Commercial Soil Erosion Permit Application
|
|
- Allyson Matthews
- 5 years ago
- Views:
Transcription
1 CLINTON COUNTY COMMUNITY DEVELOPMENT Commercial Soil Erosion Permit Application Soil Erosion, Sedimentation Control and Drainage Enforcement Division Under the Provisions of Part 91 of Act 451, 1994 as Amended 100 E. State St., Suite 1300 St. Johns, MI Phone: (989) Fax: (989) (Fill out all sections of this permit application or it will not be considered valid.) In accordance with Part 91 of Act 451, 1994, as amended and its corresponding General Rules, the undersigned herewith makes application for a grading permit for the following required fields: 1. GENERAL INFORMATION (Type or Print Clearly in Ink) Required: All Commercial Soil Erosion & Sedimentation Control Applications must be accompanied by two signed & sealed copies of Soil Erosion & Sedimentation Control Plan prepared under the direction of a professional engineer certified in the State of Michigan that meets or exceeds SESC plan requirements, unless waived in writing by the County Enforcing Agency. Development Name : Work to be performed: Commercial Industrial Other Street Name Township :, Section (s): Parcel Number: Street Address (if applicable): Nearest Major Crossroads: 2. APPLICANT INFORMATION Applicant Name Firm Name if Applicable Daytime Phone Pager/Cell 3. LAND OWNER INFORMATION Landowner Name Daytime Phone Pager/Cell 4. ON-SITE RESPONSIBLE INDIVIDUAL INFORMATION (NOT THE COMPANY) Name Firm Name if Applicable Daytime Phone Pager/Cell
2 5. EROSION AND SEDIMENTATION CONTROL PLAN BY INFORMATION Contact Name : Firm Name: Daytime Phone Pager/Cell 6. PROJECT INFORMATION a. Type of earth change: b. Total area of parcel (in acres) : Total area of proposed earth change (in acres): c. Anticipated earthwork starting date: Anticipated final inspection date : d. Type of soil(s) : e. Check type of drawings submitted with application: Location Map Topographic Map Site Development Plan Final Grading & Drainage Plan Erosion & Sediment Control Plan (Mandatory) Other: 7. PERFORMANCE DEPOSIT (If Required) Amount Required $ Cash Check Name of Company: Address: City: State: Zip: Phone: Fax: Local Agent: Address: City: State: Zip: Phone: Fax: 8. HYDROLOGIC CHARACTERISTICS OF SITE INFORMATION Type of Ultimate drainage outlet(s) (Check if applicable and complete the right column) Existing Proposed : Distance to Existing : Open County Drain Lake / Pond River / Stream Enclosed Drain Name of Open County Drain: Name of Lake / Pond: Name of River / Stream: Name of Drain: Detention Basin (with outlet) Retention Basin (no outlet) Wetland Open Ditch Overland Flow Private Storm System
3 9. MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY (MDEQ) a. Will the project include any work or disruption within a 100 year flood plain? - Yes No b. Does project include any work within the cross-section of a lake / stream / drain / wetland? Yes No c. Will the earth disturbance be one or more acres and discharge a lake / stream / drain / wetland? Yes No d. Is a M.D.E.Q. Permit required? Yes No e. If - Yes - Provide MDEQ PERMIT # 10. Part 31, STORM WATER PERMITS All proposed earth disturbance sites of five acres or larger are required to obtain an N. P. D. E. S. (National Pollution Discharge Elimination Systems) permit/notice of coverage from the M.D.E.Q. prior to the commencement of earth disturbance. Permit application forms are available from the Office of the Clinton County Community Development Office and the address below: Donna Cervelli Michigan Department of Environmental Quality Storm Water Permits - S W Q D Construction Fees P.O. Box #30439 Lansing, MI STORM WATER OPERATOR INFORMATION If 5 acres or more disturbed, indicate Storm water manager. Name : Firm Name : Certification : # Expiration Date : Address : City : State Zip : Fax : # Pager : # Daytime Phone :# E- Mail : General Conditions and Responsibilities Issuance of the Soil Erosion and Sedimentation Control Permit does not waive the necessity of obtaining other federal, state, and local permits that may be required. All disturbed areas must be seeded/sodded no more than 5 days after final grade is established. Temporary soil erosion and sedimentation control measures must remain until permanent stabilization measures are in place. If a change in ownership of the property occurs prior to the closure of the permit, a Permit Transfer (will be provided with permit) to the new owner is required. If the permit is not transferred, the original permittee will remain the responsible party for any fines, fees, or enforcement action. This application serves as written consent for the Clinton County Community Development office to enter onto the site for the purpose of inspection.
