Citizen and Developer s Guide to the Permitting and Approval Process for Land Development in Stillwater Borough, Columbia County, Pennsylvania

Similar documents
Citizen s Guide to the Permitting and Approval Process for Land Development in Pennsylvania

Interpretation. Outline. Permit & Approval Extension Act 46 of 2010 (SB 1042) Act 87 of 2012 (SB 1263) Act 54 of 2013 (HB 784)

Standard Operating Procedures (SOP) for New NPDES Individual Permit for Stormwater Discharges Associated with Construction Activities.

6.1 Planned Unit Development District

September 4, I. Pre-Application Process

Lackawanna County Conservation District Erosion and Sediment Control Plan Review Fee Schedule and Application Form

ORDINANCE. D. The Planning Commission shall be vested with the authority to approve or disapprove Lot Add-on plans.

I Pre-Application Process

ORDINANCE NO. 33 PENINSULA TOWNSHIP STORM WATER CONTROL ORDINANCE. Description of Purpose and Nature:

UPPER CHICHESTER TOWNSHIP ZONING HEARING BOARD P.O. BOX 2187 UPPER CHICHESTER, PA (610)

IN THE COURT OF COMMON PLEAS OF LYCOMING COUNTY, PENNSYLVANIA

ARTICLE 16 PLANNED RESIDENTIAL DEVELOPMENTS

ARTICLE 7 AMENDMENTS TO ORDINANCE

TILDEN TOWNSHIP PLANNING COMMISSION

BOROUGH OF CALIFORNIA WASHINGTON COUNTY, PENNSYLVANIA ORDINANCE NO. 524

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

FIRST READING: SECOND READING: PUBLISHED: PASSED: TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION

Iowa County Airport Zoning Ordinance

ARTICLE 7 AMENDMENTS TO ORDINANCE

WEST NOTTINGHAM TOWNSHIP ORDINANCE NO

Application For Rezoning

Standard Operating Procedures (SOP) for new NPDES General Permit for Stormwater Discharges Associated with Construction Activities.

ZONING ORDINANCE FOR THE TRI-COUNTY REGIONAL AIRPORT

ARTICLE 7 AMENDMENTS TO ORDINANCE

CITY OF KENT, OHIO ZONING CODE CHAPTER 1107 CONDITIONAL ZONING CERTIFICATES AND SPECIALLY PERMITTED USES Page

TILDEN TOWNSHIP PLANNING COMMISSION

BRECKNOCK TOWNSHIP, BERKS COUNTY, PENNSYLVANIA ORDINANCE NO. 167

EAST NOTTINGHAM TOWNSHIP ZONING ORDINANCE ARTICLE XXII ZONING HEARING BOARD

Pennsylvania Municipalities Planning Code. Provisions Specifying Time Limits, Time Periods, Etc. Third Edition November 2007

4. Such inspector shall complete the appropriate portions on the form and certify that the property has been tested and certify the results of such

ORDINANCE NO Ordinance No Page 1 of 7. Language to be added is underlined. Language to be deleted is struck through.

OTHER DOCUMENTS: Indicate title, number of pages and originator

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

ARTICLE XIV ADMINISTRATION

Accessory Buildings (Portion pulled from Town Code Updated 2015)

ORDINANCE NO WHEREAS, the Common Council of the City of Fort Atkinson makes the following findings and determinations:

Public Hearing Published 11/16/2017 First Reading 12/07/2017 Public Hearing 12/07/2017 Adopted 12/21/2017 ORDINANCE NO.

DOCKET NO. D CP-1 DELAWARE RIVER BASIN COMMISSION

City of Coquitlam BYLAW

FRANKLIN TOWNSHIP YORK COUNTY, PENNSYLVANIA ORDINANCE NO

COMMONWEALTH OF PENNSYLVANIA POSTING AUTHORITY EXCESS MAINTENANCE AGREEMENT

Act 537. Pennsylvania Sewage Facilities Act. With Index

WEST HEMPFIELD TOWNSHIP SUPERVISORS MEETING Minutes of March 5, 2013

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION III OF TITLE 20 MENDOCINO TOWN ZONING CODE

MINOR VARIANCE OR PERMISSION APPLICATION GUIDE

Public Notice. Notice No. CELRP-OP 15-LOP1 Expiration Date: March 11, 2020

Township of SLIPPERY ROCK BUTLER COUNTY

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

UNIFIED DEVELOPMENT ORDINANCE

Sewage Disposal ARTICLE II SEWAGE RETAINING TANKS

DISCLAIMER FOR ALL CITY OF KISSIMMEE DEVELOPMENT REVIEW APPLICATIONS

CHAPTER 159 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL

Greg Jones Airspace and Land Use Manager (850)

