BASIC SOCIAL ASSESSMENT REPORT FOR THE N11, SECTION 13, MOKOPANE

Similar documents
SOCIAL IMPACT ASSESSMENT FOR THE SWAZILAND RAIL LINK PROJECT

SOCIAL IMPACT ASSESSMENT FOR THE SWAZILAND RAIL LINK PROJECT

2. Bylaw Amendments. 2.1 City Amendments. 2.2 Owner/Agent Amendments The City may initiate amendments to this bylaw, including the zoning maps.

Aggregate Permit Conditions / Site Plan Notes. Lands & Waters Aggregate & Petroleum Resources March 15, 2006

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW NUMBER

DISTRICT OF LAKE COUNTRY BYLAW DEVELOPMENT APPLICATION PROCEDURES BYLAW CONSOLIDATED VERSION

Isles of Scilly Link Penzance Harbour Development

THE NATIONAL RAILWAY SAFETY REGULATOR ACT, 2002 (Act No.16 OF 2002)

MUNICIPALITY OF EAST HANTS BYLAW NUMBER P-100

SCR Introduced by Senators Smith, Lesko: Begay, Burges, Farnsworth D, Griffin, McGuire, Yee; Representatives Finchem, Kern, Mesnard

YORK COUNTY GOVERNMENT

14. General functions, powers and duties of department. Effective: April 1, 2005

BYLAW NO. 18/2006 NOW THEREFORE THE COUNCIL OF THE MUNICIPAL DISTRICT OF FOOTHILLS NO. 31 ENACTS AS FOLLOWS:

EBRD Performance Requirement 5

PIKE TOWNSHIP, OHIO July 6, 2010 ZONING REGULATIONS

Government Gazette REPUBLIC OF SOUTH AFRICA

Managing Social Impacts of Labour Influx

SOIL REMOVAL AND DEPOSITION BYLAW

Daniel Owen (World Bank) with Jay Wagner; Susan Dowse; Murray Jones; Marla Orenstein (Plexus Energy)

PROJECT-INDUCED MIGRATION AND IMPACT ASSESSMENT

ADVERTISING SIGNAGE IN PUBLIC PLACES

CHAPTER 17:01 STATISTICS

AN ORDINANCE REGULATING THE SETBACK DISTANCE OF STRUCTURES FROM THE RIGHT-OF-WAY OF HIGHWAYS

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

TITLE 16 STREETS AND SIDEWALKS, ETC 1 CHAPTER 1 MISCELLANEOUS

TIM G-0180: Road Network Development Sector Project Contract Packages R1 Liquica - Maubara Road Contract Packages R2 Karimbala Atabae Road

2. PLAN ADMINISTRATION

Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold

BY-LAW NO This By-law may be cited as Camrose County Road Use By-law

1. These Regulations may be cited as the City of Corner Brook Third Party and Digital Signage Regulations.

THE CORPORATION OF THE COUNTY OF WELLINGTON BY-LAW NUMBER

THE CORPORATION OF THE CITY OF WELLAND. BY-LAW NUMBER '-I fu A BY-LAW TO REGULATE ELECTION SIGNS WITHIN THE CITY OF WELLAND

WELSH LANGUAGE IMPACT ASSESSMENT

WFP SUDAN SPECIAL OPERATION

B Y - L A W N U M B E R A BY-LAW TO PROVIDE FOR THE PROTECTION OF HIGHWAYS IN WINDSOR

HIGHWAYS DEVELOPMENT AND PROTECTION REGULATION

THE CORPORATION OF THE CITY OF PENTICTON SIGN REGULATIONS BYLAW NO

CITY OF EDMONTON BYLAW SAFETY CODES PERMIT BYLAW (CONSOLIDATED ON JANUARY 1, 2016)

(Code 2004, ; Ord. No , 1, )

Mining Toolkit. In-Migration

NATIONAL ENVIRONMENTAL MANAGEMENT SECOND AMENDMENT ACT

APPLICATlON FOR AUTHORISATlON FOR THE CONSTRUCTION OF A 4O0KV TRANSMISSION LINE BETWEEN DUVHA POWER STATION AND JANUS SUBSTATION, LIMPOPO PROVINCE

CONTINUING CONSOLIDATION OF BY-LAW NO. 6854

ARTICLE 7 AMENDMENTS TO ORDINANCE

23 USC 148. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

WANGANUI DISTRICT COUNCIL WANGANUI DISTRICT BYLAW

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1

The Power of. Sri Lankans. For Peace, Justice and Equality

DISTRICT OF VANDERHOOF SIGN BYLAW NO. 995, 2006

9 ROADSIDE MEMORIAL SIGNAGE PROGRAM

PROPERTY MAINTENANCE. Chapter 438 FENCES - HEIGHT - REGULATION

VILLAGE OF KEREMEOS. BYLAW NO. 586, 1998 Revised May CONSOLIDATED FOR CONVENIENCE WITH AMENDMENT BYLAW NOS. 680, 2004, 795, 2012 and 818

STRENGTHENING RURAL CANADA: Fewer & Older: Population and Demographic Crossroads in Rural Saskatchewan. An Executive Summary

Plan and Zoning Commission City of Richmond Heights, Missouri

Response to National Housing Federation Consultation on Funding Supported and Sheltered Housing

OFFICE CONSOLIDATION FENCE BY-LAW BY-LAW NUMBER By-Law Number Date Passed Section Amended

Chapter CONDITIONAL USES

2018 Municipal Election. Sign Information for Candidates & Third Party Advertisers. #wrvotes

AUTOMATED AND ELECTRIC VEHICLES BILL DELEGATED POWERS MEMORANDUM BY THE DEPARTMENT FOR TRANSPORT

The history of Wendywood is tied to the history of Sandton. The Sandton

STRENGTHENING RURAL CANADA: Fewer & Older: The Coming Population and Demographic Challenges in Rural Newfoundland & Labrador

ELECTION AND POLITICAL SIGNS

Kimberley Kilburn, Acting District Manager, Municipal Licensing and Standards. Municipal Licensing and Standards Folder # FEN 00 IR

12 Socio Economic Effects

SOCIAL IMPACT ASSESSMENT FOR THE SWAZILAND RAIL LINK PROJECT

BEING A BY-LAW to regulate Election Signs and to repeal By-law RE

Building Capacity to Make Transport Work for Women and Men in Vietnam

HOME OCCUPATION PERMIT APPLICATION Incomplete applications will not be processed

RESOLUTION TO AMEND UNIFIED LAND DEVELOPMENT CODE

(JULY 2000 EDITION, Pub. by City of LA) Rev. 9/13/

SIGN BYLAW

THE CORPORATION OF THE CITY OF BURLINGTON BY-LAW NUMBER

Msinga Municipality APPLICATION FORM

Woodstock Village Ordinances Revision #3 Title 8; Chapter 1-Page 1 REVISION #3 OF EDITION #4 TITLE 8 TRAFFIC, VEHICLES & PARKING

APPENDIX B. Environmental Justice Evaluation

SOIL REMOVAL BYLAW

RIJS Volume 2, Issue 7 (July 2013) ISSN: A Journal of Radix International Educational and. Research Consortium RIJS

THE CITY OF VAUGHAN BY-LAW NUMBER

Social Impact Assessment of the Proposed N2 Wild Coast Toll Highway. HIV/AIDS prevalence rate of 33.5% the highest in the country.

B Y - L A W N U M B E R

Resettlement and Impact Assessment points of intersection

Guidance Note 5 Land Acquisition and Involuntary Resettlement

SIDEWALK CAFÉ PERMIT APPLICATION

EXECUTIVE SUMMARY. Land Use Management and Democratic Governance in the City of Johannesburg. Case Study: Diepsloot

LAW OF THE REPUBLIC OF TAJIKISTAN ON THE STATE BORDER OF THE REPUBLIC OF TAJIKISTAN SECTION V. THE REGIME AT STATE BORDER CROSSING POINTS

TITLE 16 STREETS AND SIDEWALKS, ETC 1 CHAPTER 1 MISCELLANEOUS

EX-ante Evaluation. 1. Name of the Project. 2. Background and Necessity of the Project. Japanese ODA Loan

ARTICLE 7 AMENDMENTS TO ORDINANCE

CITY OF COVINGTON Comprehensive Zoning Ordinance ADOPTED DRAFT

Semi-annual Social Safeguards Monitoring Report (January to June 2012)

India: Delhi Meerut Regional Rapid Transit System Project

TITLE 16 STREETS AND SIDEWALKS, ETC. 1 CHAPTER 1 MISCELLANEOUS

TOWN OF BEAUMONT BYLAW #837-14

CHAPTER 110. BE IT ENACTED by the Senate and General Assembly of the State of New Jersey: 1. R.S.39:4-8 is amended to read as follows:

