Contract Transfer. D Ordinance I] Proclamation H Policy Update Code Update I] Other FUNDING SOURCE/IMPACT. O General Fund Impact

Size: px
Start display at page:

Download "Contract Transfer. D Ordinance I] Proclamation H Policy Update Code Update I] Other FUNDING SOURCE/IMPACT. O General Fund Impact"

Transcription

1 .ETING DATE: April a,2018 Submitting Department(s): Public Works Agency COUNTY OF GLENN AGENDA ITEM TRANSMITTAL BRIEF SUBJECT/ISSUE DESCRIPTION: Authorize the Public Works Director to execute the Lawrence & Associates Contract (PPWA 2if04) Amendment #2. Authorize the Public Works Director to approve future amendments up to a total contract value of $144,911. Contact: Mohammad Qureshi, Director Phone: (530) *- ' AGENDA PLACEMENT APPOINTMENT- Appearances by: (Specify Name & Title) ATTACHMENTS LEGAL/PERSONNEL/FISCAL 3 Board Report [3 County Counsel Letter Personnel ^ Minute Order Finance Contract Transfer Grant App. LERK INSTRUCTIONS Required Minutes Resolution Return Minute Order Business- No 3 Consent Return Certified Copy Of: D Correspondence Reports & Notices AFFECTED DEPARTMENT(S) Other: Receive Concurrence "" D Ordinance I] Proclamation H Policy Update Code Update I] Other PUBLIC HEARINGS & COMMITTEE VACANCIES ublic Hearings: Published Affidavit on File w/clerk Affected Parties Notified Committees: Vacancy Posted Application Attached LEGISLATION State ID Federal Bill#: Latest Version of Bill D Draft Letter Attached D List of Supporters/Opposers D Statement of Relevance to County Interests D Description Attached FUNDING SOURCE/IMPACT O General Fund Impact 03 Other: 0200 SW Enterprise Budgeted Transfer Attached 4/5ths Vote Required Contingency Request CONTRACTS, LEASES & AGREEMENTS O New Renewal 03 Amendment D Insurance Certificate Contract Report Date of Original Contract: 09/20//2016 Contract No.: PPWA 2404 Fiscal Year: 2016/2017 RECOMMENDED ACTION/MOTION: A. Authorize Public Works Director, or designee, to execute Amendment No. 2 of the Lawrence & Associates landfill closure contract (PPWA 2404). B. Authorize Public Works Director, or designee, to approve and execute future amendments to the Lawrence & Associates landfill closure contract (PPWA 2404) up to a total not-to-exceed amount of $144,911 contingent on review and approval by County Counsel. Reviewed By (if applicable): Mohammad Qureshi, Director Personnel Director Approved 'WL as to.form by: WILLIAM J. VANA3EK County Counsel County of Glenn, California Departm^m/of Finance

2 PUBLIC WORKS AGENCY P.O. Box 1070 / 111 N. Colusa Street Willows, CA Fax Mohammad Dr. Q Qureshi, Director *" ' * 55 * BOARD REPORT EXECUTIVE SUMMARY: Pursuant to the authority granted by the Board of Supervisors on September 20, 2016, the Public Works Agency (Agency) contracted with Lawrence & Associates for the purpose of providing engineering services for the landfill closure project. In an effort to minimize closure construction costs, additional engineering design was requested of Lawrence & Associates; Amendment No. 2 addresses those additional tasks. RECOMMENDATION(S): A. Authorize Public Works Director, or designee, to execute Amendment No. 2 of the Lawrence & Associates landfill closure contract (PPWA 2404). B. Authorize Public Works Director, or designee, to approve and execute future amendments to the Lawrence & Associates landfill closure contract (PPWA 2404) up to a total not-to-exceed amount of $144,911 contingent on review and approval by County Counsel. HISTORY AND BACKGROUND: Lawrence & Associates (L&A) was retained by Glenn County in 2010 to design an expansion of the Landfill, prepare a Final Closure and Post-closure Maintenance Plan, prepare permitting documents and assist with California Environmental Quality Act (CEQA) review. At the Board meeting on September 6, 2011, staff was instructed to cease exploring landfill expansion options, and to proceed with the construction of a transfer station and landfill closure. On September 20, 2016, the Board approved, by minute order #16, the execution of a new contract with Lawrence & Associates to provide engineering design and construction monitoring services for the landfill closure project. The Board approved Amendment No. 1 at the April 3, 2018, meeting authorizing Lawrence & Associates to make changes to the Final Closure Post Closure Maintenance Plan, as requested by the Regional Water Quality Control Board. FISCAL/PERSONNEL IMPACT(S): Lawrence & Associates anticipates performing the work defined in Contract Amendment No. 2 for a cost of $16,090. If Amendment No. 2 is approved, the total contract value would be $129,911. As stated above, staff is requesting authorization to approve future amendments up to $15,000, bringing the total not-toexceed amount to $144,911. Project costs are budgeted in the solid waste enterprise fund. ANALYSIS/DISCUSSION: The additional design work requested by the Agency resulted in a reduction of the engineer s estimate by approximately $100,000. fsbr.

3 AMENDMENT NO. 2 TO AGREEMENT No. PPW 2404 BETWEEN COUNTY OF GLENN AND LAWRENCE & ASSOCIATES PROVIDING ENGINEERING SERVICES WHEREAS, the parties have executed an agreement entitled AGREEMENT BETWEEN THE COUNTY OF GLENN ("COUNTY") AND LAWRENCE & ASSOCIATES ("CONSULTANT") dated November 1, 2016; and WHEREAS, the parties previously amended the terms of the Agreement on April 4, 2018; and WHEREAS, the parties again desire to amend the terms of the Agreement; and NOW, THEREFORE, in consideration of the mutual promisees herein, the parties do hereby amend the Agreement as follows: Section 1, entitled "RESPONSIBILITIES OF CONTRACTOR," is hereby deleted and hereby amended to read as follows: 1. RESPONSIBILITIES OF THE CONTRACTOR During the term of this agreement, Contractor shall provide services as described in the Scope of Work section in the proposal for "SERVICES DURING FINAL CLOSURE OF GLENN COUNTY LANDFILL", attached hereto as Exhibit A and incorporated herein by this reference, the Scope of Work described on page 2 of the March 22, 2018, Letter entitled "REQUEST FOR CHANGE ORDER- GLENN COUNTY LANDFILL CLOSURE- PPWA 2404", attached hereto as Exhibit B and incorporated herein by this reference, and the Scope of Work described on page 2 of the March 7, 2019, letter entitled "REQUEST FOR CHANGE ORDER #2-PPWA 2404", attached hereto as Exhibit C and incorporated by this reference. All services are to be performed in accordance as required by the Local Enforcement Agency (LEA) of the California Integrated Waste Management Board (CIWMB), Regional Water Quality Control Board (RWQCB) Region 5 and all Federal, State, and local codes. Section 3, entitled "COMPENSATION," is hereby deleted and hereby amended to read as follows: 3. COMPENSATION Contractor shall be paid after satisfactorily completing the duties described herein. Contractor shall be paid at the rates provided in Exhibit A, Attachment B- Fee Schedule, Exhibit B, Attachment A- Cost Proposal, and Exhibit C, Attachment A - Cost Estimate. Contractor shall not perform additional work withou prior written authorization from the Director of Public Works Agency, or designee. Page 1of 2

