Tackling Electrical System Efficiency, Safety and Reliability for pharmaceutical plants

Size: px
Start display at page:

Download "Tackling Electrical System Efficiency, Safety and Reliability for pharmaceutical plants"

Transcription

1 Tackling Electrical System Efficiency, Safety and Reliability for pharmaceutical plants.

2 MSD Rathdrum Site History 1961 Loftus Bryan Chemicals Ltd 1964 P1 Production Plant 1975 P2, QC / R&D & Pilot Plant 1, Engineering / Warehouse 1977 FDA Approval q 1980 Schering-Plough acquired LBC q 1983 P3 Production Plant q 1986 R&D II / Pilot Plant Ext (P7) q 1995 P5 Production Plant q 2000 P5 Extension q 2005 P2/3/4 Annex q 2009 Construction of H2 Facility (P6) q 2009 Merck/Schering Plough Merger

3 Facility Aerial View

4 Incidents at Rathdrum P7 Fire Failure of Switchgear Protection Coordination not configured correctly Power disruption to complete Facility Significant property damage & Business disruption Equalisation Tank Explosion Electrical Fault Inadequate Electrical Protection Significant property damage & Business disruption Both out of hours no injury to personnel

5 Fundamental Objectives of the Electrical Maintenance Function In most large-scale manufacturing sites the Electrical Distribution System (EDS) might be considered as the Back Bone that sustains all operations on site. The key objectives of EDS maintenance fall under three headings 1. Safety of the EDS Ensuring that the EDS presents no safety hazards to personnel using or interacting with the system 2. Reliability / Continuity of Supply Ensuring that all possible precautions are taken to prevent power outages that could inflict serious losses due to interruption of critical production processes. 3. Efficiency & Protection of the EDS Asset In most large-scale manufacturing sites, the EDS represents a significant investment that must be protected against inadvertent abuses or incidents: e.g. Ø Ø Ø Overloads/Short-circuits Local site hazards e.g. corrosion, explosive atmospheres Extraneous circumstances e.g. storm or lightning damage

6 Safety of the Electrical Distribution System

7 Safety of the EDS 1. Statutory Instruments governing Safety at Work It is important to understand how the legal framework governing electrical safety at work is structured 1. Health & Safety Authority HSA The Safety Health and Welfare at Work Act Commission for Energy Regulation CER 3. Local Fire Authority Ø Electrical Safety legislation in Ireland is determined by two published documents - S.I. 299 General Application Regulations - National Wiring Rules published by the Electro Technical Council of Ireland (ETCI)

8 Safety of the EDS 2. The Safety Statement The cornerstone of the Health and Safety Act is the Safety Statement The Act requires every employer to: a) identify the hazards and assess the risks at his place of work b) prepare a written statement which specifies the manner in which safety of employees will be secured In the event of an accident at work the starting point in all follow-up investigations is the same: Can I see your Safety Statement In addition, special protection related to Electrical Systems is now the focus of critical attention from HSA and needs to be addressed appropriately. Ø Periodic Electrical inspection & testing 2014 Ø Electrical PPE Ø Control of Electrical Hazards

9 Recent statistics Thirty-two workers were killed in fatal electrical accidents over the ten-year period , according to the annual report of the Electro-Technical Council of Ireland s Safety Committee. The equipment involved in the fatal accidents was: Ø overhead lines in 18 cases, Ø fixed apparatus in 6 cases, Ø 3 in both cable/wiring and portable apparatus, Ø 3 accidents involved circuit breakers and Ø 2 flexes. Ø 1power transformer and Ø 1 socket.

10 Arc Flash Hazard Is an explosive release of energy caused by an electrical short circuit

11 Consequences of an Arc Flash Hazard Ø Arc flash injuries range from minor burns to 3 rd degree burns and potential death due to the energy released. Ø Equipment Damage: Costly to repair Ø Plant Shutdown: Reduced productivity It is estimated that as many as 80% of electrical injuries are a result of Arc Flash rather than electric shock (NFPA 70E).

12 Arc Flash Study Arc Flash Hazard Analysis conducted using a Software Model Ø Compliance with industry standards: S.I.299, NFPA70E, IEEE1584, IEC Ø Identified the magnitude of the electrical hazard Protection circuitry changes were required to reduce energy levels. Ø Helped to develop a safety program to mitigate the risks associated with electrical equipment. Labelling of Switchgear Ø Recommendations for Electrical PPE. Change of Maintenance Overalls Appropriate Electrical Tools

13 Software Model Load Flow, Capacity, Protection Coordination, Actual usage, etc

14 Software Model Advantages: - Centralised source of electrical data & drawings - Analysis tool for various modes of operation - Expansion planning - Equipment sizing and capacity identification Analysis Types: - Load/Power Flow Analysis - Fault Level Analysis - Protection Coordination - Arc Flash Analysis - Reliability Analysis - Harmonic Analysis, etc.

15 Efficiency & Protection of the EDS Asset

16 Protection Coordination Ø Protection relays disconnect the fault in a time that; q Safely limits fault energy q Prevents electrocution q Is within equipment capability q Minimises the impact on the network Ø Discrimination is adequate Ø Protection relays remain stable Ø Relay performs at minimum fault levels

17 Protection Coordination

18 Protection of the EDS Asset 1. Circuit Capacities Ensuring that all major circuits in the system have a current carrying capacity commensurate with the existing plant loadings. 2. Protection Coordination This is the simple principle of ensuring that circuit breaker trip settings are set in a hierarchical manner that ensures that faults are cleared as close as possible to the point of occurrence A fault at [A] should be cleared by the breaker at [A] not by the breaker at [B] thereby bringing out many branches of the network unaffected by the original fault. 3. How can these settings be wrong? The EDS system is an evolving asset. It is constantly being modified to accommodate new plant and processes. It can happen that significant extra loads are added to particular circuits without fully appreciating their impact on the overall protection setting of the system

