THE NEW RIAI BUILDING CONTRACT: A MUCH NEEDED FACELIFT FOR AN OLD DAME? BY MARTIN COONEY

Size: px
Start display at page:

Download "THE NEW RIAI BUILDING CONTRACT: A MUCH NEEDED FACELIFT FOR AN OLD DAME? BY MARTIN COONEY"

Transcription

1 The Construction Bar Association of Ireland The Law Library Distillery Building Church Street, Dublin 7 THE NEW RIAI BUILDING CONTRACT: A MUCH NEEDED FACELIFT FOR AN OLD DAME? BY MARTIN COONEY CONSTRUCTION BAR ASSOCIATION OF IRELAND ANNUAL CONFERENCE, 27 TH APRIL Introduction the development of Standard Form Contracts in Construction 1.1. Freedom of contract is a long established principle of the common law. This refers to the ability of parties to agree contracts without unnecessary interference by the legislature or government. The logic behind the principle is succinctly summarised as follows: the fact that all persons whose interests are affected by an arrangement have freely and with full knowledge agreed on that arrangement, is, in general, cogent evidence in favour of its justice. When all persons interested in a particular transaction have given their consent to it and are satisfied, the law may safely step in with its sanctions to guarantee that right be done by the fulfillment of reasonable expectations The courts in England were particularly supportive of the concept in the nineteenth century and, as such, parties were free to agree contractual terms 1 Sir David Hughes Parry, The Sanctity of Contracts in English Law, The Hamlyn Lectures, Tenth Series, (The Hamlyn Trust London, Stevens & Sons Limited)

2 without significant interference or restrictions. As a result, standard form contracts were developed which set out the rights and responsibilities of the parties. Uff highlights that their obvious advantage is that they become well-known and predictable, and their provisions can be interpreted by the courts thus providing additional guidance for users. 2 He traces standard forms of construction contracts to the nineteenth century when most major building projects were undertaken by local authorities. 3 As standard forms developed, however, concerns arose that they allowed stronger parties take advantage of weaker parties. Lord Denning pointed out: Faced with this abuse of power- by the strong against the weak by the use of the small print of the conditions the judges did what they could to put a curb upon it. They still had before them the idol freedom of contract. They still knelt down and worshipped it, but they concealed under their cloaks a secret weapon. They used it to stab the idol in the back. This weapon was called the true construction of the contract. They used it with great skill and ingenuity Thus, slowly but surely, the concept of freedom of contract came to be restricted by the courts. As trade and commerce developed, particularly in terms of consumers, the legislature introduced statutory provisions which implied rights and obligations on parties to contracts. Construction contracts were no different, although a sector specific piece of legislation was not introduced in the UK until the late twentieth century in terms of the Housing Grants, Construction and Regeneration Act Nevertheless, the use of standard form contracts in the construction industry in the UK became widespread. Standard forms were developed by a number of professional bodies which gradually extended to the production of suites of contracts to deal with different circumstances and procurement methods. Ireland was no different, with the RIAI having 2 John Uff, Construction Law (10 th edn, Sweet & Maxwell 2009) Uff (n 2) George Mitchell (Chesterhall) Ltd v Finney Lock Seeds Ltd [1982] QB 284, 297 2

3 decided to develop a standard form contract in the late nineteenth century, which was ultimately first published in 1910 in agreement with the Master Builders. 5 Keane identifies that this first edition appears to have been used up to 1939, when a revised draft of a new edition was circulated. This led to a disagreement with the precursor to the CIF (the Federation of Building Contractors and Allied Employers of Ireland) and it was not until 1950 that matters were resolved. 6 In order to avoid such disputes in the future, a Liaison Committee was established with representatives of the RIAI, CIF, SCSI and ACEI to interpret and review the standard form The latest edition of the standard form is the RIAI Construction Contract August 2017 Edition which is identified as an amended version of the 2012 edition. 7 The focus of this paper will be on the amendments, however, it is worth providing some information on the nature of the RIAI Construction Contract so as to give some context to the discussion. 2. The RIAI Contract 2.1. The RIAI publishes four standard form construction contracts which are: The RIAI Construction Contract where Quantities form part of the contract (the Yellow Form ); The RIAI Construction Contract where Quantities do not form part of the contract (the Blue Form ); Articles of Agreement SF88, 1999 Edition (the Short Form ); and RIAI Building Contract, August 2002 (the White Form ). This paper will focus exclusively on the first two standard forms, the Yellow and Blue Forms, which are essentially two versions of the one standard form. They will be referred to collectively hereafter as the RIAI Contract The RIAI Contract is the most widely used private sector contract in Ireland and, as such, may be considered the Grand Dame of standard 5 David Keane, The RIAI Contracts: A Working Guide (4 th edn, The RIAI 2001) 26 6 Keane (n.5) 27 7 RIAI Construction Contract August 2017 Edition, cover page. 3

4 forms in Ireland. It has been produced by the RIAI in agreement with the Construction Industry Federation and the Society of Chartered Surveyors Ireland. Therefore, it is believed that all parties interests are represented i.e. those of the client, the construction industry and the professions. As a result, it is generally considered to be a fair contract with a level balancing of risk allocation. Nevertheless, it is common that this standard form contract is heavily amended and, so much so, that there are what are considered to be industry standard amendments Both the Yellow and Blue Forms are designed to be used in a traditional project procurement context i.e. where the client/employer has carried out the design The Yellow Form is a remeasurement contract which means that the work is measured and paid on the basis of rates identified in a Bill of Quantities. It anticipates that the design will be completed before the contract and a full measured Bill of Quantities has been prepared. The contract consists of the form of contract, contract drawings and contract bills By contrast, the Blue Form is a lump sum fixed price contract. This means that the contractor is expected to complete the works for a fixed price. Therefore, a Bill of Quantities is not required as the cost of the work is encompassed in the fixed price. There is, however, a schedule of rates which is to be used a basis for pricing variations under the contract. The contract documents consist of the form of contract, contract drawings, specifications and a schedule of rates. Lump sum fixed price contracts are popular as they are believed to give an employer/client greater certainty over costs and more cost control The RIAI Contract is divided into sections: the Articles of Agreement, Conditions of Contract and the Schedule. The Articles of Agreement provide the essential details in relation to the contract and the fundamental agreement between the parties. They contain the details of the parties, the Works, the contract documents, the Contract Sum, and the parties 4

5 agents. It also contains the execution blocks so that the contract can be signed as a simple contract or as a deed. It is designed so that the parties can fill in the requisite blanks so as to complete the agreement between them Details of the operational and management mechanisms are provided in the Conditions of Contract. There are 38 clauses in the Conditions dealing with everything from management, variations, payment and dispute resolution. The dispute resolution clause provides for negotiations, conciliation and arbitration The Appendix provides a mechanism for inserting details which vary from project to project. Similar to the Articles of Agreement, it has specific blanks that must be completed by the parties. There are now eighteen items relating to specific clauses in the contract which can be completed by the parties according to the agreed commercial arrangements Whilst it is considered to be balanced, the RIAI Contract is amended practically as a matter of course. Employers/clients will amend clauses to make the terms more favourable to them and to push more risk on the contractor. Similarly, contractors will seek to do likewise with employers/clients. Funders will also require that amendments are made to give greater cost certainty, to provide for certain deliverables during the course of the contract and on completion and to ensure the provision of access and information to their representatives Amendments are usually prepared as a separate document which incorporate the RIAI Contract and then identifies the amendments to specific provisions of the RIAI Contract. This means that any amendments must be read in conjunction with the RIAI contract, usually with the two documents side by side as you work your way through them. Hence, it can be a difficult job to ascertain what the actual contractual provisions are when you have a schedule of detailed amendments. Nevertheless, it remains the preferred standard form contract in the industry. 5

6 3. The 2017 Edits to the RIAI Contract 3.1. The RIAI Contracts Drafting Group (the CDG ) is working on a complete overhaul and modernisation of the RIAI Contract whilst engaging in liaison with the various stakeholders in the industry. 8 The wider scope of the CDG s work includes: a complete overhaul of the RIAI Contract this will include the use of plain English; a revised structure for ease of navigation; provisions on building control and building regulations; revisions in respect of the use of Nominated Sub-Contractors; a revision of the insurance provisions; time bars; optional provisions to deal with common funders requirements; related documents and forms; and an extended Practice Note and Guide; a new Short Form 2018 (SF18) to replace SF88; a new Design & Build standard form; and accompanying Project Management Guides, forms and certificates Whilst the CDG is still working on the overhaul of the suite of contracts, the 2017 edition of the RIAI Contract was produced and published mainly as a response to the introduction of the Construction Contracts Act 2013 (the 2013 Act ) and the Building Control (Amendment) Regulations It was felt that this was urgently required so as to reflect the current legislative framework and changing practice since the 2012 edition As previously noted, the 2017 edition is an amended version of the 2012 edition with seven main amendments ( Edits ). Therefore, the 2012 edition has been given a facelift as opposed to a complete overhaul. These Edits are as follows: Edit 1 The Execution block in the Articles of Agreement dealing with the identity of the parties; Edit 2 An expansion of the definition of the Works provided in clause 1 of the Conditions of Contract; 8 RIAI, Practice Note for RIAI Constructions Contracts (RIAI 2017) 2 6

7 Edit 3 Redefining clause 38 of the Conditions of Contract to focus on avoiding and resolving disputes; Edit 4 there is a proposed amendment for the way VAT will be dealt with, however, this has been postponed pending further liaison with industry stakeholders; Edit 5 amendments have been made to reflect the provisions of the 2013 Act. This includes adding a new Article 5 to the Articles of Agreement, amendments to clause 35 of the Conditions of Contract and the inclusion of an additional item in the Appendix; Edit 6 the terms of the RIAI Contract have been amended to make them gender neutral; and Edit 7 this relates to updating the text of a retention bond. This was postponed in the first print run of this edition but will be included in the second print run (March 2018) It is worth considering each of the Edits which have been introduced in some more detail. Edits 4 and 7 are excluded from consideration at this time The amendment of the execution block of the RIAI Contract by Edit 1 is designed to avoid any doubt as to the identity of the parties. 9 The execution block has been expanded to provide for the inclusion of a company s registration number and its CRO registered address. It also includes wording to identify that the contract is being signed by an authorised partner, if one of the parties is a partnership Edit 2 involves the addition of two new sub-clauses to clause 1 (Definitions) of the Conditions of Contract. Clause 1(d) has been added which identifies that references to the defined term Works in the contract shall include the Contractor s compliance with the Building Regulations, the Building Control Regulations under the Building Control Acts and with the provisions of the Code of Practice for Inspecting and 9 RIAI (n.8) 2 7

8 Certifying Buildings and Works. 10 The second addition, Clause 1(e), deals with the delivery of notices and when they will be considered validly delivered Clause 38 has been amended by Edit 3. The title has been changed from Disputes Resolution to Avoiding and Resolving Disputes and the stated intention of the revised wording is to support the culture of negotiation by the parties so as to limit the avoidable escalation of disputes and to promote early resolution. 11 Clause 38(a)(i) has been amended to refer to disputes being resolved through negotiation, albeit it does not oblige the parties to attempt negotiation as a first step. The language in respect of referring a dispute to conciliation has moved from mandating conciliation ( shall be referred to conciliation ) to recommending it ( the parties should enter into conciliation ). As a result, the default mandatory dispute resolution process under the RIAI Contract is arbitration clause 38(b). Additional provisions have been added at the end of clause 38 to deal with Conciliation and the Conciliator s Recommendation Edit 5 deals with the impact of the 2013 Act. The first amendment is to the Articles of Agreement whereby a new Article 5 has been inserted. This identifies that all notices arising under the 2013 Act shall be delivered by registered post except for payment claims which may be delivered by . It notes that the Architect may notify the Contractor of a change of address after the contract is formed. The Appendix has been amended to require the parties to identify the Architect s address for the purpose of Article 5. Clause 35 (Certificates and Payments) has been amended to identify the first payment claim date as being one month from the actual date of possession of the site clause 35(b). It also now provides that a detailed progress statement may include a payment claim notice pursuant to section 4 of the 2013 Act. The Architect is obliged to provide reasons for any difference between any amount certified and the amount 10 Published by the Department of Housing, Planning, Community and Local Government current at the Designated Date (as defined in the RIAI Contract) 11 RIAI (n.8) 6 8

9 applied for in a progress statement. The 2012 edition only obliged the Architect to explain the difference if the Contractor requested an explanation Finally, Edit 6 involved removing any reference to gender specific wording such as him/he/his throughout. 4. Was the facelift required? 4.1. So did the Grand Dame really need the facelift or should she have been allowed to retire gracefully in the near future? Whilst I believe the amendments are laudable and the intentions are good, I submit that the Grand Dame should have been allowed to retire when the new suite of documents are published. My views should be considered in the context of the CDG s current significant undertaking, which will ultimately result in a revised suite of contracts. I have great sympathy for the position of the CDG and the RIAI whereby they are seeking to maintain a market leading standard form contract which can be used by a myriad of parties with a varying range of knowledge of contract administration and legal requirements. I also acknowledge that it can take some considerable time for all stakeholders to agree on the wording of a standard text. They have succeeded in keeping the Edits straightforward and to a minimum and I would suggest, have addressed any immediate pressure the various stakeholders have brought to bear. Nevertheless, I believe there was merit in leaving the 2012 edition as it was with a view to allowing the CDG focus on its current mandate and to avoid confusion in the industry The 2012 edition has continued to be used since the Building Control (Amendment) Regulations 2014 were introduced and the 2013 Act was commenced in Parties have generally altered their standard amendments to reflect the position and the 2012 edition continues to be used successfully today. Indeed, I am finding that parties are requesting that the 2012 edition be used as the base document for current projects; otherwise the instructing party will have to pay the costs of the preparation 9

10 of a new suite of amendments, where their existing amendments already provide for many of the Edits in the 2017 edition This also ties in with the fact that a new suite of standard form contracts are expected in the future. Clients are reticent to incur the costs of creating amendments to the 2017 edition where they will have to bear those costs again when the new suite is published. They appear to be happy to proceed on the basis of the 2012 edition with their own amendments Let us also look at the Edits themselves and what they seek to achieve. Edit 1 amends the execution block to provide certainty of the identity of the parties. I have found, in practice, that either: (i) the parties will be specifically identified in the opening provisions of the Articles of Agreement, including their registered numbers; or (ii) amendments will have been made to replace the Articles of Agreement with a client form that includes provisions identifying the parties I believe that the addition of two new sub-clauses in clause 1 of the Conditions of Contract, provided for by Edit 2, was unwarranted. The extension of the definition of the term Works serves to cover obligations which the Contractor is statutorily required to comply with in any event. These obligations are implied by law and, if the Contractor did not comply with them, the Employer could mount a claim for breach of an implied term and/or breach of statutory duty. In any event, the Architect has a policing function under both the contract and the legislation so that any lack of compliance should be picked up at an early stage The addition of clause 1(e) in relation to validity of delivery of notices is a nice to have but I am not sure it needed a specific amendment at this stage. One could have regard to the provisions of clause 1(b) to see that Saturdays, Sundays, Statutory Holidays and Good Friday were not to be counted where any act, matter or thing is to be done in a stated period of working days. I submit that the delivery of a notice would be deemed to be an act, matter or thing to be done under the contract. 10

11 4.7. I am not convinced that the amendments made by Edit 5 for the purpose of the 2013 Act were required. The relevant sections of the 2013 Act provide: 3(1) A construction contract shall provide for (a) the amount of each interim payment to be made under the construction contract, and (b) the amount of the final payment to be made under the construction contract, or for an adequate mechanism for determining those amounts 3(2) A construction contract shall provide for (a) the payment claim date, or an adequate mechanism for determining the payment claim date, for each amount due under the construction contract, and (b) the period between the payment claim date for each such amount and the date on which the amount is so due.... 4(1) This section applies where, not later than 5 days after the payment claim date, an executing party to a construction contract delivers a payment claim notice relating to a payment claim to the other party or another person specified under the construction contract. 4(2) A payment claim notice is a notice specifying (a) the amount claimed (even if the amount is zero), (b) the period, stage of work or activity to which the payment claim relates, (c) the subject matter of the payment claim, and (d) the basis of the calculation of the amount claimed. 4(3) If the other party or specified person referred to in subsection (1) contests that the amount is due and payable, then the other party or specified person 11

12 (a) shall deliver a response to the payment claim notice to the executing party, not later than 21 days after the payment claim date, specifying (i) the amount proposed to be paid, (ii) the reason or reasons for the difference between the amount in the payment claim notice and the amount referred to in subparagraph (i), and (iii) the basis on which the amount referred to in subparagraph (i) is calculated, and (b) if the matter has not been settled by the day on which the amount is due, shall pay the amount referred to in paragraph (a) to the executing party not later than on that day It is my view that clause 35 (Certificates and Payments) of the 2012 edition provides a mechanism for determining the amount of each interim payment and the final payment to be made under the contract and thus complies with section 3(1) and 3(2) of the 2013 Act. Clause 35(b) of the 2012 edition identifies that the Contractor must submit, at the period of Interim Certificates identified in the Appendix, a detailed progress statement to entitle it to a certificate from the Architect of the amount due from the Employer to the Contractor. This certificate must be paid by the Employer within seven working days of presentation of the Certificate by the Contractor to the Employer. Thus the existing provisions of the 2012 edition identify how to determine the payment claim date through the use of the period of Interim Certificates. It also identifies the period between the payment claim date and the date on which the amount is due by specifying the time period for provision of the Certificate by the Architect and the period for honouring it by the Employer Clauses 35(h) and 35(i) identify the mechanism for determining the final payment under the contract through the final account process and the issuing of a Final Certificate. It also identifies when the Contractor is to 12

13 submit its documents for the purpose of calculation of the Final Certificate, the time period within which the Architect must complete measurement and valuation of the Works, when the Final Certificate shall be issued and when the amounts identified in the Final Certificate become a debt payable to the Contractor I would note that the RIAI Contract is generally used as the main contract and, therefore, section 3(3) and the schedule of the 2013 Act do not then apply In relation to section 4 of the 2013 Act, I believe that the Architect fulfils the role of another person specified under the construction contract as required by section 4(1). The Architect is identified as the person to whom the Contractor s applications for payment are made. Further, I find that, in practice, the Contractor s detailed progress statement provides the information required pursuant to section 4(2). The Architect s Certificate acts as the response required by section 4(3) although the 2012 edition does not require the Architect to provide reasons for any difference. Nevertheless, it only requires an agreed contract administration process to ensure the Architect provides reasons with every Certificate and which would ensure compliance with the 2013 Act without the need for amendments to the contract. This may also be said for any notices to be provided so as to remove any doubt about compliance with the 2013 Act The means by which notices are given under the contract, including in relation to payment applications, is a matter for the parties. Therefore, it should be up to the parties to agree whether they want payment notices to be exchanged by . In general, payment claims are completed by so I would submit that the insertion of Article 5 was not required as a specific provision. Or if you are going to make such an amendment, why not provide the parties with a range of options? I am conscious that the CDG and RIAI is trying to cover a broad spectrum of parties when drafting the amendments and, therefore, these amendments 13

14 also serve to educate and highlight key legislative provisions. In experience, I find that if parties are not sophisticated enough to be aware of the legislative provisions, then they rarely operate the contractual mechanisms. I also have experience of sophisticated parties taking advantage of less knowledgeable counterparts but, in those circumstances, I have found that the less knowledgeable party failed to read or administer the contract so it did not really matter what the documents said in any event Finally, whilst equality and diversity are big issues in the industry at the moment, I am not sure that Edit 6, which makes the 2012 edition gender neutral, was a burning issue at this point in time. Suffice it to say that, from my point of view, there are other areas of the industry that could be looked at first! 5. Conclusion 5.1. This paper is in no way meant to denigrate or take away from the colossal work that has been, and is being, carried out by the CDG and the RIAI. I accept that they are in a damned if you do, damned if you don t situation where they have likely been under pressure to revise the 2012 edition for some time. There has been a great deal of publicity and a certain amount of media panic surrounding the introduction of the 2013 Act and the Building Control (Amendment) Regulations 2014 and I think that many parties may have unfairly criticised the 2012 edition without fully understanding it or the legislative provisions I think it is a testament to the RIAI that the 2012 edition is such a good document and is so widely used. As the Grand Dame of standard form contracts in Ireland, it has a sterling reputation, is well liked and is first recommended. Perhaps I am being romantic but my view is that if you are going to retire the old lady, then let her go in dignity without trying to knock years off her. Let the successor take the mantle when it is ready. 14

IMPROVING PAYMENT PRACTICES IN THE CONSTRUCTION INDUSTRY

IMPROVING PAYMENT PRACTICES IN THE CONSTRUCTION INDUSTRY IMPROVING PAYMENT PRACTICES IN THE CONSTRUCTION INDUSTRY Report of the DTI s post-consultation event held in London on 14th February 2006 On Valentine s Day 2006, the Right Honourable Alun Michael MP compared

More information

Elements of a Civil Claim

Elements of a Civil Claim Elements of a Civil Claim This presentation provides an overview of the elements of a civil claim, with particular reference to construction claims, and looks at each dispute resolution option in the context

More information

Introduction Agreement

Introduction Agreement Introduction Agreement between Spigo Malta Ltd. and Introducer Table of Contents 1.Interpretation...3 2.Introductions...4 3.Anti-bribery compliance...5 4.Commission and payment...6 5.Obligations of Spigo...8

More information

Corporations Act 2001 Company Limited by Guarantee. CONSTITUTION OF ALLIED HEALTH PROFESSIONS AUSTRALIA LTD ACN Amended 1 August 2017

Corporations Act 2001 Company Limited by Guarantee. CONSTITUTION OF ALLIED HEALTH PROFESSIONS AUSTRALIA LTD ACN Amended 1 August 2017 Corporations Act 2001 Company Limited by Guarantee CONSTITUTION OF ALLIED HEALTH PROFESSIONS AUSTRALIA LTD ACN 083 141 664 Amended 1 August 2017 INTRODUCTION 1. Objects 1.1 The objects for which the Company

More information

White Young Green Consulting v Brooke House Sixth Form College [2007] APP.L.R. 05/22

White Young Green Consulting v Brooke House Sixth Form College [2007] APP.L.R. 05/22 JUDGMENT : Mr Justice Ramsey : TCC. 22 nd May 2007 Introduction 1. This is an application for leave to appeal under s.69(3) of the Arbitration Act 1996. The arbitration concerns the appointment of the

More information

2009 No (L. 20) TRIBUNALS AND INQUIRIES

2009 No (L. 20) TRIBUNALS AND INQUIRIES S T A T U T O R Y I N S T R U M E N T S 2009 No. 1976 (L. 20) TRIBUNALS AND INQUIRIES The Tribunal Procedure (First-tier Tribunal) (General Regulatory Chamber) Rules 2009 Made - - - - 16th July 2009 Laid

More information

THE BUILDING CONTROL AMENDMENT REGULATIONS. Martin Waldron BL

THE BUILDING CONTROL AMENDMENT REGULATIONS. Martin Waldron BL MARTIN WALDRON BL FCIArb MSCSI MRICS Accredited Adjudicator & Mediator Law Library The Four Courts Dublin 7 +353(1)8177865 +353(86)2395167 www.waldron.ie martin@waldron.ie THE BUILDING CONTROL AMENDMENT

More information

Deed of Company Arrangement

Deed of Company Arrangement Deed of Company Arrangement Matthew James Donnelly Deed Administrator David Mark Hodgson Deed Administrator Riverline Enterprises Pty Ltd ACN 112 906 144 (Administrators Appointed) trading as Matera Construction

More information

JCLI Scottish Landscape Works Agreement 2013 (JCLI SLWA 2013)

JCLI Scottish Landscape Works Agreement 2013 (JCLI SLWA 2013) JCLI Scottish Landscape Works Agreement 2013 (JCLI SLWA 2013) for use with the JCLI Landscape Works Contract 2012 (JCLI LWC 2012) JCLI Scottish Landscape Works Agreement (JCLI SLWA) This document has been

More information

London Borough of Hillingdon. - and - Uxbridge BID Ltd BID OPERATING AGREEMENT

London Borough of Hillingdon. - and - Uxbridge BID Ltd BID OPERATING AGREEMENT Dated London Borough of Hillingdon and Uxbridge BID Ltd BID OPERATING AGREEMENT THIS DEED is made the day of 2015 BETWEEN (1) The London Borough of Hillingdon (2) Uxbridge BID Co. Ltd. (the "BID Company")

More information

Ebbsfleet Development Corporation. Date of meeting : 18/05/2105 Agenda item : EDC 15 / 017

Ebbsfleet Development Corporation. Date of meeting : 18/05/2105 Agenda item : EDC 15 / 017 Ebbsfleet Development Corporation Date of meeting : 18/05/2105 Agenda item : EDC 15 / 017 1 Background: 1.1 The Ebbsfleet Development Corporation (EDC) was established on the 20th April 2015. The planning

More information

Anglo American Procurement Solutions Site

Anglo American Procurement Solutions Site Anglo American Procurement Solutions Site Access Terms and Conditions Anglo American Services (UK) Ltd Anglo American Procurement Solutions Site Access Terms and Conditions ~*~ Access Terms and Conditions

More information

CONCODE. Guide to the agreement for the appointment of architects, surveyors and engineers for commissions in the NHS (1995edition) STATUS IN WALES

CONCODE. Guide to the agreement for the appointment of architects, surveyors and engineers for commissions in the NHS (1995edition) STATUS IN WALES CONCODE Guide to the agreement for the appointment of architects, surveyors and engineers for commissions in the NHS (1995edition) 1995 STATUS IN WALES ARCHIVED For queries on the status of this document

More information

APPLICATION FOR THE (A) THE APPOINTMENT OF A CONCILIATOR [ ] (B) THE APPOINTMENT OF A MEDIATOR [ ]

APPLICATION FOR THE (A) THE APPOINTMENT OF A CONCILIATOR [ ] (B) THE APPOINTMENT OF A MEDIATOR [ ] APPLICATION FOR THE (A) THE APPOINTMENT OF A CONCILIATOR [ ] OR (B) THE APPOINTMENT OF A MEDIATOR [ ] BY THE PRESIDENT OF THE SOCIETY OF CHARTERED SURVEYORS IRELAND IN RESPECT OF A CONSTRUCTION OR RELATED

More information

JCLI Scottish Landscape Maintenance Works Agreement April 2017 (JCLI SLMWA )

JCLI Scottish Landscape Maintenance Works Agreement April 2017 (JCLI SLMWA ) JCLI Scottish Landscape Maintenance Works Agreement April 2017 (JCLI SLMWA 2017-04) for use with the JCLI Landscape Maintenance Works Contract 2017 (JCLI LMWC 2017) JCLI Scottish Landscape Maintenance

More information

Planning (Listed Buildings and Conservation Areas) Act 1990

Planning (Listed Buildings and Conservation Areas) Act 1990 Planning (Listed Buildings and Conservation Areas) Act 1990 Page 1 Planning (Listed Buildings and Conservation Areas) Act 1990 1990 CHAPTER 9 Sweet & Maxwell Ltd. UK Statutes Crown Copyright. Reproduced

More information

BIG ISLAND CONSTRUCTION (HONG KONG) LTD v ABDOOLALLY EBRAHIM & CO (HONG KONG) LTD - [1994] 3 HKC 518

BIG ISLAND CONSTRUCTION (HONG KONG) LTD v ABDOOLALLY EBRAHIM & CO (HONG KONG) LTD - [1994] 3 HKC 518 1 BIG ISLAND CONSTRUCTION (HONG KONG) LTD v ABDOOLALLY EBRAHIM & CO (HONG KONG) LTD - [1994] 3 HKC 518 HIGH COURT KAPLAN J ACTION NO 11313 OF 1993 28 July 1994 Civil Procedure -- Summary judgment -- Lack

More information

To participate in the Local Government Pension Scheme

To participate in the Local Government Pension Scheme DATED 2 (1) THE ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD and (2) [ ] and (3) [ ] ADMISSION AGREEMENT To participate in the Local Government Pension Scheme Admission Agreement v3 01/18 2 CONTENTS 1. DEFINITIONS

More information

STANDARD CFA TERMS AND CONDITIONS FOR PERSONAL INJURY CASES TREATED AS ANNEXED TO THE CONDITIONAL FEE AGREEMENT BETWEEN SOLICITOR AND COUNSEL

STANDARD CFA TERMS AND CONDITIONS FOR PERSONAL INJURY CASES TREATED AS ANNEXED TO THE CONDITIONAL FEE AGREEMENT BETWEEN SOLICITOR AND COUNSEL STANDARD CFA TERMS AND CONDITIONS FOR PERSONAL INJURY CASES TREATED AS ANNEXED TO THE CONDITIONAL FEE AGREEMENT BETWEEN SOLICITOR AND COUNSEL FOR USE AFTER 31 JANUARY 2013 PLEASE NOTE: THESE TERMS WILL

More information

Getting ready for Ontario s new Construction Act. Understanding the key changes and how to prepare for them. Howard Krupat

Getting ready for Ontario s new Construction Act. Understanding the key changes and how to prepare for them. Howard Krupat Getting ready for Ontario s new Construction Act Understanding the key changes and how to prepare for them Howard Krupat Getting ready for Ontario s new Construction Act Understanding the key changes and

More information

Note Deed Poll. Dated 19 December 2014

Note Deed Poll. Dated 19 December 2014 Dated in relation to the A$15,000,000,000 Medium Term Note Programme of Lloyds Bank plc and Lloyds Banking Group plc (each an Issuer, and together the Issuers ) The Notes have not been and will not be

More information

RESPONSE TO REVIEW OF THE CONSTRUCTION CONTRACTS (SECURITY OF PAYMENTS) ACT (NT): ISSUES PAPER OCTOBER 2017

RESPONSE TO REVIEW OF THE CONSTRUCTION CONTRACTS (SECURITY OF PAYMENTS) ACT (NT): ISSUES PAPER OCTOBER 2017 HIA Submission to the Department of Attorney-General & Justice RESPONSE TO REVIEW OF THE CONSTRUCTION CONTRACTS (SECURITY OF PAYMENTS) ACT (NT): ISSUES PAPER OCTOBER 2017 28 November 2017 1. EXECUTIVE

More information

9/13/2013 gerard o sullivan Mulcahy McDonagh & Partners 1

9/13/2013 gerard o sullivan Mulcahy McDonagh & Partners 1 STATUTORY IMPLIED PAYMENT TERMS AND STATUTORY ADJUDCIATION THE CONSTRUCTION CONTRACTS ACT Number 34 of 2013 SEPTEMBER 2013 Gerry O Sullivan FSCSI FRICS FCIArb 9/13/2013 gerard o sullivan Mulcahy McDonagh

More information

ICSA Connect Guidance Notes & Constitution for ICSA Groups

ICSA Connect Guidance Notes & Constitution for ICSA Groups ICSA Connect Guidance Notes & Constitution for ICSA Groups Any member based in the UK who wishes to form a group under the new ICSA Connect arrangements should use this constitution. Whilst it is envisaged

More information

Dated [ ] NORFOLK COUNTY COUNCIL AND [ ] MEMBERS ACCESS AGREEMENT RE LGPS FRAMEWORK ARRANGEMENTS

Dated [ ] NORFOLK COUNTY COUNCIL AND [ ] MEMBERS ACCESS AGREEMENT RE LGPS FRAMEWORK ARRANGEMENTS Dated [ ] NORFOLK COUNTY COUNCIL AND [ ] MEMBERS ACCESS AGREEMENT RE LGPS FRAMEWORK ARRANGEMENTS nplaw/[ ] 1 THIS AGREEMENT is made the day of [ ] BETWEEN NORFOLK COUNTY COUNCIL of County Hall, Martineau

More information

CAPACITY MARKET FRAMEWORK AGREEMENT

CAPACITY MARKET FRAMEWORK AGREEMENT CAPACITY MARKET FRAMEWORK AGREEMENT THIS CAPACITY MARKET FRAMEWORK AGREEMENT is made as a deed on the day of 2017 day of 2017 BETWEEN 1. EIRGRID plc, an Irish company formed pursuant to Regulation 34 of

More information

FINANCIAL GUIDANCE AND CLAIMS BILL [HL] EXPLANATORY NOTES ON COMMONS AMENDMENTS

FINANCIAL GUIDANCE AND CLAIMS BILL [HL] EXPLANATORY NOTES ON COMMONS AMENDMENTS FINANCIAL GUIDANCE AND CLAIMS BILL [HL] EXPLANATORY NOTES ON COMMONS AMENDMENTS What these notes do 1 Claims Bill [HL] as brought from the House of Commons on 24 April 2018. 2 They have been prepared by

More information

[INSERT NAME OF DEPOSIT PLACING ENTITY/PARTY A] as Principal. and. [INSERT NAME OF DEPOSIT TAKING ENTITY/PARTY B] as Agent

[INSERT NAME OF DEPOSIT PLACING ENTITY/PARTY A] as Principal. and. [INSERT NAME OF DEPOSIT TAKING ENTITY/PARTY B] as Agent Dated: 14 th August 2008 As approved by Shari'ah (pursuant to the Fatwa signed on 7 th September 2008) This document is in a non-binding, recommended form and intended to be used as a starting point for

More information

MODEL CLAUSES FOR ALTERNATIVE DISPUTE RESOLUTION

MODEL CLAUSES FOR ALTERNATIVE DISPUTE RESOLUTION 1 Background MODEL CLAUSES FOR ALTERNATIVE DISPUTE RESOLUTION This paper and the clauses that are set out below form a companion-piece to the chapter entitled Alternative Dispute Resolution Clauses in

More information

UK PURCHASE AGREEMENT

UK PURCHASE AGREEMENT C RIO TINTO PLC AND RIO TINTO LIMITED UK PURCHASE AGREEMENT LINKLATERS One Silk Street London EC2Y 8HQ Telephone: (44-20) 7456 2000 Facsimile: (44-20) 7456 2222 Ref: JAGI/NZH This Agreement is made on

More information

The Employment Law Changes Introduced on 6 April 2012

The Employment Law Changes Introduced on 6 April 2012 The Employment Law Changes Introduced on 6 April 2012 1) April is normally a time for change in employment law and this April was no exception. On 6 April some significant procedural changes and amendments

More information

Deed. Lookout Road Hard Rock Quarry. Planning Agreement

Deed. Lookout Road Hard Rock Quarry. Planning Agreement Deed Lookout Road Hard Rock Quarry Planning Agreement Under s93f of the Environmental Planning and Assessment Act 1979 Date: lindsaytaylorlawyers Level 9, Suite 3, 420 George Street, Sydney NSW 2000, Australia

More information

CARIBBEAN COURT OF JUSTICE APPELLATE JURISDICTION RULES 2017

CARIBBEAN COURT OF JUSTICE APPELLATE JURISDICTION RULES 2017 CARIBBEAN COURT OF JUSTICE APPELLATE JURISDICTION RULES 2017 In exercise of the powers conferred on the President of the Caribbean Court of Justice pursuant to Article 21 of the Agreement Establishing

More information

GENERAL TERMS AND CONDITIONS FOR THE SUPPLY OF GOODS AND SERVICES

GENERAL TERMS AND CONDITIONS FOR THE SUPPLY OF GOODS AND SERVICES GENERAL TERMS AND CONDITIONS FOR THE SUPPLY OF GOODS AND SERVICES 1 Interpretation 1.1 Definitions. In these Conditions, the following definitions apply: Business Day means a day (other than a Saturday,

More information

GUARANTEE AND INDEMNITY

GUARANTEE AND INDEMNITY (1) INSPIRED ASSET MANAGEMENT limited (2) MORE GROUP CAPITAL SERVICES LIMITED DATED 2018 GUARANTEE AND INDEMNITY Salisbury House London Wall London EC2M PS Tel: 020 738 9271 Fax: 020 728 72 Ref: CBA/AC/GRM1.1

More information

Model letters for use by the Contractor

Model letters for use by the Contractor 178 Appendices Model letters for use by the Contractor Letter to the Engineer c.c. Employer ML 1.3 Sub - Clause 1.3 Communications We confirm the agreement made between us on (date) in respect of site

More information

NO About this consultation paper. Introduction 3. Background 3-5. The Standard of Proof Rule The Proposed New Rules 9-10

NO About this consultation paper. Introduction 3. Background 3-5. The Standard of Proof Rule The Proposed New Rules 9-10 INDEX PAGE NO About this consultation paper Introduction 3 Background 3-5 The Standard of Proof Rule 5 5-8 The Proposed New Rules 9-10 Equality Impact Assessment 10 How to Respond 11 Appendix A: Draft

More information

THE BRITISH SOCIETY FOR HAEMATOLOGY REGULATIONS

THE BRITISH SOCIETY FOR HAEMATOLOGY REGULATIONS THE BRITISH SOCIETY FOR HAEMATOLOGY REGULATIONS These Regulations of The British Society for Haematology ( the Society ) are made by the Trustees of the Society on 18 June 2010 and revised on 16 June 2016

More information

Agreement for Supply of Services (short form)

Agreement for Supply of Services (short form) Agreement for Supply of Services (short form) The British Council: The Client Date: [THE BRITISH COUNCIL, incorporated by Royal Charter and registered as a charity (under number 209131 in England & Wales

More information

LFMI MEDIA SERVICES LIMITED T/A RUE POINT MEDIA

LFMI MEDIA SERVICES LIMITED T/A RUE POINT MEDIA Dated: September 2017 LFMI MEDIA SERVICES LIMITED T/A RUE POINT MEDIA TERMS AND CONDITIONS FOR THE SUPPLY OF SERVICES 1. INTERPRETATION 1.1 THE FOLLOWING DEFINITIONS AND RULES OF INTERPRETATION APPLY IN

More information

8. Part 4 (General) contains general and supplemental provisions.

8. Part 4 (General) contains general and supplemental provisions. DELEGATED POWERS AND REGULATORY REFORM COMMITTEE HIGHER EDUCATION AND RESEARCH BILL Memorandum by the Department for Education Introduction 1. This Memorandum has been prepared for the Delegated Powers

More information

RULES FOR KAISER PERMANENTE MEMBER ARBITRATIONS ADMINISTERED BY THE OFFICE OF THE INDEPENDENT ADMINISTRATOR

RULES FOR KAISER PERMANENTE MEMBER ARBITRATIONS ADMINISTERED BY THE OFFICE OF THE INDEPENDENT ADMINISTRATOR RULES FOR KAISER PERMANENTE MEMBER ARBITRATIONS ADMINISTERED BY THE OFFICE OF THE INDEPENDENT ADMINISTRATOR AMENDED AS OF JANUARY 1, 2016 TABLE OF CONTENTS A. GENERAL RULES...1 1. Goal...1 2. Administration

More information

1. It is simply an expression of intention to enter into a contract in the future; and 2. It will usually have no binding effect.

1. It is simply an expression of intention to enter into a contract in the future; and 2. It will usually have no binding effect. LETTERS OF INTENT REVIEWED The purpose of this article is to consider the following: 1. What is a letter of intent; 2. What is their purpose; 3. What is their contractual significance; 4. How is remuneration

More information

POST-ACTION PROTOCOL PART II LANDLORD AND TENANT ACT 1954

POST-ACTION PROTOCOL PART II LANDLORD AND TENANT ACT 1954 POST-ACTION PROTOCOL PART II LANDLORD AND TENANT ACT 1954 Introduction 1. Business tenancy renewals are governed by Part II of the Landlord and Tenant Act 1954 (the 1954 Act ) and Part 56 of the CPR (and

More information

TERMS AND CONDITIONS OF SALES

TERMS AND CONDITIONS OF SALES 1. Acceptance No Contract, Order or information (literature, drawings etc.) provided to or by the Purchaser shall be binding on Infra Green Ltd unless confirmed in the Infra Green Ltd Order Confirmation.

More information

ATM ACCESS AUSTRALIA LIMITED ATM ACCESS CODE

ATM ACCESS AUSTRALIA LIMITED ATM ACCESS CODE Effective 1 January 2011 Version 003 ATM ACCESS AUSTRALIA LIMITED ABN 52 130 571 103 A Company limited by Guarantee ATM ACCESS CODE Commencement Date: 3 March 2009 Copyright 2009 ATM Access Australia Limited

More information

DATED 20 HSBC BANK PLC. and [FUNDER] and [COMPANY] DEED OF PRIORITY

DATED 20 HSBC BANK PLC. and [FUNDER] and [COMPANY] DEED OF PRIORITY Funder Priority specified assets. DATED 20 HSBC BANK PLC and [FUNDER] and [COMPANY] DEED OF PRIORITY CONTENTS PAGE 1 DEFINITIONS AND INTERPRETATION... 1 2 CONSENTS... 2 3 PRIORITIES... 2 4 CONTINUING SECURITY...

More information

[2005] VCAT Arrow International Australia Pty Ltd Indevelco Pty Ltd Perpetual Nominees Ltd as custodian of the Colonial First State Income Fund

[2005] VCAT Arrow International Australia Pty Ltd Indevelco Pty Ltd Perpetual Nominees Ltd as custodian of the Colonial First State Income Fund VICTORIAN CIVIL AND ADMINISTRATIVE TRIBUNAL CIVIL DIVISION DOMESTIC BUILDING LIST VCAT REFERENCE NO. D181/2004 CATCHWORDS Requests for Further and Better Particulars and further discovery nature of this

More information

PROCEDURE FOR DETAILED ASSESSMENT OF COSTS AND DEFAULT PROVISIONS

PROCEDURE FOR DETAILED ASSESSMENT OF COSTS AND DEFAULT PROVISIONS PRACTICE DIRECTION PART 47 DIRECTIONS RELATING TO PART 47 PROCEDURE FOR DETAILED ASSESSMENT OF COSTS AND DEFAULT PROVISIONS SECTION 28 TIME WHEN ASSESSMENT MAY BE CARRIED OUT: RULE 47.1 28.1 (1) For the

More information

CONSTRUCTION BRIEFING November 2016

CONSTRUCTION BRIEFING November 2016 CONSTRUCTION BRIEFING November 2016 New Pre-Action Protocol for Construction and Engineering Disputes launched The Second Edition of the Pre-Action Protocol for Construction and Engineering Disputes comes

More information

MCPS MEMBERSHIP AGREEMENT (MA2) AND ANNEXES

MCPS MEMBERSHIP AGREEMENT (MA2) AND ANNEXES MCPS MEMBERSHIP AGREEMENT (MA2) AND ANNEXES 1. APPOINTMENT OF MCPS 1.1 The Member hereby appoints MCPS to act as the Member s sole and exclusive agent in the Territory to manage and administer the Rights

More information

1. Name, Foundation and Legal Status Objectives Principles Language and Communication Members Good Standing..

1. Name, Foundation and Legal Status Objectives Principles Language and Communication Members Good Standing.. RULES Section 1: General Provisions 1. Name, Foundation and Legal Status. 3 2. Objectives. 3 3. Principles.. 4 4. Language and Communication. 5 Section 2: Membership 5. Members... 6 6. Good Standing..

More information

Criminal Finances Bill

Criminal Finances Bill [AS AMENDED IN PUBLIC BILL COMMITTEE] CONTENTS PART 1 PROCEEDS OF CRIME CHAPTER 1 INVESTIGATIONS Unexplained wealth orders: England and Wales and Northern Ireland 1 Unexplained wealth orders: England and

More information

TIME OF ESSENCE IN CONSTRUCTION. CHAPTER ONE

TIME OF ESSENCE IN CONSTRUCTION. CHAPTER ONE 1 TIME OF ESSENCE IN CONSTRUCTION. CHAPTER ONE 1.1 Background study. It is often said that for a building or construction project, there are three objectives which the owner of the project is aiming 1.

More information

IN THE SUPREME COURT OF BELIZE, A.D VISION ARCHITECTS & CONTRACTORS LTD MINISTER OF NATURAL RESOURCES & AGRICULTURE

IN THE SUPREME COURT OF BELIZE, A.D VISION ARCHITECTS & CONTRACTORS LTD MINISTER OF NATURAL RESOURCES & AGRICULTURE CLAIM NO: 732 of 2015 BETWEEN IN THE SUPREME COURT OF BELIZE, A.D. 2018 VISION ARCHITECTS & CONTRACTORS LTD CLAIMANT AND SOLID WASTE MANAGEMENT AUTHORITY MINISTER OF NATURAL RESOURCES & AGRICULTURE DEFENDANTS

More information

IMPORTANT NOTICE. Information that must be set out in notice of adjudication served on residential occupier.

IMPORTANT NOTICE. Information that must be set out in notice of adjudication served on residential occupier. IMPORTANT NOTICE Information that must be set out in notice of adjudication served on residential occupier. You have been served with a notice of adjudication under the Construction Contracts Act 2002

More information

March 2016 INVESTOR TERMS OF SERVICE

March 2016 INVESTOR TERMS OF SERVICE March 2016 INVESTOR TERMS OF SERVICE This Agreement is between you and Financial Pulse Limited and sets out the terms on which Financial Pulse offers you access to and use of certain services via the online

More information

PART I THE SCOTTISH PARLIAMENT

PART I THE SCOTTISH PARLIAMENT An Act to provide for the establishment of a Scottish Parliament and Administration and other changes in the government of Scotland; to provide for changes in the constitution and functions of certain

More information

THE COMPANIES ACT 2006 PRIVATE COMPANY LIMITED BY SHARES ARTICLES OF ASSOCIATION CHESTER-LE-STREET GC TRADING LIMITED. (Company)

THE COMPANIES ACT 2006 PRIVATE COMPANY LIMITED BY SHARES ARTICLES OF ASSOCIATION CHESTER-LE-STREET GC TRADING LIMITED. (Company) THE COMPANIES ACT 2006 PRIVATE COMPANY LIMITED BY SHARES ARTICLES OF ASSOCIATION OF CHESTER-LE-STREET GC TRADING LIMITED (Company) 1. INTERPRETATION 1.1 In these Articles, unless the context otherwise

More information

Working Paper. The Danish law on the posting of workers. Martin Gräs Lind Aarhus School of Business, Aarhus University. No.

Working Paper. The Danish law on the posting of workers. Martin Gräs Lind Aarhus School of Business, Aarhus University. No. FORMULA Free movement, labour market regulation and multilevel governance in the enlarged EU/EEA a Nordic and comparative perspective UNIVERSITY of OSLO Department of Private Law The Danish law on the

More information

UK UNFAIR TERMS IN CONSUMER CONTRACTS REGULATIONS 1999 (SI 1999 NO 2083)

UK UNFAIR TERMS IN CONSUMER CONTRACTS REGULATIONS 1999 (SI 1999 NO 2083) UK UNFAIR TERMS IN CONSUMER CONTRACTS REGULATIONS 1999 (SI 1999 NO 2083) Sec. 1 Citation and commencement These Regulations may be cited as the Unfair Terms in Consumer Contracts Regulations 1999 and shall

More information

INTERNATIONAL COMMERCIAL AGENCY AGREEMENT TEMPLATE

INTERNATIONAL COMMERCIAL AGENCY AGREEMENT TEMPLATE INTERNATIONAL COMMERCIAL AGENCY AGREEMENT TEMPLATE Download International Commercial Agency Agreement sample in Word format. Fill in the blanks and choose the terms of this international agreement that

More information

Unit 5 : ADJUDICATION

Unit 5 : ADJUDICATION Unit 5 : ADJUDICATION WHAT IS ADJUDICATION? Adjudication is a quick and inexpensive process in which an independent third party makes binding decisions on construction contract disputes. The adjudicator

More information

Housing Development Schemes for Retired Person s Act

Housing Development Schemes for Retired Person s Act Housing Development Schemes for Retired Person s Act - Act 65 of 1988 - HOUSING DEVELOPMENT SCHEMES FOR RETIRED PERSONS ACT 65 OF 1988 [ASSENTED TO 17 JUNE 1988] [DATE OF COMMENCEMENT: 1 JULY 1989] (Afrikaans

More information

Trustmark Licence Agreement

Trustmark Licence Agreement Trustmark Licence Agreement This Agreement is dated as of the Commencement Date Between: (1) Retail Excellence, having its principal place of business at 1 Barrack Street, Ennis, County Clare ("we", "us",

More information

ASSOCIATION OF LOCAL AUTHORITY CHIEF EXECUTIVES AND SENIOR MANAGERS

ASSOCIATION OF LOCAL AUTHORITY CHIEF EXECUTIVES AND SENIOR MANAGERS ASSOCIATION OF LOCAL AUTHORITY CHIEF EXECUTIVES AND SENIOR MANAGERS MISSION STATEMENT ALACE exists to further and defend the interests of its Members by seeking, through collective action and individual

More information

1.1 Explain when it is necessary and appropriate to make an interim application to the court

1.1 Explain when it is necessary and appropriate to make an interim application to the court Title Tactics and costs in Commercial Litigation Level 4 Credit value 7 Learning outcomes The learner will: 1 Understand the procedures for making an interim application to the court Assessment criteria

More information

SUBMISSION OF THE SCOTTISH LAW COMMISSION ON THE CONTRACT (THIRD PARTY RIGHTS) (SCOTLAND) BILL

SUBMISSION OF THE SCOTTISH LAW COMMISSION ON THE CONTRACT (THIRD PARTY RIGHTS) (SCOTLAND) BILL SUBMISSION OF THE SCOTTISH LAW COMMISSION ON THE CONTRACT (THIRD PARTY RIGHTS) (SCOTLAND) BILL Introduction The Scottish Law Commission was established in 1965 to make recommendations to government to

More information

The Companies Act Private Company Limited by Guarantee. Articles of Association. Bowls Scotland (the Company )

The Companies Act Private Company Limited by Guarantee. Articles of Association. Bowls Scotland (the Company ) Company Number: SC386410 The Companies Act 2006 Private Company Limited by Guarantee Articles of Association of Bowls Scotland (the Company ) (adopted on 15 December 2010 and amended by special resolutions

More information

Arbitration Act of United Kingdom United Kingdom of Great Britain and Northern Ireland

Arbitration Act of United Kingdom United Kingdom of Great Britain and Northern Ireland Arbitration Act of United Kingdom United Kingdom of Great Britain and Northern Ireland (Royaume-Uni - Royaume-Uni de Grande-Bretagne et d'irlande du Nord) ARBITRATION ACT 1996 1996 CHAPTER 23 An Act to

More information

PART C AGREEMENT FOR THE PROVISION OF CLEANING SERVICES. [insert service provider]

PART C AGREEMENT FOR THE PROVISION OF CLEANING SERVICES. [insert service provider] PART C AGREEMENT FOR THE PROVISION OF CLEANING SERVICES [insert service provider] Contents 1 Interpretation 5 1.1 Definitions 5 1.2 Interpretation 7 1.3 Headings 8 2 Term 8 2.1 Term 8 2.2 Extension of

More information

TERMS AND CONDITIONS WHICH APPLY TO THE SALE OF ALL CEMENT AND SUPPLY OF RELATED SERVICES BY HOPE CEMENT LIMITED

TERMS AND CONDITIONS WHICH APPLY TO THE SALE OF ALL CEMENT AND SUPPLY OF RELATED SERVICES BY HOPE CEMENT LIMITED TERMS AND CONDITIONS WHICH APPLY TO THE SALE OF ALL CEMENT AND SUPPLY OF RELATED SERVICES BY HOPE CEMENT LIMITED 1. BASIS OF THE CONTRACT 1.1 All Materials sold by the Company shall be subject to these

More information

FINAL SUPPLY CHAIN SOLUTION LTD TERMS AND CONDITIONS FOR THE SUPPLY OF LOGISTICS SERVICES

FINAL SUPPLY CHAIN SOLUTION LTD TERMS AND CONDITIONS FOR THE SUPPLY OF LOGISTICS SERVICES SUPPLY CHAIN SOLUTION LTD TERMS AND CONDITIONS FOR THE SUPPLY OF LOGISTICS SERVICES Supply Chain Solution Ltd is not a common carrier and only accepts goods for carriage and/or storage on that condition

More information

Republic of South Africa. Companies Act, No 71 of 2008, as amended MEMORANDUM OF INCORPORATION FOR A NON-PROFIT COMPANY

Republic of South Africa. Companies Act, No 71 of 2008, as amended MEMORANDUM OF INCORPORATION FOR A NON-PROFIT COMPANY Republic of South Africa Companies Act, No 71 of 2008, as amended MEMORANDUM OF INCORPORATION FOR A NON-PROFIT COMPANY Name of company: CRICKET SOUTH AFRICA NPC Registration No.: 2002/002641/08 This MOI

More information

MODEL INTERNATIONAL COMMERCIAL AGENCY CONTRACT INTERNATIONAL COMMERCIAL AGENCY CONTRACT

MODEL INTERNATIONAL COMMERCIAL AGENCY CONTRACT INTERNATIONAL COMMERCIAL AGENCY CONTRACT MODEL INTERNATIONAL COMMERCIAL AGENCY CONTRACT The International Commercial Agency Contract is used for activities requiring a commercial agent to promote the sale of goods in overseas markets. In this

More information

The Association of South African Quantity Surveyors Die Vereniging van Suid-Afrikaanse Bourekenaars

The Association of South African Quantity Surveyors Die Vereniging van Suid-Afrikaanse Bourekenaars The Association of South African Quantity Surveyors Die Vereniging van Suid-Afrikaanse Bourekenaars BY-LAWS I N D E X SECTION TITLE PAGE NO 1 DEFINITIONS AND INTERPRETATIONS. 2 2 MEMBERSHIP CATEGORIES..

More information

Republic of South Africa. Companies Act, 2008 MEMORANDUM OF INCORPORATION FOR A NON PROFIT COMPANY WITH MEMBERS

Republic of South Africa. Companies Act, 2008 MEMORANDUM OF INCORPORATION FOR A NON PROFIT COMPANY WITH MEMBERS Republic of South Africa Companies Act, 2008 MEMORANDUM OF INCORPORATION FOR A NON PROFIT COMPANY WITH MEMBERS Name of company: THE referred to in this Memorandum of Incorporation as the IoDSA Registration

More information

Applied Business Solutions Ltd Software Distribution Agreement Document No :- 15

Applied Business Solutions Ltd Software Distribution Agreement Document No :- 15 Dated: We and us means Applied Business Solutions Ltd of of Zealley House, Greenhill Way, Kingsteignton, NEWTON ABBOT, Devon, TQ12 3SB a company registered in England, No 3272968, whose registered office

More information

Note Deed Poll. Dated 22 August 2013

Note Deed Poll. Dated 22 August 2013 Note Deed Poll Dated 22 August 2013 in relation to the A$5,000,000,000 Debt Issuance Programme of Anglo American plc and Anglo American Capital plc ( Issuers ) King & Wood Mallesons Level 61 Governor Phillip

More information

SECTION 1 INTRODUCTORY RULES...

