ICC Industry Advisory Committee DRAFT MEETING MINUTES. August 9, Underwriters Laboratory

Similar documents
SSPC 90.2 Committee Hilton Hotel Salt Lake City Salt Lake City, UT June 2008

ICC CONSENSUS PROCEDURES

NFPA TECHNICAL COMMITTEE FOR Powered Rescue Tools

MEETING OF THE ICC INDUSTRY ADVISORY COMMITTEE

ICC Code Development Process July/2018

Ph: Fax: East Philadelphia Street Ontario, California USA To:

Fire Service Voting Guide

FACILITATOR S SUMMARY REPORT OF THE MAY 12, 2017 TELECONFERENCE MEETING

International Code Council: The Update Process for the International Codes and Standards

DLI Staff & Visitors. Jeff Lebowski (Gen. Counsel, DLI)

SDI PROCEDURES FOR ANSI-APPROVED STANDARDS FOR STEEL DECK

Minutes STRUCTURAL TAC PRESENT: STRUCTURAL TAC NOT PRESENT: STAFF PRESENT: MEETING FACILITATION:

APPLICATION FOR ICC Codes & Standards

Approved Revisions to UL s Accredited Procedures Effective November 1, 2009

6) IMC 7) ADMIN 8) IRC-B 9) 10) Complete the

ICC-ES APPLICATION FOR BUILDING PRODUCT LISTING REPORT FORM A

SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018

NOTICE OF SPECIAL MEETING OF THE BARTLESVILLE EDUCATION AUTHORITY

MINUTES ICC BOARD OF DIRECTORS SEPTEMBER 5, 2003 NASHVILLE, TN

TENTATIVE MEETING MINUTES MEETING 5

Standards Development Policies and Procedures. 1.0 Standards Development

Meeting Minutes: Plumbing Board

FLORIDA BUILDING CODE

Policies and Procedures for Standards Development for the IEEE Communication Society/Green ICT Standards Committee (COM/GreenICT-SC)

FLORIDA BUILDING COMMISSION

RLGA. How Can You Change a Building Code? By Ronald L. Geren, AIA, CSI, CCS, CCCA, SCIP

American National Standard For Electrical Rigid Aluminum Conduit (ERAC)

INTERNATIONAL CODE COUNCIL, INC. JULY 20, 2016 BOARD OF DIRECTORS MEETING MINUTES CASPER, WYOMING JULY 20, :30 AM MST MEETING AGENDA

UNIFORM CONSTRUCTION CODE ADVISORY BOARD Minutes of Meeting, February 12, 2016 Location 101 South Broad Street Trenton, New Jersey 08625

Minutes of the North Carolina Building Code Council December 12, 2011 Raleigh, NC

SJI Procedures for the Development, Approval, and Maintenance of SJI American National Standards

Policies and Procedures for Standards Development for the Industrial Electronics Society (IES) Standards Committee. Date of Submittal: August

ASABE/ICC Landscape Irrigation Sprinkler and Emitter Standard

ICC ICC/NSSA Standard for the Design and Construction of Storm Shelters

MINUTES OF THE MEETING NFPA CORRELATING COMMITTEE ON FIRE AND EMERGENCY SERVICES PROTECTIVE CLOTHING AND EQUIPMENT

APPLICATION FOR ICC Codes & Standards

A quorum was established at 1 PM EDT. 2. Review of agenda (Stanke) No modifications were made to the agenda.

Alternate Members Bradford Cronin Daniel Finnegan Coy Kevin Hill David LeBlanc Thomas Norton

MINUTES OF THE WATER AND SEWER DISTRIBUTORS OF AMERICA BOARD OF DIRECTORS' MEETING Sunday, March 28, 2004

Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards

ASME Codes and Standards. Development Committee Procedures. With Supplemental Requirements For Committees. Under the Jurisdiction of the

Procedures for ASME Codes and Standards Development Committees

Kansas Section ASAE Minutes Annual Meeting Minutes, Kansas Section of American Society of Agricultural Engineers

Policies and Procedures for Standards Development for the IEEE Cloud Computing Standards Committee. Date of Submittal: 08 July 2016

