1 Accomplishments IceCube Project Monthly Report April 2009 Interviews for seasonal driller positions were completed and positions filled. Support and logistical requirements for the Season were submitted via the SIP process. During April 2009, the overall detector uptime was 95.6% and the clean in-ice uptime was 85.7%. Most of the lost clean time was dedicated to further DAQ improvements. The data warehouse enhancements were completed in April. The new improved Production Data and Production Simulation file systems are working well. Detector Commissioning and Verification as well as Online Filters and Triggers, are ready for IceCube 59 string (IC59) data runs. In preparation for moving to the IC59 run the Amanda TWR data system was shut down on April 1st. We are now running in IceCube only mode. As of mid-april we have resolved insufficient data throughput problems and are close to issuing a new DAQ release. Final IC59 test data is being verified by the physics working groups with a plan to transition to IC59 in mid May. North-West side of the Amundsen-Scott South Pole station covered with its winter snow coat, and the Milky-Way in the background. Picture: courtesy of Patrick Cullis

2 Cost and Schedule Performance The project is 90.1% complete versus the plan of 89.9% complete, as measured using earned value techniques. Remaining contingency is $7.0M and the contingency as a percentage of remaining work is 26.4%. The contingency continues to be carefully managed to ensure the successful completion of the MREFC project. Page 2

3 The schedule variance at the end of March 2009 is a favorable $385K (last month was $350K). The variance is related to RPSC s schedule performance during the FY08/09 Pole Season. The earned value cost variance at the end of March 2009 is a favorable $1,758K (was $1,559K last month). RPSC positive cost variance of $992K (last month was $913K), is due to lower than planned labor and On-Ice support charges in FY2008 and in FY2009. The $498K favorable cost variance in Implementation (last month was $475K) is the result of lower training costs and a labor ramp down ahead of schedule. Contingency Status and Plans during the month of March 2009, the total Remaining Contingency has been decreased from $7.3M to $7.0M after implementing Change Request IC0142. Total Contingency % of the cost-to-go has been slightly decreased from 26.8% to 26.4%. Description Date Approved Total Baseline Allocated Budget Allocated Budget Change Contingency Budget Budgeted Cost of Work Remaining Contingency % of Remaining Work Status as of December , , ,773 29, % CR 0138 Request to procure Iridium Modem, 02/04/09 275, , ,653 Disc Array and perform a CPU Upgrade CR 0139 Request to procure 3 additional 02/04/09 275, , ,492 Disc Arrays CR 0140 Add effort to correct Pole data and 02/25/09 275, , ,327 reprocess taped data CR 0141 Procure a Disc Array for PSU 02/25/09 275, , ,321 Status as of January , , ,321 28, % Status as of February , , ,321 27, % IC0142 Add NPX SE effort to /01/09 275, , ,022 Status as of March , , ,022 26, % During the 4 th quarter of Project Year 7 (January 2009 March 2009), the contingency percentage of remaining work increased slightly from 26.3% to 26.4%. Page 3

4 Item Risk Assessment & Potential Contingency Adjustments 1. Contingency likely to be required to mitigate technical, cost and schedule risks associated with the approved scope of work. Risk assessments are made at WBS-Level 4 to determine the value of the risk exposure as a percent of the cost of work remaining. 2. Pre-Operations for additional capacity enhancements to the data storage and network systems both at the South Pole and in the Northern Hemisphere, and for extending software development efforts. 3. RPSC FY08-FY11 Baseline Re-Plan including the FY08 Closeout (-$600K) and FY10 Fuel cost savings (-$400K). 4. Cost of the limited amount of remaining instrumentation for an 86-string detector, 80 strings from the original proposal plus the six deep core strings financed by European partners. The additional instrumentation is 5 surface-to-dom cables and ~100 DOMs Estimate ($K) $2,097K $1,000K -$750K $1,350K 5. RPSC estimate of base cost to support the installation of six strings during the 2010/11 drilling season. The current RPSC baseline already includes support for 80 strings. 6. Project Year 7 Closeout for all WBS items excluding RPSC and the ANG. The closeout will return authorized budget to IceCube contingency due to lower drilling training and travel costs and staffing ramping down ahead of plan. 7. The cost to retro IceCube equipment/materials from the South Pole at the end of the project in FY2012. This conservative estimate is based on RPSC's Rev 8 Budget. 8. Potential cost to retain experienced key personnel in PY9 to ensure the success of the last drilling and installation season and the timely completion of the construction project. $1,340K -$300K $1,050K $700K 9. Potential additional Fuel Cost exposure during the last season of drilling (FY2011) $450K Available Contingency as of Mar 31, 2009 Total $6,937K $7,022K GPRA FY09 Mid Year Estimate (U.S. budget only) U.S. Budget At Completion (BAC) $237.4M U.S. Planned Value through FY09 (BCWS) $220.0M Planned Value % Complete of the BAC 92.8% Drill Operation and Installation Procurements and repairs to the Enhanced Hot Water Drill Equipment (EHWD) are underway. The outline for an EHWD documentation and end-ofproject turnover package is complete. Work on fabricating a surface hose-handler and people-mover sled is in process. Additional snowmobiles were procured and retrofitted for the South Pole. Parts for a prototype heater (Sioux) were secured and an installation plan was drafted. Preparation of the Test-Bed at the UW Physical Sciences Laboratory for the off-season training is underway. Interviews for seasonal driller positions were completed and positions filled. All support and logistical requirements for the South Pole Season were finalized and submitted via the SIP process. Page 4

5 Detector Commissioning and Verification Commissioning and verification tasks are complete and the detector is ready for IceCube-59 (IC59) data taking. During recent test runs, verification efforts played an important role in diagnosing problems such as the EMI signals in some newly-deployed modules due to a meteor radar experiment located near IceCube, and finding dropped DOMs. The team is developing a test that compares a known good average waveform for each DOM to the one obtained in the current run. Preparatory to that the team took the first simple step and added a plot of the average waveform for each DOM to the verification-monitoring web page. Long-term studies of IC40 data will begin once IC40 data taking is completed. An initial good run list for IC40 running was released. Data Acquisition Hardware and Software During March 2009 the DAQ development team worked on the Cactus release for IC59. This release will fully support readout of the IceCube detector in Soft Local Coincidence (SLC) mode both for the in-ice and IceTop sub-detectors, and provides special triggering support for the newly deployed DeepCore array. Several performance problems manifested only when the full 59 strings and trigger set were deployed and tested at South Pole with the result that the data throughput was not sufficient to keep up with the IC59 trigger rate (approx 1900 Hz up from 1250 Hz for IC40). As of mid-april we resolved throughput issues and are close to issuing a release of Cactus in order to start the IC59 run. Several test runs were taken with SLC enabled. The data rate is about a factor of two higher than estimated due to a higher than anticipated rate of isolated hits and also due to a miscalculation during estimation which did not properly account for buffer overheads (the technical explanation is given below). We are working on amelioration strategies because the observed data volume (~20 MB/sec event data volume to disk) is problematic for downstream processors. The main contributing factor to the +100% increase in data rate comes from an improper estimate performed in October 2008 with early test data. At that time a single string was taken out of DAQ and run in SLC mode in order to estimate the 2009 run period data rates. Unfortunately, using a single string was not sufficient to demonstrate the additional event volume due to readout of nearly empty strings: the readout of a single string has a buffer header that is approximately 100 bytes. This was a much smaller fraction of the total readout buffer when the detector was operated in HLC mode, which had larger data volume associated with the non-header information in the readout (the hits) because (a) the hits are themselves larger and (b) there were typically many HLC hits in the string. Now, the presence of isolated hits, many of them noise hits, reduces contributions of both (a) and (b) resulting in a relatively large volume of readout header in the event. Page 5

6 IceCube Maintenance and Operations Detector Up Time 95.6% IceCube Clean Run Up-Time not including AMANDA Array 85.7% Unscheduled Downtime 0.6% Events from DAQ 3.25 billion The IceCube detector ran and took data without major issues during April The overall detector uptime was 95.6% and the clean in-ice uptime was 85.7%. Most of the lost clean time was dedicated to further DAQ development and long test runs of the soft local coincidence data collection. As of this writing all known issues with SLC have been solved. Two previously established milestones were completed in time: 1) The end of combined TWR+IceCube operations and the permanent deployment of the new Live experiment control software, and 2) decommissioning of the previous anvil code. Still missing is the transition to full IC59 operation, which is expected to happen in May after the filtered test data taken with IC59 is checked by physics working groups and filter proposers. During an IC59 test run an unusual trigger fluctuation pattern was noticed. Upon more investigation it became clear that some DOM triggering rates were changing over time and that there were unusual waveforms (with sinusoidal oscillations) in a large group of DOMs (approximately 100). These effects were traced within days to the interference from a 10 kw, 46.3 MHz antenna at the South Pole surface (from a Meteor finding experiment called COBRA). To mitigate this issue a DAQ configuration was developed that raised the PMT gains and the absolute value of the discriminator threshold to match. An early version of that configuration was deployed and tested with the antenna in the full power operation mode and also during quiet antenna time. Both runs showed clean behavior. With this configuration in place, the radio antenna is not a roadblock to start IC59 operations. Page 6

7 Data Handling South Pole systems operations in the IceCube Laboratory (ICL) continued through April with systems operating smoothly. There were occasional stops to the IC40 run for test runs in preparation for IC59. The figure below shows the daily satellite data transfer rates. The data warehouse upgrades were completed in March and April. The migration to the new data/exp and data/sim with improved file system performance are working well and production data processing and production simulation are no longer hampered by limited disk space and performance. Online & Offline Filtering, Software & Database The Joint-Event Builder and Processing and Filter server (JEB/PnF) merging of IC40 and Amanda TWR data streams continues at South Pole sending filtered data sets over the satellite. In preparation for moving to the IC59 run the Amanda TWR data system was shut down April 1 st. We are now running in IceCube only mode. There were several issues in deploying the IC59 DAQ system that caused some delays in the IC59 run start. These included higher then expected data rates due to adding the isolated SLC hits, and the discovery of some RF pickups on the DOMs from a nearby experiment at the South Pole. Final IC59 test data was collected at the end of April. The test data is being verified by the physics working groups with a plan to transition from IC40 to IC59 in mid May. The major work in online filtering and software systems was: 1. Continued development of IC59 online filter and triggers (completed in April). 2. Continued work for release of new PnF filter system at start of IC59 run. This will be the final major release of the PnF filter system and will include improved performance capable of running with the full IceCube array, improved monitoring and logging with integration into the IceCube Live system, and more robust process distribution framework for the reconstruction workers. Page 7

8 3. IceTray V3 development work moving forward. This includes work to separate out some core software for sharing with the KM3Net collaboration, which has adopted the IceTray framework for the data analysis system. Offline Level 2 filtering and high level reconstruction of the IC40 data continued to make progress last month. Continued mass production of high-level reconstructions at the IceCube Data Center is going well. Processing of satellite-filtered data for IC40 is going smoothly. Simulation IceSim, IceCube s Monte Carlo simulation program, as such is fairly mature now, and the development has been somewhat limited to improved performance and fine tuning. This task is moving more to the physics groups with the focus of the central project on program maintenance and production running. Education and Outreach IceCube winterovers participated in the 100 Hours of Astronomy's Around the World in 80 Telescopes with a live webcast from the South Pole, on April 4 th. IceCube uploaded text, images, and video to the 100 Hours website. This year marks the 50th anniversary of the signing of the Antarctic Treaty with a celebration in Baltimore, Maryland. IceCube had an exhibit at the Maryland Science Center as part of the events surrounding the Antarctic Treaty Consultative Meeting (ATCM). A team from the University of Delaware attended to talk about Polar Science. On April 4 th, IceCube participated in Science Expeditions, a hands-on open house on the UW campus featuring science research programs and projects. Quality Assurance and Safety The IceCube Quality & Safety Manger will be participating in a design review sponsored by the National Science Foundation and the National Ecological Observatory Network Project (NEON) Project. The monthly reports are posted at IceCube Monthly Reports. Meetings and Events Science Advisory Committee Meeting at UW-Madison May 20 21, 2009 Driller Training at UW-Madison July 25 August 7, 2009 Collaboration Meeting at Humboldt University September 21 25, 2009 Joint Software Meeting with Antares/KM3Net September 25 27, 2009 Page 8

IceCube Project Monthly Report - December 2008

IceCube Project Monthly Report - December 2008 Accomplishments IceCube Project Monthly Report - December 2008 Drilling and string installation at the South Pole is about one week ahead of the schedule. Ten strings were successfully installed by the

More information

Increased drilling efficiency saved approximately 26,000 gallons of fuel.

