Hot Work Program June 2017

Similar documents
Hot Work Program. Purpose of Procedure:

MCW s Hot Work Permit Program

(WELDING, CUTTING, AND OPEN FLAME WORK)

Hot Work Policy & Procedure

Desert Research Institute Hot Work Permit Program

Areas that have been designed and constructed for performing open-flame or spark-producing work.

SUNY Geneseo ENVIRONMENTAL HEALTH & SAFETY

Hot Work Program. Program Origination: October, 2017

IWU PHYSICAL PLANT SAFETY PROGRAM

HOT WORK SAFETY GUIDE. Specific responsibilities relating to hot work operations are outlined below.

HOT WORK PROGRAM OSHA

Hot Work Permit Program

Non Electrical Hot Work Program

Public Input No. 17-NFPA 51B-2015 [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Hot Work Procedures. Competent means possessing knowledge, experience and training to perform a specific duty.

Hot Work Permitting Procedure

DUQUESNE UNIVERSITY HOT WORK PROGRAM

University of Nevada, Reno

Hot Work Program. Roles and Responsibilities. Management. PAI Responsibilities

Guide to Hot Work NFPA 51B Understanding the new requirements after July 1, 2018

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY SAFETY AND HEALTH RISK MANAGEMENT AND SAFETY

Roger Williams University Hot Work Plan

The Ohio State University. Hot Work Permit Program (Welding, Cutting and Brazing)

Hot Work and Welding Management Procedures Attached to FIN-INS Introduction. 1.1 Purpose

HOT WORK PROGRAM October 2016

HOT WORK PERMIT PROGRAM REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING & COMPLIANCE OFFICE

Hot Work Permit Guidelines

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HOT WORK PERMITTING PROGRAM

General Hot Work Program Guidelines. Lyndsey Beaudin

Environmental, Health and Safety. UNC Charlotte Hot Work Program (Welding, Cutting, and Brazing)

Hot Work Safety Program

Prevention of Hot Work Fires in Healthcare Facilities. Sherie Van Slyke Engineering Specialist

University of Central Missouri Hot Work Permit Program

Hot Work Permit Program

HOT WORK MANAGEMENT PROGRAM

PURPOSE:... 3 EMPLOYEE CLASSIFICATIONS:... 3 OUTSIDE PERSONNEL (I.E., CONTRACTORS):... 4 HOT WORK REQUIREMENTS:... 4 EMPLOYEE TRAINING:...

Fire Safety & Hot Work Permits. Oakland University Office of EH&S

Hot Work Permitting Program

SAFETY AND HEALTH STANDARD HOT WORK PERMIT Effective Date: 06/10/10 Standard: 16.1 Document Number: KUCSH0040 Rev: 04

Hot Work Program. SUNY Canton. Purpose

Hot Work Safety and the Permitting Process. Leaders Guide and Quiz

University Environmental Health and Safety. Hot Work Permit Program

Villanova University Department of Environmental Health and Safety Policy and Procedure Manual

"HOT WORK SAFETY AND THE PERMITTING PROCESS"

STANDARD PROCEDURE INSTRUCTION

DRAFT Hot Work Procedure South Shore Regional School Board

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

RISKTOPICS. DISCUSSION For the purposes of this document, hot work: Management practices: Hot work Property and Business Interruption January 2013

KENNECOTT UTAH COPPER

HOT WORK GUIDELINES 3. MANDATORY AREAS REQUIRING HOT WORK PERMITS Within the Service Station Site

OFFICE OF STATE HUMAN RESOURCES

Program Title Hot Work Program. Classification Fire Safety and Emergency Response. Program No INTRODUCTION

Fire caused by Hot Works. A guide to loss prevention

Hot Work Permit Program

Loss Prevention Standards

Risk Control Guide HOT WORK

Fire safety basics for hot work operatives. CFPA-E Guideline No 12:2012 F

KENNECOTT UTAH COPPER

M E M O R A N D U M. NFPA 51B First Draft Technical Committee FINAL Ballot Results (A2018)

Safe Code of Practice. No.05 Hot Works Procedure

HOT WORK SAFETY GUIDELINE

This program applies to University faculty, staff, students, vendors, or contractors performing Hot Work on behalf of the University of Iowa.

Pocket Guide to Hot Work Loss Prevention. Sixth Edition

University of Delaware.

