Meeting Minutes GADSTF Event Subgroup Conference Call

Size: px
Start display at page:

Download "Meeting Minutes GADSTF Event Subgroup Conference Call"

Transcription

1 Meeting Minutes GADSTF Event Subgroup Conference Call 10:30 12:00 pm Eastern Conference Call Introduction The meeting began with a welcome by Robin Siewert, Event Subgroup Leader. Mike Curley then acknowledged the NERC Antitrust Guidelines and read the NERC public notice required for all NERC conference calls. The public notice for all NERC conference calls states: Participants are reminded that this conference call is public. The access number was posted on the NERC website and widely distributed. Speakers on the call should keep in mind that the listening audience may include members of the press and representatives of various governmental authorities, in addition to the expected participation by industry stakeholders. Robin briefly went over the agenda (Attachment 1) for today s conference call, including the scope for the events subgroup team (Attachment 2). Our basic task is to determine if reporting of GADS data should be mandatory for all generating units to make the grid more reliable. If the decision is made to make it mandatory, then what part of the events elements should be mandatory? Robin began by polling those on the call as to who does and does not now report their data to NERC. Mike Davis of the Sacramento Municipal Utility District said that they report their data to their balancing authority but not directly to NERC. Dean Ellis of Dynegy stated that they report to their ISO. Howard Ferguson of NextEra Energy said that some report and some do not. Lester Gant at TVA stated that they report for their nuclear and coal fired units, but not presently for their hydro and gas turbines. Robin proposed that if we did make reporting mandatory, that we might want to consider unit size as one of the criteria for reporting. There was a considerable amount of discussion on this matter. One proposal on the size criteria was 20 mva at a 0.85 power factor for a unit or 75 mva at a 0.85 power factor for a plant. Peter Wong, of ISO New England, was the only planner on the call. Peter felt that we need to get down to a lower level, maybe 5

2 MW. Others agreed that small units could be important in voltage support for the grid and that the concept of a minimum size was a good idea. Other discussion centered on the types of units that should be reported to NERC, including coal fired, nuclear, gas turbines, renewables, hydro, diesel, etc. INPO has been invited to come to the meeting in Atlanta, so we would need to find out what their requirements are. When Robin polled the team members on where they would stand in making reporting mandatory, no one was totally opposed to the idea. Albert Hicks of Southern Company, did have some reservations about how it would be handled. Mike Curley of NERC indicated that if the decision was made to make reporting mandatory, that it would probably be implemented under section 1600 of Rules of Procedure (Attachment 3). It is not intended to make this something that is auditable. With an average of 380,000 records per year, NERC depends on the reporters to be the eyes and ears as far as auditing. If reporting does become mandatory, then it would probably be 4-6 months before it is put into place (July 2011), with reporting beginning in January Action Items By the close of business on Friday, September 3, Robin would like everyone to provide their input on whether reporting should be mandatory and if so to what event reporting elements should be mandatory. She will compile this list to have it ready for our next meeting. Mike s staff will work with our group in providing the Doodle tool to help schedule our next two meetings. Adjournment The conference call was adjourned by Robin Siewert. GADS Task Force Events Subgroup Conference Call 2

3 Attendance List Name Company Representing Robin Siewert Brian Hollinghaus Lester Gant Mike Curley Howard Ferguson Lou DeLuca Steve MacDonald Mike Davis Katie Ege Ben Legrange Dean Ellis Peter Wong Matthew Cinadr Albert Hicks E. ON U.S. Electric Power Research Institute Tennessee Valley Authority NERC Staff NextEra Energy FPL Energy Oglethorpe Power Corporation Sacramento Municipal Utility District Great River Energy GE Energy Dynegy ISO New England, Inc. NYSDPS Southern Company Services GADS Task Force Events Subgroup Conference Call 3

4 Meeting Agenda GADSTF Event Subgroup Conference Call 10:30 12:00 p.m. Eastern Dial-In: (866) Access Code: Welcome (Robin Siewert, Event Subgroup Leader) NERC Anti-Trust Guidelines (Mike Curley, NERC Staff) 1. Introduction to the Document Event Subgroup Scope a. Discussion of goals and process to meet time lines b. Sub-Group Deadlines i. Complete all conference call/web meetings by Friday September 17 ii. Complete Report of Event Subgroup to GADSTF by Wednesday September 22 c. Proposed attack on the work i. Discuss purpose ii. Discuss activities from Scope d. Need for Communicating to Entire GADSTF 2. Q&A i. Secretaries of each group will take notes and report the recommendations and findings to all GADSTF members. ii. iii. 3. Next Steps 4. Adjourn Secretaries should review and have the approval of their sub-group before sending the minutes of their calls to the entire GADSTF GADSTF to all members: i. Agree on Next Meeting(s) GADS Task Force Events Subgroup Conference Call 4

5 Generating Availability Data Systems Task Force Wind Team Scope Purpose The Event Sub-group (ES) of the Generating Availability Data System (GADS) Task Force (TF) is tasked with determining how much, if any, of GADS event records should be considered mandatory based upon looking at the reliability of the whole grid. Otherwise, if the decision is to leave event data as voluntary, determine if it is sufficient to meet the needs of the industry. Background GADS has been collected by NERC since Over 11 million outage records have been collected for benchmarking purposes and in support of bulk power system reliability. There are many uses of the data for plant engineers, generating staff members, generation dispatch, system planners, ISO members, transmission, architect engineers (for new generation), government agencies, and others. There are numerous free, public reports issued showing the performance of various types of generating plants (fossil, nuclear, gas turbine, etc.). A similar database of information is now being collected by Transmission (TADS) and it is mandatory. Another database for Demand Response is DADS which is in Phase I of voluntary, but is planned to end with Phase II being mandatory. Whereas data submittal of GADS has been voluntary since inception and about 77% of North American electric Generator Owners (GO) provide GADS data to NERC. Activities Review the uses of GADS data for the following: Has GADS event data been useful in the past? Is it essential now? Is it worth the time, cost, and effort to continue collecting the event data? If there were no GADS, would it be missed? How important is GADS event data to supporting and improving the bulk power system reliability? What is the level of the event data that should or should not be considered mandatory to support the bulk power system reliability? Membership The ES will be comprised of the GADSTF members and Observers that volunteered to help on this sub-group (18 in total plus the assigned NERC staff member). Governance All conference calls and web meetings will be completed by Friday September 17, A report of the ES will be sent to the GADSTF by Wednesday, September 22, The ES will report their recommendations and findings to the GADSTF at the face-to-face GADSTF meeting September 30-October 1, Meetings Conference calls and Web meetings will be used to address focused topics. GADS Task Force Events Subgroup Conference Call 5