SECTION 4 PERMITTED SIGNAGE NOT REQUIRING A PERMIT 11

NO SIDEWALK CAFÉS REGULATION BYLAW A BYLAW OF THE CITY OF VICTORIA

CORPORATION OF THE TOWNSHIP OF ESQUIMALT PARKING BYLAW 1992 BYLAW NO. 2011

AND AMENDMENTS THERETO (Bylaw No. 1165)

TRIBAL DEVELOPMENT PLAN

PETITION FOR PLANNING & ZONING COMMISSION REVIEW. Case Number P&Z - - Development Name/Address. INFORMATION (Office Only) INDEX. Date of Submission

Transcription:

E02.JNB.000973 BASIC SOCIAL ASSESSMENT REPORT FOR THE N11, SECTION 13, MOKOPANE 15 August 2012 SANRAL Tel: +27 (0) 11 7986000 Email: kimm@ssi.co.za Building No 5, Country Club Estate, 21 Woodlands Drive, Woodmead, 2191

DOCUMENT DESCRIPTION Client: SANRAL Report Name: Basic Social Assessment for N11, Section 13, Mokopane SSI Environmental Reference Number: E02.JNB.000973 Authority Reference: NEAS:DEA/EIA/0000428/2011- DEA:12/12/20/2375 Compiled by: Kim Moonsamy Date: 15 August 2012 Location: Durban Reviewer: Kim Moonsamy Signature SSI Environmental All rights reserved No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, without the written permission from SSI Environmental.

TABLE OF CONTENTS 1 INTRODUCTION 3 1.1 THE PROPOSED DEVELOPMENT 3 1.2 CONSTRUCTION LABOUR 4 1.3 STUDY OBJECTIVE 4 2 THE STUDY ENVIRONMENT 4 2.1 DISTRICT AND LOCAL MUNICIPAL AREAS 4 2.2 THE TRADITIONAL AUTHORITY MOKOPANE 5 3 UNDERSTANDING PROXIMATE COMMUNITIES 5 3.1 BUSINESSES 7 3.2 BURIAL SITES 8 3.3 SERVICE PROVISION 8 3.4 QUALITATIVE DATA GATHERED 9 4 IMPACT ANALYSIS AND RECOMMENDED MITIGATION 11 4.1 IMPACT RATING 11 4.2 IMPACT SUMMARY 18 LIST OF FIGURES FIGURE 1-1 : SITE LOCATION 4 FIGURE 3-1 : SITE LOCATION AND VILLAGES 6 FIGURE 3-2 SEMI FORMAL/ FORMAL HOUSING 6 FIGURE 3-3 SEMI FORMAL/ FORMAL HOUSING 6 FIGURE 3-4 SEMI FORMAL/ FORMAL HOUSING 7 FIGURE 3-5 SEMI FORMAL/ FORMAL HOUSING 7 FIGURE 3-6 FORMAL BUSINESS 7 FIGURE 3-7 FORMAL BUSINESS 7 FIGURE 3-8 INFORMAL BUSINESS 7 FIGURE 3-9 POSSIBLE FORMAL BUSINESS 7 FIGURE 3-10 INFORMAL BUSINESS 8 FIGURE 3-11 POSSIBLE FORMAL BUSINESS 8 FIGURE 3-12 HEAVY VEHICLE ROAD USAGE 9 FIGURE 3-13 TYPICAL INTERSECTION ALONG N11 9 FIGURE 3-14 DONKEY AND TRAILER 9 FIGURE 3-15 TRAFFIC AT INTERSECTION - N11 9 FIGURE 3-16 MINDMAP OF COMMUNITY ISSUES 10 E02.DUR.000973 SSI Environmental

