1 Introduction A hot work management system and associated permit is a formal recorded process used to help control work which is identified as potentially hazardous, and is an important part of an organisation s loss prevention strategy. Experience has shown that a satisfactory standard of care and supervision is far more likely to be achieved where a formalised written permit to work system is in force, under competent supervision with the authority to ensure compliance with procedures. Hot work includes any activity which generates or requires the use of flame, heat or sparks. Common hot work processes include: gas and electric welding and cutting equipment; blow lamps and blow torches; electric or gas hot air guns, heaters or blowers; bitumen and tar boilers; angle grinders and grinding wheels; brazing and soldering; and drilling. Use of hot work is a major cause of losses within commercial properties, especially during construction schemes, maintenance or refurbishment projects. Many of these losses are the result of carelessness and ineffective supervision. Hot work activities may ignite adjacent or unseen material, heat may be conducted away from the working area by metal components and sparks, or hot metal may travel a long distance whilst retaining the potential to ignite combustible materials. Frequent training should be provided to all relevant personnel to make them aware of the risks associated with hot work. In addition to controlling hot work operations undertaken by their own staff, organisations should also be aware that it is vital to control the hot work operations of third parties, contractors and sub-contractors. Strict supervision of hot work completed by contractors is critical and should follow the hot work permit authorising procedures and fire watch protocols detailed within the organisation s operational instructions. Regular inspection of the hot work operation should be carried out and where the task is located in a high risk area, own staff supervision of the contractors should be completed. Page 1 of 10

2 Hot Work Safe System of Work General Precautions Hot work should be considered as the last resort and work should not default to such hazardous activities. It should only be authorised where a safer method of work is not available, and where possible, alternatives should be sought or the work moved to an area specifically designated for such works. For example, pipe jointing may be possible without soldered fittings; pipes could be cut using cold cutting techniques or items to be the subject of hot work could be removed to a safe area designated for that purpose, and for which no permit is required, such as a dedicated workshop welding bay. Hot work should only be undertaken by trained and competent individuals. In premises protected by sprinkler systems, hot work should not be carried out when the sprinkler system or water supply is shut off (impaired). When hot work is being undertaken in premises fitted with automatic fire detection systems, only the local detectors or the zone where the work is being carried out should be isolated (impaired). The zone or detectors should be reinstated as soon as the task has been completed. Appropriately trained person(s), not directly involved with the work, should provide: a continuous fire watch during the work; and an additional 60 minutes continuous monitoring immediately after completion of the work. Depending on the exposure, risk or hazard, following this 60 minutes continuous monitoring, a further 180 minutes of intermittent checks should also be provided. In some circumstances, following a risk assessment, it may be determined that extended continuous monitoring or a further intermittent checking period may be required. This fire watch is to detect and extinguish any incipient burning materials in the work area, and in all adjoining areas to which sparks and heat may spread. These could include the floors above and below, and areas on the other sides of walls from where the work is being carried out. Therefore more than one trained fire watch could be included. The trained person should have at least two appropriate fire extinguishing appliance to hand at all times and be trained in their selection and use. Trained persons completing the hot work and those providing the fire watch should be familiar with the means of escape, and the method of raising the alarm and notifying the Fire Brigade. Hot work permits should only be issued for one shift. Where the work goes across shifts, then a new permit should be authorised and responsibilities formally reconfirmed or reassigned. Alternatively the start time of the work should be managed to fit more appropriately with the operating hours/shifts of the area involved. Hot work should be prohibited on combustible construction. Prior to the commencement of work Before any attempt is made to start the proposed hot work, a formal risk assessment should be carried out and the results recorded, to assess the possible consequences of the task. The following questions should be considered, together with specific questions according to the actual conditions: Is it necessary for hot work to be carried out? Would it be practical to transfer the item being worked upon to a safer area, e.g. a workshop, or perhaps employ an alternative solution, e.g. use of bolts or compression joints rather than the use of hot work? Page 2 of 10

3 If the hot work task resulted in a fire: o Who or what is at risk in the room? o Could fire spread out of the room, and if so what other occupancies could be involved? Is there any incompatible process in progress in the relevant area, such as the use of flammable solvents to lay flooring? Is the hot work planned to be in or on combustible construction materials, such as composite panels with combustible insulation? o If so then this work should not start. Hot work should be prohibited on all combustible construction. Is there a backup for any mechanical or electrical equipment, computer systems and data which could be damaged by fire? Are there any personnel who are required to use the area at the same time as the hot work is being carried out? Can alternative arrangements be made? Could the work lead to the organisation s security being compromised? Are the fire protection/detection systems in full working order in the area the work is to be completed (no impairments)? Clear the area within 10 metres of the hot work process. The distance may need to be more than 10 metres in some circumstances, especially where overhead work is to be undertaken. All items of combustible materials, flammable liquids, and all elements of combustible construction and surface finishes should be protected, as should any openings, holes or gaps in walls, floors and ceilings through which sparks could pass. Floors should be swept clean and flammable solvents must not be used to clean surfaces immediately before work commences. Where combustible materials within 10 metres cannot be removed, they should be protected by the use of non-combustible or purpose-made blankets, drapes or screens. Combustible floors within the area should be covered with overlapping sheets of non-combustible material or wetted and liberally covered with sand. Care should be taken to ensure that any gaps in flooring are adequately covered, and flammable liquids should always be removed from the area. Good ventilation should be provided in all areas where hot work is to be carried out, as the task may produce volumes of smoke and fumes. Hot work should not be undertaken in an atmosphere containing flammable vapours or dusts or on or near equipment or tanks containing flammable/combustible liquids or materials. Where a hazardous atmosphere is suspected, air samples should be taken and work only commenced when the atmosphere has been certified to be non-hazardous. Any pipes, equipment or tanks containing flammable liquids should be appropriately purged and tests completed to confirm no flammable liquid or vapour is present. If there is a risk that the hazardous atmosphere may recur, the job should not commence until further precautions are implemented and additional testing completed. Before carrying out work on one side of a wall or partition, an examination should be made of the area on the other side to ensure that any combustible materials are not in danger of ignition by direct or conducted heat. Heat may be readily conducted where walls are metal or where metal items such as beams, bolts, ducting, cable trays or pipes etc., penetrate to the other side. Page 3 of 10

