1 AGENDA 1618th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT April 11, :45 CLOSED SESSION 4:30 P.M. ROLL CALL & PUBLIC BOARD MEETING MSD OFFICES 2350 MARKET STREET ROOM ROLL CALL 2 CLOSED SESSION TO DISCUSS THE PURCHASE OR SALE OF REAL ESTATE UNDER (2) AND PERSONNEL ACTIONS UNDER (3); RSMO 1988 SUPP. 3 APPROVAL OF JOURNAL OF PRECEDING MEETING: March 14, 2019 (1617th) 4 COMMENTS BY THE CHAIR 5 REPORT OF EXECUTIVE DIRECTOR YES 6 REPORT OF THE BOARD COMMITTEES April 2, 2019 Audit, Program Mngt & Stakeholder April 9, 2019 Finance 7 COMMENTS FROM THE PUBLIC 8 SUBMISSION OF PUBLIC HEARING REPORTS - None 9 COMMUNICATIONS None 10 CONSENT AGENDA: 11 through 21 1

2 CONSENT AGENDA ORDINANCES 11 Adoption of Proposed Ordinance No CSO Volume Reduction Green Infrastructure Fresh Coast Community Greening Site (13154) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with Greenprint Retrofits, LLC for cost sharing for green infrastructure construction in CSO Volume Reduction Green Infrastructure Fresh Coast Community Greening Site (13154) in the City of St. Louis, Missouri. 12 Adoption of Proposed Ordinance No Royal Pines Pump Station (P-739) Replacement (12193) Making a supplemental appropriation of One Hundred Twenty Thousand Dollars ($120,000.00) from the Sanitary Replacement Fund to be used for pump station improvements in Royal Pines Pump Station (P-739) Replacement (12193) in the City of Maryland Heights, Missouri. 13 Adoption of Proposed Ordinance No Bissell Point WWTF Redundant Sludge Acceptance System (12828) Appropriating Three Million Four Hundred Thousand Dollars ($3,400,000.00) from the Sanitary Replacement Fund to be used for wastewater treatment plant construction in Bissell Point WWTF Redundant Sludge Acceptance System (12828) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Plocher Construction Company, Inc. for the aforesaid wastewater treatment plant construction. 14 Adoption of Proposed Ordinance No CSO Volume Reduction Green Infrastructure (11146) Making a supplemental appropriation of Five Million Dollars ($5,000,000.00) from the General Fund to be used for construction of green infrastructure in CSO Volume Reduction Green Infrastructure (11146) in the City of St. Louis, Missouri. 15 Adoption of Proposed Ordinance No Earth City Shoreline Pump Station (P-704) Replacement (12155) Appropriating Six Hundred Twenty Thousand Dollars ($620,000.00) from the Sanitary Replacement Fund to be used for pump station improvements in Earth City Shoreline Pump Station (P-704) Replacement (12155) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Kelpe Contracting, Inc. for the aforesaid pump station improvements. 16 Adoption of Proposed Ordinance No FF-16 Schuetz Meadowside to Page Sanitary Relief (10601) Making a supplemental appropriation of Four Million Seven Hundred Thousand Dollars ($4,700,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in FF-16 Schuetz Meadowside to Page Sanitary Relief (10601) in the City of Maryland Heights and Unincorporated St. Louis County, Missouri. 2

3 17 Adoption of Proposed Ordinance No Jefferson Barracks Tunnel (Lemay WWTP to Martigney PS) (11711) Making a supplemental appropriation of Twenty Million Dollars ($20,000,000.00) from the Sanitary Replacement Fund to be used for sanitary storage tunnel in Jefferson Barracks Tunnel (Lemay WWTP to Martigney PS) (11711) in Unincorporated St. Louis County, Missouri. 18 Adoption of Proposed Ordinance No Lackland Rd. Uceyle Ave. Storm Sewer (11304) Appropriating Two Hundred Sixty-Five Thousand Dollars ($265,000.00) from the Operation, Maintenance, Construction, Improvement Fund of University City to be used for storm sewer construction in Lackland Rd. Uceyle Ave. Storm Sewer (11304) in the City of Overland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Wehmeyer Farms, Inc. for the aforesaid storm sewer construction. 19 Adoption of Proposed Ordinance No Queen Anne Place at Sappington Storm Improvements (12767) Appropriating Three Hundred Fifty Thousand Dollars ($350,000.00) from the Operation, Maintenance, Construction, Improvement Fund of Deer Creek for cost sharing for storm sewer construction in Queen Anne Place at Sappington Storm Improvements (12767) in the City of Glendale, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an intergovernmental agreement under Contract No with the City of Glendale, Missouri to provide financial assistance for storm sewer construction. 20 Adoption of Proposed Ordinance No Saxonhall Drive #10965 Storm Sewer (11420) Appropriating Eighty Thousand Dollars ($80,000.00) from the Districtwide Stormwater Fund to be used for storm sewer construction in Saxonhall Drive #10965 Storm Sewer (11420) in the City of Bridgeton, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with J. H. Berra Construction Co., Inc. for the aforesaid storm sewer construction. 21 Adoption of Proposed Ordinance No Bissell & Lemay WWTF Fluidized Bed Incinerators (12565) Appropriating Five Hundred Seventy-Seven Thousand Dollars ($577,000.00) from the Sanitary Replacement Fund to be used for design in Bissell & Lemay WWTF Fluidized Bed Incinerators (12565) in the City of St. Louis and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Black & Veatch Corporation for the aforesaid design. UNFINISHED BUSINESS Ordinances 22 Amendment & Adoption of Proposed Ordinance No Prevailing Wage Requirements for MSD Repealing Ordinance No , as adopted March 16, 2017, and enacting a new ordinance in lieu thereof establishing a new policy, in compliance with Ordinance No , for the use of prevailing wage requirements for District purchases 3

4 NEW BUSINESS ORDINANCES 23 Introduction and Adoption of Proposed Ordinance No Big Bend to Papin Storm Sewer Phase I (10035) Making a supplemental appropriation of Sixty-Five Thousand Dollars ($65,000.00) from the Operation, Maintenance, Construction, Improvement Fund of Seminary Branch of River Des Peres and Seventy-Five Thousand Dollars ($75,000.00) from the Districtwide Stormwater Fund to be used for storm sewer construction in Big Bend to Papin Storm Sewer Phase I (10035) in the City of Webster Groves, Missouri. 24 Introduction of Proposed Ordinance No Bissell Coldwater Missouri Meramec Public I/I Reduction (2019) Contract A (12029) Appropriating Five Million Three Hundred Thousand Dollars ($5,300,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer rehabilitation in Bissell Coldwater Missouri Meramec Public I/I Reduction (2019) Contract A (12029) in the Cities of Ballwin, Fenton, Kirkwood, and Sunset Hills, and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Insituform Technologies USA, LLC for the aforesaid sanitary sewer rehabilitation. 25 Introduction of Proposed Ordinance No Creve Coeur Creek Sanitary Trunk Sewer Relief Phase VI (SKME-021) (11729) Appropriating Five Million Eight Hundred Thousand Dollars ($5,800,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Creve Coeur Creek Sanitary Trunk Sewer Relief Phase VI (SKME-021) (11729) in the City of Chesterfield, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Unnerstall Contracting Company, Ltd for the aforesaid sanitary sewer construction. 26 Introduction of Proposed Ordinance No Ashland & Semple Bioretention (CB 4364) CSO VR GI (12890) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Ideal Landscape Construction, Inc. for green infrastructure construction in Ashland & Semple Bioretention (CB 4364) CSO VR GI (12890) in the City of St. Louis, Missouri. 27 Introduction of Proposed Ordinance No Era Ave Block Sewer Separation (10856) Appropriating One Hundred Sixty-Five Thousand Dollars ($165,000.00) from the Sanitary Replacement Fund to be used for private I/I removal in Era Ave Block Sewer Separation (10856) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with J. H. Berra Construction Co., Inc. for the aforesaid private I/I removal. 28 Introduction of Proposed Ordinance No Gravois Trunk (Whitecliff to RDP) Sanitary Relocation Phase VI (Buckley Rd to Union Rd) (11766) Appropriating One Million Eight Hundred Thousand Dollars ($1,800,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Gravois Trunk (Whitecliff to RDP) Sanitary Relocation Phase VI (Buckley Rd to Union Rd) (11766) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Kolb Grading, LLC for the aforesaid sanitary sewer construction. 29 Introduction of Proposed Ordinance No Infrastructure Repairs (Rehabilitation) (2019) 4

5 NEW BUSINESS Contract B (12018) Appropriating One Million Nine Hundred Thousand Dollars ($1,900,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer rehabilitation in Infrastructure Repairs (Rehabilitation) (2019) Contract B (12018) in the City of St. Louis, and Various Municipalities in St. Louis County and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Visu-Sewer of Missouri, LLC for the aforesaid sanitary sewer rehabilitation. 30 Introduction of Proposed Ordinance No Jennings Station Road/North Baden Basin (11142) Appropriating Three Million Seven Hundred Fifty Thousand Dollars ($3,750,000.00) from the Sanitary Replacement Fund to be used for storm sewer construction in Jennings Station Road/North Baden Basin (11142) in the Cities of Flordell Hills and Jennings, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with J. H. Berra Construction Co., Inc. for the aforesaid storm sewer construction. 31 Introduction of Proposed Ordinance No University City I/I Reduction East (UR-08 and UR-09) (11984) Appropriating Four Million Five Hundred Thousand Dollars ($4,500,000.00) from the Sanitary Replacement Fund to be used for private I/I removal and storm sewer construction in University City I/I Reduction East (UR-08 and UR-09) (11984) in the Cities of Olivette, Overland, Normandy, University City, and Vinita Park, and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Fred M. Luth & Sons, Inc. for the aforesaid private I/I removal and storm sewer construction. 32 Introduction of Proposed Ordinance No Upper Maline Trunk Sanitary Relief Phase IV Section B (11791) Making a supplemental appropriation of Three Million Four Hundred Thousand Dollars ($3,400,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Upper Maline Trunk Sanitary Relief Phase IV Section B (11791) in the Cities of Berkeley, Kinloch, and Unincorporated St. Louis County, Missouri. 33 Introduction of Proposed Ordinance No City Lakes Storage Modifications for CSO Control (12794) Appropriating Five Hundred Fifty Thousand Dollars ($550,000.00) from the Sanitary Replacement Fund to be used for combined sewer construction in City Lakes Storage Modifications for CSO Control (12794) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with L. Keeley Construction Company for the aforesaid combined sewer construction. 34 Introduction and Adoption of Proposed Ordinance No Diplomat Lane Outfall Stabilization (11447) Making a supplemental appropriation of Fifty Thousand Dollars ($50,000.00) from the Districtwide Stormwater Fund to be used for storm sewer construction in Diplomat Lane Outfall Stabilization (11447) in the City of Chesterfield, Missouri. 35 Introduction of Proposed Ordinance No Stone Hill Dr 4701 Storm Sewer (11033) Appropriating One Hundred Five Thousand Dollars ($105,000.00) from the Districtwide 5

