1 AMENDMENT NO. 7 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT For Russell Street/South 3rd Environmental Impact Statement Project STPU and BR 8105(8); CN 4128 This Amendment has been prepared to supplement the tasks originally outlined by HKM Engineering Inc. (DOWL HKM) in our Scope of Services dated July 14, This supplement is necessary to complete the Final Environmental Impact Statement (FEIS) and address new requirements that resulted from agency comments relative to the Traffic Analysis Update (TAU). This modification will extend the contract schedule to December 24, A new activity tasks are outlined in the sections below. Any variation from the Activity, Tasks, and sub-tasks outlined in this Amendment will be considered out-of-scope and subject to further contract modification. I Understanding of Scope DOWL HKM is currently providing services to the City of Missoula (City) under our original Scope (dated July 14, 2006), the Professional Engineering Services Agreement (dated August 4, 2006), Amendment No. 1, Amendment No. 2, Amendment No. 3, Amendment No. 4, Amendment No. 5, and Amendment No. 6. Gallatin Public Affairs, a subconsultant to DOWL HKM, will perform the remaining work for the Final EIS (see attached subconsultant scope of services). This Amendment is intended to augment MDT Activity 198 as outlined below. II Project Tasks The following DOWL HKM Activities are numbered in keeping with those set up in the original Scope of Services for this project. Activity 1.0 Project Scoping DOWL HKM completed the following Scoping tasks for Amendment No. 6 whose cost are covered under this amendment: Task 1.1 Develop Amendment to Professional Engineering Agreement Services; Amendment No. 6. Task 1.2 Coordinate with Bison Engineering, City, MDT, and FHWA (scope, budget, schedule, and contract). DOWL HKM will complete the following Scoping tasks under this Amendment: Task 1.3 Develop Amendment to Professional Engineering Agreement Services. Task 1.4 Manage development of a revised project schedule. Task 1.5 Coordinate with City, MDT, and FHWA (scope, budget, schedule, and contract; including one trip to Missoula for City Council Meeting).

2 AMENDMENT NO. 7 RUSSELL STREET SOUTH 3RD STREET ENVIRONMENTAL IMPACT STATEMENT Activity 1.0 Deliverables: Final Amendment No. 7 Final Amended Schedule Activity 2.0 Preliminary Environmental DOWL HKM does not anticipate any changes to our scope or cost under this activity. Activity 3.0 Preliminary Roadway Design 3.1 South 3 rd Street Analysis In Amendment No. 4, DOWL HKM was asked to update alternative layout schematics based upon the results of the Traffic Analysis Update and update the cost estimates for the alternatives that were revised for the Russell corridor. In addition to these scoped items, there were unintended, out-of-scope consequences from changing the Russell traffic planning horizon from 2025 to 2035 to be consistent with the Long Range Transportation Plan (LRTP). This change in the planning horizon necessitated assessing operations for 2035 on South 3 rd Street. DOWL HKM provided two technical memoranda addressing both the functions of roundabouts with the 2035 data and which alternatives would work the best with the new data. Consequently, additional analysis was required to determine that a different Preferred Alternative (signalized intersections) for South 3 rd Street would satisfy Purpose and Need. The intent of this task is to account for the out-of-scope analysis performed for South 3 rd Street, drafting two memoranda, and updating graphics for South 3 rd Street to reflect the new Preferred Alternative. Activity 4.0 Environmental Documentation In Amendment No. 3, DOWL HKM budgeted for 50 copies of the FEIS containing 220 color pages and 30 black/white pages per document. Considering the increased number of pages included in the comment/response appendix, the addition of the TAU summary, and in-depth explanations added to the FEIS, there will be more pages per copy than originally scoped. This assumes the majority of additional pages will be black and white. MDT and the City also requested 80 copies of the document in order to meet the public s needs. This is 30 more copies than was originally scoped. Activity 5.0 Public Involvement DOWL HKM does not anticipate any changes to our scope or cost under this activity. Activity 6.0 Project Management 6.1 Additional Weekly Team Meetings Based on project discussion during the August 20, 2009 conference call, the team decided that weekly meetings would be beneficial in order to resolve schedule-critical issues and to keep the project moving forward and on schedule. Additionally, weekly team meetings were hosted in order for team members to concur on responses to public comments and therefore avoid multiple iterations of the lengthy comment / response appendix. Weekly team meetings concluded in mid-november resulting in six additional team meetings. DOWL HKM attended these meetings and drafted meeting minutes for each of these meetings. Furthermore, many meetings lasted longer than the scoped duration anticipated. As such, DOWL HKM requests additional time for attending these long meetings as well as drafting meeting minutes beyond the scoped, one-hour meetings.

3 AMENDMENT NO. 7 RUSSELL STREET SOUTH 3RD STREET ENVIRONMENTAL IMPACT STATEMENT 6.2 Schedule Extension Based on the additional air quality analysis, a three-month agency iterative review process, and to allow for formal project close-out procedures, the overall project completion date has extended from August 2010 to December 2010; an extension of four months from what was originally scoped. The extra time required is included in this Amendment, which will take the contract to December 24, Based on discussion during the February 4, 2010 meeting, it is likely that the team will need to have some weekly meetings as well as bi-weekly meetings until the end of October This Amendment assumes one month of weekly meetings and one month of bi-weekly meetings. As such, DOWL HKM estimates that there will be 6 additional one-hour team meetings beyond what was originally scoped. DOWL HKM requests that two people attend these meetings for a total of 12 hours as well as an additional 21 hours to draft meeting minutes from these team meetings. DOWL HKM will prepare monthly status reports and provide monthly invoicing during this additional four-month period. DOWL HKM requests an additional eight (8) hours for this task. III Cost Estimate DOWL HKM proposes to complete the additional task to facilitate completion of the FEIS with a contract Amendment amount as outlined in attached Final Cost Summary. The overall contract value with DOWL HKM is as follows: Original Contract Amount: $ 368, Amendment No Amendment No. 2 31, Amendment No , Amendment No. 4 Amendment No. 5 Amendment No. 6 Amendment No , , , , Amended Contract Value: $861, IV Schedule The City of Missoula, MDT, FHWA, and DOWL HKM have all committed to making this project a priority for completion in the most expeditious manner possible. The attached schedule outlines a process for the completion, review, and approval of the air quality conformance documentation and Final EIS documents, and a Record of Decision (ROD) within a 9 month period from start of the air quality conformance analysis. This revised schedule is consistent with MDT s current Consultant Design flowchart, and with the task durations as collaboratively developed by the City/MDT/FHWA and DOWL HKM Project Team. This Amendment will extend the overall contract completion date to the end of December 2010.

4 AMENDMENT NO. 7 RUSSELL STREET SOUTH 3RD STREET ENVIRONMENTAL IMPACT STATEMENT Engineer: DOWL HKM 104 East Broadway Helena, MT Karen B. Fagg, Vice President Date: Date: Phillip A. Odegard, Western Region Manager Owner: City of Missoula Missoula City Hall 435 Ryman Street Missoula, MT John Engen, Mayor Date: Martha L. Rehbein, City Clerk Date: Approved as to form: Jim Nugent, City Attorney Date:

5 Attachment A-1 March 30, 2010 Cost Estimate: Amendment # 7 Russell Street / South Third Street Final Environmental Impact Statement City of Missoula Odegard J. Jespersen Salle Becken-Gaddo Cormier Lead Engineer Planner Project Engineer Designer Traffic Engineer Total 1.0 Project Scoping 1.1 Develop Scope/Budge/Contract Bison Scope/Budge/Contract Develop revised project schedule Coord. with City, MDT and FHWA Preliminary Environmental No changes Preliminary Roadway Design 3.1 3rd Street Analysis Environmental Documentation No changes Public Involvement No changes Project Management 6.1 Additional Weekly Team Meetings Schedule Extension Total Hours Adjusted Direct Hourly Rates $44.50 $21.50 $26.50 $22.50 $42.00 Direct Labor Total $2, $2, $0.00 $ $1, $7, Overhead (169.70%) $3, $3, $0.00 $1, $3, $12, Fixed Fee (12 %) $2, Expenses (see breakout below) $11, Total DOWL HKM Modification $ 33,399 Subconsultant: Gallatin Public Affairs $ 50,079 Total Estimate of Amendment # 7 $83,478 Detailed Expense Breakout: quantitiy cost per total cost Reproduction (see Attachment A-2) ** $11, Vehicle Rental 0 $50.00 $0.00 Mileage 240 $0.50 $ Per Diem 0 $39.00 $0.00 Hotel Stays 0 $ $0.00 Advertisements 0 $ $0.00 Postage 0 $0.44 $0.00 $11,619.00

6 Russell Street / South 3 rd Street - EIS (STPU M 8105(8); UPN 4128) At-A-Glance Progress Report as of: March 18, 2010 November 09 December 09 January 2010 February 2010 March 2010 April 2010 May 2010 June 2010 July 2010 August 2010 September 2010 October 2010 November Extended review of Comment/Response. New traffic analysis on South 3 rd Street Coordination with EPA/DEQ/FHWA regarding Air Quality issues Scope and Cost development with Bison Engineering NEW TASK Air Quality Analysis 198 C-3 Revise C/R and prep FEIS 198 E-4 Review FEIS 198 C-5 Modify FEIS E-6 Approval to print C-7 Print for Legal 198 E-8 Legal Sufficiency Review C-13 Print FEIS 198 C-9 C-11 Revise based on Legal Print Sig. E E-12 Print Review FEIS and sign approval 199 E-14 Distribute FEIS 199 C-1 Draft ROD 199 E-2 Review Draft ROD Activity Sub- Activity Activity Description Status Negotiated Durations (in working days) Due Date Actual Delivery Date Comments Critical Path PR Data Collection 100 % complete 15 March 20, 2009 Final on Late, but involved substantial and valuable collaboration with MDT Conference Call # % complete Week of April 2, PR Draft Tech Memo # % complete 10 April 20, 2009 May 4, 2009 Late, but will not affect overall schedule. Comments due May City/MDT/FHWA Review of Tech Memo # % complete 10 May 4, 2009 May 22, 2009 Review period extended to obtain comments from all parties Team Meeting # % complete Week of April 13, 2009 Minutes provided to attendees on April 20, Final Tech Memo # % complete 5 May 11, 2009 May 28, 2009 Late, but will not affect overall schedule. -- PR Conference Call # % complete May 21, 2009 May 21, PR Draft Tech Memo # % complete 10 June 2, 2009 June 4, 2009 Late, but will not affect overall schedule City/MDT/FHWA Review of Tech Memo # % complete 10 June 15, 2009 June 25, 2009 Review period extended to June 18 to give two full weeks Team Meeting # % complete Week of June 15, 2009 Minutes provided to attendees on June 22, Final Tech Memo # % complete 5 June 22, 2009 July 9, 2009 All agreed at team meeting to accept Tech Memo 2 as final. -- PR Draft Tech Memo # % complete 10 July 20, 2009* July 21, 2009 All agreed to new submittal date of July 20, City/MDT/FHWA Review of Tech Memo # % complete 10 August 3, 2009* No formal comments received Conference Call # % complete Week of * July 27, Final Tech Memo # % complete 10 August 10, 2009* August 12, PR Draft Final Report 100 % complete 15 August 10, 2009 August 12, City/MDT/FHWA Review of Draft Final Report 10 August 24, Conference Call # 4 Presentation to City Council August 17, 2009 August 17, Final Report 5 August 31, 2009 September 3, C-1 Gallatin/HKM to prepare C/R Appendix 100 % complete 15 September 21, /9-20, 2009 May still require some coordination with EPA regarding air/water issues. -- E-2 MDT/FHWA to review C/R Appendix 100 % complete 13 October 7, 2009 October 8, NEW TASK Bison Engineering Air Quality Analysis 30 March 22, 2010** Bison anticipates completion of the Draft report by C-3 Gallatin/HKM to modify C/R and Prepare FEIS 90 % complete 10 April 5, 2010** Iterative Review Will be complete pending revisions based on Air Quality analysis. E-4 MDT/FHWA to review Internal Draft FEIS 15 April 26, 2010** C-5 HKM to modify Draft FEIS based on comments 10 May 10, 2010** E-6 MDT/FHWA to provide print approval for Legal Suff. 5 May 17, 2010** C-7 HKM to print for Legal Sufficiency Review 5 May 24, 2010** E-8 FHWA Legal Sufficiency Review 25 June 30, 2010** C-9 Revise FEIS based on Legal Sufficiency Review 10 July 15, 2010** E-10 MDT/FHWA provide print approval 5 July 20, 2010** C-11 HKM to print FEIS for Signature 5 July 27, 2010** E-12 MDT/FHWA to review and sign FEIS 15 August 17, 2010** C-13 Print FEIS for Distribution 5 August 24, 2010** E-14 Distribute FEIS 32 October 12, 2010** 199 C-1 Draft Record of Decision 10 October 26, 2010** E-2 MDT/FHWA Review Draft Record of Decision 10 Nov. 10, 2010** *Notes: * Revised Date ** Revised Date as of

7 Agreement No. 09X07 Exhibit A Gallatin Public Affairs - Modification # 2 (March 29, rd REVISION) for: Russell Street / South 3 rd Street Environmental Impact Statement Modification # 1 was executed in April 2009 in anticipation of the scope changes resulting from the Missoula City Council request for a peer review. Kittleson & Associates completed their Traffic Analysis Update (TAU) in August Throughout the summer, Gallatin continued to participate in bi-weekly team meetings, provided input and direction to the team regarding NEPA implications of the various analyses and recommendations from the TAU, and continued to work on responses to comments on the DEIS that would not be affected by the outcome of Kittleson s TAU. Gallatin remained on track with schedule and budget up through August and began submitting portions of the Draft Comment/Response appendix in mid-september, with the complete appendix completed on schedule in late September. The project team began what turned into a three-month iterative review of the Comment/Response appendix, Court Reporter appendix, and Hearing Transcript appendix. During this time, MDT, FHWA, EPA and DEQ also discussed the need for additional air quality analyses which would be required due to the updated traffic projections and operational analysis. There was a lengthy delay in the overall schedule as the regulatory agencies discussed the appropriate approach and scope of analysis. Modification # 2 will cover Gallatin Public Affairs time and costs associated with the lengthy iterative review, additional team meetings, preparation of an additional appendix to summarize the Kittleson report, and redrafting substantial portions of the main body of the EIS based on changes in the traffic analysis and Preferred Alternative on South 3 rd Street. This modification also assumes an eight (8) month schedule extension and will cover the additional time and expenses associated with team meetings, project management, and monthly reporting and invoicing activities. Activity 198 C-1 Respond to comments, create comment and response document for public comments. In Modification # 1, Gallatin requested an additional 24 hours under this task to incorporate new information received from the Traffic Analysis Update into the comment/response appendix. While considerable time was expended on the incorporation of this new information into the Comment/Response appendix, Gallatin believes this budget to have been sufficient and does not request any additional scope or budget for this sub-task. Activity 198 C-3 Revise comment and response document. Gallatin requested an additional 16 hours under Modification # 1 for this task. The additional hours for this task under Modification # 1 were intended to facilitate an early review of appropriate portions of the comment/response appendix in order to facilitate earlier completion of this task following the TAU. Gallatin had a total of 80 hours for preparation, review, and final edits to the Comment/Response Appendix. Over the course of the last three months, Gallatin has engaged in seven additional meetings for a total of approximately 21 hours to discuss text edits in detail. Since submittal of the