4 Section 4, entitled "BILLING AND PAYMENT/' is hereby deleted and hereby amended to read as follows: 4. BILLING AND PAYMENT Contractor shall submit to the Public Works Agency Director, or designee, a detailed statement of services rendered within 15 days after completion of the services described in Exhibits A, B, and C. Contractor shall be paid per the schedule of fees described in Exhibit A, Attachment B-Fee Schedule, and Exhibit B, Attachment A- Cost Proposal, and Exhibit C, Attachment A- Cost Estimate. All other terms of the Agreement shall remain in force and effect. EXECUTED at Willows, California, on CONSULTANT COUNTY OF GLENN Bonnie Lampley, President Lawrence & Associates Mohammad Qureshi, Director Public Works Agency APPROVED AS TO FORM: l/vii, William Vanasek, County Counsel Glenn County Page 2 of 2

5 EXHIBIT C LAWRENCE & ASSOCIATES ENGINEERS & GEOLOGISTS P T7 March 7, 2019 Dr. Mohammad Qureshi Public Works Director Glenn County Public Works Agency P.O. Box 1070 Willows, CA Dear Dr. Qureshi: SUBJECT: REQUEST FOR CHANGE ORDER #2 - GLENN COUNTY LANDFILL CLOSURE- PPW AGREEMENT #2404. Per your request, this letter is Lawrence & Associates (L&A) Change Order #2 (Change Order) to revise the Bid Documents related to the Final Closure of the Glenn County Landfill, under the existing agreement PPW 2404 with Glenn County. This Change Order updates the Bid Documents, the Technical Drawings, and Project Specifications, to reflect changes to the construction scope and schedule requested by Glenn County. Background The Final Closure and Post Closure Maintenance Plan (FCPCMP) was submitted to the Regional Water Quality Control Board (RWQCB) in June of 2015, based on 2013 topography. Because the FCPCMP must be submitted two years prior to closure as required by the Title 27 of the California Code of Regulations, the drawings and specifications in the FCPCMP at that point in time were preliminary in nature. L&A was subsequently retained by Glenn County in June 2016 to prepare the closure cap drawings and specifications (using 2016 topography). Shortly after retaining L&A the County found that the landfill capacity was being consumed faster than anticipated and requested that L&A incorporate revised closure grading into the construction drawings. As a result, the RWQCB requested a revision to the FCPCMP. In August of 2017, on behalf of Glenn County, L&A, submitted a revised FCPCMP that included updates related to a revised closure configuration described above, and to reflect the scope of work in which Glenn County personnel would ( 1) correct spots that are too steep (steeper than 3-to-1, H-to-V) or too flat (flatter than 3%), (2) construct the foundation layer portion of the closure cap, or haul soil to 3590 Iron Court Shasta Lake, California (530) fax (530)

6 Dr. Mohammad Qureshi Request for Change Order #2 - PPWA 2404 March 7, 2019 Page 2 of 3 the closure cap for later use by a contractor, (3) allow County earthwork during dry periods in the winter, and (4) sequence construction over a two-year period starting in The RWQCB reviewed and commented on the revised FCPCMP in a letter from Mr. Patrick DeCarvalho of the RWQCB to Mr. Matt Gomes of Glenn County dated October 9, In their review, the RWQCB strongly discouraged winter work and required that the final closure construction activities be covered under the State General Construction Stormwater Permit. Glenn County staff subsequently elected to have a contractor perform all of the remaining closure work only during summer construction seasons, and requested that L&A revise the drawings and specifications to reflect the revised scope of work. L&A revised the drawings and specifications to address this request and to comply with the RWQCB review. The drawings and specifications were subsequently combined with the Contract Documents and submitted to the funding agency (USDA) for review. After some minor changes the contract documents were approved for bidding. Subsequently, Glenn County requested a delayed two-year closure schedule with construction, starting in In response to the revised schedule, the RWQCB requested an update to the FCPCMP be submitted reflecting the revised schedule. For proper context, the specifications and drawings, were replaced with the current bid documents, and a portion of the text describing construction responsibilities were revised. In addition, the introductory section was revised to describe how the changes requested in the October 2017 RWQCB letter were addressed in the revision. L&A prepared the requested RWQCB revision of the FCPCMP under Change Order #1 to the approved PPW Agreement # The revision was submitted in May 2018 to the RWQCB. Since that time, the construction of the new Transfer Station and scale booth at the landfill has occurred, and the landfill closure cap construction placed on hold, at the request of the County, until the Transfer Station construction is complete. As of January 2019, the construction of the Transfer Station is nearly complete (pending painting). Additionally, in November 2018, new topography was flown for the landfill, in anticipation of updating the closure documents. Concurrent with this, the County staff re-reviewed the closure bid documents, including the Drawings and Technical Specifications. Scope of Work This scope of work and Change Order #2 includes incorporating the County requested changes into the bid documents under Task 1 of the approved contract, including: Update the design drawings based on the 2018 topography, including changes to newly constructed roadways, ditches, placed waste/fill, inert waste, transfer station construction, relocation of the scales booth/scales, and connection locations for closure cap and culvert connections. P T7 Lawrence & Associates

7 Dr. Mohammad Qureshi Request for Change Order 02 - PPWA 2404 March 7, 2019 Page 3 of 3 Minimize the erosion control costs, specifically by reducing the amount of 'angular rock used. This is in response to the lack of local angular rock and a comfort level with the Public Works Agency for the use of grass-lined swales for closure. In areas where rock is necessary, angular rock will be deleted and replaced with round " and/or locally available" rock. Modify the closure plans to show the northern access road to remain in a gravel condition and allow other existing roadways to remain as-existing or be within future closure construction areas. This item is to minimize the quantity of improved (gravel) roadways at the facility and reduce closure cap costs. Eliminate the emergency spillway from the northern pond and outslope the central access roadway into the existing stormwater basin. The spillway was a redundant design feature and may be added at a future date, if desired by the County. Update the Technical Specifications and Engineer s Estimate based on the above items. Update to the Bid Documents, also referred to as the Contract Documents, including the revised County of Glenn contractor Agreement, and coordination with the County on materials testing requests for qualifications (RFQ). Preparation of an Addendum #1 to the Bid documents to reflect the outslope of the central access road and reduction of two storm drains associated with the existing in-slope road design. As shown on the Attachment A, the cost of this Change Order #2 is estimated to be $16,090. The pre-bidding site meeting, and responses to questions from the contractor, are included in the original scope of work for this project and remain unchanged by this Change Order #2. We appreciate the opportunity to support the County on this project, please proceed to process this change order #2 to the original contract. If you have any questions, feel free to contact me at (530) or at dbrown@lwmc.com. Sincerely, David Brown Senior Civil Engineer enc.: Attachment A- Cost Estimate P T7 Laurence & Associates

8 COST ESTIMATE Attachment A Glenn County Landfill - Change Order #2 (PPWA 2404) Quantity (where applicable) Closure Bid Documents 1. Update design drawings based on 2018 topography, including roadways, ditches, placed waste/fill, transfer station construction, relocation of the scales, termination/connections, erosion control minimization, and improved roadway elimination (per County request). 2. Update to Technical Specifications 3. Update of Engineer's estimate 4. Additional Bid Support (RFQ for Soils Testing & Observation) Principal Engr. Geol. $ Senior Engineer $ Senior Engr Geol. $ Associate Engineer $ Associate Geologist $ Travel $80.00 AutoCAD 1 Auto CAD II Clerical Expenses or Tech $85.00 $75.00 $ Mileage $0.70 Task Total Update of Bid Documents (Contract Documents) 8 Totals $11,315 $405 $170 $4,200 $16,090 TOTAL ESTIMATED COST $16,090 Note: Our commitment is to the total project budget. Work-hour and staff allocations to individual activities are approximate, and are shown to indicate approximate level of effort. The maximum indicated total fee will not be exceeded without written authorization.