6 NEW BUSINESS Stormwater Fund to be used for storm sewer construction in Stone Hill Dr 4701 Storm Sewer (11033) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Taylormade Construction Co., LLC for the aforesaid storm sewer construction. 36 Introduction of Proposed Ordinance No Marmont Court #339 Storm Sewer (11489) Appropriating One Hundred Forty-Five Thousand Dollars ($145,000.00) from the Districtwide Stormwater Fund to be used for storm sewer construction in Marmont Court #339 Storm Sewer (11489) in the City of Chesterfield, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No with Bates Utility Company, Inc. for the aforesaid storm sewer construction. 37 Introduction and Adoption of Proposed Ordinance No FY19 Rate Commission Budget Adjustment Request Amending Ordinance 14920, as adopted June 14, 2018, by repealing Section Two, and enacting in lieu thereof a new Section 2, pertaining to an additional appropriation of Twenty-Six Thousand One Hundred Dollars ($26,100.00) from the General Fund to be used for public outreach by the Rate Commission relating to the District s 2019 Rate Change Proposal thereby increasing previously authorized FY19 expense appropriations in the General Fund from One Hundred Sixty-Six Million Six Hundred Ninety-Eight Thousand Three Hundred Forty-Five Dollars ($166,698,345.00) to One Hundred Sixty-Six Million Seven Hundred Twenty-Four Thousand Four Hundred Forty-Five Dollars ($166,724,445.00) and increasing total District budget appropriations from Three Hundred Thirty-Two Million Five Hundred Forty-Six Thousand Five Hundred Sixty-Seven Dollars ($332,546,567.00) to Three Hundred Thirty-Two Million Five Hundred Seventy-Two Thousand Six Hundred Sixty-Seven Dollars ($332,572,667.00). 38 Introduction of Proposed Ordinance No Workforce Development Grant Program Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with The Building and Construction Trades Council of St. Louis (BCTC), whereby BCTC will provide a Workforce Development Training Program for the District which facilitates providing assistance for low income, unemployed, and underemployed individuals within the MSD service area to obtain training and development for sewer construction occupations. 39 Introduction of Proposed Ordinance No Federal Legislative Consulting Services- Cardinal Point Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Cardinal Point Partners, LLC, whereby Cardinal Point Partners, LLC will provide federal legislative services for the District, with an emergency clause. 6

7 RESOLUTIONS 40 Adoption of Resolution No Expressing the Board of Trustees appreciation to Anthony E. Bohn for his 26 years of exemplary service to the Metropolitan St. Louis Sewer District from March 8, 1993, to his retirement effective April 1, Adoption of Resolution No Expressing the Board of Trustees appreciation to David L. Frierdich for his 20 years of exemplary service to the Metropolitan St. Louis Sewer District from August 17, 1998, to his retirement effective April 1, Adoption of Resolution No Expressing the Board of Trustees appreciation to Patrick Rains for his 25 years of exemplary service to the Metropolitan St. Louis Sewer District from January 3, 1994, to his retirement effective May 1, Adoption of Resolution No Reverend Ronald L. Bobo, Sr. served on the Board of Trustees of The Metropolitan St. Louis Sewer District from January 12, 2016 to April 11, Rev. Bobo's contribution serving on the Stakeholder Relations and Audit Committees, as Vice- Chairman and Chairman respectively, and as the Vice-Chairman of the Board of Trustees, assured a continued diligent focus on the District s fiscal matters. In addition, Rev. Bobo's contributions to the St. Louis Community reach far beyond his service on the District's Board, including but not limited to, serving as founder of Great Things, Inc. Foundation, Founder and Executive Director of Sharing Hope International Ministries and serving as Pastor of West Side Missionary Baptist Church for 32 years, as well as a member of numerous non-profit and other organizations through the St. Louis Region. 44 Adoption of Resolution No District Rate Model Support & Feasibility Study Raftelis The adoption of Resolution No will exercise option year two (2) of the contract previously authorized by Ordinance No , adopted May 11, 2017, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Raftelis Financial Consultants, Inc., whereby Raftelis Financial Consultants, Inc. would provide rate design software, training and support services; rate proposal preparation and expert testimony for anticipated future rate commission proceedings; preparation of financial feasibility studies as needed for the issuance of District bonds and assist with public communications regarding future stormwater initiatives. 45 ITEMS PROPOSED FOR INTRODUCTION AND ADOPTION AT THE NEXT BOARD MEETING -None 46 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD 47 ADJOURNMENT 7

8 AGENDA ITEM NUMBER: Introduction and Adoption of Proposed Ordinance No NAME OF PROJECT: Big Bend to Papin Storm Sewer Phase I (10035) North of Interstate 44 and West of South Elm in the City of Webster Groves, Missouri Storm Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates additional funds. What does action accomplish?: Provides additional funds for the construction of a CIP project. Contractor: ABNA, Inc. Previous District Contract: Yes 4140 Lindell Blvd. St. Louis, MO Number of bidders: Low Bid: High Bid: Appropriation Amount: $140, Designer s Estimate: $726, Total MWBE Participation: 17.02% (MBE Goal is 17% - African American) Tee & E Trucking, Inc. (African American) 8.35% - MBE Top to Bottom Cleaning Solution & Landscaping, LLC (African American) 1.86% - MBE Zoie, LLC (African American) 6.81% - MBE ABNA, Inc. (African American) 82.98% - MWBE Prime Type of Contract: Unit Cost Properties Affected: 20 Properties Benefiting: 40 Designed by: Hart, Inc. The work to be done under Contract #21313 consists of the construction of approximately 1,624 lineal feet of storm sewers varying in size from 12-inches to 36-inches in diameter and appurtenances, and one (1) PIRR disconnect. The purpose of this project is to alleviate basement and yard flooding at 527 Ivanhoe Place and 147 Kenilworth Place, and yard flooding at 231 and 253 Papin Avenue, and 211 Simmons Avenue in the City of Webster Groves. This project is scheduled to be completed in 240 days. Budgeted: Capital Improvement Program Budget Year: FY2018, Pg. 187 Amount: $860,000 #5593 Seminary Branch of River Des Peres OMCI Fund $65,000 #5120 Districtwide Stormwater Fund $75,000 Additional Comments: This supplemental appropriation is necessary due to the relocation costs associated with utility conflicts, pavement replacement, and additional structures. The water and gas relocation requirements are more extensive than anticipated. Conflicts necessitated a redesign to include additional structures by the engineer. The construction will require more restoration and pavement than originally anticipated. Staff is requesting introduction and adoption at the April 11, 2019 Board Meeting due to pavement repairs and restoration commencing soon. This supplemental request will bring the total appropriation for this project to $915,000. 8

9 10/08/15 Ord. No Amount: $210,000 Hart, Inc. Design Contract No /09/17 Ord. No Amount: $775,000 Big Bend to Papin Storm Sewer Phase I (10035) Original Construction Contract No

10 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Bissell Coldwater Missouri Meramec Public I/I Reduction (2019) Contract A (12029) Various Sites in the Cities of Ballwin, Fenton, Kirkwood, and Sunset Hills, and Unincorporated St. Louis County, Missouri Sanitary Sewer Rehabilitation (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. Contractor: Insituform Technologies USA, LLC Previous District Contract: Yes Edison Avenue Chesterfield, MO Number of bidders: 2 Low Bid: $5,142, High Bid: $5,383, Appropriation Amount: $5,300, Designer s Estimate: $6,071, Total MWBE Participation: 20.04% (MBE Goal is 10% - WBE Goal is 10%) XL Contracting (African American) 10.02% - MBE DFW Infrastructure 4.92% - WBE TMLA 5.10% - WBE Type of Contract: Unit Cost Properties Affected: 1,377 Properties Benefiting: 3,453 Designed by: Wood Environment & Infrastructure Solutions, Inc. The work to be done under Contract #21757 consists of the rehabilitation of approximately 98,638 lineal feet of sanitary sewers varying in size from 6-inches to 36-inches in diameter using cured-in-place pipe (CIPP) methods, 140 lineal feet of sanitary sewers 96-inches in diameter using cured-in-place pipe (CIPP) methods or epoxy-lining methods, 606 manholes, 1,442 service connections, and 21 point repairs. The purpose of this project is to reduce inflow/infiltration (I/I) in the Grand Glaize, Watkins Creek, Fenton Creek, and Fishpot Creek watersheds. This project is scheduled to be completed in 750 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 85 Amount: $8,900,000 #6660 Sanitary Replacement Fund Additional Comments: An additional contingency of $10,000 for utility relocation (Water - $10,000) is included in the appropriation. The designer s estimate decreased due to a reduction in the length of sewer requiring rehabilitation. This project is expected to be funded by a low interest loan from the State of Missouri, under the State Revolving Loan Fund (SRF). 08/10/17 Ord. No Amount: $81,000 Amec Foster Wheeler Environment & Infrastructure, Inc. Design Contract No Amendment 10

11 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Creve Coeur Creek Sanitary Trunk Sewer Relief Phase VI (SKME-021) (11729) West of Schoettler Drive and North of Clayton Road in the City of Chesterfield, Missouri Sanitary Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. Contractor: Unnerstall Contracting Company, Ltd Previous District Contract: Yes 2803 West Osage Pacific, MO Number of bidders: 3 Low Bid: $5,238, High Bid: $6,826, Appropriation Amount: $5,800, Designer s Estimate: $6,570, Total MWBE Participation: 17.80% (MBE Goal is 17% - African American) B & P Construction (African American) 17.80% - MWBE Type of Contract: Unit Cost Properties Affected: 27 Properties Benefiting: 3,818 Designed by: Wood Environment & Infrastructure Solutions, Inc. The work to be done under Contract #21742 consists of the construction of approximately 7,833 lineal feet of 10-inch to 24-inch diameter sanitary sewers, approximately 100 lineal feet of 18-inch to 54-inch diameter storm sewers, and appurtenances. The purpose of this project is to reduce basement backups and relieve overcharged sanitary sewers. This project will provide for the elimination of two (2) constructed SSOs (BP-036 & BP-037). This project is scheduled to be completed in 545 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 92 Amount: $7,000,000 #6660 Sanitary Replacement Fund Additional Comments: An additional contingency of $350,000 for utility relocation (Electric - $200,000, Telephone - $50,000 & Water - $100,000) is included in the appropriation. This project is expected to be funded by Bond proceeds. 08/11/16 Ord. No Amount: $760,000 Amec Foster Wheeler Environment & Infrastructure, Inc. Design Contract No Amendment 11

