SHORELINE MANAGEMENT PERMIT SHEET. SP Douglas County Transportation and Land. o Denied. September 21, 2018

Size: px
Start display at page:

Download "SHORELINE MANAGEMENT PERMIT SHEET. SP Douglas County Transportation and Land. o Denied. September 21, 2018"

Transcription

1 SHORELINE MANAGEMENT PERMIT SHEET Application #: Administering SP Douglas County Transportation and Land Type of Permit: Shoreline Approved Development o Denied Date of Action: September 21, 2018 Date Mailed to DOE/AG RCW and the County Regional Shoreline Master Program, a permit is Dwight Jensen, Riverview Enterprises Jeffrey Christiansen Bostian 5561 Kenwood Woodinville, WA Seattle, W A undertake the development: An for a shoreline development to two ground-based boatlifts. Upon the 2 Lots on Drive, Orondo, Within 200 feet Columbia River and/or ="'v...,l<u\,u wetlands. The project will be within a shoreline of state-wide significance CRCW The project located within a Conservancy designation. The County Regional Master Program is applicable to this development. Development pursuant to this permit shall be undertaken in conformance with the following terms and l. The project in on file submitted on May 9, The applicant shall comply with all local, state regulations. 3. A copy of and attached shall be kept be provided to contractor and all working within the area at all times. applicant, contractor, machinery operators and all others working within the shoreline area shall have read this permit and attached conditions follow its at all times. 4. The marked hazardous conditions for to the County. SP f6

2 5. number and date of 6. The application shall proceed with the Fish & Wild] Management and Mitigation by Grette ''''''"'V'UL'''', "",,,,"'''11''' May 9, Where a permanent means of shall be installed for the plantings that is designed by a landscape architect or equivalent professional. Said design meet the specific needs of riparian steppe vegetation. 8, as shown on the mitigation plan received May 9, 8 project. 9. A five year monitoring shall commence upon ofthe irrigation A surety in conformance with Title County Code between the property owner and Douglas County Transportation and Land Services upon ofthe shoreline County must approve for the cost of installation, plant material, soil amendments, irrigation, seed mix and necessary monitoring by the biologist of and Washington State tax. lo. The mitigation maintained to ensure the are successful. Maintenance shall ensure 100% survival of the 4 years following shall include as-needed undesirable plants; ",..r,tp{'t.".., nf'l t'i~{,f'i")ii" plants, and repair and and mitigation the first year and 80% to rectify problems, ''''',...".v shrubs and small trees any dead plants. 11. shall to Douglas County and mitigation installation; 3 years mitigation installation; and 5 years mitigation Monitoring reports shall by a qualified '-'''"'Av... ' defined by Douglas The biologist must that the conditions provisions in the Habitat Management and Mitigation Plan submitted by Grette ASSO(~lat:es, received May 9, 2018 satisfied. 12. Sequential release of funds with the surety with the conditions of approval and the management and occur in of 113 conformance with the standards that are not met are only minimally out actively being pursued owner to to consider a or more ofthe following plan. Release plan and conditions and contingency compliance, the may ofthe scheduled increment. Non-compliance can result in one carry-over of the surety amount to the next review period; use of to remedy the scheduling a with Douglas County to review conformance with the conditions of approval and to determine what actions may be appropriate. 13. Where a condition imposed Washington State Department Corps of to allow for project redesign found consistent Management Act 14. to installation ofthe project, County PUD, must may be found and Wildlife, HPA Douglas County Land with the approvals County Code, the requirements ofthe or permitting issued '-'u...'v. shall have agencies; Master Program, and ofapproval from applicable agencies, including the to the County. SP f6

3 15. Construction of been granted must be commenced within two (2) years ofthe Authorization to development granted by the (5) years from filing date ofthe permit. FINDINGS 1. The applicants are Jensen, Riverview LLC, Bostian Rd., Woodinville, WA and Christenson, 5561 Kenwood PI N, WA The is: Larry Grette '''""VvUW,",'' LLC, 151 S. StelOl, Wenatchee, WA is an application a shoreline substantial development permit to install 4. The project serve 2 Lots on Desert Shores Drive, Orondo, W A. 5. in addition to the val.n""f, community existing within the Columbia and within the Desert Shores 6. within the Rural Conservancy shoreline environment and is further within the NW of Section 21, Township 26N, 21 W.M., County, Washington. Douglas County Parcel (serving and ). 7. The properties are in the Rural zoning district. 8. The Columbia River Shoreline section ofthe subject properties is as Rural by the Douglas Regional Master Program. 9. WAC establishes criteria Management Substantial Development Permits. This states that a substantial development permit shall be granted only development is consistent policies and of the Act; provisions of this regulation; the applicable master program adopted or approved for the area. 10. A Fish & Wildlife Habitat Management and Mitigation Plan received May 9, 2018 was performed the project Associates. 11. The installation of the two boatlifts will impact the environment. A Wildlife Management and Mitigation has that a total of250 sq ft the boatlifts. 12. The application proposes 610 sq ft of mitigation. A planting plan is proposed within Fish & Wildlife and 13. proposed in the Wildlife Management and Mitigation meets the of the Douglas County Regional Master Program. 14. County a Determination on ;)el)telti 4,2018 in with WAC (Optional DNS). 15. Agency comments were received PllD. 16. No comments have been 17. Surrounding property owners were given the opportunity to comment on a copy ofthe decision, can appeal subject to Title 14. SP f6

4 18. Proper property owners were given the opportunity to hearing. 19. WAC requires that construction must be commenced within 2 years shoreline that for shall 5 years after the date ofthe shoreline permit. development will not adversely the general public, health, safety and 21. record public after legal was held on *, 18. and at the on behalf applicant was Lehman. Mr. Lehman,,","',Ull,"," that he with all representations within the and applicant had no objection to any the proposed conditions of No H..."'V... the public at the 23. At record public the entire staff file was admitted into 24. Public agencies with jurisdiction over this project were an opportunity to review Agencies that responded comments were into the and considered by the Hearing in rendering Decision. Any Conclusion of Law that is more correctly a of Fact is incorporated as such by this..",r,,,..,,,,,,(,p L CONCLUSIONS OF LAW As conditioned, the development meets the goals, policies implementation recommendations as set forth in Douglas Countywide Plan and the Douglas County Shoreline Master Program. 2. As conditioned, this proposal is consistent applicable state laws regulations. 3. As proposed, and "''-''''''''..., potential impacts the project can mitigated. 4. Public ntpt"pclrc will be by approval ofthis...,.,""'""0<> 5. As conditioned, the proposal is consistent Title 18 "Zoning" Title 19 "Environment" of the County 6. LJA'''''''''''''' has been ",..""nt~'rt authority to render this Decision. 7. Any Finding of that is more a Conclusion Law is incorporated as by this,.pr'''''p,n('p This permit is granted pursuant to the County Shoreline Master Program, as amended, and nothing in this permit shah excuse the applicant from compliance with any other state, or local statutes, ordinances, or applicable to this project, but not inconsistent with the Shoreline Management Act of 1971 (Chapter RCW). This may be rescinded pursuant to RCW (7) in the event the permittee fails to comply with the terms and conditions CONSTRUCTION PURSUANT THIS SHALL IS AUTHORIZED UNTIL TWENTY-ONE (21) DAYS FROM THE AS Page 4 of6