COUNTY OF GLENN AGENDA ITEM TRANSMITTAL

COUNTY OF GLENN AGENDA ITEM TRANSMITTAL COUNTY OF GLENN AGENDA ITEM TRANSMITTAL MEETING DATE: April 2, 2019 BRIEF SUBJECT/ISSUE DESCRIPTION: Submitting Department^): Clerk of the Board Upon recommendation from the Glenn County Resource Conservation

More information

SUBCHAPTER 4B - EROSION AND SEDIMENT CONTROL

SUBCHAPTER 4B - EROSION AND SEDIMENT CONTROL _ SUBCHAPTER 4B - EROSION AND SEDIMENT CONTROL 15A NCAC 04B.0101 AUTHORITY 113A-64; Repealed Eff. November 1, 1984. 15A NCAC 04B.0102 15A NCAC 04B.0103 PURPOSE SCOPE Authority G.S. 113A-54(a)(b); Amended

More information

ARTICLE 20 SOIL EROSION AND SEDIMENTATION CONTROL

ARTICLE 20 SOIL EROSION AND SEDIMENTATION CONTROL ARTICLE 20 SOIL EROSION AND SEDIMENTATION CONTROL 20.1. General Requirements 20.1-1. Plan Required. No person shall initiate any land-disturbing activity without an erosion control plan approved by the

More information

Public hearing to adopt Ordinance 1375 C.S. amending Title 15, Buildings and Construction, of the Martinez Municipal Code

Public hearing to adopt Ordinance 1375 C.S. amending Title 15, Buildings and Construction, of the Martinez Municipal Code CITY OF MARTINEZ CITY COUNCIL AGENDA December 4, 2013 TO: FROM: SUBJECT: Mayor and City Council Don Salts, Deputy Public Works Director Mercy G. Cabral, Deputy City Clerk Public hearing to adopt Ordinance

More information

Erosion & Sedimentation Control Resource Type: Sedimentation Control Ordinance Document Last Updated in Database: February 24, 2016

Erosion & Sedimentation Control Resource Type: Sedimentation Control Ordinance Document Last Updated in Database: February 24, 2016 Topic: Erosion & Sedimentation Control Resource Type: Regulations State: North Carolina Jurisdiction Type: Municipal Municipality: City of Greensboro Year (adopted, written, etc.): Unknown Community Type

More information

CHAPTER 3. Building Code

CHAPTER 3. Building Code CHAPTER 3 Building Code ADOPTION OF BUILDING CODE 3.005 Definitions 3.010 Adoption of the State Building Code as the Lincoln County Building Code 3.012 Additional Specific Adoption of the State Electrical

More information

EXECUTIVE/COUNCIL APPROVAL FORM

EXECUTIVE/COUNCIL APPROVAL FORM EXECUTIVE/COUNCIL APPROVAL FORM MANAGEMENT ROUTING: TO: COUNCIL CHAIRPERSON: EXECUTIVE Dave Somers SNOHOMISH COUNTY COUNCIL DEPUTY EXECUTIVE EXEC. DIRECTOR DEPT. DIRECTOR DEPARTMENT DIV. MGR. DIVISION

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 060821.002 AN ORDINANCE OF THE CITY OF THE VILLAGE OF BEAR CREEK, TEXAS, REQUIRING A PERMIT FOR THE CONSTRUCTION OF A DRIVEWAY; PROHIBITING DRIVEWAYS OR CULVERTS BEING CONSTRUCTED OR MAINTAINED

More information

STORMWATER TREATMENT DEVICE AND LOW IMPACT DEVELOPMENT STRUCTURE ACCESS AND MAINTENANCE AGREEMENT

STORMWATER TREATMENT DEVICE AND LOW IMPACT DEVELOPMENT STRUCTURE ACCESS AND MAINTENANCE AGREEMENT RECORDING REQUESTED BY: City of Modesto PLEASE RETURN TO / MAIL TO: City of Modesto City Clerk P.O. Box 642 Modesto, CA 95353 SPACE ABOVE THIS LINE FOR RECORDER S USE STORMWATER TREATMENT DEVICE AND LOW

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING

DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING (By authority conferred on the environmental quality by section 63103 of 1994 PA 451, MCL 324.63103) PART 1.

More information

Commercial Soil Erosion Permit Application

Commercial Soil Erosion Permit Application CLINTON COUNTY COMMUNITY DEVELOPMENT Commercial Soil Erosion Permit Application Soil Erosion, Sedimentation Control and Drainage Enforcement Division Under the Provisions of Part 91 of Act 451, 1994 as

More information

SAMPLE SERVICING AGREEMENT. THIS AGREEMENT made in duplicate this day of, 20, Between:

SAMPLE SERVICING AGREEMENT. THIS AGREEMENT made in duplicate this day of, 20, Between: ROAD CONSTRUCTION AGREEMENT THIS AGREEMENT made in duplicate this day of, 20, Between: the of, Address:, Saskatchewan, S, a corporate municipality in the Province of Saskatchewan (hereinafter called the

More information

Nonmetallic Mining Reclamation Permit Application Required.

Nonmetallic Mining Reclamation Permit Application Required. Article C: Sec. 16-1-12 Permitting Nonmetallic Mining Reclamation Permit Application Required. No person may engage in nonmetallic mining or in nonmetallic mining reclamation without possessing a nonmetallic

More information

* * * * * * * * * * * * * * * * * * * * * * COMPLAINT. COME NOW Plaintiffs, THOMAS FINCH and KATHLEEN FINCH, by and through

* * * * * * * * * * * * * * * * * * * * * * COMPLAINT. COME NOW Plaintiffs, THOMAS FINCH and KATHLEEN FINCH, by and through ELECTRONICALLY FILED 10/23/2013 4:43 PM 02-CV-2013-902873.00 CIRCUIT COURT OF MOBILE COUNTY, ALABAMA JOJO SCHWARZAUER, CLERK IN THE CIRCUIT COURT OF MOBILE COUNTY, ALABAMA THOMAS FINCH AND KATHLEEN FINCH,

More information

AGREEMENT TO RECEIVE AND LAND APPLY BIOSOLIDS WITH CITY OF LINCOLN, NEBRASKA

AGREEMENT TO RECEIVE AND LAND APPLY BIOSOLIDS WITH CITY OF LINCOLN, NEBRASKA AGREEMENT TO RECEIVE AND LAND APPLY BIOSOLIDS WITH CITY OF LINCOLN, NEBRASKA THIS AGREEMENT, made this day of,, by and between of County, Nebraska, hereinafter called " Operator", and the City of Lincoln,

More information

Chapter 12 Erosion Control Regulations

Chapter 12 Erosion Control Regulations Chapter 12 Erosion Control Regulations Rev. 02/01/05 Section 12-100 Purpose The purpose of this Chapter is to establish minimum standards to deter erosion and sedimentation problems within the City of

More information

DOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER h Street NW East Wenatchee, WAS BEFORE THE DOUGLAS COUNTY HEARING EXAMINER

DOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER h Street NW East Wenatchee, WAS BEFORE THE DOUGLAS COUNTY HEARING EXAMINER DOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER 140 19 1h Street NW East Wenatchee, WAS 98802-4109 BEFORE THE DOUGLAS COUNTY HEARING EXAMINER IN THE MATTER OF ) FINDINGS OF FACT, ) CONCLUSIONS OF LAW, AND

More information

CHAPTER 23: DETENTION BASIN STANDARDS Introduction and Goals Administration Standards Standard Attachments 23.

