1 Social Monitoring Report Project Number: August 2015 Period: January 2015 March 2015 IND: Uttarakhand Urban Sector Development Investment Program - Project 2 Prepared by: Urban Development Department, Government of Uttarakhand, Dehradun This report has been submitted to ADB by the Urban Development Department, Government of Uttarakhand, Dehradun and is made publicly available in accordance with ADB s public communications policy (2011). It does not necessarily reflect the views of ADB. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

2

3 Government of Uttarakhand Urban Development Department ADB Assisted Uttarakhand Urban Sector Development Investment Program (UUSDIP) [ADB Loan No IND] Quarterly Social Monitoring Report For January March 2015 Investment Program Management Unit i

4 ABBREVIATIONS ADB DPs BC BDO BPL BTA CAPP CBO CPR DSC ESMC EA FGD FHH GoI GoU GRC IA IP IR IPMU IPIU IPMC LA LAA M&E NGO NPRR PDPs PH PWD RoW RF RP R&R SC ST SCDO SIA TLC ToR UDD UUSDIP VC Asian Development Bank Affected Persons Backward Community Block Development Officer Below Poverty Line Bridge Technical Assistance Community Awareness Public Participation Community Based Organization Community Property Resources Design and Supervision Consultants Environment and Social Management Cell Executing Agency Focus Group Discussions Female Headed Household Government of India Government of Uttarakhand Grievance Redressal Committee/ Grievance Redressal Cell Implementing Agency Indigenous Peoples Involuntary Resettlement Investment Program Management Unit Investment Program Implementation Unit Investment Program Management Consultants Land Acquisition Land Acquisition Act Monitoring and Evaluation Non-Government Organizations National Policy on Resettlement & Rehabilitation Project Affected Persons Physically Handicapped Public Works Department Right of Way Resettlement Framework Resettlement Plan Resettlement & Rehabilitation Schedule Caste Schedule Tribe Social and Community Development Officer Social Impact Assessment Town Level Committee Terms of Reference Urban Development Department Uttarakhand Urban Sector Development Investment Program Valuation Committee ii

5 Contents PROJECT FACT SHEET 4 I. INTRODUCTION 5 II. VALIDATION 5 SUMMARY OF RESETTLEMENT IMPLEMENTATION TRANCHE-II 6 III. INSTITUTIONAL ARRANGEMENT 10 IV. RP IMPLEMENTATION 14 V. CONSULTATION AND PARTICIPATION 18 VI. PUBLIC DISCLOSURE 19 VII. GRIEVANCE REDRESSAL 20 VIII. INCOME RESTORATION ACTIVITIES 20 IX. LAND ACQUISITION 20 X. RELOCATION SITES 21 XI. REPLACEMENT OF COMMUNITY ASSETS 21 XII. MONITORING 21 XIII. IMPLEMENTATION OF GENDER ACTION PLAN (GAP) 24 XIV. CRITICAL ISSUES 27 APPENDIX-1- SUB PROJECT SUMMARY TRANCHE-II 29 PHOTOGRAPHS 52 iii

6 Project Fact Sheet (Garhwal Region& Kumaon Region) Loan 2797-IND Subproject Executing Agency Implementing Agency Uttarakhand Urban Sector Development Investment Program (UUSDIP) The Executing Agency (EA) for the Investment Program is the Uttarakhand Government s Urban Development Department (UDD). The EA has established the Investment Program Management units (IPMU) to execute, manage and monitor the implementation of the Investment Program, and provide overall policy directions. IPMU has the mandate to closely supervise and monitor every component under the Investment Program. IPMU has engaged Uttarakhand Pey Jal Nigam (UPJN) as an implementing agency PIU-1 for water supply and PIU-2 for waste water management (sewerage) components at Dehradun and PIU-Roorkee for both water supply & waste water management (sewerage) components Roorkee. Similarly Uttarakhand Public Works Department (PWD) would be the implementing agency for roads and traffic management components. Urban Local Bodies (ULBs) have been given a major role in implementing solid waste management and slum up gradation components. Monitoring Period Covered January, 2015 to March, 2015 Page 4

7 I. Introduction 1. Uttarakhand Urban Sector Development Investment Program (UUSDIP) is intended to optimize social and economic development and poverty reduction throughout the urban sector in Uttarakhand. UUSDIP will also provide policy reforms to strengthen urban governance, management, and support for urban infrastructure and services. This will be achieved through investments in urban infrastructure (water supply, sewerage and sanitation, solid waste management, urban drainage, urban transport and roads). The Investment Program will support the Government of India (GoI) and the Government of Uttarakhand (GoU) in their policy of balanced regional socio-economic development and poverty reduction through improvements in urban governance, management, and infrastructure and service provision in 31 towns of Uttarakhand 1 in planned manner of four Tranches. 2. The Investment Program will support: (i) water supply; (ii) sewerage and sewage treatment; (iii) municipal solid waste management; (iv) urban roads and traffic management; (v) slum upgrading and poverty reduction; and (vi) planning and design, institutional and policy development, capacity building, and to raise awareness. 3. Tranche II, Loan No The Project was sanctioned in January, The town covered under this project are Dehradun, Roorkee, Nainital, Haldwani and Ramnagar. Total 14 sub projects of Tranche-II are currently under implementation for water supply, sewage & sewerage treatment. The description of towns covered under this project is mentioned below - Garhwal Region- Project Towns are Dehradun & Roorkee. There are total 10 subprojects in Garhwal region. Out of this 07 subproject packages are of water supply and 03 subproject packages are of waste water management. Kumaon Region -Project Towns are Nainital, Haldwani and Ramnagar. There are 04 sub project packages of water supply. 4. The Investment Program will minimize resettlement impacts by prioritizing rehabilitation and optimization work within existing facilities or premises. New construction is proposed on vacant Government land where feasible. There are no significant resettlement issues in the ongoing Tranche II sub-projects. Resettlement planning undertaken during program preparation shows that for Tranche II, the main resettlement impacts will be due to rehabilitation and laying of pipe networks. Impacts are temporary in nature confined to squatters on RoW and roadside shops in busy market areas. II. Validation 5. It is confirmed that in all the subprojects, which are covered in this report, there are no Indigenous People (IP), no land acquisition, and all impacts are temporary in nature. The livelihood of the people will get impacted only during the construction activity for which they will be compensated as per the ADB guidelines. 6. The Resettlement Plans (RPs) were prepared for the subproject packages having temporary Involuntary Resettlement (IR) impacts. Affected persons were identified through the 1 These towns are: Almora, Bageshwar, Bajpur, Barkot, Champawat, Dehradun, Gangotri, Gopeshwar, Haldwani, Haridwar, Jaspur, Joshimath, Kashipur, Kichcha, Kotdwar, Manglore, Mussoorie, Nainital, New Tehri, Pauri, Pithoragarh, Ramnagar, Roorkee, Rudraprayag, Rudrapur, Srinagar, Kedarnath, Badrinath, Sitarganj, Uttarkashi, and Yamunotri. Page 5

8 census survey on the basis of ADB s Involuntary Resettlement Policy of 1995 & updation of data as per actual site conditions. 7. Out of the 14 subproject packages, 11 subproject packages of water supply system and 03 waste water management packages have temporary resettlement impacts in both Garhwal and Kumaon region. Affected persons were identified through census survey conducted in various project locations based on the corridor of impact. Based on the census survey and confirmation of detailed designs, there are no expected impacts on permanent structures. Impacts are confined to mobile vendors and small shops in market or residential areas. The main nature of livelihood is small scale selling activities of fruits, vegetables and other assorted items. 8. It can be seen from Table 1 that there are 269 estimated DPs in Garhwal region cumulative of all the subproject packages having temporary impacts except the subprojects of waste water management Roorkee. As per the meeting of Executive Committee held on , the decision was taken to split the waste water management sub project WWM01RK, into two subprojects i.e WWM01RK & WWM03RK, based on sewered & unsewered area. ADB has also consented & suggested vide -dated to stagger the bidding period for the two packages with invitation of bids for the replacement/rehabilitation works first & later laying of new sewer lines accordingly the estimates have been revised. Due to change of STP site sub project WWM02RK, impact assessment & updation of RP is under progress for the sub projects WWM01RK, WWM02RK& WWM03RK. In Kumaon region there are 276 estimated DPs of all subproject packages having temporary impacts. 9. Table 1 shows that there are 276 estimated DPs cumulative of all the subproject packages having temporary impacts. Unlike Tranche I subprojects In each RP detailed budget has been provisioned to mitigate the impact on any possible temporary impact on the livelihood of the identified APs. 10. Total impacts on subprojects of water supply system Dehradun& Roorkee are 269 DPs and 276 in Nainital, Haldwani and Ramnagar. The category of impacts is squatters or small shop owners on the RoW of roads who would be affected temporarily during pipe laying works. In each RP detailed budget has been provisioned to mitigate the impact on any possible temporary impact on the livelihood of the identified DPs. The RPs prepared under Tranche II would be verified before commencement of civil works in each package. Sl. No. Name of the Subproject Table 1: Summary of Resettlement Implementation Total number of DPs Perm Tempora anen ry t Implementation Status Verificatio n by DSC Differen ce of DPs that from approv ed RP Vulner ability Status Ownersh ip of Land (1) (2) (3) (4) (5) (6) (7) (8) Dehradun 1. Supplying, Laying, Govt. Jointing, Testing & Land Commissioning of clear water transmission and None None NA NA NA NA feeder mains from Page 6

9 Sl. No. Name of the Subproject Total number of DPs Perm Tempora anen ry t Implementation Status Verificatio n by DSC Differen ce of DPs that from approv ed RP Vulner ability Status Ownersh ip of Land (1) (2) (3) (4) (5) (6) (7) (8) various clear water Reservoir to Over Head Tanks - WSS05DN 2. Design, Construction, Commissioning, 3. Operation and Maintenance of Intake works, Water Treatment Plant, Rehabilitation and up gradation of existing water treatment plant in Dehradun - WSS06DN Water Supply Distribution System for 19 Zones (Zone 4b, 15, 20, 22, 27, 17, 23,26,33, 34,35,36, 3,5,11,12,13,14&41) in Dehradun- WSS07DN in Dehradun- (Clubbing Packages WSS07DN, WSS09DN & WSS10DN) 4. Supplying, laying, jointing, testing and commissioning of raw water gravity main from Massi falls up to Shahenshahi Ashram water treatment plant in Dehradun- WSS08DN 5. Supplying and installing of domestic water meters covering all Domestic & commercial connections in Dehradun- WSS12DN 6. Water Supply Distribution system of Roorkee - WSS01RK 7. Supplying and installing of domestic water meters covering all Domestic & commercial connections in Roorkee- None None NA NA NA NA None Combine d RP was prepared for these packages for 196 DPs WSS07D N- 53 WSS09D N- 72 WSS10D N- 71 Total 67 (08 FHH and 59 SC) None None NA NA NA NA None None NA NA NA NA None 73 Roorkee None None NA NA NA NA Total 18 (18 SC househ olds) Page 7

10 Sl. No. Total number of DPs Perm Tempora anen ry t Implementation Status Verificatio n by DSC Differen ce of DPs that from approv ed RP Vulner ability Status Ownersh ip of Land (1) (2) (3) (4) (5) (6) (7) (8) WSS02RK 8. Providing, Laying, Jointing, Testing and Commissioning of Sewer Networks including replacement of existing sewer in Amber Talab, Ram Nagar, Old Railway road, Chow Mandi, Sainik colony etc (Zone 2 & 3) of Roorkee WWM01RK Due to change of STP site from Sati Mohalla to Saliar Ibrahimpur, updation of RP is under process 9. Construction of 33 MLD Sewerage Treatment Plant in Roorkee. - WWM02RK 10. Providing, Laying, Jointing, Testing and Commissioning of Sewer network in Ganeshpur Area (Zone-4) of Roorkee- WWM03RK Sub Total NIL Nainital 11. Providing laying and jointing of distribution mains including fitting, fixing of specials, valves etc and construction of chambers and providing house connection in Nainital (WSS05NL) None APs identified during RP preparation. Re verification survey carried out by DSC-II on September, 2014, in the section where construction work is over 17 th and observed that 5 No APs (01 Female) as identified during the preparation of RP residing in this corridor got no disruption to their livelihood. They have given a certificate in this regard which is also Name of the Subproject Reverification survey carried out in the Maldhan cottage & Zila Parishad Road area After reverificati on in the area where construc tion work is going on DPs are Page 8

11 Sl. No. Name of the Subproject Total number of DPs Perm Tempora anen ry t Implementation Status Verificatio n by DSC Differen ce of DPs that from approv ed RP Vulner ability Status Ownersh ip of Land (1) (2) (3) (4) (5) (6) (7) (8) attached in annex-ii. Construction work is yet to take place in the corridor of 12. Supply and installation of water meters covering all domestic and commercial connections in the town (WSS06NL) Haldwani 13. Design supply and construction of over head service Reservoirs and connecting Rising Mains with appurtenant works different location at Haldwani Town (WSS01HL) None None None 50 impact where other 20 APs are located. Thus only 20 APs are identified till. 50 APs identified during RP preparation Re verification survey carried out by DSC-II on 30 th October, 2014, in the section where construction work is over and observed that 4 No APs (02 SC) as identified during the preparation of RP residing in this corridor got no disruption to their livelihood. They have given a certificate in this regard which is also attached in annex-iii. Re-Survey is yet to take place in the corridor of After reverificati on in the area where construc tion work is going on DPs are 46 Page 9

