PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension

Size: px
Start display at page:

Download "PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension"

Transcription

1 Resettlement Due Diligence Report Project Number: October 2014 PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension Prepared by Chongzuo Investment Corporation for Urban Development For Guangxi Project Management Office This report has been submitted to ADB by the Guangxi Southwestern Cities Development Project Management Office and is made publicly available in accordance with ADB s public communications policy (2011). It does not necessarily reflect the views of ADB.

2 ADB Loan Project ADB Loan 2657-PRC: Guangxi Southwestern Cities Development Project Chongzuo Shijinglin Road West Extension Resettlement Due Diligence Report Chongzuo Investment Corporation for Urban Development October 2014

3 1. Summary for Chongzuo Shijinglin Road West Extension 1.1 Extension Content Shijinglin Road West Extension, as part of Chongzuo urban road and traffic safety facilities subproject of Guangxi Southwest Urban Development Project, has a width of 15.5m and a length of m, the road needs widening to a width of 54 m for Guangxi Gardening Expo which will be held in Extension Location Chongzuo Shijinglin Road West Extension is one of main stems, which is connected with the new area in the urban south and Ningming Road to the west and travelling across the Shijinglin conservation area and Shuikouhu conservation area, bridging the southern and the northern part of the city and the old city districts according to Chongzuo master planning in east-west direction. 1.3 Extension Context According to Chongzuo Urban Master Plan ( ), Chongzuo Shijinglin Road West Extension is designed as urban level II road with 6 dual-lanes and width of 60 meters. The construction contains two stages: i) short-term project with width of 15.5 meters, 2 dual-lanes and 50 km/h designed bicycle speed; ii) long-term project with width of 54 meters, 6 dual-lanes and 60 km/h designed bicycle speed. In 2009, Chongzuo Shijinglin Road West Extension is involved in ADB Guangxi Southwest Urban Development Project as one of sub-project of Chongzuo urban road and transport safety project. The 7 th Guangxi Gardening Expo will be held in October 2015 beside northwest Shuikou Lake in Chongzuo. According to Notice on Arrangement of the 6 th and 7 th Guangxi World Garden Expo, infrastructure construction around Expo must be finished by the end of June Chongzuo Shijinglin Road West Extension, as the main traffic of Chongzuo Expo, cannot meet the traffic requirement due to the Expo event. To solve the issue of actual traffic demand, it is proposed to start long-term Chongzuo Shijinglin Road West Extension project in advance, i.e. extend the road width to 54 meters. 1

4 1.4 Extension Approval The land use application was approved by Chongzuo Land and Resources Bureau on March (Chongzuo LRB Document No ). 2. Extension Land Acquisition and Relocation Impact Chongzuo Shijinglin Road West Extension will increase permanent land acquisition ha, affecting 133 persons from 32 households; increase relocation area 1, m 2, affecting 31 persons from 7 households. Of the relocation affected 7 households, 6 households with 27 persons are also affected by the increased land acquisition. The other household has 4 people doing business in Nanning and live there too. In conclusion, Chongzuo Shijinglin Road West Extension will increase 137 people from 33 households (see Table 1). The extension will require relocation of 2 hafnium electricity poles, 2 hafnium communication poles and 200 meter wires. Among new households involved in extension, there is no disabilities, and other vulnerable people. Also, there is no other ground appendage facilities needs be moved. House demolition Land acquisition Table 1 Shijinglin Road West Extension Resettlement Scope and Impact Male Female Total Area m Impact Household Impact Person Area Ha Impact Household Impact Person Total 1 Impact Household Impact Person Data source: Project Land Acquisition Approval Document, Chongzuo Land Acquisition Office, Chongzuo PMO, survey result. 2.1 Land Acquisition Impact Chongzuo Shijinglin Road West Extension will increase permanent land acquisition ha, which is 248% of planned 4.64 ha, including agricultural land 7.83 ha, arable 1 Among 7 relocation households, 6 of them is affected by land acquisition. Therefore the total household and person affected does not equals to the sum of acquisition and relocation. 2

5 land 2.54 ha, construction land 1.01 ha, and unused land 2.70 ha. (see Table 2) Table 2 Newly-added Land Acquisition (Hectare) Before extension After extension Increase Rate Total Project Land % Agricultural land % Arable land % Construction land % Unused land % Data source: Project Land Acquisition Approval Document and Chongzuo PMO Permanent land being acquired formally belongs to Wuwei Concrete Plant, Shuikou Village of Jiangnan township and Xincun Village of Jiangzhou township. The acquisition affects 21 households with 88 persons in Shuikou Village, and 11 households with45 persons in Xincun Village. The rates of land loss of all households involved in the acquisition are all below 5%. Unit Jiangnan Shuikou Village Table 3 Land Acquisition Impact Jiangzhou Xin Village Male Female Total Household Person Data source: Chongzuo Land Acquisition Office and Chongzuo PMO 2.2 Relocation Impact Chongzuo Shijinglin Road West Extension will increase 1, m 2 of house demolition including 1, m 2 of brick concrete structure houses and m 2 of brick structure houses. Brick concrete structure Table 4 Relocation Area (m 2 ) Brick and wood structure 3 Brick structure Mud house Total old redline new redline 60 2, , increase 1, , Data source: Chongzuo PMO House demolition in Chongzuo Shijinglin Road West Extension will make relocation of