CHAPTER 23: DETENTION BASIN STANDARDS Introduction and Goals Administration Standards Standard Attachments 23. CHAPTER 23: DETENTION BASIN STANDARDS 23.00 Introduction and Goals 23.01 Administration 23.02 Standards 23.03 Standard Attachments 23.1 23.00 INTRODUCTION AND GOALS A. The purpose of this chapter is to

More information

ORDINANCE NO CHAPTER 71 EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES

ORDINANCE NO CHAPTER 71 EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES ENG ORDINANCE NO. 024-06 CHAPTER 71 EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES 71.01 GENERAL (a). Soil erosion contributes to the impairment of drainageways, increases road and storm sewer maintenance

More information

The Board of Supervisors of the County of Riverside Ordains as Follows:

The Board of Supervisors of the County of Riverside Ordains as Follows: ORDINANCE NO. 555 (AS AMENDED THROUGH 555.19) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO. 555 IMPLEMENTING THE SURFACE MINING AND RECLAMATION ACT OF 1975 The Board of Supervisors of

More information

Agreement No. A-07261

Agreement No. A-07261 INCLUDES AMENDMENTS: Reso. 2008-49, effective Jan. 2009 Reso. 2008-50, effective Jan. 2009 Agreement No. A-07261 JOINT POWERS AGREEMENT BETWEEN THE CITY OF SALINAS, THE CITY OF GONZALES, THE CITY OF GREENFIELD,

More information

WHEREAS, BOTH the City and CCSD desire to complete the 76 th Avenue SW improvements on the same schedule as the new elementary school construction,

WHEREAS, BOTH the City and CCSD desire to complete the 76 th Avenue SW improvements on the same schedule as the new elementary school construction, City/CCSD 28E Agreement January 21, 2013 Page 1 28E Agreement between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) regarding the reconstruction of 76 th Avenue SW

More information

City of Warwick, Rhode Island Municipal Code

City of Warwick, Rhode Island Municipal Code City of Warwick, Rhode Island Municipal Code Chapter 68 - SOIL EROSION AND SEDIMENT CONTROL FOOTNOTE(S): --- (1) --- Cross reference Buildings and building regulations, ch. 8; excavations in streets and

More information

Soil Erosion and Sedimentation Control Regulations TABLE OF CONTENTS

Soil Erosion and Sedimentation Control Regulations TABLE OF CONTENTS TABLE OF CONTENTS 96.01 Title...2 96.02 Purposes....2 96.03 Definitions...2 96.04 Scope and Exclusions...6 96.05 General Requirements....7 96.06 Objectives....18 96.07 Standards for Land Disturbing Activity....19

More information

CHAPTER 04 - SEDIMENTATION CONTROL SUBCHAPTER 04A - SEDIMENTATION CONTROL COMMISSION ORGANIZATION

CHAPTER 04 - SEDIMENTATION CONTROL SUBCHAPTER 04A - SEDIMENTATION CONTROL COMMISSION ORGANIZATION CHAPTER 04 - SEDIMENTATION CONTROL This Chapter 4 of Title 15A of the North Carolina Administrative Code (T15A.04); SEDIMENTATION CONTROL; has been transferred and recodified from Chapter 16 of Title 15

More information

LEGISLATIVE COUNSELʹS DIGEST

LEGISLATIVE COUNSELʹS DIGEST Assembly Bill No. 1142 CHAPTER 7 An act to amend Sections 2715.5, 2733, 2770, 2772, 2773.1, 2774, 2774.1, 2774.2, and 2774.4 of, to add Sections 2736, 2772.1, and 2773.4 to, and to add and repeal Section

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-PR Regulation No. 1165-2-18 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Water Resources Policies and Authorities REIMBURSEMENT FOR NON-FEDERAL PARTICIPATION IN CIVIL

More information

Columbia County Nonmetallic Mining Reclamation Ordinance. Title 16 Chapter 600

Columbia County Nonmetallic Mining Reclamation Ordinance. Title 16 Chapter 600 Title 16 Chapter 600 Columbia County Board of Supervisors Adopted: May 16, 2001 Amended: June 20, 2007 1 Table of Contents Subchapter 16-601 Introduction... 1 SECTIONS:... 1 16-601-010 PURPOSE... 1 16-601-020

More information

MEMORANDUM OF AGREEMENT BETWEEN MONTANA RAIL LINK, INC. AND THE INTERNATIONAL ASSOCIATION OF MACHINISTS & AEROSPACE WORKERS

MEMORANDUM OF AGREEMENT BETWEEN MONTANA RAIL LINK, INC. AND THE INTERNATIONAL ASSOCIATION OF MACHINISTS & AEROSPACE WORKERS MEMORANDUM OF AGREEMENT BETWEEN MONTANA RAIL LINK, INC. AND THE INTERNATIONAL ASSOCIATION OF MACHINISTS & AEROSPACE WORKERS This Agreement, dated December 1, 1992, by and between Montana Rail Link, Inc.

More information

FRANKLIN TOWNSHIP YORK COUNTY, PENNSYLVANIA ORDINANCE NO

FRANKLIN TOWNSHIP YORK COUNTY, PENNSYLVANIA ORDINANCE NO FRANKLIN TOWNSHIP YORK COUNTY, PENNSYLVANIA ORDINANCE NO. 2018-3 AN ORDINANCE AMENDING THE FRANKLIN TOWNSHIP ZONING ORDINANCE (ORDINANCE NO. 2006-1, AS AMENDED) TO REPLACE SECTION 205, PERTAINING TO STEEP

More information

ORDINANCE NO. The Board of Supervisors of the Alameda County Flood Control and Water Conservation District do ordain as follows: SECTION I.

ORDINANCE NO. The Board of Supervisors of the Alameda County Flood Control and Water Conservation District do ordain as follows: SECTION I. ORDINANCE NO. AN ORDINANCE PROHIBITING THE ACCESS OR TRESPASS INTO THE RIGHT-OF-WAY OF THE ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FOR ANY PURPOSE, WITHOUT FIRST OBTAINING AN APPROPRIATE

More information

CITY OF LYNN In City Council

CITY OF LYNN In City Council April 8, 1998 IN THE YEAR ONE THOUSAND NINE HUNDRED NINETY EIGHT AN ORDINANCE DEFINING THE APPLICATION PROCESS, REVIEW AND ISSUANCE OF PERMITS BY THE DEPARTMENT OF PUBLIC WORKS IN THE CITY OF LYNN Be it

More information

COMMERCIAL DRIVEWAYS AND PRIVATE STREET ENTRANCES ON COUNTY ROADS

COMMERCIAL DRIVEWAYS AND PRIVATE STREET ENTRANCES ON COUNTY ROADS COMMERCIAL DRIVEWAYS AND PRIVATE STREET ENTRANCES ON COUNTY ROADS 1. Permit application(s) shall be in accordance with the attached GENERAL REQUIREMENTS and the following instructions. 2. The Kent County

More information

AN ORDINANCE BE IT ORDAINED AND ENACTED BY THE COUNTY COUNCIL OF YORK COUNTY, SOUTH CAROLINA:

AN ORDINANCE BE IT ORDAINED AND ENACTED BY THE COUNTY COUNCIL OF YORK COUNTY, SOUTH CAROLINA: AN ORDINANCE TO ESTABLISH AND CREATE A SPECIAL TAX DISTRICT TO BE KNOWN AS LAKE WYLIE PARKS AND RECREATION DISTRICT IN YORK COUNTY, SOUTH CAROLINA; TO DEFINE ITS AREAS AND BOUNDARIES; TO DEFINE THE NATURE

