A guide to objecting to an application for a planning permit

Similar documents
A working guide to seeking enforcement in planning matters and nuisance under the Public Health and Wellbeing Act

Advocacy Guide No. 4:

MELBOURNE PLANNING SCHEME AMENDMENT C271

Calculating Council s 60 Day Statutory Timeframe

Preparing Documents for VCAT

Practice Note PNVCAT 6 Hearing Fees

Environmental Planning and Assessment Regulation 2000

Calculating Council s 60 Day Statutory Timeframe

A GUIDE TO PLANNING ENFORCEMENT IN VICTORIA

VICTORIAN CIVIL AND ADMINISTRATIVE TRIBUNAL OWNERS CORPORATIONS. Alan Vassie Ian Lulham Bernadette Steele

The Aboriginal Heritage Act 2006 and the planning permit process

Electricity Retail Licence. NewRet Pty Ltd

21 September As addressed. Melbourne Planning Scheme Amendment C258: Heritage Revisions. Panel Advice and Directions

Tribunals and Licensing Authorities (Miscellaneous Amendments) Bill

Aboriginal Heritage Act 2006

Planning and Urban Management Act 2004

2004 Planning and Urban Management 2004 No. 5 SAMOA

PARLIAMENT OF VICTORIA. Planning and Building Legislation Amendment (Housing Affordability and Other Matters) Bill 2017

Kathy Mitchell Chief Panel Member, Planning Panels Victoria

Environmental Planning and Assessment Amendment (Infrastructure and Other Planning Reform) Act 2005 No 43

CATCHWORDS. Application for Review of order; Residential 1 Zone; proposal for three dwellings on a lot; Order amended. 4 December 2007 ORDER

1 The decision of the responsible authority is set aside. 2 In permit application No. 577/2008/P no permit is issued.

SUBMISSION TO THE REVIEW OF THE FLORA AND FAUNA GUARANTEE ACT, 1988 (Vic).

Building Control (General Amendment) Act 1988

Victorian Civil and Administrative Tribunal

Clearing of Native Vegetation

Authorised Version. Planning and Building Legislation Amendment (Housing Affordability and Other Matters) Act 2017

Enforcement Officers Conference

Victorian Civil and Administrative Tribunal Rules 2008

This Policy is State Environmental Planning Policy No 55 Remediation of Land.

NEIGHBOURHOOD DISPUTES RESOLUTION ACT Presented by Bronwyn Ablett

INQUIRY INTO EXCEPTIONS AND EXEMPTION TO THE EQUAL OPPORTUNITY ACT 1995

Aboriginal Heritage Act 2006

Appointment of a migration agent or exempt agent or other authorised recipient

LAND USE PLANNING AND APPROVALS AMENDMENT BILL 2013

1 The following dates are the dates referred to in these orders. Item Action Date Time Duration Number of members Compulsory Conference

Public Consultation Guidelines For Electricity, Gas & Water Licences and Electricity & Gas Standard Form Contracts July 2006

Environmental law, EIA and the role of environmental consultants

Access to Justice: Regulation of power stations

The Privacy Policy links to the following Objective contained within the City Plan

Complaints: Dispute Resolution Procedures

May PO Box Melbourne VIC DX 128 Melbourne Tel Fax justiceconnect.org.au

PROMOTION OF ADMINISTRATIVE JUSTICE ACT 3 OF 2000

Investments, Life Insurance & Superannuation Terms of Reference

Engineers Registration Bill 2018

INFORMATION REGARDING PROTECTION OF ADJOINING PROPERTIES.

State Environmental Planning Policy No 55 Remediation of Land

ORDINANCE XVII DISMISSAL AND REMOVAL FROM OFFICE OF ACADEMIC STAFF: TRIBUNAL AND APPEALS PROCEDURES

Noise. Fact Sheet 25. Environmental Defender s Office of Western Australia (Inc.) An introduction to Noise. What is noise?

