Response to the Queries for Allotment of Coal Mines to Government Companies

Size: px
Start display at page:

Download "Response to the Queries for Allotment of Coal Mines to Government Companies"

Transcription

1 Response to the Queries for Allotment of Coal Mines to Government Companies 1 Clause the applicant shall have incurred an expenditure of not less than thirty per cent (30%) of the total project cost of the unit or phase of the Specified End Use Plant(s) for which a coal linkage has not been granted. Clause However, an applicant having coal linkage shall also be considered for allotment for their existing specified end use plant(s), if such applicant commits to surrender their existing coal linkages for the same. The existing coal linkage shall then be tapered off as per extant policy. Can application be filed for additional coal requirement of existing plant/unit, which is in operation and existing coal linkage is less as compared to the coal requirement of the plant/unit, without surrendering existing coal linkage? As per the Allotment Document. Application can be submitted for coal requirement of existing plant/unit, which is in operation and has coal linkage, if such Applicant commits to surrender their existing coal linkages for the same. The existing coal linkage shall then be tapered off as per extant policy. 2 Clause No. 3.2-Eligibility requirement for Applicant UPRVUNL is running thermal power projects to the tune of 5933MW in the State of UP. The Coal requirement from these projects as per norms of 5MTPA works out to 30MTPA against which coal linkage available as per FSA is only 25MTPA meaning a shortfall of 5.00MTPA. In case the of coal is accounted for, then the reserve required for the shortfall in the next 30 years the same shall be around 215MT. Can UPRVUNL apply for a Coal Block for fulfilling this shortfall which shall facilitate UP, an energy starved & land locked state to avoid additional burden on import of coal. Coal has not been stipulated in the Allotment Document. As per Clause and Clause of the Allotment Document, the Applicant shall have incurred an expenditure of not less than 30% of the total project cost of the unit or phase of the Specified EUP(s) for which a coal linkage has not been granted. However, an Applicant having coal linkage shall also be considered for Allotment for their existing Specified EUP(s), if such Applicant commits to surrender their existing coal linkages for the same. The existing coal linkage shall then be tapered off as per extant policy.

2 3 Clause No. 3.2-Eligibility requirement for Applicant Chendipada and Chendipada-II Coal Block situated in Distt Angul, Odisha was allotted in 2007 jointly to U.P Rajya Vidyut Utpadan Nigam Ltd, Chattishgarh Mineral Devlopment Corp. Ltd. and Maharashtra Power Generation Corp. Ltd. for the End Use projects as specified In the allotment letter itself. The three mentioned State utilites formed a Joint Venture Company by the name of UCM Coal Company Ltd. for mining of the said Coal Block. Now will the present dispensation whether UCM Coal Company Ltd. is eligible to take part In the allotment process. The fact remains that UCM Coal Company Ltd does not have any end use project of its own. 4 Clause No. 3.2-Eligibility requirement for Applicant "The Applicant shall have incurred an expenditure of not less than thirty percent (30%) of the total project cost of the unit or phase of the Specified End Use Plant(s) for which a coal linkage has not been granted." 1. Jawaharpur 2X660 MW, Obra 'c" 2X660 MW and Harduaganj 1X660 MW were planned to come up in the State Sector in U.P. in the 12th Plan. The Project environment clearances were not granted by the MOEF due to non availiblity of 1st Stage Forest clearance In line with the circulater dated of MOEF. Because of non clearance of EC for the project no major investments could be made in the said projects. However land, water, DPR, PPA, Financial Closure and other related clearances are available for all three projects. Now In the present dispensation whether the State Sector PSU can apply for the above End Use Projects. Since in the proposed Jawaharpur 2X660 MW, Obra 'c" 2X660 MW and Harduaganj 1X660 MW project land, water, DPR, PPA, Financial Closure and other related clearances are available they should be allowed to participate in the allotment process. In those cases where the land, water, DPR, PPA, Financial Closure and other related clearances are available for the End Use Projects they should be As per the Eligibility Conditions specifed in Clause of the Allotment Document, the Applicant shall have incurred an expenditure of not less than thirty per cent (30%) of the total project cost of the unit or phase of the Specified End Use Plant(s) for which a coal linkage has not been granted. However, in cases where Applicant is a JV of two or more Government Companies, any JV partner shall meet the the above criteria. As per Clause of the Allotment Document.

3 allowed to participate in the allotment process for which necessary provision may be made In the Eligibility condition. 2. In case if expenditure incurred is less than 30% of the Total Project Cost of the units, is it possible to waiver the 30% expenditure clause. Suggested Text: The applicant shall have taken advance action for construction of power plant including land acquisition and for which coal linkage has not been granted. NLC, a Navratna Company under Ministry of Coal has proposed to set up 3*660 MW STPP at Sirkali, Tamilnadu with an estimated cost of Rs cr in Phase-I. The PPA has been signed with Govt of TN. The land acquisition activities have been started. The Jilga-Barpali coal block was allotted in the past but the block is geologically disturbed and deep seated and may not meet coal requirement. The MoC has been informed about the same. Therefore, a separate block may be allotted keeping the another 1980 MW expansion/ Phase-II program.

4 5 Clause No. 3.2-Eligibility requirement for Applicant "However, an Applicant having coal linkage shall also be considered for Allotment for their existing specified End Use Plant(s), if such Applicant commits to surrender their existing coal linkages for the same. The existing coal linkage shall then be tapered off as per extant policy." "An applicant having coal linkage for the specified End Use Plant shall surrender such coal linkage without any reservation or condition before execution of the Allotment Order In case the Applicant is declared as Allottee." In the case of State of U.P. the Coal Block allotted shall be situated in another State. In such a case the development of the Coal Block is dependent on external factors. In such a situation if the current linkage is converted into tapering linkage and the coal block development exceeds the time limit as mentioned in Allotment letter then the tapering linkage should continue for the exisiting project till the production starts in the coal block. State of U.P. is not a coal bearing State. Thus any coal block allotted, the same would be from out side U.P, therefore the suggestion for amendment has been given. As per Allotment Document. The existing coal linkage shall be tapered off as per extant policy.

5 (g)- "Only 1 (one) application has been made for the Coal Mine with reference to a particular Specified End Use Plant" and "No Applicant shall submit more than I (one) application for the Coal Mine, either directly or indirectly. However, the Applicant can apply for more than one coal mine for same Specified End Use Plant." 1. Both the provisions are contradictory in themselves. Appropriate clarification may be incorporated in the document. The contradiction may be removed. 2. Whether Bid can be made for more than one Coal Blocks for one End Use Projects. If yes accordingly necessary provision be made in the documents. Because Clause (g) those not allow but Clause allows the same and the same has been clarified in Schedule-II General Information format also. 3. In case of Bid for Block with larger reserves which may cater to more then one End Use Project is made, whether the same would be responsive or not. Such Bid should be made responsive. Accordingly necessary provisions be made. In the list of Coal Block to be allotted there are such blocks which can cater to more than one End Use Projects An Applicant can submit only one Application for a particular Coal Mine with reference to a particular Specified EUP. However, such Applicant is allowed to submit separate Applications with respect to above Specified End Use Plant for coal mines other than one for which an application has already been submitted. In other words, an Applicant can submit only one Application for one Coal Mine with respect to one Specified End Use Plant. Thus, an Applicant can submit another Application for the same coal mine for a different EUP. 3. Yes, the Application shall be considered as responsive.

6 (a) - Requirement of coal for power generation capacity coming up in the As per Allotment Document. State till the year It is proposed that End Use Projects coming up in the 13th Five Year plan should be included. Accordingly provisions be made. 2. Deficit Power States should be given preference/priority in the evalution criteria. 3. State Power Projects which were earlier linked to a Coal Block which now stands cancelled should be allotted Coal Blocks on priority basis. The Projects envisaged in the State of U.P. are expected to come up in the 13th five year plan. Accordingly the amendment has been proposed, otherwise no upcommg project of State of U.P. would qualify for allotment despite the fact that the State of U.P. is a energy starved State and is making all out efforts for setting up new power projects III the state. Jawaharpur 2X660 MW, Obra 'C" 2X660 MW and Harduaganj 1X660 MW were earlier linked to Chendipada Coal Block Distt Angul Odisha which now stands cancelled. Thus, Coal Block for these projects should be allotted on priority basis 8 Annexure I- Format of Power of Attorney. The Power of Attorney is to be signed by Chief In case of the Joint Venture Company whether the Power of Attorney is to be Executive Officer or such other official of the signed by the Chief Executive of the Joint Venture Company or the Power of Applicant i.e. the JV Company in this case. Attorney is to be issued by the parent companies separately in favour of the Joint Venture Company. 9 Annexure II- Format of Affidavit. In case of the Joint Venture Company whether the Affidavit is to be signed by the Chief Executive of the Joint Venture Company or the Affidavit is to be issued by the parent companies separately in favour of the Joint Venture Company. The Affidavit is to be signed by Authorised Signatory of the Applicant i.e. the JV Company in this case.

7 10 Schedule II- General Information- *if the Application is for multiple End Use Plants, information required under 3.1 to 3.8 should be furnished for each of the End Use Plant. The clause-3.1 to 3.8 should be amended to read as 4.1 to 4.8 which is a typographical error. This should be read as if the Application is for multiple End Use Plants, information required under 4.1 to 4.8 should be furnished for each of the End Use Plant. 11 Schedule II- General Information- **Coal requirement shall be calculated on the basis of benchmarks. As on date GCV and consumption norms are unknown. 12 While downloading for each coal block, no Allotment Document found separately for that block like that of coal blocks for auction given. 13 No files are available while trying to download for Parsa, Tadicherla-I, Mahanadi-Machchhakata & Utkal D&E. 14 Clause Upfront amount for each coalblock is not provided. 15 Clause What about if application for coal linkage is pending with GoI? 2. Is it require to submit any certificate for the expenditure incurred w.r.t. specified end-use? If require, then who has to certify? 16 Clause 6.1 (a) 1. Requirement of coal for power generation capacity coming up in the state till the year Who has to certify? 17 Clause 6.1 (b) 1. Proximity of the end use plant from the coal mine. Is there any limit? What about end-use plant is far away from coal block? Benchmark consumption norm shall be provided shortly. Single Allotment Document has been issued for all the Coal Mines being allotted. Files have been Uploaded Shall be provided shortly. 1. Applicant is eligible to submit Application. However, as per Allotment Document, the Applicant shall commit to surrender any linkage for the same End Use Plant, if it is awarded at a later date. 2. No separate certificate is required to be submitted for expenditure incurred. Formats, Schedules and documents as mentioned in the Allotment Document are required to be submitted. This information shall be provided by CEA. Priority will be given to Applicants with Specified EUP closer to the Coal Mine, as per Clause 6.1 of the Allotment Document.

