SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

Similar documents
KERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram. November 27, Tamil Nadu Electricity Board

TAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)

Respondents. Present in the Hearing: Respondents

GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR

MODEL POWER PURCHASE AGREEMENT BETWEEN JAMMU AND KASHMIR POWER DEVELOPMENT DEPARTMENT AND. M/s (IPP)

ASSAM ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018 NOTIFICATION

Terms and conditions for supply of 50 MW and part thereof on Short Term basis from December 2007 to May 2008

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION

(A Govt. of Maharashtra Undertaking) - CIN: U40109MH2005SGC153645

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

No. HPSEBL/CE(SO&P)/IS-60A(Vol-IV)/ Dated:

Distribution List (WRLDC Letter No. WRLDC/MO/RPS/PG-EPMPL/2018) 1. Executive Director, POWER GRID WRTS-1 2. Executive Director, POWER GRID WRTS-2 3.

PUBLIC WORKS NOTIFICATIONS TELANGANA STATE ELECTRICITY REGULATORY COMMISSION: HYDERABAD

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Notification

Shortage / Surplus Power available with TATA POWER -DDL

BSES Rajdhani Power Limited. Bid Document for Banking of Power by BRPL. Banking of Power for to Through: Competitive Bidding

Shortage / Surplus Power available with TATA POWER -DDL

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION

DETAILED PROCEDURE FOR GRANT OF CONNECTIVITY & OPEN ACCESS IN INTRA-STATE TRANSMISSION SYSTEM

Case No.139 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member

Request for Proposal (RfP) Notice

Shortage / Surplus Power available with TATA POWER -DDL

TRANSMISSION SERVICE AGREEMENT

ORDER (Hearing on & )

:)_~0'16 /F., Date: ')')_' v9.?j!j)f FIN-PCC-PAY

No. HPSEBL/CE(SO&P)/IS-60A(Vol-II)/ As per list attached.

UTTARAKHAND POWER CORPORATION LTD. BID DOCUMENT FOR PURCHASE OF POWER COMMERCIAL AND GENERAL CONDITIONS

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX

THE GAZETTE OF INDIA EXTRAORDINARY PART-1 SECTION 1 PUBLISHED BY AUTHORITY MINISTRY OF POWER. RESOLUTION Dated 29 th November, 2005

DETAILED PROCEDURE FOR GRANT OF CONNECTIVITY TO PROJECTS BASED ON RENEWABLE SOURCES TO INTER-STATE TRANSMISSION SYSTEM

Request for Proposal (RfP) Notice

CHAPTER I: PRELIMINARY

AGREEMENT FOR LONG TERM ACCESS WITHOUT SYSTEM STRENGTHENING BETWEEN POWER GRID CORPORATION OF INDIA LIMITED AND. (Name of Long Term Customer)

Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016

Index. 1. Introduction: Scope of the Guidelines Preparation for inviting bids Tariff Structure 6. 5.

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014

GUIDELINES/PROCEDURE FOR IMPLEMENTATION OF SHORT TERM OPEN ACCESS (STOA)

Minutes of 1 st Meeting of Committee for National Electricity Plan,2015 held on 1 st September 2015 at New Delhi

TRANSMISSION AGREEMENT FOR CONNECTIVITY BETWEEN POWER GRID CORPORATION OF INDIA LIMITED AND (NAME OF STAGE-II CONNECTIVITY GRANTEE) AND

THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW

NLC TAMILNADU POWER LIMITED

42, Free Press House, 1, Kalpana Square, 215, Nariman Point, Bhubaneswar Mumbai AUDITORS REPORT

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

Formation of approach Roads and Drains For NTPL- CISF Barracks & Quarters and for Residential Quarters ( Phase-2) at NTPL Town ship at Tuticorin

The Planning Authority (Levy of infrastructure and amenities charges) Rules, 2007.

INFORMATION OF THE. POWER ManagEMEnt DEPaRtMEnt. B.E.S. & T. Undertaking

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 211/MP/2012

Addendum-3, dated 01 March 2018 for the recalled tender. This addendum shall be the part of the RFP, Draft PPA, ISA and LSA.