12 Sl. No. Name of the Subproject Total number of DPs Perm Tempora anen ry t Implementation Status Verificatio n by DSC Differen ce of DPs that from approv ed RP Vulner ability Status Ownersh ip of Land (1) (2) (3) (4) (5) (6) (7) (8) impact where other 20 APs are located. Thus only 46 APs are identified till. Ramnagar 14. Augmentation and reorganization of water supply scheme at Ramnagar (WSS01RM) None 201 Not yet started 201 APs identifie d during RP prepara tion Sub Total Nil Total Nil Source: CAPP NGOs in Dehradun, & updation of RPs prepared for this project. *This figure could change during verification process and actual implementation of the RPs. **Re-verification survey report submitted by CAPP NGOs 11. Separate subproject package wise tables (A.1 to A.10) for Garhwal region and (B.1 to B.4) of Kumaon Region are placed in Appendix 1 showing the engineering components in brief and related resettlement impacts of all the subprojects under Tranche I. III. Institutional Arrangement 12. Executing Agency (EA):The Urban Development Department (UDD) of Uttarakhand is the executing Agency (EA) of the investment program. The EA has already set up a statelevel Investment Program Management Unit (IPMU) headed by Program Director. 13. Implementing Agencies: The Implementing Agencies (IAs) has also set up state level Investment Program Implementation Units (IPIUs) known as IPIU Central IPIU(C), and district or town level sub IPIU to manage implementation of sub-project packages in their respective districts/towns 2. At present IPIU(C) is converted into PIU-1 for water supply and PIU-2 for waste water management. Investment Program Management Consultants (IPMC) who was providing program management support, assuring the technical quality of design and 2 The IA for the investment program is the Uttarakhand Pey Jal Nigan (UPJN) for water supply and sewerage sub-projects, and the Public Works Department (PWD) for roads and traffic management subprojects. Page 10

13 construction, and providing advice on policy reforms assisted the IPMU. At present IPMU is not assisted by IPMC as IPMC has been demobilized on 16 th Jan IPIU is assisted by Design and Supervision Consultants (DSCs), who are designing the infrastructure, managing tendering Contractors and supervising the construction process. Construction Contractors (CC) has been appointed to build elements of the infrastructure. 15. To address the environmental and social issues Environment and Social Management Cell (ESMC) was constituted within the institutional framework of IPMU on 30th July A full time SCDO Ms. Seema Singh joined IPMU on 1st August, At IPIU level, there is no social expert available at present. 16. Consultants Garhwal Region: DSC-1, Mott Mac Donald has a resettlement specialist who is working closely with the ESMC and is responsible for updating existing RPs, preparing new RPs/ RPs for future subprojects, and also support in monitoring and grievance redressal. The Resettlement Expert is available on an intermittent basis for the Project. In DSC 1 at Dehradun, the Resettlement Specialist Mr. Sharad Misra was mobilized on 15 th April 2014 as replacement. Social Development expert position was dropped after discussion with IPMU. Kumaon Region: The DSC-2, Stup Consultants Pvt. Ltd. has a resettlement specialist and social consultant who are working closely with the ESMC. Resettlement specialist is responsible for updating existing RPs, preparing new RPs/ RPs for future subprojects, and also support in monitoring and grievance redressal. The Resettlement Expert is available on an intermittent basis for the Project. In DSC 2 at Dehradun, the Resettlement Specialist Mr. Neeraj Tiwari was mobilized on 2 nd December, 2013 as replacement.mr. Suresh Mr. Khandoori is Social Development Expert. (i) (ii) Scope of work/key tasks for Resettlement management/monitoring expert is as under: Assist the EA in preparing resettlement plans for the sub projects proposed to be covered under the project in accordance with relevant government policies and guidelines and ADB s Involuntary Resettlement Policy. Assist the EA in identifying land acquisition and resettlement (LAR) requirement. (iii) Prepare the development plans for indigenous people, if necessary, in accordance with the agreed Indigenous Peoples Development Plan for the Investment Program, ADB s Policy on Indigenous Peoples. Scope of work/key tasks for Social Development expert is as under: (i) (ii) (iii) Conduct a poverty and social impact analysis Conduct a stakeholder analysis and prepare a participation strategy or plan outlining how to involve which stakeholders at different stages of the Project cycle Conduct a gender assessment and prepare a gender development strategy or gender action plan. Page 11

14 (iv) Assit PIUs and PMUs in all community/social development activities and slum improvement works taken up under the project. 17. RP Implementing Agency CAPP NGO: In Garhwal Region for Community Awareness and Participation Program (CAPP),an NGO named Himalayan Institute Hospital Trust (HIHT) Dehradun was engaged as CAPP consultant (NGOs) in February CAPP NGO demobilized on 31st May In Kumaon Region CAPP-NGO namely Institute for Development Support (IDS) in Nainital was mobilized from Feb 2011 to 30 June 2013 and from November 13 to Feb 14. Presently there is no NGO in Garhwal and Kumaon region. The hiring of support agency/social consultant/ngo is under process. 18. Scope of Work of NGO: Support agency/social consultant/ngo is formed as Social Consultant and will assist EA for Community Awareness including Implementation of Resettlement Plan (RP), and Implementation of Gender Action Plan (GAP) in Dehradun, Haridwar& Roorkee towns of Garhwal Region and Nainital, Haldwani& Ramnagar towns of Kumaon Region. Conducting Community Awareness Campaign Implementation of Resettlement Plan Implementation of Gender Action Plan 19. Valuation Committee (VC) : In July 2010 a Valuation Committee (VC) was constituted at IPMU level for disbursement of payment to the DPs; vide office order no. UUSDIP/122/1699 Dated To comply with the agreed Resettlement Framework, the formation of a proper Valuation Committee at town PIU level was constituted for the sub project package WSS02D. 20. For compliance of social safe guard issues & implementation of RP for the balance work of Tranche -II, Process of formation of Valuation committee has been initiated. Page 12

15 Organizational Chart of Uttrakhand Urban Sector Development Investment Programme Asian Development Bank (ADB) Government of India (Gol) Government of Uttarakhand (GoU) Implementation Agency (IA) Investment Program Implementation Unit Executive Agency (UDD) Town Committee IPIUs in Districts (UPJN) : Implementing Agency Water Supply & Sewerage Investment Program Implementation Unit (PWD) : Implementing Agency Major Roads & Traffic Management Investment Program Implementation Unit (ULBs) : Implementing Agency SWM, Minor Roads & Slum Improvement (Assisted by IPMU Special Cell) General Body Chair: Chief Secretary Executive Committee Chair: Secretary, UDD Member: Secretary Finance Member: Secretary PWD Member: Program Director Investment Program Management Unit Investment Program Director Staff deputed from relevant department and ULBs Investment Decision and Supervision Consultants (DSCs) Investment Program Management Consultants (IPMC) Page 13

16 IV. RP Implementation 21. Total 03 Resettlement Plans (RPs) were prepared in Garhwal Region & 03 RPs were prepared in Kumaon Region. All RPs were duly approved by ADB for the subproject packages having temporary Involuntary Resettlement (IR). All the RPs have been revised and further NOC from ADB was availed. The approval status of RPs for various sub-projects under UUSDIP is presented in table 2 below Table 2 : Status of Resettlement Plans for Tranche II Dehradun WSS05DN-Supply Laying, Jointing, Testing & Commissioning of clear water transmission and feeder mains from clear water Reservoir to Over RP not required Head Tanks WSS06DN- Design, Construction, Commissioning, Operation and Maintenance of Intake works, Water Treatment Plant, RP not required Rehabilitation and up gradation of existing water treatment plant in Dehradun WSS07DN- Water Supply Distribution System for 19 Zones (Zone 4b, 15, 20, 22, 27, 17, 23,26,33, 34,35,36, 3,5,11,12,13,14&41) in Dehradun- (Clubbing Packages WSS07DN, WSS09DN & WSS10DN) WSS08DN- Supplying, Laying, Jointing, Testing and Commissioning of Raw Water Gravity Main from Massi Falls up to Shahenshahi Ashram Water Treatment Plant Dehradun WSS12DN- Supplying and installing of domestic water meters covering all Domestic & commercial connections in Dehradun Roorkee WSS01RK-Water Supply Distribution System Roorkee WSS02RK-Supply and Installation of Domestic Water Meters covering all Domestic & Commercial connection in Roorkee WWM01RK- Providing, Laying, Jointing, Testing and Commissioning of Sewer Networks including replacement of existing sewer in Amber Talab, Ram Nagar, Old Railway road, Chow Mandi, Sainik colony etc (Zone 2 & 3) of Roorkee WWM02RK- Construction of 33 MLD Sewerage Treatment Plant in Roorkee. WWM03RK- Providing, Laying, Jointing, Testing and Commissioning of Sewer network in Ganeshpur Area (Zone-4) of Roorkee Nainital WSS05NL-Providing laying and jointing of distribution mains including fitting, fixing of specials, valves etc and construction of chambers NOC on Combined RP was prepared for these packages for 196 DPs WSS07DN- 53 WSS09DN- 72 WSS10DN- 71 RP not required RP not required NOC on , RP was prepared for 73 DPs RP not required RP was approved for 64 DPs. Updation of RP is under process due to change of STP Site from Sati Mohalla to Saliar Ibrahimpur. RP was prepared for 25 APs Page 14

17 and providing house connection in Nainital WSS06NL- Supply and installation of water meters covering all domestic and commercial connections in the town Haldwani WSS01HL- Design supply and construction of over head service Reservoirs and connecting Rising Mains with appurtenant works different location at Haldwani Town Ramnagar WSS01RM- Augmentation and reorganization of water supply scheme at Ramnagar RP not required RP was prepared for 50 APs RP was prepared for 201 APs 22. Challenges for Implementation of RP: Due to unavailability of implementing NGO, most of R&R activities are awaited which could be done after mobilization of NGO. In Garhwal Region for Community Awareness and Participation Program (CAPP), an NGO named Himalayan Institute Hospital Trust (HIHT) was engaged as CAPP consultant from February CAPP NGO demobilized on 31 st May In Kumaon Region CAPP NGO named Institute for Development Support (IDS) was engaged from Feb 2011 to 30 th June 2013 and again from November 2013 to February CAPP NGO in Kumaon demobilized in March After the payment of compensation to the DPs under various subprojects, respective resettlement plans will be updated accordingly and will be submitted to ADB for approval. During actual execution of civil works in the corridor where DPs are located, it is likely that impacts will be minimized and avoided. Contractors will be asked to ensure that measures are taken to minimize the loss of access (leaving spaces for access between mounds of soil, providing walkways and metal sheets to maintain access across trenches) are being made to minimize such impacts by using proper work schedule (avoid busy business hours, phased construction schedule, working on one segment at a time on one side of the road) and techniques. 24. The follow up activities for implementation of resettlement plans and delivery of entitlements has been tabulated below. Only the subproject packages having IR impacts were considered. Table 3: Status on Delivery of entitlements Tranche II Name of Subproject Clubbing Packages WSS07DN, WSS09DN & WSS10DN- Water Supply Distribution System for 19 Zones (4b, 15, 20, 22, 27, 17, Preparation of Micro Plan R&R activities awaited due to unavailability of resettlement implementing Verification of APs Garhwal Region 196 APs identified during RP preparation(combined RP was prepared for these 3 subproject packages) Issuance of ID cards R&R activities awaited due to unavailability of resettlement implementing agency/ Entitled Amount in (Rs.) Rs as per RP budget Compe nsation Amount paid(rs.) Nil Page 15

18 Name of Subproject 23, 26, 33, 34, 35, 36, 3, 5, 11, 12, 13, 14, & 41 ) WSS01RK-Water Supply Distribution System Roorkee WWM01RK- Sewerage System for Ganeshpur Area, Amber Talab Area and Ram Nagar Area of Roorkee Town. WWM02RK- Construction of 33 MLD STP for Roorkee town Preparation of Micro Plan agency/ NGO R&R activities awaited due to unavailability of resettlement implementing agency/ NGO R&R activities awaited due to unavailability of resettlement implementing agency/ NGO Verification of APs 73 APs identified during RP preparation Due to change of STP Site, revised RP will be submit in November, 2014 Issuance of ID cards NGO R&R activities awaited due to unavailability of resettlement implementing agency/ NGO. R&R activities awaited due to unavailability of resettlement implementing agency/ Entitled Amount in (Rs.) Rs as per RP budget Due to change of STP Site, revised RP will be submitted in November, 2014 Kumaon Region WSS05NL- Providing R&R activities Total 25 APs identified R&R activities Rs NA laying and jointing of awaited due to during RP preparation. awaited due to as per RP distribution mains unavailability Re verification unavailability of budget including fitting, fixing of survey carried out by resettlement of specials, valves etc resettlement DSC-II on 17 th implementing and construction of chambers and providing house connection in Nainital implementing agency/ NGO September, 2014, in the section where construction work is over and observed that 5 No APs (01 Female) as identified agency/ NGO during the preparation of RP residing in this corridor got no disruption to their livelihood. Haldwani WSS01HL- Design R&R activities Total 50 APs identified R&R activities Rs NIL supply and awaited due to during RP preparation. awaited due to as per RP construction of over unavailability Re verification survey unavailability of budget head service of carried out by DSC-II resettlement Reservoirs and resettlement on 30 th October, 2014, implementing connecting Rising implementing in the section where agency/ Mains with appurtenant agency/ construction work is NGO works different location NGO over and observed at Haldwani Town that 4 No APs (02 SC) as identified during the preparation of RP residing in this corridor got no disruption to their livelihood. Ramnagar WSS01RM- R&R activities Total 201 APs R&R activities Rs NIL Compe nsation Amount paid(rs.) NIL NIL Page 16

19 Name of Subproject Augmentation and reorganization of water supply scheme at Ramnagar Preparation of Micro Plan awaited due to unavailability of resettlement implementing agency/ NGO Verification of APs identified during RP preparation Issuance of ID cards awaited due to unavailability of resettlement implementing agency/ NGO Entitled Amount in (Rs.) as per RP budget Compe nsation Amount paid(rs.) Page 17

