IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

Similar documents
ARBITRATION AGREEMENT ALERT-- U.S. FIFTH CIRCUIT COURT OF APPEALS INVALIDATES ARBITRATION CLAUSE IN AT-WILL HANDBOOK, APPLYING TEXAS LAW

IN THE UNITED STATES DISTRICT COURT

IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF NORTH CAROLINA ASHEVILLE DIVISION CIVIL CASE NO. 1:16-cv MR-DLH

Case 3:16-cv L Document 9 Filed 10/27/16 Page 1 of 7 PageID 48 IN THE UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF TEXAS DALLAS DIVISION

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

UNITED STATES COURT OF APPEALS FOR THE SECOND CIRCUIT. August Term, 2012

Case 2:15-cv NJB-SS Document 47 Filed 01/13/16 Page 1 of 16 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA

UNITED STATES COURT OF APPEALS FOR THE SECOND CIRCUIT

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA VERSUS NO ORDER AND REASONS ON MOTION

Case 0:10-cv WPD Document 24 Entered on FLSD Docket 03/31/2011 Page 1 of 13 UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF FLORIDA

PRECEDENTIAL UNITED STATES COURT OF APPEALS FOR THE THIRD CIRCUIT. No

UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF NORTH CAROLINA CHARLOTTE DIVISION CIVIL ACTION NO: 3:07-CV DCK

IN THE UNITED STATES COURT OF APPEALS FOR THE ELEVENTH CIRCUIT. No Non-Argument Calendar. D.C. Docket No.

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF MISSOURI EASTERN DIVISION

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

STATE OF MICHIGAN COURT OF APPEALS

Case 6:14-cv CEM-TBS Document 31 Filed 01/16/15 Page 1 of 10 PageID 1331

No. 116,764 IN THE COURT OF APPEALS OF THE STATE OF KANSAS

Case 4:15-cv Document 31 Filed in TXSD on 07/19/16 Page 1 of 10 UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF TEXAS HOUSTON DIVISION ORDER

Case 2:14-cv SPL Document 25 Filed 09/11/14 Page 1 of 16 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF ARIZONA

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

PUBLISH UNITED STATES COURT OF APPEALS TENTH CIRCUIT

IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF TEXAS AUSTIN DIVISION

DISTRICT COURT OF APPEAL OF THE STATE OF FLORIDA FOURTH DISTRICT

NOT DESIGNATED FOR PUBLICATION. No. 116,907 IN THE COURT OF APPEALS OF THE STATE OF KANSAS. JUSTIN GARBERG and TREVOR GARBERG, Appellees,

MEMORANDUM OPINION AND ORDER. arbitrable. Concluding that the arbitrator, not the court, should decide this issue, the court

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

OF FLORIDA THIRD DISTRICT

Case 1:13-cv GBL-IDD Document 50 Filed 04/11/16 Page 1 of 8 PageID# 637 UNPUBLISHED UNITED STATES COURT OF APPEALS FOR THE FOURTH CIRCUIT

IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF NORTH CAROLINA WESTERN DIVISION. No. 5:14-CV-133-FL ) ) ) ) ) ) ) ) ) ) ) )

IN THE SUPREME COURT OF THE STATE OF KANSAS. No. 113,037 SYLLABUS BY THE COURT

IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF TEXAS WICHITA FALLS DIVISION

* * * * * * * (Court composed of Judge Dennis R. Bagneris, Sr., Judge Terri F. Love, Judge Edwin A. Lombard)

IN THE COURT OF APPEALS OF TENNESSEE AT JACKSON March 17, 2005 Session

IN THE DISTRICT COURT OF APPEAL OF THE STATE OF FLORIDA FIFTH DISTRICT

STATE OF MICHIGAN COURT OF APPEALS

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF MISSOURI EASTERN DIVISION

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

LEXSEE. BALFOUR BEATTY INFRASTRUCTURE, INC., Plaintiff - Appellant, v. MAYOR AND CITY COUNCIL OF BALTIMORE, Defendant - Appellee. No.

M. Stephen Turner, P.A., and J. Nels Bjorkquist, of Broad and Cassel, Tallahassee, for Appellant.

IN THE COURT OF APPEALS OF TENNESSEE AT NASHVILLE February 4, 2010 Session

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF CALIFORNIA. Before the Court is Twin City Fire Insurance Company s ( Twin City ) Motion for

United States Court of Appeals For the Eighth Circuit

Case 3:11-cv DPJ -FKB Document 26 Filed 01/05/12 Page 1 of 10

Case 1:09-cv BLW Document 19 Filed 05/20/2009 Page 1 of 7 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF IDAHO. MEMORANDUM DECISION vs.

