1.0 Introductions: All in attendance were self-introduced. In attendance were:

Dry Type Transformers Subcommittee Unapproved Meeting Minutes March 22, 2006 Costa Mesa, California

Dry Type Transformers Subcommittee Unapproved Meeting Minutes October 17, 2007 Minneapolis, Minnesota

Dry Type Transformers Subcommittee Unapproved Meeting Minutes March 14, 2007 Dallas, Texas

3.0 Chapter Status Report

Insulation Life Subcommittee - Unapproved Meeting Minutes November 2, 2011 Boston, MA

Capacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2018 Joint Technical Committee Meeting Minutes Jacksonville, Florida

Revision to Emerald Book IEEE Std May 6, IEEE P1100 Working Group Minutes Page - 1

Capacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2017 Joint Technical Committee Meeting Minutes New Orleans, Louisiana

Revision to Emerald Book IEEE Std October 7, IEEE P1100 Working Group Minutes Page - 1

The meeting was called to order at 1:30p by Chris Searles, Chair of the EESB Committee.

IEEE PES STATIONARY BATTERY COMMITTEE

MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE Nashville, TN March 14, 2012

Capacitor Subcommittee of the Transmission and Distribution Committee 2014 IEEE PES General Meeting Minutes National Harbor, MD

Board Meeting 05/29/2002, Wednesday San Diego, CA. Regency Room, Horton Grand. Meeting called to order by President Roger Ohman, Jr.

AAEA Extension Section 1999 Minutes

The following guests requested membership. Since the document is in ballot, no new WG members will be accepted.

MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE-PES TRANSFORMER COMMITTEE Munich, DE - March 31, 2013

IEEE Power and Energy Society Entity Annual Report

The Power Transformers Subcommittee met on Wednesday, March 20 th, 2013 at 1:30 p.m. with sufficient attendance to reach a quorum.

Subcommittee Meeting Wednesday March 16, 2005 at 3:00pm 33 Members 12 Guests 1 Guest Requesting Membership 45 TOTAL

The attendees introduced themselves and reported affiliations.

IEEE P Recommended Practice for Motor Protection in Industrial and Commercial Power Systems

IEC/IEEE Dual Logo Program

Guide to Participation in the ASA Standards Program. For Current and Future Organizational Members of

FLORIDA 911 COORDINATORS ASSOCIATION, INC. BY-LAWS

EXECUTIVE LEADERSHIP COMMITTEE TELECONFERENCE

PCPA EXECUTIVE BOARD MEETING September 15, 2000 Messiah College, Grantham, PA

Meeting Minutes. Attendees:

By-laws for Marlborough Special Education Parent Advisory Council (M-SEPAC)

4.0 CHAIR S REPORT SUSAN MCNELLY

Meeting Minutes. Attendees:

IEC/IEEE Dual Logo Agreement Joint Development. Jodi Haasz International Affairs Senior Manager 6 November 2017

Technical Committee No. 3 Information structures, documentation and graphical symbols

IEEE PES STATIONARY BATTERY COMMITTEE

Jan-Henrik Tiedemann IEC Community Manager. SESKO-IEC Training Workshop Helsinki, September International Electrotechnical Commission

Wallcovering Installers Association Board of Directors March 9 & 10, 2015 New Orleans, LA

By-Laws of the National Honor Society Central High School Chapter

Singh Matharu Kirk Melson Jim Parello Vish Patel Ted Riccio Rebecca Steinman Yvonne Williams (Vice Chair/Secretary)

Meeting Time: 3:00pm, Wednesday, October 23, Future Meetings. New Members Transformer Standards Activity

BYLAWS AND STANDING RULES ZETA STATE MISSISSIPPI THE DELTA KAPPA GAMMA SOCIETY INTERNATIONAL

Chasco Camera Club. Constitution, By-Laws, Rules and Guide Lines. Revised ~~~~~~~~~~~~~ October Revised ~~~~~~~~~~~~~ March 2, 1983

RECORD OF PROCEEDINGS. West Metro Fire Protection District Civil Service Committee Meeting August 9, 2012

Meeting Minutes Administrative Subcommittee of the Transmission and Distribution Committee Montreal, Canada June 22, 2006

NTAG OPERATING PROCEDURES

Liaisons Report by the BIML Additional information

WORLD INTELLECTUAL PROPERTY ORGANIZATION GENEVA SPECIAL UNION FOR THE INTERNATIONAL PATENT CLASSIFICATION (IPC UNION) AD HOC IPC REFORM WORKING GROUP

Minutes of T&D ADCOM Meeting

SSPC 90.2 Committee Hilton Hotel Salt Lake City Salt Lake City, UT June 2008

IEEE Product Safety Engineering Society Board of Directors Meeting. Meeting Notes

IEEE PES STATIONARY BATTERY COMMITTEE

Change 1-07/15. The purpose, objective, or problem. Specific text changes are shown in the following slides

The Chair asked if any additions were needed to the issued agenda, there were none.

