1 IceCube Project Monthly Report - November 2008 Accomplishments Completed commissioning of the IceCube Seasonal Equipment Site and started deep ice drilling on December 3 rd, two days ahead of schedule. The quick start-up of the drill resulted in less fuel consumption than originally planned. Successfully deployed the first three IceCube strings of the 2008/09 installation season by December 11, five days earlier than last season. The drill is performing well. Nearly all of the cargo needed for this season arrived by December 4 th. Eight cycles of DOM acceptance tests were completed at the South Pole without any major problems. All minor problems were resolved and all DOMs passed. With the start of the Pole season and increased activities on the South Pole systems, IC40- string operations during Nov 2008 achieved an overall 98.3% uptime. Completed the installation of equipment in the IceCube Laboratory (ICL), for the additional strings being deployed this year. Fifteen refurbished DOMHub computers arrived at the South Pole and were installed into the ICL racks. The total count of hubs at Pole is now 79. The UW data warehouse capacity increases are nearing completion. The work was slightly delayed due to ongoing reliability issues with the old data disks. Offline filtering of the IC40 data and simulation data production are delayed pending establishing stable operations of the UW data warehouse and the capacity enhancements. Action at Hole 36 on December 6, l-r: fork-lift towing IceTop water transport tank to fill tanks at station 36; red crates with test of DRMs being conducted by Jan Auffenberg from ICL; TOS-1 and drill tower being towed into position for drilling 3rd hold of the season. Photo Tom Gaisser Cost and Schedule Performance - The project is 88.2% complete versus the plan of 88.1% complete, as measured using earned value techniques. Remaining contingency is $8.7M and the contingency as a percentage of remaining work is 27.5%. The contingency continues to be carefully managed to ensure the successful completion of the MREFC project with 80 strings plus six Deep Core strings. There was no change to the contingency budget during this month.
2 Page 2
3 The Schedule Variance at the end of October 2008 is a favorable $207K, reduced from $270K at the end of the previous month. The variance is mostly related to the RPSC s FY2008 schedule performance variance. The Cost Variance at the end of October 2008 is a favorable $1,459K, an increase from $1,290K at the end of last month. RPSC has a positive cost variance of $554K due to lower than planned labor and On-Ice support charges in FY2008. The $656K favorable variance in Implementation was caused by lower than planned training costs, lagging invoices and labor ramp down ahead of schedule. Contingency Status and Plans The contingency % of remaining work has increased from 26% to 27.5% during October The cost of fuel for the FY2010 season is now anticipated to be less than planned since it will be purchased this month. The cost of fuel in FY2011, the final installation season, will be purchased in one year. 10/31/08 IceCube Total Project Budget Baseline - Change Log ($K) No. NA NA Description Status as of September 2008 Status as of October 2008 Total Baseline Allocated Budget Allocated Budget Change Contingency Budget Budgeted Cost of Work Remaining Contingency % of Remaining Work 275, , ,656 33, % 275, , ,656 31, % Page 3
4 Risk Assessment & Potential Contingency Adjustments Item 1. Potential cost impact of mitigating technical, cost and schedule risks associated with the defined scope of work. Risk assessments are made at WBS-Level 4 to determine the value of the risk exposure as a percent of the cost of work remaining. Estimate ($K) $2,523K 2. Pre-Operations for additional enhancements to the data storage and network systems. $250K 3. RPSC FY08 Closeout: Potential return of RPSC authorized budget to IceCube contingency -$400K 4. Annual Baseline Review of Project Years 8-10 of all WBSs excluding WBS 1.6 RPSC. $1,000K 5. Instrumentation critical path materials for up to 86 strings (purchase and additional five surface to DOM cables and build an additional ~100 DOMs). 6. Current RPSC estimate of base cost to support the installation of six strings during the 2010/11 drilling season. 7. The estimate cost to retro IceCube equipment/materials from the South Pole at the end of the project in FY Potential cost exposure to additional fuel price increases beyond normal inflation and for transferring the installation of 4 strings from FY2009 to FY Potential cost exposure should a full FY2011 drilling season be required resulting in the need to send UW personnel to the South Pole in FY2012 to dismantle the drill equipment/materials and prepare the equipment for retro out of South Pole. Available Contingency as of Oct 31, 2008 Total $1,350K $1,340K $825K $600K $450K $7,938K $8,656K Drill Operation and Installation The first hole, hole #18, of the 2008 to 2009 season commenced at approximately 10:30 a.m. on Wednesday, December 3 rd, two days ahead of schedule. Drilling proceeded smoothly with no major issues and completed at approximately 11:30 p.m. on Thursday, December 4 th. String deployment was completed by 3:00 p.m. on Friday, December 5 th. Hole #27, the second of the season, began on Friday, December 5 th and finished on Saturday, December 6 th and the string was deployed on Sunday, December 7 th. The third hole, hole #36, started on Tuesday, December 9 th and was completed on Wednesday, December 10 th. Deployment of this string finished on Thursday, December 11 th. Overall both the hot water drill and firn drill are performing well. Nearly all of the cargo needed for this season, including the Paro pressure sensors required for deployment, had arrived by December 4 th. Also, two retrograde shipments have already left the South Pole. The data magnetic media tapes were shipped to the IceCube office in Wisconsin and an ICDS Compressor was shipped to McMurdo. Page 4