Increased drilling efficiency saved approximately 26,000 gallons of fuel. IceCube Project Monthly Report January 2010 Accomplishments Drilling and string installation ended ten days early this season with twenty strings installed, including the DeepCore strings. This work was

More information

IceCube Project Monthly Report November 2007

IceCube Project Monthly Report November 2007 Accomplishments IceCube Project Monthly Report November 2007 Completed the commissioning of the IceCube Seasonal Equipment Site in preparations for drilling. Started deep ice drilling on December 5 following

More information

FULL SCALE DOM PRODUCTION DETERMINE FULL DEPLOYMENT RATE DEPLOY INITIAL STRINGS & TANKS COMPLETE EHWD INTEGRATION & TEST

FULL SCALE DOM PRODUCTION DETERMINE FULL DEPLOYMENT RATE DEPLOY INITIAL STRINGS & TANKS COMPLETE EHWD INTEGRATION & TEST IceCube Project Monthly Report - July 2008 Accomplishments The Integrated Master Schedule is currently being revised based upon RPSC support, flight changes and station opening constraints. Currently,

More information

IceCube Project Monthly Report April An IceCube collaboration meeting was held in Madison from April 29 th through May 3 rd.

IceCube Project Monthly Report April An IceCube collaboration meeting was held in Madison from April 29 th through May 3 rd. IceCube Project Monthly Report April 2008 Accomplishments An IceCube collaboration meeting was held in Madison from April 29 th through May 3 rd. Commenced inspection and testing the drill cables that

More information

IceCube Project Monthly Report March DOM production is in progress at the three production sites world-wide and proceeding according to plan.

IceCube Project Monthly Report March DOM production is in progress at the three production sites world-wide and proceeding according to plan. IceCube Project Monthly Report March 2008 Accomplishments 2007/2008 season review and strategic planning meetings held in Madison on March 11 12. Drilling off-ice tasking schedule developed, personnel

More information

IceCube Project Monthly Report - December 2009

IceCube Project Monthly Report - December 2009 Accomplishments IceCube Project Monthly Report - December 2009 Drill camp setup and commissioning was completed three days ahead of the schedule for this season. Deep drilling commenced on 4 December 2009.

More information

Cost and Schedule Performance The project is 81.7% complete versus the plan of 82.2% complete, as measured using earned value techniques.

Cost and Schedule Performance The project is 81.7% complete versus the plan of 82.2% complete, as measured using earned value techniques. IceCube Project Monthly Report February 2008 Accomplishments All on-ice drilling and installation activities were closed after completing the drilling and string deployment of a total of 18 strings. Developed

More information

Nearly all of the cargo needed for this season arrived by December 4 th.

Nearly all of the cargo needed for this season arrived by December 4 th. IceCube Project Monthly Report - November 2008 Accomplishments Completed commissioning of the IceCube Seasonal Equipment Site and started deep ice drilling on December 3 rd, two days ahead of schedule.

More information

IceCube Project Monthly Report - September 2010

IceCube Project Monthly Report - September 2010 IceCube Project Monthly Report - September 2010 Accomplishments 19,000 pounds of repaired equipment, spares, and materials have been shipped to the South Pole. IceCube conducted a successful internal readiness

More information

IceCube Project Monthly Report November 2006

IceCube Project Monthly Report November 2006 IceCube Project Monthly Report November 2006 Accomplishments The first hole of the season, hole #58, commenced with firn drilling on December 11 th (the South Pole is 19 hours ahead of UW) and was completed

More information

IceCube Project Monthly Report - October 2010

IceCube Project Monthly Report - October 2010 DOLLARS IN MILLIONS Accomplishments IceCube Project Monthly Report - October 2010 The first IceCube drillers departed for South Pole in late October to prepare the Seasonal Equipment Site for the upcoming

More information

IceCube Project Baseline

IceCube Project Baseline IceCube Project Monthly Report February 25 Accomplishments Six weeks after the first IceCube string was deployed and two weeks after freeze-in all 6 DOMs are operating and reading data. The 16 IceTop DOMs

More information

IceCube Project Monthly Report December 2005

IceCube Project Monthly Report December 2005 IceCube Project Monthly Report December 2005 Accomplishments The IceCube drill crew completed four holes as of January 13 th. The locations of the four holes are 29, 39, 38, and 30. The drilling start

More information

IceCube Project Monthly Report November 2005

IceCube Project Monthly Report November 2005 IceCube Project Monthly Report November 200 Accomplishments The annual IceCube construction season at the South Pole is underway. The project will conduct work at the South Pole from mid November through

More information

IceCube Project Monthly Report June 2005

IceCube Project Monthly Report June 2005 IceCube Project Monthly Report June 25 Accomplishments All DOMs installed at the South Pole continue to produce physics quality data (6 DOMs in the ice and 16 DOMs in surface tanks). Faculty and students

More information

The IceCube Upgrade Marek Kowalski DESY & Humboldt-University Zeuthen-Meeting in Mainz September 2018

The IceCube Upgrade Marek Kowalski DESY & Humboldt-University Zeuthen-Meeting in Mainz September 2018 The IceCube Upgrade Marek Kowalski DESY & Humboldt-University Zeuthen-Meeting in Mainz September 2018 South Pole 2009!1 The IceCube Upgrade The next step in precision astroparticle physics with IceCube

More information

DM-Ice A Direct Dark Matter Search at the South Pole

DM-Ice A Direct Dark Matter Search at the South Pole DM-Ice A Direct Dark Matter Search at the South Pole Karsten Heeger University of Wisconsin on behalf of the DM-Ice Collaboration Karsten Heeger, Univ. of Wisconsin Alpha Spectra, October 10, 2011 Alpha

More information

Dark Matter Searches with AMANDA and IceCube

Dark Matter Searches with AMANDA and IceCube Dark Matter Searches with AMANDA and IceCube Catherine De Clercq for the IceCube Collaboration Vrije Universiteit Brussel IDM 2008 Overview 1. Neutrinos from WIMP annihilations in Sun and Earth 2. The

More information

DM-Ice A Direct Dark Matter Search at the South Pole

DM-Ice A Direct Dark Matter Search at the South Pole DM-Ice A Direct Dark Matter Search at the South Pole Karsten Heeger University of Wisconsin on behalf of the DM-Ice Collaboration TIPP2011, June 10, 2011 Techniques for Detecting Dark Matter Indirect detection

More information

DM-Ice: A Search for Dark Matter in the Antarctic Ice

DM-Ice: A Search for Dark Matter in the Antarctic Ice DM-Ice: A Search for Dark Matter in the Antarctic Ice University of Wisconsin - Madison Indirect and Direct Detection of Dark Matter Aspen Center for Physics February 6-12, 2011 1 Direct detection of dark