PENN TOWNSHIP CUMBERLAND COUNTY, PENNSYLVANIA ORDINANCE NUMBER HOLDING TANKS

APPLICATION TO AMEND THE ZONING BY-LAW

PENNSYLVANIA SEWAGE FACILITIES ACT Act of Jan. 24, (1966) 1965, P.L. 1535, No. 537 AN ACT Providing for the planning and regulation of community

ORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:

SUBDIVISION AGREEMENT

ARTICLE 1 INTRODUCTION

Chapter 13: Sewers & Sewage Disposal

MEETING MINUTES March 12, 2014 WEST EARL SEWER AUTHORITY PO BOX 725 BROWNSTOWN, PA

MEETING MINUTES April 10, 2013 WEST EARL SEWER AUTHORITY PO BOX 725 BROWNSTOWN, PA

municipalities shall have governmental corporate and proprietary powers to enable

DISTRICT OF LAKE COUNTRY BYLAW DEVELOPMENT APPLICATION PROCEDURES BYLAW CONSOLIDATED VERSION

Act upon building, construction and use applications which are under the jurisdiction of the Code Enforcement Officer.

ARTICLE XXIII ADMINISTRATION AND ENFORCEMENT

City of Aurora PLANNING COMMISSION MEETING MINUTES January 20, 2016

CITY OF LYNN In City Council

ARTICLE 9 AMENDMENTS. Table of Contents

Instructions for Official Plan Amendment Application

Article 18 Amendments and Zoning Procedures

302 CMR: DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

REGULATORY PROCEDURES SECTION 12 REGULATORY PROCEDURES

Section, Township N, Range E. Is project in MWRDGC combined sewer area Yes No. Basic Information (Required in all cases)...schedule A (Page 4 of 8)

Article I PREAMBLE, TITLE, PURPOSE and LEGAL CLAUSES

Article Administration and Procedures

REZONING, USE PERMIT & CONCURRENT VARIANCE APPLICATION APPLICANT S CHECKLIST

ARTICLE VI. SOIL EROSION AND SEDIMENTATION PREVENTION*

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT

SECTION I GENERAL PROVISIONS

TOWN OF HOLLIS, NEW HAMPSHIRE EXCAVATION, REMOVAL OR MOVEMENT OF EARTH REGULATIONS

ARTICLE 22 GENERAL ADMINISTRATION AND ENFORCEMENT. Contents

MINOR SUBDIVISION DEVELOPMENT IN JOHNSON COUNTY:

ARTICLE 2. ADMINISTRATION CHAPTER 20 AUTHORITY OF REVIEWING/DECISION MAKING BODIES AND OFFICIALS Sections:

CITY OF BILLINGS CITY OF BILLINGS MISSION STATEMENT: TO DELIVER COST EFFECTIVE PUBLIC SERVICES THAT ENHANCE OUR COMMUNITY'S QUALITY OF LIFE

DOCKET NO. D DELAWARE RIVER BASIN COMMISSION

ORDINANCE NO. 03- O~

TOWN OF ST. GERMAIN P. O. BOX 7 ST. GERMAIN, WI 54558

MISSISSIPPI LEGISLATURE REGULAR SESSION 2013 COMMITTEE SUBSTITUTE FOR HOUSE BILL NO. 719

SUBTITLE II CHAPTER GENERAL PROVISIONS

Ch. 71 SEWAGE FACILITIES 25. Subpart C. PROTECTION OF NATURAL RESOURCES I. LAND RESOURCES II. WATER RESOURCES III. AIR RESOURCES...

Public hearing to adopt Ordinance 1375 C.S. amending Title 15, Buildings and Construction, of the Martinez Municipal Code

The Chairman called the Meeting to order at 12 Noon, welcomed the one visitor and noted the Meeting was being recorded.

