F i. Resettlement Action Plan RP21I1. World Bank Loan Hunan Urban Development Project. Corridor Component. Mar (Changsha Section)

Size: px
Start display at page:

Download "F i. Resettlement Action Plan RP21I1. World Bank Loan Hunan Urban Development Project. Corridor Component. Mar (Changsha Section)"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP21I1 Volume 4 World Bank Loan Hunan Urban Development Project Corridor Component (Changsha Section) Resettlement Action Plan Prepared by Hunan Provincial CZT Economic Integration Office Mar F i Giy pv4

2

3 World Bank Loan Hunan Urban Development Project Corridor Component (Changsha Section) Resettlement Action Plan Prepared by Hunan Provincial CZT Economic Integration Office Mar. 2004

4

5 Approval Shou Xian Qing Check Xie Zeng Li Compile Zhao Geng Qiang Liu Yi Wei Major participators Zhao Geng Qiang Cao Huan Fu Huan Yu Long Zhou Qiong Hu Ying Lu Hai Tang Tan Zhi Juan Ren Bin Liu Yi Wei

6

7 Content 1. Summary Project Background Project name and Location Briefing on the Employer Project Background Roles of Project in the Region Project Briefing Geographic Position of the Region Major Construction Contents Cost Estimates and Schedule Social and Economic Benefits of the Project ProjectAffected Scope Preparation of Resettlement Plan Basis for Preparation Methodology for Preparation Project Impact Measures to Avoid or Minimize Land Acquisition and Relocation Measure in the Design Stage Measures in Construction Stage Physical Indexes Affected by the Project Measures and Procedures in Investigation Land Affected by the Project Population Affected by the Project Relocation of House and Affiliated Buildings Scattered Trees and Tombs Infrastructure and Special Facilities Enterprises and Privately Owned Shops Culture Relics and Vulnerable Group Project ImpactAnalysis General Situation of Natural and Social Economic in Project Affected Area 3-1

8 3.1 The General Situation of Nature and geography in Project ImpactArea The General Situation of Social Economy in Each project Impact County (District) Tianxin District Changsha County Social and Economic Conditions of Townships (Town) Affected by the Project Muyun Town Datuo Township baseline of Village basic Economic Codition of Resettlers' Families Affected by the Project Survey Content The Methods and Process of Investigation Social and Economic Situation in Project Zone Living Standard in Project Zone Public Infrastructure in Project Area Impact of Land Acquisition on Social and Economy of Local Population Law Framework and Policies Law Framework Related Policies of World Bank Policies Target of the Project Compensation Qualification Compensation Principles Varies Land Requisition Compensation Policies and Standards Ownership Sheet Resettlement Measures Resettlement Strategy Resettlement Targets Resettlement Principles Resettlers' Living Restoration Plan Principle and Procedures of Resettlement Points Alternative Plan of House Reconstruction and Reconstruction Infrastructure and Public Facilities Resettlers' Production Arrangement Plan 5-9

9 5.3.1 Resettlement and Production Arrangement tasks Targets of Resettlement and Production Arrangement Environment Capacity Analysis Agricultural Arrangement Scheme Non-Agricultural Arrangement Scheme The Restoration Measures of Enterprises, Institutions and Sideline of Villages & 5-16 Groups Resettlement of the weak group Restoration Measures for Resettlers' Economic Income Economic Income Level Comparison and Analysis of Resettlers before and after 5-25 Relocation 6. Organization and Responsibilities Organization Participating Resettlement Planning Organizations Implementation Management Organizations Supervision Organization Resettlement Management System Staffing and Facilities for Resettlement Organizations Responsibility of Project office Responsibilities of Resettlement office Responsibilities of Leaders of Townships (Town) Responsibilities of Design Units Responsibilities of Monitoring Units Staffing and Equipments Provided in Resettlement Organization Training Training Plan of Resettlement Management Staff Resettlement Production Skill Training Plan Measures for Organization Strengthening Public Participation and Harmonization with Residents in the Host Sites Public Participation Strategy Public Participation Approach and Measures Participation Approach Participation and Consultation Measures Public Participation in Preparation of Resettlement Planning Report 7-3

10 7.4 Public Participation Plan during Resettlement Report Implementation Women's participation Harmonization with Residents in the Host Sites Appeal Procedures Potential Complained Problems and Resolutions Appeal Channels and Procedures Environmental Protection and Management Needs for Environmental Protection Dismantling and Cleaning up Environment Management in Resettlement Area Monitoring and Evaluation Internal Monitoring Internal Monitoring Purposes Internal Monitoring Organization Internal Monitoring Content Internal Monitoring Responsibilities External Monitoring Evaluation Purpose of Monitoring Monitoring and Evaluation Organization Monitoring and Evaluation Content Monitoring and Evaluation Responsibility Independent Monitoring and Evaluation Measures Monitoring Evaluation Period Resettlement Evaluation Compensation Cost Estimate Cost Estimate Narrative Basis Cost Other Cost Basic Contingency 11-3

11 Relevant Taxes balance of Land Compensation Fee and Production Resettlement Investment Fund Use Fund Management and Auditing Resettlement Implementation Scheduling Principles for Scheduling Schedule Resettlement Implementation Schedule Yearly Fund Use Plan Attached Drawings Attached Drawing Attached tables Annex Agreement Important Contract and Agreement Contract of Resettlement Project Construction Measurement and payment 14-3 ATTACHED TABLES ATTACHED FIGURE

12 I i

13 Att achpd _-- - Draving I -. ' ims-1i.'. -_ -SJiematiDrawing of ' ographical Location XPgroject Region-- ;- F -_ < hanfsha Z-3 :S WS W~~~ecio tf~~~~~~~~~~~~~~~~~~~~~~......~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ l *_i~~~~~~~~~~~~~~~~~~~~~~~~~~~l

14 -

15 Resettlement Action Plan for Comdor Component (Changsha Section) 1. Summary 1.1 Project Background Project Name and Location Project Name: Section) of CZT. Flood Control Landscape Corridor Component (FCLRP, Changsha Project Proposed Location: The route is from the east of Houzishi Bridge along the Xiangjiang River, passes the Jiefangyuan, Nantuoyuan, reaches Changsha Gaoguo Sweet Factory, and meets national highway No.107 with a total length 21.58km Briefing on the Employer The Employer: Changsha Urban Construction Investment Development Co., Ltd. According to the Official Reply on Setting up Changsha Urban Construction Investment Development Co., Ltd. by the government and the Corporation Law of P. R. China, Changsha Urban Construction Investment Development Co., Ltd was formally registered for establishment on 18th August 1998, with the independent legal person qualification. The company represents Changsha municipal government as the investor, functioning as the main body of property rights for Changsha urban construction state-owned assets. And the company is responsible for efficiently operating urban construction state-owned assets, widely tapping financing channels and improving the effect of urban construction capital usage, in order to improve the urban construction, and social and economic development in Changsha. The concrete function of the company is to function as the main body of investment for urban construction state-owned assets, operate pursuant to law and manage the state-owned assets within the authorized scope, secure the safety of state-owned assets, and safeguard the rights and benefits of state-owned assets. According to the urban construction plan and its own economic strength, the company shall raise capital for urban construction by every means and forms. Well manage, use and activate the urban construction capital, and raise a loan or provide with guaranty for urban construction to the outside on behalf of municipal government. Entrusted by the 1 -I

16 Resettlement Action Plan for Corridor Component (Changsha Section) municipal government and municipal Construction Committee, when investing in the authorized urban infrastructure, the company is responsible for compensated investing, compensated using and providing with compensated service, in order to ensure the safety and added-value of the capital for investment. In accordance with the plan of capital usage for city maintenance issued jointly by municipal Planning Committee, municipal Financial Bureau and municipal Construction Committee, the company shall verify and allocate the capital, and entrust the bank to grant a loan. Through overall development in real estate and building material assets trade as well as some other project investment and operation activities relevant to urban construction, the company is also responsible for accumulating capital for urban construction. Changsha municipal Financial Bureau appropriated the company's first-stage registered capital of 50 million yuan in cash. On 28th, August, 1998, with the approval of Changsha State-owned Assets Management Bureau, the state-owned assets in 9 enterprises, including The First Water Plant, The Second Water Plant, The Third Water Plant, The Fourth Water Plant, The Fifth Water Plant, The Seventh Water Plant, The First Sewage Disposal Plant, The Second Sewage Disposal Plant and Changsha Gas Corporation, were put under the administration of Changsha Urban Construction Investment Development Co., Ltd. And it is allowed to increase the registered capital. As the capital comes from the state-owned assets in above mentioned 9 enterprises, the existing total assets of the company are 958 million yuan. The company practises general manager responsibility system, led by the board of directors. According to the requirements of operation, such four function departments as administration office (comprehensive depart.), planning and financial department, operation and development department and project management department, were set up. There are 20 permanent employees with the educational background above college, among which the employees with high- or medium-grade professional title account for 95%. Since the foundation of company, supported by the municipal committee and government and some other relevant departments, the company has made full use of the state-owned assets, actively participated in business and capital attraction, and undertaken project financing. It negotiated with Hong Kong and Tai land International Group and has 1-2

17 Resettlement Action Plan for Cornidor Component (Changsha Section) initiatively signed an agreement. Only in 1999,300 million yuan of capital was raised and 3 million yuan of loan was repaid. 237 million yuan of investment in projects such as Liberation West Road, Baisha North road, Chengnan West road, Tongzipo road, flood control project on both banks of Xiangjiang River, Laodong road, etc, has been accomplished Project Background Located in the center and east forward of Hunan province, the region of Changsha, Zhuzhou and Xiangtan is in the key position of the intersection of southern China. It is the region with high concentration of large, medium and small cities in Hunan Province or even in central and western part of the whole country, which includes 3 prefecture-level cities, 4 county-level cities, 8 counties, 166 towns and 362 townships. It is also the region with the most developed economy in Hunan province, and its total area is 28,254 square kilometers, which accounts for 13.34% of the whole province. At the end of 2000, the number of the whole population was million, accounting for 18.9% of the whole province. Located in the geographic central part of Hunan province, the three cities, Changsha, Zhuzhou and Xiangtan, are not only in the region with the most developed economy, but also the political, economic and cultural center of whole province. In terms of geographic location, the three cities all face the Xiangjiang River, with the triangular balance of power. It has been the hinterland of central China with the pivot role of linking the north to the south and connecting the east with the west. Its geographic superiority is very obvious. In terms of communications, the three cities have very convenient cubic comprehensive transport network of water, land and air. In terms of air transport, this region has Huanghua international airport. In terms of highways, it has 3 vertical and 4 horizontal communication lines, which are Jingzhu express way, NO.106 national road, NO.107 national road, Shangduan expressway, Changchang expressway, NO.319 national road, and NO.320 national road. In terms of railways, it has 3 trunk lines like Jingguang, Zhegan and Xiangqian; 4 local railways like Shichang, Liliu, Licha and Tanshao; and Zhuzhou station which is the largest railway freight service train-assembly station. In 1-3

18 Resettlement Action Plan for Comdor Component (Changsha Section) terms of water transport, it has the main course of Xiangjiang River, which connects with the Changjiang River. In 2000, the accomplished GDP in the three cities were billion yuan, with a growth rate of 10.6%, which accounted for 31.9% of the whole province. The contribution rate of the three cities to the economy of the whole province reached 38%. Per-capita GDP was 9,386yuan. The ratio of three industrialized structure was 13.5:42.7:43.8. The industrial level was 3.1 percentage points than the average level of the whole province. In 2002, the total financial revenue in the three cities was billion yuan with a growth rate of 8.4%, which accounted for 42.6% of the whole province. The disposable income of the urban residents was 6,732yuan and the net increase of rural residents' income was 2,834yuan, with an increase of 917yuan and 687yuan than the whole province respectively. The total retail sales of social consumer goods were billion yuan, accounting for 31.7% of the whole province. The total volume of import and export was billion dollars, accounting for 85.7% of the whole province. Of this total, the export value was 1.58 billion dollars, accounting for 88.3% of the whole province. The district area of cities was square kilometers, accounting for 36.02% of the cities in the whole province. The density of GDP was 3,841,200yuan per square kilometer, 2.44 fold as the average level (1,572,100yuan) of the whole province. In order to improve the changes from the partial superiority of the three cities to scale superiority, from city partition to city combination, and from resource extensive form and low benefit to resource intensive form, high technology, high benefit and export-oriented economy, Hunan provincial government made a decision to strongly propel the economic integration of the three cities and create a city group with its own characteristics in the central and western part of our country. A large core economic growth pole, which can attract and absorb such economic elements as talent, materials circulation, information flow etc, will appear and generate great economic benefits as a result. The centers of the three cities are about 40-50km away from each other and distribute along the Xiangjiang River in a triangle shaped. It is 128km form Yueliang island of Changsha to Kongzhou island of Zhuzhou. Along the line, there are 84 square kilometers of river area, 13.1 square kilometers of islands, square kilometers of land area on 1-4

19 Resettlement Action Plan for Comdor Component (Changsha Section) both banks, over 100 hills and mountains, 15 islands, 3 large cities and 11 small towns. In light of these characteristics, experts and scholars put forward the view of taking the Xiangjiang Landscape Belt project as the breakthrough point for raising capital, in the early stage of study on the economic integration of Changsha, Zhuzhou and Xiangtan. After over two years' early stage preparation, the provincial Planning Committee organized a large number of professionals in and out of our country to perform field investigation and theoretical research. In April 2001, Xiangjiang Ecological Economic Belt was formally listed into Hunan Changzhutan Economic Integration in Tenth Five-year Plan. After that, Xiangjiang Ecological Economic Belt Conception Program was drafted by the Germany Obermeyer Design Consulting Corp. and passed the professional review in the last ten-day period of March. In August, 2002, China City Planning Design Institute and Hunan Provincial Planning Committee jointly drafted The General Program Scheme of Xiangjiang Ecological Economic Belt Development and Construction. The scheme put forward that with Xiangjiang River as bridge, the landscape road with integration of flood control, ecological greening and tourism, shall be constructed and a batch of tourism leisure district, high-tech garden, high-grade residential quarters, and key small towns shall be constructed along the landscape road to form an intensive economic comprehensive entity. At present, Xiangjiang Ecological Economic Zones has initiated the project taking flood control Corridor Component a key point. The Changsha Urban Construction Investment Development Co. Ltd. has entrusted resettlement design unit to prepare resettlement action plan, and after they accepted the task, they organized a investigation group with good technology and go to the locale to investigate Roles of Project in the Region The Changsha section of Xiangjiang Ecological Economy Zone is the beginning part of the whole Economy Zone. It is suited at a very important position, has significant function and meaning in traffic improving, three-city integration, the urban and rural areas' development, flood control, damage reducing and ecological environment protection, etc This Project is the key to CZT economic integration 1-5

20 Resettlement Action Plan for Comidor Component (Changsha Section) CZT city group economic integration is a dynamic process, and the development and construction of the Xiangjiang Ecological Economy Zone is exactly the key and propeller. First, Xiangjiang Ecological Economy Zone covers Changsha, Zhuzhou, and Xiangtan to make up a belt region, which breaks the limitation of single city administration. United planning, administration and development is favorable for harmonizing the relationship of land management, urban and rural areas' construction, finance and revenue, ecological protection, infrastructure construction, landscaping and other aspects among the three cities and villages and towns along the river, which can speed up the CZT economy integrative process. Second, the coordination development of Xiangjiang Ecological Economy Zone will play a demonstration role and have an important function and meaning in the zone development from belt to plane. This development of Xiangjiang banks' ecology, agriculture, housing and traveling model area is a typical performance and sample for CZT economy unifying, while gaining experience from these models, so as to apply the model of the ecological economic practice into everywhere of the CZT cities. In addition, CZT now has basically possessed the regional unifying development qualifications. The Xiangjiang Ecological Economy Zone construction is a move and breakthrough, which powers Hunan economic development. With some economic function, Xiangjiang Ecological Economy Zone makes good use of the beautiful coastal ecological environment to pull the boost of the third industry such as tourism and entertainment while ensuring and well constructing the mother river's ecological environment condition, which makes this region's ecology, society and economy develop harmoniously. This demonstration construction can enhance the influence of Xiangjiang Ecological Economy Zone and the popularity of CZT, benefit in absorbing board and home investments, and accelerate the unifying process This Project is the necessity in bringing the Golden Region Advantages into full play. Analyzing from Changsha space structure evolvement trend, extending to the east or south is definitely the major direction of the city land usage. As the provincial government 1-6

21 Resettlement Action Plan for Corridor Component (Changsha Section) moves south, Changsha Road opens to traffic, Shaoshan Road carries on reform and broadening, Huoxing Road commence to build and series of other basic projects start, "Southern Changsha" is ready to portrait itself during Changsha modernization process. Taking the prior traffic area advantage, 'Southeast New Town", which rounded by the third circle Road and Jingzhu expressway, is likely to be the core of CZT cities. Changsha Section of Xiangjiang Ecological Economy Zone traverses this area, through Houzishi bridge, turn west to reach Xiaoxiang Road and Yuelu university town, turn north to connect Xiangjiang Road to join Wuyi Road and many other main roads, turn east to connect the second Ring Road, Changsha Road and directly link Jingzhu expressway, and turn south to stretch to Zhaoshan scenery zone contacting some other scenic spots like Muyun town etc on the way. The planning and construction of this project can rationalize the south Changsha's main road and branches to improve the road usage efficiency; make the south Changsha Central Business District traffic more accessible to meet the even larger financial activities requirements and enlarge city development space; regular the out-move population living in city major district within the first ring road, to guide the urban suburbanizing movement from passive to voluntary and convert the old region and perfectly expand the new city region; furthermore stimulate the growing of 'integrative cities" business in south Changsha to foster new hot interests in city's development and construction, and outline the city's new look combing both pleasant environment and modern atmosphere. Besides, the project applies the highways to connect sight-seeing zone such as the moon island, Juzizhou, Zhaoshan. With the common ware projections like green fields, cultural viewpoints, entertainment facilities along the road, the citizens' living standard is greatly lifted This Project meets the deed of flood control and damage reduction along the Xiangjiang River Changsha city, with dense population, concentrative properties, locates at the lower reaches of Xiangjiang, Dongting region. The flood is always foul here for the low-lying topography. The square of area bellow the water level takes up 25.3% in case the serious 1-7

22 Resefflement Action Plan for Comdor Component (Changsha Section) floods in 100 years occur. In particular, the riverside surface is average between 30m to 33m high, and the average water level of many years' is above the surface from 1 to 3 meters, so it is vulnerable to the threat of flood strike. It's difficult to withstand large scale of flood with the city's present flood and logging control facilities because they are low-efficiency, the embankment construction is not well considered, so the protection circle hasn't closed, the already built body of embankment is short in height, of low-standard, and the vulnerable sections, invisible dangers haven't been tackled and cleared off completely. Changsha' overall flood control capability can not resist flood in less than 20 years, which does not go with its social economic status as the province capital. Ever since 1950, the direct economic loss of Changsha city has been averagely over 10 million yuan in the serious flood years. It amounts to 780 million RMB in 1994, and 1860 million in With the economic development and social advancement, the floods would cause even greater losses and worse consequence. Flood control construction is an important purpose of this project, and the main function of Xiangjiang Ecological Economy Zone. The Changsha section's flood control construction scope ranges from Heishipu station, Jingguang railway line to zhaoshan, the total area is 28.07km 2, with Jiefangyuan(14.47KM 2 ) of Changsha city and Nantuoyuan(13.6KM2) of Changsha's county included. The two sections is 23.9km altogether in length, made of earth. The top of the embankment is 37-39m high and 4-10m wide. The body is built through multi-heightening and thickening stage by stage, so the earth fulfillment is relatively complicated, plus the different degree of damages due to the attacks of various nature disaster, geographical effects and human factors, dangerous situations occur here and there on the embankment whenever the flood periods come, especially incessant threats appear in part of it during several great floods in 90s. The project upgrades the standard of Jiegangyuan to withstand flood in 100 years, the Nantuoyun 50 years (also at the road flood control standard). The standard of logging control can practice close lock gate for 10 years and drain the area stricken by the heavy rainstorm for 24 hours within 24 hours. If completed, the local people will shake off the suffering of floods in the flood periods. I -8

23 Resettlement Action Plan for Corridor Component (Changsha Section) 1.2 Project Briefing Geographic Position of the Region Changsha City is located in East Longitude of ' ',North latitude of 28000'28030', with the Xiangjiang River running through the center of the city from the north, and then through Yueyang to Changjiang river. The physiognomy is that one half is covered with hills and the other half is covered with plain. The city is coupled with mountains and rivers, with the Xiangjiang river running through from the North to the south, and the Yuelu Mountain, Gu Mountain on the west. The eastern part of Changsha is fairly flat. The anabranches of Xiangjiang in this area are Liuyang river, Laodao river and Qijiang river Major Construction Contents Flood Control Landscape Corridor Component of CZT (Changsha section) is given in Table Tablel.2-1 1) Road project Major Construction Contents of The Project Item Unit Quantity Line length (Grade I) km Roadbed earthwork mj Roadbed protection m Drainage m Pavement m' z Bridge mz 830 Culvert m/hole 6439/88 Intercrossing No. 10 Traffic works and facilities km Special roadbed treatment mz , Hydro and flood control works Dike heightening and thickening km 23.9 Dike body grouting i/hole 13215/1752 Dike foundation treatment (high-pressure swing grouting) i/hole 26564/3677 Lengthening culvert gate No

24 ResefttementAcfion Plan for Comdor Component (Changsha Section) Major Construction Contents of The Project Tablel.2-1 Item Unit Quantity Reconstructing culvert gate No. 1 Installed capacity of electric drainage station Set /kw 22/3910 Strengthening flood channel No./km 5/10.8 River channel clearing barrier house mr/ridgepole 11750/44 River channel clearing barrier waste dock No. 4 Slope and foot protection m , Road landscape and afferestation Afferestation area (km)' 0.9 Humanizing and scenic spot No Cost Estimates and Schedule The total cost of Flood Control Landscape Corridor Component of CZT (Changsha section) project is million yuan, the time limit for the project is 29 months, from September of 2004 to December of 2007,of which, the compensation fund is million yuan. The resettlement is planned to begin in April of 2004 and finish in July of Social and Economic Benefits of the Project Assessment Basis and Narratives The assessment of the Project is divided into two part: domestic economic assessment and financial analysis. According to the Economic Assessment Methods and Parameters of Construction Project ( 2 nd edition) and the implementation detail provision for the Economic Assessment Methods and Parameters of urban public facilities construction, which are issued jointly by the State Planning and Development Commission and the Ministry of Construction, with the principle of that benefit should be consistent with the cost, domestic economic analysis and financial assessment is applied National Economic Assessment According to the principle of collocating the resource suitably, domestic economic assessment observers the benefit. and cost of the project from the aspect of the:whole of 1-10

25 Resettlement Action Plan for Comdor Component (Changsha Section) the country, calculates the net contribution of the project to the country with several economic parameters such as shadow price, shadow salary, shadow exchange rate, and reality accounting, assesses the rationality of the project. The nation profit analysis is used by the way of calculate the direct quantitative economic benefit with the Yes-No method. 1) Methods and Parameters Domestic Economic Assessment is based on the Economic Assessment Methods and Parameters of Construction Project ( 2 nd edition) and Economic Assessment Methods of road construction project. The assessment model refer to the investment environment optimization and feasibility research. methods for the According to the principle that benefit should be consistent with the cost, the value of the parameters are as follow: Social converting rate: 10% Trade cost rate: 6% Shadow price: Shadow exchange rate: Salvage value: Time limit of the assessment: based on port price ldollar=8.3rmb according to the Assessment Methods, 50% of the project cost is calculated into the last year as minus. the assessment period comprises construction period and 2) Calculation of Economic Cost operation period, the construction lasts 2 years ( ), the operation lasts 20years. The cost comprises the construction investment and the interest of loan of the construction period, the maintaining cost, management cost, mending cost of the flood-prevention project, operation cost of the flood-prevention facilities and administration cost etc. It is adjusted to economic cost according to the requirement for analyzing the domestic economy. That is million yuan. 1-11

26 Resettlement Action Plan for Conidor Component (Changsha Section) 3) Economic Benefit Assessment The benefit of the project is from reducing the operation cost, the time of the passengers and traffic accident. The detail can be seen on Tablel.2-2. Table1.2-2 National Economic Cost and Benefit Analysis Table Social discount rate(10%) Cost (10 4 Profit Static Cost Benefit Net Economic Year cot(0 (10 ~ profit Discount YYuan) uan) (104 Yuan) factor present present present evaluation index value value value ENPV ( Yuan): 36292; EIRR(%): 20.57; EBCR: 1.97; Payback period (year): Salvage value 1-12

27 Resettlement Action Plan for Comidor Component (Changsha Section) Financial Analysis According to the Guide to Feasibility Study of Investment Project compiled by the China International Engineering Consulting Corp. entrusted by the State Planning Commission, financial internal benefit rate, financial net present value, investment payback period are not included with the financial analysis method as to the nonprofit project, and the payback day should be calculated for the project with loan and income. When the item is operated, normal maintaining and administration cost is 4.74 million yuan, of which: road mending cost 910 thousand, flood-prevention project cost 3.43 million, administration cost 400thousand. The Project Employer is the Changsha Urban Construction Investment Development Co. Ltd., the loan will be paid off with the appropriated money from city maintenance fund of Changsha and the land operation revenue of the Changsha Urban Constructiorn Investment Development Co. Ltd. Based on the conditions above, the World Bank loan will be repaid based on 5 year grace period and later 15 years repaid in an equal amount. As to the loan from the national banks, only the interest is repaid during the construction period, and the loan will be repaid in an equal amount in 18 years after operation, the total loan period lasts 20 years Social Assessment 1 ) Analysis of the Social Impact of the Project A) The fast development of the Xiangjiang economy zone and the built road along the river can lead to the growing up of the towns along the river, laying a steady foundation for the CZT integrating; B) The along-river sight road,with the main purpose of touring, lie fallowing and sighting, will fully bring forth the special Jingchu culture charm of Xiangjiang river; C) With the protection and resume of the ecological environment and the development and prosperity of the township economy, the two shores of the Xiangjiang in the future will be very beautiful and the residential condition along with the life quality will be 1-13

28 Resettlement Action Plan for Coridor Component (Changsha Section) much better. D) The massive remove of the houses and the resettlement affected by the project, will gain compensation by the government of Changsha City according to the related laws. 2) Compatibility Analysis of the Project Locus A) The attitude of different groups: i ) The most important of the sustainable developing ecosystem in the CZT area is the Xiangjiang and coastwise ecosystem. As long as Xiangjiang river and its coastwise become the embryo of the ecological economic development, the sustainable development of the CZT city-group area can realized. So the Hunan provincial government brings forward the built of Xiangjiang ecological economy band, strengthening the function of the economic development axis, and ranks it as one of the marking project of CZT integration; ii )The project could beautify the coastwise environment, speed the development of touring-and -sighting, entertainment and lie fallow etc, as well as develop non-pollution high-tech 2nd industry and sighting ecological agriculture, making the ecology society and economy develop harmoniously, which is consistent with the benefit and development goal of the local government. So the Changsha Municipal Government attaches great importance to this opportunity, plunges into the construction actively;iii) The good coastwise ecological environment could provide a wonderful ground for the citizens' entertainment, improve their life quality, so the people of Changsha City expect that the project will soon be implemented;iv) As for the involved relocatees, with the reasonable compensation and resettlement of the government, they will accept the arrangement of the government considering the whole. B) The attitude and support of the organizations of all levels: because the construction of the project is an important decision based on the investigation and reasoning of the Hunan provincial government, the subordinate governments will try their best to provide advantage of transportation, communication, power, water-supply and favor of social welfare and others. C) The compatibility of the local culture: the Xiangjiang and its coastwise has a very 1-14

29 Resettlement Action Plan for Comdor Component (Changsha Section) long history, with many famous historical people and plenty of historic site. Changsha is a famous historic city, with the special local advantage and profound inside culture, possessing good development foundation and immense potential. According to the Development Plan of the Culture Industry of Hunan Province, with 10 years' endeavors, Changsha City will become the central cultural city with profound anthropological spirit, dense cultural atmosphere and developed cultural industry, and the famous destination for tourist. All of these will offer strong security for the successful implementation of the project. 3) Conclusion on Social Assessment A) The project is an important part of the CZT economic integration, provides the possibility of the ecological construction, tourism development, agriculture progress, industry prosperity, environment beautification of the coastwise of Xiangjiang River. B) There is risk in it, however, if the governments of all levels and the related organizations could strengthen the governing, adopt effective prevention measurements and pay attention to the integrative planning and harmonizing, the amount of risk could be reduced to the minimum. 1.3 Project Affected Scope Project affecting zone covers from Xiangjiang riverside at the east of Houzishi Bridge of Changsha city to Gaoguo Sweet Factory of Changsha city at Zhaoshan, it has the whole length of 21.58km. The width of investigation includes all of outside embankment and 50m of inside embankment. The residence relocation affected 13 villages (52 groups), like Muyun town of Changsha County, Datuo Township in Tianxing Area, Xinkaipu Office and so on; land acquisition affects 12 villages (57 groups), and another 55 units in all. 1.4 Preparation of Resettlement Plan Basis for Preparation Basis for Preparation (1) Xiangjiang Ecological Economic Zone Concept Plan prepared by German 1-15

30 Resettlement Acdon Plan for Comdor Component (Changsha Section) Obermeyer Consulting Corporation; (2) Development and Construction Integral Planning Scheme for Xiangjiang Ecological Economic Zone prepared by China City Plan and Design Research Institute and Hunan Provincial Development and Planning Committee; (3) Changzhutan Economic Integration Plan for Transportation, Electricity, Finance, Information and Environment Protection prepared by Hunan Provincial Development and Planning Committee and CZT Economic Integration Office; (4) Preliminary Design Report for Changsha Urban Flood Control Project prepared by Hunan Hydro and Power Design institute; (5) Changsha Urban Flood Control Plan jointly prepared by Changsha Flood and Drought Control Headquarters and Changsha Hydro and Power Survey and Design Institute; (6) Geological Investigation Report for Jiefangyuan, Nanyuan Embankment Project prepared by Changsha Investigation Non-ferrous Metal Industry; Design and Research Institute, China (7) Survey Technical Report for CZT Landscape Road of Flood Control (Changsha Section) prepared by Changsha Investigation Design and Research Institute, China Non-ferrous Metal Industry; (8) Feasibility Study Report (Changsha Section) for CZT Urban Development Program of Landscape Road of Flood Control Project prepared by Hunan Provincial International Consulting Corporation Targets (1) The engineering, technical and economic measures shall be employed to avoid or minimize land acquisition and relocation physical quantities; when land acquisition and relocation is inevitable, effective measures shall be employed to reduce the impact of land acquisition and relocation on the local residents' production and living as much as possible; 1-16

31 Resefflement Action Plan for Comdor Component (Changsha Section) (2) Social economic investigation and corresponding resettlement action plan are made during the preparation of the project. The resettlement is based on physical indexes and compensation criteria, targeting to improve or at least rehabilitate resettlers' original living standard. (4) Development-oriented resettlement is highly recommenced. The rural resettlement should depend on land as well as in virtue of the developed second and third industry to increase the employment opportunities; (5) Resettlers and existing residents in the host site are encouraged to participate the planning of resettlement and planning scheme; (6) Resettlers will be given prior consideration for relocation in the original community. (7) Both resettlers and existing residents in the host sites will benefit from this project Methodology for Preparation Hunan Provincial Changzhutan Economic Integration Office, with participation of related units, resettlement consultant unit as well as government at all levels jointly organizes resettlement action plan work. In July, 2003, with the active cooperation of government at all levels in project zone, dedicated people perform physical indexes in the scope affected by land acquisition, and full investigation Stat. of resettlers' household basic conditions, adapt sampling survey investigate their willingness. Meanwhile, holding a resettlement coordination meeting with the participation of the employers, the designers, government at all levels affected and the resettlement representatives, they listened to the opinions of various parties, discussed resettlement scheme, the ways of resettlement living restoration, compensation by adapting law framework and criteria etc., then proposed initial resettlement planning program. In line with the established policies of our country, law and statute and requirements of the World Bank for resettlement, they performed reasonability analysis and feasibility study analysis for how townships at all levels (street office) in project zone affected, improved and perfected in accordance with the suggestions of technical assistance experts of the BANK and consultant experts of Motor MacDonald Company after their reading and observation on site, completed preparation of resettlement action plan report at last. It was checked and approved by local government in project zone. 1-17

32 i i

33 Resettlement Action Plan for Corridor Component (Changsha Section) 2. Project Influence 2.1 Measures to Avoid or Minimize Land Acquisition and Relocation In order to minimize the influence on the local social economy due to the project construction, the plan of flood control landscape road shall be modified and optimized, and special technique demonstration is needed. The main purpose of optimizing plan is to reduce the construction land acquisition, decrease resettlement relocation, lower project cost and facilitate the construction Measures in the Design Stage During the project planning and designing, when in the comparison of optimized plans, the influence on the local social economy due to the project construction shall be taken account of as much as possible, as the key factor in comparison of plan optimizing. (1) In the juncture between Sanxing village of Muxun town, and Xingang village of Datuo town, there is a tributary of Xiang River named Xingang River, on which there is a lower standard highway bridge. And the existing dyke here along the river embankment is more than 1700 meters. If a high standard highway bridge is built in the river mouth to match with the new dyke road later, it will not only straighten the road along the dyke, but also reduce the physical relocation resettlement 44 households 179 persons (including agriculture population 165 persons), house relocation Gm 2 (including brick and concrete m 2, brick and timber m 2, earth and timber m 2, sundry house m 2 ) and land acquisition mu(including water land 79.74mu, dry land 64.71mu, pond 19.75mu and residential house land mu), as well as a little affiliated facilities such as sunning ground, bounding wall, etc. (2) At the forth group of Nantuo Village, Muyun Town, there is a Temper of Baogong of Tongzhi Period, Qing Dynasty. In order to protect this ancient construction, the original modification line is changed in the project designing. In this way, physical relocation resettlement of Baogong Temper and Muyun Headquarter for 2-1

34 Resettlement Action Plan for Comdor Component (Changsha Section) Flood-prevention and Drought-fighting can be minimized m 2 (including brick and concrete m 2, brick and timber m 2, earth and timber m 2, sundry houses m 2 ) as well as some additional facilities such as sunning ground and bounding wall. Physical indexes affected by the reducing is given in table 2.1-1, Indexes of Land Occupation Reduction by Scheme Optimization Table2.1-1 Township Paddy field Dry land Pond Residential site Subtotal Village Groups (Town) (mu) (mu) (mu) (mu) Muyun Shanxing Huangjiaping Damaoping Datuo Xinghang Xiangpuyuan Subtotal (3) The construction plan shall be optimized, time limit for the project shall be shortened and the period for house relocation and construction shall be properly arranged in order to minimize the resettlers' property cost. For example, the period for house relocation and rebuilding is usually chosen in slack season and land occupation is usually arranged after harvest. (4) The inconvenience brought to local residents' life and production due to the construction of flood control landscape road shall be taken fully account of in planning. Generally speaking, considering the convenience of local residents' life and production, make sure the damage of infrastructure and special facilities due to the construction of flood control landscape road could be restored, guaranteeing the normal performance of infrastructure and special facilities Measures in Construction Stage Land acquisition and relocation in this project are distributed in linear. As far as the whole project zone is concerned, the project construction has not large influence on the local industrial and agricultural production, people's life and social economy. However, in order to minimize the influence on local area due to the project operation, more attention must be paid to the arrangement on the work site and the selection of construction plan, avoiding the unnecessary land acquisition and house relocation as much as possible. 2-2

35 Resettlement Action Plan for Corridor Component (Changsha Section) Indexes of House Relocation Reduction by Scheme Optimization Table2.1-2 Household People Brick and concrete Brick and wood Earth and wood Miscellaneous Township (Town) Village Group Subtotal (household) (No.) (m 2 ) (m 2 ) (m 2 ) house (m 2 ) Residence Muyun Shanxing Huangjiaping Damaoping Datuo Xinghang Xiangpu yuan Non-residence Total

