1 ADDENDUM II - Minutes of Pre-bid meeting held on 12 th March 2018 for 500 MW Wind Tender dated (Phase II). GUVNL has floated tender for procurement of 500 MW Wind Power through RFS dated (Phase II) with a Greenshoe option for procurement of additional 500 MW. A pre-bid meeting with the prospective bidders was held on 12 th March 2018 at GETRI, Vadodara in this regard. M/s CRISIL Risk and Infrastructure Solutions Limited who is consultant to GUVNL, made a presentation covering key bid parameters and other provisions of bid documents. Further, during the meeting, GUVNL addressed queries raised by prospective bidders. The clarifications issued by GUVNL against the queries raised by the prospective bidders are as under: Sr. 1 Maximum Bid Capacity Some of the bidders have suggested keeping a maximum cap of 125 MW per bidder in line with the SECI bidding documents with a view to have larger participation and reduce the risk of project execution of 500 MW by a single bidder. Clarification Power Plants with higher project capacity will be able to achieve economies of scale and the resultant lower cost of power will benefit the consumers of the State and enable the State to meet the RE target in cost efficient manner. IWTMA has suggested to introduce maximum cap of 20% of the bid size to have wider distribution of capacity amongst participating bidders. 2 Minimum Project Capacity Whether the minimum project capacity of 25 MW is individual capacity proposed at a single location / substation (to be declared in Table in Format 6.1 of RfS) or Cumulative capacity bidded by a single bidder. Clarification The minimum project capacity of 25 MW shall have to be the cumulative capacity of the Bidder considering all the locations.
2 3 Capacity Offered & Project Scope Whether project capacity can be within ± 5% as allowed in previous Bid? Yes, Project Capacity can be within ± 5% of the contracted capacity. However, necessary evacuation consent shall have to be arranged from GETCO / CTU. 4 Reverse Auction IWTMA has requested GUVNL to opt for transparent closed bidding process instead of e-reverse bidding as mostly adopted in other sectors in case of domestic bidding. 5 Clause shall have to choose the location(s) and sub-station(s) for their proposed Wind Power Project from the above list as amended / updated by GETCO from time to time. One of the requested to keep it open for the bidders to choose the substation as choosing from GETCO s list of location / substations will bring restriction and may not include good wind sites. The RE Sector has evolved manifold and the transition from FiT regime to Competitive Bidding regime and e- reverse auction clearly points to the growing maturity of the Indian RE Sector. In the past one year, SECI and many other States viz. Tamilnadu, Gujarat, Maharashtra, etc. have successfully concluded at least more than 10 auctions for Wind and Solar power procurement which is a clear sign of well-established and matured sector. Further, MoP Guidelines also provides for the option of e-reverse bidding for final selection of bidders. The list of substations provided by GETCO is an indicative list. may choose the location and/or substation in consultation with GETCO depending upon the capacity available for integration at GETCO s/s.
3 6 Applicability of STU (GETCO) Charges and losses In case of Projects connected through CTU Network, whether STU (GETCO) Charges and losses shall be to the account of? Can a bidder use the CTU / ISTS network, and if yes, then what is the withdrawal charge of GETCO? Or is there any GERC / GETCO circular. In case of Projects connected through CTU Network, the CTU Charges and losses upto GETCO Periphery (if any) shall be to the account of. The Delivery Point being GETCO Periphery, STU (GETCO) charges and losses shall be to the account of GUVNL. 7 Connectivity One of the has submitted that it is likely that the Successful Bidder might not have firm connectivity at their preferred location or there might not be adequate capacity available in the substation where they intend to develop their project. GUVNL / GETCO should arrange for connectivity to the Successful Bidder. The Bidder has sought clarity whether winning a bid entitle them to have connectivity and clarification in case where two Successful propose to develop their project at the same location and do not have any firm connectivity. Clause of the RfS clearly stipulates that the responsibility of getting grid connectivity with GETCO / CTU shall entirely be to the account of Successful Bidder and shall be at the cost of the Successful Bidder. The list of substations provided by GETCO is an indicative list. may choose the location and/or substation in consultation with GETCO depending upon the capacity available for integration at GETCO s/s In case the Successful quote their bids at the same location and/or sub-station, then the priority of allotment of s/s shall be done based on their ranking in Reverse Auction. Similar merit based ranking methodology shall be followed for Greenshoe option.
4 8 Normative transmission losses between Wind Farm Pooling Station and GETCO s receiving sub-station One of the has requested to remove the additional deductions for normative transmission losses since there is waiver of ISTS transmission charges and losses and keep same policy for both CTU & STU connected projects 9 RLMM Technology Many expressed concern that allowing the WTGs listed under RLMM updated until 7 months of PPA will restrict deployment of newer / advanced technology, better CUF%, better hub height, etc. Accordingly, in order to derive the benefits of latest technology and thereby cost efficiency, recommended allowing WTGs listed under RLMM list updated until COD. Clarification Irrespective of the Projects connected through CTU or STU Network, the Delivery Point shall be GETCO Periphery. Accordingly, the STU (GETCO) charges and losses shall be to the account of GUVNL. The normative transmission losses provided in the RfS are indicative line losses (between the Pooling stations and nearest GETCO s/s) for the projects proposed to be installed in existing / new Pooling Station and connected to GETCO. Since, as per prevailing practice, the metering is done at Pooling s/s, the delivered energy (GETCO Periphery) shall be arrived at by deducting the normative transmission losses mentioned in the Tender Documents, between Wind Farm Pooling Station and GETCO s receiving sub-station from the energy recorded at Pooling s/s. Considering the concern of majority of the, GUVNL shall allow usage of latest technology prevalent (listed under the RLMM list) until SCOD of the Project in line with SECI s Tranche IV Bidding documents. GUVNL shall make necessary amendments in the RfS and PPA in the provisions relating to RLMM technology.
