TRIBAL DEVELOPMENT PLAN

Size: px
Start display at page:

Download "TRIBAL DEVELOPMENT PLAN"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Rehabilitation, Upgradation and Strengthening of Nuapada-Bango Munda Section of NH-217 in the State of 1.1 Project Background TRIBAL DEVELOPMENT PLAN IPP623v6 The Ministry of Road Transport and Highways (MoRT&H), Government of India has decided for rehabilitation and upgradation of the existing National Highway No 217 from Nuapada to Bangomunda section (from km to km ) to 2-lane/ 2- lane with paved shoulders configuration in the State of. A total of 33 project roads with approx total length of kms have been selected by MoRT&H for improvements. They have been grouped grouped under A, B, C and D. Of these Project roads covered under Phase I of NHIIP are located in Bihar,, Karnataka, Rajasthan, and West Bengal and are likely to be implemented with the World Bank (WB) assistance. In order to fulfill the above task, MoRT&H has appointed M/s SPAN Consultant Pvt. Ltd. (now SNC-Lavalin Infrastructure Pvt. Ltd) for the preparation of Detailed Project Report for Rehabilitation and Upgrading to 2-lane/ 2 -lane with paved shoulders configuration for this section of the National Highway in the State of. 1.2 Project Road Description (SP/D/7) National Highway No. 217 takes off from NH-6 and ends at NH-201. The project road section is a part of NH-217 starting from Km (about 10 kms from Nuapada) and ending at Km (6 Kms short of Bango Munda) falling in the state of. The length of the project road section is 68 kms. The project road section passes through rolling & plain terrain. Index map of the project road is at Figure 1.1. C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-1

2 Figure 1.1: Index Map The National Highway No. 217 has been renumbered and consequently the earlier project sections falling under NH 217 have been reorganized. New NH number & chainage along with old NH No. and Chainage are presented in Table 1.1. Table 1.1: New NH Numbers & Chainages Old NH Chainage New Chainage Length (km) No. (km) NH No. (km) to to to to Tribal Scenario in the Project Area has large tribal population, who are at various stages of socio-economic development. At one extreme are the groups which lead a relatively secluded and archaic mode of life keeping their core culture intact, while at the other extreme there are communities which are indistinguishable from the general agricultural communities. The tribal people express their cultural identity and distinctiveness in their social organization, language, rituals and festivals and also in their dress, ornaments, art and craft 1. Overall, the state of ranks third in 1 The tribes of though belong to three linguistic divisions, yet they have lots of socio-cultural similarities between them. These commonalities signify homogeneity of their cultures and together they characterize the notion or concept of tribalism. Tribal societies share certain common characteristics and by these they are distinguished from complex or advanced societies. C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-2

3 terms of tribal population in India. They constituted 10.84% of the total tribal population of India as per 2001 census. houses 62 types of tribes, of which 13 are primitive. The State has one of the richest diverse tribal populations in the country. Sizable agglomeration of tribal population in has moved to mining, industrial and urban areas for earning a secured living through wage-labour. During the past three decades the process of industrial urbanization in the tribal belt of has been accelerated through the operation of mines and establishment of industries. Mostly persons from advanced tribal communities, such as Santal, Munda, Ho, Oraon, Kisan, Gond etc. have taken to this economic pursuit in order to relieve pressure from their limited land and other resources. The project road does not pass through any notified schedule area of the State. However, there is Tribal population along the project road at Nuapada and Bolangir districts. Census Survey of likely to be affected due to project interventions identifies 7 schedule tribes families along the project road. These seven households are scattered at the five locations of Banjhibal, Bilenjor, Sanmaheshwar, Rajakhariar and Junani villages. All of these impacted households are non-titleholders. Further details on socio-economic characteristics and impacts on these ST families are given below (Tribal specific impact information is also provided in detail in chapter 4, Resettlement Action Plan). 1.4 Methodology used to Assess Tribal Issues Structured questionnaires, open-ended formats, group discussion during preparation of Village Diary etc were used to assess the impact. The data collected through socio-economic survey and census survey was another source of information for social assessment of tribes. Consultation Methodology: consultations was carried out with the likely affected tribal population in a culturally appropriate manner using local languages where needed. It took place in different modes one on one interaction during household survey and group meetings along with other PAPs. Most of the village level consultations were carried out during the social screening and detailed Social Impact assessment between December 2010 to December 2011 and these were in addition to the focus group discussions and interviews with individual ST affected families. All of these consultations were free, prior, and informed to the affected tribal people. As needed, specific consultations were conducted among the women members. A total of 16 consultations were organized during the project preparation stages (Refer Table 5.3, 5.4). There was woman representation in all these meetings and their concerns raised have been documented. Relevant documents of Public consultation are attached as annexure 5.1 and 5.2. The census surveys and consultation with specific groups including tribal along the project stretches identified some critical tribal issues that need to be addressed under the project. Constitution of India has provided base for the government to formulate special programs for the development of these vulnerable groups. Typically, vulnerability is relatively high among Scheduled tribes/indigenous people. Dislocation and loss of livelihood caused by road widening and development may further aggravate the disadvantaged situation unless special attention is paid to them. In this connection an assessment of impacts specifically on Scheduled Tribes (ST) has been done during the social assessment. This chapter discusses C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-3

4 the issues/impacts likely to be caused due to proposed project interventions and actions necessary to mitigate the impact. 1.5 Project Affected Tribal Populations and their Socio-Economic Status The average household size of the tribal population in the area is 4.6 which is not very different from 4.8 average HH size of the PIA. As the table 8.1 shows, the total of 7 tribal families (with 32 PAPs) will be affected by the project. Table 8.1: Village wise Tribal Project Affected Households S. No. Village Name ST Families PAPs Household Size 1 Banjibahal 1 3 N/A 2 Bilenjor Sanmaheswar Rajakhariar Junani Total 7 32 Marital Status: As per socio-economic survey, 16 (50.00%) tribals are married while 13 (42.63%) persons are unmarried. Marital status of tribal population is mentioned in Table 8.2. Table 8.2: Details of Marital status S. No Marital Status of PAPs Number % 1 Married Unmarried Widowed Total Education Status: Majority (=43.75%) of the project affected tribals have secondary level education. However, it is important to note that nearly 22% (n=7) of them are illiterate. Table 8.3: Literacy Level No Literacy Level Number % 1 Illiterate Primary Schooling Upper Primary C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-4

