Review of impact of post tsunami reconstruction and rehabilitation of. infrastructure facilities

Size: px
Start display at page:

Download "Review of impact of post tsunami reconstruction and rehabilitation of. infrastructure facilities"

Transcription

1 Review of impact of post tsunami reconstruction and rehabilitation of infrastructure facilities Palliyaguru, RS, Amaratunga, RDG and Haigh, RP Title Authors Type URL Published Date 2006 Review of impact of post tsunami reconstruction and rehabilitation of infrastructure facilities Palliyaguru, RS, Amaratunga, RDG and Haigh, RP Conference or Workshop Item This version is available at: USIR is a digital collection of the research output of the University of Salford. Where copyright permits, full text material held in the repository is made freely available online and can be read, downloaded and copied for non commercial private study or research purposes. Please check the manuscript for any further copyright restrictions. For more information, including our policy and submission procedure, please contact the Repository Team at: usir@salford.ac.uk.

2 COBRA 2006 The construction and building research conference of the Royal Institution of Chartered Surveyors University College London, 7-8 September 2006

3 COBRA 2006 PROCEEDINGS OF THE ANNUAL RESEARCH CONFERENCE OF THE ROYAL INSTITUTION OF CHARTERED SURVEYORS Held on Thursday 7th and Friday 8 th September 2006 at University College London Joint Conference Directors Stephen Brown Stephen Pryke Editor: Elaine Sivyer

4 COBRA 2006 Proceedings published by: The RICS, 12 Great George Street Parliament Square London SW1P 3AD In association with: The Bartlett School University College London, WC1E 7HB RICS, The Bartlett School, UCL and the contributors First published 2006 ISBN:

5 Review of Impact of Post-Tsunami Reconstruction and Rehabilitation on Infrastructure Facilities R. Palliyaguru, D. Amaratunga and R. Haigh Research Institute for the Built and Human Environment, University of Salford, Salford, M5 4WT; On 26 December 2004, an earthquake in the West Coast of Northern Sumatra set off a series of other earthquakes lasting for several hours which resulted in a Tsunami in the Indian Ocean. This led to widespread disaster, particularly in Sri Lanka, India, the Maldives, Indonesia and Thailand, with damage also in Malaysia, Bangladesh, Somalia, the Seychelles and Kenya. Sri Lanka, the pearl of the Indian Ocean, blessed with abundant natural resources, faced one of the worst natural disasters recorded in recent history. The Tsunami struck a relatively thin but long coastal area stretching over 1,000 kilometers - two thirds of the country's coastline. The destructive ocean waves killed more than 35,000 people, displaced nearly 2,500,000 people and destroyed thousands of houses. The overall damage to Sri Lanka is estimated at $1 billion, with a large proportion of losses concentrated in housing, tourism, fisheries and transportation. Development Partners range from private individuals both inside and outside Sri Lanka, to governments and NGOs. Coastal infrastructure, namely roads, railways, power, telecommunications, water supply and fishing ports were also significantly affected. Reactions ranged from immediate assistance to communities and local governments in restarting to function as speedily as possible, to short and long-term assistance in supporting communities to rebuild their infrastructure and housing so that they might again have normal lives and eventually recover from the trauma of the tsunami. As the infrastructure consists primarily of transportation, electric and telecommunications, and water and sewerage facilities that provide services to the public through a network of roads, rails, ports, airports, pipes and lines, the effectiveness of infrastructure systems impact on all economic activities. In this context, this paper aims to analyse the impact of the Tsunami on infrastructure facilities in Sri Lanka and how the post- Tsunami reconstruction process has affected the development of the same. A comprehensive literature review was carried out regarding the Tsunami and its impact on the nation. The infrastructure-related reconstruction and rehabilitation data were obtained from the RADA (Reconstruction And Development Agency, formerly TAFREN) through unstructured interviews conducted among personnel involved in the reconstruction and rehabilitation of infrastructure facilities. Results confirm that after almost one and a half years, the Tsunami rehabilitation process is slow as compared to its start. Keywords: Tsunami, infrastructure, reconstruction, disaster management.

6 INDIAN OCEAN TSUNAMI 2004 OVERVIEW Sri Lanka, the pearl of the Indian Ocean, blessed with abundant natural resources, faced one of the worst natural disasters recorded in recent history. An under-sea quake, measured at 8.9 on the Richter Scale by the Hawaii Seismic Centre, occurred near Sumatra in the early hours of 26 December 2004 and set off a series of waves which devastated parts of India, Bangladesh, Indonesia, Thailand, Malaysia, Sri Lanka, the Maldives, Somalia, the Seychelles, Kenya in the East African Coast. Sri Lanka was one of the countries which suffered the heaviest losses. The percentage of the coastal population affected ranges from about 20% in the southern districts of Galle, Matara and Hambantota, to 80% in the north and east districts of Ampara, Batticaloa, Mullativu and Trincomalee. The overall damage is estimated at $1 billion, with major losses concentrated in the housing, tourism, fisheries and transport sectors (ADB, 2006). Total losses across all sectors are estimated to be about 5% of the GDP of Sri Lanka (ADB, 2006). The largest share of output losses appear to be in the fisheries and tourism sectors due to lost income and production. Many people working in the informal sector who serviced the fisheries, tourism sectors and the coastal communities have lost their homes and livelihoods, causing greater vulnerability to poverty. OVERALL DAMAGES The Tsunami has led to an unprecedented loss of life, also causing severe damage to private and commercial property as well as the productive assets and livelihoods of people in 13 districts. These losses include: 35,322 people were killed, more than 516,150 people were displaced and over two thirds of the island s coastline and outlying 13 districts were affected. Over 6000 are reported missing (United Nations, 2005). An estimated 98,000 houses were damaged or destroyed, leaving approximately 940,000 people with no homes to return to (United Nations, 2005). 65% of the room capacity in the hotel sector has been affected, with all the seaside resorts damaged. The road and rail transport from Colombo to Hambantota in the south and some parts of the Puttalam district were badly damaged. Railway lines required major repairs. Approximately 800km of national roads, together with about 1500km of provincial and local government roads were damaged by the force of the Tsunami, along with 25 bridges and causeways located in the north, east and south of the country. The Tsunami had a devastating effect on the coastal fisheries industry, leaving 16,919 fishing boats lost or destroyed and a further 7,266 damaged. An estimated 1 million fishing nets were also lost. Many of the landing sites around the coast were also seriously damaged. 90% of the fishing crafts were reported to have been damaged, with 100% of the modern sea-going fleet completely destroyed. 10 out of the 12 fisheries harbors were damaged, while 8 were completely destroyed.

7 IMPACT OF THE TSUNAMI ON INFRASTRUCTURE FACILITIES The Tsunami further damaged coastal infrastructure that was already in a seriously debilitated condition due to the recent conflict, maintenance neglect, lack of development investment and the effects of high rainfall and flooding in recent years. Specific impacts on the coastal infrastructure included: Roads: erosion damage occurred on sections of the coastal highway network and a number of bridges were damaged or completely washed away. A total length of approximately 800km of National Road was damaged, together with about 1500km of provincial and local government roads. Railways: sections of track-work, bridges, signalling and communications systems, buildings and some rolling stock were severely damaged on the 160km of coastline between Colombo and Matara. Electricity: the electricity distribution system and service connections suffered damage throughout the Tsunami-affected areas. Water Supply and Sanitation: potable water treatment and reticulation systems suffered damage, and local supply systems - mainly ground water sourced - suffered damage and salt water intrusion. Ports: facilities and vessels were damaged at the ports of Galle, Trincomalee, Kankasanthurai and Point Pedro, and the perimeter wall. Some equipment was also damaged at the Oluwil Port Training Centre. DISASTER MANAGEMENT A precise definition of environmental disaster is difficult. Natural disasters are those elements of the physical environment harmful to Man and caused by forces extraneous to him. Natural disasters have also been seen as acts of god. We tend to overemphasise the surprise factor of a disaster when, in reality, it is now possible to delineate many hazard prone areas and to recognise that common disasters, such as floods, are recurrent events at certain locations. It is clear that risk assessment and risk perception have to be combined in the attempts made by governments and others to reduce environmental disasters. Effective disaster management requires accurate and timely information, which is utilised for a number of vital tasks. Disaster management activities can be grouped into five phases that are related by time and function to all types of emergencies and disasters. These phases are also related to each other, and each involves different types of skills. Planning: activities necessary to analyse and document the possibility of an emergency or disaster and the potential consequences or impacts on life, property and the environment. This includes assessing the hazards, risks, mitigation, preparedness, response and recovery needs. Mitigation: activities that actually eliminate or reduce the probability of a disaster; for example, an arms build-up to deter enemy attack, or legislation that requires stringent building codes in earthquake prone areas. It also includes long-term activities designed to reduce the effects of unavoidable disasters; for example, land use management, establishing comprehensive emergency management programs and so forth.

