DENVER PUBLIC COMMENT FORM 2015 International Codes
|
|
- Damon Montgomery
- 6 years ago
- Views:
Transcription
1 Community Planning and Development Development Services 201 W. Colfax Ave., Dept. 205 Denver, CO p: DENVER PUBLIC COMMENT FORM 2015 International Codes Instructions Public comments on the posted International Code amendments must be received by the end of the day on Monday November 16, Please this form and any other relevant materials to 1) Submitter Information Name: Matt Cooper Date: 8/25/15 Organization (if applicable): Group 14 Engineering Phone and , 2) Provide the International Code name and section number for which you are submitting a public comment. IECC Sections C , C202, C408.2, C , C , C408.3, C , C , Figure C and C ) Provide your reasoning for the public comment and justification on why the Building or Fire Code Committee s original action should be reconsidered. If you are proposing a language change to an approved amendment, please do so in underline and strikethrough format. One proposal was originally provided and heard by the Building Code Review Committee regarding Section C408 Commissioning. During discussion by the committee, they felt like there were too many items contained within one proposal to be easily discussed. Therefore, I have provided seven separate proposals for the Task Force s consideration to clarify the commissioning section of the 2015 IECC. These clarifications should be considered individually, but the overall intent of these proposals is to better define terms based on industry practice, clarify submittal requirements and timing, proposes language changes to discuss the independence of commissioning authority, proposed a commission compliance checklist, and outlines credentials needed for those conducting building commissioning. By breaking the one proposal up into seven different proposals they can be considered individually and allows changes to be made in one area and not others. See the included individual proposals as follows:
2 a. Section C and C b. C202, C408.2, C , C and C c. C408.1 d. C e. C and Figure C f. C , C and C408.3 g. C
3 DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment proposal must address climate, clarity and/or cost. 1) Submitter Information Name: Matt Cooper Date: August 25, 2015 Organization (if applicable): Group14 Engineering, Inc. Phone: address: 2) *Signature: * I hereby grant and assign to City and County of Denver all rights in copyright I may have in any authorship contributions I make to City and County of Denver in connection with this proposal. I understand that I will have no rights in any City and County of Denver publications that use such contributions in the form submitted by me or another similar form and certify that such contributions are not protected by the copyright of any other person or entity. Note: electronic signatures are acceptable. 3) Indicate which International Code (I-Code) you propose to amend (please use acronym): _IECC If your code proposal requires an amendment to another I-Code, please indicate which other I-Code and section(s) is impacted, and provide the necessary language within the proposal form. See section below for list of names and acronyms for the International Codes. 4) Be sure to format your proposal and include all information as indicated on pages 2-3 of this form. 5) Send your proposal to Community Planning and Development (CPD), attention: Jill Jennings Golich, via at jill.jenningsgolich@denvergov.org. An submittal should include an electronic version saved with a file name as follows: 2015_public_amendment_proposal_Codname_SectionReference, where Codename_SectionReference is replaced using the code and section being proposed (for instance 2015_public_amendmnet_proposal_IBC_Section312 ). The only formatting necessary is BOLDING, STRIKEOUT AND UNDERLINING. Please do not provide additional formatting such as this will be done by CPD. Please use a separate form for each proposal submitted unless as allowed in 3) above. Note: All amendment proposals received will receive an acknowledgment, and will be posted on the Building Code website to allow the public review. Please check here if a separate graphic file is provided. Graphic materials (graphs, maps, drawings, charts, photographs, etc.) must be submitted as separate electronic files in either PDF, JPEG or TIF format (300 DPI minimum resolution; 600 DPI or more preferred) even though they may also be embedded in your submittal. Acronym DBC-AP IBC IECC IEBC IFC IFGC IMC Code Name Denver Building Code Administrative Provisions International Building Code International Energy Conservation Code International Existing Building Code International Fire Code International Fuel Gas Code International Mechanical Code Acronym IPC IRC NEC Code Name International Plumbing Code International Residential Code National Electrical Code
4 AMENDMENT PROPOSAL Please provide all of the following items in your amendment proposal. Your proposal may be entered on the following form, or you may attach a separate file. However, please read the instructions for each part of the amendment proposal. Code Sections/Tables/Figures Proposed for Revision: Note: If the proposal is for a new section, indicate (new). C C
5 Revise as follows: C Final inspection. The building shall have a final inspection and shall not be occupied until approved. The final inspection shall include verification of the installation and proper operation of all required building controls, and documentation verifying activities associated with required building commissioning have been conducted and findings of noncompliance corrected. Buildings, or portions thereof, shall not be considered for a final inspection until the code official has received a letter of transmittal from the building owner acknowledging that the building owner has received the Preliminary Commissioning Report from the building owner or owner s authorized agent as required in Section C C Acceptance of report. Buildings, or portions thereof, shall not be considered acceptable for a final inspection pursuant to Section C104.3C until the code official has received a letter of transmittal from the building owner acknowledging that the building owner or owner s authorized agent has received the Preliminary Commissioning Report from the building owner or owner s authorized agent.
6 Supporting Information: The following items are required to be included. Purpose: The proponent shall clearly state the purpose of the proposed amendment to climate and/or clarify that are specific to the City and County of Denver (e.g., clarify the Code; revise outdated material; substitute new or revised material for physical, environmental and customary characteristics; add new requirements to the Code; delete current requirements, etc to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver.) Commissioning Report submission to the code official o Provides definitive evidence and disposition of commissioning execution from the owner to the code official prior to final inspection. Correction in section C that references section C104.3 in lieu of C Reasons: The proponent shall justify changing the current Code provisions, stating why the proposal is necessary to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver. Proposals that add or delete requirements shall be supported by a logical explanation which clearly shows why the current does not reflect physical, environmental and customary characteristics that are specific to the City and County of Denver and explains how such proposals will improve the Code. Commissioning Report submission to the code official: o Testing, Adjusting and Balancing reports are commonly required for Certificate of Occupancy. The Cx Report is equally important in validating the building s readiness for final inspection and as such should be submitted to the code official prior to final inspection. Additionally, the burden of transferring a preliminary commissioning report to the code official is no more burdensome that writing and delivery a letter of transmittal. Section C directly references commissioning, the process of submitting a preliminary commissioning report and explicitly references section C This appears to be an obvious error in the code. Substantiation: The proponent shall substantiate the proposed amendment based on technical information and substantiation. Substantiation provided which is reviewed and determined as not germane to the technical issues addressed in the proposed amendment shall be identified as such. The proponent shall be notified if the proposal is considered an incomplete proposal, and the proposal shall be held until the deficiencies are corrected. The burden of providing substantiating material lies with the proponent of the amendment proposal. A minimum of two copies of all substantiating information shall be submitted. See responses in sections above. Bibliography: The proponent shall submit a bibliography when substantiating material is associated with the amendment proposal. The proponent shall make the substantiating materials available for review. None.