Newsletter No. 84 Special Issue December 2008

GMARC MEETING MINUTES 20-SEP-2016 V1.0

IEEE AEROSPACE AND ELECTRONIC SYSTEMS SOCIETY (AESS) BYLAWS Revision 2012

ISO/IEC Directives, Part 1 Procedures for the technical work

AACRAO Annual Meeting Program Committee Planning Calendar 2019 Annual Meeting - March 31 - April 3, 2019 Los Angeles, CA

Power Transformers Subcommittee

1791 Tullie Circle, N.E./Atlanta, GA TC/TG/MTG/TRG MINUTES COVER SHEET

RCSC Executive Committee Meeting Wednesday, June 4th, 2014 Stanley Hotel, Estes Park, CO 2:00 pm to 6:00 pm local time.

IEEE P Recommended Practice for Motor Protection in Industrial and Commercial Power Systems

GMARC MEETING MINUTES 21-JUN-2016 V1.2

The Georgia Association of Fire Chiefs

Annex C Distribution Subcommittee Chair: Stephen Shull

GRADUATE STUDENT SENATE Public Meeting Minutes December 8, 2011

Minutes of Fairview Airport Runway Association

ISO/IEC JTC1/SC7 /N2856

Meeting Minutes Appellate Section Executive Council Mid-Year Meeting January 20, 2005, Miami, Florida

BYLAWS OF THE VIRGINIA STUDENT COUNCILS ASSOCIATION A COMMITTEE OF THE VIRGINIA ASSOCIATION OF SECONDARY SCHOOL PRINCIPALS, INC.

H 8072 S T A T E O F R H O D E I S L A N D

UNT SGA 48 th Student Senate Spring 2018 Session Cole & Umeh Administration Wednesday, January 31, 2018

Dick Titus called the meeting to order at 1:35 p.m. The meeting was held upstairs in the Magnolia Point Clubhouse.

Grace A. Dow Memorial Library Board Meeting May 17, 2017, 7:00 p.m. City Hall Council Chambers

IEEE PES STATIONARY BATTERY COMMITTEE

IEEE POWER ENGINEERING SOCIETY TECHNICAL COUNCIL ORGANIZATION AND PROCEDURES MANUAL. Revision: July 2003

Minutes. FSA meeting-october 17, Sebring, Florida

ASIS INTERNATIONAL STANDARDS & GUIDELINES. September 2015

Note: These minutes were approved by the Grassroots Government Advocacy Committee on November 1, 2016.

Six new members were added to the roster and introduced to the SC.

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC Tullie Circle, N.E./Atlanta, GA

IEEE SYSTEMS COUNCIL BYLAWS

These draft minutes must be approved by this committee to be the official record. Name Affiliation Address Status

TRAILER ESTATES PARK & RECREATION DISTRICT BYLAWS

MSSADA MASSACHUSETTS SECONDARY SCHOOL ATHLETIC DIRECTORS ASSOCIATION

IEEE PES STATIONARY BATTERY COMMITTEE

ISO/IEC JTC1/SC7 Software Engineering Secretariat: CANADA (SCC) JTC1/SC7 WG10 Convener

BYLAWS (Adopted January 1, 2005; Amended October 26, 2007; October 22, 2010; December 30, 2014)

TC-5: High Power Electromagnetics

IEEE-SA Standards Board Standards Review Committee (RevCom) approved Meeting Minutes 14 June :00 a.m. 1:00 p.m. Milan, Italy

2015 Georgia Republican Convention Planning Manual

NATIONAL BOARD OF GOVERNORS RECORD OF PROCEEDINGS Wednesday, January hrs EDT

Meeting Announcement AGENDA

SMIIC DIRECTIVES, PART 1 PROCEDURES FOR THE TECHNICAL WORK. (SECOND EDITION, April 2019)