8 18 Clause 10.2 That the Applicant has coal linkage [insert details of coal linkage and linked Specified End Use Plant(s) and What to write if application for coal linkage is pending with GoI? 19 Clause 10.3 [Insert separate paragraph for each ] 1. Whether the documents submitted/ will be submitted are to be mentioned? 2. Whether Affidavit & verification will be signed by the same person, i.e, the Authorized signatory? 20 Power of Attorney (PoA) & Affidavit No. 9 Annexure I & II 1. Value of stamp not indicated 2. Whether One PoA and One Affidavit is sufficient for all the mines and end use or separate documents for each mine shall be required Suggestion: PoA in Rs 100 stamp paper and Affidavit in Rs Hard copy of Affidavit & PoA Whether the Documents can be submitted by Hand also?by hand submission shall also be permitted to avoid any postal delays. 22 Schedule II page 42 Specified End-use MPPGCL is having two units(600 MW each) in phase I at SSTPS Khandwa with total linkage of LMT for both units. Whether we can apply for coal block for a single unit? The allottee should surrender half / proportional quantity of coal linkage only. The allottee should surrender half / proportional quantity of coal linkage only. Such information is to be provided. Applicant shall commit to surrender any linkage for the same End Use Plant, if it is awarded at a later date. 1. Yes, the documents submitted physically or uploaded on MSTC website are required to be mentioned. 2. Yes, these are to be signed by the Authorized Signatory of the Applicant. 1. Value of stamp paper shall be in accordance with applicable laws. 2. Separate PoA & Affidavit are required to be submitted for each Application Yes As per Clause of Allotment Document Application can be submitted only for unit or phase of Specified End Use Plants for which a coal linkage has not been granted. The Applicant can chose to submit Application for a single unit (Specified End Use Plant) subject to its commitment to surrender its existing coal linkage for the Specified End Use Plant.

9 23 Clause As per Clause of Allotment Document. Applicant having coal linkage shall have to surrender their existing coal linkage. This clause shall only be applicable when the linkage plus production from mine is more than the requirement of coal for the end use plant. Provision for surrender of only excess quantity over the requirement of end use plant should be allowed. 24 Clause The Applicant shall have incurred an expenditure of not less than thirty per cent (30%) of the total project cost of the unit or phase of the Specified End Use Plant(s) for which a coal linkage has not been granted. As per Clause of the Allotment Document. In case if expenditure incurred is less than 30% of the Total Project Cost of the units, is it possible to waiver the 30% expenditure clause. Suggested Text: The applicant shall have taken advance action for construction of power plant including land acquisition and for which coal linkage has not been granted. NUPPL, a JV company of NLC and UPRUVNL (with paid up capital ratio 51:49) has proposed to establish 3 units of 660 MW at Ghatampur (UP) at the cost of Rs cr. The capital cost is Rs cr per unit. The expenditure incurred is Rs. 150 cr i.e. about 3% of capital cost per unit. Pachwara South coal block is also allotted for this project. But progress of development is very slow due to law and order problem. Therefore, new block is required. After allotment, the existing block will be surrendered :"Authorised Signatory" shall mean the individual representing an Applicant who has been duly authorised on behalf of such Applicant to execute and submit the Application in accordance with the terms hereof. Who has to authorize the AUTHORISED SIGNATORY?Whether Managing Director, or Company Secretary etc., Managing Director/ CMD/ Chief Executive Officer/ Chairman

10 26 12: SCHEDULEI: Application Form Applicant's Ref. No.: Is the Applicant's Ref. No.same as Bidder Ref No. provided by MSTC after executing registration? If not, what is this number? 27 12: SCHEDULEI: Application Form.: (Last Para) In terms of Clause d)(b) of Allotment Document, we are enclosing herewith power of Attorney & affidavit in the name of the person who has signed this offer on behalf of the firm. 1. What is Clause d)(b) of Allotment Document? 2. Who is authorized signatory to sign the Schedule I: Application Form? Whether the Managing Director, or the Company Secretary, or the Authorised Person etc., 28 Clause 12: Schedule II : General Information 4.6 Project Cost (Rs Crores) 4.7 Cost incurred as on December 31,2014 Whether it has to be certified by the Company or Chartered Accountant? However, an Applicant having coal linkage shall also be considered for Allotment for their existing Specified End Use Plant(s), if such Applicant commits to surrender their existing coal linkages for the same. The existing coal linkage shall then be tapered off as per extant policy. Whether coal linkage can be extended till the development period of coal block allotted for Specified End Use Plant(s)?In case specified end use power plant is already commissioned, surrendering coal linkage without having coal supply from allotted coal block will result in no fuel supply to end use power plant. Suggestion: However, an Applicant having coal linkage shall also be considered for Allotment for their existing Specified End Use Plant(s), if such Applicant commits to surrender their existing coal linkages for the same. The existing coal linkage shall then be tapered off after commencement of coal production from allotted coal block as per extant policy. Applicant's Ref. No. is same as Bidder Ref No. provided by MSTC. 1. Clause d)(b) should be read as Clause (b) 2. Application forms provided in Annexure IV to be signed by Authorised Signatory Schedule II is to be signed by the Authorised Signatory of Applicant. No additional certification is required. As per Allotment Document

11 30 Clause (f) Notwithstanding the above, in the event that the Nominated Authority or the Central Government determines that a Preferred Applicant should not be declared the Allottee on account of any reason whatsoever, including without limitation the withdrawal of the Preferred Applicant from the allotment process for the Coal Mine or the Preferred Applicant ceasing to comply with the Eligibility Conditions, then the Coal Mine may be subjected to re-allotment or being granted to the custody of a Designated Custodian, and this allotment process may be annulled. In case of withdrawal of preferred applicant, coal block shall be allotted to the second applicant. Carrying reallotment process again will further delay the process of allocation of coal blocks. Suggestion: Notwithstanding the above, in the event that the Nominated Authority or the Central Government determines that a Preferred Applicant should not be declared the Allottee on account of any reason whatsoever, including without limitation the withdrawal of the Preferred Applicant from the allotment process for the Coal Mine or the Preferred Applicant ceasing to comply with the Eligibility Conditions, then the Coal Mine shall be allotted to second preferred applicant for allotment. 31 Clause 6.1 Evaluation of Applications: Point (a), (b), (c) 1. Whether any weightages given to point (a) and (b)? 2. Whether any weightage is given to readiness of specified end use power plant? 3. In case of State having power deficit and having more coal requirement for sustainable operation of power plant but power plants are not likely to be implemented by 2017, whether relaxation will be given to such end use plants in calculating coal requirement? Clause (f) shall be read as: "Notwithstanding the above, in the event that the Nominated Authority or the Central Government determines that a Preferred Applicant should not be declared the Allottee on account of any reason whatsoever, including without limitation the withdrawal of the Preferred Applicant from the allotment process for the Coal Mine or the Preferred Applicant ceasing to comply with the Eligibility Conditions, then the Coal Mine shall be allotted to second preferred applicant." Applications shall be considered for the purpose of selection of Preferred Allottee as per Clause 6.1 of Allotment Document.

12 (Eligibility requirement of the documents) The ministry is requested to clarify the eligibility of the applicant to bid for a particular coal block based on the extractible reserves vis-à-vis end use plant requirements. Since, the tender document for auction of the coal has specified that, Extractable reserves of the Coal Mine should not exceed 150% of the annual coal requirement for 30 years of the Specified End Use Plant(s), The ministry is requested to clarify whether any such similar eligibility criteria for coal block exists for allotment as well? 33 Clause The Applicant shall have incurred an expenditure of not less than thirty per cent (30%) of the total project cost of the unit or phase of the Specified End Use Plant(s). Schedule II of the Allotment Document under Annexure-IV (Sr. No. 4.7) Eligibility for Allotment shall be as per Allotment Document. No such eligibility criteria. Schedule II is to be signed by the Authorised Signatory of Applicant. No additional certification is required. 34 The Ministry is requested to clarify whether the applicant is required to submit the certificate from the Charter Accountant certifying the actual cost incurred by the Petitioner till 31st December Clause & The Applicant shall have incurred an expenditure of not less than thirty per cent (30%) However, an Applicant having coal linkage shall also be considered for Allotment for their existing Specified End Use Plant(s), if such Applicant commits to surrender their existing coal linkages.. From the clause & clause 3.2.3, it is inferred that the already existing (operational) plants having coal linkage would be considered for allocation. However, from the above, it is not clear whether the upcoming plants where more than 30% of the expenditure has been incurred would be eligible to apply for the allocation or not. As per Clause of the Allotment Document, operational plants/under construction unit or phase of a plant for which an expenditure of not less than 30% of total project cost has been incurred and for which a coal linkage has not been granted shall be eligible for Allotment. As per Clause of the Allotment Document, an Applicant having coal linkage shall also be considered for Allotment for their existing Specified End Use Plant(s), if such Applicant commits to surrender their existing coal linkages for the same.

13 The Ministry is requested to clarify the same. 35 Clause Subsequent to registration, Applicants may download the second set of documents, including: (a) the Mine Dossier specific to the Coal Mine; and (b) Allotment Document. In the website, the Allotment Document for specific coal mine has not been found under second set of documents. Single Allotment Document has been issued for all the Coal Mines being allotted.

