HP 8753E. Option H39. Three-Port Test Set

Size: px
Start display at page:

Download "HP 8753E. Option H39. Three-Port Test Set"

Transcription

1 User's and Service Guide HP 8753E Option H39 Three-Port Test Set ABCDE Printed in USA

2 HP part number: Printed in USA August 1998 Notice The information contained in this document is subject to change without notice. Hewlett-Packard makes no warranty of any kind with regard to this material, including but not limited to, the implied warranties of merchantability and tness for a particular purpose. Hewlett-Packard shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this material. Safety and Regulatory Information For safety and regulatory information refer to the HP 8753E User's Guide and Service Guide. c Copyright 1998 Hewlett-Packard Company

3 User's Guide Description This book consists of two major sections, the user's guide and the service guide. This guide provides the information necessary to operate the HP 8753E Option H39. The HP 8753E User's Guide and HP 8753E Service Guide should be used in conjunction with this guide. Refer to \Reference Material" in Chapter 2 of this guide for part numbers. The HP 8753E Option H39 User's Guide assumes that the operator of the HP 8753E Option H39 is familiar with the operation of the HP 8753E and the terms used for that instrument. If the HP 8753E Option H39 is set up or operated as a standard HP 8753E, refer to the HP 8753E User's Guide. All specications for the HP 8753E Option H39 are consistent with the standard HP 8753E, with the exception of the specications outlined in this guide. Refer to Chapter 3, \Specications," in this guide. The HP 8753E Option H39 can be used with all standard options and congurations available for the HP 8753E, with the exception of Option 011 and 075. The HP 8753E Option H39 User's Guide contains the following chapters: Introduction Operation Specications iii

4 Service Guide Description This book consists of two major sections, the user's guide and the service guide. This guide provides the information necessary to service the HP 8753E Option H39. The HP 8753E Service Guide should be used in conjunction with this guide. Refer to \Reference Material" in Chapter 2 of the HP 8753E Option H39 User's Guide for the part number. The HP 8753E Option H39 Service Guide assumes that the service personnel are familiar with the troubleshooting and servicing of the HP 8753E and the terms used for that instrument. It is recommended that if any servicing of the HP 8753E Option H39 is needed you should contact your nearest HP service center. The HP 8753E Option H39 Service Guide contains the following chapters: Service Equipment System Verication and Performance Tests Test Record for 30 khz to 3 GHz Test Record for 30 khz to 6 GHz Theory of Operation and Troubleshooting Replaceable Parts iv

5 User's Guide for the HP 8753E Option H39 Three-Port Test Set ABCDE Printed in USA

6

7 Contents 1. Introduction Three-Port Test Set Operation Reference Material Front Panel Features Menu Map Test Set I/O Port Parameters Test Set I/O Example 1: Transmission Measurements Example 2: Duplexer Setup Sequence Commands Sequence Example HP-IB Commands and their Measurements Example 1: Uncouple Channel 1 and Channel Example 2: Setting the HP 8753E Option H39 for a Full Two-Port Cal Sequence Operator's Check Description Procedure Repeatability Check for Port 1 and Port Repeatability Check for Port 2 and Port Repeatability Check for Port 1 and Port Contents-1

8 3. Specications Measurement Capabilities Frequency Response Raw (Uncorrected) Performance Characteristics Measurement Characteristics (Corrected) Output Power Characteristics Average Noise Level System Performance Summary Typical Measurement Uncertainty Index Contents-2

9 Figures 2-1. HP 8753E Option H39 Front Panel Menu Map S21 Measurement Uncertainty Characteristic Curves (Corrected, Typical) S11 Measurement Uncertainty Characteristic Curves (Corrected, Typical) Tables 2-1. Test Set I/O Port Parameters HP-IB Commands Contents-3

10

11 1 Introduction Three-Port Test Set The HP 8753E Option H39 is a modied HP 8753E network analyzer that adds a third test port to the HP 8753E test set. The test ports allow measurement applications for three-port devices with the ability to make S-parameter measurements between any two test ports. This user's guide provides information on how to operate the HP 8753E Option H39 using I/O commands and HP{IB commands, as well as examples of how to implement the commands. Further information on how to control the HP 8753E can be found in the HP 8753E User's and Service Guide. Refer to the \Reference Material" in Chapter 2 for the part number of the HP 8753E User's and Service Guide. This user's guide also provides the specications for the HP 8753E Option H39. Note Test port 1 and test port 3 are the instrument's default ports: on preset or when power is turned on, port 1 and port 3 are active. The port status is indicated by an LED status light located to the right of each test port. Three states are indicated by the LED status light: Bright: Indicates the source (incident) port. Dim: Indicates the receive (through) port. O: Indicates the port is inactive. For further information on the status indicators, refer to the \Front Panel Features" section in this Chapter 2 of this user's guide, and the \Theory of Operation and Troubleshooting" section in the HP 8753E Option H39 Service Guide. Introduction 1-1

12

13 2 Operation This chapter contains the following sections: Reference Material Front Panel Features Menu Map Test Set I/O Port Parameters Sequence Commands HP-IB Commands Operator's Check Reference Material Description HP Part Number HP 8753E User's Guide HP 8753E Service Guide Operation 2-1

14 Front Panel Features Figure 2-1 shows the front panel features of the HP 8753E Option H39. Figure 2-1. HP 8753E Option H39 Front Panel 1. Test Port 1 2. Test Port 1 Status LED 3. Test Port 2 4. Test Port 2 Status LED 5. Test Port 3 6. Test Port 3 Status LED 7. R CHANNEL IN to R CHANNEL OUT Jumper (standard on the HP 8753E) 2-2 Operation

15 Note Test Port LEDs: The LED to the right of each test port indicates the status of that port. The LEDs show which ports are active, which is providing the source of the RF power, and which port is inactive. The LEDs are lit to indicate which ports are active. The inactive port LED is not lit. The brightest LED indicates the port supplying the RF source. The dim LED indicates the receiver port. The following shows the LED status at preset or power up. 1. Port 1 LED is bright. 2. Port 2 LED is o. 3. Port 3 LED is dim. Operation 2-3

16 Menu Map The test set can be controlled by the network analyzer using the sequencing key (4Seq5) on the front panel. Figure 2-2 shows the menus available under the 4Seq5 key. NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O FWD and NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O REV control the test ports. Figure 2-2. Menu Map 2-4 Operation

17 Test Set I/O Port Parameters Table 2-1 shows the nine S-parameters that can be measured with the HP 8753E Option H39. Table 2-1. Test Set I/O Port Parameters Measurements Reection 1) Port 1 2) Port 2 3) Port 3 Ports and Port Paths S-parameters S11 S22 S33 Parameter Displayed on Analyzer S11 S11, S22 S22 Test Set I/O Setting FWD 7 6 Test Set I/O Setting REV 5 7 Transmission 4) Port 1-Port 3 5) Port 2-Port 3 6) Port 1-Port 2 S31, S13 S32, S23 S21, S12 S21, S12 S21, S12 S21, S Test ports 1, 2, and 3 can be switched independently, depending on the test set I/O (FWD or REV) value, and the network analyzer's test state, forward (FWD) or reverse (REV). When the network analyzer is in the dual-channel mode and the channels are uncoupled, the test set I/O (FWD and REV) can be set dierently regardless of the FWD and REV I/O setting. Only the S11, S21, S12, and S22 parameters are displayed on the network analyzer. Refer to \Example 2: Duplexer Setup" in this chapter for more information. Caution Before performing a full 2-port calibration, make sure that both the TESTSET I/O FWD and the TESTSET I/O REV settings are set the same. Operation 2-5

18 The Option H39 can be controlled in a number of dierent ways. The following information is provided as a guide on how to control the HP 8753E Option H39 in the following ways: Through the front panel menus. Through TTL I/O sequence menu. Through Test sequencing. Through HP-IB commands. The examples listed should be used only as possible ways of setting up and controlling the HP 8753E Option H39. Test Set I/O The test set I/O may be set by using the following key strokes. Press 4Seq5 NNNNNNNNNNNNNNNNNNNNNNN TTL I/O NNNNNNNNNNNNNNNNNNNNNNN TTL OUT NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O FWD and enter the value setting, then press NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O REV and enter the value setting. Refer to Table 2-1 for value settings. Example 1: Transmission Measurements The following key strokes will set up the instrument for measuring transmission from port 1 to port 3 on channel 1, and measuring transmission from port 3 to port 2 on channel Press 4Chan 15 4Meas5 2. Press 4Seq5 3. Press 4Chan 25 4Meas5 4. Press 4Seq5 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Trans: FWD S21 (B/R). NNNNNNNNNNNNNNNNNNNNNNN TTL I/O NNNNNNNNNNNNNNNNNNNNNNN TTL OUT NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O FWD 475 4x15. NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Trans: FWD S12 (A/R). NNNNNNNNNNNNNNNNNNNNNNN TTL I/O NNNNNNNNNNNNNNNNNNNNNNN TTL OUT NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O REV 465 4x15. Note These examples may be saved in an instrument state and recalled later. Test port settings and TTL states are saved in the instrument state. To save this instrument state, press 4Save/Recall5 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SAVE STATE. 2-6 Operation

19 Example 2: Duplexer Setup The following example measures a duplexer. The following keystrokes will set up the HP 8753E Option H39 to measure from port 1 to port 3 on channel 1, and from port 2 to port 3 is channel 2. In this example steps 4 and 7 indicate where you would perform a calibration. 1. Turn coupled channel o. Press 4Menu5 2. Press 4Chan 15 4Meas5 3. Press 4Seq x15. NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Trans: FWD S21 (B/R). NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN COUPLED CH OFF. NNNNNNNNNNNNNNNNNNNNNNN TTL I/O NNNNNNNNNNNNNNNNNNNNNNN TTL OUT NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O FWD 475 4x15 4. Perform a two-port calibration on channel 1, for port 1 and port Press 4Chan 25 4Meas5 6. Press 4Seq x15. NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Trans: REV S21 B/R. NNNNNNNNNNNNNNNNNNNNNNN TTL I/O NNNNNNNNNNNNNNNNNNNNNNN TTL OUT NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O FWD 465 4x15 7. Perform a two-port calibration on channel 2, for port 2 and port Turn dual channel on. Press 4Display5 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN DUAL CHAN ON. NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O REV NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O REV The HP 8753E Option H39 with the coupled channel o (see Example 2: Duplexer Setup), and the dual-channel display on (see Example 2: Duplexer Setup), can measure two separate, independent ports. Measurement capabilities are shown for channel 1 and channel 2. Measurement capabilities on channel 1: S21=Port 1{Port 3 Trans. S11=Port 1 Re. S22=Port 3 Re. S12=Port 3{Port 1 Trans. Operation 2-7