NOT DESIGNATED FOR PUBLICATION. No. 118,990 IN THE COURT OF APPEALS OF THE STATE OF KANSAS. JENNIFER VANDONSEL-SANTOYO, Appellee,

Case 2:15-cv JRG-RSP Document 27 Filed 05/20/16 Page 1 of 9 PageID #: 167

NON-PRECEDENTIAL DECISION SEE SUPERIOR COURT I.O.P : : : : : : : : : : : : : :

United States Court of Appeals for the Federal Circuit

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

SUPREME COURT OF ALABAMA

STATE OF MICHIGAN COURT OF APPEALS

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

IN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF MISSISSIPPI SOUTHERN DIVISION HANCOCK MEDICAL CENTER PLAINTIFF

United States Court of Appeals FIFTH CIRCUIT OFFICE OF THE CLERK TEL S. MAESTRI PLACE NEW ORLEANS, LA 70130

STATE OF MICHIGAN COURT OF APPEALS

Strickland v. Arch Ins. Co.

Public Notice, Consumer and Governmental Affairs Bureau Seeks Further Comment on

[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION EDITION

Case 3:15-cv GNS Document 12 Filed 03/31/16 Page 1 of 11 PageID #: 482

COURT OF APPEAL, FOURTH APPELLATE DISTRICT DIVISION ONE STATE OF CALIFORNIA

IN THE UNITED STATES COURT OF APPEALS FOR THE ELEVENTH CIRCUIT. No Non-Argument Calendar. D.C. Docket No.

What You Should Know About General Agreements of Indemnity and Why You Should Know It

IN THE COURT OF APPEALS OF THE STATE OF NEW MEXICO. v. No. 34,846

Salvino Steel Iron v. Safeco Ins Co Amer

Cont Casualty Co v. Fleming Steel Co

UNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA TAMPA DIVISION. v. Case No. 8:13-cv-3136-T-33EAJ ORDER

v No Oakland Circuit Court ARI KRESCH, LAW-FIRM, KRESCH

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

Case 2:12-cv GP Document 27 Filed 01/17/13 Page 1 of 6 IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF PENNSYLVANIA

Case 1:15-cv JMF Document 9 Filed 08/27/15 Page 1 of 14

Addison Ins. Co. v Island Blvd. Condo. Ass'n. Opinion

2 Appeals. 2. Builders Mutual Insurance Co. v. Meeting Street Builders, LLC, N.C. App., 736 S.E.2d 197 (2012).

Court of Appeals, State of Michigan ORDER

Case 2:18-cv RLR Document 25 Entered on FLSD Docket 02/06/2019 Page 1 of 7 UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF FLORIDA

UNITED STATES COURT OF APPEALS

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

IN THE COURT OF APPEALS OF THE STATE OF WASHINGTON

STATE OF MICHIGAN COURT OF APPEALS

IN THE SUPREME COURT OF MISSISSIPPI NO.2010-CA-00632

D(F FILED IN CLERK'S OFFICE U S DISTRICT COURTED N y

Case 1:15-cv JSR Document 144 Filed 08/26/16 Page 1 of 8

JOSE C. LISBOA, JR. KIMBERLY LISBOA

BRIEF OF APPELLANT PREMIER ENTERTAINMENT BILOXI LLC D/B/A HARD ROCK HOTEL & CASINO

STATE OF MICHIGAN COURT OF APPEALS

UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF CALIFORNIA

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT. No

Struggle over Consolidation of Arbitration Proceedings Continues: The Eighth Circuit Chooses Sides, The

STATE OF LOUISIANA COURT OF APPEAL, THIRD CIRCUIT ENTERGY GULF STATES LOUISIANA, LLC **********

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF MICHIGAN SOUTHERN DIVISION. Case No. 12-cv HON. GERSHWIN A. DRAIN

UNITED STATES COURT OF APPEALS TENTH CIRCUIT. Plaintiff - Appellee, No v. (D. Wyoming) ROBERT JOHN KUEKER, ORDER AND JUDGMENT *

PRESENT: Lemons, C.J., Goodwyn, Powell, Kelsey, and McCullough, JJ., and Russell and Millette, S.JJ.