1 This matter is listed for hearing on Thursday 17 February 2011 at am for one day.

CHALLENGING ENVIRONMENTAL DECISIONS:

KEY DIFFERENCES BETWEEN THE UNIFORM LAW AND THE NEW SOUTH WALES AND VICTORIAN LEGAL PROFESSION ACTS

Federal Court and Federal Circuit Court Regulation 2012

Body Corporate Plan No. PS509946A v VM Romano Construction Group Pty Ltd & Anor (Domestic Building) [2009] VCAT 1662

DIVIDING FENCES. A self-help kit about the law of building and maintaining fences between neighbours

FAMILY SUPPORT FOR CHILDREN WITH DISABILITIES ACT

Privacy Policy. Cabcharge will only collect personal information which is necessary for the operation of its business.

SELECTION POLICY AND APPEALS PROCESS FOR UCI WORLD CHAMPIONSHIPS

GRIEVANCE PROCEDURE BY-LAW TABLE OF CONTENTS

Information Privacy Act 2000

Employee Relations Act 1992

Australian Conservation Foundation v Latrobe City Council

PRACTICE NOTE PNPE9 (Amendment of Plans and Applications) PLANNING AND ENVIRONMENT LIST

Resolving tenancy disputes

Environmental Planning and Assessment Regulation 2000

MIGRATION LAW IMPACTS OF INFRINGEMENTS AND MINOR CRIMINAL MATTERS FOR NON-CITIZEN CLIENTS 1 *

Town and Country Planning (Scotland) Act 1997

(2 August 2017 to date) PROMOTION OF ADMINISTRATIVE JUSTICE ACT 3 OF 2000

14 October The Australian Law Reform Commission Level 40, MLC Tower 19 Martin Place Sydney NSW to:

Letter STUDENT NUMBER LEGAL STUDIES. Written examination. Tuesday 11 November 2014

Architects Regulation 2012

Guidelines for advertisers

JULIA GREENHAM BARRISTER

The Guide to the Assessment Review Board (ARB)

D E C I S I O N N O T I C E Planning Act 2016

Supreme Court (Fees) Regulations. Exposure Draft

LOVEGROVE SOLICITORS GUILTY UNTIL PROVEN INNOCENT? THE BUILDING PROFESSIONALS BILL 2005, AND WHAT IT MEANS FOR CERTIFIERS

Access to Information

Department of the Premier and Cabinet Circular. PC032 Lobbyist Code of Conduct. October 2009

Consultation Paper 172 Review of EDR jurisdiction over complaints when members commence debt recovery legal proceedings

Estate Agents (Amendment) Act 1994

Marie Elizabeth Hawley Yarra Ranges Shire Council 10 Glendale Court, Kilsyth Melbourne Tonia Komesaroff, Member Hearing

Child Protection. Working with Children Checks Policy

980 No. 91] Town and Oountry Planning [1953

Trees (Disputes Between Neighbours) Act 2006

Caulfield Racecourse Reserve Bill 2017

Division 1 Preliminary

BILATERAL AGREEMENT ON THE LEGAL PROFESSION UNIFORM FRAMEWORK

Water Compliance Reporting Manual

Workplace Relations Regulations 2006

Introduction 2. What is Self-representation? 2. Who Can Self-represent? 2. Help for Self-represented Litigants 3

Equal Opportunity Act 1995

Planning Directive No. 6 and Interim Planning Directive No. 2

Pollution (Control) Act 2013

Environmental Planning and Assessment Amendment (Part 3A Repeal) Act 2011 No 22

General Synod Episcopal Standards (Child Protection) Canon 2017 Adopting Ordinance 2017

1. The costs of the preliminary hearing on 29 October 2002 are costs in the proceeding.

These Officers can be contacted by:

This fact sheet covers:

Disability Discrimination Act CHAPTER 13 CONTENTS. Go to Preamble. Public authorities

Transcription:

Objections Kit

Objections Kit A guide to objecting to an application for a planning permit About Environmental Justice Australia Environmental Justice Australia are nature s lawyers. We use the law to protect our environment, and we work to change our laws to make sure they protect the right of all Australians to clean air, clean water and healthy ecosystems. For further information contact: Environmental Justice Australia Phone: 03 8341 3100 (Melbourne metropolitan area) 1300 EDOVIC (1300 336842) (Local call cost for callers outside Melbourne metropolitan area) Fax: 03 8341 3111 E-mail: admin@envirojustice.org.au Website: www.envirojustice.org.au Post: PO Box 12123, A Beckett Street PO, Melbourne VIC 8006 Address: Level 3, the 60L Green Building, 60 Leicester Street, Carlton SEEK LEGAL ADVICE REGARDING SPECIFIC CASES While all care has been taken in preparing this publication, it is not a substitute for legal advice in individual cases. For any specific questions, seek legal advice. Produced & published by Environment Defenders Office (Victoria) Ltd Original Publication date: August 2007 This kit cannot be reproduced without consent of author Page 2 Environmental Justice Australia August 2007