MINUTES CITY OF CAMARILLO CITY COUNCIL ADJOURNED REGULAR MEETING WEDNESDAY, NOVEMBER 2, 2016

APPROVED MINUTES ASC C63 SC1: Techniques and Development April 22, 2009 IEEE Headquarters, Piscataway, New Jersey

Meeting Minutes December 11, 2009

Present per attendance roster & recorded to AM System: 96 Guests present: 114 Membership requested: X Membership accepted: X

Transcription:

IEEE Surge Protective Devices Main Committee (3.0) Meeting Minutes Fall Meeting, OMNI at the CNN Center, Atlanta October 12, 2007 1) Call to order Chairman Doug Dorr called meeting to order, members and guests introduced themselves. There were 15 members and 4 interested parties in attendance. 2) Approval of agenda Agenda was displayed via projector and was approved with one item added under new business as documented below in the New Business section of these minutes. 3) Approval of minutes of last meeting The Spring 2007 Meeting Minutes from Clearwater, Florida were approved as posted on the SPDC online community website with no changes. 4) Subcommittee reports (3.1) Administrative & Standards Doug Dorr Doug reported that A&S met for 4 hours on Wednesday October 3rd, 2007 and will need a similar time slot for the Spring 2008 meeting. The officer changes were posted Highlights from the A&S meeting included the awards ceremony at the luncheon and a new effort to get IEEE fellow nominations from the SPDC membership.. Draft minutes for A&S will be posted on the on-line community website under the 3.1 Main committee folder (once approved). Unapproved minutes will be filed in the unapproved minutes folder. 1. Secretaries Report Ken Brown a. Awards Presentation Bill Goldbach presented the awards at the awards ceremony. The recipients of the awards are documented in the A&S minutes. b. Financial Update - The IEEE balance is approximately $8,000 following the Fall meeting which is $4500 below the end of the Spring Meeting. Financially the SPDC is in good shape and will end up the year somewhere around last years ending balance. c. Future Meeting Dates Ken reported that the fall meeting was now confirmed for October 1-5, 2007 at the Omni CNN center in Atlanta 2. Bibliography- Carl Lindquist i. Carl met Wednesday for 3.5hrs and 5 of 14 members attended ii. Carl requested 4 hours on Wednesday for the next meeting. iii. Three task forces running that could turn into working groups iv. Symbols library is going well and should be turned on soon v. Mick placed the IEC dictionary link on the grouper website.

Page 2 vi. The flow chart requires that all new documents go to 3.2 for a review of the definitions. The HV and LV coordinator should ensure that this review occurs. vii. Action: The working group chairs will review the flow chart (revision 5) at the Spring Meeting. viii. Mick Maytum: The flow chart will be sent by email to the high and low voltage chairs. ix. The IEEE may have funding for the bibliography work. 3. High Voltage Sub-Committee Report - Steve Hensley a. Steve reported the highlights from his meeting and a copy of the HV subcommittee report was added to this report as an appendix. Highlights include: i. Action: Steve will submit the schedule for the Spring meeting. ii. Mike Comber has 1 new member in WG iii. Mikes group is developing a rational for each test. iv. Eva s group completed work toward the application guide and look at items to write the next time around v. Dave Jackson s and Rusty Robbins group did not meet but are expected to meet in the Spring vi. Big item this session was the application guide (new issue). Battling editorial issues with the templates. The PAR was extended. vii. Dave Jackson s corrigendum is out for ballot viii. Ray Hill gave a presentation on NEETRAK testing ix. Online community is a great place to put documents but getting work done works better when the document is sent by email. x. Steve stated that the HV group will be missing many people including himself. xi. Trying to get the straw poll of who is going to attend the Fall Meeting in Costa Rica. We will need to facilitate web meetings if the turn out is low. xii. Action: Steve will survey the members and provide an estimate of members planning to attend the Fall meeting in Costa Rica xiii. Action: Doug will hold a Webex practice session 4. Low Voltage Sub-Committee Report Ray Hill a. Ray reported the highlights from his meeting and a copy LV subcommittee report will be added to this report as an appendix. Highlights include: i. WG 3.6.6 and 3.6.9 renamed the working group to better reflect their purpose. WG 3.6.4 will change their name also. ii. WG 3.6.2 Review ballot results for.35 and they will write a new Par for.35