5 Day-shift deployment team with the last DOM on String 18. Left-right, Ben Benischek, Jens Berdermann, Freija Descamps, Matthew ( Red ) Mathiason, Erik Verhagen, Andy Laundrie. Photo-Tom Ham Digital Optical Module Testing South Pole Acceptance Test number 8 (SPAT 8) was completed without any problems. SPAT 2 included four just arrived Japanese Golden HQE DOMs. Minor problems have included plastic connectors breaking and a few light leaks. All minor problems were resolved and all DOMs have passed testing. Digital Optical Cable Module Page 5 and
6 Production Status and Plans DOM Integration ceased as planned at all production sites pending the delivery of materials in November and December. It will resume in January 2009 at PSL and in Sweden. DESY in Germany successfully completed all of their DOM Integration and Test activities on schedule. DOM production is not a critical path activity. Detector Commissioning and Verification Verification continues to run since the start of IC40 data taking. New disk and new computers have been deployed at the South Pole and are being tested by C&V personnel to insure that they will work as expected. An interface to the Bad Run list has been created, modeled on a similar interface to the Bad DOM list, and is undergoing testing. A framework for verification of simulation, modeled closely on the framework used for verifying data quality, has been completed and being used in test mode by Dawn Williams (U. Alabama), working with personnel at UW and elsewhere. As a first step to improve the way we treat the saturation response of the IceCube DOMs, the measured response of an average DOM will be used for all deployed DOMs. Until now, a single DOM s response was also used, but it was not deemed average. Future improvements entail calibrating each DOM separately since the variation from DOM to DOM is not small. This will require significant effort, both in data taking and in data analysis. Planning for this process is underway, under the leadership of Chris Wendt (UW) with close interaction with Dawn Williams for data taking questions, and Kurt Woschnagg (UC-Berkeley) as L3 lead for calibration. Data Acquisition Hardware and Software Fifteen refurbished DOMHub computers arrived at the South Pole and were installed into the IceCube Laboratory (ICL) racks. The total count of hubs at Pole is now 79. Next year a final shipment of 25 hubs will complete the hub delivery for the entire IceCube array. Planning for the migration to three new Proliant DL380 server platforms was completed, however the actual change over occurred in the month of December. The DAQ software remained at Bay Wolf release - the next release is expected mid-december. Numerous improvements to flasher calibration operation, soft Local Coincidence, and IceCube Live! integration were checked into the code tree leading to this next release. Operationally the DAQ remained stable during the month of November - the daily uptime chart is plotted below - availability of data for science analysis is above 98%. The Winter-Over experiment operator crew rotated and the new personnel have begun operation of the DAQ and online systems. Page 6
7 IceCube Maintenance and Operations Detector Up Time 98.3% IceCube Clean Run Up-Time not including AMANDA Array 97.1% Unscheduled Downtime 0.85% Events from DAQ 3.51 billion With the start of the Pole season we have seen increased activities on the South Pole systems. Nevertheless data taking during Nov 2008 achieved an overall 98.3% uptime. The in-ice clean run uptime was 97.1%, lower than typical but high considering the large amount of activities and special runs/configurations. The main activity on the detector during this month (besides normal data-taking) was calibration and characterization of the AMANDA DAQ electronics. This is an important and timely activity because the system is due to be decommissioned in April While the AMANDA array was calibrated and characterized, the rest of IceCube kept taking data as usual. About 20% of this month, the detector ran without collecting data from AMANDA as a consequence. Data Handling South Pole systems in the IceCube Laboratory (ICL) began IC40 physics operation in April Operations continued through October with systems operating smoothly. The figure below shows the daily satellite data transfer rates. The work in November included completing the installation of equipment in the ICL for the additional strings being deployed this year, and continuing work on upgrading the UW data warehouse. ICL computing installation is complete for operation of the IC56 detector. In addition to added hardware for the 16 new strings, there were major upgrades to the DAQ and PnF servers and disk systems. These systems now have the performance required to accommodate the full IceCube/IceTop detector when completed. The data warehouse capacity increase is nearing completion, with current estimate of the switch to the new disks for data of January 1, The work was slightly delayed due to ongoing reliability issues with the old data disks taking away manpower for the enhancements. The instability of the over taxed old data disks were the main reason for the needed enhancements. Page 7
8 Filtering, Software & Database Filtering of IC40 data began in April 2008 representing the full transition from IC22 to IC40 running. The Joint-Event Builder and Processing and Filter server (JEB/PnF) merging of IceCube-40 and Amanda TWR data streams continues at South Pole sending filtered data sets of about 35 GB/day or more over the satellite. Significant effort in November went into improved and upgraded integration of the PnF system into the IceCube Live monitoring system, which is planned to come into full operation with the start of the IC56 run in April We see no significant delays or technical issues in meeting this milestone. The PnF/JEB filter system was moved to the new upgraded computers in the ICL. The transition went smoothly with no major technical issues. Software and architectural work on the PnF/JEB online filter system continues in preparation for the larger data rates next year with the IC56 detector. This