SEVENTEENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004.

Similar documents
West Bengal State Electricity Distribution Company Limited

Annexure 2 (See Clause 4.11) Application for Supply of Electricity at High Tension (to be submitted in 5 sets)

MPERC (Procedure of Application for License) REGULATIONS, 2004.

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT)

SEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004

4. PROCEDURE FOR RELEASE OF NEW CONNECTION AND MODIFICATION IN EXISTING CONNECTION

Maharashtra Electricity Regulatory Commission (Procedure for filing appeal before the Appellate Authority) Regulations, 2004

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED

1. Regn. No. & date. 2. Existing Account No. (If any) To The Punjab State Power Corporation Limited,

HPSEBL Form CS-1 (b) HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A STATE GOVERNMENT UNDERTAKING)

Application for IEX Membership

AGREEMENT FOR SUPPLY OF HT ENERGY

Bhopal dated 6th August, 2004

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA NOTIFICATION Shimla, the 21 st September, 2015

Application Form for New Connection

Application for REC Membership

Application Form for New Connection

3. Full name of Applicant's father / husband 4. Status code of applicant (See serial no. 11 of the instructions) 5. Applicant's present address

PROCEDURE FOR REGISTRATION OF RENEWABLE ENERGY GENERATION PROJECT BY CENTRAL AGENCY

Gujarat Electricity Regulatory Commission (GERC) Electricity Supply Code and Related Matters Regulations. Notification No.

INDEX. Sr. No. Particulars Page No.

The Orissa Electricity (Duty) Act, 1961.

AGREEMENT FOR SUPPLY OF LT ENERGY

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION

NOTIFICATION. The 8th May, [Electricity Supply Code and Related Matters Regulations, 2004 (First Amendment) 2007]

HARYANA ELECTRICITY REGULATORY COMMISSION. Notification. The 10th August, Electricity Supply Code. (1) recovery of electricity charges,

The Chairman, Himachal Pradesh Micro & Small Enterprises Facilitation Council-cum-Director of Industries, H.P.

P.U.(A) 247/2001 GEOGRAPHICAL INDICATIONS REGULATIONS 2001

THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7,

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

The Himachal Pradesh Electricity Supply Code, 2009 CHAPTER - 1 GENERAL

ELECTRICITY SUPPLY CODE REGULATION 2011 (WITH 1 st & 2 nd AMENDMENT)

NOTIFICATION Shimla -2, the 21st January, 2006

Agreement for H.V./ L.V. Consumer.

THANE MUNICIPAL CORPORATION, THANE. RAJIV GANDHI MEDICAL COLLEGE & CHHATRAPATI SHIVAJI MAHARAJ HOSPITAL, KALWA. E-TENDERING

Supply shall generally be given at the following voltages on the basis of contracted load:

Issuing Authority. The supply of material shall be governed by Form-B of UPPCL alongwith following special conditions:-

Odisha Real Estate Regulatory Authority Regulations, 2017

MPERC (Establishment of Forum and Electricity Ombudsman for redressal of grievances of the consumers) (Revision-I) Regulations, 2009

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION

Gujarat Electricity Regulatory Commission (GERC)

NOTICE. MPERC (Establishment of Forum and Electricity Ombudsman for redressal of grievances of the consumers) Regulations, 2004

Jammu and Kashmir State Electricity Regulatory Commission

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 20 PAUSH 1929(S) (NO. PATNA 27) PATNA, FRIDAY, 10TH JANUARY 2008

No.MePDCL/D(D)/T-383(B)/ /6 Dated 6 th December 2016 OFFICE ORDER

THE ENERGY ACT, (No. 12 of 2006)

P.U. (A) 47/2011 TRADE MARKS (AMENDMENT) REGULATIONS 2011

CHAPTER I. (1) In these rules, unless the context otherwise requires,- Act means the Gujarat Town Planning and Urban Development Act, 1976;

[TO BE PUBLISHED IN GAZETTE OF INDIA, EXTRAORDINARY, PART II, SECTION 3, SUB-SECTION (i)]

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION

UTTAR PRADESH ELECTRICITY SUPPLY CODE (DISTRIBUTION CODE)

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX

ANDHRA PRADESH ELECTRICAL LICENSING REGULATIONS, (As amended up to ) NOTIFICATION

CHECK LIST DULY FILLED IN TO BE ATTACHED WITH THE TENDER. 1 Whether Earnest Money is enclosed. Yes/No

Dr. Harisingh Gour Vishwavidyalaya, SAGAR.(M.P.)