6 GADS Task Force Events Subgroup Conference Call 6

7 GADS Task Force Events Subgroup Conference Call 7

8 GADS Task Force Events Subgroup Conference Call 8

9 GADS Task Force Events Subgroup Conference Call 9

10 GADS Task Force Events Subgroup Conference Call 10

11 GADS Task Force Events Subgroup Conference Call 11

Minutes Planning Committee Teleconference/Web Meeting

Minutes Planning Committee Teleconference/Web Meeting Minutes Planning Committee Teleconference/Web Meeting July 11, 2011 9 11a.m. (Eastern) Planning Committee (PC) Chair Jeff Mitchell presided over the meeting. The meeting notice, agenda, and list of attendees

More information

Meeting Notes Project Modifications to CIP Standards Drafting Team Week of January 29, 2018

Meeting Notes Project Modifications to CIP Standards Drafting Team Week of January 29, 2018 Meeting Notes Project 2016-02 Modifications to CIP Standards Drafting Team Week of January 29, 2018 David Revill, Standard Drafting Team (SDT) Chair, called the meeting to order. Mat Bunch reviewed the

More information

Agenda Personnel Certification Governance Committee August 9, :00 a.m. 5:00 p.m. Atlantic August 10, :00 a.m. 5:00 p.m.

Agenda Personnel Certification Governance Committee August 9, :00 a.m. 5:00 p.m. Atlantic August 10, :00 a.m. 5:00 p.m. Agenda Personnel Certification Governance Committee August 9, 2016 8:00 a.m. 5:00 p.m. Atlantic August 10, 2016 8:00 a.m. 5:00 p.m. Atlantic Delta Halifax 1990 Barrington Street Halifax, NS B3J 1P2 Canada

More information

Agenda Standards Committee Process Subcommittee Meeting September 12, :00 5:00 p.m. Pacific

Agenda Standards Committee Process Subcommittee Meeting September 12, :00 5:00 p.m. Pacific Agenda Standards Committee Process Subcommittee Meeting September 12, 2018 1:00 5:00 p.m. Pacific Dial-in: 1-415-655-0002 Access Code: 737 525 345 Meeting Password: 091218 Click here for: Webinar Access

More information

Agenda Standards Committee Process Subcommittee Meeting August 18, :30 3:30 p.m. Eastern

Agenda Standards Committee Process Subcommittee Meeting August 18, :30 3:30 p.m. Eastern Agenda Standards Committee Process Subcommittee Meeting August 18, 2017 1:30 3:30 p.m. Eastern Dial-in: 1-415-655-0002 Access Code: 739 849 179 Meeting Password: 081817 Click here for: Webinar Access Introduction

More information

Agenda Project Management and Oversight Subcommittee (PMOS) December 13, :00 p.m. to 5:00 p.m. Eastern

Agenda Project Management and Oversight Subcommittee (PMOS) December 13, :00 p.m. to 5:00 p.m. Eastern Agenda Project Management and Oversight Subcommittee (PMOS) December 13, 2016 1:00 p.m. to 5:00 p.m. Eastern NERC Atlanta, Georgia Dial-in: 1-866-740-1260 Access Code: 1326651 Security/Passcode: 121316

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting December 6, :00 10:00 a.m. Eastern

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting December 6, :00 10:00 a.m. Eastern Agenda Project Management and Oversight Subcommittee (PMOS) Meeting December 6, 2017 8:00 10:00 a.m. Eastern Dial-in: 1-415-655-0002 Access Code: 739 651 531 Meeting Password: 120617 Click here for: WebEx

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting July 27, 2017 Noon 1:30 p.m. Eastern

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting July 27, 2017 Noon 1:30 p.m. Eastern Agenda Project Management and Oversight Subcommittee (PMOS) Meeting July 27, 2017 Noon 1:30 p.m. Eastern Dial-in: 1-415-655-0002 Access Code: 732 693 226 Meeting Password: 072717 Click here for: WebEx

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting December 12, :00 10:00 a.m. Eastern

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting December 12, :00 10:00 a.m. Eastern Agenda Project Management and Oversight Subcommittee (PMOS) Meeting December 12, 2018 8:00 10:00 a.m. Eastern NERC Headquarters 3353 Peachtree Road N.E. Suite 600 Atlanta, GA 30336 Dial-in: 1-415-655-0002

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR RELIABILITY CORPORATION )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR RELIABILITY CORPORATION ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION NORTH AMERICAN ELECTRIC ) Docket No. RR06-1-000 RELIABILITY CORPORATION ) QUARTERLY REPORT OF THE NORTH AMERICAN ELECTRIC RELIABILITY

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 13, :00 10:00 a.m. Pacific

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 13, :00 10:00 a.m. Pacific Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 13, 2018 8:00 10:00 a.m. Pacific Sacramento Municipal Utility District (SMUD) Rubicon Room 6301 S Street Sacramento, CA 95817

More information

Agenda Project Management and Oversight Subcommittee Conference Call February 13, :00 3:00 p.m. Eastern

Agenda Project Management and Oversight Subcommittee Conference Call February 13, :00 3:00 p.m. Eastern Agenda Project Management and Oversight Subcommittee Conference Call February 13, 2019 1:00 3:00 p.m. Eastern Dial-in: 1-415-655-0002 Access Code: 735 026 077 Meeting Password: 021319 Click here for: WebEx

More information

Agenda Standards Interface Subcommittee (SIS)