8 Russell Street EIS Contract Modification # 2 Page 2 Draft Comment/Response appendix, Gallatin has expended over 255 hours on meetings and editing of the Comment/Response appendices. This has been a valuable effort, but has clearly exceeded the expectations of all parties. Gallatin requests an additional 160 hours for this sub-task. Activity 198 NEW Prepare Traffic Analysis Update Summary Appendix. Gallatin to prepare an FEIS appendix to summarize the Kittleson & Associates technical memoranda and Final Report for the Traffic Analysis Update. This appendix will serve as a summary of the Kittleson work and a focused response to several public comments on the DEIS. Gallatin requests a total of 30 hours for this new sub-task. Activity 198 C-5 Prepare Final EIS Gallatin requested an additional 16 hours for this task under Modification # 1 in order to accommodate unanticipated revisions as a result of the Traffic Analysis Update. Modification # 1 stipulated the following: For the purposes of the schedule and cost estimate presented in this Contract Modification, it must be noted that the assumption on the part of the consultant is that the results of the Peer Review will not result in substantial changes to the DEIS. In reality, the Traffic Analysis Update (Peer Review) has resulted in the need for substantial changes to the Chapter 2 discussion regarding safety and operational analyses. The subsequent traffic analysis on South 3 rd Street will also result in substantial changes to Chapter 2 and Chapter 4 through the change in the Preferred Alternative. The project team also identified the need for additional air quality analysis which will result in unforeseen coordination with a sub-consultant, EPA, and DEQ, as well as edits to the EIS. With this modification, Gallatin will edit the document to provide updated traffic data, analysis, and conclusions that go well beyond a validation of the contents of the DEIS. This incorporation of new data and graphics is anticipated to exceed our current budget, and Gallatin requests an additional 120 hours for this sub-task. Activity 198 C-7 Print FEIS for FHWA Legal Sufficiency Gallatin does not anticipate any changes to our scope or cost under this activity. Activity 198 C-9 Respond to comments from Legal Sufficiency Due to the substantive number of comments received, and the potential legal challenge(s) outlined in the comments, Gallatin requests an additional 24 hours to coordinate with FHWA Legal Counsel to ensure modifications can be made in a timely fashion. March 29, 2010

9 Russell Street EIS Contract Modification # 2 Page 3 Activity 198 C-11 Print for Federal Register Gallatin does not anticipate any changes to our scope or cost under this activity. Activity 199 C-1 Prepare Preliminary Record of Decision Gallatin does not anticipate any changes in our scope or cost under this activity. Schedule: Gallatin Public Affairs assumes, based on the current schedule, that our engagement with this project will be extended an additional six (6) months (with a ROD completed by the end of October 2010). To account for any minor changes in the schedule and time to close out contracts with DOWL HKM, this modification would extend Gallatin services to December 24, Additional time associated with this extension includes ten (10) hours for re-scoping the project and negotiating this modification, and approximately four (4) hours per month for team meetings, routine coordination with the City of Missoula, and monthly progress reporting and invoicing. Cost Estimate: As outlined in the attached spreadsheet, Gallatin Public Affairs proposes to complete the above tasks with a contract modification amount not to exceed $50,078.84, and a total sub-contract amount of $144, Any work and schedule extensions outside the above scope may be subject to additional fees. Any such work will be identified prior to completion and a request for contract modification will be initiated. March 29, 2010

10 Exhibit B Agreement No. 09X07 Gallatin Public Affairs Cost Estimate - March 29, 2010 (3rd Revision) Russell Street / South 3rd Street - Environmental Impact Statement Task James Schott Total 198 C-1 Preliminary Draft - FEIS C-3 Revise Comment/Response Document NEW Kittleson Summary Appendix C-5 Final EIS C-7 Print FEIS for Legal Sufficiency C-9 Respond to Legal Comments C-11 Print for Fed Register C-1 Draft Record of Decision Weekly/Bi-weekly Team Meetings Project Team Coordination Total Hours Direct Hourly Rate $45.00 $17.50 Direct Labor Total $10, $3, $13, Overhead (233.37) $31, Fixed Fee (12 %) $5, Expenses $0.00 Total Sub-Contract Amount - Modification 2 $50,078.84

Russell T. Vought~ Acting Director

Russell T. Vought~ Acting Director Executive Office ofthe President Office of Management and Budget February 26, 2019 Executive Office ofthe President Council on Environmental Quality M-19-11 MEMORANDUM FOR THE SECRETARY OF TRANSPORTATION

More information

Executive Summary Amendment to the Planning Commission Rules & Regulations HEARING DATE: FEBRUARY 5, 2015

Executive Summary Amendment to the Planning Commission Rules & Regulations HEARING DATE: FEBRUARY 5, 2015 Executive Summary Amendment to the Planning Commission Rules & Regulations HEARING DATE: FEBRUARY 5, 2015 Project Name: Staff Contact: Recommendation: Amendments to the CPC Rules & Regulations Jonas P.

More information

SWCAA 802. SEPA Procedures

SWCAA 802. SEPA Procedures SWCAA 802 SEPA Procedures Effective Date: June 18, 2017 Filed with Code Reviser (CR-101) WSR 16-23-080 November 15, 2016 Preliminary Notice Published WSR 16-23 December 7, 2016 Filed with Code Reviser

More information

N.J.A.C. 6A:6, STATE BOARD OF EDUCATION RULEMAKING PROCESS TABLE OF CONTENTS

N.J.A.C. 6A:6, STATE BOARD OF EDUCATION RULEMAKING PROCESS TABLE OF CONTENTS N.J.A.C. 6A:6, STATE BOARD OF EDUCATION RULEMAKING PROCESS TABLE OF CONTENTS SUBCHAPTER 1. GENERAL PROVISIONS 6A:6-1.1 Scope 6A:6-1.2 Definitions SUBCHAPTER 2. NOTICE OF ANTICIPATED RULEMAKING ACTIVITY

More information

SERC Regional Standards Development Procedure Exhibit C to the Amended and Restated Regional Entity Delegation Agreement between

SERC Regional Standards Development Procedure Exhibit C to the Amended and Restated Regional Entity Delegation Agreement between SERC Regional Standards Development Procedure Exhibit C to the Amended and Restated Regional Entity Delegation Agreement between North American Electric Reliability Corporation and SERC Reliability Corporation

More information

ASSOCIATION OF CANCER EXECUTIVES 2017 ANNUAL MEETING * CALL FOR PROPOSALS *

ASSOCIATION OF CANCER EXECUTIVES 2017 ANNUAL MEETING * CALL FOR PROPOSALS * ASSOCIATION OF CANCER EXECUTIVES 2017 ANNUAL MEETING * CALL FOR PROPOSALS * We are thrilled to have your interest in submitting a proposal to be a part of the 23rd ACE Annual Meeting to be held in Austin,

More information

BYLAWS OF THE TALLAHASSEE-LEON COUNTY PLANNING COMMISSION

BYLAWS OF THE TALLAHASSEE-LEON COUNTY PLANNING COMMISSION 0 0 0 0 BYLAWS OF THE TALLAHASSEE-LEON COUNTY PLANNING COMMISSION These Bylaws govern the actions of the Tallahassee-Leon County Planning Commission in its capacity as the Planning Commission, the Local

More information

"SPECIAL" EXECUTIVE BOARD MEETING AGENDA

SPECIAL EXECUTIVE BOARD MEETING AGENDA "SPECIAL" EXECUTIVE BOARD MEETING AGENDA DATE: PLACE: July 5, 2016 TIME: 10:00 AM to 10:30 AM Conference Call - To join the conference, call 520-421-8673, hit # key to join Irene's Cell 520-705-5143 Executive

More information

AGREEMENT. by and between the CITY OF LOS ANGELES. and ERNST & YOUNG INFRASTRUCTURE ADVISORS, LLC. for the DOWNTOWN LA STREETCAR PROJECT