5 10 Clause Definition of Chartered Accountant Chartered Accountant shall mean a person practicing in India or a firm whereof all the partners practicing in India as a Chartered Accountants Act, 1949; 11 Clause Capacity Allocation Under Greenshoe Option One of the has proposed following amendment to the definition in line with the SECI bid document. For bidders or its Parent, Affiliate or Ultimate Parent or any Group Company Incorporated in India, Chartered Accountant shall mean a person practicing in India or a firm whereof all the partners practicing in India as a Chartered Accountants Act, 1949; For bidders or its Parent, Affiliate or Ultimate Parent or any Group Company Incorporated in countries other than India, Chartered Accountant shall mean a person or a firm practicing in the respective country and designated / registered under the corresponding Statutes / laws of the respective country One of the has sought clarification regarding allocation of capacity under Greenshoe Option and stated that the priority to CPSU / GPSU may exhaust the capacity or take maximum allocation leaving little or no capacity for private players. One of the has proposed that the bid capacity may be revised to 800 MW Certificate of Chartered Account practicing in country other than India will not be accepted in this Tender. Offer of additional 500 MW capacity under Green Shoe option shall be at the discretion of GUVNL. It is to clarify that Non-participating Central PSUs / State PSUs / Govt. Controlled Organizations who express interest after the bidding will not be considered for capacity allocation under Greenshoe Option. Further, Successful cannot get
6 with 200 MW as Green Shoe option. Alternative proposal by the Bidder was to revise the total bid capacity to 1000 MW IWTMA has suggested revising the bid capacity to 1000 MW with additional 200 MW under Green Shoe option instead of keeping the provision of 100% capacity to be offered at L1 rate under Green Shoe Option in order to have wider bidding and discovery of tariff. additional capacity allocation under Greenshoe Option. Therefore the Private Players will get the option to tieup capacity under the Greenshoe Option after the Central PSUs / State PSUs / Govt. Controlled Organizations who have participated in the Bid. 12 Clause 3.4: Qualification Requirement One of the has requested to introduce requirement of having tie-up with OEMs for the project along with availability of necessary GEDA / GETCO approvals for project to be eligible under the Bid as per the technical criteria. IWTMA has requested that the should have prior (pre-bid) tie-up with manufacturers and the same should be declared in their bids with a condition not to change it post bidding. Such a criteria will support proper planning w.r.t. manufacturing and project activities. No Change Required 13 Clause Eligibility criteria (i) The Net-Worth of the Bidder One of the has requested to relax the cut-off date of to for Parent / Foreign - The cut-off date for Net Worth criteria shall be
7 or its Affiliate or Parent / Ultimate Parent for the financial year ended on shall not be less than INR 1.24 Crores per MW (of the capacity quoted)... Companies as their FY is Calendar Year. considered as or or as the case may be. GUVNL shall incorporate necessary amendment in the RfS in the provisions pertaining to Net Worth Certificate, Annual Accounts, etc. 14 Clause (RFS) The Successful Bidder shall not be entitled to deemed generation in case of any delay in grant of connectivity. 15 Clause 3.6.2: (RFS) Identification of 100% (hundred per cent) land at the time of bid submission. One of the have requested to delete Clause of the RfS stating that the Successful Bidder should be entitled to deemed generation in case of any delay in grant of connectivity since the same is on account of reasons beyond the control of the Successful Bidder. requested to relax / increase the timeline for 100% land identification at the time of financial closure instead of bid submission. One of the requested to allow achieving clear title and possession of at least 75% at the time of financial closure Clause of the RfS clearly stipulates that the responsibility of getting grid connectivity with GETCO / CTU shall entirely be of the Successful Bidder and shall be at the cost of the Successful Bidder. The clause is as per the Guidelines issued by MoP. It is to further clarify that identification of 100% of land is required at the time of bid submission, while, Ownership of lease hold and possession of 100% (hundred per cent) of the required land for the Project in the name of Wind Project Developer is required at the time of Financial Closure 16 Clause 3.7: Performance Bank Some of the have requested that PBG should be reduced to INR 20 lakhs No change required.
8 Guarantees per MW which would reduce the impact on Project Cost by unblocking the working capital. 17 Clause: 3.8 (ii) (RFS) Forfeiture of EMD.... (ii) In case, GUVNL offers to execute the PPA with the Selected Bidder and if the Selected Bidder does not submit the requisite documents or does not execute the PPA within the stipulated time period... AND Clause of RfS - Selection of In case of the last selected bidder, if the balance project capacity is less than the total project capacity mentioned by the bidder, (Note: It will be mandatory for the last selected Bidder to accept the last Project capacity offered by GUVNL, which may be less than the capacity quoted by him). raised concern that partial capacity below certain extent may not be viable especially in case of bigger size projects and requested that it should not be mandatory for them to accept the same and it should not be mandatory for the Last Successful Bidder to accept the capacity offered by GUVNL and they should be allowed first right of refusal for remaining capacity. Accordingly they suggested to modify the clause 3.1 Forfeiture of EMD as under:- The BG towards EMD shall be encashed by GUVNL in following cases: (i) If the bidder withdraws or varies the bid after due date and time of bid submission and during the validity of the bid; (ii) In case, GUVNL offers to execute the PPA with the Selected Bidder and if the Selected Bidder does not submit the requisite documents or does not execute the PPA within the stipulated time period, unless the capacity offered to the bidder by GUVNL is less than capacity bidded by the bidder. - In case the partial capacity offered to the last Bidder after completion of the e-ra is lower than 50% of the total quoted capacity by such Bidder, the Bidder shall have an option to refuse such offered partial capacity, and the BG against EMD submitted by such Bidder shall be returned along with those of the Unsuccessful. Further, in case if it is greater than or equal to 50% of the total quoted capacity by such Bidder, then it shall be mandatory for the last Bidder to accept such partial capacity offered against its quoted capacity. In case the last Bidder refuses to accept such partial capacity offered by GUVNL, the BG against EMD submitted by such Bidder shall be encashed by GUVNL. GUVNL shall incorporate necessary amendment in the above provisions in the RfS
9 18 Clause (i) of the RfS and Article 3.1 (iv) (a) Criteria for generation Annual declared CUF% Some have requested for option to provide different CUF for different sites and not single CUF for entire capacity as project can be at multiple locations. shall have the discretion to indicate either single CUF% for the entire capacity of the Project OR may choose to provide different CUF% for different locations. While, there were many other who opined that a single CUF considering the weighted average CUFs of various locations at which they intend to set up the Project may be allowed. CUF% band variation Prospective have expressed problems regarding declaring annual CUF for the Project especially due to variability in wind pattern as the seasonal cycle in India is dominated by the South Asian Monsoon. have requested to provide flexibility in the provisions pertaining to CUF. Some have proposed that either the band of +10% & -15% (first 10 years) and -20% (11th to 25th year) may be removed and power generated should be purchased at PPA tariff. Alternatively, they suggested revising the annual declared CUF on yearly basis or at an interval of 5 years or maximum 5 times during the tenure of PPA. GUVNL shall incorporate necessary amendment in the Format of Covering Letter enclosed in RFS and Schedule 4 of PPA. As regard to the band of CUF%, no change required.
10 19 Clause (ii): (RFS) Shortfall in Generation: 20 Clause (iii) Excess Generation: One of the has expressed difficulty in generating energy corresponding to CUF stating that unlike Solar, wind has huge variations which affect generation by ±40%. The clause (ii) regarding shortfall in generation to be procured by 75% of PPA tariff may entail to build in a risk mechanism and thereby higher tariff. Accordingly, Bidder has requested to delete clause (ii). One of the has requested to delete clause (iii) of the RfS for procurement of excess generation beyond 10% of declared annual CUF a@ 75% of PPA tariff stating that the tariffs through bidding process are highly competitive and a 25% discount for excess generation is unjustifiable. No Change Required The Clause is as per the Guidelines issued by MoP. No Change Required: The Clause is as per the Guidelines issued by MoP. 21 Clause (v) Offtake Constraints Due to Back down Generation Compensation = 50% x [(Average Generation during the month corresponding to the capacity backed down) PPA tariff When backing down is arising not for security of Grid, equipment, personnel or other such conditions, compensation should be given at 100% of the PPA No Change Required The Clause is as per the Guidelines issued by MoP.