19 Load Flow Analysis Ø Power Flow (kw, kva, kvar) Ø Sizing of Switchgear and Cables Ø Assess Branch and Network Losses Ø Examine the impact of changes before implementation Ø Stranded capacity identification

20 Reliability / Continuity of the Electrical Supply

21 Electrical System Reliability Model for continuous reliability used at Rathdrum

22 Consequences of Poor Reliability Ø Equipment Downtime/Failure - 64bln Ø Waste in Product - 45bln Ø Production Downtime - 36bln Ø Labour - 5bln * EU 2007 Leonardo Energy

23 Incidents at Rathdrum P7 Fire Failure of Switchgear Power disruption to complete Facility Equalisation Tank Explosion Electrical Fault Significant property damage & Business disruption Significant property damage & Business disruption Cost 800k+ Cost 600k+ Both out of hours no injury to personnel

24 Key elements of Electrical Reliability Ø In depth knowledge of the existing Electrical Infrastructure Ø Power Quality Analysis Ø Detailed System Modeling Ø Probabilistic Risk Assessment using IEEE 493 Reliability Standard

25 Power Quality Problems encountered with Poor Power Quality Ø Failure of mission critical electronic systems Ø Computer / Electronic Equipment Damage Ø Data Loss (Server locking up 200k+) Ø Circuit Breaker tripping (?) Ø Relays - Nuisance Tripping Ø Capacitor Bank Failure Ø Transformers & Cables overheating ( 100k+) Ø Motor / Process Equipment Malfunction

26 EDS Monitoring Capital justification for Energy Monitoring

27 Batch Manufacturing No Baseline Alerts Able to quantify Improvements

28 Added Benefits EDMS Analyse harmonics, voltage sag, PFC, transients, system unbalance Assist in preventive and predictive maintenance Identify source and frequency of events Determine the need for power conditioning equipment

29 TRANSIENT VOLTAGES Hidden Transients are (typically a few milliseconds duration) power disturbances: Ø Surge - Ø Noise - Effect - Effect - Large magnitude voltage/current problems Hardware Damage Small magnitude fast rise voltage problem Software / Hardware errors, system lock-up

30 Voltage Sag / Swell Voltage sag / swell events generate high currents (inrush of motors and other devices).

31 Reliability Evaluation Methods Failure Mode Evaluation Analysis (FMEA) State Enumeration Method IEEE493 Software model is the basis

32 Reliability Overview

33 Reliability Solution Cost vs. Plant Availability Cost of unplanned downtime Software Model Power Quality capability Using Data for the Elec Dist performance Availability

34 MSD Rathdrum Hosts Visit A conference of EU member state regulators visited the Rathdrum site to view the two Hydrogenation installations, due to the exemplary standard of work. A design comparison between the original 1988 installation and the more recent 2010 project.

35 Summary Key Take Away 1. Safety of the EDS Arc Flash Assessment Electrical PPE 2. Reliability / Continuity of Supply Electrical Maintenance Reliability Programme 3. Efficiency & Protection of the EDS Asset The EDS represents a significant investment that must be protected against inadvertent abuses or incidents. 4. Site Wide Overview Holistic approach required to assess the impact of add on or extensions

36 Questions Thank You

Electricity Act, 1998 Loi de 1998 sur l électricité

Electricity Act, 1998 Loi de 1998 sur l électricité Electricity Act, 1998 Loi de 1998 sur l électricité ONTARIO REGULATION 22/04 ELECTRICAL DISTRIBUTION SAFETY Consolidation Period: From October 1, 2017 to the e-laws currency date. Last amendment: O. Reg.

More information

NET METERING CONNECTION AGREEMENT

NET METERING CONNECTION AGREEMENT NET METERING CONNECTION AGREEMENT This Agreement is made and entered into at Mumbai on this day of 20 between,(i)... (name of consumer), having its premises at... and Consumer No. (hereinafter referred

More information

SCHEDULE 2B NATIONAL TERMS OF CONNECTION

SCHEDULE 2B NATIONAL TERMS OF CONNECTION SCHEDULE 2B NATIONAL TERMS OF CONNECTION Version 8.0 effective from 01 October 2016 SECTION 1 (A) Introduction: The electricity that is supplied to, or exported from, the premises is conveyed using the

More information

Service Agreement No. under PG&E FERC Electric Tariff Volume No. 5

Service Agreement No. under PG&E FERC Electric Tariff Volume No. 5 Interconnection Agreement Between Pacific Gas and Electric Company and Northern California Power Agency and City of Alameda, City of Biggs, City of Gridley, City of Healdsburg, City of Lodi, City of Lompoc,

More information

Wyandotte Municipal Services

Wyandotte Municipal Services Electric, Steam, Water Cable Television and High Speed Internet Service since 1889 An Equal Opportunity Employer Wyandotte Municipal Services Expedited Generator Interconnection Requirements INTRODUCTION

More information

ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD. Copyright 2009 All rights reserved.

ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD. Copyright 2009 All rights reserved. ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD Copyright 2009 All rights reserved. ISOLATED OPERATIONS LO/TO WORK STANDARD ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD Copyright

More information

Understanding EPO and its Downtime Risks

Understanding EPO and its Downtime Risks Understanding EPO and its Downtime Risks By Ashok Kulkarni Stephen McCluer White Paper #22 Revision 2 Executive Summary An Emergency Power Off (EPO) system is intended to power down a single piece of electronic

More information

PUBLIC WORKS DEPARTMENT 1769 Georgetown Rd., Hudson, Ohio (330) office SOLAR INTERCONNECTION APPLICATION PACKET

PUBLIC WORKS DEPARTMENT 1769 Georgetown Rd., Hudson, Ohio (330) office SOLAR INTERCONNECTION APPLICATION PACKET PUBLIC WORKS DEPARTMENT 1769 Georgetown Rd., Hudson, Ohio 44236 (330) 342-1750 office SOLAR INTERCONNECTION APPLICATION PACKET CITY OF HUDSON HUDSON PUBLIC POWER Photovoltaic Interconnection Manual Index

More information

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004 ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004 2 THE ORISSA GAZETTE EXTRA ORDINARY PUBLISHED BY AUTHORITY NO.711, CUTTACK, FRIDAY, MAY 28, 2004 / JAISTHA

More information

TAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)

TAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement) TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 34A CHENNAI, WEDNESDAY, SEPTEMBER 1, 2004 Aavani 16, Tarana, Thiruvalluvar Aandu - 2035 Part VI --- Section 2 (Supplement) NOTIFICATIONS BY HEADS

More information

NORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES

NORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES ONCE PRINTED THIS IS AN UNCONTROLLED DOCUMENT NORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES OF CUSTOMERS RECEIVING HIGH VOLTAGE SUPPLY SRG

More information

Electricity Regulations 1947

Electricity Regulations 1947 Western Australia Electricity Act 1945 Electricity Regulations 1947 As at 01 Jan 2011 Version 05-c0-00 Western Australia Electricity Regulations 1947 CONTENTS Part I Preliminary 1. Citation 1 2. Terms

More information

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF MONTANA BILLINGS DIVISION

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF MONTANA BILLINGS DIVISION Case 1:16-cv-00005-SPW-CSO Document 4 Filed 04/01/16 Page 1 of 28 Kathleen L. DeSoto GARLINGTON, LOHN & ROBINSON, PLLP 350 Ryman Street P. O. Box 7909 Missoula, MT 59807-7909 Telephone (406) 523-2500 Telefax

More information

GENERATOR INTERCONNECTION & OPERATING AGREEMENT FOR CATEGORY 3-5 PROJECTS WITH AGGREGATE GENERATOR OUTPUT. OF GREATER THAN 150 kw

GENERATOR INTERCONNECTION & OPERATING AGREEMENT FOR CATEGORY 3-5 PROJECTS WITH AGGREGATE GENERATOR OUTPUT. OF GREATER THAN 150 kw GENERATOR INTERCONNECTION & OPERATING AGREEMENT FOR CATEGORY 3-5 PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF GREATER THAN 150 kw GENERATOR INTERCONNECTION & OPERATING AGREEMENT BETWEEN UPPER PENINSULA

More information

INDEX. Sr. No. Particulars Page No.

INDEX. Sr. No. Particulars Page No. MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Mumbai DRAFT Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination

More information

Electricity (Safety, Quality and Continuity) Regulation

Electricity (Safety, Quality and Continuity) Regulation Electricity (Safety, Quality and Continuity) Regulation I fldgi ( ^I& fpoh - YS%,xld m%cd;dka;s%l iudcjd ckrcfha w;s úfyi.eiü m;%h - 2016'07'13 1A Y% S,xld m%cd;dka;% sl iudcjd ckrcfha.eiü m;%h w;s úfyi

More information

RENEWABLE ENERGY INTERCONNECTION AGREEMENT

RENEWABLE ENERGY INTERCONNECTION AGREEMENT RENEWABLE ENERGY INTERCONNECTION AGREEMENT This Renewable Energy Interconnection Agreement is made this day of, 20 BETWEEN THE BARBADOS LIGHT & POWER COMPANY LIMITED, a company incorporated under the Companies

More information

EDB Information Disclosure Requirements Information Templates for Schedules 11a 13

EDB Information Disclosure Requirements Information Templates for Schedules 11a 13 EDB Information Disclosure Requirements Information Templates for Schedules 11a 13 Disclosure Date 31 March 2019 Start Date (first day) 1 April 2019 Templates for Schedules 11a 13 (Asset Management Plan)

More information

Lead Acid Battery Maintenance and Testing

Lead Acid Battery Maintenance and Testing 1 Lead Acid Battery Maintenance and Testing Moderator Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments during the presentation 3 Today s Presenter: Rod Van

More information

TELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE. [Company Name]... [Address]

TELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE. [Company Name]... [Address] Form 034(1) Licence No. TELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE DATE OF ISSUE: [ ] [Company Name]... of [Address].. (the licensee ) is licensed, subject to the following

More information

SECTION #6 - REFERENCE #2. Standard Toronto Hydro Connection Agreements Terms of Conditions

SECTION #6 - REFERENCE #2. Standard Toronto Hydro Connection Agreements Terms of Conditions SECTION #6 - REFERENCE #2 Standard Toronto Hydro Connection Agreements Terms of Conditions : o Toronto Hydro-Electric System Limited Connection Agreement Schedule B1: o Micro-Embedded Generation Facility

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION TAMIL NADU ELECTRICITY DISTRIBUTION CODE. (As amended up to )

TAMIL NADU ELECTRICITY REGULATORY COMMISSION TAMIL NADU ELECTRICITY DISTRIBUTION CODE. (As amended up to ) 85 TAMIL NADU ELECTRICITY REGULATORY COMMISSION TAMIL NADU ELECTRICITY DISTRIBUTION CODE (As amended up to 3--00) Notification No. TNERC/DC/8-3, dated, 07-0-00 WHEREAS the Tamil Nadu Electricity Regulatory

More information

Annex I To Loughborough University Estates Services Health and Safety Policy

Annex I To Loughborough University Estates Services Health and Safety Policy Annex I Annex I To Loughborough University Estates Services Health and Safety Policy High Voltage Electricity System Safety Rules And Associated Safety Guidance 1. Introduction a. These Safety Rules are