AGREEMENT. by and between the CITY OF LOS ANGELES. and ERNST & YOUNG INFRASTRUCTURE ADVISORS, LLC. for the DOWNTOWN LA STREETCAR PROJECT AGREEMENT by and between the CITY OF LOS ANGELES and ERNST & YOUNG INFRASTRUCTURE ADVISORS, LLC. for the DOWNTOWN LA STREETCAR PROJECT This Agreement is made by and between the City of Los Angeles, California,

More information

State Environmental Policy Act Compliance

State Environmental Policy Act Compliance Page 1 of 8 Purpose State Environmental Policy Act Compliance The purpose of this policy is to adopt by reference the policies of the State Environmental Policy act. Scope This policy applies to the Superintendent,

More information

Amendments to the 2040 Total Mobility Plan of the Coastal Region Metropolitan Planning Organization (CORE MPO)

Amendments to the 2040 Total Mobility Plan of the Coastal Region Metropolitan Planning Organization (CORE MPO) Amendments to the 2040 Total Mobility Plan of the Coastal Region Metropolitan Planning Organization (CORE MPO) June 2018 The CORE MPO s current Metropolitan Transportation Plan (MTP), CORE Connections

More information

STATE ENVIRONMENTAL POLICY ACT COMPLIANCE

STATE ENVIRONMENTAL POLICY ACT COMPLIANCE STATE ENVIRONMENTAL POLICY ACT COMPLIANCE The district accepts its responsibility, as described by the Washington state legislature in the State Environmental Policy Act, specifically Chapter 43.21C. Adoption

More information

MEMORANDUM OF AGREEMENT BETWEEN MONTANA RAIL LINK, INC. AND THE INTERNATIONAL ASSOCIATION OF MACHINISTS & AEROSPACE WORKERS

MEMORANDUM OF AGREEMENT BETWEEN MONTANA RAIL LINK, INC. AND THE INTERNATIONAL ASSOCIATION OF MACHINISTS & AEROSPACE WORKERS MEMORANDUM OF AGREEMENT BETWEEN MONTANA RAIL LINK, INC. AND THE INTERNATIONAL ASSOCIATION OF MACHINISTS & AEROSPACE WORKERS This Agreement, dated December 1, 1992, by and between Montana Rail Link, Inc.

More information

PROCEDURE 6890P STATE ENVIRONMENTAL POLICY ACT COMPLIANCE WAC WAC

PROCEDURE 6890P STATE ENVIRONMENTAL POLICY ACT COMPLIANCE WAC WAC STATE ENVIRONMENTAL POLICY ACT COMPLIANCE SECTION 1: POLICIES AND AUTHORITY The Board accepts its responsibilities, as set forth in the State Environmental Policy Act, Chapter 43.21 RCW. SECTION 2: ADOPTION

More information

RULES OF PROCEDURE. For Applications & Appeals

RULES OF PROCEDURE. For Applications & Appeals Attachment A Resolution of adoption, 2009 KITSAP COUNTY OFFICE OF THE HEARING EXAMINER RULES OF PROCEDURE For Applications & Appeals Adopted June 22, 2009 BOCC Resolution No 116 2009 Note: Res No 116-2009

More information

COMMUNITY DEVELOPMENT BLOCK GRANT AWARD AGREEMENT AWARD AGREEMENT 12-10

COMMUNITY DEVELOPMENT BLOCK GRANT AWARD AGREEMENT AWARD AGREEMENT 12-10 CFDA NO. 14.218 COMMUNITY DEVELOPMENT BLOCK GRANT AWARD AGREEMENT AWARD AGREEMENT 12-10 This Award Agreement is entered into by RAMP OF MONTANA (grant recipient), a Montana non-profit corporation, and

More information

STATE ENVIRONMENTAL POLICY ACT COMPLIANCE

STATE ENVIRONMENTAL POLICY ACT COMPLIANCE STATE ENVIRONMENTAL POLICY ACT COMPLIANCE Policy No. 6890 February 15, 2012 Page 1 of 8 It is the policy of the Seattle School Board that the district will comply with the Washington State Environmental

More information

GUIDELINES FOR PROPOSALS FOR HOSTING AND CONDUCTING THE OCEANS XX MTS/IEEE CONFERENCE

GUIDELINES FOR PROPOSALS FOR HOSTING AND CONDUCTING THE OCEANS XX MTS/IEEE CONFERENCE Introduction Approved Version August 15, 1999 GuidLnV3a.doc 8/15/99 GUIDELINES FOR PROPOSALS FOR HOSTING AND CONDUCTING THE OCEANS XX MTS/IEEE CONFERENCE August 1999 The Marine Technology Society and the

More information

BIG CASE MANAGEMENT HEARINGS OPINION GUIDELINE

BIG CASE MANAGEMENT HEARINGS OPINION GUIDELINE BIG CASE MANAGEMENT HEARINGS OPINION GUIDELINE TERMS & CONDITIONS FOR COUNSEL IN BIG CASES As counsel conducting big cases you are required to comply with the following terms and conditions. A breach of

More information

BEFORE THE UNITED STATES FEDERAL ENERGY REGULATORY COMMISSION

BEFORE THE UNITED STATES FEDERAL ENERGY REGULATORY COMMISSION BEFORE THE UNITED STATES FEDERAL ENERGY REGULATORY COMMISSION Denver Board of Water Commissioners ) Amendment Application for ) FERC Project No. 2035-0999 Gross Reservoir Hydroelectric Project ) SAVE THE

More information

RESOLUTION NO. PSRC-EB

RESOLUTION NO. PSRC-EB RESOLUTION NO. PSRC-EB-2016-01 A RESOLUTION of the Executive Board of the Puget Sound Regional Council Adopting Procedures and Policies Implementing the State Environmental Policy Act, RCW 43.21C and Chapter

More information

REQUEST FOR QUALIFICATIONS VARIOUS BOROUGH PROFESSIONAL POSITIONS AND EXTRAORDINARY UNSPECIFIABLE SERVICES POSTIONS. ISSUE DATE: November 14, 2018

REQUEST FOR QUALIFICATIONS VARIOUS BOROUGH PROFESSIONAL POSITIONS AND EXTRAORDINARY UNSPECIFIABLE SERVICES POSTIONS. ISSUE DATE: November 14, 2018 NOTE: To receive addenda or modification to this Request for Qualifications, please provide the Borough Clerk with Respondent s name, email address, and phone number upon receipt of this document. REQUEST

More information

MEMORANDUM OF AGREEMENT For Devolution of Secondary Highway System Construction

MEMORANDUM OF AGREEMENT For Devolution of Secondary Highway System Construction MEMORANDUM OF AGREEMENT For Devolution of Secondary Highway System Construction THIS MEMORANDUM OF AGREEMENT, made and executed in triplicate this day of, 200_, by and between the COUNTY of, Virginia,

More information

SEPA ORDINANCE. Flexible thresholds for categorical exemptions ENVIRONMENTAL IMPACT STATEMENT (EIS) Preparation of EIS--Additional considerations

SEPA ORDINANCE. Flexible thresholds for categorical exemptions ENVIRONMENTAL IMPACT STATEMENT (EIS) Preparation of EIS--Additional considerations SEPA ORDINANCE CHAPTER 1 Section 1.1 CHAPTER 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 2.5 Section 2.6 Section 2.7 CHAPTER 3 Section 3.1 Section 3.2 Section 3.3 Section 3.4 Section 3.5

More information

Township of Middle 33 MECHANIC STREET CAPE MAY COURT HOUSE, NJ 08210

Township of Middle 33 MECHANIC STREET CAPE MAY COURT HOUSE, NJ 08210 Township of Middle 33 MECHANIC STREET CAPE MAY COURT HOUSE, NJ 08210 Important Notice The reverse side of this form contains important information related to your rights concerning government records.