11 22 Clause 3.10: (RFS) Financial Closure or Project Financing Arrangement: In The Successful Bidder shall report tie-up of Financing Arrangements for the Project(s) within 7 months from the date of execution of PPA. Some of the have requested to increase the timeline for financial closure from 7 months to 9 12 months considering the difficulties that WPDs face in procuring land, meeting other conditions of Financial Closure. No Change Required: The Clause is as per the Guidelines issued by MoP. 23 Change in location Clause 3.10 B (vii) of RfS have sought clarification whether bidder is allowed to change the location of project after bid submission and/or signing of PPA, if yes, till what period bidder is allowed to change the location of project? One of the bidders have requested that change in project locations may be allowed to be changed only once and only upto the timeline for achievement of Financial Closure Clarification are allowed to change the location(s) upto Seven (7) months from the date of execution of PPA subject to the condition that the timelines for commissioning i.e. the SCOD shall not be changed and consequences of delay in commissioning shall be solely on the account of the Clause 3.10 B (vii) of the RfS shall be modified and replaced as under: For avoidance of doubt, it is hereby clarified that change in location shall be allowed upto Seven (7) months from the date of execution of PPA subject to the condition that the timeline for commissioning i.e. SCOD shall not be changed and consequences of delay in commissioning shall be solely on the account of bidders.
12 24 Clause : Part Commissioning 25 Clause Early Commissioning One of the has requested for reduction to 10 MW plus sizes so as to enable IPPs to become competitive so that the CAPEX can initiate generation of electricity and thereby can reduce Project IDC. Some other requested to allow part commissioning on per WTG basis prevalent under FiT regime as the erection is completed for each WTG separately. have expressed that setting up of Wind Projects involves large area of land, RoW for WTG locations, internal / external roads, HV EHV electrical lines & Poling s/s etc which has a lot of uncertainties which cannot be accurately predicted beforehand. Accordingly, have requested to procure power at 100% of PPA tariff instead of 75% of PPA Tariff in case of early commissioning. No Change Required: The Clause is as per the Guidelines issued by MoP. No Change Required The Clause is as per the Guidelines issued by MoP. 26 Clause Penalty for delay in commissioning Some of the referred to amendments in SECI s latest bidding documents and requested GUVNL to amend the penalty for tariff reduction from 0.5 paisa / kwh / day to 0.15 paisa / kwh / day in case of delay in Clarification It is essential to discourage non-serious players and take punitive actions as a disciplinary measure to ensure timely completion of project.
13 commissioning of the project beyond 6 months from SCOD. 27 Clause 3.15 (11) (iii) Instruction to : Inconsistency in the clause pertaining to providing certificate of shareholding of the bidding company at Clause 3.15 (11) (iii) & (iv) ~ One providing for 30 days and other providing for 2 weeks time. Clause 3.15 (11) (iii) shall be modified and replaced as under: A certificate of shareholding of the bidding company, its Parent and Ultimate Parent (if any), duly certified by a practicing Chartered Accountant / Company Secretary as on a date within 30 days prior to the last date of bid submission. 28 Clause 3.15 (9) - Tie-up of Financing Arrangements for the projects within 7 months from the date of issue of LoA. Inadvertent error Clause 3.15 (9) shall be modified and replaced as under: Tie-up of Financing Arrangements for the projects within 7 months from the date of execution of PPA 29 Clause 3.22: Right of GUVNL to reject a bid One of the have suggested that there should be defined conditions for rejection of bids and such rejection should not happen after winning the bid. No change required. The bid inviting entity reserves the right to accept or reject the bid(s) and to annul the bidding process and reject all the bids without assigning any reasons. If GUVNL finds lack of competition, arbitrary / unreasonable prices, etc. GUVNL may reject the bid(s) and/or annul the process and opt for re-tendering, if required.
14 30 Clause 4.3.2: Total eligible bidders for reverse auction shall be decided as mentioned below: 31 Clause (iv) - During Reverse Auction, the bidder shall not have the option of changing the total project capacity while quoting tariff during reverse auction 32 Clause 4.3: Extension of time in e-ra The initial auction period will be In the table provided under Clause of RfS, the bidders invited for RA shall be 0.8*St which means that first 80% of the bidders on the basis of their start price shall be invited for RA. It is requested to remove such conditionality of rejection as the reverse auction is independent of the start price and the prices discovered till date have been only market driven. Allowing all technically qualified bidders to participate in e-ra will bring in more competition and provide attractive tariffs to the GUVNL. Some of the referred to MSEDCL s recent wind tender and accordingly requested to allow amending their project capacity during the reverse auction as this will bring in more competition during e-ra. Further, in case of upward amendment in the project capacity and in case the bidder becomes successful, GUVNL may ask the bidder to submit additional EMD within 10 days of conclusion of reverse auction. The extension time for reverse auction is 5 min as per RfS. If a bidder is in Red Zone bucket, then is he allowed to The criteria / formula have been framed to ensure competition and so that the bid in a prudent manner. Allowing all technically qualified bidders to be eligible for e-ra might lead to quoting of unrealistic prices by the while quoting their initial price bids. Clarification Altering bid capacity during the ongoing biding / reverse auction will defeat the purpose of Competitive Bidding. Therefore the shall not be allowed to change their quoted capacity during reverse auction. Hence, No Change Required For auto-extension of reverse auction, the bidder in the red zone will have to change his bid price within 5
15 of 30 minutes (thirty minutes) with a provision of auto extension by five minutes from the scheduled / extended closing time if any fresh bid is received in last five minutes of auction period or extended auction period. change the tariff? minutes of the receipt of the last bid in such a manner that he falls in the green / orange zone. In case no valid bid is received (affecting the bucketfilling) during last five minutes of auction period or extended auction period, then the reverse auction process will get closed. 33 Annexure B: List of Banks (RFS) As the bid submission date is 2 nd April, 2018, have requested to clarify about the eligibility of BGs issued by the banks enlisted under Annexure B. As per Finance Dept. GR EMD/10/2016/328/DMO, GUVNL can accept Bank Guarantees issued by All Nationalized Banks including Pvt Sector Bank IDBI Bank and Pvt Sector Banks viz. Axis Bank, HDFC Bank & ICICI Bank on permanent basis. 34 Preamble of PPA Some of the intending to develop Projects connected through CTU network have stated that as per the conditions of MoP, GoI s waiver of ISTS transmission charges and losses, the waiver is applicable only for the projects awarded through competitive bidding and for entering into PPAs with entities / DISCOMs for compliance of RPPO. Further, Guarantees issued from the list of Banks mentioned at (B) in the Annexure B before will also be accepted. GUVNL shall make necessary modification in the preamble of the PPA.