Modified Implementation and Support Agreement for Grid Connected Solar Photo Voltaic Projects for 2000 MW Pavagada Ultra Mega Solar Park in Karnataka

AGREEMENT FOR SALE OF POWER. THIS AGREEMENT FOR SALE OF POWER is made and executed at on the day of, 2017 ( Agreement ) BY AND BETWEEN

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 119/MP/2013. Date of Hearing: Date of Order :

Order on. Petition No. 58/2013

Lunawat & Co. Chartered Accountants Website:

WHEELING AND BANKING AGREEMENT FORMAT FOR NON-REC ROUTE PROJECTS. This Wheeling and Banking Agreement is made at on this.. day of

PRESTIGE BELLA VISTA FLAT OWNERS WELFARE ASSOCIATION - PBVFOWA

GOVERNMENT OF KARNATAKA NOTIFICATION

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012)

Case No. 64 of Shri. V. P. Raja, Chairman Shri. Vijay L. Sonavane, Member ORDER

TAMIL NADU GOVERNMENT GAZETTE

NLC TAMILNADU POWER LIMITED ( A J V C b e tw e e n N L C & T A N G E D C O & a s u b s id ia r y o f N L C L td )

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC)

THE TAMIL NADU ELECTRICITY REGULATORY COMMISSION

Maharashtra State Electricity Distribution Company Ltd. TENDER DOCUMENT FOR BANKING OF POWER ON FIRM BASIS

HIGH COURT OF ANDHRA PRADESH::HYDERABAD ABSTRACT

Sri. Alex Soharab. V.F, M/s. Southern Engineering Corporation, V/830-A, Development Area, Edayar, Muppathadom , Aluva.

Case No.06/2016 Date of Grievance : Date of Order :

File No.23014/1/2017-CLD Government of India Ministry of Coal <0> OFFICE MEMORANDUM

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.

The clarifications issued by GUVNL against the queries raised by the prospective bidders are as under:

Case No. 68 of Coram. Shri. I. M. Bohari, Member Shri. Mukesh Khullar, Member. M/s RattanIndia Nasik Power Ltd.

NEW DELHI. Shri M. Deena. to the National Load Despatch e Energy Certificates to

2018 Bill 13. Fourth Session, 29th Legislature, 67 Elizabeth II THE LEGISLATIVE ASSEMBLY OF ALBERTA BILL 13

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER

No.MePDCL/D(D)/T-383(B)/ /6 Dated 6 th December 2016 OFFICE ORDER

TAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)

765 kv S/C Mainpuri-Hapur & Mainpuri-Greater Noida Line with 765 kv/400 kv AIS at Hapur & Greater Noida and Associated Schemes/Work

Issuing Authority. The supply of material shall be governed by Form-B of UPPCL alongwith following special conditions:-

CONSTITUTION RECIPROCAL ELECTRICAL COUNCIL, INCORPORATED STATE OF MICHIGAN

TAMIL NADU ELECTRICITY REGULATORY COMMISSION TAMIL NADU ELECTRICITY DISTRIBUTION CODE. (As amended up to )

BY-LAWS SOUTHERN ASSOCIATION OF AGRICULTURAL SCIENTISTS, INC. (Formerly, Association of Southern Agricultural Workers, Inc.)

Case No. 02 of Shri V. P. Raja, Chairman Shri S. B. Kulkarni, Member Shri V. L. Sonavane, Member

TAMIL NADU GOVERNMENT GAZETTE

Rules of Procedure of the WHO Regional Committee for South-East Asia

S 2807 S T A T E O F R H O D E I S L A N D

Draft. Implementation and Support Agreement for Grid Connected Solar Photo Voltaic Projects In Raghanesda Ultra Mega Solar Park(700 MW) in Gujarat

DRAFT STANDARD POWER SALE AGREEMENT FOR SALE OF.. MW BUNDLED POWER ON LONG TERM BASIS (UNDER NEW PROJECTS SCHEME) Between

Before the Madhya Pradesh Electricity Regulatory Commission, Bhopal

CONSTITUTION OF THE SAN ANTONIO AUDUBON SOCIETY, INCORPORATED

THE VILLAGE AT WORDENS POND HOMEOWNERS ASSOCIATION, INC. CONSTITUTION AND BY-LAWS (Revised January, 2015)

Taiwan Mobile Co., Ltd. ( the Company ) Rules of Procedure for Board of Directors Meetings

National Electric Power Regulatory Authority (Wheeling of Electric Power) Regulations, 2015

TCN 01. Ref: PSER:SCT:FKK-S1805:TCN-01 Date:

CONSTITUTION AND BY LAWS. "Warren Council of Senior Citizens, Incorporated

Abstract. G.O.(Ms)No. 113 Dated: (Thiruvalluvar Aandu 2043, Nandana, Karthigai - 29)