5 Schooling 4 Secondary Graduate Total Age Structure: The maximum number (78.13%) of tribal PAPs are in productive age group of years. Details are as follows: Table 8.4: Age Structure of PAPs S. No Age Group (Years) Male Female Total Age Group in % to above Total Employment and Occupation Status: Out of 32 tribal PAPs, only 15 (=47%) are employed. Out of 15, only two (i.e. 13%) of them are salaried people. Majority of the employed people are actually self-employed in their small businesses such as petty shops, tea kiosks etc. Among the employed ones, one is daily wage earner and one agriculture laborer (see Table 8.5A & 8.5B). Table 8.5A: Employment Status of PAPs S. No Employment Status Number % 1 Employed Unemployed Total Table 8.5B: Occupational Pattern of PAPs S. No Occupational Pattern Number % 1 Agricultural Laborer Daily Wage Earner Salaried Business Total C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-5

6 Language and Culture: The language spoken by the affected tribal households is Oriya which is similar to the general population along the project road. No unique socio-cultural practices were reported during the one to one interviews. Income: The income level of the entire area is low compared to other parts of the state and the. Income detail of the households is as below: Table 8.6: Income Status of Employed Tribal PAPs S. No Income Level Number % 1 Below Rs Rs Rs Above Total However, the area itself has been identified as one of the most backward areas of the state and has a special program called Biju KBK (Kalahandi Bolangir Korapot). These state and national funded programs which are currently being implemented in the area are listed in detail in Chapter Potential on Tribal Population The impact on Tribal population in the project area is limited. Also this project area does not fall under the schedule V area (See letter from ST and SC Development Department, Government of Odisha attached as Annexure 2.2). 1.7 Impact on Structures There is no land acquisition envisaged under the project. The impacts are on semipermanent structures and movable kiosks (Temporary structures). These structures are non titleholders. Since there will be only partial impacts in these structures, these people can continue operating from their existing structures and also earned their livelihoods without much disruption and hence do not require relocation.. Table 8.7: Types of Impacted Structures S. No Category of Structure Number Status of Ownership % 1 Temporary 5 Squatters Semi-Permanent 1 Encroacher Permanent 1 Encroacher Total Concerns raised by tribal population along the project road: Since the affected tribal families were few and scattered, their views were recorded through one to one interviews C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-6

7 and village level meetings. The concerns raised were no different from the concerns raised by the general community. Table 5.2 and Table 5.3 in Chapter 5 systematically present the concerns shared by the affected tribals and other project affected along with the mitigation measures suggested during consultations. 1.8 Impact Mitigation Measures The objective of the Tribal Development Framework in the RPF is to design and implement projects in a way that fosters full respect for Indigenous Peoples dignity, human rights, and cultural uniqueness and so that they: (a) receive culturally compatible social and economic benefits; and (b) do not suffer adverse effects during the development process. Mitigation measures proposed below are in line with the objectives of this framework R&R Assistances R&R assistances would be provided for the identified impacts on structures to the PAPs. Additional provisions for i..e non-paps are: i) The affected CPRs shall be relocated or restored in consultation with the community in compliance with the RPF. ii) Additional/ new community facility(ies) will be provided in certain habitations along the project road as value addition to the project. Details of these community welfare facilities/works are given below: i. Criteria: The criteria for selection and implementation of works would be as follows: i. Habitations which have high percentage (> 50%) of SC & ST population would be selected for providing community facility/works; and ; ii. Community works shall be those that strictly benefit the larger section of the village rather than an individual or a small group/section of individuals iii. The activity should not be already covered under some existing government scheme; iv. An indicative list of works are: 1. Provision of boundary wall for education and health facilities, community building, religious structure; 2. Provision of furniture for school and health facilities 3. Provision of shelter for bus stand; 4. Hand pumps or repair to hand pumps; 5. Repair of dug-well, other village community infrastructure; and 6. Platform for meeting place of village community or women 7. Repair works, leveling, etc. of internal paths ii. Process: In selected habitations implementation support agency shall hold consultations with community /villagers to ascertain the need and benefit of any community good.the villagers will decide as to what type of community facility is needed in their habitation unanimously. A resolution in this regard will be passed by the villagers following the official procedure which will then be submitted to the Project Authority. The resolution shall contain details i. on the nature and type of community work requested; ii. the likely benefit accrued; C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-7

8 iii. an approximate number of persons who shall benefit from it; iv. consensus reached amongst the village community members on the activity; and v. Post Construction management measures by the community vi. finally a statement of proposed support and cooperation for the activity with signatures (or thumb-impressions) of the participants The RAP Implementation Support Agency shall support in documentation of the minutes of the meeting and preparation of the resolution and forward the same to the RRO. The RRO will verify the activity and confirm that all pre-set criteria for such works have been met. Upon approval of RRO and Sub-project level agency, the RAP Implementation Support Agency shall prepare a micro-plan for submission to RRO who shall forward it to SPIU with appropriate justification. The SPIU shall forward the same for approval of MoRTH. MoRTH will review the micro plan that contains the following details: i. Planned community welfare work (s) ii. Location and population of the village, iii. Cost of the activity iv. Intended and likely benefit v. Procurement plan for materials vi. Likely duration for execution of the work(s) vii. Number of labor required viii. Details of Minutes of meeting and resolution passed by the village, ix. Design required, if any iii. Implementation: Upon approval and sanction of the requisite amount by MoRTH, Sub-project level agency through RRO and RAP Implementation Support Agency will i. get the design prepared, in case it is required ii. hold consultations with the community/villagers with the designin presence of the RRO to ensure that modifications or changes suggested by the community/villagers are heard and incorporated. iii. The Project Authority will then issue a purchase order for purchase of necessary materials and goods iv. The RAP Implementation Support Agency shall periodically update the RRO on the progress of the works. v. Upon completion, it shall prepare a Work Completion Report with details of the activity final actual cost, working condition of the community asset along with photographs; vi. RRO shall visit the site for verification and ensure handing over of the asset to the community prior to approval of the report vii. Upon verification by the RRO and handover of the community work, the RRO shall submit his report to SPIU and MoRTH Monitoring will be done by the Sub-project Agency while the evaluation of the community works shall be undertaken during the end-term evaluation by the agency contracted by MoRTH C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-8