4 Where work is to be undertaken on composite building panels or similar constructions, the type of insulating or other materials behind metal or other non-combustible surfaces should be assessed. If combustible materials are identified or suspected, hot work should be prohibited and alternative methods employed. If in doubt, it should be assumed that panels have a combustible core. Cold stores, in particular, may incorporate large amounts of combustible insulating materials in both wall and ceiling panels. An inspection should be carried out for voids above, below or around the work area, such as false ceilings, cable ducts or other cavities, which may be able to transmit flames or smoke from one area to another. Care must be taken when working in or on timber frame structures, such as roofs and buildings where a timber frame form of construction may have been adopted, e.g. angle grinding of old pipes. Caution must also be taken in heritage properties where voids are commonly encountered, for example, behind panelling in window frames. Liaison should be established in multiple occupancy buildings before work commences, to enable contractors or others to be effectively controlled, and access made available to areas adjacent to where work is being undertaken. A secure area should be provided for any items removed from the area being worked upon. Upon completion of hot work When work is complete, paint strippings, hot stub ends of welding rods and other hot waste materials should be removed and disposed of safely. All equipment, including gas cylinders etc., should be removed to a secure area at the end of the working period or when the task is completed, if this is sooner. Where work has been undertaken, a continuous fire watch should be maintained for at least 60 minutes following cessation of hot work operations, or for an additional period as determined by the fire risk assessment. Following the continuous fire watch an intermittent fire watch of up to 180 minutes should be employed. This should be based on the risk to the building and the business. It should consider the occupancy, construction, continuity of combustible materials, threat to the business and exposures to the site etc. The frequency of the checks should be between 15 and 30 minutes, based on a risk assessment. Based on the completion of formal risk assessments, the 180 minutes intermittent fire watch can, on occasions either be reduced or even increased. If reduced, the risk assessment should indicate why the fire watch is reduced and what additional, alternative or mitigating measures are in place. It is far safer to start with the 60 minute (continuous) minute (intermittent) fire watch and risk assess down, as appropriate. A fire watch must be maintained during lunch or tea breaks or any other temporary cessations of work. Once the fire watch is completed and there are no signs of fire, the permit can be finally signed off. Page 4 of 10

5 Equipment used for hot work - Precautions All hot work procedures should only be carried out by trained personnel, using equipment which is in good condition and being used in accordance with the manufacturer s instructions. Any equipment and hoses should be checked prior to each period of use, and any gas cylinders should be adequately supported, preferably by mounting on purpose-built trolleys. When using oxy-fuel gas equipment, flashbacks can occur. Hose check valves, which prevent back-feeding (one of the main causes of flashback), should be fitted to hoses for oxygen and fuel applications, such as acetylene or propane. Flashback arrestors, designed to quench flashback, should also be fitted to all gas, including oxygen, supply lines. Wherever possible, the use of acetylene should be avoided and an alternative solution provided. Acetylene is a flammable gas that is unstable and liable to decomposition at elevated temperatures and pressures. As a result, acetylene in cylinders, once suspected to be unstable, constitutes a unique firefighting hazard in comparison with other gas cylinders. Where the use of acetylene cannot be avoided, only the minimum number of cylinders should be present on site, and these should be removed as soon as their work is complete. The cable connecting any electric welding apparatus to the source of electrical supply should be as short as possible. Care should be taken to ensure that all wiring is of suitable design and construction to carry the heavy currents required, and all connections must be correctly made so that they cannot give rise to overheating or sparking. Operators should be made aware of the importance of three connections (welding lead, welding return and welding safety earth) for every welding circuit. Before each period of use, the electric cables should be inspected visually to ensure that they have not been damaged by heat or abrasion, and all welding and cutting equipment should be periodically inspected and tested by a competent person. LPG blow lamps, blow torches and heaters should be extinguished and allowed to cool before changing cylinders. Paraffin or petrol blow lamps should only be filled and lit in the open, and should not be refilled when hot. Blow lamps and blow torches should be lit as short a time as possible before work commences, and extinguished immediately the work ceases they should not be left unattended when alight or hot. Lighting of the torch should only be carried out in accordance with manufacturer s instructions. Electrically powered hot air guns or blowers are a particular source of danger as no flame is apparent. When using these appliances the same safety measures should be observed as when undertaking other forms of hot work. The electrical cable to the blower should be inspected visually prior to each period of use, and the equipment periodically inspected and tested by a competent person. Bitumen and tar boilers, along with similar equipment, should only be taken onto roofs in exceptional circumstances, when a non-combustible heat insulating base must be provided to prevent heat igniting the roof. The boiler should always be on a firm and level surface where spilled material can easily be controlled, and the equipment must be supervised by an experienced operator at all times. Gas cylinders must be at least three metres from the burner and gas hoses checked to ensure they are in good condition and properly fitted prior to each period of work. Additional gas cylinders not in use should be stored away from the working area. The bitumen level and its temperature should be monitored and the lid normally kept on the boiler. The burner should be turned off before transporting the boiler on a lorry or trailer. Page 5 of 10

6 In respect of angle grinders and grinding wheels, the correct grade of wheel or disc must be used for the task, and before each period of use the wheel or disc checked to ensure that it is securely fastened, in good condition, and that the electric cable has not been damaged. Contracted work Prior to entering into a contractual arrangement with contractors, advice should be obtained from your insurer or insurance adviser, as the adequacy of contractor s insurance arrangements may vary considerably. Contractors should be made aware of the specific site hazards and the fire safety procedures to be adopted, including the hot work permit system and fire watch requirements. A written undertaking to observe the precautions should be obtained from the contractor(s) prior to commencement of work. Procedure for hot work permits Persons nominated to authorise hot work, must have experience or training in the problems associated with hot work, and be of suitable status to ensure compliance with the procedures. Prior to work commencing, a hot work permit must be obtained from the authorised person an example permit is included within this document (see Appendix 1) and an interactive version can also be found at: Aviva RC7 Interactive Hot Work Permit. A separate permit should be used on every occasion that hot work of any type is undertaken, and must not be issued without considering the significance of any other permits to work in the vicinity. It should be issued for a specific task that is to be undertaken in a clearly identified area. Hot work permits should not be issued for protracted periods, and separate permits should normally be issued for work which extends across shifts. Before issuing a permit, a check should be made to ensure that the hot work will be completed in time for any shift change-over, end of shift/work day or for the appropriate post-work fire watch to take place see previous section on fire watch requirements. If this is not the case then additional precautions and alternative arrangements will need to be implemented. Before completing the first part of the hot work permit, the work place area needs to be visited by all parties involved. The person responsible for issuing the permit for the work should then complete the checklist, a copy is attached see Appendix 2, in conjunction with the person responsible for carrying out the work, to indicate that fire protection measures are adequate, suitable precautions have been taken and the equipment to be used is safe. If the person authorised to issue the hot work permit is not satisfied with the arrangements, further measures may be requested, and any additional conditions entered in the space provided. The earliest time at which a final fire-check should be made will also be specified. This will normally be at least 60 minutes after the time of expiry of the hot work permit, when work must be complete. If trained individuals will not be available to make this check, e.g. in the case of a permit issued late in the day, work must not be commenced. The hot work permit should be completed in duplicate, with the top copy handed to the person responsible for carrying out the work. The second copy should be retained by the issuer who may wish to inspect the site of the work, or instigate spot checks to ensure that conditions have been met and that work is complete before the hot work permit expires. The completed form should be returned to the issuer and retained for future references. The hot work permit system should be regularly audited to ensure compliance with procedures. Page 6 of 10

7 Acknowledgements RC7 Recommendations for hot work: RISCAuthority Further risk management information can be obtained from Aviva Risk Management Solutions Please Note This document contains general information and guidance and is not and should not be relied on as specific advice. The document may not cover every risk, exposure or hazard that may arise and Aviva recommend that you obtain specific advice relevant to the circumstances. AVIVA accepts no responsibility or liability towards any person who may rely upon this document. Page 7 of 10