final major architectural upgrade to the online filter system is in final testing for scheduled delivery for the IC56 run. This will be the last major JEB/PnF release under the MREFC construction next year, and this system will be the final design with full performance for the 80-string detector. Work continued in earnest for setting the online physics filters for next year s IC56 run. This process continues to be ahead of last years schedule. The preliminary estimate for all online filter proposals from the physics working groups is 52 GB/day, which is within next year s IceCube satellite bandwidth allocation. Offline filtering of the IC40 data was a stand still last month. Although the L2 reconstruction software has been tested and is ready to go, there has been a delay waiting for the upgrade to the data warehouse, which is required for stable offline L2 reconstruction to begin. We expect that Page 8
9 full L2 production processing will start when the data warehouse upgrade is complete by January 1, Although about four to six weeks behind where we wanted to be, but still well ahead of last years schedule. Simulation Simulation production has essentially been halted to wait for the data warehouse upgrade. We do have sufficient simulation datasets available for preliminary IC40 studies, IC56 filter studies and most IC22 data analysis. We expect that full production will resume in January Education and Outreach Jim Madsen, UW River Falls, reached agreement with the Knowles Science Teaching Foundation and PolarTrec to support teachers to work with IceCube for the next year and tentatively beyond that. The basic plan is that four KSTF Fellows (high school teachers) will train in Alaska with PolarTrec and at UW River Falls with IceCube in the summer of Two additional teachers will train at UW River Falls with a possibility of training in Alaska. One of the teachers will travel to the South Pole in the 2009 to 2010 season while the others will be in contact and bring polar science to their classrooms. PolarTrec will make a formal announcement in January. Dr. Madsen will solicit collaboration members to join the training at River Falls or work with either teachers or students in the Upward Bound program. Quality Assurance and Safety No significant issues to report. The monthly reports are posted at IceCube Monthly Reports. The On-Ice Weekly Construction reports are posted at On-Ice Weekly Construction Report. C-17 air-drop and fly-by. Photos H. Kolanoski Meetings and Events IceCube Maintenance & Operations Proposal Due April 1, 2009 Spring Collaboration Meeting at UW-Madison April 28 May 2, 2009 Science Advisory Committee Meeting at UW-Madison May 20 May 21, 2009 NSF Annual Review Date Proposed by IceCube June 3 4, 2009 Page 9
IceCube Project Monthly Report - December 2008
Accomplishments IceCube Project Monthly Report - December 2008 Drilling and string installation at the South Pole is about one week ahead of the schedule. Ten strings were successfully installed by the
More informationIceCube Project Monthly Report November 2007
Accomplishments IceCube Project Monthly Report November 2007 Completed the commissioning of the IceCube Seasonal Equipment Site in preparations for drilling. Started deep ice drilling on December 5 following
More informationIncreased drilling efficiency saved approximately 26,000 gallons of fuel.
IceCube Project Monthly Report January 2010 Accomplishments Drilling and string installation ended ten days early this season with twenty strings installed, including the DeepCore strings. This work was
More informationFULL SCALE DOM PRODUCTION DETERMINE FULL DEPLOYMENT RATE DEPLOY INITIAL STRINGS & TANKS COMPLETE EHWD INTEGRATION & TEST
IceCube Project Monthly Report - July 2008 Accomplishments The Integrated Master Schedule is currently being revised based upon RPSC support, flight changes and station opening constraints. Currently,
More informationIceCube Project Monthly Report December 2005
IceCube Project Monthly Report December 2005 Accomplishments The IceCube drill crew completed four holes as of January 13 th. The locations of the four holes are 29, 39, 38, and 30. The drilling start
More informationIceCube Project Monthly Report April An IceCube collaboration meeting was held in Madison from April 29 th through May 3 rd.
IceCube Project Monthly Report April 2008 Accomplishments An IceCube collaboration meeting was held in Madison from April 29 th through May 3 rd. Commenced inspection and testing the drill cables that
More informationIceCube Project Monthly Report - December 2009
Accomplishments IceCube Project Monthly Report - December 2009 Drill camp setup and commissioning was completed three days ahead of the schedule for this season. Deep drilling commenced on 4 December 2009.
More informationIceCube Project Monthly Report November 2006
IceCube Project Monthly Report November 2006 Accomplishments The first hole of the season, hole #58, commenced with firn drilling on December 11 th (the South Pole is 19 hours ahead of UW) and was completed
More informationIceCube Project Monthly Report April 2009
Accomplishments IceCube Project Monthly Report April 2009 Interviews for seasonal driller positions were completed and positions filled. Support and logistical requirements for the 2009 2010 Season were
More informationCost and Schedule Performance The project is 81.7% complete versus the plan of 82.2% complete, as measured using earned value techniques.
IceCube Project Monthly Report February 2008 Accomplishments All on-ice drilling and installation activities were closed after completing the drilling and string deployment of a total of 18 strings. Developed
More informationIceCube Project Baseline
IceCube Project Monthly Report February 25 Accomplishments Six weeks after the first IceCube string was deployed and two weeks after freeze-in all 6 DOMs are operating and reading data. The 16 IceTop DOMs
More informationIceCube Project Monthly Report March DOM production is in progress at the three production sites world-wide and proceeding according to plan.
