Jemena Electricity Networks

Size: px
Start display at page:

Download "Jemena Electricity Networks"

Transcription

1 Total Document 2005 Edition Change Summary TXU AGL Electricy United Energy Distribution Office of the chief Electrical Inspector (ESV) SP AusNet Jemena Electricity Networks United Energy Energy Safe Victoria (ESV) Section 1 Clause, Figure, Table Numbers & Titles 1.2 References No change No change Deleted -This list of references has been made as comprehensive as possible at the time of publication. However, other references may have been applicable at the time but inadvertently omitted, and the references listed may have been amended or made obsolete and new references may be applicable. The user is responsible to ensure correct references are applied. Inserted - The following list of reference documents and organisations have been compiled for information purposes only. The documents and organisations referred to within the table are considered current at the time of publication of these rules. As these references are subject to change, it is the users responsibility to confirm the particular organisations or documents referenced are current. Substituted National Electricity (Victoria) Act 1997 with National Electricity (Victoria) Act 2005 Substituted National Electricity Code with National Electricity Rules Substituted Australian Standards with Standards Australia and corrected website Deleted NECA National Electricity Code Administrator and website Inserted Australian Energy Market Commission and website Inserted Australian Energy Regulator and website Substituted Energy Safe Victoria and website for Office of Chief Electrical Inspector Deleted Office of the Regulator-General Act 1994 Electricity Safety bold print Code of Practice bold print

2 1.3 Definitions No change No change Advanced Infrastructure (AMI) Inserted The infrastructure associated with the installation and operation of electricity metering and communications including interval meters designed to transmit data to and receive data from a remote locality. Common Property Revised to align with the definition contained in the Owners Corporations Act 2006 Customer Revised to align with the definition contained in the Electricity Distribution Code 2006 Substituted - Supply Disconnection Device A supply disconnection and reconnection as required by clause 7.5 (Supply Disconnection Devices) device, with Occupancy Disconnection Device - A device provided for the purpose of disconnection and reconnection of individually metered occupancies within multiple occupancy premises. Inserted - Owners Corporation - means a body corporate which is incorporated by registration of a plan of subdivision or a plan of strata or cluster subdivision; Substituted Private Overhead Electric Line (POEL) Private Aerial Line (PAL) has the same meaning as that in the Electricity Safety (Installations) Regulations, with Private Aerial Line (PAL) has the same meaning as that in the Electricity Safety (Installations) Regulations Substituted - Supply Connection Facility A facility containing consumer terminals, eg, pillar, cubicle, switch board or CT enclosure, with Service Connection Facility A facility containing consumer terminals provided for the connection of a Distributor s service cable, eg, pillar, cubicle, switchboard or CT enclosure. Deleted Underground Reticulated Distribution (URD) Term is obsolete Deleted Un-metered Supply Self explanatory

3 Section 2 Clause, Figure, Table Numbers & Titles Administration No Change No Change Substituted the Office of the Chief Electrical Inspector with Energy Safe Victoria. Added, Institute of Electrical Inspectors Publication No Change No Change Amended first paragraph to reflect new and amended document and clarify names of publishers Figure 2.1 Revision Process 2.6-A No Change Figure renumbered 2.6-A 2.9 Scope No Change No Change Deleted last paragraph which previously excluded embedded network customers from the SIR requirements. SIR now has certain requirements for embedded networks Application and Application Responsibilities 2.12 Exceptional Circumstances No Change No Change Substituted 1 September 2005 with 1 January 2014 first sentence. No Change No Change Updated contact details. Figure 2.2 Stakeholders 2.15-A No Change Figure renumbered 2.15-A Substituted the Office of the Chief Electrical Inspector with Energy Safe Victoria Substituted National Electricity Marketing Management Company (NEMMCO)(Manage application of the National Electricity Code) with Australian Energy Market Operator (AEMO) Substituted National Electricity Code Administrator (NECA) (Administrator of the National Electricity Code) with Australian Energy Regulator (AER) (National Electricity Rules Regulator) Electricity Customer Code Definitions No Change No Change Responsible Person changed NEC to NER

4 Section 4 Clause, Figure, Table Numbers & Titles Section 4 General Rules Section 5 General Rules All clause and figure numbers changed to align with section number change. 4.1 Safety 5.1 Safety to No Go Zone No Go Zone Removed from section 7 and inserted into section 5. to Underground Cables Underground Cables Removed from section 7 and inserted into section 5. to Substations Substations Removed from section 7 and inserted into section 5. to Poles and Overhead Lines Poles and Overhead Lines Removed from section 7 and inserted into section 5. to Service Pits Service Pits Removed from section 7 and inserted into section 5. to Proximity of Electrical Installation and Distributor Assets Proximity of Electrical Installation and Distributor Assets Removed from section 7 and inserted into section 5. to Supply Isolation Supply Isolation Removed from section 7 and inserted into section 5. to New clause New clause Remote Deenergisation, Reenergisation Remote De-energisation, Re-energisation. Clause number Compliance with Regulations, Codes of Practices and these Rules 5.2 Compliance with Regulations, Codes of Practices and these Rules General New sub-clause

5 4.3 Testing Testing New sub-clause 7.8 and to Private Overhead Electric Lines (POEL) Private Aerial Lines (PAL) Content of clauses have been consolidated into a single clause 4.4 Equipment Acceptance Equipment Required to be Accepted Equipment Not Required to be Accepted 5.5 Equipment Acceptance Equipment Required to be Accepted Equipment Not Required to be Accepted Clause renumbered Inserted reference to into clause (Equipment Required to Be Accepted) 4.5 Labelling 5.4 Labelling 4.6 Access to Distributors Equipment 4.7 Victoria Power Industry Lock 5.5 Access to Distributors Equipment 5.6 Sealing and Locking Victoria Power Industry Lock New clause Fig 4.1 Victoria Power Industry Lock Fig 5.6-A Victoria Power Industry Locks Series 2 New lock Types 5.7 Private Electric Lines on Public Land 5.8 Multiple Occupancy Buildings and Subdivisions (General) New clause New clause

6 Section 5 Clause, Figure, Table Numbers & Titles Section 5 Supply Application, Connection & Disconnection Section 4 Supply Application, Connection & Disconnection All clause and figure numbers changed to align with section number change. 5.1 Conditions of Supply 5.2 Negotiations for Obtaining / Altering an Electricity Supply and Warning against Premature Expenditure 5.3 Typical Connection Process 5.4 Application for Supply 4.1 Conditions of Supply 4.2 Negotiations for Obtaining / Altering an Electricity Supply and Warning against Premature Expenditure 4.3 Typical Connection Process 4.4 Application for Supply Availability Clause renumbered 4.4 Clause title changed to Application for Supply Availability Applications Applications High Voltage Electrical Installations Low Voltage Electrical Installations Electrical Installations on Public Land High Voltage Electrical Installations Low Voltage Electrical Installations Electrical Installations on Public Land Subdivisions Multiple Occupancy Buildings or Subdivisions (Application) Clause renumbered Clause title changed to Multiple Occupancy Buildings or Subdivisions (Application). Clause rewritten to clarify the intent.