Nonmetallic Mining Reclamation Permit Application Required.

LOT SPLIT APPLICATION

Action Required in the Event of Abandonment of Cellular Tower Staff Review Proposals by the Applicant

CHAPTER BUILDING PERMITS

ARTICLE 9. DEVELOPMENT REVIEW

Procedure for Filing a Site Plan Exemption

City of Safford Drainage Ordinance; Adopted September 24 th, 2001

Transcription:

Citizen and Developer s Guide to the Permitting and Approval Process for Land Development in Stillwater Borough, Columbia County, Pennsylvania Contact Information Stillwater Borough 63 McHenry St. Stillwater, Pa 17878 Phone: (570)925-2381 Borough Council Members (Meets the first Wednesday of each month at 7:00 PM in the Borough Building, Stillwater.) John Kline, Jr. President (570)952-6766 Robin Kline (570)925-6766 Earl Weaver, Sr. (570)925-2491 James Reed (570)925-2381 Herold Miller (570)925-2381 George Kline (570)925-2381 Mayor Dan McHenry (570)925-2381 Borough Secretary Karen Hilley (570)925-2381 Sewage Officer John Belles (570)256-4271 Cell: (570)760-2424 Zoning Officer Ronald Caldwell (570)925-6280 Solicitor Harding & Hill (570)784-6770 Zoning Board & All Borough Council Members Gerald McMichaels (570)925-6153

Stillwater Borough (continued-page 2) Planning Agency (Not a Commission): (The Stillwater Borough Planning Agency is a review body only. The approval of all Subdivisions and Land Development applications is the responsibility of the Columbia County Planning Commission.) John Kline, Jr. President (570)952-6766 Robin Kline (570)925-6766 Earl Weaver, Sr. (570)925-2491 James Reed (570)925-2381 Herold Miller (570)925-2381 George Kline (570)925-2381 Columbia County Planning Commission Board Members (Meets the third Tuesday of every month at 6:30 PM.) William Brobst, Chairman Dr. Brian Johnson, Vice-Chair Terry Hoover, Secretary Edwin Lease, Treasurer Ernest Shearer, Jr. Michelle Bella Edward Sidinger Tammy Robbins Ron Kocher Ordinances Columbia County SALDO Columbia County SALDO fee schedule Subdivision and Land Development The following information is not all inclusive and is meant only to be a general guideline. For detailed requirements, applications and information consult the Columbia County Subdivision and Land Development Ordinance (SALDO) and speak with the Zoning Officer. Definitions of Subdivision and Land Development For a COMPLETE list of definitions of Subdivision and Land Development see the SALDO, Article 8, DEFINITIONS.) Subdivision and applications and land development applications shall be submitted as separate applications. Single applications including both subdivision and land development proposals will not be accepted. Minor Subdivision: any subdivision abutting an existing public street or road, cumulatively involving no more than (5) five lots, parcels of land, or other divisions of land from the same parent tract within 15 years prior to the filing of a completed application, which does not require a new street, the installations of sanitary sewers, storm sewer, water mains or pipes, or other public improvements.

Stillwater Borough (continued-page 3) Major Subdivision: any subdivision as defined herein involving 6 or more lots, parcels of land, or other divisions of land whether or not they involve new streets, additional utilities, or other improvements; all subdivisions not considered Minor Subdivisions for plan processing purposes. Land Development: The development of property as specified below: a. The improvement of (1) one lot or (2) two or more contiguous lots, tracts or parcels of land for any purpose involving: 1. a group of two or more residential or nonresidential buildings or structures, whether proposed initially or cumulatively, or a single nonresidential building or structure on a lot or lots regardless of the number of occupants or tenure; or 2. the division or allocation of land or space, whether initially or cumulatively, between or among (2) two or more existing or prospective occupants by means of, or for the purpose of streets, common areas, leaseholds, condominiums, building groups or other features; or b. Any subdivision of land. (FOR EXCLUSIONS, see the definition of Land Development in the SALDO, Article 6, DEFINITIONS, Section 600 page 84 for definitions of Types of Land Development (Industrial, Campground, etc) see SALDO, Article 6, DEFINITIONS, Section 602 page 602-608) Sketch Plan: an informal plan, not necessarily to exact scale, indicating salient exiting features of a tract and its surroundings and the general layout of a proposed subdivision or land development. Submittal and Review Process Submittal Requirements: Preliminary Plan Applications for the Preliminary Plan review and approval of a proposed subdivision or land development shall be submitted and processed in accordance with the following procedures. 1. Application. Submit to the Columbia County Secretary: a. (8) eight copies of the Preliminary Plat b. (2) two copies of all data required to be submitted with the said plat. Additional copies of the plat and supporting information may be required by the Planning Commission. Consideration of any application filed less than 21 days prior to a regularly scheduled meeting of the commission shall be deferred until the next regularly scheduled Commission meeting. c. Appropriate filing fee in the form of a check or money order made payable to the Township of South Centre for an amount established by a fee schedule adopted by resolution of the Board of Supervisors, which is available from the Township Administrator

