Safe Work Permits Procedure

Similar documents
Permit to Work Procedure

HSE - Permit to Work Procedure

Hot Work Procedure. Work Health and Safety Policy Responsible Officer. Executive Director, Infrastructure Services and Development Approved by

PRO Hot Work

Permit to Work Major Hazard Standard

Process: Permit to Work PS-OP-RC-2011

PRO Hot Work

STANDARD PROCEDURE INSTRUCTION

Environmental, Health and Safety. UNC Charlotte Hot Work Program (Welding, Cutting, and Brazing)

Permit to Work Systems

HOT WORK 1. PURPOSE 2. SCOPE 3. KEY TERMS

Coles Express Work Clearance: Induction for Contractors

Hot Work Procedures. Competent means possessing knowledge, experience and training to perform a specific duty.

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HOT WORK PERMITTING PROGRAM

Electricity Supply (Safety and Network Management) Regulation 2014

ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD. Copyright 2009 All rights reserved.

Hot Work Program. Purpose of Procedure:

Making sense of risk Risk engineering. Marine hot work Permit to Work (PTW) systems

Hot Work Program. Program Origination: October, 2017

(WELDING, CUTTING, AND OPEN FLAME WORK)

Roger Williams University Hot Work Plan

HOT WORK PERMIT PROGRAM REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING & COMPLIANCE OFFICE

Apply for Hot Works Permit

Electricity Act, 1998 Loi de 1998 sur l électricité

Hot Work Safety Program

KENNECOTT UTAH COPPER

Hot Work Permit Program

Electricity (Consumer Safety) Regulation 2006

HOT WORK MANAGEMENT PROGRAM

University of Central Missouri Hot Work Permit Program

HEALTH & SAFETY HOT WORK INSTRUCTIONS

Hot Work Policy & Procedure

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

Title: Safe Work Procedure. Function: Ecology & Safety No.: CTC-SAF-037 Page: 1 of 6 Reviewed: 3/1/2017 Effective: 4/1/2017 Supersedes: 3/20/16

HOT WORK SAFETY GUIDE. Specific responsibilities relating to hot work operations are outlined below.

Villanova University Department of Environmental Health and Safety Policy and Procedure Manual

OFFICE OF STATE HUMAN RESOURCES

Non Electrical Hot Work Program

HOT WORK GUIDELINES 3. MANDATORY AREAS REQUIRING HOT WORK PERMITS Within the Service Station Site

4.1 PERMIT TO WORK PROCEDURE

Safety & Risk Management

Protection of the Environment Legislation Amendment Act 2014 No 65

RISKTOPICS. DISCUSSION For the purposes of this document, hot work: Management practices: Hot work Property and Business Interruption January 2013

Fire caused by Hot Works. A guide to loss prevention

Annex I To Loughborough University Estates Services Health and Safety Policy

Hot Work Program June 2017

The Ohio State University. Hot Work Permit Program (Welding, Cutting and Brazing)

PRO Permit to Work

Desert Research Institute Hot Work Permit Program

Hot Work Safety and the Permitting Process. Leaders Guide and Quiz

Hot Work Program. Roles and Responsibilities. Management. PAI Responsibilities

Hot Work and Welding Management Procedures Attached to FIN-INS Introduction. 1.1 Purpose

"HOT WORK SAFETY AND THE PERMITTING PROCESS"

HOT WORK PROGRAM OSHA

SUNY Geneseo ENVIRONMENTAL HEALTH & SAFETY

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

WHS-029 Use of Temporary Barrier Tape

Areas that have been designed and constructed for performing open-flame or spark-producing work.

HOT WORK SAFETY GUIDELINE

Fire safety basics for hot work operatives. CFPA-E Guideline No 12:2012 F

TELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE. [Company Name]... [Address]

Hot Work Permit Program

University of Nevada, Reno

Health and Safety Policy

KENNECOTT UTAH COPPER

SAFETY AND HEALTH STANDARD HOT WORK PERMIT Effective Date: 06/10/10 Standard: 16.1 Document Number: KUCSH0040 Rev: 04

Chapter 17 ELECTRICAL CODE

Coal Mining Safety and Health Act 1999

SAFEWORK PRACTICES SAFE WORK PERMITTING CAT A-1 SOP #6

Program Title Hot Work Program. Classification Fire Safety and Emergency Response. Program No INTRODUCTION

Permit to Work System Training for Supervisors Managing Hot Works & Other Permits - Presenter s Guide

Energy Networks Association

Hot Work Program. SUNY Canton. Purpose

Permit to Work East Arm and Fort Hill Wharf

TITLE 12 BUILDING, UTILITY, ETC. CODES CHAPTER 1 BUILDING CODE 1

FRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN

This program applies to University faculty, staff, students, vendors, or contractors performing Hot Work on behalf of the University of Iowa.

Using the WPTW System: Frequently Asked Questions

INTER-DEPARTMENTAL PROCEDURE

Safe Code of Practice. No.05 Hot Works Procedure

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

Hot Work Permit Guidelines

ARLINGTON COUNTY CODE. Chapter 55 UNDERGROUND UTILITY PROTECTION

Fire Safety & Hot Work Permits. Oakland University Office of EH&S

Prevention of Hot Work Fires in Healthcare Facilities. Sherie Van Slyke Engineering Specialist

Loss Prevention Standards

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY SAFETY AND HEALTH RISK MANAGEMENT AND SAFETY

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY. To provide instruction for the issue and control of permits authorizing Hot Work operations.

Hot Work Permitting Program

HOT WORK PROGRAM October 2016

NORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES

MCW s Hot Work Permit Program

Lakeland Regional Sewer District lakelandrsd.com

University Environmental Health and Safety. Hot Work Permit Program

(Space for sketch on back - Submit detailed plan if available)

WAUKESHA COUNTY VILLAGE OF OCONOMOWOC LAKE STATE OF WISCONSIN ORDINANCE NO. 173 (as amended by ordinance 241)

PRO Permit to Work

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLARKSVILLE, TENNESSEE:

Hot Works Permit. 1. General Details* (to be completed by Applicant)

Hot Work Permitting Procedure

Transcription:

Launceston Airport Safe Work Permits Procedure Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 1 of 12

Table of Contents 1. Safe Work Permits... 3 1.1 Special Authorities... 4 1.2 Permit and Authority Numbering... 4 1.3 Work Site Delineation... 4 1.4 Role Definitions... 4 1.5 Permits/Authorities to be available at the Work Site... 5 1.6 Authorised Issuing Officer to retain a copy of the Permit/Authority... 5 1.7 Filing of completed original Permits/Authorities... 5 1.8 Minimum notice... 5 1.9 Authorised Issuing Officers... 6 1.10 Additional PTW Sign on Sheet... 6 1.11 Permit to Work Flowchart... 7 2. Isolation Procedure... 8 2.1 Isolation Equipment... 9 2.2 Isolation Flowchart... 10 3 Concealed Services Authority... 11 4 Confined Space Authority... 11 5 Crane/Boom Authority... 11 6 Hot Work Authority... 11 7 Electrical Works Authority... 12 Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 2 of 12

1. Safe Work Permits The objectives of the safe work permit procedure are to: Ensure the safety of people;; Prevent harm to the environment, equipment or other property;; and Preserve our capability to deliver to our customers. The permit system is applicable to all work being carried out on Launceston Airport owned and/or operated plant and assets. It follows fundamental hazard identification, communication and risk management processes with some check/hold points: At the end of work scope approval. After identifying hazards and determining and agreeing controls. Before the actual start of work. A permit may not be required for routine operational and maintenance activities where: A Standard Operating Procedure ( SOP ) exists which covers the full scope of works;; Following a risk assessment, the controlled risks are assessed as low;; or The intent of safe work permit procedure has been achieved under category B contractor works management systems. (Service provider contractors) There are two types of permit used by Launceston Airport: A Permit to Work ( PTW ) (formally known as a PERCOW ) this permit is the overarching risk management process. Depending upon the scope of work a special authority may also be required. (Appendix A) Special Authority these authorities are applicable to specific risks. Special authorities may be issued without a PTW. Please refer to the following flowchart to determine the need for a PTW. All workers engaged in active work under the scope of the permit shall be signed on to the permit unless alternative control measures have been put in place to ensure all workers understand the conditions of the permit, risks present and mitigating actions to be implemented. If the work you are about to perform is subject to a PTW, only proceed if: All hazards have been identified, risk assessed and controlled effectively. The scope of work and proposed timing for the permit is clearly defined and understood. The permit has been issued by an authorised issuing officer for the site, facility or work. All required and approved supporting documents have been identified and obtained for work. These may include: o o o An isolation procedure to control risk of potentially harmful energy sources. Any special authorities. Any other related documents required such as the working at heights checklist, asbestos checklist, etc. Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 3 of 12

The conditions of the permit have been communicated with everyone involved in or affected by the work. When circumstances on the job change, work shall be stopped and the area made safe. Risks shall be re- assessed and approved by an authorised issuing officer for that area/location before recommencing work. 1.1 Special Authorities Special authorities shall be used for specific hazardous activities and include the following: Concealed Services Authority This authority shall be used for any work that requires excavation or penetration. Confined Space Authority This authority shall be used for all work involving a confined space. Crane/Boom Authority This authority shall be used for all work involving a crane or boom type equipment (concrete pump, elevated work platform, etc) Hot Work Authority This authority shall be used for any work that is likely to produce flame, heat or sparks. Electrical Works Authority This authority shall be used for all electrical work as an attachment to the Permit to Work. 1.2 Permit and Authority Numbering All permits and authorities shall be uniquely numbered based on the date and time of issue. It has been considered unlikely that two permits/authorities of the same type could be issued at the same time at Launceston Airport. DD/MM/YY HHMM For example: A Permit to Work issued 30 th May 2014 at 1015 would be numbered: PTW/300514 1015 A Confined Space Authority issued 5 th June 2014 at 1430 would be numbered: CSA/050614 1430 1.3 Work Site Delineation It will be the responsibility of the AIO to ensure that the work site covered by any permit is clearly identified with the PIC and where required documented to remove any doubt as to the extent of works covered by the permit. 1.4 Role Definitions The safe work permits used by Launceston Airport refer to specific roles which have certain responsibilities under the permit. Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 4 of 12

Authorised Issuing Officer ( AIO ) Is a person employed by Launceston Airport who is competent in the safe work permit process and understands the control measures that are required for a permit to be issued. The AIO is responsible to ensure that the PIC understands the conditions imposed by the permit. Where APAL isolation is identified as risk mitigation, the AIO shall perform the isolations as per the requirements under section 2 of this procedure. Manager Operations & Compliance ( MOC ) Is the person ultimately responsible for the safety of the Launceston Airport from an operational perspective. Person in Charge ( PIC ) of Works Is any person to whom a permit is issued who is deemed competent and capable to perform the work and ensure that the work complies with any conditions imposed under the permit. Safety Observer ( SO ) Is a person appointed who is competent and capable of performing the role of SO for the works where the requirement has been identified during the risk assessment. The SO s prime role is to ensure that all risk control measures identified under the risk assessment are implemented. Where an SO is appointed, their role is exclusive and they must not engage in any other task. For certain Airside works, the SO may perform the role of the Work Safety Officer ( WSO ) as defined under section 10 of the Manual of Standards Part 139 Aerodromes, provided the role of WSO does not detract from their role as SO or vice versa. 1.5 Permits/Authorities to be available at the Work Site The original of all issued permits/authorities and supporting documentation must be retained at the work site by the PIC for the duration of the work and be available to all persons who sign on to it. 1.6 Authorised Issuing Officer to retain a copy of the Permit/Authority The AIO shall retain a copy of all issued permits/authorities and supporting documentation for the duration of the works. 1.7 Filing of completed original Permits/Authorities Upon completion of the works, all completed original permits/authorities and supporting documentation shall be emailed by the AIO to permits@lst.com.au for archiving and auditing. Hard copies of completed permits/authorities shall be retained by the AIO for future reference. 1.8 Minimum notice A minimum of 48 hours notice is required for any permit/authority to be issued. Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 5 of 12

1.9 Authorised Issuing Officers The following people have been approved by Launceston Airport to carry out the role of AIO for the issue of permits and authorities in their respective areas of expertise. It is important to ensure that the AIO who issues the permit or authority fully understands the scope of work, the risks involved and the type of services that may be impacted upon. Permit/Authority Type Permit to Work Concealed Services Confined Space Crane/Boom Hot Work Electrical Work Authorised Issuing Officer Building & Grounds Manager Greg Higgins Building & Grounds Team Leader Bill Greensmith Engineering Manager Peter Bartle Electrical Team Leader Geoff Stevenson Building & Grounds Manager Greg Higgins Building & Grounds Team Leader Bill Greensmith Engineering Manager Peter Bartle Electrical Team Leader Geoff Stevenson Building & Grounds Manager Greg Higgins Engineering Manager Peter Bartle Manager Operations and Compliance Peter Holmes (or delegate) Building & Grounds Manager Greg Higgins Building & Grounds Team Leader Bill Greensmith Engineering Manager Peter Bartle Electrical Team Leader Geoff Stevenson Engineering Manager Peter Bartle Electrical Team Leader Geoff Stevenson 1.10 Additional PTW Sign on Sheet Where there are more members of the work party to sign on to the permit to work than spaces available, APAL-SWP-008 Additional PTW Sign on Sheet shall be used and attached to the permit to work. Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 6 of 12

1.11 Permit to Work Flowchart This flowchart is to be used to determine when a permit to work is required. Is a Permit to Work Required? (1) Is there an SOP that covers the full scope of work? SOP covering 100% scope? (2) Complete a risk assessment. Are all the controlled risks scored as Low? Risk Assessment controls score LOW risk? (>LOW) (ALL LOW) (3) Is more than one special authority required? ie Hot Work, Confined Space, Concealed Services, etc >1 special authority required? (4) Will the work stop operation of the car parks, terminal, aprons, taxiways or runways? Can work stop certain operations? (5) Does APAL need to isolate plant or equipment to enable the work to be performed safely? Power, water, sewer, etc APAL isolation required? (6) If the work is not being performed by a contractor a Permit to Work will not be required Work being done by contractor? (7) Category A and B Contractors are required to work under their own Safety Management System and manage risks accordingly Contractor working under own SMS? (8) Where the Contractor can be supervised directly by APAL, a Permit to Work will not be required. Contractor supervised by APAL? No Permit to Work Required Permit to Work Required Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 7 of 12

2. Isolation Procedure The isolation procedure is designed to protect people from unexpected energisation, start- up or release of energy while they are working on plant or equipment. The isolation procedure covers three categories of isolation. The flowchart in section 2.1 outlines the type of isolation required based on risk. Directly controlled isolations - where locking and tagging is not necessary. Where isolation, dissipation or restraint of energy sources is carried out by physical removal or separation of plant components and each worker can keep the means of isolation, dissipation and restraint under continuous observation and control. Personal isolations - where it is practicable for the person or persons performing the work to personally isolate and tag out the plant or equipment and the person is competent and authorised to do so. The individual shall apply a hasp and lock (where applicable) and attach a danger tag every device or other means used for isolating, dissipating or restraining energy on the plant with a personal danger tag. The person or persons shall write on the danger tag in the spaces provided: reason for isolation/tagging their name (printed) their signature date of tagging. Each person shall then verify that each isolation is effective before commencing work on the plant. Upon completion of work, each person shall remove their isolation lock(s) and tag(s) and restore the isolation. APAL isolations - where directly controlled or personal isolations cannot be performed or will not mitigate the risk, it will be necessary for the AIO to perform the required isolations. The AIO shall identify all required isolation points to make the work site safe and once operated, apply a hasp and lock (where applicable) and attach a danger tag to every device used for isolating, dissipating or restraining energy on the plant or equipment. The AIO shall write on the danger tag in the spaces provided: reason for isolation/tagging their name (printed) their signature date of tagging. The AIO shall then verify that each isolation is effective before handing the permit over to the PIC. The PIC shall then apply their own individual isolation lock to the hasp (where fitted) or place their own personal danger tag on each isolation point. Each person who signs onto the permit to work shall then apply their own individual isolation lock to the hasp (where fitted) or place their own personal danger tag on each isolation point. Upon completion of work, each person shall remove their isolation lock(s) and tag(s) from each isolation point. The AIO shall then remove their isolation lock(s) and tag(s) from each isolation point and restore the isolation. Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 8 of 12

Examples of plant or equipment that may require isolation include, but not limited to: Electrical circuits Stormwater lines Conveyor systems Water lines Rotating machinery Pressurised air Sewer lines Pressure gas lines 2.1 Isolation Equipment Danger Do Not Operate Tags Any form of Danger Do Not Operate tag is acceptable for use provided there is room to clearly write the following information: reason for isolation/tagging their name (printed) their signature date of tagging. Isolation Lock Isolation locks must be uniquely keyed and have a metal shackle. Preference should be given for using red-coloured locks. Hasp Metal hasps shall only be used. Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 9 of 12