8 Appendix 1 Sample Hot Work Permit A copy of the completed permit should be retained for auditing purposes. ISSUING COMPANY PERMIT NUMBER A. PROPOSAL (to be completed by the person responsible for carrying out the work). BUILDING EXACT LOCATION OF PROPOSED WORK NATURE OF WORK TO BE UNDERTAKEN I have completed and submitted the Checklist and understand the scope of work and precautions to be taken. SIGNED DATE BLOCK CAPITALS POSITION CONTRACTOR COMPANY (WHERE APPLICABLE) B. AGREEMENT (to be completed by Company Safety Officer or other nominated person the Issuer of the Permit ) This Hot Work Permit is issued subject to the following conditions: DATE & TIME PERMIT ISSUED: EXPIRY OF PERMIT** (TIME): ** It is not desirable to issue permits for protracted periods. Fresh permits should be issued where, for example, work extends from morning to afternoon. A FINAL CHECK OF THE WORK AREA SHALL BE MADE, NOT BEFORE (TIME): ADDITIONAL CONDITIONS REQUIRED: The above location has been examined and the precautions checklist that accompanies this form has been complied with. I have carried out a risk assessment and consider that there is no reasonably practical alternative to doing the job using hot work. I have been provided with evidence of appropriate Public Liability Insurance. SIGNED DATE BLOCK CAPITALS POSITION C. FOLLOWING COMPLETION OF WORK (to be completed by member of staff or contractor responsible for the work. The permit should then be returned to the issuer) The work area and all adjacent areas to which sparks and heat might have spread (such as floors below and above and areas on other sides of walls) have been inspected and found to be free of smouldering materials and flames. Stub ends of welding rods and other hot waste materials have been removed and disposed of safely. Any isolated automatic fire detectors or detection zones have been reinstated. All equipment, including gas cylinders, has been removed to a safe area. TIME INSPECTION COMPLETED (this must be at least 60 minutes after work has been completed as determined by the fire risk assessment for the task): D. SIGN OFF BY ISSUER OF PERMIT The hot work has been completed. Any detector(s) or zones of the fire alarm system that were isolated have been fully reinstated. SIGNED BLOCK CAPITALS DATE Page 8 of 10

9 Appendix 2 Sample Hot Work Permit Checklist The following checks should be carried out by the hot work operative at the hot work site prior to commencing hot work. The person carrying out these checks should tick the appropriate boxes, and then return the Checklist to the Hot Work Permit Issuer. ISSUING COMPANY PERMIT NUMBER GENERAL Wherever practicable the use of hot work should be avoided and a safer way employed. If you cannot comply with the following points, do not go ahead with the hot work. FIRE PROTECTION: Where sprinklers are installed, they are operative. (In sprinklered premises, hot work should not be carried out when the water supply to the sprinkler system is shut off.) Where an automatic fire detection system has been installed, it will be kept operative. Only the zone where the hot work is being carried out will be isolated for the period whilst hot work is in progress. A trained person not directly involved with the work will provide a continuous fire watch during the period of hot work. Following completion of each period of work, the continuous fire watch will remain in place for at least 60 minutes, with further checks at regular intervals up to 180 minutes, or a period as determined by the fire risk assessment, after completion to ensure that the working area and all adjacent areas, including the floors below and above, and areas on the other side of walls, screens, partitions and above false ceilings, are free of smouldering materials and flames. At least two appropriate extinguishers are immediately available. The personnel undertaking the work and providing the fire watch are trained in their use. Personnel involved with the work and providing the fire watch are familiar with the means of escape and method of raising the alarm/calling the fire brigade. PRECAUTIONS WITHIN 10 METRES (MINIMUM) OF THE WORK AREA: Combustible materials have been cleared from the area. Where materials cannot be removed, protection has been provided by non-combustible or purpose-made blankets, drapes or screens. Flammable liquids have been removed from the area. Floors have been swept clean. Combustible floors have been covered with overlapping sheets of non-combustible material or wetted and liberally covered with sand. All openings and gaps (combustible floors or otherwise) are adequately covered. Protection (non-combustible or purpose-made blankets, drapes or screens) has been provided for: walls, partitions and ceilings of combustible construction or surface finish; and all holes and other openings in walls, partitions and ceilings through which sparks could pass. Where work is being carried out on building panels, an assessment has been made of insulating or other materials behind or forming the core of the panels. Combustible materials have been moved away from the far side of walls or partitions where heat could be conducted, especially where these incorporate metal. Enclosed equipment (tanks, containers, dust collectors etc.) has been emptied and tested, or is known to be free of flammable concentrations of vapour or dust. EQUIPMENT: Equipment for hot work has been checked and found to be in good repair. Gas cylinders have been properly secured. SIGNED BLOCK CAPITALS DATE Page 9 of 10

10 Appendix 3 Common Hot Work Permit Failings Lack of procedures to assess whether hot work is necessary i.e. can the task be completed using alternative measures which do not require the need for hot work. Inappropriate dedicated hot work areas where formal permits deemed unnecessary, e.g. maintenance workshop - same assessments, procedures and controls should be applied. If large numbers of permits are regularly issued, their use may be seen as a formality meaning that an appropriate assessment of the area/risk may not be completed. Conversely, if an organisation rarely carries out hot work, they may be inclined not to implement a permit system given the infrequency of such work. Hot work permit form is poorly designed. Contractors not adequately monitored as they are deemed by an organisation to be the experts in the type of work they are undertaking. The same robust procedures should apply to both own employees and contractors. Contractors are not employees of the organisation where they are undertaking hot work, have no direct investment in the company and so may be inclined to work faster, increasing the possibility of cutting corners, resulting in an increased loss potential. Contractors should be able to demonstrate their ability to carry out the work safely, complying with your organisation s hot work system. Hot work permit procedures and guidelines not adhered to. Permit does not identify all the potential hazards e.g. not inspecting for combustible insulation in nearby composite panels or combustible materials on lower floors where stray sparks could travel, or failure to consider conduction as a means of heat transfer especially on ducting systems and steel construction fires have occurred where heat conducted has ignited combustible materials located more than 10 metres away from the hot work location. Competent individual not inspecting the area where the work will be completed prior to issuing the permit, e.g. to ensure that appropriate arrangements are in place. Permit remains open for a shift/day rather than being restricted to the shortest period required for the task to be completed. No formal communication of the hot work task between different teams when there is a handover/shift change. Inadequate property loss prevention procedures. Lack of appropriate training for all those individuals involved in the permit process. No dedicated fire watch with appropriate portable fire extinguishers, to monitor the area both during the work and also for a defined period after completion of the work. Fire watch duration inadequate for the work being completed. Number of fire watches and their location not consistent with the risk and/or location of hot work, e.g. on the floor of the hot work area; on the floor/level below; on the other side of a non-full height wall. Hot work task completed at the end of the working day and so not allowing sufficient time for appropriate fire watch duration. Fire watch responsibility not formally signed-over following personnel change. Poor enforcement of the permit to work system. Hot work permit form not signed-off correctly following completion of the work. Fire protection/detection systems not restored following completion of the work. Inadequate auditing of the hot work permit system. Page 10 of 10

RC 7 V2 3/12/07 3:41 am Page 1 RC7 for hot work

RC 7 V2 3/12/07 3:41 am Page 1 RC7 for hot work for hot work RC7 LOSS PREVENTION RECOMMENDATIONS The aim of the FPA series of Recommendations is to provide loss prevention guidance for industrial and commercial premises and systems. The series continues

More information

HOT WORK PROGRAM OSHA

HOT WORK PROGRAM OSHA HOT WORK PROGRAM 1910.252 OSHA Table of Contents Purpose... 3 Definitions... 3 Responsibilities... 3 Hot Work Permitted Locations... 5 Fire Prevention Precautions... 5 Personal Protective Equipment...