4 Soil Erosion and its resulting sedimentation to water systems is identified as the #1 threat to the surface waters of the State of Michigan. Millions of tons of soil are lost across the country each year and millions of dollars are spent in correcting the problems brought on by this form of environmental degradation. 1. The landowner (permittee) or legal representative of the permittee on an approved permit is responsible for installation and maintenance of soil erosion and sedimentation control measures and the ultimate stabilization of the site. If the property is sold and legal transfer of the permit has not transpired, i.e., new owners signature on the existing original permit, the original Permittee is held responsible for all fines and stabilization measures for compliance with Part If the County Enforcing Agent (CEA) fo r Part 91, the Clinton County Community Development Office, finds it necessary to issue a violation to a permit holder, violations shall be addressed immediately. A person shall not maintain or undertake an earth change governed by Part 91 rules or the County s SESC ordinance, except in accordance with Part 91, the rules or ordinance and pursuant to the plan and permit approved by the County Enforcing Agency. A person who violates this is guilty of a misdemeanor. 3. The permit holder is responsible for the attainment of site stabilization. A site that is defined as being stabilized is one that has achieved its prescribed final grading and vegetative establishment or other covering resistant to erosion as per the approved SESC plan (i.e. a good stand of grass is present as defined by the inspector). 4. In order to prevent soil erosion and subsequent sedimentation of streams, lakes, and wetlands and to keep sediment on the site, the undersigned applicant agrees to faithfully implement the following practices during and after the construction process: a. Avoid unnecessary removal of existing vegetative soil cover. b. Divert any runoff water into areas where the sediment will settle out of the runoff water before it leaves the site. c. Sod, seed and mulch, or use other approved erosion control measures on all disturbed areas as soon as possible after final grade is established (not more than 5 days). d. Apply fertilizer and lime in amount adequate for the soil type. e. During the construction process and until final grade can be established, seed all bare areas with temporary vegetative cover such as rye grass and oats. f. Provide and maintain any structures, rip-rap, or other permanent means to control possible future erosion of soil from the site. 5. The permit holder is also responsible for maintaining the validity of the permit bond throughout the duration of construction and ultimate stabilization of a site. If the Bond expires and the site lacks proper stabilization, the permit holder will be notified by certified mail. If thirty days passes, the permit will expire. At that time the permit holder shall be required to apply to the Clinton County Community Development Office for a new permit and be responsible for all fees. 6. The SESC inspector m ay req uire add itional control measures if a site inspection ind icates th at original measures are not sufficient to prevent erosion. 7. The permit holder acknowledges and gives permission to the CEA or agents of the CEA to enter the property for inspection purposes. 12. OWNER & APPLICANT SIGNATURE S (TWO SIGNATURES ARE REQUIRED) I (we) affirm that the information provided on this application is accurate and that I (we) will comply with the requirements of Part 91 and i ts corresponding rules, the Clinton County Soil Erosion and Sedimentation Control Ordinance, and applicable local ordinances. I (we) acknowledge that I (we) have read and will comply with the general conditions and responsibilities as outlined in this application. I have read the application instructions and completed the permit applicati on. I understand that applications not fully completed will be delayed. I hereby acknowledge that I have read the above statement of responsib ility under Part 91 and understand my responsibilities. Owner s Signature : Date : Applicant s Signature : Date : 2 SIGNED& SEALED EROSION & SEDIMENT CONTROL PLANS MUST BE SUBMITTED WITH THIS APPLICATION
5 RESIDENTIAL CLINTON COUNTY SOIL EROSION AND SEDIMENTATION CONTROL FEE SCHEDULE Permit Permit Project Type Fee Duration New Home $125 6 months Addition $75 6 months Assessory Building not exceeding 1000 sq. ft. $75 6 months In-ground Pool 6 months Pond $75 6 months *Must re-apply for new permit after 8 months Extension Fee* (2 months only) COMMERCIAL Project Type Plan Permit Incremental Surety Permit Extension Review Base Fee Adjustment Required Duration Fee (first acre/mile) (Each Add'l acre/mile) (Per Acre/mile) Commercial & Residential Site Development Projects $250 $250 ac. $125 ac. $750 ac. 12 months No Extensions (Includes development of new roads) Cut and Fill Operations $100 $250 ac. $125 ac. $750 ac. 4 months ac. (2 mo.) (Includes mass grading projects) Surface Mining Operations $250 0 ac. n/a $750 ac. 24 months $250 (12 mo.) (Total acreage from SUP application) Utilities $100 $150 mi. mi. $1000 mi. 6 months No Extensions (Permit fee may be waived for plowed in utilities) ADDITIONAL INFORMATION All fees will be required prior to the issuance of permit. Fee will be doubled for starting work without a permit. A waiver is issued for projects that do not require a SESC permit. There is no charge for a permit waiver. Surety may be in the form of a surety bond, certified check, or irrevocable bank letter of credit. A Permit Transfer is required if the property changes ownership prior to the closure of the permit. There is no charge for the transfer. Issuance of a Notice of Violation will result in an additional $100 charge to the permit holder. Adopted by Clinton County Board of Commissioners 12/15/06 Effective Date January 1, 2007
Residential Soil Erosion Permit Application
CLINTON COUNTY COMMUNITY DEVELOPMENT Residential Soil Erosion Permit Application Soil Erosion, Sedimentation Control and Drainage Enforcement Division Under the Provisions of Part 91 of Act 451, 1994 as
More informationARENAC COUNTY ORDINANCE SOIL EROSION AND SEDIMENTATION CONTROL
ARENAC COUNTY ORDINANCE 2017-01 SOIL EROSION AND SEDIMENTATION CONTROL WHEREAS, the State of Michigan has authorized counties to adopt a Soil Erosion and Sedimentation Control Ordinance pursuant to Part
More informationBERRIEN COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE ORDINANCE #24. Adopted: September 5, 2013