20 V. Consultation and Participation 25. Till May, 2013 CAPP NGOs has organized the public awareness campaigns for appraising the short-term inconveniences and long term benefits of the project in order to gain full support of the beneficiaries. CAPP has also been helpful to make beneficiaries aware of preventive care to avoid environmental health related hazards during construction and of their responsibilities to avoid wastage of water, including issues such as water rates, metering, user charges and property tax reform etc. for achieving the goals of the Investment Program in totality. 26. An awareness program was organized on at Dehradun to generate awareness among the community about sanitation. Hon`ble Chief Minister, Uttarakhand was the chief guest at the program. 27. Two public consultation meeting were organized for relocation of temple. One meeting was organized with community members on & another meeting was organized on with Chief Executive Officer, Municipal Corporation, Dehradun, DPD UUSDIP, and other stakeholders at the premises of temple for obtaining a public consent for relocation of temple. During the consultations, options for relocation of temple and deity with the consent of committee members, devotees and local people was discussed. Chief Executive Officer, Municipal Corporation, Dehradun, suggested to relocate the temple on Government Land (plot no-206) with area ha opposite the present temple site across the NH Two consultation was organized with community members on and at STP site and Adarsh Nagar Roorkee respectively and an effort has been made to help people understand the positive impacts and benefits from the project and get their participation in the project. The grievance of the community were recorded during the consultation and forwarded to concerned official for resolving them. 29. For Updation of RP WWM01D, WWM02D, WWM03D& WWM04D, the Consultants have analyzed the potential impact on women folk by means of undertaking FGDs during the course of social assessments. 15 women- headed households were identified having their heads as woman among the APs. 30. Objective of consultations - establish rapport between the project affected persons and other stakeholders for the success of the project; build an environment where people understand and appreciate the need and importance of the project; learn from the people about the issues in terms of the regional linkages, safety, and other social dimensions of the region/ area that need to be considered while execution of the project; facilitate the partnership and ownership of the community through their involvement in the decision making process; and understand and incorporate the views of the people in the execution process in order to minimize the future resistance and delays. Page 18

21 Recording/registering the grievance for redressal by the competent authority/stakeholders. Table 4: Summary of Public Consultations S.NO Date Venue subject No. of participants Descriptions Male Female Dehradun Dehradun Relocation of temple at Kargi Zone The objective of these consultation was to take consent of public for relocation of temple. Temple trustee/members & local public have given consent for relocation of temple Dehradun Relocation of temple at Kargi Zone 23 The objective of these consultation was to take consent of public and government on the proposed relocation site. Chief Executive officer Municipal Corporation, Dehradun has allowed/consented to relocate the temple on Government Land Plot No- 206 area Ha Opposite the present temple site across the NH-72. Chief Executive office Municipal corporation, Dehradun has given No Objection certificate (NOC) vide letter no. 368 dated for relocation of CPR Dehradun Sanitation awareness program Awareness about the program. Hon`ble Chief Minister, Uttarakhand was the chief guest of the program. Roorkee STP site, Roorkee OHT site Adarsh Nagar Roorkee Public awareness Public awareness and grievance redress 8 10 Community awareness on project components 17 8 Provide information to the community about the project and seek their participation in the project. The grievance of the community were recorded and forwarded to concerned official for resolving them. VI. Public Disclosure All the RPs prepared under UUSDIP has been disclosed on the Program website ( as well as on ADB website. The RPs are also available in the Program units- IPIU and IPMU. Simplified version of the RP and the Entitlement Matrix has been prepared in local language (Hindi) and distributed in the form of handbills to the concerned stakeholders. During preparation of Micro Plans DPs were duly consulted and this practice will be carried throughout the Program implementation. The handbills were attached in the earlier reports. 31. The internal monitoring reports have been disclosed on the Program website as well as on ADB website. As per the loan agreement the Social Monitoring Reports will be prepared quarterly and would be duly uploaded on the websites. Page 19

22 VII. Grievance Redressal Mechanism 32. For redressal of grievances provisions have been made at PIU Dehradun, PIU Roorkee & PIU Nainital to record and redress public grievances. The process so designed has the following 2 modes for recording the grievances; A separate corner has been created under the existing website A toll free number ( ) has been procured under UUSDIP for registering grievances. 33. The Town Level Committee (TLC), acting as a grievance redress committee (GRC) is chaired by the Mayor or Chairperson with representatives ward members, the district magistrate, collector, commissioner, special area development authority, Uttarakhand Pey Jal Nigam UPJN, Uttarakhand Jal Sansthan UJS, Public works Department PWD, business, and civil society. Although GRC meets at a regular interval. 34. Till now, 459 grievances were recorded. Out of 459 grievances 450 has been redressed & 09 is under process. Table 5: Grievances Recorded and addressed Grievance recorded till Dec Grievance recorded in the Qtr (Jan. to March, 2015) Grievance Resolved till date Balance Rest of the grievances were related to other departments. VIII. Income Restoration Activities 35. DPs were provided advance information regarding the upcoming construction activities to ensure no or minimum disruption in their livelihood. If, and when required they will be assisted in temporary shift for the continued economic and livelihood activities. For example, the affected DPs will be assisted to shift to the other side of the road, where there is no construction activity. Ensuing there is no income or access loss during subproject construction which is the responsibility of the contractor. 36. Willing and vulnerable DPs/AFs would be given priority in project construction employment. No permanent involuntary resettlement impacts were identified resulting into shift of trade or economic activity for the DPs/AFs IX. Land Acquisition 37. There is no land acquisition for any of the subprojects under Tranche II. The Investment Program has minimized resettlement impacts by prioritizing rehabilitation and Page 20

23 optimization work within existing facilities or premises. New construction is proposed on vacant Government land where feasible. 38. However if land acquisition is required at any stage of the subproject implementation then the process will be in accordance with guidelines laid in the Resettlement Framework of UUSDIP&also as per existing applicable acts & laws. X. Relocation Sites 39. Since there is no land acquisition & displacement in the project, so relocation site is not required for this project. All the impacts under Tranche II are temporary in nature and confined to mobile vendors and roadside shops in busy market areas. XI. Replacement of Community Assets 40. There is no replacement of community assets. XII. Monitoring 41. In principal resettlement activities are implemented in accordance with the Resettlement Plans prepared for the subprojects as category B. Due to this internal monitoring of implementation of RP has been done by UUSDIP & DSCs. The table below summarizes the implementation activities as indicated in RPs. Table 6: Status and stages of Resettlement Plan Implementation Sl.No Activities Status Remarks 1. Census survey Done for updation of RPs 2. Preparation and updation of RPs 3. RP review and approval 4. Issue notice to DPs 5. Compensation and resettlement assistance Done Done Prior information (through community meetings and discussions) Being implemented case by case basis. All the RPs of Tranche I has been updated based on census survey. Refer to table 3 for details. All the RPs of Tranche I has been updated based on census survey. Refer to table 3 for details. However this is a continuous process and subproject specific RPs would be updated after actual payment of compensation to DPs. All the RPs are duly approved by ADB. After demobilization of CAPP NGO, IPMU, DSC, PIU Staff & Contractor are involved for issuing notice through ward member, elite member of the construction site & public consultation meetings. In Kumaon region under subproject package WSS05NL re verification survey carried out by DSC II in the section where construction work is over and observed that 58 DPs (01 Female) as identified during the preparation of RP residing in this corridor got no disruption to their livelihood. In Kumaon region under subproject Package WSS01HL re verification survey carried out by DSC-II in the section where construction work is over and observed that 4 DPs (02 SC) as identified during the preparation of RP residing in Page 21

24 Sl.No Activities Status Remarks this corridor got no disruption to their livelihood. 6. Relocation as required 7. Takeover possession acquired property of 8. Rehabilitation of temporarily occupied lands 9. Consultations with DPs during rehabilitation activities 10. Grievance redressal 11. Internal monitoring No need for any permanent relocation. No such property under possession of any private party was acquired. Done Done. Continuous process Done. Continuous activity Done. Continuous activity DPs are being provided with prior information before civil work, would be provided assistance in relocation to the other side of road where necessary for their continued business activities. Community meetings were being organized on a regular basis as well up to May 2013 by the CAPP NGO At present Community meetings including feedback of affected persons are being organized by the SCDO UUSDIP, RM&ME of DSC-1. A separate corner has been created under the existing website A toll free number ( ) has been procured under UUSDIP for registering grievances. After demobilization of CAPP NGO, Grievance/complaint register has been maintained at IPMU, PIU level and assistance by DSC Social Monitoring Reports are being prepared on quarterly basis by RM&ME of DSCs 42. Status of compliance with Covenants: Dissemination of information and orientation on HIV/AIDS and other STDs were provided to the labors residing on the various labor camps as a part of the health and hygiene awareness program conducted by the CAPP NGOs in program towns till demobilization. 43. After demobilization of CAPP NGO, periodic visits have been conducted by the SCDO- UUSDIP, RM&ME DSC-1& DSC-2 as a part of the program to ensure healthy living conditions at the labor camps. Contractor representatives and laborers were oriented on the importance of equal wages for men and women involved in the construction activities. The labors were also oriented on the use of personal safety equipments like wearing of gloves, helmets, boots etc. The table below provides the compliance status with the covenants achieved under UUSDIP. Table 7: Status of compliance with Covenants Covenants items Land Acquisition and Resettlement The State through the EA shall undertake the Project in accordance with the Borrower s and State laws and regulations, ADB s Policy on Involuntary Resettlement (1995) and the Resettlement Framework (RF). Compliance status Complied. Responsible Agency Uttarakhand Urban Sector Development Agency / Page 22

25 Covenants items Compliance status Responsible Agency UUSDIP The State through the EA shall ensure that to the extent possible, Subprojects will not require land acquisition or involuntary resettlement; however, if and acquisition and /or involuntary resettlement are required for any subproject; the EA shall ensure following (i) a RP for the Subproject, acceptable to ADB is prepared, in accordance with applicable laws and regulations and the RF, and submitted to ADB for review and approval before award of related civil works contract proper consultation during preparation of the RP with the affected persons, as also disclosure of the RP to the affected persons including information on land acquisition and compensation process undertaken; (ii) All land, rights of way and other land-related rights required for the Subproject are acquired or made available; (iii) All affected persons are compensated and paid resettlement assistance in accordance with the agreed RP, before award of civil works contracts of the related subproject including any section-wise handover thereof, strictly in accordance with the stipulation in the related civil works contract. If during detailed design and implementation, any modification and/additional land acquisition or involuntary resettlement impacts are identified, the RP will be prepared (or modified if existing) in accordance with applicable laws and regulations and the RF and prior approval of ADB obtained before further implementation of the RP and the Subproject; (iv) Ensure that efficient grievance redressal mechanisms are in place in accordance with the related RP to assist affected persons resolve queries and complaints if any, in a timely manner; and (v) Ensure that all compensation at replacement value for acquired assets made to affected persons well in advance for them to make alternative arrangements, before award of civil works contracts. Indigenous Peoples The State through the EA shall ensure that if any impact is identified during planning, design, or implementation of any Subproject on indigenous peoples, that an Indigenous Peoples Development Plan (IPDP) or integration of specific actions for the indigenous people in the RP is prepared in accordance with ADB s Policy on Indigenous Peoples (1998) and the Indigenous Peoples Development Framework (IPDF) and that the same is further approved by ADB before award of related civil works contract, and (ii) implementation before commencement of related civil works contract. Any updating or revision of the IPDP due to change in detailed designs or during implementation shall be in accordance with applicable laws and regulations and the IPDF and prior approval of ADB obtained before further implementation of the IPDP and the Subproject. Social Issues The State through the EA shall ensure that civil works contracts under the Project follow all applicable labor laws of the Borrower and the State and that these further include provisions to the effect that contractors; (i) carry out HIV/AIDS awareness programs for labor and disseminate information at worksites on risks of sexually transmitted diseases and HIV/ADIS as part of health and safety measures for those employed during construction; and (ii) follow and implement all statutory provisions on labor (including not employing or using children as labor and equal pay for equal work), health, safety, welfare, sanitation, and working conditions. Such contracts Being complied with. Being complied With. Being complied with. Uttarakhand Urban Sector Development Agency / UUSDIP Uttarakhand Urban Sector Development Agency / UUSDIP Uttarakhand Urban Sector Development Agency / UUSDIP Page 23

26 Covenants items shall also include clauses for termination by the State or EA in case of any breach of the stated provisions by the contractors. Compliance status Responsible Agency XIII. Implementation of GAP 44. Gender Action Plan Guidelines for the UUSDIP Sub-projects and Gender Action Plan (GAP) Monitoring Format has been developed under UUSDIP. These documents were circulated to DSCs, PIUs and other stakeholders for reference as well as to incorporate gender guidelines during planning and implementation of all types of subproject activities. Status of Implementation of GAP has been tabulated below:- Activities, Indicators and Targets Table 8: Status of Implementation of GAP Progress to Date Progress for the Quarter (January to April 2015) Cumulative Progress (August 2014 to March 2015 Issues and Challenges Output 1: Water supply infrastructure improved in Dehradun, Nainital, Haldwani, Ramnagar and Roorkee; Sewerage infrastructure improved in Roorkee Activity 1.1: Public information awareness-raising campaigns on water supply and sanitation Indicator 1: Four project awarenessraising seminars/ meetings conducted for each of five project town (Nainital, Dehradun, Haldwani, Roorkee and Ramnagar)` Target: At least 50% women participation in Nainital, At least 30% women participation in Dehradun and Haldwani, At least 25% women participation in Roorkee, At least 20% women participation in Ramnagar Indicator 2: Two billboards on the project highlighting its benefits to women and the poor put up in strategic places in each project town (2*31 towns=62 billboards) Indicator 3: One audio-visual presentation (educational video) on gender in water supply and sanitation produced, for use in public orientation seminars 6 Public consultations have been organized at Roorkee and Dehradun. A total of 49 women and 62 men participated in the program. The objective was to Aware community about the program and provide information on long term benefit of the program. Sharing problems community face during implementation of the work. Social safety and security of women and adolescent girls. Safeguard measures. Sanitation awareness program was organized on 10 th December 2014 at Dehradun. 219 women and 392 men sanitation workers participated in the program. Hon`ble Chief Minister was the chief guest of the program. The objective of the program was to generate awareness about sanitation among the community. 9 public consultations have been organized at Roorkee and Dehradun. A total of 49 women and 108 men participated in the program. The objective was to Aware community about the program and provide information on long term benefit of the program. Sharing problems community face during implementation of the work. Social safety and The CAPP NGO has been demobilize d in February 2014 in Nainital and June 2013 in Dehradun. The process of hiring NGO is in progress. The activities can be implemente d effectively after mobilizatio n of NGO. Page 24