9 For undertaking community works a sum of Rs. 20 lakhs has been provisioned in the Bills of Quantities of the civil works contractor Other Possible (Direct and Indirect) to Tribal Populations and Management/ Mitigation Measures Based on the consultations with the community along the project road, other direct and indirect impacts envisaged during construction are listed in table below. Preferential treatment of Tribal and other vulnerable groups has been recommended as part of mitigation measures. Phase Likely Direct Likely Indirect Project Demand for labor Frustration of Execution Local people not being included in the construction activities Likely Management/Mitigation Measures Advise the contractors about the criteria for selecting workers, prioritizing the people in the Project Area as long as they meet the technical requirements. Give preference to the vulnerable especially the tribal population. Increase in the expectations of local population and stakeholders. Inform the community in the Project Area about the job vacancies, identifying the number of available positions and the application requirements. This information will be displayed by the offices of the implementing Agency, as well as the contractor s site office. Preference will be given to Tribals and other vulnerable population. The executing agency or their contractors will train the local workers including tribal in the application of environmental, safety, and occupational health provisions, as well as in the knowledge and mandatory compliance of the Workers Code of Conduct Contractor to design and implement a Temporary Hiring Program for the local population that will anticipate the demand of skilled and unskilled work force, the time the employment will last and the requirements the applicant will have to meet to be accepted. Needs of the Tribal population will have to be specially been addressed. Inform local stakeholders, through local and regional communication media on the location of his offices where they may learn about job opportunities for laborers and the priorities that will be given to local workers. The Tribal welfare officer and the Implementation Support Agencymay also be involved for increased participation and C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-9

10 Phase Likely Direct Generation of jobs, as well as an increased demand for goods and services (raw materials, equipment rental, food supply, accommodations, etc.) during construction of the road The possible arrival of foreign workers in the area (Foreign referring to workers who are not residents/locals of the area) Risk of traffic accidents Likely Indirect Migration to the project area in order to seek employment Increased level of income in the Project area Stimulation local economy of Conflicts and quarrels between suppliers and contractors Interaction between the Project workers and the women from local populations Traffic accidents caused by dumping construction material on the site Likely Management/Mitigation Measures information dissemination. To decrease and control the flow of population or people seeking employment in the Project area. It must be made clear through the mass media that priority will be given to the people who live in the Project area and especially the vulnerable including ST. The PIU will consider mechanisms to allow purchasing local products, as long as the local market prices remain competitive and are not affected by the company's interest. If there are any material being sold by a Tribal trader he may be given preference over others Offer training to local economic agencies for the development of small and micro enterprises. Training programmes with Tribals will be organized. Implement a sales system to determine the best offer regarding competitive products and services. The grievance redressal committee shall have representation from Tribal Welfare Department. In other words, implement a sales system designed to locate goods and services at competitive prices, good quality and in amounts required. Wide diffusion of the Project Workers Code of Conduct and the establishment of sanctions for offenders specially for tribal population All workers and subcontractors must be subject to a Social Code of Conduct. Documentation and diffusion of training and educational programs Provide training for the project working force (contractors and subcontractors) on the Security and Health Plan Sensitization programme on safety issues for end users and specifically for tribal population. Erect traffic signals in the critical areas of the Project. Provide informative talks for the local population on security measures to reduce risk of accidents. Establish and inform drivers of the speed limits C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-10

11 Phase Likely Direct Likely Indirect Likely Management/Mitigation Measures Ensure that contractors and subcontractors implement measures to reduce or avoid potential accidents that may affect the population in the area and the Project workers themselves. Provide speed breakers near habitations, schools and market places etc of tribal population Hire and train security personnel devoted exclusively to preventing accidents in the access road and controlling the speed of the vehicles transporting construction material. 1.9 Consultation and Participation As presented, the project does have some minor negative impacts to tribal populations, which are easily manageable. The tribals have extended their support to the project given that the potential negative impacts and risks are properly mitigated or managed, as outlined in this chapter. It is also highly recommended that the tribals are regularly consulted at different stages of project implementation. All communication and information dissemination in the project area shall be done in the culturally appropriate way. The details are provided in the consultation and participation Framework in chapter 5 of Resettlement Action Plan Implementation Arrangements The qualification criteria to invite Implementation Support Agency includes prior experience of working in the project region/area during last 3 years for a minimum period of 3 months. Knowledge of local language is a necessary qualification for key professionals. Knowledge of local language and experience of working in the region desired. This is to ensure that the Implementation Support Agency team is sensitive to the language, socio cultural profile and practices of the project area, particularly scheduled castes and scheduled tribes Budget In addition to R&R implementation cost, an amount for undertaking community works has been provisioned in the Bills of Quantities to be executed through the civil contracts. For details see Resettlement Action Plan) C:\re\ _ _D\original\IPP623v60India00Dev0Plan0Box374360B.doc 8-11

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL REPORT Resettlement and Rehabilitation (R&R) Entitlement Framework RP297 Under

More information

India. Public Works Department. DETAILED PROJECT REPORT Volume - IX: Resettlement Action Plan. July 2015 GOVERNMENT OF UTTAR PRADESH