8 Preparedness: activities necessary to the extent that mitigation measures have not, nor cannot prevent disasters. In the preparedness phase, governments, organisations and individuals develop plans to save lives and minimise disaster damage; for example, compiling state resource inventories, mounting training exercises, installing early warning systems and preparing predetermined emergency response forces. Preparedness measures also seek to enhance disaster response operations. Response: activities following an emergency or disaster. These activities are designed to provide emergency assistance for victims. They also seek to stabilize the situation, reduce the probability of secondary damage and speed up recovery operations. Recovery: activities necessary to return all systems to normal or better. They include two sets of activities: Short-term recovery activities return vital life support systems to minimum operating standards. Long-term recovery activities may continue for a number of years after a disaster. Their purpose is to return life to normal or improved levels; for example, redevelopment loans, legal assistance, community planning and the reconstruction of infrastructure facilities. DISASTER MANAGEMENT IN TSUNAMI RECONSTRUCTION Immediately after the Tsunami, positive collective actions were taken on a scale never known before. Individuals, small groups, the government, religious institutions, private sector organisations, the media and non-governmental organisations all rushed to reach distraught and desperate fellow citizens. Recognising the seriousness, urgency and magnitude, the government created an institutional mechanism to efficiently coordinate assistance. This mechanism built upon donor delivery of assistance and agreed upon guiding principles for the recovery process; these included transparency and accountability, subsidiary, co-ordination and consultation. In the aftermath of tsunami, the President set up three task forces: 1. Task Force for Rescue and Relief (TAFRER) 2. Task Force for Law and Order and Logistics (TAFLOL) 3. Task Force to Rebuild the Nation (TAFREN) At the national level, the Center for National Operations (CNO) was established under the President to co-ordinate relief operations and to gather and disseminate information. Within two months, the provision of immediate relief was streamlined and the relevant government officers at the national, provincial, local and village levels began to play key roles. The CNO was disbanded in February 2005 when TAFRER and TAFLOL were merged to form TAFOR (Task Force for Relief), with a mandate for looking after the well-being of affected groups. TAFREN was created as the primary institutional mechanism in recovery and reconstruction. TAFREN s role was to co-ordinate, facilitate and assist implementing organisations in co-ordinating donor assistance and fund-raising activities, expediting the procurement process, and enabling implementing agencies through capacity building. Today the TAFREN function as RADA. In September 2005 TAFREN reorganised itself, focusing on four thematic areas:

9 Getting people back into homes. Restoring livelihoods. Health education and protection for all. Upgrade national infrastructure. ANALYSIS OF TSUNAMI RECONSTRUCTION AND REHABILITATION OF INFRASTRUCTURE PROJECTS Naturally, re-housing the people was first on the government s list of priorities, pushing the rehabilitation and reconstruction of the economic infrastructure to second place and thereby affecting the growth potential of the country further. Therefore after attending to emergency repairs, the government has entered into the phase of rehabilitation and reconstruction of national infrastructure in the affected areas, with the support of many development partners. However, although almost all the required funding has been received, in some cases contracts have been awarded and rehabilitation work is in progress, whereas in others contracts have not been finalized. The reconstruction phase is likely to take off from the rehabilitation process and may not be the outcome of a set of well-designed and considered plans. If the reconstruction process goes along these lines, Sri Lanka may loose an opportunity to re-build the devastated portions of the country. However, all indications are that badly laid out settlements with sub-standard housing and inadequate infrastructure will spring up once again this time with government funding rather than foreign aids. Even though immediate rehabilitation has been very successful, the collected information suggests the progress of long-term rehabilitation of infrastructure facilities is slow. ROADS AND BRIDGES The affected roads were repaired and made motorable within two weeks of the Tsunami, while sufficient repairs to bridges / the installation of temporary Baily bridges was implemented to enable the movement of traffic. Long-term development plans for roads and bridges were also introduced and initiated perfectly. The current statuses of the post-tsunami reconstruction of roads and bridges are shown in Tables 1 and 2.

10 Table 1: Rehabilitation and reconstruction status of road network as at 30 April S/NO Name of Road with Route No. Rehab. Work Type District Length of Road (km) Tentative cost (Rs. Mn) Donor Present Status START DATE COMPLETION DATE 1 Rehabilitation of Colombo Galle Hambantota Wellawaya Road (A2) from Katukurunda (Kalutara) to Matara A KA/GA/MA WB Quarries & Crushers are in operation in all 3 contracts. Binder course 30 L.Km in Pck I, 3.2 L.km in Pck II and 2.3 L m in Pck III completed. Clearing drains, culverts are in progress. Sep-05 Mar-07 2 Rehabilitation of Wellawaya to Monaragala to Siyambalanduwa to Karaitivu. C MO/AM WB Pck 9 tender s were closd on and evaluation is in progress. Pck 10 tenders will be closed on Jun-06 Sep-08 3 Rehabilitation of Colombo Galle Hambantota Wellawaya Road (A2) from Matara to Weerawila MA/HA/MO Panegamuwa Debarawewa B HA Tissa Kirinda (B422) HA EC CATB approved PQ list for ICB sent for ADB concurrence and response is awaited. Bid documents submitted for ADB concurrence. Tender documents for LCB Southern sector is under review by TEC. RFP documents for consultancy have been issued to 11 preselected firms. The original submission date needs extension due to subsequent change of scope of civil works. Jun-06 Sep-08 7 Section necessary for emegency repairs in Tsunami affected Region- STAART GA/MA/HA/AM/ BA/TR/ MU/JA _ 1700 JAPAN Works are in progress on 23 items N.H & 31 items Access roads. Estimates are prepared for other items. Total expenditure as at is 78millions. Jan-05 Dec-06 8 Potuvil to Akkaraipattu C EC CATB approved PQ list for ICB sent for ADB concurrence and response is awaited. Bid documents submitted for ADB concurrence. RFP documents for consultancy have been issued to 11 preselected firms. The original submission date needs extension due to subsequent change of scope of civil works. Jun-06 Sep-08 9 Akkaraipattu to Batticaloa (A004) to Thirukkondiyamadu (A15) (junction with A11) B AM/BA JAPAN Loan Agreement was signed in March TEC approved PQ documents, Bid documents and RFP documents were submitted to CATB. Contract Awards are expected by December 2006 Dec-06 Dec Construction of roads from Thrikkondiyadumadu to Verugal to Mutur to Trincomalee Rehabilitation of Allai Kantale Road (B10) including Causeways 6m with shoulder. C BA/TR C TR AFD Consultants have mobilized. PQ documents for Civil Works are being reviewed by the consultants Contract Award is expected by February 2007 Feb-07 Sep Construction of roads from Trincomalee to Pulmoddai C TR Mullaitivu-Mankulam Road (AA034) MU Mullaitivu-Puliyankulam Road (B296) MU C Paranthan- Karachchi-Mullaitivu Road (AA035) MU/KI ADB CATB approved PQ list for ICB sent for ADB concurrence and response is awaited. Bid documents submitted for ADB concurrence. RFP documents for consultancy have been issued to 11 preselected firms. The original submission date needs extension due to subsequent change of scope of civil works. Jun-06 Sep Point-Pedro - Kodikamam (B68) JA Main Scope of Work A B C Repair & pave with Asphaltic Concrete (AC), including small structures Rehabilitate and improve to 2-lane, repave with Asphaltic Concrete (AC), including small structures Rehabilitate and improve to 2-lane, repave with Double Bituminous Surface Treatment (DBST), including small structure (Source: Reconstruction and Development Agency)