More information

NORTHERN IRELAND ELECTRICITY plc. and THE CONNECTED PARTY NAMED IN PART C OF THIS AGREEMENT HIGH VOLTAGE CONNECTION AGREEMENT

NORTHERN IRELAND ELECTRICITY plc. and THE CONNECTED PARTY NAMED IN PART C OF THIS AGREEMENT HIGH VOLTAGE CONNECTION AGREEMENT NORTHERN IRELAND ELECTRICITY plc and THE CONNECTED PARTY NAMED IN PART C OF THIS AGREEMENT HIGH VOLTAGE CONNECTION AGREEMENT CMS Cameron McKenna Mitre House 160 Aldersgate Street London EC1A 4DD T +44(0)20

More information

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw)

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw) INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw) This Interconnection and Parallel Operating Agreement ( Agreement ) is entered into on (insert

More information

ELECTRICITY ACT Cap 95 8 July 1939 ELECTRICITY ACT. Revised Laws of Mauritius

ELECTRICITY ACT Cap 95 8 July 1939 ELECTRICITY ACT. Revised Laws of Mauritius Revised Laws of Mauritius ELECTRICITY ACT Cap 95 8 July 1939 ARRANGEMENT OF SECTIONS SECTION 1. Short title 2. Interpretation 3. Application of Act 4. Permit for supply of electricity 5. Objections to

More information

ELECTRICITY ACT 1939

ELECTRICITY ACT 1939 ELECTRICITY ACT 1939 Act 21/1939 Lane Cap 95 ARRANGEMENT OF SECTIONS 1. Short title 2. Interpretation 3. Application of Act 4. Permits for the supply of electricity 5. Objections to the granting of a permit

More information

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.8 Utility Distribution Company Operating Agreement (UDCOA)

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.8 Utility Distribution Company Operating Agreement (UDCOA) Utility Distribution Company Operating Agreement (UDCOA) THIS OPERATING AGREEMENT is dated this day of, and is entered into, by and between: (1) [Full legal name of UDC] having its registered and principal

More information

Agreement File Reference PRCN024X - Unmetered Connection Agreement - Long Form doc

Agreement File Reference PRCN024X - Unmetered Connection Agreement - Long Form doc AGREEMENT FOR UNMETERED CONNECTION TO [EASTERN POWER NETWORKS PLC s LONDON POWER NETWORKS PLC s SOUTH EASTERN POWER NETWORKS PLC s UK POWER NETWORKS (IDNO) LTD s] DISTRIBUTION SYSTEM Income Services Manager

More information

TELECOMMUNICATIONS ORDINANCE (Chapter 106) SERVICES-BASED OPERATOR LICENCE. [Name of Licensee]...

TELECOMMUNICATIONS ORDINANCE (Chapter 106) SERVICES-BASED OPERATOR LICENCE. [Name of Licensee]... Form 030(3) Licence No. TELECOMMUNICATIONS ORDINANCE (Chapter 106) SERVICES-BASED OPERATOR LICENCE DATE OF ISSUE: [Date] [Name of Licensee]... of [Address]... (the licensee ) is licensed, subject to the

More information

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA)

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Electrical Equipment of Industrial Machinery

More information

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw)

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw) INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw) This Interconnection and Parallel Operating Agreement ( Agreement ) is entered into on (insert

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: NEC Code-Making Panel 1 FROM: Kimberly Shea, Administrator,

More information

Electricity Supply (Safety and Network Management) Regulation 2014

Electricity Supply (Safety and Network Management) Regulation 2014 New South Wales Electricity Supply (Safety and Network Management) Regulation 2014 under the Electricity Supply Act 1995 Her Excellency the Governor, with the advice of the Executive Council, has made

More information

Chapter 7-2 PUBLIC SAFETY EMERGENCY RESPONSE COST RECOVERY

Chapter 7-2 PUBLIC SAFETY EMERGENCY RESPONSE COST RECOVERY Sections: Chapter 7-2 PUBLIC SAFETY EMERGENCY RESPONSE COST RECOVERY 7-02-01 TITLE, PURPOSE, AUTHORITY TO ESTABLISH A MITIGATION COSTS SCHEDULE AND RECOVERY 7-02-02 DEFINITIONS 7-02-03 BILLING AND COLLECTION

More information

THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, (Made under section 45) ARRANGEMENT OF RULES

THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, (Made under section 45) ARRANGEMENT OF RULES GOVERNMENT NOTICE No. 175/2016 Published on 13 th May, 2016 THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, 2016 (Made under section 45) ARRANGEMENT OF RULES 1. Citation 2. Application

More information

Implementation Plan Project PRC-005 FERC Order No. 803 Directive PRC-005-6

Implementation Plan Project PRC-005 FERC Order No. 803 Directive PRC-005-6 Project 2007-17.4 PRC-005 FERC Order No. 803 Directive PRC-005-6 Standards Involved Approval: PRC 005 6 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Retirement: PRC

More information

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA)

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Electrical Equipment of Industrial Machinery

More information

Electricity (Consumer Safety) Regulation 2006

Electricity (Consumer Safety) Regulation 2006 New South Wales Electricity (Consumer Safety) Regulation 2006 under the Electricity (Consumer Safety) Act 2004 Her Excellency the Governor, with the advice of the Executive Council, has made the following

More information

Safety & Risk Management

Safety & Risk Management Safety & Risk Management (B) Construction Safety Law http://www.mom.gov.sg/legislation/ occupational-safetyhealth/pages/default.aspx ACTS Work Injury Compensation Act (WICA) Workplace Safety and Health

More information

SCHEDULE 2 - EXHIBIT 2 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE

SCHEDULE 2 - EXHIBIT 2 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE SCHEDULE 2 - EXHIBIT 2 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE BILATERAL EMBEDDED GENERATION AGREEMENT [USE OF SYSTEM FOR AN EMBEDDED

More information

Agreement for H.V./ L.V. Consumer.