Order on. Petition No. 38/2013

ARTICLE I - Name. ARTICLE II - Purpose

DRAFT STANDARD POWER PURCHASE AGREEMENT FOR PROCUREMENT OF.. MW SOLAR POWER ON LONG TERM BASIS. Between... [ Insert Name of Solar Power Developer]

Transcription:

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU AGENDA FOR THE 26 th MEETING OF COMMERCIAL SUB- COMMITTEE OF SRPC TO BE HELD AT CHENNAI ON 21 ST NOVEMBER 2014 1. CONFIRMATION OF THE MINUTES OF THE 25 th MEETING Minutes of the 25 th Meeting of the Commercial Sub-Committee of SRPC Committee held at NTPC, Simhadri on 22 nd August 2014 were issued vide letter No. SRPC/SE-I/CC-25/2014/ 8047-069 dated 3 rd September 2014. The Minutes may please be confirmed. 2. SIMHADRI STPS SCHEDULES FOR 12-10-2014 TO 25-10-2014 A Meeting of APSLDC, TSSLDC, SRLDC, NTPC & SRPC Secretariat was held on 05th November 2014 at SRHQ, NTPC, Secunderabad to discuss issues relating to schedules of Simhadri STPS for the period from 12.10.2014 to 25.10.2014 (Record Notes of discussions at Annexure-I). After deliberations, the following had been agreed: Generation schedule of Simhadri STPS needs to be revised to actual generation for all the time blocks from block No.34 of 12 th October 2014 to block No.88 of 25 th October 2014. Scheduled drawal of beneficiaries of Simhadri STPS (Stage II) also needs to be revised accordingly. With regard to issues pertaining to Simhadri STPS Stage-I from 26 th October 2014, NTPC, APTRANSCO & SRLDC to discuss and settle the matter separately. NTPC would furnish a detailed proposal to SRPC Secretariat with regard to DC during the outage of the station. Exemption from Hon ble CERC had not been obtained by AP SLDC, and TS SLDC was of the view that scheduling should be carried out by SRLDC. SRLDC had asked AP on the details of exemption or action in this regard if any. It had requested to flag the issue for discussion in forthcoming Meeting of Commercial Sub-Committee. Other Issues Discussed in the Meeting: SRLDC had informed that for the blocks 39 to 61 for 12 th Oct 2014 replacing schedules with actual for Talcher Stage II could be considered. The same had been agreed.

SRPC Secretariat had informed that APTRANSCO vide letter dated 03.11.2014 (Annexure-II) had asked NTPC to obtain HT power supply from APEPDCL in colony premises of Simhadri Power Project. NTPC had informed that they had replied to APTRANSCO, in this regard. The issue would be further deliberated in the ensuing Meeting of Commercial Sub-Committee. 3. DRAWAL POINTS OF COASTAL ENERGEN In the 25 th Meeting of Commercial Sub-Committee held on 22 nd August 2014, it had been agreed that energy accounting of drawal by Coastal Energen be based on the meters at Madurai end on Madurai-Coastal line and meters at Coastal end on Coastal-NTPL line. It had also been noted that energy accounting of startup power drawl by NTPL would be based on the energy meters provided at NTPL end.. Subsequently, TANTRANSCO vide letter dated 11.09. 2014 (Annexure-III) had stated that metering point for 400 KV Madurai Coastal Energen line be at Coastal Energen end. SRPC Secretariat vide letter dated 17.09.2014 (Annexure-IV) had requested CTU to intimate the connectivity of Coastal Energen for the interim arrangement (LILO of Madurai- Tuticorin JV line). SRLDC vide letter dated 26.09.2014 (Annexure-V) had opined that metering point for accounting of injection by Coastal Energen line in the interim arrangement, shall be based on SEMs at Madurai end and NTPL end. Clarification from CTU is awaited please. Agenda Notes for the 26 h Meeting of Commercial Sub-Committee of SRPC Page 2/6