LIST OF TABLES TABLE 4-1 IMPACT RATING AND MITIGATION TABLE (RESULTS) 13 E02.DUR.000973 SSI Environmental

1 INTRODUCTION The Environment Department within SSI-DHV has the pleasure in submitting this Basic social assessment for the rehabilitation of National route (N11) Section 13 in Mokopane, Limpopo province. This study is a specialist study to the Environmental Impact Basic Assessment study that is currently underway. 1.1 The Proposed Development The SANRAL is proposing to Rehabilitate Section 13 of the National Route 11 (N11) which covers a distance of approximately 24km in Mokopane, Limpopo Province. The rehabilitation will include: A. Road works The road works include amongst others the items listed below: Widening of the existing road to include surfaced shoulders which will be approximately 15 meters in total width Provision of climbing lanes / overtaking lanes where required. Upgrading of existing and installation of new storm water culverts Widening of major in-situ culverts. Vertical re-alignment of the road at several points along the route. Possible widening of the existing road reserve will also be necessary due to the narrow width of the existing road reserve. Upgrading of existing intersections. Relocation of utility services affected by the upgrading of the road. B. Bridges Widening and rehabilitation of four (4) existing bridges which are numbered as follows: - Bridge 1 no 1582 - Bridge 2 no 1241 - Bridge 3 no 1170 - Bridge 4 no 1115 C. Borrow Pits / Quarry Four natural gravel borrow pits and one hard rock quarry will be utilised for the rehabilitation of the project route. The google image below shows Section 13 of the N11 road, including the bridges and borrow pits that form part of the development zone. E02.JNB.000973 Page 3 SSI Environmental

FIGURE 1-1 : SITE LOCATION 1.2 Construction Labour Until the construction team is assembled, it is not possible to assume local procurement labour figures, however this SIA highlights the steps that commissioned construction companies can employ to provide for recruitment of local labour during the construction phase. 1.3 Study Objective The Social baseline assessment will provide a baseline description of the study area, specifically focussing on the users living and working in close proximity to the proposed facilities development. The potential impacts of the proposed development on the social environment will be identified and assessed in terms of an agreed assessment methodology. Mitigation measures will be proposed to enhance the positive impacts and reduce the significance of the negative impacts. 2 THE STUDY ENVIRONMENT 2.1 District and Local Municipal Areas The proposed development area lies within the jurisdiction of the Waterberg District Municipality (DM) and the Mogalakwena Local Municipality (LM). The Waterberg DM is one of five districts of Limpopo province of South Africa. The seat of Waterberg is Modimolle (formerly known as Nylstroom). The majority of the population speak Northern Sotho (2001 Census). The estimated population in the DM in 2010, was 703 631 people, and 160 719 recorded households. The population density in the DM is 15.7 people per kilometer squared (km²) (Wikipedia: http://en.wikipedia.org/wiki/waterberg_district_municipality). E02.JNB.000973 Page 4 SSI Environmental

The seat of Mogalakwena Local Municipality is Mokopane. Mogalakwena Local Municipality contains over 50% of the Waterberg DM s total population that is estimated at approximately 557 896 in 2001 and 596 094 in 2007 respectively. This is an increase of about 38 198. However, estimates for Mogalakwena population size vary. Most recent estimates are based on the 2007 Community Survey by Statistics South Africa. According to these figures the total population of Mogalakwena Municipality adds up to 330 644 persons at 75 313 households. The average household is home to 4,4 persons. Many households are home to more than ten persons. It should, however, be noted that the population size of the municipality could be more than the number of people indicated as many people live on farms throughout the area. The area population changes with the seasons, since many residents migrate to work elsewhere. The annual population growth rate is estimated at 1,4%, which represents the average provincial population growth rate (Mogalakwena IDP 2011-2012 Draft). 2.2 The Traditional Authority Mokopane Chief V Kekana is the present Chief of the Mokopane Traditional Authority, which has jurisdiction over the majority of all land within the area. The Environmental Basic Assessment has evidence of engagement with the Chief, where the details of the project were explained and the Chief s responses to the proposed development were recorded. This social assessment acknowledges the main concerns emanating from the consultation with the Chief (Minutes of Meeting, 10 February 2012), as: People will be sensitive to the existence of borrow pits. Their perception may be that borrow pits are open cast mines; Fence off the borrow pit areas as it may be a danger to people and animals; Any relocation issues must be brought to the Chief s attention, and a resolution found; The upgraded road may be assist in people and traffic movement, however it is likely to become more dangerous. Public must be made aware of what safety measures will be put in place fencing between communities and the road, pedestrian (walk-over) bridges, etc. 3 UNDERSTANDING PROXIMATE COMMUNITIES The development area stretches from the outskirts of the town of Mokopane, northwards to a distance of approximately 24 kilometers. There are numerous villages that are found along the route, all of which rest within the jurisdiction of the Mogalakwena LM and Mokopane Traditional Authority. These include: Moshate (Ward 25), 4 villages (Ward 22), Madiba, Masehlaneng, Maruteng (Ward 23), Parkmore, Pholo park, Mitchel, Sekgakgapeng (Ward 29), Moshade, Seghaghapile (Ward 30), Tamahansi (Ward 21), Gamagongwa (Ward 20), and New informal settlement 7 miles (Ward 20) E02.JNB.000973 Page 5 SSI Environmental