6 4 households in Shuikou Village and 3 households in Xincun Village, affecting 31 persons in total. Table 5 Relocation Impact Jiangnan Shuikou Village Jiangzhou Xin Village Male Female Total Household Person Data source: Chongzuo Relocation Office, PMO and survey result 3. Public Consulting and Information Disclosure During the extension designing, Chongzuo Land Acquisition and Relocation Office, local government and urban investment company jointly conducted public consultation and information disclosure to affected people, in the 2 villages once a week on average. The consultation and disclosure covers the reasons for widening the road, the impacts, the compensation, site of relocation, etc. which much facilitated the affected people s understanding the situation and cooperation. 4. Land Acquisition and Relocation Compensation According to Chongzuo Document No.148 (2012), from January 2013 on, the compensation standard increased (see Table 6). In fact, besides the policy compensation, Chongzuo Municipal Government will offer additional CNY 75,000 to each affected household. Table 6 Land Acquisition and Relocation Compensation Standard Item Unit Before 2013 After Jan 2013 Arable land CNY/mu Paddy/dry land 13,700 Paddy/dry land 23,290 Arable land CNY/mu Vegetable land 25,384 Vegetable land 41,249 Young crop CNY/mu Paddy land 1,300 dry land 2, Sugar cane 2,313 Vegetable land 2,100 Vegetable land 2,100 Brick and concrete house CNY/m 3 600~ ~900 Compensation CNY/household 0 75,000 Data source: Government Document No. 148 (2012) and updated Resettlement Plan 4

7 5. Resettlement Plan The three affected households from Xin Village will be resettled to centralized settlement site which is near Chongzuo bus station, and will be offered additional compensation and 30 m 2 homestead with Santongyiping 2 for the households to build their new houses. The four affected households in Shuikou Village will be resettled in their Village through assistance from the Chongzuo resettlement Office, and local government, and will be offered compensation and homestead with Santongyiping. During the period of relocation, the government will offer temporary transition fee, including house build fee and per diem, in specific: i) a temporary living place and CNY 30,000 house build fee 3 ; ii) a per diem of CNY 150 per month until moving in to new houses. 6. Recovery Measures for affected households The affected 33 households will follow similar recovery plan to that in the project updated resettlement plan, including: 0.3 mu land for each person affected; Priority job opportunity, including created by the engineering company, etc; Various training for affected people, such as driving, chief, gardening, etc. Social Insurance for the affected people, including pension and medical insurance as indicated in Guangxi Relocation Farmers Insurance Document; Subsistence allowances for vulnerable people; 7. Complaint Mechanism The original project complaint mechanism is followed. The affected household, group or individual can submit complaint concerning any resettlement and compensation issue. Besides government complaint procedure, the project has established public complaint procedure through village committee. The affected group or person, if not satisfied to local complaint result, can seek for legal solution. The project will conduct public meeting, resettlement booklet and media to help affected person understand the procedure. The resettlement authorities shall deal with complaint in time. 2 That is, flat ground with access to road, access to electricity and access to water. 3 In fact CNY 10,000 per household will be adequate for building a new temporary house. 5

8 8. Cost Estimate The cost of extension compensation is CNY 8,300,000, including CNY 4,100,000 of land acquisition fee, CNY 3,200,000 of resettlement fee and CNY 1,000,000 for others. 9. Resettlement Implementation Progress By the end of August 2014, land acquisition was completed. Relocation of 7 households will be completed by end of February 2015, and will be moved to new houses in April The ground appendages will be finished by the end of February Internal and External Monitoring From 3 rd quarter 2014 on, the project internal and external monitoring will include land acquisition, relocation and resettlement impact and livelihoods recovery for Chongzuo Shijinglin Road west extension construction. 6

Prepared by Guangxi Baise Development and Investment Group Co., Ltd. with the assistance of Beijing Enrimu Science & Technology Consulting Co., Ltd.