HOT WORK PROCEDURE. A Page 1 of 20

RC 7 V2 3/12/07 3:41 am Page 1 RC7 for hot work

Hot Work. Approved by: Ruth Hampton Review Date: 6 th December 2015

Hot Work Procedure. Work Health and Safety Policy Responsible Officer. Executive Director, Infrastructure Services and Development Approved by

Supersedes: 2/16 (Rev.10) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

PRC-SAF-22. Zachary Site. SAFETY POLICIES and PROCEDURES. Hot Work Permit. Revision #3-06/03/2011. Date Reason For Change Changed/Reviewed By

Permit to Work Procedure

HOT WORK 1. PURPOSE 2. SCOPE 3. KEY TERMS

Permit to Work System Training for Supervisors Managing Hot Works & Other Permits - Presenter s Guide

VIRU KEEMIA GRUPP AS. Hot Works Safety Management Instruction No. 136

PURPOSE To specify the minimum requirements for controlling risks associated with Hot Work activities.

Making sense of risk Risk engineering. Marine hot work Permit to Work (PTW) systems

Dangers of Hot Work: Key Lessons from CSB Investigations

Record of Revisions. SVP & General Manager, Freeport. Date Revision No. Details of Change

Luke Fania, Environment Team Leader David Donehue, Manager/Corporate Environment Megan Calvert, HSE Systems Manager

Hot Work. A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Full Review of Document

CHAPTER 1 GENERAL. 1

PRO Hot Work

Coles Express Work Clearance: Induction for Contractors

PRO Hot Work

Classification: Public Rev. 00 June 2018 Page 1 of 25

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY. To provide instruction for the issue and control of permits authorizing Hot Work operations.

GARFIELD COUNTY ORDINANCE NO.

HSE - Permit to Work Procedure

Permit to Work Systems

SAFEWORK PRACTICES SAFE WORK PERMITTING CAT A-1 SOP #6

A LOCAL LAW PROVIDING FOR THE ADMINISTRATION AND ENFORCEMENT OF THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE

. A. report to the security guard B. inform the foreman C. drink more water D. apply for a Permit-to-work.

PROCEDURES FOR HOT WORK PERMITS, HOT WORK DISPENSATIONS & GAS FREE CERTIFICATES

University of Arizona AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2012 EDITION

53 NYS UNIFORM FIRE PREVENTION & BUILDING CODES 53. Chapter 53

TOWN OF WINDSOR BYLAW # 18 PREVENTION OF FIRE BYLAW

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

NC General Statutes - Chapter 95 Article 7A 1

Transcription:

Hot Work Program June 2017

Hot Work Program TABLE of CONTENTS I. General Information II. Definitions III. Roles and Responsibilities IV. Hot Work Areas V. Hot Work Permit VI. Hot Work Permit-Not Required VII. Training and Recordkeeping Appendix A. Hot Work Permit Form

Hot Work Program I. General This standard shall provide guidance for persons, including outside contractors and project managers, who manage, supervise, and perform hot work. This standard shall cover the following hot work processes: A. Welding/Soldering B. Grinding C. Thawing pipe D. Similar applications producing a spark, flame, or heat II. Definitions Designated Area: Permanent location designed or approved for hot work operations to be performed regularly. Hot Work: Any work involving burning, welding, or similar operations that is capable of initiating fires or explosions. Management: All persons, including owners, contractors, and so on, who are responsible for hot work operations. Permit: A document issued by the permit authorizing individual for the purpose of authorizing performance of a specified activity. Permit Authorizing Individual (PAI): The individual designated by management to authorize hot work. The PAI cannot be the hot work operator. Welding/Soldering: Includes processes such as are welding, oxy-fuel gas welding, open-flame soldering, brazing, thermal spraying, oxygen cutting, and arc cutting.

