BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW. Petition No.: 960/2014

Similar documents
ORDER (Hearing on & )

Respondents. Present in the Hearing: Respondents

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

Case No. 22 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

Case No. 17 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member. Reliance Infrastructure Ltd., Santacruz (E).

No. HPSEBL/CE(SO&P)/IS-60A(Vol-IV)/ Dated:

Petition No 973 of 2014 and 1036,1037,1038,1039 &1040 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012)

BIHAR ELECTRICITY REGULATORY COMMISSION

THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW

In the matter of: M/s Rauzagaon Chini Mills (A unit of Balrampur Chini Mills Ltd.) Rauzagaon , District Barabanki (U.P.

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

2. Chief Engineer (PPA) UP Power Corporation Limited 14 th Floor, Shakti Bhawan Ext. 14 Ashok Marg, Lucknow.Respondent

Petition No 768 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order :

UTTARAKHAND POWER CORPORATION LTD. BID DOCUMENT FOR PURCHASE OF POWER COMMERCIAL AND GENERAL CONDITIONS

Order on. Petition No. 58/2013

No. HPSEBL/CE(SO&P)/IS-60A(Vol-II)/ As per list attached.

Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016

Shortage / Surplus Power available with TATA POWER -DDL

Shortage / Surplus Power available with TATA POWER -DDL

ASSAM ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018 NOTIFICATION

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

Distribution List (WRLDC Letter No. WRLDC/MO/RPS/PG-EPMPL/2018) 1. Executive Director, POWER GRID WRTS-1 2. Executive Director, POWER GRID WRTS-2 3.

Case No.139 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member

Shortage / Surplus Power available with TATA POWER -DDL

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW

Index. 1. Introduction: Scope of the Guidelines Preparation for inviting bids Tariff Structure 6. 5.

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION

Order on. Petition No. 38/2013

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

Case No. 7 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member

PROCUREMENT OF RENEWABLE (Solar) POWER ON SHORT-TERM BASIS THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS INVITATION FOR BIDS

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER

Suo-Motu Petition No. 2/2018

Petition No.881 of 2013, 952 of 2014, 1043 of 2015, 1092& 1093 of 2016 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

STANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM. Under Case 1 Bidding Procedure THROUGH

Case No. 64 of Shri. V. P. Raja, Chairman Shri. Vijay L. Sonavane, Member ORDER

Draft Supplementary Power Purchase Agreement

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014

Terms and conditions for supply of 50 MW and part thereof on Short Term basis from December 2007 to May 2008

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX

Request for Proposal (RfP) Notice

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. Investigate and to take appropriate action against M/s Torrent and further to cancel the

Case No. 02 of Shri V. P. Raja, Chairman Shri S. B. Kulkarni, Member Shri V. L. Sonavane, Member

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Notice dated U/s130 of Electricity Act2003.

Case No. 295 of Coram. Anand B. Kulkarni, Chairperson Mukesh Khullar, Member. Adani Power Maharashtra Limited (APML)

BSES Rajdhani Power Limited. Bid Document for Banking of Power by BRPL. Banking of Power for to Through: Competitive Bidding

Case No. 167 of Coram. Smt. Chandra Iyengar, Chairperson Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 211/MP/2012

Request for Proposal Document. For Selection of Developer for Setting up of

Case No. 61 of In the matter of. Petition of Wardha Power Company Ltd. for Review of Order dated 17 January, 2014 in Case No.

BEFORE THE H.P. ELECTRICITY REGULATORY COMMISSION AT SHIMLA

AGREEMENT FOR SALE OF POWER. THIS AGREEMENT FOR SALE OF POWER is made and executed at on the day of, 2017 ( Agreement ) BY AND BETWEEN

Case No. 166 of The Tata Power Co. Ltd. (Generation) [TPC-G] Brihanmumbai Electric Supply & Transport Undertaking (BEST)...