7 5.4.3 Distributor Substation on Customer s Premises 5.5 Notification of Electrical Work New Connections & Work not requiring an appointment Distributor Substation on Customer s Premises 4.5 Notification of Electrical Work New Connections & Work not requiring an appointment Table 5.1 Documents for Most Frequently Requested Work Documents for Most Frequently Requested Work Table number change Work requiring an appointment Other Documentation Work requiring an appointment Other Documentation 5.6 Charges 4.6 Charges Form Electrical Work Request Form Electrical Work Request Updated Form Application for Abolishment of Electricity Supply Form Application for Abolishment of Electricity Supply Updated Form Reconnection of Electricity Supply New Form Form Photovoltaic (Solar) Generator Connection Form New Form

8 Section 6 Clause, Figure, Table Numbers & Titles Section 6 Supply Characteristics and Supply Section 6 Supply Types, Use and Protection Section title changed Supply Systems Supply Systems Substituted 240V, 415V and 480V with 230V, 400V and 460V respectively Table 6.1 Standard Nominal Voltages and Voltage Variations Table Standard Nominal Voltages and Voltage Variations <1.0 kv Row Steady State column substituted + 6% with + 10% and 6% Less than 1 Minute column substituted +10% with + 14% and 10% Prospective Short Circuit Current Prospective Short Circuit Current 2 new sub-clauses introduced Low Voltage New sub-clause. Reference to fault duration times deleted High Voltage New sub-clause Provision Provision Substituted (Application for Supply) with (Application for Supply Availability) Conditions and considerations related to the provision of more than one point of supply have been expanded Number of Consumer Terminals per Point of Supply 6.4 Supply Arrangement Diagrams Number of Consumer Terminals per Point of Supply 6.4 Supply Arrangement Diagrams Clause amended to assist in determining if exceptional circumstances are valid. Inserted 2 nd last paragraph to include location and operation of any alternative supply Switched Loads Switched Loads Substituted 480/240 with 460/230 and 415/240 with 400/ Fall in Voltage Method Current Measurement Method Fall in Voltage Method Current Measurement Method Inserted 01 at start of second dot point Deleted, with a back-stopped ammeter and inserted, using an ammeter with hold function to record current value

9 6.7 Supply Capacity 6.7 Supply Capacity (Maximum Demand by Limitation) 7.4 Service Protection 6.8 Installation & Supply Protection 7.4 Service Protection 6.8 Installation & Supply Protection 7.4 Service Protection 6.8 Installation & Supply Protection Figure 6.8-B Clause rewritten to align with the intent of the Regulations and certain provisions of the Wiring Rules Clause deleted from section 7 and inserted in Section 6 Clause title changed from Service Protection to Installation & Supply Protection Clause rewritten to align with the intent of the Regulations New Figure provides graphical description of acceptable supply protection 6.8 Sources of Alternative Supply 6.9 Sources of Alternative Supply Clause rewritten to address current technologies

10 Section 7 Clause, Figure, Table Numbers & Titles 7.1 Services 7.1 Distributor s LV Network/Electrical Installation Connection New clause title Type of Service Type of Supply New clause title Network Underground New clause Network Overhead New clause Sub-Stations New clause Connections to Services 7.13 Selection of Connection Type New clause title 7.2 Underground Supplies 7.2 Service Pits New title. Clause 7.2, sub-clauses and Table reconfigured 7.3 Overhead Supplies Underground Service Cables New clause title, clause number 7.3, sub-clauses, Tables and figures reconfigured. 7.4 Service Protection 7.2.4, , and Supply Protection New titles various clauses; Aerial, Underground and Substations Supply Protection. 7.5 Supply Disconnection Devices Occupancy Disconnection Devices (ODD) New clause number 7.6 Safety when working on or near Network Assets No Go Zone New clause number and title 7.7 Consumer s Mains 7.5 Un-metered Consumer Mains & Sub-Mains New clause number and title

11 7.8.1 Private Overhead Electric Lines (POEL) Private Electric Lines on Public Land Electrical Installations on Public Land Private Aerial Lines (PAL) 5.7 Private Electric Lines on Public Land 7.9 Electrical Installations on Public Land New clause number and title New clause number New clause number 7.14 Typical Supply Arrangements 7.10-A 7.10 I Various New supply arrangement figures illustrate the intent of clause 7.10

12 Section 8 Clause, Figure, Table Numbers & Titles Alterations and Additions Timber Panels & Boards Text incorporated into clause Meter Panels, Surrounds and Enclosures Facilities New title Meter Panels, Surrounds and Enclosures Meters - Temperature Limits of Specified Operating Range Reference to temperature limits have been deleted from clause Meter Panels Meter Panels New clause number Surrounds and Enclosures Surrounds and Enclosures New clause number Meter Enclosures Meter Enclosures New dot point re; construction and location. 8.5 Equipment Equipment New clause number 8.6 Meter Panel Labelling Single Occupancy Labelling New clause number Labelling New clause number Multiple Occupancies 8.7 Protection Labelling New clause number Protection against Damage to and Interference with Equipment, and Injury to Persons New title 8.8 Location 8.6 Location New clause number

13 8.8.3 Multiple Occupancy Electrical Installations Grouping of Meters New clause title. Clause reconfigured. 8.9 Access 8.5 Access New clause number 8.10 Determination Of Meter Type 8.10 Determination Of Meter Type Direct Connected Meter Limits of Current Carrying Capacity Meters - Temperature Limits of Specified Operating Range New clause title. Clause amended to provide additional guidance related to meter type selection. New clause title. Clause inserted to reflect the limits defined in NMI M6-1, Electricity Meters, Part 1: Metrological and Technical Requirements Direct Connected 8.9 Direct Connected New clause number, Clause expanded to include additional information and new Figure 8.9- A Figure 8.9-A Meter Panel Heights & Minimum Clearances Changes to direct connected meter panel clearance heights New Figure 8.9-A Meter Wiring Meter Wiring New clause number 8.10 Specific Situation Requirements New clause Single Occupancy Single Occupancy Reconfiguration of various clauses (b) Commercial / Industrial Meter Locations New clause. Figure 8.10-B Small/Medium Individual Commercial/Industrial Installations Acceptable Meter Locations New figure