IceCube Project Monthly Report March 2008 Accomplishments 2007/2008 season review and strategic planning meetings held in Madison on March 11 12. Drilling off-ice tasking schedule developed, personnel
More informationIceCube Project Monthly Report November 2005
IceCube Project Monthly Report November 200 Accomplishments The annual IceCube construction season at the South Pole is underway. The project will conduct work at the South Pole from mid November through
More informationIceCube Project Monthly Report - September 2010
IceCube Project Monthly Report - September 2010 Accomplishments 19,000 pounds of repaired equipment, spares, and materials have been shipped to the South Pole. IceCube conducted a successful internal readiness
More informationIceCube Project Monthly Report June 2005
IceCube Project Monthly Report June 25 Accomplishments All DOMs installed at the South Pole continue to produce physics quality data (6 DOMs in the ice and 16 DOMs in surface tanks). Faculty and students
More informationIceCube Project Monthly Report - October 2010
DOLLARS IN MILLIONS Accomplishments IceCube Project Monthly Report - October 2010 The first IceCube drillers departed for South Pole in late October to prepare the Seasonal Equipment Site for the upcoming
More informationThe IceCube Upgrade Marek Kowalski DESY & Humboldt-University Zeuthen-Meeting in Mainz September 2018
The IceCube Upgrade Marek Kowalski DESY & Humboldt-University Zeuthen-Meeting in Mainz September 2018 South Pole 2009!1 The IceCube Upgrade The next step in precision astroparticle physics with IceCube
More informationDM-Ice A Direct Dark Matter Search at the South Pole
DM-Ice A Direct Dark Matter Search at the South Pole Karsten Heeger University of Wisconsin on behalf of the DM-Ice Collaboration Karsten Heeger, Univ. of Wisconsin Alpha Spectra, October 10, 2011 Alpha
More informationTraining Calendar ALPHA PARTNERS
ALPHA PARTNERS Training Calendar +2348033045484, +2349060008877, +2349060007799, +2349060002727. Ebute-Metta, Yaba Lagos., info@alphapartnerstrainings.com BEST CATEGORIES AWARDS GLOBAL QUALITY Global
More informationApril, June. o 9:15 10:45 am in person before Program Council meeting February, May
FY 2018 Program Council Meeting Schedule Operations Committee o 11:00 am 1:00 pm via /conference call 3 rd Wednesday of month, August, January, April; 2 nd Wednesday in October Outreach and Committee o
More informationDM-Ice A Direct Dark Matter Search at the South Pole
DM-Ice A Direct Dark Matter Search at the South Pole Karsten Heeger University of Wisconsin on behalf of the DM-Ice Collaboration TIPP2011, June 10, 2011 Techniques for Detecting Dark Matter Indirect detection
More informationCALVERT COUNTY FIRE & RESCUE COMMISSION Tuesday, March 28, 2017 at 19:00 Hours MINUTES
I. CALL TO ORDER A. Meeting called to order by Chair Bob Hall at 19:05 hours II. III. IV. CONFIRMATION OF QUORUM A. Commission Members Present Present Bob Hall, Tom Breen, Allen Williams, Ashley Bless,
More informationREPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
EN EN EN EUROPEAN COMMISSION Brussels, 22.10.2010 COM(2010) 588 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL ON THE DEVELOPMENT OF THE VISA INFORMATION SYSTEM (VIS) IN 2009
More informationThe Angola National ID Card
The Angola National ID Card Advanced document security for a widely dispersed population 25 by Uwe Ludwig The Republic of Angola in south-central Africa is bordered by Namibia to the South, the Democratic
More informationDark Matter Searches with AMANDA and IceCube
Dark Matter Searches with AMANDA and IceCube Catherine De Clercq for the IceCube Collaboration Vrije Universiteit Brussel IDM 2008 Overview 1. Neutrinos from WIMP annihilations in Sun and Earth 2. The
More informationDM-Ice: A Search for Dark Matter in the Antarctic Ice
DM-Ice: A Search for Dark Matter in the Antarctic Ice University of Wisconsin - Madison Indirect and Direct Detection of Dark Matter Aspen Center for Physics February 6-12, 2011 1 Direct detection of dark
More informationSearch for Dark Matter Captured in the Sun with the IceCube Neutrino Observatory
Search for Dark Matter Captured in the Sun with the IceCube Neutrino Observatory for the IceCube Collaboration The Oscar Klein Centre for Cosmoparticle Physics, Stockholm University 9th International Conference
More informationInnovative installation techniques for fiber drop terminals. White paper
Innovative installation techniques for fiber drop terminals White paper As fiber-to-the-premises (FTTP) deployments increase, innovative methodologies are being developed to make the installer s life easier.
More informationKey Considerations for Implementing Bodies and Oversight Actors
Implementing and Overseeing Electronic Voting and Counting Technologies Key Considerations for Implementing Bodies and Oversight Actors Lead Authors Ben Goldsmith Holly Ruthrauff This publication is made
More informationMembers action as necessary on closed session items. 12 Future agenda items Members 13 Next meeting date Members 14 Adjourn Members
INFORMATION SERVICES COMMITTEE MEETING AGENDA Tuesday, December 6, 2016 at 4:00 p.m. Lower Level Conference Room located in the Pierce County Office Building 412 W. Kinne St., Ellsworth, WI # Action Presenter
More informationHon Hai Precision Industry Co., Ltd. Articles of Incorporation Chapter I General Provisions
Hon Hai Precision Industry Co., Ltd. Articles of Incorporation Chapter I General Provisions Article 1 Article 2 The Company, organized under the Company Act as a Company limited by shares, and shall be
More informationRESOLUTION NO
RESOLUTION NO. 07-22-12 RESOLUTION OF THE BOARD OF EDUCATION OF THE TUSTIN UNIFIED SCHOOL DISTRICT ORDERING AN ELECTION TO AUTHORIZE THE ISSUANCE OF SCHOOL BONDS IN SCHOOL FACILITIES IMPROVEMENT DISTRICT
More informationTraining Calendar ALPHA PARTNERS
ALPHA PARTNERS Training Calendar 08033045484, 09060002727, 09060007799, 09060008877 Ebute-Metta, Yaba Lagos., info@alphapartnerstrainings.com Contents Finance and Accounting 3-6 International Training
More informationAmended Technical Indicator Descriptions
Electoral Commission Amended Technical Descriptions Updated For 2017/18 2017/18 ANNUAL PERFORMANCE PLAN Page 1 2018 ANNUAL PERFORMANCE PLAN Technical indicator descriptions Programme 1: Administration
More informationRECORDS MANAGEMENT GOVERNMENT FINANCE OFFICERS ASSOCIATION OF ALABAMA 8/17/2016
RECORDS MANAGEMENT GOVERNMENT FINANCE OFFICERS ASSOCIATION OF ALABAMA August 18, 2016 Presentation by Becky Hébert, Alabama Department of Archives and History 1 George Doak moving archival records in the
More informationStatement on Security & Auditability
Statement on Security & Auditability Introduction This document is designed to assist Hart customers by providing key facts and support in preparation for the upcoming November 2016 election cycle. It
More informationNew High-Speed Network Connects Dadaab Aid Agencies For Collaboration. a project by NetHope and partners Inveneo, Cisco and USAID
New High-Speed Network Connects Dadaab Aid Agencies For Collaboration a project by NetHope and partners Inveneo, Cisco and USAID The worst drought and famine in more than 60 years have threatened the livelihood
More informationJulie Ponce-Doyle Harold Damron Kim Knutsen. MOTION by Damron, seconded by Knutsen to approve minutes from August 8, 2012 as presented.