7 Referenced Standards: List any new referenced standards that are proposed to be referenced in the code and provide a minimum of one electronic copy. Should the amendment proposal be recommended for inclusion in the amendment package, you must provide two hard copies. None. Impact: Discuss the impact of the proposed amendment and answer the three questions below on the impact of the amendment proposal. Effect of the proposed amendment on the cost of design: Increase Reduce No Effect Effect of the proposed amendment on the cost of construction: Increase Reduce No Effect Is the amendment proposal more or less restrictive than the I-Codes? More Less Same Departmental Impact: To be filled out by CPD/DFD Note: The department shall indicate one of the following regarding the impact of the amendment proposal: Effect of the proposed amendment on the time to review: Increase Reduce No Effect Effect of the proposed amendment on the cost of enforcement/inspection: Increase Reduce No Effect
8 DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES UPDATED DEADLINE: JANUARY 9, 2015 NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment proposal must address climate, clarity and/or cost. 1) Submitter Information Name: Matt Cooper Date: August 25, 2015 Organization (if applicable): Group14 Engineering, Inc. Phone: address: 2) *Signature: * I hereby grant and assign to City and County of Denver all rights in copyright I may have in any authorship contributions I make to City and County of Denver in connection with this proposal. I understand that I will have no rights in any City and County of Denver publications that use such contributions in the form submitted by me or another similar form and certify that such contributions are not protected by the copyright of any other person or entity. Note: electronic signatures are acceptable. 3) Indicate which International Code (I-Code) you propose to amend (please use acronym): _IECC If your code proposal requires an amendment to another I-Code, please indicate which other I-Code and section(s) is impacted, and provide the necessary language within the proposal form. See section below for list of names and acronyms for the International Codes. 4) Be sure to format your proposal and include all information as indicated on pages 2-3 of this form. 5) Send your proposal to Community Planning and Development (CPD), attention: Jill Jennings Golich, via at jill.jenningsgolich@denvergov.org. An submittal should include an electronic version saved with a file name as follows: 2015_public_amendment_proposal_Codname_SectionReference, where Codename_SectionReference is replaced using the code and section being proposed (for instance 2015_public_amendmnet_proposal_IBC_Section312 ). The only formatting necessary is BOLDING, STRIKEOUT AND UNDERLINING. Please do not provide additional formatting such as this will be done by CPD. Please use a separate form for each proposal submitted unless as allowed in 3) above. Note: All amendment proposals received will receive an acknowledgment, and will be posted on the Building Code website to allow the public review. Please check here if a separate graphic file is provided. Graphic materials (graphs, maps, drawings, charts, photographs, etc.) must be submitted as separate electronic files in either PDF, JPEG or TIF format (300 DPI minimum resolution; 600 DPI or more preferred) even though they may also be embedded in your submittal. Acronym DBC-AP IBC IECC IEBC IFC IFGC IMC Code Name Denver Building Code Administrative Provisions International Building Code International Energy Conservation Code International Existing Building Code International Fire Code International Fuel Gas Code International Mechanical Code Acronym IPC IRC NEC Code Name International Plumbing Code International Residential Code National Electrical Code
9 AMENDMENT PROPOSAL Please provide all of the following items in your amendment proposal. Your proposal may be entered on the following form, or you may attach a separate file. However, please read the instructions for each part of the amendment proposal. Code Sections/Tables/Figures Proposed for Revision: Note: If the proposal is for a new section, indicate (new). C202 C408.2 C C C
10 Proposal: Show the proposal using strikeout or underline format. At the beginning of each section, include one of the following instruction lines: Revise as follows Add new text as follows Delete and substitute as follows Delete without substitution Add new text as follows: SECTION C202 GENERAL DEFINITIONS QUALIFIED COMMISSIONING AUTHORITY. The individual or agency identified by the owner or owner s agent that serves as an objective and independent advocate for the owner and is responsible for the execution of the commissioning process. The individual or agency serving as the qualified commissioning authority shall have a building commissioning certification from an ISO/IES accredited agency, or shall have at least two years experience commissioning of projects of a similar scale and complexity and is a licensed professional engineer by the State of Colorado, Revise as follows: C408.2 Mechanical systems and service water-heating systems commissioning and completion requirements. Prior to the final mechanical and plumbing inspections, the registered design professional or approved agency qualified commissioning authority shall provide evidence of mechanical systems commissioning and completion in accordance with the provisions of this section. Revise and add new text as follows: C Commissioning plan. A commissioning plan shall be developed by a registered design professional qualified commissioning authority and shall include the following items: Revise as follows: C Preliminary commissioning report. A preliminary report of commissioning test procedures and results shall be completed and certified by the registered design professional or approved agency qualified commissioning authority and provided to the building owner or owner s authorized agent. The report shall be organized with mechanical, and service hot water findings in separate sections to allow independent review. The report shall be identified as Preliminary Commissioning Report, and shall include a statement indicating the qualified commissioning authority s qualifications in accordance with Section C202, and identify: Revise and add new text as follows: C Functional testing. Prior to passing final inspection, the registered design professional qualified commissioning authority shall provide evidence that the lighting control systems have been tested to ensure that control hardware and software are calibrated, adjusted, programmed and in proper working condition in accordance with the construction documents and manufacturer s instructions. Functional testing shall be in accordance with Sections C and C for the applicable control type.
11 Supporting Information: The following items are required to be included. Purpose: The proponent shall clearly state the purpose of the proposed amendment to climate and/or clarify that are specific to the City and County of Denver (e.g., clarify the Code; revise outdated material; substitute new or revised material for physical, environmental and customary characteristics; add new requirements to the Code; delete current requirements, etc to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver.) Replacement of the terms Registered Design Professional and Approved Agency with the single term of Qualified Commissioning Authority: o Ensure higher quality commissioning execution through qualification of commissioning practitioners. o Eliminate confusion related to terminology not typically used in the Commissioning Industry. Definition of Qualified Commissioning Authority o Commissioning is a specialized profession and the execution of commissioning should requirement a level of competence. Reasons: The proponent shall justify changing the current Code provisions, stating why the proposal is necessary to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver. Proposals that add or delete requirements shall be supported by a logical explanation which clearly shows why the current does not reflect physical, environmental and customary characteristics that are specific to the City and County of Denver and explains how such proposals will improve the Code. Replacement of the terms Registered Design Professional and Approved Agency with the single term of Qualified Commissioning Authority: o o Registered Design Professional is confusing in that some may mistakenly believe that the project s Design Engineer is being required to self-execute the commissioning of her design. As this presents a conflict of interest this terminology should be removed. Additionally, Approved Agency is not a common term used in the commissioning industry. Qualified Commissioning Authority is a more common term to the industry and requiring the Commissioning Authority to be qualified in the practice will ensure better execution of the process and in turn improve building energy performance. Substantiation: The proponent shall substantiate the proposed amendment based on technical information and substantiation. Substantiation provided which is reviewed and determined as not germane to the technical issues addressed in the proposed amendment shall be identified as such. The proponent shall be notified if the proposal is considered an incomplete proposal, and the proposal shall be held until the deficiencies are corrected. The burden of providing substantiating material lies with the proponent of the amendment proposal. A minimum of two copies of all substantiating information shall be submitted. IECC section C104.4 recognizes that third-party inspection agencies require qualifications and reliability relevant to the building components and systems they are inspecting. As commissioning is a specialized industry with skilled professionals, the Denver Amendments should recognize that qualifications are necessary to adequately execute this scope of work. There are currently multiple commissioning credentials from various organizations and identifying which credential best suits Denver is difficult at best. However, the International Accreditation Service, a subsidiary of the International Code Council and the Department of Energy are separately pursuing commissioning personnel accreditation processes using ISO/IEC As this effort is not fully developed, I also propose a combination of the professional engineering license and a minimum years of experience. Bibliography: The proponent shall submit a bibliography when substantiating material is associated with the amendment proposal. The proponent shall make the substantiating materials available for review. Chelednik, Michael. TDBP Technique: July IAS and DOE Cx Certifications. The American Institute of Architects. 21 August < Referenced Standards:
12 List any new referenced standards that are proposed to be referenced in the code and provide a minimum of one electronic copy. Should the amendment proposal be recommended for inclusion in the amendment package, you must provide two hard copies. None. Impact: Discuss the impact of the proposed amendment and answer the three questions below on the impact of the amendment proposal. Effect of the proposed amendment on the cost of design: Increase Reduce No Effect Effect of the proposed amendment on the cost of construction: Increase Reduce No Effect Is the amendment proposal more or less restrictive than the I-Codes? More Less Same Departmental Impact: To be filled out by CPD/DFD Note: The department shall indicate one of the following regarding the impact of the amendment proposal: Effect of the proposed amendment on the time to review: Increase Reduce No Effect Effect of the proposed amendment on the cost of enforcement/inspection: Increase Reduce No Effect
13 DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment proposal must address climate, clarity and/or cost. 1) Submitter Information Name: Matt Cooper Date: August 25, 2015 Organization (if applicable): Group14 Engineering, Inc. Phone: address: 2) *Signature: * I hereby grant and assign to City and County of Denver all rights in copyright I may have in any authorship contributions I make to City and County of Denver in connection with this proposal. I understand that I will have no rights in any City and County of Denver publications that use such contributions in the form submitted by me or another similar form and certify that such contributions are not protected by the copyright of any other person or entity. Note: electronic signatures are acceptable. 3) Indicate which International Code (I-Code) you propose to amend (please use acronym): _IECC If your code proposal requires an amendment to another I-Code, please indicate which other I-Code and section(s) is impacted, and provide the necessary language within the proposal form. See section below for list of names and acronyms for the International Codes. 4) Be sure to format your proposal and include all information as indicated on pages 2-3 of this form. 5) Send your proposal to Community Planning and Development (CPD), attention: Jill Jennings Golich, via at jill.jenningsgolich@denvergov.org. An submittal should include an electronic version saved with a file name as follows: 2015_public_amendment_proposal_Codname_SectionReference, where Codename_SectionReference is replaced using the code and section being proposed (for instance 2015_public_amendmnet_proposal_IBC_Section312 ). The only formatting necessary is BOLDING, STRIKEOUT AND UNDERLINING. Please do not provide additional formatting such as this will be done by CPD. Please use a separate form for each proposal submitted unless as allowed in 3) above. Note: All amendment proposals received will receive an acknowledgment, and will be posted on the Building Code website to allow the public review. Please check here if a separate graphic file is provided. Graphic materials (graphs, maps, drawings, charts, photographs, etc.) must be submitted as separate electronic files in either PDF, JPEG or TIF format (300 DPI minimum resolution; 600 DPI or more preferred) even though they may also be embedded in your submittal. Acronym DBC-AP IBC IECC IEBC IFC IFGC IMC Code Name Denver Building Code Administrative Provisions International Building Code International Energy Conservation Code International Existing Building Code International Fire Code International Fuel Gas Code International Mechanical Code Acronym IPC IRC NEC Code Name International Plumbing Code International Residential Code National Electrical Code
14 AMENDMENT PROPOSAL Please provide all of the following items in your amendment proposal. Your proposal may be entered on the following form, or you may attach a separate file. However, please read the instructions for each part of the amendment proposal. Code Sections/Tables/Figures Proposed for Revision: Note: If the proposal is for a new section, indicate (new). C408.1
15 Revise as follows: C408.1 General. This section covers the commissioning of the building mechanical systems in Section C403, service water heating systems in Section C404, and electrical power and lighting systems in Section C405.