More information

CONSTRUCTION SITE / EXCAVATION EROSION CONTROL

CONSTRUCTION SITE / EXCAVATION EROSION CONTROL ORDINANCE NO. 1347-2008 AN ORDINANCE TO AMEND CHAPTER 15 TITLE 2 OF THE CODE OF ORDINANCES OF THE CITY OF ONALASKA RELATING TO CONSTRUCTION SITE/EXCAVATION EROSION CONTROL THE COMMON COUNCIL OF THE CITY

More information

COUNTY OF LOS ANGELES DEPARTMENT OF MENTAL HEALTH. March 6, 2003

COUNTY OF LOS ANGELES DEPARTMENT OF MENTAL HEALTH. March 6, 2003 COUNTY OF LOS ANGELES MARVIN J. SOUTHARD, D.S.W. Director DAVID MEYER Chief Deputy Director RODERICK SHANER, M.D. Medical Director 550 SOUTH VERMONT AVENUE, LOS ANGELES, CALIFORNIA 90020 Reply To: Fax:

More information

Sec/Twp/Rge: S14/T28S/R23E, S23/T28S/R23E

Sec/Twp/Rge: S14/T28S/R23E, S23/T28S/R23E 2379 Broad Street, Brooksville, Florida 34604-6899 (352) 796-7211 or 1-800-423-1476 (FL only) SUNCOM 628-4150 TDD only 1-800-231-6103 (FL only) On the Internet at: WaterMatters.org An Equal Opportunity

More information

ARTICLE X. SOIL EROSION AND SEDIMENTATION CONTROL

ARTICLE X. SOIL EROSION AND SEDIMENTATION CONTROL ARTICLE X. SOIL EROSION AND SEDIMENTATION CONTROL Sec. 5-140. Reserved. Editor's note: Section 1 of an ordinance adopted Oct. 7, 1997, repealed former 5-140, which pertained to incorporation of the soil

More information

Chapter 33G SERVICE CONCURRENCY MANAGEMENT PROGRAM

Chapter 33G SERVICE CONCURRENCY MANAGEMENT PROGRAM Chapter 33G SERVICE CONCURRENCY MANAGEMENT PROGRAM Sec. 33G-1. Title. This chapter shall be known as the "Metro-Miami-Dade County Service Concurrency Management Program." (Ord. No. 89-66, 1, 7-11-89; Ord.

More information

PLAZA ELEMENTARY SCHOOL DISTRICT. California Uniform Public Construction Cost Accounting Act (CUPCCAA) HAND BOOK

PLAZA ELEMENTARY SCHOOL DISTRICT. California Uniform Public Construction Cost Accounting Act (CUPCCAA) HAND BOOK PLAZA ELEMENTARY SCHOOL DISTRICT California Uniform Public Construction Cost Accounting Act (CUPCCAA) HAND BOOK Table of Contents INTRODUCTION...2 WHAT IS CUPCCAA?...2 BENEFITS OF CUPCCAA...2 TRADITIONAL

More information

PROCUREMENT POLICIES AND PROCEDURES. BOARD OF DIRECTORS POLICY AND PROCEDURE No. BOD 014

PROCUREMENT POLICIES AND PROCEDURES. BOARD OF DIRECTORS POLICY AND PROCEDURE No. BOD 014 PROCUREMENT POLICIES AND PROCEDURES BOARD OF DIRECTORS POLICY AND PROCEDURE No. BOD 014 APPROVED BY CRRA BOARD OF DIRECTORS EFFECTIVE SEPTEMBER 24, 2009 CONTENTS 1. PREAMBLE...1 1.1 General Policy... 1

More information

PERMIT AGREEMENT FOR THE ACCOMODATION OF UTILITY FACILITIES AND RELOCATION ON PUBLIC CITY RIGHT-OF-WAY

PERMIT AGREEMENT FOR THE ACCOMODATION OF UTILITY FACILITIES AND RELOCATION ON PUBLIC CITY RIGHT-OF-WAY ~ CITY OF ROBERTSDALE VI'!.. (9~ City of Robertsdale Planning Department P. O. Box 429 Robertsdale, AI. 36567 Permit No: Permit Date-:------ - PERMIT AGREEMENT FOR THE ACCOMODATION OF UTILITY FACILITIES

More information

The Corporation of The Township of Lanark Highlands. TENDER #PW Resurfacing Lavant Mill Road

The Corporation of The Township of Lanark Highlands. TENDER #PW Resurfacing Lavant Mill Road The Corporation of The TENDER #PW 2016-02 Resurfacing Name of Firm or Individual Address Telephone and Fax Number Email Address Name of Person Signing for Firm Position of Person Signing for Firm TENDERS

More information

BEFORE THE DOUGLAS COUNTY HEARING EXAMINER I. FINDINGS OF FACT

BEFORE THE DOUGLAS COUNTY HEARING EXAMINER I. FINDINGS OF FACT DOUGLASCOr~TY DEPARTMENT OF HEARING EXAMINER 140 19 th Street NW East Wenatchee, WAS 98802-4109 BEFORE THE DOUGLAS COUNTY HEARING EXAMINER I~ THE MATTER OF ) FINDINGS OF FACT, ) CONCLUSIO~S OF LA W, A~D

More information

Hamilton City Council BYLAWS HAMILTON STORMWATER BYLAW 2015

Hamilton City Council BYLAWS HAMILTON STORMWATER BYLAW 2015 Approved By: Hamilton City Council Date Adopted : 28 May 2015 Date In Force: 28 September 2015 Clause 7.1(e) - 12 months from enforcement date Clause7.1(f) 6 months from enforcement date Review Date: To

More information

STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT. Whereas, I (we),, hereinafter termed the

STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT. Whereas, I (we),, hereinafter termed the STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT Whereas, I (we) (Name of Applicant) (Mailing Address),, hereinafter termed the (City) (State) Applicant, request permission and authority

More information

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 1376

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 1376 CHAPTER 2001-134 Committee Substitute for Committee Substitute for Senate Bill No. 1376 An act relating to mining; amending s. 378.035, F.S.; reserving certain funds in the Nonmandatory Land Reclamation

More information

QUARRY COMMUNITY DEVELOPMENT DISTRICT COLLIER COUNTY SPECIAL BOARD MEETING MAY 3, :00 A.M.

QUARRY COMMUNITY DEVELOPMENT DISTRICT COLLIER COUNTY SPECIAL BOARD MEETING MAY 3, :00 A.M. QUARRY COMMUNITY DEVELOPMENT DISTRICT COLLIER COUNTY SPECIAL BOARD MEETING MAY 3, 2018 10:00 A.M. Special District Services, Inc. 27499 Riverview Center Boulevard, #253 Bonita Springs, FL 33134 www.quarrycdd.org

More information

SENATE, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED FEBRUARY 5, 2018

SENATE, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED FEBRUARY 5, 2018 SENATE, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED FEBRUARY, 0 Sponsored by: Senator PATRICK J. DIEGNAN, JR. District (Middlesex) SYNOPSIS Renames county vocational school districts as county career

More information

Support Services 2500 S. State Street Salt Lake City, UT 84115

Support Services 2500 S. State Street Salt Lake City, UT 84115 Support Services 2500 S. State Street Salt Lake City, UT 84115 PHONE: 385-646-4597 FAX: 385-646-4351 www.graniteschools.org July 1, 2016 Superintendent Martin W. Bates GRANITE SCHOOL DISTRICT 2500 South

More information

AGENDA REPORT. Meeting Date: June 29, 2017 Item Number: E 27 To: From:

AGENDA REPORT. Meeting Date: June 29, 2017 Item Number: E 27 To: From: Meeting Date: June 29, 2017 Item Number: E 27 To: From: Subject: AGENDA REPORT Honorable Mayor & City Council Ken Pfalzgraf, Urban Forest Manager Caitlin Sims, Senior Management Analyst AMENDMENT NO. 3