More information

Hot Work Program June 2017

Hot Work Program June 2017 Hot Work Program June 2017 Hot Work Program TABLE of CONTENTS I. General Information II. Definitions III. Roles and Responsibilities IV. Hot Work Areas V. Hot Work Permit VI. Hot Work Permit-Not Required

More information

Fire caused by Hot Works. A guide to loss prevention

Fire caused by Hot Works. A guide to loss prevention Fire caused by Hot Works A guide to loss prevention Hot Work is usually defined as any open flame, spark or heat producing activity and is typically associated with cutting, welding, grinding and brazing

More information

(WELDING, CUTTING, AND OPEN FLAME WORK)

(WELDING, CUTTING, AND OPEN FLAME WORK) THE UNIVERSITY OF TEXAS AT TYLER Hot Work (WELDING, CUTTING, AND OPEN FLAME WORK) Program 2016 Table of Contents 1. INTRODUCTION... 3 2. PURPOSE... 3 3. APPLICATION... 3 4. DEFINITIONS... 3 5. PROGRAM

More information

Safe Code of Practice. No.05 Hot Works Procedure

Safe Code of Practice. No.05 Hot Works Procedure Safe Code of Practice No.05 Hot Works Procedure Version: 1.0 Date: 28 TH June 2016 Date: 28/0616 Review Date: 28/06/19 Issue No: 6 Page 1 of 7 INTRODUCTION The aim of this Safe Code of Practice is to give

More information

Roger Williams University Hot Work Plan

Roger Williams University Hot Work Plan Roger Williams University Hot Work Plan Roger Williams University Dept. Of Environmental Health and Safety One Old Ferry Road Bristol, RI 02809 Adopted: April 26, 2011(President s Cabinet) Roger Williams

More information

Fire safety basics for hot work operatives. CFPA-E Guideline No 12:2012 F

Fire safety basics for hot work operatives. CFPA-E Guideline No 12:2012 F Fire safety basics for hot work operatives CFPA-E Guideline No 12:2012 F FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation

More information

Desert Research Institute Hot Work Permit Program

Desert Research Institute Hot Work Permit Program 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this policy is to prevent any fires that may result from hot work processes. 1.2 SCOPE 1.2.1 For the purposes of this policy, hot work is defined as any temporary

More information

Hot Work Permit Program

Hot Work Permit Program Environmental Health and Safety Office Hot Work Permit Program Permitting Process for welding, cutting and brazing. Adopted: March 6, 2007 Revised: 7/18/16 http://www.stlawu.edu/environmentalhealth-and-safety/environmental-healthand-safety-policies

More information

The Ohio State University. Hot Work Permit Program (Welding, Cutting and Brazing)

The Ohio State University. Hot Work Permit Program (Welding, Cutting and Brazing) Environmental Health & Safety 1314 Kinnear Rd. Columbus, Ohio 43212 Phone (614) 292-1284 Fax (614) 292-6404 http://www.ehs.osu.edu/ The Ohio State University Hot Work Permit Program (Welding, Cutting and

More information

Hot Work Program. Program Origination: October, 2017

Hot Work Program. Program Origination: October, 2017 Hot Work Program Program Origination: October, 2017 Contact Personnel: Jason Kayser, Fire & Safety Specialist Jason.kayser@uni.edu 319-273-2004 Hot Work Program UNI Employees & Contractors October, 2017

More information

Hot Work Program. Purpose of Procedure:

Hot Work Program. Purpose of Procedure: BGSU Hot Work Program Page 1 Bowling Green State University Purpose of Procedure: Hot Work Program These procedures have been established to comply with Ohio s Public Employee Risk Reduction Act, the OSHA

More information

IWU PHYSICAL PLANT SAFETY PROGRAM

IWU PHYSICAL PLANT SAFETY PROGRAM STANDARDS Welding, Cutting and Brazing/General Requirements OSHA 1910.252, 1. Purpose Hot work is any temporary or permanent operation involving open flames or producing heat and/or sparks. This includes

More information

SUNY Geneseo ENVIRONMENTAL HEALTH & SAFETY

SUNY Geneseo ENVIRONMENTAL HEALTH & SAFETY Revision No.: 1 Page 1 of 7 I. PURPOSE The purpose of this policy is to establish minimum standards for safely conducting hot work tasks to help mitigate hazards that could occur during hot work operations.

More information

PURPOSE:... 3 EMPLOYEE CLASSIFICATIONS:... 3 OUTSIDE PERSONNEL (I.E., CONTRACTORS):... 4 HOT WORK REQUIREMENTS:... 4 EMPLOYEE TRAINING:...

PURPOSE:... 3 EMPLOYEE CLASSIFICATIONS:... 3 OUTSIDE PERSONNEL (I.E., CONTRACTORS):... 4 HOT WORK REQUIREMENTS:... 4 EMPLOYEE TRAINING:... South Central College North Mankato/Mankato Campus 1920 Lee Boulevard N. Mankato, MN 56002-1920 Faribault Campus 1225 Third Street SW Faribault, MN 55021-5782 Adoption Date: 09-18-15 Revision Date: 02-23-17

More information

Hot Work Procedures. Competent means possessing knowledge, experience and training to perform a specific duty.

Hot Work Procedures. Competent means possessing knowledge, experience and training to perform a specific duty. Hot Work Procedures Purpose This procedure will provide the knowledge and equipment required to minimize the identified workplace hazards associated with Hot Work. These procedures will provide: information

More information

HOT WORK PERMIT PROGRAM REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING & COMPLIANCE OFFICE

HOT WORK PERMIT PROGRAM REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING & COMPLIANCE OFFICE University of Vermont Department of Physical Plant Burlington, Vermont HOT WORK PERMIT PROGRAM REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING & COMPLIANCE OFFICE

More information

Non Electrical Hot Work Program

Non Electrical Hot Work Program Environmental Health and Safety Name: Non Electrical Hot Work Program Date Created: 02/18/2014 Date Revised: Created By: Bob Happel PURPOSE The purpose of this Program is to protect people and property

More information

HOT WORK SAFETY GUIDE. Specific responsibilities relating to hot work operations are outlined below.

