April 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Similar documents
Section GT&C, Awarding of Available and Planned Pipeline Capacity, Bid Procedures ( Section ). 2

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

July 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

July 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

May 23, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

main. July 6, 2017

February 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Mailing Address: P.O. Box 1642 Houston, TX

April 10, Via etariff. Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

MIDCONTINENT EXPRESS PIPELINE LLC

March 31, Columbia Gulf Transmission, LLC. 700 Louisiana Street, Suite 700 Houston, TX

March 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Order No. 587-Y Compliance Filing, Colorado Interstate Gas Company, L.L.C.; Docket No. RP19-

March 22, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

June 2, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

December 18, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Kimberly D. Bose, Secretary

April 16, Docket No. ER

Transco submits the amendments for inclusion in Original Volume No. 1A of Transco s FERC Gas Tariff.

Tennessee Gas Pipeline Company, L.L.C. Orion Project Negotiated Rate and Non-Conforming Agreement Filing Docket Nos. RP and CP

A. Zonal Agreements and Termination of the GFA

June 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Magalie R.

December 1, Columbia Gas Transmission, LLC. 700 Louisiana Street, Suite 700 Houston, TX

February 12, Notice of Certificate of Concurrence Regarding Agua Caliente Solar LGIA

NorthWestern Energy requests an effective date of March 12, 2016, for the proposed revisions.

December 13, 2004 VIA ELECTRONIC FILING

PJM Interconnection, L.L.C. and Progress Energy Carolinas, Inc. Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

March 28, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Philis J. Posey, Acting Secretary

October 1, PJM Interconnection, L.L.C., Docket No. ER Default Allocation Assessment Clarifying Revisions

November 10,2004. The Honorable Magalie R. Salas Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

California lndependent System Operator Corporation Docket No. ER Compliance Filing

November 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426

February 20, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Magalie R. Salas, Secretary

April 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

December 19, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

February 26, , NEGOTIATED RATE AGREEMENTS TABLE OF CONTENTS, Version , SourceGas Arkansas, Inc (RS FT), Version 1.0.

November 30, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

An etariff XML filing package, filed as a zip (compressed) file, containing:

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

December 18, Filing of PSP Agreement with Placer County Water Agency

August 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

December 28, Via Electronic Filing

May 21, 2010 VIA ELECTRONIC MAIL. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Arizona Public Service Company, Docket No. ER , Agency Agreement

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

February 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

November 21, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

The Atlantic Building 950 F Street, N. W. Washington, DC Fax: Direct Dial:

The North American Electric Reliability Corporation ( NERC ) hereby submits the

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

MIDCONTINENT EXPRESS PIPELINE LLC

November 12, 2004 VIA ELECTRONIC FILING

July 13, FTS Service Agreement No Between Columbia Gas Transmission, LLC and EQT Energy, LLC Dated July 13, 2016

166 FERC 61,098 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC February 8, In Reply Refer To:

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

January 4, Filing of Service Agreement No Docket No. ER

SCHIFF HARDIN LLP. January 24, 2011 VIA ELECTRONIC FILING

March 27, Tariff Amendment to Modify Administrative Oversight of the Department of Market Monitoring

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

October 10, FERC Electric Tariff No. 7, Transmission Control Agreement

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. United Water Conservation District Project No.

September 2, FTS Service Agreement No Between Columbia Gas Transmission, LLC and Cabot Oil & Gas Corporation Dated January 2, 2015

RAILROAD COMMISSION OF TEXAS GAS SERVICES DIVISION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

1. TRCP 194 created a new discovery tool entitled Requests for Disclosure.

February 12, Southwest Power Pool, Inc., Docket No. ER15- Submission of Interconnection Agreement

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Jnofflclal FERC-Generated PDF of Received by FERC OSEC 07/08/2005 in Docket#: ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Governors of the States of Arizona, California, Colorado, Montana, Nevada, New Mexico, Oregon, Utah, Washington and Wyoming, Docket No.

SCHIFF HARDIN LLP A Limited Liability Partnership Including Professional Corporations

November 7, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

OPERATIONAL BALANCING AGREEMENT FORM OF SERVICE AGREEMENT CONTRACT NO.

May 22, Docket No. ER Amendment to Transmission Interconnection Agreement

IS0 CALIFORNIA. February 2,2004

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Vineyard Wind LLC ) Docket No. ER

November 9, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

The executive director has declared the above referenced application received on September 9, 2009, administratively complete on?.

