It is necessary to precedently consider resettlers in aspect of building workers for project. The project construction will provide good opportunity to obtain jobs for resettlers, including leveling land, excavating foundation, pouring concrete, erecting steel structure, laying pipes, etc. Though some works are temporary, they will provide short-term income source to local, it is useful to help them to raise the living standards and restore the livelihood. (3) For the prior resettlement of the worker in the second and third industry, the local governments are planning to extend the position channel in the traditional service area such as commerce and meal, develop the tourism and service industry in Yaozhou community, develop the position serving for community citizens, logistics of enterprises and community management, and the commonweal positions for the cleaning, greening, safeguard and maintenance of common facilities. (4) For the out-of-job workers that engage in individual service (except the industry that the state prohibit), the mange tax, urban maintenance and construction tax, education aftachment tax and income tax could not be given in 3 years. And all administrative fee such as manage fee, registered fee and certificate fee could not be given in 3 years. (5) The assurance foundation fee for out-of-job workers loaning will be set up, the capital that need in the fee will be collected in the finance, the assurance organization will be decided by the local governments. If the out-of-job workers need loaning to make business by themselves, the small loanings will be supplied in the following procedures: application at first, recommendation by the community or the villages, inspection by the labor insurance service organization, assurance by the assurance organization, check the loanings by the commercial bank. The loanings shall be or be under than 20,000 RMB yuan and the period is less than 2 years. If the postponed is needed, 1 year postponed 5-26

143 Resettement Acton Plan for Comdor Component (Xiangtan Urban Section) could be applied. The interest of the loaning shall be decided based on the loan interest issued by the People's Bank of China. For the low interest business, the national finance will compensate the total interest in the period, and in the postponed period, this condition will not happen. The highest amount of the loaning shall be 5 times of the assurance fee, the period is the same as the loaning's. for the out-of-job workers that make business incorporate, the loaning scope shall be extended based on the persons and business 5.4 Comparison of Family Economic Income Levels before and after Resettlement Just because the project influence is small, after relocation, the resettler households to be resettled will still be based on agricultural production, and the second and third industry develop simultaneously. Though per capita farmland will be reduced, through improving soil, perfecting farmland and water facilities, optimizing planting structure and developing the second and third industry such as transportation and commerce and trade, the resettler per capita net income will obtain stable growth and is expected to reach economic target value up to the planned level year. Comparison of family economic income levels before and after resettlement is shown in the Table Table Family Income Comparison Table before and after Relocation for FCLCC (Xiangtan Urban Section) Item Unit Y 2002 Y 2003 Y 2004 Y 2005 Y 2006 A) Family members Person years old laborer Person Non-labourer Person B) Contracted Collective land mu Paddy field mu Dry land (Vegetable land) mu C) Family income and expenditure 1.Total Income yuan , Planting income yuan Animal husbandry income yuan Fishery income yuan Industry income uan

144 Resefflement Acdon Plan for Comdor Component (Xiangtan Urban Section) Table Family Income Comparison Table before and after Relocation for FCLCC (Xiangtan Urban Section) Item Unit Y 2002 Y 2003 Y 2004 Y 2005 Y 2006 Construction income yuan Transportation income yuan Commercial income yuan Service sector yuan Total expenditures yuan ; Production expenditure yuan Other expenditure yuan Net income yuan B Workout income of farmer yuan Distritutable net income yuan Farmers' income vuan ) Per capita net income yuan/person D) Economic production value

145 Resettlement Action Plan for Comdor Component (Xianghan Urban Section) 6 Organization and Responsibilities 6.1 Organization Participating Resettlement Planning The Hunan Development and Planning Committee acts as the organization unit for the Project. Hunan Changzhutan Integration Office (CZTEIO) under it as standing organization, which takes responsibilities of organization and coordination preparation work for the Project and preparation Resettlement Action Plan specifically, is a bridge between World Bank and Xiangtan area and its various departments. Officials from Xiangtan Urban Construction Investment Development Co., Ltd. participated in the investigation and planning. And Officials from townships, villages, village leaders and representatives of people in the zone affected by the Project, participated in investigation and planning too. 6.2 Organization and Responsibilities of Resettlement Implementation and Management Organization Xiangtan Urban Construction Investment Development Co., Ltd. as only stockholder for the Project, entrusts the project headquarter (company) formed by Xiangtan Municipal Government to take responsibility to carry out the project. The officials of project headquarter transferred from government, state-land administrative departments, hydro departments, and agriculture departments. There are five departments -engineering department, resettlement department, procurement department, supervision department, financial department, and one office under project offices. Each township (town) and village affected by the Project has 1-2 major leaders (for township, 1 government official and 1 official from stated-land administrative station undertake township leaders; for village, head of village undertake the leadership), who are responsible for resettlement under its jurisdiction. The Project Organizational Chart is as following: 6-1

146 ResetOlement Action Plan for Cormdor Component (Xianglan Urban Section) Organizational Chart for FCLCC (Xiangtan Urban Section) CZTEIO WB Project Group I Xiangtan World Bank Project Office n Xiangtan Urban Construction L Independent Monitoring and Investment Development Co., Evaluation Organization l Resettlement Project Headquarter Xiangtan Relocation Design Unit Office Eng Supervision Resettlement Procurement Financial Executive Dept Dept Dept Dept Dept Office Reseftte Organization Responsibilities 1 ) Responsibilities of project headquarters Xiangtan Urban Construction Investment Development Co., Ltd. entrusted project headquarters (companies) to take full charge of various works of CZT Flood Control landscape Corridor component (Xiangtan Urban Section). The engineering department, resettlement department, procurement department, supervision department, financial department and the offices under it handles all specific work. Its main responsibilities are as follows: 6i) To set down the policies of land acquisition and relocation for the Project. 6-2

147 Resettement Action Plan for Cornidor Component (Xiangtan Urban Section) ( To entrust the designing company to define the scope affected by the Project and investigate the physical index affected by land acquisition and relocation, and take responsibility to keep these data. To apply for land-use planning permit and land-use construction permit. ( To be responsible for training the resettlement cadres who work at Land Acquisition and Relocation of Resettlement Office. (5) To organize and coordinate the preparation and implementation of Resettlement Action Plan Report. To be responsible for management, disbursement and supervision of resettlement fund. ) To direct, coordinate and supervise resettlement implementation activities and its progress. ) To preside and check internal monitoring activities and prepare the land acquisition and relocation resettlement progress report. To make decisions of external monitoring organization and assist its activities. 2) Responsibilities of resettlement department The resettlement department is on behalf of the employers to exercise the function of management, planning, implementation, coordination, supervision and monitoring for resettlement work. The resettlement department take responsibility of resettlement work under its jurisdiction. ( To entrust the design units to define the scope affected by the Project, investigate the physical index affected by land acquisition and relocation and take responsibility to save the data. (X) To assist the preparation of Resettlement and Rehabilitates Program Report 6-3

148 Resetlernent Action Plan for Comdor Component p<iangtan Urban Section) and to be responsible for resettlement implementation activities. To be responsible for selecting main resettlement cadres to get technical training. ( To organize people to make an agreement and make resettlement policies known. (5) To direct, coordinate and supervise resettlement implementation works and its progress of the related departments or units on land acquisition and relocation resettlement. To take charge of resettlement work and disbursing resettlement funds in accordance with To help displace and adjust production land from those who do business to those who are willing to do farming. To carry out internal monitoring work and prepare the internal supervision report and report the municipal project resettlement management office periodically. To assist external monitoring work. 3) Responsibilities of Xiangtan Municipal Land Requisition and Demolishment Office The Xiangtan Municipal Land Requisition and Demolishment Office is managed by Xiangtan Real Estate Administration Bureau, there are professional persons working on the land requisition and house demolishment involved in the urban construction. The main responsibilities are: c To investigate the physical index affected by land acquisition and relocation and take responsibility to save the data. (2) To be responsible for selecting main resettlement cadres to get technical training. 64

149 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) ( To make resettlement policies known and report the resettlers' advices or suggestions to the related administration dept. (A) To report the land requisition or resettlement progress to the Project Employer. 4) Responsibilities of leaders in all townships, villages (communities) These offices will be led by the leader in charge in various townships (counties) formed by the land administrative bureau, post station, people's public affairs bureau and major cadres. Its main responsibilities are as follows: (X) To participate the investigation of the Project and assist the preparation of Resettlement Action Plan. ( To organize people to participate and make them know the resettlement policies. To implement, check, supervise and take notes of resettlement activities of all resettlers in the township (town). (a) To transact the procedure of resettlers' relocation. To supervise land acquisition, the dismantlement of house and appendix buildings, as well as house-reconstruction and relocation. To report the situation of land acquisition, relocation and resettlement to county stated-land administrative bureau and resettlement management To coordinate and deal with the contradiction and problems harmoniously in working. 5) Responsibilities of design units In planning and design stage, it should exactly investigate physical index of land acquisition and relocation, environment capacity, developable utilization resources, assist 6-5

150 Reseftlement Action Plan for Cormdor Component (Xiangtan Urban Section) district government in project zone to develop resettlement schemes, prepare the cost estimate of compensations investment of land acquisition and relocation and Resettlement Action Plan report, and make the relevant drawings. In implementation stage, it should provide the supervision unit with design document, technical, drawings and notices in time, perform design technical transfer to project headquarters at all levels in stages, assist the resettlement offices at all levels in physical relocation and production resettlement, and improve and perfect the program in line with the actual situation. 6.3 Supervision Organization 1) External Independent Monitoring and Evaluation Organization For external independent monitoring and evaluation organization, the employers will entrust qualified units. Its main responsibilities are as follows: (c As independent organization, observe resettlement planning and all constructed aspects, evaluate and monitor regarding physical relocation and effect of the Project and resettlers' adaptability to society, provide monitoring and evaluation report to World Bank through the resettlement offices. ( Provide the technical consulting to resettlement office with data survey and direction ways. 2) Internal Supervision Organization The objectives of internal supervision is to ensure the resettlement organization at all levels to exercise its good function during implementation of RRP, and ensure that legal interest of the people affected by the project would be not intruded and the engineering carry out smoothly. The audit organization of municipal and district government exercise the audit supervision right for related units law under the jurisdiction in line with law stipulation; meanwhile, in order that all the resettlement organizations obey the principles and timetable of Resettlement Action Plan, all units responsible should supervise affiliated organization. 6-6

151 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) 6.4 Resettlement Management System Resettlement engineering management implements such three systems as the employer responsibility, project supervision, project tendering, and contract administration etc. The project headquarter takes fully charge of resettlement implementation work and tendering work of special facilities and infrastructure constructions. Additionally, independent monitoring and evaluation unit will be invited and contracted to supervise and monitor the resettlement. In addition, Xiangtan Urban Construction Investment Development Co., Ltd. will use computer for information management and keep all resettlement files and data during implementation. 6.5 Staffing and Facilities for Resettlement Organizations In order that the resettlement of the Project can go smoothly, every project office has designated dedicated working staff for resettlement to form a bottom-up free information-delivering channel. The staff of resettlement organization composed of qualified administrative and professionals, with a certain working experience in land acquisition and resettlement. Every village and related office (townships) has founded dedicated resettlement organizations staffed with technicians required. More details for staffing and facilities for resettlement organizations is given in table Organization facilities provided mainly refer to hiring office and purchasing office equipments. The funds used to purchase newly increased office equipments listed in project implementation fees. Office equipments purchase list of this project is shown in

152 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table Staffing of Project Resettlement Organization for FCLCC (Xiangtan Urban Section) Organiation Name Unit Title Proposed Position Project leading group Huang Yigong Xiangtan City Planning Committee Head, Integration Office Group leader Ma Lianweng XUCIDC General Manager Vlice group leader Project headquarters Zhen Zhikui XUCIDC Vice general manager Head Zhong Xinghua Xiangtan State Land Administrative Bureau Chairman, Trade union Vice head Huang Yong Xiangtan City Planning Bureau Vice head Vice head Zhong Jianyong Yuetang District Government Vice governor Vice head Resettlement Dept. of project Liu Jian Xiangtan Land Acquisition and. Relocation Head Head headquarters Office Wu Qiang XUCIDC Project official Vice head Ji Zhaoxiang XUCIDC Project official 6-8

153 Resetlement Action Plan for Cornidor Component (Xiangtan Urban Secton) Office Equipments Purchase List for FCLCC (Xiangtan Urban Section) Table6.5-2 Name Name Unit Jnit Quantity Quantity ~~~~~Unit U(yuan) price F-unds (104 yuan) Air conditioner Set 3000 Icebox Set Computer Set Printer, copy machine Set Photographer Set Camera Set Professional books, tools 1 Printing loss ' 1 Desk in the office Set Council board, file cupboard Set 1 Sofa, tea table Set 0.5 Total Training In order to make smoothly implement resettlement carry gut, it is necessary to train resettlers and resettlement working staff and set up training plan Training Plan of Resettlement Management Staff Personnel training and human resources development system in city, county (city, district), township, and village resettlement organization at all levels will be established. The ways of training includes speech made by leaders/experts, technical training program set by various units, visiting other resettlement projects as well as on-site training of technicians and management personnel. Training contents include: (1) Principles and policies of resettlement; (2) Resettlement engineering planning management training; (3) Resettlement implementation planning design (4) Resettlement implementation schedule management (5) Resettlement financial management (6) Management information system (7) Resettlement engineering quality control 6-9