16 Supporting Information: The following items are required to be included. Purpose: The proponent shall clearly state the purpose of the proposed amendment to climate and/or clarify that are specific to the City and County of Denver (e.g., clarify the Code; revise outdated material; substitute new or revised material for physical, environmental and customary characteristics; add new requirements to the Code; delete current requirements, etc to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver.) C408.1 Add reference to Service Water Heating Systems and associated section for clarification. Reasons: The proponent shall justify changing the current Code provisions, stating why the proposal is necessary to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver. Proposals that add or delete requirements shall be supported by a logical explanation which clearly shows why the current does not reflect physical, environmental and customary characteristics that are specific to the City and County of Denver and explains how such proposals will improve the Code. See responses in section above. Substantiation: The proponent shall substantiate the proposed amendment based on technical information and substantiation. Substantiation provided which is reviewed and determined as not germane to the technical issues addressed in the proposed amendment shall be identified as such. The proponent shall be notified if the proposal is considered an incomplete proposal, and the proposal shall be held until the deficiencies are corrected. The burden of providing substantiating material lies with the proponent of the amendment proposal. A minimum of two copies of all substantiating information shall be submitted. See responses in section above. Bibliography: The proponent shall submit a bibliography when substantiating material is associated with the amendment proposal. The proponent shall make the substantiating materials available for review.
17 Referenced Standards: List any new referenced standards that are proposed to be referenced in the code and provide a minimum of one electronic copy. Should the amendment proposal be recommended for inclusion in the amendment package, you must provide two hard copies. None. Impact: Discuss the impact of the proposed amendment and answer the three questions below on the impact of the amendment proposal. Effect of the proposed amendment on the cost of design: Increase Reduce No Effect Effect of the proposed amendment on the cost of construction: Increase Reduce No Effect Is the amendment proposal more or less restrictive than the I-Codes? More Less Same Departmental Impact: To be filled out by CPD/DFD Note: The department shall indicate one of the following regarding the impact of the amendment proposal: Effect of the proposed amendment on the time to review: Increase Reduce No Effect Effect of the proposed amendment on the cost of enforcement/inspection: Increase Reduce No Effect
18 DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES UPDATED DEADLINE: JANUARY 9, 2015 NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment proposal must address climate, clarity and/or cost. 1) Submitter Information Name: Matt Cooper Date: August 25, 2015 Organization (if applicable): Group14 Engineering, Inc. Phone: address: 2) *Signature: * I hereby grant and assign to City and County of Denver all rights in copyright I may have in any authorship contributions I make to City and County of Denver in connection with this proposal. I understand that I will have no rights in any City and County of Denver publications that use such contributions in the form submitted by me or another similar form and certify that such contributions are not protected by the copyright of any other person or entity. Note: electronic signatures are acceptable. 3) Indicate which International Code (I-Code) you propose to amend (please use acronym): _IECC If your code proposal requires an amendment to another I-Code, please indicate which other I-Code and section(s) is impacted, and provide the necessary language within the proposal form. See section below for list of names and acronyms for the International Codes. 4) Be sure to format your proposal and include all information as indicated on pages 2-3 of this form. 5) Send your proposal to Community Planning and Development (CPD), attention: Jill Jennings Golich, via at jill.jenningsgolich@denvergov.org. An submittal should include an electronic version saved with a file name as follows: 2015_public_amendment_proposal_Codname_SectionReference, where Codename_SectionReference is replaced using the code and section being proposed (for instance 2015_public_amendmnet_proposal_IBC_Section312 ). The only formatting necessary is BOLDING, STRIKEOUT AND UNDERLINING. Please do not provide additional formatting such as this will be done by CPD. Please use a separate form for each proposal submitted unless as allowed in 3) above. Note: All amendment proposals received will receive an acknowledgment, and will be posted on the Building Code website to allow the public review. Please check here if a separate graphic file is provided. Graphic materials (graphs, maps, drawings, charts, photographs, etc.) must be submitted as separate electronic files in either PDF, JPEG or TIF format (300 DPI minimum resolution; 600 DPI or more preferred) even though they may also be embedded in your submittal. Acronym DBC-AP IBC IECC IEBC IFC IFGC IMC Code Name Denver Building Code Administrative Provisions International Building Code International Energy Conservation Code International Existing Building Code International Fire Code International Fuel Gas Code International Mechanical Code Acronym IPC IRC NEC Code Name International Plumbing Code International Residential Code National Electrical Code
19 AMENDMENT PROPOSAL Please provide all of the following items in your amendment proposal. Your proposal may be entered on the following form, or you may attach a separate file. However, please read the instructions for each part of the amendment proposal. Code Sections/Tables/Figures Proposed for Revision: Note: If the proposal is for a new section, indicate (new). C
20 Proposal: Show the proposal using strikeout or underline format. At the beginning of each section, include one of the following instruction lines: Revise as follows Add new text as follows Delete and substitute as follows Delete without substitution Add new text as follows: C Commissioning plan. A commissioning plan shall be developed by a registered design professional or approved agency Qualified Commissioning Authority and shall include the following items: 1. A narrative description of the activities that will be accomplished during each phase of commissioning, including the personnel intended to accomplish each of the activities. 2. A listing of specific equipment appliances or systems to be tested and a description of the tests to be performed. 3. Functions to be tested including, but not limited to, calibrations and economizer controls. 4. Conditions under which the test will be performed. Testing shall affirm winter and summer design conditions and full outside air conditions. 5. Measurable criteria for performance. 6. Where the Qualified Commissioning Authority is an employee of one of the registered design professionals of record or an employee or subcontractor of the project contractor, an In-House Commissioning Disclosure and Conflict Management Plan shall be included in the commissioning plan. This Plan shall disclose the Qualified Commissioning Authority s contractual relationship with other team members and provide a conflict management plan demonstrating that the qualified commissioning authority is free to identify issues discovered and report directly to the owner.
21 Supporting Information: The following items are required to be included. Purpose: The proponent shall clearly state the purpose of the proposed amendment to climate and/or clarify that are specific to the City and County of Denver (e.g., clarify the Code; revise outdated material; substitute new or revised material for physical, environmental and customary characteristics; add new requirements to the Code; delete current requirements, etc to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver.) Addition of an In-House Commissioning Disclosure and Conflict Management Plan o Help ensure that a conflict of interest does not arise when Design Engineers and Contractors selfexecute commissioning of their own designs and installations. Reasons: The proponent shall justify changing the current Code provisions, stating why the proposal is necessary to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver. Proposals that add or delete requirements shall be supported by a logical explanation which clearly shows why the current does not reflect physical, environmental and customary characteristics that are specific to the City and County of Denver and explains how such proposals will improve the Code. Requiring third-party independence of the Commissioning Authority is advocated by multiple building industry groups to avoid conflict of interest inherent in any process that permits self-execution of a quality control or verification process. Substantiation: The proponent shall substantiate the proposed amendment based on technical information and substantiation. Substantiation provided which is reviewed and determined as not germane to the technical issues addressed in the proposed amendment shall be identified as such. The proponent shall be notified if the proposal is considered an incomplete proposal, and the proposal shall be held until the deficiencies are corrected. The burden of providing substantiating material lies with the proponent of the amendment proposal. A minimum of two copies of all substantiating information shall be submitted IECC Section C104.4 o Section C104.4 does not speak directly to the independence of the commissioning authority, but rather addresses the requirements for third-party inspection agencies to be not be affiliated with the building design and construction. The code clearly recognizes that potential conflict can arise when independence of quality control agencies is not required by the code. o Furthermore, the IECC defines Building Commissioning as a process that verifies building systems installation and functionality according to number of minimum requirements including code requirements. The Strategic Guide to Commissioning o This document was spearheaded by ASHRAE and presented on June 24, The following participating organizations joined ASHRAE in the development of this document: SMACNA, AIA, NEBB, ICC, ACG, BOMA, USGBC, Building Commissioning Association (BCA), National Instituted of Building Sciences, and the Council of American Mechanical and Electrical Engineers. o In Section 6: Commissioning Authority Characteristics, this document states, In the selection of a commissioning authority it is important that it be based on the qualifications and experience of the proposed candidate The Commissioning Authority is an objective and independent advocate for the owner. The Commissioning Authority should work directly for the owner, keeping the owner's objectives and best interests as the top priority A conflict of interest may exist if the Commissioning Authority s firm has other project responsibilities or function, and/or is not under direct contract to the owner. The commissioning authority needs to be a provider without any financial or business interests or potential conflicts of interest that would interfere with the faithful execution of his/her duties.