36 Resettlement Action Plan for Cormidor Component (Changsha Section) 2.2 Physical Indexes Affected by the Project In June, 2003, according to the project land occupation scope defined in the design, the investigation staff performed all round survey and register of the population quantity, land type and area, house structure and area as well as affiliated facilities, quantity of wood and fruit trees in affected areas. The project of Flood Control Landscape Corridor Component of CZT (Changsha section) involves Muxun town of Changsha County, and Datuo town as well as Xinkaipu town of Tianxin district, Changsha, totally 13 villages and 52 groups. Physical indexes affected by the project for more detail is shown in Appendix Measures and Procedures in Investigation In June, 2003, according to the project land occupation scope defined in the design, coordinating with working staff of towns and villages, the investigation staff performed all round survey and register of the population quantity, land type and area, house structure and area as well as affiliated facilities, quantity of wood and fruit trees in affected areas. All round survey on project land occupation was performed in group as unit. With 1:2000 topographic maps, the investigation staff laid out the boundary line on the spot, measured on the map with computers and calculated the land area. With maps, they checked the house to be relocated within the scope on the spot, measured the house according to the type of household and structure, registered affiliated facilities, scattered fruit trees and sundry trees one household after another and obtained the approval of the resettlers with signature. The special facilities affected by the project such as simply-built highway, broadcast line, telecommunication line, transmission line, etc, which need to be restored or reconstructed, were investigated and registered on the spot Land Affected by the Project 1) Permanent Project Land Occupation Flood Control Landscape Corridor Component of CZT (Changsha section) needs occupy land mu permanently, including collective land mu, state land 71.45mu. The collective land includes the cultivated land mu(including water land mu, vegetable land mu, dry land mu), pond 86.10mu, fish pond 5.07mu, orchard 1.17mu, wood land 5.76mu, grass land 27.72mu, residential house land 91.78mu, public land mu, road land 19.60mu, channel land 0.84mu, other land 47.50mu. 2-4

37 Resettlement Action Plan for Comdor Component (Changsha Section) Engineering Permanent Occupation Collectively-owned Land Table Table Item Unit Tianxin District Changsha County Datuo Village Xinkaipu Muyun town Total 1) Cultivated Land mu Paddy Field mu Vegetable Land mu Dry Land mu ) Pond mu ) Fish Pond mu ) Orchard mu ) Forest Land mu ) Grass Land mu ) Residential Site mu ) Public Use Land mu ) Road Use Land mu ) Channel mu ) Other Land mu Total mu Permanent project occupied land for more detail is shown in Appendix 2. 2) Temporary Land Occupation The project shall occupy temporary land mu, including economic forest mu, timber forest mu and wasteland mu. The influence of permanent land occupation should be considered in the construction temporary facilities. No other additional occupied land should be considered Population Affected by the Project 1) Relocation population: 588 people 2) Requisition and relocation population: 1314 people 3) Requisition population: 715 people 2-5

38 Resettlement Action Plan for Corridor Component (Changsha Section) 4) Population of enterprise: 236 people 5) The total population affected by the project: 2853 people. Population Affected by the Project Table Agriculture population (people) Enterprise County Township Requisition population Total (District) (Town) Relocation and Requisition (people) (people) relocation Tianxin Datuo Xinkaipu Changsha Muyun Total Relocation of Houses and Affiliated Buildings The project involves 3 towns, 13 villages and 52 groups in Changsha county and Changsha Tianxin district. The relocation population is 502 households with 1902 persons (including agriculture population 1760 persons). The relocation houses are m 2 including residential houses m 2 (brick and concrete m 2, brick and timber m 2, earth and timber m 2, sundry houses m 2 ), non-residential houses m 2 (brick and concrete m 2, brick and timber m 2, earth and timber 21.72m 2, sundry houses m 2 ). Sunning ground m 2, bounding wall m 2, 375 wells and 54 methane tanks are also affected. House relocation detail is shown in Appendix Scattered Trees and Tombs 5797 scattered trees including 1960 scattered fruit trees and 3837 sundry trees are affected by the project. 8 tombs are relocated due to the project affection. Scattered trees and tomb influence for more details is show in Appendix3. 2-6

39 Resettlement Action Plan for Comdor Component (Changsha Section) House Relocation Indexes Table Table Brick and Brick and County Township Village Group Earth and Miscellaneous (District) (Town) (No.) (No.) concrete wood Subtotal wood (m 2 ) house (m 2 ) (m2) Residence (m2) Tianxin Datuo Xinkaipu Non- Changsha Muyun Residence Total

40 ResettlementAction Plan for Corridor Component (Changsha Section) Infrastructure and Special Facilities According to the scope of the project land occupation defined in the design, the investigation staff investigated and registers the affected special facilities to be restored or reconstructed on the spot, including simply built highway, broadcast line, telecommunication line, transmission line, etc. All that have been affected are simply-built highway 3.65km, tractor road 0.12km, high voltage transmission line 8.88km, low voltage transmission line 9.06km, 11 transformers, telecommunication line 6.06km, channel 0.58km, 15 electrical water supply machines and 1 wharf. Special facilities affected for more detail is show in Table Enterprises and Privately Owned Shops Through investigation, totally 55 enterprises and units with 236 persons are affected and involved within the scope of project land acquisition, including 30 enterprises 215 persons and 5 units 21 persons (NO.2 Light Industry School, NO.4 General Investigation Group of Geological Administration, Construction Part of Changsha Railway General Corporation, Datuodi Committee and the Power-supply Station of Hunan Electric Corporation). Other 20 enterprises are the public houses and the pump houses of the village or group. In the 30 enterprises, seven enterprises including Timber Corporation of Hunan province, China Hydro power-baju Group, Meats Alliance Processing Factory, Dasheng Furniture Factory, Bashang Meats Alliance Factory and Black Limewater Factory have an impact on the demolish and remove of the houses. Expect Gaoguo Sugar Enterprise, Changsha Machine Tool Factory and Zhongyi Stock limited Corporation; the other 23 enterprises all have to be relocated. Privately owned shops are not affected within the scope of project land acquisition. Affected enterprises detail is show in Appendix 3 and

41 Resefflement Action Plan for Corridor Component (Changsha Section) Table Special Facility Table Affected by the Project Road Facilities Power Transmission Facilities County Township ~~~Tractor Hih LwTelecommunication (District) Township Village (No.) Simple Road Voltage Voltage Transformer Line Pump (km in Station Canal (kim) Dock Ship Highway(km) Line Line (Set) (No.) (No.) (kin) (km) (km) Changsha Muyun County Town Muyun Lianhe Fengcheng Yaotang Nantuo Sanxing Tianxing Datuo District. Xingang Datuo Xinglong Total Muyun

42 ResettlementAction Plan for Comdor Component (Changsha Section) Cultural Relics and Vulnerable Groups 1) Cultural Relics: cultural relics are not affected by the project construction. 2) Vulnerable groups: 25 impoverished households not including minority are affected in the project zone. 2.3 Project Impact Analysis Affected by the project construction, the original production system within the affected scope will be damaged to some degree, which will has a little influence on the local residents' life and production. The decrease of land resources makes part of peasants lose their dependent material base for livelihood, which leads them to have to adapt to the new environment again for life and production. However, during the project designing, the project designing unit has taken fully consideration of the damage to local life and production system caused by the land acquisition, kept on optimizing the project program and taken measures to reduce the scope of relocation and land acquisition, in order to minimize the influence of project construction on local life and production. As a result, the construction of this project will not make large damage to the original conditions of life and production in each village. Meanwhile, because the land occupation of this project distributes along the river embankment in the form of belt, the project influence is obvious only in part of project zone as far as project construction is concerned. The project construction will not have large influence on local industrial and agricultural production, people's life and the development of social economy. At present, most of the area along the Xiangjiang River often suffers from floods, which restrict the fast development of local economy. The project of flood control landscape road provides an opportunity for local residents to rebuild society and production system. After the completion of project, it will strengthen the capacity to fight a flood and deal with the emergency, decrease the impact of flood, provide a good environment for safeguarding citizen's life and property to the maximum degree, speed up the circulation of local agriculture products and improve the development of local economy. Besides, with the compensatory payment, by means of improving farmland irrigation facilities, transforming farmland with middle and lower output, and adjusting industry structure, the patential of 2-10

43 Resettlement Action Plan for Corridor Component (Changsha Section) exiting land resources can be fully explored and the unit output can be increased so as to make up for the lost of income due to the decrease of cultivated land and reach or surpass the original level as soon as possible. 2-11

44

45 Resefflement Action Plan for Comdor Component (Changsha Section) 3. General Situation of Nature and Social Economy in Project Impact Area 3.1 General Situation of Nature and Geography in Project impact Area The project's location, Changsha, is situated in the north of the central part of Hunan province, and is in the lower reaches of The Xiangjiang River. It is the capital of Hunan province and the core area of the Five Region and Corridor economic belt. The completion of this project will improve the ecological environment in project impact area, flood control capacity and investment environment, which will make Changsha not suffer from the flood and improve sustainable development of local economy. 1) Location Changsha is located between eastern longitude ' and ',and between northern latitude and 28030'. The Xiangjiang River flows through the center of the city from south to north, and flows into Changjiang River in Yueyang. The topography and landforms of Changsha are 50% mountains and hills, and 50% flatlands. The city depends on the mountain and river, and Xiangjiang River runs through from south to north. There are Yuelu Mountain and Gushan Mountain in the west while it is flatter in the eastern part. There are such rivers, which flow into Xiangjiang, as Liuyang River, Laodao River, Jinjiang River. 2) Administrative Divisions Changsha, which has 3,000 years history, is famous as the Famous City in Chuhan and is the capital of Hunan province. It is the political, economic and cultural center of the province and also the center that Dongtinghu area opening and development in the Changjiang development area of China relies on. There are such five districts as Furong, Tianxin, Yuelu, Kaifu and Yuhua, and such four counties as Changsha, Wangcheng, Ninxiang and Liuyang. The total area is km 2, of which the urban area is 554 km 2. The total population is 5,830,000, of which the non-agricultural population in the urban area is 1,860,000. 3) Natural Resources 3-1

46 Resettlement Actfon Plan for Corridor Component (Changsha Section) a) Tourism resources: Changsha has a long history, beautiful scenery, plentiful famous places, historic sites and memorial places, and is one of the first 24 historical and cultural famous cities which were approved by the State Council in China. It is so famous that it has the title of The Famous City in Chuhan and beautiful landscape and historical prefecture. It has formed such a city structure as one river, two banks, and culture in east while market in west. There are such the most famous places and historic sites in them as Yuelu Mountain, Lushansi Temple, Yuelushuyuan which is one of the most 4 famous academies of classical learning in Chinese antiquity, Kaifusi Temple, Tianxinge, Juzizhou, Martyr Park, Qingshuitang which is the old site of CPC Xiang area Committee, Hunan first Normal School, the old site of Hunan Self-study University, the old site of Xinmin Association, Mawangdui ancient tomb of Xihan and the former homes of some historic famous people as Yang Kaihui, Huang Xing, Cai Hesen, Xu Teli, Liu Shaoqi. Liuyang Daweishan and Ningxiang Huitang are also good places to take a trip. At the end of 1998, Changsha was among the first group of cities that were given the title of China Excellent Tourism City by the nation. b) The mineral resources: Mineral resources of Changsha is abundant, the mineral mostly distributes in Ningxiang, Liuyang and north of Wangcheng. There are 51 kinds of mineral such as coal, phosphor, sulphur, and chrysanthemum stone and so on. It has 27 large mineral beds, 56 small mineral beds and 256 mineral points. The mineral, which reserves rank the first in the whole country, contains Haicang Stone, chrysanthemum stone, etc. And the reserves, which rank the first in the whole province, contain phosphor, sulphur, copper, zinc. c) Biological resources: There are 26 sections, 881 categories and 1973kinds of altitude foliages in the whole city. There are 14 kinds belong to the national pivot protection, and 14 kinds belong to two or three grade protection. Animal's species are also numerous. 4) General Situation of Social Economy Since the reform and opening, both the economic construction and development of the 3-2

47 Resettlement Action Plan for Corridor Component (Changsha Section) social causes in Changsha have achieved great success. The local total output value amounted to billion Yuan, the total production value of industry and agriculture amounted to 73,727 billion Yuan, and the total value of foreign import and export amounted to billion dollars. The average of income can be dominated by urban citizens is 7985 Yuan, in Changsha is an important basement of merchandise food and merchandise pig in the country and the production of food and porker is on the top in the whole country. Large amount of agricultural products as well as sideline products such as marine products, vegetable, fruit, tobacco, Xiang lotus, edibility germ, tea etc, form the vivid characteristic of Changsha agriculture. In accompany with the development of the market economy, Changsha agriculture should pay attention to change the traditional agriculture into the market agriculture, suburb type agriculture and ecosystem agriculture. The industries in Changsha take food, light spin, electronics, machine as pillar industry, and other industries such as chemical engineering, building materials, medicine, car, metallurgy...etc. have good foundation too. We have developed the multicolor tube, computer, cigarette, electric appliances in car, air condition, etc. There are 100 various products that have been launched into the international market, and sold to more than 100 countries and regions. The total production value of 62,049 billion Yuan was completed in industry, state-owned business enterprise and state-owned shareholding enterprise. It had made up the deficits and get surpluses in the mass, in The industry of Changsha has stepped into the orbit characterized by centering on improving economic benefits, and continual, stable, and coordinated development. Changsha has a developed commerce and it is a commodity staple place, which had a warm of merchants and prosperous trade since ancient times. Since the reform and opening, Changsha's circulation has quickly developed into the most superior industry. The construction of market is developing vigorously and net points of market spread all over the city. There are more than 120,000 kinds of business net points and the total value of social commodity retail was billion Yuan in The business net, which is a unite of large, middle and small; a unite of high, middle and low; a unite of comprehensive and professional market, rational arrangement, clear levels, and multilevel, has been 3-3

48 Resettlement Action Plan for Cormidor Component (Changsha Section) formed. Youyi Group and Dongtant department building have entered the first hundred powerful retails of the whole country. The radiation coverage about staple commodity quantity, trade volume, and activities of business has an important position in the whole province even in the whole center of southern region in china. Changsha is situated on the communicated point of opening and development area along the Changjiang River and economic circle of south China. It is the most important region economic developing strategy named One Point, One Line' in Hunan. The point is Changsha, and the line is from Beijing to Guangdong. It closes to Han and Hui, connect Guangdong and Pudong. It is the inland of coastland and the front line of inland. Our country encourages foreign merchants to invest in the central and southern inland area, in order to reduce the economic development special differences between coastland area in the east and inland area in the center and south. Being the connection of inland and coastland, Changsha has become a foreign investment hot spot due to its special region condition. 5) Situation of Communications It has advanced communications in this region. There are four kinds of comprehensive transport as aviation, railway, highway, water transport. a) Aviation: The Changsha Huanghua airport, which was built in 1980s, is a first-class airport. It can offer large and middle sized airplane for taking off and touching down during the day and night. 39 airlines have been opened and some large and middle-sized cities like Beijing, Shanghai, Guangzhou, Shenzhen, Hong Kong, Bangkok, etc, can be arrived in immediately. b) Railway: The Jing-Guang Railway multiple tracks run through from north to south and both the Xiang-Qin railway and he-gang railway connect east and west. The railway from Changsha to Shimen has been completed and begun to perform. Changsha will be an important transportation junction in the country. c) Highway: Highways in Changsha extend in all directions, taking the national and provincial roads as major lines and county level and town level roads as branches. 910km of road has been opened to traffic. NO.107 national road which connects Beijing with Shenzhen is in the city and NO.319 national road.which 3-4

49 Resettlement Action Plan for Cornidor Component (Changsha Section) connects Chengdu and Xiamen is in the city. The highways, which connect Changsha and Xiangtan, Changsha and Changde, and the high standard road, which connects Changsha and Liuyang, have been completed and opened to traffic. The roads to every city in the province have been more and more convenient. d) Water transport: The Changsha port can load to rivers and the sea and the natural river's line in the whole port area of the city is about 95 km long, so that 1000 tons heavy ship can navigate every season. 6) The Existing Major Problems a) The total economy quantity is not large, and the whole quality is not high, both of which do not conform to the development position and mission of Changsha. There are clear bottleneck of insufficient capital and problems of low economy outward degree during the economic operation. b) Economic construction is not reasonable enough, the nonpublic-owned economic specific gravity is on the low side and the step of traditional industry technique innovation is not quick. The pillar industry scale is over small, the economic construction adjustment mission is heavy and the economic movement quantity needs to be increased; c) The employment pressure is large. The urban and rural residents' income increase slowly. d) The change of government function still can't adapt to market economy development. The economic order still should be strict regulated and organized; e) The pressure exists due to both international and internal economic development competition and the large pressure of carrying out the economy transformation exists. 7) The Target of the Regional Social Economy Development The primary struggling targets of Changsha social economic development in the period of 3-5

50 Resefflement Action Plan for Comdor Component (Changsha Section) Tenth Five-year are as follows: a) The target of the economy increase: The local total output value will increase above 11% on average a year and the local total output value of whole city will reach 130 billion Yuan in 2005.The social fixed assets will increase 14% on average a year and the investment rate will be about 30%. The total amount of import and export will increase 13.4% on average a year, directly make use 2 billion dollars, and will increase 29% on average a year. Local public financial income will increase above 11% on average a year, reaching 6 billion dollars in b) The social development target: the rate of population natural increase will be controlled within 5 %o in the whole city, the total population of whole city will be 660*1 04 in 2005 and the level of urbanization will increase 46%. The high school education will be gained ground basically and the proportion of people who accept senior education in the population of the same age will increase to 20%. The contribution rate of technology advancement to economy will increase 10 percentage points. c) People's life index: all the disposal income of residents in urban area will reach Yuan per person in 2005 and all the disposal income of farmers will reach 4100 Yuan per person. The greening rate of the city will reach 40% and the rate of forest coverage of the whole city will reach 52%. The housing area will reach 15m 2 per person in city and the housing area will reach 45 m 2 per person in countryside. 3.2 General Situation of Social Economy in Each Project Impact County (District) 3.2.lTianxin District The whole district made every effort to carry out the strategy of Improving Quality and Thriving the northern and the Southern Cities, persisting in walking a road as three product rich the district, industry strong the district, science and education alive the district, legally manage the district in Every business presented a flourishing situation. 3-6

51 Resettlement Action Plan for Corridor Component (Changsha Section) 1) Comprehension National economy persistently, steadily, quickly increases. 1, millions Yuan of the local total output value was achieved in a whole year. Computing according to the comparative price, it up 16.6% more than Of this total the value of increase in the first industry was million Yuan, up 4.5%; the value of increase in the second industry was million Yuan, up 23.1 %; and the value of increase in the third industry was 1, million Yuan, up 14.6%. The ration of the first, the second and third industry was 5.07: 32.06: Comparing with 2001, the proportion of the first industry reduced 0.38 percentage points, the proportion of the second industry reduced 1.4 percentage points, and the proportion of the third industry reduced 1.35 percentage points. The local financial normal budget income exceeded 0.2 billion Yuan in the whole district for the first time. Achieving million Yuan, this was computed in old caliber, up 45.2% more than the same period last year. Normal budget income achieved million Yuan, which was computed in new caliber, up 43% more than the same period last year. The adjustment of economic structure is continuously becoming better and better. In 2002, with the direction of market requirement in agriculture, the planting industry was adjusted in strength and became much larger. The increases of the second industry speeded up clearly and the progress of economic structure adjustment speeded up much more. Reform on enterprises was made an outstanding effect and the industry gardens construction progress speeded up comprehensively. The drawing power of investment in fixed assets and requirement of consumption was strong, the progress of new district construction speeded up and the real estate was keeping growing smoothly. Scale of investment was enlarged continuously and effect of enlisting merchants was outstanding. Progress of Three Changes was moving on continuously. A new structure of agricultural industry has been formed in the whole district. Four companies, which are engaged in producing agricultural products, have been developed. The controllable income of farmers is 4967 Yuan per person, up 10.4% comparing with the same period last year. The Hunan Tianxin environment industry garden is being constructed smoothly, and has been ratified as province-class garden by the provincial government. Three companies 3-7

52 Resettlement Action Plan for Comdor Component (Changsha Sectfon) which achieved output value above 0.1 billion Yuan such as High Voltage Switch Corporation have been developed. Six large sized industry companies have been increased. Results of new district's planning construction and old district's transformation are very outstanding, with 46,000 m 2 slums transformation has been completed, and 193,000 m 2 economical and suitable house built. Progress of urban construction is speeding up. Labors' employment is stable and wage increase is stable too. In 2002, 7227 persons were employed, up 3.3% comparing with last year. There were 4293 persons in state-owned units, 1714 persons in collective-owned units, and 1220 persons in the others. The average wage of the workers, who were employed, was Yuan at the end of the year, up 23.23% compared with last year. The economic environment has been much more perfect. Farmer's burden is lessened and 19 charge tablets in agriculture were built as requirement in 14 villages, which are controlled in the district. Effect of tax reform in countryside was outstanding. Compared with last year, 67 Yuan per person of farmers' burden was eased. Reporting center of administrative economic development environment has been founded. 26 requirements of every kind were received in 2002, and the rate of finished was 100%, and it promoted the economic development environment to be better effectively. The major problems of economic and social development are: The deep contradiction in economic operation was still outstanding relatively. The support of economic increases still has not formed a structure, effect of agriculture is not good enough, companies' abilities of self-creative and adapt to the market need to be improved. The pressure of employment and reemployment in the city are still heavy. 2) Agriculture Agriculture and rural economy are developing smoothly million Yuan of the total output value in agriculture, forestry, stock raising and fishery has been completed in the whole year, up 5% compared with the same period last year, among them: there were million Yuan in agriculture; 2.09 million Yuan in forestry, million Yuan in stock raising and million Yuan in fishery. The total grain yield is 2773 tons, down 67.3% 3-8

53 Resettlement Action Plan for Corridor Component (Changsha Section) compared with the same period last year. Some adjustment in agricultural product structure has been made and there was the yield was increase or decrease to some extent, among it: Cereal yields were 1949 tons, down 76.3% compared with the same period last year, 156 tons in fruit, 9 tons in lotus seeds, up 87.95%, 50% respectively. There were mu of cultivated land at the end of the year. The stock raising and fishery are developing smoothly thousands of pork pigs were produced in the whole year, up 13.7% compared with 2001; 2296 tons of aquatic products were produced, up 9.2%; and the product quantity of pork pig was 3932 tons, up 12.6% compared with the same period last year. The progress of planting industry structure's adjustment speeded up. In 2002, mu of rice planting area were reduced in the whole year and the target of canceling rice production came true. A product structure like the major of three economical plants such as vegetable, young soybean and nursery stock had been formed. In 2002, the planting area of vegetable and economical crops was mu, a increase of 3300 mu compared with last year, up 16.5%. Milk industry developed quickly. There were 350 cows living stock on hand at the end of the year, up 4.2% compared with 2001 and the output of milk was 590 tons, up 71 %. 3) Industry and Construction Industrial production is developing smoothly. In 2002, million Yuan of total output value in industry was completed, up 13.4% compared with last year. Among it: there were million Yuan in the industrial companies sales revenue above 5 million Yuan, up 44.4% and million Yuan in the industrial companies sales revenue less than the former, up 1.2%. Among the companies which scale is over it, there were million Yuan in light industry, up 32.3% and million Yuan in heavy industry, up 51.4%. Among the output of the companies which scale is over it, there were million Yuan in collective-owned companies, million Yuan in joint - stock companies and million Yuan in limited duty companies and million Yuan in privately companies. The degree of technology development is strengthened. The industrial companies, which scales are over it, completed a value of new product million Yuan in the whole 3-9

54 Resettlement Action Plan for Conidor Component (Changsha Section) district, up 175% compared with last year. The independently business accounting industry companies, which scales are over it, completed a total value of profit of 37.7 million Yuan, a increase of clearly 9.89 million Yuan, up 35.5%. The sales rate of industry products had been improved 3.1 percent, and reached 101.2% and the total economy benefit is very good. Construction production and management are developing smoothly. In 2002, Grade 4 and above construction companies completed an output value of million Yuan in the whole district, and reached to million Yuan, up 58.6% compared with the same period last year. The house area, which was completed, was m 2 and the rate of completed house building was 26.1%. 4) Investment in Fixed Assets The fixed assets investment is developing continuously and quickly. The guidance of City Management and the strategy of speeding up the urbanization progress are being carried out vigorously. Investment projects are growing to a great extent. There are 65 projects of fixed assets investment in the whole year, up 20 compared with last year. The fixed assets investment of total society was completed million Yuan, up 77.03% compared with the same period last year. The state-owned fixed assets investment and the others completed million Yuan, up 69.57% compared with the same period last year. The achievement of basement construction is outstanding and the real estate investment created a new history level. In 2002, an investment of million Yuan of basement construction was completed in the whole district, up 16.25% compared with the same period last year and an investment of million Yuan of real estate was completed in the whole year, up % compared with the same period last year. 23 meters of vehicle road in the second and third section of Changsha Road was opened to traffic. 35 million Yuan of the Shuyuan South Road's enlarging project funds was in place, and 100% relocation and removal mission was completed. The situation of commercial houses' selling was good and the area of the house which had been sold was 172 thousands m 2, up %. The degree of technology transformation is being enlarged and the construction of key 3-10

55 Resettlement Action Plan for Comdor Component (Changsha Section) projects is moving on smoothly. An investment of million Yuan of technology transformation was completed in the whole year, up % compared with the same period last year. There were12 projects being built in the whole year, and the construction were undertaken smoothly. 5) Business and Trade The consume commodity market keeps growing vigorously. In 2002, Because of exhibitions and holidays, a total value of million Yuan of social retail sales was completed, up 21.2% compared with In terms of the economic type, public owned economy completed a value of million in retail, up 19.7% compared with the same period last year, and made up 12.6% of social retail sales. Nonpublic owned economy completed a value of million in retail sales, up 22.5% compared with the same period last year, and made up 87.4% of social retail sales. In terms of the class of the business, the total value of wholesale and retail was million Yuan, up 23.6% compared with the same period last year; the value of catering service was million Yuan, up 19% compared with the same period last year and the value of the other forms were 41.5 million Yuan, up 4.7% compared with the same period last year. 6) Business and Capital Attraction Work of business attraction made a gratifying result. There were million dollars worth of foreign capital in the whole year, up 63.8% compared with the same period last year and million Yuan of domestic capital from the other provinces, up 94.2% compared with the same period last year, which ranked the third in the city continuously. The total income of the three kinds of companies such as foreign, private, and joint ventures companies' sales was billion Yuan and the total value of import and export was million dollars million Yuan of nongovernmental capital were initialized and utilized. 7) Education and Science Technology The education cause is developing smoothly. There are 9 middle schools, 55 primary schools and 35 kindergartens, in the area under the district's jurisdiction, the total number 3-11

56 Resettlement Acfion Plan for Comidor Component (Changsha Section) of the students is 26092; Of which, the there are primary school students, 7384 middle school students, and 4018 kindergartens students In 2002, the investment for improving education conditions was 5.8 million Yuan. The enrolment rate in primary school for the students of right age is 100% and the proportion of graduated students in primary schools entering higher school is 100%. New results have been achieved in education. The education results are gratifying. The Tongpujie primary school was nominated as one of the first hundred of United Nations environmental protection government. The Yoyo primary school got the honor title as the excellent activity school of the nation juvenile work committee Young Pioneer Creative Cup. The Shuguang primary school got the first place of The Ninth Five Years art education task. The 22 nd middle school in Changsha became a practice basement of nation creative education and the gth middle school in Changsha became one of the five schools, which have the qualification for recommending students to the higher school. The science and technology develop further million Yuan of the three kinds of funds for science technology reached in the whole district, and made up 1.36% of the whole district's financial budget expenditure. The exact value of science technology, which was put on market, was 3.69 million Yuan in the whole district. 55 new science technology products were exploited. There are 9 high new technological development companies million worth of high new technological products output value were completed, up 37.1% compared with 2001 and million Yuan of tax revenue was achieved, up 32.1 % compared with the same period last year. The contributions of high new technology and progress of science technology to Tianxin's economy was enlarged day and day. 8) Hygiene, Culture and Sports The hygiene cause is developing smoothly. There are 231 medical organizations in the area under the district's jurisdiction. There are 30 hospitals and public health clinics, 1 health supervision organization, 1 organization for caring for women and children's health, 1 disease prevention and cure control center. There are 1200 personnel with 885 doctors and 315 nurses. There are 20 villages, which have medical treatment station, and there are 60 hygienic personnel in the-countryside. In 2002, the death rate of pregnant women 3-12

57 Resettlement Action Plan for Corridor Component (Changsha Section) was 0 and the death rate of babies was 9M6. The work of caring women and children had been in the position of NO.1 comprehensively in the whole city for five years continuously. The culture and sports activities are developing vigorously, and have a brilliant result. The work of sports persists that the masses and the competitive sports develop coordinately. In the Ninth Sports Game of the whole province, the gymnastics delegation as the major of District Huang Xing primary school gymnastics team got 23 golden medals, and was given the Contribution Praise in the Ninth Sports Game. 9) Environmental Protection The comprehensive regulation in the city environment has made an outstanding effect. 69 environment pollution disposal projects were completed in the whole district and 1.75 million Yuan for pollution disposal was invested. Both the industrial waste water disposal rate and comprehensive use rate of industrial solid waste material were improved. The newly added greening area was m 2 and the area of removing nonconforming buildings for greening was m 2. Greening area of m 2 was newly added in the key projects and its located units. 10) Population, People's lives and Social Security According to the statistics from the public security department, the total population of the whole district was persons at the end of the year with a increase of persons compared with last year. The birth rate in the whole district was 6.82%9, and increased 0.28 micro points compared with last year. The death rate was 6.12%0, and increased 2.18 micro points compared with last year. The natural growth rate was 0.7%o, and declinel.89 micro points compared with last year. The district service function has been improved further. In 2002, 4.25 million Yuan of community funds were allocated in the whole district, and 46 projects as 'stars' light plan' were fixed in advance, with funds of 3.4 million Yuan invested. The total area of houses for communities' offices, activities and service in the whole district reached 24000m 2. There were 2 streets, which were appraised as cities-class model in the whole district, 10 communities were appraised as the demonstration model in the whole city and

58 Resettlement Ac&on Plan for Comdor Component (Changsha Section) demonstration communities were checked and reached the expected standard. The social security work was further strengthened. A total value of 2.09 million Yuan of companies' old age pension was levied in the whole district, the number of workers who participated in the unemployment pension was 6613, and 14.5 million Yuan unemployment relief fund was allocated. The number of people who receive the lowest city lives security fund was 16379, the total value which had been allocated was million Yuan, and the enough social specified quantity had been allocated. The number of people who participated in the basic medical insurance was The work on employment and reemployment got substantial gains persons in urban area were arranged for work in the whole year, with 6021 laid-off workers reemployed, which took the NO.1 position in the whole city Changsha County In 2002, the Sanhua strategy was implemented in an all-round way. With the focus on the strategic economic goal of Super Normal and Development with Leap and Bound, the reform on economic structure was continuously deepened, the environment for economic development was further optimized and the intensity of financial construction was strengthened. As a result, each item of economic index reached or even surpassed the expected target, national economy maintained rapid and healthy development, and every social cause prospered. All that paved the way for the complete fulfillment of Tenth Five-year Plan and created a good beginning for building comprehensive well-off society. 1) Synthesis In 2002, *104 Yuan of the local total output value was achieved in a whole year. It is the first time to breakthrough 10 billion Yuan. Computing according to the comparative price, it up 13.2% more than Of this total the value of increase in the first industry was *104 Yuan, up 4.1%; the value of increase in the second industry was *104 Yuan, up 16.4%; and the value of increase in the third industry was *1 04 Yuan, up 13%. The ration of the first, the second and third industry was 17.6: 54: Comparing with last year, the proportion of the first industry reduced 1 percentage point, the proportion of the second industry reduced 0.2 percentage points, 3-14

59 *~~~~~~~~~~~~~~~~~~~~~~~~~~ Resettlement Action Plan for Comdor Component (Changsha Section) and the proportion of the third industry reduced 0.4 percentage points. In the accumulative amplitude, the contribution rate of the first, second and third industries are 5.8%, 67.4% and 26.8% respectively; make the GDP increase 0.76, 8.91 and 3.53 percentage point respectively. The per capita GDP is Yuan; which is 1400 Yuan more than that in 2001, up 5.8%. The total quantity of the economy and benefit keep on improving. The economic structure is being more reasonable. Structural adjusting is the main point of agriculture with three supporting industries. The industrialization of agriculture has made a great breakthrough. The second industry develops steadily; industry is strengthened with the nucleus of 'one district and six gardens'. The industrialization paves into the substantiality phrase and industry economy becomes more important in the county economy. The third industry becomes stronger and the commercial houses and sell become the shining point in the county economy. 2) Agriculture and Rural Economy Rural economy is developing smoothly. In 2002, *104 Yuan of the total output value in agriculture, forestry, stock raising and fishery has been completed, up 4.5% compared with the same period last year. Of which the total output of agriculture is *104 Yuan, up 9.1%; forestry 5658*104 Yuan, down 0.6%; stock raising *104 Yuan, down 0.2%; fishery 8879*104 Yuan, sown 4.8%. The rural structure adjusting has made a great breakthrough. Tea, vegetable, flower and nursery become intensives and stipulates. The high quality food supplies reaches 75%; tea garden area is 3.3*104 mu, up 11.9% compared with last year; of which well-bred tea area is 1.1*104 mu with the quality of 4522*1 04 ton. The vegetable area is 29.97*1 04 mu with total output of 69.7 ton and 27.2*104 ton garden truck. The product quantity of food is 48.52*104 tons, down 8.6% compared with the same period last year; cotton production is 33 ton, down 3%; the oilseed production is 7378 ton, up 14% compared with last year; total output of fruit is 4.6*1 04 ton, up 2.8 times. Flower and nursery industry become large scale and good with the area of 6.36*104 mu of 270 kinds; the output is 319 million, up 1.6 times compared with last year. With the base on afforestation and greening, and the focus on resources exploitation, utilization and protection, the industrialization of forestry production has been propelled. 3-15

60 ResettlementAction Plan for Comidor Component (Changsha Section) All that accomplished in a whole year were reforestation area of 12,000mu, tending of middle or young trees 23,000mu, low yielding forest renovation mu, forest reservation 12,488mu, and 1.55 million new-planted trees. The output of tung tree seeds and oil tea seeds were 178 tons and 25,850 tons respectively, more or less increase than previous year. The production of animal husbandry has developed smoothly. Pig raising industry, featuring breed improvement and resources exploitation, maintains stable development. The output of full-grown pigs was million heads and the full-grown pork pigs were million heads. The total amount of raised pigs was million heads and 964,000 heads in sheds. Compared with previous year, all that mentioned above increased with different degrees. Herbivore breeding develops well, especially milk production, which is the main direction of animal husbandry restructuring in this county. The number of existing milk cows are 1,282 heads with a growth rate of 46.3%, compared with the same periods. The milk output is 3,120 tons, up 97.5%. At present, the number of households engaged in milk cow breeding has reached 50. In terms of fishery production, the breeding area of famous aquatic products increases. The output of aquatic products in the whole county was 14,000 tons, up 5.8% than previous year and fresh fish were 12,400 tons, down 6% than previous year. Over 8,300mu of breeding area for famous aquatic products such as Baichang, Jiazhou lu, Chawei fish, Huangsong ye fish, etc, were extended in a whole year. The contract on aquarium fish breeding in Huangxing Township was signed in Kunming Trade Fair, with 20 million yuan. Success has been achieved in the rural infrastructure construction. The effective irrigation area is mu and the total power of machinery used in agriculture is million kw. Land area ploughed by tractors reaches 1.07 million mu and 50 combines were popularized. The capital of million yuan was invested in the water conservancy construction million cubic meters of earth and stone were removed, 80 standard ponds were newly increased and 56km of standard canals were in masonry. 68 water pump station in 65 sites of 2,200kw were reconstructed and repaired, which improved the capacity of flood prevention and drought defying. 3-16