14 Multiple Occupancy Buildings and Subdivisions ( Arrangements) New clause and sub clauses Tables 8.2 and 8.3 Maximum Number of Occupancy Meters per Panel Multiple Occupancy Typical Meter Panel Sizes Tables consolidated into single table (a) & (b) Multiple Occupancy Occupancy Disconnection Devices (ODD) New clause title. Clause has been redrafted to include Occupancy Disconnection Devices (ODD). Supply Disconnection Devices has been deleted Embedded Networks Replaces the embedded network guidelines contained on the VSIR web site 8.12 LV Current Transformer 8.11 LV Current Transformer New clause number Clearances Clearances Changes to LV CT meter panel clearance heights General Clarification of busbar arrangements within CT enclosures added Fuses Fuses Clause expanded to include safe operation of fuse carriers Communications Equipment) New clause.

15 Section 9 Clause, Figure, Table Numbers & Titles Control of incoming HV Supply Control of incoming HV Supply Introduced a requirement for the provision of earth switches and locking arrangements 9.8 Protection 9.8 Protection Expanded clause to include protection device type and protection characteristics Earthing of Equipment General Requirements Freestanding Meter Enclosures Earthing of Equipment General Requirements Freestanding Meter Enclosures Inserted; The cross sectional area of earthing conductors associated with metering secondary wiring shall be 4mm 2. Dot point 3; Inserted to the area requires the issue of an Electrical Access Authority. Clause redrafted Test Facilities Test Facilities Inserted; a suitable position areas that require the issue of an Electrical Access Authority for entry Table Transformer Performance Requirements Table 9.1 Transformer Performance Requirements Reference to Ground Fault Neutralisers installed and not installed

NORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES

NORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES ONCE PRINTED THIS IS AN UNCONTROLLED DOCUMENT NORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES OF CUSTOMERS RECEIVING HIGH VOLTAGE SUPPLY SRG

More information

Annex I To Loughborough University Estates Services Health and Safety Policy

Annex I To Loughborough University Estates Services Health and Safety Policy Annex I Annex I To Loughborough University Estates Services Health and Safety Policy High Voltage Electricity System Safety Rules And Associated Safety Guidance 1. Introduction a. These Safety Rules are

More information

Electricity Regulations 1947

Electricity Regulations 1947 Western Australia Electricity Act 1945 Electricity Regulations 1947 As at 01 Jan 2011 Version 05-c0-00 Western Australia Electricity Regulations 1947 CONTENTS Part I Preliminary 1. Citation 1 2. Terms

More information

Electricity Act, 1998 Loi de 1998 sur l électricité

Electricity Act, 1998 Loi de 1998 sur l électricité Electricity Act, 1998 Loi de 1998 sur l électricité ONTARIO REGULATION 22/04 ELECTRICAL DISTRIBUTION SAFETY Consolidation Period: From October 1, 2017 to the e-laws currency date. Last amendment: O. Reg.

More information

TXU ELECTRICITY LTD ABN STANDARD TERMS AND CONDITIONS ELECTRICITY DISTRIBUTION CONTRACT

TXU ELECTRICITY LTD ABN STANDARD TERMS AND CONDITIONS ELECTRICITY DISTRIBUTION CONTRACT Electricity Industry Act 2000 PUBLICATION OF TERMS AND CONDITIONS UNDER SECTION 40A TXU ELECTRICITY LTD ABN 91 064 651 118 STANDARD TERMS AND CONDITIONS ELECTRICITY DISTRIBUTION CONTRACT INTRODUCTION These

More information

Electricity (Safety, Quality and Continuity) Regulation

Electricity (Safety, Quality and Continuity) Regulation Electricity (Safety, Quality and Continuity) Regulation I fldgi ( ^I& fpoh - YS%,xld m%cd;dka;s%l iudcjd ckrcfha w;s úfyi.eiü m;%h - 2016'07'13 1A Y% S,xld m%cd;dka;% sl iudcjd ckrcfha.eiü m;%h w;s úfyi

More information

Electricity (Consumer Safety) Regulation 2006

Electricity (Consumer Safety) Regulation 2006 New South Wales Electricity (Consumer Safety) Regulation 2006 under the Electricity (Consumer Safety) Act 2004 Her Excellency the Governor, with the advice of the Executive Council, has made the following

More information

SCHEDULE 2B NATIONAL TERMS OF CONNECTION

SCHEDULE 2B NATIONAL TERMS OF CONNECTION SCHEDULE 2B NATIONAL TERMS OF CONNECTION Version 8.0 effective from 01 October 2016 SECTION 1 (A) Introduction: The electricity that is supplied to, or exported from, the premises is conveyed using the

More information

EDB Information Disclosure Requirements Information Templates for Schedules 11a 13

EDB Information Disclosure Requirements Information Templates for Schedules 11a 13 EDB Information Disclosure Requirements Information Templates for Schedules 11a 13 Disclosure Date 31 March 2019 Start Date (first day) 1 April 2019 Templates for Schedules 11a 13 (Asset Management Plan)

More information

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT)

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT) PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT) Note. The procedures and guidelines mentioned herein are in accordance with

More information

GUIDE TO THE ROLE OF THE METERING COORDINATOR

GUIDE TO THE ROLE OF THE METERING COORDINATOR GUIDE TO THE ROLE OF THE METERING COORDINATOR PREPARED BY: AEMO MARKETS VERSION: 1.1 EFFECTIVE DATE: 01 DECEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: TITLE: PETER GEERS

More information

Local Authorities Act 23 of 1992 section 94(2)(a) read with section 94(1)

Local Authorities Act 23 of 1992 section 94(2)(a) read with section 94(1) MADE IN TERMS OF section 94(2) read with section 94(1) Government Notice 71 of 1996 (GG 1283) came into force on date of publication: 1 April 1996 1. Definitions INDEX PART 1 GENERAL CONDITIONS OF SUPPLY

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: NEC Code-Making Panel 1 FROM: Kimberly Shea, Administrator,

More information

TELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE. [Company Name]... [Address]

TELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE. [Company Name]... [Address] Form 034(1) Licence No. TELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE DATE OF ISSUE: [ ] [Company Name]... of [Address].. (the licensee ) is licensed, subject to the following

