Permit to Work Procedure

Similar documents
Hot Work Procedures. Competent means possessing knowledge, experience and training to perform a specific duty.

PRO Hot Work

HOT WORK PROGRAM OSHA

PRO Hot Work

HOT WORK 1. PURPOSE 2. SCOPE 3. KEY TERMS

Safe Work Permits Procedure

HOT WORK GUIDELINES 3. MANDATORY AREAS REQUIRING HOT WORK PERMITS Within the Service Station Site

Hot Work Program. Program Origination: October, 2017

HSE - Permit to Work Procedure

Making sense of risk Risk engineering. Marine hot work Permit to Work (PTW) systems

Hot Work Procedure. Work Health and Safety Policy Responsible Officer. Executive Director, Infrastructure Services and Development Approved by

Desert Research Institute Hot Work Permit Program

Hot Work Program June 2017

Environmental, Health and Safety. UNC Charlotte Hot Work Program (Welding, Cutting, and Brazing)

Apply for Hot Works Permit

"HOT WORK SAFETY AND THE PERMITTING PROCESS"

Hot Work and Welding Management Procedures Attached to FIN-INS Introduction. 1.1 Purpose

4.1 PERMIT TO WORK PROCEDURE

Areas that have been designed and constructed for performing open-flame or spark-producing work.

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

HOT WORK PERMIT PROGRAM REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING & COMPLIANCE OFFICE

Fire caused by Hot Works. A guide to loss prevention

Hot Work Safety and the Permitting Process. Leaders Guide and Quiz

PRO Permit to Work

Risk Control Guide HOT WORK

Permit to Work Major Hazard Standard

Hot Work Permit Program

Hot Work. Approved by: Ruth Hampton Review Date: 6 th December 2015

PRO Permit to Work

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HOT WORK PERMITTING PROGRAM

MCW s Hot Work Permit Program

The Ohio State University. Hot Work Permit Program (Welding, Cutting and Brazing)

(WELDING, CUTTING, AND OPEN FLAME WORK)

Process: Permit to Work PS-OP-RC-2011

Using the WPTW System: Frequently Asked Questions

SUNY Geneseo ENVIRONMENTAL HEALTH & SAFETY

Permit to Work Systems

Permit to Work System Training for Supervisors Managing Hot Works & Other Permits - Presenter s Guide

SAFETY AND HEALTH STANDARD HOT WORK PERMIT Effective Date: 06/10/10 Standard: 16.1 Document Number: KUCSH0040 Rev: 04

KENNECOTT UTAH COPPER

Coles Express Work Clearance: Induction for Contractors

HOT WORK SAFETY GUIDE. Specific responsibilities relating to hot work operations are outlined below.

PURPOSE:... 3 EMPLOYEE CLASSIFICATIONS:... 3 OUTSIDE PERSONNEL (I.E., CONTRACTORS):... 4 HOT WORK REQUIREMENTS:... 4 EMPLOYEE TRAINING:...

HOT WORK MANAGEMENT PROGRAM

Hot Work Policy & Procedure

Roger Williams University Hot Work Plan

Hot Work Program. Purpose of Procedure:

SAFEWORK PRACTICES SAFE WORK PERMITTING CAT A-1 SOP #6

Hot Work Safety Program

Safe Code of Practice. No.05 Hot Works Procedure

HOT WORK PROCEDURE. A Page 1 of 20

Non Electrical Hot Work Program

Loss Prevention Standards

HEALTH & SAFETY HOT WORK INSTRUCTIONS

HOT WORK SAFETY GUIDELINE

STANDARD PROCEDURE INSTRUCTION

RUTGERS UNIVERSITY HOT WORK PERMIT PROGRAM

Hot Work. A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Full Review of Document

PURPOSE To specify the minimum requirements for controlling risks associated with Hot Work activities.