PREAMBLE BERRIEN COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE ORDINANCE #24 Adopted: September 5, 2013 This is an Ordinance to administrate and regulate the proper use and protection of natural
More informationORDINANCE NO. 33 PENINSULA TOWNSHIP STORM WATER CONTROL ORDINANCE. Description of Purpose and Nature:
ORDINANCE NO. 33 PENINSULA TOWNSHIP STORM WATER CONTROL ORDINANCE Description of Purpose and Nature: AN ORDINANCE TO PROVIDE FOR STORM WATER MANAGEMENT PRACTICES AND REVIEW OF STORM WATER MANAGEMENT PLANS
More informationGuidelines for Submittals for Land Disturbance Permits
Guidelines for Submittals for Land Disturbance Permits A Land Disturbance Permit (LDP) is a local permit required by the City of Shawnee for any land disturbance occurring in a given area. "Land Disturbance"
More informationChapter 12 Erosion Control Regulations
Chapter 12 Erosion Control Regulations Rev. 02/01/05 Section 12-100 Purpose The purpose of this Chapter is to establish minimum standards to deter erosion and sedimentation problems within the City of
More informationARTICLE VI. SOIL EROSION AND SEDIMENTATION PREVENTION*
ARTICLE VI. SOIL EROSION AND SEDIMENTATION PREVENTION* *Editor's note: Ord. No. 02-486, 1, adopted April 8, 2002, amended art. VI in its entirety and enacted similar provisions as set out herein. The former
More informationMAINTENANCE & WARRANTY BOND. Carroll County Board of Commissioners 423 College Street, Carrollton, Georgia, 30117
CARROLL COUNTY, GEORGIA MAINTENANCE & WARRANTY BOND (Name of Surety) (Address of Surety) KNOW ALL MEN BY THESE PRESENTS: that a Corporation, hereinafter called Principal, and a Corporation of the State
More informationARTICLE 20 SOIL EROSION AND SEDIMENTATION CONTROL
ARTICLE 20 SOIL EROSION AND SEDIMENTATION CONTROL 20.1. General Requirements 20.1-1. Plan Required. No person shall initiate any land-disturbing activity without an erosion control plan approved by the
More informationCHARTER TOWNSHIP OF LANSING INGHAM COUNTY, MICHIGAN ORDINANCE NO. 50.2
CHARTER TOWNSHIP OF LANSING INGHAM COUNTY, MICHIGAN ORDINANCE NO. 50.2 AN ORDINANCE OF THE CHARTER TOWNSHIP OF LANSING, INGHAM COUNTY, MICHIGAN, PROVIDING THAT THE CODE OF ORDINANCES, CHARTER TOWNSHIP
More informationNonmetallic Mining Reclamation Permit Application Required.
Article C: Sec. 16-1-12 Permitting Nonmetallic Mining Reclamation Permit Application Required. No person may engage in nonmetallic mining or in nonmetallic mining reclamation without possessing a nonmetallic
More informationCOMMERCIAL DRIVEWAYS AND PRIVATE STREET ENTRANCES ON COUNTY ROADS
COMMERCIAL DRIVEWAYS AND PRIVATE STREET ENTRANCES ON COUNTY ROADS 1. Permit application(s) shall be in accordance with the attached GENERAL REQUIREMENTS and the following instructions. 2. The Kent County
More informationLackawanna County Conservation District Erosion and Sediment Control Plan Review Fee Schedule and Application Form
Lackawanna County Conservation District Erosion and Sediment Control Plan Review Fee Schedule and Application Form (Amended by the Conservation District Board of Directors on April 19, 2012) 100 Title:
More informationEROSION AND SEDIMENT ORDINANCE OF MIDDLESEX COUNTY (Effective: July 20, 1994)
EROSION AND SEDIMENT ORDINANCE OF MIDDLESEX COUNTY (Effective: July 20, 1994) Section 1-1. TITLE, PURPOSE, AND AUTHORITY This ordinance shall be known as the "Erosion and Sediment Control Ordinance of
More informationErosion & Sedimentation Control Resource Type: Sedimentation Control Ordinance Document Last Updated in Database: February 24, 2016
Topic: Erosion & Sedimentation Control Resource Type: Regulations State: North Carolina Jurisdiction Type: Municipal Municipality: City of Greensboro Year (adopted, written, etc.): Unknown Community Type
More informationCHAPTER 3. Building Code
CHAPTER 3 Building Code ADOPTION OF BUILDING CODE 3.005 Definitions 3.010 Adoption of the State Building Code as the Lincoln County Building Code 3.012 Additional Specific Adoption of the State Electrical
More informationEROSION & SEDIMENT CONTROL ORDINANCE
EROSION & SEDIMENT CONTROL ORDINANCE SECTION 46-60 TITLE, PURPOSE, AUTHORITY This ordinance shall be known as the Erosion and Sediment Control Ordinance of Prince Edward County. The purpose of this chapter
More informationLITTLETON PLANNING BOARD STORMWATER MANAGEMENT AND EROSION CONTROL REGULATIONS
LITTLETON PLANNING BOARD STORMWATER MANAGEMENT AND EROSION CONTROL REGULATIONS 1. AUTHORITY AND PURPOSE 1.1. These Regulations are promulgated by the Littleton Planning Board under the authority of the
More informationCONSTRUCTION SITE / EXCAVATION EROSION CONTROL
ORDINANCE NO. 1347-2008 AN ORDINANCE TO AMEND CHAPTER 15 TITLE 2 OF THE CODE OF ORDINANCES OF THE CITY OF ONALASKA RELATING TO CONSTRUCTION SITE/EXCAVATION EROSION CONTROL THE COMMON COUNCIL OF THE CITY
More informationBERKELEY COUNTY ENGINEERING AND
BERKELEY COUNTY ENGINEERING AND BUILDING INSPECTIONS 400 West Stephen Street - Suite 202, Martinsburg, WV 25401-3838 Telephone: 304-264-1966, Fax: 304-262-3128 Web Page: www.berkeleywv.org COMMERCIAL /SUBDIVISION
More informationCITY OF REVERE WETLANDS BY-LAW
CITY OF REVERE WETLANDS BY-LAW SECTION l: APPLICATION The purpose of this by-law is to protect the wetlands of the City of Revere by controlling activities deemed to have a significant effect upon wetland
More informationSECTION 9. FEEDLOT REGULATIONS
SECTION 9. FEEDLOT REGULATIONS Subsection 9.1: Statutory Authorization, Policy & General Provisions A. Statutory Authorization. The Swift County Feedlot Regulations are adopted pursuant to the authorization
More informationCITY OF OLATHE. Please type or print. PROPERTY OWNER NAME (PERMIT HOLDER): OWNER AGENT: ADDRESS: CITY: STATE: ZIP:
OFFICE USE ONLY: PERMIT NO. CITY OF OLATHE LAND DISTURBANCE PERMIT APPLICATION DEVELOPMENT-PLAT NAME: PROPERTY LOCATION: RELATED OLATHE PERMIT #: Please type or print. ESTIMATED DATE OF START OF CONSTRUCTION:
More informationmunicipalities shall have governmental corporate and proprietary powers to enable
ORDINANCE 06 908 AN ORDINANCE OF THE CITY OF PALMETTO AMENDING CHAPTER 29 ARTICLE VII ESTABLISHING A STORMWATER UTILITY PURSUANT TO SECTION OF 403 0893 1 FLORIDA STATUTES PROVIDING FOR ESTABLISHMENT OF
More informationColumbia County Nonmetallic Mining Reclamation Ordinance. Title 16 Chapter 600
Title 16 Chapter 600 Columbia County Board of Supervisors Adopted: May 16, 2001 Amended: June 20, 2007 1 Table of Contents Subchapter 16-601 Introduction... 1 SECTIONS:... 1 16-601-010 PURPOSE... 1 16-601-020
More informationDEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING
DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING (By authority conferred on the environmental quality by section 63103 of 1994 PA 451, MCL 324.63103) PART 1.