HOT WORK SAFETY GUIDE. Specific responsibilities relating to hot work operations are outlined below. HOT WORK SAFETY GUIDE Version Date Comments 5 March, 2012 Revised document 6 June, 2015 Update code citation - SFPC 2012 A. INTRODUCTION The purpose of this Guide is to provide information regarding welding

More information

DUQUESNE UNIVERSITY HOT WORK PROGRAM

DUQUESNE UNIVERSITY HOT WORK PROGRAM DUQUESNE UNIVERSITY HOT WORK PROGRAM Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 2 General Requirements 2 Welding or Cutting Containers

More information

HOT WORK GUIDELINES 3. MANDATORY AREAS REQUIRING HOT WORK PERMITS Within the Service Station Site

HOT WORK GUIDELINES 3. MANDATORY AREAS REQUIRING HOT WORK PERMITS Within the Service Station Site 1. GENERAL This procedure gives guidelines for the precautions and preparation that should be followed to ensure that work covered by a hot work permit can be carried out safely without risk to people

More information

HOT WORK SAFETY GUIDELINE

HOT WORK SAFETY GUIDELINE HOT WORK SAFETY GUIDELINE SAFETY GUIDELINE 2017 1 Hot work safety guideline Index 1 Hot work training... 2 2 Purpose of the safety guidelines... 2 3 Binding force of the safety guidelines... 2 4 Definitions...

More information

Hot Work and Welding Management Procedures Attached to FIN-INS Introduction. 1.1 Purpose

Hot Work and Welding Management Procedures Attached to FIN-INS Introduction. 1.1 Purpose 1. Introduction 1.1 Purpose Hot Work and Welding Management Procedures Attached to FIN-INS-22 Indiana University Insurance, Loss Control and Claims (INLOCC) and Indiana University Environmental Health

More information

Hot Work Program. Roles and Responsibilities. Management. PAI Responsibilities

Hot Work Program. Roles and Responsibilities. Management. PAI Responsibilities Hot Work Program Scope is aware of the hazards associated with hot work operations (cutting, welding, brazing and soldering, grinding, etc.) is committed to keeping our employees safe and to control hazards

More information

Hot Work Permitting Procedure

Hot Work Permitting Procedure Hot Work Permitting Procedure Purpose Audience Policy This procedure is designed to ensure that spark and flame producing construction and maintenance activities do not present an undue fire hazard to

More information

Hot Work Permit Guidelines

Hot Work Permit Guidelines 2408 Wanda Daley Drive Ames, Iowa 50011-3602 (515) 294-5359 www.ehs.iastate.edu Copyright 2014 Reviewed 2015 2 Hot Work Permit Guidelines Directory of Service and Emergency Providers Services Environmental

More information

University of Nevada, Reno

University of Nevada, Reno University of Nevada, Reno HOT WORK PERMIT PROGRAM Program Contact Person: John A. Braun, CSP Environmental Health and Safety University of Nevada, Reno Phone: 775-784-6478 HOT WORK PERMIT PROGRAM UNIVERSITY

More information

Prevention of Hot Work Fires in Healthcare Facilities. Sherie Van Slyke Engineering Specialist

Prevention of Hot Work Fires in Healthcare Facilities. Sherie Van Slyke Engineering Specialist Prevention of Hot Work Fires in Healthcare Facilities Sherie Van Slyke Engineering Specialist Are hot work fires common in hospitals? What is hot work? Hot work statistics The contractor component. Construction

More information

Hot Work Safety Program

Hot Work Safety Program Hot Work Safety Program 6900-2.0 Associated OHS Process: General Industry & Construction Safety The master copy of this document resides in electronic format. Printed copies of this document are for convenience

More information

General Hot Work Program Guidelines. Lyndsey Beaudin

General Hot Work Program Guidelines. Lyndsey Beaudin General Hot Work Program Guidelines Lyndsey Beaudin WHY SUCH A HOT TOPIC? NEW YORK STATE OFFICE OF FIRE PROTECTION AND CONTROL Violation: Hot Work Permit not issued for Hot Work Area 2603.4 Hot Work Program

More information

STANDARD PROCEDURE INSTRUCTION

STANDARD PROCEDURE INSTRUCTION STANDARD PROCEDURE INSTRUCTION Title SPI Department Hot Work Permit Supersedes SPI Dated # 34-3 Effective Date Safety, Health and Environment Dec 22, 2014 Jan 19, 2016 Hot Work Permit 1. PURPOSE 1.1 To

More information

HOT WORK MANAGEMENT PROGRAM

HOT WORK MANAGEMENT PROGRAM HOT WORK MANAGEMENT PROGRAM Rose-Hulman Institute of Technology Table of Contents SECTION 1.0 Purpose 2.0 Regulatory Reference 3.0 Scope 4.0 Elements of the Program 5.0 Responsibility 6.0 Training and

More information

Villanova University Department of Environmental Health and Safety Policy and Procedure Manual

Villanova University Department of Environmental Health and Safety Policy and Procedure Manual Villanova University Department of Environmental Health and Safety Policy and Procedure Manual Subject: Hot Works Procedure Number: S15 Effective: 20 Apr 99 Revised: 9-15-15 I Purpose: To establish a procedure

More information

Hot Work Permitting Program

Hot Work Permitting Program Hot Work Permitting Program Environmental Health, Safety, and Risk Management Department Box 6113, SFA Station Nacogdoches, Texas 75962-6113 Original: January 2004 Revised: January 2011, April 2018 Table

More information

RISKTOPICS. DISCUSSION For the purposes of this document, hot work: Management practices: Hot work Property and Business Interruption January 2013

RISKTOPICS. DISCUSSION For the purposes of this document, hot work: Management practices: Hot work Property and Business Interruption January 2013 RISKTOPICS Management practices: Hot work Property and Business Interruption January 2013 This document highlights the property conservation responsibilities of those who utilize hot work outside of areas

More information

Areas that have been designed and constructed for performing open-flame or spark-producing work.

Areas that have been designed and constructed for performing open-flame or spark-producing work. PURPOSE Baylor University recognizes that there is a potential for injury to people and damage to property that can result from fire or sparks that arise when hot work is performed outside of a designated

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HOT WORK PERMITTING PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HOT WORK PERMITTING PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 2 EMPLOYEE TRAINING AND DOCUMENTATION 3 PROGRAM REQUIREMENTS 4 HOT WORK PERMIT PLANNING AND PRECAUTIONS 4 6 FIREWATCH 6, 7 HOT WORK

More information

OFFICE OF STATE HUMAN RESOURCES

OFFICE OF STATE HUMAN RESOURCES OFFICE OF STATE HUMAN RESOURCES NUMBER: HWP-1 TOTAL PAGES: 6 SUBJECT: Hot Work Program Effective Date: Revision Date: Revision #: RELATED LEGISLATION: This program outlines procedures for [Agency/University]

More information

Risk Control Guide HOT WORK

Risk Control Guide HOT WORK HOT WORK RCG003 (E)-v2-01/2017 Page 1 2017 Royal & Sun Alliance Insurance plc Introduction Hot work is defined as any operation that involves open flames or produces heat or sparks, e.g. cutting, grinding,

More information

MCW s Hot Work Permit Program

MCW s Hot Work Permit Program 2019 MCW s Hot Work Permit Program - Hot Work/Fire Watch Operations This document is the Medical College of Wisconsin s (MCW) written program for conducting hot work, and identifies roles and responsibilities

More information

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM REV 10/2015 TABLE OF CONTENTS HOT WORK PERMIT PROGRAM Contents A. PURPOSE AND SCOPE... 3 B. HOT WORK PERMIT PROCEDURES... 3 C. HOT WORK PERMIT PROHIBITED CONDITIONS:...

