Classification: Public Rev. 00 June 2018 Page 1 of 25

INTER-DEPARTMENTAL PROCEDURE

SAFEWORK PRACTICES SAFE WORK PERMITTING CAT A-1 SOP #6

PRO Hot Work

Permit to Work Procedure

Making sense of risk Risk engineering. Marine hot work Permit to Work (PTW) systems

HSE guidelines. SApril 2017 WORK PERMITS

Villanova University Department of Environmental Health and Safety Policy and Procedure Manual

(WELDING, CUTTING, AND OPEN FLAME WORK)

Hot Work Procedures. Competent means possessing knowledge, experience and training to perform a specific duty.

HOT WORK SAFETY GUIDE. Specific responsibilities relating to hot work operations are outlined below.

HOT WORK SAFETY GUIDELINE

University of Delaware.

Environmental, Health and Safety. UNC Charlotte Hot Work Program (Welding, Cutting, and Brazing)

"HOT WORK SAFETY AND THE PERMITTING PROCESS"

HSE - Permit to Work Procedure

EDITION. March 2011 WORK PERMITS. Health. Safety HSEW A WAY OF LIVING. Standards for professionals, be aware!

HOT WORK 1. PURPOSE 2. SCOPE 3. KEY TERMS

Permit to Work Major Hazard Standard

Hot Work Safety and the Permitting Process. Leaders Guide and Quiz

HOT WORK PROGRAM OSHA

The Ohio State University. Hot Work Permit Program (Welding, Cutting and Brazing)

HSE guidelines. SApril 2017 WORK PERMITS

Hot Work and Welding Management Procedures Attached to FIN-INS Introduction. 1.1 Purpose

Hot Work Program. Program Origination: October, 2017

PRO Permit to Work

IWU PHYSICAL PLANT SAFETY PROGRAM

Health and Safety Policy

Hot Work Program. SUNY Canton. Purpose

Hot Work. A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Full Review of Document

PRO Permit to Work

Fire safety basics for hot work operatives. CFPA-E Guideline No 12:2012 F

Process: Permit to Work PS-OP-RC-2011

Hot Work Permit Program

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HOT WORK PERMITTING PROGRAM

University of Central Missouri Hot Work Permit Program

Hot Work Safety Program

PURPOSE To specify the minimum requirements for controlling risks associated with Hot Work activities.

Areas that have been designed and constructed for performing open-flame or spark-producing work.

Loss Prevention Standards

HOT / COLD WORK PERMIT DIRECTIONS NFPA 51B /306 NAVSEA Standard Item Box Title Instructions Examples

Hot Work. Approved by: Ruth Hampton Review Date: 6 th December 2015

Hot Works Permit. 1. General Details* (to be completed by Applicant)

Application for a Full or 30 Day Temporary Identity Pass

Permit to Work Systems

Title: Safe Work Procedure. Function: Ecology & Safety No.: CTC-SAF-037 Page: 1 of 6 Reviewed: 3/1/2017 Effective: 4/1/2017 Supersedes: 3/20/16

HOT WORK GUIDELINES 3. MANDATORY AREAS REQUIRING HOT WORK PERMITS Within the Service Station Site

Roger Williams University Hot Work Plan

SAFETY AND HEALTH STANDARD HOT WORK PERMIT Effective Date: 06/10/10 Standard: 16.1 Document Number: KUCSH0040 Rev: 04

Safe Work Permits Procedure

Hot Work Permitting Program

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

Fire caused by Hot Works. A guide to loss prevention

WASTE TREATMENT SYSTEMS OWNER S AERATOR MANUAL

BYLAW NO. 3551/2015 NOW THEREFORE COUNCIL OF THE CITY OF RED DEER ENACTS AS FOLLOWS: PART I TITLE, PURPOSE AND DEFINITIONS

MCW s Hot Work Permit Program

University of Arizona AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2012 EDITION

Hot Work Program June 2017

BALLOT BOX CHECKLIST

OFFICE OF STATE HUMAN RESOURCES

ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD. Copyright 2009 All rights reserved.