WILL COUNTY 9-1-1 EMERGENCY TELEPHONE SYSTEM BOARD FINANCE AND EQUIPMENT COMMITTEE MEETING MINUTES Wednesday, October 10, 2012 ETSB 9-1-1 Administrative Office Board Room 2561 Division Street, Joliet,
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 8, 2013
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 8, 2013 Item 10, Report No. 39, of the Committee of the Whole, which was adopted, as amended, by the Council of the City of Vaughan on October
More informationCook County Emergency Telephone System Board
Cook County Emergency Telephone System Board ive, Cook County Sheriff s Police Headquarters ATTENDANCE Board members in attendance were Mr. Michael, Ms. Joellen Bailey, and Mr. Scott, Mr. John, Mr. Thomas,
More informationRUSH FIRE DISTRICT BOARD OF FIRE COMMISSIONERS 1971 Rush-Mendon Road, Rush, New York Unapproved Minutes October 16, 2018
RUSH FIRE DISTRICT BOARD OF FIRE COMMISSIONERS 1971 Rush-Mendon Road, Rush, New York 14543 Unapproved Minutes October 16, 2018 Roll Call: Chairman Robert Faugh called the Public Hearing on the Budget to
More informationCRS Report for Congress
CRS Report for Congress Received through the CRS Web Order Code RS22026 January 13, 2005 Summary Border Security: Fences Along the U.S. International Border Blas Nuñez-Neto Analyst in Social Legislation
More informationPublic Services and Procurement Canada Departmental Oversight Branch
Public Services and Procurement Canada Departmental Oversight Branch Fixed Wing Search and Rescue Replacement Aircraft FAIRNESS MONITOR CONTRACTOR S FINAL REPORT June 14, 2016 Submitted to: Director, Fairness
More informationBoard of Light, Gas and Water Commissioners220 S. Main Street
Board of Light, Gas and Water Commissioners220 S. Main Street Board Meeting ~ Preliminary Agenda ~ Memphis, TN 38103 www.mlgw.com Wednesday, September 18, 2013 10:30 AM Board Room INFORMATION FOR THE BENEFIT
More informationINFORMATION SYSTEMS COMMITTEE
Notice of Public Meeting Thursday, April 14, 2016 2:00 p.m. INFORMATION SYSTEMS COMMITTEE 1 of 18 Door County Government Center Chambers Room (C102), 1 st Floor 421 Nebraska Street, Sturgeon Bay, WI IS
More informationIn 2008, it was approved for COMTEX to proceed with the project.
Case Study Title: Author: Designing and Building a New Packroom Facility to Centralize Hospital Groups Sterile Surgical Linen Pack Processing Jim Sprout, PrePak Business Manager BACKGROUND The primary
More informationS-1. Supplementary Provisions. (Date of Enforcement) Article 1 These Articles of Agreement shall come into force as of July 1, 1999.
S-1 Supplementary Provisions (Date of Enforcement) Article 1 These Articles of Agreement shall come into force as of July 1, 1999. (Interim Measures Concerning Application of Charges, Etc.) Article 2 With
More informationLEE COUNTY WOMEN S TENNIS LEAGUE JOB DESCRIPTIONS
JOB DESCRIPTIONS TABLE OF CONTENTS EXECUTIVE DIRECTOR... 2 ASSOCIATE DIRECTOR... 3 LEAGUE SECRETARY... 4 LEAGUE TREASURER... 5 WEBSITE ADMINISTRATOR... 6 COMPUTER PROGRAMMER... 6 WEBMASTER... 6 DATABASE
More informationRECORD OF PROCEEDINGS. XENIA TOWNSHIP TRUSTEES: August 20, :00 PM
RECORD OF PROCEEDINGS MINUTES OF THE REGULAR MEETING XENIA TOWNSHIP TRUSTEES: August 20, 2015 7:00 PM Note: These minutes are a summary of the discussion and are not a word for word account of the discussions.