16 Accordingly, they have requested to mention / cite reference of for compliance of RPPO in the PPA. 35 Definition of Delivered Energy in PPA One of the has requested to change the definition of Delivered Energy stating that in case of net import of energy, the Power Producer should be charged at PPA tariff ant not at HT Temporary Tariff since it would be unfair to pay charges of import of energy higher than the PPA tariff. Clarification The rider is pertaining only in case of net import of energy by the WPD during a month. Accordingly, in case the WPD draws power from the grid the charges applicable shall be at HT Temporary tariff. Hence, no change required 36 Article of the PPA Notice for synchronization and commissioning RfS Clause 3.13 states that Power Producer is required to give 10 days notice to GUVNL while PPA Section states that Power Producer is required to give 30 days notice to GUVNL of the date on which it intends to synchronize the Power Project to the grid system. It is to clarify that as per the provisions of RfS and PPA the Power Producer has to give (1) 30 days written notice to the SLDC & GUVNL of the date on which it intends to synchronize the Power Project to the Grid System and (2) 10 days advance written notice to GUVNL regarding the Commercial Operation Date. The same has been adequately provided at PPA Article and Article 2 Definition of COD & RfS Clause 3.13 respectively. 37 Article 6.5 of the PPA Payment Security One of the have recommended the following: a) LC value - should be equivalent to 6 months GUVNL has already incorporated the provision of establishing Letter of Credit equivalent to one month s
17 b) Escrow Mechanism - In case of repeat failure (3 times), State / Central Govt liable to pay c) Interest for delay payment automatic average billing. Further, provision of late payment surcharge is also there in the PPA document. Besides, considering the fact that GUVNL has excellent track record of making timely payment(s) by availing rebate on prompt payment prior to due date, GUVNL does not require to keep additional provisions as suggested. 38 Article 9.2 of the PPA Change in Law Change in law provision under the PPA which provides for relief for 1% of increase or decrease of the estimated revenue may be further clarified for the impact beyond 1 %. Clarification It is very much likely that allowing all actual impacts dues to any change in taxes, duties, etc may become a tool for seeking tariff revision and result into litigations / Petitions. It should be at actual due impact of such change in law due to any change or introduction of new taxes / duties / levies etc. Further, it might create uncertainty in tariff to DISCOMs and/or end consumers as the scope of change in law is too wide creating ambiguity to figure out the implications related thereto. GUVNL has therefore kept the Change in Law clause in line with the GUVNL s earlier wind and solar tenders covering only the Change in Law resulting into additional tax, duty, cess, etc on generation of electricity (leviable on the final output in form of energy) or sale of electricity to be pass through. Any other post-bidding increase in costs should be risk factored by the WPG and the same shall not be
18 allowed as pass-through unnecessarily increasing the uncertainty and burden on end consumers. 39 Article Force Majeure Events Heavy rains should also be included as Act of God since this has an impact on the overall Project timelines. Article 8.1 a (x) already provides that exceptionally adverse weather conditions which are in excess of the statistical measure of the last hundred (100) years are already covered under Force Majeure. 40 Approval of GERC One of the has questioned whether GUVNL has taken approval for the tender from GERC or not. In accordance with the guidelines dated , GUVNL has initiated this tender under intimation to GERC. Further, upon successful completion of the bidding process, GUVNL shall approach GERC for adoption of tariff and approval of process. 41 Revised list of substations for RE Integration The revised list of GETCO s substations for RE integration is placed on GETCO s website and may be accessed through following link:-
Addendum-3, dated 01 March 2018 for the recalled tender. This addendum shall be the part of the RFP, Draft PPA, ISA and LSA.
Addendum-3, dated 01 March 2018 for the recalled tender. This addendum shall be the part of the RFP, Draft PPA, ISA and LSA. Sl. No. Existing Clause no. Existing clause Amended clause (Read as) 1. Page
More informationIndex. 1. Introduction: Scope of the Guidelines Preparation for inviting bids Tariff Structure 6. 5.
Index 1. Introduction: 1 2. Scope of the Guidelines 2 3. Preparation for inviting bids 4 4. Tariff Structure 6 5. Bidding Process 8 6. Bid submission and evaluation 10 7. Contract award and conclusion
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM Present: Shri. S. Venugopal, Member Shri. K. Vikraman Nair, Member OP No 56 / 18 In the matter of : Petition for grant of approval for
More informationCase No. 7 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationCOMMERCIAL TERMS AND CONDITIONS
COMMERCIAL TERMS AND CONDITIONS 1. The price of link shall be inclusive of all duties, taxes and levies paid or payable on components, sub assemblies and any material used. 2. The owner reserves right
More informationREQUEST FOR SELECTION (RfS) DOCUMENT FOR PROCUREMENT OF 50 MW POWER GENERATED FROM BIOMASS PROJECTS IN MAHARASHTRA ISSUED BY
Maharashtra State Electricity Distribution Co. Ltd REQUEST FOR SELECTION (RfS) DOCUMENT FOR PROCUREMENT OF 50 MW POWER GENERATED FROM BIOMASS PROJECTS IN MAHARASHTRA RfS No. MSEDCL/RE/BIOMASS/2018/38 Dated
More informationTRANSMISSION AGREEMENT FOR CONNECTIVITY BETWEEN POWER GRID CORPORATION OF INDIA LIMITED AND (NAME OF STAGE-II CONNECTIVITY GRANTEE) AND
TRANSMISSION AGREEMENT FOR CONNECTIVITY BETWEEN POWER GRID CORPORATION OF INDIA LIMITED AND (NAME OF STAGE-II CONNECTIVITY GRANTEE) AND (NAME OF ISTS LICENSEE) [If applicable] This Transmission Agreement
More informationAGREEMENT FOR SALE OF POWER. THIS AGREEMENT FOR SALE OF POWER is made and executed at on the day of, 2017 ( Agreement ) BY AND BETWEEN