154 Resettlement Acton Plan for Comndor Component (Xiangtan Urban Section) (8) Project supervision (9) Resettlement monitoring and evaluation; (1 0) Resettlement project management; Resettlement Production Skill Training Plan Before moving into new sites and livelihood environment, resettlers shall be trained in production technology and agriculture technology management. Some farmers may be not familiar with the agriculture production mode in host site and some may grow many kinds of economic plants (such as vegetables, flowers, landscape forest, fruits) according to others suggestion, which need train them and support agriculture development. Some farmers will get employment opportunities in second industry and service sector, but it needs to have special employment training. Some young people who had good education background can be sent to colleges to receive 1-2 year's high-level training. After graduations, they can go back, which will be favorable for training local people. More details are shown in Table Improving Measures for Organization (1) Strengthening Staffing The staffs in organization composed of dedicated technicians and administrative people. All of them should be equipped with some professional and management quality. (2) Strengthening Training A. Organize the main staffs of the organizations at all levels to get technical training and make them aware the resettlement policies and the requirement of World Bank. B. Organize the resettlement staffs of townships (towns) to be trained to improve technical quality and treatment capability. (3) Paying due regard to ensure sufficiency funds and equipments (4) To sep up database, intensify information feedback to expedite top-down and bottom-up information flow. The decision-making for resolution of important and major problems will be made by 6-10

155 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) resettlements leading groups. (5) To strengthen report system and internal monitoring, timely resolve the problem occurred. (6) To establish external monitoring and evaluation mechanism and forecasting and warning system. 6-11

156 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) Table6.6-1 Resettlement Training Plan for FCLCC (Xiangtan Urban Section) Time Place Training Speech-maker methodfe Trainee No. Training content fee Training class World Bank official staff from 4 persons 1. Project Identification, Provincial risk planning an Sep provincial, 2003 city, and committee training sustainability, and approval procedures county RO center for World Bank Project yuan Dec Dec Main contents of project preparation. Xiangtan Urban Expert lecture 1.Management staff Construction 3 persons 1. Principles and policies of resettlement from city RO Investment 2.Management staff Development 18 Co. Ltd. 2. Resettlement planning management from County persons training World Bank official, (districts) 3. Resettlement financial resettlement management expert 2* MIS yuan 5. Resettlement implementation management etc. Class Management staff 1.Townships (Towns) 8 persons Jan Yutn Distrct Govemment from city resettlement management office staff 2.Villages 14 Do 31C yuan management Feb. staff 2004 persons Domestic Visit Feb.2005 Resettlement implementation and monitoring Major staff of RO at 10 management different 10*104 levels persons yuan Oversea visit Jul Major staff of RO at and training provincial and 12*10 city 6 persons Resettlement _ implementation management ~~~~~~~~~~~~~~levels yuan Class Jun.2004 Yuetang District County RO Resettlers' 30 1.Producrtion technology management 3.0*104 Jun.2005 Govemment agnculture experts representatives persons 2. Agriculture technology management yuan 1 3. Employment in second and third industry I 6-12

157 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) 7.Public Participation and Harmonization with Residents in the Host Sites 7.1 Public Participation Strategy In order to maintain legal rights of resettlers and relocated units in line with relevant national, provincial and municipal policies, laws and regulations on relocation and resettlement, reduce dissatisfaction and dispute, aim at renovation and construction features, further establish relevant polices and implementation detail for project relocation and resettlement, further do well resettlement plan preparation, implementation and organization work, realize proper resettlement targets, emphasis has been given to resettlers' participation and consultation for hearing extensively resettlers' comments in resettlement policy establishment, planning preparation and implementation stages of the Project. During making the feasibility study at the preliminary stage, Xiangtan Zhaoshan Economic and Trading Tourism Development General Company has collected the comments and proposals on the plan, resettlement, and relocation work from the residential resettlement and non-residential resettlement household of the project zone and the relevant district, townships and village administrative department at all levels. 7.2 Public Participation Approach and Measures Participation and Consultation Approach Before undertaking the investigation, the work outline as well as survey content, methodology, requirement, etc, have been prepared by consultation with the opinion of the local governments. Also the assigners of the local governments have involved in the investigation group and worked together. During extensive investigation, leaders from the townships, villages and groups and the resettlers' representatives were invited to participate in the investigation. Some issues about the necessity of project, project benefit, project influence, principle of compensation and resettlement progress were propagandized and the possible resettlement orientation was consulted together. 7-1

158 ResettlementActon Plan for Comdor Component (Xiangtan Urtban Section) In the resettlement planning period, the plan preparation unit, municipal, district and village govemment shall negotiate, get the suggestions, requirements and problems, and select the reseffle zone. In the on-site investigation, the natives, relative leaders shall take part in the site-selection. After the proving, the negotiation has active meaning in the resettlement selection, and plan preparation that the resettler could receive Measures for Participation and Consultation Public participation and consultation mainly take the form of informal discussion and resettlement willingness sampling investigation. By this means, the purpose of project as well as the content and importance are illustrated to the resettlers' representatives and some relevant issues about resettlement program are consulted with resettlers' representatives together. Through investigation, the designing unit will take full consideration of public participation and consultation comments. On the base of not violating the general program principle, the house building resettlement plan and production resettlement approach will get close to the resettlement willingness as much as possible, achieving an appropriate program and satisfaction of the resettlers. In the period of resettlement implementation, the form of informal discussion and resettlement willingness sampling investigation will still be taken, in order to collect resettlers' information, investigate resettlement willingness and further improve the resettlement program. In order to ensure the resettlers and local governments fully understand the details of Resettlement Action Plan as well as compensation and resettlement plan of this project, Xiangtan Zhaoshan Economic and Trading Tourism Development General Company intends to make the affected resettlers know the Resettlement Relocation Plan, checked and approved by the BANK, which is put in the company office, and collect the resettlement information which is to be issued on the bulletin board or in the newspaper in the affected area or to be made into a information pamphlet to distribute to every resettler. The resettlement information mainly includes: the loss -suffered property, compensation criteria, compensation amount resettlement policy, the resettlers' rights and interests, the comment feedback and appeal channels, etc. 7-2

159 Resettlement Acton Plan for Cormdor Component (Xiangtan Urban Section) 7.3 Public Participation in Preparation of Resettlement Planning Report During the preparation stage and drafting process of Resettlement Action Plan, local governments and resettlers' communities successively took part in the following work: (1) During the practicality survey of land acquisition and relocation infection, the project office (company), village, villager groups and resettlers' representatives all took part in the investigation. (2) The project headquarters (company) successively organized and held the propaganda meeting attended by local cadres at different level and different types of affected persons, extensively propagandized the existing national, provincial, municipal policies on resettlement in our country as well as different types of policies and requirements in Work Bank, heard the attendees' opinion on how to decrease the influence of project, resettle the resettlers for land acquisition and relocation, and the compensation criteria for different types of affected communities, and performed extensively constutation. Policy Openness Table7.3-1 Purpose Contents Who with whom When Where Project impact 1.Amount of physical In project zone, when indexes and the scale Investigation team administrative performing of relocation and land are made of management social acquisition, municipal urban organization Township economic 2.Social economic construction Government Village investigation situation in project investment company residential committee affected area and resettlement resident house and design company nonresident house affected. Preliminary 1.Listening to consultation of opinions and compensation comments about. ~~~~District government, policy and project plan municipal urban relocation plan 2.Delegates of construction company Within project scope when relocates take part in and the person affected preparing for resettlement work resettlement SCHEME I 7-3

160 Resettement Action Plan for Comdor Component (Xiangtan Urban Section) Purpose Contents Municipal unbar construction Six investment company, months Relocation Site project offices and the before relocation relocation I I representatives (3) Form the first ten days of September to the end of it, in the process of resettlement planning, by means of holding informal discussion attended by village cadres and resettlers' representatives or interviewing resettlers randomly, the staff of project headquarters (company) went deep into the each village and village groups. In the form of the informal conference and interview the resettlers at random to further collect their comments and proposals on the resettlement, including the resettlement site choosing, production restoration measure, house relation and the compensation policy for land acquisition and resettlement. From the survey and analysis, it is known that all of the resettlers supported the project, as 93.94% resettlers thought the project had a very big influence on them, 3.79% resettlers thought it had small influence and 2.27% resettlers thought it had little. With regard to the form of house rebuilding resettlement, most of the resettlers preferred to move-back in their original site and rebuilding the house and to purchase the house rebuilding resettlement, separately accounts for 98% and 2%. With regard to the form of life resettlement, 85.24% resettlers opted to adjust farmland from their own villages, 14.76% resettlers opted to be engaged in the second and third industry. I _ 7-4

161 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) Table7.3-2 Public Participation and Opinion Table Time Place Partisans No. of participate Discussion Final result contents Xiangtan 22(of which 5 municipal female) planning committee, urban construction Support The company, Introduction, project meeting Yuetang district influence scope cruc room of government, Yuetang design unit, and resettlement initial construction and agree with district municipal program for the policies on government planning Project principles bureau, state-land administrative bureau, the resettlement representatives Xiangtan 26(of which 6 Ask for the Decide various municipal female) opinions of compensation planning compensation criteria, committee, criteria, resektlement urban resettlement polices and construction program and land land The company, acquisition acquisition meeting Yuetang district polices room of government,. Yuetang design unit, district government municipal planning bureau, state-land administrative bureau, the resettlement representatives (4) From now on, the project headquarters and the resettlement organization at all levels will adapt the following measures to enforce propaganda for resettlement policy to the resettlers and to encourage their participation: a) Propagandizing the resettlement information In order to ensure the resettlers and local governments fully understand the details of Resettlement Action Plan as well as compensation and resettlement plan of this project, headquarters intend to make the affected resettlers know the Resettlement Relocation 7-5

162 ResetJement Acton Plan for Comdor Component (Xiangtan Urban Section) Plan, checked and approved by the BANK, which is put in the company office, and collect the resettlement information which is to be issued on the bulletin board or in the newspaper in the affected area or to be made into a information pamphlet to distribute to every resettler. The resettlement information mainly includes: the loss -suffered property, compensation criteria, compensation amount resettlement policy, the resettlers' rights and interests, the comment feedback and appeal channels, etc. b) Holding meetings The meetings should be held before the land acquisition and physical resettlement. We should keep going deep into the resettler communities to explain the relevant policies, stipulations, and compensation criteria to let them know the situation and do some arrangement. c) By means of TV, broadcasting and newspaper to propagandize the construction Table7.3-3 content, progress, and resettlement policy of the project. Information Openness Documents Publication ways Data Place Including the introduction of Holding meeting Project zone Land acquisition and Bulletin Relocation Including the introduction of Resettlement handbooks Project zone Land acquisition and Holding meetings Relocation Publishing the notice of Bulletin Project zone Resettlement plan Including the introduction of Holding meeting Municipal newspaper in Land acquisition and Bulletin project zone Relocation Including the introduction of Resettlement handbooks Xiangtan urban Land acquisition and Holding meetings construction investment corporation limited Relocation 7.4 Public Participation and Planning during Resettlement Action Plan Implementation The whole implementation of the Resettlement Action Plan for the Project encourage 7-6

163 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) participation of resettlers Participation in House Reconstruction 1) House compensation criteria The level of house compensation criteria has directly connection with resettlers' interests. Before house relocation, the relevant resettlement organization will consult with the resettlers on the house compensation criteria and sign agreement. The result of consultation must be made public on the bulletin board before signing agreement in order to be supervised by audience. 2) Location for House Rebuilding and Approaches for House Building In the preparation and drafting stage of Resettlement Action Plan, the relevant departments performed relevant investigation on the location for resettlers' house rebuilding as well as approach. According to the result of public opinion poll, most of the resettlers prefer to choose the rebuilding site within their village, and are willing to dismantle and rebuild by themselves. The local governments will provide corresponding assistance in the different stages of resettlement house building. 3) Dispose of the old houses All the resettlement households will receive house compensation according to the relocation rate. Within the fixed time, the resettlement household can freely choose to dismantle or rebuild first and the original material of their houses and be allocated and used by them Participation in Production Resettlement Adjustment and allocation of land as well as other agriculture development project will all be participated by all of villagers in each villager group, especially for resettlers who have special need for land Participation in the Use and Management for Land Compensation Cost Land compensation fund, which could not be retained and peculated by any unit or person, is collectively owned in the village groups. After the compensation fund reaches village group collectivity, it should be planed as a whole by the village group collectivity, in order to make sure the fund could be only used for the resettlement. The use of fund must 7-7