More information

Butte School District #1 Request for Proposal (RFP)

Butte School District #1 Request for Proposal (RFP) Certification Request for Proposal (RFP) Bid Acknowledgement Form Bread Products The Respondent herby certifies by submission and signature of this proposal that the Respondent complies fully with this

More information

ORDINANCE NO. 735 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF HEDWIG

ORDINANCE NO. 735 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF HEDWIG ORDINANCE NO. 735 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF HEDWIG VILLAGE, TEXAS AMENDING ARTICLE V, ZONING REGULATIONS, SECTION 509, PLANNED UNIT DEVELOPMENTS, OF THE HEDWIG VILLAGE PLANNING AND

More information

RULES OF PROCEDURE FOR PROCEEDINGS BEFORE THE HEARING EXAMINER OF THE CITY OF PUYALLUP, WASHINGTON CHAPTER I: HEARINGS ON PERMIT APPLICATIONS

RULES OF PROCEDURE FOR PROCEEDINGS BEFORE THE HEARING EXAMINER OF THE CITY OF PUYALLUP, WASHINGTON CHAPTER I: HEARINGS ON PERMIT APPLICATIONS RULES OF PROCEDURE FOR PROCEEDINGS BEFORE THE HEARING EXAMINER OF THE CITY OF PUYALLUP, WASHINGTON CHAPTER I: HEARINGS ON PERMIT APPLICATIONS Purpose These are intended to facilitate orderly open record

More information

Westchester Elementary PTA Standing Rules

Westchester Elementary PTA Standing Rules Standing Rules are procedures or general policies that serve as a supplement to our Unit bylaws, and provide structure for the day-to-day operations of our PTA. They are adopted and/or amended by a majority

More information

Correctional Population Forecasts

Correctional Population Forecasts Colorado Division of Criminal Justice Correctional Population Forecasts Pursuant to 24-33.5-503 (m), C.R.S. Linda Harrison February 2012 Office of Research and Statistics Division of Criminal Justice Colorado

More information

Case 2:05-cv TJW Document 211 Filed 12/21/2005 Page 1 of 11

Case 2:05-cv TJW Document 211 Filed 12/21/2005 Page 1 of 11 Case 2:05-cv-00195-TJW Document 211 Filed 12/21/2005 Page 1 of 11 IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF TEXAS MARSHALL DIVISION DIGITAL CHOICE OF TEXAS, LLC V. CIVIL NO. 2:05-CV-195(TJW)

More information

YORK COUNTY GOVERNMENT

YORK COUNTY GOVERNMENT MEMORANDUM TO: FROM: RE: DATE: June 20, 2016 York County Council York County Planning Commission Audra Miller, Planning Director YORK COUNTY GOVERNMENT Planning & Development Services Proposed Revisions

More information

CONTRACT FOR PROFESSIONAL SERVICES By and between TOWN OF JONESBORO And CHIEF FINANCIAL OFFICER And LOUISIANA LEGISLATIVE AUDITOR STATE OF LOUISIANA

CONTRACT FOR PROFESSIONAL SERVICES By and between TOWN OF JONESBORO And CHIEF FINANCIAL OFFICER And LOUISIANA LEGISLATIVE AUDITOR STATE OF LOUISIANA CONTRACT FOR PROFESSIONAL SERVICES By and between TOWN OF JONESBORO And CHIEF FINANCIAL OFFICER And LOUISIANA LEGISLATIVE AUDITOR STATE OF LOUISIANA THIS AGREEMENT made and entered into effective this

More information

Nationwide Mutual Insurance Company

Nationwide Mutual Insurance Company Nationwide Mutual Insurance Company Part II: Contingent Liability Division Specific Billing Guidelines Table of Contents Introduction Page 3 I. Additional Requirements Page 3 II. Minimum Invoice Requirements

More information

TRANSBAY JOINT POWERS AUTHORITY

TRANSBAY JOINT POWERS AUTHORITY STAFF REPORT FOR CALENDAR ITEM NO.: 11 FOR THE MEETING OF: April 11, 2019 TRANSBAY JOINT POWERS AUTHORITY BRIEF DESCRIPTION: Authorize the Executive Director to execute Amendment No. 4 to Intergovernmental

More information

AMEREN CORPORATION CORPORATE GOVERNANCE GUIDELINES

AMEREN CORPORATION CORPORATE GOVERNANCE GUIDELINES AMEREN CORPORATION CORPORATE GOVERNANCE GUIDELINES The Board of Directors (the Board ) of Ameren Corporation (the Company ) has adopted the following Corporate Governance Guidelines (the Guidelines ) to

More information

ARTICLE 9 AMENDMENTS. Table of Contents

ARTICLE 9 AMENDMENTS. Table of Contents ARTICLE 9 AMENDMENTS Table of Contents 9-1 AMENDMENTS IN GENERAL... 1 9-2 INITIATION OF AMENDMENTS... 1 9-3 PLANNING BOARD REVIEW AND RECOMMENDATION... 2 9-4 CITY COUNCIL REVIEW AND ADOPTION... 2 9-5 PUBLIC

More information

Policies for the Use of Consultants on Local Traditional Projects Effective March 30, 2006

Policies for the Use of Consultants on Local Traditional Projects Effective March 30, 2006 Policies for the Use of Consultants on Local Traditional Projects Effective March 30, 2006 Purpose This document establishes policies for administration of consultant contracts when Federal funds are used

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW SENATE BILL 781

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW SENATE BILL 781 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW 2011-398 SENATE BILL 781 AN ACT TO INCREASE REGULATORY EFFICIENCY IN ORDER TO BALANCE JOB CREATION AND ENVIRONMENTAL PROTECTION. The General

More information

SAN FRANCISCO PLANNING COMMISSION City and & County of San Francisco, California

SAN FRANCISCO PLANNING COMMISSION City and & County of San Francisco, California SAN FRANCISCO PLANNING COMMISSION City and & County of San Francisco, California Rules and & Regulations ARTICLE I NAME Section 1. The Name of this Commission shall be SAN FRANCISCO PLANNING COMMISSION.

More information

CITY OF DUNNELLON, FLORIDA CITY ATTORNEY CONTRACT #AGR THIS AGREEMENT is made and entered into as of its Effective Date, by

CITY OF DUNNELLON, FLORIDA CITY ATTORNEY CONTRACT #AGR THIS AGREEMENT is made and entered into as of its Effective Date, by CITY OF DUNNELLON, FLORIDA CITY ATTORNEY CONTRACT #AGR2016-01 THIS AGREEMENT is made and entered into as of its Effective Date, by and between CITYOF DUNNELLON, FLORIDA, a Florida municipal corporation

More information

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL FRCC-RE-STD-001 Effective Date: March 3, 2017 Version: 1 3000 Bayport Drive, Suite 600 Tampa, Florida 33607-8410 (813) 289-5644 - Phone (813)

More information

City of Castle Pines, Colorado CITY OF CASTLE PINES 7501 VILLAGE SQUARE DRIVE, SUITE 100 CASTLE PINES, CO CITY COUNCIL- February 23, 2016

City of Castle Pines, Colorado CITY OF CASTLE PINES 7501 VILLAGE SQUARE DRIVE, SUITE 100 CASTLE PINES, CO CITY COUNCIL- February 23, 2016 cmo'- C~~! L 0 R A t~~s City of Castle Pines, Colorado CITY OF CASTLE PINES 7501 VILLAGE SQUARE DRIVE, SUITE 100 CASTLE PINES, CO 80108 CITY COUNCIL- February 23, 2016 AGENDA ITEM #9A- Resolution No. 16-06

More information

Performance Work Statement Court Reporting/Recorder Services Date: June 2014

Performance Work Statement Court Reporting/Recorder Services Date: June 2014 Performance Work Statement Court Reporting/Recorder Services Date: June 2014 1. POINTS OF CONTACT: Project Manager: Contracting: TBD TBD 2. GENERAL DESCRIPTION: The Blanket Purchase Agreement (BPA) Holder/Contractor

More information

Supreme Court of the State of New York County of Nassau IAS Trial Part 22 Part Rules Updated: January 25, 2018

Supreme Court of the State of New York County of Nassau IAS Trial Part 22 Part Rules Updated: January 25, 2018 Supreme Court of the State of New York County of Nassau IAS Trial Part 22 Part Rules Updated: January 25, 2018 Justice: Law Secretary: Secretary: Part Clerk: Hon. Sharon M.J. Gianelli, J.S.C. Karen L.