11 Table 2: Rehabilitation and reconstruction status of bridges as at 30 April Project Name District Main Item of Work Proposed Estimated Cost ( Rs. Mn ) Funding Arrangements Present Status Start Date Completion Dtae 5 major bridges on A2 Kalutara to Matara at Akurala, Seenigama, Magalla, Goyyapana & Weligama. GA/ MA Reconstruction 650 JAPAN Bye Passes constructed. Foundations under construction.overall progress is 54.5% Aug-05 Dec-06 Arugam Bay Bridge (Including approach roads) AM Reconstruction 600 USAID Consultancy Contract was awarded. Designs will be completed by consultants by Mid May Civil work Contract Award is expected by August Sep-06 Dec-08 Komari bridge and causeway Periakallar Causeway Koddaikallar Causeway Panichankerni bridge AM New Construction 800 Loan Agreement was signed in March Designs Kallady Bridge BA Reconstruction 970 JAPAN are being carried out. Contract Award is expected by Dec-06 Dec-08 December JAPAN Detailed designs completed for Periakallar and Koddaikallar causeways. De-tour constructed and opened for traffic. Coffer dams are under construction. Designs still continue on Komari and Panichanerni bridges. Progress is very slow. Sep-05 Dec-06 Oddaimavadi Bridge BA Reconstruction 1100 SPAIN Funds pledged. Loan Agreement is yet to be signed. Project Committee has submitted the report on Project Plan. Contract Awards are expected by September Sep-06 Dec-08 Verugal Bridge 270 Reconstruction Kayankerny bridge 150 Mutur bridge TR 300 Gangei Bridge including access New Construction 300 AFD Consultancy awarded and designs wil be carrid out by the consultants. Contract Award is expected by September Sep-06 Dec-08 Upparu Bridge including access 400 Irakkandi Bridge (new 2 lane bridge to replace 1 lane bridge) Koduwakattumalai Bridge (currently a ferry) Yan Oya Bridge (currently a ferry) TR New Construction 1190 SPAIN Funds pledged. Loan Agreement is yet to be signed. Project Committee has submitted the report on Project Plan. Contract Awards are expected by September Sep-06 Dec-08 Bridge to replace Kinya Ferry (existing project) TR New Construction 1260 SAUDI Contract awarded in November Contractor has mobilised and commenced works. Nov-05 Feb-08 Mahanama Bridge at Matara Town MA Reconstruction 700 KOICA Designs were completed and work will start by May Consultants have mobilized (Source: Reconstruction and Development Agency) AM - Ampara BA - Batticaloa GA - Galle HA - Hambantota JA - Jaffna KA - Kalutara KI - Kilinochchi MA - Matara MO - Monaragala MU - Mullativu TR - Trincomalee May-06 May-09 FISHERIES The fisheries industry was one of the sectors hit hardest by the Tsunami. In addition to the loss of lives and homes, fishermen also had the additional burden of watching their livelihoods disappear as the gigantic waves tossed their fishing equipment onto rooftops and trees. However, with assistance from the government and local and international donors, the industry is taking tentative steps to return to pre-tsunami conditions. New nets have also been issued to the fishermen by the government and NGOs to enable them to recommence fishing (RADA, 2006). ELECTRICITY The government has planned a three stage approach to rebuilding the power supply. The first phase - costing US$ 25 million - will focus on the installation of electrical distribution systems along the coastal belt. Work on this phase has already begun. At present, 47 substations are once more in operation. Approximately 170km of voltage lines have also been repaired, enabling the restoration of power to 8,580 families. The second stage - costing a further US$ 42 million - envisages further rehabilitation of the damaged electrical distribution system. Donor nations have already pledged funds for this phase. A third stage costing US$ 48 million will provide for the provision of additional transmission and generation of power along the coastal areas (RADA, 2006).

12 WATER SUPPLY All the water supply systems in coastal area which were affected by the Tsunami were fully or partly damaged. The current progress of rehabilitation work regarding the water supply is shown in Table 3. Table 3: District summary resettlement site water supply status progress. Housing Schemes / Units Intermediate Water Supply Solution Permanenant Water Supply Solution District No of Housing Schemes with Donor Commitment No of Housing Schemes Under Implementation Total No of Units No of Housing Schemes with Water Supply % of Housing Schemes Covered with Water Supply No of Housing Schemes with Water Supply Method Identified No of Housing Schemes Water Supply System Implementation is in Progress Design Stage Construction Stage % of Housing Schemes, Water Supply System Implementation is in Progress Design Stage Construction Stage Kalutara % % 4% Galle % % 55% Matara % % 14% Hambantota % % 77% Ampara % % 0% Batticaloa % % 0% Trincomallee % % 0% Mullativu % % 0% Killinochi % % 0% Jaffna % % 0% Gampaha % % 0% Colombo % % 0% (Source: Reconstruction and Development Agency) SANITATION Sanitation was also badly affected by the Tsunami. The immediate rehabilitation needs were fulfilled perfectly, but the long-term sanitary projects are still in progress. CAUSES FOR DELAYS IN RECONSTRUCTION OF INFRASTRUCTURE FACILITIES This section briefly identifies the causes for delays in post tsunami re- construction of infrastructure facilities in Sri Lanka. Equity In Sri Lanka, equity issues have attracted a lot of attention. The government has made an effort to ensure equal access to support for all Tsunami-affected people. Whereas entitlements and allocation are the same, the pace of progress is still slower in the north-east, given capacity gaps, lower levels of economic activity and security constraints and concerns in the un-cleared LTTE areas. (Liberation Tigers of Tamil Eelam is a politico-military separatist organisation that has been waging an at times violent campaign for a separate state comprising the Tamil-majority North and East regions of Sri Lanka). Particular attention has also been paid to equity regarding

13 conflict-affected areas. For example, nearly 5,000 houses have been constructed in 2005, and another 15,000 are planned to be constructed in 2006 with similar standards to Tsunami-affected houses. However, more efforts and resources will be necessary to address the needs of conflict-affected people and international resources for this issue remain limited. Communication barriers Communication between the stakeholders in rehabilitation is also a main factor affecting the reconstruction program. In particular, the lack of communication between LTTE and the Sri Lankan Government has had an immense impact on the people in the north east. Even though the housing in the north east area is almost completely reconstructed, the other infrastructure facilities are still in the procurement stages. Difficulties in establishing legal ownership of affected properties due to lack of documentation The legal ownership of damaged properties still poses a big problem to the reconstruction of the affected areas, as almost all the documentation was destroyed by the tidal waves. The poor capacity of existing organisations in: Disaster preparedness. Handling present tasks. Capacity building with existing human resources. Incorporating the best practices in environmental sustainability. Disaster management. Lack of land Soon after the Tsunami, the government declared a 100/200 metre strip of land as a 'no build zone' along the coastal belt of Sri Lanka. Consequently, the reconstruction and redevelopment phases of the Tsunami devastated areas were lagging behind for want of land beyond the so-called buffer zone, especially in Colombo, Kalutara and Gampaha districts. But later, due to appeals from the public and various other parties, the government decided to revise the 100/200 metre buffer zone with immediate effect to a range of between metres in the Southern Districts and metres in the North East, in order to accommodate special projects and those involved in fisheries related activities. Donors stepping back from investing Some of the donors agreed to invest in Sri Lanka if the peace remains. However, in accordance with the current situation, some of the donors have stepped back from their position and this has resulted in several of the government reconstruction projects being abandoned. Victims of the Tsunami The major obstacle to a speedy and efficient reconstruction process is the fact that the Tsunami killed many members of the public service and the armed services, whilst also destroying the physical infrastructure which housed the service-delivery points of the Government of Sri Lanka. Standard of the construction industry The national construction industry does not have the required number of contractors, equipment, skilled workforce, modern management practices or access to finance

