1 Donald A. Fellows, Jr. Manager of Revenue and Tariffs September 28, 2000 ADVICE 1488-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Revisions of Various Filed Forms Southern California Edison Company (SCE) hereby submits for filing the following changes to its tariff schedules. The revised tariff sheets are listed on Attachment A and are attached hereto. PURPOSE This advice filing revises Forms: , Disconnection Notice Past Due Utility Service and Other Services; , Disconnection Notice Returned Check; , Disconnection Notice Closed SCE Account; and , Disconnection Notice Past Due Security Deposit. The revisions to these forms are made with the goal of improving the customer s comprehension of the notices that are now written in easyto-understand language. BACKGROUND Customer Focus Groups and Benchmarking studies at other utilities were conducted to identify which revisions should be made to these existing forms. Previously, Form was titled Final Call Notice; Form was titled Returned Check Final Call Notice; Form was titled Closed Account Final Call Notice, and Form was titled Deposit Final Call Notice. From the Focus Groups, SCE found that the verbiage Final Call Notice is misconstrued as a last chance to pay rather than a warning of pending disconnection if payment is not made by the expiration date of the notice. Thus, for all four notices the verbiage Final Call Notice in the notice s title has been replaced with Disconnection Notice. P.O. Box Walnut Grove Ave. Rosemead, California (626) Fax (626)

2 ADVICE 1488-E (U 338-E) September 28, 2000 Except for elderly and handicapped customers, SCE attempts to contact all domestic customers by telephone once the required Overdue-Discontinuance Of Service Notice has expired. At the time the telephone contact is attempted, SCE also mails out a second notice called the Disconnection Notice. The elderly and handicapped customers have this notice hand delivered to their service address. Forms , , , and have been expanded to two pages so that additional information can be displayed and the following improvements will be included: The service address now appears in the upper left corner where previously only the mailing address appeared because customers with multiple properties using one mailing address could not distinguish for which service account the notice was rendered; SCE s Internet address also now appears on the top of the notice. This is a benefit to customers because SCE.COM provides a comprehensive list of Authorized Payment Agencies (APA s) and SCE District Offices; A distinctive plug and socket icon has been added to the top of the notice to make it easily recognizable to customers with marginal English-language reading skills that this notice pertains to the disconnection of service; Customers are also presented with a summary of additional charges they will have to pay to have service restored after a disconnection. By warning customers of the high cost of reconnection, SCE hopes to encourage prompt payment and avoid the disconnection of service. Various payment options are clearly defined to encourage prompt payment; The second page of the notice allows for a listing of nearby Payment Locations; both APA s and SCE District Offices with the cross-street of each location and the hours of operation. Up to six locations can be displayed and the selection of locations is based on the customer s mailing address zip code: and There is also a section called Other Information You Should Know and it summarizes some of the most important information from the back of the notices. All of these notices are printed on white paper with the SCE logo and the yellow band at the top of the notice. The back of the notices is its own form and continues to be used for all bills and notices. It is not being changed. No cost information is required for this advice filing.

3 ADVICE 1488-E (U 338-E) September 28, 2000 This advice filing will not increase any rate or charge, cause the withdrawal of service, or conflict with any other schedule or rule. EFFECTIVE DATE This advice filing will become effective on the 40th calendar day after the date filed, which is November 7, NOTICE Anyone wishing to protest this advice filing may do so by letter via U.S. Mail, facsimile, or electronically, any of which must be received no later than 20 days after the date of this advice filing. Protests should be mailed to: IMC Program Manager Energy Division California Public Utilities Commission 505 Van Ness Avenue, Room 4002 San Francisco, California Facsimile: (415) jjr@cpuc.ca.gov Copies should also be mailed to the attention of the Director, Energy Division, Room 4004 (same address above). In addition, protests and all other correspondence regarding this advice letter should also be sent by letter and transmitted via facsimile or electronically to the attention of: Donald A. Fellows Manager of Revenue and Tariffs Southern California Edison Company 2244 Walnut Grove Avenue, Rm. 303 Rosemead, California Facsimile: (626) fellowda@sce.com

4 ADVICE 1488-E (U 338-E) September 28, 2000 Bruce Foster Vice President of Regulatory Operations Southern California Edison Company 601 Van Ness Avenue, Suite 2040 San Francisco, California Facsimile: (415) fosterbc@sce.com There are no restrictions on who may file a protest, but the protest shall set forth specifically the grounds upon which it is based and shall be submitted expeditiously. In accordance with Section III, Paragraph G, of General Order No. 96-A, SCE is mailing copies of this advice filing to the interested parties shown on the attached service list. Address change requests to the attached GO 96-A Service List should be directed to Emelyn Lawler at (626) (Emelyn.Lawler@sce.com), or John Montanye at (626) (John.Montanye@sce.com). Further, in accordance with Public Utilities Code Section 491, notice to the public is hereby given by filing and keeping the advice filing open for public inspection at SCE s corporate headquarters. Southern California Edison Company DAF:jhm:Disconnect Notices.doc Enclosures Donald A. Fellows, Jr.