AGREEMENT FOR SALE OF POWER THIS AGREEMENT FOR SALE OF POWER is made and executed at on the day of, 2017 ( Agreement ) BY AND BETWEEN National Aluminium Company Limited (NALCO) a company incorporated under
More informationPOWER PURCHASE AGREEMENT BETWEEN ELECTRICITY SUPPLY COMPANY (ESCOM) AND. [Insert the name of Solar Power Developer] FOR
POWER PURCHASE AGREEMENT BETWEEN ELECTRICITY SUPPLY COMPANY (ESCOM) AND [Insert the name of Solar Power Developer] FOR Development of Solar Power Project in the State of Karnataka Table of Contents ARTICLE
More information(A Govt. of Maharashtra Undertaking) - CIN: U40109MH2005SGC153645
(A Govt. of Maharashtra Undertaking) - CIN: U40109MH2005SGC153645 PROCEDURE FOR DISTRIBUTION OPEN ACCESS INDEX Sr. No. Chapters Page No. 01 Preamble 02 02 Types of Open Access 02 03 Eligibility to Seek
More informationMADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012)
MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL Sub : In the matter of approval of Power Purchase Agreement. ORDER (Date of Order : 7 th September, 2012) Petition No.11 of 2012 1. MP Power Management
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION
KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. 1824/CT/KSERC/2012 Dated, Thiruvananthapuram 10 th September, 2013 Kerala State Electricity Regulatory Commission (Connectivity and Intrastate
More informationCase No. 22 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.com
More informationASSAM ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018 NOTIFICATION
ASSAM ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018 November 2018 NOTIFICATION No. AERC 694/2018 - In exercise of the powers conferred under sub-section
More informationPOWER PURCHASE AGREEMENT BETWEEN ELECTRICITY SUPPLY COMPANY (ESCOM) AND FOR. Development of Solar Power Project in the State of Karnataka
POWER PURCHASE AGREEMENT BETWEEN ELECTRICITY SUPPLY COMPANY (ESCOM) AND ------------------ FOR Development of Solar Power Project in the State of Karnataka (This page is intentionally left blank) `2 Table
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014
104 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014 ELECTRICITY ACT, 2003. No./MERC/Tech/Open Access Transmission/Regulations/2014/561. In exercise
More informationRequest for Proposal (RfP) Notice
1 Request for Proposal (RfP) Notice SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED NORTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LTD/Short/18-19/ET(
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX Part A: PRELIMINARY 3 1. Short Title, Applicability and Commencement 3 2. Definitions 3 3. Eligibility to
More informationPROCUREMENT OF RENEWABLE (Solar) POWER ON SHORT-TERM BASIS THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS INVITATION FOR BIDS
PROCUREMENT OF RENEWABLE (Solar) POWER ON SHORT-TERM BASIS THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS (As per Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement
More informationShortage / Surplus Power available with TATA POWER -DDL
20.02.2019 Shortage / Surplus Power available with TATA POWER -DDL 1. Details of Surplus power available with TATA POWER -DDL along with terms and Conditions for Banking of Power is as mentioned below:
More informationADDENDUM. Sl.No. Page No / Clause. No. [Type text]
Tamilnadu Polymer Industries Park Limited (TPIPL) 19-A, Rukmini Lakshmipathi Road, Egmore, Chennai 600 008, Tamil Nadu Tel: 91-44-28551192; 28554479/80/84; Fax: 91-44-28553729 Request for proposal (RFP)
More informationMODEL POWER PURCHASE AGREEMENT BETWEEN JAMMU AND KASHMIR POWER DEVELOPMENT DEPARTMENT AND. M/s (IPP)
MODEL POWER PURCHASE AGREEMENT BETWEEN JAMMU AND KASHMIR POWER DEVELOPMENT DEPARTMENT AND M/s ----------------------------- (IPP) J&K STATE HYDROELECTRIC PROJECTS DEVELOPMENT POLICY 2011 21 POWER PURCHASE
More informationShortage / Surplus Power available with TATA POWER -DDL
01.01.2018 Shortage / Surplus Power available with TATA POWER -DDL 1. Details of Surplus power available with TATA POWER -DDL along with terms and Conditions for Banking of Power is as mentioned below:
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX Part A: PRELIMINARY 4 1. Short Title, extent and commencement 4 2. Definitions 4 3. Eligibility to seek
More informationRequest for Proposal VOLUME I. Request for Proposal. 07 Dec 2017
Request for Proposal SHORT TERM TENDER FOR DEVELOPMENT OF 860 MW (AC) SOLAR POWER PROJECTS IN KARNATAKA TO BE IMPLEMENTED IN 43 TALUKAS/ CONSTITUENCIES VOLUME I Request for Proposal 07 Dec 2017 KARNATAKA
More informationShortage / Surplus Power available with TATA POWER -DDL
09.07.2018 Shortage / Surplus Power available with TATA POWER -DDL 1. Details of Surplus power available with TATA POWER -DDL along with terms and Conditions for Banking of Power is as mentioned below:
More informationSuo-Motu Petition No. 2/2018
Page 1 of 6 BEFORE THE ARUNACHAL PRADESH STATE ELECTRICITY REGULATORY COMMISSION ITANAGAR Suo-Motu Petition No. 2/2018 In the Matter of Compliance of Renewable Purchase Obligation targets as specified
More informationRequest for Proposal (RfP) For. Procurement of 215 MW Power. From. Grid Connect Solar PV Power Projects. Through
Request for Proposal (RfP) For Procurement of 215 MW Power From Grid Connect Solar PV Power Projects Through Tariff Based Competitive Bidding Process RfPNo: 01/UPNEDS/GRID Connect/RfP/2015 Dated:31.01.2015
More informationSTANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM. Under Case 1 Bidding Procedure THROUGH
STANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM Under Case 1 Bidding Procedure THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS (As per Bidding Guidelines, issued by the Government
More informationDETAILED PROCEDURE FOR GRANT OF CONNECTIVITY TO PROJECTS BASED ON RENEWABLE SOURCES TO INTER-STATE TRANSMISSION SYSTEM
Annexure DETAILED PROCEDURE FOR GRANT OF CONNECTIVITY TO PROJECTS BASED ON RENEWABLE SOURCES TO INTER-STATE TRANSMISSION SYSTEM 1. This Procedure is being issued in accordance with Regulation 27 of the
More informationMAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.
