Investigation of hydromechanical interactions at the tail void of bored tunnels due to grouting
|
|
- Irma Marlene Hawkins
- 5 years ago
- Views:
Transcription
1 RUHR-UNIVERSITÄT BOCHUM Investigation of hydromechanical interactions at the tail void of bored tunnels due to grouting Arash Lavasan Tom Schanz Presented by: Zdenek Zizka Chair of Foundation Engineering, Soil and Rock Mechanics Faculty of Civil and Environemntal Engineering Ruhr-Universität Bochum SFB 837 9th International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground Sao Paulo
2 Motivation and Challenges Subsystems: Ø Progressive excavation Ø Face support Ø Volume loss due to overcutting and conicity Ø Grouting at TBM tail Ø Lining installation Excess pp around TBM Main Challenges in numerical simulations: Ø Adequate constitutive model for soil Ø Adequate simulation of subsystems: Ø Hydromechanical interactions around TBM Ø Consolidation in grout and subsoil Ø Time dependent mechanical behavior of grout 2
3 Objectives The main objective is to study the influence of different strategies for numerical simulation of HM process around TBM on: Ø Settlement trough Ø Excess pore pressure generation and dissipation at the tail of TBM Ø Structural forces in lining element The numerical simulation accounts for: Ø Stress redistribution & volume loss around the TBM Ø Mechanical / Hydromechanical grouting pressure Ø Degradation of permeability in subsoil due to Ø Time dependent evolution of the stiffness in grout (in one scenario) 3
4 Assumptions Type of the soil: Ø Soft to medium dense normally consolidated Clay with very low permeability Type of constitutive model for soil: Ø Hardening soil model ABCD ABCDABCDABCD Properties of structural lining elements: Ø Linear elastic ABCD ABCD ABCDABCD. ABCDABCDABCD ABCD ABCD ABCD ABCD ABCDABCD m φ ψ ABCD Ø 2D 1 plate element E Ø Lining thickness: 2 cm ABCD ABCD ABCD ABCDABCD (MPa) (-) (deg.) (m/sec) (-) (kn/m 2 ) (-) ABCD ABCD ABCD ABCD 4
5 Assumptions Tunnel Geometry Ø Tunnel diameter (D=8 m) Ø Overburden (1.D=12 m) Ø Target volume loss:. % Tunnel-lining likely configurations: Ø Upward arrangement Ø Centered arranegment Ø Downward arrangment Time dependent grout properties: Ø Stiffness (deformability) Ø Poisson s ratio (compressibility) Ø Properties chosen to highlight the Stiffness (MPa) lower grouting pressure higher grouting pressure influence of, Stiffness Poisson's ratio, Time (hour),,4,4,3,3 Poisson's ratio
6 Simulation Scenarios (undrained+) #1 Stress release method: Stage 1 Stage 2 Stage 3 γ * γ #2 Soil stiffness reduction method: Stage 1 Stage 2 Stage 3 E * E E #3 Mechanical pressure boundary on drilled zone: Stage 1 Stage 2 Stage 3 p g Stage 2: undrained Stage 3: undrained + p g =2 kpa (uniform) In-situe stress at tunnel crown p =2 kpa 6
7 Simulation Scenarios (undrained+) #4 Deformation release (predefined contraction): Stage 1 Stage 2 Stage 3 ε r # Hydrostatic pressure boundary on cavity and lining: Stage 1 Stage 2 Stage 3 p g #6 Reduced lining stiffness method: Stage 2: undrained Stage 3: undrained + p g =2 kpa (uniform) In-situe stress at tunnel crown p =2 kpa Stage 1 Stage 2 Stage 3 EA * EI * EA EI 7
8 Simulation Scenarios (staged construction) #7 Time dependent HM pressure boundary : E grout (t) ν grout (t) Hydraulic pressure In grout for 2 hr To generate excess pore pressure in grout Stage 1 Stage 2 Closed hydraulic boundary for 1 hr Note: these 7 scenarios are defined in a manner to have identical volume loss around the TBM =. % E grout Fully (t) coupled ν grout hydromechanical (t) analysis Stage 3 Pressure (kpa) Grout pressure Excess PP Time (hour) 8
9 Results and conclusion (settlement trough) Distance from tunnel centre (m) construction construction Stress release γ * #1 Soil stiffness release E * #2 Mechanical pressure Hydrostatic pressure # Distance from tunnel centre (m) -1 construction -1 Lining stiffness reduction #6 p g EA * EI * construction - -1 construction construction p g ε r #3 Deformation release #4 Time dependent HM E grout (t) ν grout (t) # Distance from tunnel centre (m) construction 9