14 needed to maintain the required speed of the post-tsunami reconstruction work. In addition, the cost of construction material is increasing. Procurement delay The government s procurement methods are very lengthy and tedious, which makes the reconstruction process very slow. CONCLUSION A natural disaster will almost certainly strike again in the near future; the problem is that nobody knows exactly when. Logically, it can be expected that at least in principle precautions and remedies will be planned and systemic decisions be made concerning what to do next time. However in reality, up-front planning is often totally absent or, at best, insufficient, and post-disaster decisions are improvised in a rush and in difficult circumstances. After the Tsunami hit Sri Lanka, the Sri Lankan government, recognising the seriousness, urgency and magnitude of the problem coupled with the lack of experience, created an institutional mechanism to efficiently co-ordinate assistance. However, the government s rehabilitation projects are running slowly due to several causes. Currently the disaster management team faces two main challenges in reconstructing the affected area. The first is the unfamiliarity of the event; since there was no awareness of proper disaster management systems, there were lots of errors in past rehabilitation programs. Solving past errors is the main challenge to the disaster management team. The second is the current status of the peace process. A breakdown of the ceasefire agreement between the Government of Sri Lanka and the LTTE has slowed down the reconstruction process and may threaten the security of aid workers. These are the main reasons for the delays in the reconstruction of infrastructure facilities, and now, after almost one and a half years, the post-tsunami rehabilitation process is very slow as compared to its start. REFERENCES United Nations, Office of the Secretary-General s Special Envoy for Tsunami Recovery (2005), Tsunami recovery: taking stock after 12 months, New York. WEBSITE REFERENCES Asian Development Bank (2006), Sri Lanka: Tsunami summary, rationid=guest, viewed 17 June Recoverlanka (2005), Scientific background on the Indian Ocean earthquake and tsunami, viewed 18 June OTHER USEFUL WEBSITES

CHANGING PERCEPTION AND MOVING TOWARDS BUILDING A SAFER SRI LANKA

CHANGING PERCEPTION AND MOVING TOWARDS BUILDING A SAFER SRI LANKA Symposium on Estimating the Recurrence Interval and Behavior in the Indian Ocean via a Survey Tsunami related Sedimentation conducted by National Research Institute for Earth Science and Disaster Prevention(

More information

Disaster Diplomacy: Sri Lanka following the Tsunami Devastation

Disaster Diplomacy: Sri Lanka following the Tsunami Devastation 1 Disaster Diplomacy: Sri Lanka following the Tsunami Devastation The extent of the destruction caused by the Tsunami which struck Sri Lanka on the Boxing Day of 2004 was unimaginable. The Tsunami waves

More information

Sri Lanka after the Indian Ocean tsunami

Sri Lanka after the Indian Ocean tsunami Sri Lanka after the Indian Ocean tsunami Prof. Tissa Vitarana Minister of Science and Technology Sri Lanka 08.09.2006 1 In this presentation.. What happened in Sri Lanka on 26 th December 2004 Effect of

More information

Of the many countries affected by the tsunami of December , our group

Of the many countries affected by the tsunami of December , our group Of the many countries affected by the tsunami of December 26 2004, our group has chosen Sri Lanka as the recipient of our fundraising. Many different agencies are working with the Republic of Sri Lanka

More information

Economic Challenges of Post-Tsunami Reconstruction in Sri Lanka

Economic Challenges of Post-Tsunami Reconstruction in Sri Lanka Economic Challenges of Post-Tsunami Reconstruction in Sri Lanka Dushni Weerakoon Sisira Jayasuriya Nisha Arunatilake Paul Steele August 2007 ADB Institute Discussion Paper No. 75 This study updates and

More information

Memorandum of Understanding ( MOU ) for the Establishment of a Post-Tsunami Operational Management Structure ( P-TOMS )

Memorandum of Understanding ( MOU ) for the Establishment of a Post-Tsunami Operational Management Structure ( P-TOMS ) Memorandum of Understanding ( MOU ) for the Establishment of a Post-Tsunami Operational Management Structure ( P-TOMS ) Preamble WHEREAS the tsunami that struck Sri Lanka on December 26, 2004 (the tsunami

More information

TAMILS REHABILITATION ORGANISATION. Report on Emergency Relief and Rehabilitation for Tsunami Affected Sri Lanka; 26 December, June, 2005

TAMILS REHABILITATION ORGANISATION. Report on Emergency Relief and Rehabilitation for Tsunami Affected Sri Lanka; 26 December, June, 2005 TAMILS REHABILITATION ORGANISATION Report on Emergency Relief and Rehabilitation for Tsunami Affected Sri Lanka; 26 December, 2004 26 June, 2005 Contents Page Introduction 3 Letter from TRO Board of Governors

More information

ILO STRATEGY FOR THE RECONSTRUCTION, REHABILITATION AND RECOVERY OF THE EARTHQUAKE AND TSUNAMI-AFFECTED COUNTRIES IN ASIA

ILO STRATEGY FOR THE RECONSTRUCTION, REHABILITATION AND RECOVERY OF THE EARTHQUAKE AND TSUNAMI-AFFECTED COUNTRIES IN ASIA 1 ILO STRATEGY FOR THE RECONSTRUCTION, REHABILITATION AND RECOVERY OF THE EARTHQUAKE AND TSUNAMI-AFFECTED COUNTRIES IN ASIA THE BACKGROUND The UN Secretary-General described the December 26, 2004 catastrophe

More information

Post tsunami recovery capacity gaps in Sri Lanka

Post tsunami recovery capacity gaps in Sri Lanka Post tsunami recovery capacity gaps in Sri Lanka Kaushal Keraminiyage, Research Institute for the Built and Human Environment, University of Salford (email: k.p.keraminiyage@salford.ac.uk ) Dilanthi Amaratunga,

More information

Japan s Support to the SAARC (Priority Areas and Policies)

Japan s Support to the SAARC (Priority Areas and Policies) Japan s Support to the SAARC (Priority Areas and Policies) April 3, 2007 The Government of Japan attaches great importance to the role of the SAARC in South Asia and will implement the following policies,

More information

General Assembly Economic and Social Council

General Assembly Economic and Social Council United Nations A/61/87 General Assembly Economic and Social Council Distr.: General 26 May 2006 Original: English General Assembly Sixty-first session Item 67 (a) of the preliminary list* Strengthening

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO. Primary Emergency Humanitarian Aid Decision

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO. Primary Emergency Humanitarian Aid Decision EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO PRIMARY EMERGENCY DECISION Primary Emergency Humanitarian Aid Decision 23 02 01 Title: Primary Emergency aid to the victims of the earthquake

More information

UNHCR S RESPONSE TO NEW DISPLACEMENT IN SRI LANKA:

UNHCR S RESPONSE TO NEW DISPLACEMENT IN SRI LANKA: EM UNHCR S RESPONSE TO NEW DISPLACEMENT IN SRI LANKA: September 2006 Overview The security situation in Sri Lanka has deteriorated rapidly, with conflict erupting on three separate fronts across the North

More information

The Indian Ocean Tsunami Preliminary Field Report on Sri Lanka. Social Science Reconnaissance Team Members:

The Indian Ocean Tsunami Preliminary Field Report on Sri Lanka. Social Science Reconnaissance Team Members: The Indian Ocean Tsunami Preliminary Field Report on Sri Lanka Social Science Reconnaissance Team Members: Havidán Rodríguez, Tricia Wachtendorf, James Kendra, Joseph Trainor, and Ram Alagan (ICES) Disaster