SEC-I MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. BID DOCUMENTS FOR PURCHASE OF POWER (COMPETITIVE BIDDING) COMMERCIAL AND GENERAL CONDITIONS TENDER NO.CE(PP)T-1/2006-2007 CHIEF ENGINEER (PP) POWER
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL FOR PROCUREMENT OF 150 MW POWER FROM GRID CONNECTED SOLAR ENERGY SOURCES FOR LONG TERM UNDER TARIFF BASED COMPETITIVE BIDDING PROCESS FOR MEETING THE REQUIREMENTS OF THREE DISCOMS
More informationDraft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016
Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION In exercise of powers conferred by Section 181 read with relevant provisions
More informationKARNATAKA POWER CORPORATION LIMITED (A PREMIER POWER GENERATING COMPANY OF GOVERNMENT OF KARNATAKA)
KARNATAKA POWER CORPORATION LIMITED (A PREMIER POWER GENERATING COMPANY OF GOVERNMENT OF KARNATAKA) BELLARY THERMAL POWER STATION, KARNATAKA. WATER AUGMENTATION FOR BELLARY TPS UNIT 3 (1 X 700 MW) SHORT
More informationSCHEDULE-- A. Tender No: MGVCL/PP/4053/CCTV. No
Sr. No. SCHEDULE-- A Tender No: MGVCL/PP/4053/CCTV Description of material Tendered Quantity in No. 1 2 3 1 2 Supply of CCTV surveillance system as per MGVCL S specifications. Installation, Commissioning
More informationRequest for Proposal Document. For Selection of Developer for Setting up of
Request for Proposal Document For Selection of Developer for Setting up of 8 MW Solar PV Power Plant on the land of Procurer at Village Jaun Samana, Greater Noida For Procurement on Long Term Basis by
More informationCase No.139 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationDRAFT STANDARD POWER PURCHASE AGREEMENT FOR PROCUREMENT OF.. MW SOLAR POWER ON LONG TERM BASIS. Between... [ Insert Name of Solar Power Developer]
DRAFT STANDARD POWER PURCHASE AGREEMENT FOR PROCUREMENT OF.. MW SOLAR POWER ON LONG TERM BASIS Between.. [ Insert Name of Solar Power Developer] And NTPC Vidyut Vyapar Nigam Ltd. (NVVN). [Insert month
More informationNOTICE INVITING TENDER (NIT)
NOTICE INVITING TENDER (NIT) 1.1 GENERAL 1.1.1 Name of Work: Delhi Metro Rail Corporation (DMRC) Ltd. invites open e-tenders from eligible applicants, who fulfill qualification criteria as stipulated in
More informationTerms and conditions for supply of 50 MW and part thereof on Short Term basis from December 2007 to May 2008
Terms and conditions for supply of 50 MW and part thereof on Short Term basis from December 2007 to May 2008 1. Quantum The quantum of power requirement from December 2007 to May 2008 is minimum of 50
More informationFAST RESERVE TENDER RULES AND STANDARD CONTRACT TERMS
FAST RESERVE TENDER RULES AND STANDARD CONTRACT TERMS ISSUE #2 DATED 1 APRIL 2013 DRAFT DOCUMENT Network Operations National Grid Electricity Transmission plc National Grid House Warwick Technology Park
More informationREQUEST FOR PROPOSAL For Food Plaza for Leasing
REQUEST FOR PROPOSAL For Food Plaza for Leasing At Khadgara Bus Stand, Ranchi, Jharkhand Ranchi Municipal Corporation Ranchi, Jharkhand 1 Disclaimer The information contained in this Request for Proposal
More informationNOTICE INVITING TENDER (NIT)
NOTICE INVITING TENDER (NIT) 1.1 GENERAL 1.1.1 Name of Work: Delhi Metro Rail Corporation (DMRC) Ltd. invites open tenders from eligible applicants, who fulfill qualification criteria as stipulated in
More informationREPLY TO PRE BID QUERIES MINING LEASE FOR CEMENT GRADE LIME STONE
1 Clause 4.1(i) Revenue Survey Particulars is included in Information memorandum Land owned by State Government & Land not owned by State government has been marked on the map but proper Revenue survey
More informationTHE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW
Petition No 851 & 861 of 2012 Before THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Date of Order: 20.03.2013 IN THE MATTER OF: Deemed Energy claim of RPSCL Petition No 851 of 2012 BETWEEN
More informationTAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)
TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 30A CHENNAI, WEDNESDAY, AUGUST 3, 2005 Aadi 18, Parthiba, Thiruvalluvar Aandu - 2036 Part VI --- Section 2 (Supplement) NOTIFICATIONS BY HEADS OF
More informationNo. HPSEBL/CE(SO&P)/IS-60A(Vol-IV)/ Dated:
Tender Document No.: 4 HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A State Government Undertaking) Office of the Chief Engineer (SO&P), Vidyut Bhawan, Shimla-171004 (HP) Tel./Fax No. 0177-2653119,
More informationPOWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only)
JD(Tariff) Page 1 9/20/2006 POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only) THIS AGREEMENT made this day of,200 at between M/s.being a Company registered
More informationAnneuxure -II: Amendments - 03 Amendments (BID No: SECI/C&P/IITB/SoUL/ Amendment - 03) NIT: SECI/C&P/IITB/SoUL/102016
Anneuxure -II: Amendments - 03 Amendments (BID No: SECI/C&P/IITB/SoUL/102016 Amendment - 03) NIT: SECI/C&P/IITB/SoUL/102016 SI Section Point Sub-point Original Version Amendment 1 ITB 3.1 iii Joint Ventures
More informationTHE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)
THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO) (NO. 4/99) (Issued under OERC Order Dt. 31.03.99 in Case No. 25/98) Western Electricity Supply Company of Orissa Limited Registered office:
More informationCENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 211/MP/2012
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 211/MP/2012 Coram: Dr. Pramod Deo, Chairperson Shri S. Jayaraman, Member Shri V.S. Verma, Member Shri M. Deena Dayalan, Member Date of Hearing:
More informationMaharashtra State Electricity Distribution Company Ltd. TENDER DOCUMENT FOR BANKING OF POWER ON FIRM BASIS
Maharashtra State Electricity Distribution Company Ltd. TENDER DOCUMENT FOR BANKING OF POWER ON FIRM BASIS COMMERCIAL AND GENERAL CONDITIONS TENDER NO: CE/PP/MSEDCL/Banking/18-19/ 01 DATE: 20.06.2018 The
More informationMADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER
MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER (Date of Order : 7 th September, 2012) Petition Nos.7, 8, 9, 10 & 12 of 2012 1. MP Power Management Co. Ltd., Jabalpur 2. MP Paschim Kshetra
More informationRequest for Proposal (RfP) Notice
1 Request for Proposal (RfP) Notice SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED NORTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LTD/TSPCC/Tender
More informationNIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012
NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012 1 P a g e REGULATION NO: 0112 NIGERIAN ELECTRICITY REGULATORY COMMISSION In exercise of its powers to make Regulations
More informationCase No. 17 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member. Reliance Infrastructure Ltd., Santacruz (E).
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in
More informationDRAFT STANDARD POWER SALE AGREEMENT FOR SALE OF.. MW BUNDLED POWER ON LONG TERM BASIS (UNDER NEW PROJECTS SCHEME) Between
DRAFT STANDARD POWER SALE AGREEMENT FOR SALE OF.. MW BUNDLED POWER ON LONG TERM BASIS (UNDER NEW PROJECTS SCHEME) Between NTPC Vidyut Vyapar Nigam Limited (NVVN) And [Insert Name of Distribution Utility].
More informationSTANDARD REQUEST FOR PROPOSAL DOCUMENT FOR SELECTION OF TRANSMISSION SERVICE PROVIDER THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS
STANDARD REQUEST FOR PROPOSAL DOCUMENT FOR SELECTION OF TRANSMISSION SERVICE PROVIDER THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS TO ESTABLISH TRANSMISSION SYSTEM FOR.. [Insert NAME OF PROJECT] ISSUED
More informationMineral Block Auction in Odisha
Mineral Block Auction in Odisha Odisha Mineral Block Auction (Phase III) Queries & Responses Queries & Responses to Tender Documents dated March 07, 2017 Phase - III Directorate of Mines Steel & Mines
More informationPOWER PURCHASE AGREEMENT
POWER PURCHASE AGREEMENT FOR PROCUREMENT OF SOLAR POWER FROM UNIT [ ] LOCATED IN THE REWA SOLAR PROJECT AT GURH TEHSIL, DISTRICT: REWA STATE: MADHYA PRADESH ON LONG TERM BASIS BETWEEN [FIRST PROCURER S
More informationGOVERNMENT OF MAHARASHTRA. Tender Document. Block
GOVERNMENT OF MAHARASHTRA Tender Document Block This Tender Document is non-transferable. The Price of this Tender Document is INR 5,00,000 (Rupees Five Lakh). June 13, 2016 Contents Contents... 2 1. Important
More informationPROCEEDINGS OF THE GOVERNMENT OF KARNATAKA
PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA PREAMBLE: Sub : Procurement of works - use of Standard Tender Document - Revision - Reg. Read : (1) G.O.No.FD 9 PCL 2004 dtd:6-8-2005 (2) G.O.No.FD 6 PCL 2006
More informationGUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR
GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Draft Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) (First Amendment) Regulations, 2016 Notification No.. of 2016 In exercise
More informationINVITATION TO BID. The Lump-sum Fixed Price/Amount shall be on the basis of following tender documents.