20 Measurement capabilities on Channel 2: S21=Port 2{Port 3 Trans. S11=Port 2 Re. S22=Port 3 Re. S12=Port 3{Port 2 Trans. Note These examples may be saved in an instrument state and recalled later. Test port settings and TTL states are saved in the instrument state. To save this instrument state, press 4Save/Recall5 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SAVE STATE. 2-8 Operation

21 Sequence Commands The test set I/O may be set by using the test sequencing function. Sequence Example The following example sets up port conguration for port 1 to port 2, and port 2 for to port Press 4Seq5 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN NEW SEQ/MODIFY SEQ NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SEQUENCE 1 SEQ1 NNNNNNNNNNNNNNNNNNNNNNN TTL I/O NNNNNNNNNNNNNNNNNNNNNNN TTL OUT. 2. Press NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O FWD 455 4x Press NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O REV 455 4x Press NNNNNNNNNNNNNNNNNNNN RETURN NNNNNNNNNNNNNNNNNNNN RETURN NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN DONE SEQ MODIFY. 5. Press NNNNNNNNNNNNNN MORE NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TITLE SEQUENCE NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SEQUENCE 1 SEQ1 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN ERASE TITLE. 6. Rotate the front panel knob and select the following: NNNNN P NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SELECT LETTER NNNNN 1 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SELECT LETTER NNNNN 2 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SELECT LETTER NNNNNNNNNNNNNN DONE NNNNNNNNNNNNNNNNNNNN RETURN. 7. Press NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN NEW SEQ/MODIFY SEQ NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SEQUENCE 2 SEQ2 NNNNNNNNNNNNNNNNNNNNNNN TTL I/O NNNNNNNNNNNNNNNNNNNNNNN TTL OUT. 8. Press NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O FWD 465 4x Press NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O REV 465 4x Press NNNNNNNNNNNNNNNNNNNN RETURN NNNNNNNNNNNNNNNNNNNN RETURN NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN DONE SEQ MODIFY. 11. Press NNNNNNNNNNNNNN MORE NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TITLE SEQUENCE NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SEQUENCE 2 SEQ2 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN ERASE TITLE. 12. Rotate the front panel knob and select the following: NNNNN P NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SELECT LETTER NNNNN 2 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SELECT LETTER NNNNN 3 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SELECT LETTER NNNNNNNNNNNNNN DONE NNNNNNNNNNNNNNNNNNNN RETURN. 13. Press 4Preset5. Display softkeys should show NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SEQUENCE 1 P12 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SEQUENCE 2 P23.For more information about sequencing and its capabilities, refer to the HP 8753E User's Guide. Pressing NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SEQUENCE 1 P12 sets the analyzer to measure between ports 1 and 2. Pressing NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SEQUENCE 2 P23 sets the analyzer to measure between ports 2 and 3. Operation 2-9

22 HP-IB Commands and their Measurements Table 2-2 shows the HP-IB commands that can be used to externally calibrate and control the port conguration for the HP 8753E Option H39. Table 2-2. HP-IB Commands HP-IB Command TSTIOFWD7 TSTIOFWD6 TSTIOFWD5 TSTIOREV7 TSTIOREV6 TSTIOREV5 Measurement PORT 1 to PORT 3: S21, S11 PORT 2 to PORT 3: S21, S11 PORT 1 to PORT 2: S21, S11 PORT 3 to PORT 1: S12, S22 PORT 3 to PORT 2: S12, S22 PORT 2 to PORT 1: S12, S22 Example 1: Uncouple Channel 1 and Channel 2 In this example, the network analyzer's Chan1 and Chan2 are uncoupled. Chan1 and Chan2 testset I/O FWD and I/O REV are set independently. The network analyzer display is set so both Chan1 and Chan2 are displayed. In the following commands, Nwa is the address of the network analyzer. OUTPUT Nwa;\COUPOFF" OUTPUT Nwa;\CHAN1";\S21"!uncouples channels!set channel 1 to measure S21 OUTPUT Nwa;\TSTIOFWD7"!ports 1 and 3 selected for channel 1 OUTPUT Nwa;\TSTIOREV7"!ports 1 and 3 selected for channel 1 OUTPUT Nwa;\DUACON"!dual channel display on For more information and how to externally calibrate and control the HP 8753E Option H39, refer to the HP 8753E User's Guide and the HP 8753E Programming Guide Operation

23 Example 2: Setting the HP 8753E Option H39 for a Full Two-Port Cal Sequence The following HP{IB commands set up the HP 8753E Option H39 to perform a full two{port calibration from port 2 to port 3. This command is followed by performing a two{port calibration. In the following commands, Nwa is the address of the network analyzer. OUTPUT Nwa;\CHAN2";\S21"!set channel 2 to measure S21 OUTPUT Nwa;\TSTIOFWD6"!ports 2 and 3 selected for channel 2 OUTPUT Nwa;\TSTIOREV6"!ports 2 and 3 selected for channel 2 For more information and capabilities on how to externally calibrate and control the HP 8753E Option H39, refer to the HP 8753E User's Guide and the HP 8753E Programming Guide. Operation 2-11

24 Operator's Check Description The operator's check consists of two softkey-initiated tests: Port 1 Op Chk and Port 2 Op Chk. A short is connected to port 1 (port 2, port 3) to reect all the source energy back into the analyzer for an S 11 (S 22 ) measurement. The rst part of Port 1, Op Chk checks the repeatability of the transfer switch. An S 11 measurement is stored in memory and the switch is toggled to port 3 and then back to port 1 where another S 11 measurement is made. The dierence between the memory trace and the second trace is switch repeatability. The remaining parts of both tests exercise the internal attenuator in 5 db steps over a 55 db range. The resulting measurements must be within a limit testing window to pass the test. The window size is based on source and receiver specications. The operator's check determines the following: The source is phase locked across the entire frequency range. All three samplers are functioning properly. All transfer switches and receiver switches are operational. The attenuator steps 5 db at a time. Required Equipment Short (m) :::::::::::::::::::::::::::::part of the HP 85032B calibration kit Analyzer warm-up time: 30 minutes Operation

25 Procedure Repeatability Check for Port 1 and Port 3 1. Disconnect all devices, peripherals, and accessories (including adapters and limiters) from the analyzer. 2. Run the test for port 1 and press 4Preset5 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SERVICE MENU NNNNNNNNNNNNNNNNN TESTS NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN EXTERNAL TESTS. NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN PRESET: FACTORY 4System5 3. The display should show TEST 21 Port 1 Op Chk in the active area. 4. Press NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN EXECUTE TEST to begin the test. 5. At the prompt, connect the short to port 1. Make sure the connection is tight. 6. Press NNNNNNNNNNNNNNNNNNNNNNNNNN CONTINUE. The test is a sequence of subtests. At the end of the subtests, the test title and result will be displayed. If all tests pass successfully, the overall test status will be PASS. Ifany test fails, the overall test status will be FAIL. 7. Run the test for port 3 and press the step 4*5 key. The display should show TEST 22 Port 2 Op Chk in the active entry area. 8. Repeat steps 4 through 6. Note Do not follow the display prompt. Connect the short to port 3. Repeatability Check for Port 2 and Port 3 9. Press 4Seq5 NNNNNNNNNNNNNNNNNNNNNNN TTL I/O NNNNNNNNNNNNNNNNNNNNNNN TTL OUT NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O FWD 465 4x Run the test for port 2 and press 4System5 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN EXTERNAL TESTS. NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SERVICE MENU NNNNNNNNNNNNNNNNN TESTS NNNNNNNNNNNNNNNNNNNNNNN I/O REV 465 4x The display should show TEST 21 Port 1 Op Chk in the active area. 12. Press NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN EXECUTE TEST to begin the test. Operation 2-13

26 13. At the prompt, connect the short to port 2. Make sure the connection is tight. 14. Press NNNNNNNNNNNNNNNNNNNNNNNNNN CONTINUE. See note below. Note Do not follow the display prompt. Connect the short to port 2. The test is a sequence of subtests. At the end of the subtests, the test title and result will be displayed. If all tests pass successfully, the overall test status will be PASS. Ifany test fails, the overall test status will be FAIL. 15. Run the test for port 3 and press the step 4*5 key. The display will show TEST 22 Port 2 Op Chk in the active entry area. 16. Repeat steps 12 through 14. Note Do not follow the display prompt. Connect the short to port 3. Repeatability Check for Port 1 and Port Press 4Seq5 NNNNNNNNNNNNNNNNNNNNNNN TTL I/O NNNNNNNNNNNNNNNNNNNNNNN TTL OUT NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TESTSET I/O FWD 455 4x Run the test for port 1 and press 4System5 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN EXTERNAL TESTS. NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN SERVICE MENU NNNNNNNNNNNNNNNNN TESTS NNNNNNNNNNNNNNNNNNNNNNN I/O REV 455 4x The display should show TEST 21 Port 1 Op Chk in the active area. 20. Press NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN EXECUTE TEST to begin the test. 21. At the prompt, connect the short to port 1. Make sure the connection is tight. 22. Press NNNNNNNNNNNNNNNNNNNNNNNNNN CONTINUE. The test is a sequence of subtests. At the end of the subtests, the test title and result will be displayed. If all tests pass successfully, the overall test status will be PASS. Ifany test fails, the overall test status will be FAIL Operation

27 23. Run the test for port 2 and press the step 4*5 key. The display should show TEST 22 Port 2 Op Chk in the active entry area. 24. Repeat steps 20 through If all tests pass, the analyzer is about 80% veried. If any test fails, refer to the HP 8753E Service Guide, \Faulty Group Isolation" in Chapter 4 or check the following: a. Make sure that the connection is tight. Repeat the test. b. Visually inspect the connector interfaces and clean them if necessary (refer to \Principles of Microwave Connector Care" in Chapter 1 of the HP 8753E Service Guide. c. Verify that the short meets published specications. d. Substitute another short, and repeat the test. e. Refer to troubleshooting in the HP 8753E Option H39 Service Guide. Operation 2-15

