GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES

Similar documents
NOTICE OF ANNUAL PRE-QUALIFICATION OF CONTRACTORS FOR THE INSTALLATION, REPLACEMENT AND/OR RELOCATION OF PUMP STATIONS AND APPURTENANCES

RFQ-CD Re-Bid Wildfire Underbrush Mowing. Required Submittal Packet

1993 Specifications CSJ SPECIAL PROVISION ITEM 2 INSTRUCTIONS TO BIDDERS

12-Inch Water Line Replacement Across Panther Branch SJRA Project No. WDPR N001 SECTION PROPOSAL FORM

ADVERTISEMENT FOR BID Section Page 1 of 6

THE CITY OF NEW YORK DEPARTMENT OF INFORMATION TECHNOLOGY AND TELECOMMUNICATIONS

REQUEST FOR PROPOSALS RFP SEASONAL ARTIFICIAL ICE SKATING RINK

REQUEST FOR PROPOSALS For the Installation and Maintenance of a Backup and Disaster Recovery System

ITB-PW Concrete psi with Fiber Mesh. Required Submittals

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT GILMORE, POLARIS, AND RIDGEWAY WATERLINE REPLACEMENT PROJECT ADDENDUM NO. 1 JANUARY 25, 2017

SOLICITATION # EATONTON-PUTNAM SENIOR CITIZEN CENTER CONGREGATE MEALS PROGRAM

1911/1936 & Turner Creek Districts Sanitary Sewer I&I Abatement Project Phase 2

REQUEST FOR QUOTATION For Uniterruptible Power Supply Battery Repalcement and Service

INVITATION FOR BID Bid #1012 Ambulance Graphics

AGREEMENT 4 pages. SPECIFICATION 1 page. LABOR & MATERIALS 4 pages. PERFORMANCE BOND 4 pages

QUOTE NUMBER: The Number Must Appear On All Quotations and Related Correspondence.

REQUEST FOR QUOTATION For Purchase and Installation of a SMART board System

00400 BID FORMS AND SUPPLEMENTS

Request for Proposal. INDEPENDENT CONTRACTOR ATTORNEY ACE CODE ENFORCEMENT Ref #121817RFPSOL LUZERNE COUNTY PENNSYLVANIA

REQUEST FOR PROPOSALS FOR INDEPENDENT ENGINEER SERVICES FOR POST CLOSURE CARE AT ORDOT CLOSURE FACILITY PROJECT NO.: RECEIVER-RFP ADDENDUM NO.

INSTRUCTIONS TO BIDDERS REQUEST FOR QUALIFICATIONS AND PROPOSAL THE BOROUGH OF LAVALLETTE, COUNTY OF OCEAN, NEW JERSEY 2019 CALENDAR YEAR

PUTNAM COUNTY PUBLIC WORKS DEPARTMENT RIGHT-OF-WAY USE PERMIT APPLICATION

CITY OF WINSTON-SALEM FORSYTH COUNTY, NORTH CAROLINA

DESIGN - BUILD PROPOSAL OF

REQUEST FOR PROPOSAL Enterprise Asset Management System

BID FORM EAST LINCOLN COUNTY SEWER IMPROVEMENTS WSP # I

Attachment C Federal Clauses & Certifications

REQUEST FOR PROPOSAL Police Department Roof System Renovation

ATTACHMENT U.3. Representations, Certifications and Other Statements of Offerors/Bidders

LEGAL NOTICE - ADVERTISEMENT FOR BID

1995 Metric For Routine Maintenance Contracts Only SPECIAL PROVISION ITEM 2 INSTRUCTIONS TO BIDDERS

ATTACHMENT NO. 1 BIDDER S PROPOSAL ACKNOWLEDGEMENT

Location & Subject Matter Substance of Change Proposed Changes

REQUEST FOR QUOTATION FOR BATTERIES FOR VOTING MACHINES FOR CHATHAM COUNTY

**Applicants must submit a copy of their diploma or transcript before receiving consideration for training.**

CITY OF WINSTON-SALEM FORSYTH COUNTY, NORTH CAROLINA REQUEST FOR LETTERS OF INTEREST/STATEMENT OF QUALIFICATIONS FOR PROFESSIONAL ENGINEERING SERVICES

REQUEST FOR STATEMENT OF QUALIFICATIONS (SOQ) FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF ADMINISTRATION

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

The Number Must Appear On All Quotations and Related Correspondence.