27 security of women and adolescent girls Safeguard measures. Activity 1.2: Identify the BPL households and poor FHHs 3 for targeting in the provision of subsidized connections and water fee rates Indicator: Roster of BPL HHs and poor FHHs developed for each project town Activity 1.3: Develop a provulnerability 4 schedule of tariffs for water supply and sewerage. Indicator: Pro-vulnerability schedule of tariffs developed and adopted Activity 1.4: Provide subsidized (or on concessionary rates) individual water connections, water meters, and sewerage connections to BPL households and poor FHHs in each project town. Indicator: 38,000 of BPL households and poor FHHs (approximately, 19% of total HHs) in each project town provided with subsidized individual water supply and sewerage connections and meters. Target: Approx. 19% of households in each project town Activity 1.5: Ensure implementation of core labor standards for all workers employed in construction and rehabilitation work, including the protection of women workers from any form of sexual harassment, discrimination and violence. Indicators 1: Inclusion of a provision in contracts of sub-projects ensuring the implementation of core labor standards, including the protection of women workers from any form of sexual harassment, discrimination, and violence. Target: All bidding documents/contract agreements Indicator 2: Safe and humane living Segregated data is being maintained at PIU level. Uttarakhand Jal Sansthan GO No. 118/29 (1)/ 2013-(59P)/ 2004 dated 29 January 2013 on schedule of tariffs has been collected. Site visits were organized at construction sites and labor camps of WSS05DN, WSS06DN, WWM02RD(RT), WSS01RK, WSS05NL, WSS01RM packages. The labor (6 women and 33 men) at the sites were provided information on the importance of safety measures to be followed at the construction sites. The labors were oriented on the use of personal safety equipments like wearing of gloves, helmets, boots etc. The labors were also provided information about their rights. The Core labor standard implementation is mentioned in all the contract agreements 3 Female-headed household (FHH) refers to households without adult males, widows, separated, divorces, unmarried and de facto women heads whose husbands have migrated for work for long period of time. 4 Vulnerable households is defined as those fulfilling five or more of the following criteria: (i) household belongs to most backward communities, (ii) head of household is a woman, (iii) head of household is illiterate, (iv) head of household is working as a daily wage laborer, (v) household with income below poverty line, and (vi) household residing in a kutcha house. Page 25

28 quarters are provided for all workers, including separate quarters for women. Target: All project construction sites contractor (5 persons, 4 at Dehradun and 1 at Roorkee) was also oriented for providing facilities to the labors at the sites and the camps. The contract agreements of all contracts has the provision of core labor standard. A letter has been sent to all the PIUs for ensuring organization of awareness camps on HIV/AIDs and health camps by the contractor. Health check up camp for the labor was organized on 20th April at Dehradun for for labor (33 labors (30 men and 03 women) of WSS096DN. Health check up camp was organized on at Roorkee for 36 labor s (15 women and 21 men) of WW01RK. Output 2: Operations and maintenance (O&M) of the assets created by the subprojects improved in Nainital Activity 2.1: Employment of women in O&M included in subproject contracts at the same pay level as their men counterparts Target and indicator: Provisions for the employment of at least 25% women in O&M are included in subproject contracts Activity 2.2:Training poor women on O&M of water supply and sewerage Target and indicator:30 poor women ((who have the aptitude and appropriate educational background) Activity 2.3: Employ women in O&M work Target and Indicator: 18 women (25% of total) Discussion with Uttarakhand Jal Sansthan is being done this and could be finally decided most probably in the month of June. Output 3. Project planning, management and implementation skills and transparency enhanced in UUSDA Activity 3.1: Employ at least 15% women in expert positions and at least 30% women in junior/support positions in project management and implementation. Target and indicator: At least 2 women in PMU, 3 women in entire PIUs, 3 women in PMC and 3 women each DSC Activity 3.2: Develop training modules on gender sensitive project management and implementation. Target and indicator: Two training modules PMU level At expert position- 1 women, SCDO Project Management 1, Account Assistant Support Staff = 1 DSCs Project Management 1 Expert position 1 Page 26

29 Activity 3.3: Conduct trainings on gender sensitive project management and implementation to all project staff of PMU, PIU, PMC, DSC, and CAPP-NGOs. Indicator: Two trainings Target: All project staff of PMU, PIU, PMC, DSC, and CAPP- NGOs Activity 3.4: Incorporate gender indicators in PMIS Target and indicator: PMIS developed with gender indicators and populated with sexdisaggregated data Activity 3.5: Conduct trainings or other capacity building activities on gender-responsive and socialinclusive governance, and planning and management of O&M Indicator: Elected ULB officials trained on gender-responsive and social-inclusive governance, and planning and management of O&M. Target: All elected ULB officials BPL = below poverty line, CAPP = Community Awareness and Participation Program, DSC = design and supervision consultants, FHH = female-headed household, NGO = nongovernment organizations, O&M = operations and maintenance, PIU = project implementation unit, PMC = project management consultants, PMIS = project management information system, PMU = project management unit, ULB = urban local body, UUSDA = Uttarakhand Urban Sector Development Agency. XIV. Critical Issues Disbursement of compensation is still pending with IPIU. Mobilization of Social Consultant/NGO is still pending. Good Practices Series of public consultation and disclosure policy has been very helpful for smooth implementation of work: For example series of discussion and consultation with the farmers (title-holders) resulted in pipe line laying without any problem through their agricultural land. Amount of compensation was also decided after due consultation with the DPs. An agreement for future O&M was also made with the families. Transparent procedure in the form of formation and involvement of TLC and Grievance Redressal Cell (GRC) was actually helpful in projecting the transparent nature of work and ensured participation. DPs were provided advance information regarding the upcoming construction activities to ensure no or minimum disruption in their livelihood. If, and when required they will be assisted in temporary shift for the continued economic and livelihood activities. For example, the affected DPs will be assisted to shift to the other side of the road, where there is no construction activity. Ensuing there is no income or access loss during subproject construction which is the responsibility of the contractor. Page 27

30 A separate corner has been created under the existing website and a toll free number ( ) has been procured under UUSDIP for registering grievances. Gender Action Plan Guidelines for the UUSDIP Sub-projects and Gender Action Plan (GAP) Monitoring Format has been developed under UUSDIP. These documents were circulated to DSCs & PIUs for reference as well as to incorporate gender guidelines during planning and implementation of all types of subproject activities. For minimizing the socio-economic impact and maintaining the quality, project has provision of laying of HDPE pipe which is light in weight and each pipe is of length of 6 mtrs. The laying is easy as compared to the earlier proposed pipe of RCC which was of 2.5 mtrs length only. Joining each pipe was manual and time consuming, this has drastically been reduced by use of HDPE pipe where number of joints has reduced because of larger length of the pipe and also the joints are made using latest electromechanical device. The use of HDPE pipe has overall minimized the time of laying, earlier the trench had to be open overnight sometime for two to three days for completing the work. Thus use of HDPE pipe has minimized the time of laying and also the excavation width resulted reduced affected persons & number of days of loss of livelihood. Site visits were made and consultations were organized in order to assess the impact based on the detailed engineering design. It was envisaged that the impact of laying sewer lines will be restricted to the lanes and streets having width less than or equal to 3.5 mtr because of the reason that enough of space remain available in lanes having width more than 3.5 mtr which provides enough width for movement and thus has no impact in such lanes. Periodic visits have been conducted by the SCDO-UUSDIP, RM&ME DSC-1&2 as a part of the program to ensure healthy living conditions at the labor camps. Contractor representatives and laborers were oriented on the importance of equal wages for men and women involved in the construction activities. Page 28

31 Appendix 1 Subproject Wise Summary Tables Tranche II A-1 Supply, Laying, jointing,testing and Commissioning of clear water transmission and feeder mains from various clear water Reservoir to Over Head Tanks in Dehradun city WSS05DN 1 Introduction a) Proposed Sub-project components Supplying, laying, jointing, Testing and Commissioning of DI K 7 and K 9 pipe lines for rising mains and feeder mains in the water supply system of Dehradun city. It is further proposed to design transmission main from Dilaram Bazaar water work to supply water to OHT in lower zones with view to save on energy charges in the lower zones for achieving on energy charges. b) Proposed Sub-project components that This package does not involve LA and R&R involve LA and R&R 2 Sub-project components wise Progress a) Engineering Progress 1. Procured DI Pipes: m 2. Laid DI Pipes: m 3. Tested DI Pipes: m 4. Road Restoration: 2.69 km 5. Thrust Block Constructed: 47 Nos 6. RCC Air Valve Chamber Constructed: 03 Nos Total Physical Progress-43.8%. b) Ground Clearing/Utility Shifting Continuous process. c) Obtaining NOCs etc. Proposal under preparation 3 RP Verification and Update a) Verification of LA and list of DPs Proposed Subproject components do not involve LA and any R&R issues. Hence RP is not prepared. b) Difference of LA and DPs that from approved RP c) Compensation for LA NA d) Compensation for Temporary DPs NA e) Compensation (others, if any-mention) NA Total land in Ha: Nil. Total DPs: Nil f) Revised Total RP Budget (only NA compensation) g) RP updating, submission to the ADB and its approval NA 4 Payment of Compensation and Resettlement Assistance a) Issue of ID cards (start and completion NA date) b) Total ID cards issued till date NA c) Progress of compensation payment NA (Total number of DPs paid) d) Total RP budget utilized (only compensation) NA 5 Consultation and Disclosure Activities and Grievance Procedures a) Consultations and Disclosure Meetings Regular cluster level meetings conducted on monthly frequency basis as public disclosure process by the CAPP NGOs up to mobilization date May, Periodic visits/ have been conducted by the SCDO-UUSDIP, RM&ME DSC-1 as a part of the program Page 29

32 b) Assistance provided to vulnerable DPs Nil. c) Total grievances recorded (with details) As a part of Grievance redressal mechanism public grievances are captured and addressed by CAPP NGO and IPIU. d) Total grievances addressed completely and closed 6 Institutions Involved and Contacted a) Institutions involved for RP verification and update b) Institution/NGO involved in RP implementation c) Other Institutions contacted as a part of consultation and disclosure requirements All the grievances received in Dehradun with mitigation measures are tabulated & resolved. RP verification activity is not required for this particular subproject. RP not required for this subproject. 1. Nagar Nigam, Dehradun 2. Uttarakhand Jal Sansthan 3. Pey Jal Nigam For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 30

33 A-2 Design, Construction, Commissioning, Operation and Maintenance of Intake works, Water Treatment Plant, Rehabilitation and up gradation of existing Water Treatment Plants in Dehradun City WSS06DN 1 Introduction a) Proposed Sub-project components This subproject involves as following works. 1.Design and Construction of 15 mld conventional Water Treatment Plant and 10 mld Water Softening Plant at Purukul Gram including construction of Intake works at Galogi Power House, including Design and Construction of water treatment units and Rehabilitation 2. Up-gradation of Dilaram Bazaar WTP for enhancing of the plant capacity from 20 mld to 27.5 mld and Rehabilitation and up-gradation of Existing water Treatment Plants of 14 mld capacity at Shehanshai Ashram in Dehradun city including Operation and Maintenance of all water treatment plants for the period of three years. b) Proposed Sub-project components that involve LA and R&R This package does not involve LA and R&R as the proposed works are to be constructed on existing lands under ownership of UJS. 2 Sub-project components wise Progress a) Engineering Progress Galogi Intake: Structural Drawing submitted on to PIU-1 for approval Purukulgram WTP (New Work): Process Design/ Drg is Approved on Demolition of existing units completed Approach Road: 5.5m width 727 m completed. Staff Quarter: Plumbing, Electrical & finishing works are under progress. Chemical House: Brick Masonry for walls and 2nd lift column casting under progress. Retaining wall: 4m-15m, 3m-4.8m, 2.4m-90.52m length(total m) in eastern side of the site completed. Raft of 8m Rtn wall back side of Chemical House is under progress for length 21 m & southern side 2.4m Rtn wall for length 20m is under progress. CWR 350KL Top Dome work is completed and ventilation above Dome, finishing works are under progressclarifloculator Finishing works are under progress. Filter House: Earth works excavation for foundation & PCC for 17 out of 37 casted and Reinforcement works are under progress. Shahenshahi Ashram WTP (Rehabilitation Work): Rehabilitation works in 1st Settling tank fixing of truff& channel are -Completed, Laying of Tube Settlers are under progress and laying of Filter media for 1st Filter bed is under progress Wash Water Tank: Earth work excavation for foundation & PCC -Completed Page 31

34 Chlorination Room: Earth work excavation for foundation under progress. Dilaram Bazar WTP(20MLD) (Rehabilitation Work) Rehabilitation works in 1st Settling tank works are under progress Flocculator-20MLD: RCC for Raft Casted and Side wall shuttering works are under progress. Dilaram Bazar WTP (7.5 MLD) (New Work): Filter House: Foundation works -Completed & Filter units above GL brick masonry for walls and column casting, Filter units are under progress. Sedimentation Tank: Earth works excavation & PCC is -Completed & RCC footing & column upto bottom level of Raft -Completed. Aeration Fountain: RCC footing casted and columns are under progress. Total Physical Progress-24%. b) Ground Clearing/Utility Shifting Not Arising. c) Obtaining NOCs etc. Already obtained from UJS. 3 RP Verification and Update a) Verification of LA and list of DPs Proposed Subproject components do not involve LA and any R&R issues. Hence RP is not prepared. b) Difference of LA and DPs that from approved RP Total land in Ha: Nil. Total DPs: Nil c) Compensation for LA NA d) Compensation for Temporary DPs NA e) Compensation (others, if any-mention) NA f) Revised Total RP Budget (only NA compensation) g) RP updating, submission to the ADB and its approval NA 4 Payment of Compensation and Resettlement Assistance a) Issue of ID cards (start and completion NA date) b) Total ID cards issued till date NA c) Progress of compensation payment NA (Total number of DPs paid) d) Total RP budget utilized (only compensation) NA 5 Consultation and Disclosure Activities and Grievance Procedures a) Consultations and Disclosure Meetings Regular cluster level meetings conducted on monthly frequency basis as public disclosure process by the CAPP NGOs up to mobilization date May, Periodic visits/ have been conducted by the SCDO-UUSDIP, RM&ME DSC-1 as a part of the program Page 32