Stillwater Borough (continued-page 4) Review Process: 2. Referrals. Upon request of the said application, The Planning Commission Staff shall refer one (1) copy of the Final Plat and any related documentation to the following officials and such others, as appropriate, for their review and report. Referrals shall be distributed to the appropriate agencies and officials within seven (7) working days of the date of submittal to the Planning Commission. a. Local municipal governing bodies will be allotted thirty (30) days for review and comment. If no written comments are received within the aforementioned thirty (30) day review and comment period the municipality forfeits its right to comment. However, at the discretion of the Planning Commission a time extension may be considered. b. Local Officials must acknowledge receipt of plans by returning the signed acknowledgement form, which shall provide by the Planning Commission (See Appendix A.) c. Planning Commission Engineer, at the discretion of the Planning Commission. Site inspections may also be requested. d. Pennsylvania Department of Transportation when the subdivision or land development will front on an existing or proposed State Route or will have a proposed street requiring access to such a route. e. Pennsylvania Department of Environmental Protection for any necessary report with respect to sewer and water facilities. f. Columbia County Conservation District for review with respect to drainage and erosion consideration and proposed stormwater management facilities. g. Any additional agencies and/ or officials as deemed necessary by the Planning Commission including but not limited to emergency management agencies and school districts. 1. Review and Action. The Planning Commission shall review the Preliminary Plan for conformance with the provisions of this Ordinance and shall render its decision and communicate the same to the applicant not later than 90 days following the date of the regularly scheduled Planning Commission meeting next following the date the application was deemed complete, provided that, should the next regular meeting occur more than 30 days following the filing of the completed application, the said 90-day period shall be measured from the 30 th day following the date the application was deemed complete. A plan will be deemed complete upon receipt by the Planning Commission of all required plans and supporting data, including plan review and processing fees. The applicant shall be notified in writing of the decision of the Planning Commission not later than 15 days following the decision. These provisions shall apply in accordance with the Pennsylvania Municipalities Planning Code, Section 508 as amended.

Stillwater Borough (continued-page 5) a. No Action. If no decision is rendered on an application at the regularly scheduled monthly meeting of the Planning Commission the Planning Commission, as a courtesy to the applicant, may issue to the applicant written comments outlining the known deficiencies of the submittal. Such communication shall not be considered all-inclusive. As per the Pennsylvania Municipalities Planning Code a ninety (90) day review period is allotted. All deficiencies discovered with the said ninety (90) day review period will be relevant to any action taken on the plan. b. Time Extension. In the event an applicant may require additional time to address and/or correct deficiencies concerning a submittal, and in order to allow the Planning Commission to defer its decision on the application beyond the original ninety (90) day review period, an applicant may grant a waiver of the said review period and request that a decision be delayed in order to enable the applicant to correct deficiencies in the plan submittal before a decision is made. The waiver shall be made in writing, signed by the applicant, and shall state the length of the time by which the original review period shall be extended as a result of the waiver. The signed waiver shall be presented to the Planning Commission prior to the expiration of the original review period. c. Preliminary Plan Conditional Approval. The Planning Commission may conditionally approve the Preliminary Plan in which case it shall specify all additional information and/ or changes that shall be required. Any conditional approval is contingent upon the applicant s written acceptance of the conditions specified by the Planning Commission. The applicant shall respond as to acceptance of all conditions within 15 days of the date of receipt of the Planning Commission s written correspondence specifying said conditions. If written acceptance is received within the 15-day period, the approval shall be deemed complete, contingent upon the acceptable completion of all required items, when applicable. If written refection is received within the 15-day period, or the applicant fails to respond within the 15-day period, the approval shall be nullified. Plans shall not be signed by the Planning Commission until receipt of the written acceptance from the applicant and until all applicable requirements of the approval have been adequately addressed. d. Preliminary Plan Disapproval. If the Preliminary Plan is disapproved, the Planning Commission shall specify the defects found and requirements that have not been met, citing in each case, the provisions of the Ordinance relied upon. e. Noted Action. The Planning Commission shall issue written notification of its action, in letter form, within 15 days of its action. If the Preliminary Plan is granted an approval, the Commission shall sign a minimum of six (6) copies of the Preliminary Plan. A minimum of two (2) copies shall be retained by the Planning Commission, three (3) shall be forwarded to the applicant or his agent, as appropriate, and one (1) shall be forwarded to the local municipal secretary. Submittal Requirements: Final Plan Applications for the Final Plan review and approval of a proposed subdivision or land development shall be submitted and processed in accordance with the following procedures.

Stillwater Borough (continued-page 6) 1. Application. Submit to the Columbia County Secretary: a. (8) eight copies of the Final Plat b. (2) two copies of all data required to be submitted with the said plat. Additional copies of the plat and supporting information may be required by the Planning Commission. Consideration of any application filed less than 21 days prior to a regularly scheduled meeting of the commission shall be deferred until the next regularly scheduled Commission meeting. c. Appropriate filing fee in the form of a check or money order made payable to the Township of South Centre for an amount established by a fee schedule adopted by resolution of the Board of Supervisors, which is available from the Township Administrator 2. Referrals. Upon request of the said application, The Planning Commission Staff shall refer one (1) copy of the Final Plat and any related documentation to the following officials and such others, as appropriate, for their review and report. Referrals shall be distributed to the appropriate officials within seven (7) working days of the date of submittal to the Planning Commission. a. Local municipal governing bodies will be allotted thirty (30) days for review and comment. If no written comments are received within the aforementioned thirty (30) day review and comment period the municipality forfeits its right to comment. However, at the discretion of the Planning Commission a time extension may be considered. b. Local Officials must acknowledge receipt of plans by returning the signed acknowledgement form, which shall provide by the Planning Commission (See Appendix A.) c. Planning Commission Engineer, at the discretion of the Planning Commission. Site inspections may also be requested. d. Pennsylvania Department of Transportation when the subdivision or land development will front on an existing or proposed State Route or will have a proposed street requiring access to such a route. e. Pennsylvania Department of Environmental Protection for any necessary report regarding sewer and water facilities. f. Columbia County Conservation District for review of required drainage or stormwater management facilities. g. Any additional agencies and/ or officials deemed necessary by the Planning Commission including but not limited to emergency management agencies and school districts.

Stillwater Borough (continued-page 7) Review Process: 1. Review and Action. The Planning Commission shall review the Final Plan for conformance with the provisions of this Ordinance and shall render its decision and communicate the same to the applicant not later than 90 days following the date of the regularly scheduled Planning Commission meeting next following the date the application was deemed complete, provided that, should the next regular meeting occur more than 30 days following the filing of the completed application, the said 90-day period shall be measured from the 30 th day following the date the application was deemed complete. A plan will be deemed complete upon receipt by the Planning Commission of all required plans and supporting data, including plan review and processing fees. The applicant shall be notified in writing of the decision of the Planning Commission not later than 15 days following the decision. These provisions shall apply in accordance with the Pennsylvania Municipalities Planning Code, Section 508 as amended. a. No Action. If no decision is rendered on an application at the regularly scheduled monthly meeting of the Planning Commission the Planning Commission, as a courtesy to the applicant, may issue to the applicant written comments outlining the known deficiencies of the submittal. Such communication shall not be considered all-inclusive. As per the Pennsylvania Municipalities Planning Code a ninety (90) day review period is allotted. All deficiencies discovered with the said ninety (90) day review period will be relevant to any action taken on the plan. b. Time Extension. In the event an applicant may require additional time to address and/or correct deficiencies concerning a submittal, and in order to allow the Planning Commission to defer its decision on the application beyond the original ninety (90) day review period, an applicant may grant a waiver of the said review period and request that a decision be delayed in order to enable the applicant to correct deficiencies in the plan submittal before a decision is made. The waiver shall be made in writing, signed by the applicant, and shall state the length of the time by which the original review period shall be extended as a result of the waiver. The signed waiver shall be presented to the Planning Commission prior to the expiration of the original review period. c. Final Plan Conditional Approval. The Planning Commission may conditionally approve the Final Plan in which case it shall specify all additional information and/or changes that shall be required. Any conditional approval is contingent upon the applicant s written acceptance of the conditions specified by the Planning Commission. The applicant shall respond as to acceptance of all conditions within 15 days of the date of receipt of the Planning Commission s written correspondence specifying said conditions. If written acceptance is received within the 15-day period, the approval shall be deemed complete, contingent upon the acceptable completion of all required items, when applicable. If written refection is received within the 15-day period, or the applicant fails to respond within the 15-day period, the