Prepared by Guangxi Baise Development and Investment Group Co., Ltd. with the assistance of Beijing Enrimu Science & Technology Consulting Co., Ltd. Resettlement Planning Document Updated Resettlement Plan Document Stage: Final Project Number: 42010 March 2012 People's Republic of China: Guangxi Southwestern Cities Development Project Baise City Urban

More information

PRC: Liaoning Small Cities and Towns Development Demonstration Sector Project

PRC: Liaoning Small Cities and Towns Development Demonstration Sector Project Resettlement Monitoring Report Project Number: 42382 August 2012 PRC: Liaoning Small Cities and Towns Development Demonstration Sector Project Prepared by: Liaoning Urban Construction and Renewal Project

More information

PRC: Hunan Roads Development II Project External Monitoring Report on Land Acquisition and Resettlement For Yuanling Local Road(II)

PRC: Hunan Roads Development II Project External Monitoring Report on Land Acquisition and Resettlement For Yuanling Local Road(II) Social Monitoring Report Project Number: 35338 September 2009 PRC: Hunan Roads Development II Project External Monitoring Report on Land Acquisition and Resettlement For Yuanling Local Road(II) Prepared

More information

PRC: Guangxi Beibu Gulf Cities Development Project

PRC: Guangxi Beibu Gulf Cities Development Project Resettlement Plan December 2010 PRC: Guangxi Beibu Gulf Cities Development Project Beihai City Yinpan Urban Road and Related Infrastructures Component Prepared by Beihai Road and Port Construction and

More information

Guizhou Vocational Education Development Program Land Acquisition and Involuntary Resettlement Due Diligence

Guizhou Vocational Education Development Program Land Acquisition and Involuntary Resettlement Due Diligence Guizhou Vocational Education Development Program Land Acquisition and Involuntary Resettlement Due Diligence Guizhou Provincial Education Department July 2015 1 Contents 1 Brief Introduction... 1 2 Qingzhen

More information

Resettlement Plan. PRC: Jiangxi Ji an Sustainable Urban Transport Project. November 2017

Resettlement Plan. PRC: Jiangxi Ji an Sustainable Urban Transport Project. November 2017 Resettlement Plan November 2017 PRC: Jiangxi Ji an Sustainable Urban Transport Project Prepared by Ji an Project Management Office (Ji an Urban Investment and Development Company) for the Ji an Municipal

More information

PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Tranche 2

PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Tranche 2 Resettlement Plan Project Number: 50050-004 July 2017 PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Tranche 2 Prepared by the Guangxi Zhuang Autonomous Region Government

More information

PRC: Yunnan Pu er Regional Integrated Road Network Development Project

PRC: Yunnan Pu er Regional Integrated Road Network Development Project Resettlement Plan (Draft) July 2014 PRC: Yunnan Pu er Regional Integrated Road Network Development Project Prepared by Pu er City Transportation Bureau for the Asian Development Bank. CURRENCY EQUIVALENTS

More information

PRC: Hunan Roads Development III Project Huayuan-Fenghuang Local Road Component

PRC: Hunan Roads Development III Project Huayuan-Fenghuang Local Road Component Resettlement Planning Document Resettlement Plan Document Stage: Final Project Number: 37494 May 2009 PRC: Hunan Roads Development III Project Huayuan-Fenghuang Local Road Component Prepared by Huayuan

More information

PRC: Chongqing Urban Rural Infrastructure Development Demonstration II Project

PRC: Chongqing Urban Rural Infrastructure Development Demonstration II Project Resettlement Plan August 2013 PRC: Chongqing Urban Rural Infrastructure Development Demonstration II Project Prepared by Fuling District Traffic-Tourism Construction Investment Group Co., Ltd. for the

More information

People s Republic of China: Gansu Baiyin Integrated Urban Development Project

People s Republic of China: Gansu Baiyin Integrated Urban Development Project Social Monitoring Report # 1 & 2 Semiannual Reports April 2015 People s Republic of China: Gansu Baiyin Integrated Urban Development Project Prepared by Shanghai Yiji Construction Consultants Co., Ltd

More information

Proposed Loan People s Republic of China: Hebei Elderly Care Development Project

Proposed Loan People s Republic of China: Hebei Elderly Care Development Project Resettlement Plan: Xinji City November 2016 Proposed Loan People s Republic of China: Hebei Elderly Care Development Project Prepared by the Hebei Project Management Office for the Asian Development Bank.

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized The World Bank SFG3873 REV Public Disclosure Authorized Hezhou Urban Water Infrastructure and Environment Improvement Project Public Disclosure Authorized Resettlement Policy

More information

Resettlement Policy Framework

Resettlement Policy Framework Urban Transport Improvement Project of Tianjin by Using the World Bank Loan Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Shanxi Small Cities and Towns Development Demonstration Sector Project

Shanxi Small Cities and Towns Development Demonstration Sector Project Involuntary Resettlement Due Diligence Report Project Number: 42383 September, 2012 Shanxi Small Cities and Towns Development Demonstration Sector Project Qingxu: Urban Surface Water Improvement Subproject

More information

People s Republic of China: Yunnan Chuxiong Urban Environment Improvement Project