Case3:13-cv SI Document39 Filed11/18/13 Page1 of 8

UNITED STATES COURT OF APPEALS FOR THE NINTH CIRCUIT

Transcription:

Case: 15-60083 Document: 00513290279 Page: 1 Date Filed: 12/01/2015 IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT NEW ORLEANS GLASS COMPANY, INCORPORATED, United States Court of Appeals Fifth Circuit FILED December 1, 2015 Lyle W. Cayce Clerk Plaintiff - Appellee v. ROY ANDERSON CORPORATION, Defendant - Appellant Appeal from the United States District Court for the Southern District of Mississippi USDC No. 1:14-CV-177 Before DAVIS, PRADO, and SOUTHWICK, Circuit Judges. W. EUGENE DAVIS, Circuit Judge:* Defendant-Appellant Roy Anderson Corp. ( RAC ) appeals from the district court s denial of its motion to compel arbitration. Because we conclude that the subcontract at issue requires arbitration under these circumstances, we reverse and remand. * Pursuant to 5TH CIR. R. 47.5, the court has determined that this opinion should not be published and is not precedent except under the limited circumstances set forth in 5TH CIR. R. 47.5.4.

Case: 15-60083 Document: 00513290279 Page: 2 Date Filed: 12/01/2015 I. BACKGROUND This dispute arises out of the construction of the Sea Breeze Condominiums and Resort ( Project ) in Biloxi, Mississippi. The Project was owned and developed by Sea Breeze I, LLC ( Developer ), and owners of individual units belonged to the Sea Breeze Condominiums and Resort Owners Association ( Owners Association ). The Developer engaged RAC as its general contractor. RAC in turn engaged a number of subcontractors, including Plaintiff-Appellee New Orleans Glass Co. ( NOG ). RAC and NOG executed a subcontract dated January 27, 2005 ( RAC-NOG Subcontract ), which is central to this dispute. Following completion of work in 2007, the Developer and Owners Association were unhappy with the quality of the construction and/or design of the Project, and both initiated arbitration proceedings (later consolidated) against RAC and the architect. The Developer s demand sought damages, as well as undetermined amounts for repairs to the pool, windows, curtain walls, and transfer slab, while the Owners Association demand asserted similar claims, referring to issues with the pool and pool deck area, windows, curtain walls, the slab and foundation and various other parts of the building.... Based on its investigation, RAC determined that the arbitration demands concerned certain of its subcontractors work, and it filed a Third- Party Demand for Arbitration on March 7, 2014, against many of its subcontractors, including NOG, followed by a Second Amended Third-Party Demand for Arbitration on April 18, 2014. In its arbitration demand, RAC invoked the broad defense and indemnity clause of Section 19.1 of each of its subcontracts, which provides: To the fullest extent permitted by law, the Subcontractor covenants to defend, indemnify, save harmless, protect, and exonerate both the Contractor (its agents, employees, representatives, and sureties) and the Owner, separately and 2

Case: 15-60083 Document: 00513290279 Page: 3 Date Filed: 12/01/2015 severally, from any and all liability, claim, losses, suits, actions, demands, arbitrations, administrative proceedings, awards, judgments, expenses, attorneys fees, and costs pertaining to economic loss or damages, labor disputes, safety requirements, performance or nonperformance of obligations, certifications, property rights of third parties, personal injury, bodily injury, sickness, disease, death, or damage to or destruction of property (including loss of use thereof) which are caused in whole or in part, which arise from or occur in connection with work undertaken or to be performed by the Subcontractor, its subcontractors, or the agents or employees of any of them or which arise from or occur in connection with any other act or omission relating to the Subcontractor, its subcontractors, or the agents or employees of any of them, or to this Subcontract or to the Subcontract Work. The foregoing covenants and indemnity obligations shall apply to the fullest extent permitted by law. The Subcontractor s indemnity obligation and liability to the Contractor shall extend to the maximum extent allowed by applicable law. In addition, RAC asserted that in all of its subcontracts, each subcontractor agreed to arbitrate disputes between it and RAC. In a footnote, it explained that the RAC-NOG Subcontract contains different dispute resolution language, but nevertheless binds [NOG] to appear in this arbitration proceeding. Specifically, RAC invoked Section 27.3 of the RAC- NOG Subcontract, which provides: If the Contractor has a claim or dispute involving the same general subject matter, either in whole or in part, with any third party if elected by the Contractor, the Subcontractor shall assert its claims and defenses in and shall be bound by the same forum and in the same proceeding which has jurisdiction over the claims or disputes between the Contractor and such third party. Instead of joining the consolidated arbitration proceeding, NOG filed a Complaint for Declaratory Relief in the United States District Court for the Southern District of Mississippi. In its complaint, it summarized the same facts set out above but disputed that Section 27.3 applies here, claiming that Section 27.3 applies in circumstances where RAC and NOG each have similar 3