Agenda Standards Interface Subcommittee (SIS) Agenda Standards Interface Subcommittee (SIS) 8 a.m. 12 p.m. (local time) Sheraton St. Louis City Center 400 South 14th Street St. Louis, MO 314-231-5007 Welcome NERC Antitrust Guidelines (Attachment 1a)

More information

Meeting Notes Project SOL Standard Drafting Team

Meeting Notes Project SOL Standard Drafting Team Meeting Notes Project 2015-09 SOL Standard Drafting Team February 15, 2017 8:00 a.m. 5:00 p.m. MT February 16, 2017 8:00 a.m. 5:00 p.m. MT February 17, 2017 7:30 a.m. 11:00 a.m. MT Xcel Energy Office 2

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Conference Call January 26, 2017 Noon to 1:30 p.m. Eastern

Agenda Project Management and Oversight Subcommittee (PMOS) Conference Call January 26, 2017 Noon to 1:30 p.m. Eastern Agenda Project Management and Oversight Subcommittee (PMOS) Conference Call January 26, 2017 Noon to 1:30 p.m. Eastern Dial-in: 1-415-655-0002 Access Code 738 640 489 Meeting Password: 012617 Click here

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 13, :00 to 5:00 p.m. Pacific

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 13, :00 to 5:00 p.m. Pacific Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 13, 2016 1:00 to 5:00 p.m. Pacific Dial-in: 1-866-740-2560 Access Code: 1326651 Security/Passcode: 091316 Click here for: Webinar

More information

Rules of Procedure. Effective: May 4, 2016

Rules of Procedure. Effective: May 4, 2016 Rules of Procedure Effective: May 4, 2016 Rules of Procedure of the North American Electric Reliability Corporation TABLE OF CONTENTS SECTION 100 APPLICABILITY OF RULES OF PROCEDURE... 1 SECTION 200 DEFINITIONS

More information

Meeting Notes Project Disturbance Monitoring Standard Drafting Team April 16-19, 2013

Meeting Notes Project Disturbance Monitoring Standard Drafting Team April 16-19, 2013 Meeting Notes Standard Drafting Team April 16-19, 2013 Atlanta, GA Administrative 1. Introductions chair remarks The meeting was brought to order by Lee Pedowicz, chair at 1:00 p.m. ET on Tuesday, April

More information

Approved Meeting Minutes Standards Committee

Approved Meeting Minutes Standards Committee Approved Meeting Minutes Standards Committee April 11, 2012 8-5 p.m. Eastern April 12, 2012 8-3 p.m. Eastern Tampa, FL 1. Administrative Items The Standards Committee (SC) held a meeting on Wednesday,

More information

MEETING AGENDA. MRO Protective Relay Subcommittee. February 16 1:00 p.m. to 5:00 p.m. February 17, :00 a.m. to Noon

MEETING AGENDA. MRO Protective Relay Subcommittee. February 16 1:00 p.m. to 5:00 p.m. February 17, :00 a.m. to Noon MEETING AGENDA MRO Protective Relay Subcommittee February 16 1:00 p.m. to 5:00 p.m. February 17, 2017 8:00 a.m. to Noon MRO Corporate Offices, King Conference Center St. Paul, MN 55102 380 St. Peter Street

More information

ATCT Drafting Team. May 15 17, Meeting Minutes

ATCT Drafting Team. May 15 17, Meeting Minutes May 15 17, 2007 The ATCDT Drafting Team met jointly with the NAESB Business Practices subcommittee on May 17, from 10 a.m. (10:00) EDT to approximately 2:30 p.m. (14:30) EDT. The agenda and attendance

More information

FINAL. New York State Reliability Council (NYSRC) Reliability Rules Subcommittee (RRS) Minutes of Meeting #21

FINAL. New York State Reliability Council (NYSRC) Reliability Rules Subcommittee (RRS) Minutes of Meeting #21 FINAL New York State Reliability Council (NYSRC) Reliability Rules Subcommittee (RRS) Minutes of Meeting #21 RRS Meeting @ Chariot Restaurant, Rt. 20, Guilderland, NY Friday, February 2, 2001 Attendance

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting June 13, :00 10:00 a.m. Eastern

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting June 13, :00 10:00 a.m. Eastern Agenda Project Management and Oversight Subcommittee (PMOS) Meeting June 13, 2018 8:00 10:00 a.m. Eastern Dial-in: 1-415-655-0002 Access Code: 858 128 721 Meeting Password: 061318 Click here for: WebEx

More information

DRAFT. Summary Minutes and Highlights

DRAFT. Summary Minutes and Highlights DRAFT Summary Minutes and Highlights New York State Reliability Council, L.L.C. (NYSRC) Reliability Compliance Monitoring Subcommittee Meeting No. 67 July 7, 2005 NYISO Washington Avenue Extension Offices

More information

Agenda Critical infrastructure Protection Committee

Agenda Critical infrastructure Protection Committee Agenda Critical infrastructure Protection Committee DHS Sponsored Classified Briefing December 14, 2011 8:00 a.m.-noon EST Off-Site December 14, 2011 1:00 p.m. EST to December 15, 2011 12:00 p.m. Westin

More information

Meeting Notes Project 2016-EPR-02 August 11, 2016

Meeting Notes Project 2016-EPR-02 August 11, 2016 Meeting Notes Project 2016-EPR-02 August 11, 2016 Conference Call Administrative 1. Introductions The meeting was brought to order by the Chair S. Solis at 3:00 p.m. Eastern, Thursday, August 11, 2016.