4. PAYMENT OF TRANSMISSION CHARGES & OPENING OF LC DRAWAL OF START UP POWER DURING COMMSSIOING PERIOD BY GENERATING STATIONS SRTS- II vide letter dated 05.11.2014 (Annexure-VI) have furnished agenda item for deliberation in the Meeting. They have received a request from M/s NLC seeking the details for establishing the LC for NLC-II Expansion project for which start power being availed from 01.11.2014. It is proposed that Generators may be advised to establish an LC equal to 2 months withdrawal charges for the highest MW indicated by them for the period of drawal. However, the charges can be billed on the generator only after the same is reflected in the RTA. Further as these transmission charges so collected will be over and above YTC, the necessary modalities for disbursement of the same shall also are requested to be clarified. 5. 220 kv BHAVINI SIRUCHERI, BHAVINI ARNI AND BHAVINI -KANCHEEPURAM TRANSMISSION LINES OF PGCIL BHAVINI vide letter dated 06.11.2014 (ANNEXURE-VII) have requested for inclusion of the following item in the Meeting: Status of the 220 kv BHAVINI Sirucheri, BHAVINI Arni and BHAVINI- Kancheepuram transmission lines commissioned by PGCIL. 6. DECLARATION OF ISTS ELEMENTS & ISGS IN TO COMMERCIAL OPERATION In the 25 th Meeting of Commercial Sub-Committee, the details of ISTS & ISGS expected to be declared under commercial operation during 2014-15 was noted and is as furnished below: (a) By PGCIL Sl. No. Transmission Element Remarks 1. 400 kv Nellore-Thiruvalam Commissioned on 14.04.2014 2. 400 kv Thiruvalam-Melakottaiyur D/C Commissioned on 24.07.2014 3. 400/220 kv Madhugiri S/S Expected by November 2014 4. 765 kv Kurnool-Thiruvalam D/C Expected by November 2014 5. 765/400 kv Thiruvalam S/S 400 kv Commissioned Nov. 2014 6. 400 kv Vijayawada-Nellore D/C Expected by November 2014 7. 400 kv Gooty-Madhugiri D/C Expected by Nov/Dec 2014 8. 400 kv Somanahalli-New Salem Expected by December 2014 9. 400 kv Madhugiri-Yelahanka D/C line Expected by March 2015 10. 765 kv Salem-Madhugiri Expected by March 2015 Agenda Notes for the 26 h Meeting of Commercial Sub-Committee of SRPC Page 3/6

(b) BY STATE UTILITIES Sl. No Transmission Element Expected Date 1. 400/230 kv Thiruvalam S/S (TN) ICT-1 by 15.08.2014 ICT-2 by 31.08.2014 2. 400 kv Pugalur-Kalavindapattu (TN) One Ckt commissioned. 2 nd Ckt by September 2014 3. 400 kv Mettur- Singarapet- Thiruvalam Expected by September 2014 (TN) 4. 400kV Krishnapattanam-Chittoor (AP) Expected by October 2014 (c) ISGS Sl. No. Station Expected Date 1. NLC- Neyveli TS-II Expansion Unit-I (250MW) by August 2014 Unit- II (250MW) by September 2014 2. NPCIL- KKNPP Unit-I (1000MW) by end August 2014 3. BHAVINI- Kalpakkam PFBR (500 MW) by November 2014 4. NTECL- Vallur STPS Unit-III (500MW) by August 2014 5. NLC Tamil Nadu Power Limited (NTPL) at Tuticorin Unit- I (500 MW) by August 2014 Unit- II (500 MW) by September 2014 The Utilities are requested to kindly furnish the latest updates. 7. ITEMS PRPOSED BY KSEB KSEB vide letter dated 07.11.2014 (Annexure-VIII) have proposed the following items for discussion: Outstanding Payments from KPTCL Outstanding Payments from APPCC Outstanding Payment between SR&WR 8. ITEMS PRPOSED BY TANTRANSCO TANTRANSCO vide letter dated 10.11.2014 (Annexure-IX) have proposed the following items for discussion: Discrepancies noticed in RLDC Charges claimed by NTPC for the month of May 2014 Pending payment between TANTRANSCO and PCKL Energy Transactions between Western Region and Southern Region Frequency Linked Penalty/Incentive Scheme For Over Drawal/ Under Drawal of Shares Agenda Notes for the 26 h Meeting of Commercial Sub-Committee of SRPC Page 4/6