28

29 3 Specifications All specications for the HP 8753E Option H39 are consistent with those for the standard HP 8753E, with the exception of the specications found in this chapter. Specifications 3-1

30 Measurement Capabilities Port Paths Port 1 to Port 3 1 Port 1 to Port 2 Port 2 to Port 3 S-Parameter Measurements S11, S21, S12, S22 S11, S21, S12, S22 S11, S21, S12, S22 1 Default for Preset and Power up. Frequency Response Frequency Response (2565 C) Specication Port 1 and Port khz to 3 GHz 61 db 3 GHz to 6 GHz 62 db Port khz to 3 GHz 2 db p-p 3 GHz to 6 GHz 4 db p-p 1 Peak to Peak deviation from nominal trace across the frequency range. 3-2 Specifications

31 Raw (Uncorrected) Performance Characteristics Measurement Characteristics (Uncorrected 1 ) 30 khz to 300 khz to 300 khz GHz 1.3 GHz to 3 GHz 3 GHz to 6 GHz Directivity 20 db 3 35 db 30 db 20 db Source Match 10 db 4 16 db 16 db 12 db Load Match 5 18 db 18 db 16 db 14 db Reection Tracking db 61.5 db 61.5 db 62.5 db Transmission Tracking db 61.5 db 61.5 db 62.5 db Crosstalk 90 db 100 db 100 db 90 db 1 Applies at 2565 C. 2 Typical 3 15 db, 30 khz to 50 khz 4 10 db, 30 khz to 50 khz 5 O-state Load Match typically 18 db, 100 khz to 3 GHz, 16 db, 3 GHz to 6 GHz 6 Deviation of nominal trace across the frequency response. Measurement Characteristics (Corrected) Measurement Characteristics(Corrected 1 ) 30 khz to 300 khz to 300 khz GHz 1.3 GHz to 3 GHz 3 GHz to 6 GHz Directivity 50 db 50 db 47 db 40 db Source Match 49 db 42 db 35 db 31 db Load Match 50 db 50 db 47 db 40 db Reection Tracking db db db db Transmission Tracking db db db db 1 At 25 C 65 C. 2 Typical Specifications 3-3

32 Output Power Characteristics Output Power Characteristics Port 1 Standard and Option 006 Port 2 and Port 3 Standard and Option 006 Range 085 dbm to +10 dbm 085 dbm to +7 dbm Average Noise Level Average Noise Level Specication 300 khz to 3 GHz 3 khz IF Bandwidth 081 db 10 Hz IF Bandwidth 0102 db 3 GHz to 6 GHz 3 khz IF Bandwidth 076 db 10 Hz IF Bandwidth 097 db 3-4 Specifications

33 System Performance Summary Equipment Required Calibration Kit ::::::::::::::::::::::::::::::::::::::::::::::HP 85032B/E Test Port Cables ::::::::::::::::::::::::::::::::::::::::::::::::HP 11857D Typical Measurement Uncertainty The following graphs show the typical measurement uncertainty of a three-port device after full two-port error calibration. The curves utilize an RSS model for the contribution of residual systematic errors, dynamic accuracy, and switch repeatability. The isolation values on the curves represent the isolation that the device presents to the uncorrected port outside the measurement path. Specifications 3-5

34 Figure 3-1 shows the S21 transmission coecient (db) for a three-port device when the third port is terminated in the inactive test port over a 300 khz to 6 GHz frequency range. Figure 3-1. S21 Measurement Uncertainty Characteristic Curves (Corrected, Typical) 3-6 Specifications

35 Figure 3-2 shows the S11 reection coecient (db) for a three-port device when the third port is terminated in the inactive test port over a 300 khz to 6 GHz frequency range. Figure 3-2. S11 Measurement Uncertainty Characteristic Curves (Corrected, Typical) Specifications 3-7

36

37 Index A average noise level, 3-4 C commands, 2-1 D duplexer setup example, 2-7 F features, 2-1 frequency response, 3-2 front panel, 2-1 H HP-IB commands, 2-10 I introduction, i I/O parameters, 2-1 M measurement capabilities, 3-2 measurement capabilities channel 1, 2-7 measurement capabilities channel 2, 2-8 measurement characteristics (corrected), 3-3 menu map, 2-1 O operation, i operator's check, 2-1, 2-12 output power characteristics, 3-4 R raw (uncorrected performance characteristics, 3-3 Rchannel, 2-2 reference material, 2-1 S sequence command example, 2-9 sequence commands, 2-9 specications, i, 3-1 status LED, 2-2 system performance summary, 3-5 T test port, 2-2 test port LED, 2-2 test set I/O port parameters, 2-5 three-port test set, 1-1 transmission measurement example, 2-6 typical measurement uncertainty, 3-5 Index-1

38

39 Service Guide for the HP 8753E Option H39 Three-Port Test Set ABCDE Printed in USA

40

41 Contents 1. Service Equipment 2. System Verication and Performance Tests How totest the Performance of Your Analyzer Performance Test Record General Instrument Setup Information System Verication Cycle and Kit Recertication HP 8753E Option H39 System Verication Port 1 to Port 3 Initialization Instrument Setup Port 1 to Port 3 Measurement Calibration Port 1 to Port 3 Device Verication Port 2 Verication In Case of Diculty for Port 1 to Port Performance Tests Test Port Output Frequency Range and Accuracy Specications Equipment Required In Case of Diculty External Source Mode Frequency Range Specications Equipment Required In Case of Diculty Test Port Output Power Accuracy Specications Equipment Required In Case of Diculty Test Port Output Power Range and Linearity Specications Equipment Required Contents-1

42 Contents-2 Additional Equipment Required for Analyzers with Option In Case of Diculty Minimum R Channel Level Specications Equipment Required In Case of Diculty Test Port Input Noise Floor Level Specications Equipment Required Port 1 Noise Floor Level from 300 khz to 3 GHz (IF BW = 3 khz) Port 1 Noise Floor Level from 300 khz to 3 GHz (IF BW = 10 Hz) Port 2 B Channel Noise Floor Level from 300 khz to 3 GHz (IF BW = 10 Hz) Port 2 B Channel Noise Floor Level from 300 khz to 3 GHz (IF BW = 3 khz) Port 2 B Channel Noise Floor Level from 3 GHz to 6 GHz (IF BW = 3 khz) Port 2 B Channel Noise Floor Level from 3 GHz to 6 GHz (IF BW = 10 Hz) Port 1 Noise Floor Level from 3 GHz to 6 GHz (IF BW = 10 Hz) Port 1 Noise Floor Level from 3 GHz to 6 GHz (IF BW = 3 khz) Port 2 A Channel Noise Floor Level from 300 khz to 3 GHz (IF BW = 3 khz) Port 2 A Channel Noise Floor Level from 300 khz to 3 GHz (IF BW = 10 Hz) Port 3 Noise Floor Level from 300 khz to 3 GHz (IF BW = 10 Hz) Port 3 Noise Floor Level from 300 khz to 3 GHz (IF BW = 3 khz) Port 3 Noise Floor Level from 3 GHz to 6 GHz (IF BW = 3 khz) Port 3 Noise Floor Level from 3 GHz to 6 GHz (IF BW = 10 Hz)

43 Port 2 A Channel Noise Floor Level from 3 GHz to 6 GHz (IF BW = 10 Hz) Port 2 A Channel Noise Floor Level from 3 GHz to 6 GHz (IF BW = 3 khz) In Case of Diculty Test Port Input Frequency Response Specications Equipment Required Additional Equipment Required for Analyzers with Option Power Meter Calibration for Test Port 1 from 300 khz to 3 GHz Test Port 3 Input Frequency Response from 300 khz to 3 GHz 2-52 Test Port 2 Input Frequency Response from 300 khz to 3 GHz Reverse Direction Power Meter Calibration on Port 3 from 300 khz to 3 GHz Test Port 1 Input Frequency Response from 300 khz to 3 GHz 2-55 Test Port 2 Input Frequency Response from 300 khz to 3 GHz Forward Direction Power Meter Calibration for Test Port 3 from 3 GHz to 6 GHz 2-56 Test Port 1 Input Frequency Response from 3 GHz to 6 GHz Test Port 2 Input Frequency Response from 3 GHz to 6 GHz, Forward Direction Power Meter Calibration on Test Port 1 from 3 GHz to 6 GHz 2-60 Test Port 3 Input Frequency Response from 3 GHz to 6 GHz Test Port 2 Input Frequency Response from 3 GHz to 6 GHz, Reverse Direction In Case of Diculty Test Port Crosstalk Specications Equipment Required Test Port Crosstalk (Port 1 and Port 3) Crosstalk to Test Port 3 from 300 khz to 3 GHz Crosstalk to Test Port 1 from 300 khz to 3 GHz Crosstalk to Test Port 1 from 3 GHz to 6 GHz Crosstalk to Test Port 3 from 3 GHz to 6 GHz Test Port Crosstalk (Port 2 and Port 3) Crosstalk to Test Port 3 from 300 khz to 3 GHz Contents-3

44 Contents-4 Crosstalk to Test Port 2 from 300 khz to 3 GHz Crosstalk to Test Port 2 from 3 GHz to 6 GHz Crosstalk to Test Port 3 from 3 GHz to 6 GHz Test Port Crosstalk (Port 1 and Port 2) Crosstalk to Test Port 2 from 300 khz to 3 GHz Crosstalk to Test Port 1 from 300 khz to 3 GHz Crosstalk to Test Port 1 from 3 GHz to 6 GHz Crosstalk to Test Port 2 from 3 GHz to 6 GHz In Case of Diculty Calibration Coecients Specications Equipment Required Port 1 to Port 3 Full 2-Port Calibration Directivity (Forward) Calibration Coecient Source Match (Forward) Calibration Coecient Transmission Tracking (Forward) Calibration Coecient Reection Tracking (Forward) Calibration Coecient Load Match (Reverse) Calibration Coecient Transmission Tracking (Reverse) Calibration Coecient Port 1 to Port 3 Second Full 2-Port Calibration Load Match (Forward) Calibration Coecient Directivity (Reverse) Calibration Coecient Source Match (Reverse) Calibration Coecient Reection Tracking (Reverse) Calibration Coecient Port 2 to Port 3 Full 2-Port Calibration Directivity (Forward) Calibration Coecient Source Match (Forward) Calibration Coecient Transmission Tracking (Forward) Calibration Coecient Reection Tracking (Forward) Calibration Coecient Load Match (Reverse) Calibration Coecient Transmission Tracking (Reverse) Calibration Coecient Port 2 to Port 3 Second Full 2-Port Calibration Load Match (Forward) Calibration Coecient Directivity (Reverse) Calibration Coecient Source Match (Reverse) Calibration Coecient Reection Tracking (Reverse) Calibration Coecient Port 1 to Port 2 Full 2-Port Calibration Directivity (Forward) Calibration Coecient