10 RUHR-UNIVERSITÄT BOCHUM Results and conclusion (lining def. & pore pres.) Stress release Hydrostatic pressure - γ* #1 # pg - Soil stiffness reduction - - EA* EI* - #3 - Undeformed tunnel εr Time dependent HM Egrout(t) νgrout(t) Deformation release #6 #7 - pg Lining stiffness reduction Mechanical pressure E* #2 #4 Deformed tunnel after construction (scale factor: 1) Deformed tunnel after (scale factor: 1) 1
11 Results and conclusion (lining force) RUHR-UNIVERSITÄT BOCHUM Scenario N max_constructio n (kn/m) N max_consolidation (kn/m) # # # #4 14.7* 1.9** # # # Scenario M max_construction (kn.m/m) M max_consolidatio n (kn.m/m) # # # # # # # * tension is developed at the tunnel crown kn/m ** tension is developed at the tunnel crown 9.1 kn/m Soil stiffness release E * Stress release γ * Mechanical pressure p g Deformation release ε r Hydrostatic pressure p g Lining stiffness red. EA * EI * Time dependent HM E grout (t) ν grout (t) #1 #2 #3 #4 # #6 #7 11
12 Thank you for your attention 12
Computational Inelasticity FHLN05. Assignment A non-linear elasto-plastic problem
Computational Inelasticity FHLN05 Assignment 2016 A non-linear elasto-plastic problem General instructions A written report should be submitted to the Division of Solid Mechanics no later than 1 November
More informationModular Slab Track. Asfordby Slab Installation IVES PORR V-Tras. PWI Winter Conference December
Modular Slab Track Asfordby Slab Installation IVES PORR V-Tras PWI Winter Conference December 2014 1 www.rhomberg-sersa.com Development of the Modular concept Although many forms of slab track have been
More informationTitle 30: Public Service
Title 30: Public Service Chapter 86: Vermont Underground Utility Damage Prevention System 7001. Definitions In this chapter: (1) "Board" means the public service board. (2) "Company" means any public utility
More informationENVIRONMENTAL PROTECTION ACT EXCAVATION PITS REGULATIONS
c t ENVIRONMENTAL PROTECTION ACT EXCAVATION PITS REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to October 17,
More informationSelf-Selection and the Earnings of Immigrants
Self-Selection and the Earnings of Immigrants George Borjas (1987) Omid Ghaderi & Ali Yadegari April 7, 2018 George Borjas (1987) GSME, Applied Economics Seminars April 7, 2018 1 / 24 Abstract The age-earnings
More information1 Introduction to the Recommendations and their Application Principles
1 Introduction to the Recommendations and their Application Principles Note: The following paragraphs are taken in part from the EAB (2006) or are based on them. 1.1 National and International Regulations
More informationScope of Services and Fee Agreement Soil Engineering Services During Earthwork Construction Black Oak Estates, Subdivision 7462 Diablo, California
February 28, 1995 Land Based Research and Development 111 Deerwood Road, Suite 200 San Ramon, CA 94583 Attention: Subject: Mr. Mike Bedker Scope of Services and Fee Agreement Soil Engineering Services
More informationGeotechnical Society of Ireland Biennial Named Lecture
Geotechnical Society of Ireland Biennial Named Lecture Fintan Buggy, Chairman GSI AGM 23 April 2015 Proposed Amendments to GSI Statutes Clause 7 Meetings. Additional sub clauses shall be added as follows:
More informationIC Chapter 26. Damage to Underground Facilities
IC 8-1-26 Chapter 26. Damage to Underground Facilities IC 8-1-26-1 Application of chapter Sec. 1. (a) Except as provided by this section, this chapter does not apply to the following: (1) Excavation that
More informationIC Chapter 26. Damage to Underground Facilities
IC 8-1-26 Chapter 26. Damage to Underground Facilities IC 8-1-26-1 Application of chapter Sec. 1. (a) Except as provided by this section, this chapter does not apply to the following: (1) Excavation that
More informationM-Series, Actuator Overview. Machine Screw Cutaway. UNI-LIFT Machine Screw Actuators offer precise. 12