More information

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA)

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Electrical Equipment of Industrial Machinery

More information

ELECTRICITY ACT Cap 95 8 July 1939 ELECTRICITY ACT. Revised Laws of Mauritius

ELECTRICITY ACT Cap 95 8 July 1939 ELECTRICITY ACT. Revised Laws of Mauritius Revised Laws of Mauritius ELECTRICITY ACT Cap 95 8 July 1939 ARRANGEMENT OF SECTIONS SECTION 1. Short title 2. Interpretation 3. Application of Act 4. Permit for supply of electricity 5. Objections to

More information

KERALA STATE ELECTRICITY BOARD TERMS AND CONDITIONS OF SUPPLY, 2005

KERALA STATE ELECTRICITY BOARD TERMS AND CONDITIONS OF SUPPLY, 2005 KERALA STATE ELECTRICITY BOARD TERMS AND CONDITIONS OF SUPPLY, 2005 PART I GENERAL 1. Definitions (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) Act means the Electricity Act, 2003 (Central Act 36 of 2003) as

More information

ALFRED DUMA LOCAL MUNICIPALITY ELECTRICITY SUPPLY BYLAW

ALFRED DUMA LOCAL MUNICIPALITY ELECTRICITY SUPPLY BYLAW ALFRED DUMA LOCAL MUNICIPALITY ELECTRICITY SUPPLY BYLAW ELECTRICITY SUPPLY BYLAW NOTICE IS HEREBY GIVEN in terms of Section 160(4) of the Constitution of the Republic of South Africa, Act 108 of 1996 as

More information

ELECTRICITY ACT 1939

ELECTRICITY ACT 1939 ELECTRICITY ACT 1939 Act 21/1939 Lane Cap 95 ARRANGEMENT OF SECTIONS 1. Short title 2. Interpretation 3. Application of Act 4. Permits for the supply of electricity 5. Objections to the granting of a permit

More information

ORDINANCE NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF MEADOWS PLACE, TEXAS:

ORDINANCE NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF MEADOWS PLACE, TEXAS: ORDINANCE 2017-05 AN ORDINANCE OF THE CITY OF MEADOWS PLACE, TEXAS, REPEALING SUBSECTION 150.02(D) OF SECTION 150.02 OF CHAPTER 150 OF THE CODE OF ORDINANCES AND SUBSTITUTING A NEW SUBSECTION 150.02(D)

More information

SULTANATE OF OMAN GENERATION LICENCE. (Renewable Energy) Bahwan Astonfield Solar Power LLC GRANTED TO

SULTANATE OF OMAN GENERATION LICENCE. (Renewable Energy) Bahwan Astonfield Solar Power LLC GRANTED TO SULTANATE OF OMAN GENERATION LICENCE (Renewable Energy) GRANTED TO Bahwan Astonfield Solar Power LLC GRANTED ON: 1 st July 2015 CONTENTS PART I: THE LICENCE... 1 1. GRANT OF LICENCE... 3 2. CONDITIONS

More information

CITY OF MELISSA, TEXAS

CITY OF MELISSA, TEXAS CITY OF MELISSA, TEXAS ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF MELISSA, TEXAS, AMENDING MELISSA S CODE OF ORDINANCES, ORDINANCE NO. 92-04, AS AMENDED, CHAPTER 12 (PLANNING AND ZONING),

More information

Electricity Supply (Safety and Network Management) Regulation 2014

Electricity Supply (Safety and Network Management) Regulation 2014 New South Wales Electricity Supply (Safety and Network Management) Regulation 2014 under the Electricity Supply Act 1995 Her Excellency the Governor, with the advice of the Executive Council, has made

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 14.8.2012 Official Journal of the European Union L 217/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 23 July 2012 amending Decisions 2002/731/EC, 2002/732/EC, 2002/733/EC, 2002/735/EC and

More information

THE TAMIL NADU LIFTS RULES, (G.o.Ms.No.173, Energy (B1), 3rd November 1997)

THE TAMIL NADU LIFTS RULES, (G.o.Ms.No.173, Energy (B1), 3rd November 1997) No.SRO.A/117(c)/97.- THE TAMIL NADU LIFTS RULES, 1997 (G.o.Ms.No.173, Energy (B1), 3rd November 1997) In exercise of the powers conferred by sub-section (1) of Section 22 of the Tamil Nadu Lifts Act, 1997

More information

2009 Bill 50. Second Session, 27th Legislature, 58 Elizabeth II THE LEGISLATIVE ASSEMBLY OF ALBERTA BILL 50 ELECTRIC STATUTES AMENDMENT ACT, 2009

2009 Bill 50. Second Session, 27th Legislature, 58 Elizabeth II THE LEGISLATIVE ASSEMBLY OF ALBERTA BILL 50 ELECTRIC STATUTES AMENDMENT ACT, 2009 2009 Bill 50 Second Session, 27th Legislature, 58 Elizabeth II THE LEGISLATIVE ASSEMBLY OF ALBERTA BILL 50 ELECTRIC STATUTES AMENDMENT ACT, 2009 THE MINISTER OF ENERGY First Reading.......................................................

More information

ELECTRICITY REGULATIONS FOR COMPULSORY NORMS AND STANDARDS FOR RETICULATION SERVICES (GN R773 in GG of 18 July 2008)

ELECTRICITY REGULATIONS FOR COMPULSORY NORMS AND STANDARDS FOR RETICULATION SERVICES (GN R773 in GG of 18 July 2008) ELECTRICITY REGULATION ACT 4 OF 2006 [ASSENTED TO 27 JUNE 2006] [DATE OF COMMENCEMENT: 1 AUGUST 2006] (except s. 34: 1 December 2004) (English text signed by the President) as amended by Electricity Regulation

More information

This document includes relevant guidance previously contained in MSP 4.1, which has now been withdrawn.