22 Bibliography: The proponent shall submit a bibliography when substantiating material is associated with the amendment proposal. The proponent shall make the substantiating materials available for review. ASHRAE; The Strategic Guide to Commissioning, 2014 Referenced Standards: List any new referenced standards that are proposed to be referenced in the code and provide a minimum of one electronic copy. Should the amendment proposal be recommended for inclusion in the amendment package, you must provide two hard copies.
23 None. Impact: Discuss the impact of the proposed amendment and answer the three questions below on the impact of the amendment proposal. Effect of the proposed amendment on the cost of design: Increase Reduce No Effect Effect of the proposed amendment on the cost of construction: Increase Reduce No Effect Is the amendment proposal more or less restrictive than the I-Codes? More Less Same Departmental Impact: To be filled out by CPD/DFD Note: The department shall indicate one of the following regarding the impact of the amendment proposal: Effect of the proposed amendment on the time to review: Increase Reduce No Effect Effect of the proposed amendment on the cost of enforcement/inspection: Increase Reduce No Effect
24 DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment proposal must address climate, clarity and/or cost. 1) Submitter Information Name: Matt Cooper Date: August 25, 2015 Organization (if applicable): Group14 Engineering, Inc. Phone: address: 2) *Signature: * I hereby grant and assign to City and County of Denver all rights in copyright I may have in any authorship contributions I make to City and County of Denver in connection with this proposal. I understand that I will have no rights in any City and County of Denver publications that use such contributions in the form submitted by me or another similar form and certify that such contributions are not protected by the copyright of any other person or entity. Note: electronic signatures are acceptable. 3) Indicate which International Code (I-Code) you propose to amend (please use acronym): _IECC If your code proposal requires an amendment to another I-Code, please indicate which other I-Code and section(s) is impacted, and provide the necessary language within the proposal form. See section below for list of names and acronyms for the International Codes. 4) Be sure to format your proposal and include all information as indicated on pages 2-3 of this form. 5) Send your proposal to Community Planning and Development (CPD), attention: Jill Jennings Golich, via at jill.jenningsgolich@denvergov.org. An submittal should include an electronic version saved with a file name as follows: 2015_public_amendment_proposal_Codname_SectionReference, where Codename_SectionReference is replaced using the code and section being proposed (for instance 2015_public_amendmnet_proposal_IBC_Section312 ). The only formatting necessary is BOLDING, STRIKEOUT AND UNDERLINING. Please do not provide additional formatting such as this will be done by CPD. Please use a separate form for each proposal submitted unless as allowed in 3) above. Note: All amendment proposals received will receive an acknowledgment, and will be posted on the Building Code website to allow the public review. Please check here if a separate graphic file is provided. Graphic materials (graphs, maps, drawings, charts, photographs, etc.) must be submitted as separate electronic files in either PDF, JPEG or TIF format (300 DPI minimum resolution; 600 DPI or more preferred) even though they may also be embedded in your submittal. Acronym DBC-AP IBC IECC IEBC IFC IFGC IMC Code Name Denver Building Code Administrative Provisions International Building Code International Energy Conservation Code International Existing Building Code International Fire Code International Fuel Gas Code International Mechanical Code Acronym IPC IRC NEC Code Name International Plumbing Code International Residential Code National Electrical Code
25 AMENDMENT PROPOSAL Please provide all of the following items in your amendment proposal. Your proposal may be entered on the following form, or you may attach a separate file. However, please read the instructions for each part of the amendment proposal. Code Sections/Tables/Figures Proposed for Revision: Note: If the proposal is for a new section, indicate (new). C Figure C (New)
26 Add new text as follows: C Preliminary commissioning report. A preliminary report of commissioning test procedures and results shall be completed and certified by the registered design professional or approved agency and provided to the building owner or owner s authorized agent. The report shall be organized with mechanical, and service hot water findings in separate sections to allow independent review. The report shall be identified as Preliminary Commissioning Report, include the completed Commissioning Compliance Checklist (Figure C ) and shall identify: Add new Figure as follows: Figure C COMMISSIONING COMPLIANCE CHECKLIST Project Information Commissioning Plan (Section C ) Systems Adjusting and Balancing (Section C ) Functional Testing (Sections C and C ) Supporting Documents (Sections C ) Preliminary Commissioning Report (Section C ) Certification Project Name: Project Address: Commissioning Authority: Commissioning Plan was used during construction and includes all items required by Section C Systems Adjusting and Balancing has been completed Air and water flow rates have been measured and adjusted to deliver final flow rates within the tolerances provided in the produce specifications. HVAC Equipment Functional Testing has been executed. If applicable, deferred and/or follow-up testing is scheduled to be provided on: HVAC Controls Functional Testing has been executed. If applicable, deferred and/or follow-up testing is scheduled to be provided on: Economizers Functional Testing has been executed. If applicable, deferred and/or follow-up testing is scheduled to be provided on: Lighting Controls Functional Testing has been executed. If applicable, deferred and/or follow-up testing is scheduled to be provided on: Service Water Heating System Functional Testing has been executed. If applicable, deferred and/or follow-up testing is scheduled to be provided on: Manuals, record documents and training have been completed or are scheduled System documentation has been provided to the owner or scheduled to be delivered to the owner on: Record documents have been submitted to owner or scheduled to be delivered to the owner on: Training has been completed or scheduled to be completed on: Preliminary Commissioning Report submitted to Owner and includes all items required by Section C with Denver Amendments I hereby certify that the commissioning provider has provided me with evidence of mechanical, service water heating and lighting systems commissioning in accordance with the 2015 IECC with Denver Amendments. Signature of Building Owner or Owner s Representative Date
27 Supporting Information: The following items are required to be included. Purpose: The proponent shall clearly state the purpose of the proposed amendment to climate and/or clarify that are specific to the City and County of Denver (e.g., clarify the Code; revise outdated material; substitute new or revised material for physical, environmental and customary characteristics; add new requirements to the Code; delete current requirements, etc to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver.) Addition of a Commissioning Compliance Checklist: o Streamline the final inspection submission process as it relates to building system commissioning execution. Reasons: The proponent shall justify changing the current Code provisions, stating why the proposal is necessary to reflect physical, environmental and customary characteristics that are specific to the City and County of Denver. Proposals that add or delete requirements shall be supported by a logical explanation which clearly shows why the current does not reflect physical, environmental and customary characteristics that are specific to the City and County of Denver and explains how such proposals will improve the Code. Addition of a Commissioning Compliance Checklist: o To streamline the submission process to the code official for final inspections. Substantiation: The proponent shall substantiate the proposed amendment based on technical information and substantiation. Substantiation provided which is reviewed and determined as not germane to the technical issues addressed in the proposed amendment shall be identified as such. The proponent shall be notified if the proposal is considered an incomplete proposal, and the proposal shall be held until the deficiencies are corrected. The burden of providing substantiating material lies with the proponent of the amendment proposal. A minimum of two copies of all substantiating information shall be submitted. See responses in sections above. Bibliography: The proponent shall submit a bibliography when substantiating material is associated with the amendment proposal. The proponent shall make the substantiating materials available for review.
