FIDIC Conditions of Contract for Construction

Similar documents
Delays. Dr. Mohammad S. El-Mashaleh. Delays

Model letters for use by the Contractor

COMPARISON TABLE OF DISPUTE BOARD RULES

Valuation of Variations. FIDIC and what happens when you change it. David Risbridger. Leonie Sellers. 21 July 2016

CORRIGENDUM No 1 WORKS TENDER DOSSIER

CONSTRUCTION INDUSTRY DEVELOPMENT BOARD

Evolution of dispute resolution under the FIDIC Red Book. Bill Smith, Partner 10 May 2018

Dispute Board Rules. in force as from 1 September Standard ICC Dispute Board Clauses. Model Dispute Board Member Agreement

1.2. This book covers the three Agreements published by JBCC (see 2.1 below) and the MBSA 2014 Domestic Subcontract Agreement.

LIMITATIONS AND CONSTRAINTS IMPOSED BY ROMANIAN LAW ON FIDIC CONDITIONS OF CONTRACT A CONTRACTOR S DILEMMA WHILE PERFORMING PUBLIC WORKS IN ROMANIA

FORM 32 PERFORMANCE BOND UNDER SECTION 85.1 OF THE ACT Construction Act

N O T I F I C A T I O N

AN OUNCE OF PREVENTION IS WORTH A POUND OF CURE - Benjamin Franklin. Gordon L. Jaynes 24 May 2018

AGREEMENT FOR. THE PLANNING, DESIGN AND CONSTRUCTION OF INFRASTRUCTURE WORKS ON BEHALF OF THE MUNICIPAL COUNCIL OF WINDHOEK ON PROJECT [Insert Name]

BILL NO. 1 PRELIMINARIES. Item Quantity Rate Amount No. NOTES:

Kirkyla & Remeza, Inc. v. Dep't of Design and Construction OATH Index No. 1060/04, mem. dec. (June 11, 2004)

MOMBASA PORT AREA ROAD DEVELOPMENT PROJECT BIDDING DOCUMENTS FOR THE CONSTRUCTION OF MWACHE JUNCTION TSUNZA MTEZA SECTION (PACKAGE 2)

PUBLIC PROCUREMENT RULES, 2004

ICON DRILLING PURCHASE ORDER TERMS & CONDITIONS

General Terms and Conditions (GTCs) Valid as of: 1 October 2016

ROADS, PUBLIC WORKS & TRANSPORT SECTOR TENDER DOCUMENT

GOVERNMENT PROCUREMENT ARTICLE 47. Objective. ARTICLE 48 Scope and coverage. (ii) an international agreement relating to the stationing of troops; and

ICC Rules of Conciliation and Arbitration 1975

Clause 3 deals with the duties and obligations of the Engineer and his assistants.

THIS INDEPENDENT ENGINEER'S AGREEMENT (this Independent Engineer's Agreement) is made on [ ]

UTTAR PRADESH CONTINGENCY FUND ACT,

Procurement Guidelines for. the Japanese Grants. (Type I)

Design and Construct Contract - Standard User Funding Agreement

Conditions of Contract for Purchase of Goods and Services

CALL FOR TENDER No D/SE/10/02. Fundamental rights of persons with intellectual disabilities and persons with mental health problems ANNEX B

HOPE CONSTRUCTION MATERIALS. General Conditions. of Contract for. the purchase and. supply of. goods, plant, and materials with services (UK only)

General Terms and Conditions for the Provision of Services and Work of FAG Aerospace GmbH & Co. KG

Tender Document. Water Main Air Scouring for The Outback Regional Water Alliance. Outback Regional Water Alliance Care of Longreach Regional Council

2014 SASKATCHEWAN EMPLOYMENT 2014 CHAPTER 27. An Act to amend The Saskatchewan Employment Act and to repeal The Public Service Essential Services Act

SPECIAL CONDITIONS OF CONTRACT (FOR USE WITH THE ACQS HKIA/HKIS STANDARD FORM OF BUILDING CONTRACT WITH QUANTITIES 2005 EDITION)

The Gap in Sub-Clause 20.7 of The 1999 FIDIC Contracts for Major Works

FRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN

SCOPE OF WORK 1.03 COORDINATION OF SPECIFICATIONS, PLANS, AND SPECIAL PROVISIONS

Building and Construction Industry Security of Payment Act 1999 No 46

CHEMELIL SUGAR COMPANY LIMITED

GENERAL PROVISIONS FOR FIXED-PRICE CONTRACTS (MATERIEL) (14 April 2015)