14 36 Clause Files have been uploaded Subsequent to registration, Applicants may download the second set of documents, including: (a) the Mine Dossier specific to the Coal Mine; and (b) Allotment Document. The mine dossier for the following coal mines (covered in Annexure-IV & List of Coal Mines published for Allotment), are not available on the MSTC Website: Parsa. Gare Palma Sector II. Mahanadi, Machhakata. Utkal D, Utkal E. Chendipada, Chendipada II. Tadicherla-I. The Ministry is requested to clarify as to when the mine dossier for the said coal blocks would be available on MSTC website or whether the said blocks are excluded from the allotment procedure. 37 Clause & In addition to submission of Application electronically, Applicants are also required to submit hard copy(ies) of following documents.. Ministry is requested to provide the deadline for the submission of hard copies of affidavit and Power of Attorney As per Clause of Allotment Document. For Last Date, kindly refer to Clause 3.6.1

15 38 Clause 6.1 In the event that, more than one Application is considered to be in compliance with all the Eligibility Conditions and responsive pursuant to Clause 3.5, then such Applications shall be considered for the purpose of selection from amongst the qualified Applicants in accordance with following norms: a) Requirement of coal for power generation capacity coming up in the State till the year 2017 The Ministry is requested to clarify whether the capacity added till 2017 would include only those plants wherein the expenditure of atleast 30% of the project cost has been incurred till 31st December 2014 or would include those plants as well where the expenditure till the aforesaid date is less than 30% of the project cost. 39 Clause 6.1 a) Requirement of coal for power generation capacity coming up in the State till the year b) Proximity of the end use plant from the coal mine. c) In case the Applicant is owned by a coal bearing State Government, relaxation from the above norms may be considered to encourage setting up of End Use Plant(s) close to pit-heads The Ministry is requested to clarify the methodology adopted for the evaluation of the application as to what would be the weightage for each of the norms provide in the clause Annexure-IV, Schedule-II, Sr. No. 4.4 The Ministry is requested to notify the average GCV of the coal available from the particular coal block. Eligibility Criteria for Allotment shall be as per Clause 3.2 of Allotment Document. Applications shall be considered for selection as per Clause 6.1 of Allotment Document. Applications shall be considered for the purpose of selection of Preferred Allottee as per Clause 6.1 of Allotment Document. Coal requirement to be submitted as per benchmarks. Benchmarks shall be uploaded shortly.

16 41 Clause No. 3.6 Schedule of Allotment process Last date of submission of Application 6th Feb 2015 The Ministry is requested to extend the timeline for submission of Application, as GSECL being a Govt. Company, requires considerable time to take the requisite approval Preferred Applicant shall have the meaning ascribed thereto in (a) Clause 3.4.2(c) in case where only one Application is considered to be in compliance with all the Eligibility Conditions and is responsive pursuant to Clause 3.5; or (b) Clause 3.4.2(d) in case where more than one Application is considered to be in compliance with all the Eligibility Conditions and is responsive pursuant to Clause 3.5. The sentence under Clause (b) i.e (d) is not complete due to omission. The allotment process will be conducted as per the Schedule provided under Clause of the Allotment Document. As per Allotment Document Clarity may be put in accordingly Reference Index Reference Index shall mean: (a) in cases where Specified End Use is generation of power, the pre-specified escalation formula that is prescribed in the prevailing bidding document for Case 1 bidding as formulated by Ministry of Power for escalation of fuel cost from captive mines; (b) in cases where Specified End Use is other than generation of power, the Reference Index shall be the Wholesale Price Index published in the month of April of the relevant year. As per Allotment Document. For Reference Index kindly refer to new bidding document for Case 1 bidding available at Ministry of Power's website. Escalation formula for power generation to be given in Allotment Document

17 Section 5(1) of the Ordinance prescribes eligibility for allotment of Schedule I coal mines (as defined in the Ordinance), which includes the Coal Mine. Applicants are required to ensure that they meet the conditions mentioned in Section 5(1) of the Ordinance which is quoted below for reference: Section 5. (1) of the Ordinance: 5(1) Notwithstanding the provisions contained in sub-sections (1) and (3) of section 4, the Central Government may allot a Schedule I coal mine to a Government company or corporation which is not a joint venture with private company or to a company which has been awarded a power project on the basis of competitive bids for tariff (including Ultra Mega Power Projects) from specified Schedule I coal mines by making an allotment order in accordance with such rules as may be prescribed and the State Government shall grant a reconnaissance permit, prospecting licence or mining lease in respect of any area containing coal to such company or corporation: Provided that the Government company or corporation may carry on coal mining in any form either for its own consumption, sale or for any other purpose in accordance with the permit, prospecting licence or mining lease, as the case may be. Provided further that no company other than a Government company or corporation shall hold more than twenty-six percent of the paid up share capital in the Government company or corporation or in the joint venture between a Government company or corporation, either directly or through any of its subsidiary company or associate company. Provided also that a joint venture of any two or more Government companies or corporations shall be prohibited from alienating or transferring any interest, except the taking of loans or advances from a bank or financial institution, in the joint venture of whatsoever nature including ownership in favour of a third party. With existing provision, any no. of private company with less than 26% share can become a joint venture partner of Government Company. As per the Ordinance, Rules and the Allotment Document.

18 As per Allotment Document Upon allocation of the Coal Mine, the Allottee may revise the mine plan for extraction of more coal in accordance with the provisions of Applicable Law and the Allotment Agreement. Suggested Text Upon allocation of a Coal Mine, the allottee may revise the mining plan of the Coal Mine for a. Increase in the rate of Coal Production. b. Rationalize Land Use Management for reducing Land coverage. c. To achieve improved environmental compatibility. d. Rationalize overburden Management. e. Revisit river rerouting to increase coal extraction 46 The added items (b) to (e) would be environment friendly & cost effective Clause no : As per Allotment Document The Applicant shall have incurred an expenditure of not less than 30% of the total project cost of the unit or phase of the Specified End Use Plant(s) for which a coal linkage has not been granted. Clause no may be exempted for Power projects of which all developmental activities (Land Acquisition and statutory clearances) are completed and awaiting for Coal linkage from Ministry of Coal. For some of APGENCO projects, Coal linkage has been pending before Ministry of coal from MoEF permission has been pending for want of firm coal linkage. And all other permissions have already been obtained. Therefore, Power projects with less than 30% expenditure and with all clearance except coal linkage may be allowed to participate for allocation of

19 coal block 47 Clause No "Ordinance" shall mean the Coal Mines (Special Provisions) Ordinance, 2014 or the Coal Mines (Special Provision) Second Ordinance, 2014 as the case may be." As per Allotment Document The Coal Mines (Special Provisions) Ordinance,2014 has been repealed as per section 33(1) of The Coal Mines (Special Provisions) Second Ordinance, 2014 so The Coal Mines (Special Provisions) Ordinance, 2014 shall be removed from the definition of Ordinance. Suggested Text "Ordinance" shall mean the Coal Mines (Special Provision) Second Ordinance, 2014."

20 48 Clause No "Specified End Use Plant(s)" shall mean one or more plant of the Applicant engaged in the Specified End Use. The definition does not include the plant of the JV partner's plant to be identified as Specified End Use Plant. Further, for achieving better efficiency and management, state government may nominate one of its company for allotment of coal blocks for better management while identifying a plant owned by another govenrment company as specified end use plant. Therefore specified end use plant of another government company shall also be considered under the definition if so nominated by state government. As the JV is also eligible for seeking allotment of mine as per the provision of the Oridnance, so the JV Partner's Plant shall be considered to be identified as Specified End Use Plant. Further, for achieving better efficiency and management, state government may nominate one of its company for allotment of coal blocks for better management while identifying a plant owned by another govenrment company as specified end use plant. Therefore specified end use plant of another government company shall also be considered under the definition if so nominated by state government. As per the Eligibility Conditions specifed in Clause of the Allotment Document, the Applicant shall have incurred an expenditure of not less than thirty per cent (30%) of the total project cost of the unit or phase of the Specified End Use Plant(s) for which a coal linkage has not been granted. However, in cases where Applicant is a JV of two or more Government Companies, any JV partner shall meet the the above criteria.

21 49 Clause no (1) Notwithstanding the provisions contained in sub-sections (1) and (3) of section 4, the Central Government may allot a Schedule I coal mine to a Government company or corporation which is not a joint venture with private company or to a company which has been awarded a power project on the basis of competitive bids for tariff (including Ultra Mega Power Projects) from specified Schedule I coal mines by making an allotment order in accordance with such rules as may be prescribed and the State Government shall grant a reconnaissance permit, prospecting licence or mining lease in respect of any area containing coal to such company or corporation: The Section 5(1) of Ordinance is wrongly quoted. The Correct provisions of 5(1) is contained in the Coal Mines (Special Provisions) Second Ordinance, Clause no The Applicant shall have incurred an expenditure of not less than thirty per cent (30%) of the total project cost of the unit or phase of the Specified End Use Plant(s) for which a coal linkage has not been granted. Rather than using the 30% threshold, it is suggested that fair and objective criteria such as award of EPC Contract for Power Plant alongwith advance and commencement of construction, be taken into consideration for qualifying the Applicants. As the coal is being sought for specified end use only, provisions of the Allotment Document should seek expenditure on the Specified End Use Plant (s) for which the allotment is being applied for. It shall read as: "Notwithstanding the provisions contained in subsections (1) and (3) of section 4, the Central Government may allot a Schedule I coal mine to a Government company or corporation or to a joint venture between two or more Government companies or corporations or to a company which has been awarded a power project on the basis of competitive bids for tariff (including Ultra Mega Power Projects) from specified Schedule I coal mines by making an allotment order in accordance with such rules as may be prescribed and the State Government shall grant a reconnaissance permit, prospecting licence or mining lease in respect of any area containing coal to such company or corporation:" As per Allotment Document

22 51 # As per section 5(1) of the Ordinance, a Government Company which is not a Joint Venture with private company, is eligible for allotment of a Schedule-I coal mine /coal-block. It is also mentioned that the Government Company may carry on coal mining in any form either for its own consumption, sale or for any other purpose in accordance with the mining lease. # Odisha Mining Corporation Ltd (OMC) is a mining company of Odisha State Government, primarily engaged in mining of iron ore, manganese, bauxite etc. OMC has diversified its activities and entered into thermal power generation in the year 2007, by forming a J.V Company with another State PSU, namely Odisha Hydro Power Corporation Ltd. (OHPC) on 50:50 sharing basis. This J.V Company under the name of Odisha Thermal Power Corporation Ltd (OTPCL) is now setting up a thermal power plant of 3 X 800 MW capacity. # It is proposed that with its core competency in mining sector and its financial capability, OMC may develop coal-blocks to be allocated by the Central Government for supply of coal to the power plants being set up by OTPCL and also for the future expansion programmes. As per the Eligibility Conditions specifed in Clause 3.2 of the Allotment Document, a joint venture of two or more Government companies or corporations is eligible subject to Clause and # It is requested to clarify as to whether OMC is eligible for allotment of coalblock(s) by the Central Government under the above proposed arrangement The Applicant shall have incurred an expenditure of not less than thirty per cent (30%) of the total project cost of the unit or phase of the Specified End Use Plant(s) for which a coal linkage has not been granted. As per Allotment Document As, under Rule 11 of Coal Mines (Special Provision) Rule 2014, which governs allotment of coal blocks, there is no such stipulation for qualification on the basis of percentage of total expenditure incurred in the end-use project. For Government Companies like NTPC, before investment approval is