5 DEFINED IN RCW (6) AND WAC , OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN TWENTY-ONE (21) DAYS FROM THE DATE OF SUCH FILING HAVE TERMINATED; EXCEPT AS PROVIDED IN RCW (5)(a)(b)(c). Substantial progress toward construction of the project for which this permit has been granted must be accomplished within two (2) years of the filing date of this permit. Authorization to conduct development activities granted by this permit shall terminate five (5) years from the filing date of this permit. Approved this 21 sl day of September, Anyone aggrieved by this decision has twenty-one (21) days from the "date of receipt" as defined in RCW 43.21B.001 to file a petition for review with the Shorelines Hearings Board as provided for in Washington law. SP Page 5 of6

6 THIS SECTION FOR DEPARTMENT OF ECOLOGY USE ONLY CONDITIONAL USE OR VARIANCE PERMIT TO A Date received the This conditional permit is approved/denied by the pursuant to Chapter RCW. Development shall be undertaken to the following additional terms and conditions: Authorized Official f6

SHORELINE MANAGEMENT PERMIT ACTION SHEET. Brian Miller 340 W. Marine View Dr. Orondo, WA

SHORELINE MANAGEMENT PERMIT ACTION SHEET. Brian Miller 340 W. Marine View Dr. Orondo, WA SHORELINE MANAGEMENT PERMIT ACTION SHEET Application #: Administering Agency SP-16-03 Douglas County Transportation and Land Services Type of Permit: Shoreline Substantial Development Action: Approved

More information

SP-l3-03 Douglas County Transportation and Land Services

SP-l3-03 Douglas County Transportation and Land Services SHORELINE MANAGEMENT PERMIT ACTION SHEET Application #: Administering Agency SP-l3-03 Douglas County Transportation and Land Services Type of Permit: Shoreline Substantial Development Action: Approved

More information

SHORELINE MANAGEMENT PERMIT ACTION SHEET. SP-lS-01 Douglas County Transportation and Land Services

SHORELINE MANAGEMENT PERMIT ACTION SHEET. SP-lS-01 Douglas County Transportation and Land Services SHORELINE MANAGEMENT PERMIT ACTION SHEET Application #: Administering Agency SP-lS-01 Douglas County Transportation and Land Services Type of Permit: Shoreline Substantial Development Permit Action: Approved

More information

SHORELINE MANAGEMENT PERMIT ACTION SHEET

SHORELINE MANAGEMENT PERMIT ACTION SHEET SHORELINE MANAGEMENT PERMIT ACTION SHEET Application #: Administering Agency Douglas County Transportation and Land Services Type of Permit: Shoreline Substantial Development Action: Approved 0 Denied

More information

SHORELINE MANAGEMENT PERMI ACTION SHEET

SHORELINE MANAGEMENT PERMI ACTION SHEET SHORELINE MANAGEMENT PERMI ACTION SHEET ~..., '''' \01:. '~ F~E ~f:.,\7 OCT 26 2017 Application #: 0 OUGlAS COUNTY T Administering Agency Douglas County Transportation and Lan ~ ~\i-i~ < LS Type of Permit:

More information

SHORELINE MANAGEMENT PERMIT ACTION SHEET

SHORELINE MANAGEMENT PERMIT ACTION SHEET SHORELINE MANAGEMENT PERMIT ACTION SHEET Application #: Administering Agency Pierre - Kirkpatrick Douglas County Transportation and Land Services Type of Permit: Shoreline Substantial Development Action:

More information

Douglas County Hearing Examiner

Douglas County Hearing Examiner RECEIVED Douglas County Hearing Examiner Andrew L. Kottkamp, Hearing Examiner FEB 21 2012 Douglas County TLS IN THE MATTER OF PA-11-01 FINDINGS OF FACT, CONCLUSIONS OF LAW, DECISION AND CONDITIONS OF APPROVAL

More information

BEFORE THE DOUGLAS COUNTY HEARING EXAMINER I. FINDINGS OF FACT

BEFORE THE DOUGLAS COUNTY HEARING EXAMINER I. FINDINGS OF FACT DOUGLASCOr~TY DEPARTMENT OF HEARING EXAMINER 140 19 th Street NW East Wenatchee, WAS 98802-4109 BEFORE THE DOUGLAS COUNTY HEARING EXAMINER I~ THE MATTER OF ) FINDINGS OF FACT, ) CONCLUSIO~S OF LA W, A~D

More information

DOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER h Street NW East Wenatchee, WAS BEFORE THE DOUGLAS COUNTY HEARING EXAMINER

DOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER h Street NW East Wenatchee, WAS BEFORE THE DOUGLAS COUNTY HEARING EXAMINER DOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER 140 19 1h Street NW East Wenatchee, WAS 98802-4109 BEFORE THE DOUGLAS COUNTY HEARING EXAMINER IN THE MATTER OF ) FINDINGS OF FACT, ) CONCLUSIONS OF LAW, AND

More information

AGENDA Wednesday January 9, :30 PM Douglas County Public Services Building Hearing Room th Street NW, East Wenatchee, WA

AGENDA Wednesday January 9, :30 PM Douglas County Public Services Building Hearing Room th Street NW, East Wenatchee, WA AGENDA Wednesday January 9, 2019 5:30 PM Douglas County Public Services Building Hearing Room 140 19th Street NW, East Wenatchee, WA I. CALL MEETING TO ORDER II. ADMINISTRATIVE PROCEDURES a) Review minutes

More information

STEVENS COUNTY TITLE 8 TIMBER AND FOREST PRACTICES

STEVENS COUNTY TITLE 8 TIMBER AND FOREST PRACTICES STEVENS COUNTY TITLE 8 TIMBER AND FOREST PRACTICES Adopted July 14, 1998 (Resolution #80-1998) TABLE OF CONTENTS CHAPTER 8.02 GENERAL PROVISIONS 8.02.010 Authority 8.02.020 Purpose CHAPTER 8.04 WAIVER

More information

Chapter 7 Administrative Procedures

Chapter 7 Administrative Procedures Chapter 7 Administrative Procedures 7.1 Introduction 7.2 General Compliance 7.3 Applicability 7.4 Administrative Authority and Responsibility 7.5 Processing of Permits 7.6 Enforcement, Violations and Penalties

More information

BEFORE THE BOARD OF COUNTY COMMISSIONERS FOR JOSEPHINE COUNTY

BEFORE THE BOARD OF COUNTY COMMISSIONERS FOR JOSEPHINE COUNTY BEFORE THE BOARD OF COUNTY COMMISSIONERS FOR JOSEPHINE COUNTY Ordinance No. 2006 001 AN ORDINANCE AMENDING THE JOSEPHINE COUNTY RURAL LAND DEVELOPMENT CODE (ORD. 94-4) TO ADD AND REPLACE DEFINITIONS CONTAINED

More information

CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance #

CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance # CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE Adopted: June 1, 2000 by Ordinance # 1999-215 This new language is located in Article V - Site Development Standards, and replaces the Bear Creek (B-C) Overlay

More information

DETERMINATION OF NON-SIGNIFICANCE (DNS)

DETERMINATION OF NON-SIGNIFICANCE (DNS) DETERMINATION OF NON-SIGNIFICANCE (DNS) Application No.: Description of proposal: Proponent: Location of proposal: Lead agency: SEP17-003 and ZTR16-004 New Residential Development Standards: The proposed

More information

CHAPTER DEVELOPMENT STANDARDS FOREST PRACTICE REGULATIONS

CHAPTER DEVELOPMENT STANDARDS FOREST PRACTICE REGULATIONS CHAPTER 21.17 DEVELOPMENT STANDARDS FOREST PRACTICE REGULATIONS SECTIONS: 21.17.010 21.17.020 21.17.030 21.17.040 21.17.050 21.17.060 21.17.070 21.17.080 21.17.010 21.17.020 21.17.030 21.17.040 Authority.

More information

C HAPTER 9: ENFORCEMENT AND VIOLATIONS. Enforcement Responsibilities

C HAPTER 9: ENFORCEMENT AND VIOLATIONS. Enforcement Responsibilities C HAPTER 9: ENFORCEMENT AND VIOLATIONS The success of land use and development regulations is largely dependent on effective enforcement. As part of its Critical Area program, a local government is responsible

More information

Enforcement violations - penalties

Enforcement violations - penalties Thurston County Planning Department BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS Changes from Planning Commission Recommendation TCC 24.92 6/4/2012 Enforcement

More information

Suburban; Rural Town of Brookhaven Tree Preservation Ordinance. Abstract. Resource. Topic:

Suburban; Rural Town of Brookhaven Tree Preservation Ordinance. Abstract. Resource. Topic: Land Use Law Center Gaining Ground Information Database Topic: Resource Type: State: Jurisdiction Type: Municipality: Year (adopted, written, etc.): 1989-1992 Community Type applicable to: Title: Document

More information

Enforcement violations - penalties

Enforcement violations - penalties Thurston County Planning Department DRAFT IN PROGRESS AMENDMENTS TO THE CRITICAL AREAS REGULATIONS TCC 24.92 01/19/2011 Chapter 24.92 Enforcement violations - penalties ENFORCEMENT VIOLATIONS - PENALTIES

More information

CHAPTER 3. Building Code

CHAPTER 3. Building Code CHAPTER 3 Building Code ADOPTION OF BUILDING CODE 3.005 Definitions 3.010 Adoption of the State Building Code as the Lincoln County Building Code 3.012 Additional Specific Adoption of the State Electrical

More information

Article VII - Administration and Enactment

Article VII - Administration and Enactment Section 700 '700.1 PERMITS Building/Zoning Permits: Where required by the Penn Township Building Permit Ordinance for the erection, enlargement, repair, alteration, moving or demolition of any structure,

More information

SEPA ORDINANCE. Flexible thresholds for categorical exemptions ENVIRONMENTAL IMPACT STATEMENT (EIS) Preparation of EIS--Additional considerations

SEPA ORDINANCE. Flexible thresholds for categorical exemptions ENVIRONMENTAL IMPACT STATEMENT (EIS) Preparation of EIS--Additional considerations SEPA ORDINANCE CHAPTER 1 Section 1.1 CHAPTER 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 2.5 Section 2.6 Section 2.7 CHAPTER 3 Section 3.1 Section 3.2 Section 3.3 Section 3.4 Section 3.5

More information

Accessory Buildings (Portion pulled from Town Code Updated 2015)

Accessory Buildings (Portion pulled from Town Code Updated 2015) Accessory Buildings (Portion pulled from Town Code Updated 2015) SECTION 1: TITLE 13 entitled Zoning, Chapter 2 entitled General Provisions, Section 13-2-10 entitled Building Location, Subsection 13.2.10(b)

More information

LOCAL LAW NO. OF 2018 TOWN BOARD TOWN OF NEW CASTLE PROPOSED LOCAL LAW AMENDING CHAPTER 121 OF THE CODE OF THE TOWN OF NEW CASTLE

LOCAL LAW NO. OF 2018 TOWN BOARD TOWN OF NEW CASTLE PROPOSED LOCAL LAW AMENDING CHAPTER 121 OF THE CODE OF THE TOWN OF NEW CASTLE LOCAL LAW NO. OF 2018 TOWN BOARD TOWN OF NEW CASTLE PROPOSED LOCAL LAW AMENDING CHAPTER 121 OF THE CODE OF THE TOWN OF NEW CASTLE BE IT ENACTED by the Town Board of the Town of New Castle as follows: A

More information

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON November 13, :30 P.M.

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON November 13, :30 P.M. COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON November 13, 2018 1:30 P.M. 1. Flag Salute 2. Minutes 3. Vouchers 4. Public Comment 5. New Employee

More information

Plan and Zoning Commission City of Richmond Heights, Missouri

Plan and Zoning Commission City of Richmond Heights, Missouri Plan and Zoning Commission City of Richmond Heights, Missouri Regular Meeting 7:00 p.m., Thursday, September 17, 2015 City Council Chambers Richmond Heights City Hall Call to order: Roll Call: (Note name

More information

1.000 Development Permit Procedures and Administration

1.000 Development Permit Procedures and Administration CHAPTER 1 1.000 Development Permit Procedures and Administration 1.010 Purpose and Applicability A. The purpose of this chapter of the City of Lacey Development Guidelines and Public Works Standards is

More information

A. Implement the goals and policies of the Comprehensive Plan for citizen involvement and the planning process;

A. Implement the goals and policies of the Comprehensive Plan for citizen involvement and the planning process; 1307 PROCEDURES 1307.01 PURPOSE Section 1307 is adopted to: A. Implement the goals and policies of the Comprehensive Plan for citizen involvement and the planning process; B. Establish uniform procedures

More information

BEFORE THE SKAGIT COUNTY HEARING EXAMINER FINDINGS, CONCLUSIONS AND DECISION. (1) Special Use Permit; (2)Variance

BEFORE THE SKAGIT COUNTY HEARING EXAMINER FINDINGS, CONCLUSIONS AND DECISION. (1) Special Use Permit; (2)Variance BEFORE THE SKAGIT COUNTY HEARING EXAMINER FINDINGS, CONCLUSIONS AND DECISION Applicant: File Nos: Requests: Location: Land Use Designation: Summary of Proposal: Public Hearing: Recommendation: Decision:

More information

EROSION & SEDIMENT CONTROL ORDINANCE

EROSION & SEDIMENT CONTROL ORDINANCE EROSION & SEDIMENT CONTROL ORDINANCE SECTION 46-60 TITLE, PURPOSE, AUTHORITY This ordinance shall be known as the Erosion and Sediment Control Ordinance of Prince Edward County. The purpose of this chapter

More information

ORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:

ORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA: ORD-3258 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 AN ORDINANCE TO AMEND SECTIONS 30-57, 30-58, 30-60, 30-60.1, 30-71, 30-73, 30-74 AND 30-77 AND ADD SECTIONS 30-62

More information

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON SEPTEMBER 14, :30 P.M.

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON SEPTEMBER 14, :30 P.M. COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON SEPTEMBER 14, 2015-1:30 P.M. 1. Flag Salute 2. Minutes 3. Vouchers 4. Public Comment 5. Bid Opening

More information

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT Public Notice US Army Corps of Engineers Louisville District Public Notice No. Date: Expiration Date: RGP No. 003 9 Jul 08 9 Jul 13 Please address all comments and inquiries to: U.S. Army Corps of Engineers,

More information

To: Honorable City Council Date: 03/20/12 From: Richard A. Leahy, City Manager By: Thomas E. Hansen, RE., Public Works Director

To: Honorable City Council Date: 03/20/12 From: Richard A. Leahy, City Manager By: Thomas E. Hansen, RE., Public Works Director CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WVVW.CLIATOODINVILLE.WA.US To: Honorable City Council Date: 03/20/12 From: Richard A. Leahy, City Manager

More information

Title 19 Environmental Protection Chapter 5 Land Clearing

Title 19 Environmental Protection Chapter 5 Land Clearing Title 19 Environmental Protection Chapter 5 Land Clearing Sec. 19-05.010 Title 19-05.020 Purpose and Scope 19-05.030 Jurisdiction 19-05.040 Authority 19-05.050 Findings 19-05.060 Definitions 19-05.070

More information

EROSION AND SEDIMENT ORDINANCE OF MIDDLESEX COUNTY (Effective: July 20, 1994)

EROSION AND SEDIMENT ORDINANCE OF MIDDLESEX COUNTY (Effective: July 20, 1994) EROSION AND SEDIMENT ORDINANCE OF MIDDLESEX COUNTY (Effective: July 20, 1994) Section 1-1. TITLE, PURPOSE, AND AUTHORITY This ordinance shall be known as the "Erosion and Sediment Control Ordinance of

More information

Middlesex County EROSION AND SEDIMENT CONTROL ORDINANCE Adopted September 16, 2008

Middlesex County EROSION AND SEDIMENT CONTROL ORDINANCE Adopted September 16, 2008 Middlesex County E&S Control Ordinance Page 1 of 9 Adopted 9/16/2008 Middlesex County EROSION AND SEDIMENT CONTROL ORDINANCE Adopted September 16, 2008 Section 1-1. TITLE, PURPOSE, AND AUTHORITY This ordinance

More information

ARTICLE 10: ADMINISTRATION AND ENFORCEMENT OF ORDINANCE

ARTICLE 10: ADMINISTRATION AND ENFORCEMENT OF ORDINANCE ARTICLE 10: ADMINISTRATION AND ENFORCEMENT OF ORDINANCE Section 10.0 - Zoning Administrator A. The provision of this Ordinance shall be administered in accordance with the Michigan Zoning Enabling Act,

More information

Chapter AMENDMENTS TO THE COMPREHENSIVE PLAN, LAND USE MAP, AND DEVELOPMENT CODE

Chapter AMENDMENTS TO THE COMPREHENSIVE PLAN, LAND USE MAP, AND DEVELOPMENT CODE Chapter 14.15 AMENDMENTS TO THE COMPREHENSIVE PLAN, LAND USE MAP, AND DEVELOPMENT CODE Sections 14.15.010 Early and continuous public participation 14.15.020 Initiation of amendments 14.15.030 Scheduling

More information

(3) "Conservation district" means a conservation district authorized under part 93.

(3) Conservation district means a conservation district authorized under part 93. PART 91, SOIL EROSION AND SEDIMENTATION CONTROL OF THE NATURAL RESOURCES AND ENVIRONMENTAL PROTECTION ACT 1994 PA 451, AS AMENDED (Includes all amendments through 8-1-05) 324.9101 Definitions; A to W.