NBIMS-US PROJECT COMMITTEE RULES OF GOVERNANCE

Minutes (tentative as of ) GBI Consensus Body Meeting #38 BSR/GBI X Webinar

APPLICATION FOR ICC Codes Committees

IEEE PES STATIONARY BATTERY COMMITTEE

Regulations Governing Consensus Development of the Uniform Solar, Hydronics & Geothermal and Swimming Pool, Spa & Hot Tub Codes

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC Tullie Circle, N.E./Atlanta, GA

ASME Codes and Standards. Development Committee Procedures. With Supplemental Requirements For Committees. Under the Jurisdiction of the

MONROE COUNTY FIRE MARSHALS AND INSPECTORS ASSOCIATION 2018 MEETING MINUTES April 18, 2018

ICC 901/ SRCC Solar Thermal Collector Standard

MONTHLY ACTIVITY REPORT

Board Meeting 05/29/2002, Wednesday San Diego, CA. Regency Room, Horton Grand. Meeting called to order by President Roger Ohman, Jr.

Underwriters Labarotories. Code UL 1703 UL 1741 UL 2703 E IGC

June Regulations Governing Consensus Development of the Water Efficiency and Sanitation Standard

APPROVED MINUTES ASC C63 SC1: Techniques and Development April 22, 2009 IEEE Headquarters, Piscataway, New Jersey

ANSI Essential Requirements: Due process requirements for American National Standards

ASSE INTERNATIONAL BOARD OF DIRECTORS PROPOSED BYLAWS CHANGES

Plumbing Board Meeting Minutes July 19, 2016 at 9:30 a.m.

TITLE 12 BUILDING, UTILITY, ETC. CODES 1

American Water Works Association (AWWA) Standards Program Operating Procedures

MEMORANDUM. Subject: NFPA 101 Proposed Tentative Interim Amendment (TIA) No.1114

TIA Procedures for American National Standards (PANS)

Gateway to the Lakes "

MEETING NOTICE PUBLIC WORKS STANDARDS, INC. GREENBOOK COMMITTEE January 20, 2011 Meeting Notice

ASHRAE TC 9.2 Industrial Air Conditioning Annual Meeting Agenda - Houston, TX Hilton Americas, Room Grand E Tuesday 6/26/18 1:00 3:30 P.M.

CITY OF PINE ISLAND 250 SOUTH MAIN STREET PINE ISLAND, MN 55963

SME SPOKANE CHAPTER 248 P.O. Box Spokane, WA JANUARY PROGRAM TOUR OF

Chapter 2 POLICIES. 201 Scope

TECHNOLOGY COUNCIL MEETING Summer Conference, Atlanta, GA Wednesday, July 1, 2015

Revision to Emerald Book IEEE Std May 6, IEEE P1100 Working Group Minutes Page - 1

IEEE Surge Protective Devices Main Committee (3.0) Meeting Minutes Fall Meeting, OMNI at the CNN Center, Atlanta October 12, 2007

Pipeline Transportation Systems for Liquids and Slurries

American National Standard for Electric Connectors Sealed Insulated Underground Connector Systems Rated 600 Volts

Schiff, Hardin LLP William M. Hannay Present Present

THE GREEN BUILDING INITIATIVE (GBI) PROCEDURES FOR THE DEVELOPMENT AND MAINTENANCE OF GREEN BUILDING STANDARDS. Document Code: GBI- PRO B

INTERNATIONAL CODE COUNCIL

Project Committee Rules of Governance

Draft - Regular Meeting of the Five Lakes Association Board of Directors October 11, 2010

ICC CONSENSUS PROCEDURES

1:00 p.m. 5:30 p.m. (EDT) Allison Cruz-Mitchell, Deputy Dir. Programs. Chip Koval Gayle Miller

AMERICAN IRON AND STEEL INSTITUTE PROCEDURES FOR ANSI-APPROVED STANDARDS FOR COLD-FORMED STEEL DESIGN AND CONSTRUCTION

1. Call to Order Prasad Kadambi called the meeting to order and introductions were made.

CITY OF AURORA ARCHITECTURAL BOARD OF REVIEW MEETING MINUTES August 8, 2013

COUNCIL ON HOUSING Public Session Huling Cove Community Building Lewes, Delaware October 14, 2009