McCRACKEN COUNTY BOARD OF EDUCATION

ITB-CD Re-Bid Term Contract for Code Enforcement Mowing and General Clean Up Services. Required Submittal Packet. Revised per Addendum 2

BID FORM FOR CONSTRUCTION CONTRACTS

INVITATION TO BID. FURNISHING AND DELIVERING GASOLINE AND DIESEL FUEL Requisition No. PW

PROPOSAL ADS ST (BELL) PIPE SMOOTH INTERIOR CORRUGATED POLYETHYLENE CULVERT PIPE

Dear Independent Contractor,

Bidders shall execute the following forms and return the signed original with their proposal.

EXHIBIT 3 - FORMS REQUIRED FOR SUBMISSION WITH PROPOSAL ATTACHMENT A BUSINESS OVERVIEW AND QUESTIONNAIRE FORM TABLE 1 GENERAL INFORMATION

This is NOT AN ORDER, it is an invitation for a competitive sealed proposal.

DATE: June 7,

CITY OF SPRING HILL, TENNESSEE REQUEST FOR PROPOSAL FOR. Sandblasting & Painting of Fire Hydrants

REQUEST FOR QUOTATION For Muster Room Classroom Tables for the Chatham County Detention Center

INVITATION FOR BID Annual Water Meter Purchase

INVITATION FOR BID Chipeta Lake Park Tree Trimming

Florida Court Interpreter Program. Application for Court Interpreter Registration

DOCUMENT INSTRUCTIONS TO BIDDERS

LEGAL NOTICE REQUEST FOR BID SEALED BID For. Reinforcing Steel for Freymuth Road Box Culvert. For

City of Portsmouth Portsmouth, New Hampshire Valet Parking Services from Loading Zone located at Pleasant Street. Bid#63-17 INVITATION TO BID

Cherokee Nation

CERTIFICATION OF PROSPECTIVE CONTRACTOR REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION

REQUEST FOR STATEMENT OF QUALIFICATIONS FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF ADMINISTRATION

REQUEST FOR PROPOSALS CARROLL COUNTY BOARD OF COMMISSIONERS. NATURAL GAS MARKETER AND SUPPLIER (Solicitation No 19-A002)

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET - P.O. BOX 191 MANCHESTER, CONNECTICUT

Diesel Engine Replacement for. Gillig Low Floor Buses

TOWN OF QUEENSBURY PURCHASE OF A NEW KIOTI TRACTOR FOR USE BY THE QUEENSBURY CEMETERY DEPARTMENT BID DOCUMENTS

MUNICIPAL UTILITY PERMIT ISSUANCE AGREEMENT

CITY OF HOPKINSVILLE

Request for Proposal 2019 Calendar Year

REQUEST FOR QUOTATION For Purchase and Installation of an Interactive Projector/Whiteboard System

STATE OF FLORIDA DEPARTMENT OF CHILDREN AND FAMILIES NORTHEAST FLORIDA STATE HOSPITAL

COLLEGE SERVICES GUIDELINES AND PROCEDURES MANUAL REVISED MARCH 10, 2011

RIGHT-OF-WAY PERMIT SUBMITTAL REQUIREMENTS CHECKLIST

CERTIFICATE. Final. Upon. Instructions: letterhead. Page 1 of 3. CDC Documents. Revised 1/22/2018