5 Public Utilities Commission 1488-E Attachment A Cal. P.U.C. Cancelling Cal. Sheet No. Title of Sheet P.U.C. Sheet No. Revised E Revised E Revised E Revised E Disconnection Notice, Past Due Security Deposit, Form Disconnection Notice, Past Due Utility Service and Other Services, Form Disconnection Notice, Returned Check, Form Disconnection Notice, Closed SCE Account, Form Original E Original E Original E Original E Revised E Table of Contents Revised E Revised E Table of Contents Revised E Revised E Table of Contents Revised E 1488e.doc 1

6 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Original Cal. PUC Sheet No E DISCONNECTION NOTICE PAST DUE SECURITY DEPOSIT Form

7 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Original Cal. PUC Sheet No E DISCONNECTION NOTICE PAST DUE UTILITY SERVICE AND OTHER SERVICES Form

8 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Original Cal. PUC Sheet No E DISCONNECTION NOTICE RETURNED CHECK Form

9 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Original Cal. PUC Sheet No E DISCONNECTION NOTICE CLOSED SCE ACCOUNT Form

10 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E TABLE OF CONTENTS Sheet 16 of 17 (Continued) SAMPLE FORMS (Continued) Form Cal. P.U.C. No. Statements (Cont d) Sheet No. Collection/Disconnect Notices C-299 Disconnect Order E C Final Call E CSD-386 Notice to Comply E CSD-470 Notice of Termination - Electric Service E EDP-122 Reminder E Notice of Call - Meter Test E Final Call E Payment Receipt E Disconnect Order E Extension Notice E Medical Baseline Application E A Renewal Medical Baseline Application E Deposit Final Call E Request for Change of Rate Schedule E Local Office Payment Receipt E All-Purpose Form Backer E Closed Account Overdue Notice E Closed Account Collection Notice E Closed Account Final Collection Notice E Closed Account Notice of Transfer E Closed Account Transfer Notice E Request To Pay Deposit E Disconnection Notice, Past Due Security Deposit E Deposit Urgent Notice E Deposit Receipt E Past Due Service Termination Notice E Disconnection Notice, Past Due Utility Service and Other Services E Urgent Notice E Disconnection Notice, Returned Check E (Continued)

11 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E TABLE OF CONTENTS Sheet 17 of 17 (Continued) SAMPLE FORMS (Continued) Form Cal. P.U.C. No. Statements (Cont d) Sheet No. Collection/Disconnect - Departing Load Notices This is a Request to Pay a Competition Transition Charge E Lump Sum Past Due Competition Transition Charge Payment & Deposit For Failure E To Notify Competition Transition Charge Payment & Notice of Deposit E Departing Load Customer Competition Transition Charge E Monthly Statement Departing Load Customer Competition Transition Charge E Past Due Notice This is a Request to Pay a Competition Transition Charge E Lump Sum Departing Load Competition Transition Charge Agreement E Lump Sum Payment Arrangement for Departing Load E Customers Amendment to the Departing Load Competition Transition E Charge Agreement for Subsequently Obtained CTC Exemption Operating Notices Request To Pay Deposit E Deposit Final Call Notice E Deposit Urgent Notice E Deposit Receipt E Past Due Service Termination Notice E Final Call Notice E Urgent Notice E Returned Check Final Call Notice E Closed Account Past Due Notice E Disconnection Notice, Closed SCE Account E C-101B Meter Reading Postal Card E C-136 Notice of Call E C-143 Notice to Make Application and Establish Credit E C-274A Locked Service Notice E

12 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E TABLE OF CONTENTS Sheet 1 of 17 Cal. P.U.C. Sheet No. TITLE PAGE E TABLE OF CONTENTS - RATE SCHEDULES E TABLE OF CONTENTS - LIST OF CONTRACTS AND DEVIATIONS E TABLE OF CONTENTS - RULES E TABLE OF CONTENTS - BASELINE REGIONS E TABLE OF CONTENTS - SAMPLE FORMS E E PRELIMINARY STATEMENT: A. Territory Served E B. Description of Service E C. Procedure to Obtain Service E D. Establishment of Credit and Deposits E E. General E F. Symbols E G. Gross Revenue Sharing Mechanism E E H. Baseline Service E I. NOT IN USE... J. NOT IN USE... K. NOT IN USE... L. NOT IN USE... M. Income Tax Component of Contributions E N. Memorandum Accounts E E E E E E E E E O. California Alternative Rates for Energy (CARE) Adjustment Clause E P. Optional Pricing Adjustment Clause (OPAC) E (T) (T) (T) (T) (T) (Continued)

