ISA99 Working Group 5 Meeting Notes
|
|
- Irma Summers
- 6 years ago
- Views:
Transcription
1 Date: February 4, 2016 Time: 11:00 ET US Lead: E. Cosman Notes: E. Cosman Distribution: ISA99 committee and stakeholders ISA99 Working Group 5 Meeting Notes ISA 67 Alexander Drive PO Box Research Triangle Park, NC Telephone 919/ Fax 919/ Name Affiliation Group Present Ayman Al-Issa WG1 Eliana Brazda ISA Staff P Eric Cosman OIT Concepts LLC Chair P William Cotter 3M PI&CS WG6 John Cusimano AE Solutions WG7 Jim Gilsinn Kenexis WG2 P Andrew Ginter Waterfall WG1 Tom Good WG2 Vic Hammond Argonne National Laboratory WG12 P Dennis Holstein Opus Consulting Group WG12 P Lee Neitzel Consultant TC65 WG10 Johan Nye ExxonMobil WG4 Tom Phinney Consultant TC65 WG10 Jeff Potter Emerson Process Management WG3/4/7 P Charley Robinson ISA Staff P Ragnar Schierholz ABB WG3 Kevin Staggs Honeywell Corporate Research WG4 P Herman Storey Consultant WG9 Donovan Tindill Honeywell WG6 Joe Weiss Applied Control Solutions WG11 P Linda Wolffe P Present; p Partial attendance; D Declined or Unavailable P Page 1 of 6
2 1. Old Business 1.1 Action Items The following are pending from previous meetings: ID Action Item Responsibility Status Comments 43 Determine plans for a ballot to adopt IEC Locate earlier notes about the proposed liaison between ISA99 and IEEE and shared with Dennis H. 45 Draft a note to work and task group leaders about the intent of New and Continuing Business Eric, Jim Open Have to include the associated workbook Eric C. Eric C. In addition to regular work group updates the following specific topics will be addressed in this meeting. Level 1 activity with Marathon 3. Working Group Updates 3.1 WG1: Technologies (From January 21, 2016): There was no update from this work group. The group has been inactive since November. 3.2 WG2: Security Program (From January 21, 2016): WG2 did not meet the last couple weeks due to Jim s travel schedule. They are continuing to revise the document and prepare the next working draft. This group is working on edits to There was a question from Tom G. about consideration of cloud computing models, and how to share data with service providers. Dennis is working with CIGRE and OMG in this area. 3.3 WG3: Concepts and Models (From January 21, 2016): This group met on January 18th. Maturity models was the primary topic for this meeting. The basic model was accepted by those present. Security levels was the focus topic of the most recent meeting (February 1 st ). The meeting notes are on the portal. Users of have reported difficulty in applying the security level concept as it was defined in that standard. Information from ISA84 WG9 and the IEC working group is also being considered WG3TG1 (Terminology) Open Open (From January 21, 2016): There was no recent update from this task group. This task group will be meeting later today. Work is underway to finalize the master glossary. Bruce B. is working very well as a task group lead. Page 2 of 6
3 3.3.2 WG3TG3 (Protection Levels) (From January 21, 2016): The discussion of the purpose of the group is complete. The next meeting will start a discussion of the protection level concept. This group is starting to discuss the protection level concept (i.e., security levels at various levels of maturity). 3.4 WG4: Technical Requirements (From January 21, 2016): Task group 6 has completed a CDV of It has been reviewed by Johan and Kevin and submitted to the committee chairs for ballot. Preparations are underway for the ballot. All of the comments on the previous DC have been addressed (ISA and IEC). Jim will complete a final review of the current draft before the ballot is issued. 3.5 WG6: Patch Management (From January 21, 2016): There has been no recent meeting of this group. There has been no recent meeting of this group. The focus remains on the possible elevation to a standard. 3.6 WG7: Safety & Security (From January 21, 2016): The new IEC work group on security and safety will hold their first meeting in Helsinki in June. Joe mentioned that we also have to keep the nuclear sector in mind. Everyone is encouraged to review the draft of ISA-TR and pass comments to Hal Thomas. 3.7 WG8: Communication and Outreach (From January 21, 2016): This group is not active. This group is not active. 3.8 WG9: Wireless and Security JWG (From January 21, 2016): There was no update from this work group. There was no update from this work group. 3.9 WG11: ISA99-ISA67 JWG on cyber security for nuclear plants (From January 21, 2016): The Nuclear Threat Initiative (NTI) has issued a report about nuclear plants and cybersecurity. There was no update from this work group WG12: Metrics (From January 21, 2016): This group is still waiting for results from the IEC review of their draft for comment. They have the ISA comments. Members of the group are waiting for update from IEC on this activity. The WG responses to IEC comments have been reviewed by Tom P. and he highlighted those requiring further action. Vic is working on this. When this is done the NP can be issued. IEC has the final document draft (including edits). Page 3 of 6
