1 RESETTLEMENT FRAMEWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the Secondary Education Modernization Project II in Sri Lanka Ministry of Education This report was prepared by the Borrower and is not an ADB document. The report is available on request. 25 October 2004
2 A. Project Background 1. The Secondary Education Modernization Project II has two objectives: to support the government s strategy to improve the quality, equity and management efficiency of secondary education and make it more responsive to labor market requirements and; to contribute to the government s long term policy on peace building by increasing equity of access to quality education and promoting education for social cohesion. The project will target approximately AB and IC schools. It is proposed that physical infrastructure and facilities of 1AB and 1C schools that are considered to be below accepted standards need to be developed and therefore, minor civil works will be undertaken in selected schools. Civil works include construction of computer learning rooms, libraries, activity rooms, science Laboratories and toilets, partitioning classrooms, conversion of existing rooms to libraries and science laboratories and computer learning centers by extensions to the existing buildings. The types of civil works envisaged are similar to civil works carried out under the Secondary Education Modernization Project (TA 1756). 2. The proposed civil works do not envisage any involuntary resettlement work and land acquisition. The potential number of households that may be affected is in any event small and would fall under the category of insignificant resettlement under the Asian Development Bank s (ADB) Policy on Involuntary Resettlement. However, Resettlement Plans (RPs) will be prepared accordingly whenever the need for resettlement is identified. A Resettlement Framework (RF) has been prepared to ensure that if resettlement needs are identified the project implementing agency follows the procedures for involuntary resetllement in compliance with both ADB s Policy on Involuntary Resettlement and National Involuntary Resetllement Policy of the Government of Sri Lanka. 3. The extent of civil works at each school will be minor construction works and improvements to the existing buildings and extensions. Therefore, the following Resettlement Framework for rehabilitation works was agreed upon between the Government and ADB to guide the Government in preparing a Resettlement Plan (RP) should this be found to be necessary during implementation. B. Policy Framework and Entitlements 4. Sri Lanka adopted a National Involuntary Resettlement Policy (NIRP) in May Amendments to the Land Acquisition Act have been drafted. The Land Acquisition Act No. 8 of 1979 would provide the legal basis for the NIRP. Land and asset acquisition will be undertaken within the framework of the Land acquisition Act and it provides various steps to be involved in land acquisition and compensation. Since there are inadequacies of the payment of compensation under the act compensation for lands, structures and other assets will be calculated and paid at full replacement cost. The Ministry of Lands (MOL) has the overall responsibility for implementing the national policy. The current Land Acquisition and Resettlement Unit under NIRP will continue land acquisition and resettlement for the construction and rehabilitation works. The Executing Agency, Ministry of Education will be instructed by the Resettlement Division of the Ministry of Lands on how to prepare and implement resettlement plans including adequate compensation package, resettlement of affected people in consultation with their needs and income restoration programs. For this purpose Land Acquisition and Resettlement Committees (LARC) will be established to pay adequate compensation. The principal aim of the RP is to address social impacts and ensure the restoration and improvements of living standards of affected households. The Entitlement
3 Matrix section 5 provides various compensation and entitlement policies that will be applied to broad categories of affected people. This matrix will be revised at the implementation of the RP with the identification of different categories of affected people. The principles, objectives and scope of the NIRP are very similar to those of the ADB. The Resettlement Framework aims to ensure that screening, planning and management procedures for involuntary resettlement on all civil works will be in compliance with ADB s Policy on Involuntary Resettlement and other ADB social safeguard policies. 