Stillwater Borough (continued-page 8) Zoning approval shall be nullified. Plans shall not be signed by the Planning Commission until receipt of the written acceptance from the applicant and until all applicable requirements of the approval have been adequately addressed. d. Noted Action. The Planning Commission shall issue written notification of its action, in letter form, within 15 days of its action. If the Final Plan is granted an approval, the Commission shall sign a minimum of six (6) copies of the Final Plan. A minimum of two (2) copies shall be retained by the Planning Commission, three (3) shall be forwarded to the applicant or his agent, as appropriate, and one (1) shall be forwarded to the local municipal secretary. e. Final Plan Disapproval. If the Final Plan is disapproved, the Planning Commission shall specify the defects found and describe the requirements, which have not been met and shall, in each case, cite the provisions of the Ordinance relied upon. For detailed requirements, applications and information consult the Stillwater Borough Zoning Ordinance and speak with the Zoning Officer. State and Federal Requirements Associated With Subdivision and Land Development State Contact Information Department of Environmental Protection (DEP) PA Dept of Environmental Protection NC Regional Office Office Hours 8 a.m. - 4 p.m. Phone: 570 327-3636 (24 hours) Department of Conservation and Natural Resources (DCNR) State Park Region 4 (East) Kevin Fazzini, Regional Park Manager Phone - 215-453-5000 Department of Community and Economic Development (DCED) Email: ra-dcedcs@pa.gov Phone: 866-GO-NEWPA (866-466-3972)

Stillwater Borough (continued-page 9) Pennsylvania Department of Transportation (PennDOT) PennDOT Engineering District 3-0 Jim Krise, Permit Manager Telephone: 570-368-4277 Department of Labor and Industry General information: 717-787-5279 Public Utility Commission (PUC) General Information: 800-692-7380 Farm Bureau General Information: 717-761-2740 State Approval and Permits 1. NPDES Permits for Discharge of Stormwater Associated with Construction Activities Columbia County Conservation District (570-784-1310) should be contacted at any time that you are going to be causing Earth Disturbance to check to see if a permit is required. 2. Water Obstruction and Encroachment Permits Columbia County Conservation District (570-784-1310) should be contacted if you are to be doing anything involving waters of the Commonwealth, Chapter 105 regulations define this as any watercourse, stream or bodies of waters and their floodway. 3. Sewage (Act 537) Approvals Any subdivisions or land developments should involve contacting the local municipal Sewage Enforcement Officer to determine if sewage planning is needed for what you are proposing. For general information a person could also contact DEP Sewage Office at 570-327-3668 4. Public Water Supply Permits When a involves the creation of a public water facility which is intended to distribute water to individuals a Public water supply permit is needed from DEP. Any questions can be referred to the DEP Northcentral Water Supply Offices at 570-327-3490.