Case: 15-60083 Document: 00513290279 Page: 4 Date Filed: 12/01/2015 claims against third parties, and it does not apply to claims between RAC and NOG. In NOG s reading, Section 27.3 is irrelevant to claims solely between RAC and NOG, which it asserts are governed by Sections 27.4 and 27.5 (discussed below), which require RAC and NOG to litigate claims between them unless they specifically agree to arbitrate them. NOG prayed for a declaratory judgment declaring that: A. RAC and NOG did not agree to arbitrate their claims or disputes arising under the RAC-NOG Subcontract; B. Any claims or disputes arising under the RAC-NOG Subcontract must be litigated in a court of competent jurisdiction located either in Harrison County, Mississippi, if a state court action, or in the Southern District of Mississippi, if a federal court action; C. This Court is a court of competent jurisdiction for the purpose of litigating claims or disputes arising under the RAC- NOG Subcontract, including RAC s claim for contractual indemnity;... Thus, the primary purpose of NOG s declaratory judgment is to avoid arbitration. NOG has also prayed for a declaratory judgment declaring that RAC s contractual indemnity claim is premature because RAC asserted it prior to any judgment against RAC. This appeal will determine which forum may address that question. Soon after NOG filed its declaratory judgment action, RAC filed a Motion to Compel Arbitration and to Dismiss in the district court, re-asserting its argument that under Section 27.3 of the RAC-NOG Subcontract, NOG is required to arbitrate its dispute with NAC in the existing arbitration. The district court denied RAC s motion. In a Memorandum Opinion and Order, the district court rejected RAC s interpretation of the RAC-NOG Subcontract and adopted NOG s. Specifically, the district court interpreted Section 27.3 to apply when the subcontractor has a claim or dispute with a 4

Case: 15-60083 Document: 00513290279 Page: 5 Date Filed: 12/01/2015 third party, while Section 27.4 controls when the subcontractor has a claim or dispute with the contractor. 1 Because it found no contractual basis for requiring NOG to arbitrate its dispute with RAC, it denied RAC s motion. It also stayed the proceedings in the district court pending the outcome of RAC s ongoing consolidated arbitration. RAC appealed. II. STANDARD OF REVIEW AND APPLICABLE LAW This Court reviews de novo the grant or denial of a motion to compel arbitration. 2 As the district court noted, this case falls under the Federal Arbitration Act ( FAA ), 9 U.S.C. 1 et seq., which applies to written arbitration agreements involving interstate commerce, like the RAC-NOG Subcontract in this case. 3 In adjudicating a motion to compel arbitration under the Federal Arbitration Act, courts generally conduct a two-step inquiry. The first step is to determine whether the parties agreed to arbitrate the dispute in question. This determination involves two considerations: (1) whether there is a valid agreement to arbitrate between the parties; and (2) whether the dispute in question falls within the scope of that arbitration agreement. When deciding whether the parties agreed to arbitrate the dispute in question, courts generally... should apply ordinary state-law principles that govern the formation of contracts. In applying state law, however, due regard must be given to the federal policy favoring arbitration, and ambiguities as to the scope of the arbitration clause itself must be resolved in favor of arbitration. The second step is to determine whether legal constraints external to the parties agreement foreclosed the arbitration of those claims. 4 1 District Court Memorandum Opinion and Order Denying Defendant s Motion to Compel Arbitration and to Dismiss, No. 1:14CV177, slip op. at 6 (S.D. Miss. Jan. 22, 2015) (hereinafter District Court Order ). 2 Fleetwood Enterprises, Inc. v. Gaskamp, 280 F.3d 1069, 1073 (5th Cir. 2002), opinion supplemented on denial of reh'g, 303 F.3d 570 (5th Cir. 2002) (citing Webb v. Investacorp, 89 F.3d 252, 257 (5th Cir. 1996)). 3 District Court Order, slip op. at 3. 4 Webb, 89 F.3d at 257-58 (citations omitted). 5