More information

This Agreement is made as ofon May 1, by and between the Fallen Leaf Lake

This Agreement is made as ofon May 1, by and between the Fallen Leaf Lake EMPLOYMENT AGREEMENT FOR FIRE CHIEF OF THE FALLEN LEAF LAKE COMMUNITY SERVICES DISTRICT Field Code Changed This Agreement is made as ofon May 1, 20161 by and between the Fallen Leaf Lake Community Services

More information

ORDINANCE NO. O

ORDINANCE NO. O Draft of January 26, 2018 ORDINANCE NO. O-2018-011-01 AN ORDINANCE CALLING A BOND ELECTION TO BE HELD IN THE CITY OF HALTOM CITY, TEXAS; MAKING PROVISION FOR THE CONDUCT OF A JOINT ELECTION; AND RESOLVING

More information

Intergovernmental Agreement. For Growth Management. City of Loveland, Colorado and Larimer County, Colorado

Intergovernmental Agreement. For Growth Management. City of Loveland, Colorado and Larimer County, Colorado Intergovernmental Agreement For Growth Management City of Loveland, Colorado and Larimer County, Colorado Approved January 12, 2004 Intergovernmental Agreement for Growth Management Table of Contents 1.0

More information

ARTICLE I. ESTABLISHMENT AND OPERATION OF THE BINGHAMTON-JOHNSON CITY JOINT SEWAGE TREATMENT FACILITIES.

ARTICLE I. ESTABLISHMENT AND OPERATION OF THE BINGHAMTON-JOHNSON CITY JOINT SEWAGE TREATMENT FACILITIES. BINGHAMTON-JOHNSON CITY JOINT SEWAGE TREATMENT FACILITIES INTERMUNICIPAL AGREEMENT [HISTORY: IMA I adopted 7-14-1965 by the City of Binghamton and the Village of Johnson City; amended 12-7-1967 by IMA

More information

RESOLUTION # BOROUGH OF HIGH BRIDGE COUNTY OF HUNTERDON STATE OF NEW JERSEY SHARED SERVICES AGREEMENT BY AND BETWEEN

RESOLUTION # BOROUGH OF HIGH BRIDGE COUNTY OF HUNTERDON STATE OF NEW JERSEY SHARED SERVICES AGREEMENT BY AND BETWEEN February 13, 2014 RESOLUTION #67-2014 BOROUGH OF HIGH BRIDGE COUNTY OF HUNTERDON STATE OF NEW JERSEY SHARED SERVICES AGREEMENT BY AND BETWEEN THE HIGH BRIDGE SCHOOL DISTRICT AND BOROUGH OF HIGH BRIDGE

More information

South Carolina Department of Transportation. Engineering Directive

South Carolina Department of Transportation. Engineering Directive South Carolina Department of Transportation Engineering Directive Directive Number: ED-41 Effective: May 1, 2018 Subject: References: Primary Department: Removal of Roads or Sections of Roads from the

More information

Revised Agenda Item No. 9

Revised Agenda Item No. 9 DISCUSSION CALENDAR Project Delivery Revised Agenda Item No. 9 Board of Directors Meeting February 6, 2019 10:30 a.m. Location: San Bernardino County Transportation Authority First Floor Lobby Board Room

More information

LAKE COUNTY ROAD DEPARTMENT P.O. BOX 908 LAKEVIEW, OREGON APPLICATION FOR RIGHT-OF-WAY PERMIT

LAKE COUNTY ROAD DEPARTMENT P.O. BOX 908 LAKEVIEW, OREGON APPLICATION FOR RIGHT-OF-WAY PERMIT LAKE COUNTY ROAD DEPARTMENT P.O. BOX 908 LAKEVIEW, OREGON 97630 541-947-6048 COUNTY USE ONLY lakecoroad@co.lake.or.us APPLICATION FOR RIGHT-OF-WAY PERMIT LAKE COUNTY, OREGON APPLICANT S NAME: ADDRESS:

More information

Sec/Twp/Rge: S07/T27S/R25E, S12/T27S/R24E

Sec/Twp/Rge: S07/T27S/R25E, S12/T27S/R24E 2379 Broad Street, Brooksville, Florida 34604-6899 (352) 796-7211 or 1-800-423-1476 (FL only) SUNCOM 628-4150 TDD only 1-800-231-6103 (FL only) On the Internet at: WaterMatters.org An Equal Opportunity

More information

The foregoing recitals are true and correct and are incorporated herein by reference.

The foregoing recitals are true and correct and are incorporated herein by reference. 1.0 RECITATIONS The foregoing recitals are true and correct and are incorporated herein by reference. 2.0 DEFINITIONS 2.1 The term aggrieved or adversely affected person means any person or local government

More information

Environment and Parks WATER ACT. BEING CHAPTER W-3 RS.A (the "Water Act") ENFORCEMENT ORDER NO. WA-EO-2018/07-LAR

Environment and Parks WATER ACT. BEING CHAPTER W-3 RS.A (the Water Act) ENFORCEMENT ORDER NO. WA-EO-2018/07-LAR Environment and Parks WATER ACT BEING CHAPTER W-3 RS.A. 2000 (the "Water Act") ENFORCEMENT ORDER NO. WA-EO-2018/07-LAR Tim Kalinski 606 Beach Avenue Cold Lake, AB T9M 1G5 Kalinko Enterprises Ltd. P.O.

More information

OFFICIAL ORDINANCE SOO LINE TRAIL RULES AND SAFETY REGULATIONS PINE COUNTY, MN

OFFICIAL ORDINANCE SOO LINE TRAIL RULES AND SAFETY REGULATIONS PINE COUNTY, MN OFFICIAL ORDINANCE SOO LINE TRAIL RULES AND SAFETY REGULATIONS PINE COUNTY, MN AN ORDINANCE PROVIDING FOR THE USE OF THE ABANDONED SOO LINE RAILROAD RIGHT-OF-WAY WITHIN THE BOUNDARIES OF PINE COUNTY, MINNESOTA.

More information

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CASTLE PINES, COLORADO, THAT:

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CASTLE PINES, COLORADO, THAT: RESOLUTION NO. 11-76 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CASTLE PINES, COLORADO APPROVING THE FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH VISUAL ENVIRONMENTS, INC. FOR THE PROVISION

More information

This Agreement is made ason May 1, by and between the Fallen Leaf Lake

This Agreement is made ason May 1, by and between the Fallen Leaf Lake EMPLOYMENT AGREEMENT FOR GENERAL MANAGER OF THE FALLEN LEAF LAKE COMMUNITY SERVICES DISTRICT Field Code Changed This Agreement is made ason May 1, 201611 by and between the Fallen Leaf Lake Community Services

More information

FLORENCE COUNTY CODE OF GENERAL ORDINANCES CHAPTER 13. Ordinance for Non-Metallic Mining Reclamation

FLORENCE COUNTY CODE OF GENERAL ORDINANCES CHAPTER 13. Ordinance for Non-Metallic Mining Reclamation FLORENCE COUNTY CODE OF GENERAL ORDINANCES CHAPTER 13 Ordinance for Non-Metallic Mining Reclamation Adopted: June 19, 2001 Amended: June 15, 2004 (Increase Fees) Amended: May 15, 2007 (Reflect revised

More information

CHAPTER 24 NON-METALLIC MINING PART I - GENERAL PART II - STANDARDS

CHAPTER 24 NON-METALLIC MINING PART I - GENERAL PART II - STANDARDS CHAPTER 24 NON-METALLIC MINING PART I - GENERAL 24.01 Title. 24.02 Purpose. 24.03 Statutory Authority. 24.04 Restrictions Adopted Under Other Authority. 24.05 Interpretation. 24.06 Severability. 24.07