Cherokee County Board of Commissioners

MARCH 27, 2019 INVITATION FOR BIDS

LETTER OF INTEREST NOTICE FOR RAPID RE-HOUSING PROGRAM

METHOD OF PERFORMING UTILITY WORK WTIHIN THE TOWN OF ERWIN RIGHT-OF-WAY

INVITATION TO BID ITB # 13-03D Ductile Iron Pipe

Bid Addendum #1 Bid # 13/14-01FA: Furniture and Equipment Bid Issued March 19, 2014

Sworn Statement Dated:

PALM BEACH COUNTY DEPARTMENT OF ENGINEERING & PUBLIC WORKS LAND DEVELOPMENT DIVISION. TO: All Division Personnel PPM NUMBER: EL-O-3606

Instructions to Bidders Page 1 of 8

SAMPLES OF BILL OF SALE

REQUEST FOR PROPOSAL Rotary Park Arroyo Maintenance

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL/ENGINEERING SERVICES FOR SHERMAN INDEPENDENT SCHOOL DISTRICT

APPENDIX F PUBLIC PRIVATE PARTNERSHIP PROCUREMENT PROCEDURES

M E M 0 R A N D U M U N D E R S T A N D I N G. Between THE CITY OF LOS ANGELES, DEPARTMENT OF WATER AND POWER. and

Request for Qualifications RFQ #

Lincoln County School District

Iowa Public Employees Retirement System Request for Proposal Design and Construction Contract Administration Services

P. Concrete Slurry Backfill Removal

CONSOLIDATED SCHOOL DISTRICT 158 4/7/2014 Specifications for the Student Lockers Bid # A ADDENDUM NUMBER ONE

Cherokee Nation

Name Social Security No. Mailing Address Physical Address. City State Zip Phone ( ) Work Phone ( ) . First Choice Second Choice

Request for Proposal Number 5848-RFP-14/15. Auditing Services

INSTRUCTIONS FOR APPLICATION FOR FIBER OPTIC CABLE LICENSE

Provide Company with preliminary engineering plans and preliminary plat of subdivision before Company commences any engineering design.

REQUEST FOR QUOTATION For EMC SAN Drive & DAE Equipment

NC General Statutes - Chapter 89G 1

Request for Proposal. RFP # Non-Profit, Sports Photography

COUNTY OF LOUISA, VIRGINIA

Transcription:

July 2017 NOTICE OF PRE-QUALIFICATION OF LICENSED UTILITY CONTRACTORS FOR THE INSTALLATION, REPLACEMENT AND/OR RELOCATION OF PRESSURIZED WATER MAINS AND APPURTENANCES The Gwinnett County Board of Commissioners is soliciting applications from Licensed Utility Contractors for pre-qualification to furnish labor, materials and equipment for the installation, replacement and/or relocation of pressurized water mains and appurtenances at various locations throughout Gwinnett County. Special Conditions: The Gwinnett County Department of Water Resources shall comply with O.C.G.A 36-91-20, as amended, for mandatory pre-qualification of prospective bidders. Therefore, interested applicants should obtain a pre-qualification application from the Gwinnett County Purchasing Office, 75 Langley Drive, Lawrenceville, Georgia 30046 [Contact: Holly Cafferata, CPPB, Purchasing Manager, via Telephone (770) 822-8721, or email: Holly.Cafferata@gwinnettcounty.com]. Applications will be evaluated based on established criteria listed in this application. All qualified and disqualified applicants will be notified in writing. Contractors will be considered pre-qualified upon issuance of the tification of Pre- Qualification. Contractors under consideration for pre-qualification may NOT submit bids for projects that have advertised prior to the contractor s receipt of a notice of pre-qualification. The term of the prequalification will expire on July 31, 2022 or when the County determines otherwise. Questions regarding pre-qualification applications should be directed to Holly Cafferata. Applications may be mailed to the Gwinnett County Purchasing Division or submitted via email to Holly Cafferata. The review and approval process will require approximately three weeks from the date the application is received by the Gwinnett County Purchasing Division. Any firm not pre-qualified may direct concerns to Holly Cafferata. Applicant s qualification will be determined based upon the information presented. All questions must be answered in full, without exception. Failure to do so will result in the applicant being deemed nonresponsive, and the application returned to the applicant for completion; and applicant will not be considered for pre-qualification until such time as a complete application is submitted. Although the Purchasing Division will take effort to notify pre-qualified Contractors of bids that are based on the established criteria of the application, it is ultimately the Contractor s responsibility to ensure that they remain abreast of Gwinnett County s solicitations. Depending on the scope and complexity of work to be performed, individual projects may require a project-specific pre-qualification, independent of the standard pre-qualification process. GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES PQ1