164 Resefflement Action Plan for Corridor Component (Xiangtan Urban Secthon) be discussed to pass in villager meeting of each group and supervised by villager representatives Participation in Project Construction Project construction will have influenced local area more or less. In order to guarantee the persons affected by the project are able to get benefit from the project construction, the local people shall be actively encouraged to participate in the project construction and the convenience shall be offered to local people on material supply and labor service. 7.5 Women's Participation From the beginning of this project, the project implementation organization and the local govemment attached great importance to the effect of the women, give intendance to them and the household in which woman is the householder, brought their effect to the implementation of the resettlement. In the project-affected district, the women enjoy equal rights and status with men, playing an important part in the economic development and housing. Especially in the village, with more men working in the city, beside the responsibility for the family, the women play a very important role in the cultivation as well as the non-agricultural affairs. Therefore, in the project affected district, the women even display higher enthusiasm than man, they not only actively participate in the work of each step of the resettlement, but also played a special role in the negotiation on the way of resettlement. During the common investigation, the woman deans from all the resettlement village are invited to take part in the investigation group in order to communicate with the affected women; in the resettlers' meeting, more women than men take part in it with 60 % of the participants are women, beside holding positive attitude for the project, they paid more attention to the soundness of physical criteria and rationality of compensation standard as well as whether the compensation fee can be timely in place. During the period of resettlement planning, the people of resettlement design units actively invite the women representations of the resettlers to negotiate, hear their suggestions and requirement about the resettlement and relocations. These negotiation are significant for their release of worry 7-8

165 Resetlement Action Plan for Cormidor Component (Xiangtan Urban Section) about that the tradition production style is affected and their equal benefit from the project. It is worth attention that there is at least 1 women cadre in the resettlement implementation organization at each level of this project. The women are advised to take part in the implementation of the resettlement plan, and their relocation, especially their restoration of living, will be paid certain attention to by the resettlement implementation organization and the local government. The employment for the construction of the project will take care of the women in advance, with more opportunity for them to obtain employment. 7.6 Harmonization with Residents in the Host Sites The resettlers in this project mainly take the form of move-back rebuilding houses, so their living environment is not changed much before and after resettlement and they will easily adapt to the life in the new host sites. As to they all share the same life style and custom, it is not hard for them to live with the other residents harmoniously. Of course that does not mean that misunderstanding and conflict will not exist between the resettlers and residents in host sites. In order to improve the harmony between resettlers and the residents in host sites, the following work must be well performed: (1) Before physical relocation, the resettlers and the residents in host sites shall be involved in the resettlement planning. If cooperation, participation and feedback information of the resettlers and the residents from the host sites are needed, the right that they enjoy and the program that can be selected should be introduced to them while drafting the resettlement scheme. Direct consultation with them or making a decision with formal or informal leaders and representatives are both all right. Under most of the circumstances, the institutional arrangement could be established such as routine meeting between project officials and local parties, which pave the way for the resettlers and residents in host sites to reflect their opinions in resettlement work during the period of planning and implementation. Attention must be paid to the vulnerable groups to ensure their opinion can be fully reflected. (2) The influence on the residents in host sites shall be managed to minimize. When the 7-9

166 Resettlement Action Plan for Comdor Component (Xianglan Urban Section) resettlers move into host sites, the requirements for land, water, wood and social service, etc, will increase. When the conditions of social service and house facilities provided for the resettlers are better than what the local residents in host sites have, the conflict between the two parties will probably occur. To avoid the occurrence of such conflicts, the living conditions and social service for the residents in host sites should also be improved or at least not deteriorated. Perfect service including education, water supply, medical care, etc must be provided for the two communities as much as possible, in order to create a better social atmosphere for the harmony of both communities. 7-10

167 Resetftlement Acdton Plan for Corridor Component (Xiangtan Urban Section) 8. Appeal Procedures 8.1 Potential Complained Problems and Resolutions The resettlement schemes shall be integratively planned in view of the whole project affected area. During implementation, resettlers may have complaints resulting from actual condition change and deviation of operation. According to the experience of dealing with resettlement in the ongoing or completed projects, the complaint of resettlers can be generally divided into the following categories. 1) Index Problem Because of the error in the process of survey, statistics and calculation, such phenomena as missing items, failing to register and erroneous register will probably take place in physical indexes of relocation, which may affect the interest of resettlers. When that happens, the affected person or the villager committee that the affected person belongs to may report to the district resettlement agency in oral or in writtenr form. Then after the data reorganized, the district resettlement agency will report to the employer and supervision unit. Led by the Employer, the professionals will be organized to check on the spot, sign the resolution comments, re-register the physical indexes for the missing items as well as what failed to register and registered wrongly, and compensate according to relevant criteria. 2) Compensation Criteria Problem Minority of resettlers does not know much about national policies, laws and regulations on resettlement. They seem to worry about the compensation criteria and complain that the compensation criteria are lower, which is thought not to be able to meet the requirements of their house rebuilding and production resettlement. Before and during the implementation of the project, the designers shall, cooperating with the local governments and the resettlement agencies at different levels, explain in detail on the spot of the resettlement scheme and the calculation procedure of the compensation criteria, and disseminate the documents about national reseftlement policies and regulations, so as to make resettlers clear that the compensation criteria is prepared in accordance with relevant national regulations. These can ensure them to be able to move out, live stably and be able to develop, in a bid to eliminate the gain-giving in their minds. 8-1

168 Resetlernent Action Plan for Comdor Component (Xiangtan Uiban Section) 3) Fund Problem During the implementation, such circumstances that the resettlement fund is not disbursed timely may probably happen, which will affect the house rebuilding and production reseftlement and affect the normal life of resettlers finally. To resolve this kind of problem requires that the resettlement implementation management personnel do well in controlling such three aspects as fund, progress and quality, to guarantee that the fund can be only used for the resettlement. Besides, they shall also coordinate and supervise the financial departments in fund disbursement in accordance with the progress of the implementation every month to ensure a timely implementation of resettlement schedule. 8.2 Appeal Channels and Procedures Resettlers enjoy the citizen's right and obligation that endowed by the constitution and laws. The existing laws and regulations can completely ensure citizen's legitimate right and interest not to be violated. When the legitimate rights and interests of resettlers are violated, they have right to propose an appeal pursuant to law until their deserved right is satisfied Appeal Channel (1) Citizen appeal offices, established in all the county, city and province where the resettlers live, can receive, investigate and deal with the common appeal lodged by resettlers. (2) The legally established local resettlement administrative institutions at different levels have the authority to supervise its subordinate government's performance in resettlement from city to district. They can also receive and deal with the issue about appeal. (3) Resettlement engineering supervision units take the responsibility of supervising and checking whether local government implement rational resettlement according to laws and can deal with the resettlers' appeals by auditing, checking, coordination. (4) The independent resettlement monitoring and evaluation organization is responsible for supervising the resettlement work pursuant to relevant national laws. It is its 8-2

169 Resetlement Action Plan for Comdor Component (Xiangtan Urban Section) obligation to safeguarding the resettlers 'lawful right, to accept and report the problem that resettlers 'right is infringed upon to relevant authority. (5) The legal departments like executive administration supervision, audit, discipline inspection, judicature, procuratorate organ are established at country, province, inquisitor resettlers in which the law and discipline have been violated. The Resettlement Appeal System for the Project is given in figure Appeal Procedures The resettlers may reflect to the villager committee, if they do not satisfy with the resettlement. The villager committee (or resettlers) may directly consult with the local resettlement office for resolution, or can appeal to the upper resettlement office in oral or in written form. The upper resettlement office will make a record for the appeal and study together with the villager committee and the local resettlement office to resolve the problem within 10 days. If there is dispute and conflict which can not be resolved, the villager committee can appeal through appeal channels level by level to the administrative organs in charge such as project office, resettlement hdministrative institution, resettlement monitoring organization, citizen appeal office, executive administration supervision, discipline inspection, procuratorate organ, according to the Administrative Procedure Law of the People's Republic of China. If the villager committee or resettlers refuse to accept the resolution, they directly file a suit in a people's court. The resettlement office shall be responsible for filing all the problems that appealed and the resolution process detail records. 8-3

170 Resettlement Acfion Plan for Corridor Component (Xiangtan Urban Section) _ Provincia[, City, County Legal Juridical Dept. Provincial Project Office Provincial, City, County[ City Project Office Resettlement Monitoring & Discipline Inspection Provincial, City, County If I Project Office Appeal Office Il Evaluation Organ. Villager Committee Affected Household l Figure Resettlement Appeal System for the Project 8-4

171 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) 9.Environmental Protection and Management 9.1 Needs for Environmental Protection The environmental assessment, which is a major investment item for resettlement, shall include the impact of resettlement on environment. The Resettlement Action Plan must perform by combining with environmental assessment. Resettlement zone shall be demarcated, and population density growth value of unit land area shall be calculated. As far as agriculture project is concerned, if number of resettlement exceeds the number of people existing in the host sites, it will bring such environment problems like lopping forest, unduly browse, water-soil loss, deterioration of sanitation, pollution, etc. Therefore, the Resettlement Action Plan shall not only include proper mitigation measures (including training of resettlers), but also allow to select other host sites. The town resettlement will bring other relevant problems related to population density (like communications capability, portable water sources, sanitation system, medical treatment hygiene etc.). The constructive environmental management methods can provide good opportunities and benefits for resettlement and residents in the host area. If the resettlement may produce unacceptable impact on environment, then, other resettlement sites or more resettlement sites shall be found out. 9.2Dismantling and Cleaning up All the various garbage produced by dismantling various buildings and appendixes within the project area will be dumped into designated disposal sites specified by the Zhuzhou Environment and Hygiene Bureau. All the houses and appendixes within the project area shall be dismantled and leveled. For all the pollution sources within the project area, sanitation and sterilization shall be performed. 9.3 Environment Management in Resettlement Area Environment protection shall be adequately considered in planning, design and construction of resettlement zone and it is necessary to make the surrounding environment beautiful and comfortable as much as possible. (1) During earth excavation, excavation face shall be leveled with drainage ditches provided if necessary to mitigate hydraulic scouring on excavation surface. Trees and grass shall be planted as early as possible in disposal area to avoid water-earth 9-l

172 ResettlementAction Plan for Comdor Component (Xiangtan Urban Section) loss. Four house construction and public facilities reconstruction, the damage to forest and vegetation shall be minimized as much as possible. Tress along the highway shall be planted. (2) Sanitation in new residential house: Before moving into new resettlement houses, the surrounding environment shall be sanitized by means of sprinkling mosquito pesticide, and cleaning ruderal and waste water containers around the new residential houses after move in from time to time. (3) To select clean water source: Tight and sound water tanks shall be constructed for the spring sources and no such pollution sources like WC, cesspit, stockyard dust heap, and waste residue piles can be provided 20-30m around water sources. As the land acquisition and relocation influence by the project is not much, most of the resettlement will employ scattered move-back mode. As long as the empty land around the new residential site is well greened and water-earth loss is reduced, the difference of the resettlement area before and after construction in natural environment will not be big. The transportation environment will be improved greatly in pace with the implementation of the project and all of thepe must be a great impetus to the local economic development. 9-2

173 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) 10. Monitoring and Evaluation 10.1 Internal Monitoring Purpose and Task The purpose of internal monitoring is to ensure resettlement organization at various levels to keep a good function during the implementation processes of RAP, and ensure the legitimate interests of project affected population to make the project construction go on smoothly. The auditing organizations of city, county (district) governments will independently exercise authority to supervise the relevant units in the areas under its administration according to the legal provisions, and also ensure all the resettlement organizations to observe the principle of the RAP and the schedule to implement resettlement. Each responsible unit should supervise the work of its subordinate organizations Monitoring Organization Xiangtan Urban Construction Investment Developing Co. will adopt an internal monitoring operation mechanism to check resettlement works, establish basic database of land acquisition and relocation and to guide resettlement project and supervision of all the resettlement households and relocated units, carry out internal supervision and inspect on the whole process of resettlement preparation and implementation Implement Procedure During the implementation, Xiangtan Urban Construction Investment Developing Co., Project headquarter and the project adjustment principles of each district and county (street office) will gather the records of residents, enterprises and institutions resettlement implementation information, and transmit live activity records to province and city project office, so as to retain a continuously monitoring on implementation. Province and city project office will periodically check the implementation situation. In the above monitoring operation mechanism, stipulated information forms shall be made to achieve information transmission from relevant project office to city and province project office. As the important components of internal monitoring system, the province 10-1

174 Resetlement Acmon Plan for Comdor Component (Xiangtan Urban Secton) government, city government, project office, project headquarters will periodically check the implementation status. The internal monitoring organization and external monitoring unit will work together to follow-up the currency allocation families. Each project ofrice shall record the concrete contact ways of the currency allocation families and make it accurate during the implementation process. Carry out follow-up investigation to fulfill resettlement work after the currency allocation Monitoring Index 1) Livelihood Resettlement Livelihood resettlement monitoring index will mainly include: time and progress of resettlement physical relocation; disbursement and usage of resettlement house compensation fee; building area, site, progress and quality of house building; family income level, income source, family possessions and livelihood quality before and after resektlement physical relocation; restoration, progress and quality of water, electricity, road, post and telecommunication, television broadcasting infrastructure after resettlement; type, site,land occupation area, site leveling condition and progress of residents concentrate to build towns; employment and enrollment of resettlement, etc. 2) Production resettlement Production resettlement monitoring index will mainly include: amount, acquisition time and progress of land acquisition; disbursement and usage of land compensation fee; transform status of resettlement production ways; amount and reply and plough status of temporary land use; progress and quality of resettlement production infrastructure and special facilities reconstruction; training and its effect of resettlement production technique. 3) Others Other monitoring index mainly include: progress of resettlement implement, fulfillment status of fund, status of contract implementation and financial affairs; signing status of 10-2