45 Source Match (Forward) Calibration Coecient Transmission Tracking (Forward) Calibration Coecient Reection Tracking (Forward) Calibration Coecient Load Match (Reverse) Calibration Coecient Transmission Tracking (Reverse) Calibration Coecient Port 1 to Port 2 Second Full 2-Port Calibration Load Match (Forward) Calibration Coecient Directivity (Reverse) Calibration Coecient Source Match (Reverse) Calibration Coecient Reection Tracking (Reverse) Calibration Coecient System Trace Noise (Only for Analyzers without Option 006) 2-98 Specications Equipment Required System Trace Noise for A/R Magnitude System Trace Noise for A/R Phase System Trace Noise for B/R Magnitude System Trace Noise for B/R Phase In Case of Diculty System Trace Noise (Only for Analyzers with Option 006) Specications Equipment Required System Trace Noise for A/R Magnitude from 30 khz to 3 GHz System Trace Noise for A/R Magnitude from 3 GHz to 6 GHz System Trace Noise for A/R Phase from 3 GHz to 6 GHz System Trace Noise for A/R Phase from 30 khz to 3 GHz System Trace Noise for B/R Magnitude from 30 khz to 3 GHz System Trace Noise for B/R Magnitude from 3 GHz to 6 GHz System Trace Noise for B/R Phase from 3 GHz to 6 GHz System Trace Noise for B/R Phase from 30 khz to 3 GHz In Case of Diculty Test Port Input Impedance Specications Equipment Required In Case of Diculty Test Port Receiver Magnitude Dynamic Accuracy Specications Equipment Required Initial Calculations Contents-5

46 Contents-6 Power Meter Calibration Adapter Removal Calibration Measure Test Port 3 Magnitude Dynamic Accuracy Measure Test Port 1 Magnitude Dynamic Accuracy In Case of Diculty Test Port Receiver Magnitude Compression Specications Equipment Required Test Port 3 Magnitude Compression Test Port 1 Magnitude Compression In Case of Diculty Test Port Receiver Phase Compression Specications Equipment Required Test Port 3 Phase Compression Test Port 1 Phase Compression In Case of Diculty Test Port Output/Input Harmonics (Option 002 Analyzers without Option 006 Only) Specications Equipment Required Test Port Output Worst-Case 2nd Harmonic Test Port Output Worst-Case 3rd Harmonic Port 1 Input Worst-Case 2nd Harmonic Port 1 Input Worst-Case 3rd Harmonic Port 3 Input Worst-Case 2nd Harmonic Port 3 Input Worst-Case 3rd Harmonic Test Port Output/Input Harmonics (Option 002 Analyzers with Option 006 Only) Specications Equipment Required Test Port Output Worst-Case 2nd Harmonic Test Port Output Worst-Case 3rd Harmonic Port 1 Input Worst-Case 2nd Harmonic Port 1 Input Worst-Case 3rd Harmonic Port 3 Input Worst-Case 2nd Harmonic Port 3 Input Worst-Case 3rd Harmonic

47 2a. Performance Test Record For Analyzers with a Frequency Range of 30 khz to 3 GHz... 2a-1 2b. Performance Test Record For Analyzers with a Frequency Range of 30 khz to 6 GHz... 2b-1 3. Theory of Operation and Troubleshooting Theory of Operation Three-Port Test Set Test Port Couplers LED Front Panel Transfer Switch S Test Port 2 and 3 Source Switch S A Sampler Receiver Switch S B Sampler Receiver Switch S Port 2 Receiver Switch S Test Set Interface Troubleshooting Source No RF Source at All Test Ports No RF Source at Test Port RF Source at Test Port 1, No RF Source at Test Ports 2 or 3 or Both Receiver Section Port Port Port Replaceable Parts and Post-Repair Procedures Index Contents-7

48 Figures 2-1. System Verication Test Setup Connections for Measurement Calibration Standards Transmission Calibration Setup Connections for the 20 db Verication Device Connections for the 50 db Verication Device Mismatch Device Verication Setup Mismatch Device Verication Setup Test Port Output Frequency Range and Accuracy Test Setup External Source Mode Frequency Range Test Setup Source Output Power Accuracy Test Setup Test Port Output Power Range and Accuracy Test Setup Minimum R Channel Level Test Setup Flexible RF Cable Location Connections for Substituting the R Sampler (A4) Setup for Checking the R Sampler (A4) Source Input Noise Floor Test Setup Source Input Noise Floor Test Setup Setup for Power Meter Calibration on Test Port Test Port 3 Input Frequency Response Test Setup Setup for Power Meter Calibration on Test Port Test Port 1 Input Frequency Response Test Setup Setup for Power Meter Calibration on Test Port Setup for Test Port 1 Input Frequency Response Setup for Power Meter Calibration on Test Port Test Port 3 Input Frequency Response Test Setup Test Port Crosstalk Test Setup HP 8753E Option H39 Assembly Bottom First Full 2-Port Calibration Test Setup (Port 1 and Port 3) Transmission Calibration Test Setup (Port 1 to Port 3) Second Full 2-Port Calibration Test Setup (Port 1 to Port 3) Contents-8

49 2-31. Transmission Calibration Test Setup (Port 1 to Port 3) First Full 2-Port Calibration Test Setup (Port 2 and Port 3) Transmission Calibration Test Setup (Port 2 to Port 3) Second Full 2-Port Calibration Test Setup (Port 2 to Port 3) Transmission Calibration Test Setup (Port 2 to Port 3) First Full 2-Port Calibration Test Setup (Port 1 and Port 2) Transmission Calibration Test Setup (Port 1 to Port 2) Second Full 2-Port Calibration Test Setup (Port 1 to Port 2) Transmission Calibration Test Setup (Port 1 to Port 2) System Trace Noise Test Setup (30 khz to 3 GHz) System Trace Noise Test Setup (30 khz to 6 GHz) S11 1-Port Cal Test Setup Test Port 3 Input Impedance Test Setup S22 1-port Cal Test Setup Test Port 1 Input Impedance Test Setup Power Meter Calibration for Magnitude Dynamic Accuracy Full 2-Port Calibration with Adapter Removal Magnitude Dynamic Accuracy Measurement Test Port Magnitude Compression Test Setup Test Port Phase Compression Test Setup Test Port Output Harmonics Test Setup Receiver Harmonics Test Setup Test Port Output Harmonics Test Setup Receiver Harmonics Test Setup Source Test Setup Roll O Power Hole Loose Switch Bias Connector Receiver Setup Good Port 3 B Channel Response Good Port 1 A Channel Response Receiver Setup Good Port 2 A Channel Response Power Meter Calibration for Magnitude Dynamic Accuracy Good Port 2 B Channel Response HP 8753E Option H39 Block Diagram HP 8753E Option H39 Bottom Major Components HP 8753E Option H39 Bottom Assembly Cables Contents-9

50 3-15. HP 8753E Option H39 Assembly Top HP 8753E Option H39 Assembly Front Interface PC Board Connector Reference Contents-10

51 Tables 1-1. Required Tools Service Equipment Magnitude Dynamic Accuracy Calculations Replaceable Parts and Post-Repair Procedures Contents-11

52

53 1 Service Equipment Table 1-1 and Table 1-2 list the tools, equipment, cables, and adapters needed when servicing, testing, or adjusting the HP 8753E Option H39. Table 1-1. Required Tools T-8, T-10, T-15, T-20, and T-25 TORX screwdrivers Flat-blade screwdrivers { small, medium, and large 5/16-inch open-end wrench (for SMA nuts) 2-mm extended bit allen wrench 3/16, 5/16, and 9/16-inch hex nut drivers 5/16-inch open-end torque wrench (set to 10 in-lb) 2.5-mm hex-key driver Nonconductive and nonferrous adjustment tool Needle-nose pliers Tweezers Antistatic work mat with wrist strap Service Equipment 1-1

54 Table 1-2. Service Equipment Required Equipment Critical Specications Recommended Model Use 1 Verication Kit, 7-mm No substitute HP 85029B P Test Port Extension Cable Set, 7-mm HP 11857D A, P Printer HP ThinkJet/DeskJet/LaserJet P Adapter (3) (m) APC-7 to Type-N HP 11525A A, P Frequency Counter 30 khz to 500 MHz HP 5350B/51B/52B P Frequency Counter 500 MHz to 6 GHz (Option 006) HP 5350B/51B/52B Adapter APC-3.5 (f) to Type-N (f) HP P/N A, P Adapter Type-N (f) to BNC (m) HP P/N P External Source Maximum spurious input: <030 dbc Residual FM: <20 khz HP 83620A Cable RF APC-7, 24-inch HP P/N A, P Adapter APC-3.5 (f) to APC-7 HP P/N A, P Adapter APC-3.5 (m) to APC-7 HP P/N A, P Adapter APC-3.5 (m) to Type-N (f) HP P/N A, P Cable APC-7, 24-inch HP P/N A, P Power Sensor HP 8482A A, P, T Step Attenuator, 110 db No substitute HP 8496A Option 001, H18 P Adapter Type-N (f) to Type-N (f) HP P/N P Adapter Type-N (m) to Type-N (m) HP P/N P Cable, HP-IB HP 10833A/B/C/D A Diskette, 3.5 inch any Attenuator (2), 20 db, Type-N HP 8491A Option 020 P, T Calibration Kit, 50 Type-N No substitute HP 85032B P 50 Type-N (m) Terminations (3) No substitute HP 909F P Calibration Kit, Type-N 50 No substitute HP 85032B P Calibration Kit, 7-mm No substitute HP 85031B P Power Meter (HP-IB) HP 436A/437B/438A A, P, T Power Sensor 3 GHz to 6 GHz HP 8481A A, P, T Cable, RF (3) 50 Type-N (m) to (m) HP P/N A, P 1 P-Performance Test, A-Adjustment, T-Troubleshooting P P 1-2 Service Equipment