Revision to Emerald Book IEEE Std October 7, IEEE P1100 Working Group Minutes Page - 1

MEMBERS ABSENT. Alois Malik Y 2012 Keith Coursin N Ken Jurgensmeyer Y 2013 Bryan Dunnavant N Harry Milliken Y 2012 Florin Gavrilut N 2009

ATA REGULAR BOARD MEETING AGENDA

SOUTHEASTERN COLORADO WATER CONSERVANCY DISTRICT MINUTES

Mechanical Proposed Code Modifications 2013 Florida Building Code - Full Report This document created by the Florida Department of Business and

CITY OF SNOHOMISH Snohomish, Washington ORDINANCE 1858

Roll call was completed by self introductions.

ARIZONA POWER AUTHORITY REGULAR MEETING HELD ON JANUARY 15, 2013

Policies and Procedures for Standards Development for the Smart Buildings, Loads and Customer Systems Technical Committee

2015 UPC & UMC TECHNICAL COMMITTEE MEETING WELCOME TECHNICAL COMMITTEE IAPMO CODES AND STANDARDS DEVELOPMENT PROCESS

MINUTES OF REGULAR MEETING OF BOARD OF DIRECTORS OF THE PROVIDENCE POINT UMBRELLA ASSOCIATION. July 24, 2012

FLORIDA BUILDING COMMISSION

Accredited Standards Committee C63 Electromagnetic Compatibility

Transcription:

ICC Industry Advisory Committee DRAFT MEETING MINUTES August 9, 2005 Underwriters Laboratories Northbrook, IL 60062 800-595-9844 1. Call to order Chair Julie Ruth called the meeting to order at 1:00 P.M 2. Approve Agenda A motion was made and seconded to approve the agenda. The motion passed unanimously. 3. Self Introductions Those present introduced themselves. They were: IAC Committee Members Jonathan Humble Richard Kraus Ralph Vasami Stephen Szoke Martin Brett Donald Rowson Pat McLaughlin Richard Church Alan Thomas John Valiulis Michael Gardner Howard Hopper Robert Kelly Tom Hammerberg Dave Frable Will Warlick Robert Hackworth Ron Nickson Dan Lea Joe Hetzel Elaine Thompson Jim Olshefsky Jeff Inks Thom Zaremba Chris Jelenewicz Julie Ruth Representing American Iron & Steel Institute American Petroleum Institute Builders Hardware Manuf. Assoc. Portland Cement Assoc. National Electrical Manuf Assoc. CSPA Semiconductor Industry Assoc. Plastic Pipe and Fittings Assoc. CISPI International Firestop Council Gypsum Assoc. Underwriters Laboratory Vinyl Siding Institute Automatic Fire Alarm Assoc. U.S. General Services Admin. Wood Truss Council of America Steel Joist Institute National Multi Housing Council Cellulose Insulation Manuf. Assoc. Door and Access Systems Manuf. Assoc. International Steel Tube Institute American Society of Testing Materials National Assoc. of Home Builders Wired Glass Industry Society of Fire Protection Engineers American Architectural Manuf. Assoc.

August Sisco Wayne Geyer Steve Ferguson Dave Roodvoets Kevin Kelly National Assoc. of Architectural Metal Manuf. Steel Tank Institute & Steel Plate Fabricators Assoc. American Society of Heating, Refrigerating & Air-Conditioning Engineers SPRI National Fire Sprinkler Assoc. Guests: Jerry Heppes Jason McJury DHI IBTS Staff: Tom Frost Mike Pfeiffer Steven Thorsell Lauren Crane 4. Approval of March 16, 2005 IAC Meeting Minutes Pat McLaughlin noted that SIA should be listed as a member organization. A motion was made and seconded to approve the minutes as revised. The motion passed unanimously. 5. Chairman s Report Chairman Ruth thanked those present for their attendance. She also thanked UL for their hospitality in allowing the IAC to meet at UL s Northbrook facility and conducting a tour of their testing facility. She concluded the remarks by noting that the reason for the meeting was to allow action taken by the IAC at this meeting to be communicated to the ICC Board of Directors at their next meeting, which is scheduled to be held shortly before the ICC Annual Business Meeting in September. 6. Staff Report on ICC Activities Mike Pfeiffer gave the report on behalf of staff. 6.11 Copyright agreement on code change proposals Mike Pfeiffer indicated that the Board declined to accept the IAC recommendation on this matter and chose to maintain the alternative agreement while including only the exclusive agreement in the Procedures. Mr. Pfeiffer noted that both versions have been posted to the website.