OFFICE OF STATE HUMAN RESOURCES

Hot Work Program. SUNY Canton. Purpose

Hot Work Permitting Procedure

Prevention of Hot Work Fires in Healthcare Facilities. Sherie Van Slyke Engineering Specialist

HOT WORK PROGRAM October 2016

Permit to Work East Arm and Fort Hill Wharf

University of Central Missouri Hot Work Permit Program

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

University of Nevada, Reno

HOT WORK PERMIT PROGRAM AUBURN UNIVERSITY SAFETY AND HEALTH RISK MANAGEMENT AND SAFETY

WHS-029 Use of Temporary Barrier Tape

Hot Work Permit Guidelines

KENNECOTT UTAH COPPER

Dangers of Hot Work: Key Lessons from CSB Investigations

Luke Fania, Environment Team Leader David Donehue, Manager/Corporate Environment Megan Calvert, HSE Systems Manager

IWU PHYSICAL PLANT SAFETY PROGRAM

PROCEDURES FOR HOT WORK PERMITS, HOT WORK DISPENSATIONS & GAS FREE CERTIFICATES

This program applies to University faculty, staff, students, vendors, or contractors performing Hot Work on behalf of the University of Iowa.

Electricity Supply (Safety and Network Management) Regulation 2014

Villanova University Department of Environmental Health and Safety Policy and Procedure Manual

General Hot Work Program Guidelines. Lyndsey Beaudin

Guide to Hot Work NFPA 51B Understanding the new requirements after July 1, 2018

DUQUESNE UNIVERSITY HOT WORK PROGRAM

Hot Work Permit Program

Fire safety basics for hot work operatives. CFPA-E Guideline No 12:2012 F

Hot Work Program. Roles and Responsibilities. Management. PAI Responsibilities

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY. To provide instruction for the issue and control of permits authorizing Hot Work operations.

Public Input No. 17-NFPA 51B-2015 [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

RISKTOPICS. DISCUSSION For the purposes of this document, hot work: Management practices: Hot work Property and Business Interruption January 2013

HSE guidelines. SApril 2017 WORK PERMITS

University Environmental Health and Safety. Hot Work Permit Program

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

Hot Work Permitting Program

Health and Safety Policy

Title: Safe Work Procedure. Function: Ecology & Safety No.: CTC-SAF-037 Page: 1 of 6 Reviewed: 3/1/2017 Effective: 4/1/2017 Supersedes: 3/20/16

Fire Safety & Hot Work Permits. Oakland University Office of EH&S

Annex I To Loughborough University Estates Services Health and Safety Policy

RC 7 V2 3/12/07 3:41 am Page 1 RC7 for hot work

LAWS OF SOLOMON ISLANDS CHAPTER 74 SAFETY AT WORK ARRANGEMENT OF SECTIONS PART I INTRODUCTORY PART II GENERAL DUTIES

DRAFT Hot Work Procedure South Shore Regional School Board

HSE guidelines. SApril 2017 WORK PERMITS

Transcription:

1. Purpose The permit to work procedure provides a system for managing certain high risk activities at NT Airports sites. The purpose of this procedure is to: 2. Scope Provide a level of control to ensure risks associated with certain work activities are eliminated or minimised to prevent incidents occurring at NT Airports sites. Provides a consistent and systematic approach to the control of specific high risk activities at NT Airports sites. Provides information and outlines responsibilities to persons issuing, receiving or approving permits on NT Airports sites. This procedure outlines the minimum requirements that must be employed when issuing, receiving and conducting work that involves a permit on NT Airport sites. 3. Legal & Other Requirements NT Work Health and Safety (National Uniform Legislation) Act 2011 NT Work Health and Safety (National Uniform Legislation) Regulations AS 2550 Cranes, hoists and winches Safe Use series of standards AS/NZS 3000 Wiring Rules AS/NZS 4836 Safe working on or near low-voltage electrical installations and equipment NT Code of Practice Confined Spaces NT Code of Practice Construction Work Civil Aviation Safety Authority (CASA) Manual of Standards Part 139 4. Definitions Authorised person is a person that has the authority to issue and approve a permit for work on NT Airports works refer Table 7.1 List of Permit Approvers. PERCOW is a Permit to Commence Work on NTA property. This permit is required on any new building work undertaken on NT Airports land. Task based risk assessments (TBRA) may include Job Safety Analysis (JSA) or Safe Work Method Statement (SWMS) and will consist of a document that sets out the work activities in a logical sequence and identifies hazards and describes control measures. 5. Roles and Responsibilities 5.1. Project Managers Must check that permit processes are in place and followed by Principal Contractors. This will include verifying that appropriate TBRA s are appropriate for task. 5.2. Managers, Coordinators & Supervisors Must ensure all staff or contractors under their control understand their roles relating to the compliance with permit to work activities and carry out their duties in regard to the same. 1 of 9