Agreement for H.V./ L.V. Consumer. As per the Maharashtra Electricity Regulatory Commission (Electricity Supply Code and other Conditions of Supply) Regulations, 2005 and Electricity Act 2003. Agreement for H.V./ L.V. Consumer. Articles

More information

Author & Presenter: Deon Louw Pr.Eng. BSc.Eng. Deputy Director: Infrastructure & Planning Electricity Services

Author & Presenter: Deon Louw Pr.Eng. BSc.Eng. Deputy Director: Infrastructure & Planning Electricity Services 1 SWITCHING OFF DANGEROUS ELECTRICITY CIRCUITRY IN TERMS OF THE OCCUPATIONAL HEALTH AND SAFETY ACT (OHSA) VS CONSTRAINTS OF SWITCHING OFF SERVICES IN TERMS OF THE PROMOTION OF ADMINISTRATIVE JUSTICE ACT

More information

The Safety of Employees (Electricity) Ordinance, 1956.

The Safety of Employees (Electricity) Ordinance, 1956. OF THE STATES (Made on the 18th April, 1956.) The Safety of Employees (Electricity) Ordinance, 1956. ARRANGEMENT OF SECTIONS 201 (No. XII- 1956) PART I Interpretation I. Interpretation. PART II Safety

More information

SCOPE OF ACCREDITATION

SCOPE OF ACCREDITATION SCOPE OF ACCREDITATION KINECTRICS INC. 800 Kipling Avenue, Unit 2, KL 206 Toronto, ON M8Z 5G5 Accredited Laboratory No. 610 (Conforms with requirements of CAN-P-4E (ISO/IEC 17025:2005)) CONTACT: Mr. Dave

More information

Training Calendar ALPHA PARTNERS

Training Calendar ALPHA PARTNERS ALPHA PARTNERS Training Calendar +2348033045484, +2349060008877, +2349060007799, +2349060002727. Ebute-Metta, Yaba Lagos., info@alphapartnerstrainings.com BEST CATEGORIES AWARDS GLOBAL QUALITY Global

More information

Ref No: N Date: May 25, 2005

Ref No: N Date: May 25, 2005 Ref No: N05-045 Date: May 25, 2005 GAS PRODUCTS NO. 64 Effective Date: May 1, 2006 Call us today! We can help you stay on top of changes that will affect your Certification! 1-866-797-4272 Announcing:

More information

AGREEMENT FOR SUPPLY OF LT ENERGY

AGREEMENT FOR SUPPLY OF LT ENERGY AGREEMENT FOR SUPPLY OF LT ENERGY This agreement made on the.. day of.., 200 between the Development Commissioner, Cochin Special Economic Zone, Kakkanad for and on behalf of Cochin Special Economic Zone

More information

EXFO Care - Simulators

EXFO Care - Simulators Definitions EXFO Care - Simulators The validity of this EXFO Care for Simulators is subject to the full payment of the applicable EXFO Care fees published by EXFO or as set forth in the applicable quotation.

More information

The Electricity (Supply Services) Rules THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, (Made under section 45)

The Electricity (Supply Services) Rules THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, (Made under section 45) GOVERNMENT NOTICE No. 175 Published on 13/05/2016 THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, 2016 (Made under section 45) ARRANGEMENT OF RULES 1. Citation 2. Application 3.

More information

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT)

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT) PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT) Note. The procedures and guidelines mentioned herein are in accordance with

More information

POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only)

POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only) JD(Tariff) Page 1 9/20/2006 POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only) THIS AGREEMENT made this day of,200 at between M/s.being a Company registered

More information

S.I. No. of 2016 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2016

S.I. No. of 2016 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2016 S.I. No. of 2016 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2016 I, Paudie Coffey, Minister of State at the Department of the Environment, Community and Local Government, in exercise of the powers

More information

ELECTRICITY REGULATIONS 1994

ELECTRICITY REGULATIONS 1994 ELECTRICITY REGULATIONS 1994 IN exercise of the powers conferred by section 53 of the Electricity Supply Act 1990 [Act 447], the Minister makes the following regulations: PART 1 - PRELIMINARY Regulation

More information

Draft Safety, Health and Welfare at Work (Reporting of Accidents, Illnesses and Dangerous Occurrences) Regulations 2012

Draft Safety, Health and Welfare at Work (Reporting of Accidents, Illnesses and Dangerous Occurrences) Regulations 2012 Draft Safety, Health and Welfare at Work (Reporting of Accidents, Illnesses and Dangerous Occurrences) Regulations 2012 I,.., Minister for Jobs, Enterprise and Innovation, in exercise of the powers conferred

More information

SP MANWEB PLC - GENERAL BILATERAL TERMS AND CONDITIONS FOR ADOPTION OF CONTESTABLE WORKS PART 1 - GENERAL TERMS AND CONDITIONS

SP MANWEB PLC - GENERAL BILATERAL TERMS AND CONDITIONS FOR ADOPTION OF CONTESTABLE WORKS PART 1 - GENERAL TERMS AND CONDITIONS 1. DEFINITIONS PART 1 - GENERAL TERMS AND CONDITIONS 1.1 The following words and expressions shall (except to the extent that the context otherwise requires) have the meanings hereby assigned to them:-

More information

Training Calendar ALPHA PARTNERS

Training Calendar ALPHA PARTNERS ALPHA PARTNERS Training Calendar 08033045484, 09060002727, 09060007799, 09060008877 Ebute-Metta, Yaba Lagos., info@alphapartnerstrainings.com Contents Finance and Accounting 3-6 International Training