3. M. P. Poorv Kshetra Vidyut Vitaran Co. Ltd. - Respondents Shakti Bhawan, Rampur, Jabalpur

Case No. 224 of Coram. Shri. I.M. Bohari, Member Shri. Mukesh Khullar, Member. M/s. Vidarbha Industries Power Ltd (VIPL-G)

(A Govt. of Maharashtra Undertaking) - CIN: U40109MH2005SGC153645

765 kv S/C Mainpuri-Hapur & Mainpuri-Greater Noida Line with 765 kv/400 kv AIS at Hapur & Greater Noida and Associated Schemes/Work

CHAPTER I: PRELIMINARY

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 119/MP/2013. Date of Hearing: Date of Order :

Maharashtra State Electricity Distribution Company Ltd. TENDER DOCUMENT FOR BANKING OF POWER ON FIRM BASIS

Request for Proposal (RfP) Notice

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX

Purchased from. Scheduled Volume (MUs) Name of the Seller

BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA FEES, FINES AND CHARGES REGULATIONS,

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

MODEL POWER PURCHASE AGREEMENT BETWEEN JAMMU AND KASHMIR POWER DEVELOPMENT DEPARTMENT AND. M/s (IPP)

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Notification

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)

IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO OF 2018 VERSUS WITH CIVIL APPEAL NO OF 2018 JUDGMENT

Sangeeta Verma Secretary. No. Secy/ UPERC/Supply Code/ Lucknow: Dated Sir,

Purchased from. Scheduled Volume (MUs) Name of the Seller

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

Addendum-3, dated 01 March 2018 for the recalled tender. This addendum shall be the part of the RFP, Draft PPA, ISA and LSA.

Case No. 135 of Shri Vijay L. Sonavane, Member Smt. Chandra Iyengar, Member. (1) M/s B.S.Channabasappa & Sons...Petitioner 1

Before the Madhya Pradesh Electricity Regulatory Commission, Bhopal

DRAFT STANDARD POWER PURCHASE AGREEMENT FOR PROCUREMENT OF.. MW SOLAR POWER ON LONG TERM BASIS. Between... [ Insert Name of Solar Power Developer]

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI

MYT PETITION FOR THIRD CONTROL PERIOD FY TO FY

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/ ) QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member.

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

ORDER (Date of hearing 24 th November, 2012) (Date of order 10 th December, 2012)

SEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004

NEW DELHI. Shri M. Deena. to the National Load Despatch e Energy Certificates to

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC)

THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.1258/2017, 1259/2017, 1260/2017, 1261/2017 & 1262/2017

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA NOTIFICATION Shimla, the 21 st September, 2015

SHARE PURCHASE AGREEMENT. This SHARE PURCHASE AGREEMENT ( Agreement ) is made on this day of.., 20..,

Case No. 94 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member

REQUEST FOR SELECTION (RfS) DOCUMENT FOR PROCUREMENT OF 50 MW POWER GENERATED FROM BIOMASS PROJECTS IN MAHARASHTRA ISSUED BY

Bhopal dated 6th August, 2004

Transcription:

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition No.: 960/2014 IN THE MATTER OF: Petition under Section 63 of the Electricity Act, 2003 read with Clause 10.4 of the Guidelines for short-term (i.e. for a period less than or equals to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process issued by Ministry of Power on 15 th May, 2012, for adoption of tariff for purchase of electricity by Noida Power Company Limited, a licensee of the Hon ble Commission, from the Prospective/Successful Bidders pursuant to tariff determined through a transparent and Competitive Bidding Process adopted in accordance with the Guidelines. IN THE MATTER OF: Noida Power Company Limited (NPCL), Greater Noida.. Petitioner And Present 1. ShriDesh Deepak Verma, Chairman 2. Smt.Meenakshi Singh, Member 3. Shri I. B. Pandey, Member ORDER (Date of Hearing 13 th August, 2014) Apetition has been filed by NPCL, Greater Noida in the matter of Short Term Power Purchasefor the period from July, 2014 to September, 2014 U/S 63 of the EA, 2003 read with Cl. 10.4 of the

