March 28, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Philis J. Posey, Acting Secretary

Similar documents
February 20, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Magalie R. Salas, Secretary

June 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Magalie R.

December 18, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Kimberly D. Bose, Secretary

Transco submits the amendments for inclusion in Original Volume No. 1A of Transco s FERC Gas Tariff.

July 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Section GT&C, Awarding of Available and Planned Pipeline Capacity, Bid Procedures ( Section ). 2

December 19, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

MIDCONTINENT EXPRESS PIPELINE LLC

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

main. July 6, 2017

Mailing Address: P.O. Box 1642 Houston, TX

Millennium has reached agreement with four Anchor Shippers that provide sufficient market support to move forward with the Expansion Facilities.

Order No. 587-Y Compliance Filing, Colorado Interstate Gas Company, L.L.C.; Docket No. RP19-

July 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

May 23, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Tennessee Gas Pipeline Company, L.L.C. Orion Project Negotiated Rate and Non-Conforming Agreement Filing Docket Nos. RP and CP

April 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

FORM OF PARK AND LOAN SERVICE AGREEMENT AGREEMENT FOR PARK AND LOAN SERVICE VECTOR PIPELINE L.P.

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

February 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. United Water Conservation District Project No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION STIPULATION AND AGREEMENT

PJM Interconnection, L.L.C. and Progress Energy Carolinas, Inc. Docket No. ER

April 10, Via etariff. Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

March 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

California lndependent System Operator Corporation Docket No. ER Compliance Filing

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) )

NOTICE OF BINDING OPEN SEASON/SOLICITATION OF INTEREST Roadrunner Gas Transmission, L.L.C. June 28, 2018

OPERATIONAL BALANCING AGREEMENT FORM OF SERVICE AGREEMENT CONTRACT NO.

March 31, Columbia Gulf Transmission, LLC. 700 Louisiana Street, Suite 700 Houston, TX

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

FORM OF TITLE TRANSFER SERVICE AGREEMENT FOR TITLE TRANSFER SERVICE UNDER RATE SCHEDULE TTS

NERC Notice of Penalty regarding EFS Parlin Holdings LLC FERC Docket No. NP10-_-000

PARTICIPATING GENERATOR AGREEMENT (PGA)

MARKET PARTICIPANT SERVICE AGREEMENT. This MARKET PARTICIPANT SERVICE AGREEMENT is dated this day of, 2013 and is entered into by and between:

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.3 Net Scheduled Participating Generator Agreement

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION MOTION FOR ISSUANCE OF A PROTECTIVE ORDER

NOTICE OF BINDING OPEN SEASON/SOLICITATION OF INTEREST ONEOK WesTex Transmission, L.L.C. OWT Northbound Expansion June 7, 2018

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

PSEG Energy Resources & Trade LLC

Case KG Doc 170 Filed 11/07/18 Page 1 of 3 IN THE UNITED STATES BANKRUPTCY COURT FOR THE DISTRICT OF DELAWARE

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Northern Natural Gas Company ) Docket No. RP

MIDCONTINENT EXPRESS PIPELINE LLC

UNITED STATES OF AMERICA BEFORE THE FEDERAL REGULATORY COMMISSION. Seaway Crude Pipeline Company LLC ) Docket No. IS

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.16 Pseudo-Tie Participating Generator Agreement

June 2, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

March 22, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

December 13, 2004 VIA ELECTRONIC FILING

May 21, 2010 VIA ELECTRONIC MAIL. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

PART III GENERAL INFORMATION, INSTRUCTIONS AND CONDITIONS FOR BIDDERS

Poliducto Frontera REPRESENTATIONS. a) It s a company duly incorporated and organized pursuant the laws of Mexico;

FORM OF TITLE TRANSFER SERVICE AGREEMENT AGREEMENT FOR TITLE TRANSFER SERVICE UNDER TOLL SCHEDULE TTS VECTOR PIPELINE LIMITED PARTNERSHIP

December 28, Via Electronic Filing

132 FERC 61,107 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 376. (Docket No. RM ; Order No.

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. 18 CFR Part 33. [Docket No. RM ]

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

California Independent System Operator Corporation Fifth Replacement Tariff. B.11 Pro Forma Congestion Revenue Rights Entity Agreement