4 4. IEC committees and work groups 4.1 IEC TC65 WG10 and ISO/IEC JTC1/SC27 (From January 21, 2016): Tom Phinney and John Cusimano have resolved the outstanding items related to Tom is a member of ACSEC (Ad hoc committee on security and privacy). He has received a document with the minutes from a December meeting in Frankfurt. There is another meeting scheduled for Milan. Tom will be receiving a document describing this group and will have two weeks to review. He will share it with WG ISO/IEC Revision (IT Asset Management) This group has a document out for review and comment. Jim will share with WG IEC TC57 WG15 (From January 21, 2016): Joe forwarded a note about the sharing of the master glossary with this group, which is meeting in Munich this week. There was a meeting in Munich. They have submitted a CV. Joe has a copy and will share. Their focus appears to be on protocols but it is described as end to end security. Several technical specifications (62351) are being considered for transition to standards. 5. Committee Planning and Direction 5.1 WG5-TG1: Editors task group (Jim G.) (From January 21, 2016): There was no update from this group. The immediate task is a final review of CDV. 5.2 Committee Work Product Release Schedule 5.3 Catalog of Requirements 6. External Initiatives 6.1 IEEE (From January 21, 2016): This is a new technical committee on communications cybersecurity. It will draw in work groups from other committees. They expect to be fully operational by EOY. Dennis will continue to monitor their activities. Page 4 of 6
5 6.2 Cybersecurity in Field Bus communications (FieldComm) There are meetings planned for the strategic technical committee (STC) and some work groups. Those wishing to learn more should contact Ragnar. 6.3 ISA Jim will circulate information on this standard. 7. Membership and Recruitment 8. Conferences and Events (From January 21, 2016): Joe will attend the FERC Forum. 8.1 INCOSE (From January 21, 2016): The INCOSE meeting will be held on January 31 through February 2 in Torrance CA. Pat Gouhin attended this meeting and Joe presented remotely. 8.2 ICSJWG The next meeting of this group will be in May. 8.3 Speaking events Joe is giving keynotes on ICS security at National Academy of Science and Engineering and Business Insurance Risk conference. 9. Other Committee Business / Issues 9.1 Work with Marathon on Level 1 security Work is underway and meetings are taking place. This group meets weekly at a time that is problematic for some of us. They asking for input and contribution from the ISA SP99 team. It is not clear what they are asking for, or if/how we may able to provide it. We have to be careful to properly set expectations. Once we have these defined we can determine our response. Joe will take this message back to the group leaders. (ACTION) 10. Meeting Close The meeting adjourned at approximately 11:50 ET Action Item Update ID Action Item Responsibility Status Comments 46 Speak to those leading the Marathon effort about the need to set clear expectations for assistance from our committee. Joe W. Open Page 5 of 6
6 10.2 Next call / Adjourn The next WG5 call is scheduled for February 18, 2016 at 11:00 ET US. Page 6 of 6
Meeting Minutes. Attendees:
Meeting Minutes ISA 67 Alexander Drive P.O. Box 12277 Research Triangle Park, NC 27709 PHONE (919) 549-8411 FAX (919) 549-8288 E-MAIL info@isa.org www.isa.org Meeting: ISA77 Fossil Fuel Power Plant s Committee
More informationMeeting Minutes. Attendees:
Meeting Minutes ISA 67 Alexander Drive P.O. Box 12277 Research Triangle Park, NC 27709 PHONE (919) 549-8411 FAX (919) 549-8288 E-MAIL info@isa.org www.isa.org Meeting: Chairman: Recorder: Date/Time: Location:
More informationISA77 Fossil Fuel Power Plant Standards Committee
Meeting Minutes ISA 67 Alexander Drive P.O. Box 12277 Research Triangle Park, NC 27709 PHONE (919) 549-8411 FAX (919) 549-8288 E-MAIL info@isa.org www.isa.org Meeting: Chairman: Recorder: Date/Time: Location:
More informationCapacitor Subcommittee of the Transmission and Distribution Committee 2014 IEEE PES General Meeting Minutes National Harbor, MD
I. Introduction Capacitor Subcommittee of the Transmission and Distribution Committee 2014 IEEE PES General Meeting Minutes National Harbor, MD Wednesday, July 30, 2014 The meeting was called to order
More informationINCITS Officers Guide. Version:
INCITS Officers Guide Version: 2014.06.04 i Contents 1. Introduction... 1 2. Purpose... 1 3. Lists of Duties... 1 3.1 INCITS Subgroup Officer Duties...1 3.1.1 Chair:... 1 3.1.2 Vice-Chair:... 2 3.1.3 Secretary:...
More informationISO/IEC JTC1/SC7 /N2856
ISO/IEC JTC1/SC7 Software and Systems Engineering Secretariat: CANADA (SCC) ISO/IEC JTC1/SC7 /N2856 2003-05-26 Document Type Title Source Meeting Minutes Minutes of JTC 1/SC 7/WG 2 meeting Montréal, Québec,
More informationISO/IEC Directives Part 1
ISO/IEC DIR 1 Edition 13.0 2017-05 ISO/IEC Directives Part 1 colour inside CONTAINS THE FINAL VERSION AND THE REDLINE VERSION Procedures for the technical work ISO/IEC DIR 1:2017-05(en) THIS PUBLICATION
More informationISO/IEC Directives Part 1
ISO/IEC DIR 1 Edition 14.0 2018-05 ISO/IEC Directives Part 1 CONTAINS THE FINAL VERSION AND THE REDLINE VERSION Procedures for the technical work ISO/IEC DIR 1:2018-05(en) THIS PUBLICATION IS COPYRIGHT
More informationISO/IEC Directives, Part 1
ISO/IEC Directives, Part 1 Directives ISO/CEI, Partie 1 Procedures for the technical work Procédures pour les travaux techniques Eighth edition, 2011 International Organization for Standardization 1, ch.de
More informationNTAG OPERATING PROCEDURES
NTAG OPERATING PROCEDURES Updated January 22, 2007 1 BACKGROUND The function of the U.S. Nuclear Technical Advisory Group (NTAG) is to coordinate the United States participation on Technical Committee-85
More informationApproved Minutes IEEE-EMCS Standards Development Committee March 13, 2008 Greenville, SC
1. Meeting called to order by Vice Chairman Colin Brench at 9:00 AM. Attendance: Present Committee Members 3/13/2008 1. Stephen Berger, Chair Y 2. Colin Brench, Vice Chair Y 3. Ed Hare, Secretary Y 4.
More informationISO/IEC JTC1/SC7 /N2893
ISO/IEC JTC1/SC7 Software and Systems Engineering Secretariat: CANADA (SCC) ISO/IEC JTC1/SC7 /N2893 2003-07-14 Document Type Calling Notice and Draft Agenda Title Calling Notice and Draft Agenda - WG 12
More informationCapacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2017 Joint Technical Committee Meeting Minutes New Orleans, Louisiana
Capacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2017 Joint Technical Committee Meeting Minutes New Orleans, Louisiana Wednesday, January 11, 2017 I. General meeting introductions
More informationJan-Henrik Tiedemann IEC Community Manager. SESKO-IEC Training Workshop Helsinki, September International Electrotechnical Commission
Jan-Henrik Tiedemann IEC Community Manager SESKO-IEC Training Workshop Helsinki, September 2017 International Electrotechnical Commission TC/SC Structure Role & Responsibilities of TC/SC Officers Role
More informationISO/IEC Directives, Part 1 Procedures for the technical work
ISO/IEC Directives, Part 1 Procedures for the technical work Directives ISO/IEC, Partie 1 Procédures pour les travaux techniques Fourteenth edition, 2018 ISO/IEC 2018 ISO/IEC Directives, Part 1, 2018 COPYRIGHT
More informationASIS INTERNATIONAL STANDARDS & GUIDELINES. September 2015
New Member Guide ASIS INTERNATIONAL STANDARDS & GUIDELINES New Member Guide September 2015 Standards & Guidelines Standards Development Process IN THIS GUIDE: Part I: Part II: Part III: Part IV: Introduction
More informationIntroduction to IEC and its processes and procedures to develop IEC International Standards
INTERNATIONAL ELECTROTECHNICAL COMMISSION Introduction to IEC and its processes and procedures to develop IEC International Standards Damien LEE Technical Officer IEC Asia-Pacific Regional Centre Contents
More informationISA Standards and Practices Department
ISA Standards and Practices Department Procedures 2017 Revision ANSI Approved 13 June 2017 The International Society of Automation (ISA) 67 T.W. Alexander Drive P.O. Box 12277 Research Triangle Park, NC
More informationOperating Procedures for Accredited Standards Committee C63 Electromagnetic Compatibility (EMC) Date of Preparation: 3 March 2016
Operating Procedures for Accredited Standards Committee C63 Electromagnetic Compatibility (EMC) Date of Preparation: 3 March 2016 Date of ANSI Approval and Reaccreditation of ASC C63: 21 June 2016 Table
More informationMinutes of the meeting of ISO/IEC JTAG 2 and SCIT Geneva, Switzerland, /17
ISO Steering Committee on Image Technology ISO SCIT N 15 DATE: 2001-03-28 Minutes of the meeting of ISO/IEC JTAG 2 and SCIT Geneva, Switzerland, 2000-10-16/17 Attendance: Mr. D. McDowell Chairman Mr. Jan
More informationReference Manual. Standards Committee. Original: June 28, 2011 Latest Revision: January 24, 2018
Reference Manual Standards Committee Original: June 28, 2011 Latest Revision: January 24, 2018 FOREWORD The Standards Committee is a General Standing Committee of the Society and operates under the direction
More informationBYLAWS OF THE COMPUTER VISION FOUNDATION. 1. Name. The name of this organization shall be the Computer Vision Foundation ( the CV Foundation ).