Guidelines for Short-term (i.e. for a period less than or equals to one year) Procurement of Power by Distribution Licensees notified by MoP on 15 th March, 2012. In the hearing held on 13 th August, 2014, Mr. R. C. Agarwala, MD & CEO, Mr.Rajiv Goyal, GM- Projects, Mr.SomnathGanguly, GM-Ops, Mr. Manoj Jain, CFO, Mr. Alok Sharma, Manager-Legal & Mr. A. K. Arora, Resident Manager of NPCL were present. The facts mentioned in the petition briefly are as under: The Petitioner is a company incorporated under the provisions of the Companies Act, 1956 with Registered Office at Commercial Complex, H-Block, Alpha II Sector, Greater Noida, Uttar Pradesh and is engaged in the business of distribution and retail supply of electricity in the Greater Noida Area, Uttar Pradesh. Petitioner submitted that the Commission in Tariff Order dated 31 st May, 2013 had directed the Petitioner to procure short-term power through competitive bidding process under the Guidelines for Short-term (i.e. for a period less than or equals to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process (hereinafter referred to as the Guidelines ) dated 15 th May, 2012 issued by the Ministry of Power, Government of India. Petitioner submitted that it has filed its ARR Petition for FY 2014-15 on 28 th November 2013, wherein complete details of power procurement vis-à-vis demand and other distribution expenses were provided for the approval of the Commission. Petitioner submitted that in the ARR Petition, it had stated that as the Long term PPA executed between the Petitioner and the Essar Power (Jharkhand) Limited (hereinafter referred to as EPJL ) through competitive bidding process had been terminated by the Petitioner on 22 nd August, 2013 for not complying with the provisions of the PPA and that the said issue was subjudice before the Commission (Petition No.903/2013), therefore, the Petitioner will procure power for FY 2014-15 on Short-term/ Medium-term/ Long-term basis through Competitive bidding, as the case may be. Petitioner submitted, that in view of the above in January, 2014 it conducted a Short-term Competitive Bidding in terms with the Guidelines issued by the Ministry of Power on 15 th May, 2012 for a period of three months i.e. (April, 2014 to June 2014) for procuring upto 150 MW power. In pursuance to the said bidding, Power Purchase Agreements were signed between the Petitioner and the successful bidders. Subsequently a Petition for adoption of tariff under Section 63 of the

Electricity Act, 2013 and provisions of the Guidelines was filed before the Hon ble Commission on 3 rd March, 2014 and the Commission adopted the tariff vide its Order dated 24 th March, 2014. Petitioner submitted that meanwhile, PaschimanchalVidhyutVitran Nigam Ltd. (PVVNL)/Uttar Pradesh Power Corporation Ltd. (UPPCL) vide its letter dated 4 th February, 2014 informed the Petitioner that the 45MW power supplied by them would be stopped w.e.f. 12 th February, 2014 in the absence of any valid Power Purchase Agreement. Hence, the Petitioner made alternate arrangements to substitute the said 45 MW power. Petitioner submitted that the Commission vide its Order dated 30 th May, 2014 disposed of the Petition No. 903/2013 filed by EPJL against the termination of PPA dated 9 th May, 2012 by the Petitioner, wherein the Commission directed the Petitioner to restore the encashed Performance Bank Guarantee of Rs. 72 Crore to EPJL and therefore brought the parties to their former position. Thereby, the Commission allowed the parties to rethink over the issues in light of the facts under the provisions of the PPA. Petitioner submitted that in view of the above, EPJL s earlier letters seeking extension of Scheduled CoD by 18 months and EPJL s additional affidavit regarding supply of Power from Essar Power M.P. Limited (EPMPL) and also affidavit submitted by EPMPL before the Commission in the said Petition No. 903 of 2013, it is evident that no long term power is expected to be received from EPJL or any alternate source in near future. Petitioner submitted that in the above backdrop and to meet the growing power demand of the consumers of its licensed area, the Petitioner published a notice in Times of India and The Economic Times on 2 nd June, 2014, inviting Bids from Generators, Captive Power Plants, Licensed Power Traders, State Utilities and Distribution Licensees from all over India for procurement of 230 MW power on Short Term basis for meeting its power requirements from July 2014 to September 2014. Copies of the Newspaper clippings have also been submitted by the Petitioner along with the Petition.The last date for submission of bids was 9 th June, 2014 for both the non-financial and the financial bids. A Request for Proposal (hereinafter referred to as RfP ) was prepared detailing all the terms and conditions for supply of power and was duly uploaded on the official website of the Petitioner i.e. www.noidapower.com. Petitioner has also submitted a copy of the RfP. As per the RfP document, the Petitioner sought the power procurement on the firm basis as shown in the table below:

Table 1: Power Procurement Quantum as per RfP Period Duration (Hrs) Quantum (MW) 01.07.2014 to 30.09.2014 RTC (00:00 24:00) 180 Peak (19:00-24:00) 50 Note: 1) With minimum bid capacity of 10 MW 2) With maximum capacity of 75 MW from a single generating source. Petitioner submitted that it intended to procure up to 230 MW power (approx.) under two time blocks i.e. RTC and Peak, at the Delivery Point being the Petitioner s Periphery i.e. Interconnection of Petitioner s system with UPPTCL, for a period of 3 months from the Scheduled Delivery Date of 1 st July, 2014 in accordance with the terms of the RfP Document. Petitioner submitted that in pursuance to the bidding process the Petitioner formed a Bid Monitoring Committee consisting of the employees of the Petitioner Company and the Standing Committee which consisted of the employees of the Petitioner Company and an External Independent Member namelyshri. HaritAgarwal (Chartered Accountant, Member of Executive Committee of Northern India Regional Committee of Institute of Chartered Accountants of India). Petitioner submitted that in response to aforesaid competitive bidding process it received ten (10) proposals / bids on the last date of bid submission i.e. 9 th June, 2014. The names of all the ten bidders are mentioned herein below: Table 2: Name of the Bidders participated in the bidding process S.No. Name of the Bidder 1 M/s Manikaran Power Limited (MPL) 2 M/s GMR Energy Trading Limited (GMRETL) M/s Adani Enterprises Limited (AEL) 3 4 M/s Tata Power Trading Company Limited (TPTCL)

5 M/s PTC India Limited (PTC) 6 M/s Shree Cement Limited (SCL) 7 M/s National Energy Trading & Services Limited (NETS) 8 M/s NTPC VidyutVyapar Nigam Limited (NVVNL) 9 M/s Knowledge Infrastructure Systems (P) Limited (KISPL) 10 M/s JSW Power Trading Limited (JSWPTL) The petitioner submitted that the Non-Financial Bids were opened and evaluated by the Bid Monitoring Committee and were found in order. The Bid Monitoring Committee proceeded to open the Financial Bids of all the bidders in presence of representatives of the Bidders and the information namely quoted tariff at delivery point, trading margin (if any) etc. quoted by each bidder was also read out to all Bidders at the time of opening of Financial Bids. The Bid Monitoring Committee also tabulated the results of the bids and submitted the same to the Standing Committee for evaluation and finalization. The petitioner submitted that the Bidders in their bids quoted the Tariff at Delivery Point in the prescribed format as set out in Annexure-III of the RfP. Based on the quoted Tariff provided by the Bidders the Delivered Tariff at Petitioner s Bus was calculated. Petitioner submitted that the following factors were considered for the purpose of bid evaluation and computation of landed power purchase cost at the Petitioner s Bus: Applicable POC rates for Short-term slab as notified by CERC vide its Order No. L- 1/44/2013- CERC dated 31 st December, 2013. Transmission Charges of U.P. as Rs. 50/- per MWh. Applicable Open Access charges namely RLDC / SLDC Operation Charges and Application Fees as notified by CERC. The Transmission Losses (POC losses) as notified by NLDC for the period commencing from 13 th January, 2014 to 19 th January, 2014 to be added for the evaluation purpose. The Transmission Losses (POC losses) as notified by NLDC for the period commencing from 2 nd June, 2014 to 8 th June, 2014 shall be added for the evaluation purpose. U.P. State Transmission Losses as approved by UPERC, i.e. 3.67%.

Petitioner submitted that on the request of the bidders, the Petitioner also clarified to them that any changes in transmission charges / losses applicable for the State of U.P. will be included in bidding rates and paid according to rates computed with new tariff of transmission charges and losses as and when the same are being approved by the Commission. After examining the landed cost of the bidders the Standing Committee observed that low rates are offered by those bidders who are situated in Western Region. Petitioner submitted that during various meetings at NRLDC, all Northern States have been appraised about the availability of transmission corridor and upcoming transmission capacities. It has been further clarified that during the summer season the transmission capacity shall be restricted as per the revised Inter-regional schedule of NLDC. Petitioner submitted that in the TTC assessment report as published by NLDC for July, 2014 to September, 2014, the margin availability for STOA for WR-NR link is given as Nil. Therefore, the power scheduled from the sources situated in Western Region cannot be materialized in substance even if the scheduling is done on Advance basis. Petitioner also submitted a copy of the above report along with the Petition. Petitioner submitted that the Standing Committee also observed that, at present, UPSLDC is not allowing to off-take firm power to the Petitioner. Therefore, scheduling can only be done on Dayahead basis which has least priority in terms of allocation of transmission corridor as per the CERC (Open Access in Inter-state Transmission) Regulations, 2008 and its subsequent amendments thereof. The Petitioner has decided to challenge the unilateral decision of UPSLDC and UPPTCL not allowing Open Access to the Petitioner on Firm Basis before the Commission for directions to them. The above matter in Petition No. 934 / 2014 is subjudice before the Commission. Therefore, till the final disposal of above petition or directions in this regard by Commission, the Petitioner cannot source power on firm basis. Even, the bidders also showed reluctance to supply power on day-ahead basis. Petitioner submitted that in the absence of firm allocation of transmission corridor, the Standing Committee decided to evaluate bids submitted by Northern Region generating sources which has maximum chances to get the transmission corridor from the Regional Load Dispatch Centre, even if they are scheduled on Day-ahead basis, to secure the interest of the consumers of Greater Noida area. Petitioner submitted that subsequently, the two bidders, namely, M/s Shree Cement Limited (SCL) and M/s Manikaran Power Limited (MPL) offered to lower their rates from July, 2014 to September,