More information

Intergovernmental Agreement. For Growth Management. City of Loveland, Colorado and Larimer County, Colorado

Intergovernmental Agreement. For Growth Management. City of Loveland, Colorado and Larimer County, Colorado Intergovernmental Agreement For Growth Management City of Loveland, Colorado and Larimer County, Colorado Approved January 12, 2004 Intergovernmental Agreement for Growth Management Table of Contents 1.0

More information

WHEREAS, the Township has elected to exercise these redevelopment entity powers directly, as permitted by Section 4 of the Redevelopment Law; and

WHEREAS, the Township has elected to exercise these redevelopment entity powers directly, as permitted by Section 4 of the Redevelopment Law; and AN ORDINANCE OF THE TOWNSHIP OF WEST ORANGE, IN THE COUNTY OF ESSEX, NEW JERSEY, PROVIDING FOR CERTAIN IMPROVEMENTS WITHIN THE DOWNTOWN REDEVELOPMENT AREA, APPROPRIATING $6,300,000 THEREFOR, AND AUTHORIZING

More information

ORDINANCE NO Ordinance No Page 1 of 7. Language to be added is underlined. Language to be deleted is struck through.

ORDINANCE NO Ordinance No Page 1 of 7. Language to be added is underlined. Language to be deleted is struck through. ORDINANCE NO. 1170 AN ORDINANCE OF THE CITY OF OKEECHOBEE, FLORIDA; AMENDING PART II OF THE CODE OF ORDINANCES, SUBPART B-LAND DEVELOPMENT REGULATIONS; PROVIDING FOR AMENDMENTS TO CHAPTER 78-DEVELOPMENT

More information

CHAPTER 22 REGULATING THE SITING OF A REGIONAL POLLUTION CONTROL FACILITY

CHAPTER 22 REGULATING THE SITING OF A REGIONAL POLLUTION CONTROL FACILITY CHAPTER 22 REGULATING THE SITING OF A REGIONAL POLLUTION CONTROL FACILITY ARTICLE 1 - REGULATIONS AND PROCEDURES 3 22.1.01. DEFINITIONS... 3 22.1.02. CITY APPROVAL OF REGIONAL POLLUTION CONTROL FACILITIES...

More information

CHAPTER 7 ANNEXATION Chapter Outline

CHAPTER 7 ANNEXATION Chapter Outline CHAPTER 7 ANNEXATION Chapter Outline 1. Definitions (UCA 10-2-401)... 1 2. Purpose... 1 3. Other Definitions (UCA 10-2-401)... 1 4. The Annexation Policy Plan (UCA 10-2-401.5)... 1-3 5. The Annexation

More information

Texas Reliability Entity Standards Development Process

Texas Reliability Entity Standards Development Process Texas Reliability Entity Table of Contents I. Introduction... 3 II. Background... 3 III. Regional Standards Definition... 4 IV. Roles in the Texas RE Regional... 5 V. Texas RE Regional... 6 A. Assumptions

More information

WIPP s Hazardous Waste Facility Permit Renewal Application 9101

WIPP s Hazardous Waste Facility Permit Renewal Application 9101 WIPP s Hazardous Waste Facility Permit Renewal Application 9101 William A. Most Robert F. Kehrman Washington Regulatory and Environmental Services 4021 National Parks Highway Carlsbad, New Mexico 88220

More information

COMMISSIONED [FAMILY BIOGRAPHY] [HISTORICAL WORK] AND PUBLISHING AGREEMENT

COMMISSIONED [FAMILY BIOGRAPHY] [HISTORICAL WORK] AND PUBLISHING AGREEMENT COMMISSIONED [FAMILY BIOGRAPHY] [HISTORICAL WORK] AND PUBLISHING AGREEMENT THIS COMMISSIONED [FAMILY BIOGRAPHY] [HISTORICAL WORK] AND PUBLISHING AGREEMENT (this Agreement ) is made as of, 20 (the Effective

More information

RPO Technical Advisory Committee March 22th, :30 French Broad Room (Large) Conference Room Land of Sky Regional Council

RPO Technical Advisory Committee March 22th, :30 French Broad Room (Large) Conference Room Land of Sky Regional Council RPO Technical Advisory Committee March 22th, 2018 11:30 French Broad Room (Large) Conference Room Land of Sky Regional Council 1. WELCOME AND HOUSEKEEPING A. Welcome and Introductions Brownie Newman B.

More information

***************************************

*************************************** *************************************** Unified Government of Athens-Clarke County, Georgia Special Called Session City Hall Commission Chamber Friday, February 17, 2012 8:00 a.m. The Unified Government

More information

DEPARTMENT OF REGULATORY AGENCIES DIVISION OF REAL ESTATE CONSERVATION EASEMENTS 4 CCR 725-4

DEPARTMENT OF REGULATORY AGENCIES DIVISION OF REAL ESTATE CONSERVATION EASEMENTS 4 CCR 725-4 DEPARTMENT OF REGULATORY AGENCIES DIVISION OF REAL ESTATE CONSERVATION EASEMENTS 4 CCR 725-4 NOTICE OF PROPOSED PERMANENT RULEMAKING HEARING May 3, 2018 RULE CHAPTER 6. EXCEPTIONS AND REVIEW OF INITIAL

More information

CPR Arbitration Appeal Procedure and Commentary

CPR Arbitration Appeal Procedure and Commentary CPR Arbitration Appeal Procedure and Commentary Revision History 1999 CPR published the Arbitration Appeal Procedure. 2002 Minor editorial revisions; Case law updates added to Commentary. 2007 Minor edits

More information

SGMP Rocket City-Alabama Chapter Policy Manual

SGMP Rocket City-Alabama Chapter Policy Manual SGMP Rocket City-Alabama Chapter Policy Manual Policies and operating procedures for the Rocket City-Alabama Chapter of the Society of Government Meeting Professionals Rocket City-Alabama Chapter (RCAC)

More information

NOTICE OF REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND RELATED SERVICES. This is a REQUEST FOR PROPOSAL by UMATILLA SCHOOL DISTRICT

NOTICE OF REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND RELATED SERVICES. This is a REQUEST FOR PROPOSAL by UMATILLA SCHOOL DISTRICT NOTICE OF REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND RELATED SERVICES This is a REQUEST FOR PROPOSAL by UMATILLA SCHOOL DISTRICT FOR ARCHITECTURAL AND RELATED SERVICES IN RELATION TO THE 2016 BOND ISSUE

More information

Variance 2018 Bargersville Board of Zoning Appeals Application Kit

Variance 2018 Bargersville Board of Zoning Appeals Application Kit Variance 2018 Bargersville Board of Zoning Appeals Application Kit Step 1: Application In order to file the application, the applicant must make an appointment with the Town Planner by calling (317) 422-3103

More information

CASE NO: FORECLOSURE SCHEDULING ORDER. 1. Any prior order referring this case to Senior Judge Sandra Taylor is hereby VACATED.