More informationCHAPTER 29 DRAINAGE AND DITCHES
CHAPTER 29 DRAINAGE AND DITCHES Latest Revision 1994 29.01 GENERAL INFORMATION Ohio's drainage laws are very broad in nature and detailed in the procedure necessary to bring a project to completion. Ohio
More informationJEFFERSON COUNTY Land Development SITE IMPROVEMENTS BONDING & BOND SURETY POLICY (Effective Date: September 2, 2010)
JEFFERSON COUNTY Land Development SITE IMPROVEMENTS BONDING & BOND SURETY POLICY (Effective Date: September 2, 2010) All required bonding shall be provided by the owner/developer, approved by staff, and
More informationINSTRUCTIONS FOR SCHOOL APPLICATION
South Carolina Department of Labor, Licensing and Regulation South Carolina Board of Cosmetology 110 Centerview Dr. Columbia SC 29210 P.O. Box 11329 Columbia, SC 29211-11329 Phone: 803-896-4588 BoardInfo@llr.sc.gov
More informationSOUTHBOROUGH WETLANDS BY-LAW First Draft 1/2/92, (last revised 2/22/95) Approved at Annual Town Meeting of April 10, 1995 (Article #48)
SOUTHBOROUGH WETLANDS BY-LAW First Draft 1/2/92, (last revised 2/22/95) Approved at Annual Town Meeting of April 10, 1995 (Article #48) CHAPTER 170-1. PURPOSE The purpose of this chapter is to protect
More informationORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:
ORD-3258 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 AN ORDINANCE TO AMEND SECTIONS 30-57, 30-58, 30-60, 30-60.1, 30-71, 30-73, 30-74 AND 30-77 AND ADD SECTIONS 30-62
More informationCity of Warwick, Rhode Island Municipal Code
City of Warwick, Rhode Island Municipal Code Chapter 68 - SOIL EROSION AND SEDIMENT CONTROL FOOTNOTE(S): --- (1) --- Cross reference Buildings and building regulations, ch. 8; excavations in streets and
More informationORDINANCE NO WHEREAS the Ivins City Council previously adopted a Storm Water Management Program; and
IVINS SWMP Appendix A ORDINANCE NO. 2010-02 AN ORDINANCE OF IVINS CITY, UTAH, ADOPTING REGULATIONS FOR STORM WATER POLLUTION CONTROL WHEREAS the Ivins City Council previously adopted a Storm Water Management
More information(3) Applicability. This Section applies to the use of lands within the political boundaries of the Town of Leeds.
Section 11.01 Erosion Control 11.01(A) Title/Purpose The title of this Section is Erosion Control. The purpose of this Section is to prevent soil erosion and promote the health, safety and general welfare
More informationARTICLE II. EROSION AND SEDIMENT CONTROL DIVISION 1. GENERALLY. Sec Definitions.
ARTICLE II. EROSION AND SEDIMENT CONTROL DIVISION 1. GENERALLY Sec. 38-31. Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this
More informationOTHER DOCUMENTS: Indicate title, number of pages and originator
WATERSHED MANAGEMENT PERMIT METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 111 EAST ERIE, CHICAGO, ILLINOIS, 60611 www.mwrd.org INSTRUCTIONS FOR COMPLETING PERMIT FORM: Submit two original
More informationCITY OF SHELBYVILLE ORDINANCE NO. AN ORDINANCE OF THE CITY OF SHELBYVILLE FOR POST DEVELOPMENT STORMWATER MANAGEMENT
CITY OF SHELBYVILLE ORDINANCE NO. AN ORDINANCE OF THE CITY OF SHELBYVILLE FOR POST DEVELOPMENT STORMWATER MANAGEMENT WHEREAS, the City of Shelbyville now operates under the requirements of the Kentucky
More informationSUBCHAPTER 4B - EROSION AND SEDIMENT CONTROL
_ SUBCHAPTER 4B - EROSION AND SEDIMENT CONTROL 15A NCAC 04B.0101 AUTHORITY 113A-64; Repealed Eff. November 1, 1984. 15A NCAC 04B.0102 15A NCAC 04B.0103 PURPOSE SCOPE Authority G.S. 113A-54(a)(b); Amended
More informationSection, Township N, Range E. Is project in MWRDGC combined sewer area Yes No. Basic Information (Required in all cases)...schedule A (Page 4 of 8)
SEWERAGE SYSTEM PERMIT MWRDGC Permit No. METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 100 EAST ERIE, CHICAGO, ILLINOIS, 60611 http://www.mwrd.org 312-751-5600 INSTRUCTIONS FOR COMPLETING
More informationOUTAGAMIE COUNTY CONSTRUCTION SITE EROSION CONTROL ZONING ORDINANCE
OUTAGAMIE COUNTY CONSTRUCTION SITE EROSION CONTROL ZONING ORDINANCE TABLE OF CONTENTS Foreword S.1 Authority S.2 Findings of Fact S.3 Purpose S.4 Applicability and Jurisdiction (1) Applicability (2) Jurisdiction
More informationCompiler's note: The repealed sections pertained to definitions and soil erosion and sedimentation control program.