12 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Ashland & Semple Bioretention (CB 4364) CSO VR GI (12890) South of Natural Bridge Road and West of Union Boulevard in the City of St. Louis, Missouri Green Infrastructure Construction (015.0 Construction Costs) Why is this action necessary?: Authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. Contractor: Ideal Landscape Construction, Inc. Previous District Contract: Yes 6264 Lemay Ferry Road St. Louis, MO Number of bidders: 3 Low Bid: $241, High Bid: 326, Appropriation Amount: Designer s Estimate: $350, Total MWBE Participation: 17.66% (MBE Goal is 17% - African American) B & P Construction Inc. (African American) 17.66% - MWBE Type of Contract: Unit Cost Properties Affected: 4 Properties Benefiting: 26 Designed by: District Staff The work to be done under Contract #21769 consists of the construction of one (1) bioretention cell approximately 4,395 square feet and appurtenances. The water quality basin will capture runoff from approximately 6 acres and treat close to 77,059 gallons of stormwater. The purpose of this project is to reduce combined sewer overflows into the Mississippi River per the CSO Long Term Control Plan. This project is part of the CSO Volume Reduction Green infrastructure (11146) program. This project is scheduled to be completed in 210 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 93 Amount: $5,000,000* #1101 General Fund Additional Comments: An additional contingency of $10,000 for utility relocation (Other - $10,000) is included in the encumbered amount. 04/11/19 Ord. No Amount: $5,000,000 CSO Volume Reduction Green Infrastructure (11146) Supplemental Appropriation *Requesting Board approval of a contract with Ideal Landscape Construction Inc. for which $270, is being encumbered from Ordinance No

13 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Era Ave Block Sewer Separation (10856) North of West Florissant Avenue and East of Goodfellow Boulevard in the City of St. Louis, Missouri Private I/I Removal (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. Contractor: J. H. Berra Construction Co., Inc. Previous District Contract: Yes 5091 New Baumgartner Road St. Louis, MO Number of bidders: 3 Low Bid: $138, High Bid: $223, Appropriation Amount: $165, Designer s Estimate: $153, Total MWBE Participation: 17.28% (MBE Goal is 17% - African American) Windstar Transportation (African American) 6.77% - MBE Phillips Concrete (African American) 10.51% - MBE Type of Contract: Unit Cost Properties Affected: 10 Properties Benefiting: 2 Designed by: District staff The work to be done under Contract #21780 consists of the construction of approximately 218 lineal feet of 12-inch diameter storm sewers and appurtenances, and the removal of inflow sources from two private properties. The purpose of this project is to alleviate building backups at 5818 Era Avenue resulting from overcharged combined sewers. This project is scheduled to be completed in 90 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 101 Amount: $140,000 #6660 Sanitary Replacement Fund Additional Comments: An additional contingency of $10,000 for utility relocation (Electric - $10,000) is included in the appropriation. This project is expected to be funded by Bond proceeds. 13

14 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Gravois Trunk (Whitecliff to RDP) Sanitary Relocation Phase VI (Buckley Rd to Union Rd) (11766) South of Reavis Barracks Road and East of Interstate 55 in Unincorporated St. Louis County, Missouri Sanitary Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. Contractor: Kolb Grading, LLC Previous District Contract: Yes 5731 Westwood Drive St. Charles, MO Number of bidders: 5 Low Bid: $1,667, High Bid: $2,882, Appropriation Amount: $1,800, Designer s Estimate: $2,301, Total MWBE Participation: 17.06% (MBE Goal is 17% - African American) Zoie Contracting (African American) 10.76% - MBE McKay Hauling (African American) 6.30% - MWBE Type of Contract: Unit Cost Properties Affected: 4 Properties Benefiting: 5,412 Designed by: Burns & McDonnell Co., Inc. The work to be done under Contract #21777 consists of the construction of approximately 1,994 lineal feet of sanitary sewers varying in size from 8-inches to 54-inches in diameter and appurtenances. The purpose of this project is to relocate a portion of the existing 54-inch trunk sanitary sewer that is at risk of failure within the Gravois Creek watershed. This project is scheduled to be completed in 300 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 106 Amount: $2,500,000 #6660 Sanitary Replacement Fund Additional Comments: This project is expected to be funded by Bond proceeds. 08/11/16 Ord. No Amount: $445,000 Burns & McDonnell Co. Design Contract No Amendment 14

15 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Infrastructure Repairs (Rehabilitation) (2019) Contract B (12018) Service Areas 1 and 5 in the East and North Portions of the District in the City of St. Louis, and Various Municipalities in St. Louis County and Unincorporated St. Louis County, Missouri Sanitary Sewer Rehabilitation (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. Contractor: Visu-Sewer of Missouri, LLC Previous District Contract: Yes 7895 St. Clair Avenue East St. Louis, IL Number of bidders: 3 Low Bid: $1,821, High Bid: $2,067, Appropriation Amount: $1,900, Designer s Estimate: $2,500, Total MWBE Participation: 21.36% (MBE Goal is 10% - WBE Goal is 10%) XL Contracting, Inc. (African American) 10.98% - MBE ABNA (African American) 3.35% - MWBE TMLA 7.03% - WBE Type of Contract: Unit Cost Properties Affected: 100 Properties Benefiting: 500 Designed by: District staff The work to be done under Contract #21764 consists of the rehabilitation of approximately 32,644 lineal feet of sanitary sewers varying in size from 8-inches to 36-inches in diameter utilizing cured-in-place pipe (CIPP) methods. The purpose of this project is to reduce infiltration into and rehabilitate older, damaged and deteriorated sanitary sewers throughout the District s boundaries. Sewers identified for rehabilitation are identified through the annual CMOM inspection programs required by the Consent Decree. This project is scheduled to be completed in 365 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 114 Amount: $2,500,000 #6660 Sanitary Replacement Fund Additional Comments: This project is expected to be funded by a low interest loan from the State of Missouri, under the State Revolving Loan Fund (SRF). 15

16 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Jennings Station Road/North Baden Basin (11142) South of West Florissant Avenue and West of Goodfellow Boulevard in the Cities of Flordell Hills and Jennings, Missouri Storm Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. Contractor: J. H. Berra Construction Co., Inc. Previous District Contract: Yes 5091 New Baumgartner Road St. Louis, MO Number of bidders: 3 Low Bid: $3,482, High Bid: $4,091, Appropriation Amount: $3,750, Designer s Estimate: $4,474, Total MWBE Participation: 17.03% (MBE Goal is 17% - African American) Windstar Transportation (African American) 14.70% - MBE Westfall Hauling (African American) 1.21% - MBE Zoie LLC (African American) 1.12% - MBE Type of Contract: Unit Cost Properties Affected: 30 Properties Benefiting: 100 Designed by: Jacobs Group, Inc. and HR Green, Inc. The work to be done under Contract #21775 consists of the construction of approximately a 24.5 acre-foot detention basin, rain garden, and approximately 3,028 lineal feet of 12-inch to 48-inch diameter storm sewers and appurtenances. The purpose of this project is to reduce basement backups and alleviate wet weather surcharging and overland flooding of the combined sewer system. This project is scheduled to be completed in 450 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 117 Amount: $2,100,000 #6660 Sanitary Replacement Fund Additional Comments: An additional contingency of $160,000 for utility relocation (Electric - $60,000, Gas - $50,000 & Water - $50,000) is included in the appropriation. The designer s estimate increased due to an increase in the project scope. This project scope includes the project scope originally intended for the Paisley Roslyn Gaylord Storm Sewer Separation (11409) project scheduled for FY2020 with a total construction estimate of $2,000,000. Combining these two projects allows for greatly reduced impact on the surrounding residential neighborhoods. This project is expected to be funded by Bond proceeds. 16

17 11/10/16 Ord. No Amount: $800,000 Jacobs Group Cityshed Mitigation Program Design (Contract A) (12693) Design Contract No Amendment (Jennings Station Road/North Baden Basin (11142) project) 09/13/18 Ord. No Amount: $1,200,000 HR Green Stormwater Infrastructure Improvement Design (Contract A) (12688) Design Contract No Amendment (Paisley Roslyn Gaylord Storm Sewer Separation (11409) project) 17

18 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: University City I/I Reduction East (UR-08 and UR-09) (11984) South of Page Avenue and East of Interstate 170 in the Cities of Olivette, Overland, Normandy, University City, and Vinita Park, and Unincorporated St. Louis County, Missouri Private I/I Removal and Storm Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes 4516 McRee Avenue St. Louis, MO Number of bidders: 5 Low Bid: $3,727, High Bid: $4,492, Appropriation Amount: $4,500, Designer s Estimate: $4,867, Total MWBE Participation: 17.44% (MBE Goal is 17% - African American) Tee and E Trucking (African American) 6.17% - MBE B & P Construction (African American) 11.27% - MWBE Type of Contract: Unit Cost Properties Affected: 334 Properties Benefiting: 1,640 Designed by: Burns & McDonnell Co., Inc. The work to be done under Contract #21773 consists of the construction of approximately 6,240 lineal feet of storm and sanitary sewers varying in size from 10-inches to 42-inches in diameter and appurtenances, and the removal of inflow sources from 221 properties. The purpose of this project is to reduce inflow/infiltration (I/I) in the University City Branch watershed, reduce building backups, and relieve overcharged sanitary sewers. This project is scheduled to be completed in 700 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 136 Amount: $5,506,000 #6660 Sanitary Replacement Fund Additional Comments: An additional contingency of $480,000 for utility relocation (Electric - $250,000, Water - $200,000 & Other - $30,000) is included in the appropriation. Contingencies also include seal coatings of asphalt driveways where needed. The designer s estimate was decreased due to a reduction in project scope of 1,560 lineal feet of storm and sanitary sewers. These sewers will be included in a later project. This project is expected to be funded by Bond proceeds. 08/05/14 Ord. No Amount: $1,382,000 Burns & McDonnell Co. Design Contract No Amendment 18