More information

General Assembly Economic and Social Council

General Assembly Economic and Social Council United Nations A/62/83 General Assembly Economic and Social Council Distr.: General 21 May 2007 Original: English General Assembly Sixty-second session Item 73 of the preliminary list* Strengthening of

More information

Tsunami Recovery Status Reports

Tsunami Recovery Status Reports Tsunami Recovery Status Reports 27 International Forum on Tsunami and Earthquake International Symposium His Excellency Dr. Kusmayanto Kadiman Minister, Research and Technology, Republic of Indonesia Thank

More information

Community-Based Poverty Monitoring of Tsunami-Affected Areas in Sri-Lanka

Community-Based Poverty Monitoring of Tsunami-Affected Areas in Sri-Lanka CBMS Network Session Paper Community-Based Poverty Monitoring of Tsunami-Affected Areas in Sri-Lanka Siripala Hettige A paper presented during the 5th PEP Research Network General Meeting, June 18-22,

More information

Sri Lanka. Main Objectives. Working Environment. Impact. The Context

Sri Lanka. Main Objectives. Working Environment. Impact. The Context Sri Lanka Main Objectives UNHCR continued to work on behalf of IDPs to improve their access to national protection and humanitarian assistance. After June 2001, UNHCR turned increasingly to specific objectives

More information

Sri Lanka. Main objectives. Working environment. Impact. The context

Sri Lanka. Main objectives. Working environment. Impact. The context Main objectives In 2005, UNHCR aimed to promote and protect the rights of internally displaced persons (IDPs) and returnees, with a special emphasis on traumatized and extremely vulnerable individuals

More information

Project Information Document (PID)

Project Information Document (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name: Region: Project Information Document (PID) Sri Lanka: Puttalam Housing

More information

Disaster Risk Reduction & Regional cooperation Challenges and Opportunities

Disaster Risk Reduction & Regional cooperation Challenges and Opportunities Disaster Risk Reduction & Regional cooperation Challenges and Opportunities Santosh Kumar Prof & Head Policy, planning and Cross cutting Division National Institute of Disaster Management India South

More information

This report was prepared under the guidance of the following Steering Committee appointed by Dr. P.B. Jayasundara, Secretary, Ministry of Finance and

This report was prepared under the guidance of the following Steering Committee appointed by Dr. P.B. Jayasundara, Secretary, Ministry of Finance and This report was prepared under the guidance of the following Steering Committee appointed by Dr. P.B. Jayasundara, Secretary, Ministry of Finance and Planning. Steering Committee - Mr. B. Abeygunawardena

More information

Tabletop Exercise Situation Manual (TTX SitMan)

Tabletop Exercise Situation Manual (TTX SitMan) ASEAN REGIONAL FORUM ARF DISASTER RELIEF EXERCISE 2013 Tabletop Exercise Situation Manual (TTX SitMan) 07 11 May, 2013 Petchaburi, THAILAND For Exercise Use Only Disaster Relief Exercise 2013 (ARF DiREx2013)

More information

REBUILDING INFRASTRUCTURE IN DEVELOPING COUNTRIES: Opportunities and Challenges

REBUILDING INFRASTRUCTURE IN DEVELOPING COUNTRIES: Opportunities and Challenges 84 th Annual Meeting of the Transport Research Board National Academies January 9-13, 2005 Washington, DC REBUILDING INFRASTRUCTURE IN DEVELOPING COUNTRIES: Jelena Pantelic Senior Operations Officer Policy

More information

HUMAN SECURITY REPORT

HUMAN SECURITY REPORT HUMAN SECURITY REPORT June Volume 3, Second Quarter This issue... Covers the period April to June Introduction Taylor Owen in an article titled Human Rights, Human Security and Disarmament has discussed

More information

Lesson Learned from Building Back Aceh & Nias Better. THE ROLE OF INFRASTRUCTURE IN WOMEN s ECONOMIC EMPOWERMENT

Lesson Learned from Building Back Aceh & Nias Better. THE ROLE OF INFRASTRUCTURE IN WOMEN s ECONOMIC EMPOWERMENT Lesson Learned from Building Back Aceh & Nias Better THE ROLE OF INFRASTRUCTURE IN WOMEN s ECONOMIC EMPOWERMENT 0 HALF A MILLION PEOPLE LIVED HERE BEFORE THE 30-FEET HIGH TSUNAMI STRUCK ALMOST EVERYTHING

More information

ActionAid UK Policy Briefing on Responses to the Tsunami Disaster January 7 th 2005

ActionAid UK Policy Briefing on Responses to the Tsunami Disaster January 7 th 2005 ActionAid UK Policy Briefing on Responses to the Tsunami Disaster January 7 th 2005 EMERGENCY RESPONSE The need for a long term approach While meeting immediate needs such as food, clean water and healthcare

More information

Neighbourly Love? Jack Taylor. 72 What Difference Does Writing Make?

Neighbourly Love? Jack Taylor. 72 What Difference Does Writing Make? Jack Taylor BANDA ACEH: A 10-metre wave of unimaginable force tore through much of South-East Asia on Boxing Day 2004, devastating the region. Zainal Abidin was a poor fisherman who tended ponds off the

More information

Sri Lanka. Operational highlights. Working environment. Persons of concern

Sri Lanka. Operational highlights. Working environment. Persons of concern Operational highlights Some 144,600 internally displaced persons (IDPs) returned to their districts of origin in 2011, bringing the total number of returns since 2009 to over 430,000 persons. UNHCR provided

More information

SLI LANKA JAPAN Local Responses for meeting The Tsunami Challenge. Shigenori Asai, Japan Water Forum Rei Asada, JWF Youth Devsiri Fernando, NetWwater

SLI LANKA JAPAN Local Responses for meeting The Tsunami Challenge. Shigenori Asai, Japan Water Forum Rei Asada, JWF Youth Devsiri Fernando, NetWwater SLI LANKA JAPAN Local Responses for meeting The Tsunami Challenge Shigenori Asai, Japan Water Forum Rei Asada, JWF Youth Devsiri Fernando, NetWwater The Great Tsunami following the Sumatra Earthquake on

More information

Final Report. Comprehensive Tsunami Disaster Prevention Training Course

Final Report. Comprehensive Tsunami Disaster Prevention Training Course Final Report Comprehensive Tsunami Disaster Prevention Training Course L.P.Sonkar India Introduction Many of the counties in the world, due to its geographical, topographical and metrological conditions,

More information

Consultancy for Document Review on Status of Affected and Comparable Non-affected Population Before and After the Tsunami in Sri Lanka

Consultancy for Document Review on Status of Affected and Comparable Non-affected Population Before and After the Tsunami in Sri Lanka HPRA Report to UNICEF Consultancy for Document Review on Status of August, 2007 Submitted by Health Policy Research Associates (Pvt) Ltd. 72, Park Street, Colombo 2 Sri Lanka Tel: +94 11 231 4041 / 2 /

More information

Sri Lanka. Operational highlights. Working environment. Persons of concern

Sri Lanka. Operational highlights. Working environment. Persons of concern Operational highlights In 2010, more than 161,000 internally displaced persons (IDPs) returned to their districts of origin in Sri Lanka. UNHCR provided non-food item (NFI) return kits to some 57,600 families

More information

Challenges of Post-disaster Development of Coastal Areas in Sri Lanka 1

Challenges of Post-disaster Development of Coastal Areas in Sri Lanka 1 Challenges of Post-disaster Development of Coastal Areas in Sri Lanka 1 N. Shanmugaratnam 2 (November 2005) The question of post-disaster development of the coastal areas of Sri Lanka takes us to the heart

More information

Palitha Bandara. Sriyani Jayasundara. Ranjan Jayawardana

Palitha Bandara. Sriyani Jayasundara. Ranjan Jayawardana Palitha Bandara Sriyani Jayasundara Ranjan Jayawardana Action Plan on Tsunami Countermeasures Sri Lanka 1.0 Tsunami in Sri Lanka Sri Lanka is an island in the Indian Ocean, located in Southern Asia, Southeast