As amended on December 5, 2013 BYLAWS OF THE COMPUTER VISION FOUNDATION 1. Name. The name of this organization shall be the Computer Vision Foundation ( the CV Foundation ). 2. Purpose. The CV Foundation
More informationANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO
ANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO Edition: January 20162017 Revision to: 2.3.1.2, 2.3.3, 2.5.5.5, A3 (all related) Copyright by the American National
More informationISO/IEC Directives, Part 1 Consolidated ISO Supplement Procedures specific to ISO
ISO/IEC Directives, Part 1 Consolidated ISO Supplement Procedures specific to ISO Directives ISO/IEC, Partie 1 Supplément ISO consolidé Procédures spécifiques à l ISO Ninth edition, 2018 [Based on the
More informationCONFORMITY ASSESSMENT BOARD (CAB) Meeting 41, Geneva,
For IEC use only CAB/1647/DL 2017-06-13 INTERNATIONAL ELECTROTECHNICAL COMMISSION CONFORMITY ASSESSMENT BOARD (CAB) Meeting 41, Geneva, 2017-06-13 SUBJECT List of the decisions from CAB meeting 41, Geneva,
More informationACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016
ACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016 Accredited Standards Committee (ASC) procedure is used for the ASC Z540 Standards Committee. This version of the Accredited Standards
More informationACCREDITED PROCEDURES FOR THE DEVELOPMENT OF AMERICAN NATIONAL STANDARDS
ACCREDITED PROCEDURES FOR THE DEVELOPMENT OF AMERICAN NATIONAL STANDARDS 2 Revised Procedures published February 29, 2016. DEVELOPMENT OF AMERICAN NATIONAL STANDARDS APPA International (hereafter referred
More informationSix new members were added to the roster and introduced to the SC.
ANNEX A Bushings Subcommittee March 23, 2016 Atlanta, Georgia USA Chair: Peter Zhao was unable to attend, therefore Eric Weatherbee filled in as Chair for this meeting Secretary: Eric Weatherbee, Keith
More informationIEC/IEEE Dual Logo Agreement Joint Development. Jodi Haasz International Affairs Senior Manager 6 November 2017
IEC/IEEE Dual Logo Agreement Joint Development Jodi Haasz International Affairs Senior Manager 6 November 2017 IEC/IEEE Dual Logo Agreement Overview of the Agreement Process for Joint Development Joint
More informationCapacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2018 Joint Technical Committee Meeting Minutes Jacksonville, Florida
Capacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2018 Joint Technical Committee Meeting Minutes Jacksonville, Florida Wednesday, January 10, 2018 I. General meeting introductions
More informationCouncil of Society Delegates Rick Roop, ISA President
Meeting Agenda International Society of Automation 67 Alexander Drive P.O. Box 12277 Research Triangle Park, NC 27709 PHONE (919) 549-8411 FAX (919) 549-8288 E-MAIL info@isa.org www.isa.org Meeting: Chair:
More informationSTATUTES of the UNITED STATES NATIONAL COMMITTEE of the INTERNATIONAL ELECTROTECHNICAL COMMISSION (USNC/IEC)
STATUTES of the UNITED STATES NATIONAL COMMITTEE of the INTERNATIONAL ELECTROTECHNICAL COMMISSION (USNC/IEC) Approved by US National Committee December 2017 Approved by ANSI Board of Directors June 2018
More informationCONFORMITY ASSESSMENT BOARD (CAB) Meeting 39, Geneva,
For IEC use only CAB/1530/DL 2016-06-13 INTERNATIONAL ELECTROTECHNICAL COMMISSION CONFORMITY ASSESSMENT BOARD (CAB) Meeting 39, Geneva, 2016-06-13 SUBJECT List of the decisions from CAB meeting 39, Geneva,
More informationISO/IEC JTC1/SC7 Software Engineering Secretariat: CANADA (SCC) JTC1/SC7 WG10 Convener
N2090 1999/04/08 Doc. Type Title Source WG Meeting Minutes WG Meeting Minutes of WG10, Tel Aviv, Israel, March 22-26, 1999. JTC1/SC7 WG10 Convener Project Status Final References Action ID FYI or ACT Due
More informationACCREDITED STANDARDS COMMITTEE (ASC) OPERATING PROCEDURES
ACCREDITED STANDARDS COMMITTEE (ASC) OPERATING PROCEDURES These Accredited Standards Committee Procedures are used for the four Standards Committees (S1, S2, S3, and S12) for which the Acoustical Society
More informationIEEE Standard PC37.98
1 Preview e IEEE Standard PC37.98 Standard for Seismic Qualification of Protective Relays and Auxiliaries for Nuclear Facilities May 2011 Las Vegas, NV Suresh Channarasappa, Co-Chair (NPEC and PSRC Joint
More informationItems Category Person. 1 Call to Order Action Mike Seavey. 2 Quorum Check Action Teresa Lopes. Working Group Chairs and Designated Representatives
IEEE SCC20 16-1 Meeting Committee (e.g.; Steering) Meeting Disneyland Hotel, Anaheim, CA Congo Room, Adventure Tower 9:00AM Noon, Sunday September 11, 2016 Items Category Person 1 Call to Order Action
More informationIEEE P Wireless Personal Area Networks. IEEE P Working Group for Wireless Personal Area Networks (WPANs)
IEEE P802.15 Wireless Personal Area Networks Project Title IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Task Group 3m Minutes, meeting and conference calls. Date Submitted Source
More informationANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO
ANSI PROCEDURES FOR U.S. PARTICIPATION IN THE INTERNATIONAL STANDARDS ACTIVITIES OF ISO Edition: January 2018 Copyright by the American National Standards Institute (ANSI), 25 West 43rd Street, New York,
More informationIEC/IEEE Dual Logo Program
IEC/IEEE Dual Logo Program 7 April 2009 Jodi Haasz Senior Program Manager International Standards Programs IEC/IEEE Dual Logo Adoption (Adoption of an IEEE Standard by IEC) Submit request for the adoption
More informationSMIIC DIRECTIVES, PART 1 PROCEDURES FOR THE TECHNICAL WORK. (SECOND EDITION, April 2019)
SMC/DIR-EDT2/001 07/04/2019 For SMIIC use only SMIIC DIRECTIVES, PART 1 PROCEDURES FOR THE TECHNICAL WORK (SECOND EDITION, April 2019) THE STANDARDS AND METROLOGY INSTITUTE FOR ISLAMIC COUNTRIES (SMIIC)
More informationIEEE Product Safety Engineering Society Board of Directors Meeting. Meeting Notes
Board of Directors Meeting Meeting Notes Date: July 31, 2012 - Board of Directors Meeting Committee Members: Elya Joffe, Murlin Marks, Dan Roman, Doug Nix, Ivan VanDeWege, Thomas Ha, Jan Swart, Daniece
More informationCONFORMITY ASSESSMENT BOARD (CAB) Meeting 43, Geneva,
For IEC use only CAB/1759/DL 2018-06-11 INTERNATIONAL ELECTROTECHNICAL COMMISSION CONFORMITY ASSESSMENT BOARD (CAB) Meeting 43, Geneva, 2018-06-11 SUBJECT List of the decisions from CAB meeting 43, Geneva
More informationMinutes of the 2016 EMSOA Annual Business Meeting
Eastern Massachusetts Soccer Officials Association Minutes of 2015 Annual Business Meeting Saturday, January 22, 2017 VFW Post 2498, 20 Junction St, Needham, MA Present: Executive Board: Ric Beaudoin,
More informationOperating Procedures. of the. ANSI-Accredited U.S. TAG to ISO/TC 176. Quality Management and Quality Assurance * * * * * * * * * * * * *
Operating Procedures of the ANSI-Accredited U.S. TAG to ISO/TC 176 on Quality Management and Quality Assurance * * * * * * * * * * * * * Application of ANSI Procedures for U.S. Participation in the International
More information3B/239/RM REPORT OF MEETING
For IEC use only REPORT OF MEETING 1998-02 INTERNATIONAL ELECTROTECHNICAL COMMISSION Technical Committee No. 3 Documentation and graphical symbols Sub-Committee 3B: Documentation Unconfirmed minutes from
More informationIEEE PES STATIONARY BATTERY COMMITTEE
PES Stationary Battery Committee Meeting Minutes January 20, 2003 Monday, January 20; Corpus Christi, Texas 1. Introductions Jim McDowall called the meeting to order at 08:00. The PES Stationary Battery
More informationLocation: Plaza Tower Community Room. 300 S Duval Street, Tallahassee, FL 32301
Plaza Tower Condominium Association, Inc. Date: March 14, 2018, Time 4:00 PM The Plaza Tower Condominium Association Budget meeting was called to order at 4:01 PM by Rob Ship. Andrew provided the proof
More informationMinutes of the SDR Forum 61 st General Meeting 26 to 28 January 2009
Minutes of the SDR Forum 61 st General Meeting 26 to 28 January 2009 The 61st General Meeting was held January 26 to 28, 2009 in San Diego, California. The meeting was sponsored by and collocated with
More informationUnited States Lavender Growers Association (the USLGA ) Policies and Procedures. November 2014
United States Lavender Growers Association (the USLGA ) Policies and Procedures November 2014 USLGA, the legal entity for the United States Lavender Growers Association, is an organization chartered in
More informationPolicies and Procedures for Standards Development for the IEEE Cloud Computing Standards Committee. Date of Submittal: 08 July 2016
Policies and Procedures for Standards Development for the IEEE Cloud Computing Standards Committee Date of Submittal: 08 July 2016 Date of Acceptance: 22 September 2016 IEEE Cloud Computing Standards Committee
More informationWhat's Watt. Director s Message By Daniel Lee. Power Industry Division Newsletter. Power Industry. Dan Antonellis
Power Industry Division Newsletter What's Watt In this issue: Director s Message 1 Future ISA/POWID International Conferences 2 Summary of the 2007 POWID/EPRI Conference in Pittsburgh 3 POWID 2007 Honor
More informationMINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE-PES TRANSFORMER COMMITTEE Munich, DE - March 31, 2013
MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE-PES TRANSFORMER COMMITTEE Munich, DE - March 31, 2013 5.1 Bushing Subcommittee Peter Zhao, Chair; Eric Weatherbee, Secretary. 5.1.1 Introduction / Attendance
More informationMEMORANDUM. Subject: NFPA 259 Proposed Tentative Interim Amendment (TIA) No. 957
MEMORANDUM To: From: Technical Committee on Fire Tests Gregory Harrington, Acting Staff Liaison Date: May 12, 2009 Subject: NFPA 259 Proposed Tentative Interim Amendment (TIA) No. 957 The attached proposed
More informationOrganization and Procedures for the Committee on Standardization of Oilfield Equipment and Materials: Policy Document
Organization and Procedures for the Committee on Standardization of Oilfield Equipment and Materials: Policy Document API S1 Twenty-fourth Edition, June 2017 Contents 1 Scope... 1 2 Normative References...