175 Resettlement Action Plan for Comridor Component (Xiangtan Urban Section) resettlement physical relocation contracts; restoration status of vulnerable groups; preparation status of host site; arrangement of transition period resettlement organization; social security measure of resettlement medical treatment, hygiene etc.; organize, training, working time and efficiency etc. of resettlement organization. 4) Public participation and consultation Public participation and consultation monitoring index mainly include: time, way, frequency, content, extent and effect of resettlement and host site residents participate in consultation; proportion and its effect etc. of women and vulnerable group in public participate implement. 5) Appeal Appealed monitoring index mainly include: Channel and procedure of appeal; various problems, dispute and its solve result etc. appear in the resettlement implement process Internal Monitoring Report I Project office will perform one internal monitoring report each month for province and city project offices. Province and city project offices will submit acquisition and relocation status report to the World Bank each quarter, and internal monitoring report to the World Bank each half year. (1). Narratives on the issues in the Report (2). Important reasons affecting progress (3). Improving measures in the next quarter (4). Schedule for the next quarter A. Land acquisition (mu) B. Resident relocation (m 2 ) C. Nonresident relocation (m 2 ) 10-3

176 Resetflement Acfion Plan for Comdor Component (Xiangtan Urban Section) D. Compensation (104 yuan) 10.2 External Monitoring Evaluation Purpose and tasks External monitoring evaluation mainly periodically perform monitoring and evaluation of land acquisition and relocation from the outside of resettlement organization, and evaluate the achievement of resettlement target. Through external monitoring and evaluation work, propose evaluation observations and suggestions on resettlement process and resettlement production living standard restoration conditions to provide the engineering management department a forecast system, provide resettlers a communication channel for comments. External monitoring organization will be the consultant for the employer, follow-up investigate and evaluate resettlement plan implement activities Principal Monitoring Index 1) Monitoring the Principal Index (1) Progress: Including preparation works of land acquisition, land acquisition and relocation implement, resettlement etc. (2) Quality: Including construction quality, resettlement satisfaction extent during land acquisition and relocation implement process. (3) Investment: Including disbursement and usage status of fund. 2) Principal index of Evaluation (1) Production and Livelihood Status of Resettlement A. Economic Status: family economic development status before and after resettlement, include possession status of family means of production, means of livelihood, assets and income. 10-4

177 Resettlement Action Plan for Comidor Component (Xiangtan Urban Section) B. Environment Status: Inhabitant environment before and after resettlement, include public facilities development change status of transportation, education, hygiene, commercial service etc. culture and C. Employment status: profession changes after and before resettlement, employment rate, status of offering help to different target especially the poor households and minority ethnic group families. D. Community Development: Local community economy, environment development, interpersonal relationships, public opinion status after well resettlement. (2) Infrastructure Changing status of project affect area before and after infrastructure implement. (3) Individual business households and private shops Operation environment and operation situation change statis of individual business households and private shops before and after resettlement Monitoring Evaluation Methods Monitoring and evaluation activities are carried out based on the investigation data provide by investigation design organization and resettlement implementing organization. The assessment work based on thorough investigation and understanding adopts the methodology combining sampling investigation with rapid assessment. Typical samples (resettlement household/ village) will be selected to establish corresponding assessment index system for different influence objects. Senior resettlement experts will be invited to determine the weight of each index by Delphi methodology referring to latest international and domestic research results about livelihood quality, the indexes are treated by means of no dimension. The investigation results will be analyzed and calculated and comparison of calculation results will be made for evaluation. Independent monitoring and evaluation organization will participate in the following activities: 10-5

178 Resetflement Action Plan for Comdor Component (Xiangtan Urban Section) (1) Resettlement Living Standard Investigation Carry out overall baseline investigation and collect baseline living standard data of selected sample (the sample originally come from random sample method) to the project. Each year I or 2 times of living standard investigation to evaluate production and living standard changes of the sample. Adopt periodically investigation, random interview and scene observing etc. to get the necessary relevant data. And perform statistical analysis based on this make out the evaluation. The living standard investigation table will be composed by various indexes to measure production and living standards. The dynamic change of an identical index before and after land acquisition and relocation will reflect the change in production living standard. Whether the index design can reflect the change in resettlement production and living standard will be checked in baseline investigation and be improved in line with conditions, to ensure the acquired information can truly reflect resettlement production and living standard quantity and quality. Resettlement sample scale: land acquisition and relocation resettlement: 5%, land acquisition affected village: 20% (2) Public Consultation Independent monitoring evaluation unit will participate in village and township (town) public consultation meeting, evaluate resettlement participate effects and cooperation status of resettlement participate in resettlement plans through participate the consultation meetings. (3) Resettlement Suggestion Independent monitoring evaluation unit will frequently visit township (street office), village resettlement organization to know about resettlement reflected suggestions, and interview resettlers with different opinions through formal or informal visit, in time to reflect the suggestion and requirement of affected population and propose suggestion for work improving to make the resettlement implement process more effective. 10-6

179 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) (4) Other Responsibilities External independent monitoring evaluation organization will supervise the following activities during the implement: A. Choices of resettlement site; B. House reconstruction; C. Production resettlement and restoration; D. Support to vulnerable groups; E. Resettlement of individual business households and private shops; F. Special facilities reconstruction; G. Disbursement and the amount of compensation fee; H. Resettlement physical relocation; I. Labor employment; J. Technical skill training; K. Schedule for the above aspects; L. Resettlement organization network construction; M. Collectively owned land compensation fee disburse and resettlement income status. N. Labor employment income growth status Working Procedures (1) Perform monitoring evaluate work outline; (2) Resettlement monitoring evaluate information software development; 10-7

180 Resefflement Acton Plan for Conmidor Component (Xiangtan Urban Sechon) (3) Perform investigation outline, investigation form, typical village and typical household registration cards; (4) Sample check scheme design; (5) Baseline investigation; (6) Establish monitoring evaluation information system; (7) Monitoring investigation: A. District social economic investigation; B. Resettlement implement organization monitoring; C. Typical village investigation; D. Typical household investigation; E. Typical investigation of other targets. (8) Arrange monitoring data and establish database; (9) Comparison analysis; (10)Perform one monitoring evaluation report each year. 10-8

181 Resettlement Action Plan for Coridor Component (Xiangtan Urban Section) 11. Cost Estimate 11.1 Cost Estimate Narrative Preparation Basis (1) The World Bank Involuntary Resettlement Implementation Operational Policy (OP/BP4. 12) (2) Land Administrative Law of PR. C, issued in 1999 (3) House Dismantling and Relocation Administrative Ordinance issued in 2001 (4) Implementation Method for the Land Administrative Law of PR.QC in Hunan province, issued in 2000 (5) Hunan Provincial Cultivated land Occupation Tax Implementation Method (Amendment) (6) Notice on Administrative Charging Items and Criteria of Provincial State-land Resources jointly issued by the Hunan Provincial Price Bureau and Hunan Provincial Finance Bureau, in document XJF No [2003] 42 (7) Notice on Forest Vegetation Restoration Cost Levy and Use Temporary Provisions jointly issued by the Ministry of Finance and the State Forestry Bureau in document NO. CZNo.[ (8) Xiangtan Land Acquisition and Relocation Compensation Method in document (XZF No.[2001]18) Resettlement Compensation Cost Summary In line with relevant national laws and regulations and relevant stipulations of the World Bank operational polices OP4.12 (see chapter 4), total investment of land acquisition and relocation compensation for Changsha, Zhuzhou, Xiangtan Flood Provide Landscape Corridor Component (Xiangtan Urban and Country Section) is *1 04 Yuan, including five items as following-resettlement compensation cost, special facilities compensation cost, other cost, basic contingency, relevant taxes etc, l l l

182 Resettfement Acton Plan for Corridor Component (Xiangtan Urban Sectfon) Land Acquisition and Relocation Compensation Cost Summary for FCLCC (Xiangtan Urban Section) Table Yuetang District unit: 10 yuan Kiangtan Item Dongping Jianshe ngiah Baota Shejianctu Bantang Dishui etang Iutan Total Road Orir^e Office Township Office Office) Twnship Ofice ownship Township 1. Resettlement compensation cost ; Special faclities compensation Others 4. Other costs 5. Basic contingency Total investment Financing :ounty Local supporting funds will be used in Land acquisition and relocation compensation required for the Project. According to the analysis and calculating of the <Feasibility Study Report>, totally 4.781*104Yuan are needed in this project and the capital is 20% of the total investment, that is *104 Yuan self-financed by Xiangtan Urban and Country Construction Investment Developing Co.. World Bank loans are of US $1530*1 04 which is equal to Renminbi 12699*1 04 Yuan with the interest rate of 5%. Other loans are domestic loans of *1 04 Yuan with the loan rate of 5.76% according to the loan rate above five years promulgated by Bank of China on Feb. 20, Cost Estimate of Itemized Investment Resettlement compensation cost Rural resettlement compensation cost includes such six items as the following--land acquisition compensation cost, houses and affiliated facilities compensation cost, infrastructure compensation cost, physical relocation compensation cost, temporary transition subsidy, enterprises and units' compensatory cost and others. 1) Land acquisition compensation cost The resettlement compensation cost of this project includes permanent land acquisition 11-2

183 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) compensation cost and temporary land acquisition compensation loan with totally *1 04 Yuan. Among them are permanent land acquisition compensation cost of *104Yuan and temporary land acquisition compensation loan 9.08*104Yuan. For more details, see table

184 Resettlement Action Plan for Corridor Component (Xiangtan Urban Section) I. Permanent land use Table Land Acquisition and Relocation Compensation Cost Assembly for the FCLCC(Xiangtan Urban Section) Compensation unit price Compensation cost (10 Item Unit 4 yuan) o. of Compensation yuan) Total mu I.State land mu State land remising fund mu A.1.1.Industrial land m Residential mu Young crop compensation mu Collective land u Agriculture mu Cultivated land mu Paddy field mu Vegetable land mu Dry land mu Water pond mu Fish pond mu Forest land u Tlimber mu

185 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) Table Land Acquisition and Relocation Compensation Cost Assembly for the FCLCC(Xiangtan Urban Section) Compensation unit price Compensation cost (10 Item Unit (10 yuno. of Compensation yuan) Water surface 2.2Construction land Site land Enterprises land Road land Public land 2.3 Unused land Grass land Waste land II. Temporary land lyoung crop compensation fee Timber forest Shrubbery mu mu u mu mu mu u u u u mu 7Y mu , Land loss compensation fee mu Timber forest Shrubbery 3. Redamation cost mu mu

186 Resettlement Action Plan for Comidor Component (xiangtan Utban Secton) 2) House and affilated facilities compensation cost It mainly includes residential house, non-residential house, and affiliated facilities compensation cost, with a total of *1 04 Yuan. For more detail, see table Tablel1.2-2 House and Appendixes Compensation Cost Assembly for the FCLCC (Xiangtan Urban Section unit: 10 yuan Compensation ompensation Item unit unit Compensation QrlCOSt(104yuan) price(yuan) Total I. House m Residence m Formal house m Brick & concrete m Brick and timber m Earth and wood m Sundry house m Brick & concrete m Brick and timber m Earth and wood m Wood structure m Non-residence m Enterprise Formal house Steel & concrete m Brick & concrete m Brick and timber Earth and wood Sundry house rick & concrete

187 Resettlement Action Plan for Comidor Component (Xiangtan Urban Section) Tablell.2-2 House and Appendixes Compensation Cost Assembly for the FCLCC (Xiangtan Urban Section unit: 10 4 Item unit Compensation ompensation unit Compensation Qr CoSt(1o 4 yuan) price(yuan) Brick and timber m I.Appendix building Sunning ground m Cement m Tabia m Bounding wall m Iron made m Brick made m Protective bank m Mortar masonry m Concrete m Dry masonry m Brick laying m Well No Earth well No Pressure well No Water tank No Water basin No Manure pit No Firedamp basin No yuan 3) Infrastructure compensation cost It mainly includes land leveling, water supply, lighting, road etc. The infrastructure compensation entails a total investment of 102.3*104 Yuan. For more detail, see table

188 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) Tablell.2-31nfrastructure Compensation cost Assembly for the FCLCC(Xiangtan Urban Section) Unit: 104Yuan Item Unit Compensation rate (Yuan) Qty. Amount(10 4 Yuan) Total HH Ground leveling HH Portable water and lighting HH ) Relocation compensation cost and temporary transition subsidy Relocation compensation cost for the Project is calculated on the basis of 380 Yuan per family, and temporary transition subsidy 600 Yuan per family. 341 households with 1107 persons need to be relocated and compensation cost is 43.69*1 04 Yuan. 5) Enterprises and units compensation cost Enterprises and units compensation cost in this project includes relocation compensation cost and shutout losing cost of the enterprises and units. House and Land acquisition compensation costs are counted in non-residential and construction land compensation cost. The relocation compensatory cost of province super flood control reserve material Muhu Lake reserve spot is 20*1 04 Yuan; that of city construction research bureau is 3*1 04 Yuan; that of sand yards in every villages are Yuan/yard and that of other enterprises are 15 Yuan per m 2 according to the building area of the relocated houses. The shutout losing compensatory cost of city construction research bureau is 15*104 Yuan; that of city salt industry storage and water supple and sales organization is 3*1 04 Yuan. The sand yards of every village have not enough reconstruction condition after the project, so the shutout losing compensatory cost of them are not considered. All above are totally 75.73*1 04 Yuan. 6) Other compensation cost It includes scatter trees compensation. The Project entails 4.88 mu fruit trees to be cut down, including matured trees 2.38 mu, 2.5 mu young trees; 606 trees of other kind of trees to be cut down and 1 tombs to be relocated. Based on the compensation criteria in chapter 4, other compensation costs are of 9.76*1 04 Yuan. 11-8

189 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) Special Facilities Compensation Cost Reconstruction compensation cost for road, power transmission line, telecommunication line, cable TV lines and canals are included in this project. Since relevant dedicated departments have not proposed relocation planning in detail for special facilities affected by the Project, cost is presently estimated base on actual quantities affected and unit price. According to compensation criteria in chapter 4. The special facilities compensation cost is 99.4*104 Yuan. For more details, see table 11.24, Tablell.2-4 Special Facilities Compensation Cost Assembly for FCLCC (Xiangtan Urban Section) Unit: 104 yuan Item Unit Compensation rate Qty. Amount(1O' yuan) Total _ Road rebuilding Cement road m Simple highway km Tractor road m Transmission line rebuilding ).High-voltage km ). Low-voltage km Telecommunication line rebuilding km Cable TV line km Canal km Other Compensation Cost It includes investigation and design cost, implementation management cost, technical training cost, monitoring and evaluating cost, with a total of *104 Yuan. 1) Investigation and design cost: It used for field investigation of design department and investigation organization and preparation for resettlement action planning during project preparation. Based on 2.5% of the cost sum of items , it entails a cost of *104 Yuan. 2) Implementation management cost: 11-9

190 ResefflementAction Plan for Comdor Component (Xiangtan Urban Section) It used as management cost for resettlement implementation organization that is responsible for land acquisition and relocation. Based on 3% of the cost of item and 1% of the cost of item , it entails a cost of *104 Yuan. 3) Technical training cost: It used as technical training for resettlers and operational training for resettlement cadres. Based on 0.5% of the cost of item , it entails a cost of 31.3*104 Yuan. 4) Monitoring and evaluation cost It used for external monitoring and evaluation organization to perform its activities. Based on 1% of the cost sum of items , Basic Contingency cost it entails a cost of 62.59*1 04 Yuan. It used for various unexpected matter. Based on 10% of the cost sum of items , it entails a cost of *104 Yuan Relevant Taxes Relevant taxes include three items---calculated land occupation tax, calculated land reclamation cost and forest vegetation restoration cost, totally *1 04 Yuan. 1) Cultivated land occupation tax In line with relevant stipulations of Cultivated Land Occupation Tax Implementing Method in Hunan Province (Amendment) 'The unit and individual that occupied state-owned land and collectively-owned land as following to build houses and dealing with other nonagricultural construction should render cultivated land occupation tax on basis of the Method. (1) Paddy field and dry land used for planting crops, including matured land, newly-developed waste land of the year, interval land and land planted within 3 years before land acquisition (2) The land mainly used for planting crops and accessorily planting mulberry, tea-oil trees, fruits trees and other trees and dyke utilization lake field (3) Fish pond, lotus root pond, vegetable land, orchard (including seedling beds, 11-10

191 Resettlement Action Plan for Cormidor Component (Xiangtan Urban Section) flower beds, pharmacy beds, tea garden, mulberry garden and other economic plants garden) The land acquisition for the Project should be rendered cultivated land occupation tax. Such as paddy field, dry land, vegetable land, fishpond, with a total of mu ( m 2 ), of which the calculated lands are mu. In line with relevant stipulations in Cultivated Land Occupation Tax Implementing Method (amendment) Hunan Province, Cultivated land occupation tax standard mainly base on Per capita cultivated land, and determined by with reference to natural conditions and economic development in various district. For Per capita cultivated land, a county (including county-level city) is a unit. Cultivated land occupation tax is calculated on the basis of total population and total cultivated land stat by local statistic department".tax standard in details as following: (2) Per capita cultivated between 0.5 mu and 1 mu (including 1mu), cultivated land occupation tax is levied upon 4-8 yuan/m2. i (4) Occupation of professional vegetable land in suburb, fine fish pond used for building houses or dealing with nonagricultural construction, cultivated land occupation tax is levied upon 10 yuan/m2. In project zone, 0.55 mu per capita cultivated land (district or county as a unit) as main basis, cultivated land occupation tax is levied upon 4 yuan/m *1 04 yuan cultivated land occupation tax should be rendered. 2) Cultivated land reclamation cost In line with relevant stipulations of Notice on Administrative Charging Items and Criteria of Provincial State-land Resources jointly issued by Hunan Provincial Price Bureau and Hunan Provincial Finance Bureau, in document XJF No [2003] 42 Article 5 in the appendix: cultivated land reclamation cost: Grade 1 region (Changsha city, Zhuzhou city, Xiangtan city, Hengyang city, Yueyang city, Changde city) yuan/mu for paddy field, and 8000 yuan/mu for dry land. Common vegetable land is performed according to paddy field criterion. Il-Il

192 Resettement Action Plan for Comdor Component (Xiangtan Urban Section) *104 Yuan cultivated land reclamation cost will be rendered. 3) Forest Vegetation Restoration Cost In line with relevant stipulation of Notice on Forest Vegetation Restoration Cost Levy and Use Temporary Provisions jointly issued by the Ministry of Finance and the State Forestry Bureau in document NO. CZNo.[2002]73 Article 4: investigation, mineral-exploiting, and various construction project such as road, hydro, power, telecommunications which need to occupy, relocate or occupy forestland temporarily, checked or approved by forestry administrative department up county-level, land-use units should render forest vegetation restoration cost to county forestry administrative department up county-level. Article 6: levy standard of forestry vegetation restoration levied upon not less than the cost spending on investigation, planning, design, and wood cultivating for forestland area occupied or relocated. (1) Timberland, economic forestland, charcoal forestland, seedling beds land, tax standard of forestry vegetation restoration levied upon 6 yuan/m 2 I Forestland in city and its planning district is doubled as above. In case farmers occupied forestland to build up house as required, forest vegetation restoration cost will not be rendered during 1 0 th "Five-year" plan. Forest vegetable restoration cost of 11.07*1 04 yuan has to be rendered for the relocated timber forest of m Fund Use After resettlement compensation funds approved, Xiangtan Urban Construction Investment Developing Co. disburse the funds to project headquarters, which will disburse the funds in batch as per construction project (1) Land acquisition and resettlement compensation cost were directly disbursed to local village governments to manage uniformly and local village government will take responsibility to carry out production resettlement in various village. Project headquarters will check the situation of fund use periodically. (2) Compensation cost for resettlers' houses and its affiliated buildings and relocation subsidy disbursed to the resettlers' hands directly 11-12

193 Resettlement Action Plan for Conidor Component (Xiangtan Urban Section) (3) Compensation cost for public and infrastructure will be disbursed to contract construction units in batch by headquarters as per contract (4) Special facilities and enterprise unit compensation cost will be disbursed to original relevant departments and enterprises units affected. (5) As resettlement need to build up housed uniformly, to ensure sufficient funds to set up new house successfully, under fully respect resettlers' willingness and getting their signs for sure, headquarters manages compensation cost for house and its affiliated building uniformly. After the construction of new house, funds should be in line with the progress and the house price selected by resettlers. 11.4Balance of Land Compensation Fee and Production Resettlement Investment In line with relevant resettlement regulations The land compensation fee and resettlement subsidy will be used for restoration and production development, for employment of surplus labor resulting from land occupation and subsidy to non-employment personnel by the units whose land is acquired. The land compensation fee and resettlement subsidy can allocated to the county (city) government in a lump sum contract and used for land development and resettlement production and livelihood resettlement by county (city) government. The fund can only used for this specific purpose. Neither other utilization of the fund nor illegal private possession of the fund will be allowed. If land compensation fee and resettlement subsidy Fee cannot meet the requirements of production resettlement, the resettlement subsidy fee can be properly increased according to actual conditions. Therefore, land compensation fee and resettlement subsidy fee is the only source of fund for production resettlement, must be equal or slightly larger than total production resettlement investment. As the project zone near suburb, per capita cultivated land is only 0.55mu/person in the past. Per capita cultivated land is 0.41 mu/person in groups involved before land acquisition and 0.33mu/person after land acquisition, so land resource is limited. It should make full use of existing land resource and reduce the land acquisition influence for local agriculture It is planned to use compensation cost to develop low productivity field in project zone with reference to unit price criteria of same type engineering in province. It should increase investment for low productivity development as 1750 yean per mu, measures including hydro facilities and soil improvement. According to investigation, there are low productivity field (35%) in various villages. It is planned to renovate 11-13

194 ResettlementAction Plan for Comdor Component (Xiangtan Urban Section) calculated land mu with investment of 51.68*104yuan. According to production resettlement plan, 80.07mu cultivated land will be adjusted, and an investment of *104 Yuan will be required as per compensation unit price. The resettlement by means of second and third industry requires timely disbursement of subsidy with *1 04 Yuan. Fund for above production development totals *1 04 Yuan. In project zone, land acquisition compensation and resettlement subsidy totals *104 Yuan, which is *104 Yuan more than the production resettlement investment for agricultural population and higher than production resettlement. It indicates that land compensation criteria can satisfy the fund demand for production resettlement. The rest fund is used uniformly for follow-up development in various villages, for developing village enterprise and land resources and for other project investment input, to ensure the living standard of resettlers reach or surpass the standard as before. The land compensation fee and production resettlement Investment Balance Analysis is given in tables Tablell.4-2 Land Compensation and Production Resettlement Investment Balance Analysis Unit Amount Item Sub-item Sub-item, Unil price Qty. (1 O0 (yuan) yuan) 1. Production development investment Low-yield improvement mu and increasing investment 2. Readjust land within villages and groups Paddy field mu Vegetable iand mu Second and Third Per industry Resettlement 2. Land Compensation Item 2-iteml _

195 Resettlement Action Plan for Comdor Component (Xiangtan Urban Section) 11.5 Fund Management and Auditing The resettlement departments will submit a relocation budget according to yearly relocation schedule and yearly fund plan to the World Bank Office. After approval, the World Bank Office will allocate various funds. During fund use of resettlement department, national and Xiangtan City fund management and auditing regulations shall be strictly followed. The fund operation shall be checked and approved step by step, i.e., checked by chief of resettlement department - checked by chief of the World Bank Office -checked by chief from financial division of the World Bank Office. The financial division will, in line with checked budget and direction of the chief and after make sure the application meet the standards of the report and no errors existed, disburse fund to resettlement departments. The World Bank Office will perform mid-project auditing for resettlement fund use and adjust the budgets according to actual condition

196 i I i J i i i i I i

197 Resefflement Action Plan for Conidor Component (Xiangtan Urban Section) 12.Resettlement Implementation Scheduling The resettlement implementation schedule development shall be based on such factors as the engineering construction content of the project, work quantities, construction period and resettlement objects, resettlement mode, etc Principles for Scheduling The land acquisition and resettlement implementation schedule development will be based on engineering construction schedule and the concrete schedule will follow the following principles: 1) For the resettlement objects are rural resettlers, the implementation scheduling shall properly consider agriculture production traits and land acquisition and house relocation shall be arranged in non-planting period as much as possible to minimize the impact on agriculture production. 2) Notice will be given to enterprises at least 4 months bpfore relocation. For the enterprises that need to be rebuilt, the project office should assist the enterprises to transact land use procedure. For the enterprises having no condition of reconstruction, resettlement subsidy shall be granted timely 3) The resettlement house relocation will be performed in stages, but it shall be finished before commencement of each engineering package. 4) The compensate funds should sent before relocation in five days generally. 5) Notice will be given to resettlers at least 3 months before relocation, and at least 2 months for house reconstruction will be considered between the notice date to house relocation deadline, the affected people can stay in their existing house before completion of their new houses. 6) The house construction time will be scheduled based on engineering implementation progress, it can be proper lengthened if necessary 7) Land acquisition and relocation should be completed before starting construction 8) Land adjustment and land distribution should be completed at non-planting period. 9) Labor resettlement should be completed before land acquisition 12-1

198 Resettlement Action Plan for Cormidor Component (Xiangtan Urban Section) 10) The reconstruction of various special equipments should be completed before starting construction and relocation 11) Construction of public, infrastructure facilities will be completed at least 20 days before resettlement house construction, to minimize the impact on resettles' living 12) The resettlement training will make use of non-planting period and performed in five times with 3 days each, arranged in 1/3,1/2 of agriculture production resettlement and losing-up stages 12.2 Schedule Resettlement Implementation Schedule Based on the project master construction schedule, schedule is defined. More details are given in resettlement implementation Yearly Fund Use Plan 1) Disbursement principles (1) All the funds relatqd to land acquisition will be included in total estimated cost of the Project. Land acquisition and relocation compensation funds and others will be directly disburdened to related units, villages and individuals by Zhaoshan Flood Control Landscape Road Project Headquarter(companies). (2) Land acquisitions funds are disbursed to various administrative villages through bank by the project headquarters (companies). Each administrative village will use the funds for restoration of villager teams affected by the Project or taking on resettlement in principle. (3) The resettlement house compensation funds will be disbursed to resettlers by project headquarters (companies) before house reconstruction; for example, house compensation funds will be paid in periodic to resettlers. The last funds should be disbursed before house construction close-up. (4) Land compensation funds will be disbursed 2 months before land acquisition (5) In order that land acquisition and relocation resettlement can be carried out smoothly, financial organizations and supervision organizations will be established to ensure all funds be disbursed in time. 12-2