More information

Town of Manchester, Maine

Town of Manchester, Maine Town of Manchester, Maine E. Patrick Gilbert Town Manager February 22, 2019 To Whom It May Concern: The Town of Manchester is seeking bids for 1) a one-time landscaping project at the Town Office building;

More information

~en Siegel, City Manager

~en Siegel, City Manager 10/3/2017 City of San Juan Capistrano Agenda Report E7 TO: FROM: Honorable Mayor and Members of the City Council ~en Siegel, City Manager SUBMITTED BY: Maria Morris, City Clerk VV\V

More information

Soil Erosion and Sedimentation Control Ordinance for Kings Mountain, North Carolina

Soil Erosion and Sedimentation Control Ordinance for Kings Mountain, North Carolina Soil Erosion and Sedimentation Control Ordinance for Kings Mountain, North Carolina Section 1 Title SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE FOR KINGS MOUNTAIN, NORTH CAROLINA This Ordinance may

More information

BERKELEY COUNTY ENGINEERING AND

BERKELEY COUNTY ENGINEERING AND BERKELEY COUNTY ENGINEERING AND BUILDING INSPECTIONS 400 West Stephen Street - Suite 202, Martinsburg, WV 25401-3838 Telephone: 304-264-1966, Fax: 304-262-3128 Web Page: www.berkeleywv.org COMMERCIAL /SUBDIVISION

More information

Design Standards for Federal Aid to Secondary Roads

Design Standards for Federal Aid to Secondary Roads Design Standards for Federal Aid to Secondary Roads J. T. H allett Engineer of Roads State Highway Commission of Indiana The title for this paper may indicate that the entire discussion will be on the

More information

North Carolina Administrative Code Title 15 A Department of Environment and Natural Resources Chapter 4 Sedimentation Control

North Carolina Administrative Code Title 15 A Department of Environment and Natural Resources Chapter 4 Sedimentation Control North Carolina Administrative Code Title 15 A Department of Environment and Natural Resources Chapter 4 Sedimentation Control As amended July 1, 2000 Sedimentation Control Commission Raleigh, North Carolina

More information

I-64 HAMPTON ROADS BRIDGE-TUNNEL EXPANSION PROJECT

I-64 HAMPTON ROADS BRIDGE-TUNNEL EXPANSION PROJECT I-64 HAMPTON ROADS BRIDGE-TUNNEL EXPANSION PROJECT Subject: Statement of Clarification Relating to Final RFP Addendum No. 3 Project No: 0064-M06-032 Date: January 8, 2019 Offerors are hereby notified that

More information

COUNTY OF SAN DIEGO AIR POLLUTION CONTROL DISTRICT. DATE: June 24, San Diego County Air Pollution Control Board TO:

COUNTY OF SAN DIEGO AIR POLLUTION CONTROL DISTRICT. DATE: June 24, San Diego County Air Pollution Control Board TO: BOARD OF SUPERVISORS COUNTY OF SAN DIEGO AIR POLLUTION CONTROL DISTRICT GREG COX First District DIANNE JACOB Second District PAM SLATER-PRICE Third District RON ROBERTS Fourth District BILL HORN Fifth

More information

COMMONWEALTH OF PENNSYLVANIA POSTING AUTHORITY EXCESS MAINTENANCE AGREEMENT

COMMONWEALTH OF PENNSYLVANIA POSTING AUTHORITY EXCESS MAINTENANCE AGREEMENT Agreement Number Executed Date / / This Excess Maintenance Agreement ( Agreement ) is made and entered into, by, and between the and the USER,, FID/SS Number, with offices located at. DEFINITIONS Appurtenance

More information

The Board of Supervisors of the County of Riverside, State of California, ordains that this Ordinance is amended in its entirety to read as follows:

The Board of Supervisors of the County of Riverside, State of California, ordains that this Ordinance is amended in its entirety to read as follows: ORDINANCE NO. 617 (AS AMENDED THROUGH 617.4) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO. 617 REGULATING UNDERGROUND TANK SYSTEMS CONTAINING HAZARDOUS SUBSTANCES The Board of Supervisors

More information

Summary. Project Objectives. Background

Summary. Project Objectives. Background Summary Request for Proposals for Design Engineering and Construction Services Iowa City Water Distribution Pressure Zone Improvements Project 2019 Iowa City, Iowa The City of Iowa City is soliciting proposals

More information

City of Los Angeles CALIFORNIA

City of Los Angeles CALIFORNIA HOLLY L. WOLCOTT CITY CLERK GREGORY R. ALLISON EXECUTIVE OFFICER City of Los Angeles CALIFORNIA % OFFICE OF THE CITY CLERK ADMINISTRATIVE SERVICES DIVISION 200 N. SPRING STREET, ROOM 224 LOS ANGELES, CA

More information

Title 6 - Chapter 8 TAZEWELL COUNTY POLLUTION CONTROL FACILITY SITING ORDINANCE

Title 6 - Chapter 8 TAZEWELL COUNTY POLLUTION CONTROL FACILITY SITING ORDINANCE Title 6 - Chapter 8 TAZEWELL COUNTY POLLUTION CONTROL FACILITY SITING ORDINANCE 6 TCC 8-1 Rules of Construction 6 TCC 8-2 Definitions 6 TCC 8-3 Conditions to Filing Site Approval Application 6 TCC 8-4

More information

VERIFIED COMPLAINT FOR DECLARATORY AND INJUNCTIVE RELIEF

VERIFIED COMPLAINT FOR DECLARATORY AND INJUNCTIVE RELIEF DISTRICT COURT, GRAND COUNTY, COLORADO P.O. Box 192, 307 Moffat Ave., Hot Sulphur Springs, CO 80451 Plaintiff: TOWN OF WINTER PARK, a Colorado home rule municipal corporation; v. Defendants: CORNERSTONE

More information

CHAPTER 12 ROADS AND CONSTRUCTION AND MAINTENANCE OF DRIVEWAYS. Section 12.00, Private Access to Town Roads, consists of Sections through

CHAPTER 12 ROADS AND CONSTRUCTION AND MAINTENANCE OF DRIVEWAYS. Section 12.00, Private Access to Town Roads, consists of Sections through CHAPTER 12 ROADS AND CONSTRUCTION AND MAINTENANCE OF DRIVEWAYS SECTION 12.00 PRIVATE ACCESS TO TOWN ROADS Section 12.00, Private Access to Town Roads, consists of Sections 12.01 through 12.06. Section

More information

General Contractor shall provide their own dumpster. Dumpster shall be located in parking lot behind Gymnasium. Coordinate location with Owner.

General Contractor shall provide their own dumpster. Dumpster shall be located in parking lot behind Gymnasium. Coordinate location with Owner. ADDENDUM No. 1 Project: Carpet Replacement South Ripley Elementary Versailles, Indiana Project No: 1839.01 Date: October 12, 2018 This addendum is a part of the bid documents. Acknowledge receipt on the

More information

WATER CONSERVATION REGULATIONS

WATER CONSERVATION REGULATIONS United City of Yorkville Ordinance No. 2004-20 Ordinance Amending Water Conservation Regulations Ordinance No. 2004-17 Text TITLE 7 CHAPTER 5 PUBLIC WAYS WATER CONSERVATION REGULATIONS SECTION 7-5-15 7-5-15.