People s Republic of China: Yunnan Chuxiong Urban Environment Improvement Project Resettlement Plan July 2013 People s Republic of China: Yunnan Chuxiong Urban Environment Improvement Project Prepared by the ADB-financed Project Management Office of the Chuxiong Prefecture Government

More information

Resettlement Policy Framework and Due Diligence Report

Resettlement Policy Framework and Due Diligence Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Harbin Cold Weather Smart Public Transportation System P r o j e c t L o a n e d b y

More information

PRC: Anhui Chao Lake Environmental Rehabilitation Project

PRC: Anhui Chao Lake Environmental Rehabilitation Project Resettlement Plan February 2014 PRC: Anhui Chao Lake Environmental Rehabilitation Project Updated Resettlement Plan for Chao Lake Basin Lu an Eastern New Town District Water Environment Improvement Subproject

More information

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RPF of Additional Financing for Fujian Highway Sector Investment Project Contents RP1032

More information

People s Republic of China: Hunan Flood Management Sector Project, Hunan Province, Chenxi County

People s Republic of China: Hunan Flood Management Sector Project, Hunan Province, Chenxi County Resettlement Planning Document Resettlement Plan Document Stage: Final Project Number: 37641 August 2005 People s Republic of China: Hunan Flood Management Sector Project, Hunan Province, Chenxi County

More information

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF)

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) World Bank-financed Project World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans GSDS Certificate Grade A No.180105-sj GSDK Certificate Grade A No.180105-kj GZ Certificate Grade A No. 1032523001 S B Z Certificate Grade A No. 0 2 7 Hunan Province Youxian County Urban Flood Control Project

More information

PRC: Hubei Huangshi Urban Pollution Control and Environmental Management Project

PRC: Hubei Huangshi Urban Pollution Control and Environmental Management Project Resettlement Plan May 2012 PRC: Hubei Huangshi Urban Pollution Control and Environmental Management Project Prepared by Huangshi Municipal Government for the Asian Development Bank. CURRENCY EQUIVALENTS

More information

PRC: Guiyang Integrated Water Resources Management (Sector) Project

PRC: Guiyang Integrated Water Resources Management (Sector) Project Resettlement Plan October 2017 PRC: Guiyang Integrated Water Resources Management (Sector) Project Resettlement Plan for Mengguan Water Treatment Plant under the Hongyan Reservoir Noncore Subproject Prepared

More information

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans GSDS Certificate Grade A No.180105-sj GSDK Certificate Grade A No.180105-kj GZ Certificate Grade A No. 1032523001 S B Z Certificate Grade A No. 0 2 7 Hunan Province Shimen County Urban Flood Control Project

More information

People s Republic of China: Yunnan Chuxiong Urban Environment Improvement Project

People s Republic of China: Yunnan Chuxiong Urban Environment Improvement Project Resettlement Plan August 2013 People s Republic of China: Yunnan Chuxiong Urban Environment Improvement Project Prepared by the ADB-financed Project Management Office of the Chuxiong Prefecture Government

More information

External Resettlement Monitoring and Evaluation Report of the World Bank-financed Xining Water Environment Management Project

External Resettlement Monitoring and Evaluation Report of the World Bank-financed Xining Water Environment Management Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E4396 v1 External Resettlement Monitoring and Evaluation Report of the World Bank-financed

More information

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project Initial Poverty and Social Analysis May 2018 People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project This document is being disclosed to the public in accordance

More information

PRC: Yunnan Pu er Regional Integrated Road Network Development Project

PRC: Yunnan Pu er Regional Integrated Road Network Development Project Resettlement Plan July 214 PRC: Yunnan Pu er Regional Integrated Road Network Development Project Prepared by Pu er City Transportation Bureau for the Asian Development Bank. CURRENCY EQUIVALENTS (as of

More information

Public Transport Sub-project of Urban Comprehensive Transport Improvement Project in Xi an the south of urban bus hub terminal

Public Transport Sub-project of Urban Comprehensive Transport Improvement Project in Xi an the south of urban bus hub terminal Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Transport Sub-project of Urban Comprehensive Transport Improvement Project in

More information

Gender Equality and Development

Gender Equality and Development Overview Gender Equality and Development Welcome to Topic 3 of the e-module on Gender and Energy. We have already discussed how increased access to electricity improves men s and women s lives. Topic Three

More information

PRC: Anhui Integrated Transport Sector Improvement Project X056 Shantou, Sixian County- Minxian, Yongqiao District Section

PRC: Anhui Integrated Transport Sector Improvement Project X056 Shantou, Sixian County- Minxian, Yongqiao District Section Updated Resettlement Plan May 2011 PRC: Anhui Integrated Transport Sector Improvement Project X056 Shantou, Sixian County- Minxian, Yongqiao District Section Prepared by Anhui Highway Administration Bureau