More information

REGULATION ON THE APPROVAL AND IMPORTATION OF TELECOMMUNICATIONS EQUIPMENT CONNECTED TO PUBLIC TELECOMMUNICATIONS NETWORKS. Article 1 Definitions

REGULATION ON THE APPROVAL AND IMPORTATION OF TELECOMMUNICATIONS EQUIPMENT CONNECTED TO PUBLIC TELECOMMUNICATIONS NETWORKS. Article 1 Definitions REGULATION ON THE APPROVAL AND IMPORTATION OF TELECOMMUNICATIONS EQUIPMENT CONNECTED TO PUBLIC TELECOMMUNICATIONS NETWORKS Article 1 Definitions Unless the context otherwise requires, any word, expressions

More information

Permit to Work Procedure

Permit to Work Procedure 1. Purpose The permit to work procedure provides a system for managing certain high risk activities at NT Airports sites. The purpose of this procedure is to: 2. Scope Provide a level of control to ensure

More information

Installation of InfraStruXure for Medium Data Centers with an Emergency Power Off Circuit

Installation of InfraStruXure for Medium Data Centers with an Emergency Power Off Circuit Application Note #25 Installation of InfraStruXure for Medium Data Centers with an Emergency Power Off Circuit Many installations require the use of an Emergency Power Off (EPO) circuit to disconnect power

More information

FRENCHTOWN CHARTER TOWNSHIP PUBLIC UTILITY AND EMERGENCY RESPONSE COST RECOVERY ORDINANCE Ord. No. 205; Date of Adoption: December 9, 2003

FRENCHTOWN CHARTER TOWNSHIP PUBLIC UTILITY AND EMERGENCY RESPONSE COST RECOVERY ORDINANCE Ord. No. 205; Date of Adoption: December 9, 2003 FRENCHTOWN CHARTER TOWNSHIP PUBLIC UTILITY AND EMERGENCY RESPONSE COST RECOVERY ORDINANCE Ord. No. 205; Date of Adoption: December 9, 2003 An Ordinance to establish public safety, fire, rescue, medical

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60691 2002 AMENDMENT 1 2006-09 Amendment 1 Thermal-links Requirements and application guide IEC 2006 Droits de reproduction réservés Copyright - all rights reserved International

More information

Jemena Electricity Networks

Jemena Electricity Networks Total Document 2005 Edition Change Summary TXU AGL Electricy United Energy Distribution Office of the chief Electrical Inspector (ESV) SP AusNet Jemena Electricity Networks United Energy Energy Safe Victoria

More information

Permit to Work Systems

Permit to Work Systems Permit to Work Systems Guidance Note 12 Jul 16 1 Permits to work systems Introduction This Guidance Note gives practical information about permit to work systems. A sample template has been included in

More information

ALFRED DUMA LOCAL MUNICIPALITY ELECTRICITY SUPPLY BYLAW

ALFRED DUMA LOCAL MUNICIPALITY ELECTRICITY SUPPLY BYLAW ALFRED DUMA LOCAL MUNICIPALITY ELECTRICITY SUPPLY BYLAW ELECTRICITY SUPPLY BYLAW NOTICE IS HEREBY GIVEN in terms of Section 160(4) of the Constitution of the Republic of South Africa, Act 108 of 1996 as

More information

Reserve Bank of India Estate Department Main Office Building Nagpur Tenders For

Reserve Bank of India Estate Department Main Office Building Nagpur Tenders For Reserve Bank of India Estate Department Main Office Building Nagpur- 440 001 Tenders For Conducting Electrical Safety Audit of Bank s Main and Additional Office Building at Nagpur Part - I Name of the

More information

LICENCE. GRANTED BY THE MINISTER UNDER THE TELECOMMUNICATIONS ACT NO of [ Internet Network and Service Licensee] FOR THE

LICENCE. GRANTED BY THE MINISTER UNDER THE TELECOMMUNICATIONS ACT NO of [ Internet Network and Service Licensee] FOR THE LICENCE GRANTED BY THE MINISTER UNDER THE TELECOMMUNICATIONS ACT NO of 201.. TO [ Internet Network and Service Licensee] FOR THE INSTALLATION AND OPERATION OF INTERNET NETWORKS AND THE PROVISION OF INTERNET

More information

ORDINANCE NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF MEADOWS PLACE, TEXAS:

ORDINANCE NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF MEADOWS PLACE, TEXAS: ORDINANCE 2017-05 AN ORDINANCE OF THE CITY OF MEADOWS PLACE, TEXAS, REPEALING SUBSECTION 150.02(D) OF SECTION 150.02 OF CHAPTER 150 OF THE CODE OF ORDINANCES AND SUBSTITUTING A NEW SUBSECTION 150.02(D)

More information

TSQL SONARQUBE ANALYSIS PLUGIN

TSQL SONARQUBE ANALYSIS PLUGIN TSQL SONARQUBE ANALYSIS PLUGIN Terms and Conditions 1 TABLE OF CONTENTS 2 Introduction... 2 3 Definitions... 2 4 Product... 2 5 Payment... 2 6 TechCognia Rights and Obligations... 3 7 Intellectual Property

More information

S.I. No. of 2018 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2018

S.I. No. of 2018 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2018 S.I. No. of 2018 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2018 I, Damien English, Minister of State at the Department of Housing, Planning and Local Government, in exercise of the powers conferred

More information

Dry Type Transformers Subcommittee Unapproved Meeting Minutes March 22, 2006 Costa Mesa, California

Dry Type Transformers Subcommittee Unapproved Meeting Minutes March 22, 2006 Costa Mesa, California 7.7 DRY TYPE TRANSFORMERS SC CHAIRMAN C. W. JOHNSON, JR. 7.7.1 Introductions and Approval of Minutes The Dry Type Transformer Subcommittee met in Costa Mesa, CA on Wednesday March 22, 2006 with 14 members