28 Referenced Standards: List any new referenced standards that are proposed to be referenced in the code and provide a minimum of one electronic copy. Should the amendment proposal be recommended for inclusion in the amendment package, you must provide two hard copies. None. Impact: Discuss the impact of the proposed amendment and answer the three questions below on the impact of the amendment proposal. Effect of the proposed amendment on the cost of design: Increase Reduce No Effect Effect of the proposed amendment on the cost of construction: Increase Reduce No Effect Is the amendment proposal more or less restrictive than the I-Codes? More Less Same Departmental Impact: To be filled out by CPD/DFD Note: The department shall indicate one of the following regarding the impact of the amendment proposal: Effect of the proposed amendment on the time to review: Increase Reduce No Effect Effect of the proposed amendment on the cost of enforcement/inspection: Increase Reduce No Effect
29 DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment proposal must address climate, clarity and/or cost. 1) Submitter Information Name: Matt Cooper Date: August 25, 2015 Organization (if applicable): Group14 Engineering, Inc. Phone: address: 2) *Signature: * I hereby grant and assign to City and County of Denver all rights in copyright I may have in any authorship contributions I make to City and County of Denver in connection with this proposal. I understand that I will have no rights in any City and County of Denver publications that use such contributions in the form submitted by me or another similar form and certify that such contributions are not protected by the copyright of any other person or entity. Note: electronic signatures are acceptable. 3) Indicate which International Code (I-Code) you propose to amend (please use acronym): _IECC If your code proposal requires an amendment to another I-Code, please indicate which other I-Code and section(s) is impacted, and provide the necessary language within the proposal form. See section below for list of names and acronyms for the International Codes. 4) Be sure to format your proposal and include all information as indicated on pages 2-3 of this form. 5) Send your proposal to Community Planning and Development (CPD), attention: Jill Jennings Golich, via at jill.jenningsgolich@denvergov.org. An submittal should include an electronic version saved with a file name as follows: 2015_public_amendment_proposal_Codname_SectionReference, where Codename_SectionReference is replaced using the code and section being proposed (for instance 2015_public_amendmnet_proposal_IBC_Section312 ). The only formatting necessary is BOLDING, STRIKEOUT AND UNDERLINING. Please do not provide additional formatting such as this will be done by CPD. Please use a separate form for each proposal submitted unless as allowed in 3) above. Note: All amendment proposals received will receive an acknowledgment, and will be posted on the Building Code website to allow the public review. Please check here if a separate graphic file is provided. Graphic materials (graphs, maps, drawings, charts, photographs, etc.) must be submitted as separate electronic files in either PDF, JPEG or TIF format (300 DPI minimum resolution; 600 DPI or more preferred) even though they may also be embedded in your submittal. Acronym DBC-AP IBC IECC IEBC IFC IFGC IMC Code Name Denver Building Code Administrative Provisions International Building Code International Energy Conservation Code International Existing Building Code International Fire Code International Fuel Gas Code International Mechanical Code Acronym IPC IRC NEC Code Name International Plumbing Code International Residential Code National Electrical Code
Regular Session. Adjournment
Notice of Meeting for the Building Standards Commission of the City of Georgetown April 11, 2014 at 8:00 AM at Georgetown City Council Chambers, located at 101 E 7th, Georgetown, Texas The City of Georgetown
More informationAPPLICATION FOR ICC Codes Committees
APPLICATION FOR ICC Codes Committees It is important to complete all of the questions on this form, supply additional requested information, sign and date the application. This application can be used
More informationINTERNATIONAL CODE COUNCIL 2009/2010 CODE DEVELOPMENT CYCLE 2009/2010 REPORT OF THE PUBLIC HEARING ON THE 2009 EDITIONS OF THE
INTERNATIONAL CODE COUNCIL 2009/2010 CODE DEVELOPMENT CYCLE 2009/2010 REPORT OF THE PUBLIC HEARING ON THE 2009 EDITIONS OF THE ICC ADMINISTRATIVE CODE PROVISIONS INTERNATIONAL BUILDING CODE INTERNATIONAL
More information6) IMC 7) ADMIN 8) IRC-B 9) 10) Complete the
APPLICATION FOR ICC Codes & Standards It is important to complete all of the questions on this form, supply additional requested information, sign and date the application. This application can be used
More informationICC Code Development Process July/2018
ICC Code Development Process July/2018 ICC Code Development Powered by cdpaccess at cdpaccess.com ICC Vision Protect the health, safety and welfare of people by creating safe buildings and communities
More informationINTERNATIONAL CODE COUNCIL
INTERNATIONAL CODE COUNCIL 2018 2019 CODE DEVELOPMENT CYCLE Group A (2018) 2018 REPORT OF THE COMMITTEE ACTION HEARINGS ON THE 2018 EDITIONS OF THE GROUP A INTERNATIONAL CODES HELD IN COLUMBUS, OH APRIL
More informationINTERNATIONAL CODE COUNCIL
INTERNATIONAL CODE COUNCIL 2015 2017 CODE DEVELOPMENT CYCLE Group A (2015) 2015 REPORT OF THE COMMITTEE ACTION HEARINGS ON THE 2015 EDITIONS OF THE GROUP A INTERNATIONAL CODES HELD IN MEMPHIS, TENNESSEE
More informationAPPLICATION FOR ICC Codes & Standards
APPLICATION FOR ICC Codes & Standards It is important to complete all of the questions on this form, supply additional requested information, sign and date the application. This application can be used
More informationAdmin WG - Group B 2019 Copyright 2018 International Code Council, Inc.
1 BCAC Administrative 5-29-2018 The BCAC Admin work group is working from the philosophy that ICC is a family of codes, so administrative requirements should be consistent across books when effective.
More informationCP#28-05 Code Development
Code Development Approved: 09/24/05 Revised: 10/20/18 1.0 Introduction 1.1 Purpose of Council Policy: The purpose of this Council Policy is to prescribe the Rules of Procedure utilized in the continued
More informationChanges to the ICC Code Development Process for the 2009/2010 Code Cycle
Introduction: Changes to the ICC Code Development Process for the 2009/2010 Code Cycle Released March 23, 2009 This Tech Note was developed to clearly outline the changes that are taking place in the code
More informationAPPLICATION FOR ICC Codes & Standards
APPLICATION FOR ICC Codes & Standards It is important to complete all of the questions on this form, supply additional requested information, sign and date the application. This application can be used
More informationORDINANCE NO. 1 TRIBAL BUILDING CODE
ORDINANCE NO. 1 TRIBAL BUILDING CODE An Ordinance of the Saginaw Chippewa Indian Tribe of Michigan ( Saginaw Tribe ) adopting the International Energy Conservation Code regulating and controlling the energy
More informationAN ORDINANCE TO ADOPT A RESIDENTIAL CODE FOR THE CITY OF MOBILE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF MOBILE, ALABAMA, As Follows:
28-008 2011 AN ORDINANCE TO ADOPT A RESIDENTIAL CODE FOR THE CITY OF MOBILE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF MOBILE, ALABAMA, As Follows: SECTION ONE: Code and Appendices. That, pursuant
More informationTITLE 8. Building Regulations
TITLE 8 Building Regulations Chapter 1 Building Code 8-1-1 Adoption of Grand County Building Code as primary code 8-1-2 Purposes of Grand County Building Code 8-1-3 Modifications to Grand County Building
More informationREQUEST FOR PROPOSAL for the SINGLE AUDIT OF THE STATE OF NEVADA
LEGISLATIVE COUNSEL BUREAU AUDIT DIVISION REQUEST FOR PROPOSAL for the SINGLE AUDIT OF THE STATE OF NEVADA For the years ending JUNE 30, 2014, 2015, 2016 and 2017 RELEASE DATE: January 10, 2014 DUE DATE:
More informationCity of Tustin Community Development Department REQUEST FOR PROPOSAL FOR AS-NEEDED BUILDING INSPECTION AND PLAN CHECK SERVICES
Community Development Department REQUEST FOR PROPOSAL FOR AS-NEEDED BUILDING INSPECTION AND PLAN CHECK SERVICES DEADLINE TO SUBMIT 5:00 p.m., October 5, 2016 I. PURPOSE The Building Division is seeking
More informationIowa Public Employees Retirement System Request for Proposal Design and Construction Contract Administration Services
Iowa Public Employees Retirement System Request for Proposal Design and Construction Contract Administration Services Request for Proposal Number: O-2016-1 IPERS will receive sealed proposals until 3:00
More informationShort Title: Building Code Reg. Reform. (Public) March 18, 2015
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION H HOUSE BILL Committee Substitute Favorable // Committee Substitute # Favorable // Fourth Edition Engrossed // Senate Agriculture/Environment/Natural Resources
More informationFLORIDA BUILDING CODE
FLORIDA BUILDING CODE Sixth Edition (2017) Energy Conservation Item No. 5681L17 Florida Building Code, Energy Conservation, 6th Edition (2017) First Printing: July 2017 ISBN: 978-1-60983-695-5 COPYRIGHT
More informationTITLE 12 BUILDING, UTILITY, ETC. CODES 1
Change 2, September 15, 2015 12-1 TITLE 12 BUILDING, UTILITY, ETC. CODES 1 CHAPTER 1. BUILDING CODE. 2. PLUMBING CODE. 3. FUEL GAS CODE. 4. ENERGY CONSERVATION CODE. 5. MECHANICAL CODE. 6. RESIDENTIAL
More informationEmergency Rule Filing Form
Department of State Division of Publications 312 Rosa L. Parks Ave., 8th Floor, Snodgrass/TN Tower Nas hville, TN 37243 Ph one: 615-741-2650 Email : publications.information@tn.gov For Department of State
More informationPUBLIC CODE CHANGE PROPOSAL FORM FOR PUBLIC PROPOSALS TO THE INTERNATIONAL CODES 2012/2013 CODE DEVELOPMENT CYCLE
PUBLIC CODE CHANGE PROPOSAL FORM FOR PUBLIC PROPOSALS TO THE INTERNATIONAL CODES 2012/2013 CODE DEVELOPMENT CYCLE CLOSING DATES: Group A Codes: January 3, 2012 Group B Codes: January 3, 2013 *See Item
More informationShort Title: Building Code Reg. Reform. (Public) March 18, 2015
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 01 H HOUSE BILL Committee Substitute Favorable /1/1 Committee Substitute # Favorable /1/1 Fourth Edition Engrossed /1/1 Short Title: Building Code Reg. Reform.