More information

Search for Dark Matter Captured in the Sun with the IceCube Neutrino Observatory

Search for Dark Matter Captured in the Sun with the IceCube Neutrino Observatory Search for Dark Matter Captured in the Sun with the IceCube Neutrino Observatory for the IceCube Collaboration The Oscar Klein Centre for Cosmoparticle Physics, Stockholm University 9th International Conference

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EN EN EN EUROPEAN COMMISSION Brussels, 22.10.2010 COM(2010) 588 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL ON THE DEVELOPMENT OF THE VISA INFORMATION SYSTEM (VIS) IN 2009

More information

for the IceCube Collaboration

for the IceCube Collaboration Hermann Kolanoski Humboldt-Universität zu Berlin and DESY for the IceCube Collaboration ICRC, Aug 11-18, 2011 H.Kolanoski - IceCube Highlights 1 Cosmic Rays and Neutrinos Driving theme: Origin of Cosmic

More information

DM-Ice. A direct detection experiment for dark matter at the South Pole

DM-Ice. A direct detection experiment for dark matter at the South Pole DM-Ice A direct detection experiment for dark matter at the South Pole Reina Maruyama on behalf of the DM-Ice Collaboration University of Wisconsin - Madison UCLA Dark Matter 2012 February 22-24, 2012

More information

StuyPulse Team Charter

StuyPulse Team Charter StuyPulse Team Charter Last updated: 2016 08 29 Mission/Purpose: This is a club designed to promote interest in the study of robotics and STEM through the teamwork of students, parents, mentors, and sponsors.

More information

Amended Technical Indicator Descriptions

Amended Technical Indicator Descriptions Electoral Commission Amended Technical Descriptions Updated For 2017/18 2017/18 ANNUAL PERFORMANCE PLAN Page 1 2018 ANNUAL PERFORMANCE PLAN Technical indicator descriptions Programme 1: Administration

More information

Global Conditions (applies to all components):

Global Conditions (applies to all components): Conditions for Use ES&S The Testing Board would also recommend the following conditions for use of the voting system. These conditions are required to be in place should the Secretary approve for certification

More information

a GAO GAO HOMELAND SECURITY Performance of Information System to Monitor Foreign Students and Exchange Visitors Has Improved, but Issues Remain

a GAO GAO HOMELAND SECURITY Performance of Information System to Monitor Foreign Students and Exchange Visitors Has Improved, but Issues Remain GAO United States General Accounting Office Report to Congressional Committees June 2004 HOMELAND SECURITY Performance of Information System to Monitor Foreign Students and Exchange Visitors Has Improved,

More information

Search for Dark. Dark Matter in LHC Era Kolkata 2011

Search for Dark. Dark Matter in LHC Era Kolkata 2011 Search for Dark Matter with IceCube Catherine De Clercq for the IceCube Collaboration Vij Vrije Universiteit i i Brussel w3.iihe.ac.be Dark Matter in LHC Era Kolkata 2011 Outline Weakly Interacting Massive

More information

Special Report - Senate FY 2012 Department of Homeland Security Appropriations and California Implications - October 2011

Special Report - Senate FY 2012 Department of Homeland Security Appropriations and California Implications - October 2011 THE CALIFORNIA INSTITUTE FOR FEDERAL POLICY RESEARCH 1608 Rhode Island Avenue, NW, Suite 213, Washington, D.C. 20036 202-785-5456 fax:202-223-2330 e-mail: sullivan@calinst.org web: http://www.calinst.org

More information

Key Considerations for Implementing Bodies and Oversight Actors

Key Considerations for Implementing Bodies and Oversight Actors Implementing and Overseeing Electronic Voting and Counting Technologies Key Considerations for Implementing Bodies and Oversight Actors Lead Authors Ben Goldsmith Holly Ruthrauff This publication is made

More information

REPORT 2016/024 INTERNAL AUDIT DIVISION

REPORT 2016/024 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2016/024 Audit of information and communications technology support provided to the Office of the United Nations High Commissioner for Refugees field operations Overall results

More information

Key Considerations for Oversight Actors

Key Considerations for Oversight Actors Implementing and Overseeing Electronic Voting and Counting Technologies Key Considerations for Oversight Actors Lead Authors Ben Goldsmith Holly Ruthrauff This publication is made possible by the generous

More information

ENGLISH. Commercial Cardiovascular. Equipment Warranty

ENGLISH. Commercial Cardiovascular. Equipment Warranty ENGLISH Commercial Cardiovascular Equipment Warranty Commercial Cardiovascular Equipment Warranty PLEASE READ THESE WARRANTY TERMS AND CONDITIONS CAREFULLY BEFORE USING YOUR PRECOR INCORPORATED PRODUCT.

More information

Hon Hai Precision Industry Co., Ltd. Articles of Incorporation Chapter I General Provisions

Hon Hai Precision Industry Co., Ltd. Articles of Incorporation Chapter I General Provisions Hon Hai Precision Industry Co., Ltd. Articles of Incorporation Chapter I General Provisions Article 1 Article 2 The Company, organized under the Company Act as a Company limited by shares, and shall be

More information

BOARD OF ELECTIONS: REGISTRATION

BOARD OF ELECTIONS: REGISTRATION Case 1:13-cv-00660-TDS-JEP Document 118-6 Filed 05/19/14 Page 1 of 9 NORTH CAROLINA STATE BOARD OF ELECTIONS: REPORT ON SAME DAY REGISTRATION QUAM 3/31/2009 Experiences in the 2008 Primary General Election

More information

The documents listed below were utilized in the development of this Test Report:

The documents listed below were utilized in the development of this Test Report: 1 Introduction The purpose of this Test Report is to document the procedures that Pro V&V, Inc. followed to perform certification testing of the of the Dominion Voting System D-Suite 5.5-NC to the requirements

More information

Office of the Commissioner of Lobbying of Canada

Office of the Commissioner of Lobbying of Canada Office of the Commissioner of Lobbying of Canada 2013-14 Report on Plans and Priorities The Honourable Tony Clement, PC, MP President of the Treasury Board Table of Contents Message from the Commissioner

More information

DIRECTOR S REPORT TRANSPORTATION BOARD DECEMBER 11, 2017

DIRECTOR S REPORT TRANSPORTATION BOARD DECEMBER 11, 2017 DIRECTOR S REPORT TRANSPORTATION BOARD DECEMBER 11, 2017 1 FEDERAL UPDATE CONTINUING RESOLUTION (SHORT TERM EXTENSION OF FEDERAL FY 18 BUDGET) SET TO EXPIRE ON DECEMBER 8 TH WAS EXTENDED TO DECEMBER 22