India. Public Works Department. DETAILED PROJECT REPORT Volume - IX: Resettlement Action Plan. July 2015 GOVERNMENT OF UTTAR PRADESH Public Disclosure Authorized GOVERNMENT OF UTTAR PRADESH Public Works Department Uttar Pradesh Core Road Network Development Program Part A: Project Preparation DETAILED PROJECT REPORT Volume - IX: Resettlement

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NATIONAL HIGHWAYS INTERCONNECTIVITY IMPROVEMENT PROJECTS (NHIIP)

GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NATIONAL HIGHWAYS INTERCONNECTIVITY IMPROVEMENT PROJECTS (NHIIP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NATIONAL HIGHWAYS INTERCONNECTIVITY

More information

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007 Involuntary Resettlement - Overview Transport Forum Washington, D.C. March 30, 2007 OP 4.12 - Triggers Trigger: acquisition of land which displaces people physically and / or economically. Policy applies

More information

Project: Feasibility Report for Agra to Aligarh section of NH-93 Document: P-62/SIA Date: November 2009

Project: Feasibility Report for Agra to Aligarh section of NH-93 Document: P-62/SIA Date: November 2009 Project: Feasibility Report for Agra to Aligarh section of NH-93 Sheet: i Document: P-62/SIA Date: November 2009 Contents TABLE OF CONTENTS Table of Contents... i 1.0 INTRODUCTION... 3 1.1 Index Map of

More information

Minimizing the adverse of impact of distress migration. District study of Nayagarh in western Odisha by Madhyam Foundation

Minimizing the adverse of impact of distress migration. District study of Nayagarh in western Odisha by Madhyam Foundation Minimizing the adverse of impact of distress migration District study of Nayagarh in western Odisha by Madhyam Foundation Mr. Subrat Kumar Singhdeo, Executive Director, Madhyam Foundation, N-3 / 202, IRC

More information

IND: Mumbai Metro Rail Systems Project

IND: Mumbai Metro Rail Systems Project Social Due Diligence Report October 2018 IND: Mumbai Metro Rail Systems Project Prepared by Mumbai Metropolitan Region Development Authority, Government of India for the Asian Development Bank. ABBREVIATION

More information

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Resettlement Policy Framework for the Smallholder Agriculture Development Project

More information

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT DRAFT COMPARATIVE ANALYSIS OF NEPAL s LEGAL FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT Note: The following is based

More information

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT A. Introduction and Subprojects Components 1. Tranche 2 of the

More information

India: Jammu & Kashmir Urban Sector Development Project

India: Jammu & Kashmir Urban Sector Development Project Resettlement Planning Document Full Resettlement Plan- Improvements to B.C Road from Shakuntala Crossing to Children s Hospital Including pedestrian subway Document Stage: Final Project Number: 41116 October

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Binh Thuan Province Prepared by the Ministry of

More information

EBRD Performance Requirement 5

EBRD Performance Requirement 5 EBRD Performance Requirement 5 Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or loss of

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry

More information

IND: Chhattisgarh State Road Sector Project

IND: Chhattisgarh State Road Sector Project Resettlement Plan November 2012 IND: Chhattisgarh State Road Sector Project Dhamdha Khairagarh Road Subproject Prepared by Public Works Department, Government of Chhattisgarh for the Asian Development

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

INTRODUCTION I. BACKGROUND

INTRODUCTION I. BACKGROUND INTRODUCTION I. BACKGROUND Bihar is the second most populous State of India, comprising a little more than 10 per cent of the country s population. Situated in the eastern part of the country, the state

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of

More information

Data base on child labour in India: an assessment with respect to nature of data, period and uses

Data base on child labour in India: an assessment with respect to nature of data, period and uses Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Understanding Children s Work Project Working Paper Series, June 2001 1. 43860 Data base

More information

Dimensions of rural urban migration

Dimensions of rural urban migration CHAPTER-6 Dimensions of rural urban migration In the preceding chapter, trends in various streams of migration have been discussed. This chapter examines the various socio-economic and demographic aspects

More information

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the RESETTLEMENT FRAMEWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the Secondary Education Modernization Project II in Sri Lanka Ministry of Education

More information

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Indigenous People Planning Document Due Diligence Report Loan Number: 2796 and Grant Number: 0267 NEP October 2013 Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

More information

Resettlement and Income Restoration in Thilawa SEZ

Resettlement and Income Restoration in Thilawa SEZ Resettlement and Income Restoration in Thilawa SEZ Lessons from the first & second phases and emerging good practices Thilawa SEZ Management Committee (TSMC) Yangon Region Government (YRG) 20 February

More information

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014 Work plan of Independent Agency and Implementation of IFC Performance Standards Green Goal Ltd., 17 February 2014 Content IFC performance standards Legal grounds of Cambodia Resettlement planning process

More information

Guidelines for Identification of Eligible Households to receive Food Grains at Subsidized prices as per Section 10 of the National Food Security Act

Guidelines for Identification of Eligible Households to receive Food Grains at Subsidized prices as per Section 10 of the National Food Security Act Guidelines for Identification of Eligible Households to receive Food Grains at Subsidized prices as per Section 10 of the National Food Security Act (NFSA), 2013 I. What is National Food Security Act (NFSA)

More information

Migration and Informality

Migration and Informality Migration and Informality Alakh N. Sharma Dhruv Sood Institute for Human Development NIDM Building, 3 rd Floor, IP Estate Mahatma Gandhi Marg New Delhi-110002 Why People Migrate? Labour migration is an

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Bac Lieu Province Prepared by the Ministry of Education

More information

The Socio-economic Status of Migrant Workers in Thiruvananthapuram District of Kerala, India. By Dilip SAIKIA a

The Socio-economic Status of Migrant Workers in Thiruvananthapuram District of Kerala, India. By Dilip SAIKIA a Journal of Economic and Social Thought www.kspjournals.org Volume 3 March 2016 Issue 1 The Socio-economic Status of Migrant Workers in Thiruvananthapuram District of Kerala, India By Dilip SAIKIA a Abstract.