More informationRick Knoche Paul Kuber Ray Linton Todd Nichols Ron Overton
ACRP Board Meeting Minutes Tuesday, May 15, 2007 Horton Grand Hotel San Diego, CA Victoria Room P.O. Box 61589 Vancouver, WA. 98666-1589 Bus. 1-800-690-3921 Fax: (360)-834-3507 Board Chairman Mike Parnell
More informationWashington Utilities and Transportation Commission
Mission Statement: The UTC protects consumers by ensuring that utility and transportation services are fairly priced, available, reliable, and safe. Washington Utilities and Transportation Commission Public
More informationThe Power Transformers Subcommittee met on Wednesday, March 20 th, 2013 at 1:30 p.m. with sufficient attendance to reach a quorum.
7.6 POWER TRANSFORMERS JOE WATSON, CHAIRMAN The Power Transformers Subcommittee met on Wednesday, March 20 th, 2013 at 1:30 p.m. with sufficient attendance to reach a quorum. The minutes from the Fall
More informationIEEE Surge Protective Devices Main Committee (3.0) Meeting Minutes Fall Meeting, OMNI at the CNN Center, Atlanta October 12, 2007
IEEE Surge Protective Devices Main Committee (3.0) Meeting Minutes Fall Meeting, OMNI at the CNN Center, Atlanta October 12, 2007 1) Call to order Chairman Doug Dorr called meeting to order, members and
More informationMINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE Nashville, TN March 14, 2012
MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE Nashville, TN March 14, 2012 5.4 Bushing Subcommittee Peter Zhao, Chair; Eric Weatherbee, Secretary. 5.4.1 Introduction/Attendance
More informationMeeting Minutes Administrative Subcommittee of the Transmission and Distribution Committee Montreal, Canada June 22, 2006
Meeting Minutes Administrative Subcommittee of the Transmission and Distribution Committee Montreal, Canada June 22, 2006 1. Introductions The meeting was called to order by Gene Wolf at 7:30am. Those
More information** Adjournment ** Next Meeting: Wednesday, March 29th, 2017, 7:00 p.m.
AGENDA Wednesday, February 22, 2017 Governance Review Citizen Advisory Committee Kirby Room, Saanich Police and Fire Building 760 Vernon Avenue 7:00 9:00 p.m. 1. Approval of Agenda 2. Approval of January
More informationRULES AND PROCEDURES OF THE SOUTH AFRICAN NATIONAL COMMITTEE (SANC) 1. INTRODUCTION
Revision 1.1: 2013-02-26 AFSEC South African National Committee RULES AND PROCEDURES OF THE SOUTH AFRICAN NATIONAL COMMITTEE (SANC) 1.1 BACKGROUND 1. INTRODUCTION The International Electrotechnical Commission
More information1. Call to Order J. MacDonald
IEEE Power & Energy Society (PES) Nuclear Power Engineering Committee N10-02 Meeting Embassy Suites Lake Tahoe, South Lake Tahoe, CA Wednesday, July 21, 2010 1. Call to Order J. MacDonald The Chair, John
More informationGuide to Participation in the ASA Standards Program. For Current and Future Organizational Members of
Guide to Participation in the ASA Standards Program For Current and Future Organizational Members of Accredited Standards Committee S1, Acoustics Accredited Standards Committee S2, Mechanical Vibration
More informationNorthern Waters Library Service Merlin Consortium Bylaws
Northern Waters Library Service Merlin Consortium Bylaws Article I: Article II: Name and Authority The shared automation network, known as the Merlin Consortium, (hereafter referred to as the Consortium),
More informationInsulation Life Subcommittee - Unapproved Meeting Minutes November 2, 2011 Boston, MA
Insulation Life Subcommittee - Unapproved Meeting Minutes November 2, 2011 Boston, MA 10.3 Insulation Life Subcommittee Bruce Forsyth, Chairman The Insulation Life Subcommittee met in Boston on November
More informationNFPA TECHNICAL COMMITTEE FOR Powered Rescue Tools
NFPA TECHNICAL COMMITTEE FOR Powered Rescue Tools Embassy Suites Charlotte, NC April 10-11, 2013 Agenda 1. Call to order 2. Introduction and attendance 3. Opening remarks by Chair, Glenn Mate 4. Review
More informationSC32N2376 WG2N1797 Date:
SC32N2376 WG2N1797 Date: 2013-05-30 ISO/IEC JTC 1/SC 32/WG 2 Data Management and Interchange Working Group 2 Metadata DOCUMENT TYPE TITLE SOURCE PROJECT NUMBER STATUS REFERENCES ACTION ID. REQUESTED ACTION
More informationSCHEDULE MEETINGS OF THE BOARD OF REGENTS AND COMMITTEES THE TEXAS A&M UNIVERSITY SYSTEM College Station, Texas, November 3, 2011
10/31/2011 SCHEDULE MEETINGS OF THE BOARD OF REGENTS AND COMMITTEES THE TEXAS A&M UNIVERSITY SYSTEM College Station, Texas, November 3, 2011 PLEASE NOTE THE FOLLOWING MEETING LOCATIONS Board of Regents
More informationMeeting Announcement AGENDA