5. This policy framework has been built upon the NIRP (2001) 1, and ADB s resettlement policy. The following major policy principles and objectives are reproduced below: (viii) (ix) (x) (xi) (xii) Avoid, minimize and mitigate negative land acquisition and resettlement impacts by reviewing alternatives to the project; If involuntary resettlement is unavoidable, the displaced persons should be assisted to re-establish themselves and improve their quality of life; Gender quality and equity should be ensured and adhered to throughout the policy; Affected persons (APs) should be fully involved in the selection of relocation sites, livelihood compensation and development options at the earliest opportunity; cash compensation will be used since the project will only require small amount of land; Compensation for loss of land, structures and assets should be based on full replacement cost 2 (including transaction costs) and should be paid promptly; Resettlement should be planned and implemented with full participation of the provincial and local authorities; Assist those affected to be economically and socially integrated into the host communities, participatory measures should be designed and implemented; Common property resources and community and public services should be provided; Resettlement should be planned as a development activity; APs who do not have documented title to land should receive fair and just treatment; Vulnerable groups should be identified and given appropriate assistance to substantially improve their living standards; and The Government should bear full costs of compensation and resettlement. 6. Persons affected by the rehabilitation works will be entitled to various types of compensation and resettlement assistance that will help in the restoration of their livelihoods, at least, to the pre-project standards as shown in the following matrix. 1 To assist the relevant agencies in planning, implementing, monitoring and evaluating all involuntary resettlement impacts, the following guidelines are provided: i) General Guidelines on Planning and Implementation of Involuntary Resettlement; Guidelines for the Preparation of a Resettlement Action Plan; iii) Process Manual for the Implementation of the NIRP- Ministry of Land; and iv) Guidelines for a Participatory Resettlement Process. 2 Replacement cost means the cost of replacement of lost assets and income. If land, it means the cost of buying a replacement land near the lost land with equal productive potential plus the cost of preparing the land to levels similar to those of the affected land and cost of any registration and transfer taxes. If structures, it means current market value of building materials, required labor without deduction for depreciation and/or salvageable materials. For crops and trees, it will be based on economic production, age and type.
4 I. ENTITLEMENT MATRIX Type of Losses Entitlement Implementation Issues Temporarily affected land (during construction) Permanent Loss of land (with land title/ownership records) Loss of crops and trees by cultivators regardless of the land ownership Loss of structures and immovable assets by owners (regardless of the land title) Restoration of cultural/community structures Rental payment during the temporary use of AP s land. Cash compensation will be used since the project will only require small amount of land. Cash compensation for loss of crops at replacement cost. If sown or standing crops are damaged or uprooted, the owner of the affected crops will be compensated in cash for the loss of un-harvested crops, at the mature crop value to be assessed on the basis of current market rates. Compensation for loss of fruit trees at replacement cost which is based on the present income and crop bearing capacity. Compensation for structures/assets at full replacement costs without deduction for depreciation/ salvageable materials. The cost will include transportation and labor costs. Complete restoration work or cash compensation for rehabilitation/rebuilding of affected common property resources and cultural/structures/ installations. The land will be restored to its previous or better quality. Payment of land will be made available to the divisional secretaries as soon as the Ministry of Finance approves the proposal for payment of compensation. The trees/crops are identified and listed by the Grama Nilandaris. The trees are valued by specialized agencies such as the Coconut Development Board, Rubber Research Institute and Divisional Secretaries. Owners of affected structures will be allowed to take/reuse all the salvageable materials for rebuilding/rehabilitation of the structure. To be paid to the formal or locally recognized patrons/users' group leaders. The main categories of impacts included are loss of lands, houses and other structures, crops and trees, employment and community facilities. Some entitlements will be based on consultations with the affected persons in specific areas. Eligibility for entitlements will be based on an inventory of assets to be acquired. C. Procedures 7. For civil works included under the proposed project, the following checklist needs to be answered and resettlement needs are identified: (viii) (ix) (x) Will the subproject require land? What is the quantity of land required? Will the impact be permanent or temporary (during construction)? Who owns the land? How is land currently used? If private land, how many landowners/tenants/sharecroppers will be affected? If state land, is it subject to customary claim? If state land, are there any squatters or encroachers? Are there any houses, structures, trees and crops that will be affected? How many households will be physically displaced? Can they move back to the residual land? Are there any public or community infrastructures? Will indigenous peoples be adversely affected?