6.12 Webcast Mike Pfeiffer reported that the Final Action Hearings in Detroit would be web cast. Several IAC members expressed appreciation that the Board continues to fund this service. 6.2.1 Web cast Mac Users Staff reported that Mac users could access the web cast by using a version of MediaPlayer which is a free download which will be linked on ICC s web cast web page. 6.2.2 IAC Support for Wireless Internet in Hearing Room Mike Pfeiffer pointed out that to fulfill the IAC request for a DSL or T1 line to support wireless internet in Detroit would cost $1,000.00. Following discussion, Ron Nickson volunteered to secure IAC funding for this, securing pledges from 10 members to contribute $100.00 each. IAC requested that ICC arrange for funding of this activity in the future. 6.2.3 Commercialism of Hearings Mike Pfeiffer reported that there will be no advertising in the hearing room or on the web cast, as requested by the IAC at its last meeting, in order to protect the integrity of the code development process. 6.3 Committee Activities 6.3.1 Code Related Mike Pfeiffer reported that the Final Action Agenda had been posted July 27, 2005 and hard copies would be mailed out in the near future. He stated that due to the number of Public Comments received, the hearings would take 5 days. The hearing order was discussed, including the coordination of Plumbing & Mechanical hearing schedules with IAPMO so that interested parties may attend both organizations hearings, if necessary. Mike discussed the activities of the following committees: Code Technology Committee Administrative Ad Hoc Committee Existing Building Code Ad Hoc Committee Hazard Abatement Code Drafting Committee Referenced Standards Committee Alcohol (disinfectant) Ad Hoc Committee Water Temperature and Control Ad Hoc Committee Hydrogen Ad Hoc Committee 6.3.2 Standard Related The following standard development activities were reported:

Hurricane Resistant Construction Standard has changed to an ad hoc code development effort. Log Standard-ICC received 300 comments on the draft and the committee will meet to consider these comments. Storm Shelter Standard- To be completed in January 2006 pending the resolution of the missile impact testing issue. ANSI A117-Maintenance on-going MHCSS (Manufactured Housing)-No activity at present. Committee appointed. Bleacher Standard-No activity at present. Committee appointed. In response to a question regarding the status of the ICC low-cost sprinkler standard, staff responded that a number of comments were received in response to the filing of the PINS announcing ICC s intent to create such a standard. The majority of these comments recommended that ICC work within the existing standard development process. In response to this input, the ICC created an ad hoc committee to do just that. Development of an ICC sprinkler standard has been held in abeyance pending completion of this activity. 6.3.3 Other Reports were provided on two other ICC committee activities: Ad Hoc Terrorist Resistant Building Committee (TRB) Disaster Response Committee (DRC) 6.4.1 I-Code Adoptions It was reported that the ICC website contains reports on the federal, state and local adoptions. There have been 307 IBC adoptions so far this year and 1077 total adoptions. The websites are: www.iccsafe.org/government/federal.xls www.iccsafe.org/government/stateadoptions.xls www.iccsafe.org/government/jurisdictionadoption.xls 6.5 Federal Activities Staff read a statement from Dave Conover, indicating that ICC is working with numerous federal agencies, encouraging their participation in code-related and adoption related activities.