31 July 2018 Donald N. Heirman Chair Don HEIRMAN Consultants +1.732.741.7723 +1.732.530.5695 (Fax) d.heirman@ieee.org Thomas J. Fagan Vice Chair The Aerospace Corp. +1.571.599.5363 tjfagan@ieee.org Monrad
More informationMeeting Minutes Compliance and Certification Committee March 3, :00 p.m. - 5:00 p.m. ET March 4, :00 a.m. - Noon ET
Meeting Minutes Compliance and Certification Committee March 3, 2015 1:00 p.m. - 5:00 p.m. ET March 4, 2015 8:00 a.m. - Noon ET NERC Corporate Offices 3353 Peachtree Rd NE, Suite 600 North Tower Atlanta,
More informationAgenda Item 2.2 Accomplishment and Actions from the March Meeting NESCC Ms Robinson reviewed the action item list contained in NESCC
ANSI-NIST Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting Report Tuesday, July 23, 2013 ANSI 1899 L Street NW 11 th Floor Washington, DC 20036 Agenda Item 1 Opening of the Meeting Ms
More informationDraft MINUTES SHORT-CIRCUIT TESTING LIAISON OF THE NATIONS OF THE AMERICAS (STLNA)
STLNA 1300 North 17th Street, Suite 900, Rosslyn, VA 22209 Draft MINUTES MEETING: PLACE OF MEETING: SHORT-CIRCUIT TESTING LIAISON OF THE NATIONS OF THE AMERICAS (STLNA) IEEE/Power & Energy Society Switchgear
More informationThe Fire Trailer News
Winter 2014 Volume 21, Issue 4 The Fire Trailer News 2014-15 Officers: PRESIDENT S MESSAGE President Bill Knight 404-372-5687 Bill Knight First Vice-President John Dancsecs, Jr. 678-276-9361 Second Vice-President
More informationANSI-NIST Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting Report Thursday, November 7, 2013
ANSI-NIST Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting Report Thursday, November 7, 2013 ANSI 1899 L Street NW 11 th Floor Washington, DC 20036 Agenda Item 1 Welcome and Introductions
More information1. CIGR STATUTES. (Effective from 1st January 2017)
1. CIGR STATUTES (Effective from 1st January 2017) I - TITLE AND PURPOSES Article 1: Title and location 1. The International Commission of Agricultural and Biosystems Engineering, founded in August 1930
More informationACADEMY STANDARDS BOARD PROCEDURES FOR THE DEVELOPMENT OF AMERICAN NATIONAL STANDARDS
1. INTRODUCTION ACADEMY STANDARDS BOARD PROCEDURES FOR THE DEVELOPMENT OF AMERICAN NATIONAL STANDARDS The American Academy of Forensic Sciences (AAFS) is a not for profit organization that provides leadership
More informationU.S. District Court District of Delaware (Wilmington) CIVIL DOCKET FOR CASE #: 1:13-cv LPS
US District Court Civil Docket as of January 14, 2014 Retrieved from the court on June 16, 2014 U.S. District Court District of Delaware (Wilmington) CIVIL DOCKET FOR CASE #: 1:13-cv-01994-LPS Todic v.
More informationRADIO TECHNICAL COMMISSION FOR MARITIME SERVICES STANDARDS DEVELOPMENT POLICIES
RADIO TECHNICAL COMMISSION FOR MARITIME SERVICES STANDARDS DEVELOPMENT POLICIES VERSION 2.0 SEPTEMBER 23, 2013 COPYRIGHT 2013 RTCM Radio Technical Commission For Maritime Services 1611 N. Kent St., Suite
More informationISO TC 130 US TAG ISO TC 130
ISO TC 130 AND US TAG TO ISO TC 130 ISO TC 130 and US TAG to ISO TC 130 Background The International Organization for Standardization Technical Committee 130, Graphic Technology (ISO TC 130), is the international
More informationAmerican Nuclear Society NFSC Executive Committee (ExC) Teleconference Synopsis Thursday, August 21, 2008 (3:30 pm 5:00 pm EDT)
American Nuclear Society NFSC Executive Committee (ExC) Teleconference Synopsis Thursday, August 21, 2008 (3:30 pm 5:00 pm EDT) 1. Roll Call Roll call was taken and the teleconference was begun. 2. July
More informationAmerican Risk and Insurance Association Minutes of Mid-year Board of Directors Meeting Saturday, January 25, :15 AM to 2:37 PM
American Risk and Insurance Association Minutes of Mid-year Board of Directors Meeting Saturday, January 25, 2003 8:15 AM to 2:37 PM I. OPENING The meeting was called to order by President Mark Browne
More informationCRAY USER GROUP, INCORPORATED BYLAWS
CUG Bylaws, including Amendments approved Manchester, UK, May 22, 2002, Amendments approved Helsinki, Finland, May 7, 2008, Amendments approved Alaska, USA, May 25, 2011, and Amendments approved Napa Valley,
More informationGlobal Asset Protection Services, LLC, CT. Liberty Mutual Commercial Markets, Property, KY. Burns & McDonnell Engineering Company, MO
TECHNICAL COMMITTEE ON SINGLE BURNER BOILERS NFPA 85 First Draft Meeting Minutes February 10, 2017 8:00 AM - 5:00 PM MT Embassy Suites by Hilton Phoenix-Tempe, Tempe, AZ Attendees Committee Members: Peter
More informationThe meeting was called to order at 1:30p by Chris Searles, Chair of the EESB Committee.