Stillwater Borough (continued-page 10) 5. Pennsylvania Historic and Museum Commission (PHMC) Review The role of the Pennsylvania Bureau for Historic Preservation is to advise and assist state and federal agencies in complying with their responsibilities under various legislation, such as the National Historic Preservation Act and the PA History Code, that protect historic properties. To meet this goal, the Bureau has established the Environmental Review process, through which it reviews projects for their potential to affect historic properties. Any questions should be directed to Cheryl Nagle, (Central PA) 717.772.4519 State Approval and Permits (continued) 6. Pennsylvania Natural Diversity Inventory (PNDI) Review PNDI stands for Pennsylvania Natural Diversity Inventory which is the Environmental Review (ER) function of the Pennsylvania Natural Heritage Program (PNHP). It is set up to help identify impacts to threatened, endangered or rare plants, animals, natural communities, and geologic features throughout Pennsylvania. Any questions or to conduct a PNDI search please visit: http://www.naturalheritage.state.pa.us/homepage.aspx A PNDI search is needed for all subdivision and land developments. Additionally it is required in order to obtain several different types of permits from DEP including but not limited to a Sewage Permit. 7. Highway Occupancy Permits Any access, driveways or work to be done with in a State Right-of-Way requires a Highway Occupancy Permit to be obtained from The Pennsylvania Department of Transportation. Any and all questions regarding the need for a permit should be directed to the PennDOT Permit Manager Jim Krise at 570-368-4277 FEDERAL CONTACT INFORMATION U. S. Environmental Protection Agency (EPA) Call the Mid-Atlantic Region (800) 438-2474 (from within Region 3) (215) 814-5000 (from outside Region 3) Department of Agriculture (USDA) Bloomsburg Service Location (570) 784-1062 ext 2

Stillwater Borough (continued-page 11) Federal Aviation Administration (FAA) Harrisburg Region (717) 774-8271 Army Corps of Engineers General Questions 202-761-0011 Regulatory (Permits) 202-761-5903 U.S. Fish and Wildlife Service (USFWS) Northeast Region- Pennsylvania s Field Office 814.234.4090 FEDERAL APPROVAL AND PERMITS 1. Section 404 Clean Water Act Permits If the applicant needed a state Chapter 105 Permit from DEP (concerning Water Obstruction and Encroachment) and additional federal permit may be needed (Section 404 Permit). Section 404 Permits are issued by the U.S. Army Corps of Engineers. This permit is required for any discharge of dredged or fill material into navigable waters of the United States. Projects that impact less than 250 feet of a stream or less than one acre of wetlands may avoid Section 404 permit review by the Corps if they determine it qualifies for a joint permit review. This means that DEP will take the lead in reviewing the permit application. If the DEP feels the permit is acceptable they will issue a state Chapter 105 Permit and a federal Section 404 Permit known as the Pennsylvania State Programmatic General Permit. If the proposed project does not qualify for a joint permit then DEP and the Corps will do independent permit reviews and issue separate decisions. 2. National Environmental Policy Act (NEPA) Review The National Environmental Policy Act (NEPA) requires federal agencies to integrate environmental values into their decision making processes by considering the environmental impacts of their proposed actions and reasonable alternatives to those actions. To meet NEPA requirements federal agencies prepare a detailed statement known as an Environmental Impact Statement (EIS). EPA reviews and comments on EISs prepared by other federal agencies, maintain a national filing system for all EISs, and assure that its own actions comply with NEPA. 3. Endangered Species Act-The applicant should contact Fish and Wildlife Service if they get a hit on the PNDI (Pennsylvania Natural Diversity Inventory) for a federally listed threatened or endangered species.

Stillwater Borough (continued-page 12) 4. Federal Aviation Administration- Applicant should contact FAA if: any construction or alteration exceeding 200 ft above ground level any construction or alteration: o within 20,000 ft of a public use or military airport which exceeds a 100:1 surface from any point on the runway of each airport with its longest runway more than 3,200 ft o within 10,000 ft of a public use or military airport which exceeds a 50:1 surface from any point on the runway of each airport with its longest runway no more than 3,200 ft o within 5,000 ft of a public use heliport which exceeds a 25:1 surface any highway, railroad or other traverse way whose prescribed adjusted height would exceed the above noted standards when requested by the FAA any construction or alteration located on a public use airport or heliport regardless of height or location. Disclaimer: This guide is meant to be a general guideline for development in the Borough of Berwick. It should NOT be considered all-inclusive. For specific details and requirements concerning land development and subdivision contact the Berwick Borough Codes Enforcement Office. Prepared by the Columbia County Planning Office staff. Information contained within is relevant as of July, 2014.