35 b) Assistance provided to vulnerable DPs Nil. c) Total grievances recorded (with details) As a part of Grievance redressal mechanism public grievances are captured and addressed at IPIU level. d) Total grievances addressed completely and closed 6 Institutions Involved and Contacted a) Institutions involved for RP verification and update b) Institution/NGO involved in RP implementation c) Other Institutions contacted as a part of consultation and disclosure requirements All the grievances received in Dehradun with mitigation measures are tabulated in IPIU. RP verification activity is not required for this particular subproject. RP not required for this subproject. 1. Nagar Nigam, Dehradun 2. Uttarakhand Jal Sansthan 3. Pey Jal Nigam For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 33

36 A-3 Water Supply Distribution System for 19 Zones in Dehradun City clubbed WSS07DN (WSS07DN, WSS09DN & WSS10DN) 1 Introduction a) Proposed Sub-project components b) Proposed Sub-project components that involve LA and R&R This sub works involves water supply distribution system for 19 Zones (Zone 4b,15,20,22,27,17,23,26,33,34,35,36,3,5,11,12,13,14& 41) in Dehradun WSS07DN(clubbing all packages (WSS07DN,WSS09DN and WSS10DN) This package does not involve LA and R&R 2 Sub-project components wise Progress a) Engineering Progress 1. Construction Drgs has been issued to the Contractor. 2. Work Plan has been issued to Contractor 3. EC for DI Pipes/Valves have been recommended. 4. Scrutiny of other documents submitted by M/sJITF is completed. 5. Permission for Road cutting/ laying of water supply pipelines for 7 Zones have been provided to the Contractor. b) Ground Clearing/Utility Shifting c) Obtaining NOCs etc. Proposal under preparation 3 RP Verification and Update a) Verification of LA and list of DPs Proposed Subproject components do not involve LA and any R&R issues. Hence RP is not prepared. b) Difference of LA and DPs that from approved RP Total land in Ha: Nil. Total DPs: 196 c) Compensation for LA NA d) Compensation for Temporary DPs Rs e) Compensation (others, if anymention) NA f) Revised Total RP Budget (only Yet to be revised compensation) g) RP updating, submission to the ADB and its approval NA 4 Payment of Compensation and Resettlement Assistance a) Issue of ID cards (start and completion date) R&R activities awaited due to unavailability of resettlement implementing NGO/agency b) Total ID cards issued till date Not started c) Progress of compensation NA payment (Total number of DPs paid) d) Total RP budget utilized (only compensation) NIL 5 Consultation and Disclosure Activities and Grievance Procedures a) Consultations and Disclosure Meetings Regular cluster level meetings conducted on monthly frequency basis as public disclosure process by the CAPP NGOs up to demobilization date May,2013. Periodic visits/ have been conducted by the SCDO- UUSDIP, RM&ME DSC-1 as a part of the program Page 34

37 b) Assistance provided to vulnerable DPs c) Total grievances recorded (with details) d) Total grievances addressed completely and closed Nil. As a part of Grievance redressal mechanism public grievances are captured and addressed IPIU. All the grievances received in Dehradun with mitigation measures are tabulated by IPIU. 6 Institutions Involved and Contacted a) Institutions involved for RP verification and update ToR prepared & submitted for competent approval reg. hiring/engagement of Social Consultant/NGOs for RP b) Institution/NGO involved in RP implementation c) Other Institutions contacted as a part of consultation and disclosure requirements verification &Updation ToR prepared & submitted for competent approval reg. hiring/engagement of Social Consultant/NGOs for RP verification &Updation 1. Nagar Nigam, Dehradun 2. Uttarakhand Jal Sansthan 3. Pey Jal Nigam For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 35

38 A-4 Water Supply Distribution System for 10 Zones in Dehradun City WSS08DN 1 Introduction a) Proposed Sub-project components Supplying, laying, Jointing, testing and commissioning of Raw Water Gravity Main from Massi falls up to Shahenshahi Ashram Water Treatment Plant Dehradun b) Proposed Sub-project components that This package does not involve LA and R&R. involve LA and R&R 2 Sub-project components wise Progress a) Engineering Progress 1. Procured MS Pipes: m 2. Laid MS Pipes: m 3. Tested MS Pipes: m 4. CI Valves Fixed: 7Nos 5. Thrust Blocks Constructed: 61Nos. 6. Pre-commissioning done on Retaining Wall: 8 m, RRM work completed near Kallukhalla mm MS Pipe welding under progress for diversion of water in source (Massi Fall) 9. Fabrication for Thrust Block under progress between source 0m chainage to 250m 10. Excavation for RCC support for SCV under progress at KalluKhalla 11. Contractor has requested for Extension of Time Total Physical Progress-97.3%. b) Ground Clearing/Utility Shifting Not required c) Obtaining NOCs etc. Not required 3 RP Verification and Update a) Verification of LA and list of DPs Not needed b) Difference of LA and DPs that from NA approved RP c) Compensation for LA NA d) Compensation for Temporary DPs NA e) Compensation (others, if any-mention) NA f) Revised Total RP Budget (only NA compensation) g) RP updation, submission to the ADB and its approval NA 4 Payment of Compensation and Resettlement Assistance a) Issue of ID cards (start and completion NA date) b) Total ID cards issued till date NA c) Progress of compensation payment NA (Total number of DPs paid) d) Total RP budget utilized (only compensation) NA 5 Consultation and Disclosure Activities and Grievance Procedures a) Consultations and Disclosure Meetings Regular cluster level meetings conducted on monthly frequency basis as public disclosure process by the CAPP NGOs up to demobilization date May,2013. Periodic visits/ have been conducted by the SCDO-UUSDIP, RM&ME DSC-1 as a part of the program Page 36

39 b) Assistance provided to vulnerable DPs Nil. c) Total grievances recorded (with details) As a part of Grievance redressal mechanism public grievances are captured and addressed by IPIU. d) Total grievances addressed completely and closed 6 Institutions Involved and Contacted a) Institutions involved for RP verification and update b) Institution/NGO involved in RP implementation c) Other Institutions contacted as a part of consultation and disclosure requirements All the grievances received in Dehradun with mitigation measures are tabulated by IPIU. Not required Not required 1. Nagar Nigam, Dehradun 2. Uttarakhand Jal Sansthan 3. Pey Jal Nigam For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 37

40 A-5 Water Supply Distribution system of Roorkee Town -WSS01RK 1 Introduction a) Proposed Sub-project components This work consists of Supplying, laying, testing and commissioning of Water supply distribution network for the town of Roorkee. 5 New OHT are proposed to be constructed and all the related appurtenances such as Valves etc. are also proposed to be installed under this package. Total length of pipelines is 215 km. b) Proposed Sub-project components that involve LA and R&R This package does not involve LA and R&R as land for the OHT construction is already vacant and in possession of concerned authorities. Pipe laying in the market area requires R&R. 2 Sub-project components wise Progress a) Engineering Progress Supply Km (HDPE Km,DI-9.39Km) Laid Km (HDPE Km,DI-5.33 Km) Tested Km (HDPE Km,DI-3.16Km) Fixing of Valves- 50 Nos. House Service Connections 8827 Nos CC Road Restoration Km Paver Block Restoration-3.00KM OHSR (5 No s) Padav: Super structure for Staircase Cabin are in Progress. Indira Park: Concreting of Dome top slab completed. Fixing of Manhole is in progress. Sub structure of Staircase cabin in progress. MaqtoolPuri: Concreting of Bottom Dome Slab in progress. Ganeshpur: Design and Drawings of OHSR on New Land has been approved from PIU. Adarsh Nagar: Excavation for foundation is in progress. Legal issues are proceeding at Civil Court, Roorkee and Hon'ble High Court, Nainital. Total Physical Progress %. b) Ground Clearing/Utility Shifting Not started c) Obtaining NOCs etc. NOC obtained. 3 RP Verification and Update a) Verification of LA and list of DPs R&R activities awaited due to unavailability of resettlement implementing NGO/agency b) Difference of LA and DPs that from approved RP A total of 73 vendors, squatters, and encroachers will be temporarily affected during construction. Verification process not started yet. c) Compensation for LA Not Applicable d) Compensation for Temporary DPs R&R activities awaited due to unavailability of resettlement implementing NGO/agency e) Compensation (others, if any-mention) Not Started f) Revised Total RP Budget (only Not Started compensation) g) RP updating, submission to the ADB and its approval RP submitted on 3 rd June Payment of Compensation and Resettlement Assistance a) Issue of ID cards (start and completion date) R&R activities awaited due to unavailability of resettlement implementing NGO/agency b) Total ID cards issued till date R&R activities awaited due to unavailability of Page 38

41 resettlement implementing NGO/agency c) Progress of compensation payment (Total number of DPs paid) R&R activities awaited due to unavailability of resettlement implementing NGO/agency d) Total RP budget utilized (only compensation) R&R activities awaited due to unavailability of resettlement implementing NGO/agency 5 Consultation and Disclosure Activities and Grievance Procedures a) Consultations and Disclosure Meetings Disclosure meeting held on (annexed in the report) b) Assistance provided to vulnerable DPs Not Started c) Total grievances recorded (with details) Not Started d) Total grievances addressed completely Not Started and closed 6 Institutions Involved and Contacted a) Institutions involved for RP verification and update b) Institution/NGO involved in RP implementation c) Other Institutions contacted as a part of consultation and disclosure requirements ToR prepared & submitted for competent approval reg. hiring/engagement of Social Consultant/NGOs for RP verification &Updation ToRapproved under CSRN for hiring/engagement of Social Consultant/NGOs for RP verification &Updation Nagar Palika Roorkee Uttarakhand Jal Sansthan Pey Jal Nigam For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 39

42 A-6 Supply and installation of Domestic water meters covering all Domestic and commercial connections in Roorkee town WSS02RK 1 Introduction a) Proposed Sub-project components This works involves Supply and installation of Domestic water meters covering all Domestic and commercial connections in Roorkee town in various dia. Ranging from 15mm dia. to 100mm dia. These meters are compatible to future AMR. The works further include supply of Hand held units for automatic meter reading (2 no.) and supply of repeater unit (2 no.) and necessary software for water billing and also other accessories like strainers,cocks etc. b) Proposed Sub-project components that involve LA and R&R This package does not involve LA and R&R. 2 Sub-project components wise Progress a) Engineering Progress Bid Document prepared and DPR submitted. b) Ground Clearing/Utility Shifting Not Started c) Obtaining NOCs etc. NOC obtained 3 RP Verification and Update a) Verification of LA and list of DPs Not needed b) Difference of LA and DPs that from NA approved RP c) Compensation for LA NA d) Compensation for Temporary DPs NA e) Compensation (others, if any-mention) NA f) Revised Total RP Budget (only NA compensation) g) RP updating, submission to the ADB and its approval NA 4 Payment of Compensation and Resettlement Assistance a) Issue of ID cards (start and completion NA date) b) Total ID cards issued till date NA c) Progress of compensation payment NA (Total number of DPs paid) d) Total RP budget utilized (only compensation) NA 5 Consultation and Disclosure Activities and Grievance Procedures a) Consultations and Disclosure Meetings Disclosure meeting held on (annexed in the report) b) Assistance provided to vulnerable DPs NA c) Total grievances recorded (with details) NA d) Total grievances addressed completely and closed NA 6 Institutions Involved and Contacted a) Institutions involved for RP verification and update b) Institution/NGO involved in RP implementation c) Other Institutions contacted as a part of consultation and disclosure requirements Not required Not required Pey Jal Nigam For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 40

43 A-7 Sewerage system for Amber Talab, Ram Nagar, Old Railway Road, Chow Mandi, Sainik Colony etc (Sewered Area) (Zone-2&3) Roorkee WWM01RK 1 Introduction a) Proposed Sub-project components This work involves Supply, Laying and Installation of Waste Water Collection network for Amber Talab, Ram Nagar, Old Railway Road, Chow Mandi, Sainik Colony etc (Sewered Area) (Zone- 2&3) of Roorkee town b) Proposed Sub-project components that involve LA and R&R This package does not involve LA. Pipe laying on the roads where vendors and squatters do their business requires R&R 2 Sub-project components wise Progress a) Engineering Progress Re-Tendering is under progress: IFB for Re-bidding is published on Pre-Bid Meeting was held on , Reply to Pre-Bid Queries has been submitted. Last date for bid submission Extended to (Original was ) b) Ground Clearing/Utility Shifting Not started c) Obtaining NOCs etc. NOC obtained 3 RP Verification and Update a) Verification of LA and list of DPs Previous RP was approved for totalof 64 vendors, squatters, and encroachers will be temporarily affected during construction. Due to change of STP site, process for updation of RP is under progress. b) Difference of LA and DPs that from approved RP c) Compensation for LA Not Applicable d) Compensation for Temporary DPs Not started e) Compensation (others, if any-mention) Not started Due to change of STP site, process for updation of RP is under progress. f) Revised Total RP Budget (only compensation) Due to change of STP site process for updation of RP is under progress. g) RP updation, submission to the ADB and its approval Due to change of STP site process for updation of RP is under progress. 4 Payment of Compensation and Resettlement Assistance a) Issue of ID cards (start and completion date) R&R activities awaited due to unavailability of resettlement implementing NGO/agency b) Total ID cards issued till date Not started c) Progress of compensation payment Not started (Total number of DPs paid) d) Total RP budget utilized (only compensation) Not started 5 Consultation and Disclosure Activities and Grievance Procedures a) Consultations and Disclosure Meetings Disclosure meeting held on (annexed in the report) b) Assistance provided to vulnerable DPs Not Started c) Total grievances recorded (with details) Not Started d) Total grievances addressed completely and closed 6 Institutions Involved and Contacted a) Institutions involved for RP verification and update Not Started b) Institution/NGO involved in RP implementation c) Other Institutions contacted as a part of Pey Jal Nigam 1. IMPU-Dehradun 2. PIU-Roorkee 3. DSC-1 ToR approved under CSRN for hiring of Social Consultant/NGOs for RP verification &Updation Page 41

44 consultation and disclosure requirements For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 42