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting October 31, :00 1:30 p.m. Eastern

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting October 31, :00 1:30 p.m. Eastern Agenda Project Management and Oversight Subcommittee (PMOS) Meeting October 31, 2018 12:00 1:30 p.m. Eastern Dial-in: 1-415-655-0002 Access Code: 739 515 504 Meeting Password: 103118 Click here for: WebEx

More information

North American Electric Reliability Corporation (NERC) Rules of Procedure Effective in Manitoba April 1, 2012

North American Electric Reliability Corporation (NERC) Rules of Procedure Effective in Manitoba April 1, 2012 North American Electric Reliability Corporation (NERC) Rules of Procedure Effective in Manitoba April 1, 2012 Contents: Document Title Version with NERC Effective Date Comments NERC Rules of Procedure

More information

Agenda Standards Committee Process Subcommittee Meeting March 13, :00 5:00 p.m. Mountain

Agenda Standards Committee Process Subcommittee Meeting March 13, :00 5:00 p.m. Mountain Agenda Standards Committee Process Subcommittee Meeting March 13, 2018 1:00 5:00 p.m. Mountain Dial-in: 1-415-655-0002 Access Code: 734 514 573 Meeting Password: 03132018 Click here for: Webinar Access

More information

Mr. Andiappan reviewed MRO s Standards of Conduct and Anti-Trust Guidelines with the meeting attendees.

Mr. Andiappan reviewed MRO s Standards of Conduct and Anti-Trust Guidelines with the meeting attendees. 1 P age MIDWEST RELIABILITY ORGANIZATION Meeting Minutes of the MRO Planning Committee Meeting MRO Offices, Saint Paul, MN - 8:00 a.m. 3:00 p.m. Central 1. Call to Order Chair Gayle Nansel called the meeting

More information

Meeting of the New York State Reliability Council, L.L.C. (NYSRC) Reliability Rules Subcommittee (RRS)

Meeting of the New York State Reliability Council, L.L.C. (NYSRC) Reliability Rules Subcommittee (RRS) Meeting of the New York State Reliability Council, L.L.C. (NYSRC) Reliability Rules Subcommittee (RRS) In Attendance: Draft Minutes of Meeting #106 RRS Meeting @ NYSERDA Offices 17 Columbia Circle, Albany,

More information

MINUTES OF REGULAR MEETING OF THE BOARD, OF DIRECTORS OF THE PALMDALE WATER DISTRICT, JUNE 13, 2012:

MINUTES OF REGULAR MEETING OF THE BOARD, OF DIRECTORS OF THE PALMDALE WATER DISTRICT, JUNE 13, 2012: .,- MINUTES OF REGULAR MEETING OF THE BOARD, OF DIRECTORS OF THE PALMDALE WATER DISTRICT, JUNE 13, 2012: A regular meeting of the Board of Directors of the Palmdale Water District was held Wednesday, June

More information

130 FERC 61,051 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING RELIABILITY STANDARD. (Issued January 21, 2010)

130 FERC 61,051 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING RELIABILITY STANDARD. (Issued January 21, 2010) 130 FERC 61,051 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, and John R. Norris. North American Electric

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 23917-D01-2018 Rejection of Reliability Standard MOD-026-1 November 5, 2018 Alberta Utilities Commission Decision 23917-D01-2018 Rejection of Reliability Standard MOD-026-1 Proceeding 23917 Application

More information

MEETING AGENDA. MRO Protective Relay Subcommittee. June 12, :00 a.m. to Noon WebEx CLARITY ASSURANCE RESULTS

MEETING AGENDA. MRO Protective Relay Subcommittee. June 12, :00 a.m. to Noon WebEx CLARITY ASSURANCE RESULTS MEETING AGENDA MRO Protective Relay Subcommittee June 12, 2018 9:00 a.m. to Noon WebEx 380 St. Peter Street #800 Saint Paul, MN 55102 P. 651.855.1760 F. 651.855.1712 W. MidwestReliability.org MEETING AGENDA-MRO

More information

1. ABOUT AEIC 2. INTRODUCTION TO THIS GUIDELINE 3. AEIC COMMITTEES

1. ABOUT AEIC 2. INTRODUCTION TO THIS GUIDELINE 3. AEIC COMMITTEES ADMINISTRATIVE GUIDELINES FOR AEIC COMMITTEES / SUBCOMMITTEES 1. ABOUT AEIC 2018 AEIC is an association of electric utilities, generating companies, transmitting companies or distributing companies including

More information

Introduction. Standard Processes Manual VERSION 3.0: Effective: June 26,

Introduction. Standard Processes Manual VERSION 3.0: Effective: June 26, VERSION 3 Effective: June 26, 2013 Introduction Table of Contents Section 1.0: Introduction... 3 Section 2.0: Elements of a Reliability Standard... 6 Section 3.0: Reliability Standards Program Organization...

More information

NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012

NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012 NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012 1 P a g e REGULATION NO: 0112 NIGERIAN ELECTRICITY REGULATORY COMMISSION In exercise of its powers to make Regulations

More information

FINAL. New York State Reliability Council (NYSRC) Reliability Rules Subcommittee (RRS) Minutes of Meeting #17

FINAL. New York State Reliability Council (NYSRC) Reliability Rules Subcommittee (RRS) Minutes of Meeting #17 FINAL New York State Reliability Council (NYSRC) Reliability Rules Subcommittee (RRS) Minutes of Meeting #17 Con Edison Energy Control Center, New York City, NY Friday, October 6, 2000 Attendance Mayer

More information

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL FRCC-RE-STD-001 Effective Date: March 3, 2017 Version: 1 3000 Bayport Drive, Suite 600 Tampa, Florida 33607-8410 (813) 289-5644 - Phone (813)

More information

Member Advisory Committee (MAC) DRAFT Meeting Minutes April 20, :00 p.m. 4:00 p.m. MT Conference Call

Member Advisory Committee (MAC) DRAFT Meeting Minutes April 20, :00 p.m. 4:00 p.m. MT Conference Call Member Advisory Committee (MAC) DRAFT Meeting Minutes April 20, 2016 2:00 p.m. 4:00 p.m. MT Conference Call Web Conference Link Dial-in Number: 1-855-282-6330, Attendee Access Code: 808 908 313 1. Welcome,

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting March 15, :00 a.m. to 10:00 a.m. Mountain

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting March 15, :00 a.m. to 10:00 a.m. Mountain Agenda Project Management and Oversight Subcommittee (PMOS) Meeting March 15, 2017 8:00 a.m. to 10:00 a.m. Mountain WECC Salt Lake City, UT Dial-in: 1-415-655-0002 Access Code: 738 640 489 Meeting Password:

More information

Minutes Standards Committee Meeting September 7, :00 a.m. to 3:00 p.m. Central

Minutes Standards Committee Meeting September 7, :00 a.m. to 3:00 p.m. Central Minutes Standards Committee Meeting September 7, 2017 10:00 a.m. to 3:00 p.m. Central B. Murphy, chair, called the meeting of the Standards Committee (SC or the Committee) to order on September 7, 2017,

More information

Meeting Notes Underfrequency Load Shedding SDT Project

Meeting Notes Underfrequency Load Shedding SDT Project Meeting Notes Underfrequency Load Shedding SDT Project 2007-01 February 11, 2009 1 5 p.m. Central February 12, 2009 8 a.m. 5 p.m. Central February 13, 2009 8 a.m. noon Central 1. Administrative a) Roll

More information

Minutes Member Representatives Committee Pre-Meeting Informational Conference Call and Webinar January 16, :00 a.m. Eastern

Minutes Member Representatives Committee Pre-Meeting Informational Conference Call and Webinar January 16, :00 a.m. Eastern Minutes Member Representatives Committee Pre-Meeting Informational Conference Call and Webinar January 16, 2013 11:00 a.m. Eastern Chair Scott Helyer convened a duly noticed open meeting by conference

More information

Maryland Voter Poll Results: Offshore Wind Power

Maryland Voter Poll Results: Offshore Wind Power To: From: Interested Parties Steve Raabe, OpinionWorks Date: Subject: Overview This Maryland voter poll shows very strong support for the offshore wind proposal being considered by the General Assembly.

More information

( ) Regional reliability standard ( ) Regional criteria ( ) Policy ( ) Guideline (X) Report or other ( ) Charter Document date September 25, 2013

( ) Regional reliability standard ( ) Regional criteria ( ) Policy ( ) Guideline (X) Report or other ( ) Charter Document date September 25, 2013 Document name Category IBC Meeting Minutes ( ) Regional reliability standard ( ) Regional criteria ( ) Policy ( ) Guideline (X) Report or other ( ) Charter Document date September 25, 2013 Adopted/approved

More information

Diablo Canyon Power Plant Decommissioning Engagement Panel Charter Adopted May 24, 2018

Diablo Canyon Power Plant Decommissioning Engagement Panel Charter Adopted May 24, 2018 Diablo Canyon Power Plant Decommissioning Engagement Panel Charter Adopted May 24, 2018 1 Pacific Gas and Electric Diablo Canyon Decommissioning Engagement Panel Charter I. Introduction The Diablo Canyon

More information

MINUTES of the 4,801 st Meeting being a Special Meeting of the Commission of Public Utility District No. 1 of Grays Harbor County

MINUTES of the 4,801 st Meeting being a Special Meeting of the Commission of Public Utility District No. 1 of Grays Harbor County Page 1 of 6 MINUTES of the 4,801 st Meeting being a Special Meeting of the Commission of Public Utility District No. 1 of Grays Harbor County Office located at 220 Myrtle Street, Hoquiam, Washington Monday,

More information

RECEIVE PUBLIC COMMENTS ON SPECIFIC ISSUES RELATED TO AGENDA ITEMS 4 THROUGH 13

RECEIVE PUBLIC COMMENTS ON SPECIFIC ISSUES RELATED TO AGENDA ITEMS 4 THROUGH 13 MINUTES REGION H WATER PLANNING GROUP MEETING 10:00 A.M. February 29, 2011 SAN JACINTO RIVER AUTHORITY GENERAL AND ADMINISTRATION BUILDING 1577 DAM SITE ROAD CONROE, TEXAS MEMBERS PRESENT: David Bailey,

More information

Meeting Notes Five-Year Review of FAC Standards

Meeting Notes Five-Year Review of FAC Standards Meeting Notes Five-Year Review of FAC Standards June 17, 2013 1-5 p.m. Eastern June 18, 2013 8 a.m.-5 p.m. Eastern June 19, 2013 8 a.m.-noon Eastern NERC s DC Office 1325 G Street NW, Suite 600 Washington,

More information

Introductions and Chair s Remarks Ms. Metro welcomed members and observers and provided safety information.

Introductions and Chair s Remarks Ms. Metro welcomed members and observers and provided safety information. DRAFT Minutes Compliance and Certification Committee November 29, 2016 3:00 p.m. - 5:30 p.m. Eastern* Following Closed Session November 30, 2016 8:00 a.m. 10:30 am Eastern National Rural Electricity Cooperative

More information

Draft Minutes Corporate Governance and Human Resources Committee

Draft Minutes Corporate Governance and Human Resources Committee Draft Minutes Corporate Governance and Human Resources Committee Conference Call Chair Janice Case convened a duly noticed open conference call meeting of the Corporate Governance and Human Resources Committee

More information

Document name. Date adopted/approved March 25, 2014 Custodian (entity responsible for maintenance and upkeep)

Document name. Date adopted/approved March 25, 2014 Custodian (entity responsible for maintenance and upkeep) Document name Category Remedial Action Scheme Reliability Subcommittee Charter ( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy ( ) Guideline ( ) Report or other (x) Charter Document

More information

Agenda Interchange Subcommittee

Agenda Interchange Subcommittee Agenda Interchange Subcommittee May 26, 2010 8 a.m. 5 p.m., CDT May 27, 2010 8 a.m. 5 p.m., CDT Midwest ISO Office 1125 Energy Park Dr. St. Paul, Minnesota 55108 Telephone: 651-632-8400 1. Administrative

More information

NOTE: Agenda Times May be Adjusted as Needed during the Meeting. Proposed Meeting Objectives/Outcomes:

NOTE: Agenda Times May be Adjusted as Needed during the Meeting. Proposed Meeting Objectives/Outcomes: Review work products needed for QR of Version 5 Timed Agenda Tuesday August 16, 2011 8:00 a.m. - 5:30 p.m. EDT 8:00 a.m. Introduction, Welcome Opening and Host remarks- John Lim, Chair & Phil Huff, Vice