19 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Upper Maline Trunk Sanitary Relief Phase IV Section B (11791) East of Interstate 170 and North of Natural Bridge Road in the Cities of Berkeley, Kinloch, and Unincorporated St. Louis County, Missouri Sanitary Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates additional funds. What does action accomplish?: Provides additional funds for the construction of a CIP project, as required by Consent Decree. Contractor: J & J Boring, Inc. Previous District Contract: Yes 41 Cardinal Hill Road Winfield, MO Number of bidders: Low Bid: High Bid: Appropriation Amount: $3,400, Designer s Estimate: $13,700, Total MWBE Participation: 17.04% (MBE Goal is 17% - African American) Zoie, LLC (African American) 17.04% - MBE J & J Boring, Inc % - WBE Prime Type of Contract: Unit Cost Properties Affected: 35 Properties Benefiting: 9,500 Designed by: HR Green, Inc. The work to be done under Contract #21645 consists of the construction of approximately 45 lineal feet of 36-inch sanitary sewers and 5,950 lineal feet of sanitary sewer pipe-in-tunnel varying in size from 36-inches to 42-inches in diameter and appurtenances. This construction is the second phase of a multi-phase improvement project. The purpose of this project is to alleviate overcharged sewer mains and basement backups, and eliminate one (1) constructed SSO (BP-597). This project is scheduled to be completed in 614 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 137 Amount: $3,400,000 #6660 Sanitary Replacement Fund Additional Comments: This is a partial funding request. This supplemental appropriation will bring the total appropriation for this project to $10,400, and fully fund the construction for this project. This project is expected to be funded by Bond proceeds. 09/10/09 Ord. No Amount: $1,600,000 HR Green, Inc. Design Contract No /10/18 Ord. No Amount: $7,000,000 Upper Maline Trunk Sanitary Relief Phase IV Section B (11791) J & J Boring, Inc. Original Construction Contract No

20 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: City Lakes Storage Modifications for CSO Control (12794) Benton Park East and West Lake, Clifton Heights Lake, and Hyde Park Lake in the City of St. Louis, Missouri Combined Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. Contractor: L. Keeley Construction Company Previous District Contract: Yes 500 S. Ewing Avenue, Suite G St. Louis, MO Number of bidders: 1 Low Bid: $494, High Bid: $494, Appropriation Amount: $550, Designer s Estimate: $351, Total MWBE Participation: 47.53% (MBE Goal is 17% - African American) Clay Piping Systems (African American) 27.27% - MBE J. West Electrical Contracting (African American) 20.26% - MBE Type of Contract: Lump Sum Properties Affected: 3 Properties Benefiting: Entire Bissell Point and Lemay Watersheds Designed by: Tetra Tech, Inc. The work to be done under Contract #21778 consists of the construction of 5 floating aeration devices, water inlet control measures at 4 lakes, modifications to the existing outlet control structures at 3 lakes, and appurtenances. This project will alleviate potable water overflow from the Benton Park East and West, Clifton Heights Park, and Hyde Park Lakes in the City of St. Louis into the combined sewer system. The purpose of this project is to reduce combined sewer overflows to the Mississippi River per the CSO Long Term Control Plan. This project is scheduled to be completed in 180 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Continued Amount: $325,000 #6660 Sanitary Replacement Fund Additional Comments: An additional contingency of $30,000 for utility relocation (Water - $10,000 & Other - $20,000) is included in the appropriation. 11/10/18 Ord. No Amount: $60,000 Tetra Tech, Inc. GSA Facility & Sewer Design (2016) (11760) Contract No Amendment No. 2 20

21 AGENDA ITEM NUMBER: Introduction and Adoption of Proposed Ordinance No NAME OF PROJECT: Diplomat Lane Outfall Stabilization (11447) South of Olive Boulevard and West of N. Woods Mill Road in the City of Chesterfield, Missouri Storm Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates additional funds. What does action accomplish?: Provides additional funds for the construction of a CIP project. Contractor: Pace Construction Company Previous District Contract: Yes 1620 Woodson Road St. Louis, MO Number of bidders: Low Bid: High Bid: Appropriation Amount: $50, Designer s Estimate: $210, Total MWBE Participation: 17.03% (MBE Goal is 17% - African American) Kendall s Hauling, LLC (African American) 14.22% - MBE Zoie, LLC (African American) 2.81% - MBE Type of Contract: Unit Cost Properties Affected: 2 Properties Benefiting: 2 Designed by: M3 Group, PC The work to be done under Contract #21696 consists of the construction of approximately 116 lineal feet of storm sewers varying in size from 18-inches to 36-inches in diameter and appurtenances. The purpose of this project is to alleviate bank failure at a storm sewer outfall. This project is scheduled to be completed in 180 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 185 Amount: $641,000 #5120 Districtwide Stormwater Fund Additional Comments: This supplemental appropriation is necessary due to the costs associated with a modification of the slope stability design and materials. The proposed rock revetment was revised to a structural vegetative cover. The construction will require more vegetation than anticipated due to a change in ground conditions between the time of original survey and present day. Staff is requesting introduction and adoption at the April 11, 2019 Board Meeting due to the likelihood of completing the project in a short timeframe to correspond with vegetation growing seasons. This supplemental request will bring the total appropriation for this project to $285, /13/18 Ord. No Amount: $205,000 M3 Group, PC Stormwater Streambank Stabilization Design (Contract B) (12687) Design Contract No Amendment No. 1 10/11/18 Ord. No Amount: $235,000 Diplomat Lane Outfall Stabilization (11447) Original Construction Contract No

22 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Stone Hill Dr 4701 Storm Sewer (11033) West of Interstate 55 and South of Interstate 270 in Unincorporated St. Louis County, Missouri Storm Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. Contractor: Taylormade Construction Co., LLC Previous District Contract: Yes 1861 Chambers Road St. Louis, MO Number of bidders: 5 Low Bid: $76, High Bid: $110, Appropriation Amount: $105, Designer s Estimate: $74, Total MWBE Participation: 17.00% (MBE Goal is 17% - African American) Top to Bottom (African American) 12.89% - MBE New Generation (African American) 4.11% - MBE Taylormade Construction Co., LLC (African American) 83.00% - MBE Prime Type of Contract: Unit Cost Properties Affected: 3 Properties Benefiting: 2 Designed by: Oates Associates, Inc. The work to be done under Contract #21776 consists of the construction of approximately 70 lineal feet of concrete channel, 215 lineal feet of storm sewers varying in size from 12-inches to 18-inches in diameter, approximately 17 lineal feet of sanitary sewers 8-inches in diameter, and appurtenances. The purpose of this project is to alleviate backyard flooding at 4701 Stone Hill Drive and 4781 Ambs Road. This project is scheduled to be completed in 150 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 204 Amount: $225,000 #5120 Districtwide Stormwater Fund Additional Comments: An additional contingency of $20,000 for utility relocation (Other - $20,000) is included in the appropriation. The designer s estimate decreased due to the reduction of pipe footage and the avoidance of significant utility relocation dollars. This project was one of twenty-three design projects included in Stormwater Infrastructure Improvement Design (Contract C) (12690). 09/13/18 Ord. No Amount: $875,000 Oates Associates Stormwater Infrastructure Improvement Design (Contract C) (12690) Design Contract No Amendment 22

23 AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No NAME OF PROJECT: Marmont Court #339 Storm Sewer (11489) West of Highway 141 and North of Ladue Road in the City of Chesterfield, Missouri Storm Sewer Construction (015.0 Construction Costs) Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. Contractor: Bates Utility Company, Inc. Previous District Contract: Yes 841 Westwood Industrial Park Dr. Weldon Springs, MO Number of bidders: 4 Low Bid: $113, High Bid: $180, Appropriation Amount: $145, Designer s Estimate: $115, Total MWBE Participation: 17.20% (MBE Goal is 17% - African American) Basilico (African American) 4.41% - MBE Green Seasons Landscaping (African American) 11.91% - MBE Westfall Hauling (African American) 0.88% - MBE Type of Contract: Unit Cost Properties Affected: 3 Properties Benefiting: 3 Designed by: District staff The work to be done under Contract #21770 consists of the construction of approximately 304 lineal feet of 12-inch diameter storm sewers and appurtenances. The purpose of this project is to alleviate yard erosion at 339 Marmont Court and Stablestone Drive in Chesterfield, Missouri. This project is scheduled to be completed in 120 days. Budgeted: Capital Improvement Program Budget Year: FY2019, Pg. 223 Amount: $85,000 #5120 Districtwide Stormwater Fund Additional Comments: An additional contingency of $20,000 for utility relocation (Gas - $10,000 & Other - $10,000) is included in the appropriation. The overall project scope increased during the project design to fully address the erosion issues. 23

24 AGENDA ITEM NUMBER: INTRODUCTION AND ADOPTION PROPOSED ORDINANCE NO NAME OF PROJECT: FY19 Rate Commission Budget Adjustment Request Finance Why is this action necessary? What does action accomplish? The Rate Commission has requested an increase in its FY 2019 funding from $595,508 to $621,608. Repeals section two of Ordinance No and enacts a new Section Two pertaining to an additional appropriation from the General Fund (1101) thereby increasing previously authorized FY19 expense appropriations in the General Fund and increasing total District budget appropriations Contractor: Previous District Contract: Number of bidders: Low Bid: High Bid: Appropriation Amount: District s Estimate: MBE/WBE Participation: Plan Approval Date: Type of Contract: Properties Affected: Properties Benefiting: Designed by: Budgeted: Budget Year: Amount: See Below Fund(s) Appropriation General Fund $166,724,445 Water Backup Insurance and Reimbursement Fund 4,425,300 General Insurance Fund 6,089,400 Improvement Fund 50,519 OMCI Funds 26,239,215 Emergency Funds 0 Debt Service Funds 120,328,058 Sanitary Replacement Fund 8,715,730 Total District Appropriations $332,572,667 Additional Comments: If this action is approved, FY 2019 budget appropriations will increase by $26,100 from $332,546,567 to $332,572, /14/2018 Ordinance No Amount $332,546,567 Fiscal Year

AGENDA. 1616th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT

AGENDA. 1616th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT AGENDA 1616th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT February 14, 2019 4:30 P.M. ROLL CALL & PUBLIC BOARD MEETING MSD OFFICES 2350 MARKET STREET ROOM 109 1 ROLL CALL

More information

JOURNAL OF THE (1603nd) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT March 8, 2018

JOURNAL OF THE (1603nd) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT March 8, 2018 JOURNAL OF THE (1603nd) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT March 8, 2018 The Trustees of the District met in Room 109 at 2350 Market on the above date. Present at

More information

JOURNAL OF THE (1612 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT October 11, 2018

JOURNAL OF THE (1612 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT October 11, 2018 JOURNAL OF THE (1612 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT October 11, 2018 The Trustees of the District met in Room 109 at 2350 Market on the above date. Present

More information

JOURNAL OF THE (1534 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT July 11, :00 P.M.