NATURAL RESOURCES AND ENVIRONMENTAL PROTECTION ACT (EXCERPT) Act 451 of 1994 PART 91 SOIL EROSION AND SEDIMENTATION CONTROL 324.9101 Definitions; A to W. Sec. 9101. (1) "Agricultural practices" means all
More informationORDINANCE NO
ORDINANCE NO. 060821.002 AN ORDINANCE OF THE CITY OF THE VILLAGE OF BEAR CREEK, TEXAS, REQUIRING A PERMIT FOR THE CONSTRUCTION OF A DRIVEWAY; PROHIBITING DRIVEWAYS OR CULVERTS BEING CONSTRUCTED OR MAINTAINED
More informationPart A Checklist Overview and Instructions (Read Part A before completing Part B of the Checklist):
This document states the requirements for granting extension(s) to issued permit(s) and pertains to all development construction permits that have been issued by Land Development Division (LDD) for the
More information(3) "Conservation district" means a conservation district authorized under part 93.
PART 91, SOIL EROSION AND SEDIMENTATION CONTROL OF THE NATURAL RESOURCES AND ENVIRONMENTAL PROTECTION ACT 1994 PA 451, AS AMENDED (Includes all amendments through 8-1-05) 324.9101 Definitions; A to W.
More informationMiddlesex County EROSION AND SEDIMENT CONTROL ORDINANCE Adopted September 16, 2008
Middlesex County E&S Control Ordinance Page 1 of 9 Adopted 9/16/2008 Middlesex County EROSION AND SEDIMENT CONTROL ORDINANCE Adopted September 16, 2008 Section 1-1. TITLE, PURPOSE, AND AUTHORITY This ordinance
More informationSection 48: Land Excavation/Grading
SECTION 48: 48.01 Purpose 48.02 General Regulations 48.03 Permit Required 48.04 Application for Permit 48.05 Review and Approval 48.06 Conditions of Permit 48.07 Financial Guarantee 48.08 Failure to Comply
More informationEROSION CONTROL SECTIONS 19.0 TOWN OF DAVIDSON SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE TITLE PREAMBLE
EROSION CONTROL 19 19.0 TOWN OF DAVIDSON SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE 19.1. TITLE This Ordinance may be cited as the Town of Davidson Soil Erosion and Sedimentation Control Ordinance.
More informationSTORM DRAINAGE WORKS APPROVAL POLICY
Nova Scotia Environment and Labour STORM DRAINAGE WORKS APPROVAL POLICY Approval Date: December 10, 2002 Effective Date: December 10, 2002 Approved By: Ron L Esperance Version Control: Latest revision
More informationMECKLENBURG COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE.
MECKLENBURG COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. NOW, THEREFORE, BE IT ORDAINED by the Mecklenburg County Board of Commissioners that: Section 1. Title This Ordinance may be cited as
More informationLEGISLATIVE COUNSELʹS DIGEST
Assembly Bill No. 1142 CHAPTER 7 An act to amend Sections 2715.5, 2733, 2770, 2772, 2773.1, 2774, 2774.1, 2774.2, and 2774.4 of, to add Sections 2736, 2772.1, and 2773.4 to, and to add and repeal Section
More informationPublic hearing to adopt Ordinance 1375 C.S. amending Title 15, Buildings and Construction, of the Martinez Municipal Code
CITY OF MARTINEZ CITY COUNCIL AGENDA December 4, 2013 TO: FROM: SUBJECT: Mayor and City Council Don Salts, Deputy Public Works Director Mercy G. Cabral, Deputy City Clerk Public hearing to adopt Ordinance
More informationMECKLENBURG COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE
MECKLENBURG COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE Section 1. Title Page 2 Section 2. Preamble Page 2 Section 3. Definitions Page 2-7 Section 4. Scope and Exclusions Page 7-8 Section 5.
More informationSec/Twp/Rge: S14/T28S/R23E, S23/T28S/R23E
2379 Broad Street, Brooksville, Florida 34604-6899 (352) 796-7211 or 1-800-423-1476 (FL only) SUNCOM 628-4150 TDD only 1-800-231-6103 (FL only) On the Internet at: WaterMatters.org An Equal Opportunity
More informationThis ordinance shall be known as the Erosion and Sediment Control Ordinance of Pulaski County, Virginia.