More information

ATCT Drafting Team. May 3, Meeting Minutes

ATCT Drafting Team. May 3, Meeting Minutes May 3, 2007 A special conference call and WebEx was held on May 3, 2007 at 2 p.m. (14:00) EDT. The agenda and attendance list are affixed as Exhibits A and B, respectively. Chairman Larry Middleton and

More information

American Nuclear Society Standards Committee Working Group 3.5 Nuclear Power Plant Simulators for Use in Operator Training and Examination

American Nuclear Society Standards Committee Working Group 3.5 Nuclear Power Plant Simulators for Use in Operator Training and Examination American Nuclear Society Standards Committee Working Group 3.5 Nuclear Power Plant Simulators for Use in Operator Training and Examination MEETING MINUTES November 04-05, 1998 Recorded by Timothy Dennis

More information

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 7, :00 10:00 a.m. Central

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 7, :00 10:00 a.m. Central Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 7, 2017 8:00 10:00 a.m. Central Dial-in: 1-415-655-0002 Access Code: 735 533 405 Meeting Password: 090717 Click here for: WebEx

More information

PTO-AC Guidelines for Handling CEII Materials and CEII Requests

PTO-AC Guidelines for Handling CEII Materials and CEII Requests PTO-AC Guidelines for Handling CEII Materials and CEII Requests Effective Date: June 25, 2009 Table of Contents 1. Introduction...2 2. Acronyms and Definitions of Terms...2 2.1. CEII Defined...2 2.2. Acronyms

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Docket No. RR16- Corporation )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Docket No. RR16- Corporation ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability ) Docket No. RR16- Corporation ) PETITION OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION

More information

MEETING AGENDA. MRO Board of Directors-Only Annual Meeting. November 30, :45 pm 2:15 pm

MEETING AGENDA. MRO Board of Directors-Only Annual Meeting. November 30, :45 pm 2:15 pm MEETING AGENDA MRO Board of Directors-Only Annual Meeting November 30, 2017 1:45 pm 2:15 pm MRO Corporate Offices, King Conference Center St. Paul, MN 55102 380 St. Peter Street #800 Saint Paul, MN 55102

More information

Agenda Standards Committee Process Subcommittee December 09, :00 a.m. 12:00 p.m. Eastern

Agenda Standards Committee Process Subcommittee December 09, :00 a.m. 12:00 p.m. Eastern Agenda Standards Committee Process Subcommittee December 09, 2014 8:00 a.m. 12:00 p.m. Eastern NERC Headquarters 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 Process Subcommittee Joint

More information

Minutes Board of Trustees November 2, :00 a.m. 12:00 p.m. Eastern

Minutes Board of Trustees November 2, :00 a.m. 12:00 p.m. Eastern Minutes Board of Trustees 9:00 a.m. 12:00 p.m. Eastern Ritz-Carlton Buckhead 3434 Peachtree Road Atlanta, GA 30326 Call to Order Mr. Frederick W. Gorbet, Chair, called to order the duly noticed open meeting

More information

Conference Call and WebEx Notes Disturbance Monitoring Standard Drafting Team

Conference Call and WebEx Notes Disturbance Monitoring Standard Drafting Team Conference Call and WebEx Notes Disturbance Monitoring Standard Drafting Team Friday, April 18, 2008 2 p.m. EDT Conference Number: 1(732)694-2061 Conference code: 12080418082 Meeting Number: 717 687 982

More information

SERC Regional Standards Development Procedure Exhibit C to the Amended and Restated Regional Entity Delegation Agreement between

SERC Regional Standards Development Procedure Exhibit C to the Amended and Restated Regional Entity Delegation Agreement between SERC Regional Standards Development Procedure Exhibit C to the Amended and Restated Regional Entity Delegation Agreement between North American Electric Reliability Corporation and SERC Reliability Corporation

More information

Spokane Transit Authority 1230 West Boone Avenue Spokane, Washington (509)

Spokane Transit Authority 1230 West Boone Avenue Spokane, Washington (509) Spokane Transit Authority 1230 West Boone Avenue Spokane, Washington 99201-2686 (509) 325-6000 BOARD OPERATIONS COMMITTEE MEETING Meeting Minutes for Northside Conference Room MEMBERS PRESENT Amber Waldref,

More information

RULE ON SUPPORT SCHEME. (On Support of Generation of Electricity from Renewable Energy Sources)

RULE ON SUPPORT SCHEME. (On Support of Generation of Electricity from Renewable Energy Sources) ZYRA E RREGULLATORIT PËR ENERGJI ENERGY REGULATORY OFFICE REGULATORNI URED ZA ENERGIJU RULE ON SUPPORT SCHEME (On Support of Generation of Electricity from Renewable Energy Sources) Prishtina, 23 December

More information

MIDWEST RELIABILITY ORGANIZATION

MIDWEST RELIABILITY ORGANIZATION Page 1 of 7 MIDWEST RELIABILITY ORGANIZATION Policy and Procedure 1: MRO Board of Directors Objective The objective of this policy and procedure is to set forth the general procedures regarding board composition

More information

2001 ANNUAL HEARING POWER PLANT SITING PROGRAM SUMMARY OF PROCEEDINGS

2001 ANNUAL HEARING POWER PLANT SITING PROGRAM SUMMARY OF PROCEEDINGS 2001 ANNUAL HEARING POWER PLANT SITING PROGRAM SUMMARY OF PROCEEDINGS The following is a summary of the 2001 Annual Hearing of the Power Plant Siting Program held on December 1, 2001, at the EQB offices

More information

FINAL. New York State Reliability Council (NYSRC) Reliability Rules Subcommittee (RRS) Minutes of Meeting #19

FINAL. New York State Reliability Council (NYSRC) Reliability Rules Subcommittee (RRS) Minutes of Meeting #19 FINAL New York State Reliability Council (NYSRC) Reliability Rules Subcommittee (RRS) Minutes of Meeting #19 Regular RRS Meeting @ NMPC Eastern Regional Control Center, Guilderland, NY Monday, December

More information

present Innovation and Regulation: Shaping the Energy of Tomorrow May 17-18, 2018

present Innovation and Regulation: Shaping the Energy of Tomorrow May 17-18, 2018 THE VIRGINIA STATE CORPORATION COMMISSION THE ADMINISTRATIVE LAW SECTION OF THE VIRGINIA STATE BAR THE WILLIAM & MARY LAW SCHOOL present Innovation and Regulation: Shaping the Energy of Tomorrow May 17-18,

More information

Minutes Board of Trustees August 15, :00 a.m.-noon local time

Minutes Board of Trustees August 15, :00 a.m.-noon local time Minutes Board of Trustees August 15, 2013 8:00 a.m.-noon local time Fairmont The Queen Elizabeth 900 Rene Levesque Blvd. W Montreal, QC H3B 4A5 Canada Chair Fred Gorbet called to order a duly noticed open

More information

PARTICIPANTS AGREEMENT. among. ISO New England Inc. as the Regional Transmission Organization for New England. and. the New England Power Pool.

PARTICIPANTS AGREEMENT. among. ISO New England Inc. as the Regional Transmission Organization for New England. and. the New England Power Pool. PARTICIPANTS AGREEMENT among ISO New England Inc. as the Regional Transmission Organization for New England and the New England Power Pool and the entities that are from time to time parties hereto constituting

More information

~ AGENDA ~ City of Wilder City Council Meeting

~ AGENDA ~ City of Wilder City Council Meeting ~ AGENDA ~ City of Wilder City Council Meeting UPDATED 4-9-07 Tuesday Wilder City Council Chambers April 10, 2007 219 3 rd Street 7:30 P.M. Wilder, Idaho 83676 1. CALL TO ORDER: 2. ROLL CALL: 3. PLEDGE

More information

Capacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2017 Joint Technical Committee Meeting Minutes New Orleans, Louisiana

Capacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2017 Joint Technical Committee Meeting Minutes New Orleans, Louisiana Capacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2017 Joint Technical Committee Meeting Minutes New Orleans, Louisiana Wednesday, January 11, 2017 I. General meeting introductions

More information

Meeting Minutes Compliance and Certification Committee March 3, :00 p.m. - 5:00 p.m. ET March 4, :00 a.m. - Noon ET

Meeting Minutes Compliance and Certification Committee March 3, :00 p.m. - 5:00 p.m. ET March 4, :00 a.m. - Noon ET Meeting Minutes Compliance and Certification Committee March 3, 2015 1:00 p.m. - 5:00 p.m. ET March 4, 2015 8:00 a.m. - Noon ET NERC Corporate Offices 3353 Peachtree Rd NE, Suite 600 North Tower Atlanta,

More information

Draft Minutes Finance and Audit Committee

Draft Minutes Finance and Audit Committee Draft Minutes Finance and Audit Committee October 28, 2010 Conference Call Chair Fred Gorbet convened a duly-noticed open meeting by conference call of the Finance and Audit Committee of the North American

More information

The Westin Crystal City Hotel, Jefferson Ballroom II Level 2

The Westin Crystal City Hotel, Jefferson Ballroom II Level 2 Day One November 7 The Westin Crystal City Hotel, Jefferson Ballroom II Level 2 8:00-8:55 am Registration and Continental Breakfast 9:00 am Welcome and Overview of the RPS Summit Matthew Rosenbaum, Director

More information

Conference Call Minutes Member Representatives Committee

Conference Call Minutes Member Representatives Committee Conference Call Minutes Member Representatives Committee July 13, 2009 11 a.m. noon Chairman Steve Naumann convened a duly noticed open meeting by conference call of the North American Electric Reliability

More information

REGION C WATER PLANNING GROUP MINUTES OF AN OPEN PUBLIC MEETING SEPTEMBER 22, 2008

REGION C WATER PLANNING GROUP MINUTES OF AN OPEN PUBLIC MEETING SEPTEMBER 22, 2008 REGION C WATER PLANNING GROUP MINUTES OF AN OPEN PUBLIC MEETING The Region C Water Planning Group (RCWPG) met in an open public meeting on Monday, September 22, 2008, at 1:00 P.M. The meeting was held

More information

Calendar Year 2014 PacifiCorp News Feed OASIS Postings

Calendar Year 2014 PacifiCorp News Feed OASIS Postings Calendar Year 2014 PacifiCorp News Feed OASIS Postings 12/30/14: Revised Business Practice #56 - Use of Scheduling Identifiers on an E- Tag:On December 23, 2014, revised BP#56, version 12.0, became effective.

More information

Conference Call Minutes Member Representatives Committee

Conference Call Minutes Member Representatives Committee Conference Call Minutes Member Representatives Committee September 24, 2008 11 a.m. EDT Dial-In: 866-503-3045 Code: 63292284 Member Representatives Committee (MRC) Chairman Steve Hickok called to order

More information

RULE ON AUTHORIZATION PROCEDURE FOR CONSTRUCTION OF NEW GENERATION CAPACITIES FROM RENEWABLE ENERGY SOURCES

RULE ON AUTHORIZATION PROCEDURE FOR CONSTRUCTION OF NEW GENERATION CAPACITIES FROM RENEWABLE ENERGY SOURCES RULE ON AUTHORIZATION PROCEDURE FOR CONSTRUCTION OF NEW GENERATION CAPACITIES FROM RENEWABLE ENERGY SOURCES Pristina, 27 April 2017 Pursuant to authority given under Article 9, paragraph 1, subparagraph

More information

Approved by the Board of Directors at its February 16, 2017, meeting: MINUTES OF MEETING THE BOARD OF DIRECTORS TENNESSEE VALLEY AUTHORITY

Approved by the Board of Directors at its February 16, 2017, meeting: MINUTES OF MEETING THE BOARD OF DIRECTORS TENNESSEE VALLEY AUTHORITY No. 16-04 Approved by the Board of Directors at its February 16, 2017, meeting: Original signed by Sherry A. Quirk Executive Vice President, General Counsel and Secretary MINUTES OF MEETING OF THE BOARD

More information

MARKET PARTICIPANT SERVICE AGREEMENT. This MARKET PARTICIPANT SERVICE AGREEMENT is dated this day of, 2013 and is entered into by and between:

MARKET PARTICIPANT SERVICE AGREEMENT. This MARKET PARTICIPANT SERVICE AGREEMENT is dated this day of, 2013 and is entered into by and between: MARKET PARTICIPANT SERVICE AGREEMENT This MARKET PARTICIPANT SERVICE AGREEMENT is dated this day of, 2013 and is entered into by and between: having its registered and principal place of business located

More information

Notes Disturbance Monitoring SDT Project

Notes Disturbance Monitoring SDT Project Notes Disturbance Monitoring SDT Project 2007-11 Tuesday 2:00 p.m. 4:00 p.m. EST Dial-in Number: 866.740.1260 Code: 6088084 Webinar Log-in: https://cc.readytalk.com/r/kxjb58j6av3a 1. Administrative 1.1.