23 accorded by the Board under Maharatna Powers in any new power project, the following are necessities : Coal linkage / coal mine allotment from Ministry of Coal Environmental clearance for the end-use project as well as linked coal mine Land and water availability in totality Power Purchase Agreement (PPA) in place As per the MOEF stipulations, the environment clearance of a power project will only be considered after availability of environment clearance of the linked coal block, which in turn is dependent on St-I forest clearance of the block. Thus, prior identification of coal block and substantial progress in the coal block development in terms of availability of St.I forest clearance & environment clearance are a must before taking investment decision and award of main plant packages for any end-use power project for a Government Company like NTPC. Accordingly, it is not possible for NTPC or its JV/Subsidiary companies to make any such expenditure before the coal linkage/coal mine is allocated to NTPC. The same clarification was brought into the notice to Ministry of Coal (Nominated Authority) vide NTPC s communication dated while submitting comments against Clause No. 10(4) (d) (I) & (II) of the Draft Rules under Coal Mines (Special Provisions) Ordinance Hence, it is requested that the condition for amount (%) of expenditure incurred in the implementation of end-use project be de-linked as a part of qualification for allotment of coal blocks.

24 As per Allotment Document "However, an Applicant having coal linkage shall also be considered for Allotment for their existing Specified End Use Plant(s), if such Applicant commits to surrender their existing coal linkages for the same. The existing coal linkage shall then be tapered off as per extant policy. " An Applicant having coal linkage shall also be considered for Allotment for their existing Specified End Use Plant(s), to fulfil requirement of coal at 92% PLF, in excess of existing coal linkages for the same end-use plant, if existing coal linkage is at less PLF. And, in such cases, the existing coal linkages shall not be tapered off. NTPC operates its coal-based power plants at higher PLF and may be allowed to apply for coal block(s) to meet the shortfall in coal supply wrt coal requirement of end-use power stations at 92% PLF : Annual Contracted Quantity (ACQ) against the existing coal linkages from CIL subsidiary companies for coal-based power generating capacity commissioned till March 2009 is for supply of coal at 85% PLF (against requirement of coal at about 92% PLF). And, coal receipt corresponds with only about 80% of PLF in such generating stations. Similarly, coal receipt in the coal-based power generating capacity commissioned beyond March 2009 till date corresponds with only about 63% of PLF in such generating stations (against requirement of coal at about 92% PLF).

25 Prior to submission of Application, the Applicants are encouraged to undertake the site visit to Coal Mine, at their cost and ascertain for themselves the site conditions, location, communication, climate, availability of power, Applicable Laws and regulations, and any other matter considered relevant by them in the manner provided herein for a visit to the Coal Mine until 3 Business Days prior to the Last Date. Last Date for submission of application may be extended so that Applicants may get enough time to visit the sites of these coal blocks, which are located in six different States. The allotment process will be conducted as per the Schedule provided under Clause of the Allotment Document (Eligibility Requirement for Applicants) Whether Captive Power Generators qualify to participate in the ALLOTMENT process for the coal blocks earmarked for Specified End Use Plant (EUP) under POWER category (Eligibility Requirement for Applicants) Specified End Use as defined in Clause does not include generation of power for captive use. As per Allotment Document Joint Ventures are permitted to participate in the process. JOINT ALLOCATION OF COAL MINE: In case the individual applicant's requirement for Specified EUP is on the lower side and does not match with the Minable Reserves of the any coal block in the list, Will there be JOINT ALLOTMENT with other applicant(s)? Govt. of India may club the requirement of different applicants and jointly allot a single mine/ mines to match the coal requirement of the EUPs with the Minable Reserves of the any coal block in the list.

26 57 Annexure VI: Particulars of the coal mine and upfront amount Utkal-D & Utkal-E coal blocks have been mentioned under one serial number in the allotment list. It may be clarified whether both blocks will be taken as single Block and if not, whether applications are to be made separately for individual blocks. Suggestion Coal blocks under a particular Sl. No. can be considered separately/ jointly as per requirement of an EUP. This is necessary for matching the requirement of the EUP with the mineable reserve of the coal mine (Eligibility requirement of the applicant), & Annnexure II (Para -2 of Format for Affidavit) TAPERING OF COAL LINKAGE: After the allotment of the new coal block, whether existing coal linkage has to be surrendered immediately or will tapering of linkage will be linked to production from the coal mine. Para-2 of Annexure II Format for Affidavit: That the Applicant has coal linkage [insert details of coal linkage and linked Specified End Use Plant(s)] and commits to surrender such coal linkage without any reservation or condition with the production coal for the allotted coal mine in case the coal mine is allotted against the coal requirement presently fully met by coal linkage. Coal from the allotted coal mine may utilized for meeting the shortfall in linkage. Hence, the coal requirement projected is over above the coal linkage available. Schedule III coal mines are not yet operational. Hence surrendering an existing coal linkage for the EUP, particularly operational units, before execution of the Allotment Order for such mines may not be possible and may lead to stoppage of the plant. UtkaL D & Utkal E coal mines will be considered as a single mine under the current allotment process. Further, Upfront Amount to be paid in respect to each coal mine indicated at Annexure VI of the Allotment Document will be uploaded shortly. As per Clause of the Allotment Document

27 59 6.1(a) What is the implication of requirement of coal for the power generation capacity coming up in the state till the year 2017? The requirement may not be relevant for a CPP 60 Clause Utilisation of Coal The Allottee shall not be permitted to use the coal extracted from the Coal Mine for any purposes other than utilisation for Specified End Use. Any middling or washery rejects generated from the Coal Mine may be sold by the Allottee and the Allottee shall maintain separate records for the middling or washery rejects. However, the ` In case, if the allottee wishes to setup a reject based power plant, In that case will the allottee be allowed to set up a Reject based power project based on the Rejects at Pit Head : No Applicant shall submit more than 1 (one) Application for the Coal Mine, either directly or indirectly. However, the Applicant can apply for more than one coal mine for same Specified End Use Plant. Clause Prohibits one Applicant to submit more than one application for a coal mine, either directly or indirectly 62 It is not clear whether a single mine can be allotted to two Applicants. Earlier cases of joint allocation of a single mine to more than 1 (one) allocatee has not seen much success, and has been seen to have slowed down the development of the mine. Specified End Use as defined in Clause does not include generation of power for captive use. Utilisation coal from Coal Mine shall be as per Clause Allottee may use middlings and rejects in their reject based power plant. 1. An Applicant can submit only one Application for a particular Coal Mine with reference to a particular Specified EUP. However, such Applicant is allowed to submit separate Applications with respect to above Specified End Use Plant for coal mines other than one for which an application has already been submitted. In other words, an Applicant can submit only one Application for one Coal Mine with respect to one Specified End Use Plant. Thus, an Applicant can submit another Application for the same coal mine for a different EUP. As per Clause 3.2 of Allotment Document.

28 63 As per Clause and of the Allotment ( Eligibility) Document Whether state power utilities, which were having coal blocks and are now cancelled, are required to surrender any linkage if they are applying for same linkage from new coal block a) furnish the Performance Security as specified in Clause 7 (b) pay a fixed amount for the value of Land and Mine Infrastructure, cost of preparation of geological report borne by the Prior Allottee, cost of obtaining all statutory licenses, permits, permissions,approvals, clearances or consents relevant to the mining operations, borne by the Prior Allottee (collectively the Fixed Amount ). If the Allottee is a Prior Allottee, then, the compensation payable to such Allottee shall be set off or adjusted against the Fixed Amount payable by such Allottee. (c) pay the first instalment of the Upfront Amount as mentioned in Annexure VI against the Coal Mine. a) shall be computed as per of Allotment Agreement. b) & c) shall be uploaded shortly on MSTC's website. The amount applicable for each mine needs to be intimated for each sub head (a), (b) and (c). 65 Annexure-II Format of Affidavit As per Allotment Document That the Applicant has coal linkage [insert details of coal linkage and linked Specified End Use Plant(s)] and commits to surrender such coal linkage without any reservation or condition before execution of the Allotment Order in case the Applicant is declared as Allottee. In place of "surrender such coal linkage", it should be "surrender of linkage in proportion to allotted linkage from the coal block"

29 As per Allotment Document However, an Applicant having coal linkage shall also be considered for Allotment for their existing Specified End Use Plant(s), if such Applicant commits to surrender their existing coal linkages for the same. The existing coal linkage shall then be tapered off as per extant policy. Whether coal linkage can be extended till the development period of coal block allotted for Specified End Use Plant(s)? (f) - Notwithstanding the above, in the event that the Nominated Authority or the Central Government determines that a Preferred Applicant should not be declared the Allottee on account of any reason whatsoever, including without limitation the withdrawal of the Preferred.Applicant from the allotment process for the Coal Mine or the Preferred Applicant ceasing to comply with the Eligibility Conditions, then the Coal Mine may be subjected to re-allotment or being granted to the custody of a Designated Custodian, and this allotment process may be annulled. In case of withdrawal of preferred applicant, coal block shall be allotted to the second preferred applicant. Clause (f) shall be read as: "Notwithstanding the above, in the event that the Nominated Authority or the Central Government determines that a Preferred Applicant should not be declared the Allottee on account of any reason whatsoever, including without limitation the withdrawal of the Preferred Applicant from the allotment process for the Coal Mine or the Preferred Applicant ceasing to comply with the Eligibility Conditions, then the Coal Mine shall be allotted to second preferred applicant."