5.3. Permit Approvers Ensure task based risk assessments (TBRA) have been completed and identified controls implemented and the conditions of the permit are understood and complied with. 5.4. Permit Users Must prepare TBRA prior to permit being issued and comply with conditions of permit when issued and have tools, equipment, trained personnel required to complete the task. 5.5. WHS Advisors Needs to ensure that permits are issued, safety conditions are adhered to and systems are audited as required. 6. Training All personnel involved in issuing or receiving permits or conducting work that requires a permit must be instructed in the application of this procedure. 7. Permits 7.1. Types & Approvers Activities requiring a permit or approval to work include the following: Permit type Area involved Permit Approver* Form No. Excavation All areas All Maintenance Coordinators/ WHS Advisor / Approved Project Managers LV Electrical Access / Isolation All areas Electrical Maintenance Coordinator (EMC) / Senior Technical Officer / Technical Officer P001 P002 Fire Services Impairment Terminal & AMC EMC / Senior Technical Officer P003 Confined Space Entry All areas WHS Advisor / All Maintenance Coordinators Hot Work All areas WHS Advisor / All Maintenance Coordinators / Approved Project Managers HV Electrical Vicinity All areas Infrastructure Manager / EMC / Senior Technical Officer HV Electrical Access All areas Infrastructure Manager / EMC / Senior Technical Officer Crane (OLS - Obstacle Limitation Surfaces) All areas Airside Operations Manager / Aerodrome Safety & Standards Manager/ Airport Duty Managers DIA Terminal Roof Terminal Maintenance Coordinators / WHS Advisor Table 7.1 Permit Approvers P004 P005 P-HV01 P-HV02 OPS001 Refer WHS Advisor * Other personnel may be delegated to approve permits but they must be instructed in this procedure and be authorised by the Head of Projects & Facilities Management or equivalent. 2 of 9

7.2. When is a Permit Required? In relation to the types of permits mentioned above the following provides guidance only on when a permit is required for the different activities: 7.2.1. Excavation An excavation permit is required whenever there is a requirement to penetrate the ground on the airport precinct. It is important to note that services that are buried on airport land will not be found on the Dial Before You Dig service as NT Airports installs their own electricity, sewerage, water, gas, irrigation, communications and any other services. The permit approver will access NTA services drawings as an indicator and may request ground penetrating radar (GPR) and / or hydro potholing to determine actual locations. Dependent on locations of services relative to the proposed excavation works, permits may require an electrical vicinity permit before an excavation permit is granted. In some cases a permit may be denied in the requested location due to condition of services. 7.2.2. LV Access An LV Access permit is required whenever there is a requirement for the isolation of and/or access to any NTA owned electrical distribution boards. The intent of this permit is to ensure that the works being conducted is approved to be done, is compliant with regulatory and NTA requirements and to ensure the quality of the work is of a standard that will not impact the safe operation of the equipment. 7.2.3. Fire Services Impairment A Fire Services Impairment permit is required whenever there is: - a need to isolate any part of the NTA Fire Safety System - a need to conduct work in or around the NTA Fire Safety System The intent of this permit is to ensure the integrity of the NTA Fire Safety Systems is maintained at all times and that emergency, maintenance and operational personnel are kept informed of activities that may impact the system. In the past activities such as gyprock repair works and sanding, painting preparation and even the removing of ceiling tiles has been sufficient to inadvertently set off the systems. 7.2.4. Confined Space Entry A confined space entry permit is required whenever there is an enclosed or partially enclosed space that: Is not designed or intended primarily to be occupied by a person: and Is or is designed or intended to be, at normal atmospheric pressure while any person is in the space ; and Is or is likely to be a risk to health and safety from: - An atmosphere that does not have a safe level of oxygen, or - Contaminants, including airborne gases, vapours or dusts that may cause injury from fire or explosion, or - Harmful concentrations of any airborne contaminants; or - Engulfment Generally confined spaces are not commonly found on the airport precinct, however they are present in sewerage treatment plants and pits and some lighting pits. Permits will only be issued to appropriately trained personnel. 3 of 9