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO. Humanitarian Aid Decision

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO. Humanitarian Aid Decision EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO Humanitarian Aid Decision 23 02 01 Title: Humanitarian aid in favour of the people affected by the tsunami of 26 December 2004 and subsequent

More information

Mina Aryal Speaking at the Trade and Natural Disaster Symposium Thursday 26 April, Room W, WTO

Mina Aryal Speaking at the Trade and Natural Disaster Symposium Thursday 26 April, Room W, WTO 1 Mina Aryal Speaking at the Trade and Natural Disaster Symposium Thursday 26 April, Room W, WTO ---------------------------------------------------- I am privileged to share with you information on the

More information

INDIA : ORISSA CYCLONE

INDIA : ORISSA CYCLONE INDIA : ORISSA CYCLONE 6 December 1999 appeal no. 28/99 situation report no. 4 period covered: 17th - 26th November 1999 As the full impact of the super cyclone that devastated Orissa one month ago becomes

More information

Tsunami Victims Perceptions of the Proposed Buffer Zone and its Implications in Eastern Sri Lanka

Tsunami Victims Perceptions of the Proposed Buffer Zone and its Implications in Eastern Sri Lanka Tsunami Victims Perceptions of the Proposed Buffer Zone and its Implications in Eastern Sri Lanka N. Shanmugaratnam 1 The government seems to be more interested in enforcing the 200-meter-ban than addressing

More information

Highlights. Situation Overview. 340,000 Affected people. 237,000 Internally displaced. 4,296 Houses damaged. 84 People dead

Highlights. Situation Overview. 340,000 Affected people. 237,000 Internally displaced. 4,296 Houses damaged. 84 People dead Sri Lanka: Floods and landslides Situation Report No. 1 (as of 22 May 2016) This report is produced by OCHA Regional Office for Asia and the Pacific, in collaboration with humanitarian partners. It covers

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Samoa Post Tsunami Reconstruction

More information

What are major important lessons learned from past disasters, including the Great East Japan Earthquake?

What are major important lessons learned from past disasters, including the Great East Japan Earthquake? What are major important lessons learned from past disasters, including the Great East Japan Earthquake? experience from 2004 Indian Ocean Earthquake and Tsunami And Great East Japan Earthquake and Tsunami

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT) 1. Sector Performance, Problems, and Opportunities Road Network Improvement Project (RRP CAM 41123) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT) Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The main modes of transport

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO. Humanitarian Aid Decision

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO. Humanitarian Aid Decision EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO Humanitarian Aid Decision 23 02 01 Title: Recovery assistance to victims of Hurricane Ivan Location of operation: GRENADA Amount of decision:

More information

Tsunami Five-Year Report Q&A

Tsunami Five-Year Report Q&A Tsunami Five-Year Report Q&A Q: How much money was allocated to Tsunami relief? A: In response, the international community provided assistance on an unprecedented scale, with in excess of USD 14 billion

More information

Third year commemoration of the Haiti earthquake: Highlights of EU support to the country

Third year commemoration of the Haiti earthquake: Highlights of EU support to the country Third year commemoration of the Haiti earthquake: Highlights of EU support to the country European Commission Development and Cooperation EuropeAid Website: http://ec.europa.eu/europeaid Contacts : Alexandre

More information

Sri Lanka. Pakistan Myanmar Various Refugees

Sri Lanka. Pakistan Myanmar Various Refugees Sri Lanka The end of the 26-year conflict between Government forces and the separatist Liberation Tigers of Tamil Eelam in May 2009 changed the operational environment in Sri Lanka. The massive displacement

More information

MEMORANDUM THE CENTRE FOR POLICY ALTERNATIVES (CPA) LAND ISSUES ARISING FROM THE ETHNIC CONFLICT AND THE TSUNAMI DISASTER

MEMORANDUM THE CENTRE FOR POLICY ALTERNATIVES (CPA) LAND ISSUES ARISING FROM THE ETHNIC CONFLICT AND THE TSUNAMI DISASTER MEMORANDUM submitted by THE CENTRE FOR POLICY ALTERNATIVES (CPA) on LAND ISSUES ARISING FROM THE ETHNIC CONFLICT AND THE TSUNAMI DISASTER INTRODUCTION The Centre for Policy Alternatives (CPA) has prepared

More information

UPDATE ON THE WORLD BANK RESPONSE TO THE TSUNAMI DISASTER

UPDATE ON THE WORLD BANK RESPONSE TO THE TSUNAMI DISASTER UPDATE ON THE WORLD BANK RESPONSE TO THE TSUNAMI DISASTER APRIL 22, 2005 ABBREVIATIONS AND ACRONYMS AsDB ASEM CAS EDA FMTAAS FY GDP IBRD IDA IMF IPI JSDF LTTE MDTF MIGA NGO PPP PRI PRS SME TA UN Asian

More information

Sri Lanka. Persons of concern

Sri Lanka. Persons of concern As leader of the protection and shelter sectors including non-food items (NFIs) and camp coordination and camp management (CCCM) in Sri Lanka, UNHCR coordinated emergency humanitarian responses and advocacy

More information

General Assembly Economic and Social Council

General Assembly Economic and Social Council United Nations A/63/84 General Assembly Economic and Social Council Distr.: General 13 June 2008 Original: English General Assembly Sixty-third session Item 68 of the preliminary list* Strengthening of

More information

Rebuilding after the tsunami. Christian Aid s report one year on

Rebuilding after the tsunami. Christian Aid s report one year on Rebuilding after the tsunami Christian Aid s report one year on Tim A Hetherington/Panos Pictures The day On the morning of 26 December 2004 when children were playing on the beach and mothers were cooking

More information

CRS Report for Congress

CRS Report for Congress Order Code RS22027 Updated February 16, 2005 CRS Report for Congress Received through the CRS Web Indian Ocean Earthquake and Tsunamis: Food Aid Needs and the U.S. Response Summary Charles E. Hanrahan

More information

Case studies of Cash Transfer Programs (CTP) Sri Lanka, Lebanon and Nepal

Case studies of Cash Transfer Programs (CTP) Sri Lanka, Lebanon and Nepal Case studies of Cash Transfer Programs (CTP) Sri Lanka, Lebanon and Nepal June 2017 Solidar Suisse Humanitarian Aid Unit International Cooperation I. Introduction The nature of humanitarian crises is changing.

More information

After the Tragedy in the Indian Ocean: A time to remember, reflect and recommit.

After the Tragedy in the Indian Ocean: A time to remember, reflect and recommit. After the Tragedy in the Indian Ocean: A time to remember, reflect and recommit. December 2004 through October 2005 TSUNAMI DISASTER UPDATE 2 Overview The world has witnessed a seemingly endless stream

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO. Humanitarian Aid Decision

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO. Humanitarian Aid Decision EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO Humanitarian Aid Decision 23 02 01 Title: Humanitarian aid in favour of the people of Asia affected by the earthquake and the tsunami

More information

SAARC Disaster Management Centre

SAARC Disaster Management Centre SAARC Disaster Management Centre P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre 08-11-2007 South Asia Hazards of nature Largest, youngest and most seismic active mountain system Largest

More information

Sri Lanka Tsunami Recovery Programming and Follow-Up Needs Assessment Mission Report, WFP, May 2005

Sri Lanka Tsunami Recovery Programming and Follow-Up Needs Assessment Mission Report, WFP, May 2005 Sri Lanka Tsunami Recovery Programming and Follow-Up Needs Assessment Mission Report, WFP, May 2005 Mission members: Nicholas Crawford, Emergencies and Transitions, Rome Anette Haller, Needs Assessments,

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map. 1. Sector Performance, Problems, and Opportunities Greater Mekong Subregion Highway Expansion Phase 2 Project (RRP THA 41682) SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The transport sector