More informationCITY OF EL PASO DE ROBLES The Pass of the Oaks
CITY OF EL PASO DE ROBLES The Pass of the Oaks AGENDA OF THE SUPPLEMENTAL TAX OVERSIGHT COMMITTEE Wednesday, January 14, 2015, 6:30 p.m. MEETING LOCATION: PASO ROBLES LIBRARY/CITY HALL CONFERENCE CENTER,
More informationfor the IceCube Collaboration
Hermann Kolanoski Humboldt-Universität zu Berlin and DESY for the IceCube Collaboration ICRC, Aug 11-18, 2011 H.Kolanoski - IceCube Highlights 1 Cosmic Rays and Neutrinos Driving theme: Origin of Cosmic
More informationDora Public Library 2014 Oregon Public Library Statistical Report
Dora Public Library 214 Oregon Public Library Statistical Report Part 1 - GENERAL INFORMATION Call 53-378-527 early and often for help! See the FAQ at. Remember to update your library's entry in the online
More informationEstonian National Electoral Committee. E-Voting System. General Overview
Estonian National Electoral Committee E-Voting System General Overview Tallinn 2005-2010 Annotation This paper gives an overview of the technical and organisational aspects of the Estonian e-voting system.
More informationOptions for New Jersey s Voter-Verified Paper Record Requirement
Verifiable Elections for New Jersey: What Will It Cost? This document was prepared at the request of the Coalition for Peace Action of New Jersey by VerifiedVoting.org (VVO). VerifiedVoting.org works to
More informationPRINCE WILLIAM COUNTY ELECTORAL BOARD MINUTES September 5, 2014
PRINCE WILLIAM COUNTY ELECTORAL BOARD MINUTES September 5, 2014 CALL TO ORDER The Prince William County Electoral Board met on September 5, 2014, at 2:00 pm in the Office of the General Registrar. Attending
More informationIRMO CHAPIN RECREATION COMMISSION COMMISSION MEETING WORK SESSION MINUTES Seven Oaks Park January 25, :30p.m.
III. COMMISSION MEETING WORK SESSION MINUTES 6:30p.m. Members Attending: John Sowards, Bill Harmon, Tim Stewart, Emily Shuman, Bruce Loveless Non-members Attending: Elizabeth Taylor, Eve Mittendorf Elizabeth
More informationPhoenix Transportation 2050 (T2050) Update
Phoenix Transportation 2050 (T2050) Update Transportation Coordinator (TC) Webinar October 26, 2016 ShareTheRide.com 602.262.RIDE (7433) To hear us, turn up speakers or headset volume. Your microphone
More informationRegular Meeting of the Board of Directors Tillicum Homeowner s Association Tuesday, August 27 th, 2013, 19:00
www.winslowcreek.com 465 Winslow Way, # 317 Bainbridge Island, WA 98110 WASHINGTON STATE UBI: 602212665 Regular Meeting of the Board of Directors Tillicum Homeowner s Association Tuesday, August 27 th,
More informationDM-Ice. A direct detection experiment for dark matter at the South Pole
DM-Ice A direct detection experiment for dark matter at the South Pole Reina Maruyama on behalf of the DM-Ice Collaboration University of Wisconsin - Madison UCLA Dark Matter 2012 February 22-24, 2012
More informationMINUTES. Members Present: Iris Kiesling, Mark Kruzan, Cheryl Munson, Steve Volan
MINUTES Monroe County Solid Waste Management District Board of Directors Nat U. Hill III Meeting Room, Monroe County Courthouse Bloomington, Indiana Thursday, October 9th, 2014 4:00 p.m. Members Present:
More informationUpdate on Oil & Gas Regulatory Framework
Update on Oil & Gas Regulatory Framework February 4, 2014 Presented by: North Carolina Mining & Energy Commission 1 Civil Penalty Remissions Committee NC Mining & Energy Commission RRC NCGA Mining Committee
More informationRemote Support Terms of Service Agreement Version 1.0 / Revised March 29, 2013
IMPORTANT - PLEASE REVIEW CAREFULLY. By using Ignite Media Group Inc., DBA Cyber Medic's online or telephone technical support and solutions you are subject to this Agreement. Our Service is offered to
More informationICCES Oversight Committee Minutes of Meeting
ICCES Oversight Committee Minutes of Meeting Facilitator: Jared Pedersen Date: 05/13/2011 Location: Grandview Arvada, CO Attendees: Jared Pedersen, ICCES Manager; Bob Roper CIO; Rita Trujillo Denver County
More informationRegular Council Meeting Tuesday, May 17, Main St. - City Hall Frankfort, Michigan (231)
Regular Council Meeting Tuesday, 412 Main St. - City Hall Frankfort, Michigan 49635 (231) 352-7117 Meeting was called to order by Mayor Johnson at 5:30 p.m. Pledge of Allegiance Roll Call Present: Condon,
More informationReference services are provided through in-person visits, by telephone, via , through chat and by regular mail correspondence.
Summary The provides reference assistance to the Judiciary (judges, law clerks, administrative staff), the bar, and the public. The public includes self-represented litigants (SRLs), students, legal researchers,
More informationUniversity of California, Santa Cruz Request for Interest (RFI) Café Operator for the UC Santa Cruz McHenry Library Global Village Café
University of California, Santa Cruz Request for Interest (RFI) Café Operator for the UC Santa Cruz McHenry Library Global Village Café Issuance Date: Monday, September 27, 2010 Due Date: Monday, October
More informationPYC BOARD RESPONSIBILITIES AND JOB DESCRIPTIONS 3/22/2018
PYC BOARD RESPONSIBILITIES AND JOB DESCRIPTIONS 3/22/2018 All Board Members Prepare annual projected budget Present monthly reports on activities under your control at board meeting Authorize and present
More informationMiddlesex Public Library 1300 Mountain Avenue Middlesex, NJ Minutes of Board of Trustees Meeting on July 30, 2018
Middlesex Public Library 1300 Mountain Avenue Middlesex, NJ 08846 Minutes of Board of Trustees Meeting on July 30, 2018 Call to Order The regular meeting of the Middlesex Library Board of Trustees was
More informationFrequently Asked Questions
Transitioning to UCR reporting Q: What is the process for beginning the transition for each division of court? A: The OSCA will work with up to 20 clerks of court at a time. However, staff is available
More informationOFFICE OF THE PRINCIPAL ACCOUNTANT GENERAL (A&E) - I MADHYA PRADESH, GWALIOR. Notice Inviting Quotation
OFFICE OF THE PRINCIPAL ACCOUNTANT GENERAL (A&E) - I MADHYA PRADESH, GWALIOR Notice Inviting Quotation Sealed quotations are invited for Annual Maintenance Contract of Servers including both hardware and
More informationHopkinsville Public Transportation Advisory Committee Regular Meeting AGENDA
Hopkinsville Public Transportation Advisory Committee Regular Meeting October 18, 2018; 4:30 p.m. Hopkinsville Municipal Center Council Conference Room, 1 st Floor 715 South Virginia Street AGENDA 1. Call
More informationHOUSATONIC RESOURCES RECOVERY AUTHORITY ANNUAL MEETING MINUTES Thursday, June 25, 2015, 10:30 a.m. Room 209, Brookfield Town Hall
HOUSATONIC RESOURCES RECOVERY AUTHORITY ANNUAL MEETING MINUTES Thursday, June 25, 2015, 10:30 a.m. Room 209, Brookfield Town Hall Members or Alternates Present and Voting Others Present: Bethel, Matthew
More informationThe documents listed below were utilized in the development of this Test Report:
1 Introduction The purpose of this Test Report is to document the procedures that Pro V&V, Inc. followed to perform certification testing of the of the Dominion Voting System D-Suite 5.5-NC to the requirements
More informationREPORT 2016/024 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2016/024 Audit of information and communications technology support provided to the Office of the United Nations High Commissioner for Refugees field operations Overall results
More informationOfficial Minutes of the Oak Park Board of Education District 97, 970 Madison Street, Oak Park, Cook County, Illinois Meeting August 21, 2012
Official Minutes of the Oak Park Board of Education District 97, 970 Madison Street, Oak Park, Cook County, Illinois Meeting August 21, 2012 President Barber called the meeting to order at 6:30 p.m. Present:
More informationHARA Christmas Party Thursday December 6th Trinity Lutheran Church 414 E. Ridge Street Ishpeming. Doors open at 5:00 p.m. Dinner at around 6:15 p.m.
HARA Christmas Party Thursday December 6th Trinity Lutheran Church 414 E. Ridge Street Ishpeming Doors open at 5:00 p.m. Dinner at around 6:15 p.m. Please bring a dish to pass your own beverage tableware
More informationWOODBURY COUNTY, IOWA, CONSERVATION BOARD MINUTES OF THE THURSDAY, JANUARY 5, 2017, BOARD MEETING
WOODBURY COUNTY, IOWA, CONSERVATION BOARD MINUTES OF THE THURSDAY, JANUARY 5, 2017, BOARD MEETING The following is a true copy of the minutes of the meeting of the Woodbury County, Iowa, Conservation Board
More informationPolicy brief ARE WE RECOVERING YET? JOBS AND WAGES IN CALIFORNIA OVER THE PERIOD ARINDRAJIT DUBE, PH.D. Executive Summary AUGUST 31, 2005
Policy brief ARE WE RECOVERING YET? JOBS AND WAGES IN CALIFORNIA OVER THE 2000-2005 PERIOD ARINDRAJIT DUBE, PH.D. AUGUST 31, 2005 Executive Summary This study uses household survey data and payroll data
More informationAmerican Border Patrol 2160 E. Fry Blvd. Sierra Vista, AZ 85635
American Border Patrol 2160 E. Fry Blvd. Sierra Vista, AZ 85635 Ranch - Camp Alan C. Nelson 11615 S. Apache Sky Road Hereford, AZ 85615 1-800-600-8642 www.americanborderpatrol.com OPERATION B.E.E.F. Border
More informationSF Summary of HIPER and Defective PTFs. I B M i P R E V E N T I V E S E R V I C E P L A N N I N G I N F O R M A T I O N
SF98197 Summary of HIPER and Defective PTFs I B M i P R E V E N T I V E S E R V I C E P L A N N I N G I N F O R M A T I O N Copyright IBM Corporation 1993, 2018 - The information in this document was last
More informationRegional School District No. 14 Woodbury/Bethlehem Nonnewaug High School Renovations Project February 27, 2018
Colliers 135 New Road Madison, CT 06443 MAIN +1 860 395 0055 FAX +1 203 779 5661 Regional School District No. 14 Woodbury/Bethlehem Nonnewaug High School Renovations Project February 27, 2018 PBC Attendees:
More informationMinutes of Regular Meeting July 10, 2013
Minutes of Regular Meeting July 10, 2013 PRESENT: Commissioners Murray, Nappi, Daly and Chairman Woehrle. Also Present: Treasurer Splendido, Secretary Versocki, Chief Lingenfelter, Chief Dietrich Attorney
More informationAUSTIN UTILITIES RESIDENTIAL WATER. Schedule (110) Issued 11/13/18 Supersedes (110) Issued 11/14/17 Effective Date: Jan 2019 Sheet No.