More information

ECONOMIC CONDITIONS OF THE MIGRANT WORKERS IN KERALA: A STUDY IN THE TRIVANDRUM DISTRICT

ECONOMIC CONDITIONS OF THE MIGRANT WORKERS IN KERALA: A STUDY IN THE TRIVANDRUM DISTRICT (ISSN: 2321-4155), 33-46 Economics ECONOMIC CONDITIONS OF THE MIGRANT WORKERS IN KERALA: A STUDY IN THE TRIVANDRUM DISTRICT Dilip Saikia* ABSTRACT In recent years, Kerala has been experiencing a large

More information

Guidance Note 5 Land Acquisition and Involuntary Resettlement

Guidance Note 5 Land Acquisition and Involuntary Resettlement This Guidance Note 5 corresponds to Performance Standard 5. Please also refer to the Performance Standards 1-4 and 6-8 as well as the corresponding Guidance Notes for additional information. Bibliographical

More information

ARRANGEMENT OF SECTIONS

ARRANGEMENT OF SECTIONS LAND USE Land AND Use SPATIAL and Spatial PLANNING Planning Act, ACT, 2016 2016 Act 925 ARRANGEMENT OF SECTIONS Section Application 1. Application The Planning System Planning at National Level 2. Establishment

More information

Resettlement Plan Dili-Tibar-Liquica Road

Resettlement Plan Dili-Tibar-Liquica Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING SECTOR PROJECT November 2011 REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK

More information

Bangladesh: Urban Public and Environmental Health Sector Development Program

Bangladesh: Urban Public and Environmental Health Sector Development Program Resettlement Planning Document Draft Resettlement Framework Document Stage: Draft for Consultation Project Number: 39305 May 2009 Bangladesh: Urban Public and Environmental Health Sector Development Program

More information

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014)

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Submitted to : Egyptian Natural Gas Holding Company Prepared by: EcoConServ Environmental

More information

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1 RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1 Prepared for: CLRP-AF Project Monitoring Unit, Ministry of Environment and Spatial Planning Prepared by: replan Inc.

More information

Changing Economic Status and Life Style of Migrated Tribal Women s (A Geographical Study of Dindori District)

Changing Economic Status and Life Style of Migrated Tribal Women s (A Geographical Study of Dindori District) Changing Economic Status and Life Style of Migrated Tribal Women s (A Geographical Study of Dindori District) Dr. Lokesh Shrivastava D. Litt. 1, Dr. Ritu Rani 2, Shashikant Nag 3 Dept.of Post Graduate

More information

Resettlement and Indigenous Peoples Plan. IND: North Eastern State Roads Investment Program

Resettlement and Indigenous Peoples Plan. IND: North Eastern State Roads Investment Program Resettlement and Indigenous Peoples Plan February 2013 IND: North Eastern State Roads Investment Program Udaipur Melaghar Subproject (TR02) Prepared by Ministry of Development of North Eastern Region for

More information

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B. Module 8 - Involuntary Resettlement- Policy Principles & Requirements (World bank OP 4.12 and 4.12 Annex A) Key principles and objectives of an involuntary Resettlement Policy Resettlement planning instruments

More information

Resettlement Plan. IND: Bihar State Highways II Project. March Siwan-Siswan Subproject (SH-89)

Resettlement Plan. IND: Bihar State Highways II Project. March Siwan-Siswan Subproject (SH-89) Resettlement Plan March 2012 IND: Bihar State Highways II Project Siwan-Siswan Subproject (SH-89) Prepared by Bihar State Road Development Corporation, Government of Bihar for the Asian Development Bank.

More information

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS ENVIRONMENTAL SAFEGUARDS Objectives To ensure the environmental soundness and sustainability of projects and to support the integration

More information

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II Social Safeguards Monitoring Report Full Report November 2018 CAM: Rural Roads Improvement Project II Prepared by the Ministry of Rural Development for the Kingdom of Cambodia and the Asian Development

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

Nature And Reasons For Migration: A Case Study Of Migrated Unskilled Labour To Hyderabad City

Nature And Reasons For Migration: A Case Study Of Migrated Unskilled Labour To Hyderabad City IOSR Journal Of Humanities And Social Science (IOSR-JHSS) Volume 21, Issue11, Ver. 11 (Nov. 216) PP 21-26 e-issn: 2279-837, p-issn: 2279-845. www.iosrjournals.org Nature And Reasons For Migration: A Case

More information

GOVERNMENT OF TRIPURA DEPARTMENT OF RURAL DEVELOPMENT

GOVERNMENT OF TRIPURA DEPARTMENT OF RURAL DEVELOPMENT GOVERNMENT OF TRIPURA DEPARTMENT OF RURAL DEVELOPMENT NOTIFICATION NO In exercise of the powers conferred by sub section(1) of section32 of the National Rural Employment Guarantee Act, 2005, the Governor

More information

Revised Resettlement Plan Tibar-Gleno Road

Revised Resettlement Plan Tibar-Gleno Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING PROJECT February 2012 Democratic Republic of Timor-Leste REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS

More information

Summer School November Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK)

Summer School November Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK) Housing Policy and Circular No. 3 on Squatter Settlement Resolution Summer School 12-13 November 2014 Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK) bhskhemro@yahoo.com Content Housing Policy

More information

SOCIAL INCLUSION AND RURAL DEVELOPMENT THROUGH MGNREGA

SOCIAL INCLUSION AND RURAL DEVELOPMENT THROUGH MGNREGA SOCIAL INCLUSION AND RURAL DEVELOPMENT THROUGH MGNREGA MOOSA FARIN Assistant Professor Department of Economics AKI s Poona College of Arts, Science & Commerce Pune (MS) INDIA DR. SHAKEEL AHMED Vice-Principal