III. Roles and Responsibilities A. Management Management shall be responsible for the safe operations of hot work activity and shall establish permissible areas for hot work. Management shall ensure that only approved apparatus, such as torches, manifolds, regulators or pressure reducing valves, and acetylene generators, be used. These individuals shall be trained in the safe operation of their equipment and the safe use of the process. These individuals shall have an awareness of the inherent risks involved and understand the emergency procedures in the event of a fire. Management shall advise all contractors about site-specific flammable materials, hazardous processes and conditions, or other potential fire hazards. Contractors or sub-contractors performing hot work are responsible for their own hot work program. They are responsible for conducting their hot work activities in a sound, fire-safe manner that either meets or exceeds the precautions outlined in this hot work program. B. Permit Authorizing Individual (PAI) In conjunction with the management, the PAI shall be responsible for the safe operation of hot work activities. The PAI shall determine site-specific flammable materials, hazardous processes, or other potential fire hazards present or likely to be present in the work location. The PAI shall ensure the protection of combustibles from ignition by the following means: 1. Ensure the work is moved to a location free from combustibles. 2. If the work cannot be moved, ensure the combustibles are moved to a safe distance or have the combustibles properly shielded against ignition. 3. Ensure hot work is scheduled such that operations that could expose combustibles to ignition are not started during hot work operations. The PAI shall determine that fire protection and extinguishing equipment are properly located at the site. Where a fire watch is required, the PAI shall perform the fire watch at the site. Where a fire watch is not required, the PAI shall make a final checkup ½ hour after the completion of hot work operations to detect and extinguish possible smoldering fires. The PAI shall be familiar with the facilities and procedures for sounding an alarm in the event of a fire. They shall be aware of the inherent hazards of the work site and of the hot work and ensure that safe conditions are maintained during hot work operations. The PAI shall have the authority to stop the hot work operations if unsafe conditions develop.

The PAI shall have fire extinguishing equipment readily available and be trained in its use. Watch for fires in all exposed areas and try to extinguish them only when the fires are obviously within the capacity of the equipment available. If the fire is not within the capacity of the equipment, sound the alarm immediately. C. Hot Work Operator The hot work operator shall handle the equipment safely and use it as follows so as not to endanger lives and property. 1. The operator shall have the PAI s approval before starting hot work operations. 2. The operator shall cease hot work operations if unsafe conditions develop and shall notify management, or the PAI for reassessment of the situation. D. Fire Watch A fire watch shall be required when hot work is performed in a location where other than a minor fire might develop, or where the following conditions exist: 1. Combustible materials in building construction or contents are closer than 35 ft (11 m) to the point of operation. 2. Combustible materials are more than 35 ft (11m) away but are easily ignited by sparks. 3. Wall or floor openings within a 35 ft (11m) radius expose combustible materials in adjacent areas, including concealed spaces in walls or floors. 4. Combustible materials are adjacent to the opposite side of partitions, walls, ceilings, or roofs and are likely to be ignited. A fire watch shall be maintained for at least ½ hour after completion of hot work operations in order to detect and extinguish smoldering fires. More than one fire watch shall be required if combustible materials that could be ignited by the hot work operation cannot be directly observed by the initial fire watch. IV. Hot Work Areas A. Permissible Areas Hot work shall be allowed only in areas that are or have been made fire safe. Hot work shall be performed in either designated areas or permit-required areas. A designated area shall be a specific area designed or approved for such work, such as a maintenance shop or a detached outside location that is of noncombustible or fire-resistive construction, essentially free of combustible and flammable contents, and suitably segregated from adjacent areas. A permit-required area shall be an area that is made fire safe by removing or protecting combustibles from ignition sources.

B. Non-permissible Areas Hot work shall not be allowed in the following areas: V. Hot Work Permit a. In areas not authorized by management. b. In sprinkled buildings while such protection is impaired. c. In the presence of explosive atmospheres (that is, where mixtures of flammable gases, vapors, liquids, or dusts with air exist). d. In explosive atmospheres that can develop inside unclean or improperly prepared drums, tanks, or other containers and equipment that have previously contained such materials. e. In explosive atmospheres that can develop in areas with an accumulation of combustible dusts. Before hot work operations begin in a permit required location, a written hot work permit by the permit authorizing individual (PAI) shall be required. Before a hot work permit is issued, the following conditions shall be verified by the PAI: 1. Hot work equipment to be used shall be in satisfactory operating condition. 2. Where combustible materials are on the floor, the floor shall be swept clean for a radius of 35 ft. (11m). Combustible floors shall be protected by noncombustible or fire-retardant shields. 3. All combustibles shall be relocated at least 35ft (11m) horizontally from the work site. If relocation is impractical, combustibles shall be protected with fire-retardant covers or otherwise shielded with metal or fire-retardant guards or curtains. Edges of covers at the floor shall be tight to prevent sparks from going under them, including where several covers overlap when protecting a large pile. 4. Openings or cracks in walls, floors, or ducts within 35 ft (11m) of the site shall be tightly covered with fire-retardant or non combustible material to prevent the passage of sparks to adjacent areas. 5. If hot work is done near wall, partitions, ceilings, or roofs of combustible construction, fire-retardant shields or guards shall be provided to prevent ignition. 6. If hot work is to be done on a wall, partition, ceiling, or roof, precautions shall be taken to prevent ignition of combustibles on the other side by relocating combustibles. If it is impractical to relocate combustibles, a fire watch on the opposite side from the work shall be provided. 7. Hot work shall not be attempted on a partition, wall, ceiling, or roof that has a combustible covering or insulation, or on walls or partitions of combustible sandwich-type panel construction.