More information

BAY OF BENGAL: EARTHQUAKE & TSUNAMI

BAY OF BENGAL: EARTHQUAKE & TSUNAMI BAY OF BENGAL: EARTHQUAKE & TSUNAMI Preliminary Appeal no. 28/2004 26 December 2004 The Federation s mission is to improve the lives of vulnerable people by mobilizing the power of humanity. It is the

More information

FROM DISASTER TO RECONSTRUCTION. A Report on ADB s Response to the Asian Tsunami

FROM DISASTER TO RECONSTRUCTION. A Report on ADB s Response to the Asian Tsunami FROM DISASTER TO RECONSTRUCTION A Report on ADB s Response to the Asian Tsunami 14 December 2005 BANGLADESH I N D I A MYANMAR THAILAND Andaman and Nicobar SRI LANKA Banda Aceh MALAYSIA MALDIVES N INDONESIA

More information

SOUTH/SOUTHEAST ASIA & EAST AFRICA: EARTHQUAKE AND TSUNAMIS

SOUTH/SOUTHEAST ASIA & EAST AFRICA: EARTHQUAKE AND TSUNAMIS SOUTH/SOUTHEAST ASIA & EAST AFRICA: EARTHQUAKE AND TSUNAMIS Fact sheet No. 24 updated 16 June 2006 While construction work is being undertaken in other tsunami-affected countries where the Red Cross and

More information

WFP Somalia SPECIAL OPERATION SO

WFP Somalia SPECIAL OPERATION SO WFP Somalia SPECIAL OPERATION SO 201051 Country: Somalia Type of project: Special Operation Title: Emergency Rehabilitation Work and Capacity strengthening at the Port of Kismayo Total Cost: US$1,579,112

More information

IMPROVING THE INDONESIAN INTERAGENCY RESPONSE TO CRISES

IMPROVING THE INDONESIAN INTERAGENCY RESPONSE TO CRISES USAWC STRATEGY RESEARCH PROJECT IMPROVING THE INDONESIAN INTERAGENCY RESPONSE TO CRISES by Colonel Djarot Budiyanto Indonesian Army Colonel George J. Woods, III Project Adviser The views expressed in this

More information

Year: 2011 Last update: 16/04/2012. HUMANITARIAN IMPLEMENTATION PLAN (HIP) Sri Lanka and Tamil Nadu, India

Year: 2011 Last update: 16/04/2012. HUMANITARIAN IMPLEMENTATION PLAN (HIP) Sri Lanka and Tamil Nadu, India HUMANITARIAN IMPLEMENTATION PLAN (HIP) Sri Lanka and Tamil Nadu, India 0. MAJOR CHANGE SINCE PREVIOUS VERSIONS OF THE HIP In November 2011 a new assessment round was added under section 5.3 of this HIP,

More information

SPECIAL IMMIGRATION MEASURES INTRODUCED BY THE MRCI, IN RESPONSE TO THE TSUNAMI DISASTERS OF DECEMBER 26, 2004

SPECIAL IMMIGRATION MEASURES INTRODUCED BY THE MRCI, IN RESPONSE TO THE TSUNAMI DISASTERS OF DECEMBER 26, 2004 COURTESY TRANSLATION SPECIAL IMMIGRATION MEASURES INTRODUCED BY THE MRCI, IN RESPONSE TO THE TSUNAMI DISASTERS OF DECEMBER 26, 2004 QUESTIONS AND ANSWERS For more information on the following measures,

More information

Sri Lanka. CS 20N April 16, 2007 Mahncy Mehrotra Noelle Pineda

Sri Lanka. CS 20N April 16, 2007 Mahncy Mehrotra Noelle Pineda Sri Lanka CS 20N April 16, 2007 Mahncy Mehrotra Noelle Pineda 1 The Conflict 1920s Tension between Sinhalese majority and Tamil minority 1983 Outbreak of civil war between official government and rebel

More information

Disaster relief emergency fund (DREF) Myanmar: Magway Floods

Disaster relief emergency fund (DREF) Myanmar: Magway Floods Disaster relief emergency fund (DREF) Myanmar: Magway Floods DREF operation n MDRMM005 GLIDE n FL-2011-000167-MMR 3 November 2011 The International Federation of Red Cross and Red Crescent (IFRC) Disaster

More information

Critical analysis of Sri Lanka s economic challenges. Rohan Samarajiva OneText, 14 October 2016

Critical analysis of Sri Lanka s economic challenges. Rohan Samarajiva OneText, 14 October 2016 Critical analysis of Sri Lanka s economic challenges Rohan Samarajiva OneText, 14 October 2016 Problems... Not enough exports.... Young people wanting jobs that the economy is not producing... Getting

More information

Human Rights and Natural Disaster: The Indian Ocean Tsunami. By Hope Lewis

Human Rights and Natural Disaster: The Indian Ocean Tsunami. By Hope Lewis Human Rights and Natural Disaster: The Indian Ocean Tsunami By Hope Lewis Northeastern University School of Law Human Rights, Fall 2006, Vol. 33, No. 4, p. 12-16 Why should we focus on human rights in

More information

From Relief to Recovery

From Relief to Recovery 142 Oxfam Briefing Paper 6 January 2011 From Relief to Recovery Supporting good governance in post-earthquake Haiti www.oxfam.org EMBARGOED UNTIL 00:01 HRS GMT THURSDAY 6 JANUARY 2011 A Haitian man looks

More information

Trust And Networks In Climate Change

Trust And Networks In Climate Change TRUST AND NETWORKS IN CLIMATE CHANGE ADAPTATION STRATEGIES: EXPERIENCE OF ACEH AND YOGYAKARTA IN EARTHQUAKE INTERVENTION Muhammad Ulil Absor School of Demography, Australian National University muhammad.absor@anu.edu.au

More information

Number of samples: 1,000 Q1. Where were you at the occurrence of Tsunami on 26 December, 2004?

Number of samples: 1,000 Q1. Where were you at the occurrence of Tsunami on 26 December, 2004? 2.1 Residents Number of samples: 1,000 Q1. Where were you at the occurrence of Tsunami on 26 December, 2004? No Location of respondent Number Percentage 1 At home 516 51.60 2 In a building other than home

More information

SRI LANKA SRI LANKA 10 TH COUNCIL OF MINISTERS MEETING OF INDIAN OCEAN RIM ASSOCIATION FOR REGIONAL COOPERATION

SRI LANKA SRI LANKA 10 TH COUNCIL OF MINISTERS MEETING OF INDIAN OCEAN RIM ASSOCIATION FOR REGIONAL COOPERATION SRI LANKA SRI LANKA 10 TH COUNCIL OF MINISTERS MEETING OF INDIAN OCEAN RIM ASSOCIATION FOR REGIONAL COOPERATION August 05, 2010 Sana a, Republic of Yemen Statement delivered by Hon. Gitanjana Gunawardena

More information

MOVEMENT OF VANNI IDPS: RELEASE, RETURN and TRANSFERRED DISPLACEMENT November 2009

MOVEMENT OF VANNI IDPS: RELEASE, RETURN and TRANSFERRED DISPLACEMENT November 2009 MOVEMENT OF VANNI IDPS: RELEASE, RETURN and TRANSFERRED DISPLACEMENT November 2009 1. Introduction The release and return of Internally Displaced Persons (IDPs) from the Vanni is a critical humanitarian

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

1/24/2018 Prime Minister s address at Asian Ministerial Conference on Disaster Risk Reduction

1/24/2018 Prime Minister s address at Asian Ministerial Conference on Disaster Risk Reduction Press Information Bureau Government of India Prime Minister's Office 03-November-2016 11:47 IST Prime Minister s address at Asian Ministerial Conference on Disaster Risk Reduction Distinguished dignitaries

More information

Dear Delegates, It is a pleasure to welcome you to the 2014 Montessori Model United Nations Conference.