55 2 System Verification and Performance Tests There are two ways to conrm that the HP 8753E Option H39 network analyzer is able to make measurements as specied by Hewlett-Packard. Both ways are described in this chapter. The rst way is through the system verication procedure. With system verication, the performance of the network analyzer is conrmed as a complete measurement system. The network analyzer is used to measure the traceable behavior of test devices that are part of a verication kit. All the measurement uncertainties of the network analyzer, taken as a measurement system, have been accounted for in the serialized data disk shipped with the verication kit. The second way to conrm the specied performance of the network analyzer is by using the series of performance tests described in this chapter. Successful completion of an individual test conrms the specied performance of the specic subsystem tested, such as the source or receiver. Successful completion of the whole series of performance tests conrms the specied performance of the network analyzer as a complete measurement system. For a complete description of the verication and performance test process refer to the HP 8753E Service Guide. System Verification and Performance Tests 2-1

56 How to Test the Performance of Your Analyzer To obtain the same quality of performance testing that Hewlett-Packard has administered at the factory, you must perform one of the following: OR the system verication procedure all of the performance test procedures. This quality of performance testing guarantees that the analyzer is performing within all of the published specications. Hewlett-Packard will issue a Certicate of Calibration for your analyzer if the following conditions are met: 1. The performance verication tests are performed by personnel qualied by Hewlett-Packard. 2. Your analyzer passes all the performed tests. 3. The equipment and standards that you used to perform the tests are traceable to a national standards institute. Note If you have a particular type of measurement application that does not use all of the analyzer's measurement capabilities, you may ask your local Hewlett-Packard service center for a subset of specications that you want veried. However, this does create a potential for making incorrect measurements, if you use a dierent application than what was specied. Performance Test Record Find and use the appropriate \Performance Test Record" in the following subchapters of this guide: Performance Test Record for 30 khz to 3 GHz Performance Test Record for 30 khz to 6 GHz 2-2 System Verification and Performance Tests

57 General Instrument Setup Information In the verication procedure, the HP 8753E Option H39 is set up using Type-N (m) to APC-7 adapters. The adapters are installed on ports 1 and 3. Cables are then connected to the adapters. This setup is used throughout the verication procedure. Calibration of the instrument is done with the adapters and cables attached. If the cables are removed, the calibration will be aected and the performance of the instrument will be invalid. All connections to ports 1 and 3 are done at the open end of the cable. The analyzer will be set up to use the turn-on and preset default ports (port 1 and port 3). System verication of the HP 8753E Option H39 requires less setup, by leaving the adapters and cables on the analyzer, and utilizing the default settings. Note Once calibration is completed with the adapters and cables attached to the analyzer, the adapters and cables should remain on the analyzer until all of the verication procedure has been completed. If the adapters or cables are removed the calibration is aected and the performance of the instrument will be invalid. System Verification Cycle and Kit Recertification Hewlett-Packard recommends that you verify your network analyzer measurement system every six months. Hewlett-Packard also suggests that you get your verication kit recertied annually. Refer to the HP 85029B 7-mm Verication Kit Operating and Service Manual for more information. Check to see how the verication kit's oppy disk is labeled: If your verication disk is labeled HP 8753D Verification Data Disk, or HP 8753D & HP 8753E Verification Data Disk, you may proceed with the system verication. If your verication disk is not labeled as indicated above, you may send your HP 85029B 7-mm verication kit to the nearest service center for recertication, which includes a data disk that you can use with the HP 8753E. System Verification and Performance Tests 2-3

Agilent 87511A/B S-PARAMETER TEST SET Operation and Service Manual. Manual Change

Agilent 87511A/B S-PARAMETER TEST SET Operation and Service Manual. Manual Change Agilent 87511A/B S-PARAMETER TEST SET Operation and Service Manual Manual Change Agilent Part No. N/A May 2007 Change 1 Change the part number for the Cables (page 2-1) to the following. Component Part

More information

Quick Start Guide. Microwave Transition Analyzer

Quick Start Guide. Microwave Transition Analyzer Quick Start Guide HP 71500A and HP 70820A Microwave Transition Analyzer ABCDE HP Part No. 70820-90047 Printed in USA November 1992 Edition B.0.0 Notice The information contained in this document is subject

More information

User's Guide. Agilent 8504B. Precision. Reectometer. FINAL TRIM SIZE : 7.5 in x 9.0 in

User's Guide. Agilent 8504B. Precision. Reectometer. FINAL TRIM SIZE : 7.5 in x 9.0 in User's Guide Agilent 8504B Precision Reectometer Agilent part number: 08504-90055 Printed in USA July 2001 Lightwave Division 3910 Brickway Boulevard, Santa Rosa, CA 95403, USA Instrument Support Center:

More information

Installation Instructions HM2085-PLM Strain Gage Input Module

Installation Instructions HM2085-PLM Strain Gage Input Module Helm Instrument Company, Inc. 361 West Dussel Drive Maumee, Ohio 43537 USA Phone: 419-893-4356 Fax: 419-893-1371 www.helminstrument.com Installation Instructions HM2085-PLM Strain Gage Input Module October,

More information

( ) Raw ( ) Brushed ( ) Black. Installation Guide. Technical Support (714) DEEP Trans Pan - DODGE

( ) Raw ( ) Brushed ( ) Black. Installation Guide. Technical Support (714) DEEP Trans Pan - DODGE Pacific Performance Engineering, Inc. PPEdiesel.com (228051000) Raw (228051010) Brushed (228051020) Black Installation Guide Technical Support (714) 985-4825 Rev: 2/10/17 v5 1 DEEP Trans Pan - DODGE DISCLAIMER

More information

WASTE TREATMENT SYSTEMS OWNER S AERATOR MANUAL

WASTE TREATMENT SYSTEMS OWNER S AERATOR MANUAL WASTE TREATMENT SYSTEMS OWNER S AERATOR MANUAL NOTE: Thank you for purchasing Consolidated Treatment Systems O.E.M. replacement aerator for your Multi- Flo or Enviro-Guard wastewater treatment system.

More information

Getting Started Guide

Getting Started Guide Model USBEX260A-IC Getting Started Guide Version 1.0 August 11, 2008 Copyright, Confidentiality and Disclaimer Statements. While the information in this publication is believed to be accurate, Ellisys

More information

Fiber Distribution Frame Splice Module Accessory Kit Installation Instructions

Fiber Distribution Frame Splice Module Accessory Kit Installation Instructions Fiber Distribution Frame Splice Module Accessory Kit Installation Instructions Content Page INTRODUCTION... 1 Revision History... 1 Trademark Information... 1 Related Publications... 1 1 DESCRIPTION...

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Adventure RAck for polaris rzr Multi-purpose Utility System PRODUCT OVERVIEW 1. Rack Assembly 2. Cage Pivot Mount 3. Rack Pivot Mount 4. Striker Bracket 5. Strap Loops 6. Striker Mount (Rack side) 7. EZ-Lift

More information

The optical memory card is a Write Once media, a written area cannot be overwritten. Information stored on an optical memory card is non-volatile.

The optical memory card is a Write Once media, a written area cannot be overwritten. Information stored on an optical memory card is non-volatile. T10/99-128r0 Subject: Comments on the Committee Draft 14776-381 -Small Computer System Interface -Part 381: Optical Memory Card Device Commands (SCSI OMC). 99-107R0 on T10 site. I have a number of comments

More information

Troubleshooting Manual

Troubleshooting Manual Registrar of Voters County of Santa Clara Troubleshooting Manual Election Day Procedure Booklet Contact 1(408) 299-POLL (7655) with any questions or additional problems. Remember to note any troubleshooting

More information

ACER LIMITED WARRANTY AGREEMENT WARRANTY REFERENCE TABLE

ACER LIMITED WARRANTY AGREEMENT WARRANTY REFERENCE TABLE ACER LIMITED WARRANTY AGREEMENT WARRANTY REFERENCE TABLE Aspire Desktop Aspire Notebook and Netbook Extensa Notebook Travel Mate Notebook Warranty Length/Type Hardware Technical Support Software Support

More information

FM Legacy Converter User Guide

FM Legacy Converter User Guide FM Legacy Converter User Guide Version 1.0 Table of Contents v Ways to Convert Ø Drag and Drop Supported file types Types of content that are converted Types of content that are not converted Converting

More information

DragonBoard 410c based on Qualcomm Snapdragon 410E processor ADB Over Wi-Fi Application Note

DragonBoard 410c based on Qualcomm Snapdragon 410E processor ADB Over Wi-Fi Application Note Qualcomm Technologies, Inc. DragonBoard 410c based on Qualcomm Snapdragon 410E processor ADB Over Wi-Fi Application Note LM80-P0436-19 Rev B September 2016 2015-2016 Qualcomm Technologies, Inc. All rights

More information

END USER LICENSE AGREEMENT

END USER LICENSE AGREEMENT Last updated: March 19, 2018 END USER LICENSE AGREEMENT Thank you for your interest in this application for your mobile device (the App ) provided to you by Wozniak & Co. ( Wozniak & Co. ), which enables

More information

DragonBoard 410c based on Qualcomm Snapdragon 410E processor Connecting the UART to USB Adapter Application Note

DragonBoard 410c based on Qualcomm Snapdragon 410E processor Connecting the UART to USB Adapter Application Note Qualcomm Technologies, Inc. DragonBoard 410c based on Qualcomm Snapdragon 410E processor Connecting the UART to USB Adapter Application Note LM80-P0436-24 Rev B September 2016 2015-2016 Qualcomm Technologies,

More information

American National Standard

American National Standard ANSI C12.8-1981 (R1997, R2002, R2012) American National Standard Test Blocks and Cabinets for Installation of Self- Contained A Base Watthour Meters Secretariat: National Electrical Manufacturers Association

More information

5222 E. Baseline Road, Suite 101 Gilbert, AZ 85234

5222 E. Baseline Road, Suite 101 Gilbert, AZ 85234 User Manual December 2007 5222 E. Baseline Road, Suite 101 Gilbert, AZ 85234 Sales (800) 735-1991 Support (800) 895-6700 EDI Support (800) 689-4550 Local (480) 892-5120 Fax (480) 892-4804 Web site www.lytec.com

More information

Cadac SoundGrid I/O. User Guide

Cadac SoundGrid I/O. User Guide Cadac SoundGrid I/O User Guide 1 TABLE OF CONTENTS 1. Introduction... 3 1.1 About SoundGrid and the Cadac SoundGrid I/O... 3 1.2 Typical Uses... 4 1.3 Native/SoundGrid Comparison Table... 6 2. Hardware

More information

Wyandotte Municipal Services

Wyandotte Municipal Services Electric, Steam, Water Cable Television and High Speed Internet Service since 1889 An Equal Opportunity Employer Wyandotte Municipal Services Expedited Generator Interconnection Requirements INTRODUCTION

More information

TORQUE GAME BUILDER "PLATFORMER KIT" FRAMEWORK WITH SOURCE CODE END USER LICENSE AGREEMENT (EULA)

TORQUE GAME BUILDER PLATFORMER KIT FRAMEWORK WITH SOURCE CODE END USER LICENSE AGREEMENT (EULA) TORQUE GAME BUILDER "PLATFORMER KIT" FRAMEWORK WITH SOURCE CODE END USER LICENSE AGREEMENT (EULA) The use of the InstantAction, Inc. Torque Game Builder "Platformer Kit" ("Framework") is governed by this

More information

WCN3620 Device Revision Guide

WCN3620 Device Revision Guide Qualcomm Technologies, Inc. Device Revision Guide LM80-P0436-32 Rev. A August 2015 2015 Qualcomm Technologies, Inc. All rights reserved. Qualcomm Snapdragon is a product of Qualcomm Technologies, Inc.