More information

LUCKNOW METRO RAIL PROJECT

LUCKNOW METRO RAIL PROJECT LUCKNOW METRO RAIL PROJECT RESETTLEMENT POLICY FRAMEWORK (Final) LUCKNOW METRO RAIL CORPORATION LTD. Contents SECTION-1... 1 INTRODUCTION... 1 1.1 INTRODUCTION... 1 1.2 THE PROJECT... 1 Table 1.1: Route

More information

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project BURCU ERGIN SOCIAL SAFEGUARDS SPECIALIST WORLD BANK RSM LAUNCH WORKSHOP IZMIR, 5 JULY 2018 Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project Why is it critical

More information

SRI: Local Government Enhancement Project

SRI: Local Government Enhancement Project Draft Resettlement Framework July 2011 SRI: Local Government Enhancement Project Prepared by the Ministry of Local Government and Provincial Councils for the Asian Development Bank. CURRENCY EQUIVALENTS

More information

SECOND TAMIL NADU ROAD SECTOR PROJECT (TNRSP-II) Final Resettlement Plan

SECOND TAMIL NADU ROAD SECTOR PROJECT (TNRSP-II) Final Resettlement Plan SECOND TAMIL NADU ROAD SECTOR PROJECT (TNRSP-II) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Final Resettlement Plan for 3 Roads under PPP Public Disclosure Authorized

More information

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia)

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Republic of Sakha (Yakutia) of the Russian Federation Innovative Development of Preschool

More information

Prepared by Road Construction Department, Government of Jharkhand.

Prepared by Road Construction Department, Government of Jharkhand. Resettlement Planning Document Resettlement Plan for Dumka Barhet Section Document Stage: Draft Project Number: 40005 May 2009 India: Jharkhand State Roads Project Prepared by Road Construction Department,

More information

Mining Toolkit. In-Migration

Mining Toolkit. In-Migration Tool Child Rights and Mining Toolkit Children are the most vulnerable stakeholders regarding mining impacts, including the effects of project-related in-migration. As dependents of migrant mine workers,

More information

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY [27th January 2014] Supplement to Official Gazette 939 S.I. 7 of 2014 PUBLIC PROCUREMENT ACT (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY 1.

More information

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples THE WORLD BANK OPERATIONAL MANUAL Indigenous Peoples (Draft OP 4.10, March 09, 2000) INTRODUCTION. 1. The Bank's policy 1 towards indigenous peoples contributes to its wider objectives of poverty reduction

More information

GOVERNMENT OF INDIA MINISTRY OF MINES LOK SABHA STARRED QUESTION NO. 259 TO BE ANSWERED ON 30 TH MARCH, 2012 R&R POLICY FOR MINING PROJECTS

GOVERNMENT OF INDIA MINISTRY OF MINES LOK SABHA STARRED QUESTION NO. 259 TO BE ANSWERED ON 30 TH MARCH, 2012 R&R POLICY FOR MINING PROJECTS GOVERNMENT OF INDIA MINISTRY OF MINES LOK SABHA STARRED QUESTION NO. 259 TO BE ANSWERED ON 30 TH MARCH, 2012 R&R POLICY FOR MINING PROJECTS *259. SHRI MANSUKHBHAI D. VASAVA: SHRI S. ALAGIRI: Will the Minister

More information

SOCIAL AUDIT REPORT. (English) MEGHALAYA SOCIETY FOR SOCIAL AUDIT & TRANSPERANCY

SOCIAL AUDIT REPORT. (English) MEGHALAYA SOCIETY FOR SOCIAL AUDIT & TRANSPERANCY SOCIAL AUDIT REPORT (English) MEGHALAYA SOCIETY FOR SOCIAL AUDIT & TRANSPERANCY SOCIAL AUDIT REPORT 1 Name of the State 2 Name of the District 3 Name of C & RD Block 4 Name of AEC 5 Name of the VEC 6 Date

More information

IND: Second Jharkhand State Road Project

IND: Second Jharkhand State Road Project Resettlement Plan March 2015 IND: Second Jharkhand State Road Project Dumka Hansdiha Road Prepared by State Highways Authority of Jharkhand (SHAJ), Government of India for the Asian Development Bank. ADB

More information

Mgnregs and Rural Unemployment- A Case Study of Chanditala C.D Block- I of Hugli District, West Bengal

Mgnregs and Rural Unemployment- A Case Study of Chanditala C.D Block- I of Hugli District, West Bengal The International Journal Of Engineering And Science (IJES) Volume 3 Issue 4 Pages 21-28 2014 ISSN (e): 2319 1813 ISSN (p): 2319 1805 Mgnregs and Rural Unemployment- A Case Study of Chanditala C.D Block-

More information

Challenges Of Implementation Of Right To Education (RTE) Act 2009 For Children In The Age Group In West Bengal

Challenges Of Implementation Of Right To Education (RTE) Act 2009 For Children In The Age Group In West Bengal Challenges Of Implementation Of Right To Education (RTE) Act 2009 For Children In The 10-14 Age Group In West Bengal Ankita Dey Assistant Professor and Statistician, KPC Medical College & Hospital, Jadavpur,

More information

15-1. Provisional Record

15-1. Provisional Record International Labour Conference Provisional Record 105th Session, Geneva, May June 2016 15-1 Fifth item on the agenda: Decent work for peace, security and disaster resilience: Revision of the Employment

More information

HUMAN RESOURCES MIGRATION FROM RURAL TO URBAN WORK SPHERES

HUMAN RESOURCES MIGRATION FROM RURAL TO URBAN WORK SPHERES HUMAN RESOURCES MIGRATION FROM RURAL TO URBAN WORK SPHERES * Abstract 1. Human Migration is a universal phenomenon. 2. Migration is the movement of people from one locality to another and nowadays people

More information

1 Please see for details:

1 Please see for details: Improving customer services in telecom, electricity and public utility services: An empirical study of low-income micro-entrepreneurs in Bangladesh, India and Sri Lanka Methodology note P. Vigneswara Ilavarasan