M-, Actuator Overview UNI-LIFT Machine Screw Actuators offer precise positioning, uniform lifting speeds and capacity up to 250 tons. Standard model configurations include upright or inverted units with
More informationCase Bb (elastic, 1D vertical gradient)
Case Bb (elastic, 1D vertical gradient) Time-frequency envelope (E-GOF) and phase (P-GOF) goodness-of-fits reference: 3D01 E-GOF 3D02 (8.34) E-GOF 3D04 (6.82) E-GOF 3D07 (6.26) E-GOF 3D09 (7.26) P-GOF
More informationE Series Back Pull Out End Scution. Centrifugal Pump DIN 24255
Back Pull Out End Scution Centrifugal Pump DIN 24255 MARKET SECTORS Buidling Services, RHVAC, Agriculture, Civil, Industries Back Pull Out End Suction Centrifugal Pump DIN 24255 MATERIAL OF CONSTRUCTION
More informationIC Application of chapter IC "Account" IC "Advisory committee" IC "Approximate location"
IC 8-1-26-1 Application of chapter Sec. 1. (a) Except as provided by this section, this chapter does not apply to the following: (1) Excavation that is performed: (A) only with a hand tool; (B) on property
More informationSafety Matters for Demonstration of VAM-RAB Technology at Mandalong
Safety Matters for Demonstration of VAM-RAB Technology at Mandalong Gary Bowman Manager of Electrical Engineering May 2014 www.centennialcoal.com.au Outline Ø Background to Project Ø Project Safety Integration
More informationTITLE XXXIV PUBLIC UTILITIES
TITLE XXXIV PUBLIC UTILITIES CHAPTER 374 GENERAL REGULATIONS Underground Facility Damage Prevention System Section 374:48 374:48 Definitions. In this subdivision: I. "Commission'' means the public utilities
More informationSteel Pipes. Plastic Pipes. Seamless Pipes
Steel Pipes Plastic Pipes Seamless Pipes We, Hatboru Sanayi ve Ticaret A.S., are pleased to introduce ourselves as one of the leading producer and exporter for spiral submerged arc welded steel pipes (SSAW)
More informationCONSERVATION AND RECLAMATION REGULATION
Province of Alberta ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT CONSERVATION AND RECLAMATION REGULATION Alberta Regulation 115/1993 With amendments up to and including Alberta Regulation 103/2016 Office
More informationSTATE OF MASSACHUSETTS CHAPTER 82
STATE OF MASSACHUSETTS CHAPTER 82 SECTION 40. The following words, as used in this section and sections 40A to 40E, inclusive, shall have the following meanings: "Company", natural gas pipeline company,
More informationROUNDO Section Bending Machines Type R-1 through R-21-S
ROUNDO Section Bending Machines Type R-1 through R-21-S Friläggas 1 Roundo Section Bending Machines - Largest selection on the market ROUNDO is the worlds leading manufacturer of plate and section bending
More informationState Of Vermont Dig Safe Rules
State Of Vermont Dig Safe Rules AMENDED PSB RULE 3.800- DIGSAFE. 3.800 UNDERGROUND UTILITY DAMAGE PREVENTION 3.801 Definitions For the purpose of interpreting Chapter 86 of Title 30, the following definitions
More informationDrillScene Presentation for Finding Petroleum Drilling and the Digital Oilfield Aberdeen 08 May 2012 COPYRIGHT 2011 SEKAL AS. ALL RIGHTS RESERVED
Presentation for Finding Petroleum Drilling and the Digital Oilfield Aberdeen 08 May 2012 HISTORY Technology is based on more than 20 years of research at IRIS. DrillTronics Rig Systems and established
More informationEXPORT, MIGRATION, AND COSTS OF MARKET ENTRY EVIDENCE FROM CENTRAL EUROPEAN FIRMS
Export, Migration, and Costs of Market Entry: Evidence from Central European Firms 1 The Regional Economics Applications Laboratory (REAL) is a unit in the University of Illinois focusing on the development
More informationCode of Practice for Pits
Code of Practice for Pits September 1, 2004 (made under the Environmental Protection and Enhancement Act, RSA 2000, ce-12, as amended and Conservation and Reclamation Regulation (AR 115/93), as amended)
More informationDowner Construction (Australia) Pty Ltd v Energy Australia [2007] Adj.L.R 03/19
Judgment : Giles JA; Santow JA; Tobias JA. New South Wales Court of Appeal. 19 th March 2007 1. GILES JA: Downer Construction (Australia) Pty Ltd ("Downer") contracted with Energy Australia ("EA") to design
More informationThe Mines Regulation Act
The Mines Regulation Act being Chapter 271 of The Revised Statutes of Saskatchewan, 1940 (effective February 1, 1941). NOTE: This consolidation is not official. Amendments have been incorporated for convenience
More informationALUMINIUM ROLLERS MADE IN ITALY
ALUMINIUM ROLLERS MADE IN ITALY Alveolar aluminium rollers, diameter 60mm to 250mm (natural or anodized). Roller manufacturing will be completely based on customer's drawings. The rollers can be supplied
More informationFifth Expert Working Group on the Preservation of the Bamiyan Site. Aachen, Germany December 2006 RECOMMENDATIONS
Fifth Expert Working Group on the Preservation of the Bamiyan Site Aachen, Germany 14-16 December 2006 RECOMMENDATIONS Overall Issues The Participants of the Working Group 1. Acknowledge efforts made by
More informationData sheet: Wilo-CronoNorm-NL 80/200-3/4
Data sheet: Wilo-CronoNorm-NL /-3/ Pump curves H/m 1 1 1 1 NPSH/m,5, 1,5 1,,5 P /kw 5 3 1 3 5 55% % 5% 7% 7% 7,9% 1 5 15 5 3 35 3 5 1 3 5 7% 7,3% 7% 7% 77,9% 7,% 7,% Ø 17 Eff. 7,9% Ø 1 Ø 19 7% Ø 19 Ø 1
More informationIceCube Project Monthly Report - September 2010
IceCube Project Monthly Report - September 2010 Accomplishments 19,000 pounds of repaired equipment, spares, and materials have been shipped to the South Pole. IceCube conducted a successful internal readiness
More informationFor a permit to work within the County Highway Right-of-way (ROW), please provide the following:
KURT OSPELT Highway Superintendent COUNTY OF OSWEGO HIGHWAY DEPARTMENT 31 SCHAAD DRIVE OSWEGO, NEW YORK 13126 TELEPHONE (315) 349-8331 (315) 349-8330 FAX (315) 349-8256 For a permit to work within the
More informationUTS. UTS : Your first choice in waterproof connectors! Description. IP68/IP69K - Plastic connector
Description IP68/IP69K - Plastic connector UTS series is a range of industrial plastic circular connectors offering IP68/IP69K water protection. 4 shell s - up to 32 contact positions - are available with
More informationCertificate of Registration. issued under. the Waste Management Act and the
Certificate of Registration issued under the Waste Management Act 1996 and the Waste Management (Facility Permit and Registration) Regulations, S.I. No. 821 of 2007, as amended by Cork County Council Comhairle
More informationTOWN OF HURON Proposed Local Law No. 6 of the Year A Local Law to Impose a Moratorium on Natural Gas and Petroleum
TOWN OF HURON Proposed Local Law No. 6 of the Year 2012 A Local Law to Impose a Moratorium on Natural Gas and Petroleum Exploration and Extraction Activities Be it enacted by the Town Board of the Town
More informationALBERTA REGULATION 151/71 Oil and Gas Conservation Act OIL AND GAS CONSERVATION REGULATIONS PART 2 LICENSING OF WELLS
(Consolidated up to 85/2009) ALBERTA REGULATION 151/71 Oil and Gas Conservation Act OIL AND GAS CONSERVATION REGULATIONS 2.010(1) An application for a licence shall PART 2 LICENSING OF WELLS Application
More informationDECLARATION OF PERFORMANCE
EN DECLARATION OF PERFORMANCE according to Annex III of the Regulation (EU) Nr. 305/2011 (Construction Products Regulation) Hilti Firestop Wrap CFS-W P No. Hilti CFS-W P 1. Unique identification code of
More informationDesign of Below-the-Hook Lifting Devices
ASME BTH-1 2011 (Revision of ASME BTH-1 2008) Design of Below-the-Hook Lifting Devices AN AMERICAN NATIONAL STANDARD ASME BTH-1 2011 (Revision of ASME BTH-1 2008) Design of Below-the-Hook Lifting Devices
More informationInfrastructure Bill [HL]
Infrastructure Bill [HL] LORDS AMENDMENTS TO, CONSEQUENTIAL ON, OR IN LIEU OF, CERTAIN COMMONS AMENDMENTS [The page and line references are to Bill 124, the bill as first printed for the Commons.] After
More informationCROSSRAIL INFORMATION PAPER D12 GROUND SETTLEMENT
CROSSRAIL INFORMATION PAPER D12 GROUND SETTLEMENT This paper explains the arrangements for assessing, monitoring and mitigating the effects of ground settlement arising from Crossrail construction. It
More informationUSTOMED Flexi-Kit Smart. Flexible. Individualized.