JOURNAL OF THE (1534 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT July 11, :00 P.M. JOURNAL OF THE (1534 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT July 11, 2013 4:00 P.M. The Trustees of the District met in Room 109 at 2350 Market on the above date.

More information

JOURNAL OF THE (1586th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT December 8, 2016 at 5:00 p.m.

JOURNAL OF THE (1586th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT December 8, 2016 at 5:00 p.m. JOURNAL OF THE (1586th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT December 8, 2016 at 5:00 p.m. The Trustees of the District met in Room 109 at 2350 Market on the above

More information

JOURNAL OF THE (1569th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT October 8, 2015 at 5:00 p.m.

JOURNAL OF THE (1569th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT October 8, 2015 at 5:00 p.m. JOURNAL OF THE (1569th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT October 8, 2015 at 5:00 p.m. The Trustees of the District met in Room 109 at 2350 Market on the above

More information

JOURNAL OF THE (1555 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT November 13, :00 P.M.

JOURNAL OF THE (1555 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT November 13, :00 P.M. JOURNAL OF THE (1555 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT November 13, 2014 4:00 P.M. The Trustees of the District met in Room 109 at 2350 Market on the above

More information

JOURNAL OF THE (1592nd) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT June 8, 2017 at 5:00 p.m.

JOURNAL OF THE (1592nd) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT June 8, 2017 at 5:00 p.m. JOURNAL OF THE (1592nd) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT June 8, 2017 at 5:00 p.m. The Trustees of the District met in Room 109 at 2350 Market on the above date.

More information

JOURNAL OF THE (1358 TH ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT AUGUST 9, :00 P.M.

JOURNAL OF THE (1358 TH ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT AUGUST 9, :00 P.M. JOURNAL OF THE (1358 TH ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT AUGUST 9, 2001 5:00 P.M. The Trustees of the District met at the District s offices, 2000 Hampton Avenue,

More information

JOURNAL OF THE (1487 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT June 10, :00 P.M.

JOURNAL OF THE (1487 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT June 10, :00 P.M. JOURNAL OF THE (1487 th ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT June 10, 2010 4:00 P.M. The Trustees of the District met in Room 109 at 2350 Market on the above date.

More information

JOURNAL OF THE 1322ND MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT OCTOBER 14, :00 P.M.

JOURNAL OF THE 1322ND MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT OCTOBER 14, :00 P.M. JOURNAL OF THE 1322ND MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT OCTOBER 14, 1999-5:00 P.M. The Trustees of the District met in the Board Room at 2000 Hampton Avenue on

More information

The Trustees of the District met in Rooms 111/112 at 2350 Market on the above date. Present at meeting:

The Trustees of the District met in Rooms 111/112 at 2350 Market on the above date. Present at meeting: JOURNAL OF THE (1401 st ) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT FEBRUARY 12, 2004-4:00 P.M. The Trustees of the District met in Rooms 111/112 at 2350 Market on the

More information

O R D I N A N C E NO land benefited by the construction of sewers within the boundaries of Subdistrict No.

O R D I N A N C E NO land benefited by the construction of sewers within the boundaries of Subdistrict No. O R D I N A N C E NO. 12190 AN ORDINANCE, levying special benefit assessments against all of the land benefited by the construction of sewers within the boundaries of Subdistrict No. 99048 (West Watson

More information

JOURNAL OF THE (1588th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT February 9, 2017 at 5:00 p.m.

JOURNAL OF THE (1588th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT February 9, 2017 at 5:00 p.m. JOURNAL OF THE (1588th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT February 9, 2017 at 5:00 p.m. The Trustees of the District met in Room 109 at 2350 Market on the above

More information

JOHNSON COUNTY CODE OF REGULATIONS FOR PRIVATE INFILTRATION AND INFLOW 2010 EDITION

JOHNSON COUNTY CODE OF REGULATIONS FOR PRIVATE INFILTRATION AND INFLOW 2010 EDITION JOHNSON COUNTY CODE OF REGULATIONS FOR PRIVATE INFILTRATION AND INFLOW 2010 EDITION Johnson County Wastewater 11811 S. Sunset Drive, Suite 2500 Olathe, KS 66061-7061 (913) 715-8500 INDEX CHAPTER 1 POLICY

More information

O R D I N A N C E NO AN ORDINANCE levying special benefit assessments. against all of the land benefited by the construction of sewers

O R D I N A N C E NO AN ORDINANCE levying special benefit assessments. against all of the land benefited by the construction of sewers O R D I N A N C E NO. 1563 AN ORDINANCE levying special benefit assessments against all of the land benefited by the construction of sewers within the boundaries of Subdistrict No. 227 (Gravois-Sappington

More information

Town of Madawaska, ME. CSO Success Overcoming Funding & Design Challenges

Town of Madawaska, ME. CSO Success Overcoming Funding & Design Challenges Town of Madawaska, ME CSO Success Overcoming Funding & Design Challenges Town of Madawaska - Introduction Madawaska is in rural Aroostook County, Maine Northeastern Most Point In U.S. Population: 4,035

More information

CHAPTER 23: DETENTION BASIN STANDARDS Introduction and Goals Administration Standards Standard Attachments 23.

CHAPTER 23: DETENTION BASIN STANDARDS Introduction and Goals Administration Standards Standard Attachments 23. CHAPTER 23: DETENTION BASIN STANDARDS 23.00 Introduction and Goals 23.01 Administration 23.02 Standards 23.03 Standard Attachments 23.1 23.00 INTRODUCTION AND GOALS A. The purpose of this chapter is to

More information

H 7904 SUBSTITUTE A ======== LC005025/SUB A ======== S T A T E O F R H O D E I S L A N D

H 7904 SUBSTITUTE A ======== LC005025/SUB A ======== S T A T E O F R H O D E I S L A N D 01 -- H 0 SUBSTITUTE A LC000/SUB A S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO STATE AFFAIRS AND GOVERNMENT - CLIMATE CHANGE - RESILIENT RHODE

More information

Regular Meeting Wednesday, August 15, :30 PM Mayor s Conference Room

Regular Meeting Wednesday, August 15, :30 PM Mayor s Conference Room Regular Meeting Wednesday, August 15, 2012 5:30 PM Mayor s Conference Room Egg Harbor Township MUA 3515 Bargaintown Road Egg Harbor Township, NJ 08234 (609) 926-2671 Agenda Call meeting to order Public

More information

NORTH HUDSON SEWERAGE AUTHORITY MINUTES OF REGULAR MEETING. February 19, 2015

NORTH HUDSON SEWERAGE AUTHORITY MINUTES OF REGULAR MEETING. February 19, 2015 NORTH HUDSON SEWERAGE AUTHORITY MINUTES OF REGULAR MEETING February 19, 2015 At approximately 6:30 p.m., Chairman Raia called the meeting to order. Counsel Covello advised that this was a regular meeting

More information

ORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:

ORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA: ORD-3258 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 AN ORDINANCE TO AMEND SECTIONS 30-57, 30-58, 30-60, 30-60.1, 30-71, 30-73, 30-74 AND 30-77 AND ADD SECTIONS 30-62

More information

JOURNAL OF THE 959TH MEETING OF BOARD OF TRUSTEES THE METROPOLITAN ST, LOUIS SEWER DISTRICT Auaust 25, :30 P, M.

JOURNAL OF THE 959TH MEETING OF BOARD OF TRUSTEES THE METROPOLITAN ST, LOUIS SEWER DISTRICT Auaust 25, :30 P, M. JOURNAL OF THE 959TH MEETNG OF BOARD OF TRUSTEES THE METROPOLTAN ST, LOUS SEWER DSTRCT Auaust 25, 1982-3:30 P, M. The Trustees of the District met in the Board Room at 2000 Hampton Avenue on the above

More information

WITNESSETH: WHEREAS, on November 17, 2004, the Illinois General Assembly passed Public Act (hereinafter the Act ); and

WITNESSETH: WHEREAS, on November 17, 2004, the Illinois General Assembly passed Public Act (hereinafter the Act ); and INTERGOVERNMENTAL AGREEMENT BY AND BETWEEN THE [ENTER NAME OF UNIT OF LOCAL GOVERNMENT HERE] AND THE METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO FOR THE USAGE OF A GLOBAL POSITIONING SYSTEM

More information

Chapter 12 Erosion Control Regulations

Chapter 12 Erosion Control Regulations Chapter 12 Erosion Control Regulations Rev. 02/01/05 Section 12-100 Purpose The purpose of this Chapter is to establish minimum standards to deter erosion and sedimentation problems within the City of

More information

Township of SLIPPERY ROCK BUTLER COUNTY

Township of SLIPPERY ROCK BUTLER COUNTY Streets and Sidewalks Chapter 21 Township of SLIPPERY ROCK BUTLER COUNTY Pennsylvania Adopted: 1954. Amended 1974, 1992, 2002 REVISION: Chapter 21: Streets and Sidewalks (Revision page started year 2011)

More information

6.1 Planned Unit Development District

6.1 Planned Unit Development District 6.1 A. Intent The Planned Unit Development (PUD) District is designed to: encourage creativity and innovation in the design of developments; provide for more efficient use of land including the reduction

More information

STATE DIRECT LOAN DUE DILIGENCE REQUEST FORM (Governmental Participant)

STATE DIRECT LOAN DUE DILIGENCE REQUEST FORM (Governmental Participant) STATE DIRECT LOAN DUE DILIGENCE REQUEST FORM (Governmental Participant) The following information is requested from each participant ( Participant ) that is applying for financial assistance from the Missouri

More information

O R D I N A N C E NO. 63. AN ORDINANCE calling and providing for the holding of a. special election in Subdistrict Number Two of the River des Peres

O R D I N A N C E NO. 63. AN ORDINANCE calling and providing for the holding of a. special election in Subdistrict Number Two of the River des Peres O R D I N A N C E NO. 63 AN ORDINANCE calling and providing for the holding of a special election in Subdistrict Number Two of the River des Peres Watershed of The Metropolitan St. Louis Sewer District

More information

ACTION REQUESTED: Take whatever action Council deems advisable 7 NOTICES WERE MAILED ON APRIL 28, 2017 Colvett

ACTION REQUESTED: Take whatever action Council deems advisable 7 NOTICES WERE MAILED ON APRIL 28, 2017 Colvett CITY OF MEMPHIS COUNCIL AGENDA May 9, 2017 Public Session Tuesday, 3:30 p.m. Council Chambers, First Floor, City Hall 125 North Main Street Memphis, Tennessee 38103-2017 CALL TO ORDER by the Sergeant-at-Arms