Non Electrical Hot Work Program

BERMUDA CLEAN AIR ACT : 38

DUQUESNE UNIVERSITY HOT WORK PROGRAM

Supersedes: 2/16 (Rev.10) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

KENNECOTT UTAH COPPER

Coles Express Work Clearance: Induction for Contractors

Record of Revisions. SVP & General Manager, Freeport. Date Revision No. Details of Change

Safe Code of Practice. No.05 Hot Works Procedure

HEALTH & SAFETY HOT WORK INSTRUCTIONS

DRAFT Hot Work Procedure South Shore Regional School Board

PROCEDURES FOR HOT WORK PERMITS, HOT WORK DISPENSATIONS & GAS FREE CERTIFICATES

Western Coventry Fire District By-Laws

Work Health and Safety Amendment (Miscellaneous) Regulation 2015

PURPOSE:... 3 EMPLOYEE CLASSIFICATIONS:... 3 OUTSIDE PERSONNEL (I.E., CONTRACTORS):... 4 HOT WORK REQUIREMENTS:... 4 EMPLOYEE TRAINING:...

*Federal Law by Decree No. 3 of 2003-Telecom Law

City of Commerce City 2012 International Fire Code. Code Amendments

Prevention of Hot Work Fires in Healthcare Facilities. Sherie Van Slyke Engineering Specialist

CHAPTER 1 GENERAL. 1

Hot Work Program. Roles and Responsibilities. Management. PAI Responsibilities

Permit to Work System Training for Supervisors Managing Hot Works & Other Permits - Presenter s Guide

Subpart A ( General Provisions ) and Subpart B ( Confined and Enclosed Spaces

Draft Substitute Ordinance As Reamended July 22, 2008 S U B S T I T U T E O R D I N A N C E A S R E A M E N D E D

CLEAN AIR CONSERVATION ACT

This program applies to University faculty, staff, students, vendors, or contractors performing Hot Work on behalf of the University of Iowa.

University of Nevada, Reno

NC General Statutes - Chapter 95 Article 7A 1

HEALTH AND SAFETY CODE SECTION

ORDINANCE NO BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF LAWRENCE, KANSAS:

DAVIDSON COUNTY PLANNING DEPARTMENT Application for Amendment to the Davidson County Zoning Ordinance. Directions

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY. To provide instruction for the issue and control of permits authorizing Hot Work operations.

Hot Work Policy & Procedure

INDUSTRIAL SAFETY AND HEALTH ACT Act No. 4220, Jan. 13, 1990

HOT WORK PROCEDURE. A Page 1 of 20

RISKTOPICS. DISCUSSION For the purposes of this document, hot work: Management practices: Hot work Property and Business Interruption January 2013

Public Input No. 17-NFPA 51B-2015 [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Updated 10/06/2016 FERNDALE VOLUNTEER FIRE COMPANY, Inc. Constitution and Bylaws

Transcription:

North America Business Unit (NABU) ENSCO SAFE SYSTEM OF WORK (SSOW) Permit to Work (PTW) Materials Re-Supply Catalogue

Contents Page Permit to Work (PTW) Hardware () Permit to Work (PTW) Location Board.3 (2) Permit Rack..3 (3) Permit Rack Dividers - Authorized 4 (4) Permit Rack Dividers - Suspended...4 (5) Permit Rack Dividers - Cancelled. 4 (6) Permit Rack Dividers - Retained Isolations.4 (7) Magnetic Markers - Safety Systems Disabled..4 (8) Magnetic Markers - Pressure Testing in Progress...4 (9) Magnetic Markers - Operator / 3 rd Party Equipment. 4 (0) Magnetic Markers - Hot Work. 5 () Magnetic Markers - Cold Work..5 (2) Magnetic Markers - Entry...5 (3) Magnetic Markers - Isolations (temporary)..5 (4) Magnetic Markers - Isolations (retained)..5 (5) Magnetic Markers - Isolations (Idle)..5 (6) Isolation Tags...6 (7) Isolation Tie Wraps..6 (8) Isolation Chain..6 Permit to Work (PTW) Forms (9) Hot Work Permit 7 (20) Cold Work Permit.. 7 (2) Entry Permit....7 (22) Entry Log. 7 (23) Isolation Certificate....8 (24) Isolation Continuation Sheet 8 (25) Gas Testing Certificate.....8 (26) System Checklist... 8 (27) System Change Proposal.9 Custodian: NABU SHEM 2