August 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426

AMENDED AND RESTATED TRANSMISSION CONTROL AGREEMENT. Among The California Independent System Operator Corporation and Transmission Owners

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ADOPTING PROTECTIVE ORDER. (Issued January 23, 2012)

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.5 Dynamic Scheduling Agreement for Scheduling Coordinators

FORM OF OPERATIONAL VARIANCE SERVICE AGREEMENT AGREEMENT FOR OPERATIONAL VARIANCE SERVICE UNDER TOLL SCHEDULE OVS VECTOR PIPELINE LIMITED PARTNERSHIP

CIMARRON RIVER PIPELINE, LLC ANNOUNCES OPEN SEASON FOR FIRM NATURAL GAS TRANSPORTATION SERVICE ON THE CIMARRON EXPANSION PROJECT

1.1 Transfer of Assets. At the closing, Seller shall sell, assign, transfer, and set over to Buyer, and

A. Zonal Agreements and Termination of the GFA

Current through 2016, Chapters 1-48, ARTICLE XI-B PROMPT CONTRACTING AND INTEREST PAYMENTS FOR NOT-FOR-PROFIT ORGANIZATIONS

152 FERC 61,253 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

ENGINEERING AND PROCUREMENT AGREEMENT

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

October 1, PJM Interconnection, L.L.C., Docket No. ER Default Allocation Assessment Clarifying Revisions

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

November 12, 2004 VIA ELECTRONIC FILING

Sales Order (Processing Services)

SETTLEMENT AGREEMENT. This Settlement Agreement is made by and between: 1) Sierra Club; and 2)

November 10,2004. The Honorable Magalie R. Salas Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

RAILROAD COMMISSION OF TEXAS GAS SERVICES DIVISION

APPENDIX K DISPUTE RESOLUTION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Berry Petroleum Company ) Docket No. ER _

Intergovernmental Agreement. For Growth Management. City of Loveland, Colorado and Larimer County, Colorado

TML MultiState IEBP Executive Director EXECUTIVE SEARCH FIRM SERVICES Request for Qualifications

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

IDS Terms and Conditions Guide Effective: 09/17/2009 Page 1 of 6

UNITED STATES OF AMERICA105 FERC 61,307 FEDERAL ENERGY REGULATORY COMMISSION

Maxum Hardware, Inc. Terms and Conditions of Sale

8.130, 8.201, 8.235, 8.310, and 8.315, relating to General Applicability and Standards; Definitions;

CONSIGNMENT AGREEMENT The Golden Closet 7243 Coldwater Canyon Avenue North Hollywood, CA 91605

CITY OF GONZALES BANK DEPOSITORY SERVICE RFP

101 FERC 61, 127 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

PROCUREMENT, CONTRACT AWARD AND PROVIDER PROTESTS

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Before the Federal Communications Commission Washington, DC ) ) ) ) ) ) ) ADOPTING ORDER. Adopted: November 15, 2012 Released: November 15, 2012

USAble Corporation Network Participation Appeal Policy and Procedures

Transcription:

Transcontinental Gas Pipe Line Corporation 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713-215-2000 March 28, 2007 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Reference: Philis J. Posey, Acting Secretary Transcontinental Gas Pipe Line Corporation Compliance Filing Docket No. RP07-178-001 Ladies and Gentlemen: Transcontinental Gas Pipe Line Corporation ( Transco ) submits this filing to comply with the Federal Energy Regulatory Commission s ( Commission ) Order Accepting Tariff Sheets Subject to Conditions issued March 22, 2007 ( March 22 Order) 1 in the referenced docket. Transco hereby submits for filing with the Commission Substitute Original Sheet No. 374V and Substitute Original Sheet No. 374V.01 to its FERC Gas Tariff, Third Revised Volume No. 1 ( Tariff ), which tariff sheets are proposed to be effective March 22, 2007. Background and Explanation of Tariff Revisions On February 20, 2007, Transco filed tariff sheets 2 to add Section 55, Reservation of Capacity, to the General Terms and Conditions of its Tariff ( GT&C ). Proposed Section 55 was divided into two subsections, one setting forth the conditions under which Transco may enter into a service agreement to start at a specific date up to three years in the future, and the other setting forth the conditions under which Transco may reserve capacity for an upcoming pipeline expansion project. In the March 22 Order, the Commission accepted the tariff sheets effective March 22, 2007, subject to conditions. Specifically, regarding the provision in Section 55.2, Reservation of 1 Transcontinental Gas Pipe Line Corp., 118 FERC 61,234 (2007). 2 Ninth Revised Sheet No. 250A, Original Sheet No. 374V, and Original Sheet No. 374V.01.