More information

Initial report. Republic of Moldova

Initial report. Republic of Moldova Initial report Republic of Moldova (23 rd session) 67. The Committee considered the initial report of the Republic of Moldova (CEDAW/C/MDA/1) at its 478th, 479th and 484th meetings, on 21 and 27 June 2000

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

Youth labour market overview

Youth labour market overview 1 Youth labour market overview With 1.35 billion people, China has the largest population in the world and a total working age population of 937 million. For historical and political reasons, full employment

More information

INDIA COAL SECTOR ENVIRONMENTAL AND SOCIAL MITIGATION PROJECT (CREDIT NO IN)

INDIA COAL SECTOR ENVIRONMENTAL AND SOCIAL MITIGATION PROJECT (CREDIT NO IN) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INDIA COAL SECTOR ENVIRONMENTAL AND SOCIAL MITIGATION PROJECT (CREDIT NO. 2862-IN) MANAGEMENT

More information

Performance Standard 5 Land Acquisition and Involuntary Resettlement

Performance Standard 5 Land Acquisition and Involuntary Resettlement Introduction Performance Standard 5 1. Involuntary resettlement refers both to physical displacement (relocation or loss of shelter) and to economic displacement (loss of assets or access to assets that

More information

IND: Railway Sector Investment Program Tranche 3

IND: Railway Sector Investment Program Tranche 3 Resettlement Due Diligence Report September 2017 IND: Railway Sector Investment Program Tranche 3 Prepared by the Ministry of Railways for the Republic of India and the Asian Development Bank. CURRENCY

More information

Rehabilitation & Resettlement (R&R) Policy for Kochi Metro Rail Project March 2015

Rehabilitation & Resettlement (R&R) Policy for Kochi Metro Rail Project March 2015 Rehabilitation & Resettlement (R&R) Policy for Kochi Metro Rail Project March 2015 AARVEE Associates Architects Engineers & Consultants Private Limited 8-2-5, Ravula Residency Srinagar Colony Hyderabad

More information

Resettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Resettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank. Resettlement Plan October 2013 IND: Jammu & Kashmir Urban Sector Development Investment Programme (JKUSDIP) Construction of Storm Water Drains in the Adjoining Areas of NH Bypass (Rawalpora Chowk Chanapora

More information

Ethiopia : the Gilgel Gibe Resettlement Project

Ethiopia : the Gilgel Gibe Resettlement Project No. 141 August 1999 Findings occasionally reports on development initiatives not assisted by the World Bank. This article is one such effort. The views expressed here do not necessarily reflect the views

More information

HEADQUARTERS AGREEMENT BETWEEN THE GOVERNMENT OF THE PEOPLE S REPUBLIC OF CHINA AND THE ASIAN INFRASTRUCTURE INVESTMENT BANK. ARTICLE 1 Use of Terms

HEADQUARTERS AGREEMENT BETWEEN THE GOVERNMENT OF THE PEOPLE S REPUBLIC OF CHINA AND THE ASIAN INFRASTRUCTURE INVESTMENT BANK. ARTICLE 1 Use of Terms HEADQUARTERS AGREEMENT BETWEEN THE GOVERNMENT OF THE PEOPLE S REPUBLIC OF CHINA AND THE ASIAN INFRASTRUCTURE INVESTMENT BANK The Government of the People s Republic of China and the Asian Infrastructure

More information

Engenderment of Labour Force Surveys: Indian Experience. Prepared by. Dr. Swaraj Kumar Nath Director-General, Central Statistical Organisation INDIA

Engenderment of Labour Force Surveys: Indian Experience. Prepared by. Dr. Swaraj Kumar Nath Director-General, Central Statistical Organisation INDIA GLOBAL FORUM ON GENDER STATISTICS ESA/STAT/AC.140/5.4 10-12 December 2007 English only Rome, Italy Engenderment of Labour Force Surveys: Indian Experience Prepared by Dr. Swaraj Kumar Nath Director-General,

More information

AN ANALYSIS OF SOCIO-ECONOMIC STATUS OF SCHEDULED CASTES: A STUDY OF BORDER AREAS OF JAMMU DISTRICT

AN ANALYSIS OF SOCIO-ECONOMIC STATUS OF SCHEDULED CASTES: A STUDY OF BORDER AREAS OF JAMMU DISTRICT Indian Streams Research Journal ISSN:-2230-7850 AN ANALYSIS OF SOCIO-ECONOMIC STATUS OF SCHEDULED CASTES: A STUDY OF BORDER AREAS OF JAMMU DISTRICT ORIGINAL ARTICLE Pradeep Arora and Virendar Koundal Research

More information

Rights to land, fisheries and forests and Human Rights

Rights to land, fisheries and forests and Human Rights Fold-out User Guide to the analysis of governance, situations of human rights violations and the role of stakeholders in relation to land tenure, fisheries and forests, based on the Guidelines The Tenure

More information

GROUP C: LAND AND PROPERTY; LIVELIHOODS AND SECONDARY AND HIGHER EDUCATION

GROUP C: LAND AND PROPERTY; LIVELIHOODS AND SECONDARY AND HIGHER EDUCATION 39 GROUP C: PROTECTION OF RIGHTS RELATED TO HOUSING; LAND AND PROPERTY; LIVELIHOODS AND SECONDARY AND HIGHER EDUCATION C.1 Housing, Land and Property, and Possessions C.1.1 The right to property should

More information

IND: Railway Sector Investment Program

IND: Railway Sector Investment Program Resettlement Framework Document Stage: Final March 2011 IND: Railway Sector Investment Program Prepared by Ministry of Railways for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 16 March 2011)

More information

IS LITERACY A CAUSE OF INCREASE IN WOMEN WORK PARTICIPATION IN PUNJAB (INDIA): A REGIONAL ANALYSIS?

IS LITERACY A CAUSE OF INCREASE IN WOMEN WORK PARTICIPATION IN PUNJAB (INDIA): A REGIONAL ANALYSIS? IMPACT: International Journal of Research in Applied, Natural and Social Sciences (IMPACT: IJRANSS) ISSN(E): 2321-8851; ISSN(P): 2347-4580 Vol. 2, Issue 2, Feb 2014, 49-56 Impact Journals IS LITERACY A

More information

Workforce Participation in Tribal Districts of Gujarat: Comparative Study of ST and Non ST

Workforce Participation in Tribal Districts of Gujarat: Comparative Study of ST and Non ST Continuous issue-22 June July 2016 Workforce Participation in Tribal Districts of Gujarat: Comparative Study of ST and Non ST The constitution of India ensures that all citizens enjoy equal rights and

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS

More information

IND: Second Jharkhand State Road Project

IND: Second Jharkhand State Road Project Resettlement Plan March 2015 IND: Second Jharkhand State Road Project Khunti - Tamar Road Prepared by State Highways Authority of Jharkhand (SHAJ), Government of India for the Asian Development Bank. ADB

More information

CONCEPT PAPER: SUSTAINABLE SHELTER SOLUTIONS Internally Displaced Persons in Somalia

CONCEPT PAPER: SUSTAINABLE SHELTER SOLUTIONS Internally Displaced Persons in Somalia CONCEPT PAPER: SUSTAINABLE SHELTER SOLUTIONS Internally Displaced Persons in Somalia SHELTER CLUSTER STRATEGIC OBJECTIVES 2013-2015 There are an estimated 1.1 million IDPs in Somalia. The needs of different

More information

TERMS OF REFERENCE DEVELOP A SADC TRADE DEVELOPMENT AND TRADE PROMOTION FRAMEWORK. November 2017

TERMS OF REFERENCE DEVELOP A SADC TRADE DEVELOPMENT AND TRADE PROMOTION FRAMEWORK. November 2017 TERMS OF REFERENCE TO DEVELOP A SADC TRADE DEVELOPMENT AND TRADE PROMOTION FRAMEWORK November 2017 1. Background 1.1 The SADC Summit in April 2015, adopted the Revised Regional Indicative Strategic Development

More information

India: Uttarakhand State Road Investment Program

India: Uttarakhand State Road Investment Program Resettlement Planning Document Resettlement Plan for Kirti Nagar New Tehri Road Subproject Document Stage: Final Project Number: 38255 May 2008 India: Uttarakhand State Road Investment Program Prepared

More information

Agradweep Carnival (Mela) and Baruni Festival A Part Of Glorius Secreat Geography in India

Agradweep Carnival (Mela) and Baruni Festival A Part Of Glorius Secreat Geography in India IOSR Journal of Humanities and Social Science (JHSS) ISSN: 2279-0837, ISBN: 2279-0845. Volume 3, Issue 2 (Sep-Oct. 2012), PP 24-30 Agradweep Carnival (Mela) and Baruni Festival A Part Of Glorius Secreat

More information

Gender, labour and a just transition towards environmentally sustainable economies and societies for all

Gender, labour and a just transition towards environmentally sustainable economies and societies for all Response to the UNFCCC Secretariat call for submission on: Views on possible elements of the gender action plan to be developed under the Lima work programme on gender Gender, labour and a just transition

More information

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Final Project Number: 40282 September 2006 VIE: Calamity Damage Rehabilitation Project The summary

More information

Towards a World Bank Group Gender Strategy Consultation Meeting 9 July 2015 Feedback Summary Kingston, Jamaica

Towards a World Bank Group Gender Strategy Consultation Meeting 9 July 2015 Feedback Summary Kingston, Jamaica Towards a World Bank Group Gender Strategy Consultation Meeting 9 July 2015 Feedback Summary Kingston, Jamaica The consultation meeting with government was held on 9 July 2015 in Kingston, Jamaica. After

More information

AID FOR TRADE: CASE STORY

AID FOR TRADE: CASE STORY AID FOR TRADE: CASE STORY THE INTERNATIONAL TRADE CENTRE Gender sensitisation of trade policy in India 1 AID FOR TRADE CASE STORY: ITC CASE STORY ON GENDER DIMENSION OF AID FOR TRADE GENDER SENSITISATION

More information

Chapter III SOCIO- ECONOMIC ASSESSMENT OF SLUM POPULATION IN PIMPRI- CHINCHWAD URBAN AREA

Chapter III SOCIO- ECONOMIC ASSESSMENT OF SLUM POPULATION IN PIMPRI- CHINCHWAD URBAN AREA Chapter III SOCIO- ECONOMIC ASSESSMENT OF SLUM POPULATION IN PIMPRI- CHINCHWAD URBAN AREA 1. Introduction 2. Economic status of slum population in Pimpri Chinchwad urban area 2.1: Average Annual income

More information

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement This document should be read in conjunction with the proposed World Bank Policy to understand the proposed responsibilities of the World Bank (in the Policy) and the Borrowing Country (in the Standards).

More information

Daniel Owen (World Bank) with Jay Wagner; Susan Dowse; Murray Jones; Marla Orenstein (Plexus Energy)

Daniel Owen (World Bank) with Jay Wagner; Susan Dowse; Murray Jones; Marla Orenstein (Plexus Energy) Managing Social Impacts of Labour Influx IAIA18 Conference Proceedings Environmental Justice in Societies in Transition 38 th Annual Conference of the International Association for Impact Assessment 16-19

More information

MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT

MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Government of the People s Republic of Bangladesh Ministry of Road Transport and Bridges Roads and Highways Department Land Acquisition and Resettlement Action Plan Submitted by: November 2018 BETS Consulting

More information

12 Socio Economic Effects

12 Socio Economic Effects 12 Socio Economic Effects 12.1 Introduction This chapter considers the socio-economic impact of Edinburgh Tram Line One during its construction and operation. Two main aspects of the scheme are considered:

More information

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TRANSPORT NOTES TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP THE WORLD BANK,

More information