PTW (PTW) Hardware ) Permit Location Board 8.PTWPLB 2) Permit Rack 8.PTWPR Custodian: NABU SHEM 3

3) Permit Rack Dividers Authorized 4) Permit Rack Dividers Suspended Authorized Suspended 8.PTWPRDA 8.PTWPRDS 5) Permit Rack Dividers - Cancelled Cancelled 6) Permit Rack Dividers - Retained Isolations Retained Isolations 8.PTWPRDC 7) Magnetic Markers - Safety System Disabled 8.PTWPRDRI 9) Magnetic Markers Operator / 3 rd Party Rental Equipment R 8.PTWMMSSD 8) Magnetic Markers Pressure Testing in Progress 8.PTWMMORE P 8.PTWMMPTP Custodian: NABU SHEM 4

0) Magnetic Markers Hot Work (Red) 8.PTWMMHW ) Magnetic Markers Cold Work (Blue) 8.PTWMMCW 2) Magnetic Markers Entry (Green) 8.PTWMME 3) Magnetic Markers Temporary Isolations (Yellow Black Numbers) 8.PTWMMTI 4) Magnetic Markers Retained Isolations (Yellow Red Numbers) 8.PTWMMTIYR 5) Magnetic Markers Rig Idle (Hot Stacked) Isolations (Yellow Letter I ) Custodian: NABU SHEM 5

I 8.PTWMMTIYRL 6) Isolation Tags 8.PTWIT 7) Tie Wraps for Isolation Tags 8.PTWTW0 8) Plastic Yellow Isolation Chain 8.PTWIC Custodian: NABU SHEM 6