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT ADMINISTRATIVE CONSENT ORDER

ALLEGHENY COUNTY HEALTH DEPARTMENT ADMINISTRATIVE CONSENT ORDER ALLEGHENY COUNTY HEALTH DEPARTMENT In the Matter of: Allegheny County : Sewage : Article XIV ADMINISTRATIVE CONSENT ORDER This Administrative Consent Order is entered into this day of, 20, by and between

More information

Code of Highlands ~ Chapter 15: Utilities Article IV. Sewerage ORDINANCE AMENDMENT

Code of Highlands ~ Chapter 15: Utilities Article IV. Sewerage ORDINANCE AMENDMENT Code of Highlands ~ Chapter 15: Utilities Article IV. Sewerage ORDINANCE AMENDMENT Pursuant to an affirmative vote on the motion of Commissioner Steihler and a vote of 5 yeas to 0 nays by the Board of

More information

ORDINANCE NO. 925 THE CITY COUNCIL OF THE CITY OF WINLOCK, WASHINGTON, DO

ORDINANCE NO. 925 THE CITY COUNCIL OF THE CITY OF WINLOCK, WASHINGTON, DO ORDINANCE NO. 925 AN ORDINANCE OF THE CITY OF WINLOCK, WASHINGTON, PROVIDING FOR THE PARTIAL REIMBURSEMENT TO DEVELOPERS FOR THE COST OF CONSTRUCTING MUNICIPAL WATER, SANITARY SEWER, STORM SEWER, AND STREET

More information

Chapter 4 - Other Appointive Officers

Chapter 4 - Other Appointive Officers Chapter 4 - Other Appointive Officers 401 Village Attorney 402 Village Engineer 403 Village Treasurer 404 Building and Zoning Officer 405 Planning & Zoning Commission 406 Economic Development Commission

More information

Plan and Zoning Commission City of Richmond Heights, Missouri

Plan and Zoning Commission City of Richmond Heights, Missouri Plan and Zoning Commission City of Richmond Heights, Missouri Regular Meeting 7:00 p.m., Thursday, September 17, 2015 City Council Chambers Richmond Heights City Hall Call to order: Roll Call: (Note name

More information

Regular Meeting Wednesday, March 21, :30 PM Mayor s Conference Room

Regular Meeting Wednesday, March 21, :30 PM Mayor s Conference Room Regular Meeting Wednesday, March 21, 2012 5:30 PM Mayor s Conference Room Egg Harbor Township MUA 3515 Bargaintown Road Egg Harbor Township, NJ 08234 (609) 926-2671 Agenda Call meeting to order Public

More information

Title 15 BUILDINGS AND CONSTRUCTION

Title 15 BUILDINGS AND CONSTRUCTION Title 15 BUILDINGS AND CONSTRUCTION Chapters: 15.04 BUILDING PERMITS 15.08 BUILDING CODE 15.12 NATIONAL ELECTRICAL CODE 15.16 PLUMBING CODE 15.20 MECHANICAL CODE 15.24 EXISTING BUILDING CODE 15.28 RESIDENTIAL

More information

Vice President Daniel M. Pierce was present via telephone due to a medical circumstance.

Vice President Daniel M. Pierce was present via telephone due to a medical circumstance. March 12, 2014 Minutes of the Regular Meeting of the Board of Trustees of the North Shore Sanitary District held Wednesday, March 12, 2014 at 9:30 A.M. at the District Office of the Raymond E. Anderson

More information

Regular City Council and Housing Authority Meeting Agenda February 26, :00 PM

Regular City Council and Housing Authority Meeting Agenda February 26, :00 PM Regular City Council and Housing Authority Meeting Agenda February 26, 2018-6:00 PM City Council Chambers - Yucaipa City Hall 34272 Yucaipa Blvd., Yucaipa, California THE CITY OF YUCAIPA COMPLIES WITH

More information

MEMORANDUM OF UNDERSTANDING BETWEEN the TAHOE REGIONAL PLANNING AGENCY and COUNTY/CITY

MEMORANDUM OF UNDERSTANDING BETWEEN the TAHOE REGIONAL PLANNING AGENCY and COUNTY/CITY MEMORANDUM OF UNDERSTANDING BETWEEN the TAHOE REGIONAL PLANNING AGENCY and COUNTY/CITY This Memorandum of Understanding (MOU) is entered between the Tahoe Regional Planning Agency (TRPA) and herein referred

More information

Bartlett Municipal Planning Commission Minutes

Bartlett Municipal Planning Commission Minutes Bartlett Municipal Planning Commission Minutes Monday, June 5th, 2017 City Hall Assembly Chamber -- 7:00 P.M. The Bartlett Municipal Planning Commission met at the City Hall Assembly Chamber, on Monday,

More information

BILL ORDINANCE 10003

BILL ORDINANCE 10003 BILL 10136 ORDINANCE 10003 AN ORDINANCE AMENDING THE KIRKWOOD CODE OF ORDINANCES, CHAPTER 5, SECTION 5-6 AND ADOPTING THE 2009 INTERNATIONAL PLUMBING CODE, WITH MODIFICATIONS, AS THE PLUMBING CODE OF THE

More information

Mr. Gralik reported the Crestwood Relining pre-construction meeting is scheduled for tomorrow and the project will start shortly.

Mr. Gralik reported the Crestwood Relining pre-construction meeting is scheduled for tomorrow and the project will start shortly. CITY OF HOBART SANITARY DISTRICT/STORM WATER BOARD MEETING MEETING OF March 8, 2017 Mr. Fulton called the meeting of the Hobart Sanitary District to order at 5:05 p.m. Members in attendance: Mr. Robert

More information

MINUTES OF THE REGULAR MEETING OF THE MOUNT LAUREL TOWNSHIP MUNICIPAL UTILITIES AUTHORITY

MINUTES OF THE REGULAR MEETING OF THE MOUNT LAUREL TOWNSHIP MUNICIPAL UTILITIES AUTHORITY MINUTES OF THE REGULAR MEETING OF THE MOUNT LAUREL TOWNSHIP MUNICIPAL UTILITIES AUTHORITY May 21, 2015 Vice Chairman Francescone called the regular meeting of the Mount Laurel Township Municipal Utilities

More information

CITY OF HAZELWOOD REGULAR COUNCIL MEETING MAY 1, 2013

CITY OF HAZELWOOD REGULAR COUNCIL MEETING MAY 1, 2013 CITY OF HAZELWOOD REGULAR COUNCIL MEETING MAY 1, 2013 CALL TO ORDER A regular meeting of the Hazelwood City Council was called to order by Mayor Matthew G. Robinson at 7:30 p.m. on Wednesday, May 1, 2013

More information

RESOLUTION NO CLARION BOROUGH STORMWATER AUTHORITY Clarion County, Pennsylvania

RESOLUTION NO CLARION BOROUGH STORMWATER AUTHORITY Clarion County, Pennsylvania RESOLUTION NO. 2019-001 CLARION BOROUGH STORMWATER AUTHORITY Clarion County, Pennsylvania A RESOLUTION OF THE CLARION BOROUGH STORMWATER AUTHORITY, CLARION COUNTY, PENNSYLVANIA, ESTABLISHING A STORMWATER

More information

ORDINANCE NO. 14,314

ORDINANCE NO. 14,314 ORDINANCE NO. 14,314 AN ORDINANCE to amend the Municipal Code of the City of Des Moines, Iowa, 2000, adopted by Ordinance No. 13,827, passed June 5, 2000, and amended by Ordinance No. 14,043, passed January

More information

1986 ORDINANCES & RESOLUTIONS

1986 ORDINANCES & RESOLUTIONS 1986 ORDINANCES & RESOLUTIONS Ord/Res# A resolution accepting the amounts and rates as determined by the budget commission and authorizing the necessary tax levies and certifying them to the county auditor.

More information

O R D I N A N C E NO. 60. AN ORDINANCE directing the issuance of One Million Seven. Hundred Thousand Dollars ($1,700,000.00) General Obligation Sewer

O R D I N A N C E NO. 60. AN ORDINANCE directing the issuance of One Million Seven. Hundred Thousand Dollars ($1,700,000.00) General Obligation Sewer O R D I N A N C E NO. 60 AN ORDINANCE directing the issuance of One Million Seven Hundred Thousand Dollars ($1,700,000.00) General Obligation Sewer Bonds of the Maline Creek Trunk Subdistrict of The Metropolitan

More information

ARTICLE I. ESTABLISHMENT AND OPERATION OF THE BINGHAMTON-JOHNSON CITY JOINT SEWAGE TREATMENT FACILITIES.

ARTICLE I. ESTABLISHMENT AND OPERATION OF THE BINGHAMTON-JOHNSON CITY JOINT SEWAGE TREATMENT FACILITIES. BINGHAMTON-JOHNSON CITY JOINT SEWAGE TREATMENT FACILITIES INTERMUNICIPAL AGREEMENT [HISTORY: IMA I adopted 7-14-1965 by the City of Binghamton and the Village of Johnson City; amended 12-7-1967 by IMA

More information

BOROUGH OF BUENA WORKSHOP AGENDA APRIL 8, 2019 PAGE 1

BOROUGH OF BUENA WORKSHOP AGENDA APRIL 8, 2019 PAGE 1 PAGE 1 MEETING CALLED TO ORDER: P.M. MEETING ADJOURNED: P.M. CALL MEETING TO ORDER: Flag Salute ROLL CALL OF ATTENDANCE: SUNSHINE LAW: MAYOR S REPORT: PUBLIC HEARING: This meeting is being held in compliance

More information

Section, Township N, Range E. Is project in MWRDGC combined sewer area Yes No. Basic Information (Required in all cases)...schedule A (Page 4 of 8)

Section, Township N, Range E. Is project in MWRDGC combined sewer area Yes No. Basic Information (Required in all cases)...schedule A (Page 4 of 8) SEWERAGE SYSTEM PERMIT MWRDGC Permit No. METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 100 EAST ERIE, CHICAGO, ILLINOIS, 60611 http://www.mwrd.org 312-751-5600 INSTRUCTIONS FOR COMPLETING

More information

NORTHWESTERN WATER & SEWER DISTRICT TAPPING PROCEDURES & REQUIREMENTS

NORTHWESTERN WATER & SEWER DISTRICT TAPPING PROCEDURES & REQUIREMENTS NORTHWESTERN WATER & SEWER DISTRICT TAPPING PROCEDURES & REQUIREMENTS Revised March 2018 TABLE OF CONTENTS Page Northwestern Water & Sewer District- Rules & Regulations for Sanitary Sewer Taps 3-9 Wood

More information

Mayor Vulich introduced Interim City Administrator Dick Schrad. He advised the Council that Mr. Schrad would begin his duties on November 9, 2016.