More information

REIMBURSEMENT AGREEMENT FOR THE RUWAP RECYCLED PROJECT (AWT PHASE

REIMBURSEMENT AGREEMENT FOR THE RUWAP RECYCLED PROJECT (AWT PHASE This REIMBURSEMENT AGREEMENT FOR THE RUWAP RECYCLED PROJECT (AWT PHASE 1) (this Agreement ) is made this day of. 2016 ( Effective Date ), by and between Fort Ord Reuse Authority ( FORA ) and Marina Coast

More information

SUBDIVISION IMPROVEMENTS MAINTENANCE GUARANTEE AGREEMENT

SUBDIVISION IMPROVEMENTS MAINTENANCE GUARANTEE AGREEMENT For Staff use only S number Book of Maps Page(s) SUBDIVISION IMPROVEMENTS MAINTENANCE GUARANTEE AGREEMENT 1. Purpose: This Subdivision Improvements Maintenance Guarantee Agreement ("Agreement") is intended

More information

State of Ohio Environmental Protection Agency. TELE: (614) FAX: (614)

State of Ohio Environmental Protection Agency. TELE: (614) FAX: (614) State of Ohio Environmental Protection Agency STREET ADDRESS: Lazarus Government Center 50 W. Town St., Suite 700 Columbus, Ohio 43215 TELE: (614) 644-3020 FAX: (614) 644-3184.WWW.epa.state.oh.us MAILING

More information

Shasta-Tehama-Trinity Joint Community College District. Application for Independent Citizens Bond Oversight Committee

Shasta-Tehama-Trinity Joint Community College District. Application for Independent Citizens Bond Oversight Committee Shasta-Tehama-Trinity Joint Community College District Application for Independent Citizens Bond Oversight Committee Completed applications are to be mailed or hand-delivered to: Shasta-Tehama-Trinity

More information

City of Miami. Legislation. Ordinance: 13331

City of Miami. Legislation. Ordinance: 13331 City of Miami Legislation Ordinance: 13331 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 12-00620 Final Action Date: 7/26/2012 AN ORDINANCE OF THE MIAMI CITY COMMISSION

More information

INTRADEPARTMENTAL CORRESPONDENCE. The Honorable Board of Police Commissioners

INTRADEPARTMENTAL CORRESPONDENCE. The Honorable Board of Police Commissioners INTRADEPARTMENTAL CORRESPONDENCE October 20, 2011 1.1 TO: The Honorable Board of Police Commissioners FROM: Chief of Police SUBJECT: MOTORCYCLE TRAINING CONTRACT AGREEMENT NO. RECOMMENDED ACTION 1. That

More information

MENDOCINO COUNTY PLANNING COMMISSION MINUTES OCTOBER 16, Mendocino County Board of Supervisors Chambers, 501 Low Gap Road, Ukiah, California

MENDOCINO COUNTY PLANNING COMMISSION MINUTES OCTOBER 16, Mendocino County Board of Supervisors Chambers, 501 Low Gap Road, Ukiah, California MENDOCINO COUNTY PLANNING COMMISSION MINUTES OCTOBER 16, 2003 LOCATION: COMMISSIONERS PRESENT: COMMISSIONERS ABSENT: PLANNING & BLDG SVC STAFF PRESENT: OTHER COUNTY DEPARTMENTS PRESENT: Mendocino County

More information

1. This Agreement is entered into between the State Agency and the Contractor named below:

1. This Agreement is entered into between the State Agency and the Contractor named below: STATE OF CALIFORNIA STANDARD AGREEMENT STD 213 (Rev 06/03) AGREEMEN T NUMBER 17ISD011 REGISTRA TION NUMBER 1. This Agreement is entered into between the State Agency and the Contractor named below: STATE

More information

ORDINANCE NO WHEREAS, the Common Council of the City of Fort Atkinson makes the following findings and determinations:

ORDINANCE NO WHEREAS, the Common Council of the City of Fort Atkinson makes the following findings and determinations: ORDINANCE NO. 680 CITY OF FORT ATKINSON, JEFFERSON COUNTY, WISCONSIN AN ORDINANCE OF THE CITY OF FORT ATKINSON CREATING CHAPTER 98, ARTICLE V. PERTAINING TO THE CREATION OF A STORMWATER UTILITY The Common

More information

INTERAGENCY AGREEMENT Between the Washington State Patrol and the Washington State Department of Transportation

INTERAGENCY AGREEMENT Between the Washington State Patrol and the Washington State Department of Transportation INTERAGENCY AGREEMENT Between the Patrol and the Department of Transportation Tow Incentive Program for Heavy Truck Collisions Description of Work: The Patrol will work cooperatively with the Washington

More information

Richland County Non-Metallic

Richland County Non-Metallic Richland County Non-Metallic Mining Reclamation Ordinance No. 2 - ii - ORDINANCE NO. 07-013 Richland County Non-Metallic Mining Reclamation Ordinance No. 2 Richland County Board of Supervisors does hereby

More information

PERMIT TO CONSTRUCT, USE, AND MAINTAIN ACCESS TO A PROVINCIAL PUBLIC HIGHWAY

PERMIT TO CONSTRUCT, USE, AND MAINTAIN ACCESS TO A PROVINCIAL PUBLIC HIGHWAY PERMIT TO CONSTRUCT, USE, AND MAINTAIN ACCESS TO A PROVINCIAL PUBLIC HIGHWAY PURSUANT TO TRANSPORTATION ACT AND/OR THE INDUSTRIAL ROADS ACT AND/OR THE MOTOR VEHICLE ACT AND/OR AS DEFINED IN THE NISGA'A

More information

RESOLUTION NO CLARION BOROUGH STORMWATER AUTHORITY Clarion County, Pennsylvania

RESOLUTION NO CLARION BOROUGH STORMWATER AUTHORITY Clarion County, Pennsylvania RESOLUTION NO. 2019-001 CLARION BOROUGH STORMWATER AUTHORITY Clarion County, Pennsylvania A RESOLUTION OF THE CLARION BOROUGH STORMWATER AUTHORITY, CLARION COUNTY, PENNSYLVANIA, ESTABLISHING A STORMWATER

More information

LSB:jgj. December 5,2008

LSB:jgj. December 5,2008 WEST VIRGINIA AMERICAN WATER Linda S. Bouvette Vice President, Secretary and Corporate Counsel P. 0. Box 1906 Charleston, WV 25327 P: 304-340-2007 F: 304-340-2059 E: linda.bouvette@amwater.com December

More information

ARTICLE VI. SOIL EROSION AND SEDIMENTATION PREVENTION*

ARTICLE VI. SOIL EROSION AND SEDIMENTATION PREVENTION* ARTICLE VI. SOIL EROSION AND SEDIMENTATION PREVENTION* *Editor's note: Ord. No. 02-486, 1, adopted April 8, 2002, amended art. VI in its entirety and enacted similar provisions as set out herein. The former

More information

5.j REPORT TO MAYOR AND CITY COUNCIL SITTING AS THE LOCAL REUSE AUTHORITY TO THE HONORABLE MAYOR AND COUNCIL SITTING AS THE LOCAL REUSE AUTHORITY:

5.j REPORT TO MAYOR AND CITY COUNCIL SITTING AS THE LOCAL REUSE AUTHORITY TO THE HONORABLE MAYOR AND COUNCIL SITTING AS THE LOCAL REUSE AUTHORITY: AGENDA AGENDA ITEM ITEM NO. NO. 5.j REPORT TO MAYOR AND CITY COUNCIL SITTING AS THE LOCAL REUSE AUTHORITY TO THE HONORABLE MAYOR AND COUNCIL SITTING AS THE LOCAL REUSE AUTHORITY: DATE: July 1, 2015 SUBJECT:

More information