More information

Hot Work Policy & Procedure

Hot Work Policy & Procedure Hot Work Policy & Procedure Policy: Reference: The purpose of the PCS General Contractor Hot Work policy is to protect personnel and property from a fire caused by hot work. The PCS Hot Work procedure

More information

DRAFT Hot Work Procedure South Shore Regional School Board

DRAFT Hot Work Procedure South Shore Regional School Board Hot Work Procedure South Shore Regional School Board SSRSB Hot Work Procedure - 2010 Page 1 of 12 Introduction DRAFT Hot work comes in a variety of applications each with its own heat source severity.

More information

Hot Work. Approved by: Ruth Hampton Review Date: 6 th December 2015

Hot Work. Approved by: Ruth Hampton Review Date: 6 th December 2015 5 WHS PROCEDURE P28-01 Page 1 of 7 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment for all persons

More information

University of Central Missouri Hot Work Permit Program

University of Central Missouri Hot Work Permit Program 1. Introduction University of Central Missouri Hot Work Permit Program The University of Central Missouri's (UCM) Hot Work Program is designed to minimize risks to our campus community, which includes

More information

Hot Work Safety and the Permitting Process. Leaders Guide and Quiz

Hot Work Safety and the Permitting Process. Leaders Guide and Quiz ! Hot Work Safety and the Permitting Process Leaders Guide and Quiz 4879 INTRODUCTION TO THE PROGRAM Structure and Organization Information in this program is presented in a definite order so that employees

More information

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM REV 12/99 1 TABLE OF CONTENTS HOT WORK PERMIT PROGRAM A. Purpose and Scope.3 B. Hot Work Permit Procedures...3 C. Hot Work Permit - Prohibited Conditions...4

More information

Hot Work Permit Program

Hot Work Permit Program Hot Work Permit Program 1 2 TABLE OF CONTENTS Section Title Page 1.0 Scope 3 2.0 Standards and Regulations Involved/Target Groups 3 3.0 Responsibilities 4 4.0 Training.. 5 5.0 Recordkeeping. 5 6.0 Permits

More information

"HOT WORK SAFETY AND THE PERMITTING PROCESS"

HOT WORK SAFETY AND THE PERMITTING PROCESS PRESENTER'S GUIDE "HOT WORK SAFETY AND THE PERMITTING PROCESS" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS OUTLINE

More information

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY WHAT IS HOT WORK? WORK INVOLVING BURNING, WELDING, OR A SIMILAR OPERATION THAT IS CAPABLE OF INITIATING FIRES OR EXPLOSIONS. EXAMPLES

More information

HOT WORK PROCEDURE. A Page 1 of 20

HOT WORK PROCEDURE. A Page 1 of 20 TABLE OF CONTENTS 1. OBJECTIVE...4 2. SCOPE...4 3. DEFINITIONS...4 4. RESPONSIBILITIES...5 5. HAZARD AND RISK ASSESSMENT...5 5.1 PPA Controlled Hot Work Requirements Flow Chart...5 6. HOT WORK PERMIT...6

More information

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY SAFETY AND HEALTH RISK MANAGEMENT AND SAFETY

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY SAFETY AND HEALTH RISK MANAGEMENT AND SAFETY HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY SAFETY AND HEALTH RISK MANAGEMENT AND SAFETY WORK INVOLVING BURNING, WELDING, OR A SIMILAR OPERATION THAT IS CAPABLE OF INITIATING FIRES OR EXPLOSIONS. WHAT IS

More information

Fire Safety & Hot Work Permits. Oakland University Office of EH&S

Fire Safety & Hot Work Permits. Oakland University Office of EH&S Fire Safety & Hot Work Permits Oakland University Office of EH&S Topics of Discussion Why do we Need a Hot Work Permit Real-life Cutting/Welding Accidents When is a Hot Work Permit Required Hot Work Precautions

More information

Hot Work Procedure. Work Health and Safety Policy Responsible Officer. Executive Director, Infrastructure Services and Development Approved by

Hot Work Procedure. Work Health and Safety Policy Responsible Officer. Executive Director, Infrastructure Services and Development Approved by Hot Work Procedure Related Policy Work Health and Safety Policy Responsible Officer Executive Director, Infrastructure Services and Development Approved by Executive Director, Infrastructure Services and

More information

Environmental, Health and Safety. UNC Charlotte Hot Work Program (Welding, Cutting, and Brazing)

Environmental, Health and Safety. UNC Charlotte Hot Work Program (Welding, Cutting, and Brazing) Environmental, Health and Safety UNC Charlotte Hot Work Program (Welding, Cutting, and Brazing) January 2014 TABLE OF CONTENTS PURPOSE:... 2 SCOPE:... 2 HOT WORK RESPONSIBILITIES... 2 SPECIFIC DEPARTMENTAL

More information

PURPOSE To specify the minimum requirements for controlling risks associated with Hot Work activities.

PURPOSE To specify the minimum requirements for controlling risks associated with Hot Work activities. PURPOSE To specify the minimum requirements for controlling risks associated with Hot Work activities. 1 SCOPE This procedure defines Hot Work as any activity that may introduce a source of ignition or

More information

This program applies to University faculty, staff, students, vendors, or contractors performing Hot Work on behalf of the University of Iowa.

This program applies to University faculty, staff, students, vendors, or contractors performing Hot Work on behalf of the University of Iowa. University of Iowa Hot Work Loss Prevention Program This program has been approved for use at the University of Iowa and will remain in effect until a revised program is developed and approved. Written:

More information

Permit to Work Procedure

Permit to Work Procedure 1. Purpose The permit to work procedure provides a system for managing certain high risk activities at NT Airports sites. The purpose of this procedure is to: 2. Scope Provide a level of control to ensure

More information

University Environmental Health and Safety. Hot Work Permit Program

University Environmental Health and Safety. Hot Work Permit Program University Environmental Health and Safety Hot Work Permit Program 1 2 TABLE OF CONTENTS Section Title Page 1.0 Scope 3 2.0 Standards and Regulations Involved/Target Groups 3 3.0 Responsibilities 4 4.0

More information

Public Input No. 17-NFPA 51B-2015 [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 17-NFPA 51B-2015 [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document of 55 11/18/2016 2:12 PM Public Input No. 17-NFPA 51B-2015 [ Global Input ] 3.3.X Responsible Party. The building owner, a lessee, or a duly authorized representative. Globally change "management" everywhere

More information

HOT WORK PROGRAM October 2016

HOT WORK PROGRAM October 2016 HOT WORK PROGRAM October 2016 A. SCOPE AND APPLICATION The UNLV Hot Work Program is established in accordance with the standards listed in Section H and specifies the requirements and procedures necessary

More information

Hot Work Program. SUNY Canton. Purpose

Hot Work Program. SUNY Canton. Purpose SUNY Canton Hot Work Program Purpose Hot Work is defined as welding, thermite welding, thermal spraying, installation of torch applied roof systems, cutting, soldering, brazing, grinding, thawing pipe