AN ORDINANCE REPEALING AND REENACTING THE EROSION AND SEDIMENTATION CONTROL ORDINANCE OF PULASKI COUNTY, VIRGINIA. BE IT ORDAINED BY THE BOARD OF SUPERVISORS OF PULASKI COUNTY, VIRGINIA, THAT THE EXISTING
More informationFLORENCE COUNTY CODE OF GENERAL ORDINANCES CHAPTER 13. Ordinance for Non-Metallic Mining Reclamation
FLORENCE COUNTY CODE OF GENERAL ORDINANCES CHAPTER 13 Ordinance for Non-Metallic Mining Reclamation Adopted: June 19, 2001 Amended: June 15, 2004 (Increase Fees) Amended: May 15, 2007 (Reflect revised
More informationORDINANCE NO AMENDMENTS TO CODE. Section of the 2012 Uniform Plumbing Code is hereby amended to read as follows:
ORDINANCE NO. 15-28 AN ORDINANCE OF THE MAYOR AND COUNCIL OF THE CITY OF COLUMBUS, NEBRASKA, AMENDING CHAPTER 150 OF TITLE XV OF ORDINANCE NO. 05-47 (COLUMBUS CITY CODE) BY ADOPTING THE 2012 UNIFORM PLUMBING
More informationEROSION CONTROL SECTIONS 19.0 TOWN OF DAVIDSON SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE TITLE PREAMBLE
EROSION CONTROL 19 19.0 TOWN OF DAVIDSON SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE NOW, THEREFORE, BE IT ORDAINED by the Town Board of Davidson that: 19.1. TITLE This Ordinance may be cited as the
More informationCHAPTER 23: DETENTION BASIN STANDARDS Introduction and Goals Administration Standards Standard Attachments 23.
CHAPTER 23: DETENTION BASIN STANDARDS 23.00 Introduction and Goals 23.01 Administration 23.02 Standards 23.03 Standard Attachments 23.1 23.00 INTRODUCTION AND GOALS A. The purpose of this chapter is to
More informationFIRST READING: SECOND READING: PUBLISHED: PASSED: TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION
FIRST READING: SECOND READING: PUBLISHED: PASSED: TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION A RESOLUTION TO DELETE IN ITS ENTIRETY CHAPTER 13.30 ENTITLED TREATMENT AND DISPOSAL OF WASTEWATER
More informationMARYLAND DEPARTMENT OF THE ENVIRONMENT GENERAL PERMIT FOR CONSTRUCTION ACTIVITY General NPDES Permit Number MDR10 State Discharge Permit Number 03 GP
MARYLAND DEPARTMENT OF THE ENVIRONMENT GENERAL PERMIT FOR CONSTRUCTION ACTIVITY General NPDES Permit Number MDR10 State Discharge Permit Number 03 GP EFFECTIVE DATE: MARCH 1, 2003 EXPIRATION DATE: FEBRUARY
More informationCharter Township of Orion
Charter Township of Orion Ordinance No. 139 Stormwater Management and Soil Erosion & Sedimentation Control Ordinance Adopted October 2, 2006 Ordinances of the Charter Township of Orion Ord. 139-1 AN ORDINANCE
More informationCHAPTER 24 NON-METALLIC MINING PART I - GENERAL PART II - STANDARDS
CHAPTER 24 NON-METALLIC MINING PART I - GENERAL 24.01 Title. 24.02 Purpose. 24.03 Statutory Authority. 24.04 Restrictions Adopted Under Other Authority. 24.05 Interpretation. 24.06 Severability. 24.07
More informationSOIL REMOVAL BYLAW
SOIL REMOVAL BYLAW 3088-1997 THE FOLLOWING DOCUMENT HAS BEEN REPRODUCED FOR CONVENIENCE ONLY and is a consolidation of "District of Mission Soil Removal with the following amending bylaws: Bylaw Number
More informationUPPER CHICHESTER TOWNSHIP ZONING HEARING BOARD P.O. BOX 2187 UPPER CHICHESTER, PA (610)
UPPER CHICHESTER TOWNSHIP ZONING HEARING BOARD P.O. BOX 2187 UPPER CHICHESTER, PA 19061 (610) 485-5719 INSTRUCTIONS TO APPLICANTS A. General Instructions Applicants who have a request to make of the Zoning
More informationATTACHMENT F CT DEEP GENERAL PERMIT FOR THE DISCHARGE OF STORMWATER AND DEWATERING WASTEWATERS ASSOCIATED WITH CONSTRUCTION ACTIVITIES
Interstate Reliability Project 345-kV Transmission Lines Development & Management Plan Volume 2 ATTACHMENT F CT DEEP GENERAL PERMIT FOR THE DISCHARGE OF STORMWATER AND DEWATERING WASTEWATERS ASSOCIATED
More informationCITY OF KAMLOOPS BY-LAW NO (AS AMENDED)
This is a consolidated by -law prepared by the City of Kamloops for convenience only. The City does not w arrant that the information contained in this consolidation is current. It is the responsibility
More informationMARYLAND DEPARTMENT OF THE ENVIRONMENT GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY
MARYLAND DEPARTMENT OF THE ENVIRONMENT GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY General NPDES Permit Number MDR10 State Discharge Permit Number 09GP EFFECTIVE DATE: January 1,
More informationThe Board of Supervisors of the County of Riverside Ordains as Follows:
ORDINANCE NO. 555 (AS AMENDED THROUGH 555.19) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO. 555 IMPLEMENTING THE SURFACE MINING AND RECLAMATION ACT OF 1975 The Board of Supervisors of
More informationORDINANCE No. An ordinance amending Title III of the Humboldt County Code relating to the commercial cultivation of cannabis for medical use.