61 Resettlement Action Plan for Corridor Component (Changsha Section) 3) Industry and Building In accordance with the industrial development path of 'one zone with six parks, driving the whole county's economy", the industrialization process is strongly promoted. The industrial development pattern under the jurisdiction of county has initially taken shape, with industry at zone as its driving force and machinery manufacturing industry as its main part. Private enterprises develop rapidly, invited enterprises have an obvious advantage and industrialization steps into the rapid development orbit. 17,360,210,000 yuan of aggregate industrial gross production value was accomplished, up 27.8% than previous year. Of this total, the stat-owned enterprises and that with yearly sales revenue above 5 million yuan, achieved output value 11,278,160,000 yuan, up 35% than previous year and the industrial enterprises below specific scale achieved total output value 6,082,050,000yuan, up 3%. In 2002, the operation quality of industrial enterprises above specific scale was improved and the industrial added value above scale in the whole county was 2,880,370,000yuan, up 33.2%. Among the industrial enterprises, the output value in light industry totaled 3,879,390,000yuan, up 2.62% and that in heavy industry totaled 7,389,710,000yuan, up 47.24%. The sales revenue achieved was 11,269,100,000yuan and the production and marketing rate was 99.77%, with 1.9 percentage point than previous year. The proportion of profitable enterprises in the whole county was 77.3% and the amount of profit totaled 869,600,000yuan. There were 15 enterprises with sales revenue above 100 million yuan. Among them, there were 11 enterprises with revenue between million yuan, 1 between million yuan, and 3 above 1 billion yuan. The production and operation of building industry have increased smoothly. In 2002, the accomplished total construction value in the whole county was 3,537,400,000 yuan, up 12% than that in 2001, achieving added value 1,099,100,000yuan, up 11% than previous year. The area of completed building reached 1,660,000m 2, up 4%. The construction completion rate was 56% and the rate of building acceptance at one time was 92.2%. There are 31 construction enterprises with level above Grade 4 in the whole county. 4) Fixed Assets and Investment Promotion 3-17

62 ResettlementActfon Plan for Conidor Component (Changsha Section) The investment in fixed assets has increased smoothly. The accomplished investment in fixed assets was 3,211,980,000yuan in a whole year, up 23.2% than previous year. Of this total, the investment accomplished by the state-owned as well as township collective-owned enterprises, was 2,236,990,000yuan, up 37.7%, the investment in real estate was 283,690,000yuan and that in rural fixed assets was 473,390,000yuan, up 14.5%. Investment promotion has injected infinite vitality and activity in the economic development under the jurisdiction of county. Totally, 174 internal and external projects were signed, with internal capital in place 1.78 billion yuan, up 132% compared with the same periods. The contractual foreign capital utilized reached 142,150,000yuan, up % compared with the same periods and paid-in foreign capital was 117,600,000 dollars, up 47.8% compared with the same periods. The output value achieved by the invited enterprises was billion yuan, up 66% compared with the same periods, profit achieved was 904 million yuan, up 21%, and the tax turned over was 784 million yuan, up 48%. The accomplished total volume of import and export was 345 million dollars; including export value 103 million dollars and import value 243 million dollars. 5) Communications, Post and Telecommunication Such industries as transportation, and post and telecommunication develop very fast. In 2002, the total output value and added value achieved in traffic transportation and post and telecommunication were 1,613,000,000yuan and 800,090,000yuan respectively, up 10.5% and 10.3% respectively compared with the same periods. 22 roads of 589km at county and town level were newly constructed and reconstructed. In 2002, the accomplished volume of freight traffic, revenue of transportation and volume of circular flow in a whole county were 8.64 million tons, million yuan and million km respectively, up6%, 4.8% and 7.4% respectively. In 2002, the total business volume of post and telecommunication in the whole county was million yuan, up7.3% than previous year. Of this total, the total business volume of post was million yuan, up 10.6% and that of telecommunication was million yuan, up 4.2%. By the end of the year, the users of telephone and mobile phone had reached 154,000 households and 146,000 households respectively, up 9.2% and 46% respectively than previous year. And_ 3-18

63 Resettlement Action Plan for Corridor Component (Changsha Section) the users of internet had reached 21,700 households. 6) Trade Industry The consumption market keeps stable and tends to be blooming. The total retail sales of social consumer goods achieved were 2,040,200,000yuan in a whole year, up11.5% than previous year, with 1,552,820,000yuan in wholesale and retail trade and 173,140,000yuan in catering service, both of which accounted for 76.1% and 23.9% respectively. In terms of attribute, the proportion of nonpublic economy continued to increase, with proportion 75.5%. The retail sales accomplished by nonpublic economy were 1,541,890,000yuan, up 16.1% than previous year. The commercial enterprises in the whole county, which adopted such approaches as system innovation, flexible operation, supermarket, exclusive sales and general distribution, increased. The general level of commodity tented to decline. In a whole year, the resident's consumption price index declined 0.8% than previous year and the general level of retail price of social consumer goods dropped 1.3 percentage points than previous year. 7) Finance, Banking and Insurance Year 2002 has been the fastest one in financial revenue increase. The total financial revenue and local revenue were 753,980,000yuan and 338,400,000yuan respectively, up 28.7% and 20.9% respectively than previous year, both of which ranked the first in the whole province. The total financial expenditure was 642,480,000yuan, up 24.2% than previous year. The banking order keeps well, and deposit and loan continue to increase. In 2002, every item of deposit balance in the bank of the whole county totaled 4,924,220,000yuan with residents savings balance 3,310,990,000yuan, up 8% and 17.9% respectively than previous year. Every item of loan balance totaled 3,362,040,000yuan, up 2% than previous year. Larger breakthrough has been made in widening social insurance coverage and the social insurance becomes obviously more effective. In 2002, the number of people in administrative units, enterprises and institution, taking part in the basic pension insurance, 3-19

64 Resettlement Action Plan for Corridor Component (Changsha Section) reached 12,950. In the whole county, 625,000yuan of basic subsistence for laid-off workers was allocated and 72,740,000yuan of pension for retirees was allocated. The total volume of insurance premium and expenditure for reparations in insurance companies of the whole county were 25,329,000yuan and 12,649,000yuan respectively, up 17.5% and 1.2% respectively than previous year. 8) Science, Education, Culture and Hygiene Science and technology cause develops step by step. For consecutive 7 years, this county has maintained the name of technological advance county at national level. 3 projects at provincial level and 6 projects at municipal level were applied for. Base on consolidating the result of meeting the standard of utwo basis", in 2002, the education cause in the whole county prospered. There were 51 common middle schools, 7 vocational middle schools and 319 primary schools, with 103,479 students and 6,559 faculties. The enrolment ratio in primary school was 100%, the enrolment ratio in middle school was 99.12% and the enrolment quotas in senior middle school were 75.6%. There were 2,455 students in the whole county above college enrollment pass level, with a ratio of 76.8% for students above the pass level. Reform on structure of education fund management and system of personnel management, was implemented. The lay-out of schools was adjusted, the staffs were reduced, the faculties were optimized and the new school management mode was explored. Culture cause witnesses free development of different forms and styles in the culture. In 2002, there were 20 township cultural stations, 21 film projection units. 2,600 films were showed and over 60 theatrical festivals were organized by cultural departments, which enriched people's life in spare time. The extension rate of TV was above 80%. The China Enterprise Culture Forum was successfully held in Xingsha for the first time. Hygiene cause develops with stable steps. At the end of the year, there were 39 hygiene institutions, with 1,236 sick beds, 1,514 working staffs and 1,306 hygiene professionals. Sports cause prospers, as sports meeting has been totally held for 21 times, with 5,860 participants. 3-20

65 Resettlement Action Plan for Corridor Component (Changsha Section) 9) Population and People's Life According to the statistics released from Public Security Annual Report, at the end of the year, the number of total population was 734,000, down 0.3% compared with the same periods. Among total population, the number of agricultural population and non-agricultural population were 670,000 and 64,000 respectively. The population of birth and death this year were 7,683 persons and 8,251 persons respectively. The birth rate, death rate and natural growth rate were 10.5%o, 11.2%o and -0.8%0 respectively. The population density was 368 persons per square kilometers. The proportion of urban population in the total amount increased and the urbanization rate was 25%, 1.3 percentage point increase than previous year. People's living conditions keep on improving. In 2002, the disposable income of rural residents was 3,702yuan with a growth rate of 7.8% than previous year, per-capita consumption expenditure was 2,780yuan with an increase of 48yuan and a growth rate of 2%, and per-capita savings were 4,504yuan with a growth rate of 18.7%. 3.3 Social and Economic Conditions of Townships (Towns) Affected by the Project Muyun Town 1) Comprehensive Muyun Town is located in the southwest of Changsha County, with Xiangjiang River on the west. There is only a river between Xiuhua Town, Xiangtan City, Pingtan County, Wangcheng County, Wangcheng County and Muyun Town. On the north are Tianxi and Yuhua districts of Changsha City; on the east lies Tiaoma Town; on the south stands Zhaoshan Township, Xiangtan County and on the southeast Zhuzhou City. The eastern part of the town is high and the west is low. The landform is half-hilled. The People's Government of the town, 18 km away from Zhuzhou, Xiangtan, and Changsha, is situated in Nantuoling, which is called 'Golden Triangle" and about 40 km away from Changsha Town. It covers an area of square km-cultivated land mu (paddy field mu, dry land 2498 mu), mountain forest mu, waters area 2638 mu. It dominants two committees of Muyun City and Nantuo residents committee as well as 3-21

66 Resefflement Action Plan for Cornidor Component (Changsha Section) Gaotao, Yuntang, Yuetang, Huaxing, Litang, Beitang, Nantang, Lianke, Yangqiao, Sanxing, Naotang, Fengcheng, Muyun, Xingma, Huangjin, Xuqiao, and Litang administration villages and 184 village people groups. It has a population of agricultural population 26928, non-agricultural population 5839, floating population ) Infrastructure The consummate infrastructure and convenient transportation are the advantages of Muyun Town. National Highway 107 and Jiangguang ( Bejing to Guangzhou) railway are crossing the town south to north. Mushi and Lianyun highways are connected with National Highway 107. From 2001 to 2002, Nanhu Road, Muyuan Road ( the first term), Donghua Road, Beihuan Road and Market Road were built to make the road structure of the town. There is a transformer substation of v in the town center. The agricultural network was rebuilt and finished in the communication equipment has developed rapidly. There are 2 cellphones launching stations and a big number of people using cells in the village. Fixed phones has also progressed rapidly. By the end of 2002, the number of fixed phones has reached 10100, which has increased 581.9% compared with that of last year In 1998, Rongcheng Water Factory was built in Sanxing Village, which could produce kg water each day. The pavement of the water net was carried out along National Highway 107 in July ) Education There are one middle school, 13 primary schools and about 10 kindergartens in the town. The southern campus of Changsha Civil Administration college, Hunan Second Light Industry School stand still in the town. It basically forms the education pattern combining Children education, public education, vocational education and advanced education. In the town lies 3 first-class hospitals. The sanitation stations spread all over the town. And the sanitation facilities and hospitalization situation have obviously been improved. The wired net covers 80% of the families in the town. TV sets, refrigerators and washing machine come into the civilians' houses. Self-governing system has been set up in the village. It implements the village affairs publication and put much emphasis on family 3-22

67 Resettlement Action Plan for Corridor Component (Changsha Section) planning. Because of its success in family planning, it won the honor of model town in carrying out family planning policy in 2001 and 2002 and its practice and experience have been introduced and popularized. 4) Finance Compared 2002 with 1998, the town's GDP has added up to 950,000,000 yuan form 680,000,000 yuan, increasing rate 39%. The overall agricultural production value has added up to 101,380,000 yuan from 94,980,000 yuan, increasing rate 6.7%. the overall industrial production value has added up to 721,000,000 yuan from 51 0,00,000 yuan, the increasing rate 41.4%. The third industry such as diet, leisure and service has developed rapidly, the production value of which has added up to 127,620,000 yuan from 80,000,000 yuan, increasing rate 59.5%, which is 13.4% of GDP. Finacial income has added up to 21,420,000 yuan from 18,680,000 yuan, increasing rate 13.5%. The average governable income of farmers has added up to 3705 yuan from 2928 yuan, increasing rate 26.5%. The resident's banking amount has added up to 202,480,000 yuan from 93,000,000 yuan, increasing rate 117.7%. 5) Recruiting commercial and inviting investment The town ranks ahead in recruiting commercial, inviting investments, comprehensive fathering, justice, education, public security, women union and league committee. Since 2000, the development of Muyuan Industry Garden has provided better conditions for realzing modernization and stepping into rich and prosperous society. Relying on its geographical, transportation and resources advantages as well as the plafform of Muyuan Industry Garden, Muyuan has created a new idea of recruiting commercials and inviting investments, and tried to improve the environment for economic development, broaden the finacing channels, and dredge the channels for recruiting commercials and inviting investments. During 5 years, it has recruited 36 units, made use of 715,000,000 yuan. In total, there is 950,000,000 yuan by contract. In 2002, it recruited 12 enterprises and invited foreign investment 2,000,000 dollars, home investment 180,000,000 yuan. The health care center of the Second Hospital attached to Central South University, Hunan Coal Production Bureau, Yatai Industry Co., Ltd settled in Muyun 3-23

68 Resettlement Action Plan for Corridor Component (Changsha Section) Town. Yatai Industry was built in Oct and achieved production value 30,000,000 yuan at the end of 2001, which created a miracle in Muyun, honored 'Muyun Speed". 6) Industry Muyun Industrial Garden is a major part of Changsha Economic Technological Development Zone, which lies in the 'Golden Delta" at the link of Changsha, Xiangtan and Zhuzhou and on the north of National Highway 107. In March 2000, it was approved the town industrial district of municipal level by Changsha Town Enterprise Bureau. In 1999, Planning and Designing Institute of Hunan University finished its planning and designing, with the whole design area of 8km 2, At the end of 2002, the zone extended south and east of National Highway 107, and Changsha Road of programm construction is the outside transportation frame for the east direction in the garden, while Changsha No.4 Fast Tract of the program is the transportation frame for the south direction. The area has added up to 10-sqaure km, first year 2 km 2 finished; third year 6 km 2 finished; fifth yearlo km 2 finished. It is planned to make a comprehensive ecological industrial zone, in which the principal part is enterprise. On 28 th of August, 2001, the new zone was started to set up. By the end of 2002, the total investment has reached 1,900,000,000 yuan, in which there is 350,000,000 yuan for the road net, water-supply net, electric power net, telecommunication net, multimedia net, ecological net and some other net infrastructure facilities, and 1,550,000,000 yuan for the project. The fixed capital the zone possesses now is 1,200,000,000 yuan. With the geographical, traffic, resource and assets advantages, the zone takes advantage of the combination of Changsha, Xiangtan and Zhuzhou, the provincial government moving south, Xiangjiang River scenic zone development and the redressal of the urban industry and develops the supporting enterprises. So far, it has formed an industrial system with electronic equipment, package, construction, new material, mechanism and feed, in which the principal part is mould. From 1998 to 2002, the zone has recruited 36 units and 0.95 billion Yuan contract capital, the actual national and foreigner capital is billion Yuan, In 2002, the zone achieved industry production value 1,870,000,000 Yuan. Thereinto, some company like Sweden enterprise gets more than I billion each year; some company like Changsha Zhengda company, the Fourth Provincial Construction 3-24

69 Resettlement Action Plan for Corridor Component (Changsha Section) Company, 5712 factory and Nantuo Construction Company can gain more than 10 million per year. The zone is operated by Muyun industrial garden of Changsha economic technological development zone and urban construction development Co., Ltd., according to the policy of government leading, market functioning, head driving, industry supporting, making money on the land, rolling development. On 12th of July,2001, Secretary of the provincial committee Yang Zhengwu and Nomarch Zhuang Yunchuan made an investigation to Muyun Industrial Garden and showed their full affirmation on its market operation and development. The Industrial Zone won the first prize of Construction and management of Town Industrial Garden twice, awarded by the municipal committee and government. In Sep., 2002, it won the honor of demonstrational garden awarded by the municipal committee and government. At the end of 2002, it was appointed as the national town enterprise science and technological garden by the agricultural department. 7) Water Conservancy There are 3 yards and 6 reservoirs inside Muyun Town-the riverbanks of Guanjia lake, Xingma Lake, Nantuo Lake are 27.63km in total. The three yards is the first yard of over 10 thousand mu from Xiangjiang River to Changsha. Thus floods always visit Muyun town. In the middle of July, 1994, flood event occurred in Xingma Island. More than 1000mu area of paddy field were totally flooded, residents destroyed, 1200 people transferred and the direct economic loss 2,630,000 yuan. In June, 1998, constant rainstorms attacked Changsha and made the water level rise up to 39.59m. The section of Xuqiao embankment of Guajiahu was broken down for 200m, which caused 1500mu paddy field out of harvest and the direct loss 2,750,000 yuan. During 2002, the fall flood was following summer flood, which was worse than the former one. The town devoted 6000 labors in total, 350 labors per day and spent 200,000 yuan, prepared pebble 2000kg, stones 2000kg, timber 131 cubic meters, knitting bags 20000, machine vehicle 20, renewed brakes 15 sets. After the flood prevention, the town, according to the policy that it is better to prevent flood more than dealing with it, while it is better to build more than preventing 3-25

70 Reseftlement Action Plan for Corridor Component (Changsha Section) flood, the town increased the investment on the construction of water conservancy and made 4 maintenance on Xiangjiang bank. Thereinto, it invested 3,400,000 yuan in decorating 3.5km embankment and building up the provincial standard bank of 3.4 km, setting up a new dock in Xingma island and reconstucting 5 pump station, thus 260 spots of projects has been started, finishing land and sand area of m 2, supplying a spot for Winter Building Water Conservancy Meeting. 8) Tourism According to the Concept that I have what others don't have; I have better quality than others; I am earlier than others, Muyun Town party committee and the government has cultivated and developed some key enterprises in tourism, sight-seeing, leisure, and vacation in order to promote the agricultural modernization and lead farmers to improve the agriculture industries structure. In recent years, Village Corridor of Green Island in Lishan Hill, Tanwan Village Club, Kunlun Lake Farmer Fazenda in Litang Pool, four-seasons fruit garden in Lishan Hill and Lidaren Tour technological Garden in Moon Pool attract may visitors for their splendid country scenery and unique wild sentiment, which can not only increase the farmers' income but also promote the improvement of the agricultural structure. In 2002, it got income 75,820,000 yuan, which caused the improvement of the agricultural structure of 368mu field Datuo Township 1) Agriculture Agriculture and rural economy are developing smoothly million Yuan of the total output value in agriculture, forestry, stock raising and fishery has been completed in the whole year, up 4.9% compared with the same period last year, among them: there were million Yuan in agriculture, Yuan in forestry, million Yuan in stock raising and 5.78 million Yuan in fishery. There were acres of cultivated land at the end of the year. 2) Industry and Construction Industrial production is developing smoothly. In 2002, million Yuan of total output 3-26

71 Resettlement Action Plan for Corridor Component (Changsha Section) value in industry was completed, up 11.9% compared with last year. Construction production and management are developing smoothly. In 2002, Construction companies completed an output value of million Yuan in the whole district, up 26.6% compared with the same period last year. 3) Investment in Fixed Assets The fixed assets investment is developing continuously and quickly. The guidance of City Management and the strategy of speeding up the urbanization progress are being carried out vigorously. Investment projects are growing to a great extent. There are 19 projects of fixed assets investment in the whole year, up 5 compared with last year. The fixed assets investment of township was completed million Yuan, up 66.12% compared with the same period last year. 4) Business and Trade The consume commodity market keeps growing vigorously. In 2002, Because of exhibitions and holidays, a total value of million Yuan of social retail sales was completed, up 15.1% compared with In terms of the economic type, public owned economy completed a value of million in retail, up 16.8% compared with the same period last year, and made up 11.4% of social retail sales. Nonpublic owned economy completed a value of million in retail sales, up 18.4% compared with the same period last year, and made up 68.9% of social retail sales. In terms of the class of the business, the total value of wholesale and retail was 39265million Yuan, up 19.2% compared with the same period last year; the value of catering service was 92.82million Yuan, up 16.1% compared with the same period last year and the value of the other forms were 8.21 million Yuan, up 3.9% compared with the same period last year. 5) Education The education cause is developing smoothly. There are 1 middle school, 13 primary schools and 8 kindergartens, in the area under the district's jurisdiction. The number of children who are in kindergartens is Of which, the there are 4403 primary school students, 1687 middle school students, and 695 kindergartens students In 2002, the 3-27

72 Resefflement Action Plan for Comdor Component (Changsha Section) investment for improving education conditions was 1.03 million Yuan. The enrolment rate in primary school for the students of right age is 100% and the proportion of graduated students in primary schools entering higher school is 100%. 6) Hygiene, Culture and Sports The hygiene cause is developing smoothly. There are 31 medical organizations in the area under the district's jurisdiction. There are 215 personnel with 175 doctors and 40 nurses. There are 9 villages, which have medical treatment station, and there are 21 hygienic personnel in the countryside. In 2002, the death rate of pregnant women was 0 and the death rate of babies was 9M6. The culture and sports activities are developing vigorously. The work of sports persists that the masses and the competitive sports develop coordinately. 7) Population According to the statistics from the public security department, the total population of the whole district was persons at the end of the year The birth rate in the whole district was 6.87%o, and increased 0.35 micro points compared with last year. The death rate was 6.14%o, and increased 2.2 micro points compared with last year. The natural growth rate was 0.73%o, and declinel.87 micro points compared with last year Baseline of Village There are 12 village will be affected by the project of Flood Control Landscape Corridor Component of CZT (Changsha section), such as Sanxing, Muyun,lianhe, Fengcheng, Yaotang and Nantuo of Muyun town, Xinglong, Datuo, Xingang, Huanghe and Heishi Village of Datuo Township, culture village of Xinkaipu office, The project zone house mainly involves 13 villages See Table

73 Resettlement Action Plan for Comdor Component (Changsha Section) Table3.3-1 Baseline of Villages Affected by the Project Existing dry Per capita No. Of Subtotal Existing paddy Village People (No.) land cultivated land groups (No.) (mu) field (mu) (mu) (mu/ person) Shanxing Muyun Lianhe Fengcheng Yaotang Nantuo Xinglong Datuo Xinghang Huanghe Heishi Culture_ Village 3.4 Basic Economic Condition of Resettlers' Families Affected by the Project The main mission of the social & economic investigation is to survey the social & economic conditions within the project scope, the impact of engineering scale and project on the society & economy in the region, and also to provide fundamental data for preparing the program of land acquisition and relocation, the resettlement investment cost estimation, resettlement implementation, monitoring and evaluation etc. In June 2003, the investigating team of designing unit performed a complete investigation on various physical indexes within the project-affected zone. Special trainings have performed before the investigation Survey Content Social and economic investigation is classified into such two categories as Resettlement Baseline Investigation and Resettlement Willingness Investigation. The main contents of Resettlement Baseline Investigation contain family basic conditions, family property, economic income and expenditures, contracted collective land etc. 1 ) Family basic conditions: includes family members, their ages, their sexes, 3-29

74 Resettflement Action Plan for Corridor Component (Changsha Section) education level, their nationalities, the housing area and structure of the housing etc. 2) Family property: Means of livelihood includes heavy furniture, Color (white/black TV) TV, fridge, washing machine, VCD (DVD), air conditioner, motorcycle, bike, telephone etc; Means of production includes contracted land with output, pond, family industry and sideline, production machine (including vehicle and boat etc) 3) Family income and expenditures: Family income 6Doperational income from planting, forestry, animal husbandry, fishery, industry and commerce, ( non-operational income includes dividend, gifts from others, various subsidy, others. Family expenditures (X production expenditures includes seeds, fertilizer, pesticide, seedling, feedstuff etc (2)tax expenditures includes agriculture tax and retention, leasing farming machine, irrigation, water and electricity, burden on social obligation etc () living consumption expenditures Includes main and sub-main food, clothing, daily commodity, newspapers and books, education, fuel, water and electricity, medicine expenditures etc. Survey content of Resettlement Willingness Investigation includes awareness of Flood Control Landscape Corridor Component of CZT (Changsha section), attitudes towards the Project, receivable for the methods of production arrangement and physical relocation resettlement mode, the occupation they hope to deal with, the demands of the address of new house etc The Methods and Process of Investigation In June 2003, with the cooperation of government at all levels, Resettlement Designer organized the special persons to make inquiry about the basic conditions of their family and Resettlement willingness in area scope affected. The survey was adopted the methods of full investigation and sample analyzing and filled in by settlers. The survey forms were given to 500 settlers in area scope affected by the Project and 480 forms were effectively gotten back with efficiency 96%. As to settlers' willingness, sampling was adopted for investigation, sampling rate 25%. Designer provided the forms, which were filled in and signed by settlers, and the Employer sent them out. 3-30

75 ResettlementAction Plan for Corridor Component (Changsha Section) Social and Economic Situation in Project Zone Settlers in the Project affected zone are investigated door by door. The contents of the investigation include their name, their sexes, and relationship with the householder, their ages, education, nationality, occupation, willingness about place and mode of relocation etc. According to the investigation, the characteristic of the people affected by the Project as followings: 1) The Project entails a relocation of 502 households (including1902 persons), of which the number of agriculture population in the zone affected by Project is 1760, accounting for 92.5%, and the others who work in units or have retired accounts for 7.5%. 2) Sex proportion: 1: 0.86 (the proportion of male and female) 3) The structure of age: The number of the laborer between 17 and 60 years old accounts for 69%, under 17 accounts for 18% and up to 60 accounts for 13%. 4) Education level: 95 persons received high grade education, accounting for 5%, 266 persons received high school education, accounting for 14%, 685 persons received junior middle school education, accounting for 36%, 780persons received elementary school, accounting for 41%, and 76 persons received no education, accounting for 4%. 5) The scale of household affected: The average population in each family is 3.8,of which the labors of years old accounts for 2.5; the members below 17 years old accounts for 0.64; the members over 60 years old accounts for ) Family property: In project affected zone, every 100 resettlers' households on average own TV sets (29.2blacklwhite TV sets and 89.9 color TV sets), electric fans, 58.4 refrigerators, 67.1 washing machines, bicycles, 24.3 motorcycles, big furniture such as sofa, coat cabinet, secretary etc. 7) Family income: Family income is Yuan each year, and per capita yearly 3-31

76 Resettlement Action Plan for Corridor Component (Changsha Section) income is Yuan. Because the place of inhabitation is near to city, the family income has a lower dependency on land. Most of the inhabitants take an occupation at enterprises around or do business themselves. 8) Family expenditure: Family spends Yuan each year, and each number spends Yuan on average a year. 9) Housing conditions: The residence of relocation project lies at the edge of the city, The current residences (accounts for 51%) are relatively good, whose structures are mostly brick and concrete, and most of the residences have toilet and press well. The housing area is relatively large, per household housing area is m 2 and per capita housing area is 50.22m 2. 10) Contracting for collective land: each farming household on average contracts for 0.81 mu collective land, of which 0.54 mu is paddy field and 0.27 mu is dry land (vegetable land) 11) Resettlement willingness: Most of the households (93%) choose to reconstruct new residences near their existing residences to be favorable for employment and children schooling, and also they are familiar with local environment around. Some households will choose a new site out for considering the employment or close to the relatives. 12) Vulnerable group: The old and the children who live together with their family's members, can get care from others in the family. It is not necessary to grant women special privilege because that both the female and male enjoy equal position in Changsha, they also participate in the whole of the project; Because the resident in the Project affected zone are all Han nationality, no special attention shall be given. So far, there is no special difficult community appeared in the process of relocating and resettlement due to deficiency in economy and living ability.25 households, 95 persons of vulnerable families need special care Living Standard in Project Zone The main economic income of the residents in project zone comes from household 3-32

77 Resettlement Action Plan for Corridor Component (Changsha Section) operating. At present, the per capita yearly income of residents is Yuan, and per capita net income is 2718 Yuan. Of the per capita gross income of farmers: the planting income is Yuan, accounting for 5.12%; the forestry income is 0.23 Yuan, accounting for 0.01%; the income of animal husbandry is , accounting for 5.90%; the income of industry and sideline is Yuan, accounting for 85.47%; and the income of the others is , accounting for 3.50%. Per capita expenditure is OYuan, of which: living expenditure is Yuan, accounting for 42.55%; production expenditure is Yuan, accounting for 57.09%; and the other expenditure is 18.12Yuan, accounting for 0.36% Public infrastructure in project area According to investigation, the public infrastructures likes the transportation, water supply, electric power supply, telecommunication in the project-affected zone are comparatively developed. The external transport is very convenient; highway, railroad, water transport, aviation etc are all available. The residenters' water source is mainly from the well; water drainage system has basically been formed; rural web reconstruction has been finished too, electricity is transmitted to each household; IDD telephone is available in each village, and cell phones now are used by many residents 3.5 Impact of Land Acquisition On Society and Economy of Local Population Implementation of the project will produce impact on society and economy of the population affected to a certain degree. 1) The acquisition for land will cause different degrees for them: a) Land acquisition will make the peasants who rely on land making living to lose their living sources. So they have to leave the land where they have lived for several generations, and they have to choose the living mode, learn and master the new living skill, and to be familiar with new working circumstance. They may have some difficulty adapting them to new life environment and their living standard may be reduced within a short time. b) Land acquisition will not affect those residents who rely on non-agricultural production. The income mainly comes from the Second, third industry and the income from the planting accounting for a little proportion. No matter which resettlement method will be taken, reduce of the total income caused by the land reduce will not greatly impact 3-33

78 Resettlement Action Plan for Conidor Component (Changsha Section) their living. 2) The physical relocation of residents may consume a certain manpower and material resources. The project administrative department may take some measures which including resettler subsidy, transition compensation, shortening the transition period, subsidy for the vulnerable group building house and resettlement etc, helping the resettlers and reducing the loss of resettlement to ensure the smooth implementation of the project. 3) The remove of the enterprises may cause losses for them. a) For partly influenced enterprises, the influences of remove are partly and linear, the remove can't change the enterprises' total distribution. These enterprises won't stop producing or close because of the riverbank construction. The enterprises that reverse influenced by this project should be compensated by means of current compensation. At the same time, the safety and development of the enterprises will be greatly improved because of the increase in height and the consolidation of the river bank, and also because of the built of the road; b) For enterprises that need totally relocating, their normal production will be interrupted for a short time. And it will take more time and energy to remove the enterprises and rebuild the new location at the same time. When the project is carried out, the main remove managing department shall take a series of measures, such as current compensation, help of location choosing, privilege policy, so as to reduce the loss of the enterprises as little as possible; c) For enterprises that need partly closing or stopping, the remove will influence them the most. The main remove managing department shall take current compensation to these enterprises. The re-employment of the workers and staff members shall be well taken, or the public welfare shall be well taken, too. The life of the workers and staff members shall be guaranteed not to be influenced so great. 3-34

79 Resettlement Action Plan for Corridor Component (Changsha Section) 4. LEGAL FRAMEWORK AND POLICIES 4.1 Law Framework * World Bank, operational policy on involuntary resettlement OP/BP 4.12 * National Laws and Regulations: (1) Land Administration Law of P.R.C. (1999) (2) Designing Method of Hydropower Reservoir Inundation Treatment Plan (1996) * Hunan Provincial Laws and Regulations: (1) Hunan Provincial Implementation of Land Administration Law of P.R.C. (2000) (2) Land Requisition and Resettlement Compensation Method of Changsha (May, 2000) 4.2 Related Policies of World Bank The Resettlement Policies' target of the Bank is to enable the persons displaced by the project to share the benefit from the project. The involuntary resettlement is an inevitable problem in the project, and the overall objectives of the Bank's policy on involuntary resettlement are the following: (1) Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. Where it is not feasible to avoid resettlement, resettlement activities should be conceived and executed as sustainable development programs, providing sufficient investment resources to enable the persons displaced by the project to share in project benefits. Displaced persons should be meaningfully consulted and should have opportunities to participate in planning and implementing resettlement programs. (2) This policy applies to all components of the project that result in involuntary resettlement, regardless of the source of financing. It also applies to other activities resulting in involuntary resettlement, that in the judgment of the Bank, are (a) directly 4-I

80 ResettlementAction Plan for Comdor Component (Changsha Section) and significantly related to the Bank-assisted project, (b) necessary to achieve its objectives as set forth in the project documents; and (c) carried out, or planned to be carried out, contemporaneously with the project. (3) (a) The resettlement plan or resettlement policy framework includes measures to ensure that the displaced persons are informed about their options and rights pertaining to resettlement; i) Informed about their options and rights pertaining to resettlement; ii) Consulted on, offered choices among, and provided with technically and economically feasible resettlement alternatives; and iii) Provided prompt and effective compensation at full replacement cost for losses of assets attributable directly to the project. (b) If the impacts include physical relocation, the resettlement plan or resettlement policy framework includes measures to ensure that the displaced persons are: i) Provided assistance (such as moving allowances) during relocation; and ii) Provided with residential housing, or housing sites, or, as required, agricultural sites for which a combination of productive potential, locational advantages, and other factors is at least equivalent to the advantages of the old site. (c) Where necessary to achieve the objectives of the policy, the resettlement plan or resettlement policy framework also include measures to ensure that displaced persons are i) Offered support after displacement, for a transition period, based on a reasonable estimate of the time likely to be needed to restore their livelihood and standards of living; and ii) Provided with development assistance in addition to compensation measures described in paragraph (a) (iii), such as land preparation, credit facilities, training, or job opportunities. 4--2

81 Resettlement Action Plan for Corridor Component (Changsha Section) (4) (a) Specific components of the project will be prepared and implemented; (b) The criteria for eligibility of displaced persons will be determined; (c) Measures to assist the displaced persons in their efforts to improve their livelihoods, or at least to restore them, in real terms, while maintaining the sustainability of the park or protected area, will be identified; and (d) Potential conflicts involving displaced persons will be resolved. 4.3 Policies Target of the Project Compensation Qualification All buildings, landowners and users in the land requisition relocation area of the project will get reasonable compensation and assistance. The relocation office shall make a house relocation notice 3 days after the House Relocation Certificate has been rectified and issued to make public of displaced persons, relocation area and time limit, and a written notice for related dept. shall be given to stop doing the following procedures in the relocation area: (1) The business license rectifying and issuing for doing business in the relocation house. (2) Procedures for sell, exchange, division, present, remising, mortgage of house except the effective judgment made by People's Court or arbitration organization. (3) Examination and approval procedures for newly-built, improving and reconstruction of the house and its attachment. The deadline decided by the governments is considered as the final compensation requirements-met date in the project. The project impact persons are considered to be the persons who lose land and house and their livelihood impact because of the construction, they shall be compensated and restored in the line of their loss and quantities as well as if they are included in the final construction diagram completed before the government 4--3

82 Resettlement Action Plan for Conridor Component (Changsha Section) deadline. Or in the construction, they shall be compensated because of temporary impact. After the deadline, the cultivated land, house or resettlement of impact persons in the project impact area shall not be compensated Compensation Principles House relocation resettlement compensation work is a strong-policy, heavy-task and wide-aspect work, it is related to the direct profit of displaced persons. The compensation and right criteria are as following according to the requirements of Chinese government and World Bank laws and policies: (1) The compensation and right provide to the impact persons shall be equity and at least keep the original livelihood level before project, and the improving is needed. (2) In principal, the compensation for residential house is the way of monetary or ownership exchange; for non-residential is the way of monetary. In obeying the policies of the World Bank, the compensation fee shall be decided according to the related criteria of Urban House Dismantling and Relocation Compensation Stipulations of Changsha city. (3) The building affected by the project shall be compensated (including the waste production and living facilities of the requisition land). (4) After the land requisition, the per capita cultivated land of land requisition peasant shall be enough to maintain its living standard; if the per capita cultivated land is not enough to maintain living standard, other income resources work shall be provided. (5) In the suitable time, the related qualified conditions, compensation ratio and criteria, living restoration and income plan as well as project schedule shall be public to the impact persons. (6) The relocation building and its appendixes shall be dismantled and relocated after the compensation and resettlement receiving. All cost for land requisition shall be paid 3 months after compensation and resettlement plan approval. 4--4

83 Resettlement Action Plan for Conidor Component (Changsha Section) (7) Before the impact persons satisfy, the land requisition and relocation shall not be performed. (8) In the construction, if the temporary land using influence exists, the related compensation fee shall be paid. The compensation fee for temporary land using includes young crops fee, land loss compensation and reclamation fee. The land loss compensation fee shall be determined based on the yearly output and occupied period; the reclamation fee shall be determined based on the actual necessary cost various Land Requisition Compensation Policies and Standards 1) Related Provisions in the Law of Land Administration of P.R.C (Jan.1st, 1999) Article 2 The State may requisition land owned by collectives according to law on public interests. The State introduces the system of compensated use of land owned by the State except the land has been allocated for use by the State according to law. Article 44: Whereas the land requisition for construction purposes involves the conversion of agricultural land into construction land, approval should be obtained for the agricultural land conversion. For the land acquisition of road and pipeline engineering projects and large infrastructure construction projects approved by the provincial people's governments, autonomous regions and municipalities, and of construction projects approved by the State Council, approval should be obtained from the State Council whereas conversion of agricultural land into construction land is involved. Article 45: The approval of the following land acquisition should be obtained from the State Council: 1) Basic farmland; 2) Over 35 hectares of land beyond the basic farmland; 3) Over 70 hectares of other land. 4--5

84 Resettlement Action Plan for Corridor Component (Changsha Section) Requisition of land other than above-mentioned shall be approved by the provincial People's Government, autonomous regions and municipalities, and submit to the State Council for record. Article 46: Where land is to be acquired by the State, the acquisition shall, after approval is obtained through legal procedure, be announced by people's governments at or above the county level, which shall help execute the acquisition. Article 47: In case land acquisition shall take place, compensation shall be made in accordance with the original usage of the acquired land, which shall include a land compensation fee, a resettlement subsidy and a compensation fee for the attachment of the land and standing crops. The land compensation fee for the acquired cultivated land is 6-10 times the average annual output value (AAOV) of the land in the previous three years before land acquisition. The resettlement subsidy of acquired farmland shall be calculated according to the agricultural population to be resettled. The agricultural population to be resettled is computed with the quantity of acquired farmland divided by farmland quantity per person of the acquired unit. The resettlement subsidy for the agricultural population to be resettled shall be 4-6 times the AAOV in the previous three years. But the resettlement subsidy for farmland shall not exceed 15 times the AAOV. However, in special cases a higher resettlement subsidy may be given to a maximum of 15 times the AAOV over the last three years. The provinces or municipalities directly under the central authority shall determine the standards of compensation for the attachment of the land and standing crops. If land compensation fee and resettlement subsidy paid as per the regulations cannot keep the resettled farmers at the original standards of living, the resettlement subsidy can be increased with the approval of the governments of provinces, autonomous regions and municipalities directly under the Central Government. But the algebraic sum of land compensation fee and resettlement subsidy shall not exceed 30 times of the AAOV for the three-years of the said land before acquisition. The State Council can raise the standard of land compensation fee and resettlement subsidy under special circumstances according to the social and economic development level. Article 48: Once a plan for compensation and resettlement subsidies for acquired land is defined, the local people's government concerned shall make it known to the general public 4--6

85 Resettlement Action Plan for Corridor Component (Changsha Section) and solicit comments and suggestions from the collective economic organizations, the land of which is acquired, and the peasants. Article 49: The rural collective economic organization, the land of which is acquired, shall accept supervision by making known to its members about income and expenses of the compensation received for land acquisition. The compensation and other charges paid to the unit for its land acquired is forbidden to be encroached on or misappropriated. Article 57: The state-owned land or farmers' collective-owned land is required for temporary use for the construction and geological perambulation of the project. Approval shall be obtained from the land administration of the people's government at the county level. Land acquisition for temporary use within the city planning area shall be approved by the city planning administration and then submitted to the land administration for approval. The land user shall sign a land application contract with the land administration or countryside collective economic organization or villagers committee according to the land right or ownership and pay the compensation fee for temporary use of land as per the contract. Temporary user of land shall use the land according to the use specified in the land contract and shall not build permanent buildings on the land. The duration of land for temporary use normally shall not exceed two years. 2) Designing Method of Hydropower Reservoir Inundation Treatment Plan issued by Electric Power Industry Dept. The target of the Resettlement Plan shall be analyzed and prepared through the prophase compensation and the anaphase help based on the recourses and development condition, society and economy development plan in the relocation area according to the principle of keeping the original living standards Article the enterprises reconstruction could be planned and done together with the technique improving and industry structure adjustment. The investment of reconstruction in original scope and standard shall be considered as the hydropower compensation investment; the added investment for broadening scope and promoting 4--7

86 Resettlement Action Plan for Corridor Component (Changsha Section) standard shall be collected by the related units. For enterprises that can't reconstruct or is hard to reconstruct, the reasonable compensation shall be given based on the concrete inundation condition. 3) Hunan Provincial Implementation of Land Administration Law of P.R.C.(2000) Article 10 if there is no condition for cultivated field reclamation or the reclaimed field is not up to the requirements, the reclamation fee should be paid to Land Administration Dept. of Provincial People's Governments according to the following criterions when the examination and approval procedure for agricultural land transition is done. (1) The reclamation fees for basic cultivated land shall be times the average output value of the three years preceding the requisition of the basic cultivated land; the reclamation fee vegetable field shall be times the average output value of the three years preceding the neighborhood paddy field; (2) The reclamation fees for other cultivated land shall be 6-10 times the average output value of the three years preceding the requisition of the land. The construction unit shall place the reclamation fee on the construction investment as construction cost. The Land Administration Dept. of the Provincial People's Government shall bank the reclamation fee in special account according to the stipulation of the Provincial People's Government, the Dept. shall organize reclamation based on reclamation plan and give it to the reclamation units timely and sufficiently. Article 18 the land compensation fee for requisition land shall be calculated and paid according to the following standards: For cultivated land (including paddy field and dry land, vegetable field), rearing pond and lotus root pool, the compensation fee shall be 6-10 times the average output value of the three years preceding the requisition of the land. For orchard, tea garden and economic woodland, the compensation fee shall be 4--8

87 Resettlement Action Plan for Corridor Component (Changsha Section) 50%-100% of the neighborhood paddy field compensation fee; for other woodland, the compensation fee shall be 30%-50% of the neighborhood paddy field compensation fee. For grassland, the compensation fee shall be 30% of the neighborhood paddy field compensation fee. For villages (towns) public facilities and commonweal, enterprise land and farmer residential site, the compensation fee shall be equal to the neighborhood paddy field compensation fee. For barren and other unused land, the compensation fee shall be 20% of the neighborhood paddy field compensation fee. Article 32 one householder shall own only a residential site in the village. The residential construction in the villages shall meet the Land Usage Plan in the villages (towns).the land using area for each householder shall be less than 130m 2 cultivated land, 201m 2 in barren, and 180m 2 in other land. 4) Land Requisition Compensation and Resettlement Method of Changsha City (May, 2000) Article 9 after the issuance of the land requisition notice, the requisitioned rural collective economic organizations and peasants are forbidden to cultivate, feed and plant against time and change the using character in the requisition area. The crops planted and cultivated against time will not compensate, for the lands that change the using character; the compensation fee shall be given based on the original using character. Article 16 the land requisition compensation fees shall be paid totally 3 months after the compensation and resettlement method approval. For the refused compensation fees, the land administration dept. shall be bank the fee in the special account under the name of requisitioned land after the municipal or county People's Government consent. The requisitioned rural collective economic organizations and peasants shall displace in in 4--9

88 Resettlement Action Plan for Corridor Component (Changsha Section) the time limit described in the land requisition compensation and resettlement method. Article 20 the land compensation fee for requisition land shall be calculated and paid according to the following standards: For paddy field and dry land, vegetable field, rearing pond, the compensation fee shall be 6-10 times the average output value of the three years preceding the requisition of the land. For orchard, tea garden, the compensation fee shall be equal to the neighborhood paddy field compensation fee; for other economic woodland, the compensation fee shall be 50%-70% of the neighborhood paddy field compensation fee. For woodland, the compensation fee shall be 30%-50% of the neighborhood paddy field compensation fee; for barren and other unused land, the compensation fee shall be 20% of the neighborhood paddy field compensation fee. For agricultural land such as pond, channel, dam, the compensation fee shall be equal to the neighborhood paddy field compensation fee; for reservoir, the compensation fee shall be 60% of the neighborhood paddy field compensation fee. For road, the compensation fee shall equal to the compensation standard of other land in neighborhood. Article 21 the resettlement fee for requisition land shall be calculated and paid according to the following standards: The for requisition cultivated land shall be calculated accordingto thenumberof agricultural population to be resettled. The number of agricultural population to be resettled shall be calculated by dividing the amount of cultivated land requisitioned by the per capital land occupied of the unit whose land is requisitioned. The resettlement fees for each agricultural person to be resettled shall be4-6timesthe average annual output value of the three years preceding the requisition of the cultivated land. But the maximum resettlement fees for each agricultural person to be resettled shall not exceed 15 times of the average annual output value of the three years prior to the requisition. The resettlement fee for 4--10

89 Resettlement Action Plan for Corridor Component (Changsha Section) professional rearing pond shall be paid according to the stipulations mentioned above. For orchard, tea garden, the resettlement fee shall be 4-6timesthe average annual output value of the three years preceding the neighborhood paddy field; for other economic woodland, the resettlement fee shall be 70% of 4-6timesthe average annual output value of the three years preceding the neighborhood paddy field. For woodland, the resettlement fee shall be 30%-50% of 4-6timesthe average annual output value of the three years preceding the neighborhood paddy field; for the barren and free mountain, there are no resettlement fee. For irrigation land such as pond, channel, dam, the resettlement fee shall be the resettlement fee shall be 4-6timesthe average annual output value of the three years preceding the neighborhood paddy field; for the reservoir, the resettlement fee shall be 70% of 4-6timesthe average annual output value of the three years preceding the neighborhood paddy field. For road that need reconstruct, the resettlement fee shall be paid according to the resettlement fee standard of neighborhood land; for the road that needn't reconstruct, there is no resettlement fee. Article 41 for the peasants who own 2 in or above residential site on the rural collective-owned land, if one is dismantled, and the other meet the stipulated land using area, the reconstruction could not be done

90 Resettlement Action Plan for Corridor Component (Changsha Section) Attachment 1: Land Requisition Compensation and Resettlement Method and Implementation of Changsha City Table Land Acquisition Compensation Criteria in Changsha City (1) Unit: yuan/mu Per capita cultivated land <0.34 o Land Cat. Grade Average Output Remarks Irrigated paddy filed with ditch, canal and dam Paddy filed Climate field, cold high water table field, valley tail field Abandoned paddy field Professional Vegetable land Brick or concrete ditch, canal and basin Having part of condition of grade Having earth ditch, canal and basin. Professional Brick, concrete, stone ditch, canal, slope protection and oxygen equipment fish pond Having part of condition of grade Earth ditch, canal without slope protection 1 ~ Dry land cat.is defined based on such Dry land conditions as soil, terrain, and sunshine, irrigation condition based on soil 4--12

91 Resettlement Action Plan for Comdor Component (Changsha Section) Table Land Acquisition Land Compensation Criteria (2) Land Category Grade Compensation Criteria Remarks Orchard, tea garden Compensation as per paddy field criteria nearby 1 Compensation as per 70% paddy field criteria nearby Regular planting, large area with good hydro condition. Other economic forest land 2 Compensation as per 60%paddy field criteria nearby Regular planting, large area with good hydro condition. 3 Compensation as per 50% paddy field criteria nearby Regular planting, large area with good hydro condition. 1 Compensation as per 50% paddy field criteria nearby Man made timber land Timber land 2 Compensation as per 40% paddy field criteria nearby Non-man made arbor land. 3 Compensation as per 30% paddy field criteria nearby Shrubbery land. Waste land and hill Compensation as per 20% paddy field criteria nearby Water pond, canal, and dam Compensation as per paddy field criteria nearby With fish in pond, compensation as per 50% Reservoir Compensation as per 60% paddy field criteria nearby With fish in reservoir, compensation as per 30% Road Compensation as per paddy field criteria near the road required 4--13

92 Resettlement Action Plan for Corridor Component (Changsha Section) Attachment 2: Land Requisition Compensation and Resettlement Method and Implementation of Changsha City Table Land Acquisition Resettlement Subsidy Criteria in Changsha City (1) Unit: yuan/mu Percapita cultivated land < " B Ž 1.17 <0.34 >- ~~~~~~~~~~~~~~~~ (mulperson) <0.38 <0.42 <0.47 <0.53 <0.60 <0.69 <0.81 <0.96 <1.17 c<1.5 Land Cat. Grade Average Output Paddy field Professional Professional Pfishsional Dry land

93 Resettlement Action Plan for Comdor Component (Changsha Section) Table Land Acquisition Resettlement Subsidy Criteria (2) Land Category Grade Subsidy Criteria Remarks Orchard, tea Subsidy as per 4-6 times annual Per capita cultivated land 60.5mu, 6 times, garden average output of nearby paddy field. >0.5c-<1.5mu, 5 times,>1.5mu, 4 times Other economic Subsidy as per 70% 4-6 times Per capita cultivated land 60.5mu, 6 times, forest annual average output of nearby paddy field. >0.5-'<1.5mu, 5 times,>1.5mu, 4 times 1 Subsidy as per 50% 4-6 times output of nearby annual average Man made timberland.per capita cultivated land < 0.5mu, 6 times, > mu, 5 paddy field. times,>1.5mu, 4 times limber land 2 Subsidy as per 40% 4-6 times annual average output of nearby Non man made arbor.per capita cultivated land < 0.5mu, 6 times, >0.5 ' 1.5mu, 5 paddy field. times,>1.5mu, 4 times 3 Subsidy as per 30% 4-6 times annual average output of nearby paddy field. times Shrubbery.Per capita cultivated land S0.5mu, 6 times, >0.5S-'1.5mu, 5 times,>1.5mu, 4 Water pond, Subsidy as per 4-6 times annual Per capita cultivated land 60.5mu, 6 times, canal, dam, etc. average output of nearby paddy >0.5c <1.5mu, 5 times,>1.5mu, 4 times field. Subsidy as per 60% 4-6 times Per capita cultivated land (0.5mu, 6 times, Reservoir annual average output of nearby >0.5'-1.5mu, 5 times,>1.5mu, 4 times paddy field. Road Subsidy as per nearby land Reconstruction is required in other place. category subsidy of road required Attachment 3: Land Requisition Compensation and Resettlement Method and Implementation of Changsha City Table4.3-5 unit: yuan/m 2 Rural Houses Compensation Criteria for Land Acquisition and Relocation in Changsha Compensation Category House structure Deduction and addition factor unit price Reinforced concrete beam, pillar, board as bearing component, wall body as protective component, plywood door, Reinforced Outside wall without ceramic tiles -4% aluminum alloy window, painted inside concrete 560 Wooden window -5% wall, outside wall with ceramic tile, structure storey height± 10cm, ± 1% cement floor, water, power and lavatory facilities complete in order,. storey height of 3m 4--15

94 Resettlement Action Plan for Comdor Component (Changsha Section) Table4.3-5 unit: yuan/m 2 Rural Houses Compensation Criteria for Land Acquisition and Relocation in Changsha Compensation Category House structure Deduction and addition factor unit price Over 24cm with solid and brick wall, Whitewashing outside and inside walls - structure beam and pillar, reinforced 3% Brick and concrete floor, ceiling board, painted and Below fifth floor Door and window without painting - 2% concrete brighten glass window, packing door, 330 without roof board - 8% structure cement floor, painted inside wall, outside Above sixth bamboo mat ceiling - 5% (1) wall with drydash stone water, power, floor400 earth ground - 4% lavatory facilities complete, storey height of tabia floor - 2 % 3m storey height +10cm,+1% Brick and concrete structure (2) Solid and hollow wall, structure beam, reinforced concrete floor, ceiling, painted Without whitewashing inside and outside and brightening glass window, packing 310 walls- 5% door, cement floor, whitewashed outside Other items as above and inside walls, storey height of 3m Solid and hollow wall, wooden floor, wooden frame, wooden or T-ceiling Brick and sunshade, painted and brightening glass Without ceiling - 8% wood 250 window, packing door, cement floor, Other items as above structure (I) whitewashed outside and inside walls, storey height of 3m Outside wall solid and hollow, brick column Brick and inside or wood column wedged in wall, wood wooden house frame, bamboo mat ceiling, structure painted glass, window, and floor, tabia (2) floor, whitewashing outside and inside walls, storey height of 3m Without whitewashed inside and outside walls- 5 % Without painted door and window -2% 230 Without ceiling- 3% earth ground - 2% cement floor +2 % storey height ± 1 Ocm,+ 1 % 4--16

95 ResettlementAction Plan for Corridor Component (Changsha Section) Table4.3-5 unit: yuan/m 2 Rural Houses Compensation Criteria for Land Acquisition and Relocation in Changsha Compensation Category House structure Deduction and addition factor unit price Without whitewashing inside and outside Inside and outside earth brick and earth walls- 5% filling wall or a part of red brick wall, Earth and Without painted door and window - 2% wooden house frame, tile roof, painted wood 210 Without ceiling- 3% glass door and window, bamboo mat structure (I) earth ground - 2% ceiling, tabia floor, whitewashing outside cement floor+2% and inside wall, storey height of 3m storey height ± 1 Ocm, 1 % Earth and wood structure (2) Inside and outside earth brick and earth filling or inside wood column wedged in Glass, door and window painted +2% wall, bamboo wall, ordinary glass door and 190 Cement floor+2% window, earth ground, roof with straw, Storey height ± 1 Ocm, ± 1 % storey height of 3m Attachment 5: Land Requisition Compensation and Resettlement Method and Implementation of Changsha City Production and Living Facilities Compensation Criteria for Land Acquisition in Changsha Table Compensation Item Unit Remark cost (yuan) Cement sunning ground m 2 15 Tibia sunning ground 2 5 Bounding wall with 24cm solid and 2 Bounding wall should be built by the whole m 46 hollow wall brick mortar bond and whitewashed.50% Bounding wall without 24cm solid 2 of compensation must be done, if it is built m 42 and hollow wall with residual bricks, a part of a brick and 4--17

96 ResettlementAction Plan for Corridor Component (Changsha Section) Production and Living Facilities Compensation Criteria for Land Acquisition in Changsha Table Compensation Item Unit Remark cost (yuan) 18cm solid and brick wall m 2 48 slurry. Bricklaying m3 160 Bar stone masonry m3 145 Block masonry - m3 115 Pump well made up of brick and stone No. 600 Firedamp basin No. 800 Including pipe, gas meter Tibia, brick and stone tomb No. 800 Plus 50% for double tombs Table4.3-7 Land Acquisition and Construction Land Use Compensation Cost and Other Compensation Cost Criteria in Changsha Compensation cost Item Unit Remark (yuan) House relocation compensation cost m2 ~~~6 Calculated as per legal building area. Calculated as per legal building area, suitable House transition subsidy cost Land reclamation Month/m 2 mu 25 for the houses of township (Town),village enterprise Calculated as per legal building area, suitable 4 for villagers' houses, 40% increase for operational house enterprise 3000 The original is cultivated land The original is non-cultivated land. 5) Compensation standards (6)land compensation rate 4--18

97 Resettlement Action Plan for Corridor Component (Changsha Section) The land compensation rate shall be determined based on the land compensation multiply described in the stipulations mentioned above. a)collective-owned land compensation rate: The compensation rate for various land in project zone shall be calculated base average output in nearly 3 years, land compensation multiply described in the stipulations mentioned above. Collective-owned land compensation rate are as follows: Table Rate Calculation Table of Land Compensation Permanent Acquisition Land Output Resettlement Land Compensation Young crop Item Per mu Cost Compensation Remarks _Compensation (Yuan) Compensatio Subsidy Rate (Yuan) Multiple \lmultiple Cost Cost Cost As Per 0.81 Paddy Field mu/person cultivate land As per dry land, Vegetable Land vegetable land for family plot As per 0.81 Dry Land mu/person cultivate Pond Fish Pond Orchard Man -made timber Timber land Newly residential Grass Land site as per occupied Residential Site Public Land dry land 4--19

98 Resettlement Action Plan for Comdor Component (Changsha Section) Table Rate Calculation Table of Land Compensation Permanent Acquisition Land Output Resettlement Land Compensation Young crop Item Per mu Cost Compensation Remarks C.ompensation (Yuan) ompensation Subsidy Rate (Yuan) Multipl Multiple Cost Cost Cost Road Use Land Tunnel Others b) Stated-owned land compensation rate The stated-owned land compensation standards shall be determined referring to the related articles in the stipulations mentioned above: Enterprise land 22040yuan/mu c) Temporary land occupation compensation unit price Temporary land occupation compensation unit price includes young crop compensation cost and land reclamation cost. Young crop compensation of timber is calculated on the basis of 40% of (M)House compensation rate a)house compensation rate Based on form mentioned above, the compensation rate of various houses shall be reset price: brick and concrete structure is 320yuan/m 2, brick and wood structure is 240yuan/ m2, earth and wood is 200yuan/ m2, repository is 60 yuan/m2. The reset price shall be determined base on the typical house designing and the local lately building materials rate price: brick and concrete structure 276yuan/m 2, brick and wood structure is 214yuan/ m2, so the rate compensation is higher than the actual reset cost, the resettler can take 4--20

99 Resettlement Action Plan for Corridor Component (Changsha Section) full use of the compensation funds to build new house. The detail of the reset rate price analysis is shown in Table Rate Area Reset Price Analysis calculation Table Table Brick and Residence - Rate Concrete Brick and Wood Structure Remarks (Yuan) Structure Amount Qty. un) Qty. Amount (Yuan) 1 Major building materials Steels kg Tile No C 23.4 Cement kg Timber m Iron cast pipe kg 1.e c Felt m Asphalt kg Glass m Brick No Lime kg Sand m Gravel m Nail kg ; Scattered materials % sum of item 1 3 Wage Work. da Fee of water and electricity m Total cost m iround up Rate compensation 32( 24( b) Compensation rate of affiliated building and scatter trees: The compensation standards shall be determined according to the Land Requisition Compensation and Resettlement Method and its Implementation of Changsha. Based on the standards mentioned above: the cement bleachery is 15yuan/ m 2, tabia bleachery is 5yuan/ m 2, wall is 45yuan/ m 2, slope is 140yuan / m 3, press well is 600 yuan/well, firedamp basin 80OYuan/basin, tomb 800Yuan/tomb.Earth well, pool and 4--21

100 Resettlement Action Plan for Corridor Component (Changsha Section) scatter trees compensation standard shall be determined referring to the similar project: earth well is 200yuan/well, pool is 80yuan/ m 3, scafter fruit trees(growth)60yuan/ tree, fruit trees(young)20yuan/ tree, other scafter trees is 5yuan/tree. c) Resettlement subsidy fee: The house relocation subsidy shall be calculated as 6yuan/m 2, the house transition subsidy fee shall be calculated as 25yuan/month.m 2 for public, 4yuan/month.m 2 for individual house. d)special facilities compensation standards: Compensation rate of traffic, communication and electricity facilities shall be determined base on the reset rate calculated by local material rate in 2002 based on the needed equipment and material for similar facilities: the simple road is 70,000 yuan/km, machine cultivated road is 30,000 yuan lkm, high tension line is 25,000 yuan /km, low tension line is 10,000 yuan /km, transformer is 3000 yuan/km, mail line is 12,000 is yuan /km, pump station 5*1 04 Yuan/No., channel is 30,000 yuan/km, port is 50,000yuan/No Ownership Sheet 4--22

101 Table Resettlement Action Plan for Corridor Component (Changsha Section) Ownership Sheet Impact Type Affected Resettlement Polices Compensation Criteria people 1) Monetary resettlement, evaluation and compensation are Brick and concrete: 320 yuan/m2 : brick and wood: 240 on the basis of replacement principles for relocation house, and yuan/mi : earth and wood(wood): 200 yuan/m2i miscellaneous relocatees build house by themselves with the compensation cost. house: 60 yuan/im 2 Residence Owner 2) Poverty household can be carried out by other Poverty household: 3000 yuan/household resettlement mode. Government should help them to get bank loan Vulnerable household: 600 yuan/person preferably. 3) Physical relocation cost 6 yuan/ M 2 1) Monetary resettlement Non-residence Unit and staffs 2) Compensation cost Residence compensation criteria 3) Facilities relocation compensation cost, Relocation and non-relocation, discount as original fixed capital. Temporary User No temporary building within project zone Building 4) Interruption loss subsidy cost 25 yuan/m 2 Collective 1) Land compensation fee Paddy field2o240 yuan/ mu: dry land16530 yuan/ mu: orchard Permanend land 2) Reselement forsvoubsy c S yuan/ mu, pond yuan/ mu, Timberl1400 yuan/ mu land3)cmestofoyoncrp acquisition Enterprises State-owned land within project zone yuan/ mu / Unit Temporary 1) Young crops compensation cost: Compensation as per annual Timberl216 yuan/ mu, land average output of land category year by year Economic forestland 1824 yuan/ mu acquisition 2) Land reclaim cost 2000 yuan/ mu 4--23

102 I9 i i i

103 Reseltlement Action Plan for Corridor Component (Changsha Section) 5 Resettlement Measures Since this project is a flood protection, landscape and road project, which can bring about the safety control, beautify local environment and provide entertainment and and convenient traffic, so the affected residents in project zone are satisfactory to this project. Even though in the areas affected by project land occupation and relocation, almost every affected resident is favorable to this project. 5.1 Resettlement Strategy Resettlement Targets It is to make the rational compensation and perfect arrangement to the people affected by the Project, and ensures them to restore or surpass the original production level, income level and living standard after resettlement Resettlement Principles In accordance with laws, rules and principles of other laws and regulations concerned mentioned in resettlement law frame, in combination with experience and lessons of the built dike resettlement, under active coordination of governments at levels in project zone, the fallowing resettlement principles are primarily drawn up: 1) The presentation of resettlement plan depends upon the social and economic investigation and affected physical indexes statistics in project zone and takes the State and local policies, laws and rules on land requisition and removal and the World Bank's Operation Policy for Involuntary Resettlement OD/BP4.12 as the principles. 2) Optimize project design, pay attention to protect the cultivated land and reduce the affected scope of land requisition and removal as soon as possible. Avoid the population dense zone or multistory and high-rise buildings as far as possible, and reduce the involuntary resettlers to minimum. The convenience-for-people measures and the construction schemes for reducing disturbance to residents will be taken in the process of construction. 5-1

104 ResettlementActon Plan for Corridor Component (Changsha Section) 3) Compensation and resettlement to all involuntary resettlers are a part of project construction. It is necessary to provide sufficient funds to resettlers and help them to obtain profits from the project. 4) Ensure that the affected people can receive all compensation for resettlement losses before removing. It is necessary to make the rational living arrangement and effective production restoration to them and to give them subsidy and help for their temporary difficulties. 5) Ensure that the living standard, production capacities and income of the affected people by land requisition and removal will be restored and increased to the standard and levels before land requisition and removing. 6) The compensation for house or other properties is the replacement price, and the depreciation or discount shouldn't be deducted from the compensation. The compensation has the money compensatory way and physical compensatory way. Both money compensation and physical compensation (e.g. property right is exchanged) should, at least, be satisfied with purchasing the-houses of equal area, similar structure and similar conditions in the same area. The project unit should recommend the economical and appropriate houses to removing households and help the organizations concerned handle the physical relocation procedures (including the preferential policies that they can enjoy according to the stipulations). 7) This project will give compensation all people and all buildings affected by the Project construction in the project zone. Even if one or two people have had imperfect household register procedure or imperfect leasing procedure or imperfect business procedure or imperfect law procedure of a few of buildings, it does not become a reason to refuse to give compensation and help. 8) Some one who gets into the project zone to seize hold of land or houses without authority out of limited period will not be given compensation and resettlement. Some one who does not sign the agreement of compensation and resettlement or does refuse removing after being signed the agreement should be subject to deal with according to administrative and judicial procedures. 5-2

105 Resettlement Action Plan for Corrdor Component (Changsha Section) 9) The resettlers will obtain compensation in the transition stage of physical relocation and in the process of physical relocation. The proposed resettlement area should have the elementary infrastructure and service facilities. 10) The physical relocation of non-residential house unit will obtain subsidies for physical relocation and for losses of production stop and business stop. The local reconstruction or relocation resettlement should meet the plans and avoid the second physical relocation for the near term. 11) It is necessary to give rational consideration for the vulnerable groups and help them choose the resettlement houses and remove. 12) Units of infrastructure property right will be given the compensation for relocation and reconstruction and function restoration of infrastructure affected by the Project. 13) Make the rational compensation for the requisitioned land and losses arisen from it. The land compensation fee should be owned by the collective and used for collective economic development, improvement of the public good and resettlement of the affected villagers. The resettlement subsidy disbursement will be given the resettlement units or the resettled persons or will be used to pay the insurance expenses of the resettled persons. 14) All expenses for requisitioning land should be paid by means of the full disbursement in three months from beginning of the approval date of land requisition compensation and resettlement scheme, and the latest allowable date should be the day when this stretch of land has begun to be used for construction purpose. 15) The temporary use land is generally limited in two years. When temporarily occupying cultivated land, the occupant should restore the planting conditions in one year from the expiration date of temporary use land. If the land of temporary use is the one owned by the collective, the rural collective organization or villagers' committee should on behalf of the land owners sign the contract of temporary used land with the users and should collect the subsidies for temporarily used land from the users. When setting up the compensatory criterion of temporarily used land, it is 5-3

106 Resettlement Actfon Plan for Conidor Component (Changsha Section) necessary to consider the losses of the owners and users of the original land, including agricultural tax to be paid. When the temporarily used land will be returned, the land use character or land ownership have changed, it is necessary to relevantly increase the land compensatory level and properly arrange the users of the original land. 16) It must be to give the work arrangement all labors affected by land requisition and relocation and ensure that their living standard and income would not be reduced in spite of the land requisition and relocation. It is necessary to encourage to resettle depending upon land and support to develop the second and third industry. The farmers could volunteer to select the employment, if possible. Provided their rural residence registration will be changed into the city's, the original economic organization should help them pay all kinds of insurance expenses of resettlement population. 17) The resettlers will be encouraged to take part in drawing up resettlement action plan and executing resettlement, and the policies and criteria of compensation and resettlement should be opened and published in time. In the process of investigation to the affected persons who will be asked to make suggestions for compensation and resettlement, and these suggestions shall be reflected in the report. 18) It is necessary to pay attention to complaint and resentment of the affected people and help them rationally overcome the difficulties and inconveniences in the process of land requisition and physical relocation. It is necessary to listen to resettlers' opinions about the compensation standard, which should be solved through consultation. If it is fail in consultation, the methods of arbitration award or prosecution could be taken. 19) The concerned organizations of resettlement work should strengthen combination and coordination each other. The resettlement organizations at all levels should be perfected and train all persons at posts. 20) In the process of executing project the owner will make internal survey for project implementation, and, in addition, the survey units will be engaged to carry out 5-4

107 ResetlementAction Plan for Comdor Component (Changsha Section) external survey and will periodically submit the survey report to the World Bank. The resettlement work assessment will be done after completing all activities. 21) In the process of resettlement action plan execution, the any large changes (including reducing compensation criteria, changing the place and scope of project's land requisition and physical relocation, increasing new sub-item, changing some sub-item into domestic investment item, etc.) should be reported to The World Bank. It is possible to amend the resettlement action plan or prepare the other resettlement action plan. 22) In the World Bank's project zone, if the land requisition and relocation work of non-the World Bank project will be in advance or this work will be carried out at the same time with one's of the World Bank, the World Bank's project could be "get a lift". However, all compensation and resettlement policies should conform to the requirements of resettlement action plan. 5.2 Resettlers' Living Restoration Plan In June 2003, the resettlement design unit organized professional technician, under great coordination of the Project Employer and local governments, to conduct the on-the-spot survey, optimization and demonstration for resettlement area in the project zone. Based on actual conditions in the affected areas by the project, in combination with resettler wishes, the scattered and backward-removed way is the main resettlement way according to the project planning, and, in addition, a few people will be resettled by means of going to their relatives or friends for help Principle and Procedures of Resettlement Points Alternative Principle The purpose of house relocation and reconstruction is to provide the safe, convenient and perfect living environment to the resettlers. 1) The new resident point should possess the good topographic conditions and reliable drinking water source; 5-5

108 Resettlement Action Plan for Comdor Component (Changsha Section) 2) It must conform to production development plan; 3) It is useful to production and convenient to living and easy to management; 4) It can economize land, it is necessary to do not occupy land or to less occupy land as far as possible; 5) Considering the population growth in the future, the developing room should be left; 6) The layout of house complexes should be based on topographic features and should consider other conditions, including lighting, ventilation, afforestation and so on. 7) House designs should conform to the resettlers' wishes and their investment capacity Procedures The new site of resettlement point as been decided such that the local governments, resettlers' representatives and governments of resettlement zone will jointly made consultation in accordance with the above principles; the local governments and technicians concerned made the on-the-spot survey and shose the point and made the synthetic analysis of geology, topography, traffic, power, water source, etc; the resettlers' production and living conditions will well be considered Plan of House Relocation and Reconstruction Resettlement target and scope In light of resettlement principles, in combination with actual conditions and resettler wishes in different places, it is determined that the scattered and backward-removed resettlement way will be taken as the main resettlement way in project zone, the resettled target is all relocation households with backward-removed conditions, the resettlement scope is the administrative division of this village or the present neighborhood committee, which is in the safe zone of 50-70m from the levee toe of new dike Resettlement Point In the project zone there are 48 scattered and backward-removed resettlement points to 5-6

109 Resettlement Action Plan for Comdor Component (Changsha Section) be set up and 484 households with 1849 persons to be resettled, and other 18 households with 53 persons will be go to the relatives and friends for help Criteria of Using Land Based on the stipulations and criteria concerned for house site use land in the State Land Administrative Law of P. R. China and the Hunan Provincial Implementation Method for Land Administrative Law, it is determined that the house site land criterion for resettlers of using scattered and backward-removed reconstructing houses is Om 2 /h Housing Reconstruction The backward-removed and scattered resettlement houses will be built by resettlers themselves, and the local resettlement office and state land administration are responsible for the land requisition for new houses building. The resettlers can select the reasonable dwelling house type for building houses and they can also make a design based on their own wishes and economic situation. For more detail, see table Infrastructure and Public Facilities Because move-back resettlement mainly depends on local existing infrastructure and social service system, no special plan is made. The affected infrastructure and public facilities will partially be compensated according to the criteria defined by typical analysis. In addition to reconstruction that will be made according to original scale, original standard, original function, the local special organizations can concentrate fund or increase appropriate investment to make rational layout and uniform construction to improve original facilities on the basis of the regional economic development status and development plan and in light of the principle of Favorable for Production and Convenient for Livelihood. 5-7

110 Resettlement Action Plan for Conidor Component (Changsha Section) Table House Building Resettlement Program Table Backward-removed resettlement Going with relatives and friends Total Township Village Group (No) (No) Household Population Resettlement Household (HH) (HH) (person) (person) site site (HH) (HH) ~~~~~population (person) Household (H H) population(person) Muyun Within group Datuo Within group Xinkaipu Within group 5 10 Total Within group

111 Resettlement Action Plan for Corridor Component (Changsha Section) 5.3 Resettlers' Production Arrangement Plan Resettlement and Production Arrangement Tasks The agricultural populations who have lost farmland due to project land requisition need the production arrangement plan. According to the investigation result, the production resettlement population in the project zone will be 2029 persons. The production resettlement population in the project zone is detailed in the Annex Table Targets of Resettlement and Production Arrangement Reconstructing production activities and restoring resettlers' living standard are main standard to judge whether or not the resettlement action plan is practicable. Concerning the agricultural income, the phenomena of level difference, high or lower, naturally exist in any place, In order to ensure that the individual living standard will not decreased after resettlement, it is necessary to take restoring and surpassing resettlers' existing per capita income as the target of resettlement action plan. It is necessary to take help measures to improve the agricultural in aspect of quality and technique, and, at the same time, to take the stability of gradually increasing income of resettlers as a target of resettlement action plan. 5-9

112 Resettlement Action Plan for Corridor Component (Changsha Section) Special Facilities Relocation Program Table Table Road facilities Electrical power facilities Pump District (Township) Village Simple Tractor High-voltage Low-voltage facilities line (km) station Canal Dock (No) highway road (km) (km) (km) (No) lin )(No) ( (kmn) Changsha Muyun County Muyun Lianhe Fengcheng Raotang Nantang Sanxing Tianxin District Datuo District Xingang Datuo Xinglong Total (No) 5-10

113 Resefflement Action Plan for Comdor Component (Changsha Section) In June 2003, under coordination of owner and governments at all levers, the resettlement design unit conducted the surveys of family properties and incomes and expenditures of affected households and made records and books. According to analyzing the agricultural family income of 95 households of them, the resident per capita net income was 2733 Yuan in Regardless of presence and absence of project, the social and economical levels in project zone are continuously increasing, and resident per capita income also is increasing accordingly. In , the annual increase rate of countryside per capita income in project zone was 12.3%. In order to ensure that, after relocation, the resettlers' living standard can reach or surpass the original, and, up to project completion in 2006, the target value of per capita net income should reach 3447 Yuan Environment Capacity Analysis The environment capacity in resettlement zone means the resettlement population quantity that can stably be supported and absorbed by economic development in one area, under ensuring natural ecological sound cycle and keeping certain living standard and environmental quality. The investigation scope of the resettlement environment capacity was based on the resettler's arrangement scheme stipulated by Resettlement Rehabilitability Program Report Analysis of Land Bearing Capacity Villagers cultivate most of existing farmland in project zone, so the agricultural population to be resettled by the agricultural way has to share the original land resource with residents of resettlement zone, but it is necessary to make both the residents and resettlers to be benefited. In order to reach this aim, it should be taken the a lot of measures such as increase agricultural investment, increase soil fertility, adjust crop varieties, improve low-yield land and change dry land to into paddy field as to increase agricultural income. In the affected villages and groups, the surplus farmland mostly is more than 0.50 mu/m. The most surplus farmland quantity is in the Yanzitang Group of Lianhe Village (1.17 mu/m) and the least-in Liangjiawan Group of Heishi Village (0.17mu/m). Quite a number of surplus farmland in the affected villages have low yields due to lower input, extensive management, low-fertility soil, single crop variety, short of field water facilities and so on. 5 -II

114 ReseftiementAction Plan for Corridor Component (Changsha Section) Based on the analyzing information concemed of soil improvement in Hunan Province, the per unit yield of low-yield field could be increased by 100Kg, if taking the following improvement measures: increasing investment, improving soil, improving crop varieties, adjusting cultivation system, building water conservancy projects, strengthening field management, etc. The dry land in partial low country could be transformed into paddy fields after taking measures of increasing irrigation facilities, improving soil and so on. After that, the agricultural income of 625 Yuan/mu could be increased. In villages and groups there are total surplus farmland resource of mu, 7600 mu of them could provide the additional agricultural income of 760,000 Yuan/yr through low-yield fields improvement measures. In additional, the dry land of 628 mu could be transformed into paddy fields, it could increase the agricultural income of 392,500 Yuan/yr. Up to the planning level year, resettlers' per capita planting income will increase from 1084 Yuan/yr to 1952 Yuan/yr. By calculation of this level, through transforming low-yield fields and dry land into the paddy fields, the farmlands load capacity increase quantity of villages will reach 2045 pr Capacity Analysis of Second and Third Industry In recent years, the second and third industry rapidly develops in project zone. In 2000, their increase value accounted for 19.6% and 39.2% respectively of gross national product. Owing to increase of dike standards, decrease of flood disasters and stability of public feeling and investment increase of infrastructure (power, communications and transportation) and strengthening of information and material exchanges inside and outside the province, the second and third industry will further develop. With implementation of this project and other projects, speeding up of population urbanization progress and favorable changes of industrial structure in project zone, the proportion of second and third industry will gradually increase. The dependence on the land is reduced gradually for the farmers, and the traffic is convenient in this project district. This project district is located in the suburbs of provincial capital Changsha. The area superiority is obvious. And the number of people who are engaged in the second or the third industry is increased annually. It is predicted that the emigrants can be well settled by developing the second and the third industry such as: transportation industry, restaurant industry, business in the project influence district. 5-12

115 Resettlement Action Plan for Corridor Component (Changsha Section) As the project is carried out and accomplished, the traffic conditions in the project district will be improved further; the construction of a great batch of projects such as Muyun industry garden and Tianxin district industry garden, will supply a much broader markets for the second and the third industry. When the project is carried out, a much bigger developing space will be supplied for the transportation industry, restaurant industry, service industry and so on. It is predicted that more than 200 people is occupied, of which 55 people are in the transportation industry, 65 people in the restaurant industry, and 80 people in the service industry Agricultural Arrangement Scheme The agricultural settlement will be carried out according to the principles as follows: 1) For villages which have sufficient surplus cultivated land, the cultivated land adjustment pattern is adopted for all of them in the settlement; 2) For villages which have abundant surplus cultivated land, it is considered that the cultivated land is readjustment in their own village, and the cultivated land is distributed equal between the emigrants and the non-emigrants; 3) For villages which have not too much surplus cultivated land, it is considered that compensable adjustment, with the cultivated land of the same quality in other villages nearby, is carried out; 4) The determination of the cultivated land adjustment pattern shall be carried out, after consulting with the villagers in the settlement district and the local government. And it is shall be put into effect after approved by the local villagers. From the above analysis, it is clear that most of the affected villages and groups in project zone are rich in land resources. After reforming of low-yield fields and transforming dry land into paddy fields, output value per unit area will be increased and farmland bearing capacity will be increased. After project implementation, through adjusting cultivation ways of this village and its groups, it is fully possible to well resettle the resettlers in this village and its groups, and, by planning, mu of farmland will be readjusted within the groups and 1221 resettlers will be resettled. And after land occupation, a few of group have less surplus farmland, they should go out to get the adjusted farmland which is 5-13

116 Resefflement Action Plan for Corridor Component (Changsha Section) mu by planning, of them the paddy field of mu and dry land of mu, and 745 resettlers to be resettled Non-agricultural Arrangement Scheme There is less farmland resources in the Muyun Village of Muyun Town, Datuo Village and Heishi Village of Datuo Township, Tianxin District and Wenhua Village of Xinkaipu Township, and after adjusting a small number of farmland and resettling a part of resettlers, there are still 63 persons to be made the production arrangement. These villages are close to urban area and have convenient transportation; it provides the advantageous conditions to develop the second and third industry. By planning, 63 resettlers will be resettled by means of second and third industry ways, among them 10 persons in transportation sector, 18 pr. in food and beverage sector, 20 pr. in commercial sector and 15 pr. in service sector. The villages' production arrangement plan is detailed in Table More details about production resettlement program in project zone is shown in Annex

117 Resettlement Action Plan for Cornidor Component (Changsha Section) Table5.3-1 Production Resettlement program Table Adjusting cultivated land resettlement 2 nd and 3rd industry resettlement Village Adjust within group Adjust outside group Sum-total Township (NO) Resettlement Resettlement Resettlement Item Resont Total(person) (Mu) population (Mu) population (Mu) population (person) (person) (person) (person) Service, Muyun , transportation restaurant, Datuo commerce, service Xinkaipu Restaurant 8 34 Total

118 Resettlement Action Plan for Comdor Component (Changsha Section) The Restoration Measures of Enterprises, Institutions and Sideline of Villages & Groups 1) Enterprises: on the basis of investigation, the project land requisition will affect 30 enterprises, On the basis of the consultation with the influenced enterprises, the main managing department of the enterprises and the local government, these enterprises are settled as the following way: a) provincial wood corporation, the eighth hydroelectric bureau, the shipping corporation, the meat united processing factory, Dasheng furniture factory, Pingshang meat united factory and Heshi water factory and so on, these 7 enterprises are only influenced by the houses remove. It is considered that current compensation pattern is adopted in the settlement. And these enterprises are recovered by rebuilding in another place. b) The High-Molegular Fluctose Mill, Changsha City Machine Tool Plant and Changsha Zhongyi Co., Ltd (3 enterprises) are influenced partially, it is considered that the money compensatory way will be used and themselves will be allowed to make reconstruction or no making reconstruction. c) The other 20 enterprises should be relocated fully, which basically are aggregate reclaiming plants. After their relocation, they will not be reconstructed and restored, and their resettlement will be done by means of money compensatory way, because they will affect the use and beauty of the Flood Control, Landscape Corridor Component. These enterprises are mostly two types: One is the former state operated enterprises (7 enterprises such as the second sandstone corporation of Changsha county shipping corporation, the fourth sandstone corporation of Changsha county shipping corporation, Tianxin sandstone ground, Taiyin sandstone industry Tongda sandstone ground, Changsha city sandstone corporation Baijiahe sandstone ground, and Benchi sandstone ground), they are contracted by individual entrepreneur after convert, the workers and staff members are the former workers; the other type is privately operated enterprises (13 enterprises such as Honghua sandstone ground, Fengcheng sandstone ground, Raotang sandstone ground, Sanxing sandstone ground, Yongsheng electroplate factory, Datuo sandstone ground, Datuo prefabrication ground, Changjian sandstone ground, Xinglong cement brick factory, Xinglong prefabrication ground, Datuo central sandstone ground, Dasheng milk cow ground and 5-16

119 Resettlement Action Plan for Corridor Component (Changsha Section) Dasheng sandstone ground), the workers and staff members are local farmers. They live on plant products industry. They work here in the slack season in farming. When these 20 enterprises are closed or stopped, for the first type workers, low-insurance taking pattern is adopted as settlement; for the second type workers, they will be recommended to work in the riverbank construction. An opportunity of re-employment is applied for them, so as to guarantee that the emigrants' income is not too much influenced. The settlement program of the influenced enterprises is specified in Table ) Institutions: The project land requisition is referred to 5 institution: The Second Light Industry School, The Fourth Reconnaissance Survey Team of the Ministry of Geology, The Jiancheng Building Section of Changsha Railway General Company, Datuo Dike Administrative Committee and The Muyun Power Supply Station of Hunan Electricity. The influence on them is only house removal. The four units' relocation quantity is smallest, but the relocation quantity of the Datuo Dike Administrative Committee (DDAC) is larger. The DDAC will locally be reconstructed in combination with flood protection, and other 4 units will be given money compensation and allowed to make reconstruction or no making reconstruction. 1) The 20 public houses and machine-houses of villages and groups. The machine-houses and switch rooms will locally be reconstructed and resettled. The others will be given the money compensation, and they can decide to make reconstruction or no making reconstruction. 2) The project land requisition will not affect the individual commercial shop fronts. These enterprises are mostly two types: One is the former state operated enterprises (7 enterprises such as the second sandstone corporation of Changsha county shipping corporation, the fourth sandstone corporation of Changsha county shipping corporation, Tianxin sandstone ground, Taiyin sandstone industry Tongda sandstone ground, Changsha city sandstone corporation Baijiahe sandstone ground, and Benchi sandstone ground), they are contracted by individual entrepreneur after convert, the workers and staff members are the former workers; the other type is privately operated enterprises (

120 Resettlement Action Plan for Conidor Component (Changsha Section) enterprises such as Honghua sandstone ground, Fengcheng sandstone ground, Raotang sandstone ground,-sanxing sandstone ground, Yongsheng electroplate factory, Datuo sandstone ground, Datuo prefabrication ground, Changjian sandstone ground, Xinglong cement brick factory, Xinglong prefabrication ground, Datuo central sandstone ground, Dasheng milk cow ground and Dasheng sandstone ground), the workers and staff members are local farmers. They live on plant products industry. They work here in the slack season in farming. When these 20 enterprises are closed or stopped, for the first type workers, low-insurance taking pattern is adopted as settlement; for the second type workers, they will be recommended to work in the riverbank construction. An opportunity of re-employment is applied for them, so as to guarantee that the emigrants' income is not too much influenced. The settlement program of the influenced enterprises is specified in Table

121 Resettlement Action Plan for Corridor Component (Changsha Section) Affected Enterprise Resettlement Planning Table No. of Affected degree Relocation enterprise Stop enterprise Partly affected enterprise Stop Rebuilding affected Site time time saffnd tf time ~~ ~~~ ~~workers Changsha 64 No. 2 Sand Pit of Contracted Changsha County to Traffi indivdual, Norma 12 V Low social County Shipping Company Bureau iperation nsurance (rate) No. 4 Sand Pit of Changsha ounty Traffic ndivid to Low social County Shipping Company Bureau ndividual Norma _ insurance (rate) 3peration ~ ~ ~ ~ ~ ~ ~ ~~~Afe crovincialafe Provincial Wood Company Forestry Bureau top V scattered in ~~ ~~~~~place No. 8 Bureau of Water and National Electri After ea ormal operation V scattered in Electricity Bureau Power Company._. place _ County After Shipping Company Traffic Bureau Normal operation V scattered in place Honghua Ioa Sand idivdu Pit Fengchen peration u 5 Embankment Construction peration engchen Sand pit engchen Noratindivu 4ormal.d' 'd 12 V Construction 5e-atin ~~~~~~~~~~~~~~~Team ~~~~~~~~~~~~Embankment lte 5-19

122 Resettlement Action Plan for Corndor Component (Changsha Section) Affected Enterprise Resettlement Planning Table Affected degree Relocation enterprise Stop enterprise Partly affected District Unit Dep. Status staff Partly Rebuilding Relcation Job arrangement Relocation Remarks Stop Rebuilding afce Site tmtie of staff and time RaotangSand piraotan Nommal operabon indiv staff Pa7l Reuldn Reoato worke Relocationtrutio 4ormal individia Ebnmn aotang Sand pit aotang operation Construction Team 4ormal individual Sanxin Sand Pit Sanxin oprmationdivdu Construction peration Yongsheng Electroplate anxin Nomal individua i Construction Factory peration _ Team rsam wke ~~~~~~~~~~Embankment ~~~~~~~~~~~~~~~Team Changsha Zhongyi Stock Municipal Co.,Ltd Commerce Normal operation Co _td ureau rianxin 151 Normal individualebnm t Datuo Sand pit Datuo ommatin Construction peration Ta Team Normal individualebnm t Datuo Precasting Yard Datuo oratin Construction peration Ta Team Normal individualebnm t Changjian Sand pit Datuo ommatin Construction peration Ta Ater istrict FoAfe Meat Joint Processing Plant Dis Fooc Normal operation 4 scautered in place asheng Furniture Factory uanghe Nomral individua After Team 5-20

123 Resettlement Action Plan for Corridor Component (Changsha Section) Affected Enterprise Resettlement Planning Table Affected degree Relocation enterprise Stop enterprise Partly affected District Unit Dep. Status No.o sotaffp Rebuilding Relocation ob arrangement rart enterprise Relocation Remarks Stop Rebuilding afce Site tmtie of staff and tm workers place After Pingshang Meat Joint Plant stict Food Normal operation scattered in Supplies Bureau place After Heishi Water Factory Heishi Collectivity Nomma l scattered in operation place _ Embankment inglong Cement Bric Knlg Normal individual 046 Cntuto actory inglong peration Construction Embankment inglong Precasting Yard Xinglong Normal individuai 10 V )peration Construction Team Datuozhongxin Sand Pit Datuo Normal individual Embankment 3peration ontruction C_ Team Embankment Dashen Cattle Farm Huanghe Normal individua Construction operation Team Embankment Dasheng Sand pit Huanghe Normal individua Construction operation Team Changsha City Machine Tool Municipal Iant Machinery IBureau Normal operation Gaoguo Sugar Factory unicia Fo unpl Buea top

124 Resettlement Action Plan for Corridor Component (Changsha Section) Affected Enterprise Resettlement Planning Table Affected degree Relocation enterprise Stop enterprise Partly affected No. of District Unit Dep. Status Jtaff lob arrangement Stop Rebuilding affected Site time time of staff and time workers District Contracted tc Low social Tianxin Sand Pit onstruction ndividual, Norma 13 V insurance (rate) Bureau operation Low social Changsha Huafeng Sandisrc Construction ndividual, Norma 9 V insurance (rate) Company Bureau operation. Tongda Station of Taiyin Sand Buriau individ tc 'onsrucion ndividual,norma Company ueupeaininsurance Bojiahe Pi of Changsha San unicipal individ to onstruction ndividual,normal it Company ueupraininsurance Low social Low social ounty,otrctd olow social enchi Sand Pit n dividual Norma 1t insurance (ob) rnatrtctiinoinsurancen(rate) urau prto (rate) (rate) ~~~~~~~~~~~~~~~~~~~~~~enterp Remarks 5-22

125 Resettlement Action Plan for Comdor Component (Changsha Section) Resettlement of the Weak Group During the whole process of the resettlement, the administration department will attach great importance to the resettlement of the weak group. Certain favor will be offered to secure the rebuilding is successfully completed. 1) There are 25 weak households in the project affected area, the people in these households are aged and weak, single-relative, unable to work etc Yuan per capita of building compensation fee will be paid to these 25 households; 2) 600 Yuan per person of living compensation will be paid to the 95 people of the 25 households to help them overcome the difficulty during the remove; 3) After the implementation of the project, with the application of the weak people and the assurance of the local collective, priority can be given to them to gain the loan from the local credit cooperatives; 4) During the implementation of the project, the local collective should help the weak people select the ground for housing and arrange labor to building their houses Restoration Measures for Resettlers' Economic Income In the process of resettlers' livelihood rehabilitation, the units in charge of land requisition will give more helps to resettlers as far as possible. 1) Deliver resettlement subsidies and help resettlers search for their own jobs. 2) Strengthen the resettlers' production skill training, and the experienced experts will be asked to instruct the resettlers to develop planting and raising and rearing industries. 3) Precedently consider that use resettlers as the workers at project working site. The project construction will provide some job opportunities to resettlers, including leveling land, forestation, etc. Though some works are temporary, they can provide the short-term income source for the local resettlers, and it can help the affected persons increase the living standard and restore their livelihood. 4) The local governments will give the policies of tax reductions and financial 5-24

126 Resettlement Action Plan for Comdor Component (Changsha Section) encouragement policies on subsidies, and banks will provide loan in advanced to them Economic Income Level Comparison and Analysis of Resettlers before and after Relocation. After relocation, the resettlers who resettled by means of adjusting farmland way will still mainly be engaged in agricultural production, and their main income source is the planting income. After reinforcing dikes, floods will be reduced and production input will increase, and then agricultural output will increase year by year, so the planting income also will be raised year by year. Up to year 2006, the planting income of resettlers will reach 1952 Yuan/yr., and it will increase by 80% in comparison with that before resettlement. The per capita net income will be up to 3634 Yuan/yr. and it will exceed the economic target of 3447 Yuan/yr. For emigrants who are settled by the second or the third industry pattern, the industry and sideline income are the main resource of economic income. When the project is put into effect, the local economy will develop further, the superiority of the second or the third industry will be more obvious. After emigration, the industry and sideline income will increase annually, too. Till 2006, the total industry and sideline income of the emigrants is yuan, the average net income is 3643yuan, and it exceeds the economy target value 3447yuan, too. The comparison of family economic income level before and after resettlement is shown in the Table 5.3-3,

127 Resettlement Action Plan for Cormidor Component (Changsha Section) Family Income Comparison Table before and after Relocation (Agriculture resettlement) Table Item Unit Y 2003 Y 2004 Y 2005 Y 2006 A) Family members Person years old laborer Person Non-laborer Person B) Contracted Collective land Mu Paddy field Mu Dry land (Vegetable land) Mu C) Family income and expenditure 1. Total Income yuan Planting income yuan Forest income Animal husbandry income yuan Industry & sideline income yuan Other income yuan Total expenditures yuan Living expenditure yuan Production expenditure yuan Other expenditure yuan Total net income yuan Per capita income & expenditure yuan Per capita income yuan/person Per capita expenditure yuan/person Per capita net income yuan/person D) Economic production value

128 ResettlementAction Plan for Corridor Component (Changsha Section) Family Income Comparison Table before and after Relocation (Second, third Industry resettlement) Table 5.34 Item Unit Y 2003 Y 2004 Y 2005 Y 2006 A) Family members Person years old laborer Person Non-laborer Person B) Contracted Collective land Mu Paddy field Mu Dry land (Vegetable land) Mu 0.26 C) Family income and expenditure 1. Total Income yuan Planting income yuan Forest income Animal husbandry income yuan Industry & sideline income yuan Other income yuan Total expenditures yuan Living expenditure yuan Production expenditure yuan Other expenditure yuan Total net income yuan Per capita income & expenditure yuan Per capita income yuan/person Per capita expenditure yuan/person Per capita net income yuan/person D) Economic production value

129 Resettlement Action Plan for Comridor Component (Changsha Section) 6 Organization and Responsibilities 6.1 Organization Participating Resettlement Planning The employer-changsha Urban Construction Investment Development Company entrusted resettlement design units to complete the investigation of land acquisition and relocation and the work of resettlement action plan. The design units assigned dedicated people to undertake the work. Officials from hydro bureaus of various counties (district) and embankment committees (water committee) under it in the project zone participated in the investigation and planning. And officials from townships, villages, village leaders and representatives of people in the zone affected by the Project, participated in investigation and planning too. 6.2 Resettlement Implementation Management Organizations Table Staff Composition of Engineering Construction Headquarters Name Position Major Responsibilities Xiang Enming Head Project legal person, responsible for directing whole project completely, mainly in financial plan and operational work Responsible for resettlement work, directing compensation policy Mo Shugeng Deputy-head approval, disbursements of resettlement cost, mainly in resettlement depart. Responsible for resettlement work, directing, coordination Liao Yingce Deputy-head resettlement work between relocation headquarters and units, supervision and management relocation safety Zhu Xinyu Professional Responsible for implementation of resettlement work The Employer takes full charge of resettlement implementation. Project offices of province, cities, and districts at all levels have formed dedicated resettlement offices, which are responsible for resettlement implementation work specifically. The staff quota in resettlement office are 1-8 persons. Because resettlement is a work of governmental 6--1

130 Resettlement Action Plan for Comidor Component (Changsha Section) act with strong social activities, the staff of resettlement offices at all levels should be the officials transferred from local governments, stated-land administrative departments, hydro departments, agricultural departments etc. A person with rich management experience usually undertakes the leader of a resettlement office. Each township (town) and village affected by the Project has 1-2 major leaders (for township, 1 government official and 1 official from stated-land administrative station undertake township leaders; for village, head of village undertake the leadership), who are responsible for resettlement under its jurisdiction. 6.3 Supervision Organization The Employer will entrust qualified monitoring units-changsha Xinghuan Hydropower Engineering Technology Development Co., Ltd. as independent external monitoring unit, which is responsible for the monitoring and evaluation of land acquisition and relocation and resettlement compensation. Independent monitoring unit will perform internal supervision, and manage and provide technical consulting for the employer, provide with full information of resettlement implementation, report the progress, existing problems and suggestion to World Bank and the Employer. Internal monitoring unit is Changsha Urban Construction Investment Development Company 6.4 Resettlement Management System Resettlement engineering management implements such three systems as the employer responsibility, and project tendering, and contract administration. The Changsha Urban Construction Investment Development Company takes fully charge of resettlement implementation work and tendering work of special facilities and infrastructure constructions. Additionally, independent monitoring and evaluation unit will be invited and contracted to supervise and monitor the resettlement. In addition, project resettlement management office at all levels will use computer for information management and keep all resettlement files and data during implementation. 6--2

131 Resettlement Action Plan for Cornidor Component (Changsha Section) Project Resettlement Organizational Chart ~~~~~CZTEIOl Hunan Provincial Project H r i Construction Leading Group l Hunan Provincial World Bank Project Office Cangsha World Bank. ~~~~~~Project Office I Changsha Municipal Project Construction Leading Group I Changsha Urban Construction Investment Operation Co., Ltd I Municipal Resettlement Office l l l I Ind~~~~~~~~~~~~nependent County (district) Resettlement Monitoring Resettlement Leading Group Design unit and ; County (district) Resettlement Office. ~~~~~~~Oraani zationl Township (Town) Resettlement Office Village committee and Villager group Resettler 6--3

132 Resettlement Action Plan for Conidor Component (Changsha Section) 6.5 Staffing and Facilities for Resettlement Organizations Responsibilities of Project Office Changsha Urban Construction Investment Development Company takes full charge of various works. Financial group, comprehensive group, consulting group, engineering group, resettlement groups (offices) under it are in charge all specific work. District project offices involved manage various works uniformly under the juridical areas. Financial group, comprehensive group, consulting group, engineering group, resettlement groups (resettlement offices) under it are in change of various specific work Responsibilities of Resettlement Offices Resettlement offices are on behalf of the employers to exercise the function of management, planning, coordinating, and supervision. Resettlement offices at all levels take responsibilities of resettlement work under the jurisdiction of the scopes. 1) Physical indexes investigation, resettlement compensation, setup of resettlement program and late resettlement implementation are in need of the participation of resettlement offices and coordination with local governments. 2) Resettlement offices organize and manage specifically the work, which involves counties, township government implementation, plans and funds arrangement, coordinate the relationship of monitoring units for resettlement implementation and are responsible for resettlement work on behalf of the Employer. 3) Resettlement offices assign people to cooperate with design units to do specific planning work of various resettlement work 4) Resettlement offices at all levels supervise and monitor its affiliated resettlement offices to exercise resettlement work. Local resettlement offices are responsible for supervision and monitoring work of resettlement implementation and complete the resettlement progress report and submit to its upper monitoring departments. 5) Conditions for monitoring work and cooperation from resettlement offices will be provided Responsibilities of Leaders of Townships (Towns) 6-4

133 Resettlement Action Plan for Corridor Component (Changsha Section) The leaders shall assist the resettlement offices to carry out land adjustment and the development of second industry and service sector, help resettlers to rebuilt house, make them know the related policies, solve the problem during the resettlement implementation, intercede the resettlement entanglement, resettlers to be rich from being poor Responsibilities of Design Units In planning and design stage, it should exactly investigate physical index of land acquisition and relocation, environment capacity, developable utilization resources, assist district government in project zone to develop resettlement schemes, prepare the cost estimate of compensations investment of land acquisition and relocation and resettlement action plan report, and make the relevant drawings. In construction stage, it should provide the Contractor with design document, technical, drawings and notices in time, perform design technical transfer to project offices at all levels in stages, assist the resettlement offices at all levels in physical relocation and production resettlement, and improve and perfect the program in line with the actual situation Responsibilities of Monitoring Units A qualified monitoring unit, entrusted by the Employer as resettlement monitoring unit, will take responsibility for monitoring and evaluation of the work of relocation resettlement and implementation effect and the adaptability and provide consulting service for the Employer. 6.6 Staffing and Equipments Provided in Resettlement Organization The staff in resettlement organizations includes managers, financial analyst, engineering technicians, social workers, material supply personnel, logistic coordinator, assistants etc. The equipment provided in resettlement organization mainly involves office building, office equipment, traffic equipment, and telecommunication equipment. The detail is given in table Training In order to smoothly implement resettlement, it is necessary to train resettlers and 6--5

134 Resettlement Action Plan for Comdor Component (Changsha Section) resettlement working staff and develop a training plan. Table6.6-1 Facilities Provided for Resettlement Organization No. Equipment Type Qty. Remarks 1 Computer Lenovo YANGTIAN 3 sets One for municipal project office 6110 and one for county project office 2 Printer Minolta 2200DL 3 sets One for municipal project office and one for county project office 3 Copy Machine Nikon FT sets One for municipal project office and one for county project office 4 Digital Camera SONYDSC-V1 3 sets One for municipal project office and one for county project office 5 Air-conditioner Green 505TLY 3 sets One for municipal project office and one for county project office 6 Tables and chairs 6 sets Two for municipal project office in the office and two for county project office 7 Jeep Mitsubishi V6 3 sets One for municipal project office and one for county project office 8 Scanner Fonder Z810 3 sets One for municipal project office and one for county project office 9 Fax Machine Cannon FAX-L240 3 sets One for municipal project office and one for county project office 10 Telephone Siemens, type 3 sets One for municipal project office 8000 (6) and one for county project office Training Plan of Resettlement Management Staff Personnel training and human resources development system in city, county (city, district), township, and village resettlement organizations at all levels will be established. The ways of training includes speech made by leaders/experts, technical training program set by various units, visiting other resettlement projects as well as on-site training of technicians and management personnel. Training contents include Principles and policies of resettlement; Resettlement engineering planning management training; Resettlement implementation planning design Resettlement implementation schedule management 6-6

135 Resettlement Action Plan for Corridor Component (Changsha Section) Resettlement financial management - Management information system -Resettlement -Resettlement engineering quality control; monitoring and evaluation; Resettlement project management; Resettlement Production Skill Training Plan Before moving into new sites and livelihood environment, resettlers shall be trained in production technology and agriculture technology management. Some farmers may be not familiar with the agriculture product in host site and some may develop many kinds of economic plants (such as vegetables, flowers, landscape forest, fruits). This may need training and assistance in agriculture development. Some farmers will get opportunities of employment in second industry and service sector; they may need special employment training. Some young people who had good education background can be sent to colleges to receive 1-2 year's high-level training. After graduations, they can go back, which will be favorable for training local people. For more detail, see table Measures for Organization Strengthening (1) To define the responsibilities and incumbent scope of resettlement organizations at all levels to strengthen supervision and management. (2) To enrich strength of resettlement organizations at all levels gradually, especially specific technology strength. All kinds of people must have a certain professional and management quality and the organizations shall be equipped with technical equipment such as computer, detecting equipment, traffic tools, etc. (3) To select staffs strictly, enhance technical training, perform training for management people and technicians of resettlement organization at all levels to improve their abilities in operation and management; 6--7

136 Resettlement Action Plan for Corridor Component (Changsha Section) (4) To staff with woman carders to play important role in resettlement implementation. (5) To establish extemal monitoring and evaluation mechanism and forecasting and warning system. 6-48

137 Resefflement Action Plan for Corridor Component (Changsha Section) Table6.7-1 Resettlement Training Plan Table Time Place Speech-maker Trainee No. Training content Training fee ProvincialMaaeet saf1pro Wang Liangfang Management staff 1 planning person Domestic improvement from World procedures Bank World Provincial planning Hu Shunong Bank Project 500 yuan committxiejea commiftee Xie Jian Project Project Office Office committee committee training training center center training 1, center Main contents of project preparation. Changsha Urban 1. Management staff from 8 person (of 1. Principles and policies of resettlement; Development project office which 2 2.Resettlement planning management training; Construction 2.Management staff from women) 3.Resettlement financial management Nov Investment Cop. World Bank official Towns (districts) 4.Management information system 4000 yuan 12 person (of which 4 women) 1. Townships ( Towns ) 9 person (of management staff which 2 5.Resettlement implementation management etc. Jun Datuo Township Management staff 2.Villages management staff women) Government from project office 26 person (of which 5 women) Do yuan Resettlement 120 person (of 1. Production technology management Fub.2004 Muyun Town Town management Fub.2004 Government staffs representative from Muyun which Agriculture technology management yuan Town s women) 3. Employment in second and third industry Datuo Township Township 120 Resettlement person (of representative Feb. 2004whc50D.600ya whc 50 Government management staffs from Datuo Township women) D6 y women) 6-9

138 Resettlement Action Plan for Corridor Component (Changsha Section) Domestic similar Management staffs from 4 person (of June.2004 engineering Municipal project office which 1 Similar engineering yuan women) Domestic similar Management staffs from 16 person (of Aug.2004 engineering project offices which 4 Similar engineering yuan women) Domestic similar Management staffs for 16 person (of Aug.2005 engineering project offces which 4 Similar engineering yuan. I w om en) 6-10

139 Resettlement Action Plan for Corridor Component (Changsha Section) 7. Public Participation and Harmonization with Residents in the Host Sites 7.1 Public Participation Strategy Before undertaking investigation, the work outline as well as survey content, method. requirement, etc, should be worked out according to the opinion of the local government. Also the assigners of the local government should be involved in the investigation group and work together. During investigation, the person in charge of the country, village and group as well as the immigrant representatives would be invited to participate in the investigation. Some issues about the necessity of Droect, project benefit, project influence, principle of compensation and resettlement progress will be publicized and the possible resettlement orientation will be discussed together. During the period of resettlement programming, the staff members of resettlement program unit will consult with the leaders of different level from the city, county and county, and choose the host sites in accordance with their opinion, requirement and the exiting problem. While undertaking on-the-spot investigation, the local people and relevant leaders will participate in choosing the site. It is proved that the consultation with local governments and local people is of active significance to choose the promising host sites and formulate the plan suited to the adaptation level of immigrants. What has to be mentioned is that the women enjoy the same right as the men in the above procedure. They do not only actively take part in the resettlement work of different stages, but also play an important role in the consultation of resettlement orientation and approach. 7.2 Public Participation Approach and Measures Participation Approach Public participation and consultation mainly take the form of informal discussion and spot check of resettlement willingness. By this means, the purpose of project as well as the content and importance can be illustrated to the immigrant representatives with whom 7-1

140 Reseftlement Action Plan for Corridor Component (Changsha Section) some issues about resettlement program could be discussed. In Jun2003, with the effective cooperation of each department responsible for the project in the project zone, the immigrant willingness survey was held by the resettlement program unit as the survey targets were all immigrants who move out. The survey showed that all of the immigrants supported the project and 79.3% immigrants thought the project had a very big influence on them as 14.8% immigrants thought it had small influence and 5.9% immigrants thought it had little. With regard to the form of house rebuilding after resettlement, most of the immigrants preferred building house backward and centralized, which respectively accounted for 74.3% and 15.9% as the other form accounted for 9.8%. With regard to the form of making a life after resettlement, 76% immigrants opted to adjust farmland from their own villages, 22% immigrants opted to engage in the second or third industry and 2% immigrants choose some other means such as opening up new farmland. The unit responsible for the resettlement program should take fully account of public participation and consultation. On the base of not violating the general programming principle, the program of house rebuilding and production after resettlement should be properly formulated and get close enough to the immigrant willingness so that the immigrants could be satisfied. During the period of resettlement implementation, the form of informal discussion and resettlement willingness spot check will still be taken in order to collect immigrant information, survey the immigrant willingness and improve the resettlement program further Participation and Consultation Measures In the whole process of resettlement implementation from the beginning of project, the national laws and regulations of resettlement have been publicized to the immigrants through the approach of public participation (informal discussion), local media (TV), etc. The staff members and local governments should make the immigrants surely understand the amount of physical indexes, the calculation methods and compensation means of compensation criteria, resettlement measures, appropriating and using the fund for compensation and subsidy of immigrants, the right of immigrants and preferential policy, 7-2

141 Resettlement Action Plan for Comdor Component (Changsha Section) etc. Meanwhile, the immigrants information should also be made public to the residents in the host sits so that they may understand the situation of land requisition, the criteria of land compensation and the fund usage as well as the situation of immigrants in the host sites. Improve the degree of transparency in resettlement so as to win the support and trust of both two communities in resettlement action plan, which ensures the smoothly ongoing process of the project. 7.3Public Participation in Preparation of Resettlement Planning Report Public Participation and Opinion Table Table Time Place Participant No. of Discussion Final Result participation Content Jun Changsha Urban Changsha Urban 38 people (of Project Support to the Construction Construction which 21 introduction, project Investment and Investment and women) affective scope operation, Development Development and the approval in Co., Ltd Co., Ltd, preliminary principle of the Muyun town, resettlement resettlement Datuo town scheme policy and government and scheme resettlement representatives Sep Changsha Urban Changsha Urban 45 people (of Asking for Establish each Construction Construction which 23 advice of item of Investment and Investment and women) compensation compensation Development Development criteria, criteria, Co., Ltd Co., Ltd, resettlement resettlement personnel in scheme and policy and land charge of each land acquisition acquisition policy village, resettlement representatives 7-3

142 Resettlement Action Plan for Conidor Component (Changsha Section) Table Policy Openness Purpose Content Who with whom When Where Project impact while The amount of each type The survey group made Jun The administrative conducting survey of of physical indexes and of Changsha Urban organs in project social economy the scale of physical Construction Investment zone, town relocation and land and Development Co., govemment, villager acquisition, social Ltd and resettlement committee, affected economic situation in program unit house and project affected area non-residential house The preliminary Listening to the opinion Construction committee When Within the scope of consultation of and advice about project in each county (zone), undertaking project compensation policy plan, relocation and Changsha Urban the and relocation plan resettlement work Construction Investment possibility when prepare for and Development Co., study of the the resettlement Ltd and affected person project scheme 7.4Public Participation Plan During Resettlement Report Implementation Table Policy Openness Purpose Content Who with whom When Where The further Held consultation Changsha Urban 6 months Relocation site consultation of meeting, introduce the Construction before compensation policy relevant issue intensively; Investment and relocation and restoration plan continue listening to the Development Co., while modifying opinion and advice. Ltd, relocation resettlement Held relocation meeting, office and scheme disseminate the representatives of resettlement scheme and immigrants who compensation criteria, move out answer questions of immigrants who will move out The compensation Consultation of the The relocation After The relocation office consultation of unsatisfied item in office and affected completion of several problem resettlement scheme person resettlement when the scheme and in the course of resettlement scheme is operation completed 7-4

143 Resettlement Action Plan for Comdor Component (Changsha Section) Table Infonnation Openness Document Measure to open Date to open Place to open Introduction of the project situation Hold conference, Jun Project zone including land acquisition and Bulletin Board relocation Introduction of the project of land Immigrants propaganda Nov.2003 Project zone acquisition and relocation manual Announcement of open the Bulletin Board Nov.2003 Project zone resettlement scheme Open resettlement scheme report Bulletin Board, publish in the Dec.2003 Project zone, newspaper Municipal news Submission to World Bank Changsha Urban Dec.2003 Changsha Urban Construction Investment and Construction Development Co., Ltd, Investment and Website of World Bank Development Co., Ltd Report content that amended in the process of implementation 7.5. Women's Participation The Changsha's Women enjoy equal rights with men. They not only actively have participated in works of resettlement stages, but also have played a big role in consulting about resettlement direction and ways. In common investigation period, women, as representatives, have been asked to participate in surveying work. They not only actively participated in the whole process, but also displayed more high enthusiasm than men. Most of participant of resettlers' meeting in the villages were women. They have payed attention to main problems that are soundness of physical criteria, rationality of compensation standards and whether the compensation expenses can timely be in place. In resettlement planning period, the working people of resettlement design units carefully listened to women's opinions, requirements and existing problems. At preparing the reports, they fully considered women's opinions that are reflected in the reports. In this period, women especially pay attention to resettlement and production arrangement patterns, the cultivation radius after farmland adjustment, housing arrangement modes 7-5

144 Resettlement Action Plan for Corridor Component (Changsha Section) and directions. In addition, when the project implementation organization was established, the women's important effects are fully considered; the female cadres have been allocated in it so as to fully pay women's role in project implementation. 7.6 Harmonization with Residents in the Host Sites The resettlers in this project mainly take the form of purchasing house by themselves and building house centralized. The former purchase the houses in line with their own choice, so they will easily adapt to the life in the new host sites. As the living environment for the latter will not change a lot before and after the resettlement, and they all share the same life style and custom, it is not hard for them to live with the other residents harmoniously. Of course that does not mean that misunderstanding and conflict will not exist between the resettlers and residents in host sites. In order to improve the harmony between resettlers and the residents in host sites, the following work must be well performed: (1) Before physical relocation, the resettlers and the residents in host sites shall be involved in the resettlement planning. If cooperation, participation and feed back information of the resettlers and the residents from the host sites are needed, the right they enjoy and the program that can be selected should be introduced to them while drafting the resettlement scheme. Direct consultation with them or making a decision with formal or informal leaders and representatives are both all right. Under most of the circumstances, the institutional arrangement could be established such as routine meeting between project officials and local parties, which pave the way for the resettlers and residents in host sites to reflect their opinions in resettlement work during the period of planning and implementation. Attention must be paid to the vulnerable groups to ensure their opinion can be fully reflected. (2) The influence on the residents in host sites shall be managed to minimize. When the resettlers move into host sites, the requirements for land, water, wood and social service, etc, will increase. When the conditions of social service and house facilities provided for the resettlers are better than what the local residents in host sites have, the conflict between the two parties will probably occur. To avoid the occurrence of 7-6

145 Resettlement Action Plan for Conidor Component (Changsha Section) such conflicts, the living conditions and social service for the residents in host sites should also be improved or at least not deteriorated. Perfect service including education, water supply, medical care, etc must be provided for the two communities as much as possible, in order to create a better social atmosphere for the harmony of both communities. 7-7

146

147 Resettlement Action Plan for Conidor Component (Changsha Section) 8. Appeal Procedures 8.1 Potential Complained Problems and Resolutions The resettlement schemes shall be integratively planned in view of the whole project affected area. During implementation, resettlers may have complaints resulting from actual condition change and deviation of operation. According to the experience of dealing with resettlement in the ongoing or completed projects, the complaint of resettlers can be generally divided into the following categories. 1) Index Problem Because of the error in the process of survey, statistics and calculation, such phenomena as missing items, failing to register and erroneous register will probably take place in physical indexes of relocation, which may affect the interest of resettlers. When that happens, the affected person or the villager committee that the affected person belongs to may report to the district resettlement agency in oral or in written form. Then after the data reorganized, the district resettlement agency will report to the employer and supervision unit. Led by the Employer, the professionals will be organized to check on the spot, sign the resolution comments, re-register the physical indexes for the missing items as well as what failed to register and registered wrongly, and compensate according to relevant criteria. 2) Compensation Criteria Problem Minority of resettlers does not know much about national policies, laws and regulations on resettlement. They seem to worry about the compensation criteria and complain that the compensation criteria are lower, which is thought not to be able to meet the requirements of their house rebuilding and production resettlement. Before and during the implementation of the project, the designers shall, cooperating with the local governments and the resettlement agencies at different levels, explain in detail on the spot of the resettlement scheme and the calculation procedure of the compensation criteria, and disseminate the documents about national resettlement policies and regulations, so as to make resettlers clear that the compensation criteria is prepared in accordance with relevant national regulations. These can ensure them to be able to move out, live stably and be able to develop, in a bid to eliminate the gain-giving in their minds. 8-1

148 Resettlement Action Plan for Corridor Component (Changsha Section) 3) Fund Problem During the implementation, such circumstances that the resettlement fund is not disbursed timely may probably happen, which will affect the house rebuilding and production resettlement and affect the normal life of resettlers finally. To resolve this kind of problem requires that the resettlement implementation management personnel do well in controlling such three aspects as fund, progress and quality, to guarantee that the fund can be only used for the resettlement. Besides, they shall also coordinate and supervise the financial departments in fund disbursement in accordance with the progress of the implementation every month to ensure a timely implementation of resettlement schedule. 8.2 Appeal Channels and Procedures Resettlers enjoy the citizen's right and obligation that endowed by the constitution and laws. The existing laws and regulations can completely ensure citizen's legitimate right and interest not to be violated. When the legitimate rights and interests of resettlers are violated, they have right to propose an appeal pursuant to law until their deserved right is satisfied. (1) Appeal Channel ---- Citizen appeal offices, established in all the county, city and province where the resettlers live, can receive, investigate and deal with the common appeal lodged by resettlers. ----The legally established local resettlement administrative institutions at different levels have the authority to supervise its subordinate government's performance in resettlement from city to district. They can also receive and deal with the issue about appeal. --- The independent reseftlement monitoring and evaluation organization is responsible for supervising the resettlement work pursuant to relevant national laws. It is its obligation to safeguarding the resettlers ' lawful right, to accept and report the problem that resettlers 'right is infringed upon to relevant authority. ----The legal departments like executive administration supervision, audit, discipline 8-2

149 Resettlement Action Plan for Corrdor Component (Changsha Section) inspection, judicature, procuratorate organ are established at country, province, inquisitor resettlers in which the law and discipline have been violated. The Resettlement Appeal System for the Project is given in figure (2) Appeal Procedures The resettlers may reflect to the villager committee, if they do not satisfy with the resettlement. The villager committee (or resettlers) may directly consult with the local resettlement office for resolution, or can appeal to the upper resettlement office in oral or in written form. The upper resettlement office will make a record for the appeal and study together with the villager committee and the local resettlement office to resolve the problem within 10 days. If there is dispute and conflict which can not be resolved, the villager committee can appeal through appeal channels level by level to the administrative organs in charge such as project office, resettlement administrative institution, resettlement monitoring organization, citizen appeal office, executive administration supervision, discipline inspection, procuratorate organ, according to the Administrative Procedure Law of the People's Republic of China. If the villager committee or resettlers refuse to accept the resolution, they directly file a suit in a people's court. The resettlement office shall be responsible for filing all the problems that appealed and the resolution process detail records. 8-3

150 Resettlement Action Plan for Comdor Component (Changsha Section), Provincial, City, County Hunan Province Planning Legal Juridical Dept. Committee Provincial, City, County Discipline Inspection 1 I City Project Reseftlement Implementation Management Office A i Provincial, City, County District Project Reseftlement Reseftlement Aprv al, City Implementation Management Monitoring & Appeal Office Office Evaluation Organ. Townships (Offices) Project Reseftlement Implementation Management Office Villager Committee or Group Villager Committee or Villager groups I Affected Household l Resettlement Appeal System for the Project 8-4

151 Resettlement Action Plan for Conidor Component (Changsha Section) 9.Environmental Protection and Management 9.1 Needs for Environmental Protection The environmental assessment, which is a major investment item for resettlement, shall include the impact of resettlement on environment. The Resettlement Action Plan must perform by combining with environmental assessment. Resettlement zone shall be demarcated, and population density growth value of unit land area shall be calculated. As far as agriculture project is concerned, if number of resettlement exceeds the number of people existing in the host sites, it will bring such environment problems like lopping forest, unduly browse, water-soil loss, deterioration of sanitation, pollution, etc. Therefore, the Resettlement Action Plan shall not only include proper mitigation measures (including training of resettlers), but also allow to select other host sites. The town resettlement will bring other relevant problems related to population density (like communications capability, portable water sources, sanitation system, medical treatment hygiene, social security etc.). The constructive environmental management methods can provide good opportunities and benefits for resettlement and residents in the host area. If the resettlement may produce unacceptable impact on environment, then, other resettlement sites or more resettlement sites shall be found out. 9.2Dismantling and Cleaning up All the various garbage produced by dismantling various buildings and appendixes within the project area will be dumped into designated disposal sites specified by the Zhuzhou Environment and Hygiene Bureau. All the houses and appendixes within the project area shall be dismantled and leveled. For all the pollution sources within the project area, sanitation and sterilization shall be performed. The accumulated wastewater produced by industrial enterprises shall be discharged based on regulation. Poisonous waste residues shall be transported to designated sites for burying or filling. The storehouses for storing chemical material, disinfections and neutralization treatment shall be performed to make the soil reach sanitation criteria. 9.3 Environment Management in Resettlement Area Environment protection shall be adequately considered in planning, design and construction of resettlement zone and it is necessary to make the surrounding environment beautiful and comfortable as much as possible. 9-1

152 Resettlement Action Plan for Corridor Component (Changsha Section) a) During earth excavation, excavation face shall be leveled with drainage ditches provided if necessary to mitigate hydraulic scouring on excavation surface. Trees and grass shall be planted as early as possible in disposal area to avoid water-earth loss. Four house construction and public facilities reconstruction, the damage to forest and vegetation shall be minimized as much as possible. Tress along the highway shall be planted. b) Sanitation in new residential house: Before moving into new resettlement houses, the surrounding environment shall be sanitized by means of sprinkling mosquito pesticide, and cleaning ruderal and waste water containers around the new residential houses after move in from time to time. c) To select clean water source: Tight and sound water tanks shall be constructed for the spring sources and no such pollution sources like WC, cesspit, stockyard dust heap, and waste residue piles can be provided 20-30m around water sources. 9-2

153 Resefflement Action Plan for Corridor Component (Changsha Section) 10. Monitoring and Evaluation 10.1 Internal Monitoring Internal Monitoring Purposes The Employer performs the internal monitoring. Its purpose is to maintain a good function of resettlement organization at various levels during project implementation, cooperate and coordinate work of each party, and master resettlement status in implementation from time to time Internal Monitoring Organization The internal monitoring organization for the Project is the Hunan Provincial Changzhutan International Logistic Company. The organization will assign a dedicated leader in charge of relevant resettlement issues, who shall have resettlement working experience and authority to coordinate various departments related to resettlement. The organization shall have enough working staff. The staff shall have knowledge in dealing with resettlement working and social problems, in order to be able to perform its responsibilities Internal Monitoring Content 1) Status of resettlement physical relocation, residential site assignment, residential house reconstruction etc.; 2) Implementation progress and quality of resettlement production development projects; 3) Investigation, coordination and suggestions for main problems existed in resettlement and implementation organization during implementation; 4) Status of family income restoration after resettlement Physical Relocation; 5) Restoration status of vulnerable groups; 6) Disbursement, use and in position status of resettlement compensation fund; 7) Resettlers' participation and consultation extent during implementation; 8) Resettlers' training and its effect; 10-1

154 Resettlement Action Plan for Comdor Component (Changsha Section) 9) Working organization, training, working time and efficiency of local resettlement office Internal Monitoring Responsibilities 1) To cooperate the work of resettlement implementing organizations, upper administrative departments, external monitoring and supervision units; 2) In line with monitoring content, to establish corresponding forms to require implementing units fill and submit to upper administrative departments and the Employer every month; 3) To take part in monthly field check and investigation by supervision staff, and take part in take-over acceptance of resettlement works; 4) To supervise implementation of yearly working plan, fund use and organize yearly fund auditing jointly with provincial resettlement upper administrative department; 5) To submit status report to the BANK (proposing twice a year, on every April and October); 6) To report implementation status to provincial government periodically, and consult with upper administrative departments as necessary from time to time External Monitoring Evaluation Purpose of Monitoring The purpose of independent monitoring is to provide an evaluation on resettlement work, and to check implementation work in extensive and long-term views in a bid to evaluate whether the resettlement targets are reached Monitoring and Evaluation Organization The Employer shall retain monitoring unit, Changsha Xinghuan Hydropower Engineering Development Co., Ltd. in charge of monitoring and evaluation work for land acquisition, relocation and resettlement compensation. The independent monitoring unit will provide the Employer with comprehensive resettlement implementation information and report resettlement implementation progress existing problems and handling suggestions to the BANK and the Employer. 10-2

155 Resettlement Action Plan for Comdor Component (Changsha Section) Monitoring and Evaluation Content The independent monitoring unit will perform monitoring and evaluations on rural resettlement physical relocation, resettlement implementation effect, special facilities and infrastructure relocation and reconstruction as well as resettlement fund use effect. 1) Monitoring and evaluation of the planning and implementation of rural resettlement. Its working contends include preparation work before resettlement and relocation, planning, designing, the preparation of financing and plan implementation as well as the preparation of livelihood and production material of the resettlers. During the resettlement, the monitoring and evaluation mainly lies in the production development, land adjustment, housing relocation and reconstruction, the restoration of water supply, electricity supply, road and the progress status of other supporting infrastructure works, social service system restoration, and also the quality and the change of live and production level of the resettlers before and after the resettlement, lies in the whereabouts of the resettlers engaged in the second and third industry and their income and living after employment, lies in the investigation of their training of production and technique skills and the effort to improve their comprehensive cultural quality. 2) Monitoring and evaluation of the relocation and reconstruction of special facilities. It includes the supply of water and electricity, post and telecommunications, broadcasting and television, transportation, etc. All should be done on the baseline of the approved documents of engineering design to make monitoring and evaluation on the whole process of engineering quality, progress, and effect of the relocation and reconstruction Monitoring and Evaluation Responsibility Independent monitoring and evaluation organization should perform as the consultant of the employer, evaluate the activities by resettlement office and propose some alternative activity methods in case of potential problems to realize all the objectives of resettlement and relocation according to the action plan. Especially, the independent monitoring and evaluation organization should carry out the activities listed as follows Living standard evaluation The independent monitoring organization will perform living standard baseline investigation before resettlement implementation, in line with random sampling and a control group of the affected people. The iterant living standard investigation will be 10-3

156 Resettlement Action Plan for Comdor Component (Changsha Section) done each year (at least twice after implementation) to measure the change of livelihood criteria of the affected people. The activity is one of methods to determine the change of livelihood criteria of the affected people Public consultation The independent monitoring and evaluation unit will periodically take part in public consultation meetings held by villages and towns. Evaluation can be made to participation effect of the affected people and cooperation participation extent of the affected people during implementation of Resettlement Action Plan by means of monitoring these consultation meeting. The independent monitoring organization will also consult with the affected people to learn their knowledge, taste and expectation of the affected people in restoration of their livelihood,and will report to resettlement office the findings. These activities will continue during and after resettlement implementation Complaint problems The independent monitoring organization will periodically visit the affected sites,and interview with local resettlement offices and with the affected people to understand complaint problems. It is necessary to continuously monitor resolution efficiency for complaint problem, and to propose suggestion for potential change if necessary,in a bid to be more effective in the process Other Responsibilities The independent monitoring organization will also.propose suggestions in preparation of Resettlement Action Plan and during implementation to resettlement office,and monitor the following indicating items: (1) Compensation fund disbursement; (2) Land readjustment; (3) Resettlement site preparation and adequacy; (4) House Reconstruction; (5) Physical Relocation of affected people; (6) Training; (7) Vulnerable groups restoration; 10-4

157 Attached TWOI. PpolaIno_ Survey Detail Table of Housing Relocation Folmal Hou.. App.nd.. BoId.ng Stt64IO T-a S..-9 GC--K~n') mao(w ) FIua Coont 10D90) Ta.. (R.ntdnl,a GoOop No H-oih.liftd, Na... (Off-6) C..n.itl.) 0. 9 o. S.,,t., Bin anda RnnB,k.nd EalS afld Bouding WVl PiolWli. F-ad-fp T-60N. Popsyolion Tin,b. Woo aat Lli.G.o nd nol Bank(,l') Eal inoi 96f od). O-(N)0 o Ta. ~~~~~Coo,.. IN 8.1? L. Yoio.n S Lio)ia WangZlioqi X 3nZha.09f I L. Jianyuh, a a 14 I IS L. Jialan Loi.DoognIo M Lw yolno G.a.Oba I I S 12 X.oogZhp.g O W a L.iZanhu a S IS 3 Ui Zh6,y.V U Jinqoan 7.26 X OLianig DI I a I I *ai N go a 7-22 X.oaGoo.a I I1I 7.23 X.aGalyo a900 I 5 a 6.23 LiBingllo X. AV"fo a.Zhankln, is X* Zlwigilin O 1 IS IS 6-27 L. Ynanoi 1 go O. B-28 X.akaHoa a I I 10 ls X.a Ta.gu 8-29 X.aWWooo I 1 I a 3949a X... O-gng X.. Shio,ngq OnaSi.-Ng a so X..7T.00 Xi. Kaibin IS IS 6-31 ifoli OSanglang o i X.aZdii4h Xn. ZOnnang 5 A-12

158 Atta *d TWO Survey Detail Table of Housing Relocation Attached Table3 Popultion Formal Hous. App-d,. B.l6dng Sc.anrd Tn.. T-hilrp. Vl9ga Total Htoo R-OOy Conoty (Dratnidl -Oar (R-.daol. Gtop No P..W.lodor N.n-~.8 d ~ SrongGoo)n o gws rdr68.8 (0810T. ConrGnH l Ppao Sul cona T mtr kn Wo d yr. Ce.n G "olnd r i.rl trr- Pr)d.o F Ba_- P. ' TbNo rt og Rna 1 Om.) - SodMiour Pa I... Ia Graa Tra. 88 W.n Ch.nhrn t _ W"n,owol s6 = Wang oloig _ 1 Li. Ha Tang A88h n L. Ana l a 7-2 Wang Zlrrg s 30 _ U. JrArrn e as Is LollIang e L.oG.o" L. Zll86gOh 7-10 L hoanjlon ? I OM 78- W e I W8 M5N- n s lo XW Igo s r Is 1 so WangZ7rar3war t 714 I S e LooJInSo = Jr h." ng s s =4= 41r 11go 2403 =I= 1 = = 20 = Lomogk U X,.M W Be s W.ng PLn JShrrt9 Zh- 5 a 8 2e el e _ I I 1o 25 W.ng Ymgn = = = = = = = = re3e To. Jasp.g e 1053e o LU.Y.y."r 8 s = 1 = =20 = = 8.13 L.. D-onk I I e3 9 e B e3 9 Fr. H- c M.,e 7 ee~6 e M1 7e1 = i 8 ng rs ShrYln P 2 2 ee I L- Jr.nh _ ? = = =- A- Il

159 Survey Detail Table of Housing Relocation Attached TsbIe3 Popc94,on Foooal HOc.. Appo4ods rduiowg s40lor d 7ruu C"o8 (D.W6-a Y00 (R..ft.4..l Gwop C ka"_ 4,, (~~~-~~ To P Wo (RZ.1P'. W OO(wok) No H MN ~ ~ ~~~ Bock 404~~~A Boo k1 E.nlh nd S.fo.l.o_..' Oin3gWO rl.l P,n94, ') T-0(N Ol. l.l ooo Popol.Ooo C0nor~~~~. 7,0184,b c004 Lo.-. G-aco.nd in.1()eo -lo o )Gloo Y-0 T,.. N HO* od"um ToI sn r TH U a BrckX d Erean enhin Sbn C m n :wat > E u m=wte n, _ R m" SO M.ol03.0 *Wo Tro. T- 6-25,,y.ng Z-,ng 6 O Duol 2 a O e260 * = PW.ogo _ L. Zo..h W4 I W.ogO Xo I P.ng Zh rs_n s O 5-32 Zh.ng CGoq.ng Zh.Q ngoor _ = = Zh ng aurqlo = I_ o0, 9 9 = _ = =h = =h_4= _ 6-2e29 6OOogXco G l e 20 1 I I e m34 X1d. 5 e 6-30 W._g 6-31 P.N R.o00, Zou 6hwhw e65 I MI = xogloog Zh.o e Ts T i..qso _ e s 0.1 5_34 Zhng Lnhs Zh8.g FLpo e so Zh.ng G-o>g t4 239 e4 239 e so ZO.ogYlogoO i gt s I uJ..nhig I 3 3 5s3e Li. Dro =1e r s L.o Yqiun e L. hmngoh.n s I I a I I Zoo Shubkg L.l. B s5 1 I 6 1o L.. J Li. Jooqo.,l _ 1 _64 Zh.ng JnI-ng s L. HmI.n _ 5 8l e XU 00..I.o e 7 = 6-7 W.ng Ji.londg W _.: A

160 Attadhed TablIe3 Survey Detail Table of Housing Relocation Populelion Forma- House App-ndro B.lidng Satenrd TI. T VWr.tp Orgt w oal0.5 Sundry Cooy(lto) T-o R8.r.t.l G-op No Ho.rOldrNn.ad ad Hos Sunnn 9G... (nr BouirgWa,toeFh,a. W4) Mce mek (Off-c) Corlooffe1)Toa CE1..t Dd..Wd.N.. TOW[' H-eH 5 WIIOSboa ouee Tnbher Wooh.d F.onldYoung Poo-Hn, ) Torr)No Tre r.t. T-z W d Cor t Lr(Grne.n S,' 9enK(tn) E.dth Plessur Boe4*nr Tre re T- 2.?? LaLragq I2N go 0300 I Zh.ng Ja-inrg e 75 M _ Z.oOboe Zoo Gadro I I Zoou Cnrnq 5 5 M I _ 8 I Zoo Bor9ref 2-32 ZIrooCh is I 4 I I so s M.8rogw. 4 4 so 90 s0 I s441 In^ P,. Song Jinnger N. StW4VtIei.ed TIeodn.a e s IS 89s s _do 8 2s S as xu.g" m s I _9 95 O4rng ss L 0-79 H4 Hrr e 9ss e,aorrna e Zh..r ChMNaan e I sow so as I Zhrgouo rng i l Zh-ngMeor.r ZhagFu.og a r I 7 4 a-22 Zh.0g Faq..n 8 a O =-23 Zheng Zhoghrn = 9 7I Lrp.-oo 7 II Pan Lrpng O _ OovangZhongyu = b u OurXeoql Zh.NgZhhlre Go Jianhl o ZIhertn Yr SW.n 2 2 9s 43 es 43 9o 43 a Zh-H-eng A-9

161 S ra rr - r -2I2E X C f, i e0 t X tf4x o U XttkAAtk U) tstw0ts 0) g;4e;0s; 2 - r 2e u i ;-t ai o LF u 2

162 F~~~~~~~~~~ _0, w _ -O -O w _ ; = 0~~~~~~~~~~~~~~~~ I I. 0- ~~~~~ 0 ~ ~ ~!8 aa - j g 11' 1~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~C - ' ~~~~~~~~~~~~ 01~ ~ ~ ~~~C T1 =_T_r T hr O 0~~~- - F.2 r.2 I L I - I _ -r_ -_ =-. _ > < 0_ -- w _ ±~~~F I I~ -~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4 Ai ~~~~~~~~~~~~~~~~

163 ol.r- - - (U ,~~~~~~~~~~~ (0 ~~~~~~~ ~~~ ~~

164 Survey Detail Table of Housing Relocation Attadhed TWbO3 Populall- For-I Hu.- Appa.M.. Buorbogi Scartard T-a T-1,"r.n. Vdl.g.. Total Hos.. Sufldy Co_ty tor.9t05 Toot (Ra..4.r. Grop N. H-hd.rud.r N..n... rc.0 O ds.-.9n G-Oud(fl) nrtrk.. FrI. R-Pnto,. (Gifo.) C-rnnrt.) o. o uttl Cnrt ib,.., Wood1 Coot r.onod 8 (.' dq 8.. l ') F-thPrnu -pir 0pm T- Growl Youn d C-w B..k(. I Well -1111~~~~~~~~~~~~~~~~~~~~I. Sad Motor *~~~~~~~~P WoO 1 Y. Tr. _ 2-34 H.a Fuq,fg I I 58 G L.Lbbo.nT L.0 Hanq.n too s08 as 1 2a 2.38 Zlabor IGO to 3-12 Ztr.ng G.".qr I1 I ~~~~~~~~~~~~~~~~~(0 SF Yuan Fuq.ra s I L. B l to5 I to 3-15 M.a Wa.PNgn e o T.ng Fupro 4 I Ot a Tarrg Gaql.ng I I Zr.. Sh.h o I Tang Zt..rgt.n I UaNgl8goh Y I J.- T..q 5 5_ J-1i. UN 4 4 ~ J..h-.g UN a a I T.qJ Y9Z.g.g M0173 la II L1 C I f 8i I 2 7 W.Gooho ZhaNg Zarou M740 ti I Yu.n D-rin a H"ain so Wu Funong I H.h Chon,ini IOD H..aN.rrl 4 4_ H. asonglin I Han J-9r le L,Xu.M a L..uY.yp,ng a I a 4-8 Y... G-oh. I I 219 1? Zhr.ngL-oh,ng 1i '2_ 940 t4p19p I8O as H.. M-h"n I I A-S

165 2 ^9f --_ --_ L-r r L -- _-- L---

166 Permanent Land Occupation Survey Table Attached Table2 Tianxin District Changsha Counry Item Unit Total Datuo Township Xinkaipu District Muyun Village L n ~ ~ ~ ~~~~~~~Xnln ign Toa Datuo ehuanghe Heishi Wenhua < SubtotalXigogDtoXnagHage esh Subtotal Wnu Subtotal Sanxing Nantuo Yaotang Fengcheng Lianhe Muyun Village Village Village Village Village Village Village Village Village Village Village Village Total mu ,Cultivated Land mu Paddy Field mu Vegetable Land mu Dry Land mu ,Pond mu ,Fish Pond mu ,Orchard mu ,Timber mu ,Grass Land mu ,Resident Site mu ,Public Land mu ,Road Use Land mu ,Tunnel mu ,Other mu Need Occupation State-owned Land 71.45mu A-3

167 Attached Tablel Impact Physical Indexes Summary Table of Acquisition Land Item Unit Qty. Remarks 3,Fish Pond mu ,Orchard mu ,Timber mu 5.76 Timber mu ,Gross Land mu ,Residential Site mu ,Public Land mu ,Road Use Land mu ,Canal mu ,Other Use Land mu (2) Stated-owned Land mu (3) Temporary Land ,Production Forest mu ,Timber mu ,Waste Land mu ,Scaetered Tree No , Fruiter No Mature Tree No Young Tree No ,0ther Tree No ,Tomb No. 8 6,Special Facilities 1,Road Facilities Simple Highway km 3.65 Tractor Road km ,Power Transmission Facilities High Voltage Line km 8.88 Low Voltage Line km 9.06 Transformer Set 11 3,Telecommunication Line km ,Pump Station Site 15 5,Canal km ,Dock Site 1 A-2

168 Attached Tablel Impact Physical Indexes Summary Table of Acquisition Land Item Unit Qty. Remarks 1,Population Householder No. 502 Population No ,Houses and Appendix Buildings (1) Houses m ,Public House m Brick and Concrete m Brick and Timber m Brick and Timber m Sundry House m ,Private House m Brick and Concrete m Brick and Timber m Brick and Timber m Sundry House m (2) Appendix Buildings 1, Sunning Ground m Cement unning Ground m Earthen Sunning Ground m ,Bounding Wall m , Protective Bank , well well 375 Earth Well well 4 Pressure Well well 371 5,Firedamp Basin No. 54 6, Pond m ,Land (1) Collective Land mu ,Cultivated Land mu Paddy Land mu Vegetable Land mu Dry Land mu ,Pond mu A-1

169 - - l I

170 Resettlement Action Plan for Coridor Component (Changsha Section) The collection of the above documents has replaced the agreements, records of talks and all other documents accepted jointly by two Parties for signing the this contract prior to signing this Agreement. 3. The contractor will guarantee to fully complete the all contracted works according to the stipulations in the contract and undertake the contractor's all obligations stipulated in the contract. 4. The Contract Party will guarantee to make payment according to stipulations in contract and undertake all obligations of the contract Party. 5. This agreement will go into effect upon the signatures of the legal representatives or authorized representatives of both parties and the seals of current units. 6. This contract is done in. Of which originals, Party A and Party B have one each; _ copies, _ for contract party and for contractor. Contract party will send other copies to related enterprises. Contract Party: (Official seal): Contractor: (Official seal): Legal Representative (Signature): Legal Representative (Signature): Handler: Handler: Add: Add: Post Code: Tel: Fax: Bank of deposit: Account: Post Code: Tel: Fax: Bank of deposit: Account: Annex-7

171 Resettlement Action Plan for Comdor Component (Changsha Section) Appendix Construction Contract of Resettlement Project Name of Contract: Number of Contract: (Hereinafter referred to as the Contract Party) has a construction project and has accepted (Hereinafter referred to as the Contract Party) bid. Both have made the following Agreement, and have signed this contract agreement on - (month) - (day), _ (year). The total amount of the contract is Yuan. 1. The meanings of words of words in this Agreement are similar to the meanings of words in special contract provision and common contract provision listed in the Clause This contract includes the following documents: 1) Agreement (including the memorandum of agreement) 2) Notice to contractor. 3) Bidding sheet. 4) Provisions of special contract. 5) Provisions of common contract. 6) Technical provisions. 7) Drawings. 8) Priced quantity sheet. 9) Other documents of contract. Annex-6

172 ResettlementAction Plan for Conidor Component (Changsha Section) Resettlement and habitability Implementation Program of Flood Control and landscape Corridor Component of CZT(Changsha Section)>, the Party B will unhook connections with the Party A in resettlement and arrangement. 9. If the obligations stipulated in clauses concerned of this Agreement will not be fulfilled in resettlement and arrangement areas, two Parties can make an appeal to the Project Offices of counties (districts) through the resettlement channel. And the Project Offices of counties will provide solving methods after making investigation. 10. This Agreement is done in triplicate, Party A and Party B has one copy each, and one copy will be Kept on a file in the Project Office of counties (districts). It will go into effect upon both signatures and seals. Party A (Official seal): Party B (Signature): Legal Representative (Signature): Resettlement Office of counties (districts) (Official Seal): Legal Representative (Signature): Annex-5

173 Resettlement Action Plan for Corridor Component (Changsha Section) 2) Party B should handle the acceptance certificate in the groups (with signatures and seal of more than 70% of households of this group), villages of host sites, and should handle the registry permit of household in the Township (town) People's Government, and in addition, Party B must deal with household removal certificate at the original census register department. The Party A will make examination and approval in accordance with the copies of Party B's of acceptance certificate, registry permit of household and household removal certificate and can make Lump-sum payment of compensation and subsidy to Party B (10% of the Compensation for scattered trees will be left as expense for cutting trees down, and after completing cutting down it will be repaid). 3. Panty B should abide by requirements of township (office), county and city People's Governments and guarantee to complete the house pulling down and removing before (month) _ (day), _ (year) and to remove to resettlement houses only once. It is not allowed to random change the removing program and to come back. 4. If Party B will not have completed the removal before (month) _ (day) (year), it should be responsible for all losses arising there from. 5. Party A and People's Government of acceptance place will jointly sign a contract on Party B's production and arrangement which People's Government of acceptance place will conduct. 6. The production and settlement population will take the population at accounting settlement allowance in closing day as the guideline, not accounting the population natural growth. 7. After the resettlement households have removed to the settlement place, they must abide by the State policies, laws and regulations and respect the social customs and habits, and, in addition, will enjoy the preferential policies, which the State gives the relocatees. 8. After the Party A has carried out the settlement policies according to <The Report of Annex-4

174 Resettlement Acton Plan for Coridor Component (Changsha Section) Compensation Agreement on Resettlement and Relocating Households No: Party A: _ Township People's Government (office section), - County (District). Party B: Household head, members of a family _, Address: Group, Village, (Resident Committee), Township (Office section). In order to guarantee smooth implementation of Flood Control and landscape Corridor Component of CZT(Changsha Section) and support the State Key project construction, according to the Land Administrative Law of the People's Republic of China, the Implementation Methods of Land Administration in Hunan province and the Report on Resettlement Implementation Plan of Flood Control and landscape Corridor Component of CZT(Changsha Section) approved by the Hunan Provincial People's Government, this family is a resettlement household, and it has volunteered to use _ settlement way. The agreement on same items is wade as following, by which should jointly be abided by two parties. 1. Compensation and subsidiary items, quantity, criterion and amount. 1) The compensation items and quantity will depend upon the files which received from investigation of each household, on _ (month),_ (day), - (year). 2) Compensation accounting will be carried out according to the criteria in the <Land Requisition Compensation and Resettlement Rules and Execution Ways in Changsha City> 3) The total amount of relocation compensation is RMB_ Yuan (accounting statement is attached to document end). 2. Payment Mode of Compensation by Party A. 1) Party A will place the total compensation amount of Party B on lump-sum deposit in a special account Resettlement, relocation and construction of the Rural Credit Cooperative, and the cashing way of current bankbook will be used. Annex-3

175 Resetlement Action Plan for Corridor Component (Changsha Section) on Flood Control and landscape Road Project (Changsha Section) > and the second any physical relocation and resettlement shouldn't be caused. If the program to would be readjusted or changed, it is necessary to report to the Changsha Urban Construction Investment Developing Ltd. Co., and after approving, it could be carried out, _ People's Government should fully be answered for the consequence arisen by that the above tasks would not be completed in the fixed time. 2) Changsha Urban Construction, Investment and Development Co., Ltd. will disburse the resettlement funds on schedule to according to the plan of using funds. If the resettlement work will be influenced by that the funds cannot be disbursed on schedule, the Changsha Urban Construction, Investment and Development Co., Ltd will be held responsible for the consequences arising there from. 3) Changsha Urban Construction, Investment and Development Co., Ltd will inspect, monitor and coordinate resettlement work, and control the resettlement funds according to the Resettlement Rules. It will be responsible for examination and approval of resettlement plan implementation, assignation of the annual plan and examination and approving of special projects. 4) Changsha Urban Construction, Investment and Development Co., Ltd and People's Government sign this task document jointly. It is done in _, which have equal effect. Changsha Urban Construction, Investment Legal Representative (signature) and Development Co., Ltd: (signature) People's Government (official seal) Legal Representative (signature) Annex-2

176 Resefflement Action Plan for Corridor Component (Changsha Section) Annex 1 Contract of Relocation and Resettlement Tasks for Flood Control and landscape Corridor Component of CZT(Changsha Section) Flood Control and landscape Corridor Component of CZT(Changsha Section) is a key one in Hunan Province; it will produce the great social, economic and environmental results after its completion. The success or failure of the Project depends upon whether or not the resettlement work will be carried out smoothly. In order to achieve the construction target of project as soon as possible, it is to be definite that the units concerned have the following responsibilities and tasks: 1. Time Requirement People's Government should complete the resettlement and physical relocation of households and _ persons and production and settlement of _ persons and the corresponding infrastructure construction work before _ (month), _ (year) Meanwhile, the production development and special project construction should be completed by stages and by groups according to the Flood Control and landscape Corridor Component of CZT(Changsha Section). 2. Compensatory Investment According to examination opinion of departments concerned, it is determined to give (district) _ (county) the total compensatory investment of Yuan (see the Appendix). _ People's Government will take responsibilities for the surplus and deficits. 3. Responsibilities of Every Party 1) _ People's Government should, with in the fixed time in Clause 1, on schedule and in high quality, complete the physical relocation and resettlement tasks in coverage influenced by Flood Control and landscape Road Project (Changsha Section). In the process of relocation and settlement, it is necessary to make implementation according to <The Resettlement and Rehabilitation Program Report Annex- I

177 Resettlement Action Plan for Corridor Component (Changsha Section) irrigation infrastructure, change the slopes to terraces, improve soil and grow economic plants in a large scale. The bigger scale of implementation method makes the local resident beneficial. Besides, host site people can invest the land acquisition compensation into improving agriculture productivity or other non-agriculture income. 14-4

178 Resettlement Action Plan for Conidor Component (Changsha Section) 14) Measurement and Payment 15) Price adjustment 16) Modification 17) Break a contract and compensation 18) Dispute solving 19) Risk and insurance 20) Completion and guarantee 21) Others The specific stipulations about some concrete items for the special contract provisions should be made accordingly to the project actual situations. For example, keeping secret, contract termination, etc Resettlement Agreement a) The resettles must have chances to read and know various resettlements programs. Throught public participation, the counties resettlement office should make the resettles generally accept the resettlement and participate to set up the detailed resettlement work. b) Relocation compensation agreement. Before their relocation, the resettles should sign an agreement of relocation compensation with local government, make known the compensation quantity, relocation place, resettlement, and the responsibilities and obligation of both sides. c) Land share agreement. Make the host site people know the resettlement action plan properly. The resettles and host site people make an agreement for land and resources share. Compensate the host site villages with the land, which shares with resettlers. Provide the resettlers with finance assistance, improve the yield of per unit area capacity, the ways in details, construct 14-3

179 Resettlement Action Plan for Conidor Component (Changsha Section) Contract of Resettlement Project Construction In order to strengthen the construction market control, standardize the bidding work contract management earnestly, guarantee the lawful rights and interests of the contract party and contractor party, and ensure the construction management of project and the health and ordered conducting of bids on the honest and fair basis, the resettlement project construction contracts should be signed for building of all kinds of special works. And it is necessary to use the Contract Conditions of Water and Power Civil Engineering Construction, the " contract conditions" are divided into common contracts provisions and special contract provisions. The common contract provisions include contents as follows: 1) Meanings of terms 2) Contract documents 3) General obligation and responsibilities of both sides 4) Performance bond 5) Corresponding letters 6) Drawings 7) Transform and sub-contract 8) Personnel of contractor party and their management 9) Materials and equipment 10) Transportation 11) Project schedule 12) Engineering quality 13) Civilization construction 14-2

180 Resettlement Action Plan for Corridor Component (Changsha Section) 14. Annex 14.1 Agreement In order to enforce the management, the owner should retain dedicated people to make comprehensive trace management on quality, fund, and progress of the project during the implementation process. And the owner himself will only do some concrete management in project with large sum of investment or the influential project and participate the agreement signing of same important contract and agreement Important Contracts and Agreement a) It is necessary to sign the agreement on the total funds for resettlement and fund sources. The owner will come to an agreement about contract investment with Changsha County and the Tianxin District, which will complete the resefflement tasks in the agreed total fund limit. The resettlement funds can be adjusted in the process of using. b) It is necessary to reach an agreement about the resettlement policy and selection of resettlement zones. At this point, the Changsha County and thetianxin District basically has accepted the scheme of resettlement design units, but some places have suggested that this scheme is to be optimized. If the county level resettlement office will complete the execution of planning work, the counties concerned must support the resettlement policies. c) It is necessary to reach an agreement about land acquisition, relocation and material indexes, and the design unit has made the on-the-spot investigation and discussions about material indexes and set up the resettlement household cards. On this basis, the design unit reached an agreement with counties, townships and villages concerned, and all the data have been subjected to signatures, seals and acceptance. 14-1

181 I

182 Resettlement Action Plan for Coridor Component (Changsha Section) 13. Attached Drawings 13.1 Attached Drawing 1) Geographic Location of the Project Zone 2) Resettlers' Residence Design Drawing 13.2 Attached Tables 1) Attached Table 1: Physical Indexes Summary Affected by the Proejct 2) Attached Table 2: Project Permanent Land Occupation Investigation Table 3) Attached Table 3::House Relocation Investigation Detail 4) Attached Table 4: Enterprise Affected by the Project 5) Attached Table 5: Resettlement House Plan 6) Aftached Table 6: Production Resettlement Population Calculation Table: 7) Attached Table 7: Production Resettlement Plan 8) Attached Table 8::Land Acquisition and Relocation Cost Estimate 9) Attached Table 9: Enterprise Compensation Investment 10)Attached Table 10: Collective Land Compensation Calculation Table 1 1)Attached Table 11: Resettlement Schedule for FCLCC (Changsha Section) 13-1

183 Resettlement Action Plan for ConTidor Component (Changsha Section) Yearly Fund Use Plan Based on the resettlement implementation schedule, yearly investment plan for itemized resettlement compensation cost is prepared. The yearly fund use plan is arranged as follows: the fund for 2004 accounts for 30 percent of the total cost, i.e. 36,713,400 RMB Yuan, the fund for 2005 accounts for 50 percent, i.e. 61,189,000 RMB Yuan, the fund for 2006 accounts for 20 percent, i.e. 24,475,600 RMB Yuan. The yearly investment schedule is given in table Table 12-2 Land Acquisition Yearly Investment Schedule Total Yearly Implementation Schedule Item Sub-item Investment (104 Yuan) (104 Yuan) Year 2004 Year 2005 Year 2006 I Rural Resettlement Compensation Land Acquisition Compensation 2. House Compensation Basic Facilities Compensation 4. Other Compensation Special Facility Compensation Road Facilities Power Transmission Line Telecommuniction Line Other III Other Costs Investigation Design Cost Implementation Cost Technical Training Cost Monitoring and Evaluation Cost IV Basic Contigency V Related Taxes VI Total Investment

184 Reseftlement Action Plan for Conidor Component (Changsha Section) 12. Resettlement Implementation Scheduling 12.1 Principles for Scheduling The resettlement implementation schedule will be developed according to the project construction content, work quantities, construction period and resettlement object, resettlement mode, etc. 1) As during the resettlement relocation, the resettlement targets are mainly rural people, when the implementation scheduling, we shall properly consider agriculture production traits and shall arrange land acquisition and house relocation in non-planting period as much as possible to minimize the impact on agriculture production. 2) The compensation should be dispensed five days ahead of the time of house relocation. 3) Construction of public, infrastructure facilities will be completed at least 20 days before resettlement house construction, to minimize the impact on resettlers' living. 4) As to the quantity of the resettlement is not large, the resettlement work can be done in a time. 5) The special facilities reconstruction will be arranged on the construction close-up stage of each engineering package, to minimize the engineering construction of the project on reconstruction of special facilities Schedule Resettlement Implementation Schedule Based on project engineering construction organizational design, land acquisition and relocation shall be completed in advance to ensure that the implementation of project construction, based on which the resettlement implementation schedule is prepared. The schedule of resettlement and relocation begins on April 1 st, 2004 and ends before June 3 0 th, The village resettlement implementation schedule is detailed in attached table

185 Resettlement Action Plan for Conidor Component (Changsha Section) 2) Non-residential house: The Resettlement Unit has signed the Agreement in terms of compensation criteria, resettlement mode, and physical relocation timing. The Resettlement Unit will disburse the compensation fund directly to relocated households. 3) Land acquisition: The Resettlement Unit will sign the Agreement with the related village in terms of resettlement compensation criteria, labour resettlement method, acquisition date to disburse the compensation fund to villager committees. The relevant villager committees will use land compensation fee for production development. The resettlement subsidy fee will disburse to village collectives, which will disburse the fund to units or individuals in line with resettlement scheme. 4) Infrastructure compensation cost: The Resettlement Unit has signed infrastructure compensation agreement *with townships (villages), villager committees (residential committees) or directly signed Construction Contract for Resettlement Works with construction units. The Resettlement Unit will disburse compensation fund to relevant townships (villages), villager committees or construction contractors in batches according to contract agreement. 5) Special facilities: The Resettlement Unit has signed Compensation Investment Agreement for Special Facilities Restoration and Reconstruction with relevant departments. Via the bank, the Resettlement Unit will disburse the special facilities restoration reconstruction compensation investment to administrative departments of such facilities Fund Management and Auditing The resettlement departments will submit a relocation budget according to yearly relocation schedule and yearly fund plan to the World Bank Office. After approval, the World Bank Office will allocate various funds. During fund use of resettlement department, state and local city fund management and auditing regulations shall be strictly followed. The fund operation shall be checked and approved step by step, i.e. Checked by chief of resettlement department - by chief of the World Bank Office - by chief from financial division of the World Bank Office. The financial division will, in line with checked budget and direction of the chief and after making sure that the application meet the standards of the report and no errors existed, disburse fund to resettlement departments. The World Bank Office will perform mid-project auditing for resettlement fund use and adjust the budgets according to actual conditions. 11-6

186 Resettlement Action Plan for Corridor Component (Changsha Section) Table Balance of Land Compensation Fee and Production Resettlement Investment - Unit Cost ( 104 Item Sub-item Unit price Qty 1.Production exploitation investment (Yuan) Yuan) 1. Improving low yielding field and increased input mu Chang dry land into paddy field 3.Land adjustment out of group Paddy field mu Dry land mu nd and 3 rd industry Person resettlement 2.Land Compensation Fee ~~~~~~~~~~~~~~~~~~ Fee 3. Item 2 - Item Fund Use Within the deadline of the physical relocation appointed by the resettlement unit, the employ and the relocated households should sign a written document according to the criteria framed by this report, which deals with the residential resettlement compensation, non-residential resettlement compensation, land acquisition and use. The disbursement and use of the compensation fund will be made under the supervision of internal supervision and administrative organization and the check by external supervision organization. 1) Residential house: The Resettlement Unit has signed the Physical Relocation Compensation Agreement in terms of house baseline, compensation amount, subsidy, payment method, and timing and physical relocation timing. The Resettlement Unit will disburse the compensation fund directly to relocated households. 11-5

187 Resettlement Action Plan for Corridor Component (Changsha Section) economic forest is 6 RMB yuan per square meter and the total restoration cost is 2.31 *1 04 RMB yuan. The total related tax cost is *104 RMB yuan Balance of Land Compensation Fee and Production Resettlement Investment In line with the Land Occupation Compensation and Resettlement regulations for Large and Medium Scaled Hydropower Projects: The land compensation fee and resettlement subsidy will be used for restoration and production development, for employment of surplus labor resulting from land occupation and subsidy to non-employment personnel by the units whose land is acquired. The land compensation fee and resettlement subsidy can allocated to the county (city) government in a lump sum contract and used for land development and resettler's production and livelihood resettlement by county (city) government. The fund can only used for this specific purpose. Neither other utilization of the fund nor illegal private possession of the fund will be allowed. If land compensation fee and resettlement subsidy Fee cannot meet the requirements of production resettlement, the resettlement subsidy fee can be properly increased according to actual conditions. Therefore, land compensation fee and resettlement subsidy fee is the only source of fund for production resettlement, must be equal or slightly larger than total production resettlement investment. The land acquisition cost and resettlement subsidies in the project zone totals *104 RMB yuan, which is 14.18*104 RMB yuan higher than investment for production resettlement, indicating that the land compensation criteria are relatively appropriate and can meet the requirements of resettlement production resettlement fund and can ensure resettlers' living standard reaching existing standard. The balance of land compensation fee and production resettlement investment is given in table The collective land compensation cost calculation is given in attached table

188 Resefflement Acton Plan for Coridor Component (Changsha Section) Table Other Costs Item Sub-item Investment Remark (104 Yuan) Other costs in totali nvestigation and design cost % of the cost sum of items 2.1mplementation % of the cost sum of item 1 managed cost and 1% of the cost of item 2 3.Technical training cost % of the cost sum of iteml 4.Monitoring and % of the cost sum of items evaluation cost Basic Contingency The total basic contingency is *1 04 RMB Yuan Relevant Taxes 1)Taxes on cultivated land occupation: According to Changsha tianxin District statistic annals, the per capita cultivated land of agricultural population is 1.08 mu. In line with Hunan Cultivated Land Occupation Implementation Regulation, if per capita cultivated land possession is over 1 mu (including 1 mu), the tax is 3 to 7 RMB yuan per square meter. As we take the lower limit of 3 RMB yuan per square meter, the total tax of land occupation is *1 04 RMB yuan. 2) Reclamation cost: According to Xiang Jiafei[2003] Document No 42 of Hunan Provincial Financial Department, Yuetang District belongs to class 2 one, with its reclamation cost of 11,000 RMB yuan/mu for paddy field, and 7,000 RMB yuan/mu for dry field. So the total reclamation cost adds to *104 RMB yuan. 3) Forest vegetation restoration cost: According to the Caizong [2002] No 73 of Ministry of Financial, State Forest Administration, the forest vegetation restoration of timber and 11-3

189 Resettlement Action Plan for Conidor Component (Changsha Section) Item Tablell.1-2 Sub-item Basic Costs Investmnent (104 Yuan) Remark 1I.Rural resettlement compensation cost (1) Land Acquisition compensation (2) Relocation Compensation (3). Infrastructure Compensation (4) Enterprise compensation (5). Physical relocation subsidy (6). Scattered tree compensation (7). Tomb 0.64 (8). Poverty-stricken house building subsidy 7.53 (9). Vulnerable family subsidy Special Facilities Compensation 3. Total The compensation for enterprise affected is given in attached table Other Cost Other cost includes investigation and design cost, implementation management cost, supervision cost, monitoring cost with a total of *1 04 RMB Yuan. The other cost is given in table

190 Resettlement Action Plan for Comdor Component (Changsha Section) 11.Compensation Cost Estimates 11.1 Cost Estimate Narrative The Flood Control Landscape Corridor Component of CZT (Changsha section) includes five categories altogether: rural resettlers' compensation, special facilities compensation, other cost, basic contingency and relevant taxes, with the total investment *1 04 RMB Yuan. The land acquisition and relocation cost estimated is given in table Tablell.1-1 Investment Summary Table Item Investment 104 Yuan Remark 1. Resettlement Compensation Cost Special Facilities Cost Other Cost Basic Contingency % sum of item 1 to 3 5. Related Taxes Total Cost Sum of item 1 to 5 More details about enterprise compensation and investment are shown in Annex Basic Cost Basic cost includes resettlement relocation compensation, land occupation compensation and subsidy, special facilities compensation, etc. According to the project's object index of land occupation and relocation and the standard of compensation subsidy, the total basic cost is added up to *104 RMB Yuan. The basic cost is shown in table I-1

191 Resettlement Action Plan for Comdor Component (Changsha Section) and organize to generalize the advanced experience Monitoring Evaluation Period The independent monitoring unit working time includes project construction period and 2 years after completion of the project. The reports should be submitted in other years and it is suggested as every April and October Resettlement Evaluation After implementation, post-implementation evaluation theory and methodology will be applied to perform post-implementation evaluation on resettlement activities based on monitoring and evaluation. Its content mainly lies in evaluation on successful experience and lessons learned in terms of houses relocation, stores, enterprises and land acquisition, etc. for future use. The resettlement post-implementation unit will prepare post evaluation outline to establish evaluation index system, perform social and economic analysis investigation, and to prepare the Resettlement Post- implementation Evaluation Report for Flood Control Landscape Corridor Component of CZT (Changsha Section), which will be submitted to the World Bank office and the World Bank. 10-6

192 Resettlement Action Plan for Coridor Component (Changsha Section) (8) Infrastructure, special facilities restoration; (9) Property loss compensation; (10) Loss working time compensation; (11) Transition subsidy; (12) Property loss replacement cost compensation; (13) Schedule for the above activities (usable at any time); (14) Organization of resettlement network; Independent Monitoring and Evaluation Measures l) The monitoring and evaluation organization will write monitoring and evaluation work outline and report it to the BANK to earn its approval when the project is implemented in due form 2) The monitoring organization should assign people periodically or aperiodically to make spot check and field survey during the process of monitoring in order to find out problems. They should report in time to the project officer at various levels to take measures and solve the problems and submit the monitoring and evaluation report to the employer. 3) Establish monitoring point for resettler implementation effect and conduct a track investigation. The monitoring point should be established in line with sample check theory and adjust the establishment density according to the actual sorts of resettlers' livelihood (occupation, labor constitution, cultural level, sex and age, economic status, area distribution), but no less than 1/200 of the population or 1/50 of the total household. Established by independent monitoring organization, the monitoring point should give a certain reward whose amount can consult the rural statistician standard. 4) Establish resettler collective input and output analysis model; make analysis and prediction for the normal and typical resettlement administration. 5) Summarize the resettlement relocation effect, assist to establish demonstrative district 10-5

193 Survey Detail Table of Housing Relocation Attadred Table3 Population Formel House Apped.l Budding Sualered Tree C Y DOm_ To (Rs.4dolMr1 Gop No House-older Nl l nd EenS end Hlama House n dm W rorvi _rie _Oe anelll _m5 (Off-n) CommiB..) Agiuur ed Bik -c -d E mh t ld..dl) Bouding W.1W ) Fired-mp pondimnl TomR-kO Totel Population Subotal Concrete Ti-b., Wood Cam-t Lime. a.l= Cod m' -kanty') nenur BainGrond Tar- Yung9 Tree _ Soil men rute m Well ewedl Trea. Tr 7-25 XI Hon-gu 4 4 r XI.Yundo-g B B51 I 4B8 B 7-27 Wang D-ogy-un S S Wang Lun.rr.-g I IS -792 Wog Xmigm-g B 6 M 9 M3 96 I B 7-30 Wang Limig = = 08 I 3 1 I1 6 g91 I TanemmY g L.uHe lun B e 931 I U4 _ 2 Zheng Zh.ln rb93r Zhag Zh-mng S S 1396 c m 11 I 6 T-35 ZhrngsuShmn Ir ZSBng rooa-g 5 S t asla 58 t9 313B 50 I 91 Zh.ng xm)m II i Te RoBgul lg _ 3 B 21 ID X 5 Wangn X.h Weng Xmnguog WaNg Ti1n Igo mg = I 4 = 6-3e Wang Oluarhrg Te,,aYo tab U. Jnshan _ I _ 10-3 Zh ngchulun e64 24 I Weg9 Dhu n Hu. g.ew t Ha Yiqn 9 a 2S r L.u BrEhu.ng e Xu Xrnia X. Goihue I I = H..ng X.Nhu Ma Shngi,n I I 231 B a u 10-S Zhr.ngZhiigso 4 4 ISO I L.. Min)r LI, Zhroogg H.eng Hany.n = HUO,g Shunahang i _ Xulu _ Il Li.. H..u HumgZhVgyun I I Io B A-I3

194 01 a9 O b o Lt I0 It t flt1fl t 9009 set Ofltto, 0 NW CZ 01 to t 0to SO 0 961'd 001Z D OOtl SL91 191e060 VL O 0 lt-1560t I 199 9EZ et Z t091 S Et S ogo Kas 900 e &, a E1i 6690 LO L 691 g 0t s160r Z k lo O VL9I 0660 bg Lo Z z SW 1609t 9 9 &694X0(604Z 001l O I I 6900e z 009o z s I 6, oi LI t1919 go c bn El I L t t e & CZ 9 11-&-97 S1 0 L I 0001t e "E 6601 g0et got q9.ozk 00-0 a 01 I 0900Z it1tt o 9 660h9hfo.990 L ~ ~~~~~~~~~ a to ~~~~~ 9 01e ~ It z '9flO LO Sol 9e0O M 01-O I sit1 tt et91 Ott a N *1-01,96K0106.o 6 1 I 0~~~~~~~~~~~~~~~~~~~~~~~~o991 t 0e it1 et G960L0 e P t e L t t I 1 tb 9090g ES 1019t t Z 01-9 hls 69Z 6E o0) SC g b1o Z I so 19i e ev I 0O I 110L6961 o asoz z L0et 01s s a C Los It d ,90609P.". P t0t P-" 16900('9 Ho6u.n j 9060)049 uorfleooleb BuisnlOH lo elqejl I!Lqea AeAunS

195 Survey Detail Table of Housing Relocation Afttachd TsbIe PoputlOForma lh.u.. Appwdix BoIlding Sc.e.rd Tre Townhip, Village Tot.l NH. Sundry R -k CeoCY (01s91d Toe IRai.elral G-op N.o.. Wirsloda N-ame --[ (Z) Hos Su-nig Gr..und(m' Bo.fltW11 el-f-d Frurle M-edk,Om6.) C-Ot.Slll8 Agiu.r.I ikad Brick end VelS.dh.i.ondnd51 tboif ie Cocee Timber Wood C t LieGiacel Bnd.mt kan(.') Pad_ Prassr Fired.nr C I Sort M.A-ur Welt Watt TreTT 6 W-nlaig 9 IS i W.uZhr gk-u g 59T a T.,,lF.yuf I Wu Sh-se I 4 la 9-24 W.uHaile I 7 14 W. Jiasoheg 9-25 W.uLtoegu a W. Jirrii g SO le W.uYi-re S tts6l a w.r...ngh t W.Zarr-In t96n I 9 I Caileeg a II Zh- 0iangy I W. SoegIe o89 I 2 N-I.edar 9-26 T.. H.ij,, I 1691II s 699 Il Lr6g.Birhang I soi TarlgL.rr el I W. Xegnlmg I I W. Oinghru W. Jr9*aeg W. RN-bie T.n.oYroeg I Ma ORoeqise I I Yodeeg B I T..eYoeseg T..nFiqoe OS 53I 9-32 T.,e M..gy.eg I I I T-nrGruqr.ng lh..g Zlhah a 3 4 H... g Chustin I I T.. Ue6N I I T -Ch-g.see a a I Zh.W Shulre IS Heitlg I s a 4 7-I8 Xre Jrs-rr , Hu.eh. 7 7( I go a i a I ZsaegoY-, I I 7 A-15

196 ;i. i [I -TfF 0rfSX1 j g r U - ti: wi s0nw ~ ~ _8S_ ~ ~ ~ Sn0S N _ ~ S 0 Na - -_o N, n,o,1 - - rlo -N j _ n, -, J1 _ T----Tr _ r N

197 Survey Detail Table of Housing Relocation Attached TabIDe3 Popul.tion Formal H... Appnnd. Building Suanyrad Try T m.tiip. V l.u.- - Sundry C_ru8 ISratridt Tomi (Rauldaidl Group No H..auh.1d., an.- `00W Sunning GrOund(rr Wi(m) Frruar R-kar (090. C -,,,1) nrla Total grioulura m Snotd 8,uk end Eanlh and (mu)boudingq Wall PrOrnt. F-rdarny M(1)..( M-nd Populaion Sutotal ononst Timba Wood.. tim. Grani and mit Bnir(mi Earlh Piatlut Basin Pn(' Ob1o Gro-I -un Tra Soil Midur. Wall awad T81 YTraa II-to Wu Shu.h-ag I I as B t 3d H-angRoglu it0821 SB ilyong D W. H.-nng S S 238 2B I71t ttt 3 egg 16s L- Zh-ngo.-g B a 25 2 t2.25 Mo Srhuriu I t L. -logmin S S 341t dB I I Li Bngqrang D I W.sugtunlo I t I BI1 Changtari IBM467 tobbob ? II-is Zhang Goilu ZOang G001p H.oag Ji.- 8 a Hang K-ua HuaNg Zhlhui [Simo Hu.9gGuoqang Zling Janjun I Ztuangoalro Z Ztrrglrnu ZhraNgFuqnn t Zliangnu I 18l Z$raNgFul.n tlangngzl Zhang Haiq.ng i 1-28 ZhangoaHlian l ZltangZhionVia T..nouatan Pingahrng 15 is S18a go808 ale Zu L-anl-a Zh.ng ZSngSo I Zh.nq Funang ZattgYuapn Zhang B.nqk.n a ZhiaNgnH.n..g sos B I3-I Z.u L-ankun B B I Xu Shno Zhraog Fumig ea Xu unqi : A- 17

198 IC Ea - -~~~~~~~~~~~~~~~~~~~~ I a 13~~~~ -~~~~~~~~~zr 0 ~ ~ ~ ~ ~ ~ ~ a ~ ~ ~ A A A -

199 Survey Detail Table of Housing Relocation Aftad3ed Table3 Tg-srshlP Mlbg V r _Population Formal Hous. Sundy Appa-dJ. BoddIng Sctn.d T County (Dtdt)l 7.T-l (Rodaot.1 Group No fous.ould Na-Il,T. H -..ou.. C 01 k. *) C m) HouohtutN.m) Group No Total Agocunura Totlrn'o u se Brick SuCto and Brick and Earth and Hm') C mr BounrinB-d Lg Wl Prota_tn _ Ig~W0(811Fu M.ld R k F-ROd-p,PopllroSutta unnt T-ot., Wood C- I Lu.-. G-.ot.nd 17 Sfkn' EIBPour Bas- P"OyIl T-oBNNO) 0mB Yug T,g Hu,n;Yougon d B2 _ I H-gnOYOud D Is Zhtn Zh-tonag B Pond X.uZhrkar 6 B M.o Biln _ Zhan L.ha Old 14-8 Xu D_u _ 2 22 X. D n== 14.9 luang Yloyl s 95 I 1 S H.uqn Sh-uung 0 a w B Huanq Lh _== WanoPanggug a d =4-12 Huangftru. _ 4 4 t57 ItOSS = 35 5 Hlah 2 S a S UnL-q.o Sig L.uJ.anlio 4 4 t1t Ili I 1414 Lru Squn L, Guohuh f L. Fuq _ 1 23 _608 _ IN904 13t i Ztt0S8xluO I I an P ,, Bo... I V W,.F-I Zan Wrping V0gt81bl0 Fatn xirrp O5h. Pt-o XAltPlpu I to e WanBul to e _ B-rming _ B Lu Oar,ang Duan... in2n _Ou Zhoo Irnorong 2 I Y.n J,nYn I I = = =g N A-19

200 _ ~~ 2 _ - _ = _ - ' M _ "- w _ 2 t X~~1 1 _Fc Ii i =, :~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ :

201 Survey Detail Table of Housing Relocation Attached TWOIH3 Population Formal House Appand. Bu.rid,ng 0.".7r T-e. To-ns p Vdiaga. T n o.. - S.ndry R-.,k. County (Dht_ntl T-o (R.sid.eti Grop No Housnuody H..NS.qGm.(. F.tadamp G~ Moad,TlbN C-dt.) 4nd i Brip c Brick - and EaOUr and Sindr m Sn (C _ Wail _oundin _t _ R matts (Otond) Cuonmiga.) Total ~~~~~~~~i~u~~a Subtotal ~~C-wcot Timbr 00ti., L-% GraC =,d (in) B.ok(m') E.Adt P.a.., B...P. dm TOOO Ga Youn Tra. Cmnt oi,,,. tur WaN.11 Trao T- Tytanteog Shipprn~~~~~~CMO. ComPnl Ch- agv- (Pogy ch.,v.b. City 4~~~~Ciag..Cunt g Bl Stork SC d P0D Co = 4 9 = = = == == = lo JDnl07ro5vn0.07 rd _ XS d_ Ase t Sippin Coerpany.Ltd 440~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ S0t AT r 315 we9a502 _Ona24 _ Ge.f Paogok.7rgS.2 Sh uippng t h70g.h. 3 Mlun T00 Plant ~~~~~~~~~~ 10rnd Ma rt PrConas-Og TlinYmg~~~~~~~ _ $2834IY 02 li S 3eg Y1s Dmw~~~~~~~~~~~- S. P4 C N 7eU18 8 Y 4 _ 418 Harahripu S Chranght RAaim.y T.at."o Orstoc I Data l g H.."tt L,aaita.lgmia ~ ~ e Fundur NW so I Dyk. Cooot. Dyk. Cooota a07I ~~~~~~~~~~~G-op CowatidY A-21I

202 Attached Table3 Survey Detail Table of Housing Relocation Cn_ T-.rS z >1 VRrrAldl i r ir H F.K H...e = S..dyNr = ppkd.. Bu id =P=I= SF. Houd CountY (D04nd7) Tom T or660,.4 G-Aup No Hou.o Sunn T,*r ld' o shd n H..tlI BO. IOff-.) Co-.o.II. o...k ~,l.. L"1* G..0 d.. W.kn)775P6.766 PopoI.50 Ton56. WOSO~~~~~~~~~~~~~~~~~~~~~~~P,T V0.I9. CollWrfiy P.qg.h5V _ L_W J,* _ Pro *"'.A _ X0.oo. 4 il S G a T-r H..ngSt. C.oup 5 Vr 9 37 X.~ = = = 4 P.uc HorMr to as F I 6.r.go Flo Cs o Pump PoS4.oHo _ r-SrCtA a = POOMO Hw hi P.bl.olo _1YungC=P1h = d70 835i 3 = Y= Cr0b0 = lo6g VW" , P.570 HO = tkk W ^/ _ = NO,9H ~ ~ ~~~~~I T.UdNg P.M0., Horn ,16 Noo.60P- X,.ngan Ll.I M F..0.0y ~~~~F.oto.y Ch.nglh. S.M PK Pd 7~~~~~~~~ COI6d7776y 67~~~~~~~~~~~~ l~ooo t. A-22

203 Survey Detail Table of Housing Relocation Atached TabWe3 Population Forml- l.. Appandi Buldin,g Scallantd TI.. Tinnr"rP. Slag.. S_- G nd Wail(0Hl)FruiR- Coonty lonodsm Ton. IRaardarO Grop N. M-Wdainla N- Toal-SuO I T:., ~~~~~~,g I.,) WO M E.nh M I~~~~~~~~~~Ho..) Sunig n(n ond.ng.. Wall PronadpnonTa(N M.ne To04 Cornmt aim Gpp N t T* Agriunuitra iinl'lhouut Stad Bink and Brick and ad asbnd t - 2 ab<- Foadam TorS(N _ enl F_Rt offi.. C-dw) ~~~~Pourtin SO onraa Timban Wod L-nai.Im. Grava and i Bukrn Ed P.Yr ain P.d.)Vog G T-. Btn* K-tat 3 a b d a Bbu.illng e0 _ Si es 22 4t _ OS DO PubiM ou Id Ftraor Fta_skiptl P.M.10 Hnoua Hla.d* Tr Ra.Way VagatabI. Land Midiorn ? Palnal H..B U-. CaB.MRAdan PuDkb H _ NOa SandPM C Idt (loam I lar,aio byp Walan Company Elavnl Pon. 03. oasq. K XhOlokal _ 0081t e s 290 WtmnBtua I 4 6m BandOng 4 a8m t _HIooImnngSad T_ngd. SBnd P _ 1910 t 191 oa r SWrd CO.W. Bn(i.O. Sand PA O W.ntnng Sand tlunaal Wal_m Stppr.n lla-.a C-W Cuap-n A-23

204 Attached Tablei4 Impact Enterprise Table of Occupation Land Major Facility Major Equipment ~~~~~Work Low Machine Bic-Draw- das Dump F Electrical Drill DrilSdmn ad-bik Enterprise Name Voltage Toomer Well Wel Blander maki Mould Pump Windlass Forkldt Lathe Planer Vessel transpot Store Store Enterprise Name Low TranSfrer) (well) Well Set Equipm)ent ledr mkn ModPup benc Wi Truck Machine Press Press (o) sse m) (o Line (kin) (well) (Set) (m3) (m3) (Set) Set) Machine (set) (Set) (St (Set) Se) ()(Set) ((Set) (Set) Seto(St) syset) m3 (o Total S No. 2 Company of Changsha County Ship I _ Company III Honghua Sand Pit _ Fwngchang SandrPtl P=) = Yaotang Sand Plt _ SaW"kig Sand Pk EWctoplate Factory Changaha ZtloyA Stock Co.,ULd I 30 Datuo Sand Pk = = = _ Datuo Ptecasting Yard Changlan Sand Pit =R=_= =_=_= XFgtck CemenV t Brck Xltobng Ptecasting Yard M 8000 Datuo0wigAn Sand PR _ 1 2 _ 1 Dashen Cattle Farm = = = = = Dashen Sand PR _.. 2 _ Changsha City Machine Tool 8C_ Gaoguo Sugar Factory 25 _ No. 4 Sand Pit of Changsha County Shipping Comnpany Ttanxin Sand PR 1 = Changsha Huafeng Sand Tonigda Station of Talyn41 30 Sand Company Bophe Pit of Changsha Sanrd Pit Company Bench Sand PR A-24

205 Attached Table5 Settlement Planning Table of Resettler House-building After Scattered Settlement Plan ResettlerPent Other County (District) ownship (Town) Village Group Household Settled No. Population Total Settled Settled HotSe Settled Settled Host Site Settled Settled Population Population Host Site Population Population Population Population Private House Changsha County Muyun Sanxing Huang Jiaping Within Group Dajiaping Within Group Dajiaping Within Group Zhushan Within Group Datang Within Group 2 7 Heping Within Group Lijiaping Within Group Dongyaogang Within Group Juming Within Group Muyun Xingang Within Group Muyunshi Group Within Group Resident Committ Within Group Vegetable Marke Within Group Xingma A-25

206 Attached Table5 Settlement Planning Table of Resettler House-building After Scattered SeUtlement Plan Constract in Other Places Other County (District) ownship (Town) Village Group Household Settled No. Population Total Settled Settled H Settled Settled Settled Settled Population Population Host Site Population Population Host Site Population Population Within Group Lianhe Yanzitang Within Group Fengchen Hongjiazui Within Group Xintangping Within Group Within Group Hejiazhou Within Group Yaotang Yaotang Within Group Nantuo Within Group 4 9 Group Within Group 1 1 Within Group Tianxin Datuo Xingang Xiangpuyuan Within Group -FLijiaxingwu Within Group A-26

207 Attached Table5 Settlement Planning Table of Resettler House-building After Scattered Settlement Plan Resettlement Other County (District) ownship (Town) Village Group Household Settled No. Population Total Settled Settled Host Site Settled Settled HotSe Settled Settled Population Population Population Population Population Population Lijiaweizi Within Group Datuo Z = 2 7 Paipengzi Within Group 2 7 Huangsuping Within Group Xingiong Zhangjialaowu Within Group Sujiatao Within Group 2 5 Xinpuzi Within Group Gangbianshang Within Group Xinglongti Within Group 1 2 Zhangfengshi Within Group 3 10 Huang jiawuan Within Group Shangzhongxinga Within Group 1 3 Zhongxingang Within Group Jiangjiamaowu Within Group Wantang Within Group Caotang Within Group Yuetang Within Group Hejialong Within Group A-27

208 Attached Table5 Settlement Planning Table of Resettler House-building After Scattered Settlement Plan Constract in Other Places Other Resettlement County (District) ownship (Town) Village Group Household Settled No. Population Total Settled Settled Host Site Settled Setted HotSe Settled Settled Population Population Population Population Host Site Population Population Huanghe Shangzhongpen Within Group Xiazhongpeng Within Group Changtang Henggangzi Gangkou Within Group Gangkou Within Group Dasheng Heishi Lianjiawuan Within Group Baoziling Within Group Xinkaipu Wenhua Baoziling Within Group Group Within Group A-28

209 Attached Table6 Production Settlement Statistics Cultivated Land Adjustment Digging Cultivated Land Leftover Cultivated Land Within Out Group Cultivated Land Paddy Dry Pouto Distridt TTownship( Total Subtotal Group Dry Land Adjustment Item Adjustment Field Land Production Ditit Town) Village Group Settled Adjustment Settlement Population Pe aiapopulation Area Settled Area Settled Area Settled Area Area Per Capita Area Area (mu) Population (mu) Population (mu) Population (mu) (mu) population) (mu) (mu) L Changsha I County I Muyun Sanxing _ HuangJiaping Da Maoping Zhushan Li Jiaping Heping Datang Nantuo Group Yaotang Tuanyuan Yaotang Ai Ziping Long Wangmiao You Tuling Fengcheng _ ' A-29

210 Attached Table6_ Production Settlement Statistics Cultivated Land Adjustment Digging Cultivated Land Leftover Cultivated Land Total Subtotal Group DrytLan Out Group Cultivated Land Paddy Dry Pouto Township( Total Subtotal Group Dry Land ment Item ASeuttten Land Preodunt mfield Sett District Tw) Village Group Settled Adjustment Pplametio Town) ~~~~~~~~~~Population Per Capita Pplto Area Settled Area Settled Area Settled Area Area (MU/ Area Area (mu) Population (mu) Population (mu) Population (mu) (mu) population) (mu) (mu) Lianhe Yan Zitang Ma Yuanxiang Muyun Caichang Muyun Tianxing Datuo Xinglong Yuetang Wantang Caotang Jiangjia maowu Zhongxingang Shangzhongxingang Huang jiawuan Zhangfengshi Hejialong Xinpuzi Sujiatao Zhangjialaowu Zhubaoyuan Datuo Paipengzi Shanghuangsuping A-30

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction.