More information

The Angola National ID Card

The Angola National ID Card The Angola National ID Card Advanced document security for a widely dispersed population 25 by Uwe Ludwig The Republic of Angola in south-central Africa is bordered by Namibia to the South, the Democratic

More information

Members action as necessary on closed session items. 12 Future agenda items Members 13 Next meeting date Members 14 Adjourn Members

Members action as necessary on closed session items. 12 Future agenda items Members 13 Next meeting date Members 14 Adjourn Members INFORMATION SERVICES COMMITTEE MEETING AGENDA Tuesday, December 6, 2016 at 4:00 p.m. Lower Level Conference Room located in the Pierce County Office Building 412 W. Kinne St., Ellsworth, WI # Action Presenter

More information

Secretary of State Summary of Recommendations - House Historical Funding Levels (Millions)

Secretary of State Summary of Recommendations - House Historical Funding Levels (Millions) Page I-92 Rolando Pablos, Secretary of State Avery Saxe, LBB Analyst Secretary of State Summary of Recommendations - House Historical Funding Levels (Millions) $45.0 $42.1 $40.0 $40.2 Section 1 Method

More information

Security Analysis on an Elementary E-Voting System

Security Analysis on an Elementary E-Voting System 128 Security Analysis on an Elementary E-Voting System Xiangdong Li, Computer Systems Technology, NYC College of Technology, CUNY, Brooklyn, New York, USA Summary E-voting using RFID has many advantages

More information

Volume I Appendix A. Table of Contents

Volume I Appendix A. Table of Contents Volume I, Appendix A Table of Contents Glossary...A-1 i Volume I Appendix A A Glossary Absentee Ballot Acceptance Test Ballot Configuration Ballot Counter Ballot Counting Logic Ballot Format Ballot Image

More information

Case Study. MegaMatcher Accelerator

Case Study. MegaMatcher Accelerator MegaMatcher Accelerator Case Study Venezuela s New Biometric Voter Registration System Based on MegaMatcher biometric technology, the new system enrolls registered voters and verifies identity during local,

More information

ORDINANCE NO. 7,592 N.S. ADDING CHAPTER 2.99 TO THE BERKELEY MUNICIPAL CODE, ACQUISITION AND USE OF SURVEILLANCE TECHNOLOGY

ORDINANCE NO. 7,592 N.S. ADDING CHAPTER 2.99 TO THE BERKELEY MUNICIPAL CODE, ACQUISITION AND USE OF SURVEILLANCE TECHNOLOGY Page 1 of 8 02 ORDINANCE NO. 7,592 N.S. ADDING CHAPTER 2.99 TO THE BERKELEY MUNICIPAL CODE, ACQUISITION AND USE OF SURVEILLANCE TECHNOLOGY BE IT ORDAINED by the Council of the City of Berkeley as follows:

More information

Policy Analysis Report

Policy Analysis Report CITY AND COUNTY OF SAN FRANCISCO BOARD OF SUPERVISORS BUDGET AND LEGISLATIVE ANALYST 1390 Market Street, Suite 1150, San Francisco, CA 94102 (415) 552-9292 FAX (415) 252-0461 Policy Analysis Report To:

More information

Training Calendar ALPHA PARTNERS

Training Calendar ALPHA PARTNERS ALPHA PARTNERS Training Calendar +2348033045484, +2349060008877, +2349060007799, +2349060002727. Ebute-Metta, Yaba Lagos., info@alphapartnerstrainings.com BEST CATEGORIES AWARDS GLOBAL QUALITY Global

More information

Clerk-Recorder-Assessor- Registrar of Voters

Clerk-Recorder-Assessor- Registrar of Voters Clerk-Recorder-Assessor- Registrar of Voters William F. Rousseau, Clerk-Recorder-Assessor Elizabeth Acosta, Chief Deputy Registrar of Voters Michelle Arellano, CAO Administrative Analyst Clerk-Recorder-Assessor-ROV

More information

Immigration Visa Guide for ICT Security Specialist

Immigration Visa Guide for ICT Security Specialist Immigration Visa Guide for ICT Security Specialist A UNIT OF BRAIN DRAIN CONSULTANTS PRIVATE LIMITED Complete Immigration Visa Guide for ICT Security Specialist A2Z Immi Support Services Index 1. An Insight

More information

The CSIRO Astronomy and Space Science Phased Array Feed Development Program

The CSIRO Astronomy and Space Science Phased Array Feed Development Program The CSIRO Astronomy and Space Science Phased Array Feed Development Program Mark Bowen CSIRO Technologies for Radio Astronomy and The SKA PAF AIP 26 August 2016 CSIRO ASTRONOMY AND SPACE SCIENCE Outline

More information

Audit Report. Judiciary. April 2004

Audit Report. Judiciary. April 2004 Audit Report Judiciary April 2004 This report and any related follow-up correspondence are available to the public. Alternate formats may also be requested by contacting the Office of Legislative Audits

More information

Summary of the Full-Year Appropriation Act for the Department of Homeland Security, 2019

Summary of the Full-Year Appropriation Act for the Department of Homeland Security, 2019 The bill provides $55.841 billion in discretionary appropriations for the Department of Homeland Security (DHS), including $6.652 billion for major disaster response and recovery activities and $165 million

More information

Polar Knowledge Canada

Polar Knowledge Canada Polar Knowledge Canada Collaborating for the Future Canada s Polar Agency December 1st, 2016 Kitikmeot Socioeconomic Monitoring Committee Cambridge Bay, Nunavut What is Polar Knowledge Canada? Ø Ø Established

More information

REPORT 2015/142 INTERNAL AUDIT DIVISION

REPORT 2015/142 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/142 Audit of the operations in the Central African Republic for the Office of the United Nations High Commissioner for Refugees Overall results relating to effective

More information

Town of Madawaska, ME. CSO Success Overcoming Funding & Design Challenges

Town of Madawaska, ME. CSO Success Overcoming Funding & Design Challenges Town of Madawaska, ME CSO Success Overcoming Funding & Design Challenges Town of Madawaska - Introduction Madawaska is in rural Aroostook County, Maine Northeastern Most Point In U.S. Population: 4,035