IEEE ESSB Summer Meeting, Piscataway, NJ June 25, 2018 Minutes of ESSB Committee General Meeting The meeting was called to order at 1:30p by Chris Searles, Chair of the EESB Committee. The Chair began
More informationOperating Procedures for ASME U.S. Technical Advisory Groups for ISO Activities for TAGs Under BoS
Operating Procedures for ASME U.S. Technical Advisory Groups for ISO Activities for TAGs Under BoS Approved by the Board on Standardization (BoS) Issue 1, Rev. 0 August 1997 ASME TAG Procedures Section
More informationApproved Meeting Minutes Standards Committee
Approved Meeting Minutes Standards Committee April 11, 2012 8-5 p.m. Eastern April 12, 2012 8-3 p.m. Eastern Tampa, FL 1. Administrative Items The Standards Committee (SC) held a meeting on Wednesday,
More informationSCHEDULE. Thursday, December 6, 2007
SCHEDULE MEETINGS OF THE BOARD OF REGENTS THE TEXAS A&M UNIVERSITY SYSTEM Texas A&M University, College Station, Texas Thursday, December 6, 2007 9:00 a.m. Meeting of the Committee on Audit, BOR Meeting
More informationNew Clerk Academy. Tallahassee, Florida
New Clerk Academy Tallahassee, Florida The Legislative Process: Protocol and Advocacy The Honorable Karen E. Rushing, Sarasota County Clerk of Court, and FCCC Legislative Committee Chair Fred W. Baggett,
More informationAssociation of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards
Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards (Approved by ANSI November 23, 2015 Replaces Previous Procedures Dated May 21, 2010) The
More informationCITY OF YORBA LINDA MEMBERS CITY OF YORBA LINDA STAFF Beth Haney, Councilmember Mark Pulone, City Manager Tom Lindsey, Councilmember
AGENDA YORBA LINDA WATER DISTRICT JOINT COMMITTEE MEETING WITH CITY OF YORBA LINDA Monday, December 18, 2017, 4:00 PM YL City Hall - 4845 Casa Loma Ave, Yorba Linda CA 92886 1. CALL TO ORDER 2. PLEDGE
More informationStandards Steering Committee (SSC) Minutes 19 November 2002 Washington D.C.
Standards Steering Committee (SSC) Minutes 19 November 2002 Washington D.C. Members Present: James F. Mallay, Chair, Framatome ANP Suriya Ahmad, SSC Secretary, Calvin Hopper, N16 Chair, Oak Ridge National
More informationANSI-Accredited Standards Committee C63 Electromagnetic Compatibility
Meeting Minutes ANSI-Accredited Standards Committee C63 Electromagnetic Compatibility SUBCOMMITTEE 2 E3 Terminology Definitions and EMC Best Practices Wednesday, 02 May 2018, 1500 to 1700 IEEE Headquarters,
More informationIEEE Power and Energy Society Entity Annual Report
IEEE Power and Energy Society Entity Annual Report 2017 Entity: Chair: Vice-Chair: Secretary: Immediate Past Chair: Switchgear Committee Paul B. Sullivan Todd Irwin Keith Flowers Ted Olsen 1. Significant
More informationSeptember
September 2017 www.astm.org Main Committee Officers Duties & Responsibilities ASTM Headquarters September 21, 2017 Kate Chalfin www.astm.org Objectives To identify key duties and responsibilities of the
More informationISO/IEC Directives Supplement
ISO/IEC DIR IEC SUP ISO/IEC Directives Supplement Edition 8.0 2013-10 Procedures specific to IEC ISO/IEC DIR IEC SUP:2013(E) THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright 2013 IEC, Geneva, Switzerland
More informationThe Chair asked if any additions were needed to the issued agenda, there were none.
7.6 POWER TRANSFORMERS JOE WATSON, CHAIRMAN The Power Transformers Subcommittee met on Wednesday, March 20 th, 2013 at 1:30 p.m. The meeting was called to order by the Chair, with Vice Chair (Bill Griesacker)
More informationAmerican Nuclear Society NFSC November Meeting Minutes November 17, 2003 * New Orleans, LA
1 American Nuclear Society NFSC November Meeting Minutes November 17, 2003 * New Orleans, LA Members Present Donald J. Spellman, NFSC Chair, Oak Ridge National Laboratory Cara Ford, Standards Administrator,
More informationOPERATING COMMITTEE TERMS OF REFERENCE AND GUIDANCE
OPERATING COMMITTEE TERMS OF REFERENCE AND GUIDANCE It is the desire of the Association to encourage member firms to be active in activities and initiatives of CADSI and for them to find value in contributing
More information