45 A-8 Construction of Sewerage Treatment Plant 30 mld of Roorkee (STP) WWM02RK 1 Introduction a) Proposed Sub-project components Construction of 33 MLD STP(SBR),SPS at Mahigarn& Ganeshpur on Design, Supply, Installation, Operation and Maintenance for 5 Years with necessary Rising main and Gravity main at Roorkee. b) Proposed Sub-project components that involve LA and R&R There are no requirements for permanent land acquisition for sewerage collection system, however 3 Hectare of land has been transferred by Uttarakhand Govt for STP (a Government Order has been issued to transfer the land to the concerning department. The land was under ownership of Uttaranchal irrigation department and free of any structures, however is given on annual lease (on auction basis from last 5 years) to private landowners (14 household) for cultivation. Lease period ends on 31 March 2011 and no extension was given to that land owners. Loss of livelihood and standing crop is envisaged if the land is proposed for development of STP because they were still cultivating the land. 2 Sub-project components wise Progress a) Engineering Progress SPS Ganeshpur (12.5 MLD): Design & Construction Drawing has been Approved by PIU/ IPMU. Shuttering and Reinforcement of Wet Well and Inlet Chamber along with Cutting Edge has been completed, Mix Design of concrete has been submitted on by contractor and Approved by PIU on Rising Main from Ganeshpur SPS to BSM chowk: Procurement action reportedly initiated by contractor. Permission from NH 73 is awaited. b) Ground Clearing/Utility Shifting Not started Gravity Main from BSM Chowk to Mahigran SPS: Construction drawings approved by PIU. QAP for RCC/DI pipe has approved by PIU. SPS Mahigran (32.2 MLD): Report of Soil Investigation has been submitted by Contractor. Planning for Demolition of Existing Quarter and Construction the new is in process. Settlement of Legal issue is under process. Rising Main from Mahigran SPS to STP: Route alignment drawing for pipe laying has been issued to the Contractor for Re-Survey due to change of STP land. 33 MLD Sewage Treatment Plant: Allotment Letter of land has been issued by Nagar Nigam on subsequently PIU has issued handing over the Land to Contractor on Confirmatory Survey has been completed by Contractor for submission of Layout. Soil Investigation has been conducted by Contractor, completed on and report is awaited. Design of STP on new allocated land at Saliyar village is pending from the Contractor. Page 42

46 c) Obtaining NOCs etc. NOC obtained 3 RP Verification and Update a) Verification of LA and list of DPs Due to Change of STP Site, process for updation of RP is under progress. b) Difference of LA and DPs that from Not started approved RP c) Compensation for LA Not started d) Compensation for Temporary DPs Not started e) Compensation (others, if any-mention) Not started f) Revised Total RP Budget (only Not started compensation) g) RP updating, submission to the ADB and its approval Due to Change of STP Site, process for updation of RP is under progress & will be submit in November, Payment of Compensation and Resettlement Assistance a) Issue of ID cards (start and completion date) R&R activities awaited due to unavailability of resettlement implementing NGO/agency b) Total ID cards issued till date Not started c) Progress of compensation payment Not started (Total number of DPs paid) d) Total RP budget utilized (only compensation) Not started 5 Consultation and Disclosure Activities and Grievance Procedures a) Consultations and Disclosure Meetings Disclosure meeting held on ( annexure in the report) b) Assistance provided to vulnerable DPs Not Started c) Total grievances recorded (with details) Not Started d) Total grievances addressed completely and closed 6 Institutions Involved and Contacted a) Institutions involved for RP verification and update b) Institution/NGO involved in RP implementation c) Other Institutions contacted as a part of consultation and disclosure requirements Not Started 1. IMPU-Dehradun 2. PIU-Roorkee 3. DSC-1 ToRapproved under CSRN for hiring of Social Consultant/NGOs for RP verification &Updation Pey Jal Nigam For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 43

47 A-9 Sewerage system for Ganeshpur Area (Un-sewered Area) (Zone-4) Roorkee WWM03RK 1 Introduction a) Proposed Sub-project components This work involves Supply, Laying and Installation of Waste Water Collection network for Ganeshpur Area (Un-sewered Area) (Zone-4) of Roorkee town b) Proposed Sub-project components that involve LA and R&R This package does not involve LA. Pipe laying on the roads where vendors and squatters do their business requires R&R 2 Sub-project components wise Progress a) Engineering Progress Re-Tendering is under progress: IFB for Re-bidding is published on Pre-Bid Meeting was held on , Reply to Pre-Bid Queries has been submitted. Last date for bid submission Extended to (Original was ) b) Ground Clearing/Utility Shifting Not started c) Obtaining NOCs etc. NOC obtained 3 RP Verification and Update a) Verification of LA and list of DPs Previous RP was approved for total of 64 vendors, squatters, and encroachers will be temporarily affected during construction. Due to change of STP site, process for updation of RP is under progress. b) Difference of LA and DPs that from approved RP c) Compensation for LA Not Applicable d) Compensation for Temporary DPs Not started e) Compensation (others, if any-mention) Not started Due to change of STP site, process for updation of RP is under progress. f) Revised Total RP Budget (only compensation) Due to change of STP site process for updation of RP is under progress. g) RP updation, submission to the ADB and its approval Due to change of STP site process for updation of RP is under progress. 4 Payment of Compensation and Resettlement Assistance a) Issue of ID cards (start and completion date) R&R activities awaited due to unavailability of resettlement implementing NGO/agency b) Total ID cards issued till date Not started c) Progress of compensation payment Not started (Total number of DPs paid) d) Total RP budget utilized (only compensation) Not started 5 Consultation and Disclosure Activities and Grievance Procedures a) Consultations and Disclosure Meetings Disclosure meeting held on (annexed in the report) b) Assistance provided to vulnerable DPs Not Started c) Total grievances recorded (with details) Not Started d) Total grievances addressed completely and closed 6 Institutions Involved and Contacted a) Institutions involved for RP verification and update b) Institution/NGO involved in RP implementation c) Other Institutions contacted as a part of consultation and disclosure requirements Not Started 1. IMPU-Dehradun 2. PIU-Roorkee 3. DSC-1 ToR approved under CSRN for hiring of Social Consultant/NGOs for RP verification &Updation Pey Jal Nigam Page 44

48 For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). B -1 Providing, Laying and jointing of distribution mains including fitting, fixing of specials, valves etc and construction of chambers and providing house connection in Nainital (WSS05NL) 1 Introduction (a) Proposed Sub-Project Components Providing distribution network, construction of chambers and providing house connection in Nainital (b) Proposed Sub-project components that involve Land Acquisition (LA) and Resettlement and Rehabilitation (R&R) Proposed Subproject components do not involve LA. However, while laying of Distribution Lines will involve temporary impacts on roadside business. 2 Sub-project components wise Progress (a) Engineering Progress Procurement of pipes in progress Total 68.80KM pipes supplied KM pipe line laid KM pipe line tested Kms Road Cutting Kms Road Restored (b) Ground Clearing / Utility Shifting Transmission lines will be laid above ground where it passes from forest lands and permission has been obtained from the Forest department. (c) Obtaining NOCs etc. NOC obtained 3 RP Verification and Update (a) Verification of LA and list of APs Proposed Subproject components do not involve LA and had Temporary impact on 25 APs as per RP prepared. Re-Verification survey carried out by the DSC-II in the month of September, 2014 observed that out of 25 APs, 5 No APs were uninterrupted during execution of work. Execution of construction work is still to take place in the corridor of impact where other 20 APs are residing. Thus the total number of APs is 20. (b) Difference of LA and APs that from Total land in Ha: Nil. Total APs: 25 approved RP (c) Compensation for LA NA (d) Compensation for Temporary APs Compensation will be given as per entitlement matrix (e) Compensation (others, if any) NA (f) Revised Total RP Budget (only compensation) Rs (g) RP updation, submission to the ADB and its approval submitted 4 Payment of Compensation and Resettlement Assistance (a) Issue of ID cards (start and completion date Yet to start (b) Total ID cards issued till date Nil Page 45

49 (c) (d) Progress of compensation payment (Total number of APs paid) Total RP budget utilized (only compensation) Yet to start Nil 5 Consultation and Disclosure Activities and Grievance Procedures (a) Consultations and Disclosure Meetings Yet to start (b) Assistance provided to vulnerable APs NA (c) Total grievances recorded (with details Nil (d) Total grievances addressed completely and closed Nil 6 Institutions Involved and Contacted (a) (b) (c) Institutions involved on RP verification and update Institution/NGO involved in RP implementation Other Institutions contacted as a part of consultation and disclosure requirements 1. CAPP NGO, Nainital 2. DSC-2, Kumaun region 3. PIU, Nainital 4. IPMU, Dehradun CAPP NGO Nainital from Feb 11 to June 13 and again from Nov. 13 to Feb Nagar PalikaParishad 2. TLC Nainital For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 46

50 B 2 Design, Supply and construction of Over Head Service Reservoirs and connecting Rising mains with appurtenant works different locations at Haldwani Town (WSS01HL) 1 Introduction (a) Proposed Sub-Project Components Construction of Over Head Service Reservoirs - 1. Heera Nagar 2. Tehsil Campus 3. Saras market 4. Indira Nagar 13 Bigha 5. Cantt Area 6. Hydel Gate 7. ZilaParisahad 8. Rajpura 9. Tikonia 10. GGIC,Indira Nagar 11. Shishmahal 12. Mahila Degree college 13. Ujala Nagar/Dhobi Ghat 14. Degree College 15. Subhash Nagar 16. AwasVikas colony (b) Proposed Sub-project components that involve Land Acquisition (LA) and Resettlement and Rehabilitation (R&R) Proposed Subproject components do not involve LA. However, while laying of connecting mains will involve temporary impacts on roadside business. 2 Sub-project components wise Progress (a) Engineering Progress Contractor has submitted design & drawing of 15Nos OHSRs,which have been approved. Construction is in progress at 1. Saras Market(600 KL) Testing Completed Handing over to UJS in process 2. Tehsil Complex(600 KL) - Testing Completed Handing over to UJS in process 3. Heera Nagar(600 KL) - Testing Completed Handing over to UJS in process 4. Indira Nagar-13 Bigha(600 KL) - Testing Completed Handing over to UJS in process 5. Ujala Nagar/Dhobi Ghat(600 KL) - Testing Completed Handing over to UJS in process 6. Rajpura(600 KL)Testing Completed Handing over to UJS in process 7. JalSansthan,Tikonia(600 KL) Testing Completed Handing over to UJS in process 8. Degree College(600 KL) - Testing Completed Handing over to UJS in process 9. Girls School,Indira Nagar(600 KL) Testing Completed Handing over to UJS in processshishmahal(750 KL) Completed 10. Hydal Gate(1250KL) Completed Page 47

51 11. ZilaParishad(400 KL) Completed 12. Mahila Degree College(1450KL) Completed 13. Cantt Area(600KL) Completed 14. Subhash Nagar(750 KL) Taking over of Land in progress 15. AwasVikas Colony(600 KL) Pipe line work in Progress Construction of GLSR s at Shitlahat(1050 KL) - Tank Completed, finishing work in progress. Rising Main & connecting Mains Km pipe line supplied 8.63 Km pipe line laid 5.96Km pipe line tested. NH crossing by Trenchless in progress at 1 no location. Electro-Mechanical works- 2 Nos voltage stabilizer procured 2 Nos Transformer procured 8 Nos Panel procured 11 Nos sets of horizontal centrifugal pump procured. 2 No pumps installed at Gola pump house. Civil works for pump House- Roof Slab and Plaster Work completed, flooring work in progress at Shishmahal Pump House Roof Slab completed at Khandelwal Park Pump House AVR Room completed at Gola Pump House. (b) Ground Clearing / Utility Shifting 1. Water Supply Pipe Lines at Shitlahat 2. Shifting of Electric Conductors at Dhobi Ghat, Cantt. Area and ZilaParishad for construction of OHSR's 3. Pipe Lines at AvasVikasClony for construction of OHSR (c) Obtaining NOCs etc. - 3RP Verification and Update (a) Verification of LA and list of APs Proposed Subproject components do not involve LA and will have Temporary impact on 50 APs Hence RP is prepared. (b) Difference of LA Total land in Ha: Nil. Total APs: 50 and APs that from approved RP (c) Compensation for LA NA (d) Compensation for Temporary APs Compensation will be given as per entitlement matrix (e) Compensation (others, if any) NA Page 48

52 (f) (g) Revised Total RP Budget (only compensation) RP updation, submission to the ADB and its approval Rs submitted 4 Payment of Compensation and Resettlement Assistance (a) Issue of ID cards (start and completion date Yet to start (b) Total ID cards issued till date Nil (c) (d) Progress of compensation payment (Total number of APs paid) Total RP budget utilized (only compensation) Yet to start Nil 5 Consultation and Disclosure Activities and Grievance Procedures (a) Consultations and Disclosure Meetings Yet to start (b) Assistance provided to vulnerable APs Nil (c) Total grievances recorded (with details Nil (d) Total grievances addressed completely and closed Nil 6 Institutions Involved and Contacted (a) (b) (c) Institutions involved on RP verification and update Institution/NGO involved in RP implementation Other Institutions contacted as a part of consultation and disclosure requirements 1. CAPP NGO, Nainital 2. DSC-2, Kumaun region 3. PIU, Nainital 4. IPMU, Dehradun CAPP NGO Nainitalfrom Feb 11 to June 13 and again from Nov. 13 to Feb Nagar Nigam 2. TLC Haldwani For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 49