Table of Contents 1.0 Introduction... 4 1.1 How is use and development of land regulated in Victoria? 4 1.2 What is a planning permit? 4 1.3 Who administers planning schemes? 5 1.4 What other bodies are involved? 5 2.0 Planning Permit Applications... 6 2.1 How is a permit application made? 6 2.2 Who must be given notice of a permit application? 6 2.3 Who must give notice of a permit application? 6 2.4 How is notice of a permit application given? 7 2.5 What if I was entitled to notice but did not receive it? 7 2.6 Can I inspect the permit application? 7 3.0 Objections... 8 3.1 Can I object to a permit application? 8 3.2 Can a group of people object to a permit application? 8 3.3 How do I object to a permit application? 8 3.4 What time limits apply? 8 3.5 On what grounds can I object? 9 4.0 Decisions on permit applications... 10 4.1 What must the Responsible Authority take into account? 10 4.2 What else might the Responsible Authority take into account in appropriate circumstances? 10 4.3 What decision can the Responsible Authority make? 11 4.4 Can I appeal the Responsible Authority s decision? 11 5.0 Minister s power to decide an application... 12 5.1 When can the Minister consider a permit application? 12 5.2 Can I make submissions to the Minister? 12 5.3 What decision can the Minister make? 12 5.4 Can I appeal the Minister s decision? 12 6.0 Useful information... 13 6.1 Useful addresses 13 6.2 Useful websites 13 6.3 Legal advice 14 Environmental Justice Australia August 2007 Page 3

1.0 Introduction 1.1 How is use and development of land regulated in Victoria? The use, development and protection of land in Victoria is primarily regulated by planning schemes made pursuant to the Planning and Environment Act 1987 (PE Act). The PE Act is administered by the Minister for Planning. Planning schemes set out objectives, policies and controls for the use, development and protection of land within municipal districts. They must conform to the Victorian Planning Provisions (VPPs), which are standard planning provisions to ensure that planning schemes throughout Victoria are expressed in uniform language. The PE Act can be found at www.dms.dpc.vic.gov.au under Victorian Law Today. The VPPs and General Practice Notes can be found at www.dse.vic.gov.au under planning. Responsible Authorities (usually the local council) grant or refuse planning permits under the PE Act. The permit applicant usually has to give notice of a permit application at the direction of council. Generally, affected individuals have the opportunity to object to the grant of a permit. Where a permit is granted, they are entitled to appeal against that decision to the Victorian Civil and Administrative Tribunal (VCAT). However, objector rights can be, and often are, modified by the planning scheme. This may exclude the right to appeal a decision to grant a planning permit. 1.2 What is a planning permit? A planning permit may be required under specific provisions within a planning scheme before land can be used or developed. For example, zoning provisions generally regulate planning permit requirements for the use and development of land within that zone. It may be necessary to obtain a planning permit to operate a retail business, or a particular industry, in a given zone. Where development is proposed, planning permits may be required to construct a building, carry out works or clear native vegetation. Development requirements usually appear in zoning provisions, overlays and in the "Particular Provisions". Planning permits are different from building permits, which relate to the actual construction of a building or development. Sometimes a building permit and a planning permit will both be required for a development. To find out whether a particular use or development requires a planning permit, check the relevant planning scheme. Planning schemes may be found at www.dse.vic.gov.au/planningschemes/. Page 4 Environmental Justice Australia August 2007