RESIDENTIAL WATER Schedule (110) Issued 11/13/18 Supersedes (110) Issued 11/14/17 AVAILABLE: To all residential consumers of water lying within the corporate limits of the City of Austin. SPECIAL CONDITIONS:
More informationRULES AND REGULATIONS
RULES AND REGULATIONS Adherence to the regulations is an integral part of this contract and is a prerequisite to exhibitor participation at the 2017 Nutcracker Market. REMITTANCE OF 10% OF SALES All exhibitors
More informationKey Considerations for Oversight Actors
Implementing and Overseeing Electronic Voting and Counting Technologies Key Considerations for Oversight Actors Lead Authors Ben Goldsmith Holly Ruthrauff This publication is made possible by the generous
More informationABSENT: Pam Buzan Harold Damron MaryJo Seehausen Mike Shay
WILL COUNTY 9-1-1 EMERGENCY TELEPHONE SYSTEM BOARD MEETING MINUTES Thursday, October 25, 2012 9:00 a.m. Will County Office Building **2 nd Floor, County Board Room** 302 N. Chicago Street, Joliet, IL 60432
More informationPERFORMANCE AUDIT REPORT 100-Hour Audit
PERFORMANCE AUDIT REPORT 100-Hour Audit Information Technology Projects: Determining Whether the Chief Information Technology Officer Has Followed All Applicable Approval and Notification Requirements
More informationMINUTES REGULAR SESSION ST. MARY S COUNTY METROPOLITAN COMMISSION JUNE 9, 2011
MINUTES REGULAR SESSION ST. MARY S COUNTY METROPOLITAN COMMISSION JUNE 9, 2011 The meeting commenced at 3:01 p.m. In attendance were Commissioners Werner, St. Clair, Lancaster, Tudor, Colonna, and Hanson;
More informationBAKKEN UPDATE: GAS GATHERING Long Term Challenges
BAKKEN UPDATE: GAS GATHERING Long Term Challenges January 30, 2014 William W Koch - Director Summit Midstream GAS GATHERING: LONG TERM Ø Gathering pipeline issues Ø What are we dealing with Ø It s a Bakken
More informationBOARD OF DIRECTORS REGULAR MEETING MINUTES November 20-1:30 PM 5401 Old Redwood Highway, 1 st Floor Petaluma, CA 94954
BOARD OF DIRECTORS REGULAR MEETING MINUTES November 20-1:30 PM 5401 Old Redwood Highway, 1 st Floor Petaluma, CA 94954 1. Call to Order Chair Arnold called the meeting to order at 1:30 PM. Vice-chair Pahre
More informationTelecommunications (Interception Capability and Security) Bill
Government Bill Explanatory note General policy statement This Bill repeals and replaces the Capability) Act 2004. The main objectives of the Bill are to ensure that the interception obligations imposed
More informationCOMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON MARCH 12, :30 P.M.
COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON MARCH 12, 2018 1:30 P.M. 1. Flag Salute 2. Minutes 3. Vouchers 4. Public Comment 5. Prequalification
More informationCONVENTION ON NUCLEAR SAFETY TEXT
CONVENTION ON NUCLEAR SAFETY TEXT Opened for Signature: 20 September 1994 Entered into Force: 24 October 1996 Duration: The convention does not set any limits on its duration Number of Parties: 67 and
More informationLt. Colonel Deng Kuol Deng Director for Information & Communication Technology Directorate of Nationality, Passports & Immigration Ministry of
Lt. Colonel Deng Kuol Deng Director for Information & Communication Technology Directorate of Nationality, Passports & Immigration Ministry of Interior RSS The Directorate of Nationality, Passports and
More informationNorth Berwick Board of Selectmen's Minutes: June 17, 2008 NORTH BERWICK BOARD OF SELECTMEN MINUTES JUNE 17, 2008
1 North Berwick Board of Selectmen's Minutes: June 17, 2008 NORTH BERWICK BOARD OF SELECTMEN MINUTES JUNE 17, 2008 Present: Chairman Danforth, Selectman Whitten, Selectman Bourbon, and Selectman Drew.
More informationWINCHESTER SCHOOL BOARD WINCHESTER SCHOOL LIBRARY OCTOBER 17, 2013
WINCHESTER SCHOOL BOARD WINCHESTER SCHOOL LIBRARY OCTOBER 17, 2013 Board Members Present: R. Horton, J. Cardinale, E. Jackson, B. McGrath arrived at 6:40 pm. Board Members Absent: T. Croteau Administration
More informationEXECUTIVE CABINET Student Government Association Texas A&M University. The Student Government Association. Mission. The Executive Cabinet.
EXECUTIVE CABINET Student Government Association Texas A&M University The Student Government Association Mission The mission of the Student Government Association is to serve Texas A&M University by representing
More informationpresented motion: Starfeld; second: Bolwerk; carried. The treasurer s report for the fire department was presented to the board.
2314 President Mark Breckheimer called the village board to order at 7 p.m. on Tuesday, November 14, 2017. Roll Call all members reported present. Others present were Mike Loose, Missy Kieso, Dennis &
More informationSewage Disposal ARTICLE II SEWAGE RETAINING TANKS
15 201 Sewage Disposal 15 205 ARTICLE II SEWAGE RETAINING TANKS History: Adopted by the Board of Supervisors of Center Township as Ordinance No. 2006 05 02, as amended by Ordinance No. 2013 08 07, August
More informationMINUTES OF THE KGNU BOARD OF DIRECTORS MEETING Tuesday, September 13, Walnut, Boulder, CO
MINUTES OF THE KGNU BOARD OF DIRECTORS MEETING Tuesday, September 13, 2011 4700 Walnut, Boulder, CO Board Members Present: Barry Gilbert Judy Trompeter Basit Mustafa Chris O'Riley Sam Fuqua Meredith Carson
More information