INVITATION TO BID Document-I Name of Works: (i) Comprehensive Abatement and Removal of all hazardous material in one building of Embassy of India located at 1438 U Street NW, Washington DC 20008, and (ii)
More informationUTTARAKHAND POWER CORPORATION LTD. BID DOCUMENT FOR PURCHASE OF POWER COMMERCIAL AND GENERAL CONDITIONS
UTTARAKHAND POWER CORPORATION LTD. COMMERCIAL AND GENERAL CONDITIONS SPECIFICATION NO. UPCL/CGM-04/10-11 (POWER PURCHASE) Dated 26.07.10 Bid Document Available on the UPCL s web-site (www.upcl.org) Chief
More informationRequest for Proposal DEVELOPMENT OF SOLAR POWER PROJECTS IN THE STATE OF KARNATAKA VOLUME I. Request for Proposal. June 2014
DEVELOPMENT OF SOLAR POWER PROJECTS IN THE STATE OF KARNATAKA Request for Proposal VOLUME I Request for Proposal June 2014 KARNATAKA RENEWABLE ENERGY DEVELOPMENT LIMITED Request for Proposal Contents Volume
More informationTENDER NOTICE NO: 11 of of LTPS
Assam Power Generation Corporation Limited Office of the General Manager, LTPS, APGCL, Maibella, P.O. Suffry, Dist. Charaideo, Assam, Pin-785 689. e-mail: gm-ltps@apgcl.com Tele-Fax: 03772-254322 TENDER
More informationCase No. 64 of Shri. V. P. Raja, Chairman Shri. Vijay L. Sonavane, Member ORDER
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in
More informationDraft. Implementation and Support Agreement for Grid Connected Solar Photo Voltaic Projects In Raghanesda Ultra Mega Solar Park(700 MW) in Gujarat
Draft Implementation and Support Agreement for Grid Connected Solar Photo Voltaic Projects In Raghanesda Ultra Mega Solar Park(700 MW) in Gujarat ISSUED BY Gujarat Power Corporation Limited Block No. 6/8,
More informationNational Electric Power Regulatory Authority (Wheeling of Electric Power) Regulations, 2015
National Electric Power Regulatory Authority (Wheeling of Electric Power) Regulations, 2015 S.R.O.. In exercise of the powers conferred by Section 47 of the Regulation of Generation, Transmission and Distribution
More informationMADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL
MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL Subject: Dated: 7 th February, 2013 M/s Essar Power M. P. Limited DAILY ORDER (Date of Motion Hearing : 5 th February, 2013) Petition No.03/2013
More informationIntelligent Communication Systems India Ltd. (ICSIL) TENDER NO: F.1 (ICSIL)/01/217/ 1D Barcode Reader Tis Hazari Court/ , Dated:
Intelligent Communication Systems India Ltd. (ICSIL) (Joint Venture of TCIL - A Govt. of India Enterprise & DSIIDC - An Undertaking of Delhi Govt.) Administrative Building, 1 st Floor, Above Post Office,
More informationGOVERNMENT OF GUJARAT. Tender Document. Block
GOVERNMENT OF GUJARAT Tender Document Block This Tender Document is non-transferable. The Price of this Tender Document is INR [amount in figures] (Rupees [amount in words]). Contents Contents... 2 1.
More informationRENEWABLE ENERGY INTERCONNECTION AGREEMENT
RENEWABLE ENERGY INTERCONNECTION AGREEMENT This Renewable Energy Interconnection Agreement is made this day of, 20 BETWEEN THE BARBADOS LIGHT & POWER COMPANY LIMITED, a company incorporated under the Companies
More informationAllotment of Coal Mines to State Government Companies of Coal Bearing Host States for Sale of Coal
Allotment of Coal Mines to State Government Companies of Coal Bearing Host States for Sale of Coal Queries & Responses to Allotment Document dated April 21, 2016 Part I Nominated Authority Ministry of
More informationSOCIAL INFRASTRUCTURE DEVELOPMENT FUND
GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF POWER BID DOCUMENT PART-I (BID GUARANTEE AND BID PROPOSAL) OF CONSTRUCTION OF 132 KV SINGLE CIRCUIT TRANSMISSION LINE FROM KHUPPI TO TAWANG INCLUDING 132/33
More informationLaw No. 02/L-44 ON THE PROCEDURE FOR THE AWARD OF CONCESSIONS
UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo PROVISIONAL INSTITUTIONS OF SELF GOVERNMENT Law
More informationSl. No. Query/ Concern Clarification/ Information/ Amendment
THE ODISHA STATE CO-OPERATIVE SPINNING MILLS FEDERATION LTD.(SPINFED) Request for Proposal invited dated January 20, 2015: Development of 25,000 Spindle Cotton Spinning Mill at Konarkspin, Kesinga, Odisha.
More information1. Main & Mini Anganwadis Floor Mats(plastic) (5x7) fts. 9,805
GOVERNMENT OF MANIPUR DEPARTMENT OF SOCIAL WELFARE --- No. 5/1/14-SW(ICDS-Proc) Dated, Imphal, the 2014 INVITATION FOR BID 1. Quotations in Two Bids system, (Technical & Price Bid) are invited from reputed
More informationTENDER DOCUMENT FOR E-AUCTION FOR MINING LEASE OF GRAPHITE & ASSOCIATED MINERAL [ ] GRAPHITE BLOCK
TENDER DOCUMENT FOR E-AUCTION FOR MINING LEASE OF GRAPHITE & ASSOCIATED MINERAL OF [ ] GRAPHITE BLOCK DIRECTORATE DEPARTMENT OF MINES & GEOLOGY GOVERNMENT OF JHARKHAND Tender No: Forward Auction No: Date
More information2 Scope of work DESIGN, MANUFACTURING, TESTING, SUPPLY, 3 Enquiry Number 77/16/6002/ASM 4 Tender document available place
1. NOTICE INVITING TENDER (NIT) Tender inviting Officer Mallikarjuna N /AGM-MM-BG-II Bharat Heavy Electricals Ltd. Industrial Systems Group P.B. No. 1249, IISc Post Malleswaram; BANGALORE 560 012 E-Mail
More informationTender. for. Indian Institute of Technology Jodhpur
Tender for WatchGuard (XTM-1050) Security License Renewal at Indian Institute of Technology Jodhpur NIT No. : IITJ/SPS/IT/2016-17/37 NIT Issue Date : 25 January 2017 Last Date of Submission : 13 February
More informationiùku izca/k cksmz PORT MANAGEMENT BOARD vameku rfkk fudksckj }hilewg ANDAMAN & NICOBAR ISLANDS
iùku izca/k cksmz PORT MANAGEMENT BOARD vameku rfkk fudksckj }hilewg ANDAMAN & NICOBAR ISLANDS NOTICE INVITING TENDER Tender No. 6098 Dtd. 04.05.2017 1 Name of Work : Supply, Installation, Testing and
More informationTender. For. Server hosting CPMS and other applications. All India Institute of Medical Sciences, Jodhpur
Tender For Server hosting CPMS and other applications At All India Institute of Medical Sciences, Jodhpur NIT Issue Date : 08 th December 2017 NIT No. : Pre-Bid Meeting : 18 th December 2017 at 03:15 PM
More informationCENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION No.L-7/105(121)/2007-CERC Dated the 25 th January, 2008 In exercise of powers conferred by Section 178 of the Electricity Act, 2003 and
More information765 kv S/C Mainpuri-Hapur & Mainpuri-Greater Noida Line with 765 kv/400 kv AIS at Hapur & Greater Noida and Associated Schemes/Work
TRANSMISSION SERVICE AGREEMENT FOR PROCUREMENT OF TRANSMISSION SERVICES FOR TRANSMISSION OF ELECTRICITY THROUGH TARIFF BASED COMPETITIVE BIDDING FOR 765 kv S/C Mainpuri-Hapur & Mainpuri-Greater Noida Line
More informationMadhya Pradesh Urja Vikas Nigam Limited Invites
Madhya Pradesh Urja Vikas Nigam Limited Invites Request for Proposal (RFP) For Selection of Bidders For Implementation of ~ 10MWp Grid Connected Roof Top Solar PV Systems for Sale of Solar Power under
More informationBEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW. Petition No.: 960/2014
BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition No.: 960/2014 IN THE MATTER OF: Petition under Section 63 of the Electricity Act, 2003 read with Clause 10.4 of the Guidelines
More informationFIRST AMENDMENT TO THE ANTELOPE BIG SKY RANCH SOLAR PROJECT POWER SALES AGREEMENT BETWEEN SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY AND
Execution Copy FIRST AMENDMENT TO THE ANTELOPE BIG SKY RANCH SOLAR PROJECT POWER SALES AGREEMENT BETWEEN SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY AND THE CITY OF AZUSA, CALIFORNIA Dated as of, 2014 1
More informationTENDER ENQUIRY NO. 423E156 DATE: SCHEDULE OF COMMERCIAL DEVIATION
TENDER ENQUIRY NO. 423E156 DATE: 26.08.13 SCHEDULE OF COMMERCIAL DEVIATION The following are the deviations/ variations exception from the General Terms and Conditions: SL. NO. CLAUSE NO. OF GENERAL TERMS
More informationMODEL TENDER DOCUMENT FOR E-AUCTION MINING LEASE FOR LIMESTONE BLOCK IN STATE OF RAJASTHAN
MODEL TENDER DOCUMENT FOR E-AUCTION OF MINING LEASE FOR LIMESTONE BLOCK IN STATE OF RAJASTHAN DEPARTMENT OF MINES & PETROLEUM, GOVERNMENT OF RAJASTHAN DIRECTORATE OF MINES & GEOLOGY UDAIPUR DEPARTMENT
More informationANNEXURE - C TO OT E/ FOR CYLINDR, COVER AND ADJ.DISC CASTINGS CHECK LIST STANDARD COMMERCIAL TERMS & CONDITIONS S
ANNEXURE - C TO OT5540091E/25.04.2014 FOR CYLINDR, COVER AND ADJ.DISC CASTINGS CHECK LIST STANDARD COMMERCIAL TERMS & CONDITIONS S No. BHEL Standard Terms Supplier Confirmation Deviation (if any) 01 Terms
More informationClause No. Query (Draft) Response
RFP for Development of Bengaluru International Convention Centre (BICC) on PPP Basis Pre-Bid Conference 3 Response to Queries Clause Query (Draft) Response REQUEST FOR PROPOSAL 1. Clause 6.1.4 (page 38)
More informationWHEELING AND BANKING AGREEMENT FORMAT FOR NON-REC ROUTE PROJECTS. This Wheeling and Banking Agreement is made at on this.. day of
Annexure-1 WHEELING AND BANKING AGREEMENT FORMAT FOR NON-REC ROUTE PROJECTS This Wheeling and Banking Agreement is made at on this.. day of.. between Karnataka Power Transmission Corporation Limited, a
More informatione-tender NOTIFICATION FOR 160KVA DIESEL GENERATER SET TO THE KARNATAKA SECONDARY EDUCATION EXAMINATION BOARD
GOVERNMENT OF KARNATAKA KARNATAKA SECONDARY EDUCATION EXAMINATION BOARD, 6 TH CROSS, MALLESWARAM, BENGALURU 560 003. e-tender NOTIFICATION FOR 160KVA DIESEL GENERATER SET TO THE KARNATAKA SECONDARY EDUCATION
More informationINDIAN MARITIME UNIVERSITY (A Central University) Ministry of Shipping, Govt. of India EAST COAST ROAD, UTHANDI CHENNAI CAMPUS
INDIAN MARITIME UNIVERSITY (A Central University) Ministry of Shipping, Govt. of India EAST COAST ROAD, UTHANDI CHENNAI CAMPUS 600 119 TENDER FOR DISMANTLING & REMOVING OF BOATS, DAVITS & RELATED ACCESSORIES
More informationDELHI METRO RAIL CORPORATION LTD. (A Joint Venture of Govt. of India & Govt. of NCT, Delhi)
DELHI METRO RAIL CORPORATION LTD. (A Joint Venture of Govt. of India & Govt. of NCT, Delhi) Supply, installation, testing,commissioning of Air cooled chillers including the interconnection with existing
More informationRe-Tender. for. Supply & Installation of Low Current Dual Channel Source Meter at. Indian Institute of Technology Jodhpur
Re-Tender for Supply & Installation of Low Current Dual Channel Source Meter at Indian Institute of Technology Jodhpur NIT No. : IITJ/SPS/EE/2/2015-16/49 NIT Issue Date : 03 November 2015 Last Date of
More informationREFERENCE SECTION OF TENDER DOCUMENT Whether there is a minimum bid amount or quantum prescribed by or expected by the Govt. of M.
S. 1. TO QUERIES ON THE TENDER FOR LEASING OF AIRFIELDS OF GOVERNMENT OF MADHYA PRADESH Tender reference number: Ref.. F-42/1/LA/776 Dated: 18/12/2017 Whether there is a minimum bid amount or quantum prescribed
More informationTENDER NO. BCL/RD/ 4000 MS Scrap Cutting/2019 March 19, 2019
BRAITHWAITE & CO LIMITED (A Government of IndIA UndertAkInG Under ministry of railways) HEAD OFF. & REGD. OFF. : 5, HIDE ROAD, KOLKATA 43, TEL 2439-7415 / 4114 / 6613 / 7413, FAX :91 (033) 2439 7632 /
More information