Federal Energy Regulatory Commission March 28, 2007 Page 2 Capacity for Expansion Projects, which allowed for a capacity reservation period of up to two years prior to Transco filing the certificate application for an expansion project, the Commission directed Transco to limit such reservation period to one year. 3 Further, the Commission directed Transco to submit revised tariff language, in proposed Section 55.1, Reservation of Capacity for Service to Commence at a Future Date, to expressly state that [Transco] will separately identify on its Internet website all capacity that is anticipated to become available within the next thirty-six months and that it will not enter into any prearranged deals for capacity that has not previously been posted on its Internet website. 4 In compliance with the Commission s directives, Transco submits Substitute Original Sheet No. 374V and Substitute Original Sheet No. 374V.01. Proposed Effective Date, Motion and Waivers In accordance with the March 22 Order, the proposed effective date of the revised tariff sheets submitted herein is March 22, 2007. In the February 20, 2007 filing that initiated this proceeding, Transco reserved the right to file a later motion in the event the filed tariff sheets were suspended, modified, or accepted subject to conditions. The March 22 Order accepted the filed tariff sheets, subject to certain revisions. Therefore, Transco moves in this filing to place Ninth Revised Sheet No. 250A, Substitute Original Sheet No. 374V, and Substitute Original Sheet No. 374V.01 into effect on March 22, 2007, the effective date authorized in the March 22 Order. 5 Transco respectfully requests that the Commission grant any and all waivers of its Regulations that it deems necessary to allow the tariff sheets submitted in the February 20, 2007 filing, as modified herein to comply with the March 22 Order, to become effective March 22, 2007. Materials Submitted Herewith In accordance with, Section 154.7(1) of the Commission s Regulations (Regulations), the following material is submitted herewith: (1) In accordance with Section 154.209 of the Regulations, a proposed form of notice for the instant filing suitable for publication in the Federal Register, and a diskette copy of such notice labeled NT032807.ASC; 3 The Commission added: However, if Transco believes that it needs an extension of time to file the certificate application for a particular project for which it has reserved capacity, then Transco may request that the Commission waive this one-year tariff limit for that project and the Commission will evaluate the waiver request based on the circumstances and the support which Transco provides for the requested waiver. (March 22 Order at P 10). 4 March 22 Order at P 12. 5 Substitute Original Sheet No. 374V and Substitute Original Sheet No. 374V.01 submitted in this filing reflect the revisions required by the March 22 Order. Ninth Revised Sheet No. 250A submitted in the February 20, 2007 filing requires no modifications. Therefore, Transco is not resubmitting that sheet in the instant filing.

Federal Energy Regulatory Commission March 28, 2007 Page 3 (2) The revised tariff sheet and the redlined version of the revised tariff sheet, in accordance with Section 154.201 of the Regulations; and (3) As required by Section 154.4 of the Regulations, a diskette copy of the revised tariff sheet labeled TF032807.ASC. Posting and Certification of Service In accordance with the provisions of Section 154.2(d) of the Commission s Regulations, copies of this filing are available for public inspection, during regular business hours, in a convenient form and place at Transco s main office at 2800 Post Oak Boulevard in Houston, Texas. In addition, Transco is serving copies of the instant filing to parties on the official service list in the referenced docket, interested State Commissions, and other interested parties. Any communication regarding this filing should be sent to: Scott Turkington Director, Rates and Regulatory Transcontinental Gas Pipe Line Corporation P.O. Box 1396 Houston, Texas 77251 Email: scott.c.turkington@williams.com and copies should be mailed to: Stephen A. Hatridge Marshia Younglund Senior Counsel Manager, Regulatory Affairs Transcontinental Gas Pipe Line Corp. The Williams Companies, Inc. P.O. Box 1396 1627 Eye Street, N.W., Suite 900 Houston, Texas 77251 Washington, D.C. 20006 Email: Stephen.a.hatridge@williams.com Email: marshia.younglund@williams.com Respectfully submitted, Transcontinental Gas Pipe Line Corporation /s/ Marg Camardello By Marg Camardello Manager, Tariffs and Certificates (713) 215-3380 Email: marg.r.camardello@williams.com Filed: March 28, 2007