199 0 an im 00 Ortolre S- 00 Otober 3O QO Q5 34 _Q6..3O 4O,,-..,r,..ry 0 rc 06 2M D v-v~~~~~~~~~~ I a 79T'tE o A N.h I 2320 I IEt 2004 A.groor SFptb-t IftE 2004 Fe.bror N.tobh ti03 IftU 2003 F,.br.r Fewbr-r 31 IS 6 1I 0 IfVB 2004 N-.ro Ns... W I-IfVH 2004 N.,-bh N.-rb. 23 is p f IIr 2004 a.ro Nov.bor 40 fvh 2004 Ntorh N.t.y mi ~~~~45 ITWH 2004 F.br 2..y N..y is007 3 ifte 2004 F.bry h F.bry 25 ' 3 20I 45 If~ E 2004 Fbrtry N.r TOR 2054 F.brry F.bry m ~~~ Octe Octobe 37 -IftE s y T 2004 N.r N.-rber T JIfH Nort A,yc ItV Jrr Mye s to l5fr unh 25 20D4J.ey t TfVFi 2004 Nueh Ooty r26 27 HH Xtf E ,be Mye.,e Il F 2003 Setd.br Oac.ber uni93 0 ItvE 2004 J-ly D-c,.br TfV F 2004 Setbrh Aec.C,et Xfr E 2004 Apr Aprilr HR Iftf 2004 Apri Aprly TOf 2004 Apri April 142I t 2004 Aprilb Ap.bri 23 2 H ft E 2004 A-ptri Ap-bl ft I*V 2004 Nor1y NA... t 26 U 2 er0 s 0 go Tf Np.rh Aogoot April April IftEl 2004 April April m f 2004 April April IfVE 200 kkry A.g.iot 6 42 p.r TIfVH 2004 April N.y pe ITft 2004 April 2004 N.yi 52 3.r IfV 2004 April April porsoc fv E 2004 April April pruo If6 H 2004 joy Aug..t e IfFH 2004 Apri3l 2004 oyl --. C..) A 45 pr TfrEl 2004 April April a T ft 2004 April N.y km Ifv l 2004 April April km f* 2004 April M.y P,2004 m mu * ~~~~~~~~~~~~~ ooorf... tiaou

200 Table Resettlemient Schedule for FCLRP (Xiangtan Urban Section) 606Iq alt mg emfflooro Ct7mm 'WI Q Q05'O 2Q It U 0 10 II I 0 10 II I I S I Si km IEftIH 2004 April I April 9 T S2 ~~~~~~455 IftU Septembe J..e 17 Ss tim Tf#El2003 S.ptmb.r Febrory It 1 SI time 2 5Tft E 2004 J.n Juno Ss i-/peir TfWE 20D4 March Sepoembr43 82/t-/y.r Tit F 2004 F.bruary Septembr 61 TO ~~~~~20 TfF 2007 Joomry Jmoo.ry 20 CD,

201 ResettlementAction Plan for Comdor Component (Xiangtan Urban Section) 2) The organizations responsible for resettlement finance (1) The organizations that are responsible for rural land acquisition compensation funds are dedicated financial organizations of counties (districts) resettlers management department, land administrative bureau, and townships and village committees. (2) The organizations that are responsible for house relocation and various special facilities compensation funds are dedicated finance organization of project headquarter (company). (3) Resettlement funds adapt the mechanism of disbursement from upper to lower step by step. All organizations will perform and follow finance and auditing system, check and report fund-using and fund in-position situation, propose correction and remedy measures for accidental events to ensure funds be disbursed and used. (4) Resettlement funds use for special purposes. Holdback and appropriate for other uses not allowed by middle-organizations. More details on yearly investment plan for resettlement are shown in the following table: Yearly Resettlement Investment Plan for Resettlement Investment Yearly Investment (1 04 Yuan) Item (104Yuan) Year 2004 Year 2005 Year 2006 I Resettlement Compensation Land Acquisition Compensation III Special Facility Compensation IV Other Cost V Basic Contigency VI Related taxes Vll Total Investment

202 Attached Table 1 Resettlement Population Investigation Table for FCLRP (Xlangtan Urban Section) Basic Condition Per Capita Cultivated Production District Town Village Group Cultivated Cultivated Land Resettlement (Township) Population Land Land Occupation Population in (mu) (mu/person) (mu) (Person) Yuetang Baota Donghe Jiangbian Gaomao Mahao Beiting Yunpan Tangjia Sunjia Doumi Bantang Bantang Gongjia Wangzuo Yangque Hetang Dishui Xiaojia Hutang Wuxing Xinhua Yijia Shanshan Xinba Zhubu Sanjin

203 t!t: i i Ikjl 0..I It t I{g0g Ai O 0t-5! ts^ t2;jd1-7tisvg i :2C A S W1 = :! ppnoooooooepf! 0p(p II a 8 3 i - l---llllllllil1 {o-ts f L I X s e e e e oeo e e e o e o g?1 1l : 1 1 l l l i l l 0 o 0 I~~~~~~~~~~~~~~~~~~~~~ I I I I I I I I II I I II I I I I

204

205 I~~~~~~~~~~~~~~~~~~~~~ Sh0.4 is Wlt it 00 t i 1

206 I I i i ii I

207 I I~~~~ - II"---- -~- - I I I ~~~~~~~~-- - I g~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I

208 I i I i i i i I i

209 if M Sig E ::WM i TFI I I lllllllll I lllllooooooooooeoo ooooooo TL I7IIIY I ~~~~~~~~~~~~~~t IBt1 H I

210 ii I I I I i

211 : f Stit: -SiSf!5SfEW1if F4 f - h's:.d'i,;.;,i.... :.. : : :;f:ffe... -,-, - I It~~~~~~~~~~~~~~~~~~~~~~~~~~ 3 } 3 1. I ja I I a I I I 9 I I I a a I a

212

213 L ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~ I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~T

FILE COPY. Resettlement Action Plan. RP211 Volume 5. World Bank Loan Hunan Urban Development Project. Corridor Component (Zhaoshan Section)

FILE COPY. Resettlement Action Plan. RP211 Volume 5. World Bank Loan Hunan Urban Development Project. Corridor Component (Zhaoshan Section) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I World Bank Loan Hunan Urban Development Project Corridor Component (Zhaoshan Section)

More information

F i. Resettlement Action Plan RP21I1. World Bank Loan Hunan Urban Development Project. Corridor Component. Mar (Changsha Section)

F i. Resettlement Action Plan RP21I1. World Bank Loan Hunan Urban Development Project. Corridor Component. Mar (Changsha Section) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP21I1 Volume 4 World Bank Loan Hunan Urban Development Project Corridor Component (Changsha

More information

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction.

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction. Regulations on Residents-Resettlement for the Yangtze River Three Gorges Project Construction (Adopted at the 35th Executive Meeting of the State Council on February 15, 2001, promulgated by Decree No.

More information

People s Republic of China: Hunan Flood Management Sector Project, Hunan Province, Chenxi County

People s Republic of China: Hunan Flood Management Sector Project, Hunan Province, Chenxi County Resettlement Planning Document Resettlement Plan Document Stage: Final Project Number: 37641 August 2005 People s Republic of China: Hunan Flood Management Sector Project, Hunan Province, Chenxi County

More information

The External Resettlement Monitoring & Assessment Report

The External Resettlement Monitoring & Assessment Report The Urban Flood Control Project in the Mountainous Area in Hunan Province Loaned by the Asian Development Bank The External Resettlement Monitoring & Assessment Report (Lengshuijiang, Lianyuan, Shuangfeng,

More information

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans GSDS Certificate Grade A No.180105-sj GSDK Certificate Grade A No.180105-kj GZ Certificate Grade A No. 1032523001 S B Z Certificate Grade A No. 0 2 7 Hunan Province Youxian County Urban Flood Control Project

More information

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans GSDS Certificate Grade A No.180105-sj GSDK Certificate Grade A No.180105-kj GZ Certificate Grade A No. 1032523001 S B Z Certificate Grade A No. 0 2 7 Hunan Province Shimen County Urban Flood Control Project

More information

Public Transport Sub-project of Urban Comprehensive Transport Improvement Project in Xi an the south of urban bus hub terminal

Public Transport Sub-project of Urban Comprehensive Transport Improvement Project in Xi an the south of urban bus hub terminal Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Transport Sub-project of Urban Comprehensive Transport Improvement Project in

More information

The External Resettlement Monitoring and Evaluation Report of ADB-funded Hunan Flood Management Sector Project

The External Resettlement Monitoring and Evaluation Report of ADB-funded Hunan Flood Management Sector Project The Loan No.: 2244-PRC The External Resettlement Monitoring and Evaluation Report of ADB-funded Hunan Flood Management Sector Project No.3 Report Changsha Xinghuan Water & Electricity Engineering Technology

More information

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF)

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) World Bank-financed Project World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension

PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension Resettlement Due Diligence Report Project Number: 42010 October 2014 PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension Prepared by Chongzuo

More information

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION Table of Content Volume 4 Chapter 1: Project Description 1 PROJECT DESCRIPTION...1 1.1 THE NT2 PROJECT...1 1.2 THE NEED FOR RESETTLEMENT AND DEVELOPMENT...1 1.3 THE

More information

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RPF of Additional Financing for Fujian Highway Sector Investment Project Contents RP1032

More information

EBRD Performance Requirement 5

EBRD Performance Requirement 5 EBRD Performance Requirement 5 Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or loss of

More information

Shanxi Small Cities and Towns Development Demonstration Sector Project

Shanxi Small Cities and Towns Development Demonstration Sector Project Involuntary Resettlement Due Diligence Report Project Number: 42383 September, 2012 Shanxi Small Cities and Towns Development Demonstration Sector Project Qingxu: Urban Surface Water Improvement Subproject

More information

201X No. TRANSPORT AND WORKS, ENGLAND. The Network Rail (Suffolk Level Crossing Reduction) Order CONTENTS TRANSPORT ENGLAND PART 1 PRELIMINARY

201X No. TRANSPORT AND WORKS, ENGLAND. The Network Rail (Suffolk Level Crossing Reduction) Order CONTENTS TRANSPORT ENGLAND PART 1 PRELIMINARY 24.05.18 S T A T U T O R Y I N S T R U M E N T S 201X No. TRANSPORT AND WORKS, ENGLAND TRANSPORT ENGLAND The Network Rail (Suffolk Level Crossing Reduction) Order Made - - - - *** Coming into force - -

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized The World Bank SFG3873 REV Public Disclosure Authorized Hezhou Urban Water Infrastructure and Environment Improvement Project Public Disclosure Authorized Resettlement Policy

More information

201X No. TRANSPORT AND WORKS, ENGLAND. The Network Rail (Cambridgeshire Level Crossing Reduction) Order 201X

201X No. TRANSPORT AND WORKS, ENGLAND. The Network Rail (Cambridgeshire Level Crossing Reduction) Order 201X STATUTORY INSTRUMENTS 201X No. TRANSPORT AND WORKS, ENGLAND TRANSPORT ENGLAND The Network Rail ( Level Crossing Reduction) Order 201X Made - - - - *** Coming into force - - *** 1. Citation and commencement

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

Speech on East Asia Conference

Speech on East Asia Conference Speech on East Asia Conference FENG, Subao Director, Center for International Strategic Studies, CDI I will mainly talk about the relationship of the economy of South China respectively with that of China

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

Key Words: Song Hinh Multipurpose Project, Resettlement, Project Management Board

Key Words: Song Hinh Multipurpose Project, Resettlement, Project Management Board IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 07-02: Resettlement Song Hinh Multipurpose Project, Vietnam Key Issues:

More information

CHAPTER 3. Building Code

CHAPTER 3. Building Code CHAPTER 3 Building Code ADOPTION OF BUILDING CODE 3.005 Definitions 3.010 Adoption of the State Building Code as the Lincoln County Building Code 3.012 Additional Specific Adoption of the State Electrical

More information

PRC: Hunan Roads Development III Project Huayuan-Fenghuang Local Road Component

PRC: Hunan Roads Development III Project Huayuan-Fenghuang Local Road Component Resettlement Planning Document Resettlement Plan Document Stage: Final Project Number: 37494 May 2009 PRC: Hunan Roads Development III Project Huayuan-Fenghuang Local Road Component Prepared by Huayuan

More information

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II Social Safeguards Monitoring Report Full Report November 2018 CAM: Rural Roads Improvement Project II Prepared by the Ministry of Rural Development for the Kingdom of Cambodia and the Asian Development

More information

DISTRICT OF LAKE COUNTRY BYLAW 628, CONSOLIDATED VERSION (Includes amendment as of July 18, 2017)

DISTRICT OF LAKE COUNTRY BYLAW 628, CONSOLIDATED VERSION (Includes amendment as of July 18, 2017) DISTRICT OF LAKE COUNTRY BYLAW 628, 2007 CONSOLIDATED VERSION (Includes amendment as of July 18, 2017) This is a consolidated copy to be used for convenience only. Users are asked to refer to the Highway

More information

CITY OF TORONTO. BY-LAW No (OMB)

CITY OF TORONTO. BY-LAW No (OMB) CITY OF TORONTO BY-LAW No. 398-2000(OMB) To amend By-law No. 438-86, the General Zoning By-law, as amended, respecting lands generally bounded by Yonge Street, Shaftesbury Avenue, Price Street and Park

More information

ARTICLE 4 APPLICATION REVIEW PROCEDURES AND APPROVAL CRITERIA 3

ARTICLE 4 APPLICATION REVIEW PROCEDURES AND APPROVAL CRITERIA 3 ARTICLE 4 APPLICATION REVIEW PROCEDURES AND APPROVAL CRITERIA 3 Chapter 4.1 General Review Procedures 4 4.1.010 Purpose and Applicability Error! Bookmark not defined. 4.1.020 Zoning Checklist 6 4.1.030

More information

Prepared by Guangxi Baise Development and Investment Group Co., Ltd. with the assistance of Beijing Enrimu Science & Technology Consulting Co., Ltd.