USTOMED Flexi-Kit Smart. Flexible. Individualized. www.ustomed.de One Set 1001 Options Create your own set for all common implantological indications. Competence in Instruments MADE IN GERMANY Start to
More informationCOAL CONSERVATION ACT
Province of Alberta COAL CONSERVATION ACT Revised Statutes of Alberta 2000 Current as of June 17, 2013 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park
More informationAn Bord Pleanála. Planning Application: Kilkenny County Council. Type of Application: 10.HM0001 An Board Pleanála Page 1 of 11
An Bord Pleanála Ref.: PL10.HM0001 Development: Application to amend the Board s Decision the subject of the approval for the Kilkenny Central Access Scheme (Case reference number 10.HA0014) Planning Application:
More informationCOMPETENCE IN PRECISION AND QUALITY STEP DRILLS
COMPETENCE IN PRECISION AND QUALITY STEP DRILLS Product information The flutes of new RUKO high performance step drills are CBN ground from the solid hardened form. Because CBN (cubical boron nitride)
More informationSLANT BED CNC TURNING CENTER
1 SLANT BED CNC TURNING CENTER DESCRIPTION FTC-300 FTC-350 FTC-350L FTC-350XL FTC-350LY Swing Over Bed mm Ø 550 Ø 600 Ø 600 Ø 600 Ø 600 Max. Turning Diameter mm Ø 300 Ø 350 Ø 350 Ø 350 Ø 350 Max. Turning
More informationEarth electrodes Introduction
Earth electrodes Introduction 7 Three types of Furse earth rod are available, but the copperbonded steel cored rod is by far the most popular, due to its combination of strength, corrosion resistance and
More informationMAAG TM PPU gear unit for roller presses, horizontal mills and kilns
MAAG TM PPU gear unit for roller presses, horizontal mills and kilns 2 Our quality policy FLSmidth MAAG Gear is committed to creating long lasting relationships that establish us as a trustworthy, reliable
More informationCase 4:15-cv JED-FHM Document 2 Filed in USDC ND/OK on 08/17/15 Page 1 of 11
Case 4:15-cv-00453-JED-FHM Document 2 Filed in USDC ND/OK on 08/17/15 Page 1 of 11 THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF OKLAHOMA (1 UNITED STATES OF AMERICA, Plaintiff, v. Case
More informationGrowth and Poverty Reduction: An Empirical Analysis Nanak Kakwani
Growth and Poverty Reduction: An Empirical Analysis Nanak Kakwani Abstract. This paper develops an inequality-growth trade off index, which shows how much growth is needed to offset the adverse impact
More informationPUTNAM COUNTY PUBLIC WORKS DEPARTMENT RIGHT-OF-WAY USE PERMIT APPLICATION
DATE: PUTNAM COUNTY PUBLIC WORKS DEPARTMENT RIGHT-OF-WAY USE PERMIT APPLICATION Phone: (386)329-0346 Fax:(386)329-0340 R/W PERMIT No.: DISTRICT: ROAD No. ROAD NAME: (To be completed by Public Works Department)
More informationKlinger Manometer Serie 200
Klinger Manometer Serie 200 All stainless steel Bourdon tube pressure gauges watertight casing, dry or liquid filled execution; NS 63-100 150 200-250; Ranges included between -1 and 1.600 bar. The instruments
More informationTHE NEXT SENSATION by Alpha-Bio Tec. Experience NeO to fully understand how brilliant it is!
by Alpha-Bio Tec. 1 THE NEXT SENSATION by Alpha-Bio Tec. Alpha-Bio Tec. is proud to present the next sensation of dental solutions - the NeO implant system. NeO is the next generation of the company s
More informationDr. Jamal ALALI. Amman- Jordan
Dr. Jamal ALALI Amman- Jordan Tel: +962 6 468 0033 Fax:+962 6 468 0055 Mob: +962 797126858 32 nd Oil Shale Symposium, Oct. 15-17, 2012, Golden CSM ü Aqaba Petroleum for Oil Shale Co. signed Memorandum
More informationSTATE OF NEW HAMPSHIRE RSA 374
STATE OF NEW HAMPSHIRE RSA 374 374:48 Definitions. In this subdivision: I. Commission means the public utilities commission. II. Company means any public utility company which supplies gas, electricity,
More informationteckentrup-sperrkant The Original
teckentrup-sperrkant The Original www.teckentrup.de New Serrated Locking Washer NSK Innovative Screw and Bolt Locking Technology» Reliable bolt locking at low and high preload forces» Locking function
More informationB-Series Section Overview. Ball Screw Cutaway. UNI-LIFT Ball Screw Actuators provide high. 34
B- Section Overview UNI-LIFT Actuators provide high efficiency and high speed in a linear positioning package up to 100 tons. The low friction ball screw and nut design provides longer life at load and
More informationBuilding and Construction Industry Security of Payment Act 1999
Building and Construction Industry Security of Payment Act 1999 Reprint history: Reprint No 1 30 September 2003 Long Title An Act with respect to payments for construction work carried out, and related
More informationCITY OF KAMLOOPS BY-LAW NO (AS AMENDED)
This is a consolidated by -law prepared by the City of Kamloops for convenience only. The City does not w arrant that the information contained in this consolidation is current. It is the responsibility
More informationPROJECT PERIOD ACTIVITIES S21 tunnel Wolframstraße, Germany 2018 (present)
PROJECT PERIOD ACTIVITIES S21 tunnel Wolframstraße, 2018 (present) Formworks, reinforcing and concreting, L = 450 m, Ø = 150 m 2 Höllentalbahn East (5 tunnels), 2018 (present) Tunnel renovation, L1 = 166
More informationStep drills And, with higher dimensional precision the drills will last considerably longer while maintaining the precise process tolerances.
» STEP DRILLS Step drills The flutes of RUKO high performance step drills are CBN ground from the solid hardened form. Because CBN (cubical boron nitride) is a much harder abrasive than even silicium carbide
More informationThe IceCube Upgrade Marek Kowalski DESY & Humboldt-University Zeuthen-Meeting in Mainz September 2018
The IceCube Upgrade Marek Kowalski DESY & Humboldt-University Zeuthen-Meeting in Mainz September 2018 South Pole 2009!1 The IceCube Upgrade The next step in precision astroparticle physics with IceCube
More informationAny person violating any provisions of such code shall be punished as provided in section of this code. (Ord. 1004)
ARTICLE 4. PLUMBING CODE 4-401. A) UNIFORM PLUMBING CODE INCORPORATED. There is hereby adopted and incorporated by reference, for the purpose of establishing rules and regulations for the practice of plumbing
More informationMock-up of the Work Health and Safety (Resources) Bill 2015
Mock-up of the Work Health and Safety (Resources) Bill 2015 This mock-up has been prepared for public comment purposes only. It is indicative only and does not necessarily represent the Government s settled
More informationWire rope and chain scraper
The chain scraper head enz golden jet is a highly effective multi-purpose tool designed for easy use and maintenance under rugged work conditions. All rotating chain scraper models can be adapted to a
More informationUTILITIES CONTRACT NOTICE CONCERNING PERFORMANCE OF PIPE LAY AND TRENCHING OPERATION WITHIN THE B8 FIELD WŁADYSŁAWOWO
Pieczęć Zamawiającego Znak sprawy FH/ZP-14/2013 UTILITIES CONTRACT NOTICE CONCERNING PERFORMANCE OF PIPE LAY AND TRENCHING OPERATION WITHIN THE B8 FIELD WŁADYSŁAWOWO CONDUCTED IN A RESTRICTED TENDERING
More informationORDINANCE NO. 54 WELL ORDINANCE
ORDINANCE NO. 54 WELL ORDINANCE AN ORDINANCE OF GERMANY TOWNSHIP, ADAMS COUNTY, PENNSYLVANIA, REPEALING ORDINANCE NO. 12 DATED SEPTEMBER 8, 1980. THIS ORDINANCE SHALL BE KNOW AS THE GERMANY TOWNSHIP WELL
More informationPrimary inequality and redistribution through employer Social Security contributions: France
Primary inequality and redistribution through employer Social Security contributions: France 1976-2015 Antoine Bozio 1, Thomas Breda 2 and Malka Guillot 3 1 Paris School of Economics (PSE), EHESS 2 PSE,
More informationUNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA TAMPA DIVISION 3, 2012 ORDER
TAMPA BAY WATER, Plaintiff, v. HDR ENGINEERING, Inc., Defendant. Case No. 8:08-CV-2446-T-27TBM UNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA TAMPA DIVISION Dated: August 3, 2012 ORDER BEFORE
More informationSymmetry Asymmetry of Generic Structure Order of the Worldview as Seen by the Russians, Italians and Frenchmen
Doi:10.5901/mjss.2015.v6n4s1p419 Abstract Symmetry Asymmetry of Generic Structure Order of the Worldview as Seen by the Russians, Italians and Frenchmen Vadim A. Dorofeev PhD in Psychology, Associate Professor,
More informationMarine Boundaries and Jurisdiction Act, , 25 February 1978 PART I PRELIMINARY
Page 1 Marine Boundaries and Jurisdiction Act, 1978-3, 25 February 1978 An Act to provide for the establishment of Marine Boundaries and Jurisdiction. Commencement (By Proclamation) ENACTED by the Parliament
More informationCHAPTER 16. EXCAVATIONS AND ARTIFICIAL POOLS. 1. Article I. Excavations.
CHAPTER 16. EXCAVATIONS AND ARTIFICIAL POOLS. 1 Article I. Excavations. Sec. 16-1 Sec. 16-1. Sec. 16-2. Sec. 16-3. Sec. 16-4. Sec. 16-5. Sec. 16-6. Sec. 16-7. Sec. 16-8. Sec. 16-9. Sec. 16-10. Sec. 16-11.
More informationIntra-Rural Migration and Pathways to Greater Well-Being: Evidence from Tanzania
Intra-Rural Migration and Pathways to Greater Well-Being: Evidence from Tanzania Ayala Wineman and Thomas S. Jayne Paper presented at the Center for the Study of African Economies Conference on Economic
More informationSOIL REMOVAL AND DEPOSITION BYLAW
City of Vernon SOIL REMOVAL AND DEPOSITION BYLAW #5259 BYLAW NO. THE CORPORATION OF THE CITY OF VERNON ADOPTION BYLAW NUMBER 5259 AMENDMENTS AMENDMENT 5670 February 26, 2018 Regulatory Updates as follows:
More informationTHE CORPORATION OF THE DISTRICT OF SAANICH BYLAW NO. 5576
THE CORPORATION OF THE DISTRICT OF SAANICH BYLAW NO. 5576 TO REGULATE OR PROHIBIT THE REMOVAL OF SOIL, SAND, GRAVEL ROCK OR OTHER SUBSTANCE OF WHICH LAND IS COMPOSED FROM LANDS WITHIN THE CORPORATION OF
More informationDetermination 2007/116 Whether proposed building work at 13 McMaster Road, Dunedin, is to be carried out on land likely to be subject to slippage
Determination 2007/116 Whether proposed building work at 13 McMaster Road, Dunedin, is to be carried out on land likely to be subject to slippage 1 The matter to be determined 1.1 This is a determination
More informationUnderground Utility Damage Prevention System
Underground Utility Damage Prevention System Section 374:48 374:48 Definitions. In this subdivision: I. ""Commission'' means the public utilities commission. II. [Repealed.] III. ""Excavate'', ""excavating'',
More informationNC General Statutes - Chapter 87 Article 8A 1
Article 8A. Underground Utility Safety and Damage Prevention Act. 87-115. Short title. This Article may be cited as the "Underground Utility Safety and Damage Prevention Act." (2013-407, s. 2.) 87-116.
More informationA. PROTECTION OF UNDERGROUND FACILITIES A. PROTECTION OF UNDERGROUND FACILITIES
23 3360-A. PROTECTION OF UNDERGROUND FACILITIES 23 3360-A. PROTECTION OF UNDERGROUND FACILITIES 1. Definitions. As used in this section, unless the context otherwise indicates, the following terms shall
More informationNIGERIA: WATER RESOURCES DECREE Decree No.101. This document is available at
Commencement [23rd August 1993] NIGERIA: WATER RESOURCES DECREE 1993 Decree No.101 This document is available at www.ielrc.org/content/e9302.pdf THE FEDERAL MILITARY GOVERNMENT hereby decrees as follows-
More informationDISTRICT OF LAKE COUNTRY BYLAW 628, CONSOLIDATED VERSION (Includes amendment as of July 18, 2017)
DISTRICT OF LAKE COUNTRY BYLAW 628, 2007 CONSOLIDATED VERSION (Includes amendment as of July 18, 2017) This is a consolidated copy to be used for convenience only. Users are asked to refer to the Highway
More informationWATER RESOURCES ACT. The Complete Laws of Nigeria ARRANGEMENT OF SECTIONS SECTION
The Complete Laws of Nigeria Home WATER RESOURCES ACT ARRANGEMENT OF SECTIONS SECTION 1. Vesting of rights and control of water.in the Federal Government. 2. Rights to take and use of water. 3. Acquisition
More informationHealth and Safety in Employment Amendment Act 2013
Reprint as at 4 April 2016 Health and Safety in Employment Amendment Act 2013 Public Act 2013 No 95 Date of assent 18 November 2013 Commencement see section 2 Health and Safety in Employment Amendment
More informationIntra-Rural Migration and Pathways to Greater Well-Being: Evidence from Tanzania
Intra-Rural Migration and Pathways to Greater Well-Being: Evidence from Tanzania Ayala Wineman and Thomas S. Jayne Presentation AFRE Brown Bag Seminar Series October 11, 2016 1 Motivation Knowledge gaps
More informationTHE TOWN OF HOWARD BLASTING ORDINANCE Chapter 15
THE TOWN OF HOWARD BLASTING ORDINANCE Chapter 15 15.01 Title This ordinance shall be cited as the Town of Howard Blasting Ordinance and hereinafter referred to as this ordinance. 15.02 Authority This ordinance
More informationStep drills. And, with higher dimensional precision the drills will last considerably longer while maintaining the precise process tolerances.
STUFENBOHRER FORETS TRAPPENBOREN TRINBOR FRESE BROAS STUPŇOVITÉ WIERTŁA СТУПЕНЧАТЫЕ BURGHIE KADEMELİ STOPNIČASTI STEPENASTA LÉPSŐS PAKOPINIAI DRILLS A ÉTAGÉS ESALONADAS GRADINI STOPNIOWE ÎN FÚRÓ sac GRĄŽTAI
More informationFILL DIRT PLACEMENT, GRADING AND COMPACTION AGREEMENT
FILL DIRT PLACEMENT, GRADING AND COMPACTION AGREEMENT This Agreement is made and entered into this 27 th day of June, 2017, by and between The City of Mesquite, Nevada, a Political Subdivision of the State
More informationINDIVIDUAL WATER SYSTEMS
Salt Lake County Health Department Health Regulation #11 INDIVIDUAL WATER SYSTEMS Adopted by the Salt Lake County Board of Health November 5, 1981 Amended: August 3, 2006 August 10, 2017 Under Authority
More informationIncumbents, Challengers and Electoral Risk
MPRA Munich Personal RePEc Archive Incumbents, Challengers and Electoral Risk Vani Borooah University of Ulster December 2014 Online at https://mpra.ub.uni-muenchen.de/76617/ MPRA Paper No. 76617, posted
More informationCHAPTER 8: ENFORCEMENT AND PENALTIES
CHAPTER 8: ENFORCEMENT AND PENALTIES 8.1 RESPONSIBILITY FOR ENFORCEMENT The Land Use Department shall be responsible for enforcing this Land Development Code, unless otherwise specifically stated. 8.2
More informationDesign of Below-the-Hook Lifting Devices
ASME BTH-1 2014 (Revision of ASME BTH-1 2011) Design of Below-the-Hook Lifting Devices AN AMERICAN NATIONAL STANDARD ASME BTH-1 2014 (Revision of ASME BTH-1 2011) Design of Below-the-Hook Lifting Devices
More informationBeam Dump System. Guangrui Li. CEPC-SppC Study Group Meeting, 08 Apr. 2016, Institute of High Energy Physics, Beijing
Beam Dum System Guangrui Li CEPC-SC Study Grou Meeting, 08 Ar. 2016, Institute of High Energy Physics, Beijing Outline Brief review of injec-on and extrac-on system LHC beam dum system design Energy deosi-on
More informationGENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW HOUSE BILL 476
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW 2013-407 HOUSE BILL 476 AN ACT REWRITING THE LAWS REGULATING UNDERGROUND UTILITY DAMAGE PREVENTION. The General Assembly of North Carolina enacts:
More informationS.I. No. of 2018 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2018
S.I. No. of 2018 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2018 I, Damien English, Minister of State at the Department of Housing, Planning and Local Government, in exercise of the powers conferred
More information2013 No CONTINENTAL SHELF. The Continental Shelf (Designation of Areas) Order 2013
S T A T U T O R Y I N S T R U M E N T S 2013 No. 3162 CONTINENTAL SHELF The Continental Shelf (Designation of Areas) Order 2013 Made - - - - 11th December 2013 Coming into force - - 31st March 2014 At
More information2015 SOM Ballot Number 1. No/No Vote. Sponsored by Technical Section 3a
2015 SOM Ballot Number 1 Sponsored by Technical Section 3a 1 2 3 4 5 6 7 8 9 10 11 Concurrent ballot item to revise M 240 to remove MBI and TOC requirements. See page 3, 37 & 39-44. 44 2/6 Concurrent ballot
More informationThe CSIRO Astronomy and Space Science Phased Array Feed Development Program
The CSIRO Astronomy and Space Science Phased Array Feed Development Program Mark Bowen CSIRO Technologies for Radio Astronomy and The SKA PAF AIP 26 August 2016 CSIRO ASTRONOMY AND SPACE SCIENCE Outline
More informationMigrant Wages, Human Capital Accumulation and Return Migration
Migrant Wages, Human Capital Accumulation and Return Migration Jérôme Adda Christian Dustmann Joseph-Simon Görlach February 14, 2014 PRELIMINARY and VERY INCOMPLETE Abstract This paper analyses the wage
More informationORDINANCE NO WHEREAS, the City of Rapid City currently has ordinances regulating trenching contractors licenses within the City; and
ORDINANCE NO. 5719 AN ORDINANCE REGULATING TRENCHING CONTRACTORS LICENSES WITHN THE CITY OF RAPID CITY BY AMENDING CHAPTER 13.10 OF THE RAPID CITY MUNICIPAL CODE. WHEREAS, the City of Rapid City currently
More informationChapter Five: Forces. Ø 5.1 Forces. Ø 5.2 Friction. Ø 5.3 Forces and Equilibrium
Chapter Five: Forces Ø 5.1 Forces Ø 5.2 Friction Ø 5.3 Forces and Equilibrium 5.1 The cause of forces Ø A force is a push or pull, or an action that has the ability to change motion. Ø Forces can increase
More informationORDINANCE NO AMENDMENTS TO CODE. Section of the 2012 Uniform Plumbing Code is hereby amended to read as follows:
ORDINANCE NO. 15-28 AN ORDINANCE OF THE MAYOR AND COUNCIL OF THE CITY OF COLUMBUS, NEBRASKA, AMENDING CHAPTER 150 OF TITLE XV OF ORDINANCE NO. 05-47 (COLUMBUS CITY CODE) BY ADOPTING THE 2012 UNIFORM PLUMBING
More informationChapter 20:27 Environment Management Act (Environmental Impact Assessment & Ecosystems Protection) Regulations, 2007
Chapter 20:27 Environment Management Act (Environmental Impact Assessment & Ecosystems Protection) Regulations, 2007 1 These regulations may be cited as the Environment Management (Environmental Impact
More information