Figure 3-1 : Site Location and villages Visible verification of human living is shown in the photographs below. The type of living standards, judging by the housing structures, seems to be poor to average. There is a variety of residential buildings found along the proposed development route, a few made from clay and tin, while many are built from brick and block. For this reason, the housing type has been classified as semi formal to formal. There is a spattering of tin shacks visible, although more so towards the northern portion of the development route, where the 7 miles informal settlement has settled, adjoining the N11. There also seems to be a number of incomplete buildings, which may show evidence that residences are constructed only when cash is available. The majority of housing structures do not seem to be located within the road reserve. The Draft Basic Assessment mentions encroachment of some houses onto the reserve. This report will recommend particular mitigation for homes found within the road reserve. FIGURE 3-2 SEMI FORMAL/ FORMAL HOUSING FIGURE 3-3 SEMI FORMAL/ FORMAL HOUSING E02.JNB.000973 Page 6 SSI Environmental

FIGURE 3-4 SEMI FORMAL/ FORMAL HOUSING FIGURE 3-5 SEMI FORMAL/ FORMAL HOUSING 3.1 Businesses There are a number of roadside and off-road businesses clearly visible from the N11. Many businesses are found within formal establishments, while other informal businesses (street vendors) are found at the busiest intersections. FIGURE 3-6 FORMAL BUSINESS FIGURE 3-7 FORMAL BUSINESS FIGURE 3-8 INFORMAL BUSINESS FIGURE 3-9 POSSIBLE FORMAL BUSINESS E02.JNB.000973 Page 7 SSI Environmental

There are also tracks of vacant land along the N11. There is uncertainty regarding ownership of this land. Some land appears to serve as agricultural land, although no commercial farming activities were observed. FIGURE 3-10 INFORMAL BUSINESS FIGURE 3-11 POSSIBLE FORMAL BUSINESS 3.2 Burial Sites Results contained within the Draft Basis Assessment show that there is evidence of a burial site (community graveyard) in close proximity to the road. The degree to which this site will be affected will be addressed within the impacts sections of this report. 3.3 Service Provision The formal homes and properties in the area seem to be fully serviced with electricity and running water and sanitation. However many of the semi formal homes do still make use of outside ventilated pit latrines. The informal settlement found further north is completely un-serviced. There are four schools that service the entire are, that is, two in Tamahansi and two in Gamagongwa. Health clinics are found in the communities of Sekgakgapeng, Tamahansi, Madiba, Masehlaneng and Masodi. People utilise mainly taxis as the main form of transportation. There are many that walk or use bicycles. The major intersections (found at all points where the N11 branch off towards communities), have a very high volume of visible traffic, particularly at peak times. There are a number of both light and heavy vehicles that travel the road. Large trucks belonging to local mining companies regularly use the road. In addition to formal vehicle use, donkeys with trailers are also commonly seen traversing between vehicles and on the side of roads. Donkeys and trailers have been a traditional mode of transport and while the horse and carriage is privately owned, it is very often leased out for business purposes. E02.JNB.000973 Page 8 SSI Environmental

FIGURE 3-12 HEAVY VEHICLE ROAD USAGE FIGURE 3-13 TYPICAL INTERSECTION ALONG N11 FIGURE 3-14 DONKEY AND TRAILER FIGURE 3-15 TRAFFIC AT INTERSECTION - N11 3.4 Qualitative Data Gathered It must be noted that the data that has been analysed for the production of the impact section originated primarily from a site visit and discussion session with the Ward Councillors of the proximate communities. A meeting was set up with Chief Kekana at the Traditional authority offices in Mokopane, however it did not materialise. The result of the Ward Councillor meeting is found in the Mindmap below. E02.JNB.000973 Page 9 SSI Environmental