More information

CHAPTER 20B. CD DISTRICT (COASTAL DEVELOPMENT DISTRICT)

CHAPTER 20B. CD DISTRICT (COASTAL DEVELOPMENT DISTRICT) CHAPTER 20B. CD DISTRICT (COASTAL DEVELOPMENT DISTRICT) SECTION 6328. ESTABLISHMENT AND PURPOSE OF COASTAL DEVELOPMENT DISTRICT. There is hereby established a Coastal Development ( CD ) District for the

More information

Variance Information Sheet Pursuant to Skagit County Code Chapter Visit: for detailed information

Variance Information Sheet Pursuant to Skagit County Code Chapter Visit:  for detailed information Skagit County Planning & Development Services 1800 Continental Place Mount Vernon, WA 98273 Inspections (360) 336-9306 Office (360) 336-9410 Fax (360) 336-9416 Variance Information Sheet Pursuant to Skagit

More information

NATURAL RESOURCES AND ENVIRONMENTAL PROTECTION ACT (EXCERPT) Act 451 of 1994 PART 353 SAND DUNES PROTECTION AND MANAGEMENT

NATURAL RESOURCES AND ENVIRONMENTAL PROTECTION ACT (EXCERPT) Act 451 of 1994 PART 353 SAND DUNES PROTECTION AND MANAGEMENT NATURAL RESOURCES AND ENVIRONMENTAL PROTECTION ACT (EXCERPT) Act 451 of 1994 PART 353 SAND DUNES PROTECTION AND MANAGEMENT 324.35301 Definitions. Sec. 35301. As used in this part: (a) Contour change includes

More information

ARTICLE 7 AMENDMENTS TO ORDINANCE

ARTICLE 7 AMENDMENTS TO ORDINANCE CHAPTER 240 UNIFIED DEVELOPMENT ORDINANCE CITY OF SARATOGA SPRINGS NY ARTICLE 7 AMENDMENTS TO ORDINANCE 7.1 GENERAL AMENDMENTS 7-1 7.1.1 Authority 7-1 7.1.2 Proposal to Amend 7-1 7.1.3 Application and

More information

Compiler's note: The repealed sections pertained to definitions and soil erosion and sedimentation control program.

Compiler's note: The repealed sections pertained to definitions and soil erosion and sedimentation control program. NATURAL RESOURCES AND ENVIRONMENTAL PROTECTION ACT (EXCERPT) Act 451 of 1994 PART 91 SOIL EROSION AND SEDIMENTATION CONTROL 324.9101 Definitions; A to W. Sec. 9101. (1) "Agricultural practices" means all

More information

STATE ENVIRONMENTAL POLICY ACT COMPLIANCE

STATE ENVIRONMENTAL POLICY ACT COMPLIANCE STATE ENVIRONMENTAL POLICY ACT COMPLIANCE Policy No. 6890 February 15, 2012 Page 1 of 8 It is the policy of the Seattle School Board that the district will comply with the Washington State Environmental

More information

WASHINGTON COUNTY HABITAT CONSERVATION PLAN TECHNICAL COMMITTEE MEETING

WASHINGTON COUNTY HABITAT CONSERVATION PLAN TECHNICAL COMMITTEE MEETING WASHINGTON COUNTY HABITAT CONSERVATION PLAN TECHNICAL COMMITTEE MEETING A meeting of the Technical Committee of the HCP was held MARCH 12, 2009, in the conference room at the Washington County Administration

More information

ARTICLE 7 AMENDMENTS TO ORDINANCE

ARTICLE 7 AMENDMENTS TO ORDINANCE ARTICLE 7 AMENDMENTS TO ORDINANCE 7.1 GENERAL AMENDMENTS 7-1 7.1.1 Intent 7-1 7.1.2 Authority 7-1 7.1.3 Proposal to Amend 7-1 7.1.4 Application and Fee 7-1 7.1.5 Referral for Advisory Opinion 7-2 7.1.6

More information

POLICY AND PROCEDURES FOR ALLEY, STREET AND RIGHT-OF-WAY VACATIONS

POLICY AND PROCEDURES FOR ALLEY, STREET AND RIGHT-OF-WAY VACATIONS POLICY AND PROCEDURES FOR ALLEY, STREET AND RIGHT-OF-WAY VACATIONS PREPARED BY Community Development Department City of Council Bluffs 209 Pearl Street Council Bluffs, IA 51503 SECTION I Introduction Authority

More information

CITY OF EAGLE REZONE APPLICATION CROSS REF. FILES: Owner. Purchaser APPLICANT ADDRESS: APPLICANT OWNER ADDRESS: OWNER REPRESENTED BY:

CITY OF EAGLE REZONE APPLICATION CROSS REF. FILES: Owner. Purchaser APPLICANT ADDRESS: APPLICANT   OWNER ADDRESS: OWNER   REPRESENTED BY: CITY OF EAGLE 660 E. Civic Lane, Eagle, ID 83616 Phone #: (208) 939-0227 Fax #: (208) 938-3854 REZONE APPLICATION FILE NO.: CROSS REF. FILES: FEE: APPLICANT: Owner Purchaser APPLICANT ADDRESS: APPLICANT

More information

CRYSTAL CREEK PROPERTIES, LLC

CRYSTAL CREEK PROPERTIES, LLC IN THE OFFICE OF ADMINISTRATIVE HEARINGS CASE NUMBER 2015-0167-V CRYSTAL CREEK PROPERTIES, LLC FOURTH ASSESSMENT DISTRICT DATE HEARD: SEPTEMBER 24, 2015 ORDERED BY: DOUGLAS CLARK HOLLMANN ADMINISTRATIVE

More information

11.01 Minimum Application Requirements. Okanogan County Regional Shoreline Master Program April 1, 2009 DRAFT Chapter 11 Administration

11.01 Minimum Application Requirements. Okanogan County Regional Shoreline Master Program April 1, 2009 DRAFT Chapter 11 Administration CHAPTER 11 Administration Introduction To be authorized, all uses and developments shall be planned and carried out in a manner that is consistent with this Program and the policy of the Act as required

More information

Chapter FOREST PRACTICES

Chapter FOREST PRACTICES Chapter 17.20 FOREST PRACTICES Deleted: WAIVER OF SIX-YEAR DEVELOPMENT MORATORIUM Sections: 17.20.010 Title. 17.20.020 Authority. 17.20.030 Purpose. 17.20.040 Definitions. 17.20.050 Class IV-General Forest

More information

Town of Otis Landfill Area Protection Ordinance

Town of Otis Landfill Area Protection Ordinance Town of Otis Landfill Area Protection Ordinance Section 1. General Provisions A. Title This ordinance shall be known and cited as the landfill area protection ordinance of the town of Otis, Maine and will