ORDINANCE No. An ordinance amending Title III of the Humboldt County Code relating to the commercial cultivation of cannabis for medical use. The Board of Supervisors of the County of Humboldt ordains
More informationORDINANCE NO WHEREAS, the Common Council of the City of Fort Atkinson makes the following findings and determinations:
ORDINANCE NO. 680 CITY OF FORT ATKINSON, JEFFERSON COUNTY, WISCONSIN AN ORDINANCE OF THE CITY OF FORT ATKINSON CREATING CHAPTER 98, ARTICLE V. PERTAINING TO THE CREATION OF A STORMWATER UTILITY The Common
More informationARLINGTON COUNTY CODE. Chapter 57 EROSION AND SEDIMENT CONTROL*
ARLINGTON COUNTY CODE Chapter 57 * * Editor s Note: Ord. No. 08-01, adopted January 26, 2008, amended Ch. 57, in its entirety, to read as herein set out. 57-1. Title. 57-1. Title. 57-2. Purpose. 57-3.
More informationSURETY BOND (CORPORATION) (Public Resources Code )
CA Mine ID # (Page 1 of 5) DEPARTMENT OF CONSERVATION OFFICE OF MINE RECLAMATION (COUNTY/CITY) OF and the SURETY BOND (CORPORATION) (Public Resources Code 2773.1) Bond No. KNOW ALL PERSONS BY THESE PRESENTS,
More informationENVIRONMENT (10196) Chapter EROSION CONTROL
(10196) Chapter 16.12 Sections: 16.12.010 Purpose. 16.12.020 Scope. 16.12.030 Definitions. 16.12.040 General Provisions. 16.12.050 Project Design. 16.12.060 Erosion Control Plan. 16.12.070 Runoff Control.
More informationApplication to Work on County Right-of-Way
Permit Number: Application to Work on County Right-of-Way LaGrange County Highway Department 300 E. Factory St.; LaGrange, IN 46761 Phone: (260) 499-6353 Fax: (260) 463-7838 Email: sfarlow@lagrangecounty.org
More informationATLANTA REGIONAL COMMISSION METROPOLITAN RIVER PROTECTION ACT RULES AND REGULATIONS
ATLANTA REGIONAL COMMISSION METROPOLITAN RIVER PROTECTION ACT RULES AND REGULATIONS Adopted 5/28/03 These Rules and Regulations are adopted by the Atlanta Regional Commission pursuant to the Metropolitan
More informationARTICLE X. SOIL EROSION AND SEDIMENTATION CONTROL
ARTICLE X. SOIL EROSION AND SEDIMENTATION CONTROL Sec. 5-140. Reserved. Editor's note: Section 1 of an ordinance adopted Oct. 7, 1997, repealed former 5-140, which pertained to incorporation of the soil
More informationBYLAW A BYLAW OF STRATHCONA COUNTY TO REGULATE AND CONTROL SURFACE DRAINAGE AND SITE GRADING WITHIN STRATHCONA COUNTY.
BYLAW 32-2017 A BYLAW OF STRATHCONA COUNTY TO REGULATE AND CONTROL SURFACE DRAINAGE AND SITE GRADING WITHIN STRATHCONA COUNTY. WHEREAS the Municipal Government Act, RSA 2000, c. M-26, provides that a Municipal
More informationDOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER h Street NW East Wenatchee, WAS BEFORE THE DOUGLAS COUNTY HEARING EXAMINER
DOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER 140 19 1h Street NW East Wenatchee, WAS 98802-4109 BEFORE THE DOUGLAS COUNTY HEARING EXAMINER IN THE MATTER OF ) FINDINGS OF FACT, ) CONCLUSIONS OF LAW, AND
More informationHamilton City Council BYLAWS HAMILTON STORMWATER BYLAW 2015
Approved By: Hamilton City Council Date Adopted : 28 May 2015 Date In Force: 28 September 2015 Clause 7.1(e) - 12 months from enforcement date Clause7.1(f) 6 months from enforcement date Review Date: To
More informationA Practitioner s Guide to Instream Flow Transactions in California
A Practitioner s Guide to Instream Flow Transactions in California Appendix A Forbearance Agreement Examples Agreement for the Forbearance of Water for Fisheries Enhancement in the ---------- River System,
More informationCITY OF LYNN In City Council
April 8, 1998 IN THE YEAR ONE THOUSAND NINE HUNDRED NINETY EIGHT AN ORDINANCE DEFINING THE APPLICATION PROCESS, REVIEW AND ISSUANCE OF PERMITS BY THE DEPARTMENT OF PUBLIC WORKS IN THE CITY OF LYNN Be it
More information6.1 Planned Unit Development District
6.1 A. Intent The Planned Unit Development (PUD) District is designed to: encourage creativity and innovation in the design of developments; provide for more efficient use of land including the reduction
More informationInvitation to Bid Commerce Blvd/A1A Intersection Improvements & Signalization NC APPENDIX E ST. JOHNS RIVER WATER MANAGEMENT DISTRICT
Invitation to Bid Commerce Blvd/A1A Intersection Improvements & Signalization NC13 051 APPENDIX E ST. JOHNS RIVER WATER MANAGEMENT DISTRICT St Water Management District Kirby B. Green Ill, Director David
More informationKENOSHA COUNTY NON-METALLIC MINING RECLAMATION ORDINANCE CHAPTER 13 OF THE MUNICIPAL CODE OF KENOSHA COUNTY
KENOSHA COUNTY NON-METALLIC MINING RECLAMATION ORDINANCE BEING CHAPTER 13 OF THE MUNICIPAL CODE OF KENOSHA COUNTY EFFECTIVE DATE 06/01/02 REVISION DATE 03/05/10 Inquiries about this ordinance may be directed
More informationSOIL REMOVAL AND DEPOSITION BYLAW