FIGURE 3-16 MINDMAP OF COMMUNITY ISSUES E02.JNB.000973 Page 10 SSI Environmental

4 IMPACT ANALYSIS AND RECOMMENDED MITIGATION 4.1 Impact Rating The following parameters 1 are used to describe the impact/issues in this assessment: (i) The risk or likelihood of the impact/issue occurring; and (ii) The degree of confidence placed in the assessment of the impact/issue Please note that the rating number is provided in brackets next to the scale interval. Negative impacts are minus (-) values and positive impacts are plus (+) values. Higher negative valued impacts are more detrimental than lower negative valued impacts. 1. Temporal Scale The temporal scale defines the significance of the impact at various time scales, as an indication of the duration of the impact. Short Term (1) less than 5 years. Medium Term (2) between 5 and 15 years. Long Term (3) between 15 and 30 years. Permanent (4) over 30 years and resulting in a permanent and lasting change that will always be there. 2. Spatial Scale The spatial scale defines physical extent of the impact. Individual (0) this scale applies to person/s in the area. Household (1) this scale applies to households in the area. Localised (2) small scale impacts from a few hectares in extent e.g. local district area. Regional (3) the scale applies to impacts on a provincial level. National (4) the scale applies to impacts that will affect the whole South Africa. International (5) the scale of the impact will extend beyond the borders of South Africa. 3. Significance Scale Very High (4) The impacts would be considered by society as constituting a major and usually permanent change to the environment, and usually result in severe or very severe effects, or beneficial or very beneficial effects. High (3) These impacts will usually result in long-term effects on social and/or natural environment. Impacts rated as High will need to be considered by society as constituting an important and usually long term change to the environment, Society would probably view these impacts in a serious light. Moderate (2) These impacts will usually result in medium to long-term effects on the social and/or natural environment. Impacts rated as Moderate will need to be considered by society as constituting a fairly important and usually medium-term change to the environment, These impacts are real but not substantial. Low (1) 1 Please note that the rating number is provided in brackets next to the scale interval. Negative impacts are minus (-) values and positive impacts are plus (+) values. Higher negative valued impacts are more detrimental than lower negative valued impacts. E02.JNB.000973 Page 11 SSI Environmental

These impacts will usually result in medium to short term effects on the social and/or natural environment. Impacts rated as Low will need to be considered by the public and/or the specialist as constituting a fairly unimportant and usually short term change to the environment. These impacts are not substantial and are likely to have little real effect. Non Significant (0) There are no primary or secondary effects at all that are important to scientists or the public. 4. Risk or likelihood The risk or likelihood of all impacts taking place as a result of project actions differs. Although these impacts may be severe, the likelihood of them occurring may affect their overall significance and will be taken into account. Very unlikely to occur (1) the chance of these impacts occurring is extremely slim. Unlikely to occur (2) the risk of these impacts occurring is slight. May occur (3) the risk of these impacts is more likely, although not definite. Will definitely occur (4) this impact will occur. 5. Degree of confidence or certainty It is also necessary to state the degree of certainty or confidence with which one has predicted the significance of an impact. For this reason, a degree of certainty scale has been provided to enable the reader to ascertain how certain we are of our assessment of significance: Definite More than 90% sure of a particular fact. The use this one will need to have substantial supportive data. Probable Over 70% sure of a particular fact, or of the likelihood of that impact occurring. Possible Only over 40% sure of a particular fact or of the likelihood of an impact occurring. Unsure Less than 40% sure of a particular fact or the likelihood of an impact occurring. E02.JNB.000973 Page 12 SSI Environmental

TABLE 4-1 IMPACT RATING AND MITIGATION TABLE (RESULTS) PLANNING PHASE (PRE-CONSTRUCTION) Potential impacts: Planning Social Impacts Attending to residential and business buildings on road reserve CONSTRUCTION PHASE Significant rating of impacts Proposed Mitigation Measures Significant rating of impacts after mitigation Temporal: Permanent (4) The Draft Basic Assessment has highlighted the current challenge Temporal: Short-term (1) relating to some homes being built on the road reserve. The local Chief and Municipality must be engaged so that a resolution can be Significance: High (3) found which does not leave the affected party in a worse-off social or economic state. (This must be done prior to construction) Significance: Low (1) Likelihood: May occur (3) Likelihood: Unlikely to occur (2) Rating =12 Rating =6 Potential impacts Significant rating of impacts Proposed Mitigation Measures Significant rating of impacts after mitigation Social Impacts Loss of cultural heritage Temporal: Permanent (4) At no point should the removal of graves be considered. This would trigger a full resettlement plan for graves, a long and costly process. Temporal: Short-term (1) Utmost care should be taken during construction to not interfere with the site. It is in fact recommended that the local community be consulted and the grave site be fenced off. Significance: High (3) Likelihood: May occur (3) Any heritage sites found (or suspected) must be undertaken in accordance to a 'chance -find' procedure, where strict SAHRA protocol is followed. This also means that all construction work would halt until such time as deemed 'safe.' Significance: Moderate (2) Likelihood: May occur (3) Rating =12 Rating =8 Establishment or extension of informal settlements by people seeking work Temporal: Permanent (4) There are open spaces of land in close proximity to the development Temporal: Short-term (1) area, that may belong to private individuals or the Local Municipality. There is a great likelihood of people moving into the area, thereby extending the current state of informal settlements, particularly in the E02.JNB.000973 Page 13 SSI Environmental

