Bureau of Indian Standards CENTRAL MARKS DEPARTMENT-II(LEGAL)

Size: px
Start display at page:

Download "Bureau of Indian Standards CENTRAL MARKS DEPARTMENT-II(LEGAL)"

Transcription

1 BIS/DGO(0)/0 5 July 0 Bureau of Indian Standards CENTRAL MARKS DEPARTMENT-II(LEGAL) Subject: Adherence to time norms for Grant of BIS Certification Marks licence. Adherence to time norms is essential for delivering quality service to our clients. Due to delay in GOL the adherence of time norms gets defeated and violates the directions of Bureau given in its meeting dated (refer circular no. BIS/DGO(353)/0 dated 0 March 0). It has been time and again reiterated that the attitude of BIS officers towards the applicants/licensees should be that, without compromising on the quality of the product and its conformance to the Indian Standard in any way, BIS officers should help the manufacturers and give proper guidance to them so that they can produce products conforming to the Indian Standards. The basic methodology of bringing more manufacturers under the fold of BIS is to encourage them to apply for BIS licence and provide them timely service. This shall also increase the supply of availability of quality goods in the market for the consumers.. DG has reviewed pending application status of all BOs and has expressed his strong displeasure over the large number of pending cases in all BOs especially for Mandatory products. DG has desired that DDGRs shall review the status of all applications on daily basis and ensure proper implementation of guidelines by all BOs where applications are pending beyond the specified norms of GOL. A number of guidelines have already been issued for time bound actions namely (i) Scrutiny of application, (ii)undertaking PI/verification visits, (iii)sending samples to Sample cells, (iv)grant of licence, etc. for compliance by BOs. However, delays have been observed on the part of BOs at various stages. 3. Major points identified where delays generally occur are (i) Scrutiny of application, (ii)undertaking PI/verification visits, (iii)sending samples to Sample cells, (iv)issuance of TRs by T&Cs, (v) review based on compliance of DV, vi) grant of licence, etc. DG has directed that BOs shall adhere to time norms at each stage without fail and ensure that the CMMS data is upto date at all times for proper monitoring. In order to minimize delays at various stages of licence granting procedure and have a better tracking system DG has approved further guidelines as below: a. Clear allocation of work to Inspecting Officer (IO) by Head BO in handling of applications: Head BO shall allocate the work amongst the Inspecting officers on the basis of Technical discipline (FCT, EEE, MCM) so that each of the officers has approx. 5 licensees and also allot the geographical area for grant of new licences. The papers from the Facilitation counter (Single Window system) shall be directly sent to the concerned officer without the same being routed through Head-BO. A system should be put in place by Head-BO so that the complete information of recording of application is available to him daily for monitoring and supervision. The work related to an application shall be in totality dealt by the concerned Inspecting Officer under supervision of Head BO. The Inspecting officer is free to obtain technical/administrative inputs from any other officer, but shall not handover the GOL related work to anybody else. b. Scrutiny of application: Applications after being recorded at Facilitation counter shall reach the officer who has been allocated the work at (a) above immediately without delay. Applications shall be scrutinised strictly as per norms and applicant informed about deficiencies in the

2 application well before the date of preliminary inspection. Applicant shall be advised to ensure compliance and make information/documents available during visit for verification. No other documents/information shall be insisted for before PI. c. PI by IO: IO concerned shall undertake the PI not later than the norms specified in guidelines. Under no circumstances PI shall be postponed unless specifically requested by the applicant to do so. Such requests for postponement (upto 5 days) shall be allowed once only and in case the applicant still shows lack of preparedness for PI, the application shall be summarily rejected. However the applicant is free to resubmit the application after payment of necessary fees as and when he is ready for PI. The IO visiting the factory shall undertake all possible tests during the visit so that conformity to maximum no of parameters can be established and BIS is in a position to clearly ascertain the firms capability to produce conforming goods. It should be the responsibility of IO that all discrepancies are clearly conveyed and understood by the applicant before leaving the factory premises of the applicant and obtain written acknowledgement so that timely corrective actions can be taken by him. d. Sending samples to T&C: IOs must carry the necessary test requests at the time of PI and ensure that the samples are delivered to the Sample Cell as per the approved guidelines and acknowledgement of the Sample cell obtained. All T&Cs shall be required to acknowledge the receipt of the sample at their end to the Sample Cell of BO. e. Submission of IR by IO: IO shall also ensure that IRs are submitted timely after the PI so that the same can be reviewed for its correctness especially the Factory-testing report, DV report issued by the IO and firms capability to produce conforming goods. In case on review Head-BO feels that some additional information/action are essential for processing the case, he shall issue instructions so that all deficiencies and actions are conveyed to the applicant through a supplementary DV (communication informing supplementary deficiencies). The timely completion of these actions shall be monitored by Head-BOs so that no GOL cases are kept pending due to deficiencies in PI/IR or lack of timely communication of deficiencies to applicant for him to take actions, etc so that GOL is possible immediately on receipt of TR. f. Verification visits for compliance/verification of deficiencies/pending actions: This should be undertaken only when absolutely essential. IO shall plan for verification of pending actions wherever required so that licence can be granted as and when TR is received. There should not be any afterthought subsequent to deficiencies/discrepancies conveyed by Head-BO/IO to applicant after the review. IO shall not wait for receipt of TR for undertaking verification visits or for obtaining suitable clarification on the DV report or otherwise in respect of the case. The aim of IO in processing the case should be such so as to have the application case ready for GOL once the TR is received. g. Grant of licence: The final stage of licence granting process can have two situations depending on the status of receipt of TR- i. When TR is received: The case shall be immediately processed for GOL as per norms specified. IO shall put up the case to Head-BO for GOL. The file shall not be marked to