This document includes relevant guidance previously contained in MSP 4.1, which has now been withdrawn. 1. SCOPE This Safety Procedure supplements Part B of the Safety Rules and gives guidance on preparation, issue, receipt, transfer, clearance and cancellation of Safety Documents. This document includes

More information

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA)

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Electrical Equipment of Industrial Machinery

More information

CHAPTER 1: GENERAL. 1.1 Short Title, Extent and Commencement

CHAPTER 1: GENERAL. 1.1 Short Title, Extent and Commencement No.: JERC-11/2010:- In exercise of power conferred by Section 181 (1) and 181 (2) read with Section 50 and 43 (1), Section 44, Section 46, Section 47 (4) Section 56 of Electricity Act, 2003 (36 of 2003)

More information

The Planning and Zoning Commission met in a regular meeting with the following members present:

The Planning and Zoning Commission met in a regular meeting with the following members present: THE BARTONVILLE PLANNING AND ZONING COMMISSION MEETING HELD ON THE 1 st DAY OF MARCH, 2017, AT BARTONVILLE TOWN HALL, 1941 E. JETER ROAD, BARTONVILLE, TX 76226, COUNTY OF DENTON, TEXAS AT 7:00 P.M. The

More information

NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012

NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012 NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012 1 P a g e REGULATION NO: 0112 NIGERIAN ELECTRICITY REGULATORY COMMISSION In exercise of its powers to make Regulations

More information

Photovoltaic Inverter Network Connection Agreement

Photovoltaic Inverter Network Connection Agreement Photovoltaic Inverter Network Connection Agreement Power and Water Corporation (PWC) ABN: 15 947 352 360 / / (Day/Month/Year) Customer: Customer s ABN: (Commercial Customers Only) Note to customers 1.

More information

SEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004

SEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004 Bhopal, dated: 12 th July, 2006 No.1740&MPERC&2006. In exercise of powers conferred by Section 181 (1) of the Electricity Act, 2003 (No. 36 of 2003) and also in compliance of the notification dated 08

More information

NORTHERN IRELAND ELECTRICITY plc. and THE CONNECTED PARTY NAMED IN PART C OF THIS AGREEMENT HIGH VOLTAGE CONNECTION AGREEMENT

NORTHERN IRELAND ELECTRICITY plc. and THE CONNECTED PARTY NAMED IN PART C OF THIS AGREEMENT HIGH VOLTAGE CONNECTION AGREEMENT NORTHERN IRELAND ELECTRICITY plc and THE CONNECTED PARTY NAMED IN PART C OF THIS AGREEMENT HIGH VOLTAGE CONNECTION AGREEMENT CMS Cameron McKenna Mitre House 160 Aldersgate Street London EC1A 4DD T +44(0)20

More information

N.J.A.C. 5: NEW JERSEY ADMINISTRATIVE CODE Copyright (c) 2016 by the New Jersey Office of Administrative Law

N.J.A.C. 5: NEW JERSEY ADMINISTRATIVE CODE Copyright (c) 2016 by the New Jersey Office of Administrative Law N.J.A.C. 5:23-3.16 NEW JERSEY ADMINISTRATIVE CODE Copyright (c) 2016 by the New Jersey Office of Administrative Law *** This file includes all Regulations adopted and published through the *** *** New

More information

(1 May 2008 to date) ELECTRICITY REGULATION ACT 4 OF 2006

(1 May 2008 to date) ELECTRICITY REGULATION ACT 4 OF 2006 (1 May 2008 to date) [This is the current version and applies as from 1 May 2008, i.e. the date of commencement of the Electricity Regulation Amendment Act 28 of 2007 - to date] ELECTRICITY REGULATION

More information

INDEX. Sr. No. Particulars Page No.

INDEX. Sr. No. Particulars Page No. MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Mumbai DRAFT Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination

More information

BELIZE ELECTRICITY ACT CHAPTER 221 REVISED EDITION 2000 SHOWING THE LAW AS AT 31ST DECEMBER, 2000

BELIZE ELECTRICITY ACT CHAPTER 221 REVISED EDITION 2000 SHOWING THE LAW AS AT 31ST DECEMBER, 2000 BELIZE ELECTRICITY ACT CHAPTER 221 REVISED EDITION 2000 SHOWING THE LAW AS AT 31ST DECEMBER, 2000 This is a revised edition of the law, prepared by the Law Revision Commissioner under the authority of

More information

Gujarat Electricity Regulatory Commission (GERC)

Gujarat Electricity Regulatory Commission (GERC) Gujarat Electricity Regulatory Commission (GERC) Electricity Supply Code and Related Matters Regulations Notification No. 11 of 2005 In exercise of powers conferred under Section 181 (2) (x) read with

More information

Author & Presenter: Deon Louw Pr.Eng. BSc.Eng. Deputy Director: Infrastructure & Planning Electricity Services

Author & Presenter: Deon Louw Pr.Eng. BSc.Eng. Deputy Director: Infrastructure & Planning Electricity Services 1 SWITCHING OFF DANGEROUS ELECTRICITY CIRCUITRY IN TERMS OF THE OCCUPATIONAL HEALTH AND SAFETY ACT (OHSA) VS CONSTRAINTS OF SWITCHING OFF SERVICES IN TERMS OF THE PROMOTION OF ADMINISTRATIVE JUSTICE ACT

More information

WEST BENGAL ELECTRICITY REGULATORY COMMISSION NOTIFICATION. NO. 46/WBERC Kolkata, the 31st May, 2010.

WEST BENGAL ELECTRICITY REGULATORY COMMISSION NOTIFICATION. NO. 46/WBERC Kolkata, the 31st May, 2010. WEST BENGAL ELECTRICITY REGULATORY COMMISSION NOTIFICATION NO. 46/WBERC Kolkata, the 31st May, 2010. In exercise of the powers conferred by sub-section (1) and clauses (za) and (zb) of subsection (2) of

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION KERALA ELECTRICITY SUPPLY CODE (THIRD AMENDMENT) REGULATIONS, 2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION KERALA ELECTRICITY SUPPLY CODE (THIRD AMENDMENT) REGULATIONS, 2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION KERALA ELECTRICITY SUPPLY CODE (THIRD AMENDMENT) REGULATIONS, 2007 STATEMENT OF OBJECT AND REASONS No.KSERC/III/SupplyCodeThirdAmendment/2007/Thiruvananthapuram/

More information

SHORT TITLE, SCOPE EXTENT AND COMMENCEMENT

SHORT TITLE, SCOPE EXTENT AND COMMENCEMENT ARUNACHAL PRADESH STATE ELECTRICITY REGULATORY COMMISSION ITANAGAR NOTIFICATION 1 st June, 2018 NO. APSERC/ NOTIFICATION/: In exercise of the powers conferred by Section 50 and clause (x) of sub-section

More information

The Safety of Employees (Electricity) Ordinance, 1956.