More information

Indonesia: Enhanced Water Security Investment Project

Indonesia: Enhanced Water Security Investment Project Initial Poverty and Social Analysis March 2018 Indonesia: Enhanced Water Security Investment Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy

More information

Wangliao Road (8#) Extension Construction Project in Yongchuan District. Resettlement Action Plan

Wangliao Road (8#) Extension Construction Project in Yongchuan District. Resettlement Action Plan Public Disclosure Authorized SFG1465 World Bank-financed Chongqing Urban-Rural Integration Project Public Disclosure Authorized Wangliao Road (8#) Extension Construction Project in Yongchuan District Public

More information

Ethnic Minorities Development Framework. PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program

Ethnic Minorities Development Framework. PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Ethnic Minorities Development Framework Project Number: 50050-002 September 2016 PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Prepared by the Government of the People

More information

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Final Project Number: 40282 September 2006 VIE: Calamity Damage Rehabilitation Project The summary

More information

Resettlement Plan. the Yimu Highway Kedian to Mujiating Section Improvement. Project

Resettlement Plan. the Yimu Highway Kedian to Mujiating Section Improvement. Project ADB-financed Anhui Intermodal Sustainable Transport Project Resettlement Plan Of the Yimu Highway Kedian to Mujiating Section Improvement Project Nanling County ADB-financed Project Leading Group August

More information

Resettlement Plan: Shuangluan District. Proposed Loan People s Republic of China: Hebei Elderly Care Development Project

Resettlement Plan: Shuangluan District. Proposed Loan People s Republic of China: Hebei Elderly Care Development Project Resettlement Plan: Shuangluan District November 2016 Proposed Loan People s Republic of China: Hebei Elderly Care Development Project Prepared by the Hebei Project Management Office for the Asian Development

More information

Resettlement Action Plan

Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Financed Zhengzhou Rail Transit Line 3 Project Resettlement Action Plan

More information

PRC: Shaanxi Mountain Road Safety Demonstration Project

PRC: Shaanxi Mountain Road Safety Demonstration Project Social Monitoring Report Semi-Annual Report March 2017 PRC: Shaanxi Mountain Road Safety Demonstration Project Prepared by Shaanxi Kexin Consultant Company for the People s Republic of China and the Asian

More information

PRC: Guizhou Vocational Education Development Program

PRC: Guizhou Vocational Education Development Program Social Monitoring Report Project Number: 48101-003 Annual Report December 2017 PRC: Guizhou Vocational Education Development Program Prepared by the Monitoring Group of Guizhou Academy of Social Sciences

More information

Resettlement and Income Restoration in Thilawa SEZ

Resettlement and Income Restoration in Thilawa SEZ Resettlement and Income Restoration in Thilawa SEZ Lessons from the first & second phases and emerging good practices Thilawa SEZ Management Committee (TSMC) Yangon Region Government (YRG) 20 February

More information

The World Bank Financed Zhengzhou Rail Transit Line 3 Phase 1 Project. Supplementary Resettlement Action Plan

The World Bank Financed Zhengzhou Rail Transit Line 3 Phase 1 Project. Supplementary Resettlement Action Plan SFG2148 Public Disclosure Authorized The World Bank Financed Zhengzhou Rail Transit Line 3 Phase 1 Project Supplementary Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized

More information

The External Resettlement Monitoring & Assessment Report

The External Resettlement Monitoring & Assessment Report The Urban Flood Control Project in the Mountainous Area in Hunan Province Loaned by the Asian Development Bank The External Resettlement Monitoring & Assessment Report (Lengshuijiang, Lianyuan, Shuangfeng,

More information

PRC: Xinjiang Tacheng Border Cities and Counties Development Project

PRC: Xinjiang Tacheng Border Cities and Counties Development Project Ethnic Minority Development Plan January 2015 PRC: Xinjiang Tacheng Border Cities and Counties Development Project Prepared by the Xinjiang Tacheng Prefecture Government for the Asian Development Bank.

More information

Resettlement in Action

Resettlement in Action Resettlement in Action An Eyewitness Report from the Middle Route of China s South-North Water Transfer Project Executive Summary Prepared for International Rivers August 25, 2010 This report studies the

More information

The External Resettlement Monitoring and Evaluation Report of ADB-funded Hunan Flood Management Sector Project

The External Resettlement Monitoring and Evaluation Report of ADB-funded Hunan Flood Management Sector Project The Loan No.: 2244-PRC The External Resettlement Monitoring and Evaluation Report of ADB-funded Hunan Flood Management Sector Project No.3 Report Changsha Xinghuan Water & Electricity Engineering Technology

More information

Greater Mekong Subregion: Northern Economic Corridor Project Lao PDR. Summary Social Action Plan