More information

Turtle Creek Homeowners Association

Turtle Creek Homeowners Association Turtle Creek Homeowners Association June 13, 2016 Roll Call of Board Members: Reading of minutes from previous meeting September 2015: Old business and unfinished business (September 30, 2015) New business:

More information

ARTICLE 2.0 ADMINISTRATION AND ENFORCEMENT

ARTICLE 2.0 ADMINISTRATION AND ENFORCEMENT ARTICLE 2.0 ADMINISTRATION AND ENFORCEMENT Section 2.01 Compliance Required. No structure, site or part thereof shall be constructed, altered or maintained and no use of any structure or land shall be

More information

CHAPTER BUILDING PERMITS

CHAPTER BUILDING PERMITS CITY OF MOSES LAKE MUNICIPAL CODE CHAPTER 16.02 BUILDING PERMITS Sections: 16.02.010 Purpose of Chapter 16.02.020 Building Codes Adopted 16.02.030 Filing of Copies of Codes 16.02.040 Unplatted Areas 16.02.045

More information

302 CMR: DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

302 CMR: DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 302 CMR 3.00: SCENIC AND RECREATIONAL RIVERS ORDERS Section 3.01: Authority 3.02: Definitions 3.03: Advisory Committees 3.04: Classification of Rivers and Streams 3.05: Preliminary Informational Meetings

More information

Klickitat County Environmental Ordinance # Enacted August 23, Amended: 12/10/84 4/10/95 9/2/03

Klickitat County Environmental Ordinance # Enacted August 23, Amended: 12/10/84 4/10/95 9/2/03 Klickitat County Environmental Ordinance #121084 Enacted August 23, 1982 Amended: 12/10/84 4/10/95 9/2/03 TABLE OF CONTENTS KLICKITAT COUNTY ENVIRONMENTAL ORDINANCE SECTION 1 AUTHORITY...1 2 GENERAL REQUIREMENTS...1

More information

PENN TOWNSHIP CUMBERLAND COUNTY, PENNSYLVANIA ORDINANCE NUMBER HOLDING TANKS

PENN TOWNSHIP CUMBERLAND COUNTY, PENNSYLVANIA ORDINANCE NUMBER HOLDING TANKS PENN TOWNSHIP CUMBERLAND COUNTY, PENNSYLVANIA ORDINANCE NUMBER 2001-2 HOLDING TANKS SECTION 1. The purpose of this Ordinance is to provide for and regulate the use, maintenance and removal of new and existing

More information

Dry Creek Rancheria Band of Pomo Indians. Government Code TITLE 10. LAND USE ORDINANCE

Dry Creek Rancheria Band of Pomo Indians. Government Code TITLE 10. LAND USE ORDINANCE Dry Creek Rancheria Band of Pomo Indians Government Code TITLE 10. LAND USE ORDINANCE TABLE OF CONTENTS CHAPTER 1. SHORT TITLE, DECLARATION OF NEED, AND PURPOSE SECTION 1. Short Title SECTION 2. Findings

More information

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION ROUTE PERMIT FOR CONSTRUCTION OF A LARGE [PIPELINE TYPE] PIPELINE AND ASSOCIATED FACILITIES IN [COUNTY]

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION ROUTE PERMIT FOR CONSTRUCTION OF A LARGE [PIPELINE TYPE] PIPELINE AND ASSOCIATED FACILITIES IN [COUNTY] STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION ROUTE PERMIT FOR CONSTRUCTION OF A LARGE [PIPELINE TYPE] PIPELINE AND ASSOCIATED FACILITIES IN [COUNTY] ISSUED TO [PERMITTEE] PUC DOCKET NO. [Docket Number]

More information

CHAPTER 27 Amendments

CHAPTER 27 Amendments CHAPTER 27 Amendments Section 27.1 Intent and Purpose Amendments or supplements shall be made hereto in the same manner as provided in the Zoning Act for the enactment of this Ordinance. Section 27.2 Initiation

More information

SECTION I. Article 6 (commencing with Section 19331) is added to Chapter 3.5 of Division 8 of the Business and Professions Code, to read:

SECTION I. Article 6 (commencing with Section 19331) is added to Chapter 3.5 of Division 8 of the Business and Professions Code, to read: Ch.688-2- and civil penalties for specified violations of the Medical Marijuana Regulation and Safety Act, and would require moneys collected as a result of these fines and civil penalties to be deposited

More information

Assembly Bill No. 243 CHAPTER 688

Assembly Bill No. 243 CHAPTER 688 Assembly Bill No. 243 CHAPTER 688 An act to add Article 6 (commencing with Section 19331), Article 13 (commencing with Section 19350), and Article 17 (commencing with Section 19360) to Chapter 3.5 of Division

More information

REGULATIONS FOR THE VILLAGE OF NORTH CHEVY CHASE

REGULATIONS FOR THE VILLAGE OF NORTH CHEVY CHASE REGULATIONS FOR THE VILLAGE OF NORTH CHEVY CHASE CHAPTER 3 BUILDING PERMITS Article 1. General Provisions Section 3-101 Definitions Section 3-102 Applicable Requirements Article 2. Village Building Permits

More information

THE COMMISSION MAY ADD OR TAKE ACTIONS ON ITEMS NOT LISTED ON THIS AGENDA.

THE COMMISSION MAY ADD OR TAKE ACTIONS ON ITEMS NOT LISTED ON THIS AGENDA. Page AGENDA Planning Commission 6:30 PM - Thursday, March 21, 2019 City Hall Council Chambers, Sammamish, WA CALL TO ORDER ROLL CALL APPROVAL OF AGENDA Estimated Time 6:30 pm APPROVAL OF THE MINUTES 3-4

More information

ORDINANCE NO WHEREAS, the City is updating its land development codes to provide

ORDINANCE NO WHEREAS, the City is updating its land development codes to provide ORDINANCE NO. 709 AN ORDINANCE OF THE CITY OF GIG HARBOR, RELATING TO LAND CLEARING, RENUMBERING CHAPTER 16.44 ON THE SUBJECT OF LAND CLEARING TO CHAPTER 17.94; ELIMINATING ALL PROVISIONS IN THE CHAPTER

More information

SUBTITLE II CHAPTER GENERAL PROVISIONS

SUBTITLE II CHAPTER GENERAL PROVISIONS SUBTITLE II CHAPTER 20.20 GENERAL PROVISIONS 20.20.010 Purpose. 20.20.020 Definitions. 20.20.030 Applicability. 20.20.040 Administration and interpretation. 20.20.050 Delegation of authority. 20.20.060

More information

Title 26 Findings - Page 1 ORDINANCE NO.