COMPANY NAME: PAGE: PQ 2 TO BID GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES CONSTRUCTION PROJECTS Date of Application: Pre-qualification of Contractors for the Installation, Replacement and/or Relocation of Pressurized Water Mains and Appurtenances Type of Project: Description: Pressurized Water Mains and Appurtenances Qualify Licensed Utility Contractors to furnish labor, materials and equipment for the installation, replacement and/or relocation of pressurized water mains and appurtenances at various locations in Gwinnett County. Owner Name: Gwinnett County Applicant Name: NOTE: Gwinnett County reserves the right to approve all personnel provided by the Approved Licensed Utility Contractor including, but not limited to, Project Managers, Project Superintendents, and Subcontractors for any portion of work resulting from this pre-qualification process. PQ2

COMPANY NAME: PAGE: PQ 3 I. INSTRUCTIONS A. Applicant SHALL NOT attach information in lieu of completion of the application document. All information requested by the County SHALL be provided within the application document; however, additional pages may be attached if more space is required (or if additional projects are necessary to demonstrate ability), or as otherwise instructed within the application document. All additional pages SHOULD be clearly labeled with the applicant s name, pre-qualification application title, and page number. B. If necessary, applicant should submit additional projects to prove all pre-qualification requirements are met. C. Reference projects must be complete prior to submittal of pre-qualification application. D. Applicant s qualification will be determined based upon the information presented. All questions must be answered in full, without exception. Failure to do so may result in the applicant being deemed nonresponsive, and the application returned to the applicant for completion; and applicant will not be considered for pre-qualification until such time as a complete application is submitted. E. Only complete and accurate information shall be provided by the Applicant. The Applicant hereby warrants that, to the best of its knowledge and belief, the responses contained herein are true, accurate, and complete. The Applicant should complete the Applicant Certification included in this packet. The Applicant also acknowledges that the Owner is relying on the truth and accuracy of the responses contained herein. If it is later discovered that any material information provided by the Applicant given in response to a question, knowing it was false, shall constitute grounds for immediate disqualification and termination or rescission by the Owner of any subsequent agreement between the Owner and the Applicant. The Owner shall also have and retain any other remedies provided by law. F. If there are any questions concerning the completion of this form, the Applicant is encouraged to contact the Owner s representative: Holly Cafferata, CPPB, Purchasing Manager, Gwinnett County Purchasing Division, via email at Holly.Cafferata@gwinnettcounty.com or telephone at 770-822-8721. G. Poor performance of pre-qualified contractors will be reviewed by the Vendor Performance Committee and/or the Purchasing Policy & Review Committee and could result in the contractor being removed from the pre-qualified vendor list for the remainder of the term of the pre-qualification or as otherwise determined by the committee. In addition, the contractor may be placed on the Ineligible Source List. H. Corporations (including principal/corporate officers), Partners, and/or Individuals interested in being considered for pre-qualification with Gwinnett County SHALL NOT be currently under indictment for criminal misconduct involving any local, state or federal government entity. PQ3

COMPANY NAME: PAGE: PQ 4 II. GENERAL BACKGROUND A. Current name and address of Applicant: 1. Applicant Name: Mailing City: State and Zip: Business City: State and Zip: Telephone and Fax: E-mail: 2. Applicant is: Licensed to conduct utility business in the State of Georgia? If, Provide Applicants State of Georgia Utility License Number: B. Principals/Officers/Individuals authorized to sign contracts: Name and Title: Name and Title: Name and Title: C. Is applicant currently under indictment for criminal misconduct involving any local, state or federal government entity? Has applicant ever been indicted involving any local, state or federal government entity? If so, what was the disposition of the charges? PQ4