SECTION 1 INTRODUCTORY RULES... Preamble This Arbitration Procedure has been prepared by Engineers Ireland principally for use in disputes arising out of engineering work, and in particular construction Contracts. However its use is

More information

CHAPTER 2. Appointment of examiner

CHAPTER 2. Appointment of examiner PART 10 EXAMINERSHIPS CHAPTER 1 Interpretation 508. Interpretation (Part 10) 509. Power of court to appoint examiner 510. Petition for court 511. Independent expert s report CHAPTER 2 Appointment of examiner

More information

CMS Commercial Law Group Guide. Distribution and Agency Agreements

CMS Commercial Law Group Guide. Distribution and Agency Agreements CMS Commercial Law Group Guide Distribution and Agency Agreements February 2014 Whilst many aspects of the distribution relationship will be similar when distributing within the EU there are important

More information

1. An outline of the domestic asset recovery regime; 2. An overview of the way in which the UK can assist overseas

1. An outline of the domestic asset recovery regime; 2. An overview of the way in which the UK can assist overseas 12727Page 1 of 27 THE UK ASSET RECOVERY REGIME Introduction This presentation is divided into two parts: 1. An outline of the domestic asset recovery regime; 2. An overview of the way in which the UK can

More information

Conditions Precedent to Recovery of Loss and Expense Claims

Conditions Precedent to Recovery of Loss and Expense Claims Conditions Precedent to Recovery of Loss and Expense Claims Dated 07 January 2011 Author Robert Dalton (Head of Construction and Dispute Resolution NW for Blake Newport) Introduction There is a growing

More information

DIOCESE OF CHICHESTER

DIOCESE OF CHICHESTER DIOCESE OF CHICHESTER REQUEST FOR FORMAL ADVICE FROM THE DAC As requested, I am pleased to enclose Form A1 and the questionnaire, to enable you to seek formal advice from the DAC, as the first stage of

More information

Financial Services Tribunal Rules 2015 (as amended 2017 and 2018)

Financial Services Tribunal Rules 2015 (as amended 2017 and 2018) Rule c FINANCIAL SERVICES TRIBUNAL RULES 2015 Index Page* (* page numbers below relate to original legislation, not to this document) PART 1 PRELIMINARY 1 Title... 3 2 Commencement... 3 3 Interpretation...

More information

SUNDERLAND CITY COUNCIL (ADVANCE VOTING AND SIGNING FOR BALLOT PAPERS) PILOT ORDER 2007

SUNDERLAND CITY COUNCIL (ADVANCE VOTING AND SIGNING FOR BALLOT PAPERS) PILOT ORDER 2007 SUNDERLAND CITY COUNCIL (ADVANCE VOTING AND SIGNING FOR BALLOT PAPERS) PILOT ORDER 2007 Made - - - - 26 March 2007 Coming into force in accordance with Article 1 This Order is made in exercise of the powers

More information

1 October Code of CONDUCT

1 October Code of CONDUCT 1 October 2006 Code of CONDUCT The Australian migration advice profession sets high standards. Their high levels of knowledge of Australian migration law/procedures and professional and ethical conduct

More information

CITY ATTORNEY MODEL RETAINER AGREEMENT. By and Between THE CITY OF ******* and **************

CITY ATTORNEY MODEL RETAINER AGREEMENT. By and Between THE CITY OF ******* and ************** CITY ATTORNEY MODEL RETAINER AGREEMENT By and Between THE CITY OF ******* and ************** TABLE OF CONTENTS Table of Contents Using this Agreement....4 CITY ATTORNEY RETAINER AGREEMENT...5 1. RETAINER

More information

THE COURTS ACT. Rules made by the Chief Justice, after consultation with the Rules Committee and the Judges, under section 198 of the Courts Act

THE COURTS ACT. Rules made by the Chief Justice, after consultation with the Rules Committee and the Judges, under section 198 of the Courts Act THE COURTS ACT Rules made by the Chief Justice, after consultation with the Rules Committee and the Judges, under section 198 of the Courts Act 1. Title These rules may be cited as the Supreme Court (International

More information

Gisborne and District LIONS CLUB INC

Gisborne and District LIONS CLUB INC ASSOCIATIONS INCORPORATION REFORM ACT 2012 STATEMENT OF RULES INCLUDING P U R P O S E S Gisborne and District LIONS CLUB INC Incorporation No.: A0100541L ABN: 34 175 496 900 (201V1-4 Model Rules 26/11/2013

More information

STANDARD CONSULTANCY AGREEMENT

STANDARD CONSULTANCY AGREEMENT STANDARD CONSULTANCY AGREEMENT BMT WBM PTY LTD ABN 54 010 830 421 Full Legal Name of Client: ACN/ABN: Contract Ref: (If Applicable) AGREEMENT PARTICULARS Formation of Agreement Date: The Parties BMT WBM:

More information

Constitution of the Industrial Relations Society of Queensland Inc.

Constitution of the Industrial Relations Society of Queensland Inc. Constitution of the Industrial Relations Society of Queensland Inc. 1 TABLE OF CONTENTS 1. NAME... 5 2. REGISTERED OFFICE... 5 3. INTERPRETATION... 5 4. OBJECTIVES... 8 5. POWERS... 9 6. MEMBERSHIP...

More information

Birmingham and Solihull Mental Health NHS Foundation Trust

Birmingham and Solihull Mental Health NHS Foundation Trust Birmingham and Solihull Mental Health NHS Foundation Trust Unit 1, B1 50 Summer Hill Road Birmingham B1 3RB Licence Number: 120010 Date of Issue Version Number 01 April 2013 2.0 Dr David Bennett, Chief

More information

General Terms and Conditions of Purchase MAN General Procurement Division for Building Management Services (Facility Management) (Version: June 2018)

General Terms and Conditions of Purchase MAN General Procurement Division for Building Management Services (Facility Management) (Version: June 2018) Contents 1 Validity of these contractual conditions... 2 2 Obligations during the tender phase... 2 3 Contractual foundations... 2 4 Version... 4 5 Involvement of MAN... 5 6 Scope of services/service amendments/additions...

More information

Alternative Dispute Resolution (ADR) In Chapter 36 of his Final Report Jackson LJ wrote:

Alternative Dispute Resolution (ADR) In Chapter 36 of his Final Report Jackson LJ wrote: Alternative Dispute Resolution (ADR) In Chapter 36 of his Final Report Jackson LJ wrote: 4.2 I recommend that: (i) There should be a serious campaign (a) to ensure that all litigation lawyers and judges

More information

Construction Industry Arbitration Rules and Mediation Procedures (Including Procedures for Large, Complex Construction Disputes)

Construction Industry Arbitration Rules and Mediation Procedures (Including Procedures for Large, Complex Construction Disputes) Construction Industry Arbitration Rules and Mediation Procedures (Including Procedures for Large, Complex Construction Disputes) Rules Amended and Effective October 1, 2009 Fee Schedule Amended and Effective

More information

The Civil Procedure (Amendment) Rules 2013

The Civil Procedure (Amendment) Rules 2013 STATUTORY INSTRUMENTS 2013 No. 262 (L. 1) SENIOR COURTS OF ENGLAND AND WALES COUNTY COURTS, ENGLAND AND WALES The Civil Procedure (Amendment) Rules 2013 Made - - - - 31st January 2013 Laid before Parliament

More information

Reinforcing Security of Payment in NSW

Reinforcing Security of Payment in NSW Philip Davenport 2011 Despite set backs in the Supreme Court, the NSW Government is firmly behind security of payment and has now strengthened security of payment for subcontractors by giving them the

More information

LIMITATIONS AND CONSTRAINTS IMPOSED BY ROMANIAN LAW ON FIDIC CONDITIONS OF CONTRACT A CONTRACTOR S DILEMMA WHILE PERFORMING PUBLIC WORKS IN ROMANIA

LIMITATIONS AND CONSTRAINTS IMPOSED BY ROMANIAN LAW ON FIDIC CONDITIONS OF CONTRACT A CONTRACTOR S DILEMMA WHILE PERFORMING PUBLIC WORKS IN ROMANIA GIOVANNI DI FOLCO LIMITATIONS AND CONSTRAINTS IMPOSED BY ROMANIAN LAW ON FIDIC CONDITIONS OF CONTRACT A CONTRACTOR S DILEMMA WHILE PERFORMING PUBLIC WORKS IN ROMANIA Key aspects that Contractors, while

More information