ORISSA ELECTRICITY REGULATORY COMMISSION DISTRIBUTION (CONDITIONS OF SUPPLY) CODE, 2004

TENDER FORM Controller of Stores, HIMACHAL PRADESH (INSTRUCTION TO TENDERERS)

Hiring of Courier Agency for delivery of Provisional Degree Certificate and Transcripts to Students

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION

TAMIL NADU ELECTRICITY REGULATORY COMMISSION

BOARD OF ENGINEERS MALAYSIA CIRCULAR NO. 1/2006. GUIDELINES for AN ENGINEER TAKING OVER THE WORK OF ANOTHER

Issuing Authority. The supply of material shall be governed by Form-B of UPPCL alongwith following special conditions:-

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004

REMOTE SENSING APPLICATIONS CENTRE, U.P.

TRADEMARKS ACT R.S.A. c. T30

Business Park Maintenance Service Pvt. Ltd.

GOVT OF ASSAM OFFICE OF THE JOINT DIRECTOR OF HEALTH SERVICES cum MEMBER SECRETARY, DISTRICT HEALTH SOCIETY, KAMRUP AMINGAON, GUWAHATI-31

OCCUPATIONAL HEALTH AND SAFETY ACT, 1993 ELECTRICAL INSTALLATION REGULATIONS SCHEDULE

NOTICE INVITING TENDER

Notification PART I CHAPTER I PRELIMINARY

Supply and Installation of A3 Size Scanner

OFFICE OF THE CHIEF ELECTORAL OFFICER, HARYANA 30-BAYS BUILDING (3 rd FLOOR), SECTOR 17-B, CHANDIGARH TENDER DOCUMENT. For

ASSAM ELECTRICITY REGULATORY COMMISSION

Societies With Restricted Liability SOCIETIES WITH RESTRICTED LIABILITY REGULATIONS, 1995

CHAPTER 1: GENERAL. 1.1 Short Title, Extent and Commencement

TENDER DOCUMENT FOR RECEPTIONIST REGIONAL MUSEUM OF NATURAL HISTORY,BHOPAL

TENDER DOCUMENT FOR APPOINTMENT OF SUB-LICENSEE TO SET UP & OPERATE MILK STALLS AT RAILWAY STATIONS IN THE STATE OF ODISHA


BANK OF BARODA. Regional Office 129-D, Civil Lines Bareilly

(i) stainless steel pattis or pattas Thirty thousand rupees

UPDATED AS ON DECEMBER 4, Guidelines for Remisier Registration

BHARAT HEAVY ELECTRICALS LIMITED,

Draft JSERC (Procedure, Terms & conditions for the Grant of Transmission licensee and other related matters) Regulations, 2018

No.KFL/381/98/OT-178 October 19, 2018 TENDER FOR SUPPLY OF CALENDARS

TENDER FORM. List of available documents for the premises at Rupayan R-10, 2nd floor, Nehru Enclave, Gomati Nagar, Lucknow, comprising of 3 BHK.

Guidance Document (Medical Devices and Diagnostic Division)

HOSTEL SECTION RE-TENDER PAPER. Hostel No. / 302 / TENDER. :08/01/2018 up to 5:00 p.m.

DEPARTMENT OF CHIEF ELECTRICAL INSPECTOR, HARYANA. Application Forms

WEST BENGAL ELECTRICITY REGULATORY COMMISSION NOTIFICATION. NO. 46/WBERC Kolkata, the 31st May, 2010.

CEYLON ELECTRICITY BOARD EASTERN PROVINCE

Uttar Pradesh Electricity Regulatory Commission

TAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)

F.No.III-129/2017-NZP/ Government of India National Zoological Park Mathura Road, New Delhi - 3

Lunawat & Co. Chartered Accountants Website:

SPEED-e Application Form

NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT (ISSUE AND MANAGEMENT OF BONDS) REGULATIONS, 1987

CONTENTS. Industrial Employment (Standing Orders) Act, Preamble

CHAPTER III PROCEDURES FOR REGISTRATION REFUSAL AND INVALIDATION OF MARK

Transcription:

Notified on 25/06/2010 Bhopal, 14 th June, 2010 No. 1548 /MPERC/2010. In exercise of powers conferred by Section 181(1) and 181 (2) (x) read with Section 50 of the Electricity Act, 2003 and for removal of difficulties of various stakeholders, Madhya Pradesh Electricity Regulatory Commission hereby makes the following amendment in Madhya Pradesh Electricity Supply Code,2004 which was originally issued vide notification No. 861 dated 27.03.2004 and published on 16.04.2004. SEVENTEENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004. 1. Short Title and Commencement : (i) This Code may be called the "Madhya Pradesh Electricity Supply Code, 2004 (Seventeenth Amendment) [No. AG-I(xvii) of 2010]." (ii) (iii) This Code shall come into force with effect from the date of its publications in the Official Gazette. This Code shall extend to whole of the State of Madhya Pradesh. 2. Amendment in Chapter 3 of the Code : In the Madhya Pradesh Electricity Supply Code,2004 hereinafter called the Principal Code, in the Clause 3.4 of Chapter 3, the following shall be substituted, namely : 3.4 The supply voltage for different contract demands shall normally be as follows: Supply Voltage Minimum contract demand Maximum contract demand 230 volts -- 3 KW 400 volts Above 2 KW 75 KW (connected load may be up to and including 150 HP) 11 KV 50 KVA 300 KVA 33 KV 100 KVA 10000 KVA 132 KV 5000 KVA 50000 KVA 220 KV 40000 KVA ---

Provided that on account of technical reasons, the deviation in respect of above minimum/ maximum contract demand, may be permitted after obtaining specific approval of the Commission. However, in case of Railways, the maximum and minimum limits of contract demand on various voltage levels indicated in the above table may be relaxed by the Licensee on mutual agreement depending on the actual requirement and feasibility.\ 3. Amendment in Chapter 7 of the Code : In the Principal Code, clauses 7.9, 7.10, 7.11, 7.12 and 7.14 of Chapter 7, the following shall be substituted as follows, namely : "7.9 If the consumer so desires, one time reduction in the contract demand shall be allowed within the period of first six months from the date of commencement of agreement or three months from the date of notification of this amendment, whichever is later. The reduction in contract demand shall be limited to 50% of the contract demand (existing at the time of making the application) provided the reduced contract demand shall not be less than the minimum contract demand for a particular voltage class as specified in Chapter 3 of this Code. Supply Affording Charges and other applicable charges once paid shall not be refunded. 7.10 Application for reduction in Contract Demand shall be submitted in duplicate to the Licensee in the form prescribed for change in contract demand. A Test report from a competent Licensed Electrical Contractor shall be submitted by the consumer along with the application where alteration of installation is involved. 7.11 On receipt of application for reduction in contract demand, the Licensee shall take the following steps: (a) The licensee shall consider the grounds stated in the application and allow the application or convey the reasons for non-consideration in writing within a period of 15 days. (b) If the application is not decided by the Licensee within above-mentioned period of 15 days, the consumer may, by a written notice to the Licensee, draw its attention to the matter and if no decision is still communicated to him within the period of further

15 days, the permission of reduction of contract demand shall be deemed to have been granted. (c) The reduction in contract demand shall take effect from the first day of the month following the month in which the decision for reduction in contract demand is communicated or deemed permission is granted. 7.12 After the expiry of the initial period of agreement, the consumer will be further entitled to reduce contract demand of his connection limited to the minimum contract demand for a particular voltage class as specified in Chapter 3 of this Code and such request when made to Licensee shall come into effect from the date of completion of formalities such as execution of agreement etc. which shall be completed within a period of 30 days from the date of receipt of the application for reduction in contract demand. Any subsequent request for reduction in contract demand can also be made to the Licensee after expiry of at least one year from the date of last reduction in contract demand. The request for reduction in contract demand shall not be refused by the Licensee on the ground of dues payable to the Licensee against that connection. 7.14 When reduction of contract demand is agreed to or deemed permission is granted, a supplementary agreement shall be executed. 3. Amendment in Chapter 4 of the Code : In the Clause 4.13 of the Chapter 4 of the Principal Code, the following sentence shall be deleted, namely : "The format of the application forms is provided in Annx 1 and 2." 4. Amendment in Annexure to the Code : In the Principal Code, the Annex 1 and Annex 2 shall be substituted by as per Annexure-1 enclosed. By order of the Commission Commission Secretary