7.2.5. Hot Work A hot work permit is required whenever any operation that creates heat, sparks or hot slag that has potential to ignite flammable or combustible materials is carried out in the airport precinct and particularly the terminal and may include: Welding Brazing Oxy cutting Grinding Soldering or like processes Conditions of a hot work permit must be complied with at all times and must be verified by the Project Manager for the works as well as the permit approver. This permit may require the need for a Fire Services Impairment. 7.2.6. HV Electrical Vicinity A High Voltage (HV) Electrical Vicinity Permit is required for any work to be performed or machinery to be operated either in a powerline corridor or in close proximity to HV Electrical Apparatus. For planned work on NTA land, excavating within 3 metres but not within 1 metre of high voltage and / or low voltage cables a HV Electrical Vicinity permit must be obtained from the permit approver. In some cases a permit may be refused in the requested location due to condition of services. 7.2.7. HV Electrical Access A HV Electrical Access Permit is required in all cases where work is to be performed on or in close proximity (within 1 metre) to HV Electrical Apparatus. This permit will require isolation of the system and is done by NTA electrically qualified personnel in conjunction with the approved HV contractor who is responsible for devising and implementing HV switching for all shutdowns. 7.2.8. Crane (OLS Obstacle Limitation Surface) Crane operations within the vicinity (20kms) of Darwin Aerodrome have the potential to create air safety hazards and may affect airport operations. To protect Darwin Airport s airspace, all crane activities are required by law to be assessed and approved under the Commonwealth Airports (Protection of Airspace) Regulations 1996 before they can be carried out. As a crane operator it is an offence under Section 183 of the Airports Act 1996 to carry out, without approval, crane operations which intrude into airport s protected airspace, it is also an offence not to give information to the Airport of proposed crane activity. This form is to be completed and submitted 24hrs prior to crane operations being carried out in the vicinity of Darwin International Airport 7.2.9. DIA Terminal Roof Whilst there is no requirement for a formal permit to be issued to access the DIA terminal roof however there are stringent procedures that must be adhered to; including guidelines that all users must be instructed in, an approved risk assessment and an access register that must be signed off by a DIA responsible person prior to access being gained or works being conducted on the DIA terminal roof. These procedures can be accessed on the DIA web site > Working on Airport > Stage 6 Roof Access Permit. 4 of 9

7.3. Notice for Permits For normal planned works personnel should provide as much time as practicable to apply for a permit generally and at least two working days prior for electrical permits or fire services impairment permits to enable time to coordinate isolations and impacts to other stakeholders. In emergencies permits will be issued in consultation with stakeholders at the time to ensure the intent of the permit system process is adhered to. 7.4. Access to Permits Permits are available on the DIA website by following the links as shown below or following visual prompts (Attachment A refers): www.darwinairport.com.au > Working on Airport > Building Approvals > Stage 6. 8. Permit Procedures All permits contain important information that must be recorded and actions that must be completed and this section outlines in broad terms what this process involves. The Project Manager must be involved in all aspects of the permit approval and implementation process. 8.1. Applying for a Permit The person or member of the group performing the work, preferably the work supervisor, shall apply for the Permit prior to the commencement of the work. All sections of the Permits shall be completed legibly and in sufficient details to clearly identify the work to be performed. The Permit must be signed by the Applicant. The permit must then be forwarded to the NTA Project Manager to facilitate the permit approval process. 8.2. Approving a Permit Permits shall be issued by a designated Permit Approver. Generally no person shall be both the Permit Approver and the Applicant for any given work unless the work is being conducted for approved emergency or out of hours work. Permits should be issued only for specified activities and should not span several work crews or tasks. Once issued, the scope of the Permit may not be changed. If the scope of work to be completed changes the existing Permit shall be either amended and approved or closed and a new Permit with the amended scope applied for. The Permit Approver can request for further documentation associated with a permit at any time. 8.2.1. Review Scope of Work, Tools & Methods The Permit Approver shall review the scope of work with the Permit User to ensure a mutual understanding of what the work entails, the tools to be used and the work methods. The Permit Approver should always check the actual worksite with the Permit User prior to the permit being issued. The Permit Approver will need to ensure that the Permit User demonstrates that they: understand the nature of the work and risks associated with it; has sufficient competence and equipment to carry out the work; and accepts responsibility for work health and safety matters. 5 of 9