More informationIntroduction 2018 GROUP A PUBLIC COMMENT AGENDA OCTOBER 24-31, 2018 GREATER RICHMOND CONVENTION CENTER RICHMOND, VA
Introduction 2018 GROUP A PUBLIC COMMENT AGENDA OCTOBER 24-31, 2018 GREATER RICHMOND CONVENTION CENTER RICHMOND, VA 2018 Public Comment Agenda First Printing Publication Date: August 2018 Copyright 2018
More informationNOTICE OF PUBLIC RULEMAKING HEARING BEFORE THE COLORADO WATER QUALITY CONTROL COMMISSION
John W. Hickenlooper, Governor Christopher E. Urbina, MD, MPH Executive Director and Chief Medical Officer WATER QUALITY CONTROL COMMISSION http://www.cdphe.state.co.us/op/wqcc/index.html 4300 Cherry Creek
More informationGuide to Submitting Ballot Arguments
City and County of San Francisco Department of Elections Guide to Submitting Ballot Arguments For Local Ballot Measures In the San Francisco Voter Information Pamphlet June 5, 2018 Consolidated Direct
More informationORDINANCE # N:\WEB SITE UP DATE\Adoption of 2015 IBC_For Y Adoption_Final.docx Page 1 of 12
ORDINANCE #041317-02 AN ORDINANCE OF THE CITY OF SELMA AMENDING CHAPTER 66 OF THE CODE OF ORDINANCES AND ADOPTING THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE, REGULATING AND GOVERNING THE CONDITIONS
More informationA LOCAL LAW PROVIDING FOR THE ADMINISTRATION AND ENFORCEMENT OF THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE
A LOCAL LAW PROVIDING FOR THE ADMINISTRATION AND ENFORCEMENT OF THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE Local Law #2 of 2007. Be it enacted by the Town Board of the Town of Oswego,
More informationINTERNATIONAL CODE COUNCIL
INTERNATIONAL CODE COUNCIL 2006/2007 CODE DEVELOPMENT CYCLE VOLUME 2 PROPOSED CHANGES TO THE 2006 EDITIONS OF THE INTERNATIONAL ENERGY CONSERVATION CODE INTERNATIONAL EXISTING BUILDING CODE INTERNATIONAL
More informationDOCUMENT INSTRUCTIONS TO BIDDERS
DOCUMENT 00 21 13 Bidders shall follow the instructions in this document, and shall submit all documents, forms, and information required for consideration of a Bid. Oakland Unified School District ( District
More informationAn Introduction to Model Codes
An Introduction to Model Codes First Printing Electronic Version Publication Date: April 1997 COPYRIGHT 1996, 1997 by COUNCIL OF AMERICAN BUILDING OFFICIALS 5203 Leesburg Pike, Suite 708 Falls Church,
More informationCITY OF ROANOKE, VIRGINIA REQUEST FOR PROPOSAL FOR EXECUTIVE SEARCH SERVICES RFP NUMBER OPENING DATE: JULY 23, 2009 OPENING TIME 2:00 P.M.
CITY OF ROANOKE, VIRGINIA REQUEST FOR PROPOSAL FOR EXECUTIVE SEARCH SERVICES RFP NUMBER 10-01-02 OPENING DATE: JULY 23, 2009 OPENING TIME 2:00 P.M. The Request for Proposal and related documents may be
More informationINTERNATIONAL CODE COUNCIL CODE DEVELOPMENT CYCLE Group B (2013)
INTERNATIONAL CODE COUNCIL 2012-2014 CODE DEVELOPMENT CYCLE Group B (2013) 2013 PUBLIC COMMENT AGENDA FOR THE PROPOSED CHANGES TO THE 2012 EDITIONS OF THE INTERNATIONAL CODES ADMINISTRATIVE PROVISIONS
More informationProcedure for Filing a Site Plan Exemption
Procedure for Filing a Site Plan Exemption Dear Applicant, The Mayor and Borough Council adopt Ordinances which regulate the use of land in the Borough of Metuchen ( Borough ). The purpose of these land
More informationChapter BUILDING CODE
Chapter 15.04 BUILDING CODE Sections: 15.04.010 Title 15.04.020 Purpose 15.04.030 Adoption of Codes by Reference and Amendments to Referenced Codes 15.04.040 Design Requirements 15.04.050 Pole Buildings
More informationAttachment 2. Protected Information Practices and Procedures (PIPP) [SEE ATTACHED]
Attachment 2 Protected Information Practices and Procedures (PIPP) [SEE ATTACHED] LaGuardia Airport CTB Replacement Project Part I - Instructions to Proposers Exhibit B-6 1 INTRODUCTION...1 2 PROTECTED
More informationINVITATION TO BID FOR AIR FILTERS ITB NO: DMS-15/ THE STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES
4050 Esplanade Way Tallahassee, Florida 32399-0950 Tel: 850.488.2786 Fax: 850.922.6149 Rick Scott, Governor Chad Poppell, Secretary INVITATION TO BID FOR AIR FILTERS ITB NO: DMS-15/16-038 THE STATE OF
More informationEXHIBIT A. LARIMER COUNTY CODE Chapter 10 Article VIII. Building Contractor Licensing Program
EXHIBIT A LARIMER COUNTY CODE Chapter 10 Article VIII. Building Contractor Licensing Program Sec. 10-191 Title Sec. 10-192 Authority Sec. 10-193 Purpose Sec. 10-194 Principles of Interpretation Sec. 10-195
More informationSec BUILDING CODE; PROCEDURAL AMENDMENTS
CHAPTER 3. BUILDING REGULATIONS* ARTICLE A. BUILDING CODE* Sec. 10-3001. BUILDING CODE; PROCEDURAL AMENDMENTS The following are adopted amendments to the State Minimum Code Accessibility in Georgia Code,
More informationTOWN OF ATHELSTANE BUILDING ORDINANCE #5
TOWN OF ATHELSTANE BUILDING ORDINANCE #5 SECTION 1 - BUILDING PERMITS A. No dwelling, building, structure, mobile home or any part thereof shall be erected or installed, enlarged, set up, relocated, moved
More informationTHE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL AN ACT
PRINTER'S NO. THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL No. Session of 0 INTRODUCED BY BAKER AND RAFFERTY, JANUARY 1, 0 REFERRED TO LABOR AND INDUSTRY, JANUARY 1, 0 AN ACT 1 1 1 0 1 Amending the
More informationSTANDARD OPERATING SYSTEM
Approved: Effective: October 16, 2013 Office: Forms and Procedures Topic No. 025-020-002-j Department of Transportation PURPOSE: STANDARD OPERATING SYSTEM To establish a uniform system for developing,
More information2.3 The National Electrical Code may be examined at any state publications depository library.