May 16, 2006 ADVICE 2002-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

May 16, 2006 ADVICE 2002-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Vice President, Revenue and Tariffs May 16, 2006 ADVICE 2002-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Electronic Fund Transfers and Revision

More information

March 30, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

March 30, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Donald A. Fellows, Jr. Manager of Revenue and Tariffs March 30, 2000 ADVICE 1446-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Establishment of Form 14-574,

More information

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr. Governor April 8, 2011 Advice Letter 2556-E Akbar Jazayeri Vice President, Regulatory Operations P O Box

More information

January 25, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 25, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Director of Revenue and Tariffs January 25, 2002 (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Notice of Proposed Construction of Facilities Pursuant to General

More information

October 9, 2003 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

October 9, 2003 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs October 9, 2003 ADVICE 1751-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Addition of Universal Studios to the

More information

July 22, 1999 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

July 22, 1999 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Donald A. Fellows, Jr. Manager of Revenue and Tariffs July 22, 1999 ADVICE 1394-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Notice of Proposed Construction

More information

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr. Governor April 3, 2012 Advice Letter 2703-E Akbar Jazayeri Vice President, Regulatory Operations Southern

More information

September 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Format for Customer Generation Quarterly Report

September 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Format for Customer Generation Quarterly Report Akbar Jazayeri Director of Revenue and Tariffs September 8, 2004 ADVICE 1825-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Format for Customer Generation Quarterly

More information

July 13, 2005 ADVICE 1902-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

July 13, 2005 ADVICE 1902-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Director of Revenue and Tariffs July 13, 2005 (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Request to Record in SCE s Bark Beetle CEMA Reimbursements to Property

More information

September 3, 2003 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

September 3, 2003 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs September 3, 2003 (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Notice of Proposed Construction of Facilities

More information

SUBJECT: Establishment of the Local Capacity Requirements Products Balancing Account Pursuant to Decision

SUBJECT: Establishment of the Local Capacity Requirements Products Balancing Account Pursuant to Decision STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 March 23, 2016 Advice Letter 3354-E Russell G. Worden Director, State Regulatory

More information

May 12, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

May 12, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Donald A. Fellows, Jr. Manager of Revenue and Tariffs May 12, 2000 (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Implementation of Affiliate Transaction Rules

More information

December 22, 2005 ADVICE 1947-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

December 22, 2005 ADVICE 1947-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs December 22, 2005 ADVICE 1947-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Notice of Proposed Construction

More information

March 1, Notice of Proposed Construction Project Pursuant to General Order 131-D, DowneyMed 66/12 kv Substation

March 1, Notice of Proposed Construction Project Pursuant to General Order 131-D, DowneyMed 66/12 kv Substation Akbar Jazayeri Director of Revenue and Tariffs March 1, 2006 ADVICE 1973-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Notice of Proposed Construction Project

More information

June 3, 2014 Advice Letter 2914-E

June 3, 2014 Advice Letter 2914-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor June 3, 2014 Advice Letter 2914-E Megan Scott-Kakures Vice President, Regulatory Operations Southern

More information

September 15, 2017 Advice Letter 3641-E

September 15, 2017 Advice Letter 3641-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor September 15, 2017 Advice Letter 3641-E Director, Regulatory Operations 8631 Rush Street Rosemead,

More information

March 3, 2006 ADVICE 1976-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

March 3, 2006 ADVICE 1976-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Vice President, Revenue and Tariffs March 3, 2006 ADVICE 1976-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Required Rate Change Associated

More information

June 2, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

June 2, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto. James A. Cuillier Director FERC Rates & Regulation June 2, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: In accordance

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) ANSWER TO COMPLAINT

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) ANSWER TO COMPLAINT BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Zov s Bistro, Inc., v. Complainant, Southern California Edison Company (U338-E, Defendant. Case No. C09-01-007 (Filed January 16, 2009

More information

October 4, 2005 RE: APPLICATION /INVESTIGATION

October 4, 2005 RE: APPLICATION /INVESTIGATION Frank A. McNulty Senior Attorney mcnultfa@sce.com October 4, 2005 Docket Clerk California Public Utilities Commission 505 Van Ness Avenue San Francisco, California 94102 RE: APPLICATION 04-12-014/INVESTIGATION

More information

REPLY OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO PROTEST OF DIVISION OF RATEPAYER ADVOCATES

REPLY OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO PROTEST OF DIVISION OF RATEPAYER ADVOCATES Carol A. Schmid-Frazee Senior Attorney Carol.SchmidFrazee@sce.com May 1, 2006 Docket Clerk California Public Utilities Commission 505 Van Ness Avenue San Francisco, California 94102 RE: A.06-03-020 Dear

More information

March 22, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

March 22, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto. Karen Koyano Principal Manager FERC Rates & Compliance Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: In accordance with Sections 35.13 and 35.15 of the Federal

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57201-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55700-E SCHEDULE LS-1 Sheet 1 DIFFERENTIAL FACILIITES RATE AGREEMENT Form

More information

October 21, 2005 RE: APPLICATION /INVESTIGATION

October 21, 2005 RE: APPLICATION /INVESTIGATION James M. Lehrer Senior Attorney James.Lehrer@sce.com October 21, 2005 Docket Clerk California Public Utilities Commission 505 Van Ness Avenue San Francisco, California 94102 RE: APPLICATION 04-12-014/INVESTIGATION

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Southern California Edison Company ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Southern California Edison Company ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Southern California Edison Company ) Docket No. ER11-2694-000 JOINT PROGRESS REPORT OF PACIFIC GAS AND ELECTRIC COMPANY AND SOUTHERN

More information

September 3, 2015 Advice Letter 3264-E

September 3, 2015 Advice Letter 3264-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor September 3, 2015 Advice Letter 3264-E Russell G. Worden Director, Regulatory Operations Southern

More information

June 10, 2014 Advice Letter: 4633-G

June 10, 2014 Advice Letter: 4633-G STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 10, 2014 Advice Letter: 4633-G Rasha Prince, Director Regulatory Affairs

More information

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Southern California Edison Original Cal. PUC Sheet No. 57074-E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Sheet 1 SCHEDULE LS-1 OPTION E, ENERGY EFFICIENCY-LIGHT EMITTING DIODE (LED)

More information

GREAT OAKS WATER COMPANY

GREAT OAKS WATER COMPANY GREAT OAKS WATER COMPANY California Public Utilities Commission Division of Water and Audits Room 3102 505 Van Ness Avenue San Francisco, CA 94102-3298 July 20, 2016 P.O. Box 23490 San Jose, CA 95153 (408)

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) ANSWER TO COMPLAINT

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) ANSWER TO COMPLAINT BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Wei Ping Chen, v. Complainant, Southern California Edison Company, Defendant. Case No. C08-01-020 (Filed January 30, 2008 SOUTHERN CALIFORNIA

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) ANSWER TO COMPLAINT

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) ANSWER TO COMPLAINT BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Carole Lieff, Complainant, vs. Southern California Edison Company (U 338-E, Defendant. Case No. C.11-08-017 (Filed August 22, 2011 SOUTHERN

More information

Subject: Annual Report for Relocation Work Performed for the CHSRA in Compliance with Resolution G-3498

Subject: Annual Report for Relocation Work Performed for the CHSRA in Compliance with Resolution G-3498 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor April 24, 2017 Ronald van der Leeden Director, Regulatory Affairs Southern

More information

March 1, 2018 Advice Letter 5250-G

March 1, 2018 Advice Letter 5250-G STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 March 1, 2018 Advice Letter 5250-G Ronald van der Leeden Director, Regulatory

More information

1889-W Preliminary Statement (Continued) 1423-W 1890-W Table of Contents 1888-W

1889-W Preliminary Statement (Continued) 1423-W 1890-W Table of Contents 1888-W San Jose Water Company 110 W. Taylor Street San Jose, CA 95110-2131 March 16, 2018 California Public Utilities Commission 505 Van Ness Avenue San Francisco, CA 94102 Advice Letter No. 517A San Jose Water

More information

Schedule DM Sheet 3 MULTIFAMILY ACCOMMODATION - RESIDENTIAL HOTEL - QUALIFYING RV PARK. (Continued)

Schedule DM Sheet 3 MULTIFAMILY ACCOMMODATION - RESIDENTIAL HOTEL - QUALIFYING RV PARK. (Continued) Southern California Edison Revised Cal. PUC Sheet No. 77-E Rosemead, California (U 33-E) Cancelling Revised Cal. PUC Sheet No. 7420-E SPECIAL CONDITIONS. Multifamily Accommodation Baseline Allocations:.2.2.0.0.....7

More information

February 1, Edward N. Jackson Director of Revenue Requirements Liberty Utilities (Park Water) Corp. PO Box 7002 Downey, CA 90241

February 1, Edward N. Jackson Director of Revenue Requirements Liberty Utilities (Park Water) Corp. PO Box 7002 Downey, CA 90241 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor February 1, 2017 Edward N. Jackson Director of Revenue Requirements Liberty

More information

November 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

November 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. Karen Koyano Principal Manager FERC Rates & Compliance November 29, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose:

More information

Enclosed are copies of the following revised tariff sheets for the utility s files:

Enclosed are copies of the following revised tariff sheets for the utility s files: STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor July 10, 2018 Edward N. Jackson Director, Rates and Regulatory Affairs Liberty

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Investigation on the Commission s Own Motion Into the Operations and Practices of Southern California Edison Company;

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) MOTION FOR PARTY STATUS

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) MOTION FOR PARTY STATUS BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of San Diego Gas & Electric Company (U902M) for Approval to Extend the Mobilehome Park Utility Upgrade Program. A.17-05-008

More information

Intrastate Telecommunication Services Tariff Schedules. for. MCI Communications Services, Inc.

Intrastate Telecommunication Services Tariff Schedules. for. MCI Communications Services, Inc. 205 N. Michigan Avenue, Suite 700 Original Title This tariff, California Tariff No. 8, cancels and replaces in its entirety the current tariff on file with the Commission, Schedule CAL P.U.C. No. 1 T-7T

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Material Changes in Facts Underlying Waiver of Order No. 889 and Part 358 of the Commission s Regulations Docket Nos. AD09-7-000

More information

April 10, 2015 Advice Letters: 4767-G. SUBJECT: Revision to Schedule No. G-BTS Pursuant to D (In-Kind Energy Charge)

April 10, 2015 Advice Letters: 4767-G. SUBJECT: Revision to Schedule No. G-BTS Pursuant to D (In-Kind Energy Charge) STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 April 10, 2015 Advice Letters: 4767-G Southern California Gas Company Attention:

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Andrade & Associates, a Professional Law Corporation, vs. Complainant, Southern California Edison Company, Defendant. Case No. 07-05-014

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) PREHEARING CONFERENCE STATEMENT

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) PREHEARING CONFERENCE STATEMENT BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of San Diego Gas & Electric Company (U902M) for Approval to Extend the Mobilehome Park Utility Upgrade Program. A.17-05-008

More information

Subject: Revision to Schedule No. G-BTS Pursuant to Decision (D.)

Subject: Revision to Schedule No. G-BTS Pursuant to Decision (D.) Ronald van der Leeden Director Regulatory Affairs 555 W. Fifth Street, GT14D6 Los Angeles, CA 90013-1011 Tel: 213.244.2009 Fax: 213.244.4957 RvanderLeeden@semprautilities.com December 27, 2017 Advice No.

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southern California Edison Company ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southern California Edison Company ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southern California Edison Company ) Docket No. ER17-787-000 MOTION FOR LEAVE TO ANSWER AND ANSWER OF SOUTHERN CALIFORNIA EDISON

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA RESPONSE OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO PROTESTS

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA RESPONSE OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO PROTESTS BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application Of Southern California Edison Company (U 338-E) For Approval Of Its Forecast 2019 ERRA Proceeding Revenue Requirement. Application

More information

CALIFORNIA PUBLIC UTILITIES COMMISSION DIVISION OF WATER AND AUDITS. Advice Letter Cover Sheet

CALIFORNIA PUBLIC UTILITIES COMMISSION DIVISION OF WATER AND AUDITS. Advice Letter Cover Sheet CALIFORNIA PUBLIC UTILITIES COMMISSION DIVISION OF WATER AND AUDITS Advice Letter Cover Sheet Utility Name: California Water Service Company Date Mailed to Service List: 12/21/17 District: All Class A

More information

June 28, 2012 Advice Letter 4366-G. Subject: Notification of the Creation of New Affiliates and Revision of an Affiliate s Information

June 28, 2012 Advice Letter 4366-G. Subject: Notification of the Creation of New Affiliates and Revision of an Affiliate s Information STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 28, 2012 Advice Letter 4366-G Rasha Prince, Director Regulatory Affairs

More information

June 15, SoCalGas Advice No (U 904 G) Public Utilities Commission of the State of California. Subject: Additional Hazardous Substance Site

June 15, SoCalGas Advice No (U 904 G) Public Utilities Commission of the State of California. Subject: Additional Hazardous Substance Site Lee Schavrien Director Regulatory Case Management and Tariff Administration 101 Ash Street San Diego, CA 92101-3017 Tel: 619. 696. 4050 Fax: 619. 696. 4027 Pager: 619. 526. 7769 lschavrien@sempra.com June

More information

March 22, Advice No U-904-G. Public Utilities Commission of the State of California. Subject: Submission of Long-Term Storage Contract

March 22, Advice No U-904-G. Public Utilities Commission of the State of California. Subject: Submission of Long-Term Storage Contract Lee Schavrien Director Regulatory Case Management and Tariff Administration 101 Ash Street San Diego, CA 92101-3017 March 22, 2001 Tel: 619.696.4050 Pager: 800.456.9141 Fax: 619.696.4027 U-904-G Public

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Alliance for Nuclear Responsibility, Complainant, vs. Southern California Edison Company (U338E), Defendant. Case No. C. 13-02-013 (Filed

More information

Please Refer to Attached Sample Form

Please Refer to Attached Sample Form Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 30710-G Cancelling Revised Cal. P.U.C. Sheet No. 30024-G Gas Sample Electronic Billing Customer Agreement Please

More information

Advice Letter 5276-G. Dear Mr. van der Leeden: Advice Letter 5276-G is effective as of March 13, Sincerely,

Advice Letter 5276-G. Dear Mr. van der Leeden: Advice Letter 5276-G is effective as of March 13, Sincerely, STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 May 10, 2018 REVISED Advice Letter 5276-G Ronald van der Leeden Director,

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Joint Application of Southern California Edison Company (U 338-E and San Diego Gas & Electric Company (U 902-E For the 2018 Nuclear Decommissioning

More information

CALIFORNIA PUBLIC UTILITIES COMMISSION WATER DIVISION. Advice Letter Cover Sheet

CALIFORNIA PUBLIC UTILITIES COMMISSION WATER DIVISION. Advice Letter Cover Sheet CALIFORNIA PUBLIC UTILITIES COMMISSION WATER DIVISION Advice Letter Cover Sheet Utility Name: California Water Service Company Date Mailed to Service List: 3/7/18 All Tariffed Areas, including District:

More information

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Original Cal. PUC Sheet No. 55565-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47476-E Rule 23 Sheet 1 TABLE OF CONTENTS A. CUSTOMER SERVICE ELECTIONS

More information

November 27, Jeffrey T. Linam Vice President of Rates & Regulatory California-American Water Company 4701 Beloit Drive Sacramento, CA

November 27, Jeffrey T. Linam Vice President of Rates & Regulatory California-American Water Company 4701 Beloit Drive Sacramento, CA STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor November 27, 2018 Jeffrey T. Linam Vice President of Rates & Regulatory California-American

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E for Authority to, Among Other Things, Increase Its Authorized Revenues For Gas

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Peninsula Corridor Joint Powers Board (Caltrain) Requesting Authority for Variances from Portions of General Order 95 Application

More information

HARYANA ELECTRICITY REGULATORY COMMISSION. Notification. The 10th August, Electricity Supply Code. (1) recovery of electricity charges,

HARYANA ELECTRICITY REGULATORY COMMISSION. Notification. The 10th August, Electricity Supply Code. (1) recovery of electricity charges, HARYANA ELECTRICITY REGULATORY COMMISSION Regulation No: HERC/ 05 /2004 Notification The 10th August, 2004 Electricity Supply Code Where as the Electricity Act, 2003 provides that the Commission shall

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application Of Southern California Edison Company (U 338-E For Approval Of Its Forecast 2019 ERRA Proceeding Revenue Requirement. A.18-05-003

More information

September 6, CPUC Energy Division Attn: Tariff Unit 505 Van Ness Avenue San Francisco, CA

September 6, CPUC Energy Division Attn: Tariff Unit 505 Van Ness Avenue San Francisco, CA September 6, 2017 CPUC Energy Division Attn: Tariff Unit 505 Van Ness Avenue San Francisco, CA 94102 EDTariffUnit@cpuc.ca.gov Re: Clean Coalition s Joint Protest to Pacific Gas & Electric s Advice Letter

More information

F I L E D :45 PM

F I L E D :45 PM JSW/lil 1/7/2010 F I L E D 01-07-11 02:45 PM BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of San Diego Gas & Electric Company (U902M) for Authority, Among Other Things,

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of City and County of San Francisco for Rehearing of Resolution E-4907. Application 18-03-005 (Filed March 12, 2018) JOINT

More information

March 4, 2015 Advice Letter 3114-E

March 4, 2015 Advice Letter 3114-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor March 4, 2015 Advice Letter 3114-E Russell G. Worden Director, Regulatory Operations Southern

More information

April 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

April 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. James A. Cuillier Director FERC Rates & Regulation Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: Pursuant to Section 205 of the Federal Power Act and Section

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 60128-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 45221-E Sheet 1 ATTACHMENT AGREEMENT FOR ILLUMINATED DECORATIONS ON ORNAMENTAL

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY'S (U 338-E) REPLY TO PROTESTS

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY'S (U 338-E) REPLY TO PROTESTS BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Edison Company (U 338-E) for Authority to, Among Other Things, Increase its Authorized Revenues for

More information

Enclosed are copies of the following revised tariff sheets for the utility s files: 1387-W Residential Metered Service, page 1

Enclosed are copies of the following revised tariff sheets for the utility s files: 1387-W Residential Metered Service, page 1 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor July 10, 2018 Edward N. Jackson Director, Rates and Regulatory Affairs Liberty

More information

INTRASTATE LONG DISTANCE SERVICE. Audeamus (U-6217-C) (Name of Utility)

INTRASTATE LONG DISTANCE SERVICE. Audeamus (U-6217-C) (Name of Utility) Audeamus LLC SCHEDULE CAL. P.U.C. 1-T Kerman, California 7th Revised Title Sheet U-6217C Cancels 6th Revised Title Sheet TARIFF SCHEDULES Applicable to LONG DISTANCE TELEPHONE SERVICE of Audeamus (U-6217-C)

More information

Williams-Sonoma, Inc. (Exact name of registrant as specified in its charter)

Williams-Sonoma, Inc. (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, DC 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of Report (Date of earliest event

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator Corporation In Re Transmission Control Agreement Docket No. EL08-52-000 SOUTHERN CALIFORNIA

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION CAlifornians for Renewable Energy, Inc.; Michael E. Boyd, and Robert M. Sarvey, v. Petitioners, California Public Utilities Commission;

More information

Contact Person for questions and approval letters: Alain Blunier

Contact Person for questions and approval letters: Alain Blunier CALIFORNIA PUBLIC UTILITIES COMMISSION ADVICE LETTER FILING SUMMARY ENERGY UTILITY MUST BE COMPLETED BY LSE (Attach additional pages as needed) Company name/cpuc Utility No. Liberty Utilities (CalPeco

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION San Diego Gas & Electric Company Docket No. EL00-95-000, et al. v. Sellers of Energy and Ancillary Services Investigation of Practices

More information

DISTRICT OF COLUMBIA LEVEL 1 INTERCONNECTION APPLICATION & AGREEMENT

DISTRICT OF COLUMBIA LEVEL 1 INTERCONNECTION APPLICATION & AGREEMENT DISTRICT OF COLUMBIA LEVEL 1 INTERCONNECTION APPLICATION & AGREEMENT With Terms and Conditions for Interconnection (Lab Certified Inverter-Based Small Generator Facilities Less Than or Equal to 10kW) The

More information

Pennsylvania Residential and Small Commercial Contract Summary and Terms of Service

Pennsylvania Residential and Small Commercial Contract Summary and Terms of Service Pennsylvania Residential and Small Commercial Contract Summary and Terms of Service Our Contact Information Price Structure Generation/Supply Price Term of Agreement Deposit Oasis Power, LLC 12140 Wickchester

More information

UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT Cities of Anaheim, Azusa, Banning, Colton, and Riverside, California No. 11-1442 Petitioners, v. Federal Energy Regulatory Commission,

More information

CALIFORNIA PUBLIC UTILITIES COMMISSION WATER DIVISION. Advice Letter Cover Sheet

CALIFORNIA PUBLIC UTILITIES COMMISSION WATER DIVISION. Advice Letter Cover Sheet CALIFORNIA PUBLIC UTILITIES COMMISSION WATER DIVISION Advice Letter Cover Sheet Utility Name: California Water Service Company Date Mailed to Service List: 12/29/17 District: All Tariffed Areas CPUC Utility

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Berry Petroleum Company ) Docket No. ER _

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Berry Petroleum Company ) Docket No. ER _ UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Berry Petroleum Company ) Docket No. ER12-2233-00_ MOTION TO INTERVENE OUT-OF-TIME AND MOTION FOR CLARIFICATION OF SOUTHERN CALIFORNIA

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator Corporation ) ) ) ) Docket No. ER11-1830-000 JOINT REPLY OF SOUTHERN CALIFORNIA EDISON COMPANY,

More information

Pennsylvania Residential Contract Summary and Terms of Service - ELECTRIC

Pennsylvania Residential Contract Summary and Terms of Service - ELECTRIC Pennsylvania Residential Contract Summary and Terms of Service - ELECTRIC Our Contact Information Pricing Structure: Generation/Supply Price Statement Regarding Savings Deposit Requirements Incentives

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator Corporation ) ) ) Docket No. ER08-760-001 MOTION OF SOUTHERN CALIFORNIA EDISON COMPANY FOR

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION San Diego Gas & Electric Company Sellers of Energy and Ancillary Services Investigation of Practices of the California Independent

More information

EXECUTIVE ORDER (Revised )

EXECUTIVE ORDER (Revised ) EXECUTIVE ORDER 2012-03 (Revised 6-29-12) WHEREAS, Governor Markell in Executive Order No. 31 issued a uniform state-wide FOIA policy and encouraged all local governments to reevaluate their FOIA policies

More information

Washington Utilities and Transportation Commission

Washington Utilities and Transportation Commission Mission Statement: The UTC protects consumers by ensuring that utility and transportation services are fairly priced, available, reliable, and safe. Washington Utilities and Transportation Commission Public