City of Vernon SOIL REMOVAL AND DEPOSITION BYLAW #5259 BYLAW NO. THE CORPORATION OF THE CITY OF VERNON ADOPTION BYLAW NUMBER 5259 AMENDMENTS AMENDMENT 5670 February 26, 2018 Regulatory Updates as follows:
More informationRichland County Non-Metallic
Richland County Non-Metallic Mining Reclamation Ordinance No. 2 - ii - ORDINANCE NO. 07-013 Richland County Non-Metallic Mining Reclamation Ordinance No. 2 Richland County Board of Supervisors does hereby
More informationDepartment of Planning and Development
VILLAGE OF SOMERS Department of Planning and Development VARIANCE APPLICATION Owner: Mailing Address: Phone Number(s): To the Village of Somers Board of Appeals: Please take notice that the undersigned
More informationTOWN OF HOLLIS, NEW HAMPSHIRE EXCAVATION, REMOVAL OR MOVEMENT OF EARTH REGULATIONS
TOWN OF HOLLIS, NEW HAMPSHIRE EXCAVATION, REMOVAL OR MOVEMENT OF EARTH REGULATIONS TABLE OF CONTENTS SECTION I. AUTHORITY... 1 SECTION II. PURPOSE AND SCOPE... 1 SECTION III. DEFINITIONS:... 1 SECTION
More informationSoil Erosion and Sedimentation Control Ordinance for Kings Mountain, North Carolina
Soil Erosion and Sedimentation Control Ordinance for Kings Mountain, North Carolina Section 1 Title SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE FOR KINGS MOUNTAIN, NORTH CAROLINA This Ordinance may
More informationPart I - General TITLE. The title of this Chapter shall be "Nonmetallic Mining Reclamation Regulations" for the County of Sheboygan.
CHAPTER 78 NONMETALLIC MINING RECLAMATION REGULATIONS Part I - General 78.01 TITLE 78.02 PURPOSE 78.03 STATUTORY AUTHORITY 78.04 RESTRICTIONS ADOPTED UNDER OTHER AUTHORITY 78.05 INTERPRETATION 78.06 SEVERABILITY
More informationSUBDIVISION IMPROVEMENTS MAINTENANCE GUARANTEE AGREEMENT
For Staff use only S number Book of Maps Page(s) SUBDIVISION IMPROVEMENTS MAINTENANCE GUARANTEE AGREEMENT 1. Purpose: This Subdivision Improvements Maintenance Guarantee Agreement ("Agreement") is intended
More informationORDINANCE NO CHAPTER 71 EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES
ENG ORDINANCE NO. 024-06 CHAPTER 71 EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES 71.01 GENERAL (a). Soil erosion contributes to the impairment of drainageways, increases road and storm sewer maintenance
More informationPERSON COUNTY ROXBORO, NORTH CAROLINA APPLICATION FOR SPECIAL USE PERMIT WIRELESS TELECOMMUNICATIONS FACILITIES
CASE (ASSIGNED BY THE PLANNING DEPARTMENT) LOCATION: ZONING: CURRENT USE: It is understood that the Person County will hire Trigon Engineering as a consultant to review, analyze and evaluate all application
More information74th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. Senate Bill 149
74th OREGON LEGISLATIVE ASSEMBLY--2007 Regular Session Enrolled Senate Bill 149 Printed pursuant to Senate Interim Rule 213.28 by order of the President of the Senate in conformance with presession filing
More informationAPPLICATION FOR PERMIT: STREET OPENING AND / OR EXCAVATING IN THE RIGHT OF WAY
CITY OF COLUMBUS 229 E SCHOOL STREET * COLUMBUS, WISCONSIN 53925 920.623.5908 * FAX 920.623.5924 www.cityofcolumbuswi.com Celebrate! COLUMBUS APPLICATION FOR PERMIT: STREET OPENING AND / OR EXCAVATING
More informationAPPLICATION FOR 2019 SEWER AND WATER BUILDER S LICENSE
ASHTABULA CO. DEPARTMENT OF ENVIRONMENTAL SERVICES APPLICATION FOR 2019 SEWER AND WATER BUILDER S LICENSE The following information is required by ACDES for issuance/renewal of your Ashtabula County Sewer
More informationARTICLE 10: ADMINISTRATION AND ENFORCEMENT OF ORDINANCE
ARTICLE 10: ADMINISTRATION AND ENFORCEMENT OF ORDINANCE Section 10.0 - Zoning Administrator A. The provision of this Ordinance shall be administered in accordance with the Michigan Zoning Enabling Act,
More informationORDINANCE NO WHEREAS, the City of Rapid City currently has ordinances regulating trenching contractors licenses within the City; and
ORDINANCE NO. 5719 AN ORDINANCE REGULATING TRENCHING CONTRACTORS LICENSES WITHN THE CITY OF RAPID CITY BY AMENDING CHAPTER 13.10 OF THE RAPID CITY MUNICIPAL CODE. WHEREAS, the City of Rapid City currently
More informationROUTT COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA COMMUNICATION FORM
ROUTT COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA COMMUNICATION FORM ITEM DATE: November 24, 2015 ITEM TIME: consent agenda FROM: Alan Goldich, Planning TODAY S DATE: November 18, 2015 1. Windwalker Golf
More informationTitle 19 Environmental Protection Chapter 5 Land Clearing
Title 19 Environmental Protection Chapter 5 Land Clearing Sec. 19-05.010 Title 19-05.020 Purpose and Scope 19-05.030 Jurisdiction 19-05.040 Authority 19-05.050 Findings 19-05.060 Definitions 19-05.070
More information