Allotment of Coal Mines to State Government Companies of Coal Bearing Host States for Sale of Coal

Allotment of Coal Mines to State Government Companies of Coal Bearing Host States for Sale of Coal Allotment of Coal Mines to State Government Companies of Coal Bearing Host States for Sale of Coal Queries & Responses to Allotment Document dated April 21, 2016 Part I Nominated Authority Ministry of

More information

Mineral Block Auction in Odisha

Mineral Block Auction in Odisha Mineral Block Auction in Odisha Odisha Mineral Block Auction (Phase III) Queries & Responses Queries & Responses to Tender Documents dated March 07, 2017 Phase - III Directorate of Mines Steel & Mines

More information

Petition No 768 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order :

Petition No 768 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order : Petition No 768 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 04.11.2011 IN THE MATTER OF: Approval of determined transfer price of fuel and revised Request

More information

STANDARD COAL MINE DEVELOPMENT AND PRODUCTION AGREEMENT FOR. IRON AND STEEL, CEMENT AND CAPTIVE POWER PLANT [SCHEDULE II and III COAL MINES]

STANDARD COAL MINE DEVELOPMENT AND PRODUCTION AGREEMENT FOR. IRON AND STEEL, CEMENT AND CAPTIVE POWER PLANT [SCHEDULE II and III COAL MINES] [This Agreement supercedes the Coal Mine Development and Production Agreement for Iron and Steel, Cement and Captive Power Plant (Schedule II Coal Mines) published on January 22, 2015] STANDARD COAL MINE

More information

TENDER DOCUMENT FOR E-AUCTION FOR MINING LEASE OF GRAPHITE & ASSOCIATED MINERAL [ ] GRAPHITE BLOCK

TENDER DOCUMENT FOR E-AUCTION FOR MINING LEASE OF GRAPHITE & ASSOCIATED MINERAL [ ] GRAPHITE BLOCK TENDER DOCUMENT FOR E-AUCTION FOR MINING LEASE OF GRAPHITE & ASSOCIATED MINERAL OF [ ] GRAPHITE BLOCK DIRECTORATE DEPARTMENT OF MINES & GEOLOGY GOVERNMENT OF JHARKHAND Tender No: Forward Auction No: Date

More information

GOVERNMENT OF MAHARASHTRA. Tender Document. Block

GOVERNMENT OF MAHARASHTRA. Tender Document. Block GOVERNMENT OF MAHARASHTRA Tender Document Block This Tender Document is non-transferable. The Price of this Tender Document is INR 5,00,000 (Rupees Five Lakh). June 13, 2016 Contents Contents... 2 1. Important

More information

The Singareni Collieries Company Limited (A Government Company)

The Singareni Collieries Company Limited (A Government Company) SCHEME DOCUMENT FOR AUCTION OF COAL LINKAGES IN THE OTHERS SUB-SECTOR, TRANCHE II December 29, 2016 The Singareni Collieries Company Limited (A Government Company) Important Notice: The information contained

More information

BILL NO. 19 OF THE GAZETTE OF INDIA EXTRAORDINARY [PART II

BILL NO. 19 OF THE GAZETTE OF INDIA EXTRAORDINARY [PART II 8 THE GAZETTE OF INDIA EXTRAORDINARY [PART II BILL NO. 19 OF 2015 A Bill to provide for allocation of coal mines and vesting of the right, title and interest in and over the land and mine infrastructure

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL Subject: Dated: 7 th February, 2013 M/s Essar Power M. P. Limited DAILY ORDER (Date of Motion Hearing : 5 th February, 2013) Petition No.03/2013

More information

MODEL TENDER DOCUMENT FOR E-AUCTION MINING LEASE FOR LIMESTONE BLOCK IN STATE OF RAJASTHAN

MODEL TENDER DOCUMENT FOR E-AUCTION MINING LEASE FOR LIMESTONE BLOCK IN STATE OF RAJASTHAN MODEL TENDER DOCUMENT FOR E-AUCTION OF MINING LEASE FOR LIMESTONE BLOCK IN STATE OF RAJASTHAN DEPARTMENT OF MINES & PETROLEUM, GOVERNMENT OF RAJASTHAN DIRECTORATE OF MINES & GEOLOGY UDAIPUR DEPARTMENT

More information

THE COAL MINES (SPECIAL PROVISIONS) BILL, 2015

THE COAL MINES (SPECIAL PROVISIONS) BILL, 2015 AS INTRODUCED IN LOK SABHA Bill No. 19 of 2015 THE COAL MINES (SPECIAL PROVISIONS) BILL, 2015 ARRANGEMENT OF CLAUSES CHAPTER I PRELIMINARY CLAUSES 1. Short title, extent and commencement. 2. Declaration

More information

REPLY TO PRE BID QUERIES MINING LEASE FOR CEMENT GRADE LIME STONE

REPLY TO PRE BID QUERIES MINING LEASE FOR CEMENT GRADE LIME STONE 1 Clause 4.1(i) Revenue Survey Particulars is included in Information memorandum Land owned by State Government & Land not owned by State government has been marked on the map but proper Revenue survey

More information

Auction of Mineral Blocks in Odisha. Garramura and Kottameta Limestone Blocks (Mining Lease) Responses to Queries. Tender Document

Auction of Mineral Blocks in Odisha. Garramura and Kottameta Limestone Blocks (Mining Lease) Responses to Queries. Tender Document Auction of Mineral Blocks in Odisha Garramura and Kottameta Limestone Blocks (Mining Lease) Responses to Queries on Tender Document (Notice Inviting Tender dated October 26, 2016) Director of Mines Steel

More information

MODEL TENDER DOCUMENT FOR E-AUCTION MINING LEASE FOR CEMENT GRADE LIME STONE STATE: MADHYA PRADESH

MODEL TENDER DOCUMENT FOR E-AUCTION MINING LEASE FOR CEMENT GRADE LIME STONE STATE: MADHYA PRADESH MODEL TENDER DOCUMENT FOR E-AUCTION OF MINING LEASE FOR CEMENT GRADE LIME STONE STATE: MADHYA PRADESH DIRECTORATE OF GEOLOGY & MINING GOVERNMENT OF MADHYA PRADESH 1 of 101 Issued to All Prospective Bidder

More information

GOVERNMENT OF GUJARAT. Tender Document. Block

GOVERNMENT OF GUJARAT. Tender Document. Block GOVERNMENT OF GUJARAT Tender Document Block This Tender Document is non-transferable. The Price of this Tender Document is INR [amount in figures] (Rupees [amount in words]). Contents Contents... 2 1.

More information

SCHEME DOCUMENT FOR AUCTION OF COAL LINKAGES IN THE CEMENT SUB- SECTOR. July 13, Coal India Limited A Government of India Undertaking

SCHEME DOCUMENT FOR AUCTION OF COAL LINKAGES IN THE CEMENT SUB- SECTOR. July 13, Coal India Limited A Government of India Undertaking SCHEME DOCUMENT FOR AUCTION OF COAL LINKAGES IN THE CEMENT SUB- SECTOR July 13, 2018 Coal India Limited A Government of India Undertaking Important Notice: The information contained in this Scheme Document

More information

STANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM. Under Case 1 Bidding Procedure THROUGH

STANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM. Under Case 1 Bidding Procedure THROUGH STANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM Under Case 1 Bidding Procedure THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS (As per Bidding Guidelines, issued by the Government

More information

Index. 1. Introduction: Scope of the Guidelines Preparation for inviting bids Tariff Structure 6. 5.

Index. 1. Introduction: Scope of the Guidelines Preparation for inviting bids Tariff Structure 6. 5. Index 1. Introduction: 1 2. Scope of the Guidelines 2 3. Preparation for inviting bids 4 4. Tariff Structure 6 5. Bidding Process 8 6. Bid submission and evaluation 10 7. Contract award and conclusion

More information

STANDARD REQUEST FOR PROPOSAL DOCUMENT FOR SELECTION OF TRANSMISSION SERVICE PROVIDER THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS

STANDARD REQUEST FOR PROPOSAL DOCUMENT FOR SELECTION OF TRANSMISSION SERVICE PROVIDER THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS STANDARD REQUEST FOR PROPOSAL DOCUMENT FOR SELECTION OF TRANSMISSION SERVICE PROVIDER THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS TO ESTABLISH TRANSMISSION SYSTEM FOR.. [Insert NAME OF PROJECT] ISSUED

More information

Request for Proposal Document. For Selection of Developer for Setting up of

Request for Proposal Document. For Selection of Developer for Setting up of Request for Proposal Document For Selection of Developer for Setting up of 8 MW Solar PV Power Plant on the land of Procurer at Village Jaun Samana, Greater Noida For Procurement on Long Term Basis by

More information

the land records to the competent authority, whenever required. (4) The competent authority shall cause the substance of the notification to be publis

the land records to the competent authority, whenever required. (4) The competent authority shall cause the substance of the notification to be publis THE RAILWAYS (AMENDMENT) ACT, 2008 # NO. 11 OF 2008 $ [28th March, 2008.] + An Act further to amend the Railways Act,1989. BE it enacted by Parliament in the Fifty-ninth Year of the Republic of India as

More information

File No.23014/1/2017-CLD Government of India Ministry of Coal <0> OFFICE MEMORANDUM

File No.23014/1/2017-CLD Government of India Ministry of Coal <0> OFFICE MEMORANDUM File No.23014/1/2017-CLD Government of India Ministry of Coal IMMEDIATE BY FAX New Delhi, the 2gMarch, 2017 OFFICE MEMORANDUM Subject: Meeting of the Standing Linkage Committee (Long-Term) for Power/Sponge/Cement

More information

Notification PART I CHAPTER I PRELIMINARY

Notification PART I CHAPTER I PRELIMINARY [TO BE PUBLISHED IN THE GAZZETTE OF INDIA, EXTRAORDINARY, PART II, SECTION 3, SUB-SECTION (i)] GOVERNMENT OF INDIA MINISTRY OF COMMERCE AND INDUSTRY (DEPARTMENT OF INDUSTRIAL POLICY AND PROMOTION) Notification

More information

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012)

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012) MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL Sub : In the matter of approval of Power Purchase Agreement. ORDER (Date of Order : 7 th September, 2012) Petition No.11 of 2012 1. MP Power Management

More information

WEST BENGAL INDUSTRIAL DEVELOPMENT CORPORATION LIMITED PROTITI, 23, Abanindranath Tagore Sarani (Camac Street), Kolkata TENDER DOCUMENT FOR

WEST BENGAL INDUSTRIAL DEVELOPMENT CORPORATION LIMITED PROTITI, 23, Abanindranath Tagore Sarani (Camac Street), Kolkata TENDER DOCUMENT FOR WEST BENGAL INDUSTRIAL DEVELOPMENT CORPORATION LIMITED PROTITI, 23, Abanindranath Tagore Sarani (Camac Street), Kolkata-700 017 TENDER DOCUMENT FOR ELECTRICAL MAINTENANCE & ALLIED SERVICES at PROTITI,