Mayor Vulich introduced Interim City Administrator Dick Schrad. He advised the Council that Mr. Schrad would begin his duties on November 9, 2016. The City Council met in regular session, November 8, 2016 at 7:00 P.M. in the City Hall Council Chamber. Present on roll call: Mayor Vulich; Councilmembers: Gassman, Seeley, McGraw, O Neill, Connell and

More information

Guidelines for Submittals for Land Disturbance Permits

Guidelines for Submittals for Land Disturbance Permits Guidelines for Submittals for Land Disturbance Permits A Land Disturbance Permit (LDP) is a local permit required by the City of Shawnee for any land disturbance occurring in a given area. "Land Disturbance"

More information

13 LC S A BILL TO BE ENTITLED AN ACT

13 LC S A BILL TO BE ENTITLED AN ACT House Bill 199 (COMMITTEE SUBSTITUTE) By: Representatives Lindsey of the 54 th and Smith of the 70 th A BILL TO BE ENTITLED AN ACT 1 2 3 4 5 6 7 8 9 10 11 To amend Part 2 of Article 1 of Chapter 23 of

More information

CITY OF ST. PETERS BOARD OF ALDERMEN

CITY OF ST. PETERS BOARD OF ALDERMEN CITY OF ST. PETERS BOARD OF ALDERMEN TENTATIVE AGENDA FOR REGULAR MEETING ST. PETERS JUSTICE CENTER, 1020 GRAND TETON DRIVE, ST. PETERS, MO 63376 A. Call to Order, Mayor Len Pagano B. Roll Call C. Opening

More information

MINUTES TOWNSHIP OF MIDDLETOWN SEWERAGE AUTHORITY ADMINISTRATION OFFICE 100 BEVERLY WAY, BELFORD, NJ CAUCUS AND REGULAR MEETINGS

MINUTES TOWNSHIP OF MIDDLETOWN SEWERAGE AUTHORITY ADMINISTRATION OFFICE 100 BEVERLY WAY, BELFORD, NJ CAUCUS AND REGULAR MEETINGS MINUTES TOWNSHIP OF MIDDLETOWN SEWERAGE AUTHORITY ADMINISTRATION OFFICE 100 BEVERLY WAY, BELFORD, NJ 07718 CAUCUS AND REGULAR MEETINGS DATE OF MEETING: May 21, 2018 MEETING CALLED TO ORDER: PLEDGE OF ALLEGIANCE:

More information

CITY OF KIRKWOOD PLANNING AND ZONING COMMISSION JUNE 17, Commission Lacking the Appointment of

CITY OF KIRKWOOD PLANNING AND ZONING COMMISSION JUNE 17, Commission Lacking the Appointment of CITY OF KIRKWOOD PLANNING AND ZONING COMMISSION JUNE 17, 2015 PRESENT: Greg Frick, Chair Allen Klippel, Secretary/Treasurer Gil Kleinknecht Cindy Coronado Dan Stauder Jim O Donnell ABSENT: Wanda Drewel,

More information

PROCLAMATION - Declaring March 2, 2019 as the 11th Annual QC Fire Charity Hockey Game Benefitting Clinton Firefighters Joe Kazmier, Quad City Storm

PROCLAMATION - Declaring March 2, 2019 as the 11th Annual QC Fire Charity Hockey Game Benefitting Clinton Firefighters Joe Kazmier, Quad City Storm The City Council met in regular session, February 12, 2019 at 7:00 P.M. in the City Hall Council Chamber. Present on roll call: Mayor Vulich, Councilmembers: Gassman, Seeley, McGraw (via phone), Allesee,

More information

1967 ORDINANCES & RESOLUTIONS

1967 ORDINANCES & RESOLUTIONS 1967 ORDINANCES & RESOLUTIONS A resolution approving the report of the assessment equalization board on objections concerning the estimated assessments for the improvement of Sunset Avenue and Tennyson

More information

IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF MISSOURI WESTERN DIVISION

IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF MISSOURI WESTERN DIVISION IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF MISSOURI WESTERN DIVISION UNITED STATES OF AMERICA, ) ) ) ) ) ) Civil Action No. 4:10-cv-0497-GAF Plaintiff, ) ) v. ) ) THE CITY OF KANSAS

More information

OTHER DOCUMENTS: Indicate title, number of pages and originator

OTHER DOCUMENTS: Indicate title, number of pages and originator WATERSHED MANAGEMENT PERMIT METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 111 EAST ERIE, CHICAGO, ILLINOIS, 60611 www.mwrd.org INSTRUCTIONS FOR COMPLETING PERMIT FORM: Submit two original

More information

SECTION ADVERTISEMENT FOR BIDS

SECTION ADVERTISEMENT FOR BIDS SECTION 00 11 13 Sealed Bids for construction of the 2016 Oak Creek Water Treatment Plant Improvements, addressed to the Oak Creek Water and Sewer Utility Building, 170 West Drexel Avenue, Oak Creek, WI

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Monday, January 5, 2015 FOR IMMEDIATE RELEASE The City of Barberton, the City of Norton, and the County of Summit Department of Environmental Services (DOES) are pleased to announce that they have negotiated

More information

RESOLUTION AUTHORIZING MEETING MINUTES OF JANUARY 15,2015

RESOLUTION AUTHORIZING MEETING MINUTES OF JANUARY 15,2015 15-022 RESOLUTION AUTHORIZING MEETING MINUTES OF JANUARY 15,2015 ----------------------------------------------------------------------------,-------------------------------------------- MOTION,ED BY:

More information

REVISOR FULL-TEXT SIDE-BY-SIDE

REVISOR FULL-TEXT SIDE-BY-SIDE 1.31 ARTICLE 1 1.32 TRANSPORTATION APPROPRIATIONS 1.26 ARTICLE 1 1.27 TRANSPORTATION APPROPRIATIONS 1.33 Section 1. CITATION. 2.1 This act may be cited as the "Road and Bridge Act." 2.2 Sec. 2. SUMMARY

More information

Regular Meeting of the Board of Commissioners Monday, April 8, :30 PM

Regular Meeting of the Board of Commissioners Monday, April 8, :30 PM 1 Regular Meeting of the Board of Commissioners Monday, April 8, 2019 3:30 PM Estimated Minutes Time Allocated 03:30 PM 1 CALL TO ORDER 03:31 PM 1 APPROVAL OF AGENDA 03:32 PM 2 PUBLIC COMMENTS Public comment

More information

MINUTES OF THE MEETING OF SANITARY AND IMPROVEMENT DISTRICT NO. 5, CASS COUNTY, NEBRASKA

MINUTES OF THE MEETING OF SANITARY AND IMPROVEMENT DISTRICT NO. 5, CASS COUNTY, NEBRASKA MINUTES OF THE MEETING OF SANITARY AND IMPROVEMENT DISTRICT NO. 5, CASS COUNTY, NEBRASKA Meeting convened at 6:00 p.m. on November 20, 2018 at 3200 Buccaneer Blvd, Plattsmouth, Nebraska, inside the clubhouse

More information

Geneva, OH Code of Ordinances. CHAPTER 1042 Sewers

Geneva, OH Code of Ordinances. CHAPTER 1042 Sewers Geneva, OH Code of Ordinances 1042.01 Definitions. (Repealed in part) CHAPTER 1042 Sewers 1042.015 Connections required where available; tap-in fee. 1042.02 Permit required for each house connection. 1042.03

More information

BOUNDARY COMMISSION St. Louis County, Missouri RULES

BOUNDARY COMMISSION St. Louis County, Missouri RULES BOUNDARY COMMISSION St. Louis County, Missouri RULES May 4, 2000 Revised: December 12, 2005 Revised: August 25, 2011 1 BOUNDARY COMMISSION, ST. LOUIS COUNTY RULES ARTICLE I DEFINITIONS A. APPLICATION FEE

More information

Pre-council Conference: April 23, :30 A.M. Main Conference Room,1st Floor - To discuss any or all of the following items: Mayor Johnny Isbell

Pre-council Conference: April 23, :30 A.M. Main Conference Room,1st Floor - To discuss any or all of the following items: Mayor Johnny Isbell Pre-council Conference: April 23, 2013 9:30 A.M. Main Conference Room,1st Floor - To discuss any or all of the following items: Mayor Johnny Isbell Councilmember Ornaldo Ybarra Councilmember Jackie Welch

More information

CITY COUNCIL CITY OF RICHMOND HEIGHTS, MISSOURI. REGULAR MEETING, December 15, 2014

CITY COUNCIL CITY OF RICHMOND HEIGHTS, MISSOURI. REGULAR MEETING, December 15, 2014 CITY COUNCIL CITY OF RICHMOND HEIGHTS, MISSOURI REGULAR MEETING, December 15, 2014 A Regular Meeting of the City Council of the City of Richmond Heights, Missouri was held on Monday, December 15, 2014

More information

AGENDA CITY COUNCIL OF THE CITY OF MORENO VALLEY AUGUST 28, 2001

AGENDA CITY COUNCIL OF THE CITY OF MORENO VALLEY AUGUST 28, 2001 AGENDA CITY COUNCIL OF THE CITY OF MORENO VALLEY CALL TO ORDER PUBLIC COMMENTS ON CLOSED SESSION ITEMS ROLL CALL CLOSED SESSION - 6:00 P.M. A Closed Session of the City Council of the City of Moreno Valley

More information

BILL NO ORDINANCE NO

BILL NO ORDINANCE NO Recommendation of Planning Commission BILL NO. 3422 ORDINANCE NO. 2010-3365 AN ORDINANCE REPEALING CONDITIONAL USE PERMIT ORDINANCE 2010-3345 AND ENACTING A NEW CONDITIONAL USE PERMIT IN LIEU THEREOF TO

More information

FINAL AGREEMENT FOR LAND DIVISION IMPROVEMENTS IN ACCORDANCE WITH THE TOWN OF WESTPORT CODE FOR TOWN OF WESTPORT, DANE COUNTY, WISCONSIN

FINAL AGREEMENT FOR LAND DIVISION IMPROVEMENTS IN ACCORDANCE WITH THE TOWN OF WESTPORT CODE FOR TOWN OF WESTPORT, DANE COUNTY, WISCONSIN FINAL AGREEMENT FOR LAND DIVISION IMPROVEMENTS IN ACCORDANCE WITH THE TOWN OF WESTPORT CODE FOR (Subdivision Name or CSM No.) (Include Phase If Applicable) TOWN OF WESTPORT, DANE COUNTY, WISCONSIN THIS

More information

O R D I N A N C E NO AN ORDINANCE calling and providing for the holding of a. Special Election in a certain portion of St.