OEM Supply Agreement

General Terms and Conditions of Sale and Delivery of ERC Emissions-Reduzierungs-Concepte GmbH ( ERC )

QUALITY ASSURANCE AGREEMENT Production of packaging and/or services for the pharmaceutical industry

Collaborative Research Agreement. (Draft)

CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT 2015 EDITION

EU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL. Chapter on Public Procurement

GENERAL PANEL SERVICES AGREEMENT

Terms and Conditions of Sale

CITY INSOLVENCY DISCUSSION GROUP - CONSTRUCTION CONTRACTS AND INSOLVENCY -

General Terms of Contract

General Terms and Conditions of Purchase MAN General Procurement Division for Building Management Services (Facility Management) (Version: June 2018)

TENDER NO. NCA/PRE/015/

Reinforcing Security of Payment in NSW

1) ICC ADR proceedings are flexible and party-controlled to the greatest extent possible.

Standard terms and conditions

ANNEX XI REFERRED TO IN ARTICLE 3.21 MOVEMENT OF NATURAL PERSONS

INSTRUCTIONS TO TENDERERS

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)

INVITATION TO BID. The Lump-sum Fixed Price/Amount shall be on the basis of following tender documents.

GENERAL CONDITIONS OF THE CONTRACT (Applicable to purchase orders)

CONSULTANCY SERVICES AGREEMENT

A DAB Decision between the Notice of Dissatisfaction and the Enforcement in ICC Arbitration

RFP ATTACHMENT I: ACKNOWLEDGEMENT OF RFP TERMS AND CONDITIONS

CONTRACT. Danish Defence Acquisition and Logistics Organization. Concerning the acquisition of Rugged Mobile Data Extractor. CONTRACT NO.

Regulation PR No. 30/53 on Pricing in Public Contracts

S P P U R C H A S I N G S P WI- 03 P U R C H A S E O R D E R G T C DATE OF ISSUE: 15/11/2015 REVISION: 01

Electricity Supply Act 1995 No 94

Danish Defence Acquisition and Logistics Organization CONTRACT. Concerning the acquisition of Rugged Biometric Identification Device

CHAPTER 4 BUILDING REGULATION

EXHIBIT F-1 (I) FORM OF DESIGN-BUILD LETTER OF CREDIT VIRGINIA DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VA ATTN: [ ]

Construction Industry Security of Payment Legislation. Development Bureau

CONSULTANCY SERVICES FOR... CONTRACT NO. :... BETWEEN THE GOVERNMENT OF MALAYSIA AND (COMPANY NO. :...)

NEC4 Term Service Contract review of changes from NEC3

Chapter 10. A Note on Dispute Boards. Chapter 10

General Conditions of Purchase of BASF SE and its Affiliated Companies Located in Germany ( Principal )

Reference to Clause 10 or to the Taking-Over Certificate is found in the following clauses:-

9/13/2013 gerard o sullivan Mulcahy McDonagh & Partners 1

Rules of Procedure of the Administrative Tribunal of the Asian Development Bank

Procurement of Works

Procurement of Single Phase Pre-Paid Meters and Miniature Circuit Breakers for The Last Mile Connectivity Project (AFD/EU) (e-procurement System)

PART IV GOVERNMENT PROCUREMENT CHAPTER 15 GOVERNMENT PROCUREMENT

TERMS AND CONDITIONS FOR THE SUPPLY OF SERVICES

Conditions Precedent to Recovery of Loss and Expense Claims

CAROUSEL TERMS AND CONDITIONS

Issues raised from Adjudication Determinations. The Security of Payment (SOP) Act came into effect on 1 April 2005.