COMPANY NAME: PAGE: PQ 5 III. MINIMUM PRE-QUALIFICATION CRITERIA Contractors can submit and be qualified on all sub-sections, or specific sub-sections, which directly relate to their firm s experience only. Experience claimed for current personnel, while they were employed by another firm, WILL NOT be accepted. Please note that approval on limited sub-sections will restrict notification of projects to that type of work, only. The various sub-sections are as follows. Beginning on the following pages, list projects as noted below: 1) Pressurized water mains (small) 8 to less than 16 diameter and appurtenances. - PQ7 through PQ9 2) Pressurized water mains (medium) 16 to less than 24 diameter and appurtenances. - PQ10 through PQ12 3) Pressurized water mains (large) 24 and greater diameter and appurtenances. - PQ13 through PQ15 NOTE: If a Contractor is approved for a higher category Sub-section, they are automatically approved for all categories below that Sub-section (i.e Approved for Sub-section 3, automatically approved for Subsection 2 and 1; Approved for Sub-section 2, automatically approved for Sub-section 1). Sub-section 1) Water Mains (Small) The satisfactory completion of: Requirement Met? Requirement Three (3) pressurized water main projects consisting of 8 to less than 16 diameter ductile iron pipe (DIP) and appurtenances, of 500 linear feet or more per project, within the past eight (8) years. Three (3) projects where the applicant must have been the Licensed Utility Contractor. Two (2) projects that must have involved coordination and work in conjunction with other utilities. One (1) project that must have been performed directly for a utility or other government entity. Three (3) projects that must have been constructed within the right-of-way and/or at a road intersection, and required traffic diversion/maintenance. Two (2) projects that must have included the relocation and/or adjustment of customer water meters. Two (2) projects that must have had rock excavation. Two (2) projects that must have been constructed in an established landscaped area and involved the restoration of landscaping. One (1) project that must have had an 8 or larger live tap with tapping sleeve and valve. PQ5

COMPANY NAME: PAGE: PQ 6 Sub-section 2) Water Mains (Medium) The satisfactory completion of: Requirement Met? Requirement Three (3) pressurized water main projects consisting of 16 to less than 24 diameter ductile iron pipe (DIP) and appurtenances, of 1,000 linear feet or more per project, within the past eight (8) years. Three (3) projects where the applicant must have been the Licensed Utility Contractor. Two (2) projects that must have involved coordination and work in conjunction with other utilities. One (1) project that must have been performed directly for a utility or other government entity. Three (3) projects that must have been constructed within the right-of-way and/or at a road intersection, and required traffic diversion/maintenance. Two (2) projects that must have included the relocation and/or adjustment of customer water meters. Two (2) projects that must have had rock excavation. Two (2) projects that must have been constructed in an established landscaped area and involved the restoration of landscaping. One (1) project that must have had a 16 or larger live tap with tapping sleeve and valve. Sub-section 3) Water Mains (Large) The satisfactory completion of: Requirement Met? Requirement Three (3) pressurized water main projects consisting of 24 and greater diameter ductile iron pipe (DIP) and appurtenances, of 1,000 linear feet or more per project, within the past eight (8) years. Three (3) projects where the applicant must have been the Licensed Utility Contractor. Two (2) projects that must have involved coordination and work in conjunction with other utilities. One (1) project that must have been performed directly for a utility or other government entity. Three (3) projects that must have been constructed within the right-of-way and/or at a road intersection, and required traffic diversion/maintenance. Two (2) projects that must have included the relocation and/or adjustment of customer water meters. Two (2) projects that must have had rock excavation. Two (2) projects that must have been constructed in an established landscaped area and involved the restoration of landscaping. One (1) project that must have had a 16 or larger live tap with tapping sleeve and valve. PQ6