Case: 15-60083 Document: 00513290279 Page: 6 Date Filed: 12/01/2015 The parties agree that we must apply Mississippi s contract interpretation rules. In construing contracts under Mississippi law, the court must focus upon the objective fact the language of the contract. We are concerned with what the contracting parties have said to each other, not some secret thought of one not communicated to the other. 5 More fully, Mississippi relies on a three-tiered approach to a contract interpretation, focusing on the actual words of the contract to the exclusion of parol or extrinsic evidence. 6 First, we must look to the four corners of the contract, read[ing] the contract as a whole, so as to give effect to all of its clauses. 7 Our concern is not nearly so much with what the parties may have intended, but with what they said, since the words employed are by far the best resource for ascertaining the intent and assigning meaning with fairness and accuracy. Thus, the courts are not at liberty to infer intent contrary to that emanating from the text at issue. On the other hand, if the contract is unclear or ambiguous, the court should attempt to harmonize the provisions in accord with the parties' apparent intent. Only if the contract is unclear or ambiguous can a court go beyond the text to determine the parties true intent. [T]he mere fact that the parties disagree about the meaning of a contract does not make the contract ambiguous as a matter of law. 8 Second, if the court cannot discern the parties intent from the text alone, the court should move on to the discretionary canons of contract construction, such as the principle that a contract subject to more than one fair reading will be construed so as to most benefit the non-drafting party. 9 The 5 Facilities, Inc. v. Rogers-Usry Chevrolet, Inc., 908 So. 2d 107, 110-11 (Miss. 2005) (quoting Turner v. Terry, 799 So. 2d 25, 32 (Miss. 2001)). 6 Royer Homes of Miss., Inc. v. Chandeleur Homes, Inc., 857 So. 2d 748, 752 (Miss. 2003). 7 Id. 8 Id. at 752-53 (citations and internal quotation marks omitted, alteration in original). 9 Id. at 753. 6

Case: 15-60083 Document: 00513290279 Page: 7 Date Filed: 12/01/2015 district court noted that the canons also include the principle that specific language controls over general, inconsistent language. 10 Third and finally, if the contract continues to evade clarity as to the parties intent, the court should consider extrinsic or parol evidence. It is only when the review of a contract reaches this point that prior negotiation, agreements and conversations might be considered in determining the parties intentions in the construction of the contract. 11 As suggested above, if the subcontract requires arbitration under Mississippi law, then the arbitration provision is enforceable under the FAA. III. DOES THE SUBCONTRACT BETWEEN RAC AND NOG REQUIRE NOG TO ARBITRATE THE CLAIMS PRESENTED HERE? All parties agree that Section 27.4 generally provides that RAC and NOG agree to litigate any claims between them. The only question is whether Section 27.3 applies under these circumstances to require NOG to join the arbitration to assert any claims or defenses against RAC arising out of the same general subject matter as RAC s existing arbitration against the Developer and Owners Association. NOG argues, and the district court concluded, that Section 27.3 applies only to NOG s claims against a third party, not RAC. NOG asserted in its complaint that Section 27.3 of the RAC-NOG Subcontract... applies in circumstances where RAC and NOG each have similar claims against third parties, and it does not apply to claims between RAC and NOG. Similarly, the district court concluded that Section 27.3 applies when the subcontractor has 10 District Court Order, slip op. at 5 (citing Harris v. Harris, 988 So. 2d 376, 379 (Miss. 2008); Pursue Energy Corp. v. Perkins, 558 So. 2d 349, 352-53 (Miss. 1990)). 11 Royer, 857 So. 2d at 753 (internal citation omitted). 7

Case: 15-60083 Document: 00513290279 Page: 8 Date Filed: 12/01/2015 a claim or dispute with a third party. That reading ignores the plain language of Section 27.3, which is not limited to NOG s claims against a third party. Section 27.1 of the RAC-NOG Subcontract provides that all claims, disputes, and other matters in controversy or question between the Contractor and the Subcontractor arising out of or relating to this Subcontract shall be decided in accordance with this Section. Section 27.2 provides: If the Contractor has a claim or dispute involving the same general subject matter, either in whole or in part, with the Owner, if so elected by the Contractor, the Subcontractor shall pursue its claim or resolve its dispute by timely submission of its claim through the Contractor to the Owner, and Subcontractor s recovery and any other relief shall be limited to the amounts actually recovered or other relief actually obtained by the Contractor through the Owner on account of the Subcontractor s claims or disputes. By its plain terms, Section 27.2 applies only to claims the Subcontractor has against the Owner. It allows RAC to pursue those claims on behalf of NOG. Section 27.3 provides: If the Contractor has a claim or dispute involving the same general subject matter, either in whole or in part, with any third party if elected by the Contractor, the Subcontractor shall assert its claims and defenses in and shall be bound by the same forum and in the same proceeding which has jurisdiction over the claims or disputes between the Contractor and such third party. Unlike Section 27.2, there is no language in Section 27.3 limiting its application to NOG s claims against a particular party. Thus, the district court erred in reading Section 27.3 to apply only to NOG s claims against a third party. Instead, a plain reading shows that it applies to NOG s claims and defenses involving the same general subject matter as RAC s claim or dispute with any third party, and amounts to an agreement to arbitrate or 8