opportunities Significance: High (3) adjacent "7 Miles community." Action is required by the Municipality to Significance: Moderate (2) put in place strategies to curb the expansion of informal settlements. Likelihood: May occur (3) Likelihood: May occur (3) Rating =12 Rating =8 Changes in employment and incomes through project recruitment Temporal: Medium Term (2) Recruit unskilled and semi skilled labour locally. The formulation of a Temporal: Medium Term (2) formal recruitment policy will ensure fair access to jobs, especially for local residents. This must be a requirement of companies working in the construction and operations phases. Significance: High (3) Employment opportunities should be made known through a corporate communication function, and locally via the Local Council offices and Residents Forum. A Contractor Human Resource Development Plan Significance: High (3) Likelihood: May occur (3) will ensure the on-going training and development of staff. Likelihood: Will definitely occur (4) Certainty: Probable Rating =10 Rating =11 Increased business opportunity through the procurement of goods and services Temporal: Medium Term (2) Considerable procurement of goods and services is expected. There is no certainty in the number of people that will be employed over the Temporal: Medium Term (2) construction period. A contractor Procurement policy must be Significance: High (3) maintained. Marketing and advertising campaigns to be actively pursued in an effort to procure goods first from local producers/ Significance: High (3) suppliers, failing which, non-local suppliers may be targeted. Likelihood: May occur (3) Likelihood: May occur (3) Rating =10 Rating =10 Increased opportunity for informal business development Temporal: Medium Term (2) The construction phase will see a large spike in informal trading due to Temporal: Medium Term (2) the presence of construction staff and increased traffic (road and pedestrian) around the development area. This is of course dependent on the number of staff employed during construction. Significance: High (3) While this impact will have a high significance, the likelihood of it occurring is not rated as high - due to the presence of current street vendors. Significance: High (3) Likelihood: May occur (3) Likelihood: May occur (3) E02.JNB.000973 Page 14 SSI Environmental

Rating =10 Rating =10 Inconvenience and danger to proximate residents through increased road traffic and dust. Temporal: Medium Term (2) A policy on Contractor Health and Safety for the duration of on-site construction work, must apply, and be monitored. Particular focus is to be paid to all construction vehicles (including contractor vehicles) that are utilising adjoining roads as access routes. A Residents Forum (if not already in existence) should be set up to facilitate on-going communication between Project Management (possibly through a Community participation consultant). Regular information sharing discussions must be pursued, also giving residents an opportunity to voice concerns and grievances throughout the project construction duration. Temporal: Medium Term (2) Significance: Very High (4) Other mitigation include: Establish safe user zones (particularly for pedestrians, cyclists, etc) be put in place. This simply means that should a one-lane road be open, the road should have on its shoulder a barrier/ fence that serves to protect those not in vehicles. The width of the safe zone does not Significance: High (3) have to be very wide, as it is a temporary walkway. Likelihood: Will definitely occur Erect proper signage, preferably with light warnings. Signage (4) indicating road works, must be present all along the N11 constructionhampered Likelihood: May occur (3) road. Poor visibility due to dust and the absence of street lights may increase road hazards. Certainty: Definite Rating =12 Rating =10 Community disruption by non-local and local construction workers and opportunity seekers Temporal: Medium Term (2) It is anticipated that the majority of the non-skilled labour force will be Temporal: Short-term (1) recruited from the exiting local communities, however it is still important that a construction phase Code of Conduct should be prepared and implemented among construction workers. The Code of Conduct will enforce and monitor appropriate relationships between Significance: High (3) construction workers and community members. In addition the Community Health and Safety Policy must act to concretise safety, awareness and conduct in proximate communities. These policies are Significance: Moderate (2) Likelihood: May occur (3) vital as non-local labourers may take up residence in nearby informal settlements - thus adding to the current social ills in those communities Likelihood: May occur (3) Rating =10 Rating =8 E02.JNB.000973 Page 15 SSI Environmental