Arbitration Rules of the Court of International Commercial Arbitration of the Chamber of Commerce and Industry of Romania

Supply of Notebook Computers

Telekom Austria Group Standard Data Processing Agreement

REQUEST FOR PROPOSAL: No. RFP/HCR/ALX/SLP/2016/ 002 FOR THE ESTABLISHMENT OF SERVICE CONTRACT FOR THE PROVISION OF

GENERAL PURCHASING TERMS AND CONDITIONS. Strama-MPS Maschinenbau GmbH & Co. KG

CONDITIONS OF TENDERING (E-SUBMISSION)

FINAL SUPPLY CHAIN SOLUTION LTD TERMS AND CONDITIONS FOR THE SUPPLY OF LOGISTICS SERVICES

DATED [ ] 201[ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) FIRM FREQUENCY RESPONSE AGREEMENT

PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA

The Malaysian Standard Form BUILDING CONTRACT

CONTRACT REGULATIONS OF THE EUROCONTROL ORGANISATION

HINDUSTAN AERONAUTICS LIMITED IMM DEPARTMENT GENERAL TERMS & CONDITIONS OF CONTRACT

Conditions of Offer For the Provision of an Offer to Supply Goods

STANDARD TERMS & CONDITIONS Quotations & Service Delivery

Transcription:

FIDIC Conditions of Contract for Construction 1 1 General Provisions 2 1

1.1 Definitions 1.1.1 The Contract Contract means the Contract Agreement, the Letter of Acceptance, the Letter of Tender, these Conditions, the Specifications, the Drawings, the Schedules, and the further documents (if any) which are listed in the Contract Agreement or in the Letter of Acceptance 3 Contract Agreement means the contract agreement (if any) referred to in Sub-Clause 1.6 [Contract Agreement] 4 2

5 6 3

Letter of Acceptance means the letter of formal acceptance, signed by the Employer, of the Letter of Tender, including any annexed memoranda comprising agreements between and signed by both Parties If there is no such letter of acceptance, the expression Letter of Acceptance means the Contract Agreement and the date issuing or receiving the Letter of Acceptance means the date of signing the Contract Agreement 7 Letter of Tender means the document entitled letter of tender, which was completed by the Contractor and includes the signed offer to the Employer for the Works 8 4

9 Specifications means the document entitled specifications, as included in the Contract, and any additions and modifications to the specification in accordance with the Contract such document specifies the Works 10 5

Drawings means the drawings of the Works, as included in the Contract, and any additional and modified drawings issued by the Employer 11 Schedules means the document(s) entitled schedules, completed by the Contractor and submitted with the Letter of Tender, as included in the Contract 12 6

Appendix to Tender means the completed pages entitled appendix to tender which are appended to and form part of the Letter of Tender 13 14 7

15 Bill of Quantities and Daywork Schedule means the documents so named (if any) which are comprised in the schedules 16 8

1.1 Definitions 1.1.2 Parties and Persons Definitions of Employer, Contractor, Engineer, Contractor s representative, Employer s Personnel, Contractor s Personnel, Subcontractor, DAB, FIDIC 17 Contractor s Representative means the person named by the Contractor or appointed from time to time by the Contractor under Sub- Clause 4.3 [Contractor s Representative], who acts on behalf of the Contractor 18 9

Employer s Personnel means the Engineer, the assistants referred to in Sub-Clause 3.2 [Delegation by the Engineer] and all other staff, labour and other employees of the Engineer and of the Employer; and any other personnel notified to the Contractor, by the Employer or the Engineer, as Employer s Personnel 19 Contractor s Personnel means the Contractor s Representative and all personnel whom the Contractor utilises on Site, who may include the staff, labour and other Employees of the Contractor and of each Subcontractor; and any other personnel assisting the Contractor in the execution of the Works 20 10

Dispute Adjudication Board DAB means the person or three persons so named in the Contract, or other person(s) appointed under sub-clause 20.2 [Appointment of the Dispute Adjudication Board] or Sub-Clause 20.3 [Failure to Agree Dispute Adjudication Board] 21 FIDIC means the Federation International des Ingenieurs-Conseils, the international federation of consulting engineers 22 11

1.1 Definitions 1.1.3 Dates, Tests, Periods and Completion Base Date means the date 28 days prior to the latest date for submission of the Tender 23 Commencement Date means the date notified under Sub- Clause 8.1 [Commencement of Works] 24 12

Time of Completion means the time for completing the Works or a Section (as the case may be) under Sub-Clause 8.2 [Time for Completion], as stated in the Appendix to Tender (with any extension under Sub-Clause 8.4 [Extension of time for Completion]), calculated from the Commencement Date 25 Tests on Completion means the tests which are specified in the Contract or agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Employer Taking Over Certificate means a certificate issued under Clause 10 [Employer s Taking Over] 26 13