1.3 Who administers planning schemes? Responsible Authorities are bodies designated to administer and enforce planning schemes (Section 14 PE Act). Where a permit, the planning scheme or a section 173 agreement has been contravened, the Responsible Authority often seeks enforcement orders and may commence prosecution in the Magistrate's Court. A Responsible Authority may be: the relevant municipal (or local) council; the Minister for Planning ( Minister ); or anyone specified in the planning scheme as a Responsible Authority for that purpose. (Section 13 PE Act) 1.4 What other bodies are involved? Responsible Authorities may be required to submit copies of planning permit applications to Referral Authorities (section 55 PE Act). Referral Authorities are specified in planning schemes and include: the Environment Protection Authority (EPA); the Department of Sustainability and Environment (DSE); the Department of Human Services; and water and fire authorities. Referral Authorities are listed in clause 66 of the General Provisions section of the VPPs and planning schemes. Sometimes other provisions within the planning scheme may specify that a person or body is a Referral Authority. Referral Authorities consider permit applications and impose conditions. If they object to the granting of the permit or stipulate conditions in the permit, the Responsible Authority must follow their decision. (Sections 56 and 61(2) and 62(1)(a) PE Act) If a Responsible Authority fails to refer a permit application to a Referral Authority when it should have, the Referral Authority may request that VCAT either cancel or amend the permit. (Sections 87(3) and 89(1)(2) PE Act) The requirements of Referral Authorities can be overturned on appeal at VCAT. Environmental Justice Australia August 2007 Page 5

2.0 Planning Permit Applications 2.1 How is a permit application made? An application for a planning permit must be made to the relevant Responsible Authority, usually the local council, in accordance with the regulations (section 47(1)(a) PE Act). Application forms can be obtained from the Relevant Authority and must be filled out and lodged with them. 2.2 Who must be given notice of a permit application? The notice requirements set out in section 52(1) of the PE Act must be complied with, unless the planning scheme specifies that a permit application is exempt. Where, as will usually be the case, an application is not exempt, notice of an application must be provided pursuant to section 52(1) of then PE Act, unless the Responsible Authority is satisfied that the grant of the permit would not cause material detriment to any person. In particular, the Responsible Authority must give notice of the permit application to: the owners and occupiers of adjoining land, unless the Responsible Authority is satisfied that the grant of the permit would not cause any material detriment (section 52(1)(a)); any local council that is materially affected (section 52(1)(b)) Referral Authorities (section 52(1)(c)); the owners and occupiers of land benefited by a registered restrictive covenant, if the application is to remove or vary the restrictive covenant, or would result in a breach of the restrictive covenant (section 52(1)(ca)); any other persons the Responsible Authority considers may suffer material detriment if the permit is granted (section 52(1)(d). Note that the Responsible Authority may give any further notice that it considers appropriate of an application that is likely to be of interest or concern to the community (section 52(3)). This allows the Responsible Authority to consider objections from a larger group of people than might normally be entitled to object, and also to require notice in circumstances where the planning scheme provides that an application is exempt from section 52(1). 2.3 Who must give notice of a permit application? The permit applicant must give notice of a permit application, if directed by the Responsible Authority. Otherwise, notice may be given by the Responsible Authority itself. Page 6 Environmental Justice Australia August 2007

2.4 How is notice of a permit application given? How notice is given depends, for example, on whether a person is the owner of an adjoining property, or someone who is potentially affected for other reasons. Adjoining owners and occupiers Because the right to notice is fundamental to the objectives of the PE Act, Responsible Authorities usually ensure that adjoining owners and occupiers are informed by letter. Others In order to try to ensure that all other people who are entitled to object receive adequate notice, the following methods may be employed: placing a sign on the subject land; by publishing a notice in the local newspaper(s); giving the notice personally or sending it via post; or in any other way considered appropriate by the Responsible Authority. (Section 52 PE Act) 2.5 What if I was entitled to notice but did not receive it? Before a permit is issued Ask the Responsible Authority to consider your objection anyway. If the Responsible Authority has already decided to grant a permit, you can apply to VCAT for leave to be joined as a party to an appeal, or for leave to seek review of any decision of the Responsible Authority to grant the permit. After the permit is issued If you were not given notice and believe you should have been, you can apply to VCAT to cancel or amend the permit. (Section 87(1) PE Act) For more information see EDO Enforcement Kit, Section 5.0. 2.6 Can I inspect the permit application? Applications must be made available to the public, so you can inspect a permit application at the offices of the Responsible Authority until the completion of any appeals process. It is a good idea to make an appointment. (Section 51 PE Act and General Practice Note, December 1999, Improving Access to Planning Documents, DSE website.) A copy of every permit issued must also be available for public inspection, free of charge at the offices of the Responsible Authority. (Section 70 PE Act) Environmental Justice Australia August 2007 Page 7