More information

BURLINGTON PUBLIC LIBRARY BOARD OF LIBRARY TRUSTEES DIRECTOR S OFFICE TRUSTEES MEETING November 8, 2018 MINUTES

BURLINGTON PUBLIC LIBRARY BOARD OF LIBRARY TRUSTEES DIRECTOR S OFFICE TRUSTEES MEETING November 8, 2018 MINUTES MEMBERS PRESENT: MEMBERS ABSENT: OTHERS PRESENT: CALL TO ORDER: REVIEW OF : CITIZEN S TIME: FRIENDS: POLICY REVIEW: Robert Neufeld, Kevin Sheehan, Ram Voruganti, Adam Woodbury Steve Wasserman, Ann Way

More information

4 REGISTRATION IN EMERGENCIES

4 REGISTRATION IN EMERGENCIES 4 REGISTRATION IN EMERGENCIES 4.1 OVERVIEW AND FUNCTION Registration of new arrivals is one of UNHCR s primary activities at the onset of an emergency, in addition to identifying and assisting persons

More information

Tonawanda Island Launch Club - Dock Rules revised mar2009 membership approved 11Apr2009

Tonawanda Island Launch Club - Dock Rules revised mar2009 membership approved 11Apr2009 Tonawanda Island Launch Club - Dock Rules revised mar2009 membership approved 11Apr2009 Priority and waiting lists A. Slips will be rented only to active members in good standing. Slip preference will

More information

Overview Purpose of the EU-VIS

Overview Purpose of the EU-VIS Overview Purpose of the EU-VIS The EU-VIS Mission In 2004, faced with the growing problem of visa shopping - people from countries outside Europe s Schengen borderless area shopping around different European

More information

ARCHITECT OF THE CAPITOL

ARCHITECT OF THE CAPITOL ARCHITECT OF THE CAPITOL 2016 PERFORMANCE & ACCOUNTABILITY HIGHLIGHTS SERVE PRESERVE INSPIRE FISCAL YEAR 2016 PERFORMANCE AND ACCOUNTABILITY HIGHLIGHTS An Executive Summary of the AOC s Financial and Performance

More information

DNA Database System Oversight Committee Annual Report

DNA Database System Oversight Committee Annual Report DNA Database System Oversight Committee 2017 Annual Report Contents Page Section 1: Membership of the DNA Database System Oversight 2 Committee Section 2: Chairperson s Statement 3 Section 3: Overview

More information

Information for Immigration Levels, Settlement and Integration Consultation

Information for Immigration Levels, Settlement and Integration Consultation Information for Immigration Levels, Settlement and Integration Consultation 2017 Information for Immigration Levels, Settlement and Integration Consultation Purpose Last year s national effort to resettle

More information

H-2B Seasonal Visa Workshop. Greater Southwest Chapter CMAA January 2019

H-2B Seasonal Visa Workshop. Greater Southwest Chapter CMAA January 2019 H-2B Seasonal Visa Workshop Greater Southwest Chapter CMAA January 2019 About Pabian Law National immigration law firm with focus on private club industry 40 employees spread over 4 states (Massachusetts,

More information

Advisory Council Elections

Advisory Council Elections KairosMessenger Advisory Council Elections The Advisory Council election process is available to persons whose role in Kairos leadership authorizes their access to the election tools in Kairos Messenger.

More information

HILLSIDE PUBLIC LIBRARY BOARD OF TRUSTEES MEETING MINUTES July19, 2017

HILLSIDE PUBLIC LIBRARY BOARD OF TRUSTEES MEETING MINUTES July19, 2017 HILLSIDE PUBLIC LIBRARY BOARD OF TRUSTEES MEETING MINUTES July19, 2017 A. CALL TO ORDER: Gloria Whitaker called the meeting to order at 7:02 p.m. Public comments: Visitors are asked to identify themselves

More information

FY 2008 Technology Fee Proposal

FY 2008 Technology Fee Proposal FY 2008 Technology Fee Proposal Submitting Organization: Major Unit: Department: College of Law Law Library Contact Person: Terrance Manion E-Mail : terrance@gsu.edu Telephone: 404-651-4212 1. Project

More information

Backgrounder. This report finds that immigrants have been hit somewhat harder by the current recession than have nativeborn

Backgrounder. This report finds that immigrants have been hit somewhat harder by the current recession than have nativeborn Backgrounder Center for Immigration Studies May 2009 Trends in Immigrant and Native Employment By Steven A. Camarota and Karen Jensenius This report finds that immigrants have been hit somewhat harder

More information

ORDINANCE NO BE IT FURTHER ENACTED AND ORDAINED by the Mayor and City Council of Laurel, Maryland that

ORDINANCE NO BE IT FURTHER ENACTED AND ORDAINED by the Mayor and City Council of Laurel, Maryland that ORDINANCE NO. 1932 AN ORDINANCE OF THE MAYOR AND CITY COUNCIL OF LAUREL, MD TO AMEND THE CITY OF LAUREL UNIFIED LAND DEVELOPMENT CODE; CHAPTER 20, LAND DEVELOPMENT AND SUBDIVISION, TO ADD ARTICLE VIA,

More information

FOR DISCUSSION PURPOSES ONLY

FOR DISCUSSION PURPOSES ONLY DRAFT WIRELESS COMMUNICATION FACILITIES ORDINANCE FOR FACILITIES COVERED UNDER SECTION 6409(a) OF THE MIDDLE CLASS TAX RELIEF AND JOB CREATION ACT OF 2012 CONTENTS Chapter 18.92 City of Vista, California

More information

This Addendum Number 1 to the above referenced IFB responds to a clarification question asked with the MST response.

This Addendum Number 1 to the above referenced IFB responds to a clarification question asked with the MST response. To: All Interested Parties From: Sandra Amorim Purchasing Manager Monterey-Salinas Transit Re: IFB #19-09 Automatic Passenger Counters Addendum Number 1 This Addendum Number 1 to the above referenced IFB

More information

RAKHINE STATE CLUSTER MONTHLY REVIEW SEPTEMBER OCTOBER 2014

RAKHINE STATE CLUSTER MONTHLY REVIEW SEPTEMBER OCTOBER 2014 Page 1 of 9 RAKHINE STATE CLUSTER MONTHLY REVIEW SEPTEMBER OCTOBER 2014 Produced by: Rakhine Wash Sub Cluster team Organization: UNICEF Location: Sittwe Month: November Re: http://www.themimu.info/emergencies/wash-cluster