Tests after Completion means the tests (if any) which are specified in the Contract and which are carried out in accordance with the provisions of the Particular Conditions after the Works or Section is completed as certified under Sub-Clause 10.1 [Taking Over of the Works and Sections] 27 Defects Notification Period means the period for notifying defects in the Works or Section (as the case may be) under Sub-Clause 11.1 [Completion of Outstanding Work and Remedying Defects], as stated in the Appendix to Tender (with any extension under Sub-Clause 11.3 [Extensions of Defects Notification Period]), calculated from the date on which the Works or Section is completed as certified under Sub-Clause 10.1 [Taking Over of the Works and Sections] 28 14

Performance Certificate means the certificate issued under Sub- Clause 11.9 [Performance Certificate] 29 1.1 Definitions 1.1.4 Money and Payments Accepted Contract Amount means the amount accepted in the Letter of Acceptance for the execution and completion of the Works and the remedying of any defects 30 15

Contract Price means the price defined in Sub-Clause 14.1 [The Contract Price], and includes adjustments in accordance with the Contract 31 Cost means all expenditure reasonably incurred (or to be incurred) by the Contractor, whether on or off the Site, including overhead and similar charges, but does not include profit Retention Money means the accumulated retention moneys which the Employer retains under Sub-Clause 14.3 [Payment of Retention Money] 32 16

1.1 Definitions 1.1.5 Works and Goods Permanent Works means the permanent works to be executed by the Contractor under the Contract 33 Plant means the apparatus, machinery, and vehicles intended to form or forming part of the Permanent Works Temporary Works means all temporary works of every kind (other than Contractor s Equipment) required on Site for the execution and completion of the Permanent Works and the remedying of any defects 34 17

1.1 Definitions 1.1.6 Other Definitions Unforeseeable means not reasonably foreseeable by an experienced contractor by the date for submission of the Tender 35 1.5 Priority of Documents The documents forming the Contract are to be taken as mutually explanatory of one another 36 18

For the purposes of interpretation, the priority of the documents shall be in accordance with the following sequence (a) The Contract Agreement (if any) (b) The Letter of Acceptance (c) The Letter of Tender (d) The Particular Conditions (e) The General Conditions 37 (f) The Specifications (g) The Drawings, and (h) The Schedules and any other documents forming Part of the Contract If an ambiguity or discrepancy is found in the documents, the Engineer shall issue any necessary clarification or instruction 38 19

1.6 Contract Agreement The Parties shall enter into a Contract Agreement within 28 days after the Contractor receives the Letter of Acceptance, unless they agree otherwise The Agreement shall be based upon the form annexed to the Particular Conditions 39 40 20

41 1.8 Care and Supply of Documents The Specifications and Drawings shall be in the custody and care of the Employer Unless otherwise stated in the Contract, two copies of the Contract and of each subsequent Drawing shall be supplied to the Contractor, who may make or request further copies at the cost of the Contractor 42 21

Each of the Contractor s Documents shall be in the custody and care of the Contractor, unless and until taken over by the Employer The Contractor shall keep on the Site, a copy of the Contract, publications named in the Specifications, the Contractor s Documents (if any), the Drawings and variations and other communications given under the Contract 43 The Employer s Personnel shall have the right of access to all these documents at all reasonable times If a Party becomes aware of an error or defect of a technical nature in a document which was prepared for use in executing the Works, the Party shall promptly give notice to the other Party of such error or defect 44 22

1.9 Delayed Drawings or Instructions The Contractor shall give notice to the Engineer whenever the Works are likely to be delayed if any necessary drawing or instruction is not issued to the Contractor within a particular time, which shall be reasonable 45 The notice shall include details of the necessary drawing or instruction, details of why and by when it should be issued, and details of the nature and amount of the delay or disruption likely to be suffered if it is late 46 23

If the Contractor suffers delay and/or incurs Cost as a result of a failure of the Engineer to issue the notified drawing or instruction within a time which is reasonable and is specified in the notice with supporting details, the Contractor shall give a further notice to the Engineer and shall be entitled subject to Sub-Clause 20.1 [Contractor s Claims] to: 47 (a) an extension of time for any such delay, if completion is or will be delayed, under Sub- Clause 8.4 [Extension of Time for Completion], and (b) payment of any such Cost plus reasonable profit, which shall be included in the Contract Price After receiving this further notice, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine these matters 48 24