3.0 Objections 3.1 Can I object to a permit application? If you may be affected by the grant of a permit, you can object to the grant of a permit. (Section 57(1) PE Act) Note Even if the planning scheme does not require you be given notice of the application, you may still object. However the Responsible Authority is not required to take your objection into account. Similarly, VCAT may refuse to consider your objection if you are not affected by the proposal or if it does not raise relevant considerations. (Section 60(3) PE Act) 3.2 Can a group of people object to a permit application? A group of people may make an objection together. The group may designate a person to receive notice of the objection on their behalf and give the Responsible Authority the name and address of the person who is to receive notice of the decision. (Section 57(3) PE Act) Often this is a good idea because on appeal VCAT prefers to avoid hearing multiple submissions covering the same issues. Having an objector representative may help you to coordinate your case, save time and money, and make your presentation more effective. 3.3 How do I object to a permit application? Objections must: be in writing; clearly state the reasons for the objection; and clearly state how the person making the objection would be affected by the grant of the permit. (Section 57(2) PE Act) The Responsible Authority will probably have a prescribed form. You should contact them and enquire before you lodge an objection. You should lodge your objection with the Responsible Authority. 3.4 What time limits apply? Responsible Authorities may decide to grant or refuse a permit within 14 days of giving notice of the application. (Section 59 PE Act) Generally, you should lodge your objection within 14 days of notice of the application. However, you should contact the Responsible Authority to confirm what time frames apply. Page 8 Environmental Justice Australia August 2007

3.5 On what grounds can I object? An objection should identify how you are affected by the proposal and should address all relevant planning considerations. You should be conscious that including irrelevant matters may undermine your best arguments. For example, it is best to avoid objections based on concerns about property values. Often there is a long history of grievances between neighbours. Rather than focus on why the permit applicant is a bad person, you should focus on why the proposal is flawed. The items set out below at Sections 4.1 and 4.2 must be considered by a Responsible Authority and are a good starting point in drafting your objection. In an urban or residential context, the following are often important considerations: detriment to the amenity of the area, including the features, benefits or advantages of the local environment which people currently enjoy; effect on views, noise, traffic or general atmosphere of area; and impact on the preferred or existing character of the neighbourhood. Handy tips Tell the council officer something new. Ask yourself what is it that you know about the area that is worth protecting, before you start to research the planning scheme requirements. Keep your points succinct. Use headings and bullet points to make your submission easy to read and follow. Send your objection by email so that the planning officer can cut and paste from it. Spend time looking at the plans in order to explain the practical problems of the proposal and how they might reasonably affect you. If you can't get to the Council office, ask for a copy to be posted to you. You should also take the opportunity to speak at any Council hearing if you can. (See VCAT Brochure, Submissions in the Planning List, available on the VCAT website.) Environmental Justice Australia August 2007 Page 9

4.0 Decisions on permit applications 4.1 What must the Responsible Authority take into account? The Responsible Authority must take into account the following: The relevant planning scheme All objections and submissions which it has received, if notice of the application was required; Any decision and comments of referral authorities; and Any significant effects the Responsible Authority considers the use or development may have on the environment, or which the Responsible Authority considers the environment may have on the use or development. (Section 60(1)(a) PE Act) 4.2 What else might the Responsible Authority take into account in appropriate circumstances? Other matters the Responsible Authority may take into account, where appropriate are: Any significant social and economic effects of the use or development; Strategic plans, policy statements, codes or guidelines that have been adopted by a Minister, government department, public authority or local council; Any amendment to the planning scheme which has been adopted by a planning authority; Any agreements between the Responsible Authority and the land owner which affect the land under section 173; and Any other relevant matter. (Section 60(1)(b) PE Act) Note If the Responsible Authority considers an objection has been made primarily to secure or maintain a financial advantage for the objector, the Responsible Authority may reject the objection and proceed as if the objection had not been made. For example, a shopping centre owner objecting to a proposal for a nearby retail use because it will cause competition might be found to be made to secure financial advantage. (Section 57 PE Act) Page 10 Environmental Justice Australia August 2007