9. AUDIT OF SR UI / DEVIATION ACCOUNT & REACTIVE ENERGY POOL ACCOUNT In line with item No.15 of Annexure-I (Section 6.1 (d)) of CERC (IEGC) Regulations, 2010, RLDC shall table the complete statement of the Regional UI account and the Regional Reactive Energy pool account in the RPC s Commercial Committee Meeting on a quarterly basis, for audit by the latter. SRLDC vide letter dated 07.11.2014 (Annexure- X) have furnished the details of payment and disbursement of weekly Deviation and Reactive Energy charges for the period from 14.07.2014 to 12.10.2014. The accounts may please be audited. 10. ITEMS PRPOSED BY SRLDC SRLDC vide letter dated 07.11.2014 (ref Annexure-X) have proposed the following items for discussion: Reconciliation of UI & Reactive Charges Status of outstanding UI and Reactive charges to the pool account Non-compliance of opening of L/C for UI payment Reconciliation of Open Access disbursements Delay in SEM data transfer Time drift correction Standby SEMs installation by TNEB Forecasting and Scheduling of Wind PoC Data for Q4 of 2014-15 PSDF Fund Transfer 11. METERING SCHEMES FOR UP COMING TRANSMISSION SYSTEM CONNECTED TO TUTICORIN PS AND SALEM PS SRTS-II,PGCIL vide letter dated 16.09.2014 had furnished single line diagrams of the stations, location of proposed SEM installation and list of SEM pertaining to the element connected to Tuticorin PS and Salem PS. SRPC Secretariat vide letter dated 17.09.2014 (ANNEXURE-XI) had sought views/comments from Commercial Sub- Committee Members. The comments furnished by NLC vide letter dated 25.09.2014 had been forwarded to SRTS-II vide letter dated 26.09.2014 (ANNEXURE-XII). SRLDC had furnished comments vide letter dated 26.09.2014 (ANNEXURE-XIII). Agenda Notes for the 26 h Meeting of Commercial Sub-Committee of SRPC Page 5/6

12. ADOPTION OF LOWER CT RATIO DURING DRAWL OF STARTUP POWER BY GENERATORS In the 25 th Meeting of Commercial Sub-Committee of SRPC, it had been suggested that the matter relating to adoption of lower CT ratio be taken up with CEA. Accordingly, SRPC Secretariat vide letter dated 08.09.2014 (Annexure- XIV) had taken up with CEA. This is for information of the Committee. 13. ANY OTHER ITEM WITH THE PERMISSION OF THE CHAIR 14. DATE AND VENUE OF NEXT MEETING *** Agenda Notes for the 26 h Meeting of Commercial Sub-Committee of SRPC Page 6/6

IffiEB KERALA STATE ELECTRICITY BOARD LIMITED (tncorporated under the lndion Companies Act, 1956) (Registered office: Vydyuthi Bhavonam, Pottom, Thiruvanonthapurom 695 004) " Offiie-of the Chief Engineer (Trons.System Operation) No. CESO/EELD2/AEELD3/ABT t20t4-tst a 3 +L To The Member SecretarY (l7c) SRPC, 29, Race Course Cross Road, Bangatore-560009. Lood Dispitch centre, H.hl.T Colony(PO), Koldmossery-6835o3 T et : 0484'255 59 6 5 (CE),25 5 59 50 ; Fa x : 0484-254 3 850 E-mail : cesoklsy@gmail.com Date: /3.11.2014 The Executive Director, SRLDC Bangatore Sir, Sub: Difference in the bitateral transaction in REA for the month of June 2014 issued on 04'02.2013' Ref: 1. This office tetter dated CESo/EELD2/AELD3/ABrl2014-1511585 dtd.02.08.14. 2. Eastern Region REA for the month of June 2014 3. Western Region REA for the month of June 2014 4. Southern Region REA for the month of June 2014 ThematterofdifferencesintheSRREAwiththatofERandWRREAfor the Bitaterat Transactions in the month of June'2014 was intimated to that office v.ide ref.(1) above. But titt date, no further action has been advanced to correct the differences and issue a revised REA for this month' The matter may kindty be discussed in the forthcoming 26 th Commerciat Sub-Committee Meeting' The detaits of differences is enctosed as Annexure- I. itfifu-[ty, ^-/;) d HIEF ENGINEER(TRANS. S.O. ) ElABnltrs to SRPCu0l4.l l.l3 Diflerence in stoa.doc

tt DIFFERNCE IN ENERGY RECEIVED AT WR/ER AND SR AS PER REA FOR JUNE 2014 TRADERS NAME SRLDC APPROVAL NO. PTC. GRIDCO s12141c, s12146f s17172d, S127o9C S1 I731A s11729a 1033.1675 2114.33 2115.12 E:\ABT\hrc to SRPCU0l4.l1.13 Difference in STOA.doc