Haz Zone 0 2 H2S Zone Y N Gas Test Y N Required? Other Area Hazards: In the event of a General Alarm, shutdown portable equipment, make the worksite safe and proceed to your muster / Emergency Station Certificate Types I certify that the work authorized by the Permit will not conflict with any work or operational activities under my control. Number I certify that the isolations and safety precautions shown on this Permit, associated certificates and JSA s attached are approved. Work may now start from the time shown. The work does not conflict with any other work underway No work may be done under this Permit after the Expiry / Work May Start Permit Expires I have read and understand the description of work and precautions to be taken. The appropriate controls from the JSA are in place. I will ensure safe conditions at the worksite are maintained and that all other persons in the work group are briefed at a pre-job safety meeting and adhere to the requirements. Worksite will be left SAFE & TIDY at work stop. Work Start Work Stop Work Start Work Start Work Stop I declare that the work has been properly performed and is complete/*not complete. The equipment is left safe and the area is SAFE & TIDY. * Complete and associated certificates signed off. * Not complete and continuing on Permit No... SECTION 3 - AUTHORIZATION & Validation I have inspected the worksite and certify that the isolations and safety precautions have been completed, I authorize entry for the period shown. Entry can be made when the above conditions are completed The work does not conflict with any other work underway I have read and understand the description of work, precautions to be taken. I will ensure safe conditions at the worksite are maintained and that all persons entering the space have been briefed at a pre job safety meeting and adhere to the requirements. Worksite will be left SAFE & TIDY at all times. Valid From Valid To Work Start Person in Charge Initial when safety requirements are in place : :.. Start Permit Issuer Person in Charge Stop Print ature Print Work Start Work Stop This certificate is now closed and has been deleted from cross-referenced work permits. Permit Issuer ature Work Stop : I have read and understand the description of work and precautions to be taken. The appropriate controls from the JSA are in place. I will ensure safe conditions at the worksite are maintained and that all other persons in the work group are briefed at a pre-job safety meeting and adhere to the requirements. Worksite will be left SAFE & TIDY at work stop. Permit to Work (PTW) Forms 9) Hot Work Permit 20) Cold Work Permit PERMIT TO WORK SYSTEM PERMIT TO WORK SYSTEM Rig HOT WORK PERMIT Serial No. 02345 SECTION - WORK DESCRIPTION Worksite Work Order/JC. No... Contd. from Permit No Equipment Description.. Planned Duration: Work Description: SECTION 2 - AREA HAZARDS SECTION 3 - ASSOCIATED CERTIFICATES SECTION 4 - AUTHORIZATION & ISSUE A: COMPANY MAN (if required) B: PERMIT ISSUER C: PERSON IN CHARGE (st working period). SECTION 5 - RE-AUTHORIZATION atures in this section refer to the declarations made in Section 4 A: Permit Issuer B: Person in Charge Rig COLD WORK PERMIT Serial No. 02345 SECTION - WORK DESCRIPTION Worksite Work Order/JC. No... Contd. from Permit No Equipment Description.. Planned Duration: Work Description: SECTION 2 - AREA HAZARDS SECTION 3 - ASSOCIATED CERTIFICATES H2S Zone Y N Gas Test Y N Required? SECTION 4 - AUTHORIZATION & ISSUE A: COMPANY MAN (if required) I certify that the work authorized by the Permit will not conflict with any work or operational activities under my control. B: PERMIT ISSUER I certify that the isolations and safety precautions shown on this Permit, associated certificates and JSA s attached are approved. Work may now start from the time shown. The work does not conflict with any other work underway No work may be done under this Permit after the Expiry / Work May Start Permit Expires C: PERSON IN CHARGE (st working period). Work Start Work Stop SECTION 5 - RE-AUTHORIZATION atures in this section refer to the declarations made in Section 4 A: Permit Issuer B: Person in Charge Work Start Work Start Work Stop SECTION 6 - PERMIT CANCELLATION A. PERSON IN CHARGE *delete as appropriate B. PERMIT ISSUER The job is accepted as :- *delete as appropriate Permit ready for archive SECTION 6 - PERMIT CANCELLATION A. PERSON IN CHARGE *delete as appropriate I declare that the work has been properly performed and is complete/*not complete. The equipment is left safe and the area is SAFE & TIDY. B. PERMIT ISSUER The job is accepted as :- *delete as appropriate * Complete and associated certificates signed off. * Not complete and continuing on Permit No... Permit ready for archive st.copy : Worksite 2nd.copy : PCP. Draft C Aug 0 st.copy : Worksite 2nd.copy : PCP. Draft C Aug 0 8.PTWFHW 8.PTWFCW 2) Entry Permit 22) Re-Entry Log PERMIT TO WORK SYSTEM ENTRY PERMIT Rig... Area / Equipment No.... SECTION Serial No :...... Worksite..... Contd. from Cert. No... Raised :... Associated work permits SECTION 2 SAFETY REQUIREMENTS FOR ENTRY:(Permit Issuer to delete and initial non-applicable items).. The area/equip has been isolated from all sources of dangerous liquids, gases and fumes by insertion of spades or by removing a section of pipework and blanking the open ends of the circuit, or by agreed alternative methods. 2. The area/equipment has been isolated from all sources of electrical and mechanical power on Isolation Cert. Number. 3. The area/ equipment has been freed of all dangerous materials. 4. The surrounding area has been examined and there are no hazards that shall arise from concurrent operations/work 5. Life lines, harnesses, breathing apparatus and resuscitation equipment are available 6. Adequate access and egress is provided. 7. The area/equip is sufficiently cool. 8. Air moving equipment has been installed (if equipment fails, vacate space). Air intakes to be protected from gas/fumes and airborne particles. 9. A rescue plan has been formulated and rescue team briefed 0. Competent standby personnel have been detailed. Maximum number of persons allowed in confined space Number 2. The area/equip has passed the Atmosphere Tests as detailed in Gas Test Cert. Number 3. Continuous monitoring for toxic gases and oxygen in place. A: Permit Issuer B: Person in Charge (st working period). SECTION 4 Re-Validation atures in this section refer to the declarations made in Section 3 (Persons entering to sign reverse side of sheet) SECTION 5 - WORK COMPLETION st.copy : Worksite 2nd.copy : PCP.3 rd Copy OIM Continued on Cert. No. :... Draft B Aug 0 8.PTWFE 8.PTWRL Custodian: NABU SHEM 7

23) Isolation Certificate 24) Continued Isolation Certificate 8.PTWFIC 8.PTWFCIC 25) Gas Testing Certificate 26 Permit Checklist 8.PTWFGTC 8.PTWFPC Custodian: NABU SHEM 8

27) System Change Proposal 28) Permit Rack Wallet 8.PTWFSCP 8.PTWPRW 29) Permit Worksite Wallet ENSCO OFFSHORE COMPANY PERMIT TO WORK 8.PTWENVELOPE Custodian: NABU SHEM 9