The Safety of Employees (Electricity) Ordinance, 1956. OF THE STATES (Made on the 18th April, 1956.) The Safety of Employees (Electricity) Ordinance, 1956. ARRANGEMENT OF SECTIONS 201 (No. XII- 1956) PART I Interpretation I. Interpretation. PART II Safety

More information

ASSAM ELECTRICITY REGULATORY COMMISSION

ASSAM ELECTRICITY REGULATORY COMMISSION ASSAM ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. AERC.280/2007/22 dated 20 th December, 2016, Draft Assam Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations,

More information

Electricity (Hazards from Trees) Regulations 2003

Electricity (Hazards from Trees) Regulations 2003 Reprint as at (SR 2003/375) Dame Sian Elias, Administrator of the Government Order in Council At Wellington this 15th day of December 2003 Present: Her Excellency the Administrator of the Government in

More information

S.I. No. of 2016 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2016

S.I. No. of 2016 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2016 S.I. No. of 2016 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2016 I, Paudie Coffey, Minister of State at the Department of the Environment, Community and Local Government, in exercise of the powers

More information

PUBLIC WORKS DEPARTMENT 1769 Georgetown Rd., Hudson, Ohio (330) office SOLAR INTERCONNECTION APPLICATION PACKET

PUBLIC WORKS DEPARTMENT 1769 Georgetown Rd., Hudson, Ohio (330) office SOLAR INTERCONNECTION APPLICATION PACKET PUBLIC WORKS DEPARTMENT 1769 Georgetown Rd., Hudson, Ohio 44236 (330) 342-1750 office SOLAR INTERCONNECTION APPLICATION PACKET CITY OF HUDSON HUDSON PUBLIC POWER Photovoltaic Interconnection Manual Index

More information

ORISSA ELECTRICITY REGULATORY COMMISSION DISTRIBUTION (CONDITIONS OF SUPPLY) CODE, 2004

ORISSA ELECTRICITY REGULATORY COMMISSION DISTRIBUTION (CONDITIONS OF SUPPLY) CODE, 2004 ORISSA ELECTRICITY REGULATORY COMMISSION DISTRIBUTION (CONDITIONS OF SUPPLY) CODE, 2004 2 THE ORISSA GAZETTE EXTRA ORDINARY PUBLISHED BY AUTHORITY No.710, CUTTACK, FRIDAY, MAY 28, 2004 / JAISTHA 7, 1926

More information

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 20 PAUSH 1929(S) (NO. PATNA 27) PATNA, FRIDAY, 10TH JANUARY 2008

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 20 PAUSH 1929(S) (NO. PATNA 27) PATNA, FRIDAY, 10TH JANUARY 2008 REGISTERED NO. PT-40 The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 20 PAUSH 1929(S) (NO. PATNA 27) PATNA, FRIDAY, 10TH JANUARY 2008 BIHAR ELECTRICITY [1] REGULATORY COMMISSION BIHAR

More information

POLE ATTACHMENT STANDARDS

POLE ATTACHMENT STANDARDS CPS ENERGY POLE ATTACHMENT STANDARDS Version 3.0 Issued Date: December 6, 2017 Revision: 3.0 Revision Date: December 6, 2017 Page: i Stakeholders, Management Approval and Document Control Internal Stakeholders

More information

NET METERING CONNECTION AGREEMENT

NET METERING CONNECTION AGREEMENT NET METERING CONNECTION AGREEMENT This Agreement is made and entered into at Mumbai on this day of 20 between,(i)... (name of consumer), having its premises at... and Consumer No. (hereinafter referred

More information

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004 ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004 2 THE ORISSA GAZETTE EXTRA ORDINARY PUBLISHED BY AUTHORITY NO.711, CUTTACK, FRIDAY, MAY 28, 2004 / JAISTHA

More information

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 687

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 687 CHAPTER 2017-136 Committee Substitute for Committee Substitute for House Bill No. 687 An act relating to utilities; amending s. 337.401, F.S.; authorizing the Department of Transportation and certain local

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION TAMIL NADU ELECTRICITY DISTRIBUTION CODE. (As amended up to )

TAMIL NADU ELECTRICITY REGULATORY COMMISSION TAMIL NADU ELECTRICITY DISTRIBUTION CODE. (As amended up to ) 85 TAMIL NADU ELECTRICITY REGULATORY COMMISSION TAMIL NADU ELECTRICITY DISTRIBUTION CODE (As amended up to 3--00) Notification No. TNERC/DC/8-3, dated, 07-0-00 WHEREAS the Tamil Nadu Electricity Regulatory

More information

UTTAR PRADESH ELECTRICITY SUPPLY CODE (DISTRIBUTION CODE)

UTTAR PRADESH ELECTRICITY SUPPLY CODE (DISTRIBUTION CODE) UTTAR PRADESH ELECTRICITY SUPPLY CODE- 2002 (DISTRIBUTION CODE) Deleted: DRAFT OF INDEX CHAPTER 1 Introduction 5 Electricity Supply Code Review Panel..5 CHAPTER 2 Definitions 7 Notes and Explanation 12

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KERC-2005/IV Dated, Thiruvananthapuram, December 14, 2005. KERALA ELECTRICITY SUPPLY CODE (FIRST AMENDMENT) REGULATIONS, 2005 STATEMENT

More information

Gujarat Electricity Regulatory Commission (GERC) Electricity Supply Code and Related Matters Regulations. Notification No.

Gujarat Electricity Regulatory Commission (GERC) Electricity Supply Code and Related Matters Regulations. Notification No. Gujarat Electricity Regulatory Commission (GERC) Electricity Supply Code and Related Matters Regulations Notification No. 4 of 2015 In exercise of powers conferred under Section 181 (2) (x) read with Section

More information

CITY OF HOUSTON ELECTRICAL CODE ADMINISTRATIVE CODE PROVISIONS for the NATIONAL ELECTRICAL CODE. Adopted by Ord. No. 2017

CITY OF HOUSTON ELECTRICAL CODE ADMINISTRATIVE CODE PROVISIONS for the NATIONAL ELECTRICAL CODE. Adopted by Ord. No. 2017 CITY OF HOUSTON ELECTRICAL CODE 2017 ADMINISTRATIVE CODE PROVISIONS for the NATIONAL ELECTRICAL CODE Adopted by Ord. No. 2017 Effective September 1, 2017 2017 Houston Electrical Code CONTENTS Page Chapter

More information

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED COMPLAINT HANDLING PROCEDURE OF DISTRIBUTION LICENSEE (APPROVED BY OERC) 1. This "Complaint Handling Procedure relating to Distribution Activity (Complaint

More information

SP MANWEB PLC - GENERAL BILATERAL TERMS AND CONDITIONS FOR ADOPTION OF CONTESTABLE WORKS PART 1 - GENERAL TERMS AND CONDITIONS