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) RESPONSE

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) RESPONSE BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Pacific Gas and Electric Company for Authority, Among Other Things, to Increase Rates and Charges for Electric and Gas Service

More information

Spark Energy, LLC RESIDENTIAL AND SMALL COMMERCIAL CUSTOMER DISCLOSURE STATEMENT

Spark Energy, LLC RESIDENTIAL AND SMALL COMMERCIAL CUSTOMER DISCLOSURE STATEMENT Spark Energy, LLC RESIDENTIAL AND SMALL COMMERCIAL CUSTOMER DISCLOSURE STATEMENT Price Plan Fixed Rate 8.80 per kwh PRICE PROTECT INSTANT 12 Monthly Administrative Fee $0.0 Term of Agreement Customer Rescind

More information

Southern California Edison Revised Cal. PUC Sheet No. 928-W Rosemead, California Cancelling Revised Cal. PUC Sheet No. 829-W

Southern California Edison Revised Cal. PUC Sheet No. 928-W Rosemead, California Cancelling Revised Cal. PUC Sheet No. 829-W Southern California Edison Revised Cal. PUC Sheet No. 928-W Rosemead, California Cancelling Revised Cal. PUC Sheet No. 829-W Rule No. 14.1 Sheet 1 GENERAL INFORMATION 1. If water supplies are projected

More information

Enclosed are copies of the following revised tariff sheets for the utility's files

Enclosed are copies of the following revised tariff sheets for the utility's files STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 July 3, 2017 Jeffrey T. Linam Director -Rates & Regulation California-American

More information

State of California Health and Human Services Agency Department of Health Care Services

State of California Health and Human Services Agency Department of Health Care Services State of California Health and Human Services Agency Department of Health Care Services JENNIER KENT DIRECTOR EDMUND G. BROWN JR. GOVERNOR DATE: MHSUDS INFORMATION NOTICE NO.: 18-010 TO: SUBJECT: COUNTY

More information

Dear Consumer, Sincerely, Orange County Consumer Fraud Unit

Dear Consumer, Sincerely, Orange County Consumer Fraud Unit Dear Consumer, Thank you for contacting us. We are enclosing a complaint form for you to complete and return to us. To prevent delay in the processing of your complaint, please make sure to return the

More information

AGREEMENT FOR LIMITED INTERCONNECTION OF SOUTHERN CALIFORNIA EDISON COMPANY-220 KV SWITCHYARD TO THE ELDORADO SYSTEM FOR AN INTERIM PERIOD AMONG

AGREEMENT FOR LIMITED INTERCONNECTION OF SOUTHERN CALIFORNIA EDISON COMPANY-220 KV SWITCHYARD TO THE ELDORADO SYSTEM FOR AN INTERIM PERIOD AMONG Attachment 4 Title Page Southern California Edison Company Tariff Title: Rate Schedules Tariff Record Title: Rate Schedule FERC No. 492 FERC FPA Electric Tariff AGREEMENT FOR LIMITED INTERCONNECTION OF

More information

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection)

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection) Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection) This Agreement for Net Metering and Interconnection Services ( Agreement ) is made and entered into this (date)

More information

May 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

May 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. James A. Cuillier Director FERC Rates & Regulation May 6, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: Pursuant to

More information

SOUTHERN CALIFORNIA EDISON COMPANY ENERGY SERVICE PROVIDER SERVICE AGREEMENT

SOUTHERN CALIFORNIA EDISON COMPANY ENERGY SERVICE PROVIDER SERVICE AGREEMENT Agreement Number: This Energy Service Provider Service Agreement (this Agreement ) is made and entered into as of this day of,, by and between ( ESP ), a organized and existing under the laws of the state

More information

SUPERIOR COURT OF THE STATE OF CALIFORNIA COUNTY OF SANTA CLARA

SUPERIOR COURT OF THE STATE OF CALIFORNIA COUNTY OF SANTA CLARA GREEN & HALL, A Professional Corporation MICHAEL J. PEPEK, State Bar No. mpepek@greenhall.com SAMUEL M. DANSKIN, State Bar No. 0 sdanskin@greenhall.com MICHAEL A. ERLINGER, State Bar No. merlinger@greenhall.com

More information

CALIFORNIA PUBLIC UTILITIES COMMISSION Advice Letter Filing Summary Sheet (PAL)

CALIFORNIA PUBLIC UTILITIES COMMISSION Advice Letter Filing Summary Sheet (PAL) CALIFORNIA PUBLIC UTILITIES COMMISSION Advice Letter Filing Summary Sheet (PAL) (Date Filed / Received Stamp by CPUC Industry Division) Date AL served on parties: November 28, 2018 Company Name: AT&T California

More information