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Transcontinental Gas Pipe Line Docket No. RP07-178-001 Corporation Notice of Compliance Filing ( ) Take notice that, on March 28, 2007, Transcontinental Gas Pipe Line Corporation (Transco) submitted a compliance filing pursuant to the Federal Energy Regulatory Commission s Order Accepting Tariff Sheets Subject to Conditions issued on March 22, 2007 in Docket No. RP07-178-000. Transco states that copies of the filing were served on parties on the official service list in the above-captioned proceeding. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the efiling link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. This filing is accessible on-line at http://www.ferc.gov, using the elibrary link and is available for review in the Commission s Public Reference Room in Washington, D.C. There is an esubscription link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Philis J. Posey Acting Secretary

Transcontinental Gas Pipe Line Corporation FERC Gas Tariff Third Revised Volume No. 1 Substitute Original Sheet No. 374V GENERAL TERMS AND CONDITIONS (Continued) 55. RESERVATION OF CAPACITY 55.1 Reservation of Capacity for Service to Commence at a Future Date. Seller may elect to enter into a prearranged deal with a creditworthy Buyer ("Prearranged Shipper") willing to execute a service agreement to start at a specific date up to three years in the future for service utilizing either currently available unsubscribed capacity or capacity expected to become available at some future date, provided such capacity is not subject to a right-of-first-refusal or the applicable Buyer does not exercise its right-of-first-refusal to retain the capacity. Seller will separately identify on 1Line all capacity that is expected to become available within the next thirty-six months. Seller will not enter into any pre-arranged deals for capacity that has not previously been posted on 1Line as available capacity. (b) (c) (d) As soon as the prearranged deal is entered into (but before capacity is actually awarded or reserved by an executed service agreement), Seller will post on 1Line the prearranged deal as part of an open season bidding process in accordance with the provisions of Section 49 of these General Terms and Conditions to permit other parties an opportunity to bid on the capacity on a long-term basis. This open season bidding process will take place even if the capacity has already been subject to an open season and is currently posted as available. Any third party who meets Seller's creditworthiness standards, as set forth in Section 32 of these General Terms and Conditions, wishing to subscribe to the firm capacity, whether for service commencing immediately or in the future, can participate in the open season. Bids will be evaluated on a net present value ("NPV") basis. Such evaluation shall take into account the time value of the delay in Seller's receiving revenue under a bid for firm service to commence in the future. If a competing bid for service to commence immediately, or in the future, provides a higher NPV than the prearranged deal, the Prearranged Shipper will have a one-time right to match the highest NPV bid by notifying Seller in writing within fifteen (15) business days of receiving Seller's notification of the best bid. If the Prearranged Shipper matches the highest NPV bid, the Prearranged Shipper will be awarded the capacity; otherwise, the capacity will be awarded to the shipper providing the highest NPV bid. If the Buyer to whom the capacity is awarded meets all qualifications for service under the applicable rate schedule, Seller shall submit a service agreement to Buyer which sets forth the terms of such bid. Buyer shall execute the Service Agreement within thirty (30) days of receipt of the same. Once capacity for service to commence in the future is reserved, Seller will make such capacity available on an interim basis in accordance with Section 49 of these General Terms and Conditions. A service agreement for capacity available on such interim basis shall not be eligible for a right of first refusal for purposes of Section 48 of these General Terms and Conditions. 55.2 Reservation of Capacity for Expansion Projects. Seller may elect to reserve for a future expansion project any currently available unsubscribed capacity or capacity expected to become available at some future date, provided such capacity is not subject to a right-of-first-refusal or the applicable Buyer does not exercise its right-of-first-refusal to retain the capacity. Issued by: Frank J. Ferazzi, Vice President Issued on: March 28, 2007 Effective on: March 22, 2007 Filed to comply with order of the Federal Energy Regulatory Commission, Docket No. RP07-178-000, issued March 22, 2007, 18 FERC 61,234