Greater Mekong Subregion: Northern Economic Corridor Project Lao PDR. Summary Social Action Plan Greater Mekong Subregion: Northern Economic Corridor Project Lao PDR A. Introduction Summary Social Action Plan 1. The Northern Economic Corridor (the Project) passes through about 90 villages, all except

More information

PRC: Shanxi Small Cities and Towns Development Demonstration Sector Project

PRC: Shanxi Small Cities and Towns Development Demonstration Sector Project Resettlement Monitoring Report Project Number: 42383 February 2011 PRC: Shanxi Small Cities and Towns Development Demonstration Sector Project Prepared by National Research Center for Resettlement, Hohai

More information

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sub-project: Improving grid medium, low voltage NORTH POWER COORATION Electric Network

More information

People s Republic of China: Guizhou Rocky Desertification Area Water Management Project

People s Republic of China: Guizhou Rocky Desertification Area Water Management Project Guizhou Rocky Desertification Area Water Management Project (RRP PRC 48468) Resettlement Plan Project Number: 48468-001 May 2017 People s Republic of China: Guizhou Rocky Desertification Area Water Management

More information

SFG1344 v1. Resettlement Action Plan for Chengde Central Heating Energy Saving Reconstruction Project. Chengde Heating Group

SFG1344 v1. Resettlement Action Plan for Chengde Central Heating Energy Saving Reconstruction Project. Chengde Heating Group Public Disclosure Authorized World Bank-financed Chengde Energy-Saving Reconstruction Project SFG1344 v1 Public Disclosure Authorized Resettlement Action Plan for Chengde Energy Saving Reconstruction Project

More information

India: Jammu & Kashmir Urban Sector Development Project

India: Jammu & Kashmir Urban Sector Development Project Resettlement Planning Document Full Resettlement Plan- Improvements to B.C Road from Shakuntala Crossing to Children s Hospital Including pedestrian subway Document Stage: Final Project Number: 41116 October

More information

PRC: Guiyang Integrated Water Resources Management Sector Project

PRC: Guiyang Integrated Water Resources Management Sector Project Ethnic Minority Development Plan November 2015 PRC: Guiyang Integrated Water Resources Management Sector Project Ethnic Minority Development Plan for Hongyan Reservoir and Associated Waterworks Subproject

More information

RESETTLEMENT AND REHABILITATION PLAN

RESETTLEMENT AND REHABILITATION PLAN CHAPTER 14 RESETTLEMENT AND REHABILITATION PLAN 14.1 AFFECTED FAMILIES The total affected family may be categorized as fully affected and partially affected. Fully affected families are those who will

More information

Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject

Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject Social Monitoring Report Corrective Action Plan September 2013 Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject Prepared by the Department of Agriculture

More information

Land Acquisition and Resettlement Due Diligence Report

Land Acquisition and Resettlement Due Diligence Report Land Acquisition and Resettlement Due Diligence Report Document stage: Draft for consultation Project Number: 48434 Loan and/or Grant Number(s): {LXXXX; GXXXX; TAXXXX} March 2016 India: Visakhapatnam-Chennai

More information

External Resettlement and Social Development Monitoring and Evaluation Report

External Resettlement and Social Development Monitoring and Evaluation Report External Resettlement and Social Development Monitoring and Evaluation Report February 2018 People s Republic of China: Guiyang Integrated Water Resources Management (Sector) Project External Resettlement

More information

Updated Land Acquisition and Compensation Plan. LAO: Additional Financing of Water Supply and Sanitation Sector Project (Xamneau Subproject)

Updated Land Acquisition and Compensation Plan. LAO: Additional Financing of Water Supply and Sanitation Sector Project (Xamneau Subproject) Updated Land Acquisition and Compensation Plan April 2018 LAO: Additional Financing of Water Supply and Sanitation Sector Project (Xamneau Subproject) Part 2 Prepared by the Department of Water Supply,

More information

EX-ante Evaluation. 1. Name of the Project. 2. Background and Necessity of the Project. Japanese ODA Loan

EX-ante Evaluation. 1. Name of the Project. 2. Background and Necessity of the Project. Japanese ODA Loan Japanese ODA Loan EX-ante Evaluation 1. Name of the Project Country: Republic of El Salvador Project: San Miguel Bypass Construction Project Loan Agreement: August 20, 2014 Loan Amount: 125.95 million

More information

Poverty Registration and Precisely Targeted Multidimensional Poverty Alleviation in China

Poverty Registration and Precisely Targeted Multidimensional Poverty Alleviation in China Poverty Registration and Precisely Targeted Multidimensional Poverty Alleviation in China Zuo Changsheng Director General International Poverty Reduction Center in China(IPRCC) November 8, 2016 Contents

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

MON: Urban Development Sector Project Bulgan Subproject

MON: Urban Development Sector Project Bulgan Subproject Resettlement Completion Report Annual Report 24 December 2012 MON: Urban Development Sector Project Bulgan Subproject Prepared by Purevsuren Dorjnamjil, Resettlement Specialist, Project Management Unit

More information

Resettlement Due Diligence Report

Resettlement Due Diligence Report Resettlement Due Diligence Report August 2015 VIE: Power Transmission Investment Program, Tranche 2-500kV Pleiku-My Phuoc-Cau Bong Transmission Line Binh Phuoc Province Prepared by Central Vietnam Power

More information

The Study on Migration and Poverty Alleviation Planning of Daning County

The Study on Migration and Poverty Alleviation Planning of Daning County Open Journal of Social Sciences, 2016, 4, 138-144 Published Online April 2016 in SciRes. http://www.scirp.org/journal/jss http://dx.doi.org/10.4236/jss.2016.44019 The Study on Migration and Poverty Alleviation

More information

Case studies of Cash Transfer Programs (CTP) Sri Lanka, Lebanon and Nepal

Case studies of Cash Transfer Programs (CTP) Sri Lanka, Lebanon and Nepal Case studies of Cash Transfer Programs (CTP) Sri Lanka, Lebanon and Nepal June 2017 Solidar Suisse Humanitarian Aid Unit International Cooperation I. Introduction The nature of humanitarian crises is changing.

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

Asian Development Bank s Involuntary Resettlement Safeguards. Project Case Studies in the People s Republic of China

Asian Development Bank s Involuntary Resettlement Safeguards. Project Case Studies in the People s Republic of China Evaluation Study Reference Number: SST: REG 2006-14 Special Evaluation Study September 2006 (revised in October 2006) Asian Development Bank s Involuntary Resettlement Safeguards Project Case Studies in

More information

2017 RESETTLEMENT PLAN SCALING-UP URBAN UPGRADING PROJECT VINH LONG CITY SUB PROJECT SFG2836 V7 REV

2017 RESETTLEMENT PLAN SCALING-UP URBAN UPGRADING PROJECT VINH LONG CITY SUB PROJECT SFG2836 V7 REV SFG2836 V7 REV PEOPLE S COMMITTEE OF VINH LONG PROVINCE VINH LONG DEPARTMENT OF PLANNING & INVESTMENT SCALING-UP URBAN UPGRADING PROJECT VINH LONG CITY SUB PROJECT Public Disclosure Authorized Public Disclosure

More information

Resettlement Plan Dili-Tibar-Liquica Road

Resettlement Plan Dili-Tibar-Liquica Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING SECTOR PROJECT November 2011 REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK

More information

PRC: Xi an Urban Road Network Improvement Project

PRC: Xi an Urban Road Network Improvement Project Social Monitoring Report Semestral Report December 2013 PRC: Xi an Urban Road Network Improvement Project Prepared by Xi an Municipal Government for the People s Republic of China and the Asian Development

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

RP1633 V3. Resettlement Action Plan. the Anji Subproject. Anji County Government June 2014

RP1633 V3. Resettlement Action Plan. the Anji Subproject. Anji County Government June 2014 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank Financed Zhejiang Rural Water Supply and Sanitation Project Resettlement Action

More information

PRC: Xinjiang Regional Road Improvement Project (Korla-Kuqa Section)

PRC: Xinjiang Regional Road Improvement Project (Korla-Kuqa Section) Document Stage: Final Project Number: 39655 September 2007 PRC: Xinjiang Regional Road Improvement Project (Korla-Kuqa Section) Prepared by Communication Construction Administration Bureau of Xinjiang

More information

Revised Resettlement Plan Tibar-Gleno Road

Revised Resettlement Plan Tibar-Gleno Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING PROJECT February 2012 Democratic Republic of Timor-Leste REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS

More information

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT DRAFT COMPARATIVE ANALYSIS OF NEPAL s LEGAL FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT Note: The following is based

More information

External Resettlement Monitoring and Evaluation Report. People s Republic of China: Guiyang Integrated Water Resources Management (Sector) Project

External Resettlement Monitoring and Evaluation Report. People s Republic of China: Guiyang Integrated Water Resources Management (Sector) Project External Resettlement Monitoring and Evaluation Report # Semiannual Report December 2015 People s Republic of China: Guiyang Integrated Water Resources Management (Sector) Project External Resettlement

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry

More information

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang)

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Resettlement Plan August 2011 VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Prepared by the Lang Son Provincial People s Committee for the Asian

More information

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 07-01: Resettlement - Chiew Larn Multipurpose Project, Thailand Key

More information

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN. VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN. VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN Project Number: Loan 2225-VIE September 2013 VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE Prepared

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Samoa Post Tsunami Reconstruction

More information

Semi-annual Social Safeguards Monitoring Report (January to June 2012)

Semi-annual Social Safeguards Monitoring Report (January to June 2012) Semi-annual Social Safeguards Monitoring Report (January to June 2012) Armenia: Sustainable Urban Development Investment Program Tranche 1 Project Number: 42417 Loan Number: L2752 Prepared: July 2013 Prepared