COMPANY NAME: PAGE: PQ 7 IV. COMPANY EXPERIENCE SIMILAR PROJECTS COMPLETED A. Sub-section 1): Project. 1 - Pressurized water mains 8 to less than 16 diameter and appurtenances Contact Person E-mail Contact Person E-mail Contract Dates: Date of tice to Proceed: Date of Final Completion: Pipe Material: Pipe Length: Did this project include an 8 or larger live tap with tapping sleeve and valve? PQ7

COMPANY NAME: PAGE: PQ 8 B. Sub-section 1): Project. 2 - Pressurized water mains 8 to less than 16 diameter and appurtenances Contact Person E-mail Contact Person E-mail Contract Dates: Date of tice to Proceed: Date of Final Completion: Pipe Material: Pipe Length: Did this project include an 8 or larger live tap with tapping sleeve and valve? PQ8

COMPANY NAME: PAGE: PQ 9 C. Sub-section 1): Project. 3 - Pressurized water mains 8 to less than 16 diameter and appurtenances Contact Person E-mail Contact Person E-mail Contract Dates: Date of tice to Proceed: Date of Final Completion: Pipe Material: Pipe Length: Did this project include an 8 or larger live tap with tapping sleeve and valve? PQ9

COMPANY NAME: PAGE: PQ 10 A. Sub-section 2): Project. 1 - Pressurized water mains 16 to less than 24 in diameter and appurtenances Contact Person E-mail Contact Person E-mail Contract Dates: Date of tice to Proceed: Date of Final Completion: Pipe Material: Pipe Length: Did this project include a 16 or larger live tap with tapping sleeve and valve? PQ10

COMPANY NAME: PAGE: PQ 11 B. Sub-section 2): Project. 2 - Pressurized water mains 16 to less than 24 in diameter and appurtenances Contact Person E-mail Contact Person E-mail Contract Dates: Date of tice to Proceed: Date of Final Completion: Pipe Material: Pipe Length: Did this project include a 16 or larger live tap with tapping sleeve and valve? PQ11

COMPANY NAME: PAGE: PQ 12 C. Sub-section 2): Project. 3 - Pressurized water mains 16 to less than 24 in diameter and appurtenances Contact Person E-mail Contact Person E-mail Contract Dates: Date of tice to Proceed: Date of Final Completion: Pipe Material: Pipe Length: Did this project include a 16 or larger live tap with tapping sleeve and valve? PQ12

COMPANY NAME: PAGE: PQ 13 A. Sub-section 3): Project. 1 - Pressurized water mains 24 and greater in diameter and appurtenances Contact Person E-mail Contact Person E-mail Contract Dates: Date of tice to Proceed: Date of Final Completion: Pipe Material: Pipe Length: Did this project include a 16 or larger live tap with tapping sleeve and valve? PQ13

COMPANY NAME: PAGE: PQ 14 B. Sub-section 3): Project. 2 - Pressurized water mains 24 and greater in diameter and appurtenances Contact Person E-mail Contact Person E-mail Contract Dates: Date of tice to Proceed: Date of Final Completion: Pipe Material: Pipe Length: Did this project include a 16 or larger live tap with tapping sleeve and valve? PQ14

COMPANY NAME: PAGE: PQ 15 C. Sub-section 3): Project. 3 - Pressurized water mains 24 and greater in diameter and appurtenances Contact Person E-mail Contact Person E-mail Contract Dates: Date of tice to Proceed: Date of Final Completion: Pipe Material: Pipe Length: Did this project include a 16 or larger live tap with tapping sleeve and valve? PQ15

COMPANY NAME: PAGE: PQ 16 APPLICANT CERTIFICATION I certify to the Owner that the information and responses provided on this Application for Pre-Qualification are true, accurate and complete. The Owner, or its designated representative, may contact any entity or reference listed in this Application. Each entity or reference may make any information concerning the Applicant available to the Owner or its designated representative. Sworn to before me this day of 20. APPLICANT: By: Title: Sworn to and subscribed before me this day of 20. My Commission Expires: tary Public Seal PQ16