2.2 Isolation Flowchart Selecting isolation type (1) If the work requires isolation of any high pressure lines or high voltage, APAL must perform the isolation. High Pressure or voltage? (>415V) (3) If the Person or Persons performing the work are not competent or authorised to perform the isolation, APAL must perform the isolation. Is the Person competent & authorised to isolate? (5) If the work will have an adverse impact on airport operations, APAL must perform the isolation. Can the isolation adversely impact operations? (4) Can the isolation be performed by physical disconnection (unplug or other simple disconnection) or a barrier? Isolation by physical removal or barrier? (2) Can the means of isolation be kept under direct control and observation by the person(s) performing the work? (ie it cannot be inadvertently operated without the knowledge of the person(s)) Means of isolation under direct observation & control? Personal isolation Directly controlled isolation APAL isolation Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 10 of 12

3 Concealed Services Authority As far as is reasonably practicable, before starting any excavation or penetration, the precise location of all concealed services, buried pipe work, structures, foundations, electrical equipment, cabling, or hazardous materials, shall be identified and clearly marked to prevent damage during the work. Before beginning work the following shall be completed: the site will be inspected by a competent person checking for locations of possible concealed services. The person should utilise drawings where available and update the drawings where any differences are found. Conduct a survey of the proposed excavation/penetration area using electronic locating devices except in situations where this will not improve the safety of the work. Where possible all underground assets shall be isolated during ground breaking works. 4 Confined Space Authority A confined space register is maintained for any facility which has confined spaces that employees or contractors may enter for any reason or duration. Confined spaces may require different levels of permitting depending on the hazards associated with the work to be performed in the confined space. 5 Crane/Boom Authority A Crane/Boom authority is required to operate cranes or other boom type equipment used on the airport. An Authority ensures infringement of the prescribed airspace above the airport will be identified prior to any work commencing and where necessary risk managed. Crane/Boom Authorities must be reviewed by the Manager Operations and Compliance (MOC). Where there is no risk of the OLS being breached, the MOC may authorise the issue of the permit immediately. Where crane operation will breach the Obstacle Limitation Surface (OLS) the MOC is required to notify CASA and AirServices requesting comment prior to approval. The time for a response will be dependent upon the extent and duration of any OLS infringement. Crane/Boom Authorities shall be issued for a particular task or group of tasks to be performed and will specify the maximum boom height allowed. Where work scope or conditions change, the requirement for a new permit will be assessed by MOC to ensure the integrity of the prescribed airspace above the airport. 6 Hot Work Authority Any work involving flames, or producing heat and/or sparks is classified as hot work. If possible, move the work to a designated hot work area such as a welding bay. When this cannot be done, a hot work authority shall be issued. The hot work authority, including the control measures, should be completed by the PIC and issued by an AIO. Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 11 of 12

Hot work examples include but are not limited to the following: oxy acetylene cutting, brazing, arc welding, grinding, grit blasting. At times of high fire danger consideration shall to be given to operating chainsaws, brush cutters and steel track machines. If there is any doubt as to whether the area is a designated hot work area, the hot work procedure shall be used. 7 Electrical Works Authority In addition to a permit to work, an Electrical Works Authority must be issued for all electrical or cabling work carried out at Launceston Airport. The authority is required for: Any new electrical installation Any modification or extension of an existing installation Removal of equipment All electrical work must be performed by a licenced Electrical Contractor and conform to relevant standards and legislation. For the authority to be issued, the Electrical Contractor and their Technician must provide the following: Licence number Insurance details A risk assessment All final sub-circuits must be fitted with RCD protection. Outlets and protection devices are to be clearly labelled. The work shall comply with all current rules and regulations. All redundant cabling must be removed back to its source. Two sets of drawings must be submitted to APAL before permit can be issued. One set of drawings approved by APAL will accompany the permit. The approved set of drawings and permit must be retained at the work site for the duration of the works. A minimum of 48 hours notice must be provided and approval obtained in writing from APAL before any disconnection of supply will be made. Final connections made to APAL switchboards or circuits must be carried out in the presence of an APAL technician. Variations from the conditions of the authority or approved design are prohibited unless prior written approval is obtained from APAL. Any fixing to the floor of the terminal will require a cable location process to be conducted by APAL at the Contractors expense. Any work involving the Fire or EWIS systems will require a separate authority. A permit is not required for plug-in type electrical equipment or replacement of like for like assets such as light globes, GPOs, switches etc. however APAL should be notified. Revision: 2 March 2015 APAL-SWP-001 Safe Work Permits Procedure Page 12 of 12