Title 26 Findings - Page 1 ORDINANCE NO. Title 26 Findings - Page 1 ORDINANCE NO. AN ORDINANCE OF THURSTON COUNTY, WASHINGTON, ADDING TITLE 26 OF THE THURSTON COUNTY CODE FOR CODE ENFORCEMENT AND TO AMEND THURSTON COUNTY CODE CHAPTER 13.56, SECTION

More information

WHATCOM COUNTY HEARING EXAMINER

WHATCOM COUNTY HEARING EXAMINER WHATCOM COUNTY HEARING EXAMINER RE: Zoning Conditional Use Permit ) CUP2009-0013 Application for ) ) FINDINGS OF FACT, Paradise Lakes Country Club ) CONCLUSIONS OF LAW, ) AND DECISION SUMMARY OF APPLICATION

More information

Scott Sherrill, Town Clerk/Planning Administrator Town of Pine Knoll Shores

Scott Sherrill, Town Clerk/Planning Administrator Town of Pine Knoll Shores Scott Sherrill, Town Clerk/Planning Administrator Town of Pine Knoll Shores SOG Legislative Update Conversations with SOG DWR Information Session Conversations with NCLM Conversations with DCM Conversations

More information

CITY OF OCEAN SHORES ORDINANCE NO. 972

CITY OF OCEAN SHORES ORDINANCE NO. 972 CITY OF OCEAN SHORES ORDINANCE NO. 972 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF OCEAN SHORES, GRAYS HARBOR COUNTY, WASHINGTON, ADOPTING FINDINGS OF FACT AND CONCLUSIONS TO SUPPORT AN EMERGENCY MORATORIUM

More information

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON JANUARY 14, :30 P.M.

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON JANUARY 14, :30 P.M. COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON JANUARY 14, 2019 1:30 P.M. 1. Flag Salute 2. Minutes 3. Reorganization of Board of Commissioners 4.

More information

ARTICLE 23 TELECOMMUNICATIONS TOWERS

ARTICLE 23 TELECOMMUNICATIONS TOWERS Adopted 12-6-16 ARTICLE 23 TELECOMMUNICATIONS TOWERS Sections: 23-1 Telecommunications Towers; Permits 23-2 Fencing and Screening 23-3 Setbacks and Landscaping 23-4 Security 23-5 Access 23-6 Maintenance

More information

ORDINANCE NO. 33 PENINSULA TOWNSHIP STORM WATER CONTROL ORDINANCE. Description of Purpose and Nature:

ORDINANCE NO. 33 PENINSULA TOWNSHIP STORM WATER CONTROL ORDINANCE. Description of Purpose and Nature: ORDINANCE NO. 33 PENINSULA TOWNSHIP STORM WATER CONTROL ORDINANCE Description of Purpose and Nature: AN ORDINANCE TO PROVIDE FOR STORM WATER MANAGEMENT PRACTICES AND REVIEW OF STORM WATER MANAGEMENT PLANS

More information

ARTICLE 7 AMENDMENTS TO ORDINANCE

ARTICLE 7 AMENDMENTS TO ORDINANCE ARTICLE 7 AMENDMENTS TO ORDINANCE 7.1 GENERAL AMENDMENTS 7-1 7.1.1 Authority 7-1 7.1.2 Proposal to Amend 7-1 7.1.3 Application and Fee 7-1 7.1.4 Referral for Advisory Opinion 7-1 7.1.5 Public Hearing Notice

More information

RRC STAFF OPINION PLEASE NOTE: THIS COMMUNICATION IS EITHER 1) ONLY THE RECOMMENDATION OF AN RRC

RRC STAFF OPINION PLEASE NOTE: THIS COMMUNICATION IS EITHER 1) ONLY THE RECOMMENDATION OF AN RRC RRC STAFF OPINION PLEASE NOTE: THIS COMMUNICATION IS EITHER 1) ONLY THE RECOMMENDATION OF AN RRC STAFF ATTORNEY AS TO ACTION THAT THE ATTORNEY BELIEVES THE COMMISSION SHOULD TAKE ON THE CITED RULE AT ITS

More information

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON APRIL 8, :30 P.M.

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON APRIL 8, :30 P.M. COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON APRIL 8, 2019 1:30 P.M. 1. Flag Salute 2. Minutes 3. Vouchers 4. Bid Opening Bid Document 19-04-D, Provide

More information

MEMORANDUM OF UNDERSTANDING BETWEEN the TAHOE REGIONAL PLANNING AGENCY and COUNTY/CITY

MEMORANDUM OF UNDERSTANDING BETWEEN the TAHOE REGIONAL PLANNING AGENCY and COUNTY/CITY MEMORANDUM OF UNDERSTANDING BETWEEN the TAHOE REGIONAL PLANNING AGENCY and COUNTY/CITY This Memorandum of Understanding (MOU) is entered between the Tahoe Regional Planning Agency (TRPA) and herein referred

More information

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON DECEMBER 29, :00 A.M.

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON DECEMBER 29, :00 A.M. COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON DECEMBER 29, 2017 10:00 A.M. 1. Flag Salute 2. Minutes 3. Vouchers 4. Public Comment 5. Prequalification

More information

I. SPECIAL CONDITIONS:

I. SPECIAL CONDITIONS: General Permit No.: SAC-2014-00299 Name of Permittee: GENERAL PUBLIC Effective Date: 09 October 2015 Expiration Date: 31 December 2020 DEPARTMENT OF THE ARMY GENERAL PERMIT A General Permit to perform

More information

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON DECEMBER 14, :30 P.M.

COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON DECEMBER 14, :30 P.M. COMMISSION MEETING AGENDA PUBLIC UTILITY DISTRICT NO. 1 OF DOUGLAS COUNTY EAST WENATCHEE, WASHINGTON DECEMBER 14, 2015 3:30 P.M. 1. Flag Salute 2. Minutes 3. Vouchers 4. Public Comment 5. 20-Year Service

More information

6.1 Planned Unit Development District

6.1 Planned Unit Development District 6.1 A. Intent The Planned Unit Development (PUD) District is designed to: encourage creativity and innovation in the design of developments; provide for more efficient use of land including the reduction

More information

BY-LAW NO the protection, preservation. and removal of Trees on private property within the Township of Georgian Bay

BY-LAW NO the protection, preservation. and removal of Trees on private property within the Township of Georgian Bay THE CORPORATION OF THE TOWNSHIP OF GEORGIAN BAY BY-LAW NO. 2014-73 A By law to regulate the protection, preservation and removal of Trees on private property within the Township of Georgian Bay This By

More information

Columbia County Nonmetallic Mining Reclamation Ordinance. Title 16 Chapter 600

Columbia County Nonmetallic Mining Reclamation Ordinance. Title 16 Chapter 600 Title 16 Chapter 600 Columbia County Board of Supervisors Adopted: May 16, 2001 Amended: June 20, 2007 1 Table of Contents Subchapter 16-601 Introduction... 1 SECTIONS:... 1 16-601-010 PURPOSE... 1 16-601-020

More information

MEMORANDUM. FIRST READ: Amendments to Chapter 16 related to Streams and Stream Buffers (Rich Edinger)

MEMORANDUM. FIRST READ: Amendments to Chapter 16 related to Streams and Stream Buffers (Rich Edinger) MEMORANDUM To: From: Mayor and City Council Rich Edinger Date: 4/9/2012 Subject: FIRST READ: Amendments to Chapter 16 related to Streams and Stream Buffers (Rich Edinger) ITEM DESCRIPTION Council Member

More information

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY COUNTY COMMISSIONERS Creating Solutions for Our Future John Hutchings District One Gary Edwards District Two Bud Blake District Three HEARING EXAMINER BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In

More information

(b) A concurring vote of a majority of the membership of the Zoning Board of Appeals shall be necessary to constitute board action.

(b) A concurring vote of a majority of the membership of the Zoning Board of Appeals shall be necessary to constitute board action. Article XXII Chapter 1 ARTICLE XXII ZONING BOARD OF APPEALS Sec. 20-2200 Composition. There is hereby established a Township Zoning Board of Appeals to be composed of five (5) members. One (1) of these

More information

ARTICLE 12 PROCEDURES AND STANDARDS

ARTICLE 12 PROCEDURES AND STANDARDS ARTICLE 12 PROCEDURES AND STANDARDS Section 12.01 A. Purpose. Site Plan Review. The site plan approval procedures of this Section are instituted to provide an opportunity for the London Township Planning

More information

SOUTHBOROUGH WETLANDS BY-LAW First Draft 1/2/92, (last revised 2/22/95) Approved at Annual Town Meeting of April 10, 1995 (Article #48)

SOUTHBOROUGH WETLANDS BY-LAW First Draft 1/2/92, (last revised 2/22/95) Approved at Annual Town Meeting of April 10, 1995 (Article #48) SOUTHBOROUGH WETLANDS BY-LAW First Draft 1/2/92, (last revised 2/22/95) Approved at Annual Town Meeting of April 10, 1995 (Article #48) CHAPTER 170-1. PURPOSE The purpose of this chapter is to protect

More information

Chapter 503 Zoning Administration

Chapter 503 Zoning Administration Chapter 503 Zoning Administration 503.01 Planning and Zoning Department The Rice County Board of Commissioners hereby establishes the Planning and Zoning Department, for which the Board may appoint a Director

More information

FILLMORE COUNTY FEEDLOT ORDINANCE

FILLMORE COUNTY FEEDLOT ORDINANCE FILLMORE COUNTY FEEDLOT ORDINANCE Amended November 25, 2003 Amended May 20, 2014 Table of Contents SECTION 1 Statutory Authority........................ 1 SECTION 2 Policy..................................

More information

TITLE III. PARKS AND BOULEVARDS

TITLE III. PARKS AND BOULEVARDS City of Mapleton, ND TITLE III. PARKS AND BOULEVARDS CHAPTERS: 3-01. 3-02. 3-03. Parks. Boulevards. Trees, Shrubs, and Other Plants. CHAPTER 3-01 PARKS SECTIONS: 3-0101. Acceptance by City of Provisions

More information

MAPLE GROVE PLANNING COMMISSION June 9, 2014

MAPLE GROVE PLANNING COMMISSION June 9, 2014 MAPLE GROVE PLANNING COMMISSION CALL TO ORDER A meeting of the Maple Grove Planning Commission was held at 7:00 p.m. on at the Maple Grove City Hall, Hennepin County, Minnesota. Chair Colson called the

More information

Section 48: Land Excavation/Grading

Section 48: Land Excavation/Grading SECTION 48: 48.01 Purpose 48.02 General Regulations 48.03 Permit Required 48.04 Application for Permit 48.05 Review and Approval 48.06 Conditions of Permit 48.07 Financial Guarantee 48.08 Failure to Comply

More information

IN THE OFFICE OF ADMINISTRATIVE HEARINGS CASE NUMBER V ELLEN C. GRIFFIN SECOND ASSESSMENT DISTRICT DATE HEARD: JANUARY 5, 2016 ORDERED BY:

IN THE OFFICE OF ADMINISTRATIVE HEARINGS CASE NUMBER V ELLEN C. GRIFFIN SECOND ASSESSMENT DISTRICT DATE HEARD: JANUARY 5, 2016 ORDERED BY: IN THE OFFICE OF ADMINISTRATIVE HEARINGS CASE NUMBER 2015-0243-V ELLEN C. GRIFFIN SECOND ASSESSMENT DISTRICT DATE HEARD: JANUARY 5, 2016 ORDERED BY: DOUGLAS CLARK HOLLMANN ADMINISTRATIVE HEARING OFFICER

More information

CHAPTER 159 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL

CHAPTER 159 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL CHAPTER 159 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL 159.01 PURPOSE 159.07 INSPECTION & ENFORCEMENT 159.02 DEFINITIONS 159.08 MONITORING PROCEDURES 159.03 LANDS TO WHICH CHAPTER APPLIES 159.04 REQUIREMENTS

More information

PART A. Name: (First) (Middle) (Last) (Maiden)

PART A. Name: (First) (Middle) (Last) (Maiden) 222 N Havana Spokane WA 99202 (509) 477-2181 http://extension.wsu.edu/spokane/master-gardener-program/ Washington State University Extension Volunteer Application Form e-mail: mastergardener@spokanecounty.org

More information