O R D I N A N C E NO AN ORDINANCE calling and providing for the holding of a. Special Election in a certain portion of St. O R D I N A N C E NO. 3205 AN ORDINANCE calling and providing for the holding of a Special Election in a certain portion of St. Louis County, Missouri, outside the present boundaries of the District, for

More information

CITY OF HAZELWOOD REGULAR COUNCIL MEETING DECEMBER 6, 2017

CITY OF HAZELWOOD REGULAR COUNCIL MEETING DECEMBER 6, 2017 CITY OF HAZELWOOD REGULAR COUNCIL MEETING DECEMBER 6, 2017 CALL TO ORDER A regular meeting of the Hazelwood City Council was called to order by Mayor Matthew G. Robinson at 7:30 p.m. on Wednesday, December

More information

MINUTES OF REGULAR MEETING BOARD OF TRUSTEES ROCK RIVER WATER RECLAMATION DISTRICT THURSDAY, SEPTEMBER 24, 2015

MINUTES OF REGULAR MEETING BOARD OF TRUSTEES ROCK RIVER WATER RECLAMATION DISTRICT THURSDAY, SEPTEMBER 24, 2015 013804 MINUTES OF REGULAR MEETING BOARD OF TRUSTEES ROCK RIVER WATER RECLAMATION DISTRICT THURSDAY, SEPTEMBER 24, 2015 President Massier called the Regular Meeting of the Board of Trustees of the Rock

More information

CHAPTER 3. Building Code

CHAPTER 3. Building Code CHAPTER 3 Building Code ADOPTION OF BUILDING CODE 3.005 Definitions 3.010 Adoption of the State Building Code as the Lincoln County Building Code 3.012 Additional Specific Adoption of the State Electrical

More information

Chapter 10 BUILDINGS AND BUILDING REGULATIONS*

Chapter 10 BUILDINGS AND BUILDING REGULATIONS* Chapter 10 BUILDINGS AND BUILDING REGULATIONS* *Cross references: Community development, ch. 22; fire prevention and protection, ch. 34; stormwater management, ch. 48; subdivisions, ch. 50; utilities,

More information

ARLINGTON COUNTY CODE. Chapter 57 EROSION AND SEDIMENT CONTROL*

ARLINGTON COUNTY CODE. Chapter 57 EROSION AND SEDIMENT CONTROL* ARLINGTON COUNTY CODE Chapter 57 * * Editor s Note: Ord. No. 08-01, adopted January 26, 2008, amended Ch. 57, in its entirety, to read as herein set out. 57-1. Title. 57-1. Title. 57-2. Purpose. 57-3.

More information

PROPOSED ORDINANCE NO. XXXXX THE METROPOLITAN ST. LOUIS SEWER DISTRICT. Relating to:

PROPOSED ORDINANCE NO. XXXXX THE METROPOLITAN ST. LOUIS SEWER DISTRICT. Relating to: PROPOSED ORDINANCE NO. XXXXX OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT Relating to: NOT TO EXCEED $47,722,204* WASTEWATER SYSTEM REVENUE BOND (WIFIA DEER CREEK SANITARY TUNNEL PUMP STATION AND SANITARY

More information

A G E N D A. Nichols Hills City Council Regular Meeting Tuesday, April 13, 2004 at 5:30 p.m. Town Hall, 6407 Avondale Drive Nichols Hills, OK 73116

A G E N D A. Nichols Hills City Council Regular Meeting Tuesday, April 13, 2004 at 5:30 p.m. Town Hall, 6407 Avondale Drive Nichols Hills, OK 73116 A G E N D A Nichols Hills City Council Regular Meeting Tuesday, at 5:30 p.m. Town Hall, 6407 Avondale Drive Nichols Hills, OK 73116 HEARING IMPAIRED: Upon the receipt of a written request 48 hours prior

More information

City of Safford Drainage Ordinance; Adopted September 24 th, 2001

City of Safford Drainage Ordinance; Adopted September 24 th, 2001 City of Safford Drainage Ordinance; Adopted September 24 th, 2001 1. General Provisions 1.1. Title and Authority This regulation may be referred to as the Drainage regulation for the City of Safford and

More information

2. Roll Call Clerk. 5. Invitation for Public Comment President Lunt 6. Reports:

2. Roll Call Clerk. 5. Invitation for Public Comment President Lunt 6. Reports: AGENDA BOARD OF TRUSTEES PORTLAND WATER DISTRICT 225 Douglass Street, Portland, Maine Jeff P. Nixon Training Center 6:00 p.m., Monday, December 17, 2018 1. Convene Meeting with Pledge of Allegiance and

More information

HENRY COUNTY HEALTH CENTER REGULATION NO WASTEWATER TREATMENT SYSTEMS REGULATION

HENRY COUNTY HEALTH CENTER REGULATION NO WASTEWATER TREATMENT SYSTEMS REGULATION HENRY COUNTY HEALTH CENTER REGULATION NO. 89-1 WASTEWATER TREATMENT SYSTEMS REGULATION PURPOSE: A regulation governing the construction, modification, installation and operation of wastewater treatment

More information

ARTICLE 1 BASIC PROVISIONS SECTION BASIC PROVISIONS REGULATIONS

ARTICLE 1 BASIC PROVISIONS SECTION BASIC PROVISIONS REGULATIONS ARTICLE 1 BASIC PROVISIONS SECTION 21-01 BASIC PROVISIONS REGULATIONS Section 21-01.01. Note: This Chapter of the South Bend Municipal Code contains various word(s) and/or phrase(s) which appear in italics.

More information

IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF INDIANA

IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF INDIANA IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF INDIANA ) UNITED STATES OF AMERICA, ) ) and ) ) THE STATE OF INDIANA, ) Civil Action No. ) Plaintiffs, ) ) v. ) ) THE CITY OF FORT WAYNE,

More information

Regular Council. A prayer was offered by Mrs. Bruno. The Pledge of Allegiance was recited.

Regular Council. A prayer was offered by Mrs. Bruno. The Pledge of Allegiance was recited. The regular meeting of the Waterville Council was called to order by Mayor Lori Brodie at 7:30 p.m. in the Council Chambers of the Waterville Municipal Building. A prayer was offered by Mrs. Bruno. The

More information

Modifications to the 2018 International Plumbing Code in the City of Maryville

Modifications to the 2018 International Plumbing Code in the City of Maryville Modifications to the 2018 International Plumbing Code in the City of Maryville 12-202. Local Modifications: The following sections and appendices of the International Plumbing Code, 2018 Edition, are hereby

More information

FIRST READING: SECOND READING: PUBLISHED: PASSED: TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION

FIRST READING: SECOND READING: PUBLISHED: PASSED: TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION FIRST READING: SECOND READING: PUBLISHED: PASSED: TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION A RESOLUTION TO DELETE IN ITS ENTIRETY CHAPTER 13.30 ENTITLED TREATMENT AND DISPOSAL OF WASTEWATER

More information

JEFFERSON COUNTY Land Development SITE IMPROVEMENTS BONDING & BOND SURETY POLICY (Effective Date: September 2, 2010)

JEFFERSON COUNTY Land Development SITE IMPROVEMENTS BONDING & BOND SURETY POLICY (Effective Date: September 2, 2010) JEFFERSON COUNTY Land Development SITE IMPROVEMENTS BONDING & BOND SURETY POLICY (Effective Date: September 2, 2010) All required bonding shall be provided by the owner/developer, approved by staff, and

More information

City of Aurora PLANNING COMMISSION MEETING MINUTES January 20, 2016

City of Aurora PLANNING COMMISSION MEETING MINUTES January 20, 2016 City of Aurora PLANNING COMMISSION MEETING MINUTES January 20, 2016 The Aurora Planning Commission met in a regularly scheduled meeting on Wednesday, January 20, 2016, in Council Chambers of Aurora City

More information

NOTICE OF MEETING DES MOINES WASTEWATER RECLAMATION AUTHORITY TECHNICAL COMMITTEE

NOTICE OF MEETING DES MOINES WASTEWATER RECLAMATION AUTHORITY TECHNICAL COMMITTEE NOTICE OF MEETING DES MOINES WASTEWATER RECLAMATION AUTHORITY TECHNICAL COMMITTEE Des Moines Wastewater Reclamation Facility 3000 Vandalia Road Des Moines, Iowa June 14, 2016 1:30 p.m. AGENDA ITEM 1: ITEM

More information

South Dakota Department of Agriculture

South Dakota Department of Agriculture South Dakota Department of Agriculture 12/12/2011 South Dakota Department of Agriculture Establishing and Combining Watershed Districts Presenter: A. Blair Dunn General Counsel & Director of Agricultural

More information

IN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF INDIANA.') CONSENT DECREE

IN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF INDIANA.') CONSENT DECREE ) IN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF INDIANA UNITED STATES OF AMERICA, ), t ' ' ) and '' ' ' ) THE STATE OF INDIANA,. ) ) Plaintiffs,.') ) v. THE CITY OF INDIANAPOLIS, INDIANA,

More information

INTERGOVERNMENTAL COOPERATION AGREEMENT. between the CITY OF CREVE COEUR, MISSOURI, and the

INTERGOVERNMENTAL COOPERATION AGREEMENT. between the CITY OF CREVE COEUR, MISSOURI, and the INTERGOVERNMENTAL COOPERATION AGREEMENT between the CITY OF CREVE COEUR, MISSOURI, and the EXECUTIVE OFFICE PARK WATERSHED COMMUNITY IMPROVEMENT DISTRICT Dated as of TABLE OF CONTENTS ARTICLE I DEFINITIONS

More information

This ordinance shall be known as the Erosion and Sediment Control Ordinance of Pulaski County, Virginia.

This ordinance shall be known as the Erosion and Sediment Control Ordinance of Pulaski County, Virginia. AN ORDINANCE REPEALING AND REENACTING THE EROSION AND SEDIMENTATION CONTROL ORDINANCE OF PULASKI COUNTY, VIRGINIA. BE IT ORDAINED BY THE BOARD OF SUPERVISORS OF PULASKI COUNTY, VIRGINIA, THAT THE EXISTING

More information

DERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418

DERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418 DERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418 Frederick J. Columbo, Jr. Chairman Philip Marcucio 68 Seymour Avenue Paul Dinice, Jr. Derby, Connecticut 06418 Paul Padilla David Barboza II David

More information