2014. The SCL vide its letter dated 12 th June, 2014 has offered to lower its rate to Rs. 3.80 per kwh for the month of July, 2014 and to Rs. 3.865 per kwh for the months of August and September, 2014. Similarly, the MPL vide its letter dated 17 th June, 2014 has also offered to lower its rate to Rs. 3.73 per kwh for the month of July, 2014 and to Rs. 3.865 per kwh for the months of August and September, 2014. Petitioner also submitted the copy the above mentioned letters. In view of the downward revision of rates, the Standing Committee decided to evaluate the bids based on the revised offers received from SCL and MPL. The weighted average lowest quoted landed price at NPCL s Bus as submitted by the Petitioner are shown in the Table below: Table 3: Weighted average lowest quoted landed price at NPCL s Bus as submitted by the Petitioner Month Jul-14 Aug-14 Sep-14 Region of Generator NR NR NR RTC Power (MW) 240 250 195 Rate (Rs./kWh) 3.78 3.89 3.87 Weighted Avg. Rate (Rs. / kwh) 3.85 Petitioner submitted that the Standing Committee observed that the Weighted Average Price for procurement of power from July, 2014 to September, 2014 as tabulated above would be Rs. 3.85 per kwh which is, quite competitive as compared to the prices prevailing in the market and is the most reliable considering the entire power from NR region only. Petitioner submitted that it will be in the best interest of the consumers of Greater Noida and will enable the NPCL to provide reliable power supply to its consumers. Petitioner submitted that the Standing Committee further observed that the Landed cost at Petitioner s Bus can also be benchmarked with the CERC s Market Monitoring Cell Report of March, 2014. It has further been observed that the Weighted Average Price of the RTC power under bilateral segment from July, 2013 to September, 2013 was 4.28 per kwh, which is significantly higher than the proposed power purchase cost recommended by the Standing Committee. Petitioner submitted that, the Standing Committee further observed that on account of congestion in the interregional links and due to limited availability of generation capacity in the Northern Region, the Indian Energy Exchange (IEX) has also witnessed surge in spot market prices. The ongoing summer has recorded high temperatures which have crossed records of many years as stated in various news

items in print and electronic media and it is being predicted that the affected monsoon will result into low rains this year. Petitioner submitted that the Standing Committee also compared the rates discovered in other tenders including that of U.P. Power Corporation Limited (UPPCL). Petitioner submitted that it is evident from the below table that for the month of June, 2014 the rates discovered by UPPCL are on a higher side. Table 4: Rates discovered by UPPCL for the month of June, 2014 S. No. Bidder Region of Generator Quantum of Power (MW) Rate at UPPCL Periphery (Rs/kWh) Rates after U.P. State Charges & Losses (Rs/kWh) 1 NVVNL ER 100 4.08 4.29 2 GMR ER 100 4.08 4.29 3 Mittal ER 100 4.43 4.65 4 GMR NR 50 4.5 4.72 5 NVVNL ER 50 4.52 4.74 6 PTC ER 50 4.54 4.76 7 PTC ER 100 4.94 5.18 Petitioner submitted that the above rates as discovered by UPPCL are way higher than the tariff discovered from the NR Sources by NPCL in the present bidding process. Similarly, the rates discovered by Punjab State Power Corporation Limited (PSPCL) for the month of July, 2014 as quoted by NR sources and as shown in the Table below are also on a higher side: Table 5: Rates discovered by PSPCL for the month of July, 2014 S. No. Bidder Quantum of Power Rate at PSPCL Periphery (in MW ) (Rs/kWh) 1 SCL 100 4.03 2 TPTCL 50 4.15 3 PTC 200 4.15 4 PTC 250 4.21 5 PTC 60 4.25 6 PTC 75 4.25 7 PTC 75 4.40 8 SCL 25 4.45 9 GMRETL 200 4.70