SP MANWEB PLC - GENERAL BILATERAL TERMS AND CONDITIONS FOR ADOPTION OF CONTESTABLE WORKS PART 1 - GENERAL TERMS AND CONDITIONS 1. DEFINITIONS PART 1 - GENERAL TERMS AND CONDITIONS 1.1 The following words and expressions shall (except to the extent that the context otherwise requires) have the meanings hereby assigned to them:-

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Energy Networks Association Competition in Connections Code of Practice July 2015 Competition in Connections Code of Practice Produced in accordance with standard condition 52

More information

Solar Isolator Range. Bright solutions

Solar Isolator Range. Bright solutions Solar Isolator Range Bright solutions The World s Finest Contents Page ON-OFF Switches for Panel Mounting 4 ON-OFF Switches for Single Hole Mounting 4 ON-OFF Switches for Base Mounting with Door Clutch

More information

KERALA ELECTRICITY SUPPLY CODE 2012

KERALA ELECTRICITY SUPPLY CODE 2012 KERALA ELECTRICITY SUPPLY CODE 2012 (DRAFT) Kerala Electricity Supply Code 2012 Final Draft 1 TABLE OF CONTENTS 1. INTRODUCTION... 6 2. SHORT TITLE, SCOPE, EXTENT AND COMMENCEMENT... 7 3. DEFINITIONS AND

More information

INTERVENTION, DIRECTION AND CLAUSE INSTRUCTIONS

INTERVENTION, DIRECTION AND CLAUSE INSTRUCTIONS INTERVENTION, DIRECTION AND CLAUSE 4.8.9 INSTRUCTIONS PREPARED BY: PROCEDURE TYPE: DOCUMENT REFERENCE: FINAL APPROVER: Real Time Operations System Operating Procedure SO_OP_3707 Damien Sanford DOC. VERSION:

More information

5 Year Limited Warranty

5 Year Limited Warranty Power. On Your Terms. 5 Year Limited Warranty PHI 1.3 TM 60A SIMPLIPHI POWER, INC. REV033018 THIS LIMITED WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS. YOU MAY HAVE FURTHER LEGAL RIGHTS AND REMEDIES UNDER

More information

SCHEDULE 2 - EXHIBIT 2 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE

SCHEDULE 2 - EXHIBIT 2 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE SCHEDULE 2 - EXHIBIT 2 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE BILATERAL EMBEDDED GENERATION AGREEMENT [USE OF SYSTEM FOR AN EMBEDDED

More information

PDF Version. ELECTRICAL SAFETY ACT [REPEALED] published by Quickscribe Services Ltd.

PDF Version. ELECTRICAL SAFETY ACT [REPEALED] published by Quickscribe Services Ltd. PDF Version [Printer-friendly - ideal for printing entire document] ELECTRICAL SAFETY ACT [REPEALED] published by DISCLAIMER: These documents are provided for private study or research purposes only. Every

More information

(Use this form to file a local law with the Secretary of State.)

(Use this form to file a local law with the Secretary of State.) Local Law Filing New York State Department of State Division of Corporations, Sate Records and Uniform Commercial Code One Commerce Plaza, 99 Washington Avenue Albany, NY 12231 www.dos.ny.gov/corps (Use

More information

Application Form for New Connection

Application Form for New Connection For office use only Name of Division Name of Sub-division Application Number Date of receipt Application Form for New Connection Annexure 1 1 Applicant s Name (In Capital letters) 2 Address at which supply

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. 1824/CT/KSERC/2012 Dated, Thiruvananthapuram 10 th September, 2013 Kerala State Electricity Regulatory Commission (Connectivity and Intrastate

More information

S.I. No. of 2018 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2018

S.I. No. of 2018 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2018 S.I. No. of 2018 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2018 I, Damien English, Minister of State at the Department of Housing, Planning and Local Government, in exercise of the powers conferred

More information

ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD. Copyright 2009 All rights reserved.

ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD. Copyright 2009 All rights reserved. ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD Copyright 2009 All rights reserved. ISOLATED OPERATIONS LO/TO WORK STANDARD ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD Copyright

More information

Electricity Rules, 1937

Electricity Rules, 1937 Electricity Rules, 1937 27th March 1937 Notification No. S. 601, In exercise of the powers conferred by section 37 of the Electricity Act, 1910 (IX of 1910), and in supersession of the Electricity Rules,

More information

Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016

Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016 Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION In exercise of powers conferred by Section 181 read with relevant provisions

More information

RULES OF TENNESSEE PUBLIC UTILITY COMMISSION CHAPTER REGULATIONS FOR TELEPHONE COMPANIES TABLE OF CONTENTS

RULES OF TENNESSEE PUBLIC UTILITY COMMISSION CHAPTER REGULATIONS FOR TELEPHONE COMPANIES TABLE OF CONTENTS RULES OF TENNESSEE PUBLIC UTILITY COMMISSION CHAPTER 1220-04-02 REGULATIONS FOR TELEPHONE COMPANIES TABLE OF CONTENTS 1220-04-02-.01 Repealed 1220-04-02-.02 Repealed 1220-04-02-.03 Definitions 1220-04-02-.04

More information

POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only)

POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only) JD(Tariff) Page 1 9/20/2006 POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only) THIS AGREEMENT made this day of,200 at between M/s.being a Company registered

More information

Wyandotte Municipal Services

Wyandotte Municipal Services Electric, Steam, Water Cable Television and High Speed Internet Service since 1889 An Equal Opportunity Employer Wyandotte Municipal Services Expedited Generator Interconnection Requirements INTRODUCTION

More information

SECTION #6 - REFERENCE #2. Standard Toronto Hydro Connection Agreements Terms of Conditions

SECTION #6 - REFERENCE #2. Standard Toronto Hydro Connection Agreements Terms of Conditions SECTION #6 - REFERENCE #2 Standard Toronto Hydro Connection Agreements Terms of Conditions : o Toronto Hydro-Electric System Limited Connection Agreement Schedule B1: o Micro-Embedded Generation Facility

More information

CITY OF MUSKEGO CHAPTER 15 - ELECTRICAL CODE (Ord. # )

CITY OF MUSKEGO CHAPTER 15 - ELECTRICAL CODE (Ord. # ) CITY OF MUSKEGO CHAPTER 15 - ELECTRICAL CODE (Ord. #935-07-03-97) 15.01 OBJECT AND PURPOSE... 1 15.02 SCOPE... 1 15.021 APPLICABILITY... 1 15.025 CODE ADOPTED... 2 15.03 ENFORCEMENT... 2 15.04 INTERPRETATIONS...