More information

Mineral Resources Department, Government of Chhattisgarh REPLY TO PRE BID QUERIES FOR "AUCTION OF MINING LEASE FOR GUMA LIMESTONE BLOCK

Mineral Resources Department, Government of Chhattisgarh REPLY TO PRE BID QUERIES FOR AUCTION OF MINING LEASE FOR GUMA LIMESTONE BLOCK Mineral Resources Department, Government of Chhattisgarh Directorate of Geology & Mining Indravati Bhavan, Block-4, Second Floor, Naya Raipur, Chhattisgarh - 492002, India Phone No. 0771-2221840, Fax:

More information

NOTICE INVITING TENDER FOR WORKS (TWO COVER SYSTEM) OPEN TENDER ENQUIRY

NOTICE INVITING TENDER FOR WORKS (TWO COVER SYSTEM) OPEN TENDER ENQUIRY 1.0 INVITATION: NOTICE INVITING TENDER FOR WORKS (TWO COVER SYSTEM) OPEN TENDER ENQUIRY Sealed Tenders in the prescribed form are invited towards the description of work given in the "Tender Details" below

More information

Request for Qualification. For. Power Supply Agreement. For

Request for Qualification. For. Power Supply Agreement. For RFQ No.: APSPDCL/02/DBFOO Dated : 23 rd March 2015 Request for Qualification For Power Supply Agreement For Procurement of Electricity for 1000 MW capacity under long term by APDISCOMS on Design, Built,

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX Part A: PRELIMINARY 4 1. Short Title, extent and commencement 4 2. Definitions 4 3. Eligibility to seek

More information

THE RAILWAYS (AMENDMENT) BILL, 2008

THE RAILWAYS (AMENDMENT) BILL, 2008 TO BE INTRODUCED IN LOK SABHA Bill No. 19 of 2008 24 of 1989. THE RAILWAYS (AMENDMENT) BILL, 2008 A BILL further to amend the Railways Act,1989. BE it enacted by Parliament in the Fifty-ninth Year of the

More information

Intelligent Communication Systems India Ltd. (ICSIL) TENDER NO: F.1 (ICSIL)/01/217/ 1D Barcode Reader Tis Hazari Court/ , Dated:

Intelligent Communication Systems India Ltd. (ICSIL) TENDER NO: F.1 (ICSIL)/01/217/ 1D Barcode Reader Tis Hazari Court/ , Dated: Intelligent Communication Systems India Ltd. (ICSIL) (Joint Venture of TCIL - A Govt. of India Enterprise & DSIIDC - An Undertaking of Delhi Govt.) Administrative Building, 1 st Floor, Above Post Office,

More information

NOTICE INVITING TENDER (NIT)

NOTICE INVITING TENDER (NIT) NOTICE INVITING TENDER (NIT) 1.1 GENERAL 1.1.1 Name of Work: Delhi Metro Rail Corporation (DMRC) Ltd. invites open e-tenders from eligible applicants, who fulfill qualification criteria as stipulated in

More information

SHARE PURCHASE AGREEMENT. This SHARE PURCHASE AGREEMENT ( Agreement ) is made on this day of.., 20..,

SHARE PURCHASE AGREEMENT. This SHARE PURCHASE AGREEMENT ( Agreement ) is made on this day of.., 20.., SHARE PURCHASE AGREEMENT This SHARE PURCHASE AGREEMENT ( Agreement ) is made on this day of.., 20.., Between UTTAR PRADESH POWER CORPORATION LIMITED, a company incorporated under the Companies Act, 1956,

More information

Request for Proposal DEVELOPMENT OF SOLAR POWER PROJECTS IN THE STATE OF KARNATAKA VOLUME I. Request for Proposal. June 2014

Request for Proposal DEVELOPMENT OF SOLAR POWER PROJECTS IN THE STATE OF KARNATAKA VOLUME I. Request for Proposal. June 2014 DEVELOPMENT OF SOLAR POWER PROJECTS IN THE STATE OF KARNATAKA Request for Proposal VOLUME I Request for Proposal June 2014 KARNATAKA RENEWABLE ENERGY DEVELOPMENT LIMITED Request for Proposal Contents Volume

More information

Case No. 224 of Coram. Shri. I.M. Bohari, Member Shri. Mukesh Khullar, Member. M/s. Vidarbha Industries Power Ltd (VIPL-G)

Case No. 224 of Coram. Shri. I.M. Bohari, Member Shri. Mukesh Khullar, Member. M/s. Vidarbha Industries Power Ltd (VIPL-G) Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

us kuy QfVZykbt+lZ fyfevsm (Hkkjr ljdkj dk midze)

us kuy QfVZykbt+lZ fyfevsm (Hkkjr ljdkj dk midze) us kuy QfVZykbt+lZ fyfevsm (Hkkjr ljdkj dk midze) National Fertilizers Limited (A Government of India Undertaking) xksgkuk jksm] ikuhir] gfj;k.kk 132 106 Gohana Road, Panipat, Haryana 132 106 (ISO-9001,

More information

Addendum-3, dated 01 March 2018 for the recalled tender. This addendum shall be the part of the RFP, Draft PPA, ISA and LSA.

Addendum-3, dated 01 March 2018 for the recalled tender. This addendum shall be the part of the RFP, Draft PPA, ISA and LSA. Addendum-3, dated 01 March 2018 for the recalled tender. This addendum shall be the part of the RFP, Draft PPA, ISA and LSA. Sl. No. Existing Clause no. Existing clause Amended clause (Read as) 1. Page

More information

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER (Date of Order : 7 th September, 2012) Petition Nos.7, 8, 9, 10 & 12 of 2012 1. MP Power Management Co. Ltd., Jabalpur 2. MP Paschim Kshetra

More information

NLC TAMILNADU POWER LIMITED

NLC TAMILNADU POWER LIMITED PRESS TENDER NOTICE Dated: 08.06.2017 Sealed quotations in single cover consisting of two inner sealed covers (containing Technical cover as Part I and price cover as Part II) super scribing the Name of

More information

Sl. No. Query/ Concern Clarification/ Information/ Amendment

Sl. No. Query/ Concern Clarification/ Information/ Amendment THE ODISHA STATE CO-OPERATIVE SPINNING MILLS FEDERATION LTD.(SPINFED) Request for Proposal invited dated January 20, 2015: Development of 25,000 Spindle Cotton Spinning Mill at Konarkspin, Kesinga, Odisha.

More information

NLC TAMILNADU POWER LIMITED ( A J V C b e tw e e n N L C & T A N G E D C O & a s u b s id ia r y o f N L C L td )

NLC TAMILNADU POWER LIMITED ( A J V C b e tw e e n N L C & T A N G E D C O & a s u b s id ia r y o f N L C L td ) OPEN TENDER NOTICE Dated: 21-07-2016 Sealed quotations in single cover consisting of two inner sealed covers (containing Technical cover as Part I and price cover as Part II) super scribing the Name of

More information

AMC for attending faults of Split AC s installed over L-2E, L-3E, L-4 & including Depot.

AMC for attending faults of Split AC s installed over L-2E, L-3E, L-4 & including Depot. DELHI METRO RAIL CORPORATION LTD. (A Joint Venture of Govt. of India & Govt. of NCT, Delhi) AMC for attending faults of Split AC s installed over L-2E, L-3E, L-4 & including Depot. TENDER DOCUMENT VOLUME-I

More information

Notice Inviting Tender (NIT)

Notice Inviting Tender (NIT) TENDER NOTIFICATION NO. GMRCL/O &M/Uniform/ /PH-1/2019 Tender For "Supply of Uniform & Accessories-2019" 1. Uniform: Clothes 2. Uniform: Accessories for Ahmedabad Metro Rail Phase-1 TENDER NO.: GMRCL/O

More information

JOINT VENTURE/SHARE HOLDERS AGREEMENT. THIS AGREEMENT is executed at [Name of city ] on the day of [Date, month and year ]

JOINT VENTURE/SHARE HOLDERS AGREEMENT. THIS AGREEMENT is executed at [Name of city ] on the day of [Date, month and year ] JOINT VENTURE/SHARE HOLDERS AGREEMENT THIS AGREEMENT is executed at [Name of city ] on the day of [Date, month and year ] BETWEEN: M/S. ABC PRIVATE LIMITED. (herein after referred to as the "ABC", which

More information

CHAPTER I PRELIMINARY

CHAPTER I PRELIMINARY 10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III SEC. 4] INSOLVENCY AND BANKRUPTCY BOARD OF INDIA NOTIFICATION New Delhi, the 21 st November, 2016 Insolvency and Bankruptcy Board of India (Insolvency

More information

Joint Venture (JV) Agreement

Joint Venture (JV) Agreement Joint Venture (JV) Agreement (Joint Venture should be registered in M.P.) THIS AGREEMENT (the Agreement) is made as of the 12th day of May, 2017, by and between (First Party Name) Having registered address

More information

Notice for Sale of NPA Accounts. Invitation for Expression of Interest

Notice for Sale of NPA Accounts. Invitation for Expression of Interest Notice for Sale of NPA Accounts Invitation for Expression of Interest February, 2018 Bank of India invites bids from all eligible Asset Reconstruction Companies (ARC s)/ NBFC, Banks, FIs for sale/assignment

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member In the matter of: Fixation of transmission tariff for 7.2 KM 400 KV dedicated

More information

SUPPLY OF SILICON CARBIDE BRICKS AND SILICON CARBIDE MORTAR

SUPPLY OF SILICON CARBIDE BRICKS AND SILICON CARBIDE MORTAR IDCOL FERRO CHROME & ALLOYS LIMITED (A Wholly Owned Subsidiary of IDCOL) A Govt. of Odisha Undertaking Regd. Office Ferro Chrome Project 755 020 Jajpur Road, Dist Jajpur (Odisha) Tel. No. 06726-220212

More information

Table A (Regulated Sectors)

Table A (Regulated Sectors) Comparative Statement showing Original Rules 2014 vis-a-vis Amendment Rules 2016 issued on 14 th July 2016 Notes: 1) All additions are shown in red and deletions are shown in blue. 2) Entire Rules are

More information

ADDENDUM. Sl.No. Page No / Clause. No. [Type text]

ADDENDUM. Sl.No. Page No / Clause. No. [Type text] Tamilnadu Polymer Industries Park Limited (TPIPL) 19-A, Rukmini Lakshmipathi Road, Egmore, Chennai 600 008, Tamil Nadu Tel: 91-44-28551192; 28554479/80/84; Fax: 91-44-28553729 Request for proposal (RFP)

More information

NOTICE INVITING TENDER (NIT)

NOTICE INVITING TENDER (NIT) NOTICE INVITING TENDER (NIT) 1.1 GENERAL 1.1.1 Name of Work: Delhi Metro Rail Corporation (DMRC) Ltd. invites open tenders from eligible applicants, who fulfill qualification criteria as stipulated in

More information

Case No. 22 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER

Case No. 22 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.com

More information

INDIAN INSTITUTE OF TECHNOLOGY INDORE

INDIAN INSTITUTE OF TECHNOLOGY INDORE INDIAN INSTITUTE OF TECHNOLOGY INDORE Notice Inviting Tender 1. Item rate tenders are invited from eligible contractors registered/enlisted with Central Government Department/State Government Department/

More information

REFERENCE SECTION OF TENDER DOCUMENT Whether there is a minimum bid amount or quantum prescribed by or expected by the Govt. of M.