More information

RP-0008 VOL. 1. Resettlement Action Plan for Shenyang Urban Transport Project. The World Bank Loan Liaoning Urban Transport Project

RP-0008 VOL. 1. Resettlement Action Plan for Shenyang Urban Transport Project. The World Bank Loan Liaoning Urban Transport Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Loan Liaoning Urban Transport Project Resettlement Action Plan for Shenyang

More information

India: Delhi Meerut Regional Rapid Transit System Project

India: Delhi Meerut Regional Rapid Transit System Project Initial Poverty and Social Analysis October 2018 India: Delhi Meerut Regional Rapid Transit System Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

PRC: Hefei Urban Environment Improvement Project

PRC: Hefei Urban Environment Improvement Project Resettlement Planning Document Resettlement Plan Qingxi Road Landfill Component Document Stage: Final Project Number: 36595 December 2006 PRC: Hefei Urban Environment Improvement Project Prepared by Hefei

More information

SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP)

SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) Language: English Original: English AFRICAN DEVELOPMENT BANK GROUP SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) FOR THE ORGANIC SUGAR PROJECT OF PURE DIETS MOZAMBIQUE S.A. IN MOZAMBIQUE 0CTOBER

More information

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT A. Introduction and Subprojects Components 1. Tranche 2 of the

More information

PRC: Guizhou High Efficiency Water Utilization Demonstration in Rocky Desertification Area Project

PRC: Guizhou High Efficiency Water Utilization Demonstration in Rocky Desertification Area Project Social Monitoring Report # 2 March 2018 PRC: Guizhou High Efficiency Water Utilization Demonstration in Rocky Desertification Area Project Prepared by Guizhou Water Resources Investment Company Limited

More information

For Harbin Municipal Government Harbin Municipal Water Supply Construction Leading Group Office

For Harbin Municipal Government Harbin Municipal Water Supply Construction Leading Group Office Social Monitoring Report Project Number: 33177 June 2006 PRC: Harbin Water Supply Project Prepared by Li Mou Individual Consultant PRC For Harbin Municipal Government Harbin Municipal Water Supply Construction

More information

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction.

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction. Regulations on Residents-Resettlement for the Yangtze River Three Gorges Project Construction (Adopted at the 35th Executive Meeting of the State Council on February 15, 2001, promulgated by Decree No.

More information

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Indigenous People Planning Document Due Diligence Report Loan Number: 2796 and Grant Number: 0267 NEP October 2013 Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

More information

Ethnic Minorities Development Framework. PRC: Guiyang Integrated Water Resources Management Sector Project

Ethnic Minorities Development Framework. PRC: Guiyang Integrated Water Resources Management Sector Project Ethnic Minorities Development Framework Ethnic Minorities Development Framework Document Stage: Draft Project Number: P38594 September 2006 PRC: Guiyang Integrated Water Resources Management Sector Project

More information

VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Project

VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Project Resettlement Plan July 2012 VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Project Prepared by Ho Chi Minh City People s Committee Management Authority Of Urban Railway for the Asian Development

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of

More information

VIE: Hanoi Metro Rail System Project Line 3: Nhon-Hanoi Station Section

VIE: Hanoi Metro Rail System Project Line 3: Nhon-Hanoi Station Section Social Due Diligence Report Document Stage: Second Draft Project Number: 40080 May 2013 VIE: Hanoi Metro Rail System Project Line 3: Nhon-Hanoi Station Section Prepared by Hanoi Metro Railway Board for

More information

AFG: MFF Water Resources Development Investment Program- Tranche 1, Nangarhar Valley Development Authority Grant No: 0167 AFG

AFG: MFF Water Resources Development Investment Program- Tranche 1, Nangarhar Valley Development Authority Grant No: 0167 AFG Social Monitoring Report Semiannual Report February 2015 AFG: MFF Water Resources Development Investment Program- Tranche 1, Nangarhar Valley Development Authority 42091 Grant No: 0167 AFG Project Implementation

More information

Arrange of Tourism Infrastructure at Ananuri Castle. Abbreviated Resettlement Action Plan

Arrange of Tourism Infrastructure at Ananuri Castle. Abbreviated Resettlement Action Plan Arrange of Tourism Infrastructure at Ananuri Castle Abbreviated Resettlement Action Plan Third Regional Development Project Prepared by Ltd Eco-Spectri 7 Chavchvadze Ave, room 4 Phone: +995 322 90 44 22;

More information

Social Management Policy Framework

Social Management Policy Framework Appendix 1-2 SFG1851 GEF Mainstreaming Integrated Water and Environment Management Project Social Management Policy Framework (Amended) Public Disclosure Authorized Public Disclosure Authorized Public

More information