More information

Installation of InfraStruXure for Medium Data Centers with an Emergency Power Off Circuit

Installation of InfraStruXure for Medium Data Centers with an Emergency Power Off Circuit Application Note #25 Installation of InfraStruXure for Medium Data Centers with an Emergency Power Off Circuit Many installations require the use of an Emergency Power Off (EPO) circuit to disconnect power

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 14.8.2012 Official Journal of the European Union L 217/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 23 July 2012 amending Decisions 2002/731/EC, 2002/732/EC, 2002/733/EC, 2002/735/EC and

More information

5 Year Limited Warranty

5 Year Limited Warranty Power. On Your Terms. 5 Year Limited Warranty PHI 1.3 TM 60A SIMPLIPHI POWER, INC. REV033018 THIS LIMITED WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS. YOU MAY HAVE FURTHER LEGAL RIGHTS AND REMEDIES UNDER

More information

DART-6UL EMC Radiation test

DART-6UL EMC Radiation test DART- 6 U L E M C R A D I A T I O N T E S T VARISCITE LTD. DART-6UL EMC Radiation test 2016 Variscite Ltd. All Rights Reserved. No part of this document may be photocopied, reproduced, stored in a retrieval

More information

My Health Online 2017 Website Update Online Appointments User Guide

My Health Online 2017 Website Update Online Appointments User Guide My Health Online 2017 Website Update Online Appointments User Guide Version 1 15 June 2017 Vision The Bread Factory 1a Broughton Street London SW8 3QJ Registered No: 1788577 England www.visionhealth.co.uk

More information

PCGENESIS PAYROLL SYSTEM OPERATIONS GUIDE

PCGENESIS PAYROLL SYSTEM OPERATIONS GUIDE PCGENESIS PAYROLL SYSTEM OPERATIONS GUIDE 1/22/2009 Section I: Special Functions [Topic 1: Pay Schedule Processing, V2.1] Revision History Date Version Description Author 1/22/2009 2.1 08.04.00 Corrected

More information

Last revised: 6 April 2018 By using the Agile Manager Website, you are agreeing to these Terms of Use.

Last revised: 6 April 2018 By using the Agile Manager Website, you are agreeing to these Terms of Use. Agile Manager TERMS OF USE Last revised: 6 April 2018 By using the Agile Manager Website, you are agreeing to these Terms of Use. 1. WHO THESE TERMS OF USE APPLY TO; WHAT THEY GOVERN. This Agile Manager

More information

SHAREABLE CAR CHARGER. User Manual

SHAREABLE CAR CHARGER. User Manual V6 SHAREABLE CAR CHARGER User Manual Table of Contents Safety Information...1-3 Introduction... 4 What s Included...5 Components...6 Operation Instructions... 7-11 How to Setup the ChargeHub V6...7 How

More information

ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD. Copyright 2009 All rights reserved.

ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD. Copyright 2009 All rights reserved. ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD Copyright 2009 All rights reserved. ISOLATED OPERATIONS LO/TO WORK STANDARD ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD Copyright

More information

OPERATING MANUAL SCC P/N SELF-SERVICE COUNTERTOP UNITS >> MODELS CSC3223 / CSC / CSC NOTE: SEE P/N FOR SEPARATE FSPL*

OPERATING MANUAL SCC P/N SELF-SERVICE COUNTERTOP UNITS >> MODELS CSC3223 / CSC / CSC NOTE: SEE P/N FOR SEPARATE FSPL* READ AND SAVE THESE INSTRUCTIONS OPERATING MANUAL SELF-SERVICE COUNTERTOP UNITS >> MODELS CSC3223 / CSC3223.4254 / CSC3223.4817 SCC P/N 99425 NOTE: SEE P/N 20-16813 FOR SEPARATE FSPL* 888 E. Porter Road

More information

ISi DATABASES INTERNET LICENSE AGREEMENT

ISi DATABASES INTERNET LICENSE AGREEMENT ISi DATABASES INTERNET LICENSE AGREEMENT THIS IS AN AGREEMENT between the INSTITUTE FOR SCIENTIFIC INFORMATION, INC. (ISi ), a Pennsylvania corporation with offices at 3501 Market Street, University City

More information

Agreement for iseries and AS/400 System Restore Test Service

Agreement for iseries and AS/400 System Restore Test Service Agreement for iseries and AS/400 System Restore Test Service 1. Introduction The iseries and AS/400 System Restore Test Service (called "the Service"). The Service is provided to you, as a registered subscriber

More information

THE AGREEMENT between The REGENTS of NEW MEXICO STATE UNIVERSITY and the ARCHITECT

THE AGREEMENT between The REGENTS of NEW MEXICO STATE UNIVERSITY and the ARCHITECT THE AGREEMENT between The REGENTS of NEW MEXICO STATE UNIVERSITY and the ARCHITECT 1. PARTIES TO THE CONTRACT THIS AGREEMENT effective this day of, 20, BY AND BETWEEN THE REGENTS OF NEW MEXICO STATE UNIVERSITY

More information

Sensyflow P. Thermal air-mass flowmeter for test rigs and quality assurance 10/ EN. Function and System Design

Sensyflow P. Thermal air-mass flowmeter for test rigs and quality assurance 10/ EN. Function and System Design Sensyflow P Thermal air-mass flowmeter for test rigs and quality assurance 10/1-6.8 EN Direct mass flow measurement Wide measuring range (1:0) High measuring accuracy measuring deviation < 1 % of measured

More information

Terms of Service. By downloading, installing and using the Service, the Licensee agrees to these Terms of Service, which shall bind the Licensee.

Terms of Service. By downloading, installing and using the Service, the Licensee agrees to these Terms of Service, which shall bind the Licensee. Terms of Service TRAKiT is a mobile application that runs in the background of your device and automatically tracks your activity. TRAKiT helps you to make more sustainable transportation choices by highlighting

More information

Novanta Corporation or its Affiliates Shrink-wrap License and Warranty Agreement (Embedded Products)

Novanta Corporation or its Affiliates Shrink-wrap License and Warranty Agreement (Embedded Products) Novanta Corporation or its Affiliates Shrink-wrap License and Warranty Agreement (Embedded Products) YOU SHOULD CAREFULLY READ THE FOLLOWING TERMS AND CONDITIONS OF THIS NOVANTA SHRINK- WRAP LICENSE AND

More information

Limited Warranty Letter for BYD Photovoltaic Module

Limited Warranty Letter for BYD Photovoltaic Module Limited Warranty Letter for BYD Photovoltaic Module BYD(Shangluo) Industrial Co., LTD ( BYD ) hereby provides this Limited Warranty ( Warranty ) with respect to certain types of its photovoltaic modules

More information

Act means the Municipal Elections Act, 1996, c. 32 as amended;

Act means the Municipal Elections Act, 1996, c. 32 as amended; The Corporation of the City of Brantford 2018 Municipal Election Procedure for use of the Automated Tabulator System and Online Voting System (Pursuant to section 42(3) of the Municipal Elections Act,

More information

STEVAL-IPE012V1. Single-phase energy meter demonstration board using the STPM10 and STM8L15. Features. Description

STEVAL-IPE012V1. Single-phase energy meter demonstration board using the STPM10 and STM8L15. Features. Description STEVAL-IPE012V1 Single-phase energy meter demonstration board using the STPM10 and STM8L15 Data brief Features Accuracy: Class 1 with dynamic range 200:1 Nominal voltage: 240 V Nominal current : 5 A (I

More information

THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER

THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER 10-2017 A by-law respecting the prevention of Backflow into the Municipal Drinking Water System of The Regional Municipality of Peel. WHEREAS, the Region

More information

ForeScout Extended Module for McAfee epolicy Orchestrator

ForeScout Extended Module for McAfee epolicy Orchestrator ForeScout Extended Module for McAfee epolicy Orchestrator Version 3.1 Table of Contents About McAfee epolicy Orchestrator (epo) Integration... 4 Use Cases... 4 Additional McAfee epo Documentation... 4

More information

B-Series Section Overview. Ball Screw Cutaway. UNI-LIFT Ball Screw Actuators provide high. 34

B-Series Section Overview. Ball Screw Cutaway. UNI-LIFT Ball Screw Actuators provide high. 34 B- Section Overview UNI-LIFT Actuators provide high efficiency and high speed in a linear positioning package up to 100 tons. The low friction ball screw and nut design provides longer life at load and

More information

RX410 User s Guide RX

RX410 User s Guide RX RX410 User s Guide RX41010062010 Table of Contents TOC 5 Chapter 1: Get Started with RX410 5 Package Contents 6 Hardware Specifications 6 Operating Requirements 7 Appearance 8 LED Behavior 9 Safety Instructions

More information

SCHEDULE 3 - UNADDRESSED MAIL SERVICE TERMS AND CONDITIONS

SCHEDULE 3 - UNADDRESSED MAIL SERVICE TERMS AND CONDITIONS SCHEDULE 3 - UNADDRESSED MAIL SERVICE TERMS AND CONDITIONS 1 Introduction 1.1 These special service terms and conditions are supplementary to the Australia Post Terms and Conditions and to the extent that