Increased local risk of HIV/AIDS infection with influx of workers and opportunity seekers Temporal: Permanent (4) Significance: High (3) An increase in non-local construction workers and opportunity seekers may increase the local risk of HIV/AIDS infection, affecting young adults and especially young women. The risk is made worse where workers live on or close to the project site, or among the local communities. Although the impact will be confined to a small group at first, the longer-term implications for the spread of HIV/AIDS are important. Temporal: Permanent (4) Significance: Moderate (2) Likelihood: May occur (3) The Contractors Code of Conduct will include HIV/AIDS counselling Likelihood: May occur (3) and prevention measures. Community counselling ideas will be provided through the Community Health and Safety Plan. Rating =12 Rating =11 Local dissatisfaction due to finite jobs and perceived preferential access to these jobs and procurement Temporal: Short Term (1) Only a certain number of people will be employed during construction. This number is not known at present. In a context of widespread unemployment, local residents (and especially people in the proximate area to the development) will be dissatisfied if access to the finite construction phase jobs and the provision of associated services is perceived to be biased and preferential. Temporal: Short-term (1) Significance: Moderate (2) Likelihood: May occur (3) The establishment of a labour office during construction may squash fears that the recruitment of local labour is political, gender or culturally biased. The labour office is more likely to be seen as independent and objective. Contractors must develop and implement a Recruitment and employment policy, and a goods and services procurement policy that will promote fair access to jobs and procurement opportunities, through an objective and transparent process. Significance: Low (1) Likelihood: Unlikely to occur (2) Rating =8 Rating =6 Crime related incidents Temporal: Short Term (1) Petty crimes may occur in communities or even along the route toward Temporal: Short Term (1) the development area. A proper security strategy must be put in place for site specific crimes. The cumulative effect of added crime in the surrounding communities may enhance the dire situation. Community policing would need to be increased. Significance: Moderate (2) Significance: Moderate (2) Likelihood: May occur (3) Likelihood: May occur (3) E02.JNB.000973 Page 16 SSI Environmental

OPERATIONAL PHASE Rating =8 Rating =8 Potential impacts: Significant rating of impacts Proposed Mitigation Measures Significant rating of impacts after mitigation Social Impacts Attending to residential and business buildings on road reserve Temporal: Short-term (1) The agreement reached between the Chief and the Municipality Temporal: Short-term (1) (during the pre-construction phase) should be adhered to, and no building should be constructed within the road reserve. Significance: Low (1) Significance: Low (1) Inconvenience and danger to proximate residents through increased road traffic. Likelihood: Unlikely to occur Likelihood: Unlikely to occur (2) (2) Rating =6 Rating =6 Temporal: Permanent (4) It is recommended that traffic calming zones be established at or near Temporal: Medium Term (2) areas supporting a public facility such as a school, health facility, recreational facility, etc. The merits of implementing traffic lights at all intersections should also be investigated. Significance: High (3) The current accident rate on the N11 which passes through villages is very high. The rehabilitation of the road, while promoting traffic Significance: High (3) growth, should not leave other road users at a disadvantage. Likelihood: May occur (3) Likelihood: May occur (3) Rating =12 Rating =10 E02.JNB.000973 Page 17 SSI Environmental

4.2 Impact Summary During the Planning stage, it is expected that heritage issues will need to be addressed. This specifically relates to a nearby graveyard which may endure impacts, if not properly managed. The majority of the social impacts are predominant within the Construction phase, and a few remaining during the Operations phase. Project phase Total number of Impacts Planning 1 Construction 10 Operation 2 Total 13 Of the 13 impacts for which mitigation has been proposed, three remain high even after mitigation is proposed. Firstly, during the Construction phase the Inconvenience and danger to proximate residents through increased road traffic and dust remains high due to the density of the affected areas. At present, it is a challenge for a pedestrians to cross the N11 in a safe way, therefore it is expected that construction of the road would have a cumulative effect, even with mitigation. Secondly, Increased local risk of HIV and AIDS infection with the influx of workers and opportunity seekers also remains high after mitigation due to the long term, cumulative effect of current HIV/AIDS and the compounded challenge of increased HIV infection statistics. The third impact which remains high is found in the Operational phase and relates again to Inconvenience and danger to proximate residents through increased road traffic. The rehabilitation of the N11 will presumably contribute to higher traffic volumes. Since the surrounding communities are dealing with ever increasing resident numbers, the sheer volume of road users (including pedestrians, of which there is a large number), will contribute to ongoing potentially dangerous use of the N11. A decommissioning phase is not relevant to this proposed development. E02.JNB.000973 Page 18 SSI Environmental