53 B-3 Augmentation and Reorganization of Water Supply Scheme at Ramnagar (WSS01RM) 1 Introduction (a) Proposed Sub-Project Components 1. Source augmentation at River Kosi and at BangaJhala natural stream 2. Construction of 25 MLD capacity raw water pumping station at River kosi 3. Construction of 11 MLD capacity WTP 4. Construction of 3,125 KL capacity clear water sump 5. Installation of clear water pumps in existing clear water pumping station 6. Laying of clear water rising mains 7. Construction of three clear water reservoirs 8. Replacement/laying of 58.5 Km distribution mains 9. Laying 11.5 km BangaJhala gravity main 10. Providing house connections. (b) Proposed Sub-project components that involve Land Acquisition (LA) and Resettlement and Rehabilitation (R&R) Proposed subproject components does not involve LA. Pipelines will be buried 1 m below in a trench on the edge of the road within the existing RoW. However will have temporary impacts on roadside businesses. 2 Sub-project components wise Progress (a) Engineering Progress Design & Drawing approved for all OHSR s, (b) Ground Clearing / Utility Shifting Continuous process (c) Obtaining NOCs etc. NOC obtained Staging work completed for 2 Nos. OHSR s of 1150 KL at Tehsil, Bottom Dome in progress 3rd Brace Beam completed, 6.60 m height of columns completed out of m for 2600 KL OHSR at LakhanpurChungi Supply of 16 Km of MS & DI Pipe completed Cement Lining of 6.0 Km of MS Pipe completed Laying of MS Pipeline started 180 m MS Pipeline of 355 mm dia laid Infiltration Well 10 MLD 4th lift of wall of, protection wall for filter media completed, filling of media completed Km Pipe procured & supplied at site Km Pipe laying completed Km line tested Km Road cutting Km Road Restored. For providing 7835 No (approx.) House connections along with allied works survey work in progress, material supplied at site 20 No s House Connections completed. Page 50

54 3 RP Verification and Update (a) Verification of LA and list of APs Proposed Subproject Components does not involve LA. AP verification yet to start. (b) Difference of LA and APs that from Would be known once verification is done. approved RP Verification process not started yet. (c) Compensation for LA NA (d) Compensation for Temporary APs Compensation will be given as per entitlement matrix (e) Compensation (others, if any) Not Started (f) (g) Revised Total RP Budget (only compensation) RP updation, submission to the ADB and its approval NA Submitted 4 Payment of Compensation and Resettlement Assistance (a) Issue of ID cards (start and completion date Not started (b) Total ID cards issued till date Not started (c) Progress of compensation payment (Total number of APs paid) Not started (d) Total RP budget utilized (only compensation) Not started 5 Consultation and Disclosure Activities and Grievance Procedures (a) Consultations and Disclosure Meetings Yet to start (b) Assistance provided to vulnerable APs Not started (c) Total grievances recorded (with details Nil (d) Total grievances addressed completely and closed 6 Institutions Involved and Contacted Nil (a) (b) (c) Institutions involved on RP verification and update Institution/NGO involved in RP implementation Other Institutions contacted as a part of consultation and disclosure requirements CAPP NGO yet to mobilized DSC-2, Haldwani IPMU, Dehradun 1. Nagar PalikaRamnagar For Completing the balance R&R works, advertisement has been published for engagement of Social Consultant/ NGO for Community Awareness including Implementation of Resettlement Plan (RP)& Implementation of Gender Action Plan (GAP). Page 51

55 PHOTOGRAPHS OF PUBLIC CONSULTATION Page 52

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT A. Introduction and Subprojects Components 1. Tranche 2 of the

More information

Semi-annual Social Safeguards Monitoring Report (January to June 2012)

Semi-annual Social Safeguards Monitoring Report (January to June 2012) Semi-annual Social Safeguards Monitoring Report (January to June 2012) Armenia: Sustainable Urban Development Investment Program Tranche 1 Project Number: 42417 Loan Number: L2752 Prepared: July 2013 Prepared

More information

IND: Railway Sector Investment Program

IND: Railway Sector Investment Program Resettlement Framework Document Stage: Final March 2011 IND: Railway Sector Investment Program Prepared by Ministry of Railways for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 16 March 2011)

More information

IND: Uttarakhand Emergency Assistance Project

IND: Uttarakhand Emergency Assistance Project Resettlement Planning Document Project Number: 47229-001 March 2015 IND: Uttarakhand Emergency Assistance Project Prepared by: Uttarakhand Jal Santhan, Jal Bhawan, Dehradun, Uttarakhand This report has

More information

Bangladesh: Urban Public and Environmental Health Sector Development Program

Bangladesh: Urban Public and Environmental Health Sector Development Program Resettlement Planning Document Draft Resettlement Framework Document Stage: Draft for Consultation Project Number: 39305 May 2009 Bangladesh: Urban Public and Environmental Health Sector Development Program

More information

Land Acquisition and Resettlement Due Diligence Report

Land Acquisition and Resettlement Due Diligence Report Land Acquisition and Resettlement Due Diligence Report Document stage: Draft for consultation Project Number: 48434 Loan and/or Grant Number(s): {LXXXX; GXXXX; TAXXXX} March 2016 India: Visakhapatnam-Chennai

More information

India: Madhya Pradesh Urban Services Improvement Project (MPUSIP)

India: Madhya Pradesh Urban Services Improvement Project (MPUSIP) Resettlement Planning Document Resettlement Framework Document Stage: Draft for Consultation Project Number: 42486 June 2016 India: Madhya Pradesh Urban Services Improvement Project (MPUSIP) The resettlement

More information

India: Jammu & Kashmir Urban Sector Development Project

India: Jammu & Kashmir Urban Sector Development Project Resettlement Planning Document Full Resettlement Plan- Improvements to B.C Road from Shakuntala Crossing to Children s Hospital Including pedestrian subway Document Stage: Final Project Number: 41116 October

More information

Resettlement Plan. February Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Resettlement Plan. February Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank. Resettlement Plan February 2012 IND: Jammu & Kashmir Urban Sector Development Investment Programme (JKUSDIP) Rehabilitation and Channelization of Storm Water Drains at Channi Himmat in Jammu City Prepared

More information

IND: Uttarakhand Emergency Assistance Project

IND: Uttarakhand Emergency Assistance Project Resettlement Planning Document Project Number: 47229-001 July 2016 IND: Uttarakhand Emergency Assistance Project Sub Project : Supplementary Due Diligence Report (social) internal roads of Dehradun district

More information

IND: Uttarakhand Emergency Assistance Project

IND: Uttarakhand Emergency Assistance Project Resettlement Planning Document Project Number: 47229-001 May 2016 IND: Uttarakhand Emergency Assistance Project Sub Project : DDR for Roads of Dehradun District Submitted by Uttarakhand Emergency Assistance

More information

India: Uttarakhand State Road Investment Program

India: Uttarakhand State Road Investment Program Resettlement Planning Document Resettlement Plan for Kirti Nagar New Tehri Road Subproject Document Stage: Final Project Number: 38255 May 2008 India: Uttarakhand State Road Investment Program Prepared

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS

More information

MON: Urban Development Sector Project Bulgan Subproject

MON: Urban Development Sector Project Bulgan Subproject Resettlement Completion Report Annual Report 24 December 2012 MON: Urban Development Sector Project Bulgan Subproject Prepared by Purevsuren Dorjnamjil, Resettlement Specialist, Project Management Unit

More information

Sri Lanka: DRY ZONE URBAN WATER AND SANITATION PROJECT - for Mannar Subprojects

Sri Lanka: DRY ZONE URBAN WATER AND SANITATION PROJECT - for Mannar Subprojects Resettlement Implementation Plan Project Number: 37381-013 September 2012 Sri Lanka: DRY ZONE URBAN WATER AND SANITATION PROJECT - for Mannar Subprojects Prepared by SMEC Consultants for Dry Zone Urban

More information

IND: Uttarakhand Urban Sector Development Investment Program Tranche 2 Nainital Water Supply Distribution System Subproject

IND: Uttarakhand Urban Sector Development Investment Program Tranche 2 Nainital Water Supply Distribution System Subproject Draft Resettlement Plan July 2011 IND: Uttarakhand Urban Sector Development Investment Program Tranche 2 Nainital Water Supply Distribution System Subproject Prepared by Urban Development Department, Government

More information

Resettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Resettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank. Resettlement Plan October 2013 IND: Jammu & Kashmir Urban Sector Development Investment Programme (JKUSDIP) Construction of Storm Water Drains in the Adjoining Areas of NH Bypass (Rawalpora Chowk Chanapora

More information

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the RESETTLEMENT FRAMEWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the Secondary Education Modernization Project II in Sri Lanka Ministry of Education

More information

IND: Railway Sector Investment Program Tranche 3

IND: Railway Sector Investment Program Tranche 3 Resettlement Due Diligence Report September 2017 IND: Railway Sector Investment Program Tranche 3 Prepared by the Ministry of Railways for the Republic of India and the Asian Development Bank. CURRENCY

More information

Internal Monitoring Report. PAK: Loan 2299: Lower Bari Doab Canal Improvement Project

Internal Monitoring Report. PAK: Loan 2299: Lower Bari Doab Canal Improvement Project Internal Monitoring Report 37231-023 March 2016 PAK: Loan 2299: Lower Bari Doab Canal Improvement Project This social monitoring report is a document of the borrower. The views expressed herein do not

More information

SRI: Local Government Enhancement Project

SRI: Local Government Enhancement Project Draft Resettlement Framework July 2011 SRI: Local Government Enhancement Project Prepared by the Ministry of Local Government and Provincial Councils for the Asian Development Bank. CURRENCY EQUIVALENTS

More information

Resettlement Plan. October Prepared by the Government of Jammu and Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Resettlement Plan. October Prepared by the Government of Jammu and Kashmir, Economic Reconstruction Agency for the Asian Development Bank. Resettlement Plan October 2013 IND: Jammu and Kashmir Urban Sector Development Investment Program (JKUSDIP) - Construction of Mechanized Automated Multi Level Parking Facility at Super Bazaar, Jammu (Tranche

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B. Module 8 - Involuntary Resettlement- Policy Principles & Requirements (World bank OP 4.12 and 4.12 Annex A) Key principles and objectives of an involuntary Resettlement Policy Resettlement planning instruments

More information

SRI: Local Government Enhancement Project

SRI: Local Government Enhancement Project Appendix 13 Resettlement Framework Dec 2011 SRI: Local Government Enhancement Project CURRENCY EQUIVALENTS (as of 27 June 2011) Currency Unit = Sri Lankan Rupee/s (SLR/Rs) Rs1.00 = $0.0091 $1.0 = Rs 109.8700

More information

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL REPORT Resettlement and Rehabilitation (R&R) Entitlement Framework RP297 Under

More information

IND: Mumbai Metro Rail Systems Project

IND: Mumbai Metro Rail Systems Project Social Due Diligence Report October 2018 IND: Mumbai Metro Rail Systems Project Prepared by Mumbai Metropolitan Region Development Authority, Government of India for the Asian Development Bank. ABBREVIATION

More information

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Final Project Number: 40282 September 2006 VIE: Calamity Damage Rehabilitation Project The summary

More information

IND: Chhattisgarh State Road Sector Project

IND: Chhattisgarh State Road Sector Project Resettlement Plan November 2012 IND: Chhattisgarh State Road Sector Project Dhamdha Khairagarh Road Subproject Prepared by Public Works Department, Government of Chhattisgarh for the Asian Development

More information

Indonesia: Enhanced Water Security Investment Project

Indonesia: Enhanced Water Security Investment Project Initial Poverty and Social Analysis March 2018 Indonesia: Enhanced Water Security Investment Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy

More information

Resettlement Plan. IND: Rajasthan Urban Sector Development Program (RUSDP) Sri Ganganagar Water Supply and Sewerage Works

Resettlement Plan. IND: Rajasthan Urban Sector Development Program (RUSDP) Sri Ganganagar Water Supply and Sewerage Works Resettlement Plan Document stage: Draft for consultation Project Number: 42267 September 2014 IND: Rajasthan Urban Sector Development Program (RUSDP) Sri Ganganagar Water Supply and Sewerage Works This

More information

IND: Rajasthan Urban Sector Development Investment Program

IND: Rajasthan Urban Sector Development Investment Program Social Monitoring Report Project Number: 40031 September 2009 IND: Rajasthan Urban Sector Development Investment Program Prepared by Local Self Government Department This report has been submitted to ADB

More information

MLD - Kulhudhuffushi Harbor Expansion Project

MLD - Kulhudhuffushi Harbor Expansion Project Kulhudhuffushi Harbor Expansion Project (RRP MLD 36111-013) Due Diligence Report on Involuntary Resettlement and Indigenous Peoples March 2016 MLD - Kulhudhuffushi Harbor Expansion Project Prepared by

More information

Indigenous Peoples Development Planning Document. IND: Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program

Indigenous Peoples Development Planning Document. IND: Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Draft for Consultation Project Number: 38412 June 2009 IND: Assam Integrated Flood and Riverbank

More information

Resettlement Plan. IND: Rajasthan Urban Sector Development Program (RUSDP) Pali Water Supply and Sewerage Works

Resettlement Plan. IND: Rajasthan Urban Sector Development Program (RUSDP) Pali Water Supply and Sewerage Works Resettlement Plan Document stage: Draft for consultation Project Number: 42267 September 2014 IND: Rajasthan Urban Sector Development Program (RUSDP) Pali Water Supply and Sewerage Works This resettlement

More information

Resettlement Plan. IND: Bihar State Highways II Project. March Siwan-Siswan Subproject (SH-89)

Resettlement Plan. IND: Bihar State Highways II Project. March Siwan-Siswan Subproject (SH-89) Resettlement Plan March 2012 IND: Bihar State Highways II Project Siwan-Siswan Subproject (SH-89) Prepared by Bihar State Road Development Corporation, Government of Bihar for the Asian Development Bank.