REFERENCE SECTION OF TENDER DOCUMENT Whether there is a minimum bid amount or quantum prescribed by or expected by the Govt. of M. S. 1. TO QUERIES ON THE TENDER FOR LEASING OF AIRFIELDS OF GOVERNMENT OF MADHYA PRADESH Tender reference number: Ref.. F-42/1/LA/776 Dated: 18/12/2017 Whether there is a minimum bid amount or quantum prescribed

More information

Description Clause No. and Page No. of Original Tender Document Amendment

Description Clause No. and Page No. of Original Tender Document Amendment (MM3-CBS-REL-PYL) Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kv and 33 kv Transmission Lines

More information

Sale of NPL accounts by Dena Bank Invitation for submission of EoI

Sale of NPL accounts by Dena Bank Invitation for submission of EoI Sale of NPL accounts by Dena Bank Invitation for submission of EoI Dena Bank (or the Bank ) invites Expression of Interest from ARCs, Banks, FIs and eligible NBFCs for the proposed sale of its Non Performing

More information

GOVERNMENT OF TAMILNADU

GOVERNMENT OF TAMILNADU GOVERNMENT OF TAMILNADU COMPETITIVE RE-TENDER FOR THE SUPPLY OF ELECTRIC TABLE FANS RATE CONTRACT FOR THE SUPPLY AND COMMISSIONING OF 34,46,000 PIECES OF ELECTRIC TABLE FAN AS PER IS : 555-1979 2013-2014

More information

Draft Supplementary Power Purchase Agreement

Draft Supplementary Power Purchase Agreement Draft Supplementary Power Purchase Agreement Between Paschimanchal Vidyut Vitran Nigam Ltd. ( Procurer 1 ) and Poorvanchal Vidyut Vitran Nigam Ltd. ( Procurer 2 ) and Madhyanchal Vidyut Vitran Nigam Ltd.

More information

FORWARD CONTRACT (REGULATION) ACT, 1952.

FORWARD CONTRACT (REGULATION) ACT, 1952. FORWARD CONTRACT (REGULATION) ACT, 1952. (Act No. 74 of 1952) CHAPTER I Preliminary 1. Short title, extent and commencement. 2. Definition CHAPTER II Forward Markets Commission 3. Establishment and constitution

More information

Supply and Installation of A3 Size Scanner

Supply and Installation of A3 Size Scanner O/o PRINCIPAL CHIEF CONSERVATOR OF FORESTS MADHYA PRADESH FOREST DEPARTMENT (Information Technology Wing) Satpura Bhawan, BHOPAL 462004 (MP) Phone no. 0755-2674302 Fax no. 0755-2555480 www.mpforest.gov.in

More information

CHAPTER --- ASSESSMENT AND AUDIT

CHAPTER --- ASSESSMENT AND AUDIT 1. Provisional Assessment CHAPTER --- ASSESSMENT AND AUDIT (1) Every registered person requesting for payment of tax on a provisional basis in accordance with the provisions of sub-section (1) of section

More information

UTTARAKHAND POWER CORPORATION LTD. BID DOCUMENT FOR PURCHASE OF POWER COMMERCIAL AND GENERAL CONDITIONS

UTTARAKHAND POWER CORPORATION LTD. BID DOCUMENT FOR PURCHASE OF POWER COMMERCIAL AND GENERAL CONDITIONS UTTARAKHAND POWER CORPORATION LTD. COMMERCIAL AND GENERAL CONDITIONS SPECIFICATION NO. UPCL/CGM-04/10-11 (POWER PURCHASE) Dated 26.07.10 Bid Document Available on the UPCL s web-site (www.upcl.org) Chief

More information

i. ELECTION OF DIRECTORS EXTRACTS OF RELEVANT ACTS, SCHEME, AND REGULATIONS ETC.

i. ELECTION OF DIRECTORS EXTRACTS OF RELEVANT ACTS, SCHEME, AND REGULATIONS ETC. i. ELECTION OF DIRECTORS EXTRACTS OF RELEVANT ACTS, SCHEME, AND REGULATIONS ETC. In terms of Section 9(3) of The Banking Companies (Acquisition and Transfer of Undertakings) Act, 1970, shareholder directors

More information

Response to Bidder Queries-II

Response to Bidder Queries-II Response to Bidder Queries-II Response to Bidder Queries for Development of Outer Ring Road (ORR) on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity Basis at Chennai, Tamil Nadu as per Tender

More information

UTI INFRASTRUCTURE TECHNOLOGY AND SERVICES LIMITED

UTI INFRASTRUCTURE TECHNOLOGY AND SERVICES LIMITED UTI INFRASTRUCTURE TECHNOLOGY AND SERVICES LIMITED Name of the Tender: Empanelment of Fire Fighting System Contractors General Information UTI Infrastructure Technology And Services Limited (UTIITSL) advertises

More information

5.1 LETTER OF ACCEPTANCE

5.1 LETTER OF ACCEPTANCE Construction of New Buildings for IIT Madras Research Park Phase II, SH: - Connecting Bridge and Pergola Works Annexure - I 5.1 LETTER OF ACCEPTANCE Reference No: Date: To Contactors address Project: Construction

More information

Guidance Document (Medical Devices and Diagnostic Division)

Guidance Document (Medical Devices and Diagnostic Division) Guidance Document (Medical Devices and Diagnostic Division) Title: Guidance Document on Common Submission Format for Import of Notified Diagnostics Kits in India Doc No. : CDSCO/IVD/GD/IMP/01/00 Effective

More information

PROCEDURE FOR REGISTRATION OF RENEWABLE ENERGY GENERATION PROJECT BY CENTRAL AGENCY

PROCEDURE FOR REGISTRATION OF RENEWABLE ENERGY GENERATION PROJECT BY CENTRAL AGENCY Draft Dated 17_March_2010 PROCEDURE FOR REGISTRATION OF RENEWABLE ENERGY GENERATION PROJECT BY CENTRAL AGENCY 1. OBJECTIVE 1.1. This procedure shall provide guidance to the entities to implement Renewable

More information

PUNJAB TECHNICAL UNIVERSITY,

PUNJAB TECHNICAL UNIVERSITY, PUNJAB TECHNICAL UNIVERSITY, 1. NOTICE INVITING TENDER FOR HIRING OF BUSES Sealed Tenders are invited from reputed and established Bus Operators for supply of Buses on monthly requirement basis for a period

More information

NOTICE INVITING TENDER (e-tender)

NOTICE INVITING TENDER (e-tender) NOTICE INVITING TENDER (e-tender) DIGITIZATION OF DOCUMENTS I.E. SCANNING, INDEXING & VERIFICATION (Tender: DGTZN15) Contract DGTZN15/Notice Inviting Tender Page I 1 1.1.1 Name of Work: NOTICE INVITING

More information

The clarifications issued by GUVNL against the queries raised by the prospective bidders are as under:

The clarifications issued by GUVNL against the queries raised by the prospective bidders are as under: ADDENDUM II - Minutes of Pre-bid meeting held on 12 th March 2018 for 500 MW Wind Tender dated 23.02.2018 (Phase II). GUVNL has floated tender for procurement of 500 MW Wind Power through RFS dated 23.02.2018

More information

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO) THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO) (NO. 4/99) (Issued under OERC Order Dt. 31.03.99 in Case No. 25/98) Western Electricity Supply Company of Orissa Limited Registered office:

More information

NIT NO: F.1 (ICSIL)/01/241/ , New Delhi, Dated:

NIT NO: F.1 (ICSIL)/01/241/ , New Delhi, Dated: Intelligent Communication Systems India Ltd. (ICSIL) (Joint Venture of TCIL A Govt. of India Enterprise & DSIIDC An Undertaking of Delhi Govt.) Administrative Building, 1 st Floor, Above Post Office, Okhla

More information

KARNATAKA POWER CORPORATION LIMITED (A PREMIER POWER GENERATING COMPANY OF GOVERNMENT OF KARNATAKA)

KARNATAKA POWER CORPORATION LIMITED (A PREMIER POWER GENERATING COMPANY OF GOVERNMENT OF KARNATAKA) KARNATAKA POWER CORPORATION LIMITED (A PREMIER POWER GENERATING COMPANY OF GOVERNMENT OF KARNATAKA) BELLARY THERMAL POWER STATION, KARNATAKA. WATER AUGMENTATION FOR BELLARY TPS UNIT 3 (1 X 700 MW) SHORT

More information

REQUEST FOR PROPOSAL For Food Plaza for Leasing

REQUEST FOR PROPOSAL For Food Plaza for Leasing REQUEST FOR PROPOSAL For Food Plaza for Leasing At Khadgara Bus Stand, Ranchi, Jharkhand Ranchi Municipal Corporation Ranchi, Jharkhand 1 Disclaimer The information contained in this Request for Proposal

More information

THE COAL BEARING AREAS (ACQUISITION AND DEVELOPMENT) ACT, 1957 ARRANGEMENT OF SECTIONS

THE COAL BEARING AREAS (ACQUISITION AND DEVELOPMENT) ACT, 1957 ARRANGEMENT OF SECTIONS SECTIONS THE COAL BEARING AREAS (ACQUISITION AND DEVELOPMENT) ACT, 1957 1. Short title, extent and commencement. 2. Definitions. 3. Appointment of competent authority. ARRANGEMENT OF SECTIONS 4. Preliminary