More information

1791 Tullie Circle, N.E./Atlanta, GA TC/TG/MTG/TRG MINUTES COVER SHEET

1791 Tullie Circle, N.E./Atlanta, GA TC/TG/MTG/TRG MINUTES COVER SHEET 1791 Tullie Circle, N.E./Atlanta, GA 30329 404-636-8400 TC/TG/MTG/TRG MINUTES COVER SHEET (Minutes of all Meetings are to be distributed to all persons listed below within 60 days following the meeting)

More information

Nominating Committee Report

Nominating Committee Report Julie Simon, Director of Policy, Electric Power Supply Association, for Lynne Church (EPSA Observer) Chairman Nye excused Mr. Vann Prater and Mr. Sonny Popowsky from the meeting so the Members could conduct

More information

The meeting was called to order at 9:31 by Cara Lee Mahany Braithwait

The meeting was called to order at 9:31 by Cara Lee Mahany Braithwait Meeting minutes 1/20/15 The meeting was called to order at 9:31 by Cara Lee Mahany Braithwait Present: Deb Erwin, Xcel; Terry Nicolai, Alliant; Tim Kallies, Wisconsin Public Service; Kevin Vesperman, DOA;

More information

North American Energy Standards Board Standards Development Process

North American Energy Standards Board Standards Development Process Standards Development Process Prepared by the 1 Focused on Common Business Practices and Technical Guidelines Broadly Endorsed by the Industry That Provide Conformity Which Yield More Efficient and Effective

More information

Agenda Compliance Committee Open Session

Agenda Compliance Committee Open Session Agenda Compliance Committee Open Session February 6, 2013 10:45 a.m.-noon Pacific Hotel del Coronado 1500 Orange Avenue Coronado, CA 92118 800-468-3533 Introductions and Chair s Remarks NERC Antitrust

More information

SEA VIEW AT GUILFORD CONDOMINIUM ASSOCIATION, INC. Board of Directors Meeting

SEA VIEW AT GUILFORD CONDOMINIUM ASSOCIATION, INC. Board of Directors Meeting SEA VIEW AT GUILFORD CONDOMINIUM ASSOCIATION, INC. Board of Directors Meeting Date: Wednesday January 11, 2012 6:00 P.M. Officers Present: Ms. G. Cusanelli & Ms. C. Parkinson Owners Present: Judge Acaro,

More information

9 th SANCTUARY ADVISORY COUNCIL MEETING Clarion Nantasket Beach Hotel Hull, MA 4 December 2003 MINUTES OF MEETING

9 th SANCTUARY ADVISORY COUNCIL MEETING Clarion Nantasket Beach Hotel Hull, MA 4 December 2003 MINUTES OF MEETING U.S. DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Marine Sanctuary System Stellwagen Bank National Marine Sanctuary 175 Edward Foster Rd. Scituate, MA 02055 (781) 545-8026

More information

INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION Colorado 16 Jefferson Sedalia, Colorado

INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION Colorado 16 Jefferson Sedalia, Colorado INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION Colorado 16 Jefferson Sedalia, Colorado A regular meeting of the Board of Directors of the lntermountain Rural Electric Association was called to order at the office

More information

MINUTES OF THE WATER AND SEWER DISTRIBUTORS OF AMERICA BOARD OF DIRECTORS' MEETING Sunday, March 28, 2004

MINUTES OF THE WATER AND SEWER DISTRIBUTORS OF AMERICA BOARD OF DIRECTORS' MEETING Sunday, March 28, 2004 MINUTES OF THE WATER AND SEWER DISTRIBUTORS OF AMERICA BOARD OF DIRECTORS' MEETING Sunday, March 28, 2004 I. WELCOME/CALL TO ORDER/ANTITRUST GUIDELINES APPROVAL OF PREVIOUS MINUTES President Terry Dotson

More information

Implementation Plan Project PRC-005 FERC Order No. 803 Directive PRC-005-6

Implementation Plan Project PRC-005 FERC Order No. 803 Directive PRC-005-6 Project 2007-17.4 PRC-005 FERC Order No. 803 Directive PRC-005-6 Standards Involved Approval: PRC 005 6 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Retirement: PRC

More information

A motion was made to approve the minutes from the August 31, 2018 NPOA Board of Directors Meeting. The motion was seconded and approved unanimously.

A motion was made to approve the minutes from the August 31, 2018 NPOA Board of Directors Meeting. The motion was seconded and approved unanimously. DRAFT MINUTES NPOA Board of Directors Meeting October 6, 2018 9:00a.m. Adult Center A regular meeting of the Northstar Property Owners Association Board of Directors was called to order at 9:04a.m. by

More information

AMENDED AND RESTATED SERC RELIABILITY CORPORATION. An Alabama Nonprofit Corporation

AMENDED AND RESTATED SERC RELIABILITY CORPORATION. An Alabama Nonprofit Corporation AMENDED AND RESTATED BYLAWS OF SERC RELIABILITY CORPORATION An Alabama Nonprofit Corporation Dated as of October 10, 2007April 23, 2008 TABLE OF CONTENTS ARTICLE I - OFFICES...1 1.1 Principal Office...1

More information

150 FERC 61,212 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

150 FERC 61,212 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 150 FERC 61,212 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Chairman; Philip D. Moeller, Tony Clark, Norman C. Bay, and Colette D. Honorable.

More information