Prepared by Guangxi Baise Development and Investment Group Co., Ltd. with the assistance of Beijing Enrimu Science & Technology Consulting Co., Ltd. Resettlement Planning Document Updated Resettlement Plan Document Stage: Final Project Number: 42010 March 2012 People's Republic of China: Guangxi Southwestern Cities Development Project Baise City Urban

More information

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TRANSPORT NOTES TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP THE WORLD BANK,

More information

CITY OF KINGSTON. Ontario. By-Law Number A By-Law To Regulate Fences. By-Law Number: Date Passed: September 9, 2014

CITY OF KINGSTON. Ontario. By-Law Number A By-Law To Regulate Fences. By-Law Number: Date Passed: September 9, 2014 CITY OF KINGSTON Ontario By-Law Number 2003-405 A By-Law To Regulate Fences Passed: November 4, 2003 As Amended By By-Law Number: By-Law Number: Date Passed: 2014-140 September 9, 2014 (Office Consolidation)

More information

Public Water Supply and Sewerage Act

Public Water Supply and Sewerage Act Issuer: Riigikogu Type: act In force from: 01.01.2015 In force until: 30.06.2017 Translation published: 05.02.2015 Amended by the following acts Passed 10.02.1999 RT I 1999, 25, 363 Entry into force 22.03.1999

More information

SOIL REMOVAL AND DEPOSITION BYLAW

SOIL REMOVAL AND DEPOSITION BYLAW City of Vernon SOIL REMOVAL AND DEPOSITION BYLAW #5259 BYLAW NO. THE CORPORATION OF THE CITY OF VERNON ADOPTION BYLAW NUMBER 5259 AMENDMENTS AMENDMENT 5670 February 26, 2018 Regulatory Updates as follows:

More information

Resettlement in Action

Resettlement in Action Resettlement in Action An Eyewitness Report from the Middle Route of China s South-North Water Transfer Project Executive Summary Prepared for International Rivers August 25, 2010 This report studies the

More information

STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT. Whereas, I (we),, hereinafter termed the

STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT. Whereas, I (we),, hereinafter termed the STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT Whereas, I (we) (Name of Applicant) (Mailing Address),, hereinafter termed the (City) (State) Applicant, request permission and authority

More information

2. PLAN ADMINISTRATION

2. PLAN ADMINISTRATION 2. PLAN ADMINISTRATION 2.1 SECTION INTRODUCTION 2.1.1 This section gives an overview of District Plan administration. It discusses the sections of the Act that directly relate to the planning and resource

More information

DISTRICT OF LAKE COUNTRY BYLAW DEVELOPMENT APPLICATION PROCEDURES BYLAW CONSOLIDATED VERSION

DISTRICT OF LAKE COUNTRY BYLAW DEVELOPMENT APPLICATION PROCEDURES BYLAW CONSOLIDATED VERSION DISTRICT OF LAKE COUNTRY BYLAW 99-240 DEVELOPMENT APPLICATION PROCEDURES BYLAW CONSOLIDATED VERSION (Includes amendments as of July 4, 2017) This is a consolidated copy to be used for convenience only.

More information

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 07-01: Resettlement - Chiew Larn Multipurpose Project, Thailand Key

More information

O2-CD Zoning. B1-CD Zoning. O2-CD Zoning. RZ-1: Technical Data Sheet CHARLOTTE ETJ LIMITS 75' CLASS C RIGHT-IN / RIGHT-OUT, LEFT IN ACCESS POINT

O2-CD Zoning. B1-CD Zoning. O2-CD Zoning. RZ-1: Technical Data Sheet CHARLOTTE ETJ LIMITS 75' CLASS C RIGHT-IN / RIGHT-OUT, LEFT IN ACCESS POINT SITE PROPERTY LINE VICINITY MAP --Proposed Uses: On the portion of the Site zoned O-2(CD): a health institution (hospital), medical and general offices, and medical, dental and optical laboratory uses

More information

6.1 Planned Unit Development District

6.1 Planned Unit Development District 6.1 A. Intent The Planned Unit Development (PUD) District is designed to: encourage creativity and innovation in the design of developments; provide for more efficient use of land including the reduction

More information

Development Consent Order (as Made)

Development Consent Order (as Made) Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Development Consent Order (as Made) Folder 266 12 September 2014 S T A T

More information

THE CORPORATION OF THE CITY OF CLARENCE-ROCKLAND BY-LAW NUMBER BEING A BY-LAW TO REGULATE HEIGHT AND DESCRIPTION OF LAWFUL FENCES

THE CORPORATION OF THE CITY OF CLARENCE-ROCKLAND BY-LAW NUMBER BEING A BY-LAW TO REGULATE HEIGHT AND DESCRIPTION OF LAWFUL FENCES THE CORPORATION OF THE CITY OF CLARENCE-ROCKLAND BY-LAW NUMBER 2002-09 BEING A BY-LAW TO REGULATE HEIGHT AND DESCRIPTION OF LAWFUL FENCES WHEREAS paragraphs 25, 26, 27 and 28 of Section 210 of the Municipal

More information

EX-ante Evaluation. 1. Name of the Project. 2. Background and Necessity of the Project. Japanese ODA Loan

EX-ante Evaluation. 1. Name of the Project. 2. Background and Necessity of the Project. Japanese ODA Loan Japanese ODA Loan EX-ante Evaluation 1. Name of the Project Country: Republic of El Salvador Project: San Miguel Bypass Construction Project Loan Agreement: August 20, 2014 Loan Amount: 125.95 million

More information

EVALUATION AND COMPARISON OF POST-DISASTER HOUSING IN TURKEY; LESSONS FROM IKITELLI AND SENIRKENT

EVALUATION AND COMPARISON OF POST-DISASTER HOUSING IN TURKEY; LESSONS FROM IKITELLI AND SENIRKENT EVALUATION AND COMPARISON OF POST-DISASTER HOUSING IN TURKEY; LESSONS FROM IKITELLI AND SENIRKENT A. T. Özden Department of Architecture, Middle East Technical University, Inönü Bulvarı Ankara, 06531,

More information

HIGHWAYS DEVELOPMENT AND PROTECTION REGULATION

HIGHWAYS DEVELOPMENT AND PROTECTION REGULATION Province of Alberta HIGHWAYS DEVELOPMENT AND PROTECTION ACT HIGHWAYS DEVELOPMENT AND PROTECTION REGULATION Alberta Regulation 326/2009 With amendments up to and including Alberta Regulation 179/2016 Office

More information

CHAPTER 23: DETENTION BASIN STANDARDS Introduction and Goals Administration Standards Standard Attachments 23.

CHAPTER 23: DETENTION BASIN STANDARDS Introduction and Goals Administration Standards Standard Attachments 23. CHAPTER 23: DETENTION BASIN STANDARDS 23.00 Introduction and Goals 23.01 Administration 23.02 Standards 23.03 Standard Attachments 23.1 23.00 INTRODUCTION AND GOALS A. The purpose of this chapter is to

More information

This document contains a draft ROPA based on Option 6 and the Triangle Lands.

This document contains a draft ROPA based on Option 6 and the Triangle Lands. The December 8, 2016 Council Report on staff recommendation to expand the Bolton Rural Service Centre and a draft ROPA based on Option 4/5 can be downloaded from the Council Agenda webpage. It is acknowledged

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry

More information

Electricity Market Act 1

Electricity Market Act 1 Issuer: Riigikogu Type: act In force from: 22.07.2014 In force until: 31.12.2014 Translation published: 28.08.2014 Electricity Market Act 1 Amended by the following acts Passed 11.02.2003 RT I 2003, 25,

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of

More information

ALBEMARLE COUNTY CODE. Chapter 18. Zoning. Article IV. Procedure

ALBEMARLE COUNTY CODE. Chapter 18. Zoning. Article IV. Procedure Chapter 18. Zoning Article IV. Procedure Section 33. Zoning Text Amendments, Zoning Map Amendments, Special Use Permits And Special Exceptions Sections: 33.1 Introduction. 33.2 Initiating a zoning text

More information

THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO

THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO. 2010-91 BEING A BY-LAW FOR PRESCRIBING THE HEIGHT AND DESCRIPTION OF FENCES WITHIN THE TOWNSHIP OF SEVERN WHEREAS the Municipal Act, S.O.2001, Chapter

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

ATLANTA REGIONAL COMMISSION METROPOLITAN RIVER PROTECTION ACT RULES AND REGULATIONS

ATLANTA REGIONAL COMMISSION METROPOLITAN RIVER PROTECTION ACT RULES AND REGULATIONS ATLANTA REGIONAL COMMISSION METROPOLITAN RIVER PROTECTION ACT RULES AND REGULATIONS Adopted 5/28/03 These Rules and Regulations are adopted by the Atlanta Regional Commission pursuant to the Metropolitan

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING

DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING (By authority conferred on the environmental quality by section 63103 of 1994 PA 451, MCL 324.63103) PART 1.

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

Resettlement Policy Framework

Resettlement Policy Framework Urban Transport Improvement Project of Tianjin by Using the World Bank Loan Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Code of Practice for Pits

Code of Practice for Pits Code of Practice for Pits September 1, 2004 (made under the Environmental Protection and Enhancement Act, RSA 2000, ce-12, as amended and Conservation and Reclamation Regulation (AR 115/93), as amended)

More information

PRC: Hunan Roads Development II Project External Monitoring Report on Land Acquisition and Resettlement For Yuanling Local Road(II)

PRC: Hunan Roads Development II Project External Monitoring Report on Land Acquisition and Resettlement For Yuanling Local Road(II) Social Monitoring Report Project Number: 35338 September 2009 PRC: Hunan Roads Development II Project External Monitoring Report on Land Acquisition and Resettlement For Yuanling Local Road(II) Prepared

More information

CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance #

CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance # CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE Adopted: June 1, 2000 by Ordinance # 1999-215 This new language is located in Article V - Site Development Standards, and replaces the Bear Creek (B-C) Overlay

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Samoa Post Tsunami Reconstruction

More information

FALL RIVER REDEVELOPMENT AUTHORITY

FALL RIVER REDEVELOPMENT AUTHORITY FALL RIVER REDEVELOPMENT AUTHORITY DECLARATION OF COMMERCE PARK COVENANTS As a means of insuring proper development and job creation opportunities, the Fall River Redevelopment Authority (FRRA) would sell

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS

More information

TOWN OF BELMONT NEW HAMPSHIRE DRIVEWAY REGULATIONS. Wording to be eliminated is crossed out Wording to be added is bold, italicized

TOWN OF BELMONT NEW HAMPSHIRE DRIVEWAY REGULATIONS. Wording to be eliminated is crossed out Wording to be added is bold, italicized TOWN OF BELMONT NEW HAMPSHIRE DRIVEWAY REGULATIONS Wording to be eliminated is crossed out Wording to be added is bold, italicized ENACTED: MARCH 9, 1992 EDITION: TBD (Draft Date 6/7/18) TABLE OF CONTENTS

More information

33 CFR PART 329 DEFINITION OF NAVIGABLE WATERS OF THE UNITED STATES. Authority: 33 U.S.C. 401 et seq.

33 CFR PART 329 DEFINITION OF NAVIGABLE WATERS OF THE UNITED STATES. Authority: 33 U.S.C. 401 et seq. 33 CFR PART 329 DEFINITION OF NAVIGABLE WATERS OF THE UNITED STATES Authority: 33 U.S.C. 401 et seq. Source: 51 FR 41251, Nov. 13, 1986, unless otherwise noted. 329.1 Purpose. 329.2 Applicability. 329.3

More information

PRC: Guangxi Beibu Gulf Cities Development Project

PRC: Guangxi Beibu Gulf Cities Development Project Resettlement Plan December 2010 PRC: Guangxi Beibu Gulf Cities Development Project Beihai City Yinpan Urban Road and Related Infrastructures Component Prepared by Beihai Road and Port Construction and