1.0 STATEMENT OF BASIS AND PURPOSE 1.1 Following are the adopted changes in the Rules and Regulations of the Colorado State Electrical Board, for general clarification, for efficient management and expeditious
More informationThe Brooks Act: Federal Government Selection of Architects and Engineers
The Brooks Act: Federal Government Selection of Architects and Engineers Public Law 92-582 92nd Congress, H.R. 12807 October 27, 1972 An Act To amend the Federal Property and Administrative Services Act
More informationCHAPTER 4 BUILDING REGULATION
CHAPTER 4 BUILDING REGULATION Article I Administration 4-101 Activities regulated 4-102 Conflict with other ordinances 4-103 Building codes enforcement officer 4-104 Board of adjustment 4-105 Building
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Docket No. RR16- Corporation )
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability ) Docket No. RR16- Corporation ) PETITION OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION
More informationCITY OF WHEAT RIDGE, COLORADO INTRODUCED BY COUNCIL MEMBER STARKER COUNCIL BILL NO. 18 ORDINANCE NO Series 2015
CITY OF WHEAT RIDGE, COLORADO INTRODUCED BY COUNCIL MEMBER STARKER COUNCIL BILL NO. 18 ORDINANCE NO. 1580 Series 2015 TITLE: AN ORDINANCE ADDING A NEW ARTICLE XIII TO CHAPTER 26 OF THE WHEAT RIDGE CODE
More informationCity of Tacoma. Procedures for Public Disclosure Requests
City of Tacoma Procedures for Public Disclosure Requests Contact information: Public Records Officer City Clerk s Office 747 Market Street, Room 220 Tacoma, WA 98402 253-591-5198 BACKGROUND These procedures
More informationGuide to Submitting Ballot Arguments
City and County of San Francisco November 8, 2016 Consolidated General Election Guide to Submitting Ballot Arguments In favor of or against local ballot measures, for publication in the San Francisco Voter
More information2015 GROUP A PROPOSED CHANGES TO THE I-CODES MEMPHIS COMMITTEE ACTION HEARINGS
Introduction 2015 GROUP A PROPOSED CHANGES TO THE I-CODES MEMPHIS COMMITTEE ACTION HEARINGS April 19 28, 2015 Memphis Cook Convention Center Memphis, Tennessee First Printing Publication Date: March 2015
More informationORDINANCE NO. BISTERFELDT, CLEGG, EBERLE, JORDAN, SHEALY AND TIBBS BY THE COUNCIL:
EXECUTIVE SUNLMARY DATE: November 20,2007 FROM: Jenifer Gilliland, PDS TO: Mayor and Council RE: 0-99-07: Update of ordinance relating to the 2006 International Energy Conservation Code (IECC) This update
More information2015 IPSDC. INTERNATIONAL Private Sewage Disposal Code CODE ALERT!
2015 IPSDC INTERNATIONAL Private Sewage Disposal Code CODE ALERT! Subscribe now to receive critical code updates. Signup is easy! www.iccsafe.org/2015alert 2015 International Private Sewage Disposal Code
More informationFort Collins Amendments to the 2009 International Mechanical Code
Planning, Development & Transportation Services Community Development & Neighborhood Services 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.416.2740 970.224.6134- fax fcgov.com
More informationFlorida Engineering Laws & Rules
Florida Engineering Laws & Rules Online for 2019 by William C. Dunn, P.E. Introduction This course will help you know and understand the laws and rules that affect you as a licensed professional engineer.
More information2014 OREGON STRUCTURAL SPECIALTY CODE
PREFACE Introduction Internationally, code officials recognize the need for a modern, up-to-date building code addressing the design and installation of building systems through requirements emphasizing
More informationA Bill Regular Session, 2017 SENATE BILL 521
Stricken language would be deleted from and underlined language would be added to present law. 0 0 0 State of Arkansas As Engrossed: S// S// S// S// st General Assembly A Bill Regular Session, 0 SENATE
More informationTHE AGREEMENT between The REGENTS of NEW MEXICO STATE UNIVERSITY and the ARCHITECT
THE AGREEMENT between The REGENTS of NEW MEXICO STATE UNIVERSITY and the ARCHITECT 1. PARTIES TO THE CONTRACT THIS AGREEMENT effective this day of, 20, BY AND BETWEEN THE REGENTS OF NEW MEXICO STATE UNIVERSITY
More informationCounty Referendum Process
County Referendum Process Ventura County Elections Division MARK A. LUNN Clerk-Recorder, Registrar of Voters 800 South Victoria Avenue Ventura, CA 9009-00 (805) 654-664 venturavote.org Revised 0//7 Contents
More information53 NYS UNIFORM FIRE PREVENTION & BUILDING CODES 53. Chapter 53
53 NYS UNIFORM FIRE PREVENTION & BUILDING CODES 53 Chapter 53 A LOCAL LAW PROVIDING FOR THE ADMINISTRATION AND ENFORCEMENT OF THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE [On December 2,
More informationBritish Columbia Hydro and Power Authority ( BC Hydro )
British Columbia Hydro and Power Authority ( BC Hydro ) 1. BC Hydro s Refrigerator Relics Contest PURPOSE: The purpose of the Refrigerator Relics Contest is to identify the oldest, most unique operating
More informationApply for Hot Works Permit
Apply for Hot Works Permit Details of revisions Level Details Date Initial 1 Creation of initial document for use 20/08/2016 J.O S 2 Review and Amendment 26/02/2018 MW Title: Apply for Hot Works Permit
More informationREQUEST FOR QUALIFICATIONS (RFQ) FOR LOBBYIST SERVICES
REQUEST FOR QUALIFICATIONS (RFQ) FOR LOBBYIST SERVICES The City of St. Pete Beach ( City ) is seeking statements of qualifications for the purpose of selecting a lobbyist to provide services representing
More informationBE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FEDERAL HEIGHTS,COLORADO;
ORDINANCE NO. 16-12 INTRODUCED BY: Council Member Scharf Council Member Dougherty AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF FEDERAL HEIGHTS, COLORADO, REPEALING AND REENACTING IN ITS ENTIRETY ARTICLE
More informationASSE INTERNATIONAL BOARD OF DIRECTORS PROPOSED BYLAWS CHANGES
ASSE INTERNATIONAL BOARD OF DIRECTORS PROPOSED BYLAWS CHANGES - 2018 PROPOSED BYLAWS REVISION #1 ARTICLE VIII RULES AND REGULATIONS GOVERNING CHAPTERS Section 1. Formation of New Chapters. Chapters of
More informationAuthorities Budget Office Policy Guidance
Authorities Budget Office Policy Guidance No. 10-03 Date Issued: April 12, 2010 Supersedes: 07-04 Subject: Posting and Maintaining Reports on Public Authority Web Sites Statutory Citation: Chapter 506
More informationSample Licensing Agreement
Agreement Between Laura C. George and The Awesomest Company, Inc. This art licensing agreement (the Agreement ) is entered into as of May 10th, 2016 (the Effective Date ) between Laura C. George ( Artist
More informationD. Standard 99C, Gas and Vacuum Systems, 2005 edition, promulgated by the National Fire Protection Association ( NFPA ).
DEPARTMENT OF REGULATORY AGENCIES Examining Board of Plumbers PLUMBING 3 CCR 720-1 [Editor s Notes follow the text of the rules at the end of this CCR Document.] 1.0 STATEMENT OF BASIS AND PURPOSE 1.1
More informationACCREDITED STANDARDS COMMITTEE
ACCREDITED STANDARDS COMMITTEE ASC 137 Lighting Systems Operating Procedures (Month/Year Approved by ASC) ASC Operating Procedures 1 TABLE OF CONTENTS FOREWORD... 4 1 GENERAL... 5 1.1 Compliance with ANSI
More informationTHE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL
SENATE AMENDED PRIOR PRINTER'S NOS., PRINTER'S NO. THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. 0 Session of 1 INTRODUCED BY EVANKOVICH, DOWLING, GABLER, A. HARRIS, HARPER, ZIMMERMAN, BERNSTINE,
More information2018 PETITION FOR NOMINATION OF CANDIDATE FOR DIRECTOR
For Choptank official use only: Received: / / @ :.m. Name: Signed: 2018 PETITION FOR NOMINATION OF CANDIDATE FOR DIRECTOR To The Credentials And Election Committee of Choptank Electric Cooperative, Inc.
More information1.000 Development Permit Procedures and Administration
CHAPTER 1 1.000 Development Permit Procedures and Administration 1.010 Purpose and Applicability A. The purpose of this chapter of the City of Lacey Development Guidelines and Public Works Standards is
More informationQUALITY ASSURANCE AGREEMENT Production of packaging and/or services for the pharmaceutical industry
QUALITY ASSURANCE AGREEMENT Production of packaging and/or services for the pharmaceutical industry between and [company name] [street & number] [zip code - town or city], [country] - hereinafter referred
More informationCONSULTATIVE COUNCIL CONSENSUS PROCEDURES. General. This consensus process shall be followed by the Consultative Council (Council) and its committees.