Page 3 iii. WG 3.6.3 had a virtual chairman due to the absence of Tom Harmon. The meeting was productive iv. WG 3.6.4 working on the Trilogy.1,.2, and.45. Since the 10x350 is a test wave it was moved to.45 v. WG 3.6.6 C62.72 was published in August vi. WG 3.6.7 revising.64 looking to ballot next year vii. WG 3.6.9 Reviewed draft 11 of.44. 400 comments from balloters will be incorporated into the next draft. Reviewed.34 also viii. WG 3.6.10 Working on.50 and.51. Most work on.50 and the PAR run out at the end of the year. A new PAR will be created. ix. Action: Ray Hill will submit WG schedule with times to both Ken Brown and Tony Surtees 5. Web and Electronic Documentation Mick Maytum a. Mick reported the highlights from his meeting and a copy online subcommittee report will be added to this report as an appendix. Highlights include: i. The grouper website has moved to version 10 of software now it is much more stable ii. Forum people experienced ill planned member upgrade. The numbers dropped to 572 and 24 new member signed into the forum which is encouraging iii. Most of Mick s effort has been involved in documentation. Mick help out the IEEE FrameMaker to word conversion. iv. Mick located conversion software that provides a tremendous improvement in the process v. Mick is reviewing electronic meeting aids. Flip charts are expensive to rent and an electronic graphics template will work better and save cost. vi. Mick is looking into a VoIP Conference Phone. Down side is the internet bandwidth it will use. Benefit is ease of set up and video capability. vii. Word 2007 has several serious incompatibilities of the previous work versions. More detail located in the 3.7 report and the A&S minutes viii. Mick request the same meeting time for Spring as documented in this Fall meeting 6. IEC Tag 37A Activities Joe Koepfinger i. The report will be posted with the A&S meeting minutes. ii. Joe did not attend this main committee meeting and Doug posted and reviewed Joe report included the liaison D activities. iii. Mick stated that the LV liaisons are covered fairly well. iv. At the IEEE board meeting that an NFPA proposal to remove the utility exemption from the documents was approved. Frank noted that the proposal will probably eventually be rejected.

Page 4 7. TC37 Mike Comber a. The report will be posted with the final version of the Main Committee minutes. i. TC37 plenary meeting next month at NEMA Headquarter. First time technical committee will meet since 2004 ii. Working on a test standard for HV MOVs iii. A CD was issued last June and the comment period has just concluded iv. Maintenance team 10 over hall to the application guide activity has slowed due to convener time issues. Mike working to get the activity moving forward again v. WG 11 glossary of term and definitions work is in process vi. WG12 Andi Haa is restructuring the IEC standard for different arrestors to separate parts The activity will be brought to the TC for review. 8. TC37B Mick Maytum a. The report will be posted on www.ieeecommunities.com b. The activity is in 2 maintenance team #1 and #2. Last met last week for 3 days in Germany. Next meeting is next year in Japan. Leonard is a convener of 1 team and member of another 9. TC81 Tony Surtees a. Tony was not in attendance and no report was submitted. 10. Standards Coordinator Reports Jim Wilson HV a. Jim s report will be posted with final version of the Main Committee minutes b. Dave Jackson conducted 2 ballots since the last meeting c. Par extension are all approved Possibly 2 more par extensions will be submitted in the future. Bill Goldbach LV a. Bill was not in attendance, the report will be posted with final version of the Main Committee minutes. b. According to Bill everything is up to date and the IEEE automation is helping considerably 11. Old Business a. Surge Protection Applications for wind farms. Ron is working with Dave on this issue b. Questions by Don Zipse regarding the hazardous neutral conductor. Doug requested that papers related to this effort be shared with the IEEE-SPDC c. Doug sent an email to Chuck Denardo Chair of IEEE 1695 and offered to provide information in case they would like us to provide a rebuttal to the Zipse paper.