More information

IC Chapter 15. Ballot Card and Electronic Voting Systems; Additional Standards and Procedures for Approving System Changes

IC Chapter 15. Ballot Card and Electronic Voting Systems; Additional Standards and Procedures for Approving System Changes IC 3-11-15 Chapter 15. Ballot Card and Electronic Voting Systems; Additional Standards and Procedures for Approving System Changes IC 3-11-15-1 Applicability of chapter Sec. 1. Except as otherwise provided,

More information

SECTION #6 - REFERENCE #2. Standard Toronto Hydro Connection Agreements Terms of Conditions

SECTION #6 - REFERENCE #2. Standard Toronto Hydro Connection Agreements Terms of Conditions SECTION #6 - REFERENCE #2 Standard Toronto Hydro Connection Agreements Terms of Conditions : o Toronto Hydro-Electric System Limited Connection Agreement Schedule B1: o Micro-Embedded Generation Facility

More information

Ref. SNB/ENQ/MP/Pulse Generator/15-16/242(WP)

Ref. SNB/ENQ/MP/Pulse Generator/15-16/242(WP) SATYENDRA NATH BOSE NATIONAL CENTRE FOR BASIC SCIENCES [An Autonomous Institute under Department of Science & Technology, Government of India] BLOCK JD, SECTOR III, SALT LAKE, KOLKATA- 700 098 PHONE: +91-(0)

More information

UNCLASSIFIED. Revised: 8/21/15 UNCLASSIFIED Page 1 of 8

UNCLASSIFIED. Revised: 8/21/15 UNCLASSIFIED Page 1 of 8 UNCLASSIFIED Revised: 8/21/15 UNCLASSIFIED Page 1 of 8 UNCLASSIFIED KG-245A 1 Gbps Foreign Interoperable HAIPE INE Includes: Two User CIKs, Field Tamper Recovery Key, CLI Cable Assemble, Flexible I/O interface,

More information

F 8:00 AM 6:00 PM EST 8:30 AM 4:30 PM EST

F 8:00 AM 6:00 PM EST 8:30 AM 4:30 PM EST 16625PLAY - NOTICE - This playset product is not intended for public use. It is intended for residential application and is not warranted for public or commercial use. STOP! Call Us First! DO NOT RETURN

More information

ENERCALC Software License Agreement

ENERCALC Software License Agreement ENERCALC Software License Agreement 1 Jan 2009, revised 18-Feb-2014 & 1-Jun-2015, 9-Jun-2017 This license agreement applies to: Structural Engineering Library, STRUCTURE, RetainPro, RETAIN and 3D PLEASE

More information

Remote Support Terms of Service Agreement Version 1.0 / Revised March 29, 2013

Remote Support Terms of Service Agreement Version 1.0 / Revised March 29, 2013 IMPORTANT - PLEASE REVIEW CAREFULLY. By using Ignite Media Group Inc., DBA Cyber Medic's online or telephone technical support and solutions you are subject to this Agreement. Our Service is offered to

More information

Kit Potentiometer Rotational Analog Displacement Sensor

Kit Potentiometer Rotational Analog Displacement Sensor Kit Potentiometer Rotational nalog Displacement Sensor FETURES Conductive plastic potentiometer technology, infinite resolution nalog or digital output Low height High flexibility of wires pplicable standards:

More information

One View Watchlists Implementation Guide Release 9.2

One View Watchlists Implementation Guide Release 9.2 [1]JD Edwards EnterpriseOne Applications One View Watchlists Implementation Guide Release 9.2 E63996-03 April 2017 Describes One View Watchlists and discusses how to add and modify One View Watchlists.

More information

END USER LICENSE AGREEMENT. KnowledgePanel - PC

END USER LICENSE AGREEMENT. KnowledgePanel - PC END USER LICENSE AGREEMENT KnowledgePanel - PC 1 End User License Agreement This GfK Custom Research LLC ("GfK") Application End User License Agreement ("Agreement") applies to your use of this GfK Application

More information

SCHOOLMASTER. Appointment Scheduling. Student Information Systems. Revised - August Schoolmaster is SIF Certified

SCHOOLMASTER. Appointment Scheduling. Student Information Systems. Revised - August Schoolmaster is SIF Certified SCHOOLMASTER Student Information Systems Appointment Scheduling Revised - August 2005 Schoolmaster is SIF Certified Schoolmaster uses ctree Plus from FairCom 2005 Printed Documentation Revised August 2005

More information

Limited Warranty for PV Modules

Limited Warranty for PV Modules Limited Warranty for PV Modules Jinko Solar Import and Export Co., Ltd. ( Jinko ) warrants its Modules performance starting from the date of sale to the first customer installing (for their own use) the

More information

BALLOT BOX CHECKLIST

BALLOT BOX CHECKLIST WEEK BEFORE ELECTION 1. Call your facility contacts to confirm access to the voting site for setup and on election morning. 2. Telephone your scheduled judges no later than noon on Friday before Election

More information

STANDARD TERMS AND CONDITIONS OF SALE

STANDARD TERMS AND CONDITIONS OF SALE 1. Sale And License STANDARD TERMS AND CONDITIONS OF SALE 1.1 Controlling Conditions of Sale. All purchases and sales of Products, including all parts, kits for assembly, spare parts and components thereof

More information

TERMS OF USE AND LICENSE AGREEMENT BUCKEYE CABLEVISION, INC. Buckeye Remote Record. (Effective as of November 15, 2013) PLEASE READ CAREFULLY

TERMS OF USE AND LICENSE AGREEMENT BUCKEYE CABLEVISION, INC. Buckeye Remote Record. (Effective as of November 15, 2013) PLEASE READ CAREFULLY TERMS OF USE AND LICENSE AGREEMENT BUCKEYE CABLEVISION, INC. Buckeye Remote Record (Effective as of November 15, 2013) PLEASE READ CAREFULLY This Terms of Use and License Agreement (this "Agreement") is

More information

A2LA. P111 Technical Consensus Decisions from the Electromagnetic Advisory Committee (EMAC)

A2LA. P111 Technical Consensus Decisions from the Electromagnetic Advisory Committee (EMAC) Page 1 of 6 This document has been created and reviewed by the A2LA Electromagnetic Advisory Committee (EMAC). It provides a summary of consensus decisions voted on and approved by the EMAC and A2LA Criteria

More information

Key Considerations for Implementing Bodies and Oversight Actors

Key Considerations for Implementing Bodies and Oversight Actors Implementing and Overseeing Electronic Voting and Counting Technologies Key Considerations for Implementing Bodies and Oversight Actors Lead Authors Ben Goldsmith Holly Ruthrauff This publication is made

More information

Global Conditions (applies to all components):

Global Conditions (applies to all components): Conditions for Use ES&S The Testing Board would also recommend the following conditions for use of the voting system. These conditions are required to be in place should the Secretary approve for certification

More information

IN-POLL TABULATOR PROCEDURES

IN-POLL TABULATOR PROCEDURES IN-POLL TABULATOR PROCEDURES City of London 2018 Municipal Election Page 1 of 32 Table of Contents 1. DEFINITIONS...3 2. APPLICATION OF THIS PROCEDURE...7 3. ELECTION OFFICIALS...8 4. VOTING SUBDIVISIONS...8

More information

END USER LICENSE AGREEMENT AND TERMS OF USE

END USER LICENSE AGREEMENT AND TERMS OF USE END USER LICENSE AGREEMENT AND TERMS OF USE Please scroll down and read this End User License Agreement and Terms of Use before using the Akrapovič Custom Bikes SoundKit App for iphone (the "Application").

More information

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA)

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Electrical Equipment of Industrial Machinery

More information

A 209 SRO Telecommunications (Terminal Equipment and Public Network) Regulations

A 209 SRO Telecommunications (Terminal Equipment and Public Network) Regulations A 209 2016 Telecommunications (Terminal Equipment and SRO. 8 ARRANGEMENT OF REGULATIONS 1. Citation and commencement 2. Interpretation 3. Type approval conditions 4. Signature of applicant 5. Filing of

More information

USB-IF TRADEMARK LICENSE AGREEMENT

USB-IF TRADEMARK LICENSE AGREEMENT COMPANY: Address: Attention: Telephone: Fax: Email: USB-IF TRADEMARK LICENSE AGREEMENT This Trademark License Agreement ( License Agreement or Agreement ) is made and entered into as of the Effective Date

More information

Volume I Appendix A. Table of Contents

Volume I Appendix A. Table of Contents Volume I, Appendix A Table of Contents Glossary...A-1 i Volume I Appendix A A Glossary Absentee Ballot Acceptance Test Ballot Configuration Ballot Counter Ballot Counting Logic Ballot Format Ballot Image

More information

Trusted Logic Voting Systems with OASIS EML 4.0 (Election Markup Language)

Trusted Logic Voting Systems with OASIS EML 4.0 (Election Markup Language) April 27, 2005 http://www.oasis-open.org Trusted Logic Voting Systems with OASIS EML 4.0 (Election Markup Language) Presenter: David RR Webber Chair OASIS CAM TC http://drrw.net Contents Trusted Logic

More information

PUBLIC WORKS DEPARTMENT 1769 Georgetown Rd., Hudson, Ohio (330) office SOLAR INTERCONNECTION APPLICATION PACKET

PUBLIC WORKS DEPARTMENT 1769 Georgetown Rd., Hudson, Ohio (330) office SOLAR INTERCONNECTION APPLICATION PACKET PUBLIC WORKS DEPARTMENT 1769 Georgetown Rd., Hudson, Ohio 44236 (330) 342-1750 office SOLAR INTERCONNECTION APPLICATION PACKET CITY OF HUDSON HUDSON PUBLIC POWER Photovoltaic Interconnection Manual Index

More information

Applied Economics. Department of Economics Universidad Carlos III de Madrid

Applied Economics. Department of Economics Universidad Carlos III de Madrid Applied Economics Are Emily and Greg More Employable than Lakisha and Jamal? A Field Experiment on Labor Market Discrimination by Bertrand and Mullainathan, AER(2004) Department of Economics Universidad