More information

ON BEHALF OF THE NATIONAL CONFERENCE OF STATE LEGISLATURES LONG TERM FINANCING OF THE HIGHWAY TRUST FUND

ON BEHALF OF THE NATIONAL CONFERENCE OF STATE LEGISLATURES LONG TERM FINANCING OF THE HIGHWAY TRUST FUND STATEMENT FOR THE RECORD BY DELEGATE SALLY JAMESON, MARYLAND HOUSE OF DELEGATES AND SENATOR CAM WARD, ALABAMA SENATE Co-Chairs of the Natural Resources and Infrastructure Committee, National Conference

More information

Benefits of a Modern Court Case Management System by Richard Slowes, Former Commissioner of Minnesota Supreme Court WHITE PAPER

Benefits of a Modern Court Case Management System by Richard Slowes, Former Commissioner of Minnesota Supreme Court WHITE PAPER Benefits of a Modern Court Case Management System by Richard Slowes, Former Commissioner of Minnesota Supreme Court A well-designed CMS will deliver core functionality that provides meaningful ancillary

More information

IC Chapter 15. Ballot Card and Electronic Voting Systems; Additional Standards and Procedures for Approving System Changes

IC Chapter 15. Ballot Card and Electronic Voting Systems; Additional Standards and Procedures for Approving System Changes IC 3-11-15 Chapter 15. Ballot Card and Electronic Voting Systems; Additional Standards and Procedures for Approving System Changes IC 3-11-15-1 Applicability of chapter Sec. 1. Except as otherwise provided,

More information

NORTHWESTERN UNIVERSITY STAFF ADVISORY COUNCIL CONSTITUTION AND BYLAWS I. PRESIDENT S CHARGE TO NORTHWESTERN UNIVERSITY STAFF ADVISORY COUNCIL

NORTHWESTERN UNIVERSITY STAFF ADVISORY COUNCIL CONSTITUTION AND BYLAWS I. PRESIDENT S CHARGE TO NORTHWESTERN UNIVERSITY STAFF ADVISORY COUNCIL NORTHWESTERN UNIVERSITY STAFF ADVISORY COUNCIL CONSTITUTION AND BYLAWS I. PRESIDENT S CHARGE TO NORTHWESTERN UNIVERSITY STAFF ADVISORY COUNCIL The Northwestern University Staff Advisory Council (NUSAC

More information

IGS Strategic Implementation Plan 2014 Compiled from 2013 Component Reports February 19, 2014

IGS Strategic Implementation Plan 2014 Compiled from 2013 Component Reports February 19, 2014 IGS Strategic Implementation Plan 2014 Compiled from 2013 Component Reports February 19, 2014 As part of an annual strategic implementation planning cycle, at the year-end Governing Board meeting in December,

More information

STANDING DISCOVERY ORDER ON COPYING AND PRODUCTION OF BLOOD TESTING RECORDS

STANDING DISCOVERY ORDER ON COPYING AND PRODUCTION OF BLOOD TESTING RECORDS CAUSE NO. THE STATE OF TEXAS IN THE COUNTY CRIMINAL V. COURT AT LAW NO. MONTGOMERY COUNTY, TEXAS STANDING DISCOVERY ORDER ON COPYING AND PRODUCTION OF BLOOD TESTING RECORDS THE COURT ORDERS the District

More information

TESTIMONY OF SENATOR CURT BRAMBLE PRESIDENT PRO-TEMPORE UTAH STATE LEGISLATURE President-elect, National Conference of State Legislatures

TESTIMONY OF SENATOR CURT BRAMBLE PRESIDENT PRO-TEMPORE UTAH STATE LEGISLATURE President-elect, National Conference of State Legislatures TESTIMONY OF SENATOR CURT BRAMBLE PRESIDENT PRO-TEMPORE UTAH STATE LEGISLATURE President-elect, National Conference of State Legislatures ON BEHALF OF THE NATIONAL CONFERENCE OF STATE LEGISLATURES REGARDING

More information

COUNTY OF SACRAMENTO CALIFORNIA

COUNTY OF SACRAMENTO CALIFORNIA COUNTY OF SACRAMENTO CALIFORNIA For the Agenda of: January 29, 2019 Timed Item: 10:00 AM To: Through: From: Subject: District(s): Board of Supervisors Navdeep S. Gill, County Executive Courtney Bailey-Kanelos,

More information

SUPERIOR COURT OF THE STATE OF CALIFORNIA FOR THE COUNTY OF SACRAMENTO

SUPERIOR COURT OF THE STATE OF CALIFORNIA FOR THE COUNTY OF SACRAMENTO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 SUPERIOR COURT OF THE STATE OF CALIFORNIA DAVID SANTIAGO, individually, and on behalf of all others similarly situated, vs. FOR THE

More information

Welcome the Logistics Officer Association Professional Development Module 3, Show Me the Money. This module was developed by the Robins Air Force

Welcome the Logistics Officer Association Professional Development Module 3, Show Me the Money. This module was developed by the Robins Air Force Welcome the Logistics Officer Association Professional Development Module 3, Show Me the Money. This module was developed by the Robins Air Force Base Middle Georgia Chapter. The purpose of this module

More information

GAINESVILLE-ALACHUA COUNTY REGIONAL AIRPORT AUTHORITY MONTHLY MEETING Highlights Flightline - Conference Room Thursday, May 16, 2002

GAINESVILLE-ALACHUA COUNTY REGIONAL AIRPORT AUTHORITY MONTHLY MEETING Highlights Flightline - Conference Room Thursday, May 16, 2002 GAINESVILLE-ALACHUA COUNTY REGIONAL AIRPORT AUTHORITY MONTHLY MEETING Highlights Flightline - Conference Room Thursday, May 16, 2002 Call to Order by the Chair Chair Bainter called the meeting to order

More information

LIVINGSTON COUNTY BOARD PROPERTY COMMITTEE MINUTES OF AUGUST 3, 2015

LIVINGSTON COUNTY BOARD PROPERTY COMMITTEE MINUTES OF AUGUST 3, 2015 LIVINGSTON COUNTY BOARD PROPERTY COMMITTEE MINUTES OF AUGUST 3, 2015 Committee Chair Mike Ingles called the meeting to order at 6:02 p.m. in the committee meeting room in the Historic Livingston County

More information

DECEMBER 14, 2016 FINAL AGENDA SENIOR CITIZEN AND DISABLED RESIDENT TRANSPORTATION ADVISORY COMMITTEE REPORT (NEXT SCHEDULED REPORT JANUARY 2017)

DECEMBER 14, 2016 FINAL AGENDA SENIOR CITIZEN AND DISABLED RESIDENT TRANSPORTATION ADVISORY COMMITTEE REPORT (NEXT SCHEDULED REPORT JANUARY 2017) NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. REGULARLY SCHEDULED BOARD OF DIRECTORS MEETINGS DECEMBER

More information

ELECTORAL COMMISSION. Annual Performance Plan 2014 Technical Indicator Descriptions

ELECTORAL COMMISSION. Annual Performance Plan 2014 Technical Indicator Descriptions ELECTORAL COMMISSION Annual Performance Plan 2014 Technical Descriptions ELECTORAL COMMISSION Annual Performance Plan 2014 Technical Descriptions The Electoral Commission is pleased to present its technical

More information

LA14-20 STATE OF NEVADA. Performance Audit. Judicial Branch of Government Supreme Court of Nevada. Legislative Auditor Carson City, Nevada

LA14-20 STATE OF NEVADA. Performance Audit. Judicial Branch of Government Supreme Court of Nevada. Legislative Auditor Carson City, Nevada LA14-20 STATE OF NEVADA Performance Audit Judicial Branch of Government Supreme Court of Nevada 2014 Legislative Auditor Carson City, Nevada Audit Highlights Highlights of performance audit report on the

More information

FY 2019 Proposed Budget - General Fund Expenditures. OFFICE OF THE ELECTORAL BOARD AND VOTER REGISTRATION Linda Lindberg, Registrar

FY 2019 Proposed Budget - General Fund Expenditures. OFFICE OF THE ELECTORAL BOARD AND VOTER REGISTRATION Linda Lindberg, Registrar OFFICE OF THE ELECTORAL BOARD AND VOTER REGISTRATION Linda Lindberg, Registrar 2100 CLARENDON BLVD., SUITE 320, ARLINGTON, VA 22201 703-228-3456 voters@arlingtonva.us Our Mission: To maintain an accurate

More information

D. Statement on Internal Control Structure E. Management Summary G. Detailed Audit Findings II. MANAGEMENT'S RESPONSE...

D. Statement on Internal Control Structure E. Management Summary G. Detailed Audit Findings II. MANAGEMENT'S RESPONSE... MANATEE COUNTY CLERK OF THE CIRCUIT COURT INTERNAL AUDIT DIVISION LIBRARY SYSTEM DIVISION A U D I T R E P O R T TABLE OF CONTENTS I. INTERNAL AUDIT REPORT A. Background... 2-3 B. Purpose/Objectives; Scope...

More information

Frequently Asked Questions

Frequently Asked Questions Transitioning to UCR reporting Q: What is the process for beginning the transition for each division of court? A: The OSCA will work with up to 20 clerks of court at a time. However, staff is available

More information

4th International Industrial Supercomputing Workshop Supercomputing for industry and SMEs in the Netherlands

4th International Industrial Supercomputing Workshop Supercomputing for industry and SMEs in the Netherlands 4th International Industrial Supercomputing Workshop Supercomputing for industry and SMEs in the Netherlands Dr. Peter Michielse Deputy Director 1 Agenda q Historical example: oil reservoir simulation

More information

County Clerk s Office Election Division Voting System

County Clerk s Office Election Division Voting System A Performance Audit of the County Clerk s Office Election Division Voting System Report Number 2015-05 August 2015 Office of the Salt Lake County Auditor Executive Summary The Salt Lake County Council

More information

DuPAGE AIRPORT AUTHORITY FINANCE, BUDGET AND AUDIT COMMITTEE WEDNESDAY, SEPTEMBER 24, 2014

DuPAGE AIRPORT AUTHORITY FINANCE, BUDGET AND AUDIT COMMITTEE WEDNESDAY, SEPTEMBER 24, 2014 DuPAGE AIRPORT AUTHORITY FINANCE, BUDGET AND AUDIT COMMITTEE WEDNESDAY, SEPTEMBER 24, 2014 A meeting of the Finance, Budget and Audit Committee of the DuPage Airport Authority Board of Commissioners was

More information

SUPPORT AND UPDATE AGREEMENT ( SUA ) Concerning support and maintenance for IAR Embedded Workbench and IAR visualstate from IAR Systems AB

SUPPORT AND UPDATE AGREEMENT ( SUA ) Concerning support and maintenance for IAR Embedded Workbench and IAR visualstate from IAR Systems AB January 2012 SUPPORT AND UPDATE AGREEMENT ( SUA ) Concerning support and maintenance for IAR Embedded Workbench and IAR visualstate from IAR Systems AB PREAMBLE THIS SUPPORT AND UPDATE AGREEMENT (THE "SUA")

More information

UNIFORM RULES GOVERNING COURT REPORTING AND TRANSCRIPTS

UNIFORM RULES GOVERNING COURT REPORTING AND TRANSCRIPTS Additions are shown in bold and are underlined. Deletions are shown in bold and are [bracketed]. UNIFORM RULES GOVERNING COURT REPORTING AND TRANSCRIPTS Rule 4001. Scope of Rules and Policy (B) These rules

More information

Last month, the federal Bureau of Labor Statistics (BLS), reporting on national

Last month, the federal Bureau of Labor Statistics (BLS), reporting on national WISCONSIN S MISSING 64,000 JOBS THE WALKER RECORD SO FAR May 2012 Last month, the federal Bureau of Labor Statistics (BLS), reporting on national job trends from March 2011 to March 2012, found Wisconsin

More information

AVON ZONING ORDINANCE

AVON ZONING ORDINANCE CHAPTER 1. SECTION 1-1. SECTION 1-2. SECTION 1-3. SECTION 1-4. SECTION 1-5. SECTION 1-6. SECTION 1-7. SECTION 1-8. SECTION 1-9. SECTION 1-10. CHAPTER 2. SECTION 2-1. SECTION 2-2. SECTION 2-3. SECTION 2-4.

More information

OPERATING PROCEDURES of the Design Automation Conference Revised and Approved, August 29, 2016

OPERATING PROCEDURES of the Design Automation Conference Revised and Approved, August 29, 2016 1 2 3 4 5 6 7 8 91. NAME OPERATING PROCEDURES of the Design Automation Conference Revised and Approved, August 29, 2016 10 11 The name of this conference is the ACM/IEEE/Electronic System Design Alliance

More information

Amendment to the Infinite Campus END USER LICENSE AGREEMENT

Amendment to the Infinite Campus END USER LICENSE AGREEMENT Amendment to the Infinite Campus END USER LICENSE AGREEMENT This Amendment to the Infinite Campus End User License Agreement (the Amendment ), is made between Infinite Campus, Inc. a Minnesota corporation

More information