More information

IND: Northeastern Region Capital Cities Development Investment Program Aizawl Water Supply and Sewerage Subproject

IND: Northeastern Region Capital Cities Development Investment Program Aizawl Water Supply and Sewerage Subproject Resettlement Plan December 2011 IND: Northeastern Region Capital Cities Development Investment Program Aizawl Water Supply and Sewerage Subproject Prepared by State Investment Program Management and Implementation

More information

BAN: Railway Sector Investment Program

BAN: Railway Sector Investment Program Resettlement Planning Document Resettlement Framework Document Stage: Final Project Number: 32234 June 2006 BAN: Railway Sector Investment Program Prepared by Bangladesh Railway, Dhaka, Bangladesh The

More information

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Resettlement Policy Framework for the Smallholder Agriculture Development Project

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project Initial Poverty and Social Analysis May 2018 People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project This document is being disclosed to the public in accordance

More information

2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field

2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field Draft Safeguards Monitoring Report Project No. 38164-013 Draft Semi Annual Report December 2015 2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas

More information

IND: Uttarakhand State Roads Investment Program (Project 3)

IND: Uttarakhand State Roads Investment Program (Project 3) Resettlement Plan November 2011 IND: Uttarakhand State Roads Investment Program (Project 3) Pauri Bend Magnesite Factory Road Subproject Prepared by Public Works Department, Government of Uttarakhand for

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

The Disaster Management Act, 2005

The Disaster Management Act, 2005 GOVERNMENT OF HIMACHAL PRADESH DEPARTMENT OF REVENUE The Disaster Management Act, 2005 (National Act, Rules and Notifications) Alongwith State DM Rules and Notifications HP STATE DISASTER MANAGEMENT AUTHORITY

More information

India: Infrastructure Development Investment Program for Tourism

India: Infrastructure Development Investment Program for Tourism Infrastructure Development Investment Program for Tourism (RRP IND 40648) Resettlement Framework Document Stage: Draft for Consultation Project Number: P40648 July 2010 India: Infrastructure Development

More information

Resettlement Plan Dili-Tibar-Liquica Road

Resettlement Plan Dili-Tibar-Liquica Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING SECTOR PROJECT November 2011 REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK

More information

IND: Infrastructure Development Investment Program for Tourism - Tranche 3

IND: Infrastructure Development Investment Program for Tourism - Tranche 3 Resettlement Planning Document Project Number: 40648-034 March 2016 IND: Infrastructure Development Investment Program for Tourism - Tranche 3 Sub Project : Conservation and Adaptive Reuse of Town Hall,

More information

India: Rajasthan Urban Sector Development Investment Program Barmer Urban Transport and Roads Subproject

India: Rajasthan Urban Sector Development Investment Program Barmer Urban Transport and Roads Subproject Resettlement Plan Document Stage: Draft for Consultation Project Number: 40031 April 2012 India: Rajasthan Urban Sector Development Investment Program Barmer Urban Transport and Roads Subproject Prepared

More information

India: Preparing the Energy Efficiency Enhancement Project in the Assam Power Sector

India: Preparing the Energy Efficiency Enhancement Project in the Assam Power Sector Resettlement Planning Document Short Resettlement Plan for Tranche-2 Components Document Stage: Draft for Consultation Project Number: TA 7096-IND April 2010 India: Preparing the Energy Efficiency Enhancement

More information

LUCKNOW METRO RAIL PROJECT

LUCKNOW METRO RAIL PROJECT LUCKNOW METRO RAIL PROJECT RESETTLEMENT POLICY FRAMEWORK (Final) LUCKNOW METRO RAIL CORPORATION LTD. Contents SECTION-1... 1 INTRODUCTION... 1 1.1 INTRODUCTION... 1 1.2 THE PROJECT... 1 Table 1.1: Route

More information

Gender Equality and Development

Gender Equality and Development Overview Gender Equality and Development Welcome to Topic 3 of the e-module on Gender and Energy. We have already discussed how increased access to electricity improves men s and women s lives. Topic Three

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II Social Safeguards Monitoring Report Full Report November 2018 CAM: Rural Roads Improvement Project II Prepared by the Ministry of Rural Development for the Kingdom of Cambodia and the Asian Development

More information

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT DRAFT COMPARATIVE ANALYSIS OF NEPAL s LEGAL FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT Note: The following is based

More information

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION Table of Content Volume 4 Chapter 1: Project Description 1 PROJECT DESCRIPTION...1 1.1 THE NT2 PROJECT...1 1.2 THE NEED FOR RESETTLEMENT AND DEVELOPMENT...1 1.3 THE

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry

More information

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang)

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Resettlement Plan August 2011 VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Prepared by the Lang Son Provincial People s Committee for the Asian

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

IND: Uttarakhand Emergency Assistance Project (UEAP)

IND: Uttarakhand Emergency Assistance Project (UEAP) Social Monitoring Report Project Number: 47229-001 November 2015 Period: January 2015 June 2015 IND: Uttarakhand Emergency Assistance Project (UEAP) Submitted by Project implementation Unit Tourism (Garhwal),

More information

INDIA: Tsunami Emergency Assistance (Sector) Project

INDIA: Tsunami Emergency Assistance (Sector) Project Resettlement Planning Document Short Resettlement Plan Document Stage: Final Project Number: 39114 March 2007 INDIA: Tsunami Emergency Assistance (Sector) Project Prepared by Public Works Department, Government

More information

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014)

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Submitted to : Egyptian Natural Gas Holding Company Prepared by: EcoConServ Environmental

More information

IND: Rajasthan Urban Sector Development Investment Program

IND: Rajasthan Urban Sector Development Investment Program Social Monitoring Report Project Number: 40031 December 2009 IND: Rajasthan Urban Sector Development Investment Program Prepared by Local Self Government Department This report has been submitted to ADB

More information

THE DISASTER MANAGEMENT BILL, 2005

THE DISASTER MANAGEMENT BILL, 2005 Bill No. LV-F of 2005 THE DISASTER MANAGEMENT BILL, 2005 (AS PASSED BY THE HOUSES OF PARLIAMENT) A BILL to provide for the effective management of disasters and for matters connected therewith or incidental

More information

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING Road Development Agency 1 5 6 2 3 4 RESETTLEMENT POLICY FRAMEWORK FINAL REPORT Consultancy Services for the Design and Preparation of Bidding Documents for a Countrywide Roll-out of the Output and Performance

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Binh Thuan Province Prepared by the Ministry of

More information

TRIBAL DEVELOPMENT PLAN

TRIBAL DEVELOPMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Rehabilitation, Upgradation and Strengthening of Nuapada-Bango Munda Section of NH-217

More information

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives Page 1 of 9 Involuntary Resettlement 1. Bank 1 experience indicates that involuntary resettlement under development projects, if unmitigated, often gives rise to severe economic, social, and environmental

More information

India: Infrastructure Development Investment Program for Tourism

India: Infrastructure Development Investment Program for Tourism Infrastructure Development Investment Program for Tourism (RRP IND 40648) Resettlement Framework (Updated) Project Number: P40648 Approved: July 2010 Revised: October 2010 India: Infrastructure Development

More information

IND: Infrastructure Development Investment Program for Tourism (IDIPT)- Tranche 2

IND: Infrastructure Development Investment Program for Tourism (IDIPT)- Tranche 2 Social Monitoring Report Project Number: 40648-033 November 2017 Period: July 2016 December 2016 IND: Infrastructure Development Investment Program for Tourism (IDIPT)- Tranche 2 Submitted by Program Management

More information

Resettlement Plan: Solar-LED Streetlights. BAN: Power System Efficiency Improvement Project

Resettlement Plan: Solar-LED Streetlights. BAN: Power System Efficiency Improvement Project Resettlement Plan: Solar-LED Streetlights Document Stage: Draft Project Number: 37113 April 2011 BAN: Power System Efficiency Improvement Project Prepared by: Bangladesh Power Development Board (BPDB),

More information

BAN: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2

BAN: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 Resettlement Due Diligence Report May 2017 BAN: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 Prepared by the Roads and Highways Department, Government of the

More information

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia)

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Republic of Sakha (Yakutia) of the Russian Federation Innovative Development of Preschool

More information

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS ENVIRONMENTAL SAFEGUARDS Objectives To ensure the environmental soundness and sustainability of projects and to support the integration

More information

Revised Resettlement Plan Tibar-Gleno Road

Revised Resettlement Plan Tibar-Gleno Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING PROJECT February 2012 Democratic Republic of Timor-Leste REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS

More information

PAK: MFF II Power Transmission Enhancement Program (PTEIP II)

PAK: MFF II Power Transmission Enhancement Program (PTEIP II) Social Document stage: Draft 16 May, 2017 PAK: 48078-002 MFF II Power Transmission Enhancement Program (PTEIP II) Social Due Diligence Review of Upgradation/ Extension of NTDC s Telecommunication & SCADA

More information

Earthquake Emergency Assistance Project

Earthquake Emergency Assistance Project Government of Nepal Ministry of Federal Affairs and Local Development Central Level Project Implementation Unit Earthquake Emergency Assistance Project (ADB Loan 3260-NEP) Section IV: Gender Equality and

More information

Final Monitoring Report to the Board of Directors. on the. Implementation of Remedial Actions. for the

Final Monitoring Report to the Board of Directors. on the. Implementation of Remedial Actions. for the Final Monitoring Report to the Board of Directors on the Implementation of Remedial Actions for the Integrated Citarum Water Resources Management Investment Program Project 1 in the Republic of Indonesia

More information

SUMMARY POVERTY REDUCTION AND SOCIAL STRATEGY

SUMMARY POVERTY REDUCTION AND SOCIAL STRATEGY Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP CAM46293) SUMMARY POVERTY REDUCTION AND SOCIAL STRATEGY Country: Cambodia Project Title: Greater Mekong Subregion Tourism

More information

Ethnic Minorities Development Framework. PRC: Guiyang Integrated Water Resources Management Sector Project

Ethnic Minorities Development Framework. PRC: Guiyang Integrated Water Resources Management Sector Project Ethnic Minorities Development Framework Ethnic Minorities Development Framework Document Stage: Draft Project Number: P38594 September 2006 PRC: Guiyang Integrated Water Resources Management Sector Project

More information

Involuntary Resettlement Due Diligence Report. IND: Infrastructure Development Investment Program for Tourism Tranche 2

Involuntary Resettlement Due Diligence Report. IND: Infrastructure Development Investment Program for Tourism Tranche 2 Involuntary Resettlement Due Diligence Report Project Number: 40648-033 June 2014 IND: Infrastructure Development Investment Program for Tourism Tranche 2 Submitted by Department of Tourism, Government

More information

Indigenous Peoples Planning Framework. India: Assam Power Sector Investment Program

Indigenous Peoples Planning Framework. India: Assam Power Sector Investment Program Indigenous Peoples Planning Framework Document Stage: Draft for Consultation Project Number: 47101 (IND) September 2013 India: Assam Power Sector Investment Program Prepared by Assam Power Generation Corporation

More information

BAN: Railway Sector Investment Program

BAN: Railway Sector Investment Program Resettlement Due Diligence Report February 2016 BAN: Railway Sector Investment Program Sub Project 1: Tongi-Bhairab Bazar Double Line Project (TBDLP) Sub Project 2: Rehabilitation of Yards and Extension

More information

Resettlement and Indigenous Peoples Plan. IND: North Eastern State Roads Investment Program

Resettlement and Indigenous Peoples Plan. IND: North Eastern State Roads Investment Program Resettlement and Indigenous Peoples Plan February 2013 IND: North Eastern State Roads Investment Program Udaipur Melaghar Subproject (TR02) Prepared by Ministry of Development of North Eastern Region for

More information

Rehabilitation & Resettlement (R&R) Policy for Kochi Metro Rail Project March 2015

Rehabilitation & Resettlement (R&R) Policy for Kochi Metro Rail Project March 2015 Rehabilitation & Resettlement (R&R) Policy for Kochi Metro Rail Project March 2015 AARVEE Associates Architects Engineers & Consultants Private Limited 8-2-5, Ravula Residency Srinagar Colony Hyderabad

More information

IND: Second Jharkhand State Road Project

IND: Second Jharkhand State Road Project Resettlement Plan March 2015 IND: Second Jharkhand State Road Project Khunti - Tamar Road Prepared by State Highways Authority of Jharkhand (SHAJ), Government of India for the Asian Development Bank. ADB

More information

REPORT 2014/052 INTERNAL AUDIT DIVISION

REPORT 2014/052 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2014/052 Audit of the operations of the Regional Office in South Africa for the Office of the United Nations High Commissioner for Refugees Overall results relating to the

More information

IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project

IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Resettlement Plan (Draft) November 2013 IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Prepared by, Government of Madhya Pradesh through MP Transco, DISCOM C, DISCOM-E

More information

Land Acquisition and Resettlement Framework. BAN: Coastal Climate Resilient Infrastructure Project

Land Acquisition and Resettlement Framework. BAN: Coastal Climate Resilient Infrastructure Project Coastal Climate Resilient Infrastructure Project (RRP BAN 45084) Land Acquisition and Resettlement Framework Project Number: 45084 July 2012 BAN: Coastal Climate Resilient Infrastructure Project Prepared

More information

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems Technical Assistance Consultant s Report Project Number: 44140 Date: April 2013 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Strengthening Involuntary Resettlement Safeguard

More information

BAN: City Region Development Project for Shakhari Bazaar Urban Renewal Subproject

BAN: City Region Development Project for Shakhari Bazaar Urban Renewal Subproject Resettlement Plan Document Stage: Draft for Consultation Project Number: 39298 July 2010 BAN: City Region Development Project for Shakhari Bazaar Urban Renewal Subproject Prepared By: Local Government

More information

IND: Second Jharkhand State Road Project

IND: Second Jharkhand State Road Project Resettlement Plan March 2015 IND: Second Jharkhand State Road Project Dumka Hansdiha Road Prepared by State Highways Authority of Jharkhand (SHAJ), Government of India for the Asian Development Bank. ADB

More information

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Indigenous People Planning Document Due Diligence Report Loan Number: 2796 and Grant Number: 0267 NEP October 2013 Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

More information

IND: Infrastructure Development Investment Program for Tourism - Tranche 3

IND: Infrastructure Development Investment Program for Tourism - Tranche 3 Resettlement Planning Document Project Number: 40648-034 March 2016 IND: Infrastructure Development Investment Program for Tourism - Tranche 3 Sub Project : Eco Tourism Development at Ropar and Harike

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document Project Number: 40031-033 May 2015 IND: Rajasthan Urban Sector Development Investment Program - Tranche 2 Submitted by Rajasthan Urban Infrastructure Development Project,

More information

Public Disclosure Authorized SFG3015 V1. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized SFG3015 V1. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized SFG3015 V1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Resettlement Policy Framework Karachi Neighborhood Improvement Project February,

More information

India: Delhi Meerut Regional Rapid Transit System Project

India: Delhi Meerut Regional Rapid Transit System Project Initial Poverty and Social Analysis October 2018 India: Delhi Meerut Regional Rapid Transit System Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems Technical Assistance Consultant s Report Project Number: 44140 Date: April 2014 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Supporting and Strengthening National-Level Capacity

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Bac Lieu Province Prepared by the Ministry of Education

More information