More information

CHAPTER 94: BUILDING AND FIRE CODES

CHAPTER 94: BUILDING AND FIRE CODES CHAPTER 94: BUILDING AND FIRE CODES Section General Provisions 94.01 Codes Adopted by Reference 94.02 Application, Administration and Enforcement 94.03 Completion of Exterior Work 94.04 Permits and Fees

More information

STATE OF MICHIGAN COURT OF APPEALS

STATE OF MICHIGAN COURT OF APPEALS STATE OF MICHIGAN COURT OF APPEALS CATHIE PULLEY, Plaintiff-Appellant, UNPUBLISHED November 17, 2016 v No. 328202 Genesee Circuit Court CONSUMERS ENERGY COMPANY, LC No. 14-102857-NO Defendant-Appellee.

More information

ALL TRAFFIC SOLUTIONS MASTER SERVICES AGREEMENT

ALL TRAFFIC SOLUTIONS MASTER SERVICES AGREEMENT ALL TRAFFIC SOLUTIONS MASTER SERVICES AGREEMENT THIS AGREEMENT IS BETWEEN ALL TRAFFIC SOLUTIONS ( ATS ) AND YOU, AN ADULT INDIVIDUAL, ON BEHALF AND BINDING YOUR COMPANY AND AFFILIATED OFFICERS, DIRECTORS,

More information

STATUTORY INSTRUMENTS. S.I. No.?????????? of 2016

STATUTORY INSTRUMENTS. S.I. No.?????????? of 2016 STATUTORY INSTRUMENTS S.I. No.?????????? of 2016 EUROPEAN UNION (EQUIPMENT AND PROTECTIVE SYSTEMS INTENDED FOR USE IN POTENTIALLY EXPLOSIVE ATMOSPHERES) REGULATIONS, 2016. 1 STATUTORY INSTRUMENTS S.I.

More information

Guidance Document. on the Relationship Between. the General Product Safety Directive (GPSD)

Guidance Document. on the Relationship Between. the General Product Safety Directive (GPSD) Guidance Document on the Relationship Between the General Product Safety Directive (GPSD) and Certain Sector Directives with Provisions on Product Safety Directorate General Health and Consumer Protection

More information

Electricity Supply Act 1995 No 94

Electricity Supply Act 1995 No 94 New South Wales Electricity Supply Act 1995 No 94 Contents Part 1 Preliminary 1 Name of Act 2 Commencement 3 Objects 4 Definitions 5 Act binds Crown Page 2 2 2 2 2 Part 2 Network operations and wholesale

More information

University of Arizona AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2012 EDITION

University of Arizona AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2012 EDITION University of Arizona AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2012 EDITION The following provisions of the International Fire Code, 2012 Edition, as published by the International Code Council, Inc.

More information

CITY OF MUSKEGO CHAPTER 15 - ELECTRICAL CODE (Ord. # )

CITY OF MUSKEGO CHAPTER 15 - ELECTRICAL CODE (Ord. # ) CITY OF MUSKEGO CHAPTER 15 - ELECTRICAL CODE (Ord. #935-07-03-97) 15.01 OBJECT AND PURPOSE... 1 15.02 SCOPE... 1 15.021 APPLICABILITY... 1 15.025 CODE ADOPTED... 2 15.03 ENFORCEMENT... 2 15.04 INTERPRETATIONS...

More information

NATIONAL REGULATOR FOR COMPULSORY SPECIFICATIONS ACT (Act 5 of 2008) AMENDMENTS TO THE COMPULSORY SPECIFICATION FOR CIRCUIT -BREAKERS (VC 8036)

NATIONAL REGULATOR FOR COMPULSORY SPECIFICATIONS ACT (Act 5 of 2008) AMENDMENTS TO THE COMPULSORY SPECIFICATION FOR CIRCUIT -BREAKERS (VC 8036) Trade and Industry, Department of/ Handel en Nywerheid, Departement van 1023 National Regulator for Compulsory Specifications Act (5/2008): Amendments to the Compulsory Specification for Circuit-Breakers

More information

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO) THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO) (NO. 4/99) (Issued under OERC Order Dt. 31.03.99 in Case No. 25/98) Western Electricity Supply Company of Orissa Limited Registered office:

More information

Electricity Act 4 of 2007 section 3(4)

Electricity Act 4 of 2007 section 3(4) Republic of Namibia 1 Annotated Statutes RULES MADE IN TERMS OF section 3(4) Government Notice 47 of 2016 (GG 5950) came into force on date of publication: 16 February 2016 ARRANGEMENT OF RULES 1. Definitions

More information

THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7,

THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7, THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7, 2004 761 NOTIFICATION The 22nd December, 2003 No. AERC. 65/2003/101. In exercise of the power conferred on it by Section 181 read with Sub-section 5 of Section

More information

SHORT TITLE, SCOPE EXTENT AND COMMENCEMENT

SHORT TITLE, SCOPE EXTENT AND COMMENCEMENT ARUNACHAL PRADESH STATE ELECTRICITY REGULATORY COMMISSION ITANAGAR NOTIFICATION 1 st June, 2018 NO. APSERC/ NOTIFICATION/: In exercise of the powers conferred by Section 50 and clause (x) of sub-section

More information

Hot Work Safety Program

Hot Work Safety Program Hot Work Safety Program 6900-2.0 Associated OHS Process: General Industry & Construction Safety The master copy of this document resides in electronic format. Printed copies of this document are for convenience

More information

Local Authorities Act 23 of 1992 section 94(2)(a) read with section 94(1)