6.6 National Activities No Report 7. ICC Task Group on Floor Modifications Report- Dave Frable, task group chair, presented the report, indicating that the Task Group had 2 teleconferences in May and June. The IAC task group was balloted with the ballot being split into two issues: 1. Everything as proposed except item 5.5.2(2)(V). Eight votes in favor, 1 against. 2. Item 5.5.2(2)(V) passed 5 to 4. The chair did not vote. In June, the entire IAC was balloted. Of the more than 90 IAC members, 27 members returned ballots. Seventeen approved, 4 approved with comments and 6 disapproved. Staff summarized the ballot comments received. It was moved and seconded to present the report to the ICC Board as the recommendation of the IAC. Following extensive discussion, it was moved and seconded to amend the task force recommendations to require notification of floor modifications at the beginning of each committee hearing. Following further discussion this motion failed. It was then moved and seconded to delete item IV. This motion was subsequently withdrawn. It was moved and seconded to approve the report with a modification, delete the last line of 5.4.3 Modifications, the last 2 lines of 5.5.2(1) Submission of Written Copies and the words and made available from 5.5.2(2)(i). Following further discussion this motion passed 20/7 with the stated expectation that it be forwarded to the ICC Board of Directors. Chairman Dave Frable recommended that this task force be sunsetted. The Chair directed that the task group recess, pending action by the Board. Chairman Ruth then directed that the Task Group develop a narrative of their recommendations for the Board. 8. ICC Task Group on Green Buildings Rating Systems Report Dick Church presented the report for Chairman Ken Bland, discussing the mission, objective and deliverables of the task group. He characterized the deliverables as consisting of 2 elements a. Review of the LEED green building rating system and, b. Comparison of LEED to Green Globes.

Mr. Church concluded that The Task Force does not have a recommendation at this point. Chairman Ruth agreed to report this task group s work to the Board as an on-going activity. 9. IAC Task Group on ES Acceptance Criteria John Valiulis presented the report for absent Chair John Taecker. He discussed the concerns provided to ICC-ES senior management Nosse, Nichols and Stochlia. Following further discussion, it was moved and seconded to accept the report and forward it to the ICC-ES and ICC Boards. A motion to amend the report, deleting the last two lines of the second bullet under d. Recommended Actions was made and seconded. Following discussion the motion failed 9/13. The main motion referring the report to the Boards as submitted passed unanimously. 10. ICC Standards Guide Task Group Report Jonathan Humble introduced this item. It was moved and seconded to recommend that staff review and place an updated version of the guide on the website, deleting the bibliography. This motion passed unanimously. 11. IAC Rules for Conduct of Task Groups This topic was divided by the Chair into two issues: 1. Who is allowed to participate in a Task Group, IAC members only? The Chair cited article VII, section 3 Member Designees. It was noted that this section should allow IAC members and non-iac members to be appointed to Task Groups with full voting privileges on the task group. No further action taken. 2. Can a mail ballot be conducted at the will of the IAC or Task Force? Section 5 Voting was cited. It was concluded that other then as specifically allowed in the procedures, mail ballots are not permitted. It was noted that unless a ballot was called for in accordance with the procedures, amendment to IAC s Rules and Procedures, and when called for by simple majority attending an IAC meeting, the IAC will conduct its business at the IAC meetings. No further action taken. 12. New Business 12.1 Proposed resolution to change to three-1 year code change cycles from the current 18-month cycle

Jonathan Humble asked if the Board recalled the IAC s 1999 recommendations in support of the 18-month cycle? Staff responded that this was a member proposal, not subject to Board review. John Valiulis said that code changes should be based on facts and, facts take time. Dick Church suggested that the resolution should be for a 24-month cycle, not 12. Following further discussion it was moved and seconded to reaffirm the previous IAC position in opposition to a 12-month cycle and in support of an 18-month cycle. Chair Ruth was requested to present this view when the member resolution is discussed at the ICC Annual Business Meeting. This motion passed unanimously. 13. Date and location for the next IAC Meeting February 22, 2006 was tentatively set as the next meeting date, with ASHRAE looking into sponsoring the meeting in Atlanta. 14. Adjourn There being no further business, the Chair adjourned the meeting at 4:56 P.M. Respectfully submitted, Tom Frost