Case: 15-60083 Document: 00513290279 Page: 9 Date Filed: 12/01/2015 litigate its claims, depending on the forum of the existing dispute between RAC and a third party. Under the plain language of Section 27.3, the present circumstances trigger its application. First, RAC does have a dispute with third parties, the Developer and Owners Association. Second, the general subject matter of that dispute is alleged construction and design defects, apparently including some of NOG s work. NOG s claim or defense in this declaratory judgment action concerns the interpretation of Section 19.1 of the RAC-NOG Subcontract, a defense and indemnity obligation, which certainly concerns the same general subject matter as RAC s dispute with the third parties. Third, RAC elected to invoke Section 27.3 by asserting a third-party demand against NOG in the arbitration. Consequently, under a straightforward reading of Section 27.3, NOG agreed to arbitrate its claims under these circumstances unless somehow precluded by another contractual provision. NOG attempts to sidestep Section 27.3 by arguing that Sections 27.4 and 27.5 mean that all claims solely between NOG and RAC must be litigated unless the parties agree to arbitrate. There are a few problems with NOG s interpretation. First, Mississippi law requires that we interpret the contract so as to give full effect to every provision. NOG s reading fails to give effect to the plain language of Section 27.3 because that reading impermissibly restricts its application to NOG s claims against a third party. Second, while there may be some apparent tension between Sections 27.3 and 27.4, that tension is easily resolved by applying Mississippi s canon of statutory construction under which specific language controls over general, inconsistent language. 12 Section 27.4 is a general provision applying to claims 12 District Court Order, slip op. at 5 (citing Harris, 988 So. 2d at 379; Pursue Energy Corp., 558 So. 2d at 352-53). Although the district court mentioned this canon, it did not need to apply it because it read Section 27.3 as applying only to NOG s claims against third parties. 9

Case: 15-60083 Document: 00513290279 Page: 10 Date Filed: 12/01/2015 between NOG and RAC, while Section 27.3 applies to all claims NOG might have (whether against RAC or a third party) under specific circumstances. The clear purpose of Section 27.3 is to allow for consolidated dispute resolution when there is already a proceeding between RAC and a third party. Third, NOG argues that RAC s agreements with its other subcontractors contain much clearer provisions requiring arbitration, and RAC could have used those provisions here if it wanted that result. There is no merit to that argument. For one thing, RAC could have reached the same result in any number of ways. For another, we may only examine extrinsic evidence such as the other subcontracts if the RAC-NOG Subcontract continues to evade clarity as to the parties intent, 13 but there is no such difficulty here because it clearly and unambiguously establishes an agreement to arbitrate under these circumstances. Under the RAC-NOG Subcontract, Section 27.4 generally requires RAC and NOG to litigate claims between themselves, unless they specifically agree to arbitrate. However, Section 27.3 requires NOG to join RAC s existing arbitration or litigation with a third party if the dispute involves the same general subject matter as NOG s claim or dispute and if RAC elects to invoke the provision. Those conditions were satisfied here, and under the plain terms of Section 27.3, NOG is required to arbitrate. That plain language reading leads to more efficient dispute resolution through consolidation, and the result is clearly not coincidental. Because the arbitration clause is clear and unambiguous under Mississippi law, it is enforceable under the FAA. 13 Facilities, Inc., 908 So. 2d at 111. 10

Case: 15-60083 Document: 00513290279 Page: 11 Date Filed: 12/01/2015 IV. CONCLUSION Because the RAC-NOG Subcontract requires NOG to assert its claims and defenses in the existing arbitration between RAC and the Developer and Owners Association under these circumstances, we REVERSE the district court s January 22, 2015 order denying RAC s motion to compel arbitration and REMAND for entry of an order compelling arbitration. 11