8. Hot work that is performed on pipes or other metal that is in contact with combustible walls, partitions, ceilings, roofs, or other combustibles shall not be undertaken if the work is close enough to cause ignition by conduction. 9. Fully charge and operable fire extinguishers that are appropriate for the type of possible fire shall be available immediately at the work area. If existing hose lines are located within the hot work area defined by the permit, they shall be connected and ready for service, but shall not be required to be unrolled or charged. 10. If hot work is done in close proximity to a sprinkler head, a wet rag shall be laid over the head and then removed at the conclusion of the welding or cutting operation. 11. Special precautions shall be taken to avoid accidental activation of automatic fire detection or suppression systems (for example smoke detection, special extinguishing systems or sprinklers). 12. Nearby personnel shall be suitably protected against heat, sparks, slag, and so on. VI. Hot Work Permit-Not Required 1. Floor Tiles When repairing floor tiles by heating the tile with a hand-held heating torch, a hot work permit and fire watch is not required if the following conditions are verified: a. Ensure combustible materials are moved away from the heat source. b. Ensure Section 3.3 a, 9, 10, 11 and 12 of this program are completed. 2. Parsons Hall Grounds Shop (Designated Area) Inside welding shields. When area remains free of storage and remains in an acceptable condition. 3. Frasier Hall Room 0171 (Designated Area) Inside welding shields. When area remains free of storage and remains in an acceptable condition. 4. Heating Plant 1 st Floor (Designated Area) Allowed inside the welding shields (between Boiler 2 & 3). Blankets must be protecting the boilers and natural gas lines at all times and wood is not allowed in the area. VII. Training and Recordkeeping It is the responsibility of each department to ensure that their employees receive the required training. Training can be provided by the Environmental Health and Safety department. Training records will be retained by the Environmental Health and Safety office.

HOT WORK PERMIT BEFORE INITIATING HOT WORK, ENSURE PRECAUTIONS ARE IN PLACE! MAKE SURE AN APPROPRIATE FIRE EXTINGUISHER IS READILY AVAILABLE! This Hot Work Permit is required for any operation involving open flames or producing heat and /or sparks. This includes, but is not limited to: Brazing, Cutting, Grinding, Soldering, Thawing Pipe, Torch-Applied Roofing, and Cad welding. INSTRUCTIONS A. Verify precautions listed at right (or do not proceed with the work). B. Complete and retain this permit. HOT WORK BEING DONE BY: EMPLOYEE CONTRACTOR DATE JOB NO LOCATION/BUILDING & FLOOR REQUIRED PRECAUTIONS CHECKLIST Available sprinklers, hose streams, and extinguishers are in service/operable. Hot work equipment in good repair. Requirements within 35 ft. (10m) of work Flammable liquids, dust, lint, and oil deposits removed. Explosive atmosphere in area eliminated. Floors swept clean. Combustible floors wet down, covered with damp sand or fire-resistant sheets. Remove other combustibles where possible. Otherwise protect with fire-resistant tarpaulins or metal shields. All wall and floor openings covered. Fire-resistant tarpaulins suspended beneath work. Work on walls or ceiling/enclosed equipment NATURE OF JOB/OBJECT NAME OF PERSON DOING HOT WORK I verify the above location has been examined, the precautions checked on the Required Precautions Checklist have been taken to prevent fire, and permission is authorized for work. PAI SIGNATURE: Construction is noncombustible and without combustible covering or insulation. Combustibles on other side of walls moved away. Danger exists by conduction of heat into another area. Enclosed equipment cleaned of all combustibles. Containers purged of flammable liquids/vapors. Fire watch/hot work area monitoring Fire watch will be provided during and for 30 minutes after work, including any coffee or lunch breaks. Fire watch is supplied with suitable extinguishers. Fire watch is trained in use of this equipment and in sounding the alarm. Fire watch may be required for adjoining areas, above, and below. Monitor hot work area for 30 minutes after job is completed. PERMIT DATE TIME EXPIRES THIS PERMIT IS GOOD FOR ONE SHIFT ONLY! AM/PM Other precautions taken Confined space entry permit required. Fire Protection Impairment Permit Is area protected with smoke or heat detection Ample ventilation to remove smoke/vapor from work area Lockout/tagout required Disable detectors