Petitioner submitted that it may also be noted that due to high demand and fuel shortages by many States in the Northern India, even the gas based power plants are also operated to meet the demand. The increase in transmission capacity on WR-NR route is highly dependent upon execution of a major 765 kv transmission line projects specially Gwalior-Jaipur, which is expected to be commissioned only by end of March, 2015. These constraints have necessitated many States in NR to commence booking of power and therefore there is an increase of power rates in short-term market. Petitioner submitted that the Standing Committee has also observed that the Bulk Supply Tariff (BST) as proposed by UPPCL in its ARR petition for FY 2014-15 is Rs. 4.357 per kwh which is considerably higher than the rates discovered by the Petitioner in the present bidding process. Petitioner submitted that the Standing Committee also observed that the discovered weighted average rates of Rs. 3.85 per kwh from July, 2014 to September, 2014 is also lower than the Weighted Average Landed Cost of Rs. 3.92 per kwh of the Petitioner from July, 2013 to September, 2013 which was even net-off payment rebate. In view of the above observations and after considering all aspects in view to ensure stable supply to the consumers of Greater Noida Area at reasonable rates, the Standing Committee recommended the Petitioner to procure power from July, 2014 to September, 2014 as per following details: Table 6: Details of power procurement as recommended by the Standing Committee for July, 2014 Bidders Source Period to September, 2014 MW offered Rate at Delivery Point i.e. NPCL s Bus (Rs./kWh) MPL Jul 14 100 3.730 Jaypee -KW, H.P. Aug 14 60 3.865 Sep 14 100 3.865 SCL SCL, Jul 14 100 3.800 Rajasthan Aug 14-Sep'14 100 3.865 NETS LancoBudhil, Jul 14-Aug 14 40 3.870 H.P. Sep 14 20 3.870 PTC Govt. of H.P. Aug 14 50 4.000 Wt. Average Price 3.850 Petitioner also submitted a copy of the Standing Committee Report duly signed by all the members.

Petitioner submitted that Section 63 of the Electricity Act, 2003, states that the Commission shall adopt the tariff arrived through transparent process of bidding in accordance with guidelines issued by Central Government. The said provision is reproduced below: Section 63 (Determination of tariff by bidding process): Notwithstanding anything contained in section 62, the Appropriate Commission shall adopt the tariff if such tariff has been determined through transparent process of bidding in accordance with the guidelines issued by the Central Government. Petitioner submitted that the para 2 of Clause 10.4 of the Guidelines for Short-term Procurement of power dated 15 th May, 2012 issued by Ministry of Power, states as follows: In all other cases, the procurer(s) shall submit a petition to the Appropriate Commission for adoption of tariff within 2 days from the date of signing of PPA. Appropriate Commission should communicate the decision within 7 days from the date of submission of Petition Petitioner submitted that it has accordingly entered into Power Purchase Agreements with the successful bidders lastly on 20 th June, 2014. And in compliance to the above, it has filed the petition for adoption of tariff by the Commission. Petitioner requested the Commission to adopt the tariff as mentioned in above Table 6 arrived through the process of competitive bidding. In compliance to the terms of Article 6 of Part A- General of the Schedule of Fees of the UPERC (Fees and Fines) Regulations, 2010, the petitioner has also submitted a demand draft of Rs. 10,000/- bearing No. 232406 dated 20 th June, 2014 issued by ICICI Bank, Greater Noida for the purposes of fees for filing the Petition. Commission s Analysis: It has been observed that the Petitioner has initiated the power procurement process for procurement of Short-term power in accordance with the Guidelines for Short-term Procurement of Power by Distribution Licensees through Tariff based Bidding process, notified by the Ministry of Power on 15 th May, 2012 which is based on the direction of the Commission issued in its Tariff Order dated 31 st May, 2013. As per the submissions of the Petitioner which also includes the supporting documents, such as copy of RfP document, copy of clipping of the advertisement, copy of the report of Standing Committee,

Copy of request letters from other bidders, TTC assessment Report from July to September, 2014, it seems that the Petitioner has followed the bidding process as per the guidelines issued by the Central Government. It has also been observed that an appropriate comparison has also been made with the prevailing or estimated tariff in the procurement period before finalizing the bidders. As the power procurement has been done as per guidelines of the Central Government, hence the power procurement quantum during July, 2014 to September, 2014 along with the derived Tariff (as per Table 6)is approved by the Commission. The above will also be taken into consideration while finalising the ARR / Tariff Petition for FY 2014-15. The Petition is disposed of. (I. B. Pandey) (Meenakshi Singh) (Desh Deepak Verma) Member Member Chairman Place: Lucknow Date: August, 2014