Page 5 d. Discussion in the Emerald Book to a draft 1 of C62.72. Doug sent the information into the IEEE and the issue is in their hands. The grounding subcommittee has responsibility for both the Green Book and the Emerald book. The harmonics from all books will be consolidated into one single document. e. Ultra High Voltage Simposium. Joe was retained by the USNC committee and Joe completed an excellent report on this. There is allot of activity in this area especially in China and India. It involves high voltage only. There is a movement in the IEC to put together some ultra high voltage subcommittees. f. Flow chart is complete showing the IEEE process to revcom. 12. New Business a. Develop a new IEEE-SPDC Tutorial i. Jon asked, what are the expectations? Jon is willing to put something together from the high voltage side. Doug mentioned that it should be something documenting our knowledge in a workshop format. There is an opportunity for a group of experts to be involved in this with some guidance from A&S ii. Doug mentioned that there should be 1 from HV and 1 from LV. iii. This work is likely to bring us new members. It should be a 4-8 hour workshop. We should build and 8 hour workshop and have a condensed 4 hour workshop. iv. The workshops should have the goal of educating anyone that does not attend the meetings. v. Action: Jon Woodworth volunteered to facilitate the HV tutorial. Jon requested a 2 hour slot for the SPD Tutorial vi. Action: The group as a whole should identify reference documents such as Surges Happen to be used in the tutorial vii. Action: Jon will create an SPD workshop folder prior to the meeting for reference documentation 13. SPDC Future Meeting Locations and Schedule a. The Spring meeting will be held the week of May 12, 2008 at the Sheraton Sand Key Resort in Clearwater Florida b. The next Fall Meeting 2008 will be held the week of November 10, 2008 in Costa Rica. Meeting Adjourned IEC TC37 High Voltage Surge Arresters Report to IEEE SPD Committee October 4, 2007 IEC TC37 is comprised of the following subcommittees (SCs), maintenance teams (MTs) and working groups (WGs):

Page 6 SC37A: Low voltage surge protective devices devices SC37B: Components of surge protective devices MT4: Maintenance of IEC 60099-4 and -6 high voltage arrester testing standards MT10: Maintenance of IEC 60099-5 high voltage arrester application guide WG11: Harmonization of terms used in IEC high voltage arrester and low voltage surge protective devices standards WG12: Restructuring of IEC 60099 standards into a new multi-part document designated as IEC 61344 A separate report is expected to be provided for the activities of SC37A and SC37B. The following summary is provided for the other activities within TC37. TC37 (Chairman: Michele DeNigris, IT) A plenary meeting of TC37 is scheduled for November 8/9 in Rosslyn, VA (at NEMA headquarters). This will be the first time the TC has met since October 2004. MT4 (Convenor: Volker Hinrichsen, DE) MT4 s principal activities continue to be (1) test standard for externally-gapped line arresters (EGLA), and (2) revision to mechanical and environmental type tests of IEC 60099-4. CDs on both were issued in June of this year (37/333/CD and 37/336/CD, respectively). The National Committee comment period has just expired on both, and compilation of comments is under way for review by MT4 at a meeting scheduled for the 2 days prior to the TC37 plenary meeting. MT10 (Convenor: Tong Kwong, UK) MT10 last met in Milan, Italy on April 4-5, 2007. The MT is working on a significant overhaul of the IEC 60099-5 application guide for high voltage metal-oxide surge arresters. Due to the extensive nature of the revision of the application guide, it is considered highly probable that more than one CD will be required before the document would be ready for the CDV stage. It was expected that a first CD would be ready for issue by mid-june, but this did not happen. The convenor of this MT has expressed his desire to step down, due to other demands on his time that prevent him from devoting the necessary attention to the MT work (likely the primary reason for the CD not being ready as expected). The TC37 Secretary is working with the convenor in an effort to get activity moving forward.

Page 7 WG11 (Convenor: Mick Maytum, UK) IEC has published a glossary of all terms and definitions used in TC37 standards. A joint Working Group of WG11 and IEC TC1 is now working to refine this glossary using the new IEC database system to produce chapter 456 of the IEC dictionary (IEV). Content (from IEC/PAS 60099-7), which reduces to about 150 terms once duplications are removed, is being uploaded for review at the next meeting in Paris in November. WG12 (Convenor: Andi Haa, US) WG12 is charged with restructuring of the IEC 60099 series of standards into a new multi-part document. The new document, with new number 61644, will have a Part 10 covering general considerations followed by Parts 20, 30, 40, etc for type tests that are specific to different type of arrester (porcelain housed, polymer housed, liquid-immersed, etc). The application guide (60099-5) would be incorporated as another Part of this document. The project is currently in the zero state. The activity is largely an editorial task, to take the existing standards and restructure them into the various parts. The idea is that the standard requirements for a particular type of arrester would be completely defined by the general considerations Part 10 and the specific requirements part (Part 20, or 30, or 40, etc.) for the particular type of arrester of interest. However, there is now considerable questioning among those in the TC37 standardsmaking community as to the real value of this project. This matter will be discussed at the TC37 meeting in November, and a decision regarding the future of this activity will be made at that time. Respectfully submitted, Mike Comber Secretary TC37