5 8. In preparing the SRP, the following procedures must be followed: Consultations with various stakeholders to obtain inputs in avoiding/ minimizing the impacts, RP planning, identify needs and preferences of APs. Undertake census (100% coverage), asset inventory and detailed measurement surveys. A socio-economic survey of sample population will also be undertaken. Analyze data to identify different categories of APs based on the degree and scale of impacts of the subproject. Formulate time bound schedule for RP implementation, procedures for grievance redress, monitoring and evaluation procedures and budget. Prepare a draft RP following the entitlements matrix (para. 5). If there are new categories of APs and types of losses are identified, the entitlements will be included in accordance with ADB s policy on involuntary resettlement. Translate into local languages and present the draft subproject RP during consultation and public meetings for comments. The final RP will incorporate the comments and suggestions of the affected communities. Submit the RP to ADB for review and concurrence. The approved subproject RP will be implemented before the award of construction contracts. D. Implementation Arrangements, Consultation and Grievance Mechanisms 9. The executing agency (EA) of Ministry of Education will have overall responsibility for project coordination and implementation. A National Project Management Office (PMO) will have overall responsibility for implementation of civil works. However, the Project Management Office at in each Province will ensure that civil works are carried out according to school development plan approved by the Zonal Education Office, Provincial Director of Education and the PMO at national level. 10. Grievances will be handled by the PMO at national level with the assistance of the Provincial PMO. RPs will be disclosed through the PMO offices. The external monitoring agency appointed will carry out its own monitoring activities and will submit quarterly reports to the PMO and to ADB; these will include progress on planning and implementation of RPs. E. Cost Estimates and Financing 11. The associated costs of land acquisition and resettlement, if any, will be included in the overall Project costs. The estimate will include measures for planning and budgeting for land acquisition and resettlement costs, annual budget, and sources of funding; arrangements for approval of RP cost estimates; and the flow of funds to reach people affected.
Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005
Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project
More informationBangladesh: Urban Public and Environmental Health Sector Development Program
Resettlement Planning Document Draft Resettlement Framework Document Stage: Draft for Consultation Project Number: 39305 May 2009 Bangladesh: Urban Public and Environmental Health Sector Development Program
More informationSRI: Local Government Enhancement Project
Draft Resettlement Framework July 2011 SRI: Local Government Enhancement Project Prepared by the Ministry of Local Government and Provincial Councils for the Asian Development Bank. CURRENCY EQUIVALENTS
More informationSRI: Local Government Enhancement Project
Appendix 13 Resettlement Framework Dec 2011 SRI: Local Government Enhancement Project CURRENCY EQUIVALENTS (as of 27 June 2011) Currency Unit = Sri Lankan Rupee/s (SLR/Rs) Rs1.00 = $0.0091 $1.0 = Rs 109.8700
More informationSUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT
SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT A. Introduction and Subprojects Components 1. Tranche 2 of the
More informationAnnex 2: Does the Xayaburi resettlement comply with Lao law?
Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the
More informationPerformance Standard 5 Land Acquisition and Involuntary Resettlement
Introduction Performance Standard 5 1. Involuntary resettlement refers both to physical displacement (relocation or loss of shelter) and to economic displacement (loss of assets or access to assets that
More informationIND: Railway Sector Investment Program
Resettlement Framework Document Stage: Final March 2011 IND: Railway Sector Investment Program Prepared by Ministry of Railways for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 16 March 2011)
More informationSri Lanka: Northern Road Connectivity Project Additional Financing
Resettlement Plan June 2012 Sri Lanka: Northern Road Connectivity Project Additional Financing Prepared by the Road Development Authority, Ministry of Ports and Highways for the Asian Development Bank.
More informationInvoluntary Resettlement Due Diligence Report
Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS
More informationFlagship Capital Corporation
Resettlement Planning Document Resettlement Framework Project Number: 39906 June 2005 REG: Proposed Equity Investment Flagship Capital Corporation Prepared by Flagship Capital Corporation (Singapore) Ltd.