More information

amending the Zoning Law of the Town of Livingston in relation to solar energy uses

amending the Zoning Law of the Town of Livingston in relation to solar energy uses New York State Department of State 41 State Street, Albany, NY 12231 Local Law Filing (Use this form to file a local law with the Secretary of State.) Text of law should be given as amended. Do not include

More information

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO) THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO) (NO. 4/99) (Issued under OERC Order Dt. 31.03.99 in Case No. 25/98) Western Electricity Supply Company of Orissa Limited Registered office:

More information

Agreement for H.V./ L.V. Consumer.

Agreement for H.V./ L.V. Consumer. As per the Maharashtra Electricity Regulatory Commission (Electricity Supply Code and other Conditions of Supply) Regulations, 2005 and Electricity Act 2003. Agreement for H.V./ L.V. Consumer. Articles

More information

FRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN

FRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN FRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN WESTERN POWER DISTRIBUTION (SOUTH WEST) PLC, WESTERN POWER DISTRIBUTION (SOUTH

More information

Water Compliance Reporting Manual

Water Compliance Reporting Manual Water Compliance Reporting Manual Water Services Act 01 October 017 ME_111781660_1 (W007) Economic Regulation Authority 017 This document is available from the Economic Regulation Authority s website at

More information

ELECTRICITY REGULATIONS 1994

ELECTRICITY REGULATIONS 1994 ELECTRICITY REGULATIONS 1994 IN exercise of the powers conferred by section 53 of the Electricity Supply Act 1990 [Act 447], the Minister makes the following regulations: PART 1 - PRELIMINARY Regulation

More information

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS Ontario Provincial Standards Unit 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 Telephone: 905-704-2258 Fax: 905-704-2051 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS

More information

Meeting Time: 3:00pm, Wednesday, October 23, Future Meetings. New Members Transformer Standards Activity

Meeting Time: 3:00pm, Wednesday, October 23, Future Meetings. New Members Transformer Standards Activity 10.2 Distribution Transformer Subcommittee Report J. Edward Smith - Chairman (edsmith@h-jenterprises.com) Meeting Time: 3:00pm, Wednesday, October 23, 2002 40 Total 23 Members 16 Guests 1 Guest Requesting

More information

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLARKSVILLE, TENNESSEE:

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLARKSVILLE, TENNESSEE: ORDINANCE 64-2016-17 AN ORDINANCE AMENDING THE OFFICIAL CODE OF THE CITY OF CLARKSVILLE, TITLE 4 (BUILDING, UTILITY, AND HOUSING CODES) RELATIVE TO ADOPTION OF UPDATED CODES OF THE INTERNATIONAL CODE COUNCIL

More information

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA N$8.40 WINDHOEK - 16 February 2016 No. 5949 CONTENTS Page GENERAL NOTICE No. 46 Electricity Control Board: Economic Rules: Electricity Act, 2007... 1 General

More information

THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7,

THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7, THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7, 2004 761 NOTIFICATION The 22nd December, 2003 No. AERC. 65/2003/101. In exercise of the power conferred on it by Section 181 read with Sub-section 5 of Section

More information

Agreement File Reference PRCN024X - Unmetered Connection Agreement - Long Form doc

Agreement File Reference PRCN024X - Unmetered Connection Agreement - Long Form doc AGREEMENT FOR UNMETERED CONNECTION TO [EASTERN POWER NETWORKS PLC s LONDON POWER NETWORKS PLC s SOUTH EASTERN POWER NETWORKS PLC s UK POWER NETWORKS (IDNO) LTD s] DISTRIBUTION SYSTEM Income Services Manager

More information

WASTE TREATMENT SYSTEMS OWNER S AERATOR MANUAL

WASTE TREATMENT SYSTEMS OWNER S AERATOR MANUAL WASTE TREATMENT SYSTEMS OWNER S AERATOR MANUAL NOTE: Thank you for purchasing Consolidated Treatment Systems O.E.M. replacement aerator for your Multi- Flo or Enviro-Guard wastewater treatment system.

More information

2012 District of Columbia Code Chapter 27 Underground Facilities Protection (Section to Section ) Section Definitions Section

2012 District of Columbia Code Chapter 27 Underground Facilities Protection (Section to Section ) Section Definitions Section Chapter 27 Underground Facilities Protection (Section 34-2701 to Section 34-2709) Section 34-2701 Definitions Section 34-2702 Formation and operation of 1-call center Section 34-2703 Availability of permit

More information

M E M O R A N D U M. NFPA 99 Second Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

M E M O R A N D U M. NFPA 99 Second Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Electrical Systems

More information

AA4 submission to the Economic Regulation Authority No. 2: Western Power s proposed standard electricity transfer access contract 8 December 2017

AA4 submission to the Economic Regulation Authority No. 2: Western Power s proposed standard electricity transfer access contract 8 December 2017 AA4 submission to the Economic Regulation Authority No. 2: Western Power s proposed standard electricity transfer access contract 8 December 2017 DMS# 15104172 Page 1 of 24 Contents A. EXECUTIVE SUMMARY...

More information

West Bengal State Electricity Distribution Company Limited

West Bengal State Electricity Distribution Company Limited West Bengal State Electricity Distribution Company Limited C:\ (SOP) regulation 2010.docAnnexure A1 Application form to be used for transfer of service/meter in case of change of ownership or occupancy

More information

Sponsor: Councilwoman Janet Venecz Petitioner: Hammond Plan Commission ORDINANCE NO. 9364

Sponsor: Councilwoman Janet Venecz Petitioner: Hammond Plan Commission ORDINANCE NO. 9364 Sponsor: Councilwoman Janet Venecz Petitioner: Hammond Plan Commission ORDINANCE NO. 9364 AN ORDINANCE AMENDING ORDINANCE NO. 8514, BEING: AN ORDINANCE ESTABLISHING A ZONING PLAN FOR THE CITY OF HAMMOND

More information

DEPARTMENT OF LABOUR. Government Notice. R: October Electrical Installation Regulations, 1992

DEPARTMENT OF LABOUR. Government Notice. R: October Electrical Installation Regulations, 1992 DEPARTMENT OF LABOUR Government Notice. R: 2920 23 October 1992 Electrical Installation Regulations, 1992 The Minister of Manpower has, under section 35 of the Machinery and Occupational Safety Act, 1983

More information