The Permit Approver will review the supporting documentation which may include TBRA, licenses and any specific operating procedures relating to the permit to assess relevance and completeness. 8.2.2. Discuss Task Based Risk Assessment (TBRA) The Permit Approver will review the Permit User s proposed TBRA, safety and risk management strategies and may request additional strategies such as isolations, PPE, emergency evacuation details and the like. The Permit User must ensure that the requirements of the Permit are understood and followed by all personnel involved in the work including other staff and contractors. 8.2.3. Check work does not conflict with other works The Permit Approver or Project Manager shall check that the work does not conflict with other work being undertaken at the time and at the same location, and consult the Supervisor of adjacent work being conducted if need be and ensure normal operations are not impacted and if so ensure appropriate consultation and action has taken place. 8.2.4. Approve the Permit, The permit approver shall sign off the permit, keep a copy of the signed permit and issue the original, signed permit to the applicant. 8.3. Working under a Permit Upon receiving the Permit, the Permit User must ensure that a hard copy of the Permit and other associated documents including TBRA are displayed at the job site. Where this is not practicable, the documents must be retained by the person or member of the group performing the work. Work shall only proceed while this documentation is at the work site. The Person identified as the Person in Charge (of work team) will advise all members of the Permit conditions and ensure that they fully understand the scope and conditions and are ready to start work. 8.4. Closing out a Permit A job is not complete until all surplus materials, personal danger tags and other work materials have been removed from the location and isolations have been reinstated. Upon completion of the work, or on expiry of the Permit, the Permit User shall complete the Works Complete part of the Permit, and return it and associated documents to the Permit Approver or designate. The Permit Approver must retain the completed Permit and copies of any TBRA s duly signed off. The Permit Approver or designate will arrange for a final inspection of the job site where possible, and when satisfied, close-off the Permit 8.5. Validity of Permit Permits are only valid for the period specified and only while conditions remain unchanged. If conditions change significantly, the start of work is significantly delayed, or if work ceases for an extended period, the Permit shall become invalid. When the Permit expires before the end of the work, the Permit Approver may extend it by altering the expiry time and initialling the change. If conditions have changed, or new precautions are required, a new Permit may be generated. A Permit cannot be transferred to another Applicant (unless under approved conditions of the HV Vicinity and Access Permits). 6 of 9

All Permits are invalidated in the event of an emergency. All work must cease immediately and the work site must be left in a safe condition. All Permits must be rechecked and revalidated by the Permit Approver once the emergency is over and prior to work recommencing. 8.6. Withdrawal of Permit A breach of the Permit conditions must be brought to the attention of the Permit User by a person witnessing a breach. On receiving report of a breach, the Permit User will immediately have work stopped until the situation is discussed with the Permit Approver. The Permit Approver will withdraw a Permit if there is a failure to adhere to conditions set down in the Permit. 8.7. Audits The permit to work procedure is an important function of the safety management system for NT Airports and as such compliance with this procedure is a key performance measure for the organisation. The permit to work procedure will be audited and reviewed as required and no later than two yearly. 7 of 9

ATTACHMENT A PERMIT FORM LOCATIONS Home Page DIA Website Press Working on Airport Press Building Approvals & go to Stage 6 - Permits 8 of 9

ATTACHMENT A PERMIT FORM LOCATIONS cont d Scroll down to Stage 6 9 of 9