More informationThe Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Resettlement Policy Framework for the Smallholder Agriculture Development Project
More informationRP297. Resettlement and Rehabilitation (R&R) Entitlement Framework
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL REPORT Resettlement and Rehabilitation (R&R) Entitlement Framework RP297 Under
More informationEBRD Performance Requirement 5
EBRD Performance Requirement 5 Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or loss of
More informationTHE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives
Page 1 of 9 Involuntary Resettlement 1. Bank 1 experience indicates that involuntary resettlement under development projects, if unmitigated, often gives rise to severe economic, social, and environmental
More informationInvoluntary Resettlement Due Diligence Report
Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education
More informationInvoluntary Resettlement Due Diligence Report
Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry
More informationInvoluntary Resettlement Due Diligence Report
Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education
More informationWork plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014
Work plan of Independent Agency and Implementation of IFC Performance Standards Green Goal Ltd., 17 February 2014 Content IFC performance standards Legal grounds of Cambodia Resettlement planning process
More informationInvoluntary Resettlement Due Diligence Report
Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of
More informationInvoluntary Resettlement Due Diligence Report
Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Binh Thuan Province Prepared by the Ministry of
More informationTechnical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems
Technical Assistance Consultant s Report Project Number: 44140 Date: April 2014 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Supporting and Strengthening National-Level Capacity
More informationSri Lanka: DRY ZONE URBAN WATER AND SANITATION PROJECT - for Mannar Subprojects
Resettlement Implementation Plan Project Number: 37381-013 September 2012 Sri Lanka: DRY ZONE URBAN WATER AND SANITATION PROJECT - for Mannar Subprojects Prepared by SMEC Consultants for Dry Zone Urban
More informationSUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS
SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS ENVIRONMENTAL SAFEGUARDS Objectives To ensure the environmental soundness and sustainability of projects and to support the integration
More informationIndigenous Peoples Development Planning Document. IND: Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program
Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Draft for Consultation Project Number: 38412 June 2009 IND: Assam Integrated Flood and Riverbank
More informationResettlement Plan: Solar-LED Streetlights. BAN: Power System Efficiency Improvement Project
Resettlement Plan: Solar-LED Streetlights Document Stage: Draft Project Number: 37113 April 2011 BAN: Power System Efficiency Improvement Project Prepared by: Bangladesh Power Development Board (BPDB),
More informationIndia: Infrastructure Development Investment Program for Tourism
Infrastructure Development Investment Program for Tourism (RRP IND 40648) Resettlement Framework (Updated) Project Number: P40648 Approved: July 2010 Revised: October 2010 India: Infrastructure Development
More informationIndia: Madhya Pradesh Urban Services Improvement Project (MPUSIP)
Resettlement Planning Document Resettlement Framework Document Stage: Draft for Consultation Project Number: 42486 June 2016 India: Madhya Pradesh Urban Services Improvement Project (MPUSIP) The resettlement
More informationCambodia: Agriculture Sector Development Program
Resettlement Planning Document Resettlement Plan (Boeung Ket) Document Stage: Final Project Number: 34380 May 2009 Cambodia: Agriculture Sector Development Program Prepared by National Divestment Committee
More informationSECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement
This document should be read in conjunction with the proposed World Bank Policy to understand the proposed responsibilities of the World Bank (in the Policy) and the Borrowing Country (in the Standards).
More informationResettlement Policy Framework
Urban Transport Improvement Project of Tianjin by Using the World Bank Loan Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure
More informationGuidance Note 5 Land Acquisition and Involuntary Resettlement
This Guidance Note 5 corresponds to Performance Standard 5. Please also refer to the Performance Standards 1-4 and 6-8 as well as the corresponding Guidance Notes for additional information. Bibliographical
More informationVIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT
Resettlement Framework February 2012 VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT Prepared by the Ministry of Agriculture and Rural Development (MARD), Socialist
More informationBAN: Secondary Education Sector Investment Program
Secondary Education Sector Investment Program (RRP BAN 44213) Resettlement Framework September 2013 BAN: Secondary Education Sector Investment Program Prepared by Directorate of Secondary and Higher Education
More informationInvoluntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007
Involuntary Resettlement - Overview Transport Forum Washington, D.C. March 30, 2007 OP 4.12 - Triggers Trigger: acquisition of land which displaces people physically and / or economically. Policy applies
More informationCambodia: Agriculture Sector Development Program
Resettlement Planning Document Resettlement Plan (Chamkar Andong) Document Stage: Final Project Number: 34380 May 2009 Cambodia: Agriculture Sector Development Program Prepared by National Divestment Committee
More informationMinistry of Energy and Mining. Development Bank of Jamaica. Energy Security and Efficiency Enhancement Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Energy and Mining Development Bank of Jamaica FINAL (JANUARY 21, 2011) Energy
More informationInvoluntary Resettlement Due Diligence Report
Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Bac Lieu Province Prepared by the Ministry of Education
More informationPAK: Southern Punjab Basic Urban Services Project in the Islamic Republic of Pakistan
Resettlement Planning Document Resettlement Action Plan Waste Water Treatment Plant at Mouza Akbar Pur (Suraj Miani), Multan City Document Stage: Final Project Number: December 2007 PAK: Southern Punjab
More informationA. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.
Module 8 - Involuntary Resettlement- Policy Principles & Requirements (World bank OP 4.12 and 4.12 Annex A) Key principles and objectives of an involuntary Resettlement Policy Resettlement planning instruments
More informationVIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang)
Resettlement Plan August 2011 VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Prepared by the Lang Son Provincial People s Committee for the Asian
More informationRESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE
RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the CENTRAL
More informationIndigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project
Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Final Project Number: 40282 September 2006 VIE: Calamity Damage Rehabilitation Project The summary
More informationABBREVIATED RESETTLEMENT ACTION PLAN
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project: Irrigated Agriculture Improvement (IAIP) Subproject 1, Hoa Binh province SOCIALIST
More informationBAN: Railway Sector Investment Program
Resettlement Planning Document Resettlement Framework Document Stage: Final Project Number: 32234 June 2006 BAN: Railway Sector Investment Program Prepared by Bangladesh Railway, Dhaka, Bangladesh The
More informationResettlement and Ethnic Minority Development Framework (REMDF)
Resettlement and Ethnic Minority Development Framework (REMDF) Stage of the document: FINAL Project number: 49026-002 April 2017 VIE: Basic Infrastructure for Inclusive Growth in the Northeastern Provinces
More informationRevised Resettlement Plan Tibar-Gleno Road
REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING PROJECT February 2012 Democratic Republic of Timor-Leste REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS
More informationResettlement Framework
i Resettlement Framework Resettlement Framework Document Stage: Draft for Consultation September 2007 Cambodia: Tonle Sap Lowland Stabilization Sector Project The Resettlement Framework is a document of
More informationFRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT
DRAFT COMPARATIVE ANALYSIS OF NEPAL s LEGAL FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT Note: The following is based
More informationResettlement Plan Dili-Tibar-Liquica Road
REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING SECTOR PROJECT November 2011 REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK
More informationSemi-annual Social Safeguards Monitoring Report (January to June 2012)
Semi-annual Social Safeguards Monitoring Report (January to June 2012) Armenia: Sustainable Urban Development Investment Program Tranche 1 Project Number: 42417 Loan Number: L2752 Prepared: July 2013 Prepared
More informationIndonesia: Enhanced Water Security Investment Project
Initial Poverty and Social Analysis March 2018 Indonesia: Enhanced Water Security Investment Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy
More informationResettlement Policy Framework
Public Disclosure Authorized The World Bank SFG3873 REV Public Disclosure Authorized Hezhou Urban Water Infrastructure and Environment Improvement Project Public Disclosure Authorized Resettlement Policy
More informationWorld Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF)
World Bank-financed Project World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure
More informationSRI: Additional Financing for National Highway Sector Project
Resettlement Plan May 2011 Document Stage: Draft SRI: Additional Financing for National Highway Sector Project Hikkaduwa Baddegama Section of Hikkaduwa Baddegama Nilhena Road (B153) Prepared by Road Development
More informationIndia: Preparing the Energy Efficiency Enhancement Project in the Assam Power Sector
Resettlement Planning Document Short Resettlement Plan for Tranche-2 Components Document Stage: Draft for Consultation Project Number: TA 7096-IND April 2010 India: Preparing the Energy Efficiency Enhancement
More informationInvoluntary Resettlement Safeguards. A Planning and Implementation Good Practice Sourcebook Draft Working Document
Involuntary Resettlement Safeguards A Planning and Implementation Good Practice Sourcebook Draft Working Document November 2012 This working document was prepared by staff of Asian Development Bank. It
More informationResettlement Framework. BHU: Urban Infrastructure Project. October Prepared by the Royal Government of Bhutan for the Asian Development Bank.
Resettlement Framework October 2011 BHU: Urban Infrastructure Project Prepared by the Royal Government of Bhutan for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 5 October 2011) Currency unit
More informationASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING
Road Development Agency 1 5 6 2 3 4 RESETTLEMENT POLICY FRAMEWORK FINAL REPORT Consultancy Services for the Design and Preparation of Bidding Documents for a Countrywide Roll-out of the Output and Performance
More informationMLD: Greater Malé Environmental Improvement and Waste Management Project
Resettlement Framework Document Stage: Draft for Consultation Project Number: 51077-002 March 2018 MLD: Greater Malé Environmental Improvement and Waste Management Project Prepared by Ministry of Environment
More informationCONSTRUCTION OF PROPOSED MULTIPURPOSE BUILDING AT PAHALA KARAGAHAMUNA
Ministry of Provincial Councils and Local Government Local Government Enhancement Sector Project (Asian Development Bank Funded) Loan No. 3431 SRI DUE DILIGENCE REPORT (Social Safeguards) March 2017 CONSTRUCTION
More informationResettlement Policy Framework
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Tajikistan Ministry of Transport Central Asia Road Links Project Republic
More informationVOLUME 4 CHAPTER 1 PROJECT DESCRIPTION
VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION Table of Content Volume 4 Chapter 1: Project Description 1 PROJECT DESCRIPTION...1 1.1 THE NT2 PROJECT...1 1.2 THE NEED FOR RESETTLEMENT AND DEVELOPMENT...1 1.3 THE
More information2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field
Draft Safeguards Monitoring Report Project No. 38164-013 Draft Semi Annual Report December 2015 2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas
More informationNepal: Rural Reconstruction and Rehabilitation Sector Development Project
Resettlement Planning Document Resettlement Plan Grant Number: 0093 December 2010 Nepal: Rural Reconstruction and Rehabilitation Sector Development Project Kushma-Durlung-Salija Road Sub-Project, Kusma-Parbat
More informationTechnical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems
Technical Assistance Consultant s Report Project Number: 44140 Date: April 2013 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Strengthening Involuntary Resettlement Safeguard
More informationInvoluntary Resettlement Due Diligence Report
Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Cao Bang Province Prepared by the Ministry of Education
More informationDraft Resettlement Policy Framework
Republic of Tajikistan Ministry of Transport Central Asia Road Links Project Republic of Tajikistan Draft Resettlement Policy Framework Date: July 5, 2014 Draft Resettlement Policy Framework for Central
More informationIndia: Infrastructure Development Investment Program for Tourism
Infrastructure Development Investment Program for Tourism (RRP IND 40648) Resettlement Framework Document Stage: Draft for Consultation Project Number: P40648 July 2010 India: Infrastructure Development
More informationResettlement Plan. October Prepared by the Government of Jammu and Kashmir, Economic Reconstruction Agency for the Asian Development Bank.
Resettlement Plan October 2013 IND: Jammu and Kashmir Urban Sector Development Investment Program (JKUSDIP) - Construction of Mechanized Automated Multi Level Parking Facility at Super Bazaar, Jammu (Tranche
More informationFinal Monitoring Report to the Board of Directors. on the. Implementation of Remedial Actions. for the
Final Monitoring Report to the Board of Directors on the Implementation of Remedial Actions for the Integrated Citarum Water Resources Management Investment Program Project 1 in the Republic of Indonesia
More informationThe Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Republic of Sakha (Yakutia) of the Russian Federation Innovative Development of Preschool
More informationViet Nam: Central Region Urban Environmental Improvement Project
Resettlement Planning Document Resettlement Plan Document Stage: Updated Project Number: 34355 June 2008 Viet Nam: Central Region Urban Environmental Improvement Project Prepared by Project Coordination
More informationDUE DILIGENCE REPORT IHALAGAMA WATER TREATMENT PLANT IMPROVEMENT PROJECT
MINISTRY OF PROVINCIAL COUNCILS AND LOCAL GOVERNMENT LOCAL GOVERNMENT ENHANCEMENT SECTOR PROJECT (ASIAN DEVELOPMENT BANK FUNDED) Loan No. 3431 SRI DUE DILIGENCE REPORT (SOCIAL SAFEGUARDS) JUNE 2017 IHALAGAMA
More informationRESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Submitted to : Egyptian Natural Gas Holding Company Prepared by: EcoConServ Environmental
More informationSTAKEHOLDER ENGAGEMENT IN PLANNING AND IMPLEMENTATION OF RESETTLEMENT AND LIVELIHOOD RESTORATION
STAKEHOLDER ENGAGEMENT IN PLANNING AND IMPLEMENTATION OF RESETTLEMENT AND LIVELIHOOD RESTORATION Lead writer: Afandi Anwar Muhammad Foundation Co-writer: Aldi Muhammad Alizar IAP2 Indonesia For: IAIA event
More informationTimor-Leste: Baucau to Viqueque Highway Project
Resettlement Plan Project Number: 51115 June 2017 Timor-Leste: Baucau to Viqueque Highway Project Prepared by the Government of Timor-Leste for the Asian Development Bank. Table of Contents CHAPTER 1
More informationResettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank.
Resettlement Plan October 2013 IND: Jammu & Kashmir Urban Sector Development Investment Programme (JKUSDIP) Construction of Storm Water Drains in the Adjoining Areas of NH Bypass (Rawalpora Chowk Chanapora
More informationDecree on Compensation and Resettlement Management in Development Projects
Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity The Government No. 84 Vientiane Capital, Date: 05 / 04 / 2016 Decree on Compensation and Resettlement Management in Development
More informationGender Equality and Development
Overview Gender Equality and Development Welcome to Topic 3 of the e-module on Gender and Energy. We have already discussed how increased access to electricity improves men s and women s lives. Topic Three
More informationViet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject
Social Monitoring Report Corrective Action Plan September 2013 Viet Nam: GMS Flood and Drought Risk Management and Mitigation Project Thuong Toi Tien Subproject Prepared by the Department of Agriculture
More informationFEDERAL REPUBLIC OF ETHIOPIAN MINISTRY OF MINES
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FEDERAL REPUBLIC OF ETHIOPIAN MINISTRY OF MINES Volume II: Resettlement Policy Framework
More informationResettlement Action Plan Update for the Rehabilitation and Upgrading of Bukoba Airport
Public Disclosure Authorized UNITED REPUBLIC OF TANZANIA SFG2612 Public Disclosure Authorized MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA AIRPORTS AUTHORITY Public Disclosure Authorized Resettlement
More informationInternal Monitoring Report. PAK: Loan 2299: Lower Bari Doab Canal Improvement Project
Internal Monitoring Report 37231-023 March 2016 PAK: Loan 2299: Lower Bari Doab Canal Improvement Project This social monitoring report is a document of the borrower. The views expressed herein do not
More informationSocial Management Policy Framework
Appendix 1-2 SFG1851 GEF Mainstreaming Integrated Water and Environment Management Project Social Management Policy Framework (Amended) Public Disclosure Authorized Public Disclosure Authorized Public
More informationKingdom of Cambodia: Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project
Resettlement Plan Project Number: 46293-004 July 2014 Kingdom of Cambodia: Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project Kep Crab Market Environmental Improvements Prepared
More informationIndigenous Peoples Planning Framework. Multitranche Financing Facility VIE: Water Sector Investment Program
Water Sector Investment Program (RRP VIE 41456) Indigenous Peoples Planning Framework October 2010 Multitranche Financing Facility VIE: Water Sector Investment Program Prepared by the borrower for the
More informationMINISTRY OF COMMERCE, TRADE AND INDUSTRY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Zambia SFG2542 MINISTRY OF COMMERCE, TRADE AND INDUSTRY Project ID: No. P156492
More informationResettlement Policy Framework
SFG3184 Public Disclosure Authorized GOVERNMENT OF TAMIL NADU PUBLIC WORKS DEPARTMENT WATER RESOURCES ORGANISATION Environmental & Social Assessment and Preparation of Environmental & Social Management
More informationIndia: Delhi Meerut Regional Rapid Transit System Project
Initial Poverty and Social Analysis October 2018 India: Delhi Meerut Regional Rapid Transit System Project This document is being disclosed to the public in accordance with ADB s Public Communications
More informationIND: Mumbai Metro Rail Systems Project
Social Due Diligence Report October 2018 IND: Mumbai Metro Rail Systems Project Prepared by Mumbai Metropolitan Region Development Authority, Government of India for the Asian Development Bank. ABBREVIATION
More informationIAIA Special Symposium Resettlement and Livelihoods October Ted Pollett
IAIA Special Symposium Resettlement and Livelihoods 21 22 October 2014 Ted Pollett WHAT PLETHORA OF STANDARDS, GUIDELINES AND FRAMEWORKS? GOVERNMENT POLICIES, LEGISLATION AND REGULATIONS (NATIONAL, REGIONAL,
More informationProposed Loan People s Republic of China: Hebei Elderly Care Development Project
Resettlement Plan: Xinji City November 2016 Proposed Loan People s Republic of China: Hebei Elderly Care Development Project Prepared by the Hebei Project Management Office for the Asian Development Bank.
More informationIncome and Livelihood Restoration Plan. Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development
Income and Livelihood Restoration Plan Income and Livelihood Restoration Plan Document Stage: Final Project Number: 41013 June 2013 Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Prepared
More informationTRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TRANSPORT NOTES TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP THE WORLD BANK,
More informationEthnic Minorities Development Framework. PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program
Ethnic Minorities Development Framework Project Number: 50050-002 September 2016 PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Prepared by the Government of the People
More informationLand Acquisition and Resettlement Framework. PAK: Khyber Pakhtunkhwa Provincial Roads Improvement Project
Land Acquisition and Resettlement Framework Document Stage: Draft September 2017 PAK: Khyber Pakhtunkhwa Provincial Roads Improvement Project Prepared by Khyber Pakhtunkhwa Highways Authority, Communications
More informationCOMPILED RECOMMENDATIONS FROM INDIGENOUS PEOPLES IN THE VARIOUS COMMUNICATIONS TO THE WORLD BANK 1
COMPILED RECOMMENDATIONS FROM INDIGENOUS PEOPLES IN THE VARIOUS COMMUNICATIONS TO THE WORLD BANK 1 I. Recommendations to the ESS7 II. Overall recommendations to the draft WB Environmental and Social Framework
More informationTenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold
Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold Tenke Fungurume Mining (TFM), an affiliate of Freeport-McMoRan Copper & Gold, is the largest private foreign investment in the DRC,
More information