Transcontinental Gas Pipe Line Corporation FERC Gas Tariff Substitute Original Sheet No. 374V.01 Third Revised Volume No. 1 GENERAL TERMS AND CONDITIONS (Continued) 55. RESERVATION OF CAPACITY (Continued) 55.2 Reservation of Capacity for Expansion Projects (Continued) (b) (c) (d) Seller may reserve capacity only for a future expansion project for which an open season has been held or will be held within one year of the date Seller posts such capacity as being reserved. If Seller elects to reserve capacity for a future expansion project under this Section, such capacity may be reserved for up to one year prior to Seller filing for certificate approval for construction of the proposed expansion facilities, and thereafter until such expansion is placed into service. Seller shall, on a limited-term basis up to the in-service date of the expansion project, make available any capacity reserved under this section in accordance with Section 49 of these General Terms and Conditions. A service agreement for capacity available on such interim basis shall not be eligible for a right of first refusal for purposes of Section 48 of these General Terms and Conditions. Prior to reserving capacity for future expansion projects under this section, such capacity shall first have been made available in accordance with Section 49 of these General Terms and Conditions. Subject to the foregoing, Seller may reserve capacity by means of a posting on 1Line which shall include, without limitation: (i) (ii) (iii) (iv) (v) (vi) A description of the expansion project for which the capacity will be reserved; The total quantity of capacity to be reserved; The location of the proposed reserved capacity on Seller's system; When Seller held or anticipates holding an open season in connection with the expansion project; The projected in-service date of the expansion project; and On an ongoing basis, how much of the reserved capacity has been subscribed on an interim basis. (e) (f) To the extent that capacity reserved pursuant to this Section 55.2 is not sufficient to satisfy the requirements of an expansion project, Seller shall conduct, no later than ninety (90) days after the close of an open season for such expansion project, a reverse open season setting forth not unduly discriminatory terms for the turn back of capacity. Capacity obtained through a reverse open season shall be reserved for an expansion project pursuant to the terms of this Section 55.2; provided, however, that the posting requirements of Section 55.2(c) shall not apply to that capacity. Any capacity reserved for an expansion project that does not go forward for any reason shall be reposted as available capacity within 30 days of the date the capacity becomes available, except for capacity committed in service agreements entered into on an interim limited term basis. Issued by: Frank J. Ferazzi, Vice President Issued on: March 28, 2007 Effective on: March 22, 2007 Filed to comply with order of the Federal Energy Regulatory Commission, Docket No. RP07-178-000, issued March 22, 2007, 18 FERC 61,234

Transcontinental Gas Pipe Line Corporation Third Revised Volume No. 1 Substitute Original Sheet No. 374V Original Sheet No. 374V Effective: March 22, 2007 Issued: February 20, 2007 Page 1 GENERAL TERMS AND CONDITIONS (Continued) 55. RESERVATION OF CAPACITY 55.1 Reservation of Capacity for Service to Commence at a Future Date. Seller may elect to enter into a prearranged deal with a creditworthy Buyer ("Prearranged Shipper") willing to execute a service agreement to start at a specific date up to three years in the future for service utilizing either currently available unsubscribed capacity or capacity expected to become available at some future date, provided such capacity is not subject to a right-of-first-refusal or the applicable Buyer does not exercise its right-of-first-refusal to retain the capacity. Seller will separately identify on 1Line all capacity that is expected to become available within the next thirty-six months. Seller will not enter into any pre-arranged deals for capacity that has not previously been posted on 1Line as available capacity. (b) (c) (d) As soon as the prearranged deal is entered into (but before capacity is actually awarded or reserved by an executed service agreement), Seller will post on 1Line the prearranged deal as part of an open season bidding process in accordance with the provisions of Section 49 of these General Terms and Conditions to permit other parties an opportunity to bid on the capacity on a long-term basis. This open season bidding process will take place even if the capacity has already been subject to an open season and is currently posted as available. Any third party who meets Seller's creditworthiness standards, as set forth in Section 32 of these General Terms and Conditions, wishing to subscribe to the firm capacity, whether for service commencing immediately or in the future, can participate in the open season. Bids will be evaluated on a net present value ("NPV") basis. Such evaluation shall take into account the time value of the delay in Seller's receiving revenue under a bid for firm service to commence in the future. If a competing bid for service to commence immediately, or in the future, provides a higher NPV than the prearranged deal, the Prearranged Shipper will have a one-time right to match the highest NPV bid by notifying Seller in writing within fifteen (15) business days of receiving Seller's notification of the best bid. If the Prearranged Shipper matches the highest NPV bid, the Prearranged Shipper will be awarded the capacity; otherwise, the capacity will be awarded to the shipper providing the highest NPV bid. If the Buyer to whom the capacity is awarded meets all qualifications for service under the applicable rate schedule, Seller shall submit a service agreement to Buyer which sets forth the terms of such bid. Buyer shall execute the Service Agreement within thirty (30) days of receipt of the same. Once capacity for service to commence in the future is reserved, Seller will make such capacity available on an interim basis in accordance with Section 49 of these General Terms and Conditions. A service agreement for capacity available on such interim basis shall not be eligible for a right of first refusal for purposes of Section 48 of these General Terms and Conditions. 55.2 Reservation of Capacity for Expansion Projects. Seller may elect to reserve for a future expansion project any currently available unsubscribed capacity or capacity expected to become available at some future date, provided such capacity is not subject to a right-of-first-refusal or the applicable Buyer does not exercise its right-of-first-refusal to retain the capacity. Seller may reserve capacity only for a future expansion project for which an open season has been held or will be held within one year of the date Seller posts such capacity as being reserved. If Seller elects to reserve capacity for a future expansion project under this Section, such capacity may be reserved for up to two years prior to Seller filing for certificate approval for construction of the proposed expansion facilities, and thereafter until such expansion is placed into service.

Transcontinental Gas Pipe Line Corporation Substitute Original Sheet No. 374V.01 Third Revised Volume No. 1 Original Sheet No. 374V.01 Effective: March 22, 2007 Issued: February 20, 2007 Page 1 GENERAL TERMS AND CONDITIONS (Continued) 55. RESERVATION OF CAPACITY (Continued) 55.2 Reservation of Capacity for Expansion Projects (Continued) (b) (c) (d) Seller may reserve capacity only for a future expansion project for which an open season has been held or will be held within one year of the date Seller posts such capacity as being reserved. If Seller elects to reserve capacity for a future expansion project under this Section, such capacity may be reserved for up to two years one year prior to Seller filing for certificate approval for construction of the proposed expansion facilities, and thereafter until such expansion is placed into service. Seller shall, on a limited-term basis up to the in-service date of the expansion project, make available any capacity reserved under this section in accordance with Section 49 of these General Terms and Conditions. A service agreement for capacity available on such interim basis shall not be eligible for a right of first refusal for purposes of Section 48 of these General Terms and Conditions. Prior to reserving capacity for future expansion projects under this section, such capacity shall first have been made available in accordance with Section 49 of these General Terms and Conditions. Subject to the foregoing, Seller may reserve capacity by means of a posting on 1Line which shall include, without limitation: (i) (ii) (iii) (iv) (v) (vi) A description of the expansion project for which the capacity will be reserved; The total quantity of capacity to be reserved; The location of the proposed reserved capacity on Seller's system; When Seller held or anticipates holding an open season in connection with the expansion project; The projected in-service date of the expansion project; and On an ongoing basis, how much of the reserved capacity has been subscribed on an interim basis. (e) (f) To the extent that capacity reserved pursuant to this Section 55.2 is not sufficient to satisfy the requirements of an expansion project, Seller shall conduct, no later than ninety (90) days after the close of an open season for such expansion project, a reverse open season setting forth not unduly discriminatory terms for the turn back of capacity. Capacity obtained through a reverse open season shall be reserved for an expansion project pursuant to the terms of this Section 55.2; provided, however, that the posting requirements of Section 55.2(c) shall not apply to that capacity. Any capacity reserved for an expansion project that does not go forward for any reason shall be reposted as available capacity within 30 days of the date the capacity becomes available, except for capacity committed in service agreements entered into on an interim limited term basis.