More information

TENDER DOCUMENT FOR APPOINTMENT OF SUB-LICENSEE TO SET UP & OPERATE MILK STALLS AT RAILWAY STATIONS IN THE STATE OF ODISHA

TENDER DOCUMENT FOR APPOINTMENT OF SUB-LICENSEE TO SET UP & OPERATE MILK STALLS AT RAILWAY STATIONS IN THE STATE OF ODISHA TENDER DOCUMENT FOR APPOINTMENT OF SUB-LICENSEE TO SET UP & OPERATE MILK STALLS AT RAILWAY STATIONS IN THE STATE OF ODISHA Submission of Filled in Tender Document: Upto 1400 Hours Dtd. 02.03.15 Opening

More information

THE MINES AND MINERALS (DEVELOPMENT AND REGULATION) AMENDMENT BILL, 2015

THE MINES AND MINERALS (DEVELOPMENT AND REGULATION) AMENDMENT BILL, 2015 AS INTRODUCED IN LOK SABHA Bill No. 18 of 2015 THE MINES AND MINERALS (DEVELOPMENT AND REGULATION) AMENDMENT BILL, 2015 A BILL further to amend the Mines and Minerals (Development and Regulation) Act,

More information

INDIAN INSTITUTE OF TECHNOLOGY INDORE

INDIAN INSTITUTE OF TECHNOLOGY INDORE INDIAN INSTITUTE OF TECHNOLOGY INDORE Notice Inviting Tender 1. Item rate tenders are invited from eligible contractors registered/enlisted with Central Government Departments/State Government Departments/

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX Part A: PRELIMINARY 3 1. Short Title, Applicability and Commencement 3 2. Definitions 3 3. Eligibility to

More information

DEPARTMENT OF INFORMATION TECHNOLOGY ADDL DELUXE BUILDING, SECTOR 9 CHANDIGARH

DEPARTMENT OF INFORMATION TECHNOLOGY ADDL DELUXE BUILDING, SECTOR 9 CHANDIGARH DEPARTMENT OF INFORMATION TECHNOLOGY ADDL DELUXE BUILDING, SECTOR 9 CHANDIGARH NOTICE INVITING TENDER RAPID ENVIRONMENTAL IMPACT ASSESSMENT STUDY& SEEKING ENVIRONMENTAL CLEARANCE FOR RAJIV GANDHI CHANDIGARH

More information

AGREEMENT FOR SALE OF POWER. THIS AGREEMENT FOR SALE OF POWER is made and executed at on the day of, 2017 ( Agreement ) BY AND BETWEEN

AGREEMENT FOR SALE OF POWER. THIS AGREEMENT FOR SALE OF POWER is made and executed at on the day of, 2017 ( Agreement ) BY AND BETWEEN AGREEMENT FOR SALE OF POWER THIS AGREEMENT FOR SALE OF POWER is made and executed at on the day of, 2017 ( Agreement ) BY AND BETWEEN National Aluminium Company Limited (NALCO) a company incorporated under

More information

CENTRE FOR DEVELOPMENT OF ADVANCED COMPUTING. C-56/1, Sector-62, Institutional Area, Noida

CENTRE FOR DEVELOPMENT OF ADVANCED COMPUTING. C-56/1, Sector-62, Institutional Area, Noida स -56/1, स क टर-62, स स थ गत क ष त र, न एड 201307 CENTRE FOR DEVELOPMENT OF ADVANCED COMPUTING C-56/1, Sector-62, Institutional Area, Noida 201307 द रभ ष/Tel: 01203063311-13, फ क स/Fax::01203063317, Ref.

More information

PARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

PARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA PARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA SRI LANKA ELECTRICITY ACT, No. 20 OF 2009 [Certified on 8th April, 2009] Printed on the Order of Government Published as a Supplement to Part

More information

Tender. for. Supply & Installation of the Xenon-Arc Lamp. Indian Institute of Technology Jodhpur

Tender. for. Supply & Installation of the Xenon-Arc Lamp. Indian Institute of Technology Jodhpur Tender for Supply & Installation of the Xenon-Arc Lamp at Indian Institute of Technology Jodhpur NIT No. : IITJ/SPS/ENERGY/2/1(I)/2014-15/54 NIT Issue Date : 03 November 2014 Last Date of Submission :

More information

QUOTATION FOR DISPOSAL OF OLD & OBSELETE COMPUTER H/W SYETEM, PRINTERS ETC. Only through

QUOTATION FOR DISPOSAL OF OLD & OBSELETE COMPUTER H/W SYETEM, PRINTERS ETC. Only through Quotation No: REC/IT/93/COMPUTER(SCRAP)/2008/9 QUOTATION FOR DISPOSAL OF OLD & OBSELETE COMPUTER H/W SYETEM, PRINTERS ETC. Only through Recyclers/Re-Processors registered under Central Pollution Control

More information

COMMERCIAL TERMS AND CONDITIONS

COMMERCIAL TERMS AND CONDITIONS COMMERCIAL TERMS AND CONDITIONS 1. The price of link shall be inclusive of all duties, taxes and levies paid or payable on components, sub assemblies and any material used. 2. The owner reserves right

More information

3. M. P. Poorv Kshetra Vidyut Vitaran Co. Ltd. - Respondents Shakti Bhawan, Rampur, Jabalpur

3. M. P. Poorv Kshetra Vidyut Vitaran Co. Ltd. - Respondents Shakti Bhawan, Rampur, Jabalpur Order (Date of Motion Hearing: 30 th May 2017) (Date of Order: 02 nd June 2017) BLA Power Pvt. Ltd. 84, Marker Chambers Nariman Point, Mumbai-400 021 - Petitioner Vs. 1. Energy Department, Government of

More information

TENDER DOCUMENT. Sub: Tender for Supply, Installation & Commissioning of Fujitsu RAM for Server Hardware

TENDER DOCUMENT. Sub: Tender for Supply, Installation & Commissioning of Fujitsu RAM for Server Hardware TENDER DOCUMENT Sub: Tender for Supply, Installation & Commissioning of Fujitsu RAM for Server Hardware Tender No. : Purchase: 2016-17 (FUJITSU RAM) August 26, 2016 PART A Sealed tenders are invited for

More information

Bank Note Paper Mill India Private Limited, Mysore. For any query, you may contact at Tel , Fax

Bank Note Paper Mill India Private Limited, Mysore. For any query, you may contact at Tel , Fax Bank Note Paper Mill India Private Limited, Mysore Invites sealed quotations for Sale of Kraft Sheet & Wooden Pallets at BNPM, Mysore. The Tender document is hosted on Company s website http://www.bnpmindia.com.

More information

MINING DAMAGE PREVENTION AND RESTORATION ACT

MINING DAMAGE PREVENTION AND RESTORATION ACT MINING DAMAGE PREVENTION AND RESTORATION ACT Act No. 7551, May 31, 2005 Amended by Act No. 8355, Apr. 11, 2007 Act No. 8852, Feb. 29, 2008 Act No. 9010, Mar. 28, 2008 Act No. 9982, Jan. 27, 2010 Act No.

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014 104 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014 ELECTRICITY ACT, 2003. No./MERC/Tech/Open Access Transmission/Regulations/2014/561. In exercise

More information

Request for Proposal VOLUME I. Request for Proposal. 07 Dec 2017

Request for Proposal VOLUME I. Request for Proposal. 07 Dec 2017 Request for Proposal SHORT TERM TENDER FOR DEVELOPMENT OF 860 MW (AC) SOLAR POWER PROJECTS IN KARNATAKA TO BE IMPLEMENTED IN 43 TALUKAS/ CONSTITUENCIES VOLUME I Request for Proposal 07 Dec 2017 KARNATAKA

More information

NABHA POWER LIMITED Page 1 of 6. Response to the Clarification raised by the Vendor on RFQ

NABHA POWER LIMITED Page 1 of 6. Response to the Clarification raised by the Vendor on RFQ NABHA POWER LIMITED Page 1 of 6 Response to the Clarification raised by the Vendor on RFQ Sr. Clarification Sought No. 1. Application Due Date may be extended. 2. It is suggested that ammonia-based flue

More information

ULYSSES CLUB INCORPORATED ARBN: ABN: CONSTITUTION. AMENDED March 2009 CONTENTS INCOME AND PROPERTY

ULYSSES CLUB INCORPORATED ARBN: ABN: CONSTITUTION. AMENDED March 2009 CONTENTS INCOME AND PROPERTY ULYSSES CLUB INCORPORATED ARBN: 116090101 ABN: 25637297337 CONSTITUTION AMENDED March 2009 CONTENTS Page 3 Page 3 Page 3 Page 3 Page 4 Page 4 Page 4 Page 7 Page 7 Page 7 Page 8 Page 8 INTERPRETATION PURPOSES

More information

Constitution. NIB Holdings Limited ACN ( Company ) A public company limited by shares

Constitution. NIB Holdings Limited ACN ( Company ) A public company limited by shares Constitution NIB Holdings Limited ACN 125 633 856 ( Company ) A public company limited by shares Mallesons Stephen Jaques Level 61 Governor Phillip Tower 1 Farrer Place Sydney NSW 2000 Australia T +61

More information

SCHEDULE. Corporate Practices (Model Memorandum and Articles of Association)

SCHEDULE. Corporate Practices (Model Memorandum and Articles of Association) SCHEDULE Corporate Practices (Model Memorandum and Articles of Association) 1.102 (Schedule) [Rule 4(e)] The enclosed Model Memorandum and Articles of Association comprising the following titles have been

More information

INVITATION FOR PROPOSAL TO PROVIDE LEGAL CONSULTANCY SERVICES

INVITATION FOR PROPOSAL TO PROVIDE LEGAL CONSULTANCY SERVICES INVITATION FOR PROPOSAL TO PROVIDE LEGAL CONSULTANCY SERVICES Punjab Power Development Company Limited (PPDCL), invites proposals from consultancy firms for providing Legal Consultancy Services to the

More information

Case No. 295 of Coram. Anand B. Kulkarni, Chairperson Mukesh Khullar, Member. Adani Power Maharashtra Limited (APML)

Case No. 295 of Coram. Anand B. Kulkarni, Chairperson Mukesh Khullar, Member. Adani Power Maharashtra Limited (APML) Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information