More information

REMOTE ACCOUNT TRANSFER SERVICE AGREEMENT

REMOTE ACCOUNT TRANSFER SERVICE AGREEMENT P.O. Box 22219 San Francisco, CA 94122 800.222.1391 Members_Info@sfpcu.org www.sfpcu.org REMOTE ACCOUNT TRANSFER SERVICE AGREEMENT IMPORTANT: THE AGREEMENT SETS FORTH THE TERMS AND CONDITIONS UNDER WHICH

More information

Transition document Transition document, Version: 4.1, October 2017

Transition document Transition document, Version: 4.1, October 2017 Transition document Transition document, Version: 4.1, October 2017 Transition from a HACCP certification to a FSSC 22000 certification 1 Introduction... 2 2 General requirements for a transition to FSSC

More information

SECTION DETENTION DOOR HARDWARE

SECTION DETENTION DOOR HARDWARE #C1305-0l SECTION 087163 - PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DIRECTIVE FOR THE 2018 GENERAL ELECTION FOR ALL ELECTORAL DISTRICTS FOR VOTE COUNTING EQUIPMENT AND ACCESSIBLE VOTING EQUIPMENT

DIRECTIVE FOR THE 2018 GENERAL ELECTION FOR ALL ELECTORAL DISTRICTS FOR VOTE COUNTING EQUIPMENT AND ACCESSIBLE VOTING EQUIPMENT Office of the Chief Electoral Officer of Ontario Bureau du directeur général des élections de l Ontario DIRECTIVE FOR THE 2018 GENERAL ELECTION FOR ALL ELECTORAL DISTRICTS FOR VOTE COUNTING EQUIPMENT AND

More information

Creating and Managing Clauses. Selectica, Inc. Selectica Contract Performance Management System

Creating and Managing Clauses. Selectica, Inc. Selectica Contract Performance Management System Selectica, Inc. Selectica Contract Performance Management System Copyright 2006 Selectica, Inc. Copyright 2007 Selectica, Inc. 1740 Technology Drive, Suite 450 San Jose, CA 95110 http://www.selectica.com

More information

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw)

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw) INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw) This Interconnection and Parallel Operating Agreement ( Agreement ) is entered into on (insert

More information

Note. RM 6000F Solid State Recorder $300,000 Includes 64 GB of memory. Higher Capacities available

Note. RM 6000F Solid State Recorder $300,000 Includes 64 GB of memory. Higher Capacities available S/TAR 2010 Price List Model Description List Price per Unit Note RM 3000 Solid State Recorder $270,000 Includes 32 GB of memory. Higher Capacities available RM 3000F Solid State Recorder $240,000 Includes

More information

Solar Isolator Range. Bright solutions

Solar Isolator Range. Bright solutions Solar Isolator Range Bright solutions The World s Finest Contents Page ON-OFF Switches for Panel Mounting 4 ON-OFF Switches for Single Hole Mounting 4 ON-OFF Switches for Base Mounting with Door Clutch

More information

Other variations which are not mentioned in this document are on demand (if possible).

Other variations which are not mentioned in this document are on demand (if possible). GENERAL INFORMATION This specification document is for gas-filled thermometers manufactured by: STIKO, Industrieweg 5, 9301 LM Roden, The Netherlands. STIKO is a manufacturer of mechanical instruments

More information

Gateway. Parts Book Four Panel, Single Adjustment Frames SIEVE & CHAFFER SYSTEM. U.S. PATENT No AND FOREIGN PATENTS PENDING. Rev.

Gateway. Parts Book Four Panel, Single Adjustment Frames SIEVE & CHAFFER SYSTEM. U.S. PATENT No AND FOREIGN PATENTS PENDING. Rev. Gateway SIEVE & CHAFFER SYSTEM Parts Book Four Panel, Single Adjustment Frames U.S. PATENT No. 6890253 AND FOREIGN PATENTS PENDING Rev. B GATEWAY DIAGRAM The Gateway diagram on this page is generic, covering

More information

TERMS OF USE. 1. Background

TERMS OF USE. 1. Background TERMS OF USE 1. Background 1.1. www.loconav.com ( Website ) and the LocoNav Application ( App ) is owned, registered and operated by BT Techlabs Private Limited ("Company"), a company incorporated under

More information

NET METERING CONNECTION AGREEMENT

NET METERING CONNECTION AGREEMENT NET METERING CONNECTION AGREEMENT This Agreement is made and entered into at Mumbai on this day of 20 between,(i)... (name of consumer), having its premises at... and Consumer No. (hereinafter referred

More information

Privacy Policy & EULA: Symphony and Symphony Pro Last Updated October 12, 2018

Privacy Policy & EULA: Symphony and Symphony Pro Last Updated October 12, 2018 Privacy Policy & EULA: Symphony and Symphony Pro Last Updated October 12, 2018 Your license to each App is subject to your prior acceptance of this Licensed Application End User License Agreement ( EULA

More information

Municipal Election Procedures for the Alternate Voting Method Known as Vote by Mail and for the Use of Vote Tabulators

Municipal Election Procedures for the Alternate Voting Method Known as Vote by Mail and for the Use of Vote Tabulators Municipal Election Procedures for the Alternate Voting Method Known as Vote by Mail and for the Use of Vote Tabulators Purpose: To provide procedures for the alternate voting method known as Vote by Mail

More information

DATA ANALYSIS USING SETUPS AND SPSS: AMERICAN VOTING BEHAVIOR IN PRESIDENTIAL ELECTIONS

DATA ANALYSIS USING SETUPS AND SPSS: AMERICAN VOTING BEHAVIOR IN PRESIDENTIAL ELECTIONS Poli 300 Handout B N. R. Miller DATA ANALYSIS USING SETUPS AND SPSS: AMERICAN VOTING BEHAVIOR IN IDENTIAL ELECTIONS 1972-2004 The original SETUPS: AMERICAN VOTING BEHAVIOR IN IDENTIAL ELECTIONS 1972-1992

More information

MICROSOFT DEVICE SERVICE TERMS AND CONDITIONS

MICROSOFT DEVICE SERVICE TERMS AND CONDITIONS MICROSOFT DEVICE SERVICE TERMS AND CONDITIONS SECTION 20 CONTAINS A BINDING ARBITRATION CLAUSE AND CLASS ACTION WAIVER IF YOU LIVE IN (OR IF A BUSINESS YOUR PRINCIPAL PLACE OF BUSINESS IS IN) THE UNITED

More information

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw)

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw) INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw) This Interconnection and Parallel Operating Agreement ( Agreement ) is entered into on (insert

More information

SAXON OEM PRODUCT LICENSE AGREEMENT

SAXON OEM PRODUCT LICENSE AGREEMENT SAXON OEM PRODUCT LICENSE AGREEMENT This OEM Product License Agreement ( Agreement ), effective on date of signature ( Effective Date ) is between ("Licensee"), and Saxonica Limited ( Saxonica ) a Company

More information

Fairsail Payflow Cookbook for CSV Record Downloads

Fairsail Payflow Cookbook for CSV Record Downloads Fairsail Payflow Cookbook for CSV Record Downloads Version 10 FS-PF-CSV-CB-201410--R010.00 Fairsail 2014. All rights reserved. This document contains information proprietary to Fairsail and may not be

More information

May 10, Catherine Roberts Williamson County 508 Holly Street Georgetown, TX RE: Williamson County Sheriff s Office BDA System Expansion

May 10, Catherine Roberts Williamson County 508 Holly Street Georgetown, TX RE: Williamson County Sheriff s Office BDA System Expansion Motorola Solutions, Inc. 1507 LBJ Freeway, Suite 700 Farmers Branch, TX. 75234 USA May 10, 2017 Catherine Roberts Williamson County 508 Holly Street Georgetown, TX 78626 RE: Williamson County Sheriff s

More information

Ø Project Description. Ø Design Criteria. Ø Design Overview. Ø Design Components. Ø Schedule. Ø Testing Criteria. Background Design Implementation

Ø Project Description. Ø Design Criteria. Ø Design Overview. Ø Design Components. Ø Schedule. Ø Testing Criteria. Background Design Implementation Ø Project Description Ø Design Criteria Ø Design Overview Ø Design Components Background Design Implementation Ø Schedule Ø Testing Criteria Ø Asante Solutions, Inc. and RCPD Ø Blind user focused insulin

More information

Increased drilling efficiency saved approximately 26,000 gallons of fuel.

Increased drilling efficiency saved approximately 26,000 gallons of fuel. IceCube Project Monthly Report January 2010 Accomplishments Drilling and string installation ended ten days early this season with twenty strings installed, including the DeepCore strings. This work was

More information

MOBILE / COMPUTER APPLICATION END-USER LICENCE AGREEMENT

MOBILE / COMPUTER APPLICATION END-USER LICENCE AGREEMENT DATED January 2017 MOBILE / COMPUTER APPLICATION END-USER LICENCE AGREEMENT Between: END-USER and AFRICAN DIGITAL CONTENT HOLDINGS LIMITED THIS AGREEMENT is dated 1 January 2017 PLEASE READ CAREFULLY BEFORE

More information

600Amps Internet Services, Inc. TERMS OF SERVICE (Rev , January 1, 2018)

600Amps Internet Services, Inc. TERMS OF SERVICE (Rev , January 1, 2018) 600Amps Internet Services, Inc. TERMS OF SERVICE (Rev 201801010, January 1, 2018) PLEASE READ THIS ENTIRE AGREEMENT CAREFULLY. This Agreement with you (the "Customer"), consists of this document, and the

More information

IceCube Project Baseline

IceCube Project Baseline IceCube Project Monthly Report February 25 Accomplishments Six weeks after the first IceCube string was deployed and two weeks after freeze-in all 6 DOMs are operating and reading data. The 16 IceTop DOMs

More information

About The Beta Participant Agreement

About The Beta Participant Agreement About The Beta Participant Agreement Congratulations on being selected to participate in Canary s Beta Program! This Beta Participant Agreement is a legal document being executed between you and Canary

More information

LICENSED APPLICATION END USER LICENSE AGREEMENT Apps made available through the App Store are licensed, not sold, to you. Your license to each App is

LICENSED APPLICATION END USER LICENSE AGREEMENT Apps made available through the App Store are licensed, not sold, to you. Your license to each App is LICENSED APPLICATION END USER LICENSE AGREEMENT Apps made available through the App Store are licensed, not sold, to you. Your license to each App is subject to your prior acceptance of either this Licensed

More information