More information

DEVELOPMENT APPLICATION PROCEDURES AND FEES BYLAW NO. 2791, 2012

DEVELOPMENT APPLICATION PROCEDURES AND FEES BYLAW NO. 2791, 2012 DEVELOPMENT APPLICATION PROCEDURES AND FEES BYLAW NO. 2791, 2012 CONSOLIDATED FOR CONVENIENCE January, 2019 In case of discrepancy, the original Bylaw or Amending Bylaw must be consulted Consolidates Amendments

More information

Site Provisions 8C-1. A. General. B. Number of Parking Spaces Required. Design Manual Chapter 8 - Parking Lots 8C - Site Provisions

Site Provisions 8C-1. A. General. B. Number of Parking Spaces Required. Design Manual Chapter 8 - Parking Lots 8C - Site Provisions Design Manual Chapter 8 - Parking Lots 8C - Site Provisions 8C-1 Site Provisions A. General This section provides design criteria for site requirements such as number of parking spaces, landscaping, parking

More information

Ashe County, NC Ordinance Chapter 163: Regulation of Wind Energy Systems

Ashe County, NC Ordinance Chapter 163: Regulation of Wind Energy Systems Ashe County, NC Ordinance Chapter 163: Regulation of Wind Energy Systems Section 1 Authority and Purpose Inasmuch as Ashe County has determined that certain windmills are possibly exempt under the North

More information

LEGISLATIVE COUNSELʹS DIGEST

LEGISLATIVE COUNSELʹS DIGEST Assembly Bill No. 1142 CHAPTER 7 An act to amend Sections 2715.5, 2733, 2770, 2772, 2773.1, 2774, 2774.1, 2774.2, and 2774.4 of, to add Sections 2736, 2772.1, and 2773.4 to, and to add and repeal Section

More information

DONEGAL COUNTY COUNCIL PLANNING AND DEVELOPMENT ACTS,

DONEGAL COUNTY COUNCIL PLANNING AND DEVELOPMENT ACTS, DONEGAL COUNTY COUNCIL PLANNING AND DEVELOPMENT ACTS, 2000-2004 Manager's Order No: 2005PG1653 Reference Number: 05/2371 Name of Applicant: Address: MR HUGH KENNEDY C/O FERGUS C MURRAY CRONKERRIN ARDARA

More information

CITY OF KAMLOOPS BY-LAW NO (AS AMENDED)

CITY OF KAMLOOPS BY-LAW NO (AS AMENDED) This is a consolidated by -law prepared by the City of Kamloops for convenience only. The City does not w arrant that the information contained in this consolidation is current. It is the responsibility

More information

The Board of Supervisors of the County of Riverside, State of California, do ordain as follows:

The Board of Supervisors of the County of Riverside, State of California, do ordain as follows: ORDINANCE 499 (AS AMENDED THROUGH 499.12) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO. 499 RELATING TO ENCROACHMENTS IN COUNTY HIGHWAYS The Board of Supervisors of the County of Riverside,

More information

People s Republic of China: Guizhou Rocky Desertification Area Water Management Project

People s Republic of China: Guizhou Rocky Desertification Area Water Management Project Guizhou Rocky Desertification Area Water Management Project (RRP PRC 48468) Resettlement Plan Project Number: 48468-001 May 2017 People s Republic of China: Guizhou Rocky Desertification Area Water Management

More information

H 7904 SUBSTITUTE A ======== LC005025/SUB A ======== S T A T E O F R H O D E I S L A N D

H 7904 SUBSTITUTE A ======== LC005025/SUB A ======== S T A T E O F R H O D E I S L A N D 01 -- H 0 SUBSTITUTE A LC000/SUB A S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO STATE AFFAIRS AND GOVERNMENT - CLIMATE CHANGE - RESILIENT RHODE

More information

THE CORPORATION OF THE CITY OF WATERLOO

THE CORPORATION OF THE CITY OF WATERLOO THE CORPORATION OF THE CITY OF WATERLOO BY-LAW NUMBER 2013-0 1] A BY-LAW TO PROVIDE FOR THE REGULATION OF FENCES AND PRIVACY SCREENS WITHIN THE CITY OF WATERLOO WHEREAS section 11 (3)(7) of the Municipal

More information

Guizhou Vocational Education Development Program Land Acquisition and Involuntary Resettlement Due Diligence

Guizhou Vocational Education Development Program Land Acquisition and Involuntary Resettlement Due Diligence Guizhou Vocational Education Development Program Land Acquisition and Involuntary Resettlement Due Diligence Guizhou Provincial Education Department July 2015 1 Contents 1 Brief Introduction... 1 2 Qingzhen

More information

National Environmental Management: Protected Areas Act (Act No 57 of 2003

National Environmental Management: Protected Areas Act (Act No 57 of 2003 National Environmental Management: Protected Areas Act (Act No 57 of 2003 (English text signed by the President.) (Assented to 11 February 2004.) (Into force 01 November 2004) as amended by the National

More information

PRC: Yunnan Pu er Regional Integrated Road Network Development Project

PRC: Yunnan Pu er Regional Integrated Road Network Development Project Resettlement Plan (Draft) July 2014 PRC: Yunnan Pu er Regional Integrated Road Network Development Project Prepared by Pu er City Transportation Bureau for the Asian Development Bank. CURRENCY EQUIVALENTS

More information

Erosion & Sedimentation Control Resource Type: Sedimentation Control Ordinance Document Last Updated in Database: February 24, 2016

Erosion & Sedimentation Control Resource Type: Sedimentation Control Ordinance Document Last Updated in Database: February 24, 2016 Topic: Erosion & Sedimentation Control Resource Type: Regulations State: North Carolina Jurisdiction Type: Municipal Municipality: City of Greensboro Year (adopted, written, etc.): Unknown Community Type

More information

The Study on Migration and Poverty Alleviation Planning of Daning County

The Study on Migration and Poverty Alleviation Planning of Daning County Open Journal of Social Sciences, 2016, 4, 138-144 Published Online April 2016 in SciRes. http://www.scirp.org/journal/jss http://dx.doi.org/10.4236/jss.2016.44019 The Study on Migration and Poverty Alleviation

More information

The World Bank Financed Zhengzhou Rail Transit Line 3 Phase 1 Project. Supplementary Resettlement Action Plan

The World Bank Financed Zhengzhou Rail Transit Line 3 Phase 1 Project. Supplementary Resettlement Action Plan SFG2148 Public Disclosure Authorized The World Bank Financed Zhengzhou Rail Transit Line 3 Phase 1 Project Supplementary Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized

More information

PRC: Guiyang Integrated Water Resources Management (Sector) Project

PRC: Guiyang Integrated Water Resources Management (Sector) Project Resettlement Plan October 2017 PRC: Guiyang Integrated Water Resources Management (Sector) Project Resettlement Plan for Mengguan Water Treatment Plant under the Hongyan Reservoir Noncore Subproject Prepared

More information

Carlisle Planning Board. Rules and Regulations. Special Permits for Common Driveways

Carlisle Planning Board. Rules and Regulations. Special Permits for Common Driveways Rules and Regulations regarding Special Permits for Common Driveways Revised: October 30, 1989 July 8, 1991 March 27, 1995 Page 1 of 13 Rules and Regulations for Conservation Clusters Table of Contents

More information

SHEN Lijuan [a],* ; DING Enjun [b] ; SU Yanke [b] INTRODUCTION

SHEN Lijuan [a],* ; DING Enjun [b] ; SU Yanke [b] INTRODUCTION Higher Education of Social Science Vol. 9, No. 1, 2015, pp. 40-47 DOI: 10.3968/7291 ISSN 1927-0232 [Print] ISSN 1927-0240 [Online] www.cscanada.net www.cscanada.org The Impact and Reform Conception of

More information

Ottawa River North Shore Parklands Plan PUBLIC CONSULTATION REPORT JULY 6 TO 24, 2017

Ottawa River North Shore Parklands Plan PUBLIC CONSULTATION REPORT JULY 6 TO 24, 2017 Ottawa River North Shore Parklands Plan PUBLIC CONSULTATION REPORT JULY 6 TO 24, 2017 Contents I. Description of the project... 3 A. Background... 3 B. Objective of the project... 3 II. Online public consultation

More information

THE UTTAR PRADESH SPECIAL ECONOMIC ZONE DEVELOPMENT AUTHORITY ACT, 2002 (U.P.ACT No. 10 of 2002) [ As passed by the Uttar Pradesh Legislature ] ACT

THE UTTAR PRADESH SPECIAL ECONOMIC ZONE DEVELOPMENT AUTHORITY ACT, 2002 (U.P.ACT No. 10 of 2002) [ As passed by the Uttar Pradesh Legislature ] ACT THE UTTAR PRADESH SPECIAL ECONOMIC ZONE DEVELOPMENT AUTHORITY ACT, 2002 (U.P.ACT No. 10 of 2002) [ As passed by the Uttar Pradesh Legislature ] AN ACT to provide for the constitution of an Authority for

More information

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT Public Notice US Army Corps of Engineers Louisville District Public Notice No. Date: Expiration Date: RGP No. 003 9 Jul 08 9 Jul 13 Please address all comments and inquiries to: U.S. Army Corps of Engineers,

More information

302 CMR: DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

302 CMR: DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 302 CMR 3.00: SCENIC AND RECREATIONAL RIVERS ORDERS Section 3.01: Authority 3.02: Definitions 3.03: Advisory Committees 3.04: Classification of Rivers and Streams 3.05: Preliminary Informational Meetings

More information

ORDINANCE 499 (AS AMENDED THROUGH ) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO

ORDINANCE 499 (AS AMENDED THROUGH ) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO ORDINANCE 499 (AS AMENDED THROUGH 499.13) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO. 499 RELATING TO ENCROACHMENTS IN COUNTY HIGHWAYS The Board of Supervisors of the County of Riverside,

More information

CONSERVATION AND RECLAMATION REGULATION

CONSERVATION AND RECLAMATION REGULATION Province of Alberta ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT CONSERVATION AND RECLAMATION REGULATION Alberta Regulation 115/1993 With amendments up to and including Alberta Regulation 103/2016 Office

More information

DRAFT AMENDING BUDGET N 1 TO THE GENERAL BUDGET STATEMENT OF EXPENDITURE BY SECTION Section III - Commission. (presented by the Commission)

DRAFT AMENDING BUDGET N 1 TO THE GENERAL BUDGET STATEMENT OF EXPENDITURE BY SECTION Section III - Commission. (presented by the Commission) EN EN EN EUROPEAN COMMISSION Brussels, 14.1.2011 COM(2011) 9 final DRAFT AMENDING BUDGET N 1 TO THE GENERAL BUDGET 2011 STATEMENT OF EXPENDITURE BY SECTION Section III - Commission (presented by the Commission)

More information

SUBCHAPTER 4B - EROSION AND SEDIMENT CONTROL

SUBCHAPTER 4B - EROSION AND SEDIMENT CONTROL _ SUBCHAPTER 4B - EROSION AND SEDIMENT CONTROL 15A NCAC 04B.0101 AUTHORITY 113A-64; Repealed Eff. November 1, 1984. 15A NCAC 04B.0102 15A NCAC 04B.0103 PURPOSE SCOPE Authority G.S. 113A-54(a)(b); Amended

More information

CITY OF COVINGTON Comprehensive Zoning Ordinance ADOPTED DRAFT

CITY OF COVINGTON Comprehensive Zoning Ordinance ADOPTED DRAFT 3.3014. Additional MUOD Requirements. In addition to the required yard, landscaped buffers, signage and screening, an enhanced landscape plan shall be required of all mixed-use developments, consistent

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized PEOPLE S COMMITTEE OF PHU YEN PROVINCE PHU YEN PROJECT MANAGEMENT UNIT OF CONSTRUCTION INVESTMENT WORKS FOR AGRICULTURE AND RURAL DEVELOPMENT ----------------o0oo---------------

More information

COUNTY OF HAWAII PLANNING DEPARTMENT

COUNTY OF HAWAII PLANNING DEPARTMENT COUNTY OF HAWAII PLANNING DEPARTMENT RULES OF PRACTICE AND PROCEDURE RULE 11. SHORELINE SETBACK 11-1 Authority. Pursuant to the authority conferred upon the Planning Department by 205A-43, Hawaii Revised

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Binh Thuan Province Prepared by the Ministry of

More information

ENFORCEMENT DECREE OF THE SOIL ENVIRONMENT CONSERVATION ACT

ENFORCEMENT DECREE OF THE SOIL ENVIRONMENT CONSERVATION ACT ENFORCEMENT DECREE OF THE SOIL ENVIRONMENT CONSERVATION ACT Presidential Decree No. 14848, Dec. 29, 1995 Amended by Presidential Decree No. 16058, Dec. 31, 1998 Presidential Decree No. 17432, Dec. 19,

More information

THE CORPORATION OF THE TOWN OF INNISFIL BY-LAW NO

THE CORPORATION OF THE TOWN OF INNISFIL BY-LAW NO THE CORPORATION OF THE TOWN OF INNISFIL BY-LAW NO. 052-05 A By-law of the Corporation of the Town of Innisfil prescribing the heights and descriptions of lawful fences in the Town of Innisfil and for the

More information