CASE NO: FORECLOSURE SCHEDULING ORDER. 1. Any prior order referring this case to Senior Judge Sandra Taylor is hereby VACATED. IN THE CIRCUIT COURT OF THE 16 TH JUDICIAL CIRCUIT OF THE STATE OF FLORIDA IN AND FOR MONROE COUNTY CASE NO: Vs. Plaintiff Defendants / FORECLOSURE SCHEDULING ORDER THIS CASE having been reviewed by the

More information

Colorado PUC E-Filings System This Stipulation and Settlement Agreement ( Settlement Agreement ) dated

Colorado PUC E-Filings System This Stipulation and Settlement Agreement ( Settlement Agreement ) dated Page 1 of 12 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF EL PASO-TELLER COUNTY EMERGENCY TELEPHONE SERVICE AUTHORITY FOR APPROVAL OF AN EMERGENCY

More information

Agenda Item C.1 DISCUSSION/ACTION ITEM Meeting Date: February 17, 2015

Agenda Item C.1 DISCUSSION/ACTION ITEM Meeting Date: February 17, 2015 Agenda Item C.1 DISCUSSION/ACTION ITEM Meeting Date: February 17, 2015 TO: FROM: Mayor and Councilmembers Tim W. Giles, City Attorney CONTACT: Genie Wilson, Finance Director SUBJECT: Adoption of Ordinance

More information

Steven Bauer, Policy Advisory Committee Chairperson, Presiding

Steven Bauer, Policy Advisory Committee Chairperson, Presiding MINUTES BAY-LAKE REGIONAL PLANNING COMMISSION SHEBOYGAN METROPOLITAN AREA TECHNICAL AND POLICY ADVISORY COMMITTEES June 28, 2018 Sheboygan County Administration Building (Room 119), Sheboygan MEMBERS PRESENT:

More information

Tentative Campus Town Plan Project Timeline

Tentative Campus Town Plan Project Timeline Tentative Campus Town Project Timeline Date Meeting Task Deliverables Prior to Meeting Meeting Objectives Deliverables Post Meeting August 4, August 4, Start of Contract (12 month timer set) Developer

More information

AGENDA REGULAR MEETING/LOMPOC CITY COUNCIL TUESDAY, SEPTEMBER 3, 2002 COUNCIL CHAMBERS/100 CIVIC CENTER PLAZA 7:00 P.M.

AGENDA REGULAR MEETING/LOMPOC CITY COUNCIL TUESDAY, SEPTEMBER 3, 2002 COUNCIL CHAMBERS/100 CIVIC CENTER PLAZA 7:00 P.M. CITY COUNCIL DICK DEWEES, MAYOR MICHAEL SIMINSKI, MAYOR PRO TEMPORE DEWAYNE HOLMDAHL, COUNCILMEMBER JANICE KELLER, COUNCILMEMBER GARY KEEFE, CITY ADMINISTRATOR SHARON D. STUART, CITY ATTORNEY WILL SCHUYLER,

More information

Parcel ID Number(s): PROPORTIONATE SHARE AGREEMENT FOR <PROJECT NAME> <NAME OF ROADWAY>

Parcel ID Number(s): PROPORTIONATE SHARE AGREEMENT FOR <PROJECT NAME> <NAME OF ROADWAY> 2 This instrument prepared by and after recording return to: 4 6 8 10 12 14 16 Parcel ID Number(s): ------------------------------------------[SPACE ABOVE THIS LINE FOR RECORDING DATA]----------------------------------------

More information

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 704

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 704 CHAPTER 2008-104 Committee Substitute for Committee Substitute for Senate Bill No. 704 An act relating to administrative procedures; providing a short title; amending s. 120.52, F.S.; redefining the term

More information

AGREEMENT FOR LEGAL SERVICES FOR THE CITY OF CALABASAS R E C I T A L S:

AGREEMENT FOR LEGAL SERVICES FOR THE CITY OF CALABASAS R E C I T A L S: AGREEMENT FOR LEGAL SERVICES FOR THE CITY OF CALABASAS This amended Agreement is made and entered into by and between the law firm of Colantuono & Levin, PC, formerly known as Colantuono, Levin & Rozell,

More information

INTERLOCAL AGREEMENT BETWEEN SKAMANIA COUNTY AND THE CITY OF STEVENSON FOR PROMOTION OF TOURISM SEASONAL PUBLIC TRANSPORTATION

INTERLOCAL AGREEMENT BETWEEN SKAMANIA COUNTY AND THE CITY OF STEVENSON FOR PROMOTION OF TOURISM SEASONAL PUBLIC TRANSPORTATION INTERLOCAL AGREEMENT BETWEEN SKAMANIA COUNTY AND THE CITY OF STEVENSON FOR PROMOTION OF TOURISM SEASONAL PUBLIC TRANSPORTATION THIS AGREEMENT is entered into between Skamania County, a municipal corporation,

More information

Gallatin City-County Health Code Chapter 1

Gallatin City-County Health Code Chapter 1 Gallatin City-County Health Code Chapter 1 GENERAL PROVISIONS Gallatin City-County Health Department Originally Adopted: March 25, 2000 Revised: December 21, 2002 Revision Effective: May 28, 2005 $1.25

More information

Chapter SEPA REGULATIONS

Chapter SEPA REGULATIONS Chapter 20.790 SEPA REGULATIONS Sections: 20.790.010 Authority. 20.790.020 Contents. 20.790.110 Purpose of this Part and Adoption by Reference. 20.790.120 Designation of Responsible Official. 20.790.130

More information

Midwest Reliability Organization

Midwest Reliability Organization Midwest Reliability Organization Regional Reliability Standards Process Manual VERSION 5.1 Approved by MRO Board of Directors on December 10, 2015 Version 5.1 - Approved by FERC Effective May 6, 2016 MRO

More information

IDENTIFYING CALIFORNIA LEGISLATIVE DOCUMENTS

IDENTIFYING CALIFORNIA LEGISLATIVE DOCUMENTS IDENTIFYING CALIFORNIA LEGISLATIVE DOCUMENTS Introduction: The purpose of this document is to provide assistance in identifying the types of legislative documents available in California, and placing documents

More information

ReliabilityFirst Corporation Reliability Standards Development Procedure Version 4

ReliabilityFirst Corporation Reliability Standards Development Procedure Version 4 ReliabilityFirst Corporation Reliability Standards Development Procedure Version 4 NERC BoT Approved May 24, 2012 ReliabilityFirst Board Approved December 1, 2011 ReliabilityFirst Corporation Reliability

More information

Holly Lake Ranch Association 2017 Election of Board Member Procedures

Holly Lake Ranch Association 2017 Election of Board Member Procedures Authority In accordance with HLRA Bylaws and the HLRA Membership Vote Policies and Procedures, an election of Board Members is being conducted by the Holly Lake Ranch Election Committee. This document

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE PROPOSED RULES REGULATING CHARGES BY TAXICABS FOR SERVICE BETWEEN DENVER INTERNATIONAL AIRPORT AND DOWNTOWN DENVER,

More information

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work)

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) U.S. Department of Housing and Urban Development Office of Public and Indian Housing Office of Labor Relations

More information

OFFICE OF THE CITY COUNCIL

OFFICE OF THE CITY COUNCIL OFFICE OF THE CITY COUNCIL Annette R. Hastings 117 WEST DUVAL STREET, SUITE 425 TDC EXECUTIVE DIRECTOR 4 TH FLOOR, CITY HALL OFFICE (904) 630-7625 JACKSONVILLE, FLORIDA 32202 FAX (904) 630-2906 E-MAIL:

More information

7. PUBLIC AND AGENCY INVOLVEMENT

7. PUBLIC AND AGENCY INVOLVEMENT 7. PUBLIC AND AGENCY INVOLVEMENT Agency coordination and public involvement are crucial to the successful delivery of transportation projects. In recognition of the size, scope, and complexity of the proposed

More information

OFFICE OF THE CITY ATTORNEY

OFFICE OF THE CITY ATTORNEY OFFICE OF THE CITY ATTORNEY 435 Ryman Missoula MT 59802 (406) 552 6020 Fax: (406) 327 2105 attorney@ci.missoula.mt.us Legal Opinion 2014-014 TO: CC: FROM: John Engen, Mayor; City Council; Bruce Bender;