CONSULTATIVE COUNCIL CONSENSUS PROCEDURES Section 1. Section 2. General. This consensus process shall be followed by the Consultative Council (Council) and its committees. Definitions. 2.1 "Appointed members"
More informationRESOLUTION NO
RESOLUTION NO. 601-96 A RESOLUTION OF THE CITY OF SEDRO-WOOLLEY TO ESTABLISH POLICY TO ENSURE COMPLIANCE WITH AND SETTING THE POLICY FOR IMPLEMENTING THE LAWS OF THE STATE OF WASHINGTON WITH REGARD TO
More informationRULES OF TENNESSEE DEPARTMENT OF COMMERCE AND INS URANCE DIVISION OF FIRE PREVENTION CHAPTER REVIEW OF CONSTRUCTION PLANS AND SPECIFICATIONS
RULES OF TENNESSEE DEPARTMENT OF COMMERCE AND INS URANCE DIVISION OF FIRE PREVENTION CHAPTER 0780-2-3 REVIEW OF CONSTRUCTION PLANS AND SPECIFICATIONS TABLE OF CONTENTS 0780-2-3-.01 Definitions 0780-2-3-.06
More informationCITY OF ELK GROVE CITY COUNCIL STAFF REPORT
CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 9.2 AGENDA TITLE: A public hearing to consider introduction of an ordinance repealing and reenacting various Chapters of Title 16 of the Elk
More informationCHAPTER BUILDING PERMITS
CITY OF MOSES LAKE MUNICIPAL CODE CHAPTER 16.02 BUILDING PERMITS Sections: 16.02.010 Purpose of Chapter 16.02.020 Building Codes Adopted 16.02.030 Filing of Copies of Codes 16.02.040 Unplatted Areas 16.02.045
More informationACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016
ACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016 Accredited Standards Committee (ASC) procedure is used for the ASC Z540 Standards Committee. This version of the Accredited Standards
More informationAPPLICATION FOR BUILDING DEPARTMENTS/CODE ENFORCEMENT AGENCIES ACCREDITATION For IAS Internal Use Listing No.
APPLICATION FOR BUILDING DEPARTMENTS/CODE ENFORCEMENT AGENCIES ACCREDITATION For IAS Internal Use Listing No. New accreditation Accreditation Criteria: Number of Employees AC251 (United States) 1-10 11-25
More information[APPLICATION FOR REZONING] [Type the company name] Preferred Customer
[Type the company name] Preferred Customer [APPLICATION FOR REZONING] CITY OF DULUTH, GEORGIA DEPARTMENT OF PLANNING & DEVELOPMENT 3167 MAIN STREET DULUTH, GA Section 1 Application Instructions A. The
More informationGeneral Conditions of Purchase of BASF SE and its Affiliated Companies. Companies Located in Germany for Standard Software
1. General 1.1. These Conditions of Purchase of BASF SE and its Affiliated Companies (hereinafter Conditions of Purchase ) form an integral part of all contracts on the delivery of standard software (hereinafter
More informationCode and Regulatory Action. Michael D. Fischer, Kellen Company Code Consultant to CPI
2015 Code and Regulatory Action Michael D. Fischer, Kellen Company Code Consultant to CPI Topics for Today History of US Construction Codes Current State of National Model Codes State Code Adoption Green
More informationFILED 12/01/2017 1:43 PM ARCHIVES DIVISION SECRETARY OF STATE
OFFICE OF THE SECRETARY OF STATE DENNIS RICHARDSON SECRETARY OF STATE LESLIE CUMMINGS DEPUTY SECRETARY OF STATE TEMPORARY ADMINISTRATIVE ORDER INCLUDING STATEMENT OF NEED & JUSTIFICATION MHS 15-2017 CHAPTER
More informationS.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY
[27th January 2014] Supplement to Official Gazette 939 S.I. 7 of 2014 PUBLIC PROCUREMENT ACT (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY 1.
More informationFellow Nomination Form
Fellow Nomination Form PO Box 4429 Danbury, CT 06813-4429 USA Phone: Toll-free: 800.242.4363 (U.S.) or visit www.aiche.org/phone (outside U.S.) to obtain your country s number. Fax: 203.775.5177 To The
More informationREQUEST FOR PROPOSALS Galax Water Treatment Plant and Galax Wastewater Treatment Facility Control System Integration Service Term Contract
REQUEST FOR PROPOSALS Galax Water Treatment Plant and Galax Wastewater Treatment Facility Control System Integration Service Term Contract October 16, 2017 1.0 GENERAL INFORMATION The City of Galax is
More informationAssembly Bill No. 404 Assemblyman Frierson
Assembly Bill No. 404 Assemblyman Frierson CHAPTER... AN ACT relating to time shares; amending provisions relating to licensing and registration of sales agents, representatives, managers, developers,
More informationLEGISLATIVE PROCESS HANDBOOK (For City Departments)
LEGISLATIVE PROCESS HANDBOOK (For City Departments) BOARD OF SUPERVISORS CITY AND COUNTY OF SAN FRANCISCO 1 as of 12/16/2015 INTRODUCTION This Handbook is designed to provide the City departments with
More information[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION EDITION
[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION - 1997 EDITION This document modifies portions of the General Conditions of the Contract for Construction
More informationA. Implement the goals and policies of the Comprehensive Plan for citizen involvement and the planning process;
1307 PROCEDURES 1307.01 PURPOSE Section 1307 is adopted to: A. Implement the goals and policies of the Comprehensive Plan for citizen involvement and the planning process; B. Establish uniform procedures
More informationPOKAGON BAND OF POTAWATOMI INDIANS HEALTH, ENVIRONMENTAL PROTECTION AND BUILDING CODES ACT TABLE OF CONTENTS
POKAGON BAND OF POTAWATOMI INDIANS HEALTH, ENVIRONMENTAL PROTECTION AND BUILDING CODES ACT TABLE OF CONTENTS CHAPTER 1... 1 Section 1.01 Short Title... 1 Section 1.02 Authority... 1 Section 1.03 Purpose...
More informationCHAPTER 10. BUILDINGS. 1. Article I. In General.
CHAPTER 10. BUILDINGS. 1 Article I. In General. VERSION 03/2017 Sec. 10 Sec. 10-1. Sec. 10-2. Sec. 10-2.1. Sec. 10-3. Sec. 10-4. Sec. 10-5. Sec. 10-6. Sec. 10-7. Sec. 10-8. County Building Code adopted.
More informationChapter 4-09 MECHANICAL CODE
Chapter 4-09 MECHANICAL CODE Sections: 4-09-01 PURPOSE 4-09-02 EFFECTIVE DATE AND PUBLIC EXAMINATION OF CODE 4-09-03 AUTHORITY HAVING JURISDICTION; CITY OF BOISE 4-09-04 INTERNATIONAL MECHANICAL CODE/INTERNATIONAL
More informationA LOCAL LAW PROVIDING FOR THE ADMINISTRATION AND ENFORCEMENT OF THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE
A LOCAL LAW PROVIDING FOR THE ADMINISTRATION AND ENFORCEMENT OF THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE Local Law # 2 of 2006. Be it enacted by the Town Board of the Town of Elba,
More informationDLA Aviation Hall of Fame Guidelines
DLA Aviation Hall of Fame Guidelines PURPOSE: Throughout its dynamic and challenging history, Defense Logistics Agency (DLA) Aviation employees have made significant contributions to our Nation's defense.
More informationGENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 HOUSE BILL 252 RATIFIED BILL
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 HOUSE BILL 252 RATIFIED BILL AN ACT TO MAKE VARIOUS CHANGES AND CLARIFICATIONS TO THE STATUTES GOVERNING THE CREATION AND ENFORCEMENT OF BUILDING CODES.
More informationORDINANCE NO AN ORDINANCE TO BE KNOWN AS THE HERNANDO COUNTY,MECHANICAL CODE: PROVIDING FOR THE ADOPTION OF THE I-
ORDINANCE NO. 95-21 AN ORDINANCE TO BE KNOWN AS THE HERNANDO COUNTY,MECHANICAL CODE: PROVIDING FOR THE ADOPTION OF THE I- u STANDARD MECHANICAL CODE, 1994 EDITION; PROVIDING FOR LL MODIFICATION TO CHAPTER
More informationPage 1 of 4 Denver, Colorado, Code of Ordinances >> TITLE II - REVISED MUNICIPAL CODE >> Chapter 20 - FINANCE >> ARTICLE IV. - CONTRACTS, PURCHASES AND CONVEYANCES >> DIVISION 5. CONFIRMATION OF LAWFUL
More informationSarasota Police Department s 2017 Annual Report Cover Contest
Sarasota Police Department s 2017 Annual Report Cover Contest The concept and what we are looking for: We want students to convey what the Sarasota Police Department and the City of Sarasota means to them
More information