3 any other officer for any scrutiny/review and all deficiencies shall be cleared between IO and Head-BO within 3 working days. ii. When TR is not received even after specified time norms are over and no actions are pending on the part of firm: As per Note of sub-clause.9. of OMPC all tests which require more than one month of testing time are to be treated as long duration tests and for all such cases to be processed for GOL without waiting for the long duration TR. Unless and until specific instructions about testing time are there from PP&C(T&C) for individual products, the testing time for samples shall be considered as 5 days. The period of counting 5 days shall start from the date of receipt of sample as per the acknowledgement to be sent by T&Cs to the concerned BO. Since factory testing has already been carried out and BO has satisfied itself about the ability of applicant to produce goods conforming to relevant standards, BOs shall grant the licence provisionally wherever the Test report is not received within 5 days of it being handed over to respective T&Cs. The applicant shall be asked to submit an undertaking that in case of non-conformity of independent sample, the licence shall be processed for cancellation. BO shall review the case on receipt of TR. In case TR is found failing in any requirements the licence shall be put under stop marking and case initiated for cancellation of the licence. h. Notice for rejection of application: In case of lack of preparedness by applicant for verification visit even after BIS has informed of its intention for the same or for submission of clarifications sought by BIS, notice for rejection of application shall be issued giving him days time to complete pending actions/submit clarifications as per BIS requirements.. It is necessary that BOs shall adhere to time norms. 5. DDGRs are expected to review all applications on daily basis and send data to CMD-III(CA&M) through e.mail as per the format enclosed at Annex-A. DDGRs shall personally intervene in such cases where cases are likely to exceed time norms.. This issues with the approval of DG. -sd/-. (K Anbarasu). DDG(Certification) Ref : CMD-II (Legal)/ Copy to: ADG(AP) CVO DG Sectt All DDGs/Heads at HQs/ROs/BOs/SBOs/All T&Cs Head ITSD - for hosting on BIS website 3

4 Annexure-A DAILY REPORT PENDING APPLICATIONS AS PER TATKAL PROCEDURE Sl No Date: Total No of applications pending from previous day pending beyond time norms on previous day 3 No of fresh applications recorded today No of applications withdrawn by the applicant today 5 No of licences granted today No of applications rejected (other than withdrawal by applicant) today Total no of applications pending at the end of the day pending beyond time norms Classification of applications pending beyond time norms (at Sl No 8) based on cause of delay RO: BO BO BO3 BO BO5 BO BO7 9.A 9.B 9.C 9.D 9.E 9.F No of cases where Preliminary Inspection is not done with in 5 days of recording No of cases where IR not submitted with in 5 working days of inspection by IO to BO No of cases where sample is not deposited in the Laboratory with in 5 working days of preliminary inspection No of cases where TR is not received with in 30 days of acknowledgement by T& C No of cases where GOL is not put up by IO with in 0 days of receipt of TR No of cases due to any other reasons (details) Note: The figure shown against Sl No 8 should be equal to the sum of figures at Sl No 9.A to 9.F Note: In case of multiple reasons of delay in the same application, show it under the reason contributing to maximum delay out of 9.A to 9.F

5 DAILY REPORT PENDING APPLICATIONS AS PER SIMPLIFIED PROCEDURE Sl No Date: Total No of applications pending from previous day pending beyond time norms on previous day 3 No of fresh applications recorded today No of applications withdrawn by the applicant today 5 No of licences granted today A 9.B No of applications rejected (other than withdrawal by applicant) today Total no of applications pending at the end of the day pending beyond time norms Classification of applications pending beyond time norms (at Sl No 8) based on cause of delay No of cases where Preliminary Inspection is not done with in 5 days of recording No of cases where IR not submitted with in 5 working days of inspection by IO to BO RO: BO BO BO3 BO BO5 BO BO7 9.C No of cases where GOL is not put up by IO with in 7 days of receipt of IR (when there are no DV/pending actions from the applicant) No of cases where GOL is not put up by IO with in 90 days from date of recording (where 9.D there are DVs/pending actions from the applcant) 9.E No of cases due to any other reasons (details) Note: The figure shown against Sl No 8 should be equal to the sum of figures at Sl No 9.A to 9.E Note: In case of multiple reasons of delay in the same application, show it under the reason contributing to maximum delay out of 9.A to 9.E 5

6 DAILY REPORT PENDING APPLICATIONS AS PER NORMAL PROCEDURE Sl No Date: Total No of applications pending from previous day pending beyond time norms on previous day 3 No of fresh applications recorded today No of applications withdrawn by the applicant today 5 No of licences granted today A 9.B 9.C No of applications rejected (other than withdrawal by applicant) today Total no of applications pending at the end of the day pending beyond time norms Classification of applications pending beyond time norms (at Sl No 8) based on cause of delay No of cases where Preliminary Inspection is not done within days of recording No of cases where IR not submitted within 7 working days of inspection by IO to BO No of cases where sample is not deposited in the Laboratory within 7 working days of preliminary inspection 9.D No of cases where TR is not received within 30 days of acknowledgement by T& C 9.E 9.F No of cases where GOL is not put up by IO within 30 days of receipt of TR No of cases due to any other reasons (details) RO: BO BO BO3 BO BO5 BO BO7 Note: The figure shown against Sl No 8 should be equal to the sum of figures at Sl No 9.A to 9.F Note: In case of multiple reasons of delay in the same application, show it under the reason contributing to maximum delay out of 9.A to 9.F

Subject : Amendment to Simplified procedure for Grant of licence - category of laboratories & exclusion of Chartered Engineer-regd

Subject : Amendment to Simplified procedure for Grant of licence - category of laboratories & exclusion of Chartered Engineer-regd BIS/DGO( 355 )/2014 10 03 2014 BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT FCT) OFFICE ORDER Subject : Amendment to Simplified procedure for Grant of licence - category of laboratories & exclusion

More information

REGISTRATION DEPARTMENT

REGISTRATION DEPARTMENT REGISTRATION DEPARTMENT Ref: Registration/16:16102(Part 1) 02 Dec 2016 Subject: Guidelines for implementation of Amendment No. 2 to IS 16102(Part 1):2012 Self Ballasted LED Lamps for General Lighting Services

More information

TURKEY Trademark Regulations as last amended on October 2, 2002

TURKEY Trademark Regulations as last amended on October 2, 2002 TURKEY Trademark Regulations as last amended on October 2, 2002 TABLE OF CONTENTS PART I General Provisions Article 1 Object Article 2 Scope Article 3 Legal Foundation Article 4 Definitions Article 5 Place

More information

LIST OF DOCUMENTS TO BE ATTACHED WITH APPLICATION. No. Title of Document Page

LIST OF DOCUMENTS TO BE ATTACHED WITH APPLICATION. No. Title of Document Page Annex A LIST OF DOCUMENTS TO BE ATTACHED WITH APPLICATION No. Title of Document Page 1 Document of Central/State Government (e.g. Registration Certificate, Memorandum of Articles, Registration certificate

More information

Guidance Document (Medical Devices and Diagnostic Division)

Guidance Document (Medical Devices and Diagnostic Division) Guidance Document (Medical Devices and Diagnostic Division) Title: Guidance Document on Common Submission Format for Import of Notified Diagnostics Kits in India Doc No. : CDSCO/IVD/GD/IMP/01/00 Effective

More information

F. No. 96/54/2014 CX.1 Government of India Ministry of Finance Department of Revenue Central Board of Excise & Customs

F. No. 96/54/2014 CX.1 Government of India Ministry of Finance Department of Revenue Central Board of Excise & Customs F. No. 96/54/2014 CX.1 Government of India Ministry of Finance Department of Revenue Central Board of Excise & Customs Circular No. 1009/16/2015 CX To Principal Chief Commissioner/ Chief Commissioner of

More information

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED COMPLAINT HANDLING PROCEDURE OF DISTRIBUTION LICENSEE (APPROVED BY OERC) 1. This "Complaint Handling Procedure relating to Distribution Activity (Complaint

More information

Circular to all trading and clearing members of the Exchange

Circular to all trading and clearing members of the Exchange NATIONAL COMMODITY & DERIVATIVES EXCHANGE LIMITED Circular to all trading and clearing members of the Exchange Circular No: NCDEX/OPERATIONS-012/2006/095 Date: April 18, 2006 Subject: New formats of Bank

More information

PART TWO APPLICATION, EXAMINATION, REGISTRATION AND RENEWAL

PART TWO APPLICATION, EXAMINATION, REGISTRATION AND RENEWAL TURKEY Industrial Design Regulations Implementing Regulations under Decree-Law No. 554 pertaining to the Protection of Industrial Designs, including Amended Implementing Regulation of 31 December 1997

More information

Supply shall generally be given at the following voltages on the basis of contracted load:

Supply shall generally be given at the following voltages on the basis of contracted load: Classification of Supply- Supply shall generally be given at the following voltages on the basis of contracted load: Consumers availing supply at lower voltage than above classification will be required

More information

E/ECE/TRANS/505/Rev.3

E/ECE/TRANS/505/Rev.3 20 October 2017 Agreement Concerning the Adoption of Harmonized Technical United Nations Regulations for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and

More information

TENDER DOCUMENT FOR SUPPLY OF TATA MAGIC VEHICLES TO INDIAN INSTITUTE OF TECHNOLOGY HYDERBAD. Ref. No: IITH/101/Tender/Admin Date: Aug 23, 2018

TENDER DOCUMENT FOR SUPPLY OF TATA MAGIC VEHICLES TO INDIAN INSTITUTE OF TECHNOLOGY HYDERBAD. Ref. No: IITH/101/Tender/Admin Date: Aug 23, 2018 TENDER DOCUMENT FOR SUPPLY OF TATA MAGIC VEHICLES TO INDIAN INSTITUTE OF TECHNOLOGY HYDERBAD Ref. No: IITH/101/Tender/Admin Date: Aug 23, 2018 NOTICE INVITING TENDERS Director, IITH invites sealed tenders

More information

NIT NO: F.1 (ICSIL)/01/241/ , New Delhi, Dated:

NIT NO: F.1 (ICSIL)/01/241/ , New Delhi, Dated: Intelligent Communication Systems India Ltd. (ICSIL) (Joint Venture of TCIL A Govt. of India Enterprise & DSIIDC An Undertaking of Delhi Govt.) Administrative Building, 1 st Floor, Above Post Office, Okhla

More information

AGREEMENT. (as in force from January 1, 2018)*

AGREEMENT. (as in force from January 1, 2018)* AGREEMENT between the Federal Minister of Transport, Innovation and Technology of the Republic of Austria and the International Bureau of the World Intellectual Property Organization in relation to the

More information

Notification PART I CHAPTER I PRELIMINARY

Notification PART I CHAPTER I PRELIMINARY [TO BE PUBLISHED IN THE GAZZETTE OF INDIA, EXTRAORDINARY, PART II, SECTION 3, SUB-SECTION (i)] GOVERNMENT OF INDIA MINISTRY OF COMMERCE AND INDUSTRY (DEPARTMENT OF INDUSTRIAL POLICY AND PROMOTION) Notification

More information

Memo No:1920/WBTDCL-11013(99)/4/2018-GM(WBTDCL)-WBTDCL

Memo No:1920/WBTDCL-11013(99)/4/2018-GM(WBTDCL)-WBTDCL West Bengal Tourism Development Corporation Llimited (A Govt. of West Bengal Undertaking) Udayachal Tourist lodge (1 st Floor), DG Block, Sector II, Kolkata- 700091 Phones: 033 2359 7250, Fax : 033-2359-8292

More information

THE RULES OF PROCEDURE OF THE SOUTHERN AFRICAN CUSTOMS UNION (SACU) COUNCIL OF MINISTERS

THE RULES OF PROCEDURE OF THE SOUTHERN AFRICAN CUSTOMS UNION (SACU) COUNCIL OF MINISTERS THE RULES OF PROCEDURE OF THE SOUTHERN AFRICAN CUSTOMS UNION (SACU) COUNCIL OF MINISTERS TABLE OF CONTENTS THE RULES OF PROCEDURE OF THE SOUTHERN AFRICAN CUSTOMS UNION (SACU) COUNCIL OF MINISTERS Rule

More information

ACCESSION KIT: THE MADRID SYSTEM FOR THE INTERNATIONAL REGISTRATION OF MARKS

ACCESSION KIT: THE MADRID SYSTEM FOR THE INTERNATIONAL REGISTRATION OF MARKS ACCESSION KIT: THE MADRID SYSTEM FOR THE INTERNATIONAL REGISTRATION OF MARKS Contents THE MADRID SYSTEM FOR THE INTERNATIONAL REGISTRATION OF MARKS... 1 ADVANTAGES OF THE MADRID SYSTEM... 1 BENEFITS FOR

More information

Transition document Transition document, Version: 4.1, October 2017

Transition document Transition document, Version: 4.1, October 2017 Transition document Transition document, Version: 4.1, October 2017 Transition from a HACCP certification to a FSSC 22000 certification 1 Introduction... 2 2 General requirements for a transition to FSSC

More information

The list of eligible (admissible) documents for the purpose of legacy and linkage will remain the same as at the time of the initial application.

The list of eligible (admissible) documents for the purpose of legacy and linkage will remain the same as at the time of the initial application. Standard Operating Procedure (SOP)/modalities for disposal of claims and objections in the updation of National Register of Citizens (NRC) 1951 in Assam The Standard Operating Procedure (SOP) is being

More information

PART I PRELIMINARY MATTERS

PART I PRELIMINARY MATTERS MEDICAL DEVICE ACT 2012 (ACT 737) MEDICAL DEVICE REGULATIONS 2012 ARRANGEMENT OF REGULATIONS Regulation 1. Citation and commencement 2. Interpretation PART I PRELIMINARY MATTERS PART II CONFORMITY ASSESSMENT

More information

Fairfield Primary School. Complaints Procedures

Fairfield Primary School. Complaints Procedures Fairfield Primary School Complaints Procedures Background and introduction Section 29 of the Education Act 2002 requires the governing bodies of all maintained schools in Wales to set up procedures to

More information

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FIRE RESISTING (INSULATING) FILING CABINETS ACCORDING TO IS : 2007

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FIRE RESISTING (INSULATING) FILING CABINETS ACCORDING TO IS : 2007 Doc:STI/14561/1, September 2010 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FIRE RESISTING (INSULATING) FILING CABINETS ACCORDING TO : 2007 1. LABORATORY: A laboratory shall be maintained which

More information

Government of West Bengal Office of the Director General, West Bengal Fire & Emergency Services 13-D, Mirza Ghalib Street, Kolkata

Government of West Bengal Office of the Director General, West Bengal Fire & Emergency Services 13-D, Mirza Ghalib Street, Kolkata Government of West Bengal Office of the Director General, West Bengal Fire & Emergency Services 13-D, Mirza Ghalib Street, Kolkata 700 016. Notice inviting e-tender Notice Inviting e-tender No. 22/2014-2015

More information

INTERNATIONAL ELECTROTECHNICAL COMMISSION

INTERNATIONAL ELECTROTECHNICAL COMMISSION INTERNATIONAL ELECTROTECHNICAL COMMISSION QC 001002-2 Third edition 1998-06 IEC Quality Assessment System for Electronic Components (IECQ) Rules of Procedure Part 2: Documentation Reference number QC 001002-2:1998(E)

More information

SPPD. Our Ref: SPPD/Guidelines 01 Oct 2014

SPPD. Our Ref: SPPD/Guidelines 01 Oct 2014 SPPD Our Ref: SPPD/Guidelines 01 Oct 2014 Sub: Guidelines for Foreign Deputation of BIS Officers and Non-BIS Delegates under Own Funding or under the scheme of National System for Standardization Strengthening

More information

BUREAU OF INDIAN STANDARDS (Hallmarking Department)

BUREAU OF INDIAN STANDARDS (Hallmarking Department) BUREAU OF INDIAN STANDARDS (Hallmarking Department) BIS/DGO(377)/2014 OFFICE ORDER Subject: 1. Policy for Licensing of Jewellers 2. Agreement between Jewellers and BIS 12 May 2014 1. This Order shall supersede

More information

AGREEMENT FOR THE GRANT OF BIS LICENCE (FOR USE BY THE FOREIGN MANUFACTURER)

AGREEMENT FOR THE GRANT OF BIS LICENCE (FOR USE BY THE FOREIGN MANUFACTURER) AGREEMENT FOR THE GRANT OF BIS LICENCE (FOR USE BY THE FOREIGN MANUFACTURER) (On Rs. 100=00 non judicial stamp paper, to be attested by Notary Public) The Agreement made at New Delhi on this day of...month..

More information

NOTICE INVITING TENDER

NOTICE INVITING TENDER Page 1 of 13 ENGINEERING PROJECTS (INDIA) LTD (A Govt. of India Enterprise) 5, 1st Floor, 9 th Main, RMV Extension Sadashivnagar, Bangalore 560080 Phone No. 080-23600542 NOTICE INVITING TENDER Sub:- Tender

More information

RULES AND REGULATIONS GOVERNING THE LICENSING OF BARBER SHOPS IN MUMBAI

RULES AND REGULATIONS GOVERNING THE LICENSING OF BARBER SHOPS IN MUMBAI 1 RULES AND REGULATIONS GOVERNING THE LICENSING OF BARBER SHOPS IN MUMBAI State: Maharashtra Details of licensing procedures are as follows: Barber Shops are regulated as per the directions of Mumbai Municipal

More information

Having regard to the Treaty establishing the European Economic Community, and in particular Article 100 thereof;

Having regard to the Treaty establishing the European Economic Community, and in particular Article 100 thereof; DIRECTIVE 75/319/EEC Council Directive 75/319/EEC of 20 May 1975 on the approximation of provisions laid down by law, regulation or administrative action relating to medicinal products (OJ No L 147 of

More information

DELHI URBAN SHELTER IMPROVEMENT BOARD OFFICE OF THE EXECUTIVE ENGINEER(E-4) DRAFT NOTICE INVITING TENDER

DELHI URBAN SHELTER IMPROVEMENT BOARD OFFICE OF THE EXECUTIVE ENGINEER(E-4) DRAFT NOTICE INVITING TENDER DELHI URBAN SHELTER IMPROVEMENT BOARD OFFICE OF THE EXECUTIVE ENGINEER(E-4) DRAFT NOTICE INVITING TENDER The Executive Engineer /E-4 invites on behalf of DUSIB. Item rate e-tender in Two bid system, from

More information

APPRENTICESHIP AND TRADE CERTIFICATION BILL. No. 136

APPRENTICESHIP AND TRADE CERTIFICATION BILL. No. 136 1 BILL No. 136 An Act respecting the Saskatchewan Apprenticeship and Trade Certification Commission and providing for the Regulation and Training of Apprentices, Tradespersons and Journeypersons and the

More information

AGREEMENT FOR THE GRANT OF BIS LICENCE (FOR USE BY THE FOREIGN MANUFACTURER) (On Rs. 100=00 non judicial stamp paper, to be attested by Notary Public)

AGREEMENT FOR THE GRANT OF BIS LICENCE (FOR USE BY THE FOREIGN MANUFACTURER) (On Rs. 100=00 non judicial stamp paper, to be attested by Notary Public) AGREEMENT FOR THE GRANT OF BIS LICENCE (FOR USE BY THE FOREIGN MANUFACTURER) (On Rs. 100=00 non judicial stamp paper, to be attested by Notary Public) THE AGREEMENT MADE AT NEW DELHI ON THIS DAY OF...

More information

ENTITY STANDARD OF UKRAINE. Main Gas Pipelines INSPECTION Access Granting Procedure

ENTITY STANDARD OF UKRAINE. Main Gas Pipelines INSPECTION Access Granting Procedure ENTITY STANDARD OF UKRAINE Main Gas Pipelines INSPECTION Access Granting Procedure KYIV PJSC "UKRTRANSGAZ" 2016 INTRODUCTION 1 DEVELOPED BY Branch Centre of Technical Inspection TECHDIAGAZ of PJSC "UKRTRANSGAZ"

More information

Bangladesh Trade Marks Rules Amended on September 10, 1963

Bangladesh Trade Marks Rules Amended on September 10, 1963 Bangladesh Trade Marks Rules Amended on September 10, 1963 TABLE OF CONTENTS PART I CHAPTER I Preliminary 1. Short title and commencement. 2. Definitions.- 3. Fees. 4. Forms 5. Size, etc. of documents.

More information

NIT NO.38/EE/E-2/(DUSIB)/ /D-399 Dated: NOTICE RE-INVITING E-TENDER

NIT NO.38/EE/E-2/(DUSIB)/ /D-399 Dated: NOTICE RE-INVITING E-TENDER DELHI URBAN SHELTER IMPROVEMENT BOARD GOVT. OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER, ELECTRICAL (E-2) 1, Kilokari, Opp. Maharani Bagh, Ring Road, New Delhi-14. NIT NO.38/EE/E-2/(DUSIB)/2016-17/D-399

More information

DATE: 26/07/2016. INVITATION TO BID: No. ITB/2016/778_Corrigendum as of 11/08/2016 FOR THE ESTABLISHMENT OF FRAME AGREEMENTS FOR THE SUPPLY OF

DATE: 26/07/2016. INVITATION TO BID: No. ITB/2016/778_Corrigendum as of 11/08/2016 FOR THE ESTABLISHMENT OF FRAME AGREEMENTS FOR THE SUPPLY OF DATE: 26/07/2016 INVITATION TO BID: No. ITB/2016/778_Corrigendum as of 11/08/2016 FOR THE ESTABLISHMENT OF FRAME AGREEMENTS FOR THE SUPPLY OF ESSENTIAL MEDICINES CLOSING DATE AND TIME: 12/09/2016 23:59

More information

Governing Body 331st Session, Geneva, 26 October 9 November 2017

Governing Body 331st Session, Geneva, 26 October 9 November 2017 INTERNATIONAL LABOUR OFFICE Governing Body 331st Session, Geneva, 26 October 9 November 2017 Working Party on the Functioning of the Governing Body and the International Labour Conference GB.331/WP/GBC/3(Rev.)

More information

South Dakota Constitution

South Dakota Constitution South Dakota Constitution Article III 1. Legislative power -- Initiative and referendum. The legislative power of the state shall be vested in a Legislature which shall consist of a senate and house of

More information

Assessment Review Board

Assessment Review Board Assessment Review Board RULES OF PRACTICE AND PROCEDURE (made under section 25.1 of the Statutory Powers Procedure Act) INDEX 1. RULES Application and Definitions (Rules 1-2) Interpretation and Effect

More information

COLUMBIA RIVER GORGE COMMISSION. Chapter 350 Division 50. Plan Amendment Process. As Amended through May 1, 2011

COLUMBIA RIVER GORGE COMMISSION. Chapter 350 Division 50. Plan Amendment Process. As Amended through May 1, 2011 350-50-010. Purpose. COLUMBIA RIVER GORGE COMMISSION Chapter 350 Division 50 Plan Amendment Process As Amended through May 1, 2011 This division specifies the process of the Columbia River Gorge Commission

More information

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY [27th January 2014] Supplement to Official Gazette 939 S.I. 7 of 2014 PUBLIC PROCUREMENT ACT (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY 1.

More information

Law on the Management of Quality and Safety of Products and Services CHAPTER 6 INSPECTION PROCEDURES FOR

Law on the Management of Quality and Safety of Products and Services CHAPTER 6 INSPECTION PROCEDURES FOR Law on the Management of Quality and Safety of Products and Services CHAPTER 6 INSPECTION PROCEDURES FOR QUALITY AND SAFETY OF PRODUCTS, GOODS AND SERVICES Article 25: Acts in violations of this law shall

More information

AGREEMENT. between the Finnish Patent and Registration Office and the International Bureau of the World Intellectual Property Organization

AGREEMENT. between the Finnish Patent and Registration Office and the International Bureau of the World Intellectual Property Organization AGREEMENT between the Finnish Patent and Registration Office and the International Bureau of the World Intellectual Property Organization in relation to the functioning of the Finnish Patent and Registration

More information

GOVERNMENT OF TAMILNADU

GOVERNMENT OF TAMILNADU GOVERNMENT OF TAMILNADU COMPETITIVE RE-TENDER FOR THE SUPPLY OF ELECTRIC TABLE FANS RATE CONTRACT FOR THE SUPPLY AND COMMISSIONING OF 34,46,000 PIECES OF ELECTRIC TABLE FAN AS PER IS : 555-1979 2013-2014

More information

Professional Discipline Procedural Handbook

Professional Discipline Procedural Handbook Professional Discipline Procedural Handbook Revised Edition March 2005 Table of Contents PREAMBLE... 6 DEFINITIONS... 6 1 ADMINISTRATION-DISCIPLINE COMMITTEE... 8 1.1 Officers of the Committee... 7 1.2

More information

NORWAY Trade Marks Regulations Regulations no. 937 of June 25, 2010 Entry into force: July 1, 2010 Last changed: February 23, 2011

NORWAY Trade Marks Regulations Regulations no. 937 of June 25, 2010 Entry into force: July 1, 2010 Last changed: February 23, 2011 NORWAY Trade Marks Regulations Regulations no. 937 of June 25, 2010 Entry into force: July 1, 2010 Last changed: February 23, 2011 TABLE OF CONTENTS Chapter 1. National Trademark Applications Section 1.

More information

AGREEMENT. (as in force from September 1, 2018)*

AGREEMENT. (as in force from September 1, 2018)* AGREEMENT between the Ministry of Economic Development and Trade of Ukraine and the International Bureau of the World Intellectual Property Organization in relation to the functioning of the State Enterprise

More information

AGREEMENT. between the Indian Patent Office and the International Bureau of the World Intellectual Property Organization

AGREEMENT. between the Indian Patent Office and the International Bureau of the World Intellectual Property Organization AGREEMENT between the Indian Patent Office and the International Bureau of the World Intellectual Property Organization in relation to the functioning of the Indian Patent Office as an International Searching

More information

REQUEST FOR PROPOSAL: No RFP/2017/1025 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

REQUEST FOR PROPOSAL: No RFP/2017/1025 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF DATE: 30/10/2017 REQUEST FOR PROPOSAL: No RFP/2017/1025 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF ARMOURED VEHICLES, SPARE PARTS AND RELATED SERVICES CLOSING DATE AND TIME: 7 December

More information

MAHARASHTRA RAJYA SAHAKARI DUDH MAHASANGH MARYADIT, MUMBAI MAHANAND DAIRY, GOREGAON (EAST), MUMBAI

MAHARASHTRA RAJYA SAHAKARI DUDH MAHASANGH MARYADIT, MUMBAI MAHANAND DAIRY, GOREGAON (EAST), MUMBAI MAHARASHTRA RAJYA SAHAKARI DUDH MAHASANGH MARYADIT, MUMBAI MAHANAND DAIRY, GOREGAON (EAST), MUMBAI- 400065. NOTE: TENDER FORM NO -02-0 COST RS. 750.00 ONLY Last Date of Submission : 03.07.2014 Up to 13.00

More information

Standard Operating Procedures (SOP) for New NPDES Individual Permit for Stormwater Discharges Associated with Construction Activities.

Standard Operating Procedures (SOP) for New NPDES Individual Permit for Stormwater Discharges Associated with Construction Activities. Bureau of Waterways Engineering and Wetlands Standard Operating Procedures (SOP) for New NPDES Individual Permit for Stormwater Discharges Associated with Construction Activities DISCLAIMER: The process

More information

AS INTRODUCED IN LOK SABHA

AS INTRODUCED IN LOK SABHA 1 AS INTRODUCED IN LOK SABHA Bill No. 52 of 2012 63 of 1986. 5 10 THE BUREAU OF INDIAN STANDARDS (AMENDMENT) BILL, 2012 A BILL to amend the Bureau of Indian Standards Act, 1986. BE it enacted by Parliament

More information

TENDER EVALUATION MANUAL

TENDER EVALUATION MANUAL DA/CTR-RP 1 Issue 2 June 1985 TENDER EVALUATION MANUAL 1 The Procurement Regulations (ESA/C(2008)202) have entered into force on 01 June 2010 and replaced the Contracts Regulations (ESA/C(82)111 ANNEX

More information

STANDARDS POLICY AND PLANNING DEPARTMENT. Our Ref: SPPD/21/XII Plan/ National Guidelines

STANDARDS POLICY AND PLANNING DEPARTMENT. Our Ref: SPPD/21/XII Plan/ National Guidelines STANDARDS POLICY AND PLANNING DEPARTMENT Our Ref: SPPD/21/XII Plan/ National Guidelines 16-04-2014 Sub: Supplementary Guidelines for Payment of TA/DA to Members of BIS Technical Committees and BIS officials

More information

HMC s Certification & Terms of Use

HMC s Certification & Terms of Use HMC s Certification & Terms of Use HALAL MONITORING COMMITTEE - HMC (UK): NON-EXCLUSIVE CERTIFICATION MARK LICENCE AGREEMENT THIS LICENCE AGREEMENT is date of submission of the online application form

More information

JULY Scottish Police Authority. complaints audit

JULY Scottish Police Authority. complaints audit JULY 2014 Scottish Police Authority complaints audit 2013-14 section contents 1 background 2 introduction 3 methodology 4 findings and recommendations 5 conclusions 6 summary of recommendations Appendix

More information

NATIONAL INSTITUTE OF TECHNOLOGY ANDHRA PRADESH

NATIONAL INSTITUTE OF TECHNOLOGY ANDHRA PRADESH NATIONAL INSTITUTE OF TECHNOLOGY ANDHRA PRADESH AT SRI VASAVI ENGINEERING COLLEGE CAMPUS, TADEPALLIGUDEM 534 102 No. NITAP/CS-01(B)/2018-19 Date: 30.05.2018 INVITATION FOR TENDERS FOR SUPPLY OF Item No.

More information

(Medical Devices Division) Guidance Document

(Medical Devices Division) Guidance Document Central Drugs Standard Control Organisation (Medical Devices Division) Guidance Document Title : Guidance Document on Common Submission Format for Import Licence in Form 10 of Medical Devices in India

More information

EGYPTIAN PATENT OFFICE

EGYPTIAN PATENT OFFICE PCT Applicant s Guide National Phase National Chapter EG Page 1 EGYPTIAN PATENT OFFICE AS DESIGNATED (OR ELECTED) OFFICE CONTENTS THE ENTRY INTO THE NATIONAL PHASE SUMMARY THE PROCEDURE IN THE NATIONAL

More information

Referendums. Binding referendums

Referendums. Binding referendums Chapter 40 have been used in New Zealand for more than a century as a means of making decisions on issues of public policy. The first national referendum in the country s history was held on 7 December

More information

Government of Bangladesh MINISTRY OF COMMERCE

Government of Bangladesh MINISTRY OF COMMERCE Government of Bangladesh MINISTRY OF COMMERCE Rawalpindi, the 10 th September 1963 In exercise of the powers conferred by section 84 of the Trade Marks Act, 1940 (V of 1940), the Government of Bangladesh

More information

INVITATION OF TENDER BIDS WATER TANKS

INVITATION OF TENDER BIDS WATER TANKS TENDER NO. : MGI/DIF/09/2017-18/02 INVITATION OF TENDER BIDS FOR SUPPLY OF 2000 LITRES HDPE RAIN WATER TANKS MAHATMA GANDHI INSTITUTE OF RURAL ENERGY & DEVELOPMENT Sri Rampuraa Cross, Jakkur, Bengaluru

More information

Commercial Agents and Private Inquiry Agents Act 2004 No 70

Commercial Agents and Private Inquiry Agents Act 2004 No 70 New South Wales Commercial Agents and Private Inquiry Agents Act 2004 No 70 Contents Part 1 Part 2 Preliminary Page 1 Name of Act 2 2 Commencement 2 3 Objects 2 4 Definitions 2 Licensing of persons for

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX Part A: PRELIMINARY 4 1. Short Title, extent and commencement 4 2. Definitions 4 3. Eligibility to seek

More information

DDG(HP)SECRETARIAT. Our Ref: DDG(HP)RTI-TO/G

DDG(HP)SECRETARIAT. Our Ref: DDG(HP)RTI-TO/G DDG(HP)SECRETARIAT Our Ref: DDG(HP)RTI-TO/G 11-01-2013 Please find attahced Minutes of the meeting in which actions to be taken have been identified as also the Activity/Department required to take such

More information

The Chairman, Himachal Pradesh Micro & Small Enterprises Facilitation Council-cum-Director of Industries, H.P.

The Chairman, Himachal Pradesh Micro & Small Enterprises Facilitation Council-cum-Director of Industries, H.P. Format for filing reference under Section 18 of Micro, Small & Medium Enterprises Development Act-2006 & Rule 4 (6) of Himachal Pradesh Micro & Small Enterprises Facilitation Council Rules-2007. To The

More information

AUTOMOTIVE INDUSTRY STANDARD PRINTED BY THE AUTOMOTIVE RESEARCH ASSOCIATION OF INDIA P.B. NO. 832, PUNE

AUTOMOTIVE INDUSTRY STANDARD PRINTED BY THE AUTOMOTIVE RESEARCH ASSOCIATION OF INDIA P.B. NO. 832, PUNE AUTOMOTIVE INDUSTRY STANDARD Administrative Procedure to deal with Corrigendum, Amendments or Revisions to AIS, TAP 115/116, CMVR Notifications, IS and ISO standards, which are notified under CMVR PRINTED

More information

PATENT COOPERATION TREATY (PCT)

PATENT COOPERATION TREATY (PCT) E PCT/GL/ISPE/6 ORIGINAL: ENGLISH DATE: June 6, 2017 PATENT COOPERATION TREATY (PCT) PCT INTERNATIONAL SEARCH AND PRELIMINARY EXAMINATION GUIDELINES (Guidelines for the Processing by International Searching

More information

Complaints Handling Code of Practice. SGN Natural Gas. 27 th July 2016

Complaints Handling Code of Practice. SGN Natural Gas. 27 th July 2016 SGN Natural Gas Complaints Handling Code of Practice 27 th July 2016 10 th n 27 th July 2016 Contents 1 Introduction... 3 2 Definition of a complaint... 3 3 Specific requirements... 3 4 Monitoring and

More information

INWARD REMITTANCE RULES AND REGULATIONS 2016 ROYAL MONETARY AUTHORITY OF BHUTAN

INWARD REMITTANCE RULES AND REGULATIONS 2016 ROYAL MONETARY AUTHORITY OF BHUTAN INWARD REMITTANCE RULES AND REGULATIONS 2016 ROYAL MONETARY AUTHORITY OF BHUTAN SEPTEMBER 2016 TABLE OF CONTENT PREAMBLE... 1 CHAPTER I: PRELIMINARY... 1 CHAPTER IIA: INWARD REMITTANCE ACTIVITIES OF AUTHORIZED

More information

AMENDMENT. The existing provisions of the purchase manual vis-à-vis the revised provisions are enclosed at Annexure-A.

AMENDMENT. The existing provisions of the purchase manual vis-à-vis the revised provisions are enclosed at Annexure-A. CIL/C2D/PURCHASE MANUAL/AMENDMENT/1152 13.12.2005 AMENDMENT The amendments of Purchase Manual of Coal India Limited has been approved in the 223 rd meeting of the CIL Board held on 29 th September 2005.

More information

Water Supply And Sanitation (Quality Of Service) Rules THE WATER SUPPLY AND SANITATION ACT (CAP 272)

Water Supply And Sanitation (Quality Of Service) Rules THE WATER SUPPLY AND SANITATION ACT (CAP 272) GOVERNMENT NOTICE NO. 176 published on 12/05/2015 THE WATER SUPPLY AND SANITATION ACT (CAP 272) THE WATER SUPPLY AND SANITATION (QUALITY OF SERVICE) RULES, 2016 (Made under section 28(1) (m)) ARRANGEMENT

More information

RECEIPT. Issued to. Against receipt No. dated. No. dated

RECEIPT. Issued to. Against receipt No. dated. No. dated RECEIPT Serial No. Issued to Against receipt No. dated and payment vide Cash/Bank Draft drawn upon: No. dated for Rs.1000/- (Rupees One Thousand only). Short term Tender Documents issued on for Managing

More information

Drafting Instructions for the Trade Marks Rules THE TRADE MARKS BILL, 2015 ARRANGEMENT OF RULES

Drafting Instructions for the Trade Marks Rules THE TRADE MARKS BILL, 2015 ARRANGEMENT OF RULES THE TRADE MARKS BILL, 2015 ARRANGEMENT OF RULES PART I- PRELIMINARY 1. Short title and commencement. 2. Interpretation. 3. Fees. 4. Forms. PART II: REGISTRABILITY OF TRADE MARKS 5. Conversion to new classification

More information

Processing of Building Consent Applications

Processing of Building Consent Applications G05 Processing of Building Consent Applications Contents 1. INTRODUCTION... 1 2. MANAGING PROCESSING TIMES... 2 3. LINKAGE WITH RMA PROCESSES... 2 4. INITIAL ASSESSMENT BY CONSENTS OFFICER... 3 5. ASSESS

More information

REVISED AS OF MARCH 2014

REVISED AS OF MARCH 2014 REVISED AS OF MARCH 2014 JUDICATE WEST COMMERCIAL ARBITRATION RULES RULE 1. INTENT AND OVERVIEW 1 RULE 1.A. INTENT 1 RULE 1.B. COMMITMENT TO EFFICIENT RESOLUTION OF DISPUTES 1 RULE 2. JURISDICTION 1 RULE

More information

-COPY OF- INCOME TAX INSTRUCTION NO. 4/2011 DATED IT-

-COPY OF- INCOME TAX INSTRUCTION NO. 4/2011 DATED IT- -COPY OF- INCOME TAX INSTRUCTION NO. 4/2011 DATED 9-3-2011 IT- Instructions regarding Standard Operating Procedure on filing of Appeals/Special Leave Petitions (SLPs) by the Income Tax Department in the

More information

Delegations will find in the Annex a Presidency compromise proposal concerning the abovementioned

Delegations will find in the Annex a Presidency compromise proposal concerning the abovementioned COUNCIL OF THE EUROPEAN UNION Brussels, 20 February 2014 (OR. en) 6570/14 Interinstitutional File: 2013/0088 (COD) PI 20 CODEC 433 NOTE From: To: General Secretariat of the Council Delegations No. Cion

More information

EU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL. Chapter on Sanitary and Phytosanitary Measures

EU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL. Chapter on Sanitary and Phytosanitary Measures This document contains an EU proposal for a legal text on Sanitary and Phytosanitary Measures in the Trade Part of a possible modernised EU-Mexico Association Agreement. It has been tabled for discussion

More information

Standards Development Manual

Standards Development Manual ASC Administrative Policy and Procedure Standards Development Manual Procedures for Developing and Maintaining Standards, Interpretations, Guidelines, and Technical Reports (SD2, ASC02) Table of Contents

More information

PUDUCHERRY DISTILLERIES LIMITED (A Govt. of Puducherry Undertaking)

PUDUCHERRY DISTILLERIES LIMITED (A Govt. of Puducherry Undertaking) PUDUCHERRY DISTILLERIES LIMITED (A Govt. of Puducherry Undertaking) CIN: U15511PY1971SGC000113 RS No. 144 & 145, Ariyapalayam, Tel: 0413-2666844 / 2667578 Villianur, PUDUCHERRY, 605 110. Fax: 0413-2661556.

More information

BERMUDA COPYRIGHT TRIBUNAL RULES 2014 BR 11 / 2014

BERMUDA COPYRIGHT TRIBUNAL RULES 2014 BR 11 / 2014 QUO FA T A F U E R N T BERMUDA COPYRIGHT TRIBUNAL RULES 2014 BR 11 / 2014 TABLE OF CONTENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 PART 1 PRELIMINARY Citation Interpretation Overriding objective Tribunal

More information

Regulations to the Norwegian Patents Act (The Patent Regulations)

Regulations to the Norwegian Patents Act (The Patent Regulations) Regulations to the Norwegian Patents Act (The Patent Regulations) This is an unofficial translation of the regulations to the Norwegian Patents Act. Should there be any differences between this translation

More information

NORTH EASTERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED OFFICE OF THE CHIEF EXECUTIVE OFFICER

NORTH EASTERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED OFFICE OF THE CHIEF EXECUTIVE OFFICER NORTH EASTERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED OFFICE OF THE CHIEF EXECUTIVE OFFICER Corporate Office: Januganj, Balasore 756019, Orissa, Fax No.-06782-263259 Regd. Office: Plot No. N-1/22,

More information

Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards

Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards (Approved by ANSI November 23, 2015 Replaces Previous Procedures Dated May 21, 2010) The

More information

No. 1/5/2016-IR Govt. of India Mlnistrty of Personnel, Public Grievances & Pensions Department of Personnel & Training

No. 1/5/2016-IR Govt. of India Mlnistrty of Personnel, Public Grievances & Pensions Department of Personnel & Training No. 1/5/2016-IR Govt. of India Mlnistrty of Personnel, Public Grievances & Pensions Department of Personnel & Training CIRCULAR North Block, New Delhi Dated the 31 st March, 2017 Subject:- Framing RI"

More information

RPT-G6. Mobile Homes guidance

RPT-G6. Mobile Homes guidance Mobile Homes guidance Version 1.5 November 2015 Content RPT-G6 Part 1 Introduction Part 2 Applications to the Tribunal Part 3 How to apply Part 4 Procedures following application Part 5 Inspections and

More information

Notice For Inviting Expression Of Interest For Treatment & Disposal Of Illegal Hazardous Waste Lying At Village Khanpur, Rania Kanpur Dehat

Notice For Inviting Expression Of Interest For Treatment & Disposal Of Illegal Hazardous Waste Lying At Village Khanpur, Rania Kanpur Dehat Notice For Inviting Expression Of Interest For Treatment & Disposal Of Illegal Hazardous Waste Lying At Village Khanpur, Rania Kanpur Dehat As per directions of the expert committee for Illegal Hazardous

More information

Bylaws and Constitution

Bylaws and Constitution INTERNATIONAL FIRE SERVICE ACCREDITATION CONGRESS Bylaws and Constitution Certificate Assembly Board of Governors and Certificate Assembly Assembly of Fire Service Certifying Entities Articles 10, 11,

More information

The Hague Agreement Concerning the International Deposit of Industrial Designs of November 6, 1925

The Hague Agreement Concerning the International Deposit of Industrial Designs of November 6, 1925 The Hague Agreement Concerning the International Deposit of Industrial Designs of November 6, 1925 The Hague Act of November 28, 1960 Article 1 (1) The contracting States constitute a Special Union for

More information

ASEAN SECTORAL MUTUAL RECOGNITION ARRANGEMENT FOR GOOD MANUFACTURING PRACTICE (GMP) INSPECTION OF MANUFACTURERS OF MEDICINAL PRODUCTS

ASEAN SECTORAL MUTUAL RECOGNITION ARRANGEMENT FOR GOOD MANUFACTURING PRACTICE (GMP) INSPECTION OF MANUFACTURERS OF MEDICINAL PRODUCTS ASEAN SECTORAL MUTUAL RECOGNITION ARRANGEMENT FOR GOOD MANUFACTURING PRACTICE (GMP) INSPECTION OF MANUFACTURERS OF MEDICINAL PRODUCTS The Governments of Brunei Darussalam, the Kingdom of Cambodia, the

More information

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL FRCC-RE-STD-001 Effective Date: March 3, 2017 Version: 1 3000 Bayport Drive, Suite 600 Tampa, Florida 33607-8410 (813) 289-5644 - Phone (813)

More information

Food Act 1. Passed RT I 1999, 30, 415 Entered into force in accordance with 66.

Food Act 1. Passed RT I 1999, 30, 415 Entered into force in accordance with 66. Issuer: Riigikogu Type: act In force from: 01.01.2017 In force until: 30.06.2017 Translation published: 20.12.2016 Food Act 1 Amended by the following acts Passed 25.02.1999 RT I 1999, 30, 415 Entered

More information

Policy and Procedures for actions taken concerning non compliant products or commodities in terms of the NRCS Act, 2008 (Act 5 of 2008)

Policy and Procedures for actions taken concerning non compliant products or commodities in terms of the NRCS Act, 2008 (Act 5 of 2008) Policy and Procedures for actions taken concerning non compliant products or commodities in terms of the NRCS Act, 2008 (Act 5 of 2008) Compiled by Approved by QMS Manager (T Scriven) Chief Executive Officer

More information

GUIDELINES AND RULES FOR ORGANISING THE IFCC-EFLM EUROMEDLAB CONGRESSES OF CLINICAL CHEMISTRY AND LABORATORY MEDICINE

GUIDELINES AND RULES FOR ORGANISING THE IFCC-EFLM EUROMEDLAB CONGRESSES OF CLINICAL CHEMISTRY AND LABORATORY MEDICINE GUIDELINES AND RULES FOR ORGANISING THE IFCC-EFLM EUROMEDLAB CONGRESSES OF CLINICAL CHEMISTRY AND LABORATORY MEDICINE 1. Introduction 2. Purpose 3. Process 4. Schedule and location of the EUROMEDLAB a)

More information

Appendix A SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL STATEMENT OF GAMBLING ACT 2005 POLICY

Appendix A SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL STATEMENT OF GAMBLING ACT 2005 POLICY Appendix A SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL STATEMENT OF GAMBLING ACT 2005 POLICY 3 YEARLY REVIEW 2019 REVISED POLICY Gambling Act 2005 Contents Item Page Part A 1. Introduction 2 2. The licensing

More information

the Ministry are all available at or by contacting the Ministry on

the Ministry are all available at   or by contacting the Ministry on Determination 2015/066 Regarding the authority s refusal to issue a building consent for an extension to an aluminium factory building in respect of Clause C3.8 at 53-69 Maui Street, Pukete, Hamilton Summary

More information

TRADE MARKS RULES, 1996 (as amended)

TRADE MARKS RULES, 1996 (as amended) Amended by: Patents, Trade Marks and Design (Fees) (Amendment) Rules 2012 S.I. No. 229/2000- Trade Marks Act (Community Trade Mark) Regulations, 2000 TRADE MARKS RULES, 1996 (as amended) S.I. No. 621/2007

More information