More information

This SECOND AMENDMENT TO CONSULTANT SERVICES AGREEMENT is entered into this

This SECOND AMENDMENT TO CONSULTANT SERVICES AGREEMENT is entered into this 7/20/207 Rev. 8//205 SECOND AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES BETWEEN THE CITY OF SAN JOSE AND LANDRUM & BROWN, INCORPORATED This SECOND AMENDMENT TO CONSULTANT SERVICES AGREEMENT is entered

More information

AGENDA THE FIFTY-FIRST MEETING OF THE ONE HUNDRED AND THIRTY-SEVENTH COUNCIL OF THE CORPORATION OF THE CITY OF ST. THOMAS

AGENDA THE FIFTY-FIRST MEETING OF THE ONE HUNDRED AND THIRTY-SEVENTH COUNCIL OF THE CORPORATION OF THE CITY OF ST. THOMAS AGENDA THE FIFTY-FIRST MEETING OF THE ONE HUNDRED AND THIRTY-SEVENTH COUNCIL OF THE CORPORATION OF THE CITY OF ST. THOMAS COUNCIL CHAMBERS CITY HALL 6:00 P.M. REGULAR SESSION SEPTEMBER 5, 2017 ROUTINE

More information

REQUEST FOR PROPOSAL GOVERNMENT AFFAIRS & FEDERAL LOBBYING SERVICES

REQUEST FOR PROPOSAL GOVERNMENT AFFAIRS & FEDERAL LOBBYING SERVICES REQUEST FOR PROPOSAL GOVERNMENT AFFAIRS & FEDERAL LOBBYING SERVICES Organization: Contact: Association for Commuter Transportation One Chestnut Square, 2 nd Floor, Sharon, MA 02067 Phone: (202) 792-5801

More information

ELY SHOSHONE RULES OFAPPELLATE PROCEDURE

ELY SHOSHONE RULES OFAPPELLATE PROCEDURE [Rev. 10/10/2007 2:43:59 PM] ELY SHOSHONE RULES OFAPPELLATE PROCEDURE I. APPLICABILITY OF RULES RULE 1. SCOPE, CONSTRUCTION OF RULES (a) Scope of Rules. These rules govern procedure in appeals to the Appellate

More information

Klickitat County Environmental Ordinance # Enacted August 23, Amended: 12/10/84 4/10/95 9/2/03

Klickitat County Environmental Ordinance # Enacted August 23, Amended: 12/10/84 4/10/95 9/2/03 Klickitat County Environmental Ordinance #121084 Enacted August 23, 1982 Amended: 12/10/84 4/10/95 9/2/03 TABLE OF CONTENTS KLICKITAT COUNTY ENVIRONMENTAL ORDINANCE SECTION 1 AUTHORITY...1 2 GENERAL REQUIREMENTS...1

More information

Texas Reliability Entity Standards Development Process

Texas Reliability Entity Standards Development Process Texas Reliability Entity AA Approved by FERC Effective May 6, 2010 Cover page updated March 23, 2016 Table of Contents I. Introduction... 4 II. Background... 4 III. Regional Standards Definition... 5 IV.

More information

Minutes Lakewood City Council Regular Meeting held December 11, 2018

Minutes Lakewood City Council Regular Meeting held December 11, 2018 Minutes Lakewood City Council Regular Meeting held MEETING WAS CALLED TO ORDER at 7:30 p.m. by Mayor Croft in the Council Chambers at the Civic Center, 5000 Clark Avenue, Lakewood, California. INVOCATION

More information

RULES GOVERNING THE COURTS OF THE STATE OF NEW JERSEY RULE 2:12. APPEALS ON CERTIFICATION TO THE SUPREME COURT

RULES GOVERNING THE COURTS OF THE STATE OF NEW JERSEY RULE 2:12. APPEALS ON CERTIFICATION TO THE SUPREME COURT RULES GOVERNING THE COURTS OF THE STATE OF NEW JERSEY RULE 2:12. APPEALS ON CERTIFICATION TO THE SUPREME COURT 2:12-1. Certification on Motion of the Supreme Court The Supreme Court may on its own motion

More information

MINUTES LONGBOAT KEY TOWN COMMISSION REGULAR MEETING FEBRUARY 2, :00 P.M.

MINUTES LONGBOAT KEY TOWN COMMISSION REGULAR MEETING FEBRUARY 2, :00 P.M. MINUTES LONGBOAT KEY TOWN COMMISSION REGULAR MEETING FEBRUARY 2, 2015-7:00 P.M. Present: Also: Present: Mayor Jim Brown, Vice Mayor Jack Duncan, Commrs. Terry Gans, Lynn Larson, Irwin Pastor, Phill Younger,

More information

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

OFFICE OF THE CITY ADMINISTRATIVE OFFICER REPORT FROM OFFICE OF THE CITY ADMINISTRATIVE OFFICER To: From: August 4, 2014 The Personnel and Animal Welfare Committee Miguel A. Santana, City Administrative Officer CAO File No. 0150-08212-0001 Council

More information

SECTION 1 BACKGROUND. Chapter 1 Introduction

SECTION 1 BACKGROUND. Chapter 1 Introduction SECTION 1 BACKGROUND Chapter 1 Introduction SECTION 1 BACKGROUND Chapter 1 Introduction 1.1 Overview The 1997 City of Thornton Comprehensive Plan identified the need to create Subarea Plans "to plan for

More information

External Audit Report. The University of Texas at Austin s Center for Transportation Research TxDOT Compliance Division

External Audit Report. The University of Texas at Austin s Center for Transportation Research TxDOT Compliance Division External Audit Report The University of Texas at Austin s Center for Transportation Research TxDOT Compliance Division Objective and Scope To determine whether costs reimbursed for selected TxDOT research

More information

NEPA Case Law Update: Hot Topics and Emerging Issues

NEPA Case Law Update: Hot Topics and Emerging Issues TRB Environmental Conference NEPA Case Law Update: Hot Topics and Emerging Issues Bill Malley Perkins Coie LLP June 9, 2010 Tips for Reading Case Law Don t read too much into any single case Focus on the

More information

Roster Lawyers Tariff of Fees

Roster Lawyers Tariff of Fees Roster Lawyers Tariff of Fees December 7, 2015 Schedule 2 Roster Lawyers Tariff of Fees Table of Contents 1. Criminal Certificates 20 2. Criminal Appeal Certificates 27 3. Civil Certificates 30 4. Administrative

More information

Practices for Part 3

Practices for Part 3 Practices for Part 3 Courtroom hours are from 9:15 a.m. to 5:00 p.m. Lunch recess is from 1 p.m. to 2:15 p.m, with the courtroom closed at that time. Due to financial constraints, these hours are strictly

More information

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 10.1 AGENDA TITLE: Adopt resolution authorizing the City Manager to Execute a Multi-Agency Memorandum of Understanding with Caltrans, SACOG,

More information

NOTICE TO ALL CONSULTING ENGINEERING FIRMS

NOTICE TO ALL CONSULTING ENGINEERING FIRMS NOTICE TO ALL CONSULTING ENGINEERING FIRMS Solicitation Number S-230-18 US 176 Bridge Replacement over SCL Railroad The SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION (SCDOT) requests a letter of interest

More information

FHWA Letter Exhibit 3 TERMSHEETAGREEMENT

FHWA Letter Exhibit 3 TERMSHEETAGREEMENT TERMSHEETAGREEMENT This Term Sheet Agreement is entered into as of the 21st day of December, 2012, by and between CSX Transportation Inc., a Virginia corporation ("CSXT"), and the District of Columbia,

More information

NOTICE TO ALL CONSULTING ENGINEERING FIRMS

NOTICE TO ALL CONSULTING ENGINEERING FIRMS NOTICE TO ALL CONSULTING ENGINEERING FIRMS Project 1: US 1 Bridge Replacement over Big Horse Creek in Aiken County Project 2: US 1 Bridge Replacement over Shaws Creek in Aiken County The SOUTH CAROLINA

More information