4.3 What decision can the Responsible Authority make? The Responsible Authority may decide: to grant a permit; to grant a permit subject to conditions; or to refuse to grant a permit on any ground it thinks fit. (Section 61(1) PE Act) The Responsible Authority must refuse to grant the permit if the relevant Referral Authority objects to the grant of the permit. (Section 61(2) PE Act) If the land is coastal Crown land, the Minister administering the Coastal Management Act 1995 must consent before a permit to develop the land can be granted. (Section 61(3) PE Act). 4.4 Can I appeal the Responsible Authority s decision? Generally, an objector is entitled to appeal to VCAT in respect of a decision of a Responsible Authority to grant a planning permit. For further information see Fact Sheet 2.3 Planning Permit Appeals and the Appeals Kit. See also VCAT website under Planning and Environment and How to make an application to VCAT. Environmental Justice Australia August 2007 Page 11

5.0 Minister s power to decide an application 5.1 When can the Minister consider a permit application? Minister s call-in power Before a Responsible Authority has made a decision about a planning permit, the Minister for Planning may call in' the application if it appears to the Minister that: the planning application raises a major issue of policy and the determination of the application may have a substantial effect on the achievement or development of planning objectives; the decision on the application has been unreasonably delayed to the disadvantage of the permit applicant; or the use or development to which the application relates is required to be considered by the Minister under another law. (Section 97B PE Act) Also see General Practice Note, Ministerial Powers of Intervention in Planning and Heritage Matters, (December 1999), DSE website. A Responsible Authority can also request that the Minister make the decision in relation to an application. (Section 97C PE Act) 5.2 Can I make submissions to the Minister? Where an application is to be decided by the Minister, the Minister must, unless certain exceptions apply, appoint a planning panel (Panel) and refer any submissions or objections received to the Panel. The Panel must give anyone who made a submission or raised an objection, or any other person affected by the permit application, a reasonable opportunity to be heard, and must consider their submissions or objections. (Section 97E PE Act). 5.3 What decision can the Minister make? After considering any Panel report, the planning scheme and any other matters, the Minister may: grant the permit; grant the permit subject to conditions; or refuse to grant the permit. 5.4 Can I appeal the Minister s decision? You cannot appeal to VCAT, and VCAT cannot cancel or amend a permit, if the Minister has made a decision in respect of an application for a planning permit in accordance with the above process. (Section 97M PE Act) Page 12 Environmental Justice Australia August 2007

6.0 Useful information 6.1 Useful addresses Environment Protection Authority 40 City Road, Southbank 3006 Ph: (03) 9695 2722 Information Victoria 356 Collins Street, Melbourne, 3000 Ph: 1300 366 356 Planning Information Centre, DSE Upper Plaza, Nauru House 80 Collins Street, Melbourne, 3000 Ph: (03) 9655 8830 Victorian Civil and Administrative Tribunal 55 King Street, Melbourne, 3000 Ph: 9628 9777 6.2 Useful websites Department of Sustainability and Environment: www.dse.vic.gov.au http://www.dse.vic.gov.au/planningschemes/ http://www.dse.vic.gov.au/shared/ats.nsf/webviewdisplay?openform Environment Protection Authority: www.epa.vic.gov.au Commonwealth Department of the Environment and Water Resources: www.environment.gov.au Victorian Civil and Administrative Tribunal: www.vcat.vic.gov.au http://www.vcat.vic.gov.au/ca256dbb0022825d/page/planning+and+en vironment-legislation-practice+notes?opendocument&1=65- Planning+and+Environment~&2=35-Legislation~&3=10-Practice+Notes~ http://www.vcat.vic.gov.au/ca256dbb0022825d/page/planning+and+en vironment-hearings?opendocument&1=65- Planning+and+Environment~&2=15-Hearings~&3=~ Humane Society International: www.hsi.org.au Victorian Government: www.vic.gov.au Environmental Justice Australia August 2007 Page 13

6.3 Legal advice LEGAL ADVICE SHOULD BE SOUGHT IN SPECIFIC CASES While all care has been taken in the preparation of this publication, it is not a substitute for legal advice in individual cases. For any specific questions you should seek legal advice. Page 14 Environmental Justice Australia August 2007