Dear Delegates, It is a pleasure to welcome you to the 2014 Montessori Model United Nations Conference. Dear Delegates, It is a pleasure to welcome you to the 2014 Montessori Model United Nations Conference. The following pages intend to guide you in the research of the topics that will be debated at MMUN

More information

NPC To Address Rising Religious Tensions

NPC To Address Rising Religious Tensions NPC To Address Rising Religious Tensions NPC has commenced a new project entitled Collective Engagement for Religious Freedom (CERF), aimed at promoting religious freedom within the framework of pluralism

More information

Speech by. The Parliamentary Secretary for Foreign Affairs and Trade The Hon Bruce Billson MP

Speech by. The Parliamentary Secretary for Foreign Affairs and Trade The Hon Bruce Billson MP Speech by The Parliamentary Secretary for Foreign Affairs and Trade The Hon Bruce Billson MP At the International Meeting to Review the Implementation Of the Program of Action for the Sustainable Development

More information

In Nepal, the overall security situation deteriorated

In Nepal, the overall security situation deteriorated Bangladesh India Myanmar Nepal Sri Lanka Major developments In Nepal, the overall security situation deteriorated in 2003 after the resumption of hostilities between the Government forces and the Maoist

More information

Kingdom of Cambodia Nation Religion King National Committee for Disaster Management REPORT ON FLOOD MITIGATION STRATEGY IN CAMBODIA 2004 I. BACKGROUND Cambodia is one of the fourteen countries in Asia

More information

Sri Lanka Waiting to go home - the plight of the internally displaced

Sri Lanka Waiting to go home - the plight of the internally displaced Sri Lanka: Waiting to go home - the plight of the internally displaced GLOSSARY Sri Lanka Waiting to go home - the plight of the internally displaced CATAW Coalition for Assisting Tsunami-Affected Women

More information

Political Essay. Disaster Risk Reduction after the Indian Ocean Tsunami 2004: Built Back Better?

Political Essay. Disaster Risk Reduction after the Indian Ocean Tsunami 2004: Built Back Better? Political Essay Disaster Risk Reduction after the Indian Ocean Tsunami 2004: Built Back Better? Andrea Maria Roth NADEL MAS-Cycle 2010-2012 March 2012 Acronyms BBB BRR CNO DDPM DRM DRR EM-DAT GAM GNP GPP

More information

Situation. Report 7. centres has. declined by. By 18. On 20. closed. persons are returning to. temporary. floods have. found.

Situation. Report 7. centres has. declined by. By 18. On 20. closed. persons are returning to. temporary. floods have. found. Sri Lanka Monsoon Flood Update Situation Report 7 Date: 18 January 2011 Colomboo I. HIGHLIGHTS / KEY PRIORITIES From 13 January the flood waters began to recede and many people have returned to their homes.

More information

Place making for displaced

Place making for displaced Place making for displaced Providing User Friendly Housing Settlements for internally Displaced Persons. Champika W. Senaratne Chartered Architect Central Engineering Consultancy Bureau. Sri Lanka Introduction

More information

Where is the Money? Post-Disaster Foreign Aid Flows. Oscar Becerra University of British Columbia, Vancouver, Canada.

Where is the Money? Post-Disaster Foreign Aid Flows. Oscar Becerra University of British Columbia, Vancouver, Canada. Where is the Money? Post-Disaster Foreign Aid Flows Oscar Becerra University of British Columbia, Vancouver, Canada. Email: orbecerra@gmail.com Eduardo Cavallo Inter-American Development Bank, Washington,

More information

From Survival to Thriving Communities

From Survival to Thriving Communities From Survival to Thriving Communities Two years ago Haiti experienced the worst natural disaster in its history. Hospitals and schools collapsed, bridges fell and homes crumbled. As the dust began to settle,

More information

2-2. Promotion of World tsunami awareness day

2-2. Promotion of World tsunami awareness day BCP targeting local governments and small and medium-sized enterprises Strengthening of local DRR information infrastructure by using cutting-edge technology such as satellite imagery and ICT equipments.

More information

Executive Summary. Facilitating Connectivity in the Bay of Bengal Region. April 11, Dhaka, Bangladesh

Executive Summary. Facilitating Connectivity in the Bay of Bengal Region. April 11, Dhaka, Bangladesh Executive Summary Facilitating Connectivity in the Bay of Bengal Region April 11, 2017 Dhaka, Bangladesh The Bay of Bengal Initiative for Multi-Sectoral Technical and Economic Cooperation(BIMSTEC)comprising

More information

Data challenges and integration of data driven subnational planning

Data challenges and integration of data driven subnational planning Data challenges and integration of data driven subnational planning Thematic Session 1: Risk Informed Development Planning Demystifying the Global Agenda Frameworks into Practice Presented by - Rajesh

More information

The Logistics of Emergency Response: Tsunami versus Haiti

The Logistics of Emergency Response: Tsunami versus Haiti The Logistics of Emergency Response: Tsunami versus Haiti Ramina Samii, OPEC Fund for International Development and Luk N. Van Wassenhove, Academic Director, INSEAD Social Innovation Centre The 2004 Tsunami

More information

TSUNAMI RECONSTRUCTION April 24, Update

TSUNAMI RECONSTRUCTION April 24, Update TSUNAMI RECONSTRUCTION - Update SUMMARY OF MAJOR RECONSTRUCTION PROJECTS UNDERWAY Rehabilitation of 80 km of economically strategic road in Aceh, Indonesia Reconstruction of the 160-meter Arugam Bay Bridge

More information

The Power of. Sri Lankans. For Peace, Justice and Equality

The Power of. Sri Lankans. For Peace, Justice and Equality The Power of Sri Lankans For Peace, Justice and Equality OXFAM IN SRI LANKA STRATEGIC PLAN 2014 2019 The Power of Sri Lankans For Peace, Justice and Equality Contents OUR VISION: A PEACEFUL NATION FREE

More information

Preparing for megadisasters lessons from the Asian tsunami

Preparing for megadisasters lessons from the Asian tsunami Crawford School, ANU Preparing for megadisasters lessons from the Asian tsunami Peter McCawley Visiting Fellow, Indonesia Project Arndt-Corden Economics Division, Crawford School, ANU pmccawley@gmail.com

More information

Vacancy Announcement (VA) No

Vacancy Announcement (VA) No United Nations Human Settlements Programme No.33/9, De Fonseka Place, Colombo 05, Sri Lanka Telephone:011-2055310/11/12 Web: http://www.unhabitat.lk Vacancy Announcement (VA) No 2018-005 POSITION INFORMATION

More information

Socio-Economic Assessment of the Conflict Affected Northern and Eastern Provinces

Socio-Economic Assessment of the Conflict Affected Northern and Eastern Provinces Public Disclosure Authorized. Report No: AUS0000106 Sri Lanka Public Disclosure Authorized. Socio-Economic Assessment of the Conflict Affected Northern and Eastern Provinces April 2018 Public Disclosure

More information

GREENDALE SECONDARY SCHOOL HUMANITIES DEPARTMENT Geography Elective

GREENDALE SECONDARY SCHOOL HUMANITIES DEPARTMENT Geography Elective GREENDALE SECONDARY SCHOOL HUMANITIES DEPARTMENT Geography Elective Name: ( ) Class: Secondary Date: Revision for EOY Exam 2015 - (2) 1 A group of Secondary 4 students conducted an investigation on the

More information

philippines typhoon EMERGENCY UPDATE, FEB. 8, 2014 THREE MONTHS ON

philippines typhoon EMERGENCY UPDATE, FEB. 8, 2014 THREE MONTHS ON WHERE OXFAM IS WORKING Manila Local children fill buckets at a tapstand provided by Oxfam in the city of Tacloban. Jane Beesley / Oxfam On Nov. 8, 2013, Typhoon Haiyan (or Yolanda, as it s known locally)

More information

Tsunami Disaster Situation Report Sri Lanka

Tsunami Disaster Situation Report Sri Lanka Tsunami Disaster Situation Report Sri Lanka Report Number 2 14 January 2005 Jointly published by Tamil Information Centre (UK) Centre for Human Rights and Development (Sri Lanka) Tamil Information Centre

More information