Local Authorities Act 23 of 1992 section 94(2)(a) read with section 94(1) MADE IN TERMS OF section 94(2) read with section 94(1) Government Notice 71 of 1996 (GG 1283) came into force on date of publication: 1 April 1996 1. Definitions INDEX PART 1 GENERAL CONDITIONS OF SUPPLY

More information

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 PROJECTS (INVERTER BASED - 20kW OR LESS)

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 PROJECTS (INVERTER BASED - 20kW OR LESS) INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 PROJECTS (INVERTER BASED - 20 OR LESS) This Interconnection and Parallel Operating Agreement ( Agreement ) is entered into on (insert date

More information

Excerpts from 2011 City of Los Angeles Electrical Code and 2010 California Electrical Code (Based on 2008 National Electrical Code)

Excerpts from 2011 City of Los Angeles Electrical Code and 2010 California Electrical Code (Based on 2008 National Electrical Code) Excerpts from 2011 City of Los Angeles Electrical Code and 2010 California Electrical Code (Based on 2008 National Electrical Code) 2011 City of Los Angeles Electrical Code Excerpts: SEC. 93.0101. TITLE.

More information

Title: Safe Work Procedure. Function: Ecology & Safety No.: CTC-SAF-037 Page: 1 of 6 Reviewed: 3/1/2017 Effective: 4/1/2017 Supersedes: 3/20/16

Title: Safe Work Procedure. Function: Ecology & Safety No.: CTC-SAF-037 Page: 1 of 6 Reviewed: 3/1/2017 Effective: 4/1/2017 Supersedes: 3/20/16 Site Procedure Function: Ecology & Safety No.: CTC-SAF-037 Page: 1 of 6 Preparer: BASF Safe Work Permit Team Owner: Site Manager (Signature on File) Approver: Director (Signature on File) 1. PURPOSE To

More information

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA SECOND APPELLATE DISTRICT DIVISION SIX

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA SECOND APPELLATE DISTRICT DIVISION SIX Filed 10/26/16 CERTIFIED FOR PUBLICATION IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA SECOND APPELLATE DISTRICT DIVISION SIX AL KHOSH, v. Plaintiff and Appellant, 2d Civil No. B268937 (Super. Ct.

More information

FRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN

FRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN FRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN WESTERN POWER DISTRIBUTION (SOUTH WEST) PLC, WESTERN POWER DISTRIBUTION (SOUTH

More information

Batu Kemas Industri Sdn Bhd v Kerajaan Malaysia & Anor

Batu Kemas Industri Sdn Bhd v Kerajaan Malaysia & Anor Batu Kemas Industri Sdn Bhd v Kerajaan Malaysia & Anor Batu Kemas Industri Sdn Bhd v Kerajaan Malaysia & Anor COURT OF APPEAL, PUTRAJAYA CIVIL APPEAL NO: A 01 16 01/2013 MOHD ZAWAWI SALLEH JCA, VERNON

More information

S P P U R C H A S I N G S P WI- 03 P U R C H A S E O R D E R G T C DATE OF ISSUE: 15/11/2015 REVISION: 01

S P P U R C H A S I N G S P WI- 03 P U R C H A S E O R D E R G T C DATE OF ISSUE: 15/11/2015 REVISION: 01 S P. 1 0. 0 1 P U R C H A S I N G P U R C H A S E O R D E R G T C DATE OF ISSUE: 15/11/2015 REVISION: 01 1.0 PURPOSE These terms and conditions shall apply to the procurement of all goods, equipment, material

More information

Permit to Work Major Hazard Standard

Permit to Work Major Hazard Standard WMC Environment, Health & Safety Management System Major Hazard Standard MHS-07 DocsOpen Ref: 155520, 23/12/2003 Uncontrolled copy check web for latest revision Revision Reviewed Description of Changes

More information

CHAPTER XIV WATER AND SEWERS ARTICLE 1. WATER SERVICE

CHAPTER XIV WATER AND SEWERS ARTICLE 1. WATER SERVICE CHAPTER XIV WATER AND SEWERS ARTICLE 1. WATER SERVICE SECTION 14.0101 DEFINITIONS: For the purpose of Chapter 14, the following words and phrases shall have the meanings respectively ascribed to them by

More information

Making sense of risk Risk engineering. Marine hot work Permit to Work (PTW) systems

Making sense of risk Risk engineering. Marine hot work Permit to Work (PTW) systems Marine hot work Permit to Work (PTW) systems Marine hot work Permit to Work (PTW) systems Hot work is any operation involving open flames or producing heat and/or sparks, including but not limited to welding,

More information

KENNECOTT UTAH COPPER

KENNECOTT UTAH COPPER 16.1.1 INTRODUCTION 16.1.1.1 The purpose of this standard is to define the requirement for performing hot work operations on certain components of machinery, equipment and structures and preventing the

More information

INTERNATIONAL LABOUR CONFERENCE

INTERNATIONAL LABOUR CONFERENCE INTERNATIONAL LABOUR CONFERENCE Convention 184 CONVENTION CONCERNING SAFETY AND HEALTH IN AGRICULTURE The General Conference of the International Labour Organization, Having been convened at Geneva by

More information

CUSTOMER RELATIONSHIP AGREEMENT

CUSTOMER RELATIONSHIP AGREEMENT CUSTOMER RELATIONSHIP AGREEMENT 1. CUSTOMER RELATIONSHIP AGREEMENT ("CRA") 1.1. Our CRA sets out the standard terms and conditions on which we supply our Services to our customers. 1.2. This CRA incorporates,

More information

Consumer Product Safety Act (Tentative translation)

Consumer Product Safety Act (Tentative translation) Consumer Product Safety Act (Tentative translation) (Act No. 31 of June 6, 1973) Table of Contents Chapter I General Provisions (Articles 1 and 2) Chapter II Specified Products Section 1 Requirements and

More information