ANNEXURE -1 APPLICATION FORM HIGH TENSION/LOW TENSION SERVICE CONNECTION New Connection/Shifting of Premises/Change in Contract Demand/Change of Tariff Category/Change of Name of Consumer (Please strike-off the purpose that is not applicable) To, ---------------------------------------------- ---------------------------------------------- Affix Pass Port ---------------------------------------------- Size Photo Sir, I/We request you to supply electricity to my/our premises. The requisite information is furnished below :- 1. Consumer (a) Name of the person/organization : (b) Name of father/husband/director/ : Partner/Trustee (c) Full Address of the premises (with PIN) Where a new connection is hereby applied for/ the existing connection is proposed to

be shifted Telephone No. : Registered Office (alongwith Postal address) Residence (Postal address) E-mail : : : Bank A/C No. and name of Bank : (optional) Existing sanctioned load/contract Demand if any, :. (HT/LT) Service connection no. (For existing connection) : LT Supply : 2. Built-up area of the premises/plot area : 3. Category of supply :. (Category as provided in the list attached) 4. Purpose of supply :. (Sub-category as provided in the list attached) 5. Type of Supply : Permanent/Temporary

(Please strike-off type not applicable and tick the type applicable) If temporary specify period From :.. To :. 6. Proposed Load (a) For domestic connection : Watts Please fill-up and attach format for determination of connected load. (b) For other categories please fill up the following (Attach duly signed separate list if required) Item Load per item (Watts) No. Total Load (Watts) HT Supply 7. Voltage at which supply is required (KV) : 11 KV 33 KV 132 KV 220 KV 8. Type of supply : Temporary/Permanent (Please strike-off category not applicable and tick the category applicable) If temporary, specify period From : --------------------------- To :..

9. Steps taken by the consumer so far to set-up the installation (a) (b) (c) (d) 10. Basis of projection of Contract Demand required (a) Diversity factor assumed :.. (b) Total Connected Load :.. Attach List of Machines 11. Whether connection is required in phases :.. 12. Phasing of contract demand (CD) :.. SI.No. CD required (KVA) Tentative Date From which required Remarks 13. Purpose of installation :... 14. Category of tariff opted for :.. (as per tariff order)

15. Production of Industry? OR :.. Probable data of production 16. Category of Industry : SSI/MSI/LSI (Please strike-off category not applicable and tick the category applicable) 17. Status of land acquisition :. (Please provide proof of ownership and statutory clearances) 18. Expected date by which finance would be available : 19. Whether the requisite consent/noc (where applicable according to the list of Pollution Control Board) has been obtained from M.P. State Prevention and Control of Water Pollution Boards, Bhopal as per statutory requirements (If yes, a copy should be furnished) :. FOR ALL CONSUMERS 20. Any electricity dues outstanding in the licensee's area of operation in the consumer's name Yes/No 21. Any electricity dues outstanding for the premises for which connection applied for : Yes/No 22. Any electricity dues outstanding with the licensee against any firm with which the consumer is associated as an Owner, Partner, Director or Managing Director Yes/No (For serial nos. 20, 21 & 22 if answer is 'Yes' in any case please provide details) 23. I/We hereby declare that (a) The information provided in the form above is true to my knowledge.

(b) I/We have read the Madhya Pradesh Electricity Supply Code and agree to abide by the condition mentioned therein. (c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges. (d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter. Signature of the Consumer/Authorized Signatory Date :... Place :.. Note : The following documents shall be attached with the application form :- 1. Proof of ownership of the premises. 2. A map indicating therein in the proposed location of the plant/office and the point where supply is required. The map should normally be of the scale of 1 cm representing 1200 cm for HT connections. 3. Licensee/NOC from statutory authority, if required or a declaration by the applicant is that his connection does not fall under the requirement of NOC under any statute. 4. In case of a proprietary firm, an affidavit to be submitted stating that the applicant is the sole proprietor of the firm. 5. In case of partnership firm, a certified copy of partnership deed. 6. In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation. 7. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Licensee immediately. 8. Letter of intent for production/enhancement in production for industrial connection. 9. List of equipment proposed to be installed along with the expected load.

10. Resolution for authorization in respect of where connection required in name of firm, limited/pvt Ltd firm, company etc. 11. Registration from Industries Department wherever applicable. 12. Extract of project report relevant to power and process requirement (in case of industries). 13. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with agreement after completion of formalities.