Case 3:17-mc G Document 1 Filed 03/06/17 Page 1 of 5 PageID 1 UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF TEXAS DALLAS DIVISION

July 28, Please do not hesitate to call if you have any questions in regard to the enclosed. Very truly yours, /s/ James William Litsey

PSEG Energy Resources & Trade LLC

July 5, PJM Interconnection, L.L.C., Docket No. ER17- Amendment to Service Agreement No. 4597; Queue No. AB2-048

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Northern Natural Gas Company ) Docket No. RP

No. IN THE UNITED STATES COURT OF APPEALS FOR THE FOURTH CIRCUIT

March 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

BISON PIPELINE LLC OPERATIONAL BALANCING AGREEMENT (For Use at Point(s) of Interconnection)

March 24, Filing of CAISO Rate Schedule No. 89

No. IN THE UNITED STATES COURT OF APPEALS FOR THE FOURTH CIRCUIT

June 9, Tariff Amendment to Modify Definition of Pre-RA Import Commitment

August 31, Generator Scheduling Agreement CAISO Service Agreement No Docket No. ER

Billing Code P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. [Docket No. IC ]

TEL (503) FAX (503) Suite SW Taylor Portland, OR April 24, 2008

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C

R.P ADM-9-03 OT:RR:RD:TC H RES DEPARTMENT OF HOMELAND SECURITY BUREAU OF CUSTOMS AND BORDER PROTECTION 19 CFR PART 101

Auto accident Motion for Summary Judgment complete package

Transcription:

April 20, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: System Map Filing Docket No. RP12- - 717 Texas Street, Suite 2400 Houston, TX 77002-2761 John A. Roscher Director, Rates & Tariffs tel 832.320.5675 fax 832.320.6675 email John_Roscher@TransCanada.com web www.northernborder.com Dear Ms. Bose: ( Northern Border ), pursuant to Section 4 of the Natural Gas Act and Part 154 of the Federal Energy Regulatory Commission s ( FERC or Commission ) regulations, 1 submits for filing revised Section 3 to be part of its FERC Gas Tariff, Second Revised Volume No. 1 ( Tariff ). 2 The purpose of this filing is to update Northern Border s system map in compliance with the annual filing requirements in Section 154.106 of the Commission s regulations. Northern Border respectfully requests that the Commission accept Section 3 to become effective May 21, 2012. The names, titles, mailing addresses, and telephone numbers of those persons to whom correspondence and communications concerning this filing should be addressed are as follows: * John A. Roscher Director, Rates and Tariffs Joan F. Collins Manager, Tariffs and Compliance 717 Texas Street, Suite 2400 Houston, Texas 77002-2761 Tel. (832) 320-5651 Fax (832) 320-6651 E-mail: joan_collins@transcanada.com * Eva N. Neufeld Associate General Counsel 717 Texas Street, Suite 2400 Houston, Texas 77002-2761 Tel. (832) 320-5623 E-mail: eva_neufeld@transcanada.com * Persons designated for official service pursuant to Rule 2010. 1 18 C.F.R. Part 154 (2012). 2 Part 3 MAPS ( Section 3 ).

Statement of the Nature, Reasons and Basis for Filing Section 154.106 of the Commission s regulations requires that pipeline tariffs include a map showing the general geographic location of principal pipeline facilities and points where service is rendered. Furthermore, the regulations require that pipelines revise existing maps to reflect major system changes. Accordingly, Northern Border is submitting the instant filing to update its system map to reflect such changes for the calendar year ending December 2011. Effective Date Northern Border requests that the revised Section 3 filed herein be made effective May 21, 2012. Other Filings Which May Affect This Proceeding There are no other filings before the Commission that may significantly affect the changes proposed herein. Materials Enclosed In accordance with Section 154.7(a)(1) of the Commission s Regulations, Northern Border is submitting an etariff XML filing package, which includes: 1. This transmittal letter; 2. The clean tariff section (Appendix A); and 3. A marked version of the tariff section (Appendix B). Certificate of Service As required by Section 154.7(b) and 154.208 of the Commission s regulations, copies of the filing are being served on all of Northern Border s existing customers and upon any interested state regulatory agencies. A copy of this letter, together with other attachments, is available during regular business hours for public inspection at Northern Border s principal place of business. Pursuant to Section 385.2005 and Section 385.2011(c)(5), the undersigned has read this filing and knows its contents, and the contents are true as stated, to the best of his knowledge and belief. The undersigned possesses full power and authority to sign such filing. 2

Any questions regarding this filing may be directed to Joan Collins at (832) 320-5651. Respectfully submitted, NORTHERN BORDER PIPELINE COMPANY BY: TRANSCANADA NORTHERN BORDER INC., ITS OPERATOR John A. Roscher Director, Rates & Tariffs Enclosures 3

Appendix A Clean Tariff Section Description Version 3 MAPS v.2.0.0

PART 3 FERC Gas Tariff MAPS Second Revised Volume No. 1 v.2.0.0 Superseding v.1.0.0 System Map Issued: April 20, 2012 Effective: May 21, 2012 Docket No. Accepted:

Appendix B Marked Tariff Section Description Version 3 MAPS v.2.0.0

PART 3 FERC Gas Tariff MAPS Second Revised Volume No. 1 v.2.0.0 Superseding v.1.0.0 System Map Issued: April 20, 2012 Effective: May 21, 2012 Docket No. Accepted: