SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS Quantity ate Amount SECTION 1 BILL NO 1 PELIMINAIES BUILDING AGEEMENT AND PELIMINAIES The JBCC Series 2000 Principal Building Agreement (July 2007 edition 5.0 - reprint 1) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described The JBCC Principal Building Agreement Contract Data EC and the JBCC Principal Building Agreement Contract Data CE form an integral part of this agreement The ASAQS Preliminaries (vember 2007 edition) published by the Association of South African Quantity Surveyors for use with the said JBCC Principal Building Agreement shall be deemed to be incorporated in these bills of quantities Contractors are referred to the abovementioned documents for the intent and meaning of each clause thereof These clauses are hereinafter referred to by clause number and heading only. Where standard clauses or alternatives are not entirely applicable to this agreement such modifications, corrections or supplements as will apply are given under each relevant clause heading and such modifications, corrections or supplements shall take precedence notwithstanding anything contrary contained in the abovementioned documents Where any item is not relevant to this specific agreement such item is marked N/A (signifying "not applicable") PEAMBLES FO TADES The Model Preambles for Trades (2008 edition) as published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said Model Preambles will be entertained -1-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS Supplementary preambles are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles shall take precedence over the provisions of the said Model Preambles The contractor's prices for all items throughout these bills of quantities must take account of and include for all of the obligations, requirements and specifications given in the said Model Preambles and in any supplementary preambles PICING OF PELIMINAIES Should the contractor select Option A in terms of subclause 3.2.1 in the Contract Data - Contractor to Employer (CE) for the purpose of adjustment of these preliminaries, the amount entered into the amount column in these preliminaries is to be divided into one or more of the three categories provided namely Fixed (F), Value elated (V) and Time elated (T) SECTION A: PINCIPAL BUILDING AGEEMENT Definitions (A1) 1 Clause 1.0 - Definitions and interpretation The measuring system used for the preparation of the bills of quantities is the Standard System of Measuring Building Work (sixth edition, revised 1999) published by the Association of South African Quantity Surveyors [1.1] Objective and preparation (A2 - A14) 2 Clause 2.0 - Offer acceptance and performance obligations -2-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 3 Clause 3.0 - Documents The contract drawings are as listed on the Tender Form page of the bills of quantities Provision is made in the summary page of these bills of quantities for the inclusion of Value Added Tax (VAT) [3.5] The principal agent shall decide which portion of the priced document may be used as a specification of materials and goods or methods, if any [3.9] 4 Clause 4.0 - Design responsibility 5 Clause 5.0 - Employer's agents 6 Clause 6.0 - Contractor's site representative 7 Clause 7.0 - Compliance with laws and regulations 8 Clause 8.0 - Works risk 9 Clause 9.0 - Indemnities 10 Clause 10.0 - General insurances 11 Clause 11.0 - Special insurances - NA -3-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 12 Clause 12.0 - Effecting insurances 13 Clause 13.0 - Assignment 14 Clause 14.0 - Security Execution (A15 - A23) 15 Clause 15.0 - Preparation for and execution of the works 16 Clause 16.0 - Site and access 17 Clause 17.0 - Contract instructions 18 Clause 18.0 -Setting out of the works 19 Clause 19.0 - Temporary works and plant A corrugated iron shed should be provided by the contractor for storage of the site instruction book, plans, etc 20 Clause 20.0 - minated subcontractors 21 Clause 21.0 - Selected subcontractors -4-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 22 Clause 22.0 - Employer's direct contractors 23 Clause 23.0 - Contractor's domestic subcontractors 23.1 - The contractor shall appoint all domestic subcontractors in terms of an agreement that provides for fair and equitable conditions of contract compatible with this agreement 23.2 - All work or installations and the associated risks related to domestic subcontractors shall be the direct responsibility of the contractor Completion (A24 - A30) 24 Clause 24.0 - Practical completion 25 Clause 25.0 - Works completion 26 Clause 26.0 - Final completion 27 Clause 27.0 - Latent defects liability period 28 Clause 28.0 - Sectional completion 29 Clause 29.0 - evision of date for practical completion -5-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 30 Clause 30.0 - Penalty for late or non-completion Payment (A31 - A35) 31 Clause 31.0 - Interim payment 32 Clause 32.0 - Adjustment to the contract value 33 Clause 33.0 - ecovery of expense and loss 34 Clause 34.0 - Final account and final payment 35 Clause 35.0 - Payment to other parties Termination (A36 - A39) 36 Clause 36.0 - Termination by employer - contractor's default 37 Clause 37.0 - Termination by employer - loss and damage 38 Clause 38.0 - Termination by contractor - employer's default 39 Clause 39.0 - Termination - cessation of the works -6-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS Dispute (A40) 40 Clause 40.0 - Settlement of disputes Contract variables (A41 - A42) 41 Clause 41.0 - Post tender provisions The contractor is to complete before submission of his tender the JBCC Principal Building Agreement Contract Data CE 42 Clause 42.0 - Contractual agreement The required information of the parties and the amount of the contract sum shall be inserted in the agreement for signature of the agreement by the parties SECTION B: PELIMINAIES Definitions and interpretation (B1) 43 Clause 1.0 - Definitions and interpretation Documents (B2) 44 Clause 2.1 - Checking of documents 45 Clause 2.2 - Provisional bills of quantities -7-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 46 Clause 2.3 - Availability of construction documentation Previous work and adjoining properties (B3) 47 Clause 3.1 - Previous work - dimensional accuracy 48 Clause 3.2 - Previous work - defects 49 Clause 3.3 - Inspection of adjoining properties Samples, shop drawings and manufacturer's instructions (B4) 50 Clause 4.1 - Samples of materials F:... V:... T:... 51 Clause 4.2 - Workmanship samples 52 Clause 4.3 - Shop drawings 53 Clause 4.4 - Compliance with manufacturer's instructions Deposits and fees (B5) 54 Clause 5.1 - Deposits and fees -8-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS Temporary services (B6) 55 Clause 6.1 - Water 56 Clause 6.2 - Electricity 57 Clause 6.3 - Telecommunication facilities 58 Clause 6.4 - Ablution facilities Prime cost amounts (B7) 59 Clause 7.1 - esponsibility for prime cost amounts Special attendance on n/s subcontractors (B8) 60 Clause 8.1 - Special attendance General (B9) 61 Clause 9.1 - Protection of the works 62 Clause 9.2 - Protection/isolation of existing/sectionally occupied works 63 Clause 9.3 - Security of the works -9-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 64 Clause 9.4 - tice before covering work 65 Clause 9.5 - Disturbance 66 Clause 9.6 - Environmental disturbance 67 Clause 9.7 - Works cleaning and clearing 68 Clause 9.8 - Vermin 69 Caluse 9.9 - Overhand work Schedule of variables (B10) Information necessary for elections and completion of those clauses contained in the schedule which are necessary for tender purposes is given hereunder. Where no information is given it shall mean that no specific requirements are expected or that the clause is not relevant to this specific contract. 10.1 - Provisional bills of quantities [2.2] The quantities are provisional Yes 10.2 - Availability of construction documentation [2.3] Construction documentation is complete Yes 10.3 - Previous work - dimensional accuracy [3.1] 10.4 - Previous work - defects [3.2] -10-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 10.5 - Inspection of adjoining properties [3.3] 10.6 - Water [7.2] Option A (by contractor) Option B (by employer - free of charge) Option C (by employer - metered) Yes 10.7 - Electricity [7.3] Option A (by contractor) Option B (by employer - free of charge) Option C (by employer - metered) Yes 10.8 - Telecommunications [7.4] Telephone Yes Facsimile Yes E-mail Yes 10.9 - Ablution facilities [7.5] Option A (by contractor) Yes Option B (by employer) 10.10 - Protection of the works [9.1] 10.11 - Protection/isolation of existing/sectionally occupied works [9.2] Protection/isolation is required Yes 10.12 - Disturbance [9.5] 10.13 - Environmental disturbance [9.6] -11-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS SECTION C: SPECIFIC PELIMINAIES 70 emoval of rubbish The contractor is informed that all rubbish, loose topsoil and filling is to be removed and dumped at a dumping site by the contractor. work may continue on site before the above is removed and the site is clean. 71 Site instructions Contract instructions issued on site are to be recorded in triplicate in a site instruction book which is to be maintained on site by the contractor 72 Warranties for materials and workmanship Where warranties for materials and/or workmanship are called for, the contractor shall obtain a written warranty, addressed to the employer, from the firm supplying the materials and/or doing the work and shall deliver same to the principal agent on the final completion of the contract. The warranty shall state that workmanship, materials and installation are warranteed for a specific period from the date of final completion and that any defects that may arise during the specified period shall be made good at the expense of the firm supplying the materials and/or doing the work, upon written notice to do so. The warranty will not be enforced if the work is damaged by defects in the construction of the building in which case the responsibility fo replacement shall rest entirely with the contractor -12-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 73 Co-operation of the contractor for cost management It is specifically agreed that the contractor accepts the obligation of assisting the principal agent in implementing proper cost management. The contractor will be advised by the principal agent of all cost management procedures which will be implemented to ensure that the final building cost does not exceed the budget. The principal agent undertakes to make available to the contractor all budgetary allowances and cost assessments/reports to enable the proper procedure to be implemented and the contractor shall attend all cost plan review and cost management meetings. The contractor undertakes to extend these procedures, as necessary, to all subcontractors 74 Overtime The additional cost of overtime work shall not be for the Employer's account except when prior written agreement thereto is given by the Principal Agent F:... V:... T:... 75 Daywork daywork will be allowed F:... V:... T:... 76 Protection of existing Trees and Shrubs Protection of existing trees and shrubs is required. person may cut, disturb, damage or destroy any vegetation or possess, collect, remove, transport, export, purchase, sell, donate or in any other manner acquire or dispose of any vegetation in the garden. Where vegitation is to be removed, the area to be removed should be approved by the principal agent in conjunction with the client. -13-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 77 CIDB It is estimated that tenderers should have a CIDB contractor grading of 2GB or higher. Proof of registration with Construction Industry Development Board should be submitted with the quotation. 78 TASA Membership Contractors should be registered members of the Thatchers Association of South Africa. Proof of such membership should be submitted with the quotation. OCCUPATIONAL HEALTH AND SAFETY ON SITE IN ESPECT OF ACT NO. 85 OF 1993 79 It is required of the contractor to complete the Health and Safety Agreement (C1.4) that must be read together with and is deemed to be incorporated under this Section of the bills of quantities The contractor must take note that compliance with the Occupational Health and Safety Act is compulsory. In the event of partial or total non-compliance, the principal agent reserves the right to delay issuing any progress payment certificate until the contractor provides satisfactory proof of compliance. The contractor shall not be entitled to any compensation of whatsoever nature, including interest, due to such delay of payment. Provision for pricing of the Occupational Health and Safety Act is made under this clause and it is explicitly pointed out that all requirements of the aforementioned are deemed to be priced hereunder and no additional claims in this regard shall be entertained Fixed: Value related: Time related: -14-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS SUMMAY OF CATEGOIES Category : Fixed... Category : Value... Category : Time... Carried to Final Summary -15-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS Quantity ate Amount SECTION 2 PETOIA NATIONAL BOTANICAL GADEN BILL NO.1 ALTEATIONS (THATCH) EMOVAL OF EXISTING WOK Taking down and removing thatch roofs, etc 1 Thatch roofs not exceeding 175mm thick including glass fibre ridge cappings (battens to remain) AA: 0 AB: 0 AC: 9 AD: 0 AE: 0 AF: 28 AG: 27 AH: 0 AI: 0 AJ: 0 AK: 9 AL: 20 AM: 0 AN: 0 AO: 0 m2 92 2 Glass fibre ridge capping AA: 0 AB: 2 AC: 0 AD: 0 AE: 4 AF: 6 AG: 0 AH: 0 AI: 0 AJ: 3 AK: 0 AL: 0 AM: 0 AN: 1 AO: 0 m 16 PEPAATOY WOK TO EXISTING SUFACES 3 Prepare grass ridges to recieve glass fibre ridges (ridge measured elsewhere) AA: 4 AB: 0 AC: 0 AD: 5 AE: 0 AF: 0 AG: 0 AH: 4 AI: 20 AJ: 0 AK: 0 AL: 0 AM: 3 AN: 0 AO: 10 m 46 to Summary of Section. 2 Section. 2 Pretoria National Botanical Garden Thatch- Alterations -16-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS Quantity ate Amount SECTION 2 PETOIA NATIONAL BOTANICAL GADEN BILL NO. 2 OOF COVEING (THATCH) SUPPLEMENTAY PEAMBLES Thatchers Association of South Afirca Thatching contractors should be registered members of the Thatchers Association of South Africa. Proof of such membership should be returned with this FQ. Minimum Density of Thatch The minimum density to which the grass should be compacted is 30kg/m2/150mm thickness equirements of Thatch Grass Grass species for thatch should be the hyparthenia species Grass should have a cut length of not less than 0,76m Grass should have a minimum diameter and maximum diameter at the butt end of 1,2mm and 2,5mm respectively Grass should be acceptably straight (cut above the first node) Grass should be free of loose material Grass should not be cut in the growing season Grass should be free of seed heads when cut THATCH Section. 2 Pretoria National Botanical Garden Bill. 2 Thatch - oof Covering -17-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS Brushing of thatch including adding bundles of thatch in suitable sizes where necessary to achieve minimum density of thatch, and pulling and tensioning of the twines and replacing of suitable fixing rods interlaced through and over the bundles where necessary 1 Brushing to general roof slopes AA: 169 AB: 16 AC: 0 AD: 124 AE: 126 AF: 59 AG: 0 AH: 169 AI: 226 AJ: 56 AK: 0 AL: 0 AM: 171 AN: 54 AO: 214 m2 1 385 2 Purpose made continuous glass fibre ridge capping of not less than 1,5mm thick material 1300mm girth in suitable lengths securely fixed to thatch with 75mm wide lapped and sealed heading joints including grass filling under AA: 4 AB: 2 AC: 0 AD: 5 AE: 4 AF: 6 AG: 0 AH: 4 AI: 20 AJ: 3 AK: 0 AL: 0 AM: 3 AN: 1 AO: 10 m 61 3 Extra over ridge capping for purpose made curved returned end piece AA: 2 AB: 2 AC: 0 AD: 2 AE: 2 AF: 4 AG: 0 AH: 2 AI: 2 AJ: 2 AK: 0 AL: 0 AM: 2 AN: 2 AO: 2 24 175mm Thick thatch of hand cut grass of the Hyparrhenia Filipendula species in lengths varying from 800 to 1020mm laid in bundles of suitable size, compacted to a minimum density of 30kg/m2/150mm thickness and fixed by means of suitable fixing rods interlaced through and over the bundles at not exceeding 600mm centres and secured with tarred twine to existing battens 4 Covering to general roof slopes AA: 0 AB: 0 AC: 9 AD: 0 AE: 0 AF: 28 AG: 27 AH: 0 AI: 0 AJ: 0 AK: 9 AL: 20 AM: 0 AN: 0 AO: 0 m2 92 Section. 2 Pretoria National Botanical Garden Bill. 2 Thatch - oof Covering -18-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS 5 Purpose made glass fibre dome capping of not less than 1,5mm thick material 1300mm girth in suitable lengths securely fixed to thatch with 75mm wide lapped and sealed heading joints including grass filling under AA: 0 AB: 0 AC: 1 AD: 0 AE: 0 AF: 1 AG: 1 AH: 0 AI: 0 AJ: 0 AK: 1 AL: 1 AM: 0 AN: 0 AO: 0 5 SUNDIES 6 Fastening and securing of bolts in roof structure not exceeding 9m above floor level including replacing deteriorated bolts (roof area measured on plan) AA: 120 AB: 11 AC: 6 AD: 88 AE: 89 AF: 62 AG: 19 AH: 120 AI: 160 AJ: 40 AK: 6 AL: 14 AM: 121 AN: 38 AO: 152 m2 1 047 to Summary of Section. 2 Section. 2 Pretoria National Botanical Garden Bill. 2 Thatch - oof Covering -19-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS Section. 2 Pretoria National Botanical Garden SECTION SUMMAY - Pretoria National Botanical Garden Bill Page Amount 1 Thatch- Alterations -16-2 Thatch - oof Covering -19- Section. 2 Pretoria National Botanical Garden Carried to Final Summary -20-
SANBI NATIONAL BOTANICAL GADENS EPAIS AND MAINTENANCE OF THATCH OOFS PETOIA NATIONAL BOTANICAL GADENS FINAL SUMMAY Section Page Amount 1-15- 2 Pretoria National Botanical Garden -20- SUB TOTAL CONTINGENCIES (10%) SUB TOTAL VALUE ADDED TAX (VAT) CONTACT SUM Carried to Form of Tender -21-