More information

Program Title Hot Work Program. Classification Fire Safety and Emergency Response. Program No INTRODUCTION

Program Title Hot Work Program. Classification Fire Safety and Emergency Response. Program No INTRODUCTION 1.0 INTRODUCTION ENVIRONMENTAL HEALTH AND SAFETY PROGRAM MANUAL As part of the Weill Cornell Medical College (WCMC) Environmental Health and Safety (EHS) Program Manual, this has been established. The

More information

Pocket Guide to Hot Work Loss Prevention. Sixth Edition

Pocket Guide to Hot Work Loss Prevention. Sixth Edition Pocket Guide to Hot Work Loss Prevention Sixth Edition Pocket Guide to Hot Work Loss Prevention Sixth Edition 4 Audience This pocket guide is intended for those involved with hot work management at client

More information

KENNECOTT UTAH COPPER

KENNECOTT UTAH COPPER 16.1.1 INTRODUCTION 16.1.1.1 The purpose of this standard is to define the requirement for performing hot work operations on certain components of machinery, equipment and structures and preventing the

More information

Guide to Hot Work NFPA 51B Understanding the new requirements after July 1, 2018

Guide to Hot Work NFPA 51B Understanding the new requirements after July 1, 2018 Guide to Hot Work NFPA 51B Understanding the new requirements after July 1, 2018 What is the issue that caused the change? Unpermitted hot work was determined to be the cause of a fire that killed two

More information

SAFETY AND HEALTH STANDARD HOT WORK PERMIT Effective Date: 06/10/10 Standard: 16.1 Document Number: KUCSH0040 Rev: 04

SAFETY AND HEALTH STANDARD HOT WORK PERMIT Effective Date: 06/10/10 Standard: 16.1 Document Number: KUCSH0040 Rev: 04 16.1.1 INTRODUCTION 16.1.1.1 The purpose of this standard is to prevent the inadvertent ignition of combustible materials when performing hot work. 16.1.2 DEFINITIONS 16.1.2.1 Hot work - includes welding,

More information

HOT WORK 1. PURPOSE 2. SCOPE 3. KEY TERMS

HOT WORK 1. PURPOSE 2. SCOPE 3. KEY TERMS Doc owner: Authorised by: HR Manager WHS Group Executive Human Resources HOT WORK Version PRO-05-11-01 Issue date 08/2017 1. PURPOSE The purpose of this procedure is to provide guidance to David Jones

More information

VIRU KEEMIA GRUPP AS. Hot Works Safety Management Instruction No. 136

VIRU KEEMIA GRUPP AS. Hot Works Safety Management Instruction No. 136 VKGj.TTO/39 VIRU KEEMIA GRUPP AS KINNITAN (allkirjastatud digitaalselt) Priit Rohumaa Juhatuse esimees veebruar 2013 (allkirjastatud digitaalselt) Meelis Eldermann Juhatuse liige veebruar 2013 Hot Works

More information

Making sense of risk Risk engineering. Marine hot work Permit to Work (PTW) systems

Making sense of risk Risk engineering. Marine hot work Permit to Work (PTW) systems Marine hot work Permit to Work (PTW) systems Marine hot work Permit to Work (PTW) systems Hot work is any operation involving open flames or producing heat and/or sparks, including but not limited to welding,

More information

Coles Express Work Clearance: Induction for Contractors

Coles Express Work Clearance: Induction for Contractors Coles Express Work Clearance: Induction for Contractors Part of the Coles Online Contractor Induction system, for completion by contractors who will conduct works on Coles Express sites. Prerequisites

More information

HEALTH & SAFETY HOT WORK INSTRUCTIONS

HEALTH & SAFETY HOT WORK INSTRUCTIONS HEALTH & SAFETY HOT WORK INSTRUCTIONS 1. RISK ASSESSMENT 1.1 Requirements The hot work authoring officer (HW authorising officer), in conjunction with the employee/contractor conducting the hot work activity

More information

Hot Work Permit Program

Hot Work Permit Program Hot Work Permit Program 1 2 TABLE OF CONTENTS Section Title Page 1.0 Scope 3 2.0 Standards and Regulations Involved/Target Groups 3 3.0 Responsibilities 4 4.0 Training.. 5 5.0 Recordkeeping. 5 6.0 Permits

More information

PRO Hot Work

PRO Hot Work MS&L Procedure PRO-4.5-0001-1-07 Hot Work Version: 3 Authorised by: Tom Angliss & Owen Quake Authorisation Date: 21/11/2017 This document has been approved for release and changed as per the associated

More information

Permit to Work System Training for Supervisors Managing Hot Works & Other Permits - Presenter s Guide

Permit to Work System Training for Supervisors Managing Hot Works & Other Permits - Presenter s Guide Permit to Work System Training for Supervisors Managing Hot Works & Other Permits - Presenter s Guide TABLE OF CONTENTS 1.0 PURPOSE... 3 2.0 SCOPE... 3 3.0 RELATED DOCUMENTS... 3 4.0 TRAINING DELIVERY...

More information

University of Delaware.

University of Delaware. HOT WORK PERMIT PROGRAM The following information describes the code required Hot Work Permit Program at the University of Delaware. PART 1 GENERAL University Contact: Department of Environmental Health

More information

Fire Safety: Hot Work Risks

Fire Safety: Hot Work Risks Fire Safety: Hot Work Risks FPA Infozone 21 st June 2018 Howard Passey BEng(Hons) MIFireE FIFSM Principal Consultant Hot Works What is it? Any temporary operation or task, that involves open flames or

More information

PRO Hot Work

PRO Hot Work MS&L Procedure PRO-4.5-0001-1-07 Hot Work Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control of Work

More information

KENNECOTT UTAH COPPER

KENNECOTT UTAH COPPER 16.1.1 INTRODUCTION 16.1.1.1 The purpose of this standard is to define the requirement for performing hot work operations on certain components of machinery, equipment and structures and preventing the

More information

PROCEDURES FOR HOT WORK PERMITS, HOT WORK DISPENSATIONS & GAS FREE CERTIFICATES

PROCEDURES FOR HOT WORK PERMITS, HOT WORK DISPENSATIONS & GAS FREE CERTIFICATES PROCEDURES FOR HOT WORK PERMITS, HOT WORK DISPENSATIONS & GAS FREE CERTIFICATES Hot work permits, hot work dispensations and gas free certificates Version 9 - Aug 2015 Page 1 of 13 DOCUMENT CONTROL Document

More information

HSE - Permit to Work Procedure

HSE - Permit to Work Procedure Date Adopted: April 2016 Current Date: August 2016 Due for Review: August 2018 Division: HSE HSE - Permit to Work Procedure 1. SCOPE... 2 2. DEFINITIONS... 3 3. RESPONSIBILITIES... 5 4. PROCEDURE... 6

More information

Hot Work. A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Full Review of Document

Hot Work. A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Full Review of Document A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Title: Number: HOT WORK GM-11-036-06 Version Number: 10.0 Date Revised: 11 June 2015 Owner: Authoriser:

More information

SAFEWORK PRACTICES SAFE WORK PERMITTING CAT A-1 SOP #6

SAFEWORK PRACTICES SAFE WORK PERMITTING CAT A-1 SOP #6 SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE SAFEWORK PRACTICES Lifesaving Rules Supporting Document Work with a valid work permit when required. 1.0 PURPOSE

More information

Apply for Hot Works Permit

Apply for Hot Works Permit Apply for Hot Works Permit Details of revisions Level Details Date Initial 1 Creation of initial document for use 20/08/2016 J.O S 2 Review and Amendment 26/02/2018 MW Title: Apply for Hot Works Permit

More information

Luke Fania, Environment Team Leader David Donehue, Manager/Corporate Environment Megan Calvert, HSE Systems Manager

Luke Fania, Environment Team Leader David Donehue, Manager/Corporate Environment Megan Calvert, HSE Systems Manager Controlled Document Hot Work and Fire Risk Work Summary The purpose of this procedure is to identify and control the risks associated with Hot Work and Fire Risk Work conducted by TransGrid employees and

More information

A LOCAL LAW PROVIDING FOR THE ADMINISTRATION AND ENFORCEMENT OF THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE

A LOCAL LAW PROVIDING FOR THE ADMINISTRATION AND ENFORCEMENT OF THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE A LOCAL LAW PROVIDING FOR THE ADMINISTRATION AND ENFORCEMENT OF THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE Local Law #2 of 2007. Be it enacted by the Town Board of the Town of Oswego,

More information

Permit to Work Systems

Permit to Work Systems Permit to Work Systems Guidance Note 12 Jul 16 1 Permits to work systems Introduction This Guidance Note gives practical information about permit to work systems. A sample template has been included in

More information

CITY OF SNOHOMISH Snohomish, Washington ORDINANCE 1858

CITY OF SNOHOMISH Snohomish, Washington ORDINANCE 1858 CITY OF SNOHOMISH Snohomish, Washington ORDINANCE 1858 AN ORDINANCE OF THE CITY OF SNOHOMISH REPEALING, EXCEPT WHERE VESTED RIGHTS EXIST, TITLE 18 OF THE SNOHOMISH MUNICIPAL CODE, ORDINANCE 1795; REPEALING,

More information

TOWN OF WINDSOR BYLAW # 18 PREVENTION OF FIRE BYLAW

TOWN OF WINDSOR BYLAW # 18 PREVENTION OF FIRE BYLAW TOWN OF WINDSOR BYLAW # 18 PREVENTION OF FIRE BYLAW 18.01 No person being in any building or structure on which or in which notices have been posted by order of a fire marshal to forbid smoking therein

More information

Classification: Public Rev. 00 June 2018 Page 1 of 25

Classification: Public Rev. 00 June 2018 Page 1 of 25 Classification: Public Rev. 00 June 2018 Page 1 of 25 Rev. 00 June 2018 Page 2 of 25 Rev. 00 June 2018 Page 3 of 25 Rev. 00 June 2018 Page 4 of 25 Rev. 00 June 2018 Page 5 of 25 Rev. 00 June 2018 Page

More information

LAWS OF SOLOMON ISLANDS CHAPTER 74 SAFETY AT WORK ARRANGEMENT OF SECTIONS PART I INTRODUCTORY PART II GENERAL DUTIES

LAWS OF SOLOMON ISLANDS CHAPTER 74 SAFETY AT WORK ARRANGEMENT OF SECTIONS PART I INTRODUCTORY PART II GENERAL DUTIES 1996 Edition] LAWS OF SOLOMON ISLANDS CHAPTER 74 SAFETY AT WORK ARRANGEMENT OF SECTIONS PART I INTRODUCTORY SECTION 1. SHORT TITLE 2. MEANING OF "EMPLOYER" AND "EMPLOYEE" 3. MEANING OF "WORKPLACE" PART

More information

PRC-SAF-22. Zachary Site. SAFETY POLICIES and PROCEDURES. Hot Work Permit. Revision #3-06/03/2011. Date Reason For Change Changed/Reviewed By

PRC-SAF-22. Zachary Site. SAFETY POLICIES and PROCEDURES. Hot Work Permit. Revision #3-06/03/2011. Date Reason For Change Changed/Reviewed By ZACHARY SITE PROCEDURE NUMBER TITLE: PRC-SAF-22 (Hot Work Permit) Page 1 of 20 Rev. 1.7 Date: 06/01/15 PRC-SAF-22 Zachary Site SAFETY POLICIES and PROCEDURES Revision #3-06/03/2011 Hot Work Permit Date

More information

Municipal Ticket Information Utilization Bylaw No. 1598, 2012 adopted May 28, 2012

Municipal Ticket Information Utilization Bylaw No. 1598, 2012 adopted May 28, 2012 Municipal Ticket Information Utilization Bylaw No. 1598, 2012 adopted May 28, 2012 CONSOLIDATED FOR CONVENIENCE ONLY Includes amendments adopted up to October 9, 2018 Bylaw No. 1598, 2012 (CONSOLIDATION)

More information

Supersedes: 2/16 (Rev.10) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Supersedes: 2/16 (Rev.10) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Procedure No.: PA-020-0002 Page: 1 of 29 Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Document Revision Change Table Revision Number Revision Description Revised By Revision Date

More information

THE OCCUPATIONAL SAFETY AND HEALTH ACT. Regulations made by the Minister under section 100(5) of the Occupational Safety and Health Act

THE OCCUPATIONAL SAFETY AND HEALTH ACT. Regulations made by the Minister under section 100(5) of the Occupational Safety and Health Act Government Notice No. 27 of 2011 THE OCCUPATIONAL SAFETY AND HEALTH ACT Regulations made by the Minister under section 100(5) of the Occupational Safety and Health Act 1. These regulations may be cited

More information

A BYLAW RESPECTING OPEN FIRES AND FIREWORKS

A BYLAW RESPECTING OPEN FIRES AND FIREWORKS THE LAST MOUNTAIN REGIONAL PARK AUTHORITY, IN THE PROVINCE OF SASKATCHEWAN ENACTS AS FOLLOWS: Short Title This bylaw shall be cited as the Open Fire and Fireworks Bylaw. Purpose The purpose of this Bylaw

More information

CHAPTER 1 GENERAL. 1

CHAPTER 1 GENERAL.  1 MINISTERIAL REGULATION ON THE PRESCRIBING OF STANDARD FOR ADMINISTRATION AND MANAGEMENT OF OCCUPATIONAL SAFETY, HEALTH AND WORK ENVIRONMENT IN CONFINED SPACE B.E. 2547 -------------------------------------

More information

. A. report to the security guard B. inform the foreman C. drink more water D. apply for a Permit-to-work.

. A. report to the security guard B. inform the foreman C. drink more water D. apply for a Permit-to-work. 01 In a shipyard, before you are allowed to carry out any hot work, you must. A. report to the security guard B. inform the foreman C. drink more water D. apply for a Permit-to-work. 02 Which is a good

More information

Using the WPTW System: Frequently Asked Questions

Using the WPTW System: Frequently Asked Questions Using the WPTW System: Frequently Asked Questions The Wellsite Permit to Work (WPTW) System is a robust and comprehensive approach to the planning and authorisation of work activities on onshore wellsites.

More information