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction. Regulations on Residents-Resettlement for the Yangtze River Three Gorges Project Construction (Adopted at the 35th Executive Meeting of the State Council on February 15, 2001, promulgated by Decree No.

More information

FILE COPY. Resettlement Action Plan. RP211 Volume 5. World Bank Loan Hunan Urban Development Project. Corridor Component (Zhaoshan Section)

FILE COPY. Resettlement Action Plan. RP211 Volume 5. World Bank Loan Hunan Urban Development Project. Corridor Component (Zhaoshan Section) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I World Bank Loan Hunan Urban Development Project Corridor Component (Zhaoshan Section)

More information

People s Republic of China: Hunan Flood Management Sector Project, Hunan Province, Chenxi County

People s Republic of China: Hunan Flood Management Sector Project, Hunan Province, Chenxi County Resettlement Planning Document Resettlement Plan Document Stage: Final Project Number: 37641 August 2005 People s Republic of China: Hunan Flood Management Sector Project, Hunan Province, Chenxi County

More information

j,~~~s I, jri Is I wnflioa LLiNLL ;;dii. is Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

j,~~~s I, jri Is I wnflioa LLiNLL ;;dii. is Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized vj I j,~~~s I, jri Is I wnflioa LLiNLL ;;dii. is I4 World Bank Loan Hunan Urban Development

More information

The External Resettlement Monitoring & Assessment Report

The External Resettlement Monitoring & Assessment Report The Urban Flood Control Project in the Mountainous Area in Hunan Province Loaned by the Asian Development Bank The External Resettlement Monitoring & Assessment Report (Lengshuijiang, Lianyuan, Shuangfeng,

More information

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans GSDS Certificate Grade A No.180105-sj GSDK Certificate Grade A No.180105-kj GZ Certificate Grade A No. 1032523001 S B Z Certificate Grade A No. 0 2 7 Hunan Province Youxian County Urban Flood Control Project

More information

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RPF of Additional Financing for Fujian Highway Sector Investment Project Contents RP1032

More information

Public Transport Sub-project of Urban Comprehensive Transport Improvement Project in Xi an the south of urban bus hub terminal

Public Transport Sub-project of Urban Comprehensive Transport Improvement Project in Xi an the south of urban bus hub terminal Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Transport Sub-project of Urban Comprehensive Transport Improvement Project in

More information

Shanxi Small Cities and Towns Development Demonstration Sector Project

Shanxi Small Cities and Towns Development Demonstration Sector Project Involuntary Resettlement Due Diligence Report Project Number: 42383 September, 2012 Shanxi Small Cities and Towns Development Demonstration Sector Project Qingxu: Urban Surface Water Improvement Subproject

More information

Speech on East Asia Conference

Speech on East Asia Conference Speech on East Asia Conference FENG, Subao Director, Center for International Strategic Studies, CDI I will mainly talk about the relationship of the economy of South China respectively with that of China

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized The World Bank SFG3873 REV Public Disclosure Authorized Hezhou Urban Water Infrastructure and Environment Improvement Project Public Disclosure Authorized Resettlement Policy

More information

The Boat of Tourism for World Peace and Development. - Address by Li Keqiang, Premier of the People's Republic of China

The Boat of Tourism for World Peace and Development. - Address by Li Keqiang, Premier of the People's Republic of China The Boat of Tourism for World Peace and Development - Address by Li Keqiang, Premier of the People's Republic of China At the opening ceremony of the first World Conference on Tourism for Development (May

More information

The External Resettlement Monitoring and Evaluation Report of ADB-funded Hunan Flood Management Sector Project

The External Resettlement Monitoring and Evaluation Report of ADB-funded Hunan Flood Management Sector Project The Loan No.: 2244-PRC The External Resettlement Monitoring and Evaluation Report of ADB-funded Hunan Flood Management Sector Project No.3 Report Changsha Xinghuan Water & Electricity Engineering Technology

More information

Design Standards for Federal Aid to Secondary Roads

Design Standards for Federal Aid to Secondary Roads Design Standards for Federal Aid to Secondary Roads J. T. H allett Engineer of Roads State Highway Commission of Indiana The title for this paper may indicate that the entire discussion will be on the

More information

PRC: Hunan Roads Development II Project External Monitoring Report on Land Acquisition and Resettlement For Yuanling Local Road(II)

PRC: Hunan Roads Development II Project External Monitoring Report on Land Acquisition and Resettlement For Yuanling Local Road(II) Social Monitoring Report Project Number: 35338 September 2009 PRC: Hunan Roads Development II Project External Monitoring Report on Land Acquisition and Resettlement For Yuanling Local Road(II) Prepared

More information

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans

Resettlement Plan. Urban Flood Control Project Utilizing ADB Loans GSDS Certificate Grade A No.180105-sj GSDK Certificate Grade A No.180105-kj GZ Certificate Grade A No. 1032523001 S B Z Certificate Grade A No. 0 2 7 Hunan Province Shimen County Urban Flood Control Project

More information

THE CORPORATION OF THE CITY OF CLARENCE-ROCKLAND BY-LAW NUMBER BEING A BY-LAW TO REGULATE HEIGHT AND DESCRIPTION OF LAWFUL FENCES

THE CORPORATION OF THE CITY OF CLARENCE-ROCKLAND BY-LAW NUMBER BEING A BY-LAW TO REGULATE HEIGHT AND DESCRIPTION OF LAWFUL FENCES THE CORPORATION OF THE CITY OF CLARENCE-ROCKLAND BY-LAW NUMBER 2002-09 BEING A BY-LAW TO REGULATE HEIGHT AND DESCRIPTION OF LAWFUL FENCES WHEREAS paragraphs 25, 26, 27 and 28 of Section 210 of the Municipal

More information

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness No. 164/2013/ND-CP Hanoi, November 12, 2013 DECREE

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness No. 164/2013/ND-CP Hanoi, November 12, 2013 DECREE THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM ------- Independence - Freedom - Happiness ---------- No. 164/2013/ND-CP Hanoi, November 12, 2013 DECREE AMENDING AND SUPPLEMENTING A NUMBER OF ARTICLES OF

More information

Resettlement in Action

Resettlement in Action Resettlement in Action An Eyewitness Report from the Middle Route of China s South-North Water Transfer Project Executive Summary Prepared for International Rivers August 25, 2010 This report studies the

More information

Slum development in Ahvaz with emphasis on the All-E-Saffi sector

Slum development in Ahvaz with emphasis on the All-E-Saffi sector Slum development in Ahvaz with emphasis on the All-E-Saffi sector K. Lotfi Ahvaz Islamic Azad University, Iran Abstract Slum development is the result of the increasing growth of urbanization. It gives

More information

The Study on Migration and Poverty Alleviation Planning of Daning County

The Study on Migration and Poverty Alleviation Planning of Daning County Open Journal of Social Sciences, 2016, 4, 138-144 Published Online April 2016 in SciRes. http://www.scirp.org/journal/jss http://dx.doi.org/10.4236/jss.2016.44019 The Study on Migration and Poverty Alleviation

More information

PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension

PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension Resettlement Due Diligence Report Project Number: 42010 October 2014 PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension Prepared by Chongzuo

More information

PRC: Hunan Roads Development III Project Huayuan-Fenghuang Local Road Component

PRC: Hunan Roads Development III Project Huayuan-Fenghuang Local Road Component Resettlement Planning Document Resettlement Plan Document Stage: Final Project Number: 37494 May 2009 PRC: Hunan Roads Development III Project Huayuan-Fenghuang Local Road Component Prepared by Huayuan

More information

Palitha Bandara. Sriyani Jayasundara. Ranjan Jayawardana

Palitha Bandara. Sriyani Jayasundara. Ranjan Jayawardana Palitha Bandara Sriyani Jayasundara Ranjan Jayawardana Action Plan on Tsunami Countermeasures Sri Lanka 1.0 Tsunami in Sri Lanka Sri Lanka is an island in the Indian Ocean, located in Southern Asia, Southeast

More information

Summer School November Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK)

Summer School November Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK) Housing Policy and Circular No. 3 on Squatter Settlement Resolution Summer School 12-13 November 2014 Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK) bhskhemro@yahoo.com Content Housing Policy

More information

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II Social Safeguards Monitoring Report Full Report November 2018 CAM: Rural Roads Improvement Project II Prepared by the Ministry of Rural Development for the Kingdom of Cambodia and the Asian Development

More information

Analysis of the Influence Factors of China s Tourism Market

Analysis of the Influence Factors of China s Tourism Market Canadian Social Science Vol. 12, No. 5, 2016, pp. 79-83 DOI:10.3968/8436 ISSN 1712-8056[Print] ISSN 1923-6697[Online] www.cscanada.net www.cscanada.org Analysis of the Influence Factors of China s Tourism

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map. 1. Sector Performance, Problems, and Opportunities Greater Mekong Subregion Highway Expansion Phase 2 Project (RRP THA 41682) SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The transport sector

More information

CHINA FORUM ON THE BELT AND ROAD INITIATIVES

CHINA FORUM ON THE BELT AND ROAD INITIATIVES CHINA FORUM ON THE BELT AND ROAD INITIATIVES As a homeland of Marco Polo, Croatia embraces One Belt, One Road initiative One Belt One Road Initiative is the initiative to activate and strengthen modern

More information

The Local Improvements Act, 1993

The Local Improvements Act, 1993 1 The Local Improvements Act, 1993 being Chapter L-33.1 of the Statutes of Saskatchewan, 1993 (effective January 1, 1994) as amended by the Statutes of Saskatchewan, 1996, c.32; 2000, c.55; 2002, c.c-11.1;

More information

DEPARTMENT OF THE ENVIRONMENT. Instrument of Appointment by. the Secretary of State for the Environment. of Yorkshire Water Services Limited

DEPARTMENT OF THE ENVIRONMENT. Instrument of Appointment by. the Secretary of State for the Environment. of Yorkshire Water Services Limited DEPARTMENT OF THE ENVIRONMENT Instrument of Appointment by the Secretary of State for the Environment of Yorkshire Water Services Limited as a water and sewerage undertaker under the Water Act 1989 Department

More information

Chapter Fifty Seven: Maintain Long-Term Prosperity and Stability in Hong Kong and Macau

Chapter Fifty Seven: Maintain Long-Term Prosperity and Stability in Hong Kong and Macau 51 of 55 5/2/2011 11:06 AM Proceeding from the fundamental interests of the Chinese nation, we will promote the practice of "one country, two systems" and the great cause of the motherland's peaceful reunification,

More information

Empirical Study on Utilizing Rural Settlement

Empirical Study on Utilizing Rural Settlement Empirical Study on Utilizing Rural Settlement Taking Qidaoliang Village in Beijing as An Example Xiuzhi ZHANG Yuting CHEN OUTLINE OF PRESENTAIONS The background of the village Problems in using rural Conclusions

More information

Rural Labor Force Emigration on the Impact. and Effect of Macro-Economy in China

Rural Labor Force Emigration on the Impact. and Effect of Macro-Economy in China Rural Labor Force Emigration on the Impact and Effect of Macro-Economy in China Laiyun Sheng Department of Rural Socio-Economic Survey, National Bureau of Statistics of China China has a large amount of

More information

WASHINGTON COUNTY HIGHWAY DEPARTMENT Policy & Procedure Number Adopted on January 1, 1999 Revised on December 2, 2014

WASHINGTON COUNTY HIGHWAY DEPARTMENT Policy & Procedure Number Adopted on January 1, 1999 Revised on December 2, 2014 WASHINGTON COUNTY HIGHWAY DEPARTMENT Policy & Procedure Number 12.05 Adopted on January 1, 1999 Revised on December 2, 2014 (1) This policy and procedure is adopted to promulgate rules to regulate and

More information

Enforcement Decree of the Distribution Facilities Development and Operation Act

Enforcement Decree of the Distribution Facilities Development and Operation Act The English version is translated and uploaded only for the purpose of no other than PR, and thereby, Enforcement Decree of the Distribution Facilities Development and Operation Act in the Korean language

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Samoa Post Tsunami Reconstruction

More information

One Belt, One Road (OBOR) and The Asian Infrastructural Investment Bank (AIIB)

One Belt, One Road (OBOR) and The Asian Infrastructural Investment Bank (AIIB) *All opinions expressed herein are the author s own and do not necessarily reflect the views of any of the organisations with which the author is affiliated. One Belt, One Road (OBOR) and The Asian Infrastructural

More information

2004 Planning and Urban Management 2004 No. 5 SAMOA

2004 Planning and Urban Management 2004 No. 5 SAMOA 2004 Planning and Urban Management 2004 No. 5 SAMOA Arrangement of Provisions PART I PRELIMINARY 1. Short title and commencement 2. Interpretation PART II PLANNING AND URBAN MANAGEMENT AGENCY 3. Establishment

More information

CONSOLIDATED WITH BY-LAW THE CORPORATION OF THE TOWNSHIP OF MULMUR BY-LAW NO FENCE BY-LAW

CONSOLIDATED WITH BY-LAW THE CORPORATION OF THE TOWNSHIP OF MULMUR BY-LAW NO FENCE BY-LAW CONSOLIDATED WITH BY-LAW 17-2013 THE CORPORATION OF THE TOWNSHIP OF MULMUR BY-LAW NO. 14-2006 FENCE BY-LAW WHEREAS the Municipal Act, 2001, S.O. 2001, s. 8, provides that a Municipality has the capacity,

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT) 1. Sector Performance, Problems, and Opportunities Road Network Improvement Project (RRP CAM 41123) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT) Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The main modes of transport

More information

Key Words: Song Hinh Multipurpose Project, Resettlement, Project Management Board

Key Words: Song Hinh Multipurpose Project, Resettlement, Project Management Board IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 07-02: Resettlement Song Hinh Multipurpose Project, Vietnam Key Issues:

More information

RP156 Volume 2. Resettlement Action Plan of Environment Improvement Projects of Dongqianhu Lake in Ningbo City. (The 5th Edition)

RP156 Volume 2. Resettlement Action Plan of Environment Improvement Projects of Dongqianhu Lake in Ningbo City. (The 5th Edition) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP156 Volume 2 Resettlement Action Plan of Environment Improvement Projects of Dongqianhu

More information

Evaluation Study of Japanese ODA for Vietnam Summary

Evaluation Study of Japanese ODA for Vietnam Summary Evaluation Study of Japanese ODA for Vietnam Summary March 2002 Requested by Ministry of Foreign Affairs, Japan Prepared by International Development Center of Japan (IDCJ) 1. Evaluation result The purposes

More information

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF)

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) World Bank-financed Project World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom Happiness

SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom Happiness THE MINISTRY OF SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION Independence - Freedom Happiness -------- ---------------- No.: 13/2013/TT-BXD Hanoi, August 15, 2013 CIRCULAR PRESCRIBING VERIFICATION, APPRAISAL

More information

Resettlement Policy Framework

Resettlement Policy Framework Urban Transport Improvement Project of Tianjin by Using the World Bank Loan Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

302 CMR: DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

302 CMR: DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 302 CMR 3.00: SCENIC AND RECREATIONAL RIVERS ORDERS Section 3.01: Authority 3.02: Definitions 3.03: Advisory Committees 3.04: Classification of Rivers and Streams 3.05: Preliminary Informational Meetings

More information

SAMPLE SERVICING AGREEMENT. THIS AGREEMENT made in duplicate this day of, 20, Between:

SAMPLE SERVICING AGREEMENT. THIS AGREEMENT made in duplicate this day of, 20, Between: ROAD CONSTRUCTION AGREEMENT THIS AGREEMENT made in duplicate this day of, 20, Between: the of, Address:, Saskatchewan, S, a corporate municipality in the Province of Saskatchewan (hereinafter called the

More information

CHAPTER 29 DRAINAGE AND DITCHES

CHAPTER 29 DRAINAGE AND DITCHES CHAPTER 29 DRAINAGE AND DITCHES Latest Revision 1994 29.01 GENERAL INFORMATION Ohio's drainage laws are very broad in nature and detailed in the procedure necessary to bring a project to completion. Ohio

More information

Public Water Supply and Sewerage Act

Public Water Supply and Sewerage Act Issuer: Riigikogu Type: act In force from: 01.01.2015 In force until: 30.06.2017 Translation published: 05.02.2015 Amended by the following acts Passed 10.02.1999 RT I 1999, 25, 363 Entry into force 22.03.1999

More information

PRC: Yunnan Pu er Regional Integrated Road Network Development Project

PRC: Yunnan Pu er Regional Integrated Road Network Development Project Resettlement Plan (Draft) July 2014 PRC: Yunnan Pu er Regional Integrated Road Network Development Project Prepared by Pu er City Transportation Bureau for the Asian Development Bank. CURRENCY EQUIVALENTS

More information

CORPORATION OF THE TOWNSHIP OF ESQUIMALT PARKING BYLAW 1992 BYLAW NO. 2011

CORPORATION OF THE TOWNSHIP OF ESQUIMALT PARKING BYLAW 1992 BYLAW NO. 2011 CORPORATION OF THE TOWNSHIP OF ESQUIMALT PARKING BYLAW 1992 BYLAW NO. 2011 MAY, 2003 Consolidated for convenience. In case of discrepancy the original Bylaw or Amending Bylaws must be consulted. PARKING

More information

Competitiveness and Value Creation of Tourism Sector: In the Case of 10 ASEAN Economies

Competitiveness and Value Creation of Tourism Sector: In the Case of 10 ASEAN Economies Competitiveness and Value Creation of Tourism Sector: In the Case of 10 ASEAN Economies Apirada Chinprateep International Science Index, Economics and Management Engineering waset.org/publication/10003096

More information

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project Initial Poverty and Social Analysis May 2018 People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project This document is being disclosed to the public in accordance

More information

The Efficiency of Tourism Impact on People's Livelihood: A Theoretical Framework Zhen Su 1,a and Qiuying Li 1,b

The Efficiency of Tourism Impact on People's Livelihood: A Theoretical Framework Zhen Su 1,a and Qiuying Li 1,b 2017 2nd International Conference on Humanities Science, Management and Education Technology (HSMET 2017) ISBN: 978-1-60595-494-3 The Efficiency of Tourism Impact on People's Livelihood: A Theoretical

More information

TITLE 16 STREETS AND SIDEWALKS, ETC 1 CHAPTER 1 MISCELLANEOUS

TITLE 16 STREETS AND SIDEWALKS, ETC 1 CHAPTER 1 MISCELLANEOUS Change 5, September 9, 2004 16-1 TITLE 16 STREETS AND SIDEWALKS, ETC 1 CHAPTER 1. MISCELLANEOUS. 2. EXCAVATIONS AND CUTS. 3. PROPERTY NUMBERING AND STREET MAP. 4. STREET ACQUISITIONS. CHAPTER 1 MISCELLANEOUS

More information

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 07-01: Resettlement - Chiew Larn Multipurpose Project, Thailand Key

More information

Native Vegetation Conservation Act 1997 No 133

Native Vegetation Conservation Act 1997 No 133 New South Wales Native Vegetation Conservation Act 1997 No 133 Contents Part 1 Preliminary 1 2 3 4 5 6 7 8 9 10 11 12 Name of Act Commencement Objects of Act Definitions and notes Definition of clearing

More information

HIGHWAYS DEVELOPMENT AND PROTECTION REGULATION

HIGHWAYS DEVELOPMENT AND PROTECTION REGULATION Province of Alberta HIGHWAYS DEVELOPMENT AND PROTECTION ACT HIGHWAYS DEVELOPMENT AND PROTECTION REGULATION Alberta Regulation 326/2009 With amendments up to and including Alberta Regulation 179/2016 Office

More information

TITLE 16 STREETS AND SIDEWALKS, ETC. 1 CHAPTER 1 MISCELLANEOUS

TITLE 16 STREETS AND SIDEWALKS, ETC. 1 CHAPTER 1 MISCELLANEOUS 6- TITLE 6 STREETS AND SIDEWALKS, ETC. CHAPTER. MISCELLANEOUS. 2. EXCAVATIONS. 3. ACCEPTANCE OF PUBLIC STREETS. CHAPTER MISCELLANEOUS SECTION 6-0. Obstructing streets, alleys, or sidewalks prohibited.

More information

BAHIA INTEGRATED URBAN DEVELOPMENT PROJECT Involuntary Resettlement Plan Alagados VI Executive Summary

BAHIA INTEGRATED URBAN DEVELOPMENT PROJECT Involuntary Resettlement Plan Alagados VI Executive Summary Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1- Introduction BAHIA INTEGRATED URBAN DEVELOPMENT PROJECT Involuntary Resettlement Plan

More information

LAW ON STATE BORDER PROTECTION

LAW ON STATE BORDER PROTECTION LAW ON STATE BORDER PROTECTION I. BASIC PROVISIONS Scope of the Law Article 1 This Law regulates state border protection, organization and method of protection. State border protection pursuant to this

More information

HANDOUT FOR MULMUR TOWNSHIP RATEPAYERS SWIMMING POOLS AND FENCES May 01, 2013

HANDOUT FOR MULMUR TOWNSHIP RATEPAYERS SWIMMING POOLS AND FENCES May 01, 2013 HANDOUT FOR MULMUR TOWNSHIP RATEPAYERS SWIMMING POOLS AND FENCES May 01, 2013 Council has established rules for fencing swimming pools that meet (and in some ways exceed) the minimum requirements of the

More information

Prepared by Guangxi Baise Development and Investment Group Co., Ltd. with the assistance of Beijing Enrimu Science & Technology Consulting Co., Ltd.

Prepared by Guangxi Baise Development and Investment Group Co., Ltd. with the assistance of Beijing Enrimu Science & Technology Consulting Co., Ltd. Resettlement Planning Document Updated Resettlement Plan Document Stage: Final Project Number: 42010 March 2012 People's Republic of China: Guangxi Southwestern Cities Development Project Baise City Urban

More information

EASES Discussion Paper Series SUCCESSFUL RESERVOIR RESETTLEMENT IN CHINA SHUIKOU HYDROELECTRIC PROJECT

EASES Discussion Paper Series SUCCESSFUL RESERVOIR RESETTLEMENT IN CHINA SHUIKOU HYDROELECTRIC PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized eas, t t4si vrom"ent *.n eia.ev4opii- Z4 EASES Discussion Paper Series SUCCESSFUL RESERVOIR RESETTLEMENT IN CHINA

More information

Dobwalls and Trewidland Neighbourhood Development Plan: section 3. Evidence Base document - fourth draft September 2018

Dobwalls and Trewidland Neighbourhood Development Plan: section 3. Evidence Base document - fourth draft September 2018 Dobwalls and Trewidland Neighbourhood Development Plan: section 3 Economy and Jobs Evidence Base document - fourth draft September 2018 Contents Introduction Purpose of this Evidence Base report Themes

More information

EX-ante Evaluation. 1. Name of the Project. 2. Background and Necessity of the Project. Japanese ODA Loan

EX-ante Evaluation. 1. Name of the Project. 2. Background and Necessity of the Project. Japanese ODA Loan Japanese ODA Loan EX-ante Evaluation 1. Name of the Project Country: Republic of El Salvador Project: San Miguel Bypass Construction Project Loan Agreement: August 20, 2014 Loan Amount: 125.95 million

More information

Comparison on the Developmental Trends Between Chinese Students Studying Abroad and Foreign Students Studying in China

Comparison on the Developmental Trends Between Chinese Students Studying Abroad and Foreign Students Studying in China 34 Journal of International Students Peer-Reviewed Article ISSN: 2162-3104 Print/ ISSN: 2166-3750 Online Volume 4, Issue 1 (2014), pp. 34-47 Journal of International Students http://jistudents.org/ Comparison

More information

SHEN Lijuan [a],* ; DING Enjun [b] ; SU Yanke [b] INTRODUCTION

SHEN Lijuan [a],* ; DING Enjun [b] ; SU Yanke [b] INTRODUCTION Higher Education of Social Science Vol. 9, No. 1, 2015, pp. 40-47 DOI: 10.3968/7291 ISSN 1927-0232 [Print] ISSN 1927-0240 [Online] www.cscanada.net www.cscanada.org The Impact and Reform Conception of

More information

Action Required in the Event of Abandonment of Cellular Tower Staff Review Proposals by the Applicant

Action Required in the Event of Abandonment of Cellular Tower Staff Review Proposals by the Applicant SHELBY COUNTY ZONING REGULATIONS ARTICLE XVIII TELECOMMUNICATION TOWERS Section 1800 Section 1801 Section 1802 Section 1803 Section 1804 Section 1805 Section 1806 Section 1807 Section 1808 Section 1809

More information

Electricity Market Act 1

Electricity Market Act 1 Issuer: Riigikogu Type: act In force from: 22.07.2014 In force until: 31.12.2014 Translation published: 28.08.2014 Electricity Market Act 1 Amended by the following acts Passed 11.02.2003 RT I 2003, 25,

More information

PROPERTY MAINTENANCE. Chapter 438 FENCES - HEIGHT - REGULATION

PROPERTY MAINTENANCE. Chapter 438 FENCES - HEIGHT - REGULATION PROPERTY MAINTENANCE Chapter 438 FENCES - HEIGHT - REGULATION 4381.1 Boulevard - defined 438.1.2 Engineer - defined CHAPTER INDEX Article 1 INTERPRETATION 438.1.3 Exterior side yard - defined 438.1.4 Fence

More information

PRC: Liaoning Small Cities and Towns Development Demonstration Sector Project

PRC: Liaoning Small Cities and Towns Development Demonstration Sector Project Resettlement Monitoring Report Project Number: 42382 August 2012 PRC: Liaoning Small Cities and Towns Development Demonstration Sector Project Prepared by: Liaoning Urban Construction and Renewal Project

More information

Fifth Expert Working Group on the Preservation of the Bamiyan Site. Aachen, Germany December 2006 RECOMMENDATIONS

Fifth Expert Working Group on the Preservation of the Bamiyan Site. Aachen, Germany December 2006 RECOMMENDATIONS Fifth Expert Working Group on the Preservation of the Bamiyan Site Aachen, Germany 14-16 December 2006 RECOMMENDATIONS Overall Issues The Participants of the Working Group 1. Acknowledge efforts made by

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING

DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING (By authority conferred on the environmental quality by section 63103 of 1994 PA 451, MCL 324.63103) PART 1.

More information

M A N I T O B A ) Order No. 61/12 ) THE PUBLIC UTILITIES BOARD ACT ) May 10, 2012

M A N I T O B A ) Order No. 61/12 ) THE PUBLIC UTILITIES BOARD ACT ) May 10, 2012 M A N I T O B A ) Order No. 61/12 ) THE PUBLIC UTILITIES BOARD ACT ) May 10, 2012 BEFORE: Régis Gosselin, CGA, MBA, Chair Leonard Evans LLD, Member Monica Girouard CGA, Member Raymond Lafond, CA, Member

More information

Promotion of Management Science. for Chinese Economic and Social Development

Promotion of Management Science. for Chinese Economic and Social Development Sun Qianzhang Professor, Executive Vice President, China Academy of Management Science Promotion of Management Science for Chinese Economic and Social Development Dear friends: Greetings! I am very glad

More information

Bui Power Authority Act, 2007 Act 740

Bui Power Authority Act, 2007 Act 740 ARRANGEMENT OF SECTIONS Section The Bui Power Authority 1. Establishment of the Authority 2. Governing body of the Authority 3. Tenure of office of members 4. Meetings of the Board 5. Disclosure of interest

More information

CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance #

CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance # CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE Adopted: June 1, 2000 by Ordinance # 1999-215 This new language is located in Article V - Site Development Standards, and replaces the Bear Creek (B-C) Overlay

More information

City of Miami. FIU Digital Commons. Florida International University

City of Miami. FIU Digital Commons. Florida International University Florida International University FIU Digital Commons Miami Dade County MPO Community Background Reports 1-1-2011 City of Miami Follow this and additional works at: http://digitalcommons.fiu.edu/mpo_dade

More information

ARTICLE 1 BASIC PROVISIONS SECTION BASIC PROVISIONS REGULATIONS

ARTICLE 1 BASIC PROVISIONS SECTION BASIC PROVISIONS REGULATIONS ARTICLE 1 BASIC PROVISIONS SECTION 21-01 BASIC PROVISIONS REGULATIONS Section 21-01.01. Note: This Chapter of the South Bend Municipal Code contains various word(s) and/or phrase(s) which appear in italics.

More information

AKHILESH TRIVEDI PREPAREDNESS OF SMES TOWARDS AEC : A CASE STUDY OF TRAVEL AGENTS IN BANGKOK

AKHILESH TRIVEDI PREPAREDNESS OF SMES TOWARDS AEC : A CASE STUDY OF TRAVEL AGENTS IN BANGKOK AKHILESH TRIVEDI Faculty of Hospitality Industry, Dusit Thani College, Thailand PREPAREDNESS OF SMES TOWARDS AEC : A CASE STUDY OF TRAVEL AGENTS IN BANGKOK Abstract: This paper is a survey research conducted

More information

Analysis of current economic and trade relations between China and Vietnam. Dr. Chen Bingxian Guangxi University for Nationalities

Analysis of current economic and trade relations between China and Vietnam. Dr. Chen Bingxian Guangxi University for Nationalities Analysis of current economic and trade relations between China and Vietnam Dr. Chen Bingxian Guangxi University for Nationalities Abstract In the complicated and changing international con text, good-neighborly

More information

RP-0008 VOL. 1. Resettlement Action Plan for Shenyang Urban Transport Project. The World Bank Loan Liaoning Urban Transport Project

RP-0008 VOL. 1. Resettlement Action Plan for Shenyang Urban Transport Project. The World Bank Loan Liaoning Urban Transport Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Loan Liaoning Urban Transport Project Resettlement Action Plan for Shenyang

More information

Fourteen years after the war in Bosnia and Herzegovina (BH),

Fourteen years after the war in Bosnia and Herzegovina (BH), IDA at Work Bosnia and Herzegovina: From Post-Conflict Reconstruction to EU Integration Bosnia and Herzegovina has achieved an impressive post-conflict recovery. The challenge now is integration in Europe.

More information

Infrastructure Economics Department of Social Sciences Prof. Nalin Bharti Indian Institute of Technology Madras

Infrastructure Economics Department of Social Sciences Prof. Nalin Bharti Indian Institute of Technology Madras Infrastructure Economics Department of Social Sciences Prof. Nalin Bharti Indian Institute of Technology Madras Module 02 Lecture - 08 Experiences of Infrastructure Development in NICs Experiences of Infrastructure

More information

TITLE 16 STREETS AND SIDEWALKS, ETC 1 CHAPTER 1 MISCELLANEOUS

TITLE 16 STREETS AND SIDEWALKS, ETC 1 CHAPTER 1 MISCELLANEOUS Change 10, January 15, 2008 16-1 CHAPTER 1. MISCELLANEOUS. 2. EXCAVATIONS AND CUTS. 3. RIGHT-OF-WAY ACCEPTANCE. TITLE 16 STREETS AND SIDEWALKS, ETC 1 CHAPTER 1 MISCELLANEOUS SECTION 16-101. Obstructing

More information

Chapter 503 Zoning Administration

Chapter 503 Zoning Administration Chapter 503 Zoning Administration 503.01 Planning and Zoning Department The Rice County Board of Commissioners hereby establishes the Planning and Zoning Department, for which the Board may appoint a Director

More information

SOIL REMOVAL AND DEPOSITION BYLAW

SOIL REMOVAL AND DEPOSITION BYLAW City of Vernon SOIL REMOVAL AND DEPOSITION BYLAW #5259 BYLAW NO. THE CORPORATION OF THE CITY OF VERNON ADOPTION BYLAW NUMBER 5259 AMENDMENTS AMENDMENT 5670 February 26, 2018 Regulatory Updates as follows:

More information

ORDINANCE NO. The Board of Supervisors of the County of Alameda ordains as follows: SECTION I

ORDINANCE NO. The Board of Supervisors of the County of Alameda ordains as follows: SECTION I ORDINANCE NO. AN ORDINANCE AMENDING CHAPTER 12.08 OF TITLE 12 OF THE GENERAL ORDINANCE CODE OF THE COUNTY OF ALAMEDA RELATING TO REGULATING WIRELESS FACILITY INSTALLATIONS IN THE PUBLIC RIGHT OF WAY The

More information

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 687

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 687 CHAPTER 2017-136 Committee Substitute for Committee Substitute for House Bill No. 687 An act relating to utilities; amending s. 337.401, F.S.; authorizing the Department of Transportation and certain local

More information

H 7904 SUBSTITUTE A ======== LC005025/SUB A ======== S T A T E O F R H O D E I S L A N D

H 7904 SUBSTITUTE A ======== LC005025/SUB A ======== S T A T E O F R H O D E I S L A N D 01 -- H 0 SUBSTITUTE A LC000/SUB A S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO STATE AFFAIRS AND GOVERNMENT - CLIMATE CHANGE - RESILIENT RHODE

More information

PROGRAM ON HOUSING AND URBAN POLICY

PROGRAM ON HOUSING AND URBAN POLICY Institute of Business and Economic Research Fisher Center for Real Estate and Urban Economics PROGRAM ON HOUSING AND URBAN POLICY PROFESSIONAL REPORT SERIES PROFESSIONAL REPORT NO. P07-001 URBANIZATION

More information

Can Japan Take Standpoint Promoting Establishment of Common Currency in East Asia?

Can Japan Take Standpoint Promoting Establishment of Common Currency in East Asia? Far Eastern Studies Vol.8 March 2009 Center for Far Eastern Studies, University of Toyama Can Japan Take Standpoint Promoting Establishment of Common Currency in East Asia? Takaaki HATTORI * 1 Introduction

More information

STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT. Whereas, I (we),, hereinafter termed the

STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT. Whereas, I (we),, hereinafter termed the STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT Whereas, I (we) (Name of Applicant) (Mailing Address),, hereinafter termed the (City) (State) Applicant, request permission and authority

More information

CONVENTION ON THE PROTECTION OF THE ALPS (ALPINE CONVENTION) OFFICIAL JOURNAL OF THE EUROPEAN COMMUNITIES (TRANSLATION)

CONVENTION ON THE PROTECTION OF THE ALPS (ALPINE CONVENTION) OFFICIAL JOURNAL OF THE EUROPEAN COMMUNITIES (TRANSLATION) CONVENTION ON THE PROTECTION OF THE ALPS (ALPINE CONVENTION) OFFICIAL JOURNAL OF THE EUROPEAN COMMUNITIES (TRANSLATION) The Federal Republic of Germany, the French Republic, the Italian Republic, the Republic

More information

General Scope and Scheme of Regulation. This Article 14 establishes separate restrictions for the following categories of nonconformities:

General Scope and Scheme of Regulation. This Article 14 establishes separate restrictions for the following categories of nonconformities: LIBERTYVILLE ZONING CODE 14-1 GENERAL PROVISIONS 14-1.1 Purposes. This Article 14 regulates and limits the continued existence of uses, structures, lots, signs, and fences established prior to the effective

More information