G BEBE WE WE EX EE ade in high quality engineering cast iron. ortex ipeller. he subersible pups are supplied coplete with threaded counterflanges, packings and stainless steel bolts. pplications - ewage with suspended solids including long fibres. - or liquid ixing in stock tanks, for industrial waste and anial slurry with solids in suspension. sage liitations - ax teperature of puped liquid: C - ax iersion depth: - : between -11 - unning positioning: only vertical - utlet noinal diaeter: D G D G D G - or continuous operation, within the allowed use liits, the subersible pup ust be suberged for / of its height, at least. - uitable for fixed installation with coupling foot, guide rails and chain, or ore portable applications suspended or rested. - ree passage: G - G -9 G otor - Dry chaber otor insulation class - protection - otor electric supply voltage: three-phase x z - tarting: D.. till, kw tar/delta since, kw - otor supported by long-life self-lubricated rolling bearings - Winding protection by eans of a sealed chaber, filled with oil, which is fitted between pup and otor. Dinaic oil seal ensured by two echanical seals - ax startings per hour: G G <=, kw 1 >, kw G DEG EE Coponent up casing peller otor shaft otor casing echanical seal (pup side) echanical seal (otor side) gasket Cable lock Cable aterial E GJ E GJ stainless steel E GJ ilicu carbide/ilicu carbide G ED rubber G Carbon/luina G Carbon/teel B rubber Brass 7-17
G G 1 hackles crew x dentification plate Cover -ing -ing 7 7- Cable Cable lock 9 Cable lock washer Cable lock rubber ring 11 otor body crew x 1 peller grower washer 1 Earthing cable screw x 1 tator 1 pper bearing 17 haft with rotor peller key 19 nternal retaining ring ower bearing 1 External retaining ring -ing Die-stock flange pper echanical seal (fixed ring) pper echanical seal (rotating ring) Washer 7 -ing eal housing flange 9 ower echanical seal (fixed ring) ower echanical seal (rotating ring) 1 peller peller spacer ut 1 Gasket Counterflange 1 D crew 1 x 7 7 up body oot pedestal 9 crew x crew x 1 peller grower washer crew x Washer crew x External retaining ring G 17
BE YDC ECE G E 9 7 G 1, G, 1 l/in l/s /h 1 7 7. 7.. 9 1 1 7 9 E 1 1 G G, l/in l/s /h 1 7 7. 7.. 9 1 1 7 9 - = E 99 edientation risk nterittent running Curves established for liquids density 1kg/d, with velocity not less than 1 /s and sae viscosity as water. 17
G ECE CDE DE oinal bsorbed oltage ated /1' power power current n kw kw in -1 /h 9 7 1 1 1 1 G 1, G, G, G 1,,, 1,1 1, 1,,,,,9, 1,7,,,1,,,, 1 1 Discharge head in eters, 9 1,,,7 1,9 17, 1, 1, 7, 7, 11,9 1, 7,,,,,,,,9,,, 7,, E G D C B DE D WEG odel Diensions. Weight ree bore Ø () B C D E G kg G 1, 1 7 17 9 19 Ø / 1 1 1 1 G, 1 7 17 9 19 Ø / 1 1 1 G, G 1 1 7 7 17 17 9 9 19 19 Ø / Ø / 1 1 1 1 1 1 7 G 17
BE YDC ECE G E 9 7 G G G 1 l/in l/s /h 7 9 1 1 1 1 1.... 11. 1. 1 1.. 7 1. 7. 9. 9 17. E 1 1 G G G G 7, l/in l/s /h 7 9 1 1 1 1 1.. - = E 99 edientation risk nterittent running Curves established for liquids density 1kg/d, with velocity not less than 1 /s and sae viscosity as water. 17.. 11. 1. 1 1.. 7 1. 7. 9. 9
G ECE oinal CDE DE power 1 G,,, bsorbed oltage ated /1' power current n kw kw in -1 /h 1 1 1, 1,,1,,,,1,,,1 7 7 9 1 G 7,,71 7, 1 7,,,,,,9,,1,7,, 1 17 19 G G G G,7,7 7,71, 7,7,7,9,, 9, 7,,,, 1 9 9 Discharge head in eters 9,,9,1 7, 7,,, 1, 1,, 9,,,7 17, 1, 1, 9,,,, 17,9 1, 1,,,, 7,,1,, 1 G 7, 7,, 9,,7 9, 1,9 1,, 1, 1, 1, K E G D C B J W X DE D WEG odel G B C D E G J Diensions. K G 9 7 1 7 Ø 1 1 17 Ø Ø Ø1 7 7 1 9 1 1 7 Ø 1 17 Ø Ø Ø1 7 7 1 9 W X Weight kg 7 7 ree bore Ø () G 1 7 Ø 1 17 Ø Ø Ø1 7 7 1 9 7 G 7 7 Ø 1 17 Ø Ø Ø1 7 7 1 9 7 7 G 7 7 Ø 1 17 Ø Ø Ø1 7 7 1 9 7 7 G 7 7 Ø 1 17 Ø Ø Ø1 7 7 1 9 7 7 G 7, 7 7 Ø 1 17 Ø Ø Ø1 7 7 1 9 7 G 177
BE YDC ECE G - E 1 1 G 7 G G, l/in l/s /h 1 1.. 1. 1. 7.. 9.. 1. 1.. 19 E 1 1 G G 1 G l/in l/s /h 7 9 1 1 1 1 1.... 11. 1. 1 1.. 7 1. 7. 9. 9 17. - = E 99 edientation risk nterittent running Curves established for liquids density 1kg/d, with velocity not less than 1 /s and sae viscosity as water. 17
G ECE CDE DE oinal bsorbed oltage ated /1' ower power current n kw kw in -1 /h 1 1 7 9 1 11 G,,,,1, 11 9 9,,, 79 7,,,1,,,7, 1,9 1 1 11 11 G 7 G G G 1 7 1 7,, 1,9, Y/ 1 1 7, 1, 11, Y/ 1 91 11, 1, Y/ 9 Discharge head in eters 1,1, 11,, 9 7,7,,1 17 1 1, 1, 1,,9 11,9,9 9,9,, 1, 1,,, 1,,, 1, 7,, 11 G 1, 17, Y/ 1 9,, 9, 7, E G D W C B K J Y X DE D WEG odel Diensions. Weight ree bore Ø () B C D E G J K W X Y kg G, 77 7 Ø 1 Ø 77 7 7 Ø 7 1 9 G 7 G 77 7 Ø 1 Ø 77 7 7 Ø 7 1 77 7 Ø 1 Ø 77 7 7 Ø 7 9 9 G 77 7 Ø 1 Ø 77 7 7 Ø 7 1 G 1 7 7 Ø 1 Ø 7 7 7 Ø 7 1 G 7 7 Ø 1 Ø 7 7 7 Ø 7 G 179